22
Crossrail Line 1 Mott MacDonald Assessment of Water Impacts Technical Report Cross London Rail Links Limited 203357/31/Final/February 2005 App F - Notes.doc/ F-1 Appendix F: Impact Register Notes on Impact Tables and Mapping The impact tables presented in Appendix F should be read in conjunction with the main report text given in Volume 1 of the Assessment of Water Impact Technical Report. Certain impacts have been selected for presentation on the impact mapping. The impacts selected include all those with: Significant residual impacts. Minor non-significant residual impacts, including those with extensive compensation/mitigation and statutory consultee concerns which cannot be fully mitigated In general, impacts that are not shown are those assessed as being: Not significant. Becoming not significant after the application of routine good practice. Being designed or managed out altogether through mitigation. The impacts which have been selected for presentation on the impact mapping are shaded in the final column (residual impacts) of the impact register tables shaded. Overall Impact The severity categories take into account whether the impact is temporary or permanent Low Mod High R Not significant Remote O Significant Occasional L More likely to happen than not E Expected to happen Severity categories Likelihood Particularly significant

Appendix F: Impact Register…Crossrail Line 1 Mott MacDonald Assessment of Water Impacts Technical Report Cross London Rail Links Limited 203357/31/Final/February 2005 App F - Notes.doc

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • Crossrail Line 1 Mott MacDonald Assessment of Water Impacts Technical Report Cross London Rail Links Limited

    203357/31/Final/February 2005 App F - Notes.doc/

    F-1

    Appendix F: Impact Register

    Notes on Impact Tables and Mapping

    The impact tables presented in Appendix F should be read in conjunction with the main report text given in Volume 1 of the Assessment of Water Impact Technical Report.

    Certain impacts have been selected for presentation on the impact mapping. The impacts selected include all those with:

    • Significant residual impacts.

    • Minor non-significant residual impacts, including those with extensive compensation/mitigation and statutory consultee concerns which cannot be fully mitigated

    In general, impacts that are not shown are those assessed as being:

    • Not significant.

    • Becoming not significant after the application of routine good practice.

    • Being designed or managed out altogether through mitigation.

    The impacts which have been selected for presentation on the impact mapping are shaded in the final column (residual impacts) of the impact register tables shaded.

    Overall Impact

    The severity categories take into account whether the impact is temporary or permanent

    Low Mod High

    R Not significant Remote

    O Significant Occasional

    L More likely to happen than not

    E Expected to happen

    Severity categories

    Like

    lihoo

    d

    Particularly significant

  • Cro

    ssra

    il Li

    ne 1

    Mot

    t Mac

    Don

    ald

    Ass

    essm

    ent o

    f Wat

    er Im

    pact

    s Te

    chni

    cal R

    epor

    t

    Cro

    ss L

    ondo

    n R

    ail L

    inks

    Lim

    ited

    2033

    57/3

    1/Fi

    nal/F

    ebru

    ary

    2005

    A

    pp F

    - N

    otes

    .doc/

    F-2

    Impa

    ct S

    ever

    ity

    This

    is n

    ot e

    xaus

    tive

    but p

    rovi

    des

    the

    fram

    ewor

    k fo

    r set

    ting

    the

    impa

    ct s

    ever

    ityC

    ateg

    ory

    Gro

    undw

    ater

    Lev

    els

    (GW

    L )G

    roun

    dwat

    er F

    low

    s (G

    WF )

    Gro

    undw

    ater

    Qua

    lity

    (GW

    Q)

    Sur

    face

    wat

    er L

    evel

    s (S

    WL )

    Sur

    face

    wat

    er F

    low

    s (S

    WF )

    Sur

    face

    wat

    er Q

    ualit

    y (S

    WQ

    )

    Low

    (L

    o)

    Mod

    erat

    e

    (Mo)

    Hig

    h

    (H

    i)

    -Dee

    p aq

    uife

    r: G

    WL

    redu

    ctio

    n/ris

    e at

    GW

    sou

    rce

    1m

    to 2

    m.

    If <

    1 m

    then

    sco

    ped

    out.

    -Sha

    llow

    aqu

    ifer:

    GW

    L re

    duct

    ion/

    rise

    2

    m 2

    0 m

    from

    site

    -Sha

    llow

    aqu

    ifer:

    Per

    man

    ent

    GW

    L re

    duct

    ion/

    rise

    >0.2

    m a

    nd <

    1m

    at >

    20 m

    from

    site

    -Dee

    p aq

    uife

    r: G

    WL

    redu

    ctio

    n/ris

    e at

    GW

    sou

    rce

    >

    5 m

    .- A

    bstra

    ctio

    n no

    long

    er p

    ossi

    ble

    -Sha

    llow

    aqu

    ifer:

    Per

    man

    ent

    GW

    L re

    duct

    ion/

    rise

    > 1m

    at >

    20

    m fr

    om s

    ite.

    -Cha

    nges

    to d

    eep

    aqui

    fer

    GW

    F re

    gim

    e di

    stan

    t fro

    m

    stru

    ctur

    e-P

    erm

    anen

    t cha

    nges

    to

    shal

    low

    aqu

    ifer G

    WF

    regi

    me

    and

    flow

    into

    bas

    emen

    ts

    -Min

    or c

    hang

    es to

    sha

    llow

    or

    deep

    GW

    F, n

    o re

    cept

    or

    pres

    ent

    -Cha

    nges

    to G

    WF

    in c

    lose

    vi

    cini

    ty o

    f stru

    ctur

    e in

    min

    or,

    isol

    ated

    aqu

    ifers

    -Per

    man

    ent c

    hang

    es to

    dee

    p aq

    uife

    r GW

    F re

    gim

    e in

    clo

    se

    vici

    nity

    of s

    truct

    ure

    -Per

    man

    ent c

    hang

    es to

    sh

    allo

    w a

    quife

    r GW

    F re

    gim

    e in

    clo

    se v

    icin

    ity o

    f stru

    ctur

    e

    -Impa

    cts

    abov

    e Lo

    ndon

    Cla

    y,

    whe

    re s

    hallo

    w a

    quife

    r not

    ut

    ilised

    .-T

    empo

    rary

    det

    ecta

    ble

    dete

    riora

    tion

    in d

    eep

    aqui

    fer

    outs

    ide

    400

    day

    TTZ/

    SP

    Z.-M

    onito

    ring

    show

    ing

    no

    impa

    ct

    -Per

    man

    ent d

    etec

    tabl

    e de

    terio

    ratio

    n in

    util

    ised

    aq

    uife

    r out

    side

    400

    day

    TT

    Z/S

    PZ

    or w

    here

    see

    ping

    to

    rive

    r.-T

    empo

    rary

    det

    ecta

    ble

    dete

    riora

    tion

    with

    in 4

    00 d

    ay

    TTZ/

    SPZ

    - Tem

    pora

    ry o

    r per

    man

    ant

    dete

    riora

    tion

    with

    in 5

    0 da

    y TT

    Z/S

    PZ

    and

    abst

    ract

    ion

    no

    long

    er p

    ossi

    ble

    -Per

    man

    ent d

    evel

    opm

    ent o

    n 1:

    100

    yr fu

    nctio

    nal f

    lood

    plai

    n le

    adin

    g to

    a v

    ery

    smal

    l in

    crea

    sed

    flood

    risk

    -Tem

    pora

    ry o

    ccup

    atio

    n of

    flo

    odpl

    ain

    -Flo

    od ri

    sk re

    duce

    d by

    pr

    ovid

    ing

    flood

    pro

    tect

    ion

    -Dis

    char

    ge u

    sing

    SU

    DS

    -Tem

    pora

    ry ri

    se in

    1:1

    00 y

    r flo

    od le

    vels

    in m

    ain

    river

    s-P

    erm

    anen

    t dev

    elop

    men

    t on

    1:

    100

    yr fu

    nctio

    nal f

    lood

    plai

    n le

    adin

    g to

    mea

    sura

    ble

    incr

    ease

    d flo

    od ri

    sk

    -Any

    per

    man

    ent r

    ise

    in fl

    ood

    leve

    ls a

    t site

    s of

    hig

    h se

    nsiti

    vity

    -Min

    or a

    ltera

    tion

    to h

    ydra

    ulic

    st

    ruct

    ures

    in m

    inor

    rive

    rs,

    acce

    pted

    by

    regu

    lato

    r-S

    urfa

    ce ru

    noff

    disc

    harg

    es

    to c

    ombi

    ned

    sew

    ers

    -Alte

    ratio

    n to

    hyd

    raul

    ic

    stru

    ctur

    es in

    mai

    n riv

    ers

    -Sur

    face

    runo

    ff to

    foul

    sew

    er

    or w

    ater

    cou

    rse

    -Tem

    pora

    ry d

    isch

    arge

    of

    dew

    ater

    ing

    efflu

    ent t

    o se

    wer

    -Maj

    or a

    ltera

    tions

    to

    hydr

    aulic

    stru

    ctur

    esP

    erm

    anen

    t mod

    erat

    e in

    crea

    se in

    sur

    face

    runo

    ff to

    fo

    ul s

    ewer

    or w

    ater

    cour

    se

    -Tem

    pora

    ry ri

    sk o

    f co

    ntam

    inat

    ion

    of m

    inor

    w

    ater

    cour

    se

    -Tem

    pora

    ry ri

    sk o

    f co

    ntam

    inat

    ion

    affe

    ctin

    g m

    ain

    river

    or r

    ecep

    tor (

    e.g.

    ab

    stra

    ctio

    n, S

    SSI)

    -Tem

    pora

    ry c

    onta

    min

    atio

    n of

    mai

    n riv

    er c

    ausi

    ng

    dete

    riora

    tion

    to b

    elow

    RQ

    O

    scor

    e-P

    erm

    anen

    t det

    erio

    ratio

    n of

    w

    ater

    qua

    lity

  • Cro

    ssra

    il Li

    ne 1

    Ass

    essm

    ent o

    f Wat

    er Im

    pact

    s Te

    chni

    cal R

    epor

    tA

    ppen

    dix

    F - I

    mpa

    ct R

    egis

    ter

    Mot

    t Mac

    Don

    ald

    Cro

    ss L

    ondo

    n R

    ail L

    inks

    (WH

    AT

    & W

    HER

    E)W

    HEN

    WH

    YW

    HO

    Item

    Act

    ivity

    / Fe

    atur

    eIm

    pact

    Ref

    .Ti

    min

    gC

    ause

    of i

    mpa

    ctIm

    pact

    ca

    t'gry

    Impa

    ct (r

    isk)

    ow

    ner

    Likelihood Severity Impact Likelihood Severity Impact

    Com

    men

    ts /

    unce

    rtai

    nty

    Miti

    gatio

    n m

    easu

    res

    Likelihood Severity Impact Likelihood Severity Impact

    Res

    idua

    l im

    pact

    s

    1A

    ll C

    onst

    ruct

    ion

    S

    ites

    AA

    ll co

    nstru

    ctio

    n si

    te o

    pera

    tions

    1C

    onta

    min

    ated

    sur

    face

    runo

    ffG

    1.1

    Tem

    pora

    ry

    Ref

    uelli

    ng, s

    tock

    pilin

    g fu

    els

    and

    mat

    eria

    ls, w

    heel

    was

    hers

    , w

    ashd

    owns

    , exp

    osed

    ear

    thw

    orks

    , de

    mol

    ition

    s, d

    ust c

    ontro

    l; pa

    intin

    g et

    c

    SW

    QE

    AO

    Lo

    N

    Pro

    visi

    on fo

    r gen

    eric

    m

    itiga

    tion

    as d

    escr

    ibed

    in

    App

    endi

    x B

    and

    re

    fere

    nce

    to E

    A

    Gui

    delin

    es

    RLo

    N

    Not

    sig

    nific

    ant

    2C

    onta

    min

    atio

    n of

    sha

    llow

    gr

    ound

    wat

    erG

    1.2

    Tem

    pora

    ry

    Ref

    uelli

    ng, s

    tock

    pilin

    g fu

    els

    and

    mat

    eria

    ls, w

    heel

    was

    hers

    , w

    ashd

    owns

    , exp

    osed

    ear

    thw

    orks

    , de

    mol

    ition

    s, d

    ust c

    ontro

    l; pa

    intin

    g et

    c

    GW

    QE

    AO

    Lo

    N

    Pro

    visi

    on fo

    r gen

    eric

    m

    itiga

    tion

    as d

    escr

    ibed

    in

    App

    endi

    x B

    and

    re

    fere

    nce

    to E

    A.

    Spe

    cial

    pr

    otec

    tion

    mea

    sure

    s in

    50

    or 4

    00 d

    ay T

    TZs

    RLo

    N

    Not

    Sig

    nific

    ant

    3Lo

    ss o

    f sew

    er c

    apac

    ityG

    1.3

    Tem

    pora

    ry

    Site

    dra

    inag

    e an

    d de

    wat

    erin

    g ef

    fluen

    ts

    (whe

    re n

    o di

    scha

    rge

    cons

    ent i

    s to

    be

    obta

    ined

    ) will

    go

    to s

    ewer

    und

    er a

    pe

    rmit

    GW

    QTh

    ames

    W

    ater

    OM

    o

    S

    Met

    hod

    of w

    orki

    ng a

    nd

    entry

    poi

    nt to

    be

    agre

    ed

    with

    TW

    OLo

    N

    Not

    Sig

    nific

    ant

    4Lo

    ss o

    f sew

    er c

    apac

    ityG

    1.4

    Tem

    pora

    ry

    Set

    tlem

    ent o

    f hig

    h su

    pend

    ed s

    olid

    s in

    si

    te d

    rain

    age

    and

    dew

    ater

    ing

    efflu

    ents

    (w

    here

    no

    disc

    harg

    e co

    nsen

    t is

    to b

    e ob

    tain

    ed) g

    oing

    to s

    ewer

    und

    er a

    pe

    rmit

    GW

    QTh

    ames

    W

    ater

    OM

    o

    S

    Pro

    vide

    silt

    trap

    s an

    d bu

    nds

    and

    agre

    e co

    nsen

    t sta

    ndar

    ds w

    ith

    TW

    RLo

    N

    Not

    Sig

    nific

    ant

    5C

    onta

    min

    atio

    n of

    sur

    face

    wat

    erG

    1.5

    Tem

    pora

    ryC

    onst

    ruct

    ion

    equi

    pmen

    t wor

    king

    ove

    r or

    nea

    r con

    trolle

    d w

    ater

    s S

    WQ

    EA

    OM

    o

    S

    Use

    of b

    iode

    grad

    eabl

    e oi

    ls a

    nd E

    A n

    otifi

    catio

    n re

    quire

    d by

    Con

    stru

    ctio

    n C

    ode

    (ref

    eren

    ce to

    EA

    G

    uide

    lines

    )

    RLo

    N

    Not

    Sig

    nific

    ant

    2Im

    pact

    s on

    gr

    ound

    wat

    erA

    Con

    stru

    ctio

    n w

    orks

    re

    quiri

    ng

    dew

    ater

    ing

    1C

    hang

    e in

    gro

    undw

    ater

    leve

    ls

    and

    flow

    in th

    e sh

    allo

    w a

    quife

    rG

    2.1

    Tem

    pora

    ryG

    roun

    d br

    eak

    and

    exca

    vatio

    n th

    roug

    h th

    e dr

    ift d

    epos

    itsG

    WL

    EA

    RLo

    N

    Sha

    llow

    aqu

    ifer i

    s no

    t no

    rmal

    ly u

    sed

    for

    abst

    ract

    ion.

    Flo

    ws

    in

    shal

    low

    aqu

    ifer w

    ould

    be

    sm

    all.

    Non

    eR

    Lo

    N

    Not

    sig

    nific

    ant

    BC

    onst

    ruct

    ion

    in s

    hallo

    w a

    nd

    deep

    aqu

    ifers

    2C

    onta

    min

    atio

    n of

    sha

    llow

    gr

    ound

    wat

    erG

    2.2

    Tem

    pora

    ryG

    roun

    dwat

    er in

    con

    tact

    with

    gro

    uts

    and

    conc

    retin

    g by

    -pro

    duct

    sS

    WQ

    EA

    OLo

    N

    In g

    ener

    al, s

    hallo

    w

    grou

    ndw

    ater

    is g

    ener

    all y

    non

    pota

    ble

    and

    not

    utili

    sed

    Pro

    visi

    on fo

    r gen

    eric

    m

    itiga

    tion

    as d

    escr

    ibed

    in

    App

    endi

    x B

    RLo

    N

    Not

    sig

    nific

    ant

    3Lo

    cal i

    ncre

    ase

    in g

    roun

    dwat

    er

    leve

    ls a

    s flo

    ws

    redi

    strib

    ute

    arou

    nd s

    truct

    ures

    G

    2.3

    Tem

    pora

    ryG

    WL

    EA

    OLo

    N

    RLo

    N

    Not

    sig

    nific

    ant

    4P

    oten

    tial f

    or s

    econ

    dary

    effe

    cts

    on b

    uild

    ings

    G2.

    4Te

    mpo

    rary

    GW

    LE

    A, l

    ando

    wne

    rO

    Lo

    N

    RLo

    N

    Not

    sig

    nific

    ant

    Stru

    ctur

    es a

    ctin

    g as

    a b

    arrie

    r to

    grou

    ndw

    ater

    flow

    in s

    hallo

    w a

    quife

    r

    Loca

    l gro

    undw

    ater

    flow

    s an

    d w

    idth

    /dep

    th o

    f ob

    stru

    ctio

    n, d

    epth

    of

    cella

    rs a

    nd e

    xist

    ing

    drai

    ns

    Dra

    inag

    e th

    roug

    h cu

    t-off

    wal

    ls o

    r filt

    er d

    rain

    age

    arou

    nd p

    erim

    eter

    of

    stru

    ctur

    e

    Tabl

    e F.

    1: R

    oute

    Wid

    e Im

    pact

    and

    Gen

    eric

    Miti

    gatio

    n R

    egis

    ter

    con

    opco

    nop

    Impa

    ct s

    core

    Impa

    ct s

    core

    Pre

    Miti

    gatio

    nP

    ost M

    itiga

    tion

    203

    357/

    31/C

    /Feb

    ruar

    y 20

    05Im

    pact

    regi

    ster

    RW

    Gen

    eric

    .xls

    App

    endi

    x F.

    4

  • Cro

    ssra

    il Li

    ne 1

    Ass

    essm

    ent o

    f Wat

    er Im

    pact

    s Te

    chni

    cal R

    epor

    tA

    ppen

    dix

    F - I

    mpa

    ct R

    egis

    ter

    Mot

    t Mac

    Don

    ald

    Cro

    ss L

    ondo

    n R

    ail L

    inks

    (WH

    AT

    & W

    HER

    E)W

    HEN

    WH

    YW

    HO

    Item

    Act

    ivity

    / Fe

    atur

    eIm

    pact

    Ref

    .Ti

    min

    gC

    ause

    of i

    mpa

    ctIm

    pact

    ca

    t'gry

    Impa

    ct (r

    isk)

    ow

    ner

    Likelihood Severity Impact Likelihood Severity Impact

    Com

    men

    ts /

    unce

    rtai

    nty

    Miti

    gatio

    n m

    easu

    res

    Likelihood Severity Impact Likelihood Severity Impact

    Res

    idua

    l im

    pact

    s

    con

    opco

    nop

    Impa

    ct s

    core

    Impa

    ct s

    core

    Pre

    Miti

    gatio

    nP

    ost M

    itiga

    tion

    5O

    bstru

    ctio

    n to

    gro

    undw

    ater

    flow

    in

    Lon

    don

    Cla

    y, L

    ambe

    th G

    roup

    an

    d de

    ep a

    quife

    rG

    2.5

    Per

    man

    ent

    Wor

    ks in

    Lon

    don

    Cla

    y, L

    ambe

    th

    Gro

    up a

    nd d

    eep

    aqui

    fer

    GW

    LE

    AO

    Mo

    SEffe

    ctiv

    e th

    ickn

    ess

    of

    Cha

    lk w

    ould

    ena

    ble

    flow

    s to

    byp

    ass

    obst

    ruct

    ion

    Ext

    erna

    l gro

    ut a

    nd in

    situ

    co

    ncre

    teR

    Lo

    NNot

    sig

    nific

    ant

    6R

    edis

    tribu

    tion

    of ra

    inw

    ater

    in

    filtra

    tion

    G2.

    6Te

    mpo

    rary

    New

    are

    as o

    f har

    dsta

    ndin

    g an

    d lo

    ss o

    f re

    char

    ge to

    the

    aqui

    fer

    GW

    LE

    AO

    Lo

    N

    Are

    as o

    f har

    dsta

    ndin

    g w

    ould

    be

    smal

    lO

    Lo

    N

    Not

    sig

    nific

    ant

    CM

    odifi

    catio

    ns to

    ra

    ilway

    usa

    ge7

    Incr

    ease

    d ris

    k of

    gro

    undw

    ater

    po

    llutio

    n ac

    cide

    nts

    G2.

    7Te

    mpo

    rary

    Hig

    her r

    ailw

    ay u

    sage

    GW

    QE

    AO

    Lo

    N

    Cro

    ssra

    il w

    ould

    be

    elec

    trica

    lly p

    ower

    ed a

    nd

    usua

    lly o

    pera

    ting

    on

    dedi

    cate

    d tra

    ck

    OLo

    N

    Not

    sig

    nific

    ant

    DR

    ailw

    ay

    syst

    ems

    infra

    stru

    ctur

    e8

    Cha

    nge

    in ty

    pe o

    f pot

    entia

    l po

    llutio

    nG

    2.8

    Per

    man

    ent

    Inst

    alla

    tion

    of O

    HLE

    GW

    QE

    AR

    Lo

    NEle

    ctric

    trai

    ns w

    ith

    rege

    nera

    tive

    brak

    ing

    are

    less

    pol

    lutin

    g th

    an d

    iese

    ldr

    ains

    . Diff

    eren

    t po

    tent

    ial c

    onta

    min

    ant:

    copp

    er

    RLo

    NNot

    sig

    nific

    ant

    EG

    rout

    sha

    fts9

    Loca

    lised

    impa

    ct o

    n pe

    rmea

    bilit

    y of

    the

    shal

    low

    aqu

    ifer

    G2.

    9P

    erm

    anen

    tC

    ompe

    nsat

    ion

    grou

    ting

    GW

    FE

    AR

    Lo

    NLim

    ited

    in e

    xten

    tR

    Lo

    NNot

    sig

    nific

    ant

    3Im

    pact

    s on

    sur

    face

    w

    ater

    AD

    ispo

    sal o

    f de

    wat

    erin

    g ef

    fluen

    t1

    Loss

    of s

    ewer

    cap

    acity

    G3.

    1Te

    mpo

    rary

    Dis

    char

    ge o

    f dew

    ater

    ing

    efflu

    ent t

    o se

    wer

    SW

    FTW

    OLo

    N

    Am

    ount

    of w

    ater

    to b

    e di

    spos

    ed a

    nd s

    pare

    se

    wer

    cap

    acity

    Obt

    ain

    perm

    issi

    on fr

    om

    TWO

    Lo

    N

    Not

    sig

    nific

    ant

    BM

    odifi

    catio

    ns to

    dr

    aina

    ge:

    gene

    ral

    2Lo

    ss o

    f sew

    er c

    apac

    ity /

    cont

    rol

    of s

    urfa

    ce ru

    noff

    G3.

    2P

    erm

    anen

    tN

    ew, o

    r ext

    ensi

    on o

    f exi

    stin

    g, s

    urfa

    ce

    drai

    nage

    con

    nect

    ions

    to s

    ewer

    s S

    WQ

    EA

    /TW

    RLo

    NEA

    obj

    ects

    to ru

    noff

    exce

    edin

    g gr

    eenf

    ield

    ra

    tes

    unle

    ss d

    isch

    arge

    is

    to a

    CS

    O

    SU

    DS

    to b

    e co

    nsid

    ered

    in

    det

    aile

    d de

    sign

    . N

    WTE

    flow

    s to

    be

    cons

    ider

    ed fo

    r CS

    Os

    RLo

    NNot

    Sig

    nific

    ant

    CM

    odifi

    catio

    ns to

    dr

    aina

    ge: t

    rack

    an

    d st

    atio

    ns3

    Incr

    ease

    in p

    eak

    runo

    ffG

    3.3

    Per

    man

    ent

    Pla

    tform

    ext

    ensi

    ons

    whe

    re th

    e pl

    atfo

    rms

    are

    drai

    ned

    to a

    ny e

    xist

    ing

    pipe

    d tra

    ck d

    rain

    , rat

    her t

    han

    to th

    e ce

    ss

    SW

    FE

    AR

    Lo

    N

    Dra

    inag

    e de

    sign

    RLo

    NNot

    Sig

    nific

    ant

    4C

    onta

    min

    atio

    n of

    sur

    face

    runo

    ff G

    3.4

    Per

    man

    ent

    Incr

    ease

    d us

    e of

    railw

    ay a

    nd p

    ossi

    ble

    acci

    dent

    s, fi

    res

    etc

    lead

    ing

    to

    cont

    amin

    atio

    n in

    toe

    ditc

    hes

    and

    drai

    ns

    SW

    Q

    EA

    / New

    ork

    Rai

    l E

    mer

    genc

    y S

    ervi

    ces

    RM

    o

    NRar

    e fre

    quen

    cyIn

    cide

    nt p

    lann

    ing

    RM

    o

    NNot

    Sig

    nific

    ant

    203

    357/

    31/C

    /Feb

    ruar

    y 20

    05Im

    pact

    regi

    ster

    RW

    Gen

    eric

    .xls

    App

    endi

    x F.

    4

  • Cro

    ssra

    il Li

    ne 1

    A

    sses

    smen

    t of W

    ater

    Impa

    cts

    Tech

    nica

    l Rep

    ort

    App

    endi

    x F

    - Im

    pact

    Reg

    iste

    r

    Mot

    t Mac

    Don

    ald

    Cro

    ss L

    ondo

    n R

    ail L

    inks

    (WH

    AT

    & W

    HER

    E)W

    HEN

    WH

    YW

    HO

    Item

    Act

    ivity

    / Fe

    atur

    eIm

    pact

    Ref

    .Ti

    min

    gC

    ause

    of i

    mpa

    ctIm

    pact

    ca

    t'gry

    Impa

    ct

    (ris

    k)

    owne

    r

    Likelihood Severity

    Impact Likelihood Severity Impact

    Com

    men

    ts /

    unce

    rtai

    nty

    Miti

    gatio

    n m

    easu

    res

    Likelihood Severity Impact Likelihood Severity Impact

    Res

    idua

    l im

    pact

    s

    W25

    Mai

    denh

    ead

    Sta

    tion

    AS

    tatio

    n, tr

    acks

    an

    d si

    ding

    s w

    orks

    1C

    onta

    min

    atio

    n of

    Cha

    lk

    aqui

    fer.

    Two

    abst

    ract

    ions

    po

    tent

    ially

    affe

    cted

    W25

    .1Te

    mpo

    rary

    Sol

    uble

    con

    tam

    inan

    ts fr

    om

    cons

    truct

    ion

    wor

    ks a

    nd h

    isto

    ric

    cont

    amin

    ated

    land

    mig

    ratin

    g in

    to

    deep

    aqu

    ifer

    GW

    QW

    ell o

    wne

    rs,

    (Id 1

    39, 1

    42)

    OM

    o

    S

    Id 1

    42 u

    sed

    for s

    pray

    irr

    igat

    ion

    Goo

    d si

    te m

    anag

    emen

    t. M

    onito

    r wat

    er

    qual

    ity. C

    onsu

    ltatio

    n w

    ith w

    ell o

    wne

    rs

    is b

    eing

    und

    erta

    ken

    RLo

    N

    Not

    sig

    nific

    ant

    2

    Con

    tam

    inat

    ion

    of C

    halk

    aq

    uife

    r fro

    m o

    pera

    tions

    in th

    e si

    ding

    s ar

    ea. T

    wo

    abst

    ract

    ions

    pot

    entia

    lly

    affe

    cted

    W25

    .2P

    erm

    anen

    tS

    olub

    le c

    onta

    min

    ants

    from

    sid

    ings

    ar

    ea m

    igra

    ting

    into

    gro

    undw

    ater

    GW

    QE

    A, W

    ell

    owne

    rs (I

    d 13

    9, 1

    42)

    RM

    o

    NEle

    ctric

    not

    die

    sel

    pow

    ered

    eng

    ines

    Car

    eful

    des

    ign

    and

    appr

    opria

    te

    drai

    nage

    . P

    ossi

    ble

    use

    of m

    embr

    ane

    unde

    r tra

    cks

    and

    oil i

    nter

    cept

    ors

    RM

    o

    NNot

    sig

    nific

    ant

    BU

    tility

    di

    vers

    ion

    AW

    /035

    3C

    onta

    min

    atio

    n of

    Cha

    lk

    aqui

    fer.

    Two

    abst

    ract

    ions

    po

    tent

    ially

    affe

    cted

    W25

    .3Te

    mpo

    rary

    Sol

    uble

    con

    tam

    inan

    ts fr

    om s

    ewer

    di

    vers

    ion

    tunn

    ellin

    g m

    igra

    ting

    thro

    ugh

    deep

    aqu

    ifer

    GW

    QW

    ell o

    wne

    rs,

    (Id 1

    39, 1

    42)

    LM

    o

    S

    Id 1

    42 u

    sed

    for s

    pray

    irr

    igat

    ion

    Car

    eful

    sel

    ectio

    n of

    mac

    hine

    s,

    tunn

    ellin

    g m

    etho

    ds a

    nd fl

    uids

    . Mon

    itor

    wat

    er q

    ualit

    y. C

    onsu

    ltatio

    n w

    ith w

    ell

    owne

    rs is

    bei

    ng u

    nder

    take

    n

    OM

    o

    S

    Sig

    nific

    ant a

    t Id

    139

    W24

    Mai

    denh

    ead

    Rai

    lway

    Brid

    ge

    AB

    ridge

    wor

    ks1

    Con

    tam

    inat

    ion

    of th

    e Th

    ames

    W24

    .1Te

    mpo

    rary

    Con

    tam

    inat

    ed s

    urfa

    ce ru

    noff

    from

    w

    orks

    to th

    e Th

    ames

    Brid

    ge

    SW

    QE

    AO

    Mo

    S

    Goo

    d si

    te m

    anag

    emen

    t. P

    rovi

    sion

    for

    gene

    ric m

    itiga

    tion

    as d

    escr

    ibed

    in

    App

    endi

    x B

    RLo

    N

    Not

    sig

    nific

    ant

    W23

    Tapl

    ow

    Sta

    tion

    AS

    tatio

    n w

    orks

    1C

    onta

    min

    atio

    n of

    Tap

    low

    La

    ke a

    nd w

    et a

    rea

    to th

    e w

    est o

    f the

    sta

    tion

    W23

    .1Te

    mpo

    rary

    Con

    tam

    inat

    ed s

    urfa

    ce ru

    noff

    from

    w

    orks

    ite e

    nter

    ing

    surfa

    ce w

    ater

    s th

    roug

    h dr

    ains

    etc

    SW

    QE

    AR

    Lo

    N

    Goo

    d si

    te m

    anag

    emen

    t. P

    rovi

    sion

    for

    gene

    ric m

    itiga

    tion

    as d

    escr

    ibed

    in

    App

    endi

    x B

    RLo

    N

    Not

    sig

    nific

    ant

    W21

    Bur

    nham

    S

    tatio

    n

    AS

    tatio

    n w

    orks

    1C

    onta

    min

    atio

    n of

    the

    Cha

    lvey

    D

    itch

    W21

    .1Te

    mpo

    rary

    Con

    tam

    inat

    ed s

    urfa

    ce ru

    noff

    from

    w

    orks

    ite e

    nter

    ing

    wat

    er b

    odie

    s th

    roug

    h dr

    ains

    etc

    SW

    QE

    AR

    Lo

    N

    Goo

    d si

    te m

    anag

    emen

    t. P

    rovi

    sion

    for

    gene

    ric m

    itiga

    tion

    as d

    escr

    ibed

    in

    App

    endi

    x B

    RLo

    N

    Not

    sig

    nific

    ant

    W20

    Dov

    er R

    oad

    &

    Leig

    h R

    oad

    Brid

    ges

    ALe

    igh

    Roa

    d B

    ridge

    wor

    ks1

    Con

    tam

    inat

    ion

    of C

    halk

    aq

    uife

    r. O

    ne a

    bstra

    ctio

    n po

    tent

    ially

    affe

    cted

    W20

    .1Te

    mpo

    rary

    Sol

    uble

    con

    tam

    inan

    ts fr

    om

    cons

    truct

    ion

    wor

    ks a

    nd h

    isto

    ric

    cont

    amin

    ated

    land

    mig

    ratin

    g in

    to

    deep

    aqu

    ifer

    GW

    QE

    A, W

    ell

    owne

    r (Id

    14

    4)R

    Mo

    N

    Atte

    nuat

    ion

    in th

    e La

    mbe

    th G

    roup

    / R

    eadi

    ng B

    eds

    Goo

    d si

    te m

    anag

    emen

    t. M

    onito

    r wat

    er

    qual

    ity. C

    onsu

    ltatio

    n w

    ith w

    ell o

    wne

    rs

    is b

    eing

    und

    erta

    ken

    RLo

    N

    Not

    sig

    nific

    ant

    W19

    S

    toke

    P

    oges

    Lan

    e B

    ridge

    s

    AB

    ridge

    and

    tra

    ck w

    orks

    1

    Con

    tam

    inat

    ion

    of s

    hallo

    w a

    nd

    deep

    aqu

    ifers

    . Tw

    o ab

    stra

    ctio

    ns p

    oten

    tially

    af

    fect

    ed

    W19

    .1Te

    mp&

    Per

    m

    Sol

    uble

    con

    tam

    inan

    ts fr

    om

    cons

    truct

    ion

    wor

    ks a

    nd h

    isto

    ric

    cont

    amin

    ated

    land

    mig

    ratin

    g in

    to

    shal

    low

    and

    dee

    p aq

    uife

    r. Tr

    ack

    Dra

    inag

    e

    GW

    QE

    A,w

    ell

    owne

    r (Id

    14

    4, 1

    50)

    RM

    o

    NOLo

    NAtte

    nuat

    ion

    in th

    e La

    mbe

    th G

    roup

    / R

    eadi

    ng B

    eds

    Goo

    d si

    te m

    anag

    emen

    t. M

    onito

    r wat

    er

    qual

    ity. C

    onsu

    ltatio

    n w

    ith w

    ell o

    wne

    rs

    is b

    eing

    und

    erta

    ken.

    App

    ropr

    iate

    dr

    aina

    ge d

    esig

    n.

    RLo

    NRM

    o

    NNot

    sig

    nific

    ant

    W18

    Slo

    ugh

    Sta

    tion

    AB

    ridge

    and

    st

    atio

    n w

    orks

    1C

    onta

    min

    atio

    n of

    sha

    llow

    aq

    uife

    r. O

    ne a

    bstra

    ctio

    n po

    tent

    ially

    affe

    cted

    W18

    .1Te

    mpo

    rary

    Sol

    uble

    con

    tam

    inan

    ts m

    igra

    ting

    into

    sha

    llow

    aqu

    ifer

    GW

    FE

    A,w

    ell

    owne

    r (Id

    15

    0)R

    Mo

    N

    Goo

    d si

    te m

    anag

    emen

    t. M

    onito

    r wat

    er

    qual

    ity. C

    onsu

    ltatio

    n w

    ith w

    ell o

    wne

    rs

    is b

    eing

    und

    erta

    ken

    RLo

    N

    Not

    sig

    nific

    ant

    2C

    onta

    min

    atio

    n of

    Cha

    lk

    aqui

    fer.

    One

    abs

    tract

    ion

    pote

    ntia

    lly a

    ffect

    edW

    18.2

    Tem

    pora

    ry

    Sol

    uble

    con

    tam

    inan

    ts fr

    om

    cons

    truct

    ion

    wor

    ks a

    nd h

    isto

    ric

    cont

    amin

    ated

    land

    mig

    ratin

    g fro

    m

    shal

    low

    aqu

    ifer

    GW

    QE

    A,w

    ell

    owne

    r (Id

    14

    4)R

    Mo

    N

    Atte

    nuat

    ion

    in th

    e La

    mbe

    th G

    roup

    / R

    eadi

    ng B

    eds

    Car

    eful

    des

    ign.

    Con

    sulta

    tion

    with

    wel

    l ow

    ners

    is b

    eing

    und

    erta

    ken

    RM

    o

    N

    Not

    sig

    nific

    ant

    W17

    Mid

    dleg

    reen

    R

    oad,

    St M

    ary'

    s R

    oad

    &

    Tren

    ches

    B

    ridge

    s

    AB

    ridge

    wor

    ks

    1C

    onta

    min

    atio

    n of

    the

    Gra

    nd

    Uni

    on C

    anal

    W

    17.1

    Tem

    pora

    ryC

    onta

    min

    ated

    sur

    face

    runo

    ff fro

    m

    wor

    ksite

    ent

    erin

    g w

    ater

    bod

    y th

    roug

    h dr

    ains

    etc

    SW

    QE

    AR

    Mo

    N

    Goo

    d si

    te m

    anag

    emen

    t and

    pr

    ovis

    ions

    for g

    ener

    ic m

    itiga

    tion

    (App

    endi

    x B

    )R

    Mo

    N

    Not

    sig

    nific

    ant

    Tabl

    e F.

    2: Im

    pact

    Reg

    iste

    r - W

    este

    rn R

    oute

    Sec

    tion

    tem

    ppe

    rmte

    mp

    perm

    Impa

    ct s

    core

    Impa

    ct s

    core

    Pre

    Miti

    gatio

    nP

    ost M

    itiga

    tion

    2033

    57/3

    1/Fi

    nal/F

    ebru

    ary

    2005

    Impa

    ct R

    egis

    ter v

    er10

    3 A

    4.xl

    sWA

    ppen

    dix

    F.5

  • Cro

    ssra

    il Li

    ne 1

    A

    sses

    smen

    t of W

    ater

    Impa

    cts

    Tech

    nica

    l Rep

    ort

    App

    endi

    x F

    - Im

    pact

    Reg

    iste

    r

    Mot

    t Mac

    Don

    ald

    Cro

    ss L

    ondo

    n R

    ail L

    inks

    (WH

    AT

    & W

    HER

    E)W

    HEN

    WH

    YW

    HO

    Item

    Act

    ivity

    / Fe

    atur

    eIm

    pact

    Ref

    .Ti

    min

    gC

    ause

    of i

    mpa

    ctIm

    pact

    ca

    t'gry

    Impa

    ct

    (ris

    k)

    owne

    r

    Likelihood Severity

    Impact Likelihood Severity Impact

    Com

    men

    ts /

    unce

    rtai

    nty

    Miti

    gatio

    n m

    easu

    res

    Likelihood Severity Impact Likelihood Severity Impact

    Res

    idua

    l im

    pact

    s

    tem

    ppe

    rmte

    mp

    perm

    Impa

    ct s

    core

    Impa

    ct s

    core

    Pre

    Miti

    gatio

    nP

    ost M

    itiga

    tion

    W16

    La

    ngle

    y S

    tatio

    nA

    Sta

    tion

    and

    track

    wor

    ks1

    Con

    tam

    inat

    ion

    of G

    rand

    U

    nion

    Can

    alW

    16.1

    Tem

    pora

    ryC

    onta

    min

    ated

    sur

    face

    runo

    ff fro

    m

    wor

    ksite

    ent

    erin

    g w

    ater

    bod

    y th

    roug

    h dr

    ains

    etc

    SW

    QE

    AR

    Mo

    N

    Goo

    d si

    te m

    anag

    emen

    t and

    pr

    ovis

    ions

    for g

    ener

    ic m

    itiga

    tion

    (App

    endi

    x B

    )R

    Lo

    N

    Not

    sig

    nific

    ant

    W15

    D

    og K

    enne

    l B

    ridge

    AC

    hequ

    er

    Brid

    ge w

    orks

    1C

    onta

    min

    atio

    n of

    Hor

    ton

    Bro

    ok a

    nd d

    itche

    sW

    15.1

    Tem

    pora

    ryC

    onta

    min

    ated

    sur

    face

    runo

    ff fro

    m

    wor

    ksite

    ent

    erin

    g w

    ater

    bod

    ies

    SW

    QE

    AO

    Mo

    S

    Goo

    d si

    te m

    anag

    emen

    t and

    pr

    ovis

    ions

    for g

    ener

    ic m

    itiga

    tion

    (App

    endi

    x B

    )O

    Lo

    N

    Not

    sig

    nific

    ant

    2P

    oten

    tial f

    lood

    ing

    of H

    orto

    n B

    rook

    W15

    .2Te

    mp&

    Per

    mW

    orks

    to c

    ulve

    rt an

    d di

    tche

    s re

    duci

    ng fl

    ow c

    apac

    ity a

    nd

    caus

    ing

    min

    or h

    eadl

    oss

    SW

    FE

    AR

    Lo

    NOM

    o

    S

    Car

    eful

    des

    ign

    and

    prov

    isio

    ns fo

    r ge

    neric

    miti

    gatio

    n (A

    ppen

    dix

    B)

    RLo

    NRLo

    NNot

    sig

    nific

    ant

    BTr

    ack

    wor

    ks3

    Con

    tam

    inat

    ion

    of H

    orto

    n B

    rook

    and

    Gra

    nd U

    nion

    C

    anal

    W15

    .3Te

    mpo

    rary

    Con

    tam

    inat

    ed s

    urfa

    ce ru

    noff

    from

    w

    orks

    ite e

    nter

    ing

    wat

    er b

    odie

    s th

    roug

    h dr

    ains

    etc

    . S

    WQ

    EA

    RM

    o

    N

    Goo

    d si

    te m

    anag

    emen

    t and

    pr

    ovis

    ions

    for g

    ener

    ic m

    itiga

    tion

    (App

    endi

    x B

    )R

    Lo

    N

    Not

    sig

    nific

    ant

    4R

    educ

    tion

    in fl

    ood

    stor

    age

    capa

    city

    W15

    .4Te

    mp&

    Per

    mTr

    ack

    wid

    enin

    g on

    ext

    ende

    d em

    bank

    men

    t at f

    lood

    plai

    n to

    H

    orto

    n B

    rook

    SW

    FE

    AO

    Lo

    NOM

    o

    S C

    aref

    ul d

    esig

    n. C

    ompe

    nsat

    ion

    stor

    age

    iden

    tifie

    d O

    Lo

    NRLo

    NNon

    e. N

    o re

    duct

    ion

    in

    stor

    age

    on

    1:10

    0 ye

    ar

    flood

    pla

    in to

    H

    orto

    n B

    rook

    5In

    crea

    sed

    runo

    ff (to

    sew

    er)

    W15

    .5P

    erm

    anen

    tS

    light

    incr

    ease

    in d

    isch

    arge

    to

    sew

    er fr

    om n

    ew tr

    ack

    drai

    nage

    SW

    FE

    A,T

    ham

    es

    Wat

    erO

    Lo

    NPos

    sibl

    y di

    spos

    al to

    gr

    ound

    Car

    eful

    des

    ign

    of d

    rain

    age

    and

    prov

    isio

    ns fo

    r gen

    eric

    miti

    gatio

    n (A

    ppen

    dix

    B)

    OLo

    NNot

    sig

    nific

    ant

    W14

    Iver

    Sta

    tion

    ATh

    orne

    y La

    ne

    Brid

    ge1

    Red

    uctio

    n in

    infil

    tratio

    n an

    d in

    crea

    sed

    runo

    ff (to

    sew

    er)

    from

    new

    har

    d st

    andi

    ngW

    14.1

    Per

    man

    ent

    New

    acc

    ess

    road

    on

    gree

    nfie

    ld

    are

    redu

    cing

    nat

    ural

    infil

    tratio

    n an

    d ge

    nera

    ting

    new

    runo

    ff.G

    WQ

    EA

    OLo

    N

    App

    ropr

    aite

    dra

    inag

    e de

    sign

    , pos

    sibl

    y in

    corp

    orat

    ing

    SU

    Ds

    tech

    niqu

    esO

    Lo

    NNot

    sig

    nific

    ant

    AS

    tabl

    ing

    sidi

    ng

    1C

    onta

    min

    atio

    n of

    Riv

    er C

    olne

    by

    pol

    lute

    d gr

    ound

    wat

    erW

    13.1

    Tem

    pora

    ry

    Sol

    uble

    con

    tam

    inan

    ts fr

    om h

    isto

    ric

    cont

    amin

    ated

    land

    or t

    unne

    lling

    m

    igra

    ting

    into

    the

    river

    in s

    hallo

    w

    grou

    ndw

    ater

    GW

    QE

    AR

    Mo

    N

    G

    ood

    site

    man

    agem

    ent a

    nd

    prov

    isio

    ns fo

    r gen

    eric

    miti

    gatio

    n (A

    ppen

    dix

    B)

    RLo

    N

    Not

    sig

    nific

    ant

    2C

    onta

    min

    atio

    n of

    Fra

    y's

    Riv

    erW

    13.2

    Tem

    pora

    ryC

    onta

    min

    ated

    sur

    face

    runo

    ff fro

    m

    wor

    ksite

    ent

    erin

    g riv

    erS

    WQ

    EA

    LM

    o

    S

    Goo

    d si

    te m

    anag

    emen

    t and

    pr

    ovis

    ions

    for g

    ener

    ic m

    itiga

    tion

    (App

    endi

    x B

    )R

    Mo

    N

    Not

    sig

    nific

    ant

    3P

    oten

    tial f

    lood

    ing

    of F

    ray'

    s R

    iver

    W

    13.3

    Tem

    p&P

    erm

    Brid

    ge w

    ork

    with

    in ri

    ver r

    educ

    ing

    flow

    cap

    acity

    SW

    FE

    AR

    Mo

    NOM

    o

    S

    Car

    eful

    des

    ign

    RM

    o

    NRM

    o

    NNot

    sig

    nific

    ant

    4In

    crea

    sed

    runo

    ff to

    sew

    er

    from

    sid

    ings

    are

    aW

    13.4

    Per

    man

    ent

    Incr

    ease

    in d

    isch

    arge

    to s

    ewer

    fro

    m n

    ew tr

    ack

    drai

    nage

    and

    w

    ashi

    ng fa

    cilit

    yS

    WF

    EA

    ,Tha

    mes

    W

    ater

    OM

    o

    S

    Car

    eful

    des

    ign

    of d

    rain

    age

    and

    recy

    clin

    g. C

    onsu

    ltatio

    n w

    ith T

    ham

    es

    Wat

    er in

    itiat

    ed

    OLo

    NNot

    sig

    nific

    ant

    5U

    pstre

    am F

    lood

    ing

    W13

    .5Te

    mp&

    Per

    mN

    ew ro

    ad b

    ridge

    SW

    LE

    AO

    Mo

    SOM

    o

    S

    Hyd

    raul

    ic s

    tream

    linin

    g. P

    rovi

    de

    com

    pens

    ator

    y st

    orag

    eR

    Lo

    NRLo

    NNot

    sig

    nific

    ant

    6R

    educ

    tion

    in fl

    ood

    stor

    age

    capa

    city

    W13

    .6Te

    mp&

    Per

    mW

    orks

    aro

    und

    the

    sidi

    ngs

    SW

    LE

    AO

    Mo

    SOM

    o

    S

    Pro

    vide

    com

    pens

    ator

    y st

    orag

    eR

    Lo

    NRLo

    NNot

    sig

    nific

    ant

    W13

    W

    est D

    rayt

    on

    Sta

    tion

    and

    Col

    ne S

    ewer

    D

    iver

    sion

    (A

    W/0

    29)

    2033

    57/3

    1/Fi

    nal/F

    ebru

    ary

    2005

    Impa

    ct R

    egis

    ter v

    er10

    3 A

    4.xl

    sWA

    ppen

    dix

    F.5

  • Cro

    ssra

    il Li

    ne 1

    A

    sses

    smen

    t of W

    ater

    Impa

    cts

    Tech

    nica

    l Rep

    ort

    App

    endi

    x F

    - Im

    pact

    Reg

    iste

    r

    Mot

    t Mac

    Don

    ald

    Cro

    ss L

    ondo

    n R

    ail L

    inks

    (WH

    AT

    & W

    HER

    E)W

    HEN

    WH

    YW

    HO

    Item

    Act

    ivity

    / Fe

    atur

    eIm

    pact

    Ref

    .Ti

    min

    gC

    ause

    of i

    mpa

    ctIm

    pact

    ca

    t'gry

    Impa

    ct

    (ris

    k)

    owne

    r

    Likelihood Severity

    Impact Likelihood Severity Impact

    Com

    men

    ts /

    unce

    rtai

    nty

    Miti

    gatio

    n m

    easu

    res

    Likelihood Severity Impact Likelihood Severity Impact

    Res

    idua

    l im

    pact

    s

    tem

    ppe

    rmte

    mp

    perm

    Impa

    ct s

    core

    Impa

    ct s

    core

    Pre

    Miti

    gatio

    nP

    ost M

    itiga

    tion

    BS

    tatio

    n w

    orks

    7C

    onta

    min

    atio

    n of

    Gra

    nd

    Uni

    on C

    anal

    by

    pollu

    ted

    grou

    ndw

    ater

    W13

    .7Te

    mpo

    rary

    Sol

    uble

    con

    tam

    inan

    ts fr

    om h

    isto

    ric

    cont

    amin

    ated

    land

    mig

    ratin

    g in

    to

    the

    cana

    l in

    shal

    low

    gro

    undw

    ater

    GW

    QE

    AR

    Lo

    N

    Influ

    x of

    gro

    undw

    ater

    in

    to C

    anal

    ?

    Goo

    d si

    te m

    anag

    emen

    t and

    pr

    ovis

    ions

    for g

    ener

    ic m

    itiga

    tion

    (App

    endi

    x B

    )R

    Lo

    N

    Not

    sig

    nific

    ant

    8C

    onta

    min

    atio

    n of

    the

    Gra

    nd

    Uni

    on C

    anal

    W

    13.8

    Tem

    pora

    ryC

    onta

    min

    ated

    sur

    face

    runo

    ff fro

    m

    wor

    ksite

    ent

    erin

    g ca

    nal

    SW

    QE

    A, B

    ritis

    h W

    ater

    way

    sR

    Mo

    N

    G

    ood

    site

    man

    agem

    ent a

    nd

    prov

    isio

    ns fo

    r gen

    eric

    miti

    gatio

    n (A

    ppen

    dix

    B)

    RLo

    N

    Not

    sig

    nific

    ant

    AB

    ridge

    wor

    ks

    1C

    onta

    min

    atio

    n of

    Gra

    nd

    Uni

    on C

    anal

    by

    pollu

    ted

    grou

    ndw

    ater

    W12

    .1Te

    mpo

    rary

    Sol

    uble

    con

    tam

    inan

    ts fr

    om h

    isto

    ric

    cont

    amin

    ated

    land

    mig

    ratin

    g in

    to

    the

    cana

    l in

    shal

    low

    gro

    undw

    ater

    GW

    QE

    A, B

    ritis

    h W

    ater

    way

    sR

    Mo

    N

    Influ

    x of

    gro

    undw

    ater

    in

    to C

    anal

    ?

    Goo

    d si

    te m

    anag

    emen

    t and

    pr

    ovis

    ions

    for g

    ener

    ic m

    itiga

    tion

    (App

    endi

    x B

    )R

    Mo

    N

    Not

    sig

    nific

    ant

    2C

    onta

    min

    atio

    n of

    Gra

    nd

    Uni

    on C

    anal

    W12

    .2Te

    mpo

    rary

    Con

    tam

    inat

    ed s

    urfa

    ce ru

    noff

    from

    w

    orks

    ite e

    nter

    ing

    Can

    al v

    ia d

    rain

    s et

    c. R

    efur

    bish

    men

    t of G

    UC

    brid

    geS

    WQ

    EA

    RM

    o

    N

    Goo

    d si

    te m

    anag

    emen

    t and

    pr

    ovis

    ions

    for g

    ener

    ic m

    itiga

    tion

    (App

    endi

    x B

    )R

    Mo

    N

    Not

    sig

    nific

    ant

    W11

    S

    tock

    ley

    Flyo

    ver

    AFl

    yove

    r

    1C

    onta

    min

    atio

    n of

    Sto

    ckle

    y P

    onds

    W11

    .1Te

    mpo

    rary

    Con

    stru

    ctio

    n of

    pie

    rs w

    ithin

    the

    pond

    s. C

    onta

    min

    ated

    sur

    face

    ru

    noff

    from

    wor

    ksite

    ent

    erin

    g po

    nds

    SW

    QE

    AO

    Mo

    S

    Goo

    d si

    te m

    anag

    emen

    t and

    pr

    ovis

    ions

    for g

    ener

    ic m

    itiga

    tion

    (App

    endi

    x B

    )R

    Mo

    N

    Not

    sig

    nific

    ant

    2C

    onta

    min

    atio

    n of

    Sto

    ckle

    y P

    onds

    W11

    .2P

    erm

    anen

    tC

    onta

    min

    ated

    sur

    face

    runo

    ff fro

    m

    viad

    uct d

    rain

    s en

    terin

    g po

    nds

    via

    soak

    away

    SW

    QE

    AR

    Lo

    N

    Goo

    d dr

    aina

    ge d

    esig

    nR

    Lo

    NNot

    sig

    nific

    ant

    W10

    H

    ayes

    &

    Har

    lingt

    on

    Sta

    tion

    AB

    ridge

    wor

    ks

    1

    Con

    tam

    inat

    ed s

    urfa

    ce ru

    noff

    ente

    ring

    Pad

    ding

    ton

    Rea

    ch

    (GU

    C) a

    nd C

    owle

    y R

    each

    (G

    UC

    )

    W10

    .1Te

    mpo

    rary

    Con

    tam

    inat

    ed s

    urfa

    ce ru

    noff

    from

    w

    orks

    ites

    ente

    ring

    wat

    er b

    odie

    s.

    Brid

    ge w

    orks

    ove

    r Gra

    nd U

    nion

    C

    anal

    SW

    QE

    AL

    Mo

    S

    Goo

    d si

    te m

    anag

    emen

    t and

    pr

    ovis

    ions

    for g

    ener

    ic m

    itiga

    tion

    (App

    endi

    x B

    )R

    Lo

    N

    Not

    sig

    nific

    ant

    AS

    tatio

    n w

    orks

    1C

    onta

    min

    ated

    sur

    face

    runo

    ff en

    terin

    g G

    rand

    Uni

    on C

    anal

    (M

    aypo

    le A

    rm)

    W8.

    1Te

    mpo

    rary

    Con

    tam

    inat

    ed s

    urfa

    ce ru

    noff

    from

    w

    orks

    ite e

    nter

    ing

    Can

    al v

    ia d

    rain

    s et

    cS

    WQ

    EA

    RLo

    N

    Goo

    d si

    te m

    anag

    emen

    t and

    pr

    ovis

    ions

    for g

    ener

    ic m

    itiga

    tion

    (App

    endi

    x B

    )R

    Lo

    N

    Not

    sig

    nific

    ant

    2C

    onta

    min

    atio

    n by

    pol

    lute

    d gr

    ound

    wat

    erW

    8.2

    Tem

    pora

    ry

    Sol

    uble

    con

    tam

    inan

    ts fr

    om h

    isto

    ric

    cont

    amin

    ated

    land

    or t

    unne

    lling

    m

    igra

    ting

    into

    the

    river

    in s

    hallo

    w

    grou

    ndw

    ater

    GW

    QE

    AR

    Mo

    S

    G

    ood

    site

    man

    agem

    ent a

    nd

    prov

    isio

    ns fo

    r gen

    eric

    miti

    gatio

    n (A

    ppen

    dix

    B)

    RLo

    N

    Not

    sig

    nific

    ant

    W7

    H

    anw

    ell S

    tatio

    n A

    Sta

    tion

    wor

    ks1

    Con

    tam

    inat

    ed s

    urfa

    ce ru

    noff

    ente

    ring

    Riv

    er B

    rent

    W7.

    1Te

    mpo

    rary

    Con

    tam

    inat

    ed s

    urfa

    ce ru

    noff

    from

    w

    orks

    ite e

    nter

    ing

    the

    river

    via

    dr

    ains

    etc

    SW

    QE

    AR

    Mo

    N

    Goo

    d si

    te m

    anag

    emen

    t and

    pr

    ovis

    ions

    for g

    ener

    ic m

    itiga

    tion

    (App

    endi

    x B

    )R

    Mo

    N

    Not

    sig

    nific

    ant

    AD

    iveu

    nder

    1

    Cha

    nge

    in s

    hallo

    w

    grou

    ndw

    ater

    leve

    ls a

    roun

    d di

    veun

    der s

    truct

    ure

    W4.

    1P

    erm

    anen

    tD

    iveu

    nder

    act

    ing

    as a

    bar

    rier t

    o flo

    w in

    the

    shal

    low

    aqu

    ifer

    GW

    LE

    AO

    Mo

    S

    Pro

    vide

    dra

    inag

    e if

    need

    edR

    Lo

    NNot

    sig

    nific

    ant

    2Te

    mpo

    rary

    redu

    ctio

    n in

    se

    wer

    cap

    acity

    W4.

    2Te

    mpo

    rary

    Dis

    posa

    l of d

    ewat

    erin

    g ef

    fluen

    t to

    sew

    erS

    WF

    Tham

    es

    Wat

    erL

    Mo

    S

    Man

    age

    runo

    ff ef

    fect

    ivel

    y an

    d pr

    ovis

    ions

    for g

    ener

    ic m

    itiga

    tion

    (App

    endi

    x B

    )R

    Mo

    N

    Not

    sig

    nific

    ant

    3In

    crea

    sed

    runo

    ff to

    sew

    er

    from

    new

    har

    dsta

    ndin

    gW

    4.3

    Per

    man

    ent

    Incr

    ease

    in d

    isch

    arge

    to s

    ewer

    of

    drai

    nage

    from

    div

    eund

    er s

    truct

    ure

    SW

    FE

    AO

    Lo

    N

    Dra

    inag

    e de

    sign

    RLo

    NNot

    sig

    nific

    ant

    W12

    H

    orto

    n R

    oad

    &

    Old

    Sto

    ckle

    y R

    oad

    Brid

    ges

    W8

    S

    outh

    all S

    tatio

    n

    W4

    A

    cton

    Mai

    n Li

    ne

    Sta

    tion

    and

    Act

    on

    Div

    eund

    er

    2033

    57/3

    1/Fi

    nal/F

    ebru

    ary

    2005

    Impa

    ct R

    egis

    ter v

    er10

    3 A

    4.xl

    sWA

    ppen

    dix

    F.5

  • Cro

    ssra

    il Li

    ne 1

    A

    sses

    smen

    t of W

    ater

    Impa

    cts

    Tech

    nica

    l Rep

    ort

    App

    endi

    x F

    - Im

    pact

    Reg

    iste

    r

    Mot

    t Mac

    Don

    ald

    Cro

    ss L

    ondo

    n R

    ail L

    inks

    (WH

    AT

    & W

    HER

    E)W

    HEN

    WH

    YW

    HO

    Item

    Act

    ivity

    / Fe

    atur

    eIm

    pact

    Ref

    .Ti

    min

    gC

    ause

    of i

    mpa

    ctIm

    pact

    ca

    t'gry

    Impa

    ct

    (ris

    k)

    owne

    r

    Likelihood Severity

    Impact Likelihood Severity Impact

    Com

    men

    ts /

    unce

    rtai

    nty

    Miti

    gatio

    n m

    easu

    res

    Likelihood Severity Impact Likelihood Severity Impact

    Res

    idua

    l im

    pact

    s

    tem

    ppe

    rmte

    mp

    perm

    Impa

    ct s

    core

    Impa

    ct s

    core

    Pre

    Miti

    gatio

    nP

    ost M

    itiga

    tion

    AD

    epot

    wor

    ks1

    Con

    tam

    inat

    ed s

    urfa

    ce ru

    noff

    ente

    ring

    the

    Gra

    nd U

    nion

    C

    anal

    W3.

    1Te

    mpo

    rary

    Con

    tam

    inat

    ed s

    urfa

    ce ru

    noff

    from

    w

    orks

    ite e

    nter

    ing

    the

    cana

    l via

    dr

    ains

    etc

    .S

    WQ

    EA

    RLo

    N

    G

    ood

    site

    man

    agem

    ent a

    nd

    prov

    isio

    ns fo

    r gen

    eric

    miti

    gatio

    n (A

    ppen

    dix

    B)

    RLo

    N

    Not

    sig

    nific

    ant

    2C

    onta

    min

    atio

    n of

    sha

    llow

    aq

    uife

    r and

    Gra

    nd U

    nion

    C

    anal

    W3.

    2Te

    mpo

    rary

    Sol

    uble

    con

    tam

    inan

    ts fr

    om h

    isto

    ric

    cont

    amin

    ated

    land

    mig

    ratin

    g in

    sh

    allo

    w a

    quife

    r int

    o th

    e ca

    nal

    GW

    QE

    AR

    Lo

    N

    Goo

    d si

    te m

    anag

    emen

    t and

    pr

    ovis

    ions

    for g

    ener

    ic m

    itiga

    tion

    (App

    endi

    x B

    )R

    Lo

    N

    Not

    sig

    nific

    ant

    3In

    crea

    sed

    runo

    ff to

    sew

    er

    from

    sid

    ings

    are

    aW

    3.3

    Per

    man

    ent

    Incr

    ease

    in d

    isch

    arge

    to s

    ewer

    fro

    m n

    ew tr

    ack

    drai

    nage

    and

    w

    ashi

    ng fa

    cilit

    yS

    WF

    EA

    ,Tha

    mes

    W

    ater

    OM

    o

    N

    Car

    eful

    des

    ign

    of d

    rain

    age

    and

    recy

    clin

    gO

    Lo

    NNot

    sig

    nific

    ant

    4C

    onta

    min

    atio

    n fro

    m s

    idin

    gs

    area

    W3.

    4P

    erm

    anen

    tN

    ew d

    rain

    age

    in s

    idin

    gs a

    rea

    SW

    QE

    AR

    Lo

    NTra

    ins

    wou

    ld b

    e po

    wer

    ed b

    y el

    ectri

    city

    ra

    ther

    than

    die

    sel a

    nd

    the

    pote

    ntia

    l for

    po

    llutio

    n is

    gen

    eral

    ly

    low

    Pro

    visi

    on o

    f oil

    inte

    rcep

    tors

    . Dra

    ined

    flo

    or s

    lab

    or m

    embr

    ane

    unde

    r the

    de

    pot b

    uild

    ing

    RLo

    N

    ATr

    ack

    wor

    ks1

    Phy

    sica

    l wor

    k af

    fect

    ing

    disc

    harg

    e ou

    tlet

    W2.

    1Te

    mpo

    rary

    Wor

    ks a

    t dis

    char

    ge o

    utle

    t loc

    atio

    nS

    WL

    EA

    RM

    o

    N

    Nee

    d to

    con

    firm

    pr

    ecis

    e lo

    catio

    n of

    di

    scha

    rge

    outle

    tP

    ossi

    bly

    rem

    odel

    or m

    ove

    outle

    t poi

    ntR

    Mo

    N

    Not

    sig

    nific

    ant

    2R

    educ

    tion

    in in

    tegr

    ity o

    f ca

    nal e

    mba

    nkm

    ents

    W2.

    2Te

    mpo

    rary

    Wor

    ks a

    djac

    ent t

    o th

    e ca

    nal

    emba

    nkm

    ents

    SW

    LE

    AR

    Mo

    N

    Con

    stru

    ctio

    n m

    etho

    d an

    d pr

    ovis

    ions

    fo

    r gen

    eric

    miti

    gatio

    n (A

    ppen

    dix

    B)

    RLo

    N

    Not

    sig

    nific

    ant

    3C

    onta

    min

    ated

    sur

    face

    runo

    ff en

    terin

    g th

    e G

    rand

    Uni

    on

    Can

    alW

    2.3

    Tem

    p&P

    erm

    Con

    tam

    inat

    ed s

    urfa

    ce ru

    noff

    from

    w

    orks

    ite e

    nter

    ing

    the

    cana

    l via

    dr

    ains

    etc

    SW

    QE

    AR

    Lo

    NRLo

    N G

    ood

    site

    man

    agem

    ent a

    nd

    prov

    isio

    ns fo

    r gen

    eric

    miti

    gatio

    n (A

    ppen

    dix

    B)

    RLo

    NRLo

    NNot

    sig

    nific

    ant

    4C

    onta

    min

    atio

    n of

    sha

    llow

    aq

    uife

    r and

    Gra

    nd U

    nion

    C

    anal

    W2.

    4Te

    mpo

    rary

    Sol

    uble

    con

    tam

    inan

    ts fr

    om h

    isto

    ric

    cont

    amin

    ated

    land

    mig

    ratin

    g in

    sh

    allo

    w a

    quife

    r int

    o th

    e ca

    nal

    GW

    QE

    AR

    Mo

    N

    Sha

    llow

    gro

    undw

    ater

    in

    lim

    ited

    conn

    ectio

    n w

    ith th

    e G

    rand

    Uni

    on

    Can

    al

    Goo

    d si

    te m

    anag

    emen

    t and

    pr

    ovis

    ions

    for g

    ener

    ic m

    itiga

    tion

    (App

    endi

    x B

    )R

    Lo

    N

    Not

    sig

    nific

    ant

    W1

    Por

    tobe

    llo

    Junc

    tion

    ATr

    ack

    wor

    ks1

    Con

    tam

    inat

    ed s

    urfa

    ce ru

    noff

    ente

    ring

    the

    Gra

    nd U

    nion

    C

    anal

    W1.

    1Te

    mpo

    rary

    Con

    tam

    inat

    ed s

    urfa

    ce ru

    noff

    from

    w

    orks

    ite e

    nter

    ing

    the

    cana

    l via

    dr

    ains

    etc

    SW

    QE

    AR

    Lo

    N

    G

    ood

    site

    man

    agem

    ent a

    nd

    prov

    isio

    ns fo

    r gen

    eric

    miti

    gatio

    n (A

    ppen

    dix

    B)

    RLo

    N

    Not

    sig

    nific

    ant

    W3

    O

    ld O

    ak

    Com

    mon

    Dep

    ot

    W2

    C

    anal

    Way

    Ju

    nctio

    n

    2033

    57/3

    1/Fi

    nal/F

    ebru

    ary

    2005

    Impa

    ct R

    egis

    ter v

    er10

    3 A

    4.xl

    sWA

    ppen

    dix

    F.5

  • Cro

    ssra

    il Li

    ne 1

    A

    sses

    smen

    t of W

    ater

    Impa

    cts

    Tech

    nica

    l Rep

    ort

    App

    endi

    x F

    - Im

    pact

    Reg

    iste

    r

    Mot

    t Mac

    Don

    ald

    Cro

    ss L

    ondo

    n R

    ail L

    inks

    (WH

    AT

    & W

    HER

    E)W

    HEN

    WH

    YW

    HO

    Item

    Act

    ivity

    Impa

    ctR

    ef.

    Tim

    ing

    Cau

    se o

    f im

    pact

    Impa

    ct

    cat'g

    ry

    Impa

    ct

    (ris

    k)

    owne

    r

    Likelihood Severity Impact Likelihood Severity Impact

    Com

    men

    ts /

    unce

    rtai

    nty

    Miti

    gatio

    n m

    easu

    res

    Likelihood Severity Impact Likelihood Severity Impact

    Res

    idua

    l im

    pact

    s

    C1

    R

    oyal

    Oak

    P

    orta

    l

    A

    1C

    onta

    min

    atio

    n of

    the

    Gra

    nd

    Uni

    on C

    anal

    C1.

    1Te

    mpo

    rary

    Con

    tam

    inat

    ed s

    urfa

    ce ru

    noff

    from

    w

    orks

    ite e

    nter

    ing

    Can

    al a

    s ov

    erla

    nd fl

    ow o

    r thr

    ough

    dra

    ins

    etc

    SW

    QE

    AO

    Lo

    N

    G

    ood

    site

    man

    agem

    ent.

    Pro

    visi

    ons

    for

    gene

    ric m

    itiga

    tion

    (App

    endi

    x B

    )R

    Lo

    N

    Not

    sig

    nific

    ant

    2In

    crea

    sed

    runo

    ff to

    sew

    er

    from

    turn

    back

    sid

    ings

    C1.

    2P

    erm

    anen

    tIn

    crea

    se in

    dis

    char

    ge to

    sew

    er

    from

    new

    trac

    k dr

    aina

    ge in

    tu

    rnba

    ck fa

    cilit

    yS

    WF

    EA

    , sew

    er

    owne

    rO

    Lo

    NAdd

    ition

    al v

    olum

    es o

    f w

    ater

    wou

    ld b

    e sm

    all

    Non

    eO

    Lo

    NNot

    sig

    nific

    ant

    BTu

    nnel

    por

    tal

    3C

    hang

    e in

    sha

    llow

    gr

    ound

    wat

    er le

    vels

    aro

    und

    porta

    l stru

    ctur

    eC

    1.3

    Per

    man

    ent

    Tunn

    el p

    orta

    l act

    ing

    as a

    bar

    rier t

    o flo

    w in

    the

    shal

    low

    aqu

    ifer

    GW

    LE

    AR

    Lo

    NDep

    th o

    f ove

    rbur

    den

    less

    than

    2.5

    m.

    Flow

    s, if

    any

    , wou

    ld

    be s

    mal

    l

    Non

    eR

    Lo

    NNot

    sig

    nific

    ant

    4Lo

    cally

    risi

    ng w

    ater

    leve

    ls in

    sh

    allo

    w a

    quife

    rC

    1.4

    Per

    man

    ent

    Tunn

    el p

    orta

    l act

    ing

    as b

    arrie

    r bl

    ocki

    ng fo

    rmer

    Wes

    tbou

    rne

    Riv

    erG

    WL

    EA

    RM

    o

    NThe

    nat

    ure

    of th

    e un

    derg

    roun

    d riv

    er is

    no

    t kno

    wn

    Pro

    vide

    dra

    inag

    e if

    need

    edR

    Lo

    NNot

    sig

    nific

    ant

    5In

    crea

    sed

    runo

    ff to

    sew

    er

    from

    new

    har

    dsta

    ndin

    gC

    1.5

    Per

    man

    ent

    Incr

    ease

    in d

    isch

    arge

    to s

    ewer

    of

    drai

    nage

    from

    bas

    e sl

    abS

    WF

    EA

    OLo

    N

    Eva

    pora

    tion

    in tu

    nnel

    s, p

    rovi

    sion

    of

    pum

    p su

    mp

    RLo

    NNot

    sig

    nific

    ant

    AS

    tatio

    n bo

    x1

    Cha

    nge

    in s

    hallo

    w

    grou

    ndw

    ater

    leve

    ls a

    roun

    d st

    atio

    n bo

    xC

    2.1

    Per

    man

    ent

    Sta

    tion

    box

    actin

    g as

    a b

    arrie

    r to

    flow

    in th

    e sh

    allo

    w a

    quife

    rG

    WL

    EA

    LM

    o

    SExi

    stin

    g ba

    sem

    ent

    stru

    ctur

    es w

    ill a

    lread

    y af

    fect

    flow

    Pro

    vide

    dra

    inag

    e ar

    ound

    stru

    ctur

    e at

    ris

    k if

    need

    edO

    Lo

    NNot

    sig

    nific

    ant

    2Lo

    cally

    risi

    ng w

    ater

    leve

    ls in

    sh

    allo

    w a

    quife

    rC

    2.2

    Per

    man

    ent

    Sta

    tion

    box

    actin

    g as

    bar

    rier a

    nd

    bloc

    king

    trib

    utar

    y to

    form

    er

    Wes

    tbou

    rne

    Riv

    erG

    WL

    EA

    RM

    o

    NThe

    nat

    ure

    or

    exis

    tenc

    e of

    the

    unde

    rgro

    und

    river

    is

    not k

    now

    n

    Pro

    vide

    dra

    inag

    e if

    need

    edR

    Lo

    NNot

    sig

    nific

    ant

    3C

    onta

    min

    atio

    n of

    the

    Gra

    nd

    Uni

    on C

    anal

    C2.

    3Te

    mpo

    rary

    Con

    tam

    inat

    ed s

    urfa

    ce ru

    noff

    from

    w

    orks

    ite e

    nter

    ing

    Can

    al th

    roug

    h dr

    ains

    etc

    SW

    QE

    AR

    Mo

    N

    G

    ood

    site

    man

    agem

    ent.

    Pro

    visi

    ons

    for

    gene

    ric m

    itiga

    tion

    (App

    endi

    x B

    )R

    Mo

    N

    Not

    sig

    nific

    ant

    AH

    yde

    Par

    k S

    haft

    1C

    hang

    e in

    sha

    llow

    gr

    ound

    wat

    er le

    vels

    aro

    und

    shaf

    tC

    3.1

    Per

    man

    ent

    Cut

    and

    cov

    er b

    ox a

    ctin

    g as

    a

    barr

    ier t

    o flo

    w in

    the

    shal

    low

    aq

    uife

    rG

    WL

    EA

    OM

    o

    S

    Pro

    vide

    dra

    inag

    e if

    need

    edR

    Lo

    NNot

    sig

    nific

    ant

    2C

    onta

    min

    atio

    n of

    the

    Long

    wat

    erC

    3.2

    Tem

    pora

    ryO

    verla

    nd fl

    ow in

    to H

    yde

    Par

    k fro

    m

    wor

    king

    site

    sS

    WQ

    EA

    RM

    o

    N

    P

    rovi

    de c

    ut-o

    ff di

    tch

    arou

    nd w

    orks

    iteR

    Lo

    N

    Not

    sig

    nific

    ant

    3C

    hang

    e in

    sha

    llow

    gr

    ound

    wat

    er le

    vels

    aro

    und

    tunn

    elC

    3.3

    Per

    man

    ent

    Cut

    and

    cov

    er tu

    nnel

    act

    ing

    as a

    ba

    rrie

    r to

    flow

    in th

    e sh

    allo

    w

    aqui

    fer

    GW

    LE

    AR

    Lo

    NDep

    th o

    f ove

    rbur

    den

    less

    than

    2.5

    m.

    Flow

    s, if

    any

    , wou

    ld

    be s

    mal

    l

    Non

    eR

    Lo

    NNot

    sig

    nific

    ant

    BB

    oth

    shaf

    ts

    4Lo

    cally

    risi

    ng w

    ater

    leve

    ls in

    sh

    allo

    w a

    quife

    rC

    3.4

    Per

    man

    ent

    Sha

    ft ac

    ting

    as b

    arrie

    r and

    bl

    ocki

    ng tr

    ibut

    ary

    to fo

    rmer

    rive

    rG

    WL

    EA

    RM

    o

    NThe

    nat

    ure

    or

    exis

    tenc

    e of

    the

    unde

    rgro

    und

    river

    is

    not k

    now

    n

    Pro

    vide

    dra

    inag

    e if

    need

    edR

    Lo

    NNot

    sig

    nific

    ant

    5C

    onta

    min

    atio

    n of

    the

    Ser

    pent

    ine/

    Long

    wat

    erC

    3.5

    Tem

    pora

    ryS

    hallo

    w g

    roun

    dwat

    er fr

    om

    wor

    ksite

    mig

    ratin

    g as

    bas

    eflo

    w

    into

    Ser

    pent

    ine/

    Long

    wat

    er

    SW

    QE

    AR

    Lo

    N

    Goo

    d si

    te m

    anag

    emen

    t. P

    rovi

    sion

    s fo

    r ge

    neric

    miti

    gatio

    n (A

    ppen

    dix

    B)

    RLo

    N

    Not

    sig

    nific

    ant

    6In

    crea

    sed

    runo

    ff to

    sew

    er

    from

    new

    har

    dsta

    ndin

    gC

    3.6

    Per

    man

    ent

    Incr

    ease

    in d

    isch

    arge

    of d

    rain

    age

    from

    site

    dev

    elop

    men

    t and

    acc

    ess

    road

    sS

    WF

    EA

    OLo

    N

    App

    ropr

    iate

    dra

    inag

    e m

    easu

    res.

    P

    ossi

    ble

    use

    of S

    UD

    S te

    chni

    ques

    OLo

    NNot

    sig

    nific

    ant

    tem

    p

    C2

    P

    addi

    ngto

    n S

    tatio

    n

    C3

    H

    yde

    Par

    k &

    P

    ark

    Lane

    S

    hafts

    perm

    Wes

    tbou

    rne

    Par

    k tu

    rnba

    ck

    faci

    lity

    Tabl

    e F.

    3: Im

    pact

    Reg

    iste

    r - C

    entr

    al R

    oute

    Sec

    tion

    Impa

    ct s

    core

    Impa

    ct s

    core

    Pre

    Miti

    gatio

    nP

    ost M

    itiga

    tion

    tem

    ppe

    rm

    2033

    57/3

    1/Fi

    nal/F

    ebru

    ary

    2005

    Impa

    ct R

    egis

    ter v

    er10

    3 A

    4.xl

    sCA

    ppen

    dix

    F.6

  • Cro

    ssra

    il Li

    ne 1

    A

    sses

    smen

    t of W

    ater

    Impa

    cts

    Tech

    nica

    l Rep

    ort

    App

    endi

    x F

    - Im

    pact

    Reg

    iste

    r

    Mot

    t Mac

    Don

    ald

    Cro

    ss L

    ondo

    n R

    ail L

    inks

    (WH

    AT

    & W

    HER

    E)W

    HEN

    WH

    YW

    HO

    Item

    Act

    ivity

    Impa

    ctR

    ef.

    Tim

    ing

    Cau

    se o

    f im

    pact

    Impa

    ct

    cat'g

    ry

    Impa

    ct

    (ris

    k)

    owne

    r

    Likelihood Severity Impact Likelihood Severity Impact

    Com

    men

    ts /

    unce

    rtai

    nty

    Miti

    gatio

    n m

    easu

    res

    Likelihood Severity Impact Likelihood Severity Impact

    Res

    idua

    l im

    pact

    s

    tem

    ppe

    rm

    Impa

    ct s

    core

    Impa

    ct s

    core

    Pre

    Miti

    gatio

    nP

    ost M

    itiga

    tion

    tem

    ppe

    rm

    C4

    Bon

    d S

    treet

    S

    tatio

    n

    AS

    hafts

    1Lo

    cally

    risi

    ng w

    ater

    leve

    ls in

    sh

    allo

    w a

    quife

    rC

    4.1

    Per

    man

    ent

    Sta

    tion

    box

    actin

    g as

    bar

    rier a

    nd

    bloc

    king

    trib

    utar

    y to

    form

    er T

    ybur

    n R

    iver

    GW

    LE

    AR

    Mo

    NThe

    nat

    ure

    or

    exis

    tenc

    e of

    the

    unde

    rgro

    und

    river

    is

    not k

    now

    n

    Pro

    vide

    dra

    inag

    e if

    need

    edR

    Lo

    NNot

    sig

    nific

    ant

    2B

    lock

    ing

    of s

    and

    lens

    in th

    e Lo

    ndon

    Cla

    yC

    4.2

    Per

    man

    ent

    Sta

    tion

    tunn

    els

    bloc

    king

    wat

    er

    fille

    d sa

    nd le

    nsG

    WQ

    EA

    RLo

    NExt

    ent o

    f suc

    h sa

    nd

    lens

    es n

    ot k

    now

    nR

    Lo

    NNot

    sig

    nific

    ant

    3P

    ollu

    tion

    of H

    anov

    er G

    arde

    ns

    from

    sur

    face

    runo

    ffC

    4.3

    Tem

    pora

    ryS

    urfa

    ce ru

    noff

    from

    wor

    ksite

    en

    terin

    g th

    e ga

    rden

    sS

    WQ

    EA

    RM

    o

    N

    Goo

    d si

    te m

    anag

    emen

    t. P

    rovi

    sion

    s fo

    r ge

    neric

    miti

    gatio

    n (A

    ppen

    dix

    B)

    RLo

    N

    Not

    sig

    nific

    ant

    C6

    Fa

    rrin

    gdon

    S

    tatio

    n

    AS

    tatio

    n

    1W

    ater

    qua

    lity

    impa

    ct a

    t tw

    o C

    halk

    abs

    tract

    ions

    C6.

    1Te

    mpo

    rary

    Sol

    uble

    con

    tam

    inan

    ts fr

    om

    cons

    truct

    ion

    wor

    ks m

    igra

    ting

    into

    de

    ep a

    quife

    rG

    WQ

    Wel

    l ow

    ners

    (Id

    2 a

    nd

    poss

    ibly

    98)

    RM

    o

    N

    Atte

    nuat

    ion

    in th

    e La

    mbe

    th G

    roup

    and

    Th

    anet

    San

    ds

    Con

    sulta

    tion

    with

    wel

    l ow

    ners

    is

    curr

    ently

    bei

    ng u

    nder

    take

    n. M

    onito

    r w

    ater

    qua

    lity

    and

    mon

    itor g

    rout

    loss

    . P

    rovi

    sion

    s fo

    r gen

    eric

    miti

    gatio

    n (A

    ppen

    dix

    B)

    RLo

    N

    Not

    sig

    nific

    ant

    2Lo

    cally

    risi

    ng w

    ater

    leve

    ls in

    sh

    allo

    w a

    quife

    rC

    6.2

    Per

    man

    ent

    Wes

    tern

    Tic

    ket H

    all a

    ctin

    g as

    ba

    rrie

    r and

    blo

    ckin

    g tri

    buta

    ry to

    fo

    rmer

    Fle

    et R

    iver

    and

    Fag

    gesw

    ell

    Bro

    ok

    GW

    FE

    AR

    Mo

    NThe

    nat

    ure

    of th

    e un

    derg

    roun

    d riv

    er is

    no

    t kno

    wn

    in d

    etai

    lP

    rovi

    de d

    rain

    age

    if ne

    eded

    RLo

    NNot

    sig

    nific

    ant

    BTu

    nnel

    s

    3P

    athw

    ay to

    dee

    p aq

    uife

    r. P

    ossi

    ble

    clos

    ure

    of

    abst

    ract

    ion

    wel

    lC

    6.3

    Tem

    p&P

    erm

    Abs

    tract

    ion

    bore

    hole

    dam

    aged

    by

    settl

    emen

    t cau

    sed

    by tu

    nnel

    ling

    GW

    FW

    ell o

    wne

    r (Id

    2)

    OM

    o

    SLH

    i

    PSDec

    omm

    issi

    onin

    g of

    w

    ell r

    equi

    red

    Con

    sulta

    tion

    with

    wel

    l ow

    ner i

    s be

    ing

    unde

    rtake

    n. M

    onito

    r set

    tlem

    ent o

    r ba

    ckfil

    l wel

    l. P

    rovi

    sion

    s fo

    r gen

    eric

    m

    itiga

    tion

    (App

    endi

    x B

    )

    RLo

    NOLo

    NNot

    sig

    nific

    ant

    if com

    pens

    atio

    n pr

    ovid

    ed

    C7

    Li

    verp

    ool S

    treet

    S

    tatio

    n

    AS

    tatio

    n

    1W

    ater

    qua

    lity

    impa

    ct a

    t tw

    o C

    halk

    abs

    tract

    ions

    C

    7.1

    Tem

    pora

    ryS

    olub

    le c

    onta

    min

    ants

    from

    co

    nstru

    ctio

    n w

    orks

    mig

    ratin

    g in

    to

    deep

    aqu

    ifer

    GW

    QW

    ell o

    wne

    rs

    (Id 1

    and

    po

    ssib

    ly 4

    3)O

    Hi

    S

    Atte

    nuat

    ion

    in th

    e La

    mbe

    th G

    roup

    Con

    sulta

    tion

    with

    wel

    l ow

    ners

    is b

    eing

    un

    derta

    ken.

    Mon

    itor w

    ater

    qua

    lity

    and

    mon

    itor g

    rout

    loss

    . Pro

    visi

    ons

    for

    gene

    ric m

    itiga

    tion

    (App

    endi

    x B

    )

    RM

    o

    N

    Not

    sig

    nific

    ant

    2Lo

    cally

    risi

    ng w

    ater

    leve

    ls in

    sh

    allo

    w a

    quife

    rC

    7.2

    Per

    man

    ent

    Blo

    omfie

    ld a

    nd L

    iver

    pool

    Stre

    et

    box

    actin

    g as

    bar

    rier a

    nd b

    lock

    ing

    tribu

    tary

    to fo

    rmer

    Riv

    er W

    albr

    ook

    GW

    FE

    AR

    Mo

    NThe

    nat

    ure

    of th

    e un

    derg

    roun

    d riv

    er is

    no

    t kno

    wn

    in d

    etai

    lP

    rovi

    de d

    rain

    age

    if ne

    eded

    RM

    o

    NNot

    sig

    nific

    ant

    3P

    ollu

    tion

    of F

    insb

    ury

    Circ

    us

    Gar

    dens

    from

    sur

    face

    runo

    ffC

    7.3

    Tem

    pora

    ryS

    urfa

    ce ru

    noff

    from

    wor

    ksite

    en

    terin

    g th

    e ga

    rden

    sS

    WQ

    EA

    OM

    o

    S

    Goo

    d si

    te m

    anag

    emen

    t. P

    rovi

    sion

    s fo

    r ge

    neric

    miti

    gatio

    n (A

    ppen

    dix

    B)

    RLo

    N

    Not

    sig

    nific

    ant

    BTu

    nnel

    s

    4P

    athw

    ay to

    dee

    p aq

    uife

    r. P

    ossi

    ble

    clos

    ure

    of

    abst

    ract

    ion

    wel

    l C

    7.4

    Per

    man

    ent

    Abs

    tract

    ion

    bore

    hole

    dam

    aged

    by

    settl

    emen

    t cau

    sed

    by tu

    nnel

    ling

    GW

    FW

    ell o

    wne

    r (Id

    1)

    LH

    i

    PSDec

    omm

    issi

    on w

    ell?

    Con

    sulta

    tion

    with

    wel

    l ow

    ner i

    s be

    ing

    unde

    rtake

    n. M

    onito

    r set

    tlem

    ent o

    r ba

    ckfil

    l wel

    l. P

    rovi

    sion

    s fo

    r gen

    eric

    m

    itiga

    tion

    (App

    endi

    x B

    )

    OLo

    NNot

    sig

    nific

    ant

    if com

    pens

    atio

    n pr

    ovid

    ed

    C8

    W

    hite

    chap

    el

    Sta

    tion

    AS

    tatio

    n

    1W

    ater

    qua

    lity

    impa

    ct a

    t tw

    o C

    halk

    abs

    tract

    ions