Apple Campus 2 - Phase 2 North Tantau Ave - Sites C + D Site & Architectural ReviewOctober 2014
Key Plan
Project No. Date
RevisionNumber
Title
Project
Client
Rev. Date Reason For Issue Chk.
General Notes
Do not scale drawings. Dimensions govern.1.
All dimensions are in feet and inches unless noted otherwise.2.
3.
4.
5.Any areas indicated on this sheet are approximate and indicative only.
Foster + Partners shall be notified in writing of any discrepancies.
All dimensions shall be verified on site before proceeding with the work.
Scale at ARCH E1 Size
PUBLIC LEDGER BUILDING,SUITE 1123
150 SOUTH INDEPENDENCE MALL WEST
PHILADELPHIA, PA 19106
TEL 215.440.0030 / FAX 215.440.0041
WWW.THEOLINSTUDIO.COM
OLIN PARTNERSHIP, LTD.
LANDSCAPE ARCHITECTURE AND URBAN DESIGN
Luk and Associates
www.lukassociates.com
Phone: (510) 7243388
Hercules, CA 94547
738 Alfred Nobel Drive
© Foster Partners 2014www.fosterandpartners.com
T +1 (408) 610-5800
Cupertino, CA 95014
19050 Pruneridge Avenue
02
2193
P-1.10
06/24/2014
Apple Campus 2
Phase 2
North Tantau Avenue
Sites C & D
Apple Inc.
Not To Scale
PROJECT DIRECTORY PROJECT OVERVIEW
PROJECT OBJECTIVES
EMAIL: [email protected]
CONTACT: SARAH WILLIAMS
PHONE: 215 440 0030
PHILADELPHIA, PA 19106
150 SOUTH INDEPENDENCE MALL WEST
OLIN
LANDSCAPE ARCHITECT
DAN WHISENHUNTCONTACT:
408 996 1010PHONE:
CUPERTINO, CA 95014
MS 47-2 REF
1 INFINITE LOOP
APPLE, INC.
OWNER
●
●
●
●
●
●
●
●
●
●
●
PERMITS AND APPROVALS ASSOCIATED WITH THIS APPLICATION
●
●
CUPERTINO, CA 95014
19050 PRUNERIDGE AVENUE,
EMAIL: [email protected]
WOLFGANG WAGENER CONTACT:
408 783 1334PHONE:
FOSTER + PARTNERS
ARCHITECT
MANISH DALIACONTACT:
510 724 3388PHONE:
Hercules, CA 94547
738 Hercules Nobre Drive
LUK & ASSOCIATES
CIVIL ENGINEER
TitleNumber
DrawingDrawing
LIST OF DRAWINGS
equipment, outdoor dining and landscaping.
parking and data center facility and associated site improvements including an access ramp, surface parking lots,
parking spaces, two research and development buildings totalling 225,000 sqft, a combined 625 parking space structured
The development is comprised of four buildings: a 300,000 sqft office building with a cafeteria and about 280 basement
next several generations of Apple products.
reflection. The phase 2 buildings are intended to promote shared creativity and collaboration, and spur invention of the
landscape, which extends and connects the interior workplaces to outdoor facilities for relaxation, recreation and
and development buildings, with supporting facilities. The buildings are located in a unified and partially secured
The project replaces the current disjointed assemblage of aging corporate facilities with high performance office, research
sustainable, state-of-the-art office, research and development facilities.
reflecting Apple’s brand values of innovation, ease of use and beauty. The entire 16-acre site will be redeveloped with
Creek and I-280 Freeway, East and West of North Tantau Avenue. This new development will provide an environment
Apple proposes to develop sites C and D of Phase 2 of Apple Campus 2. These sites are located between Calabazas
Minor Modifications to the October 2013 Development Permit
Architectural and Site Approval
Apple is seeking from the City of Cupertino the approvals listed below:
CUPERTINO, CA 95014
19050 PRUNERIDGE AVENUE,
EMAIL: [email protected]
WOLFGANG WAGENER CONTACT:
408 783 1334PHONE:
FOSTER + PARTNERS
ARCHITECT
Create a campus that reflects Apple’s business and design practices, and allows for a long- term presence in Cupertino.
Exceed economic, social, and environmental sustainability goals through integrated design and development.
prioritize transit and active commute modes.
Enable a commuting culture where thoughtful site planning and regional connectivity coupled with a robust TDM program
and improve runoff by increasing permeable surfaces.
Minimize use of potable water through using recycled water, if available as a result of projects now under consideration,
grid-purchased renewable energy.
Campus’ energy from on-site renewable sources, and developing partnerships with renewable energy providers for
Achieve a net zero energy development by constructing energy efficient buildings, generating a significant amount of the
Create buildings that incorporate flexibility to respond to Apple’s future business needs.
off-campus travel.
Provide on-site amenities for Apple’s employees in order to promote employees’ health and well- being and reduce
Maximize the provision of green space, and design this space in accordance with the climate and history of the area.
East of North Tantau Avenue.
Achieve the security and privacy required for the invention of new products by eliminating public access through the site
generations of Apple products.
purpose of consolidation is to promote shared creativity and collaboration, and spur invention of the next several
engineers and support personnel in distinctive office, research and development buildings with supporting facilities. The
of Apple’s 2,200 Create innovative and beautiful buildings adjacent to the Main Apple Campus 2 that consolidates up to
The project’s specific objectives are to:
redevelop the site with new, unified, secure and private Apple buildings in close proximity to phase 1 of Apple Campus 2.
site with a mix of office, research and development and ancillary land uses. The main objective of the project is to
Sites C and D of Phase 2 of Apple Campus 2 will result in replacement and rebuilding of the entire approximately 16-acre
List of Drawings / Project Overview
01 08/15/2014 Planning - Site & Architectural Review 2
Planning - Site & Architectural Review 309/08/201402 LB
LB
P-9.05 Perspective View - Parking Structure from Northwest - Without Mesh
P-9.04 Perspective View - Parking Structure from Northwest
P-9.03 Perspective View - Testing Facilities from Northwest
P-9.02 Perspective View - Office Building from Southeast
P-9.01 Perspective View - Testing Facilities from Northeast
P-9.00 Perspective View - Office Building from Northwest
Architecture - Visualization
P-8.30 Testing Facilities - Typical Facade Rendered Elevation & External Materials
P-8.20 Parking Structure - Elevations
P-8.10 Parking Structure - Sections
P-8.03 Parking Structure - Plan View - Level B1 & PV Rooftop Canopy
P-8.02 Parking Structure - Plan View - Level 04 & 05
P-8.01 Parking Structure - Plan View - Level 02 & 03
P-8.00 Parking Structure - Plan View - Level 01
Architecture - Parking Structure
P-7.30 Testing Facilities South - Typical Facade Rendered Elevation & External Materials
P-7.20 Testing Facilities South - Elevations
P-7.10 Testing Facilities South - Sections
P-7.01 Testing Facilities South - Plan View - Level 02 & Roof
P-7.00 Testing Facilities South - Plan View - Level 01
Architecture - Testing Facilities South
P-6.30 Testing Facilities North - Typical Facade Rendered Elevation & External Materials
P-6.20 Testing Facilities North - Elevations
P-6.10 Testing Facilities North - Sections
P-6.01 Testing Facilities North - Plan View - Level 02 & Roof
P-6.00 Testing Facilities North - Plan View - Level 01
Architecture - Testing Facilities North
P-5.30 Office Building - Typical Facade Rendered Elevation & External Materials
P-5.20 Office Building - Elevations
P-5.10 Office Building - Sections
P-5.03 Office Building - Plan View - Level 04 & Roof
P-5.02 Office Building - Plan View - Level 02 & 03
P-5.01 Office Building - Plan View - Level 01
P-5.00 Office Building - Plan View - Level B1
Architecture - Office Building
P-4.70 Site Walls
P-4.60 Site Furnishings
P-4.50 Site Lighting
P-4.41 Landscape Materials
P-4.40 Material Plan
P-4.33 Planting Palette
P-4.32 Planting Schedule
P-4.31 Planting Plan - Herbaceous
P-4.30 Planting Plan - Trees
P-4.20 Landscape Plan
P-4.16 Apple Campus 2 Overall Project Tree Disposition Plan - South
P-4.15 Apple Campus 2 Overall Project Tree Disposition Plan - North
P-4.10 Proposed Tree Disposition Plan
P-4.09 Tree Disposition Plan Per EIR Entitlements October 2013
P-4.00 Existing Tree Conditions
Site - Landscape
P-3.50 Proposed Site Utilities
P-3.40 Existing Site Utilities
P-3.31 Storm Water Quality BMP Details
P-3.30 Storm Water Control Plan
P-3.21 Street Improvements
P-3.20 Street Improvements
P-3.10 Proposed Topography
P-3.00 Existing Topography
Site - Civil
P-2.41 Perspective View - Tantau Ave. Looking North
P-2.40 Perspective View - Tantau Ave. Looking South
P-2.31 Site Sections
P-2.30 Site Sections
P-2.21 Site Plan - Sites C + D - Fire / Accessibility Plan
P-2.20 Site Plan - Sites C + D - Proposed
Site - Masterplan
P-1.50 LEED Summary
P-1.40 Existing Site Plan
P-1.30 Proposed Conceptual Site Plan
P-1.21 Development Area Analysis
P-1.20 Project Data / Project Location
P-1.10 List of Drawings / Project Overview
P-1.00 Cover Sheet
General Overview
03 10/01/2014 Planning - Site & Architectural Review 4 LB
00 F+PPlanning - Site & Architectural Review06/24/2014
N
02 09/08/2014 Planning Site & Architectural Review 3 KF
02
01 1"=60'
Existing Site Plan
P-2.00
1"=60'
Existing Site Plan
NON ACCESS (5889 O
.R. 328)17
18
(Doc.
No. 13208844)'
S.C.V.W.D.E.22
(TYP.)
PLANTER
13"
4916
25"
4918
3"
4919
17"
4920
10"
4922
4923
12"
4924
4929
29"
4972
25"
4973
21"
4974
18"
4975
28"
4976
30"
4977
NON ACCESS (5889 O
.R. 328)17
18
(Doc.
No. 13208844)'
S.C.V.W.D.E.22
A-RC1
A-21
A-R
C1A-2
7
A-R
C1A-0
32
01
A-R
C1A-0
33
01
A-R
C1A-0
34
01
A-R
C1A-0
31
01
19'-5 1/2"
3.4615°
3.46
15°NO
N ACCESS (5889 O.R. 328)
1718
(Doc.
No. 13208844)'
S.C.V.W.D.E.22
R770'-7"
R760'-7"
R760'-1 13/16"
" 1611 46'-6
A-RC1
A-21
A-R
C1A-2
7
A-R
C1A-0
32
01
A-R
C1A-0
33
01
A-R
C1A-0
34
01
A-R
C1A-0
31
01
19'-5 1/2"
3.4615°
3.46
15°
25'-11 1/4"
38'-8"
15'-6"
" 1611 46'-6
25'-11 1/4"
38'-8"
15'-6"
(Doc. No. 13208844)
S.C.V.W.D.E.
NON ACCESS (5889 O
.R. 328)
(Doc. No. 13208844)
S.C.V.W.D.E.
PARCEL 5PARCEL 4
(8069 O.R. 646)
10.00' P.U.E.
(0333 O.R. 739)
10.00' PG&E EASEMENT
(8069 O.R. 646)
10.00' P.U.E.
(8600 O.R. 294)
20.0
0'
W.L.E.
NON-ACCESS
(5889 O.R. 328)
DIRT PATH
2' WIDE
VAULT
PACBELL
AC PAVEMENT
BOLLARD (TYP.)
4' TALL
CONCRETE
AC PAVEMENT
AC PAVEMENT
AC PAVEMENT
AC PAVEMENT
AC PAVEMENT
BASKETBALL POLE
CONCRETE
CO
NC
RE
TE
WA
LK
CONCRETE WALK
CONCRETE WALK
DRIV
EW
AY
AC PAVEMENT
AC PAVEMENT
AC PAVEMENT
DRIV
EW
AY
CONCRETE WALK CONCRETE WALK
CONCRETE WALK CONCRETE WALK
SID
EW
AL
KSID
EW
AL
KSID
EW
AL
K
STAIR
AC PAVEMENT
AC PAVEMENT
AC PAVEMENT
AC PAVEMENT
AC PAVEMENT
AC PAVEMENT
AC PAVEMENT
AC PAVEMENT
SID
EW
AL
KSID
EW
AL
K
SID
EW
AL
K
SID
EW
ALK
SID
EW
ALK
CO
NC
RE
TE
WA
LK
CONCRETE WALK
CONCRETE RAMP UP
CONCRETE PLATFORM
RAMP DOWN
CONC
10' TALL CLF
CONCRETE WALK
ENTRY
CONCRETE
CONCRETE WALK
CONCRETE WALK
CONCRETE
ELE
VA
TE
D
CO
NC
RE
TE
WA
LK
ELE
VA
TE
D
CO
NC
RE
TE
WA
LK
ELEVATED CONCRETE WALK
CONCRETE RAMP
CONCRETE RAMP
PLATFORM
CONCRETE
GARAGE
RAMP DOWN TO
8' TALL CLF
CONCRETE
BUILDING
EXTENSION OF
20' TALL WALL
COMPACTOR
FOR TRASH
CONCRETE PAD
TRENCH DRAIN
TRENCH DRAIN
LA
ND
SC
AP
E
LANDSCAPE
LANDSCAPE
LAN
DSCAPE
AC PAVEMENT
AC PAVEMENT
AC PAVEMENT
PAVERSLANDSCAPE
LANDSCAPE
AC PAVEMENT
LANDSCAPE
SIGN
SIGN
LANDSCAPE
LANDSCAPE
PAVERS
PAVERS
PAVERS
LANDSCAPE
LANDSCAPE
CONCRETE WALK
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
AC PAVEMENT
AC PAVEMENT
AC PAVEMENTAC PAVEMENT
AC PAVEMENT
LANDSCAPE
LAN
DSCAPE
LANDSCAPE
LANDSCAPE
ROCK BEDLANDSCAPE
LANDSCAPE
AC PAVEMENT
CONCRETE
AC PAVEMENT
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
AC PAVEMENT
AC PAVEMENT
AC PAVEMENT
AC PAVEMENT
AC PAVEMENT
AC PAVEMENT
CONCRETE
WALK
CONCRETE WALK
CONCRETE WALK
CONCRETE
WALK
CONCRETE WALK
SIGN
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LA
ND
SC
AP
E
LANDSCAPE
CONCRETEWALK
CONCRETE
CONCRETE
CONCRETE
CONCRETE
LANDSCAPE
LANDSCAPE
CO
NCRETE
WALK
AC PAVEMENT
AC PAVEMENTAC PAVEMENT
AC PAVEMENT
AC PAVEMENT
AC PAVEMENT
AC PAVEMENT
AC PAVEMENT
AC PAVEMENT
AC PAVEMENTAC PAVEMENT
AC PAVEMENT
AC PAVEMENT
AC PAVEMENT
CONCRETE WALK
PAVERS
CONCRETE WALK
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LAN
DSCAPE
LAN
DSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
AC PAVEMENT
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
CONCRETE
LAN
DSCAPE
LANDSCAPE
CO
NCRETE RA
MP
AREA
LOADING DOCK
RA
MP AREA
CHILLERS, ETC.
GENERATORS,
CHEMICAL AREA,
CONCRETE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LA
NDS
CAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
6' TALL CLF
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
AC PAVEMENT
AC PAVEMENT
AC PAVEMENT
AC PAVEMENT
AC PAVEMENT
AC PAVEMENT
AC PAVEMENT
AC PAVEMENT
AC PAVEMENT
GRASS
LANDSCAPE
GRASS
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
PAVERS
CONCRETE WALK
CONCRETE WALK
CONCRETE
CONCRETE WALK
HEADER BOARD
AC PAVEMENT
PAVERS
LA
ND
SC
AP
E
LANDSCAPE
LANDSCAPE
LANDSCAPE
GENERATOR AREA
BLOCK WALL
CONCRETE
6' TALL
CONCRETE WALK
PAVERS
LANDSCAPE
GRASS
GRASS
LA
ND
SC
AP
EL
AN
DS
CA
PE
LA
ND
SC
AP
E
CONCRETE WALK
GRASS
LANDSCAPE
LANDSCAPE
LANDSCAPE
GRASS
GRASS
LANDSCAPE
LANDSCAPE
CONCRETE WALK
CONCRETE
AC PAVEMENT
AC PAVEMENT
LANDSCAPE
LA
ND
SC
AP
E
LANDSCAPELANDSCAPELANDSCAPE
0.8' TALL
CONCRETE WALL
CONCRETE WALK
LANDSCAPE
LANDSCAPE
AC PAVEMENT
VOLLEYBALL COURT
AC PAVEMENT
AC PAVEMENT
CO
NC
RE
TE
WA
LK
SIGN
AIR VENT
RAMP
LOADING DOCK
AC PAVEMENT
LANDSCAPE
SIGNLANDSCAPE
CO
NC
RE
TE
WA
LK
LANDSCAPE
LANDSCAPE
LANDSCAPE
CONCRETE
WALK
CONCRETE
WALK
CO
NC
RE
TE
CONCRETE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPELANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
HE
AD
ER
BO
AR
D
PLANTAR
PLANTER
LANDSCAPE
GRASS
GRASS
GRASS
LANDSCAPE
TRANSFORMER
CONCRETE PATIO
ENCLOSURE
TRASH
CONCRETECONCRETE
LANDSCAPE
CONCRETE WALK
CLF
5' TALL
CONCRETE WALK
ELEVATED CONCRETE WALKWAY
LANDSCAPE
LANDSCAPE
LANDSCAPE
LA
ND
SC
AP
E
LANDSCAPE
LANDSCAPE
LANDSCAPE
LAN
DSCAPE
LOADING DOCK
CONCRETE WALK
LANDSCAPE
AC PAVEMENT
STORAGE UNIT
MOVABLE
SIGN
DIRT
GRAVEL
SIGN
CONCRETE
EB
LANDSCAPE
LANDSCAPE
LANDSCAPE
LANDSCAPE
PAVERS
LANDSCAPE
CO
NCRETE
WALK
EB
LA
NDS
CAPE
SIGN
BENCH
BENCHBENCH
SIGN
GATE
Per Mock-Up Building
Secondary Creek Access
34'
31'
North T
anta
u A
venue
North T
anta
u A
venue
North T
anta
u A
venue
I-280
I-280
20'
34'
54'
updated ROW)
(Width varies with
103,047 sqaure feet
10435 N. Tantau Ave
RC-01
103,047 sqaure feet
10435 N. Tantau Ave
RC-01
(total north and south)
100,650 square feet
10300 N. Tantau Ave
North
Tantau 1
(total north and south)
100,650 square feet
10300 N. Tantau Ave
South
Tantau 1
45,740 square feet
10400 N. Tantau Ave
Tantau 2
45,740 square feet
10400 N. Tantau Ave
Tantau 2
(temporary building)
Mock-Up
Calab
azas Cree
k
Calab
azas Creek
Project No. Date
RevisionNumber
Title
Project
Client
Rev. Date Reason For Issue Chk.
General Notes
Do not scale drawings. Dimensions govern.1.
All dimensions are in feet and inches unless noted otherwise.2.
3.
4.
5.Any areas indicated on this sheet are approximate and indicative only.
Foster + Partners shall be notified in writing of any discrepancies.
All dimensions shall be verified on site before proceeding with the work.
Scale at ARCH E1 Size
PUBLIC LEDGER BUILDING,SUITE 1123
150 SOUTH INDEPENDENCE MALL WEST
PHILADELPHIA, PA 19106
TEL 215.440.0030 / FAX 215.440.0041
WWW.THEOLINSTUDIO.COM
OLIN PARTNERSHIP, LTD.
LANDSCAPE ARCHITECTURE AND URBAN DESIGN
Luk and Associates
www.lukassociates.com
Phone: (510) 7243388
Hercules, CA 94547
738 Alfred Nobel Drive
00
06/24/2014
00 06/24/2014 Planning - Site & Architectural Review F+P
2193
Apple Campus 2
Phase 2
North Tantau Avenue
Sites C & D
Apple Inc.
Key Plan
N
© Foster Partners 2014www.fosterandpartners.com
T +1 (408) 610-5800
Cupertino, CA 95014
19050 Pruneridge Avenue
Notes
Topographic survey information on these plans has been obtained November 15th, 2012 from Kier & Wright surveyors, dated November 15,2012, and subsequent field survey.
Property Line information on these plans has been obtained from Kier & Wright surveyors, dated February, 2014 - Parcel Map.
1.
2.
Key Plan
Project No. Date
RevisionNumber
Title
Project
Client
Rev. Date Reason For Issue Chk.
General Notes
Do not scale drawings. Dimensions govern.1.
All dimensions are in feet and inches unless noted otherwise.2.
3.
4.
5.Any areas indicated on this sheet are approximate and indicative only.
Foster + Partners shall be notified in writing of any discrepancies.
All dimensions shall be verified on site before proceeding with the work.
Scale at ARCH E1 Size
PUBLIC LEDGER BUILDING,SUITE 1123
150 SOUTH INDEPENDENCE MALL WEST
PHILADELPHIA, PA 19106
TEL 215.440.0030 / FAX 215.440.0041
WWW.THEOLINSTUDIO.COM
OLIN PARTNERSHIP, LTD.
LANDSCAPE ARCHITECTURE AND URBAN DESIGN
Luk and Associates
www.lukassociates.com
Phone: (510) 7243388
Hercules, CA 94547
738 Alfred Nobel Drive
© Foster Partners 2014www.fosterandpartners.com
T +1 (408) 610-5800
Cupertino, CA 95014
19050 Pruneridge Avenue
00
2193
P-1.50
06/24/2014
Apple Campus 2
Phase 2
North Tantau Avenue
Sites C & D
Apple Inc.
Not To Scale
LEED Summary
00 F+PPlanning - Site & Architectural Review06/24/2014
N
F+P07/22/201401 Planning - Site & Arch. Review Resubmit
01