8
Noise Contours and Assessment Summary Plans Heathwall Pumping Station Doc Ref: 9.11.17 Folder 91 September 2013 DCO-DT-000-ZZZZZ-091117 Thames Tideway Tunnel Thames Water Utilities Limited Application for Development Consent Application Reference Number: WWO10001

Application Reference Number: WWO10001 Noise … · Noise Contours and Assessment Summary Plans Heathwall Pumping Station ... dB(A) Range of u levels, dB(A) ... HE4 3rd 67 62-62 62

  • Upload
    vuquynh

  • View
    220

  • Download
    0

Embed Size (px)

Citation preview

Noise Contours and Assessment Summary PlansHeathwall Pumping Station Doc Ref: 9.11.17

Folder 91 September 2013DCO-DT-000-ZZZZZ-091117

Hea

thw

all P

umpi

ng S

tatio

n

Thames Tideway Tunnel Thames Water Utilities Limited

Application for Development ConsentApplication Reference Number: WWO10001

!(

!(!(

!(

!(

!!H

HE3 RiverLodge and IconApartments

HE1 ElmQuay

HE2 NineElms PierHouseboats

HE4Riverlight HE5 Embassy

Gardens

HE6Battersea

Barge

CITY OFWESTMINSTER

LAMBETH

WANDSWORTH

FOR INFORMATION

40 0 4020 m

1PL03-NV-00111September 2013

Scale 1 : 3,000 at A3

Keyplan:

Mapping reproduced by permission of OrdnanceSurvey on behalf of HMSO. © Crown Copyright andDatabase right 2013. All rights reserved. OrdnanceSurvey licence number 100019345

© Thames Water Utilities Ltd 2008

± ±

Note: The receptors are selected on the basis that they are representative of sensitive land uses closest to the site.

T = 10 hoursTypical noise = most frequentlyoccurring monthly noise levelsat 1st floor levelConstruction activity resultingin typical noise:Month 25 - Construction of other structures

KeyLimits of Landto be Acquired or UsedLocal Authority Boundary

Representative Receptor Locations:!( Residential

!!H Non-residentialExtent of Construction Noise Mapping

Typical Construction Noise Levels 65 dBLAeq,T

65 - 70 dBLAeq,T

70 - 75 dBLAeq,T

75 - 80 dBLAeq,T

80 - 85 dBLAeq,T

> 85 dBLAeq,T

LocationHeathwall Pumping StationLondon Borough of WandsworthDocument InformationApplication for Development ConsentNoise and Vibration - Typical DaytimeConstruction Noise Figure 1

<

!(

!(!(

!(

!(

!!H

HE3 RiverLodge and IconApartments

HE1 ElmQuay

HE2 NineElms PierHouseboats

HE4Riverlight HE5 Embassy

Gardens

HE6Battersea

BargeWANDSWORTH

CITY OF WESTMINSTER

LAMBETH

FOR INFORMATION

40 0 4020 m

1PL03-NV-00112September 2013

Scale 1 : 3,000 at A3

Keyplan:

Mapping reproduced by permission of OrdnanceSurvey on behalf of HMSO. © Crown Copyright andDatabase right 2013. All rights reserved. OrdnanceSurvey licence number 100019345

© Thames Water Utilities Ltd 2008

± ±

Note: The receptors are selected on the basis that they are representative of sensitive land uses closest to the site.

T = 3 hoursTypical noise = most frequentlyoccurring monthly noise levelsat 1st floor level

KeyLimits of Landto be Acquired or UsedLocal Authority Boundary

Representative Receptor Locations:!( Residential

!!H Non-residentialExtent of Construction Noise Mapping

Typical Construction Noise Levels < 55 dBL Aeq,T

55 - 60 dBL Aeq,T

60 - 65 dBL Aeq,T

65 - 70 dBL Aeq,T

70 - 75 dBL Aeq,T

> 75 dBL Aeq,T

Location

Document InformationApplication for Development ConsentNoise and Vibration - Typical EveningConstruction Noise Figure 2

Construction activity resultingin typical noise:Month 18 - Connection tunnel construction

Heathwall Pumping StationLondon Borough of Wandsworth

!(

!(!(

!(

!(

!!H

HE3 RiverLodge and IconApartments

HE1 ElmQuay

HE2 NineElms PierHouseboats

HE4Riverlight HE5 Embassy

Gardens

HE6Battersea

Barge

CITY OFWESTMINSTER

LAMBETH

WANDSWORTH

FOR INFORMATION

40 0 4020 m

1PL03-NV-00113September 2013

Scale 1 : 3,000 at A3

Keyplan:

Mapping reproduced by permission of OrdnanceSurvey on behalf of HMSO. © Crown Copyright andDatabase right 2013. All rights reserved. OrdnanceSurvey licence number 100019345

© Thames Water Utilities Ltd 2008

± ±

Note: The receptors are selected on the basis that they are representative of sensitive land uses closest to the site.

T = 1 hourTypical noise = most frequentlyoccurring monthly noise levelsat 1st floor level

KeyLimits of Landto be Acquired or UsedLocal Authority Boundary

Representative Receptor Locations:!( Residential

!!H Non-residentialExtent of Construction Noise Mapping

Typical Construction Noise Levels 45 dBLAeq,T

45 - 50 dBLAeq,T

50 - 55 dBLAeq,T

55 - 60 dBLAeq,T

60 - 65 dBLAeq,T

> 65 dBLAeq,T

Location

Document InformationApplication for Development ConsentNoise and Vibration - Typical Night TimeConstruction Noise Figure 3

<

Construction activity resultingin typical noise:Month 18 - Connection tunnel construction

Heathwall Pumping StationLondon Borough of Wandsworth

!(

!(!(

!(

!(

!!H

CITY OFWESTMINSTER

WANDSWORTH

HE3 Rive r Lod g e a ndIcon Apa rtm e nts

HE1 ElmQua yHE2 Nine

Elm s P ie rHouse boa ts

HE4Rive rlig ht

HE5 Em ba ssyGa rd e ns

HE6 Ba tte rse a Ba rg e

FOR INFORMATION

40 0 4020 m

Loca tionHeathwall Pumping StationLond on Boroug h of Wa nd sworthDocum e nt Inform a tion

1P L03-NV-00114Se pte m be r 2013

Sca le 1 : 2,000 a t A3

Ke ypla n:

KeyLim its of La ndto be Acquire d or Use dLoca l Authority Bound a ry

Re pre se nta tive Re ce ptor Loca tions:Re ce ptor Type , Noise Sig nifica nce (d a y)!( Re sid e ntia l, Not sig nifica nt

!(Re sid e ntia l, Sig nifica nt a nd pote ntia lly e lig ible for NI

!!H Non-re sid e ntia l, N/A

Ma pping re prod uce d by pe rm ission of Ord na nceSurve y on be ha lf of HMSO. © Crown Copyrig ht a ndDa ta ba se rig ht 2013. All rig hts re se rve d . Ord na nceSurve y lice nce num be r 100019345

© Tha m e s Wa te r Utilitie s Ltd 2008

± ±

Application for Development ConsentConstruction pha se noise – sum m a ry of sig nifica nt e ffe cts (d a y)Fig ure 4

Weekday 0700 - 1900Saturday 0700 - 1300Sunday -

Assessment period

NI - noise insula tion

ID Assessment floorPotential

significance criteria, dB(A)

Range of construction noise

levels, dB(A)

Typical monthly construction noise

levels, dB(A)

Total duration above criteria for all works,

monthsDuration of worst case above criteria, months

(Site Year, phase)HE1 2nd 75 58-70 64 0 0HE2 N/A 75 55-73 64 0 0HE3 3rd 75 56-65 58 0 0HE4 3rd 75 69-76 71 1 1 (SY1, site set up)HE5 3rd 75 63-75 68 0 0HE6 N/A

Note: Traffic noise has been assessed for the proposed traffic routes leading to the strategic road network. No significant effects have been predicted.Not in use during the day

On-site construction noise

!(

!(!(

!(

!(

!!H

CITY OFWESTMINSTER

WANDSWORTH

HE3 Rive r Lodg e a ndIcon Apa rtm e nts

HE1 ElmQ ua yHE2 Nine

Elm s Pie rHouse b oa ts

HE4Rive rlig ht

HE5 Em b a ssyGa rde ns

HE6 Ba tte rse a Ba rg e

FOR INFORMATION

40 0 4020 m

Loca tionHeathwall Pumping StationLondon Boroug h of Wa ndsworthDocum e nt Inform a tion

1PL03-NV-00115Se pte m b e r 2013

Sca le 1 : 2,000 a t A3

Ke ypla n:

KeyLim its of La ndto b e Acquire d or Use dLoca l Authority Bounda ry

Re pre se nta tive Re ce ptor Loca tions:Re ce ptor Type , Noise Sig nifica nce (e ve ning )!( Re side ntia l, Not sig nifica nt

!!H Non-re side ntia l, Not sig nifica nt

Ma pping re produce d b y pe rm ission of Ordna nceSurve y on b e ha lf of HMSO. © Crown Copyrig ht a ndDa ta b a se rig ht 2013. All rig hts re se rve d. Ordna nceSurve y lice nce num b e r 100019345

© Tha m e s Wa te r Utilitie s Ltd 2008

± ±

Application for Development ConsentConstruction pha se noise – sum m a ry of sig nifica nt e ffe cts (e ve ning s a nd we e ke nds)Fig ure 5

Weekday 1900 - 2300Saturday 1300 - 2300Sunday 0700 - 2300

Assessment period

ID Assessment floorPotential

significance criteria, dB(A)

Range of construction noise

levels, dB(A)

Typical monthly construction noise

levels, dB(A)

Total duration above criteria for all works,

monthsDuration of worst case above criteria, months

(Site Year, phase)HE1 2nd 66 62-62 62 0 0HE2 N/A 67 50-50 50 0 0HE3 3rd 74 55-55 55 0 0HE4 3rd 67 62-62 62 0 0HE5 3rd 74 67-67 67 0 0HE6 N/A 67* 50-50 50 0 0

Note: Traffic noise has been assessed for the proposed traffic routes leading to the strategic road network. No significant effects have been predicted.

On-site construction noise

*Ambient baseline noise level

!(

!(!(

!(

!(

!!H

CITY OFWESTMINSTER

WANDSWORTH

HE3 Rive r Lodg e a ndIcon Apa rtm e nts

HE1 ElmQ u a yHE2 Nine

Elm s Pie rHou se b oa ts

HE4Rive rlig ht

HE5 Em b a ssyGa rde ns

HE6 Ba tte rse a Ba rg e

FOR INFORMATION

40 0 4020 m

Loca tionHeathwall Pumping StationLondon Borou g h of Wa ndsworthDocu m e nt Inform a tion

1PL03-NV-00116Se pte m b e r 2013

Sca le 1 : 2,000 a t A3

Ke ypla n:

KeyLim its of La ndto b e Acqu ire d or Use dLoca l Au thority Bou nda ry

Re pre se nta tive Re ce ptor Loca tions:Re ce ptor Type , Noise Sig nifica nce (nig ht)!( Re side ntia l, Not sig nifica nt

!!H Non-re side ntia l, Not sig nifica nt

Ma pping re produ ce d b y pe rm ission of Ordna nceSu rve y on b e ha lf of HMSO. © Crown Copyrig ht a ndDa ta b a se rig ht 2013. All rig hts re se rve d. Ordna nceSu rve y lice nce nu m b e r 100019345

© Tha m e s Wa te r Utilitie s Ltd 2008

± ±

Application for Development ConsentConstru ction pha se noise – su m m a ry of sig nifica nt e ffe cts (nig ht)Fig u re 6

Weekday 2300 -0700Saturday 2300 - 0700Sunday 2300 - 0700

Assessment period

ID Assessment floorPotential

significance criteria, dB(A)

Range of construction noise

levels, dB(A)

Typical monthly construction noise

levels, dB(A)

Total duration above criteria for all works,

monthsDuration of worst case above criteria, months

(Site Year, phase)HE1 2nd 62 62-62 62 0 0HE2 N/A 64 49-49 49 0 0HE3 3rd 67 54-54 54 0 0HE4 3rd 64 62-62 62 0 0HE5 3rd 68 67-67 67 0 0HE6 N/A 64* 49-49 49 0 0

Note: Traffic noise has been assessed for the proposed traffic routes leading to the strategic road network. No significant effects have been predicted.

On-site construction noise

*Ambient baseline noise level

Copyright notice Copyright © Thames Water Utilities Limited September 2013. All rights reserved. Any plans, drawings, designs and materials (materials) submitted by Thames Water Utilities Limited (Thames Water) as part of this application for Development Consent to the Planning Inspectorate are protected by copyright. You may only use this material (including making copies of it) in order to (a) inspect those plans, drawings, designs and materials at a more convenient time or place; or (b) to facilitate the exercise of a right to participate in the pre-examination or examination stages of the application which is available under the Planning Act 2008 and related regulations. Use for any other purpose is prohibited and further copies must not be made without the prior written consent of Thames Water. Thames Water Utilities LimitedClearwater Court, Vastern Road, Reading RG1 8DB The Thames Water logo and Thames Tideway Tunnel logo are © Thames Water Utilities Limited. All rights reserved.

10243-A3L-Copyright-imp-V01.pdf p1 12:03:00 September 21, 2013