Regional Transit Center Appendix E – Detailed Construction Cost Estimate Roaring Fork Transportation Authority Feasibility Study November 16, 2016 page E1 RFTA #201515040001 Appendix E Detailed Construction Cost Estimate An independent construction cost estimate was prepared based on the Basis of Design represented in this report. Rider Levett Bucknall is a national cost estimating company with experience and current cost history in the region. Their report i is inculded here in its entirety (Figures E.1 though E.8). The following (Table E.1 – RLB Report Summary of Amounts with Index of Figures) summary is derived directly from the report (corrections to this report are noted below): Table E.1 – RLB Report Summary of Amounts with Index of Figures (1) The RLB report did not include replacement of existing asphalt as described in 2.7 Site and Building Systems. An amount of $172,317 (based on 32,000SF @ $3.75/SF, with markups) has been added to the RLB Site cost estimate. (2) Line G302076 has an incorrect area – area should be 6,700 SF. The cost difference, with associated markups, has been deducted from the RLB Administration cost estimate. (3) This item was not provided with the RLB report. The amount included is based on a similar structure in Aspen (with escalation). This estimate is based on the current, conceptual uderstanding of the project. This level of estimating is affected by the signifcant potential to underreact to cost issues, as well as to overreact based on a limted amout of information. A prudent, and conservative approach is used. Nonetheless, the actual costs may vary as the project is developed further. Factors that can increase costs include: the economy, additional detailed drawings and definition of systems, scope packaging, contract award timing, and scope revisions. Factors that can improve costs include: the economy, additional detailed drawings and definition of systems, and competative pricing by the DesignBuild Contractor. Report Cover & Assumptions Figure E.1 pages E2 through E4 Site $975,414 (1) Figure E.2 pages E5 through E6 Entrance Road $928,037 Figure E.3 pages E7 through E8 Surface Parking $376,559 Figure E.4 pages E9 through E10 Subtotal Site $2,280,010 RTC Bus & Car Parking Garage $38,938,445 Figure E.5 pages E11 though E15 Administration Building $5,349,398 (2) Figure E.6 pages E16 through E20 Subtotal RTC $44,287,843 Maintenance Faciltiy Addition $1,383,105 Figure E.7 pages E21 through E23 Maintenance Facility Renovation $928,037 Figure E.8 pages E24 through E25 Waste Enclosure $180,000 (3) Subtotal Maintenance & Site Buildings $2,491,142 Total Construction Cost Estimate $49,058,995

Appendix E Detailed Construction Cost Estimate

  • Upload
    others

  • View
    14

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Appendix E Detailed Construction Cost Estimate

Regional Transit Center    Appendix E – Detailed Construction Cost Estimate Roaring Fork Transportation Authority    Feasibility Study 

     November 16, 2016  page E‐1   RFTA #2015‐15‐040‐001   

 

 

 

Appendix E ‐ Detailed Construction Cost Estimate   An independent construction cost estimate was prepared based on the Basis of Design represented 

in  this  report.   Rider Levett Bucknall  is a national cost estimating company with experience and 

current cost history in the region.  Their reporti is inculded here in its entirety (Figures E.1 though 

E.8).  The following (Table E.1 – RLB Report Summary of Amounts with Index of Figures) summary is 

derived directly from the report (corrections to this report are noted below): 

 

 Table E.1 – RLB Report Summary of Amounts with Index of Figures (1)  The RLB  report  did  not  include  replacement  of  existing asphalt as  described  in 2.7  Site  and Building 

Systems.  An amount of $172,317 (based on 32,000SF @ $3.75/SF, with mark‐ups) has been added to the RLB Site cost estimate. 

(2)  Line G3020‐76 has an  incorrect area – area should be 6,700 SF.   The cost difference, with associated markups, has been deducted from the RLB Administration cost estimate. 

(3)  This item was not provided with the RLB report.  The amount included is based on a similar structure in Aspen (with escalation). 

 

This  estimate  is  based  on  the  current,  conceptual  uderstanding  of  the  project.    This  level  of 

estimating is affected by the signifcant potential to under‐react to cost issues, as well as to over‐

react based on a  limted amout of  information.   A prudent, and  conservative approach  is used.  

Nonetheless, the actual costs may vary as the project is developed further.  Factors that can increase 

costs  include:  the  economy,  additional  detailed  drawings  and  definition  of  systems,  scope 

packaging, contract award timing, and scope revisions.  Factors that can improve costs include: the 

economy, additional detailed drawings and definition of systems, and competative pricing by the 

Design‐Build Contractor.

Report Cover & Assumptions Figure E.1 pages E‐2 through E‐4

Site $975,414 (1) Figure E.2 pages E‐5 through E‐6

Entrance Road $928,037 Figure E.3 pages E‐7 through E‐8

Surface Parking $376,559 Figure E.4 pages E‐9 through E‐10

Subtotal Site $2,280,010

RTC Bus & Car Parking Garage $38,938,445 Figure E.5 pages E‐11 though E‐15

Administration Building $5,349,398 (2) Figure E.6 pages E‐16 through E‐20

Subtotal RTC $44,287,843

Maintenance Faciltiy  Addition $1,383,105 Figure E.7 pages E‐21 through E‐23

Maintenance Facility Renovation $928,037 Figure E.8 pages E‐24 through E‐25

Waste Enclosure $180,000 (3)

Subtotal Maintenance & Site Buildings $2,491,142

Total Construction Cost Estimate $49,058,995

Page 2: Appendix E Detailed Construction Cost Estimate

Regional Transit Center    Appendix E – Detailed Construction Cost Estimate Roaring Fork Transportation Authority    Feasibility Study 

     November 16, 2016  page E‐2   RFTA #2015‐15‐040‐001   

 Figure E.1 – RLB Report Cover & Assumptions (image 1 of 3) 

Page 3: Appendix E Detailed Construction Cost Estimate

Regional Transit Center    Appendix E – Detailed Construction Cost Estimate Roaring Fork Transportation Authority    Feasibility Study 

     November 16, 2016  page E‐3   RFTA #2015‐15‐040‐001   

 Figure E.1 – RLB Report Cover & Assumptions (continued; image 2 of 3) 

Page 4: Appendix E Detailed Construction Cost Estimate

Regional Transit Center    Appendix E – Detailed Construction Cost Estimate Roaring Fork Transportation Authority    Feasibility Study 

     November 16, 2016  page E‐4   RFTA #2015‐15‐040‐001   

 Figure E.1 – RLB Report Cover & Assumptions (continued; image 3 of 3) 

Page 5: Appendix E Detailed Construction Cost Estimate

Regional Transit Center    Appendix E – Detailed Construction Cost Estimate Roaring Fork Transportation Authority    Feasibility Study 

     November 16, 2016  page E‐5   RFTA #2015‐15‐040‐001   

 Figure E.2 – RLB Site Construction Cost Estimate (image 1 of 2) 

Page 6: Appendix E Detailed Construction Cost Estimate

Regional Transit Center    Appendix E – Detailed Construction Cost Estimate Roaring Fork Transportation Authority    Feasibility Study 

     November 16, 2016  page E‐6   RFTA #2015‐15‐040‐001   

 Figure E.2 – RLB Site Construction Cost Estimate (continued; image 2 of 2) 

Page 7: Appendix E Detailed Construction Cost Estimate

Regional Transit Center    Appendix E – Detailed Construction Cost Estimate Roaring Fork Transportation Authority    Feasibility Study 

     November 16, 2016  page E‐7   RFTA #2015‐15‐040‐001   

 Figure E.3 – RLB Entrance Road Construction Cost Estimate (image 1 of 2) 

Page 8: Appendix E Detailed Construction Cost Estimate

Regional Transit Center    Appendix E – Detailed Construction Cost Estimate Roaring Fork Transportation Authority    Feasibility Study 

     November 16, 2016  page E‐8   RFTA #2015‐15‐040‐001   

Figure E.3 – RLB Entrance Road Construction Cost Estimate (continue; image 2 of 2) 

Page 9: Appendix E Detailed Construction Cost Estimate

Regional Transit Center    Appendix E – Detailed Construction Cost Estimate Roaring Fork Transportation Authority    Feasibility Study 

     November 16, 2016  page E‐9   RFTA #2015‐15‐040‐001   

 Figure E.4 – RLB Surface Parking Construction Cost Estimate (image 1 of 2) 

Page 10: Appendix E Detailed Construction Cost Estimate

Regional Transit Center    Appendix E – Detailed Construction Cost Estimate Roaring Fork Transportation Authority    Feasibility Study 

     November 16, 2016  page E‐10   RFTA #2015‐15‐040‐001   

 Figure E.4 – RLB Surface Parking Construction Cost Estimate (continued; image 2 of 2) 

Page 11: Appendix E Detailed Construction Cost Estimate

Regional Transit Center    Appendix E – Detailed Construction Cost Estimate Roaring Fork Transportation Authority    Feasibility Study 

     November 16, 2016  page E‐11   RFTA #2015‐15‐040‐001   

 Figure E.5 – RLB RTC Bus & Car Parking Structure Construction Cost Estimate (image 1 of 5) 

Page 12: Appendix E Detailed Construction Cost Estimate

Regional Transit Center    Appendix E – Detailed Construction Cost Estimate Roaring Fork Transportation Authority    Feasibility Study 

     November 16, 2016  page E‐12   RFTA #2015‐15‐040‐001   

 Figure E.5 – RLB RTC Bus & Car Parking Structure Construction Cost Estimate (continued; image 2 of 5) 

Page 13: Appendix E Detailed Construction Cost Estimate

Regional Transit Center    Appendix E – Detailed Construction Cost Estimate Roaring Fork Transportation Authority    Feasibility Study 

     November 16, 2016  page E‐13   RFTA #2015‐15‐040‐001   

 Figure E.5 – RLB RTC Bus & Car Parking Structure Construction Cost Estimate (continued; image 3 of 5) 

Page 14: Appendix E Detailed Construction Cost Estimate

Regional Transit Center    Appendix E – Detailed Construction Cost Estimate Roaring Fork Transportation Authority    Feasibility Study 

     November 16, 2016  page E‐14   RFTA #2015‐15‐040‐001   

 Figure E.5 – RLB RTC Bus & Car Parking Structure Construction Cost Estimate (continued; image 4 of 5) 

Page 15: Appendix E Detailed Construction Cost Estimate

Regional Transit Center    Appendix E – Detailed Construction Cost Estimate Roaring Fork Transportation Authority    Feasibility Study 

     November 16, 2016  page E‐15   RFTA #2015‐15‐040‐001   

 Figure E.5 – RLB RTC Bus & Car Parking Structure Construction Cost Estimate (continued; image 5 of 5) 

Page 16: Appendix E Detailed Construction Cost Estimate

Regional Transit Center    Appendix E – Detailed Construction Cost Estimate Roaring Fork Transportation Authority    Feasibility Study 

     November 16, 2016  page E‐16   RFTA #2015‐15‐040‐001   

 Figure E.6 – RLB Administration Construction Cost Estimate (image 1 of 5) 

Page 17: Appendix E Detailed Construction Cost Estimate

Regional Transit Center    Appendix E – Detailed Construction Cost Estimate Roaring Fork Transportation Authority    Feasibility Study 

     November 16, 2016  page E‐17   RFTA #2015‐15‐040‐001   

 

 Figure E.6 – RLB Administration Construction Cost Estimate (continued; image 2 of 5) 

Page 18: Appendix E Detailed Construction Cost Estimate

Regional Transit Center    Appendix E – Detailed Construction Cost Estimate Roaring Fork Transportation Authority    Feasibility Study 

     November 16, 2016  page E‐18   RFTA #2015‐15‐040‐001   

  Figure E.6 – RLB Administration Construction Cost Estimate (continued; image 3 of 5) 

Page 19: Appendix E Detailed Construction Cost Estimate

Regional Transit Center    Appendix E – Detailed Construction Cost Estimate Roaring Fork Transportation Authority    Feasibility Study 

     November 16, 2016  page E‐19   RFTA #2015‐15‐040‐001   

  Figure E.6 – RLB Administration Construction Cost Estimate (continued; image 4 of 5) 

Page 20: Appendix E Detailed Construction Cost Estimate

Regional Transit Center    Appendix E – Detailed Construction Cost Estimate Roaring Fork Transportation Authority    Feasibility Study 

     November 16, 2016  page E‐20   RFTA #2015‐15‐040‐001   

  Figure E.6 – RLB Administration Construction Cost Estimate (continued; image 5 of 5) 

Page 21: Appendix E Detailed Construction Cost Estimate

Regional Transit Center    Appendix E – Detailed Construction Cost Estimate Roaring Fork Transportation Authority    Feasibility Study 

     November 16, 2016  page E‐21   RFTA #2015‐15‐040‐001   

  Figure E.7 – RLB Maintenance Facility Addition Construction Cost Estimate (image 1 of 3) 

Page 22: Appendix E Detailed Construction Cost Estimate

Regional Transit Center    Appendix E – Detailed Construction Cost Estimate Roaring Fork Transportation Authority    Feasibility Study 

     November 16, 2016  page E‐22   RFTA #2015‐15‐040‐001   

  Figure E.7 – RLB Maintenance Facility Addition Construction Cost Estimate (continued; image 2 of 3) 

Page 23: Appendix E Detailed Construction Cost Estimate

Regional Transit Center    Appendix E – Detailed Construction Cost Estimate Roaring Fork Transportation Authority    Feasibility Study 

     November 16, 2016  page E‐23   RFTA #2015‐15‐040‐001   

  Figure E.7 – RLB Maintenance Facility Addition Construction Cost Estimate (continued; image 3 of 3) 

Page 24: Appendix E Detailed Construction Cost Estimate

Regional Transit Center    Appendix E – Detailed Construction Cost Estimate Roaring Fork Transportation Authority    Feasibility Study 

     November 16, 2016  page E‐24   RFTA #2015‐15‐040‐001   

  Figure E.8 – RLB Maintenance Facility Renovation Construction Cost Estimate (image 1 of 2) 

Page 25: Appendix E Detailed Construction Cost Estimate

Regional Transit Center    Appendix E – Detailed Construction Cost Estimate Roaring Fork Transportation Authority    Feasibility Study 

     November 16, 2016  page E‐25   RFTA #2015‐15‐040‐001   

  Figure E.8 – RLB Maintenance Facility Renovation Construction Cost Estimate (continued; image 2 of 2) 

Page 26: Appendix E Detailed Construction Cost Estimate

Regional Transit Center    Appendix E – Detailed Construction Cost Estimate Roaring Fork Transportation Authority    Feasibility Study 

     November 16, 2016  page E‐26   RFTA #2015‐15‐040‐001   

i   RLB  |  Rider  Levett  Bucknall  Construction  Cost  Estimate;  Concept  Design  –  Option  2  Final;  Roaring  Fork Transportation Authority; Glenwood Maintenance Facility (GMF); Glenwood Springs, CO.; dated October 18, 2016 (23 pages).  Cost estimating has been conducted throughout this feasibility study process.  The heading “Option 2” is an out of date reference that originated through the design studies conducted as a part of this report.  Ultimately, “option 2” has been renamed “2016 Basis of Design”.