7
Apple Campus 2 - Phase 2 North Tantau Ave - Sites C + D Site & Architectural Review October 2014

Apple Campus 2 - Phase 2 North Tantau Ave - Sites …...01 1"=60' Existing Site Plan P-2.00 1"=60' Existing Site Plan N O N A C C E S S (5 8 8 9 O. R. 3 2 8) 1 7 1 8 (D o c . N o

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Apple Campus 2 - Phase 2 North Tantau Ave - Sites …...01 1"=60' Existing Site Plan P-2.00 1"=60' Existing Site Plan N O N A C C E S S (5 8 8 9 O. R. 3 2 8) 1 7 1 8 (D o c . N o

Apple Campus 2 - Phase 2 North Tantau Ave - Sites C + D Site & Architectural ReviewOctober 2014

Page 2: Apple Campus 2 - Phase 2 North Tantau Ave - Sites …...01 1"=60' Existing Site Plan P-2.00 1"=60' Existing Site Plan N O N A C C E S S (5 8 8 9 O. R. 3 2 8) 1 7 1 8 (D o c . N o

Key Plan

Project No. Date

RevisionNumber

Title

Project

Client

Rev. Date Reason For Issue Chk.

General Notes

Do not scale drawings. Dimensions govern.1.

All dimensions are in feet and inches unless noted otherwise.2.

3.

4.

5.Any areas indicated on this sheet are approximate and indicative only.

Foster + Partners shall be notified in writing of any discrepancies.

All dimensions shall be verified on site before proceeding with the work.

Scale at ARCH E1 Size

PUBLIC LEDGER BUILDING,SUITE 1123

150 SOUTH INDEPENDENCE MALL WEST

PHILADELPHIA, PA 19106

TEL 215.440.0030 / FAX 215.440.0041

WWW.THEOLINSTUDIO.COM

OLIN PARTNERSHIP, LTD.

LANDSCAPE ARCHITECTURE AND URBAN DESIGN

Luk and Associates

www.lukassociates.com

Phone: (510) 7243388

Hercules, CA 94547

738 Alfred Nobel Drive

© Foster Partners 2014www.fosterandpartners.com

T +1 (408) 610-5800

Cupertino, CA 95014

19050 Pruneridge Avenue

02

2193

P-1.10

06/24/2014

Apple Campus 2

Phase 2

North Tantau Avenue

Sites C & D

Apple Inc.

Not To Scale

PROJECT DIRECTORY PROJECT OVERVIEW

PROJECT OBJECTIVES

EMAIL: [email protected]

CONTACT: SARAH WILLIAMS

PHONE: 215 440 0030

PHILADELPHIA, PA 19106

150 SOUTH INDEPENDENCE MALL WEST

OLIN

LANDSCAPE ARCHITECT

[email protected]:

DAN WHISENHUNTCONTACT:

408 996 1010PHONE:

CUPERTINO, CA 95014

MS 47-2 REF

1 INFINITE LOOP

APPLE, INC.

OWNER

PERMITS AND APPROVALS ASSOCIATED WITH THIS APPLICATION

CUPERTINO, CA 95014

19050 PRUNERIDGE AVENUE,

EMAIL: [email protected]

WOLFGANG WAGENER CONTACT:

408 783 1334PHONE:

FOSTER + PARTNERS

ARCHITECT

[email protected]:

MANISH DALIACONTACT:

510 724 3388PHONE:

Hercules, CA 94547

738 Hercules Nobre Drive

LUK & ASSOCIATES

CIVIL ENGINEER

TitleNumber

DrawingDrawing

LIST OF DRAWINGS

equipment, outdoor dining and landscaping.

parking and data center facility and associated site improvements including an access ramp, surface parking lots,

parking spaces, two research and development buildings totalling 225,000 sqft, a combined 625 parking space structured

The development is comprised of four buildings: a 300,000 sqft office building with a cafeteria and about 280 basement

next several generations of Apple products.

reflection. The phase 2 buildings are intended to promote shared creativity and collaboration, and spur invention of the

landscape, which extends and connects the interior workplaces to outdoor facilities for relaxation, recreation and

and development buildings, with supporting facilities. The buildings are located in a unified and partially secured

The project replaces the current disjointed assemblage of aging corporate facilities with high performance office, research

sustainable, state-of-the-art office, research and development facilities.

reflecting Apple’s brand values of innovation, ease of use and beauty. The entire 16-acre site will be redeveloped with

Creek and I-280 Freeway, East and West of North Tantau Avenue. This new development will provide an environment

Apple proposes to develop sites C and D of Phase 2 of Apple Campus 2. These sites are located between Calabazas

Minor Modifications to the October 2013 Development Permit

Architectural and Site Approval

Apple is seeking from the City of Cupertino the approvals listed below:

CUPERTINO, CA 95014

19050 PRUNERIDGE AVENUE,

EMAIL: [email protected]

WOLFGANG WAGENER CONTACT:

408 783 1334PHONE:

FOSTER + PARTNERS

ARCHITECT

Create a campus that reflects Apple’s business and design practices, and allows for a long- term presence in Cupertino.

Exceed economic, social, and environmental sustainability goals through integrated design and development.

prioritize transit and active commute modes.

Enable a commuting culture where thoughtful site planning and regional connectivity coupled with a robust TDM program

and improve runoff by increasing permeable surfaces.

Minimize use of potable water through using recycled water, if available as a result of projects now under consideration,

grid-purchased renewable energy.

Campus’ energy from on-site renewable sources, and developing partnerships with renewable energy providers for

Achieve a net zero energy development by constructing energy efficient buildings, generating a significant amount of the

Create buildings that incorporate flexibility to respond to Apple’s future business needs.

off-campus travel.

Provide on-site amenities for Apple’s employees in order to promote employees’ health and well- being and reduce

Maximize the provision of green space, and design this space in accordance with the climate and history of the area.

East of North Tantau Avenue.

Achieve the security and privacy required for the invention of new products by eliminating public access through the site

generations of Apple products.

purpose of consolidation is to promote shared creativity and collaboration, and spur invention of the next several

engineers and support personnel in distinctive office, research and development buildings with supporting facilities. The

of Apple’s 2,200 Create innovative and beautiful buildings adjacent to the Main Apple Campus 2 that consolidates up to

The project’s specific objectives are to:

redevelop the site with new, unified, secure and private Apple buildings in close proximity to phase 1 of Apple Campus 2.

site with a mix of office, research and development and ancillary land uses. The main objective of the project is to

Sites C and D of Phase 2 of Apple Campus 2 will result in replacement and rebuilding of the entire approximately 16-acre

List of Drawings / Project Overview

01 08/15/2014 Planning - Site & Architectural Review 2

Planning - Site & Architectural Review 309/08/201402 LB

LB

P-9.05 Perspective View - Parking Structure from Northwest - Without Mesh

P-9.04 Perspective View - Parking Structure from Northwest

P-9.03 Perspective View - Testing Facilities from Northwest

P-9.02 Perspective View - Office Building from Southeast

P-9.01 Perspective View - Testing Facilities from Northeast

P-9.00 Perspective View - Office Building from Northwest

Architecture - Visualization

P-8.30 Testing Facilities - Typical Facade Rendered Elevation & External Materials

P-8.20 Parking Structure - Elevations

P-8.10 Parking Structure - Sections

P-8.03 Parking Structure - Plan View - Level B1 & PV Rooftop Canopy

P-8.02 Parking Structure - Plan View - Level 04 & 05

P-8.01 Parking Structure - Plan View - Level 02 & 03

P-8.00 Parking Structure - Plan View - Level 01

Architecture - Parking Structure

P-7.30 Testing Facilities South - Typical Facade Rendered Elevation & External Materials

P-7.20 Testing Facilities South - Elevations

P-7.10 Testing Facilities South - Sections

P-7.01 Testing Facilities South - Plan View - Level 02 & Roof

P-7.00 Testing Facilities South - Plan View - Level 01

Architecture - Testing Facilities South

P-6.30 Testing Facilities North - Typical Facade Rendered Elevation & External Materials

P-6.20 Testing Facilities North - Elevations

P-6.10 Testing Facilities North - Sections

P-6.01 Testing Facilities North - Plan View - Level 02 & Roof

P-6.00 Testing Facilities North - Plan View - Level 01

Architecture - Testing Facilities North

P-5.30 Office Building - Typical Facade Rendered Elevation & External Materials

P-5.20 Office Building - Elevations

P-5.10 Office Building - Sections

P-5.03 Office Building - Plan View - Level 04 & Roof

P-5.02 Office Building - Plan View - Level 02 & 03

P-5.01 Office Building - Plan View - Level 01

P-5.00 Office Building - Plan View - Level B1

Architecture - Office Building

P-4.70 Site Walls

P-4.60 Site Furnishings

P-4.50 Site Lighting

P-4.41 Landscape Materials

P-4.40 Material Plan

P-4.33 Planting Palette

P-4.32 Planting Schedule

P-4.31 Planting Plan - Herbaceous

P-4.30 Planting Plan - Trees

P-4.20 Landscape Plan

P-4.16 Apple Campus 2 Overall Project Tree Disposition Plan - South

P-4.15 Apple Campus 2 Overall Project Tree Disposition Plan - North

P-4.10 Proposed Tree Disposition Plan

P-4.09 Tree Disposition Plan Per EIR Entitlements October 2013

P-4.00 Existing Tree Conditions

Site - Landscape

P-3.50 Proposed Site Utilities

P-3.40 Existing Site Utilities

P-3.31 Storm Water Quality BMP Details

P-3.30 Storm Water Control Plan

P-3.21 Street Improvements

P-3.20 Street Improvements

P-3.10 Proposed Topography

P-3.00 Existing Topography

Site - Civil

P-2.41 Perspective View - Tantau Ave. Looking North

P-2.40 Perspective View - Tantau Ave. Looking South

P-2.31 Site Sections

P-2.30 Site Sections

P-2.21 Site Plan - Sites C + D - Fire / Accessibility Plan

P-2.20 Site Plan - Sites C + D - Proposed

Site - Masterplan

P-1.50 LEED Summary

P-1.40 Existing Site Plan

P-1.30 Proposed Conceptual Site Plan

P-1.21 Development Area Analysis

P-1.20 Project Data / Project Location

P-1.10 List of Drawings / Project Overview

P-1.00 Cover Sheet

General Overview

03 10/01/2014 Planning - Site & Architectural Review 4 LB

00 F+PPlanning - Site & Architectural Review06/24/2014

N

Page 3: Apple Campus 2 - Phase 2 North Tantau Ave - Sites …...01 1"=60' Existing Site Plan P-2.00 1"=60' Existing Site Plan N O N A C C E S S (5 8 8 9 O. R. 3 2 8) 1 7 1 8 (D o c . N o
Page 4: Apple Campus 2 - Phase 2 North Tantau Ave - Sites …...01 1"=60' Existing Site Plan P-2.00 1"=60' Existing Site Plan N O N A C C E S S (5 8 8 9 O. R. 3 2 8) 1 7 1 8 (D o c . N o

02 09/08/2014 Planning ­ Site & Architectural Review 3 KF

02

Page 5: Apple Campus 2 - Phase 2 North Tantau Ave - Sites …...01 1"=60' Existing Site Plan P-2.00 1"=60' Existing Site Plan N O N A C C E S S (5 8 8 9 O. R. 3 2 8) 1 7 1 8 (D o c . N o

01 1"=60'

Existing Site Plan

P-2.00

1"=60'

Existing Site Plan

NON ACCESS (5889 O

.R. 328)17

18

(Doc.

No. 13208844)'

S.C.V.W.D.E.22

(TYP.)

PLANTER

13"

4916

25"

4918

3"

4919

17"

4920

10"

4922

4923

12"

4924

4929

29"

4972

25"

4973

21"

4974

18"

4975

28"

4976

30"

4977

NON ACCESS (5889 O

.R. 328)17

18

(Doc.

No. 13208844)'

S.C.V.W.D.E.22

A-RC1

A-21

A-R

C1A-2

7

A-R

C1A-0

32

01

A-R

C1A-0

33

01

A-R

C1A-0

34

01

A-R

C1A-0

31

01

19'-5 1/2"

3.4615°

3.46

15°NO

N ACCESS (5889 O.R. 328)

1718

(Doc.

No. 13208844)'

S.C.V.W.D.E.22

R770'-7"

R760'-7"

R760'-1 13/16"

" 1611 46'-6

A-RC1

A-21

A-R

C1A-2

7

A-R

C1A-0

32

01

A-R

C1A-0

33

01

A-R

C1A-0

34

01

A-R

C1A-0

31

01

19'-5 1/2"

3.4615°

3.46

15°

25'-11 1/4"

38'-8"

15'-6"

" 1611 46'-6

25'-11 1/4"

38'-8"

15'-6"

(Doc. No. 13208844)

S.C.V.W.D.E.

NON ACCESS (5889 O

.R. 328)

(Doc. No. 13208844)

S.C.V.W.D.E.

PARCEL 5PARCEL 4

(8069 O.R. 646)

10.00' P.U.E.

(0333 O.R. 739)

10.00' PG&E EASEMENT

(8069 O.R. 646)

10.00' P.U.E.

(8600 O.R. 294)

20.0

0'

W.L.E.

NON-ACCESS

(5889 O.R. 328)

DIRT PATH

2' WIDE

VAULT

PACBELL

AC PAVEMENT

BOLLARD (TYP.)

4' TALL

CONCRETE

AC PAVEMENT

AC PAVEMENT

AC PAVEMENT

AC PAVEMENT

AC PAVEMENT

BASKETBALL POLE

CONCRETE

CO

NC

RE

TE

WA

LK

CONCRETE WALK

CONCRETE WALK

DRIV

EW

AY

AC PAVEMENT

AC PAVEMENT

AC PAVEMENT

DRIV

EW

AY

CONCRETE WALK CONCRETE WALK

CONCRETE WALK CONCRETE WALK

SID

EW

AL

KSID

EW

AL

KSID

EW

AL

K

STAIR

AC PAVEMENT

AC PAVEMENT

AC PAVEMENT

AC PAVEMENT

AC PAVEMENT

AC PAVEMENT

AC PAVEMENT

AC PAVEMENT

SID

EW

AL

KSID

EW

AL

K

SID

EW

AL

K

SID

EW

ALK

SID

EW

ALK

CO

NC

RE

TE

WA

LK

CONCRETE WALK

CONCRETE RAMP UP

CONCRETE PLATFORM

RAMP DOWN

CONC

10' TALL CLF

CONCRETE WALK

ENTRY

CONCRETE

CONCRETE WALK

CONCRETE WALK

CONCRETE

ELE

VA

TE

D

CO

NC

RE

TE

WA

LK

ELE

VA

TE

D

CO

NC

RE

TE

WA

LK

ELEVATED CONCRETE WALK

CONCRETE RAMP

CONCRETE RAMP

PLATFORM

CONCRETE

GARAGE

RAMP DOWN TO

8' TALL CLF

CONCRETE

BUILDING

EXTENSION OF

20' TALL WALL

COMPACTOR

FOR TRASH

CONCRETE PAD

TRENCH DRAIN

TRENCH DRAIN

LA

ND

SC

AP

E

LANDSCAPE

LANDSCAPE

LAN

DSCAPE

AC PAVEMENT

AC PAVEMENT

AC PAVEMENT

PAVERSLANDSCAPE

LANDSCAPE

AC PAVEMENT

LANDSCAPE

SIGN

SIGN

LANDSCAPE

LANDSCAPE

PAVERS

PAVERS

PAVERS

LANDSCAPE

LANDSCAPE

CONCRETE WALK

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

AC PAVEMENT

AC PAVEMENT

AC PAVEMENTAC PAVEMENT

AC PAVEMENT

LANDSCAPE

LAN

DSCAPE

LANDSCAPE

LANDSCAPE

ROCK BEDLANDSCAPE

LANDSCAPE

AC PAVEMENT

CONCRETE

AC PAVEMENT

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

AC PAVEMENT

AC PAVEMENT

AC PAVEMENT

AC PAVEMENT

AC PAVEMENT

AC PAVEMENT

CONCRETE

WALK

CONCRETE WALK

CONCRETE WALK

CONCRETE

WALK

CONCRETE WALK

SIGN

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LA

ND

SC

AP

E

LANDSCAPE

CONCRETEWALK

CONCRETE

CONCRETE

CONCRETE

CONCRETE

LANDSCAPE

LANDSCAPE

CO

NCRETE

WALK

AC PAVEMENT

AC PAVEMENTAC PAVEMENT

AC PAVEMENT

AC PAVEMENT

AC PAVEMENT

AC PAVEMENT

AC PAVEMENT

AC PAVEMENT

AC PAVEMENTAC PAVEMENT

AC PAVEMENT

AC PAVEMENT

AC PAVEMENT

CONCRETE WALK

PAVERS

CONCRETE WALK

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LAN

DSCAPE

LAN

DSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

AC PAVEMENT

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

CONCRETE

LAN

DSCAPE

LANDSCAPE

CO

NCRETE RA

MP

AREA

LOADING DOCK

RA

MP AREA

CHILLERS, ETC.

GENERATORS,

CHEMICAL AREA,

CONCRETE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LA

NDS

CAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

6' TALL CLF

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

AC PAVEMENT

AC PAVEMENT

AC PAVEMENT

AC PAVEMENT

AC PAVEMENT

AC PAVEMENT

AC PAVEMENT

AC PAVEMENT

AC PAVEMENT

GRASS

LANDSCAPE

GRASS

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

PAVERS

CONCRETE WALK

CONCRETE WALK

CONCRETE

CONCRETE WALK

HEADER BOARD

AC PAVEMENT

PAVERS

LA

ND

SC

AP

E

LANDSCAPE

LANDSCAPE

LANDSCAPE

GENERATOR AREA

BLOCK WALL

CONCRETE

6' TALL

CONCRETE WALK

PAVERS

LANDSCAPE

GRASS

GRASS

LA

ND

SC

AP

EL

AN

DS

CA

PE

LA

ND

SC

AP

E

CONCRETE WALK

GRASS

LANDSCAPE

LANDSCAPE

LANDSCAPE

GRASS

GRASS

LANDSCAPE

LANDSCAPE

CONCRETE WALK

CONCRETE

AC PAVEMENT

AC PAVEMENT

LANDSCAPE

LA

ND

SC

AP

E

LANDSCAPELANDSCAPELANDSCAPE

0.8' TALL

CONCRETE WALL

CONCRETE WALK

LANDSCAPE

LANDSCAPE

AC PAVEMENT

VOLLEYBALL COURT

AC PAVEMENT

AC PAVEMENT

CO

NC

RE

TE

WA

LK

SIGN

AIR VENT

RAMP

LOADING DOCK

AC PAVEMENT

LANDSCAPE

SIGNLANDSCAPE

CO

NC

RE

TE

WA

LK

LANDSCAPE

LANDSCAPE

LANDSCAPE

CONCRETE

WALK

CONCRETE

WALK

CO

NC

RE

TE

CONCRETE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPELANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

HE

AD

ER

BO

AR

D

PLANTAR

PLANTER

LANDSCAPE

GRASS

GRASS

GRASS

LANDSCAPE

TRANSFORMER

CONCRETE PATIO

ENCLOSURE

TRASH

CONCRETECONCRETE

LANDSCAPE

CONCRETE WALK

CLF

5' TALL

CONCRETE WALK

ELEVATED CONCRETE WALKWAY

LANDSCAPE

LANDSCAPE

LANDSCAPE

LA

ND

SC

AP

E

LANDSCAPE

LANDSCAPE

LANDSCAPE

LAN

DSCAPE

LOADING DOCK

CONCRETE WALK

LANDSCAPE

AC PAVEMENT

STORAGE UNIT

MOVABLE

SIGN

DIRT

GRAVEL

SIGN

CONCRETE

EB

LANDSCAPE

LANDSCAPE

LANDSCAPE

LANDSCAPE

PAVERS

LANDSCAPE

CO

NCRETE

WALK

EB

LA

NDS

CAPE

SIGN

BENCH

BENCHBENCH

SIGN

GATE

Per Mock-Up Building

Secondary Creek Access

34'

31'

North T

anta

u A

venue

North T

anta

u A

venue

North T

anta

u A

venue

I-280

I-280

20'

34'

54'

updated ROW)

(Width varies with

103,047 sqaure feet

10435 N. Tantau Ave

RC-01

103,047 sqaure feet

10435 N. Tantau Ave

RC-01

(total north and south)

100,650 square feet

10300 N. Tantau Ave

North

Tantau 1

(total north and south)

100,650 square feet

10300 N. Tantau Ave

South

Tantau 1

45,740 square feet

10400 N. Tantau Ave

Tantau 2

45,740 square feet

10400 N. Tantau Ave

Tantau 2

(temporary building)

Mock-Up

Calab

azas Cree

k

Calab

azas Creek

Project No. Date

RevisionNumber

Title

Project

Client

Rev. Date Reason For Issue Chk.

General Notes

Do not scale drawings. Dimensions govern.1.

All dimensions are in feet and inches unless noted otherwise.2.

3.

4.

5.Any areas indicated on this sheet are approximate and indicative only.

Foster + Partners shall be notified in writing of any discrepancies.

All dimensions shall be verified on site before proceeding with the work.

Scale at ARCH E1 Size

PUBLIC LEDGER BUILDING,SUITE 1123

150 SOUTH INDEPENDENCE MALL WEST

PHILADELPHIA, PA 19106

TEL 215.440.0030 / FAX 215.440.0041

WWW.THEOLINSTUDIO.COM

OLIN PARTNERSHIP, LTD.

LANDSCAPE ARCHITECTURE AND URBAN DESIGN

Luk and Associates

www.lukassociates.com

Phone: (510) 7243388

Hercules, CA 94547

738 Alfred Nobel Drive

00

06/24/2014

00 06/24/2014 Planning - Site & Architectural Review F+P

2193

Apple Campus 2

Phase 2

North Tantau Avenue

Sites C & D

Apple Inc.

Key Plan

N

© Foster Partners 2014www.fosterandpartners.com

T +1 (408) 610-5800

Cupertino, CA 95014

19050 Pruneridge Avenue

Notes

Topographic survey information on these plans has been obtained November 15th, 2012 from Kier & Wright surveyors, dated November 15,2012, and subsequent field survey.

Property Line information on these plans has been obtained from Kier & Wright surveyors, dated February, 2014 - Parcel Map.

1.

2.

lbuendia
Snapshot
lbuendia
Text Box
P-1.40
lbuendia
Line
lbuendia
Polygon
lbuendia
Polygon
lbuendia
Polygon
lbuendia
Polygon
lbuendia
Text Box
Mock-Up (temporary building)
lbuendia
Rectangle
Page 6: Apple Campus 2 - Phase 2 North Tantau Ave - Sites …...01 1"=60' Existing Site Plan P-2.00 1"=60' Existing Site Plan N O N A C C E S S (5 8 8 9 O. R. 3 2 8) 1 7 1 8 (D o c . N o
Page 7: Apple Campus 2 - Phase 2 North Tantau Ave - Sites …...01 1"=60' Existing Site Plan P-2.00 1"=60' Existing Site Plan N O N A C C E S S (5 8 8 9 O. R. 3 2 8) 1 7 1 8 (D o c . N o

Key Plan

Project No. Date

RevisionNumber

Title

Project

Client

Rev. Date Reason For Issue Chk.

General Notes

Do not scale drawings. Dimensions govern.1.

All dimensions are in feet and inches unless noted otherwise.2.

3.

4.

5.Any areas indicated on this sheet are approximate and indicative only.

Foster + Partners shall be notified in writing of any discrepancies.

All dimensions shall be verified on site before proceeding with the work.

Scale at ARCH E1 Size

PUBLIC LEDGER BUILDING,SUITE 1123

150 SOUTH INDEPENDENCE MALL WEST

PHILADELPHIA, PA 19106

TEL 215.440.0030 / FAX 215.440.0041

WWW.THEOLINSTUDIO.COM

OLIN PARTNERSHIP, LTD.

LANDSCAPE ARCHITECTURE AND URBAN DESIGN

Luk and Associates

www.lukassociates.com

Phone: (510) 7243388

Hercules, CA 94547

738 Alfred Nobel Drive

© Foster Partners 2014www.fosterandpartners.com

T +1 (408) 610-5800

Cupertino, CA 95014

19050 Pruneridge Avenue

00

2193

P-1.50

06/24/2014

Apple Campus 2

Phase 2

North Tantau Avenue

Sites C & D

Apple Inc.

Not To Scale

LEED Summary

00 F+PPlanning - Site & Architectural Review06/24/2014

N

F+P07/22/201401 Planning - Site & Arch. Review Resubmit

01