70
Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model

APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Nawatny Ridge Final Master Utility Report Page 20

APPENDIX E – Water System Calculations and Model

Page 2: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

NAWATNY RIDGE

IRRIGATION DEMAND CALCULATIONS

Nawatny Ridge

Project #190108

Date: 2019-11-15

Irrigation Demands

Parcel Use Acreage

Walks,

Landscape &

Ammenities %

Walks,

Landscape &

Ammenities (AC)

Irrigated

Landscape %

Total Estimated

Landscape (AC)

Sod/Grass

(AC)

Drip

(AC)Native (AC)

Irrigation

Demand (AC-

ft/yr)

Irrigation Demand

(gpm)

Retirement community 73 40 29.2 50 14.60 4.4 4.4 5.8 15.45 22.98

Common Open space 31 100 31.0 40 12.40 3.7 3.7 5.0 13.12 19.52

TOTAL 104 60.2 27.00 8.1 8.1 10.8 28.57 42.51

Office Space 49 30 14.7 50 7.35 2.2 2.2 2.9 7.78 11.57

Common Open space 27 100 27.0 40 10.80 3.2 3.2 4.3 11.43 17.00

ROW 13 40 5.2 100 5.20 1.6 1.6 2.1 5.50 8.19

TOTAL 89 46.9 23.35 7.0 7.0 9.3 24.70 36.76

Open Space - Other Lands 17 100 17.0 80 13.60 4.1 4.1 5.4 14.39 21.41

Mixed use 48 30 14.4 40 5.76 1.7 1.7 2.3 6.09 9.07

Open Space - Visitor Lands 3 100 3.0 0 0.00 0.0 0.0 0.0 0.00 0.00

TOTAL 68 34.4 19.36 5.8 5.8 0.0 20.48 30.48

Mixed use 28 40 11.2 40 4.48 1.3 1.3 1.8 4.74 7.05

Open Space - Visitor Lands 12 100 12.0 0 0.00 0.0 0.0 0.0 0.00 0.00

TOTAL 40 23.2 4.48 1.3 1.3 1.8 4.74 7.05

Phase 2 Lot 1 Block 1

Phase 1 Lot 2 Block 1

Phase 2 Lot 1 Block 2

Phase 1 Lot 1 Block 2

Page 3: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

NAWATNY RIDGEDOMESTIC WATER DEMAND CALCULATIONS

Nawatny RidgeProject #190108Date: 2019-11-27Phase 1

Parcel Use Intensity Demand/ Unit Average Daily Demand (GPD)

Average Daily Demand (GPM)

Max Day Demand (GPM)*

Peak Hour Demand (GPM) *

Peak Hour Demand (GPM)**

Peak Hour Demand(2.68*Avg day)

(GPD)***

Peak Hour Demand(2.68*Avg day)

(GPM)***Irrigation Demand

Fire Flow Demand (GPM)

Phase 2 Lot 1 Block 1 Retirement community 400 Units 107.3 gal / Unit 42912 29.8 74.5 119.2 657.0 115004.2 79.9 10.6 3000Phase 1 Lot 2 Block 1 Corporate Offices 500000 sq.ft. 0.04 gal/sf 20000 13.9 34.7 55.6 441.0 53600.0 37.2 36.8 3000

Shopping Center 42500 sq.ft 0.16 gal/sf 6800 4.7 11.8 18.9 3000Business Hotel 240 Rooms 130 gal/room 31200 21.7 54.2 86.7 3000General Office 637500 sqft 0.04 gal/sf 25500 17.7 44.3 70.8 3000

Phase 2

Parcel Use Intensity Demand/ Unit Average Daily Demand (GPD)

Average Daily Demand (GPM)

Max Day Demand (GPM)*

Peak Hour Demand (GPM) *

Peak Hour Demand (GPM)**

Peak Hour Demand(2.68*Avg day)

(GPD)***

Peak Hour Demand(2.68*Avg day)

(GPM)***Irrigation Demand

Fire Flow Demand (GPM)

Phase 2 Lot 1 Block 1 Retirement community 700 Units 107.3 gal / Unit 75096 52.2 130.4 208.6 657.0 201257.3 139.8 21.3 3000Phase 1 Lot 2 Block 1 Corporate Offices 500000 sq.ft. 0.04 gal/sf 20000 13.9 34.7 55.6 441.0 53600.0 37.2 36.8 3000

Shopping Center 85000 sq.ft 0.16 gal/sf 13600 9.4 23.6 37.8 3000Business Hotel 480 Rooms 130 gal/room 62400 43.3 108.3 173.3 3000General Office 1275000 sqft 0.04 gal/sf 51000 35.4 88.5 141.7 3000

Phase 3

Parcel Use Intensity Demand/ Unit Average Daily Demand (GPD)

Average Daily Demand (GPM)

Max Day Demand (GPM)*

Peak Hour Demand (GPM) *

Peak Hour Demand (GPM)**

Peak Hour Demand(2.68*Avg day)

(GPD)***

Peak Hour Demand(2.68*Avg day)

(GPM)***Irrigation Demand

Fire Flow Demand (GPM)

Phase 2 Lot 1 Block 1 Retirement community 1100 Units 107.3 gal / Unit 118008 82.0 204.9 327.8 657.0 316261.4 219.6 31.9 3000Phase 1 Lot 2 Block 1 Corporate Offices 500000 sq.ft. 0.04 gal/sf 20000 13.9 34.7 55.6 441.0 53600.0 37.2 36.8 3000

Shopping Center 127500 sq.ft 0.16 gal/sf 20400 14.2 35.4 56.7 3000Business Hotel 720 Rooms 130 gal/room 93600 65.0 162.5 260.0 3000General Office 1912500 sqft 0.04 gal/sf 76500 53.1 132.8 212.5 3000

Phase 4

Parcel Use Intensity Demand/ Unit Average Daily Demand (GPD)

Average Daily Demand (GPM)

Max Day Demand (GPM)*

Peak Hour Demand (GPM) *

Peak Hour Demand (GPM)**

Peak Hour Demand(2.68*Avg day)

(GPD)***

Peak Hour Demand(2.68*Avg day)

(GPM)***Irrigation Demand

Fire Flow Demand (GPM)

Phase 2 Lot 1 Block 1 Retirement community 1500 Units 107.3 gal / Unit 160920 111.8 279.4 447.0 657.0 431265.6 299.5 42.5 3000Phase 1 Lot 2 Block 1 Corporate Offices 500000 sq.ft. 0.04 gal/sf 20000 13.9 34.7 55.6 441.0 53600.0 37.2 36.8 3000

Shopping Center 170000 sq.ft 0.16 gal/sf 27200 18.9 47.2 75.6 3000Business Hotel 960 Rooms 130 gal/room 124800 86.7 216.7 346.7 3000General Office 2550000 sqft 0.04 gal/sf 102000 70.8 177.1 283.3 3000

Existing Demands Use Intensity Demand/ Unit Average Daily Demand (GPD)

Average Daily Demand (GPM)

Max Day Demand (GPM)*

Peak Hour Demand (GPM) *

Peak Hour Demand(2.68*Avg day)

(GPD)***

Peak Hour Demand(2.68*Avg day)

(GPM)***Integrative Family Medicine (IFM) Medical/Office 72000 sq.ft. 0.2 gal/sf 14400 10.0 25.0 40.0 38592.0 26.8Juniper Village at Lousiville (JVL) Senior living 52 Units 72 gal/unit 3744 2.6 6.5 10.4 10033.9 7.0Monarch K-8 (MK8) School 172800 sq.ft 0.06 gal/sf 10368 7.2 18.0 28.8 27786.2 19.3Monarch High School (MHS) School 180000 sq.ft. 0.06 gal/sf 10800 7.5 18.8 30.0 28944.0 20.1

***By Request of City of Lousiville

* Per City of Westminster Design Criteria**Per City of Louisville Design Criteria

Phase 1 Lot 1 Block 2 / Phase 2 Lot 1 Block 2

Phase 1 Lot 1 Block 2 / Phase 2 Lot 1 Block 2

Phase 1 Lot 1 Block 2 / Phase 2 Lot 1 Block 2

Phase 1 Lot 1 Block 2 / Phase 2 Lot 1 Block 2

9.4

18.8

28.1

37.5

684.0

684.0

684.0

684.0

18224.0

36448.0

54672.0

680720.0

12.7

25.3

38.0

472.7

Page 4: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

SHEET NO.

DESIGNED BY:CHECKED BY:DRAWN BY:

ISSUE DATE:DATE REVISION COMMENTS

PROJECT #:

1120 Lincoln Street, Suite 1000

Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311

HarrisKocherSmith.com

11 OF 1

06-19-2019 TEHTEHTEH

190108

NAWATNY RIDGEPROPOSED WATER NETWORK

NO C

HANG

ES A

RE T

O BE

MAD

E TO

THI

S DR

AWIN

G W

ITHO

UT W

RITT

EN P

ERMI

SSIO

N OF

HAR

RIS

KOCH

ER S

MITH

.

0

SCALE: 1" =

500 500 1000

500'

Page 5: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P1 MaxCurrent Time Step: 0.000HrFlexTable: Junction Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelElevation

(ft)Demand (gpm)

Hydraulic Grade (ft)

Pressure (psi)

IFM 5,470.66 25 5,625.96 67J-2 5,475.00 0 5,626.00 65J-3 5,367.00 0 5,625.77 112J-5 5,370.00 0 5,625.80 111J-7 5,470.00 0 5,625.98 67J-9 5,430.00 0 5,625.90 85J-11 5,393.70 0 5,625.80 100J-18 5,370.00 0 5,625.72 111J-19 5,380.00 0 5,625.80 106JVL 5,467.02 7 5,625.98 69MHS 5,456.88 19 5,625.90 73MK8 5,459.71 18 5,625.91 72MU 5,377.00 120 5,625.72 108OFFICE 5,396.13 72 5,625.72 99SL 5,432.07 85 5,625.77 84

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/4gbf4h2b.xml

Page 6: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P1 MaxCurrent Time Step: 0.000HrFlexTable: Pipe Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelLength

(Scaled) (ft)Start Node Stop Node

Diameter (in)

Flow (gpm)

Velocity (ft/s)

Headloss Gradient

(ft/ft)

EX-12 118 R-3 J-7 8.0 71 0.45 0.000P-25 2,942 MU J-11 12.0 -91 0.26 0.000P-24 740 J-11 J-19 12.0 25 0.07 0.000P-23 1,963 J-9 J-11 12.0 116 0.33 0.000P-13 2,618 J-18 J-3 8.0 -25 0.16 0.000P-12 1,276 OFFICE MU 12.0 4 0.01 0.000P-11 2,397 SL OFFICE 12.0 75 0.21 0.000P-10 671 MU J-18 12.0 -25 0.07 0.000P-9 2,529 J-7 SL 12.0 160 0.45 0.000P-8 528 J-19 J-5 12.0 25 0.07 0.000EX-11 1,761 J-9 MHS 8.0 -11 0.07 0.000EX-10 185 MHS MK8 8.0 -30 0.19 0.000EX-9 718 MK8 IFM 8.0 -48 0.31 0.000EX-8 284 IFM J-2 8.0 -73 0.47 0.000EX-7 1,414 J-3 J-5 8.0 -25 0.16 0.000EX-6 252 PRV-5 R-2 8.0 0 0.00 0.000EX-5 481 J-5 PRV-5 8.0 0 0.00 0.000EX-4 2,066 JVL J-9 12.0 105 0.30 0.000EX-3 166 J-7 JVL 12.0 111 0.31 0.000EX-2 831 J-2 J-7 18.0 200 0.25 0.000EX-1 39 R-1 J-2 18.0 274 0.34 0.000

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/swdwqg2r.xml

Page 7: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P1 Max MU FireCurrent Time Step: 0.000HrFlexTable: Junction Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelElevation

(ft)Demand (gpm)

Hydraulic Grade (ft)

Pressure (psi)

IFM 5,470.66 25 5,624.70 67J-2 5,475.00 0 5,625.92 65J-3 5,367.00 0 5,597.52 100J-5 5,370.00 0 5,601.66 100J-7 5,470.00 0 5,624.70 67J-9 5,430.00 0 5,615.46 80J-11 5,393.70 0 5,602.18 90J-18 5,370.00 0 5,589.85 95J-19 5,380.00 0 5,601.88 96JVL 5,467.02 7 5,624.01 68MHS 5,456.88 19 5,621.25 71MK8 5,459.71 18 5,621.91 70MU 5,377.00 3,150 5,589.58 92OFFICE 5,396.13 72 5,596.02 86SL 5,432.07 85 5,609.26 77

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/biwiuygt.xml

Page 8: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P1 Max MU FireCurrent Time Step: 0.000HrFlexTable: Pipe Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelLength

(Scaled) (ft)Start Node Stop Node

Diameter (in)

Flow (gpm)

Velocity (ft/s)

Headloss Gradient

(ft/ft)

EX-12 118 R-3 J-7 8.0 759 4.84 0.011P-25 2,942 MU J-11 12.0 -1,327 3.77 0.004P-24 740 J-11 J-19 12.0 372 1.06 0.000P-23 1,963 J-9 J-11 12.0 1,699 4.82 0.007P-13 2,618 J-18 J-3 8.0 -372 2.38 0.003P-12 1,276 OFFICE MU 12.0 1,451 4.12 0.005P-11 2,397 SL OFFICE 12.0 1,523 4.32 0.006P-10 671 MU J-18 12.0 -372 1.06 0.000P-9 2,529 J-7 SL 12.0 1,608 4.56 0.006P-8 528 J-19 J-5 12.0 372 1.06 0.000EX-11 1,761 J-9 MHS 8.0 -396 2.53 0.003EX-10 185 MHS MK8 8.0 -415 2.65 0.004EX-9 718 MK8 IFM 8.0 -433 2.76 0.004EX-8 284 IFM J-2 8.0 -458 2.92 0.004EX-7 1,414 J-3 J-5 8.0 -372 2.38 0.003EX-6 252 PRV-5 R-2 8.0 0 0.00 0.000EX-5 481 J-5 PRV-5 8.0 0 0.00 0.000EX-4 2,066 JVL J-9 12.0 1,303 3.70 0.004EX-3 166 J-7 JVL 12.0 1,310 3.72 0.004EX-2 831 J-2 J-7 18.0 2,159 2.72 0.001EX-1 39 R-1 J-2 18.0 2,617 3.30 0.002

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/5cqxdedp.xml

Page 9: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P1 Max SL FireCurrent Time Step: 0.000HrFlexTable: Junction Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelElevation

(ft)Demand (gpm)

Hydraulic Grade (ft)

Pressure (psi)

IFM 5,470.66 25 5,625.21 67J-2 5,475.00 0 5,625.92 65J-3 5,367.00 0 5,611.60 106J-5 5,370.00 0 5,613.61 105J-7 5,470.00 0 5,624.64 67J-9 5,430.00 0 5,620.28 82J-11 5,393.70 0 5,613.85 95J-18 5,370.00 0 5,607.90 103J-19 5,380.00 0 5,613.71 101JVL 5,467.02 7 5,624.31 68MHS 5,456.88 19 5,623.30 72MK8 5,459.71 18 5,623.66 71MU 5,377.00 120 5,607.76 100OFFICE 5,396.13 72 5,604.36 90SL 5,432.07 3,081 5,598.76 72

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/km3ymdeb.xml

Page 10: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P1 Max SL FireCurrent Time Step: 0.000HrFlexTable: Pipe Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelLength

(Scaled) (ft)Start Node Stop Node

Diameter (in)

Flow (gpm)

Velocity (ft/s)

Headloss Gradient

(ft/ft)

EX-12 118 R-3 J-7 8.0 778 4.97 0.011P-25 2,942 MU J-11 12.0 -896 2.54 0.002P-24 740 J-11 J-19 12.0 251 0.71 0.000P-23 1,963 J-9 J-11 12.0 1,148 3.26 0.003P-13 2,618 J-18 J-3 8.0 -251 1.60 0.001P-12 1,276 OFFICE MU 12.0 -1,028 2.92 0.003P-11 2,397 SL OFFICE 12.0 -957 2.71 0.002P-10 671 MU J-18 12.0 -251 0.71 0.000P-9 2,529 J-7 SL 12.0 2,124 6.03 0.010P-8 528 J-19 J-5 12.0 251 0.71 0.000EX-11 1,761 J-9 MHS 8.0 -279 1.78 0.002EX-10 185 MHS MK8 8.0 -298 1.90 0.002EX-9 718 MK8 IFM 8.0 -316 2.02 0.002EX-8 284 IFM J-2 8.0 -341 2.18 0.002EX-7 1,414 J-3 J-5 8.0 -251 1.60 0.001EX-6 252 PRV-5 R-2 8.0 0 0.00 0.000EX-5 481 J-5 PRV-5 8.0 0 0.00 0.000EX-4 2,066 JVL J-9 12.0 869 2.46 0.002EX-3 166 J-7 JVL 12.0 875 2.48 0.002EX-2 831 J-2 J-7 18.0 2,221 2.80 0.002EX-1 39 R-1 J-2 18.0 2,562 3.23 0.002

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/rj0sehez.xml

Page 11: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P1 Max Office FireCurrent Time Step: 0.000HrFlexTable: Junction Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelElevation

(ft)Demand (gpm)

Hydraulic Grade (ft)

Pressure (psi)

IFM 5,470.66 25 5,624.89 67J-2 5,475.00 0 5,625.92 65J-3 5,367.00 0 5,602.84 102J-5 5,370.00 0 5,606.18 102J-7 5,470.00 0 5,624.70 67J-9 5,430.00 0 5,617.29 81J-11 5,393.70 0 5,606.59 92J-18 5,370.00 0 5,596.67 98J-19 5,380.00 0 5,606.35 98JVL 5,467.02 7 5,624.14 68MHS 5,456.88 19 5,622.03 71MK8 5,459.71 18 5,622.57 70MU 5,377.00 120 5,596.45 95OFFICE 5,396.13 3,072 5,590.48 84SL 5,432.07 85 5,606.35 75

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/rsvu4ifw.xml

Page 12: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P1 Max Office FireCurrent Time Step: 0.000HrFlexTable: Pipe Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelLength

(Scaled) (ft)Start Node Stop Node

Diameter (in)

Flow (gpm)

Velocity (ft/s)

Headloss Gradient

(ft/ft)

EX-12 118 R-3 J-7 8.0 761 4.85 0.011P-25 2,942 MU J-11 12.0 -1,181 3.35 0.003P-24 740 J-11 J-19 12.0 331 0.94 0.000P-23 1,963 J-9 J-11 12.0 1,512 4.29 0.005P-13 2,618 J-18 J-3 8.0 -331 2.11 0.002P-12 1,276 OFFICE MU 12.0 -1,392 3.95 0.005P-11 2,397 SL OFFICE 12.0 1,679 4.76 0.007P-10 671 MU J-18 12.0 -331 0.94 0.000P-9 2,529 J-7 SL 12.0 1,764 5.01 0.007P-8 528 J-19 J-5 12.0 331 0.94 0.000EX-11 1,761 J-9 MHS 8.0 -356 2.27 0.003EX-10 185 MHS MK8 8.0 -374 2.39 0.003EX-9 718 MK8 IFM 8.0 -392 2.50 0.003EX-8 284 IFM J-2 8.0 -417 2.66 0.004EX-7 1,414 J-3 J-5 8.0 -331 2.11 0.002EX-6 252 PRV-5 R-2 8.0 0 0.00 0.000EX-5 481 J-5 PRV-5 8.0 0 0.00 0.000EX-4 2,066 JVL J-9 12.0 1,156 3.28 0.003EX-3 166 J-7 JVL 12.0 1,163 3.30 0.003EX-2 831 J-2 J-7 18.0 2,167 2.73 0.001EX-1 39 R-1 J-2 18.0 2,584 3.26 0.002

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/hxvmdlzt.xml

Page 13: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P2 MaxCurrent Time Step: 0.000HrFlexTable: Junction Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelElevation

(ft)Demand (gpm)

Hydraulic Grade (ft)

Pressure (psi)

IFM 5,470.66 25 5,625.93 67J-2 5,475.00 0 5,626.00 65J-3 5,367.00 0 5,625.43 112J-5 5,370.00 0 5,625.51 111J-7 5,470.00 0 5,625.96 67J-9 5,430.00 0 5,625.76 85J-11 5,393.70 0 5,625.52 100J-18 5,370.00 0 5,625.29 110J-19 5,380.00 0 5,625.51 106JVL 5,467.02 7 5,625.95 69MHS 5,456.88 19 5,625.82 73MK8 5,459.71 18 5,625.84 72MU 5,377.00 239 5,625.29 107OFFICE 5,396.13 72 5,625.30 99SL 5,432.07 152 5,625.41 84

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/xbnmn23l.xml

Page 14: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P2 MaxCurrent Time Step: 0.000HrFlexTable: Pipe Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelLength

(Scaled) (ft)Start Node Stop Node

Diameter (in)

Flow (gpm)

Velocity (ft/s)

Headloss Gradient

(ft/ft)

EX-12 118 R-3 J-7 8.0 114 0.73 0.000P-25 2,942 MU J-11 12.0 -153 0.43 0.000P-24 740 J-11 J-19 12.0 43 0.12 0.000P-23 1,963 J-9 J-11 12.0 196 0.56 0.000P-13 2,618 J-18 J-3 8.0 -43 0.27 0.000P-12 1,276 OFFICE MU 12.0 43 0.12 0.000P-11 2,397 SL OFFICE 12.0 115 0.33 0.000P-10 671 MU J-18 12.0 -43 0.12 0.000P-9 2,529 J-7 SL 12.0 266 0.76 0.000P-8 528 J-19 J-5 12.0 43 0.12 0.000EX-11 1,761 J-9 MHS 8.0 -33 0.21 0.000EX-10 185 MHS MK8 8.0 -52 0.33 0.000EX-9 718 MK8 IFM 8.0 -70 0.45 0.000EX-8 284 IFM J-2 8.0 -95 0.61 0.000EX-7 1,414 J-3 J-5 8.0 -43 0.27 0.000EX-6 252 PRV-5 R-2 8.0 0 0.00 0.000EX-5 481 J-5 PRV-5 8.0 0 0.00 0.000EX-4 2,066 JVL J-9 12.0 163 0.46 0.000EX-3 166 J-7 JVL 12.0 170 0.48 0.000EX-2 831 J-2 J-7 18.0 322 0.41 0.000EX-1 39 R-1 J-2 18.0 417 0.53 0.000

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/hq41hfy2.xml

Page 15: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P2 Max MU FireCurrent Time Step: 0.000HrFlexTable: Junction Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelElevation

(ft)Demand (gpm)

Hydraulic Grade (ft)

Pressure (psi)

IFM 5,470.66 25 5,624.61 67J-2 5,475.00 0 5,625.91 65J-3 5,367.00 0 5,595.56 99J-5 5,370.00 0 5,599.99 100J-7 5,470.00 0 5,624.59 67J-9 5,430.00 0 5,614.72 80J-11 5,393.70 0 5,600.54 89J-18 5,370.00 0 5,587.37 94J-19 5,380.00 0 5,600.22 95JVL 5,467.02 7 5,623.85 68MHS 5,456.88 19 5,620.94 71MK8 5,459.71 18 5,621.65 70MU 5,377.00 3,239 5,587.08 91OFFICE 5,396.13 72 5,593.75 86SL 5,432.07 152 5,607.43 76

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/eqjjjgt2.xml

Page 16: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P2 Max MU FireCurrent Time Step: 0.000HrFlexTable: Pipe Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelLength

(Scaled) (ft)Start Node Stop Node

Diameter (in)

Flow (gpm)

Velocity (ft/s)

Headloss Gradient

(ft/ft)

EX-12 118 R-3 J-7 8.0 795 5.07 0.012P-25 2,942 MU J-11 12.0 -1,375 3.90 0.005P-24 740 J-11 J-19 12.0 386 1.09 0.000P-23 1,963 J-9 J-11 12.0 1,761 5.00 0.007P-13 2,618 J-18 J-3 8.0 -386 2.46 0.003P-12 1,276 OFFICE MU 12.0 1,478 4.19 0.005P-11 2,397 SL OFFICE 12.0 1,550 4.40 0.006P-10 671 MU J-18 12.0 -386 1.09 0.000P-9 2,529 J-7 SL 12.0 1,702 4.83 0.007P-8 528 J-19 J-5 12.0 386 1.09 0.000EX-11 1,761 J-9 MHS 8.0 -412 2.63 0.004EX-10 185 MHS MK8 8.0 -430 2.75 0.004EX-9 718 MK8 IFM 8.0 -448 2.86 0.004EX-8 284 IFM J-2 8.0 -473 3.02 0.005EX-7 1,414 J-3 J-5 8.0 -386 2.46 0.003EX-6 252 PRV-5 R-2 8.0 0 0.00 0.000EX-5 481 J-5 PRV-5 8.0 0 0.00 0.000EX-4 2,066 JVL J-9 12.0 1,349 3.83 0.004EX-3 166 J-7 JVL 12.0 1,356 3.85 0.004EX-2 831 J-2 J-7 18.0 2,263 2.85 0.002EX-1 39 R-1 J-2 18.0 2,736 3.45 0.002

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/lgk25vwt.xml

Page 17: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P2 Max SL FireCurrent Time Step: 0.000HrFlexTable: Junction Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelElevation

(ft)Demand (gpm)

Hydraulic Grade (ft)

Pressure (psi)

IFM 5,470.66 25 5,625.13 67J-2 5,475.00 0 5,625.92 65J-3 5,367.00 0 5,609.70 105J-5 5,370.00 0 5,611.97 105J-7 5,470.00 0 5,624.52 67J-9 5,430.00 0 5,619.56 82J-11 5,393.70 0 5,612.26 95J-18 5,370.00 0 5,605.48 102J-19 5,380.00 0 5,612.09 100JVL 5,467.02 7 5,624.15 68MHS 5,456.88 19 5,622.99 72MK8 5,459.71 18 5,623.40 71MU 5,377.00 239 5,605.33 99OFFICE 5,396.13 72 5,602.15 89SL 5,432.07 3,118 5,596.95 71

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/2symsumg.xml

Page 18: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P2 Max SL FireCurrent Time Step: 0.000HrFlexTable: Pipe Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelLength

(Scaled) (ft)Start Node Stop Node

Diameter (in)

Flow (gpm)

Velocity (ft/s)

Headloss Gradient

(ft/ft)

EX-12 118 R-3 J-7 8.0 814 5.19 0.012P-25 2,942 MU J-11 12.0 -961 2.73 0.002P-24 740 J-11 J-19 12.0 269 0.76 0.000P-23 1,963 J-9 J-11 12.0 1,230 3.49 0.004P-13 2,618 J-18 J-3 8.0 -269 1.72 0.002P-12 1,276 OFFICE MU 12.0 -991 2.81 0.002P-11 2,397 SL OFFICE 12.0 -919 2.61 0.002P-10 671 MU J-18 12.0 -269 0.76 0.000P-9 2,529 J-7 SL 12.0 2,198 6.24 0.011P-8 528 J-19 J-5 12.0 269 0.76 0.000EX-11 1,761 J-9 MHS 8.0 -299 1.91 0.002EX-10 185 MHS MK8 8.0 -318 2.03 0.002EX-9 718 MK8 IFM 8.0 -336 2.14 0.002EX-8 284 IFM J-2 8.0 -361 2.30 0.003EX-7 1,414 J-3 J-5 8.0 -269 1.72 0.002EX-6 252 PRV-5 R-2 8.0 0 0.00 0.000EX-5 481 J-5 PRV-5 8.0 0 0.00 0.000EX-4 2,066 JVL J-9 12.0 931 2.64 0.002EX-3 166 J-7 JVL 12.0 938 2.66 0.002EX-2 831 J-2 J-7 18.0 2,322 2.93 0.002EX-1 39 R-1 J-2 18.0 2,683 3.38 0.002

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/iclnuv3k.xml

Page 19: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P2 Max Office FireCurrent Time Step: 0.000HrFlexTable: Junction Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelElevation

(ft)Demand (gpm)

Hydraulic Grade (ft)

Pressure (psi)

IFM 5,470.66 25 5,624.79 67J-2 5,475.00 0 5,625.91 65J-3 5,367.00 0 5,600.42 101J-5 5,370.00 0 5,604.11 101J-7 5,470.00 0 5,624.56 67J-9 5,430.00 0 5,616.38 81J-11 5,393.70 0 5,604.56 91J-18 5,370.00 0 5,593.60 97J-19 5,380.00 0 5,604.30 97JVL 5,467.02 7 5,623.94 68MHS 5,456.88 19 5,621.64 71MK8 5,459.71 18 5,622.24 70MU 5,377.00 239 5,593.36 94OFFICE 5,396.13 3,072 5,587.68 83SL 5,432.07 152 5,604.18 74

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/twfrzeij.xml

Page 20: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P2 Max Office FireCurrent Time Step: 0.000HrFlexTable: Pipe Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelLength

(Scaled) (ft)Start Node Stop Node

Diameter (in)

Flow (gpm)

Velocity (ft/s)

Headloss Gradient

(ft/ft)

EX-12 118 R-3 J-7 8.0 804 5.13 0.012P-25 2,942 MU J-11 12.0 -1,246 3.53 0.004P-24 740 J-11 J-19 12.0 349 0.99 0.000P-23 1,963 J-9 J-11 12.0 1,595 4.53 0.006P-13 2,618 J-18 J-3 8.0 -349 2.23 0.003P-12 1,276 OFFICE MU 12.0 -1,356 3.85 0.004P-11 2,397 SL OFFICE 12.0 1,715 4.87 0.007P-10 671 MU J-18 12.0 -349 0.99 0.000P-9 2,529 J-7 SL 12.0 1,867 5.30 0.008P-8 528 J-19 J-5 12.0 349 0.99 0.000EX-11 1,761 J-9 MHS 8.0 -376 2.40 0.003EX-10 185 MHS MK8 8.0 -395 2.52 0.003EX-9 718 MK8 IFM 8.0 -413 2.63 0.004EX-8 284 IFM J-2 8.0 -438 2.79 0.004EX-7 1,414 J-3 J-5 8.0 -349 2.23 0.003EX-6 252 PRV-5 R-2 8.0 0 0.00 0.000EX-5 481 J-5 PRV-5 8.0 0 0.00 0.000EX-4 2,066 JVL J-9 12.0 1,219 3.46 0.004EX-3 166 J-7 JVL 12.0 1,226 3.48 0.004EX-2 831 J-2 J-7 18.0 2,289 2.89 0.002EX-1 39 R-1 J-2 18.0 2,727 3.44 0.002

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/hpflz2xg.xml

Page 21: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P3 MaxCurrent Time Step: 0.000HrFlexTable: Junction Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelElevation

(ft)Demand (gpm)

Hydraulic Grade (ft)

Pressure (psi)

IFM 5,470.66 25 5,625.90 67J-2 5,475.00 0 5,626.00 65J-3 5,367.00 0 5,624.92 112J-5 5,370.00 0 5,625.06 110J-7 5,470.00 0 5,625.93 67J-9 5,430.00 0 5,625.56 85J-11 5,393.70 0 5,625.08 100J-18 5,370.00 0 5,624.64 110J-19 5,380.00 0 5,625.07 106JVL 5,467.02 7 5,625.90 69MHS 5,456.88 19 5,625.71 73MK8 5,459.71 18 5,625.74 72MU 5,377.00 359 5,624.63 107OFFICE 5,396.13 72 5,624.66 99SL 5,432.07 237 5,624.83 83

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/duu0popg.xml

Page 22: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P3 MaxCurrent Time Step: 0.000HrFlexTable: Pipe Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelLength

(Scaled) (ft)Start Node Stop Node

Diameter (in)

Flow (gpm)

Velocity (ft/s)

Headloss Gradient

(ft/ft)

EX-12 118 R-3 J-7 8.0 161 1.03 0.001P-25 2,942 MU J-11 12.0 -221 0.63 0.000P-24 740 J-11 J-19 12.0 62 0.18 0.000P-23 1,963 J-9 J-11 12.0 282 0.80 0.000P-13 2,618 J-18 J-3 8.0 -62 0.39 0.000P-12 1,276 OFFICE MU 12.0 76 0.22 0.000P-11 2,397 SL OFFICE 12.0 148 0.42 0.000P-10 671 MU J-18 12.0 -62 0.18 0.000P-9 2,529 J-7 SL 12.0 385 1.09 0.000P-8 528 J-19 J-5 12.0 62 0.18 0.000EX-11 1,761 J-9 MHS 8.0 -55 0.35 0.000EX-10 185 MHS MK8 8.0 -74 0.47 0.000EX-9 718 MK8 IFM 8.0 -92 0.59 0.000EX-8 284 IFM J-2 8.0 -117 0.75 0.000EX-7 1,414 J-3 J-5 8.0 -62 0.39 0.000EX-6 252 PRV-5 R-2 8.0 0 0.00 0.000EX-5 481 J-5 PRV-5 8.0 0 0.00 0.000EX-4 2,066 JVL J-9 12.0 227 0.64 0.000EX-3 166 J-7 JVL 12.0 234 0.66 0.000EX-2 831 J-2 J-7 18.0 457 0.58 0.000EX-1 39 R-1 J-2 18.0 574 0.72 0.000

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/fvwk4h1e.xml

Page 23: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P3 Max MU FireCurrent Time Step: 0.000HrFlexTable: Junction Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelElevation

(ft)Demand (gpm)

Hydraulic Grade (ft)

Pressure (psi)

IFM 5,470.66 25 5,624.50 67J-2 5,475.00 0 5,625.90 65J-3 5,367.00 0 5,592.86 98J-5 5,370.00 0 5,597.67 99J-7 5,470.00 0 5,624.42 67J-9 5,430.00 0 5,613.71 79J-11 5,393.70 0 5,598.27 89J-18 5,370.00 0 5,583.95 93J-19 5,380.00 0 5,597.92 94JVL 5,467.02 7 5,623.62 68MHS 5,456.88 19 5,620.50 71MK8 5,459.71 18 5,621.28 70MU 5,377.00 3,359 5,583.63 89OFFICE 5,396.13 72 5,590.62 84SL 5,432.07 237 5,604.91 75

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/ltma02mx.xml

Page 24: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P3 Max MU FireCurrent Time Step: 0.000HrFlexTable: Pipe Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelLength

(Scaled) (ft)Start Node Stop Node

Diameter (in)

Flow (gpm)

Velocity (ft/s)

Headloss Gradient

(ft/ft)

EX-12 118 R-3 J-7 8.0 843 5.38 0.013P-25 2,942 MU J-11 12.0 -1,440 4.08 0.005P-24 740 J-11 J-19 12.0 404 1.15 0.000P-23 1,963 J-9 J-11 12.0 1,843 5.23 0.008P-13 2,618 J-18 J-3 8.0 -404 2.58 0.003P-12 1,276 OFFICE MU 12.0 1,516 4.30 0.005P-11 2,397 SL OFFICE 12.0 1,587 4.50 0.006P-10 671 MU J-18 12.0 -404 1.15 0.000P-9 2,529 J-7 SL 12.0 1,824 5.17 0.008P-8 528 J-19 J-5 12.0 404 1.15 0.000EX-11 1,761 J-9 MHS 8.0 -432 2.76 0.004EX-10 185 MHS MK8 8.0 -451 2.88 0.004EX-9 718 MK8 IFM 8.0 -469 2.99 0.004EX-8 284 IFM J-2 8.0 -494 3.15 0.005EX-7 1,414 J-3 J-5 8.0 -404 2.58 0.003EX-6 252 PRV-5 R-2 8.0 0 0.00 0.000EX-5 481 J-5 PRV-5 8.0 0 0.00 0.000EX-4 2,066 JVL J-9 12.0 1,411 4.00 0.005EX-3 166 J-7 JVL 12.0 1,418 4.02 0.005EX-2 831 J-2 J-7 18.0 2,399 3.02 0.002EX-1 39 R-1 J-2 18.0 2,893 3.65 0.003

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/tb1x2iys.xml

Page 25: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P3 Max SL FireCurrent Time Step: 0.000HrFlexTable: Junction Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelElevation

(ft)Demand (gpm)

Hydraulic Grade (ft)

Pressure (psi)

IFM 5,470.66 25 5,625.03 67J-2 5,475.00 0 5,625.91 65J-3 5,367.00 0 5,607.46 104J-5 5,370.00 0 5,610.06 104J-7 5,470.00 0 5,624.38 67J-9 5,430.00 0 5,618.71 82J-11 5,393.70 0 5,610.38 94J-18 5,370.00 0 5,602.66 101J-19 5,380.00 0 5,610.19 100JVL 5,467.02 7 5,623.95 68MHS 5,456.88 19 5,622.62 72MK8 5,459.71 18 5,623.08 71MU 5,377.00 359 5,602.48 98OFFICE 5,396.13 72 5,599.48 88SL 5,432.07 3,183 5,594.57 70

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/ltorj5es.xml

Page 26: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P3 Max SL FireCurrent Time Step: 0.000HrFlexTable: Pipe Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelLength

(Scaled) (ft)Start Node Stop Node

Diameter (in)

Flow (gpm)

Velocity (ft/s)

Headloss Gradient

(ft/ft)

EX-12 118 R-3 J-7 8.0 856 5.46 0.014P-25 2,942 MU J-11 12.0 -1,032 2.93 0.003P-24 740 J-11 J-19 12.0 289 0.82 0.000P-23 1,963 J-9 J-11 12.0 1,321 3.75 0.004P-13 2,618 J-18 J-3 8.0 -289 1.85 0.002P-12 1,276 OFFICE MU 12.0 -962 2.73 0.002P-11 2,397 SL OFFICE 12.0 -891 2.53 0.002P-10 671 MU J-18 12.0 -289 0.82 0.000P-9 2,529 J-7 SL 12.0 2,293 6.50 0.012P-8 528 J-19 J-5 12.0 289 0.82 0.000EX-11 1,761 J-9 MHS 8.0 -321 2.05 0.002EX-10 185 MHS MK8 8.0 -339 2.17 0.002EX-9 718 MK8 IFM 8.0 -357 2.28 0.003EX-8 284 IFM J-2 8.0 -382 2.44 0.003EX-7 1,414 J-3 J-5 8.0 -289 1.85 0.002EX-6 252 PRV-5 R-2 8.0 0 0.00 0.000EX-5 481 J-5 PRV-5 8.0 0 0.00 0.000EX-4 2,066 JVL J-9 12.0 1,000 2.84 0.003EX-3 166 J-7 JVL 12.0 1,007 2.86 0.003EX-2 831 J-2 J-7 18.0 2,443 3.08 0.002EX-1 39 R-1 J-2 18.0 2,826 3.56 0.002

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/x1lz2t3p.xml

Page 27: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P3 Max Office FireCurrent Time Step: 0.000HrFlexTable: Junction Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelElevation

(ft)Demand (gpm)

Hydraulic Grade (ft)

Pressure (psi)

IFM 5,470.66 25 5,624.67 67J-2 5,475.00 0 5,625.90 65J-3 5,367.00 0 5,597.76 100J-5 5,370.00 0 5,601.83 100J-7 5,470.00 0 5,624.40 67J-9 5,430.00 0 5,615.38 80J-11 5,393.70 0 5,602.33 90J-18 5,370.00 0 5,590.23 95J-19 5,380.00 0 5,602.04 96JVL 5,467.02 7 5,623.72 68MHS 5,456.88 19 5,621.21 71MK8 5,459.71 18 5,621.88 70MU 5,377.00 359 5,589.96 92OFFICE 5,396.13 3,072 5,584.52 82SL 5,432.07 237 5,601.59 73

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/hrqcyd5n.xml

Page 28: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P3 Max Office FireCurrent Time Step: 0.000HrFlexTable: Pipe Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelLength

(Scaled) (ft)Start Node Stop Node

Diameter (in)

Flow (gpm)

Velocity (ft/s)

Headloss Gradient

(ft/ft)

EX-12 118 R-3 J-7 8.0 851 5.43 0.014P-25 2,942 MU J-11 12.0 -1,315 3.73 0.004P-24 740 J-11 J-19 12.0 369 1.05 0.000P-23 1,963 J-9 J-11 12.0 1,683 4.77 0.007P-13 2,618 J-18 J-3 8.0 -369 2.35 0.003P-12 1,276 OFFICE MU 12.0 -1,324 3.76 0.004P-11 2,397 SL OFFICE 12.0 1,747 4.96 0.007P-10 671 MU J-18 12.0 -369 1.05 0.000P-9 2,529 J-7 SL 12.0 1,984 5.63 0.009P-8 528 J-19 J-5 12.0 369 1.05 0.000EX-11 1,761 J-9 MHS 8.0 -398 2.54 0.003EX-10 185 MHS MK8 8.0 -416 2.66 0.004EX-9 718 MK8 IFM 8.0 -434 2.77 0.004EX-8 284 IFM J-2 8.0 -459 2.93 0.004EX-7 1,414 J-3 J-5 8.0 -369 2.35 0.003EX-6 252 PRV-5 R-2 8.0 0 0.00 0.000EX-5 481 J-5 PRV-5 8.0 0 0.00 0.000EX-4 2,066 JVL J-9 12.0 1,286 3.65 0.004EX-3 166 J-7 JVL 12.0 1,292 3.67 0.004EX-2 831 J-2 J-7 18.0 2,425 3.06 0.002EX-1 39 R-1 J-2 18.0 2,884 3.64 0.003

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/esjrai0s.xml

Page 29: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P4 MaxCurrent Time Step: 0.000HrFlexTable: Junction Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelElevation

(ft)Demand (gpm)

Hydraulic Grade (ft)

Pressure (psi)

IFM 5,470.66 25 5,625.86 67J-2 5,475.00 0 5,625.99 65J-3 5,367.00 0 5,624.24 111J-5 5,370.00 0 5,624.49 110J-7 5,470.00 0 5,625.88 67J-9 5,430.00 0 5,625.30 84J-11 5,393.70 0 5,624.52 100J-18 5,370.00 0 5,623.79 110J-19 5,380.00 0 5,624.50 106JVL 5,467.02 7 5,625.84 69MHS 5,456.88 19 5,625.58 73MK8 5,459.71 18 5,625.62 72MU 5,377.00 479 5,623.77 107OFFICE 5,396.13 72 5,623.83 99SL 5,432.07 322 5,624.08 83

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/a3uqqpy3.xml

Page 30: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P4 MaxCurrent Time Step: 0.000HrFlexTable: Pipe Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelLength

(Scaled) (ft)Start Node Stop Node

Diameter (in)

Flow (gpm)

Velocity (ft/s)

Headloss Gradient

(ft/ft)

EX-12 118 R-3 J-7 8.0 209 1.33 0.001P-25 2,942 MU J-11 12.0 -288 0.82 0.000P-24 740 J-11 J-19 12.0 81 0.23 0.000P-23 1,963 J-9 J-11 12.0 369 1.05 0.000P-13 2,618 J-18 J-3 8.0 -81 0.52 0.000P-12 1,276 OFFICE MU 12.0 110 0.31 0.000P-11 2,397 SL OFFICE 12.0 181 0.51 0.000P-10 671 MU J-18 12.0 -81 0.23 0.000P-9 2,529 J-7 SL 12.0 503 1.43 0.001P-8 528 J-19 J-5 12.0 81 0.23 0.000EX-11 1,761 J-9 MHS 8.0 -77 0.49 0.000EX-10 185 MHS MK8 8.0 -96 0.61 0.000EX-9 718 MK8 IFM 8.0 -114 0.73 0.000EX-8 284 IFM J-2 8.0 -139 0.89 0.000EX-7 1,414 J-3 J-5 8.0 -81 0.52 0.000EX-6 252 PRV-5 R-2 8.0 0 0.00 0.000EX-5 481 J-5 PRV-5 8.0 0 0.00 0.000EX-4 2,066 JVL J-9 12.0 292 0.83 0.000EX-3 166 J-7 JVL 12.0 298 0.85 0.000EX-2 831 J-2 J-7 18.0 593 0.75 0.000EX-1 39 R-1 J-2 18.0 732 0.92 0.000

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/gsokihzm.xml

Page 31: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P4 Max SL FireCurrent Time Step: 0.000HrFlexTable: Junction Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelElevation

(ft)Demand (gpm)

Hydraulic Grade (ft)

Pressure (psi)

IFM 5,470.66 25 5,624.90 67J-2 5,475.00 0 5,625.90 65J-3 5,367.00 0 5,604.58 103J-5 5,370.00 0 5,607.59 103J-7 5,470.00 0 5,624.17 67J-9 5,430.00 0 5,617.61 81J-11 5,393.70 0 5,607.96 93J-18 5,370.00 0 5,599.01 99J-19 5,380.00 0 5,607.75 99JVL 5,467.02 7 5,623.68 68MHS 5,456.88 19 5,622.15 72MK8 5,459.71 18 5,622.68 71MU 5,377.00 479 5,598.81 96OFFICE 5,396.13 72 5,595.87 86SL 5,432.07 3,306 5,591.07 69

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/ebsgau2d.xml

Page 32: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P4 Max SL FireCurrent Time Step: 0.000HrFlexTable: Pipe Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelLength

(Scaled) (ft)Start Node Stop Node

Diameter (in)

Flow (gpm)

Velocity (ft/s)

Headloss Gradient

(ft/ft)

EX-12 118 R-3 J-7 8.0 912 5.82 0.015P-25 2,942 MU J-11 12.0 -1,117 3.17 0.003P-24 740 J-11 J-19 12.0 313 0.89 0.000P-23 1,963 J-9 J-11 12.0 1,430 4.06 0.005P-13 2,618 J-18 J-3 8.0 -313 2.00 0.002P-12 1,276 OFFICE MU 12.0 -952 2.70 0.002P-11 2,397 SL OFFICE 12.0 -880 2.50 0.002P-10 671 MU J-18 12.0 -313 0.89 0.000P-9 2,529 J-7 SL 12.0 2,426 6.88 0.013P-8 528 J-19 J-5 12.0 313 0.89 0.000EX-11 1,761 J-9 MHS 8.0 -347 2.22 0.003EX-10 185 MHS MK8 8.0 -366 2.34 0.003EX-9 718 MK8 IFM 8.0 -384 2.45 0.003EX-8 284 IFM J-2 8.0 -409 2.61 0.003EX-7 1,414 J-3 J-5 8.0 -313 2.00 0.002EX-6 252 PRV-5 R-2 8.0 0 0.00 0.000EX-5 481 J-5 PRV-5 8.0 0 0.00 0.000EX-4 2,066 JVL J-9 12.0 1,083 3.07 0.003EX-3 166 J-7 JVL 12.0 1,089 3.09 0.003EX-2 831 J-2 J-7 18.0 2,603 3.28 0.002EX-1 39 R-1 J-2 18.0 3,013 3.80 0.003

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/z4b2qmxk.xml

Page 33: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P4 Max MU FireCurrent Time Step: 0.000HrFlexTable: Junction Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelElevation

(ft)Demand (gpm)

Hydraulic Grade (ft)

Pressure (psi)

IFM 5,470.66 25 5,624.29 66J-2 5,475.00 0 5,625.89 65J-3 5,367.00 0 5,587.78 96J-5 5,370.00 0 5,593.33 97J-7 5,470.00 0 5,624.15 67J-9 5,430.00 0 5,611.82 79J-11 5,393.70 0 5,594.02 87J-18 5,370.00 0 5,577.51 90J-19 5,380.00 0 5,593.62 92JVL 5,467.02 7 5,623.23 68MHS 5,456.88 19 5,619.70 70MK8 5,459.71 18 5,620.59 70MU 5,377.00 3,602 5,577.14 87OFFICE 5,396.13 72 5,584.97 82SL 5,432.07 322 5,600.90 73

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/etz3d5y2.xml

Page 34: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P4 Max MU FireCurrent Time Step: 0.000HrFlexTable: Pipe Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelLength

(Scaled) (ft)Start Node Stop Node

Diameter (in)

Flow (gpm)

Velocity (ft/s)

Headloss Gradient

(ft/ft)

EX-12 118 R-3 J-7 8.0 919 5.86 0.016P-25 2,942 MU J-11 12.0 -1,554 4.41 0.006P-24 740 J-11 J-19 12.0 436 1.24 0.001P-23 1,963 J-9 J-11 12.0 1,990 5.65 0.009P-13 2,618 J-18 J-3 8.0 -436 2.78 0.004P-12 1,276 OFFICE MU 12.0 1,612 4.57 0.006P-11 2,397 SL OFFICE 12.0 1,683 4.77 0.007P-10 671 MU J-18 12.0 -436 1.24 0.001P-9 2,529 J-7 SL 12.0 2,005 5.69 0.009P-8 528 J-19 J-5 12.0 436 1.24 0.001EX-11 1,761 J-9 MHS 8.0 -468 2.99 0.004EX-10 185 MHS MK8 8.0 -487 3.11 0.005EX-9 718 MK8 IFM 8.0 -505 3.22 0.005EX-8 284 IFM J-2 8.0 -530 3.38 0.006EX-7 1,414 J-3 J-5 8.0 -436 2.78 0.004EX-6 252 PRV-5 R-2 8.0 0 0.00 0.000EX-5 481 J-5 PRV-5 8.0 0 0.00 0.000EX-4 2,066 JVL J-9 12.0 1,522 4.32 0.006EX-3 166 J-7 JVL 12.0 1,529 4.34 0.006EX-2 831 J-2 J-7 18.0 2,615 3.30 0.002EX-1 39 R-1 J-2 18.0 3,145 3.97 0.003

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/03sfffj5.xml

Page 35: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P4 Max Office FireCurrent Time Step: 0.000HrFlexTable: Junction Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelElevation

(ft)Demand (gpm)

Hydraulic Grade (ft)

Pressure (psi)

IFM 5,470.66 25 5,624.55 67J-2 5,475.00 0 5,625.89 65J-3 5,367.00 0 5,594.97 99J-5 5,370.00 0 5,599.44 99J-7 5,470.00 0 5,624.23 67J-9 5,430.00 0 5,614.33 80J-11 5,393.70 0 5,600.00 89J-18 5,370.00 0 5,586.70 94J-19 5,380.00 0 5,599.67 95JVL 5,467.02 7 5,623.48 68MHS 5,456.88 19 5,620.76 71MK8 5,459.71 18 5,621.49 70MU 5,377.00 479 5,586.41 91OFFICE 5,396.13 3,072 5,581.21 80SL 5,432.07 322 5,598.87 72

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/0tgqpaoc.xml

Page 36: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P4 Max Office FireCurrent Time Step: 0.000HrFlexTable: Pipe Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelLength

(Scaled) (ft)Start Node Stop Node

Diameter (in)

Flow (gpm)

Velocity (ft/s)

Headloss Gradient

(ft/ft)

EX-12 118 R-3 J-7 8.0 899 5.74 0.015P-25 2,942 MU J-11 12.0 -1,383 3.92 0.005P-24 740 J-11 J-19 12.0 388 1.10 0.000P-23 1,963 J-9 J-11 12.0 1,771 5.02 0.007P-13 2,618 J-18 J-3 8.0 -388 2.48 0.003P-12 1,276 OFFICE MU 12.0 -1,292 3.67 0.004P-11 2,397 SL OFFICE 12.0 1,779 5.05 0.007P-10 671 MU J-18 12.0 -388 1.10 0.000P-9 2,529 J-7 SL 12.0 2,101 5.96 0.010P-8 528 J-19 J-5 12.0 388 1.10 0.000EX-11 1,761 J-9 MHS 8.0 -419 2.68 0.004EX-10 185 MHS MK8 8.0 -438 2.80 0.004EX-9 718 MK8 IFM 8.0 -456 2.91 0.004EX-8 284 IFM J-2 8.0 -481 3.07 0.005EX-7 1,414 J-3 J-5 8.0 -388 2.48 0.003EX-6 252 PRV-5 R-2 8.0 0 0.00 0.000EX-5 481 J-5 PRV-5 8.0 0 0.00 0.000EX-4 2,066 JVL J-9 12.0 1,352 3.83 0.004EX-3 166 J-7 JVL 12.0 1,358 3.85 0.004EX-2 831 J-2 J-7 18.0 2,561 3.23 0.002EX-1 39 R-1 J-2 18.0 3,042 3.83 0.003

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/uid4iawb.xml

Page 37: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P4 Peak Hour MU FireCurrent Time Step: 0.000HrFlexTable: Junction Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelElevation

(ft)Demand (gpm)

Hydraulic Grade (ft)

Pressure (psi)

IFM 5,470.66 27 5,624.26 66J-2 5,475.00 0 5,625.89 65J-3 5,367.00 0 5,587.57 95J-5 5,370.00 0 5,593.15 97J-7 5,470.00 0 5,624.19 67J-9 5,430.00 0 5,611.76 79J-11 5,393.70 0 5,593.85 87J-18 5,370.00 0 5,577.23 90J-19 5,380.00 0 5,593.44 92JVL 5,467.02 7 5,623.26 68MHS 5,456.88 20 5,619.64 70MK8 5,459.71 19 5,620.53 70MU 5,377.00 3,684 5,576.86 86OFFICE 5,396.13 37 5,585.38 82SL 5,432.07 230 5,602.04 74

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/xp0wlgnh.xml

Page 38: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P4 Peak Hour MU FireCurrent Time Step: 0.000HrFlexTable: Pipe Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelLength

(Scaled) (ft)Start Node Stop Node

Diameter (in)

Flow (gpm)

Velocity (ft/s)

Headloss Gradient

(ft/ft)

EX-12 118 R-3 J-7 8.0 907 5.79 0.015P-25 2,942 MU J-11 12.0 -1,560 4.42 0.006P-24 740 J-11 J-19 12.0 437 1.24 0.001P-23 1,963 J-9 J-11 12.0 1,997 5.67 0.009P-13 2,618 J-18 J-3 8.0 -437 2.79 0.004P-12 1,276 OFFICE MU 12.0 1,687 4.79 0.007P-11 2,397 SL OFFICE 12.0 1,724 4.89 0.007P-10 671 MU J-18 12.0 -437 1.24 0.001P-9 2,529 J-7 SL 12.0 1,954 5.54 0.009P-8 528 J-19 J-5 12.0 437 1.24 0.001EX-11 1,761 J-9 MHS 8.0 -468 2.99 0.004EX-10 185 MHS MK8 8.0 -488 3.11 0.005EX-9 718 MK8 IFM 8.0 -507 3.24 0.005EX-8 284 IFM J-2 8.0 -534 3.41 0.006EX-7 1,414 J-3 J-5 8.0 -437 2.79 0.004EX-6 252 PRV-5 R-2 8.0 0 0.00 0.000EX-5 481 J-5 PRV-5 8.0 0 0.00 0.000EX-4 2,066 JVL J-9 12.0 1,529 4.34 0.006EX-3 166 J-7 JVL 12.0 1,536 4.36 0.006EX-2 831 J-2 J-7 18.0 2,583 3.26 0.002EX-1 39 R-1 J-2 18.0 3,117 3.93 0.003

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/5c34jz5j.xml

Page 39: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P4 Peak Hour SL FireCurrent Time Step: 0.000HrFlexTable: Junction Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelElevation

(ft)Demand (gpm)

Hydraulic Grade (ft)

Pressure (psi)

IFM 5,470.66 27 5,624.75 67J-2 5,475.00 0 5,625.88 65J-3 5,367.00 0 5,601.70 102J-5 5,370.00 0 5,605.10 102J-7 5,470.00 0 5,623.89 67J-9 5,430.00 0 5,616.46 81J-11 5,393.70 0 5,605.53 92J-18 5,370.00 0 5,595.38 98J-19 5,380.00 0 5,605.28 97JVL 5,467.02 7 5,623.33 68MHS 5,456.88 20 5,621.62 71MK8 5,459.71 19 5,622.22 70MU 5,377.00 473 5,595.16 94OFFICE 5,396.13 37 5,591.58 85SL 5,432.07 3,657 5,585.27 66

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/wx1wkhj2.xml

Page 40: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P4 Peak Hour SL FireCurrent Time Step: 0.000HrFlexTable: Pipe Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelLength

(Scaled) (ft)Start Node Stop Node

Diameter (in)

Flow (gpm)

Velocity (ft/s)

Headloss Gradient

(ft/ft)

EX-12 118 R-3 J-7 8.0 986 6.30 0.018P-25 2,942 MU J-11 12.0 -1,195 3.39 0.004P-24 740 J-11 J-19 12.0 335 0.95 0.000P-23 1,963 J-9 J-11 12.0 1,530 4.34 0.006P-13 2,618 J-18 J-3 8.0 -335 2.14 0.002P-12 1,276 OFFICE MU 12.0 -1,057 3.00 0.003P-11 2,397 SL OFFICE 12.0 -1,020 2.89 0.003P-10 671 MU J-18 12.0 -335 0.95 0.000P-9 2,529 J-7 SL 12.0 2,637 7.48 0.015P-8 528 J-19 J-5 12.0 335 0.95 0.000EX-11 1,761 J-9 MHS 8.0 -372 2.38 0.003EX-10 185 MHS MK8 8.0 -392 2.50 0.003EX-9 718 MK8 IFM 8.0 -412 2.63 0.004EX-8 284 IFM J-2 8.0 -438 2.80 0.004EX-7 1,414 J-3 J-5 8.0 -335 2.14 0.002EX-6 252 PRV-5 R-2 8.0 0 0.00 0.000EX-5 481 J-5 PRV-5 8.0 0 0.00 0.000EX-4 2,066 JVL J-9 12.0 1,158 3.28 0.003EX-3 166 J-7 JVL 12.0 1,165 3.30 0.003EX-2 831 J-2 J-7 18.0 2,815 3.55 0.002EX-1 39 R-1 J-2 18.0 3,254 4.10 0.003

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/lcwzmb5a.xml

Page 41: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P4 Peak Hour Office FireCurrent Time Step: 0.000HrFlexTable: Junction Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelElevation

(ft)Demand (gpm)

Hydraulic Grade (ft)

Pressure (psi)

IFM 5,470.66 27 5,624.34 66J-2 5,475.00 0 5,625.88 65J-3 5,367.00 0 5,590.14 97J-5 5,370.00 0 5,595.31 97J-7 5,470.00 0 5,623.99 67J-9 5,430.00 0 5,612.54 79J-11 5,393.70 0 5,595.96 88J-18 5,370.00 0 5,580.57 91J-19 5,380.00 0 5,595.58 93JVL 5,467.02 7 5,623.13 68MHS 5,456.88 20 5,619.96 71MK8 5,459.71 19 5,620.81 70MU 5,377.00 473 5,580.23 88OFFICE 5,396.13 3,441 5,573.85 77SL 5,432.07 230 5,595.74 71

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/u0hwqjkl.xml

Page 42: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Scenario: P4 Peak Hour Office FireCurrent Time Step: 0.000HrFlexTable: Pipe Table

P:\190108\Documents\Utilities\Water\WaterCAD\Filing 1 (medtronic)\2019-11-27 2nd GDP Submittal\Nawatny - Filing 1.wtg

LabelLength

(Scaled) (ft)Start Node Stop Node

Diameter (in)

Flow (gpm)

Velocity (ft/s)

Headloss Gradient

(ft/ft)

EX-12 118 R-3 J-7 8.0 961 6.13 0.017P-25 2,942 MU J-11 12.0 -1,496 4.24 0.005P-24 740 J-11 J-19 12.0 420 1.19 0.001P-23 1,963 J-9 J-11 12.0 1,916 5.43 0.008P-13 2,618 J-18 J-3 8.0 -420 2.68 0.004P-12 1,276 OFFICE MU 12.0 -1,443 4.09 0.005P-11 2,397 SL OFFICE 12.0 1,998 5.67 0.009P-10 671 MU J-18 12.0 -420 1.19 0.001P-9 2,529 J-7 SL 12.0 2,227 6.32 0.011P-8 528 J-19 J-5 12.0 420 1.19 0.001EX-11 1,761 J-9 MHS 8.0 -453 2.89 0.004EX-10 185 MHS MK8 8.0 -473 3.02 0.005EX-9 718 MK8 IFM 8.0 -492 3.14 0.005EX-8 284 IFM J-2 8.0 -519 3.31 0.005EX-7 1,414 J-3 J-5 8.0 -420 2.68 0.004EX-6 252 PRV-5 R-2 8.0 0 0.00 0.000EX-5 481 J-5 PRV-5 8.0 0 0.00 0.000EX-4 2,066 JVL J-9 12.0 1,463 4.15 0.005EX-3 166 J-7 JVL 12.0 1,470 4.17 0.005EX-2 831 J-2 J-7 18.0 2,737 3.45 0.002EX-1 39 R-1 J-2 18.0 3,256 4.11 0.003

Page 1 of 1

11/25/2019file:///C:/Users/thoffman/AppData/Local/Temp/Bentley/WaterCAD/my51acmi.xml

Page 43: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

Nawatny Ridge Final Master Utility Report Page 21

APPENDIX F – Master Utility Plan, Sanitary Sewer Plan and Profile Sheets, and Conceptual Utility Layouts

Page 44: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

SITE

EXISTING WATER MAINMUNICIPALITY BOUNDARY

PROPOSED WATER MAIN

PIPE DIAMETER CHANGE

BOULDER

COUNTY

BOULDERCOUNTY

BROOMFIELD

LOUISVILLE

LOUISVILLE

LOUISVILLE

BOULDERCOUNTY

16"

18"8"

8"

12"

12"

24"

EXISTING WATER MAIN UTILITY MAP

Page 45: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

SITE

EX SANITARY SEWER

MUNICIPALITY BOUNDARY

PROPOSED SANITARY MAIN

PIPE DIAMETER CHANGE

EX SANITARY SEWERFORCE MAIN

BOULDERCOUNTY

BOULDERCOUNTY

BROOMFIELD

LOUISVILLE

LOUISVILLE

LOUISVILLE

BOULDERCOUNTY

24"

21"

18"

15"

12"

EXISTING SANITARY MAIN UTILITY MAP

8"

Page 46: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

FILE

PATH

: P:\1

9010

8\ENG

INEE

RING

\UTI

LITIE

S\CC

D - M

ASTE

R UT

ILITY

& S

URFA

CE IM

PROV

EMEN

TS.D

WG

LAYO

UT: L

AYOU

T1NO

XRE

Fs

R

Know what's below.

Call before you dig.

CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE,

OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER

UTILITIES.

ISSUE DATE:DATE REVISION COMMENTS

SHEET NO.

DESIGNED BY:CHECKED BY:DRAWN BY:

PROJECT #:

PLOT

TED:

THU

11/14

/19 5:

05:12

P B

Y: M

ATT

LONG

1120 Lincoln Street, Suite 1000

Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311

HarrisKocherSmith.com

4141 OF 190

11-15-2019

JMNMSMJMN

190108

NAWATNY RIDGE FILING #1MASTER UTILITY & SURFACE IMPROVEMENTS

NORTHWEST

BRUE BAUKOL CAPITAL PARTNERS   

   

   

   

   

      

NO C

HANG

ES A

RE T

O BE

MAD

E TO

THI

S DR

AWIN

G W

ITHO

UT W

RITT

EN P

ERMI

SSIO

N OF

HAR

RIS

KOCH

ER S

MITH

.

0

SCALE: 1" =

100 100 200

100'

CAMPUS DR

HWY 36

NORT

HWES

T PA

RKW

AYS

96TH

ST

PARADISE LN

STORAGE TEK DRIVE

STRE

ET A

KEY MAPSCALE: 1"=2000'

STRE

ET B

TAPE DR

P

R

E

L

I

M

I

N

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

MATC

HLINE

- SEE

SHEE

T 42

Page 47: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

FILE

PATH

: P:\1

9010

8\ENG

INEE

RING

\UTI

LITIE

S\CC

D - M

ASTE

R UT

ILITY

& S

URFA

CE IM

PROV

EMEN

TS.D

WG

LAYO

UT: L

AYOU

T2NO

XRE

Fs

R

Know what's below.

Call before you dig.

CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE,

OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER

UTILITIES.

ISSUE DATE:DATE REVISION COMMENTS

SHEET NO.

DESIGNED BY:CHECKED BY:DRAWN BY:

PROJECT #:

PLOT

TED:

THU

11/14

/19 5:

05:20

P B

Y: M

ATT

LONG

1120 Lincoln Street, Suite 1000

Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311

HarrisKocherSmith.com

4242 OF 190

11-15-2019

JMNMSMJMN

190108

NAWATNY RIDGE FILING #1MASTER UTILITY & SURFACE IMPROVEMENTS

NORTH

BRUE BAUKOL CAPITAL PARTNERS   

   

   

   

   

      

NO C

HANG

ES A

RE T

O BE

MAD

E TO

THI

S DR

AWIN

G W

ITHO

UT W

RITT

EN P

ERMI

SSIO

N OF

HAR

RIS

KOCH

ER S

MITH

.

0

SCALE: 1" =

100 100 200

100'

CAMPUS DR

HWY 36

NORT

HWES

T PA

RKW

AYS

96TH

ST

PARADISE LN

STORAGE TEK DRIVE

STRE

ET A

KEY MAPSCALE: 1"=2000'

STRE

ET B

TAPE DR

P

R

E

L

I

M

I

N

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

MATC

HLINE

- SEE

SHEE

T 41

MATC

HLINE

- SEE

SHEE

T 43

MATCHLINE - SEE SHEET 44

Page 48: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

FILE

PATH

: P:\1

9010

8\ENG

INEE

RING

\UTI

LITIE

S\CC

D - M

ASTE

R UT

ILITY

& S

URFA

CE IM

PROV

EMEN

TS.D

WG

LAYO

UT: L

AYOU

T3NO

XRE

Fs

R

Know what's below.

Call before you dig.

CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE,

OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER

UTILITIES.

ISSUE DATE:DATE REVISION COMMENTS

SHEET NO.

DESIGNED BY:CHECKED BY:DRAWN BY:

PROJECT #:

PLOT

TED:

THU

11/14

/19 5:

05:30

P B

Y: M

ATT

LONG

1120 Lincoln Street, Suite 1000

Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311

HarrisKocherSmith.com

4343 OF 190

11-15-2019

JMNMSMJMN

190108

NAWATNY RIDGE FILING #1MASTER UTILITY & SURFACE IMPROVEMENTS

NORTHEAST

BRUE BAUKOL CAPITAL PARTNERS   

   

   

   

   

      

NO C

HANG

ES A

RE T

O BE

MAD

E TO

THI

S DR

AWIN

G W

ITHO

UT W

RITT

EN P

ERMI

SSIO

N OF

HAR

RIS

KOCH

ER S

MITH

.

0

SCALE: 1" =

100 100 200

100'

CAMPUS DR

HWY 36

NORT

HWES

T PA

RKW

AYS

96TH

ST

PARADISE LN

STORAGE TEK DRIVE

STRE

ET A

KEY MAPSCALE: 1"=2000'

STRE

ET B

TAPE DR

P

R

E

L

I

M

I

N

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

MATC

HLINE

- SEE

SHEE

T 42

MATCHLINE - SEE SHEET 44

Page 49: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

FILE

PATH

: P:\1

9010

8\ENG

INEE

RING

\UTI

LITIE

S\CC

D - M

ASTE

R UT

ILITY

& S

URFA

CE IM

PROV

EMEN

TS.D

WG

LAYO

UT: L

AYOU

T4NO

XRE

Fs

R

Know what's below.

Call before you dig.

CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE,

OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER

UTILITIES.

ISSUE DATE:DATE REVISION COMMENTS

SHEET NO.

DESIGNED BY:CHECKED BY:DRAWN BY:

PROJECT #:

PLOT

TED:

THU

11/14

/19 5:

05:40

P B

Y: M

ATT

LONG

1120 Lincoln Street, Suite 1000

Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311

HarrisKocherSmith.com

4444 OF 190

11-15-2019

JMNMSMJMN

190108

NAWATNY RIDGE FILING #1MASTER UTILITY & SURFACE IMPROVEMENTS

EAST

BRUE BAUKOL CAPITAL PARTNERS   

   

   

   

   

      

NO C

HANG

ES A

RE T

O BE

MAD

E TO

THI

S DR

AWIN

G W

ITHO

UT W

RITT

EN P

ERMI

SSIO

N OF

HAR

RIS

KOCH

ER S

MITH

.

0

SCALE: 1" =

100 100 200

100'

CAMPUS DR

HWY 36

NORT

HWES

T PA

RKW

AYS

96TH

ST

PARADISE LN

STORAGE TEK DRIVE

STRE

ET A

KEY MAPSCALE: 1"=2000'

STRE

ET B

TAPE DR

P

R

E

L

I

M

I

N

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

MATCHLINE - SEE SHEET 42

MATCHLINE - SEE SHEET 45

MATCHLINE - SEE SHEET 43

Page 50: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

FILE

PATH

: P:\1

9010

8\ENG

INEE

RING

\UTI

LITIE

S\CC

D - M

ASTE

R UT

ILITY

& S

URFA

CE IM

PROV

EMEN

TS.D

WG

LAYO

UT: L

AYOU

T5NO

XRE

Fs

R

Know what's below.

Call before you dig.

CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE,

OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER

UTILITIES.

ISSUE DATE:DATE REVISION COMMENTS

SHEET NO.

DESIGNED BY:CHECKED BY:DRAWN BY:

PROJECT #:

PLOT

TED:

THU

11/14

/19 5:

05:50

P B

Y: M

ATT

LONG

1120 Lincoln Street, Suite 1000

Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311

HarrisKocherSmith.com

4545 OF 190

11-15-2019

JMNMSMJMN

190108

NAWATNY RIDGE FILING #1MASTER UTILITY & SURFACE IMPROVEMENTS

SOUTHEAST

BRUE BAUKOL CAPITAL PARTNERS   

   

   

   

   

      

NO C

HANG

ES A

RE T

O BE

MAD

E TO

THI

S DR

AWIN

G W

ITHO

UT W

RITT

EN P

ERMI

SSIO

N OF

HAR

RIS

KOCH

ER S

MITH

.

0

SCALE: 1" =

100 100 200

100'

CAMPUS DR

HWY 36

NORT

HWES

T PA

RKW

AYS

96TH

ST

PARADISE LN

STORAGE TEK DRIVE

STRE

ET A

KEY MAPSCALE: 1"=2000'

STRE

ET B

TAPE DR

P

R

E

L

I

M

I

N

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

MATCHLINE - SEE SHEET 44

Page 51: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

SANITARY LINE A-F1 PROFILE

FILE

PATH

: P:\1

9010

8\ENG

INEE

RING

\UTI

LITIE

S\SA

NITA

RY\F

ILING

1\SA

NITA

RY P

&P -

CAMP

US D

R - F

1.DW

G LA

YOUT

: LAY

OUT1

NO X

REFs

R

Know what's below.

Call before you dig.

CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE,

OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER

UTILITIES.

ISSUE DATE:DATE REVISION COMMENTS

SHEET NO.

DESIGNED BY:CHECKED BY:DRAWN BY:

PROJECT #:

PLOT

TED:

THU

11/14

/19 4:

52:54

P B

Y: M

ATT

LONG

1120 Lincoln Street, Suite 1000

Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311

HarrisKocherSmith.com

124124 OF 190

11-15-2019

MMLMSMJWM

190108

NAWATNY RIDGE FILING #1SANITARY SEWER LINE A PLAN & PROFILE

BRUE BAUKOL CAPITAL PARTNERS   

   

   

   

   

      

NO C

HANG

ES A

RE T

O BE

MAD

E TO

THI

S DR

AWIN

G W

ITHO

UT W

RITT

EN P

ERMI

SSIO

N OF

HAR

RIS

KOCH

ER S

MITH

.

P

R

E

L

I

M

I

N

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

0

SCALE: 1" =

40 40 80

40'

CAMPUS DR

HWY 36

NORT

HWES

T PA

RKW

AYS

96TH

ST

PARADISE LN

STORAGE TEK DRIVE

STRE

ET A

KEY MAPSCALE: 1"=2000'

STRE

ET B

TAPE DR

MATC

HLIN

E ST

A 11

+00 -

SEE

SHE

ET 12

5

P

R

E

L

I

M

I

N

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

SANITARY SEWER LINE A PROFILEHORIZONTAL SCALE:1" = 40'

VERTICAL SCALE: 1" = 5'

MATC

HLIN

E ST

A 11

+00 -

SEE

SHE

ET 12

5

Page 52: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

SANITARY LINE A-F1 PROFILE

FILE

PATH

: P:\1

9010

8\ENG

INEE

RING

\UTI

LITIE

S\SA

NITA

RY\F

ILING

1\SA

NITA

RY P

&P -

CAMP

US D

R - F

1.DW

G LA

YOUT

: LAY

OUT2

NO X

REFs

R

Know what's below.

Call before you dig.

CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE,

OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER

UTILITIES.

ISSUE DATE:DATE REVISION COMMENTS

SHEET NO.

DESIGNED BY:CHECKED BY:DRAWN BY:

PROJECT #:

PLOT

TED:

THU

11/14

/19 4:

53:06

P B

Y: M

ATT

LONG

1120 Lincoln Street, Suite 1000

Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311

HarrisKocherSmith.com

125125 OF 190

11-15-2019

MMLMSMJWM

190108

NAWATNY RIDGE FILING #1SANITARY SEWER LINE A PLAN & PROFILE

BRUE BAUKOL CAPITAL PARTNERS   

   

   

   

   

      

NO C

HANG

ES A

RE T

O BE

MAD

E TO

THI

S DR

AWIN

G W

ITHO

UT W

RITT

EN P

ERMI

SSIO

N OF

HAR

RIS

KOCH

ER S

MITH

.

0

SCALE: 1" =

40 40 80

40'

CAMPUS DR

HWY 36

NORT

HWES

T PA

RKW

AYS

96TH

ST

PARADISE LN

STORAGE TEK DRIVE

STRE

ET A

KEY MAPSCALE: 1"=2000'

STRE

ET B

TAPE DR

MATC

HLIN

E ST

A 21

+50 -

SEE

SHE

ET 12

6

MATC

HLIN

E ST

A 11

+00 -

SEE

SHE

ET 12

4

P

R

E

L

I

M

I

N

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

SANITARY SEWER LINE A PROFILEHORIZONTAL SCALE:1" = 40'

VERTICAL SCALE: 1" = 5'

MATC

HLIN

E ST

A 21

+50 -

SEE

SHE

ET 12

6

MATC

HLIN

E ST

A 11

+00 -

SEE

SHE

ET 12

4

Page 53: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

SANITARY LINE A-F1 PROFILE

FILE

PATH

: P:\1

9010

8\ENG

INEE

RING

\UTI

LITIE

S\SA

NITA

RY\F

ILING

1\SA

NITA

RY P

&P -

CAMP

US D

R - F

1.DW

G LA

YOUT

: LAY

OUT3

NO X

REFs

R

Know what's below.

Call before you dig.

CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE,

OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER

UTILITIES.

ISSUE DATE:DATE REVISION COMMENTS

SHEET NO.

DESIGNED BY:CHECKED BY:DRAWN BY:

PROJECT #:

PLOT

TED:

THU

11/14

/19 4:

53:21

P B

Y: M

ATT

LONG

1120 Lincoln Street, Suite 1000

Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311

HarrisKocherSmith.com

126126 OF 190

11-15-2019

MMLMSMJWM

190108

NAWATNY RIDGE FILING #1SANITARY SEWER LINE A PLAN & PROFILE

BRUE BAUKOL CAPITAL PARTNERS   

   

   

   

   

      

NO C

HANG

ES A

RE T

O BE

MAD

E TO

THI

S DR

AWIN

G W

ITHO

UT W

RITT

EN P

ERMI

SSIO

N OF

HAR

RIS

KOCH

ER S

MITH

.

0

SCALE: 1" =

40 40 80

40'

CAMPUS DR

HWY 36

NORT

HWES

T PA

RKW

AYS

96TH

ST

PARADISE LN

STORAGE TEK DRIVE

STRE

ET A

KEY MAPSCALE: 1"=2000'

STRE

ET B

TAPE DR

MATCHLINE STA 21+50 - SEE SHEET 125

P

R

E

L

I

M

I

N

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

SANITARY SEWER LINE A PROFILEHORIZONTAL SCALE:1" = 40'

VERTICAL SCALE: 1" = 5'

MATC

HLIN

E ST

A 21

+50 -

SEE

SHE

ET 12

5

Page 54: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

5340

5345

5350

5355

5360

5365

5370

5375

5380

5385

5390

5340

5345

5350

5355

5360

5365

5370

5375

5380

5385

5390

FILE

PATH

: P:\1

9010

8\ENG

INEE

RING

\UTI

LITIE

S\SA

NITA

RY\F

ILING

1\SA

NITA

RY P

&P -

96TH

ST

- F1.D

WG

LAYO

UT: L

AYOU

T18 X

REFs

: ccd

- f1

- stam

p, e-

base

[U], e

-lega

l, e-u

til, ke

y map

, p-b

ase-

f1, p-

legal-

f1, p-

util[U

]

R

Know what's below.

Call before you dig.

CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE,

OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER

UTILITIES.

ISSUE DATE:DATE REVISION COMMENTS

SHEET NO.

DESIGNED BY:CHECKED BY:DRAWN BY:

PROJECT #:

PLOT

TED:

THU

11/14

/19 4:

54:10

P B

Y: M

ATT

LONG

1120 Lincoln Street, Suite 1000

Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311

HarrisKocherSmith.com

127127 OF 190

11-15-2019

JMNMSMJMN

190108

NAWATNY RIDGE FILING #1SANITARY SEWER LINE B PLAN & PROFILE

BRUE BAUKOL CAPITAL PARTNERS   

   

   

   

   

      

NO C

HANG

ES A

RE T

O BE

MAD

E TO

THI

S DR

AWIN

G W

ITHO

UT W

RITT

EN P

ERMI

SSIO

N OF

HAR

RIS

KOCH

ER S

MITH

.

0

SCALE: 1" =

40 40 80

40'

CAMPUS DR

HWY 36

NORT

HWES

T PA

RKW

AYS

96TH

ST

PARADISE LN

STORAGE TEK DRIVE

STRE

ET A

KEY MAPSCALE: 1"=2000'

STRE

ET B

TAPE DR

P

R

E

L

I

M

I

N

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

SANITARY SEWER LINE B PROFILEHORIZONTAL SCALE:1" = 40'

VERTICAL SCALE: 1" = 5'

MATC

HLIN

E ST

A: 11

+50 -

SEE

SHE

ET 12

8MA

TCHL

INE

STA:

11+5

0 - S

EE S

HEET

128

Page 55: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

5340

5345

5350

5355

5360

5365

5370

5375

5380

5385

5390

5340

5345

5350

5355

5360

5365

5370

5375

5380

5385

5390

FILE

PATH

: P:\1

9010

8\ENG

INEE

RING

\UTI

LITIE

S\SA

NITA

RY\F

ILING

1\SA

NITA

RY P

&P -

96TH

ST

- F1.D

WG

LAYO

UT: L

AYOU

T28 X

REFs

: ccd

- f1

- stam

p, e-

base

[U], e

-lega

l, e-u

til, ke

y map

, p-b

ase-

f1, p-

legal-

f1, p-

util[U

]

R

Know what's below.

Call before you dig.

CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE,

OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER

UTILITIES.

ISSUE DATE:DATE REVISION COMMENTS

SHEET NO.

DESIGNED BY:CHECKED BY:DRAWN BY:

PROJECT #:

PLOT

TED:

THU

11/14

/19 4:

54:41

P B

Y: M

ATT

LONG

1120 Lincoln Street, Suite 1000

Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311

HarrisKocherSmith.com

128128 OF 190

11-15-2019

JMNMSMJMN

190108

NAWATNY RIDGE FILING #1SANITARY SEWER LINE B PLAN & PROFILE

BRUE BAUKOL CAPITAL PARTNERS   

   

   

   

   

      

NO C

HANG

ES A

RE T

O BE

MAD

E TO

THI

S DR

AWIN

G W

ITHO

UT W

RITT

EN P

ERMI

SSIO

N OF

HAR

RIS

KOCH

ER S

MITH

.

0

SCALE: 1" =

40 40 80

40'

CAMPUS DR

HWY 36

NORT

HWES

T PA

RKW

AYS

96TH

ST

PARADISE LN

STORAGE TEK DRIVE

STRE

ET A

KEY MAPSCALE: 1"=2000'

STRE

ET B

TAPE DR

P

R

E

L

I

M

I

N

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

SANITARY SEWER LINE B PROFILEHORIZONTAL SCALE:1" = 40'

VERTICAL SCALE: 1" = 5'

MATC

HLIN

E ST

A: 22

+50 -

SEE

SHE

ET 12

9

MATC

HLIN

E ST

A: 22

+50 -

SEE

SHE

ET 12

9

MATC

HLIN

E ST

A: 11

+50 -

SEE

SHE

ET 12

7MA

TCHL

INE

STA:

11+5

0 - S

EE S

HEET

127

Page 56: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

SANITARY LINE B-F1 PROFILE

5340

5345

5350

5355

5360

5365

5370

5375

5380

5385

5390

5340

5345

5350

5355

5360

5365

5370

5375

5380

5385

5390

FILE

PATH

: P:\1

9010

8\ENG

INEE

RING

\UTI

LITIE

S\SA

NITA

RY\F

ILING

1\SA

NITA

RY P

&P -

96TH

ST

- F1.D

WG

LAYO

UT: L

AYOU

T38 X

REFs

: ccd

- f1

- stam

p, e-

base

[U], e

-lega

l, e-u

til, ke

y map

, p-b

ase-

f1, p-

legal-

f1, p-

util[U

]

R

Know what's below.

Call before you dig.

CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE,

OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER

UTILITIES.

ISSUE DATE:DATE REVISION COMMENTS

SHEET NO.

DESIGNED BY:CHECKED BY:DRAWN BY:

PROJECT #:

PLOT

TED:

THU

11/14

/19 4:

55:08

P B

Y: M

ATT

LONG

1120 Lincoln Street, Suite 1000

Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311

HarrisKocherSmith.com

129129 OF 190

11-15-2019

MMLMSMJWM

190108

NAWATNY RIDGE FILING #1SANITARY SEWER LINE B PLAN & PROFILE

BRUE BAUKOL CAPITAL PARTNERS   

   

   

   

   

      

NO C

HANG

ES A

RE T

O BE

MAD

E TO

THI

S DR

AWIN

G W

ITHO

UT W

RITT

EN P

ERMI

SSIO

N OF

HAR

RIS

KOCH

ER S

MITH

.

0

SCALE: 1" =

40 40 80

40'

CAMPUS DR

HWY 36

NORT

HWES

T PA

RKW

AYS

96TH

ST

PARADISE LN

STORAGE TEK DRIVE

STRE

ET A

KEY MAPSCALE: 1"=2000'

STRE

ET B

TAPE DR

P

R

E

L

I

M

I

N

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

SANITARY SEWER LINE B PROFILEHORIZONTAL SCALE:1" = 40'

VERTICAL SCALE: 1" = 5'

MATCHLINE STA: 33+50 - SEE SHEET 130

MATC

HLIN

E ST

A: 22

+50 -

SEE

SHE

ET 12

8

MATC

HLIN

E ST

A: 33

+50 -

SEE

SHE

ET 13

0

MATC

HLIN

E ST

A: 22

+50 -

SEE

SHE

ET 12

8

Page 57: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

5340

5345

5350

5355

5360

5365

5370

5375

5380

5385

5390

5340

5345

5350

5355

5360

5365

5370

5375

5380

5385

5390

FILE

PATH

: P:\1

9010

8\ENG

INEE

RING

\UTI

LITIE

S\SA

NITA

RY\F

ILING

1\SA

NITA

RY P

&P -

96TH

ST

- F1.D

WG

LAYO

UT: L

AYOU

T48 X

REFs

: ccd

- f1

- stam

p, e-

base

[U], e

-lega

l, e-u

til, ke

y map

, p-b

ase-

f1, p-

legal-

f1, p-

util[U

]

R

Know what's below.

Call before you dig.

CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE,

OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER

UTILITIES.

ISSUE DATE:DATE REVISION COMMENTS

SHEET NO.

DESIGNED BY:CHECKED BY:DRAWN BY:

PROJECT #:

PLOT

TED:

THU

11/14

/19 4:

55:31

P B

Y: M

ATT

LONG

1120 Lincoln Street, Suite 1000

Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311

HarrisKocherSmith.com

130130 OF 190

11-15-2019

MMLMSMJWM

190108

NAWATNY RIDGE FILING #1SANITARY SEWER LINE B PLAN & PROFILE

BRUE BAUKOL CAPITAL PARTNERS   

   

   

   

   

      

NO C

HANG

ES A

RE T

O BE

MAD

E TO

THI

S DR

AWIN

G W

ITHO

UT W

RITT

EN P

ERMI

SSIO

N OF

HAR

RIS

KOCH

ER S

MITH

.

0

SCALE: 1" =

40 40 80

40'

CAMPUS DR

HWY 36

NORT

HWES

T PA

RKW

AYS

96TH

ST

PARADISE LN

STORAGE TEK DRIVE

STRE

ET A

KEY MAPSCALE: 1"=2000'

STRE

ET B

TAPE DR

P

R

E

L

I

M

I

N

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

SANITARY SEWER LINE B PROFILEHORIZONTAL SCALE:1" = 40'

VERTICAL SCALE: 1" = 5'

MATC

HLIN

E ST

A: 39

+50 -

SEE

SHE

ET 13

1

MATC

HLIN

E ST

A: 33

+50 -

SEE

SHE

ET 12

9

MATCHLINE STA: 33+50 - SEE SHEET 129

MATCHLINE STA: 39+50 - SEE SHEET 131

Page 58: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

SANITARY LINE B-F1 PROFILE

FILE

PATH

: P:\1

9010

8\ENG

INEE

RING

\UTI

LITIE

S\SA

NITA

RY\F

ILING

1\SA

NITA

RY P

&P -

96TH

ST

- F1.D

WG

LAYO

UT: L

AYOU

T58 X

REFs

: ccd

- f1

- stam

p, e-

base

[U], e

-lega

l, e-u

til, ke

y map

, p-b

ase-

f1, p-

legal-

f1, p-

util[U

]

R

Know what's below.

Call before you dig.

CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE,

OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER

UTILITIES.

ISSUE DATE:DATE REVISION COMMENTS

SHEET NO.

DESIGNED BY:CHECKED BY:DRAWN BY:

PROJECT #:

PLOT

TED:

THU

11/14

/19 4:

55:45

P B

Y: M

ATT

LONG

1120 Lincoln Street, Suite 1000

Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311

HarrisKocherSmith.com

131131 OF 190

11-15-2019

MMLMSMJWM

190108

NAWATNY RIDGE FILING #1SANITARY SEWER LINE B PLAN & PROFILE

BRUE BAUKOL CAPITAL PARTNERS   

   

   

   

   

      

NO C

HANG

ES A

RE T

O BE

MAD

E TO

THI

S DR

AWIN

G W

ITHO

UT W

RITT

EN P

ERMI

SSIO

N OF

HAR

RIS

KOCH

ER S

MITH

.

0

SCALE: 1" =

40 40 80

40'

CAMPUS DR

HWY 36

NORT

HWES

T PA

RKW

AYS

96TH

ST

PARADISE LN

STORAGE TEK DRIVE

STRE

ET A

KEY MAPSCALE: 1"=2000'

STRE

ET B

TAPE DR

P

R

E

L

I

M

I

N

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

SANITARY SEWER LINE B PROFILEHORIZONTAL SCALE:1" = 40'

VERTICAL SCALE: 1" = 5'

MATC

HLIN

E ST

A: 39

+50 -

SEE

SHE

ET 13

0

MATC

HLIN

E ST

A: 39

+50 -

SEE

SHE

ET 13

0

Page 59: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

SANITARY LINE C-F1 PROFILE

FILE

PATH

: P:\1

9010

8\ENG

INEE

RING

\UTI

LITIE

S\SA

NITA

RY\F

ILING

1\SA

NITA

RY P

&P -

STRE

ET B

- F1

.DW

G LA

YOUT

: LAY

OUT1

9 XRE

Fs: c

cd -

f1 - s

tamp,

clien

t logo

[U], e

-bas

e, e-

legal,

e-uti

l, key

map

, p-b

ase-

f1, p-

legal-

f1, p-

util

R

Know what's below.

Call before you dig.

CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE,

OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER

UTILITIES.

ISSUE DATE:DATE REVISION COMMENTS

SHEET NO.

DESIGNED BY:CHECKED BY:DRAWN BY:

PROJECT #:

PLOT

TED:

THU

11/14

/19 4:

56:44

P B

Y: M

ATT

LONG

1120 Lincoln Street, Suite 1000

Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311

HarrisKocherSmith.com

132132 OF 190

11-15-2019

MMLMSMJWM

190108

NAWATNY RIDGE FILING #1SANITARY SEWER LINE C PLAN & PROFILE

BRUE BAUKOL CAPITAL PARTNERS   

   

   

   

   

      

NO C

HANG

ES A

RE T

O BE

MAD

E TO

THI

S DR

AWIN

G W

ITHO

UT W

RITT

EN P

ERMI

SSIO

N OF

HAR

RIS

KOCH

ER S

MITH

.

0

SCALE: 1" =

40 40 80

40'

CAMPUS DR

HWY 36

NORT

HWES

T PA

RKW

AYS

96TH

ST

PARADISE LN

STORAGE TEK DRIVE

STRE

ET A

KEY MAPSCALE: 1"=2000'

STRE

ET B

TAPE DR

MATC

HLIN

E ST

A 10

+00 -

SEE

SHE

ET 13

3MA

TCHL

INE

STA

10+0

0 - S

EE S

HEET

133

SANITARY SEWER LINE C PROFILEHORIZONTAL SCALE:1" = 40'

VERTICAL SCALE: 1" = 5'

P

R

E

L

I

M

I

N

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

Page 60: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

SANITARY LINE C-F1 PROFILE

FILE

PATH

: P:\1

9010

8\ENG

INEE

RING

\UTI

LITIE

S\SA

NITA

RY\F

ILING

1\SA

NITA

RY P

&P -

STRE

ET B

- F1

.DW

G LA

YOUT

: LAY

OUT2

9 XRE

Fs: c

cd -

f1 - s

tamp,

clien

t logo

[U], e

-bas

e, e-

legal,

e-uti

l, key

map

, p-b

ase-

f1, p-

legal-

f1, p-

util

R

Know what's below.

Call before you dig.

CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE,

OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER

UTILITIES.

ISSUE DATE:DATE REVISION COMMENTS

SHEET NO.

DESIGNED BY:CHECKED BY:DRAWN BY:

PROJECT #:

PLOT

TED:

THU

11/14

/19 4:

57:04

P B

Y: M

ATT

LONG

1120 Lincoln Street, Suite 1000

Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311

HarrisKocherSmith.com

133133 OF 190

11-15-2019

MMLMSMJWM

190108

NAWATNY RIDGE FILING #1SANITARY SEWER LINE C PLAN & PROFILE

BRUE BAUKOL CAPITAL PARTNERS   

   

   

   

   

      

NO C

HANG

ES A

RE T

O BE

MAD

E TO

THI

S DR

AWIN

G W

ITHO

UT W

RITT

EN P

ERMI

SSIO

N OF

HAR

RIS

KOCH

ER S

MITH

.

0

SCALE: 1" =

40 40 80

40'

P

R

E

L

I

M

I

N

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

CAMPUS DR

HWY 36

NORT

HWES

T PA

RKW

AYS

96TH

ST

PARADISE LN

STORAGE TEK DRIVE

STRE

ET A

KEY MAPSCALE: 1"=2000'

STRE

ET B

TAPE DR

MATC

HLIN

E ST

A 10

+00 -

SEE

SHE

ET 13

2

MATC

HLIN

E ST

A 10

+00 -

SEE

SHE

ET 13

2

SANITARY SEWER LINE C PROFILEHORIZONTAL SCALE:1" = 40'

VERTICAL SCALE: 1" = 5'

Page 61: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

SANITARY LINE FORCE MAIN-F1 PROFILEHORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 5'

5350

5355

5360

5365

5370

5375

5380

5385

5390

5350

5355

5360

5365

5370

5375

5380

5385

5390

FILE

PATH

: P:\1

9010

8\ENG

INEE

RING

\UTI

LITIE

S\SA

NITA

RY\F

ILING

1\SA

NITA

RY P

&P -

FORC

E MA

IN 1

- F1.D

WG

LAYO

UT: L

AYOU

T 1

8 XRE

Fs: c

cd -

f1 - s

tamp,

e-ba

se, e

-lega

l, e-u

til, ke

y map

- gd

p san

itary,

p-ba

se-f1

, p-le

gal-f1

, p-u

til[U]

R

Know what's below.

Call before you dig.

CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE,

OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER

UTILITIES.

ISSUE DATE:DATE REVISION COMMENTS

SHEET NO.

DESIGNED BY:CHECKED BY:DRAWN BY:

PROJECT #:

PLOT

TED:

THU

11/14

/19 4:

57:56

P B

Y: M

ATT

LONG

1120 Lincoln Street, Suite 1000

Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311

HarrisKocherSmith.com

134134 OF 190

11-15-2019

MMLMSMMML

190108

NAWATNY RIDGE FILING #1SANITARY LINE F PLAN & PROFILE

BRUE BAUKOL CAPITAL PARTNERS   

   

   

   

   

      

NO C

HANG

ES A

RE T

O BE

MAD

E TO

THI

S DR

AWIN

G W

ITHO

UT W

RITT

EN P

ERMI

SSIO

N OF

HAR

RIS

KOCH

ER S

MITH

.

0

SCALE: 1" =

40 40 80

40'

P

R

E

L

I

M

I

N

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

MATC

HLIN

E ST

A: 11

+50 -

SEE

SHE

ET 13

5

MATC

HLIN

E ST

A: 11

+50 -

SEE

SHE

ET 13

5

CAMPUS DR

HWY 36

NORT

HWES

T PA

RKW

AYS

96TH

ST

PARADISE LN

STORAGE TEK DRIVE

STRE

ET A

KEY MAPSCALE: 1"=2000'

STRE

ET B

DILLON RD DILLON RD

N 96

TH S

TCO

UNTY

RD

LINK ST

BELLA VISTA DR

LOCK ST

N 96

TH S

T

Page 62: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

SANITARY LINE FORCE MAIN-F1 PROFILEHORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 5'

5350

5355

5360

5365

5370

5375

5380

5385

5390

5350

5355

5360

5365

5370

5375

5380

5385

5390

FILE

PATH

: P:\1

9010

8\ENG

INEE

RING

\UTI

LITIE

S\SA

NITA

RY\F

ILING

1\SA

NITA

RY P

&P -

FORC

E MA

IN 1

- F1.D

WG

LAYO

UT: L

AYOU

T 2

8 XRE

Fs: c

cd -

f1 - s

tamp,

e-ba

se, e

-lega

l, e-u

til, ke

y map

- gd

p san

itary,

p-ba

se-f1

, p-le

gal-f1

, p-u

til[U]

R

Know what's below.

Call before you dig.

CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE,

OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER

UTILITIES.

ISSUE DATE:DATE REVISION COMMENTS

SHEET NO.

DESIGNED BY:CHECKED BY:DRAWN BY:

PROJECT #:

PLOT

TED:

THU

11/14

/19 4:

58:11

P B

Y: M

ATT

LONG

1120 Lincoln Street, Suite 1000

Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311

HarrisKocherSmith.com

135135 OF 190

11-15-2019

MMLMSMMML

190108

NAWATNY RIDGE FILING #1SANITARY LINE F PLAN & PROFILE

BRUE BAUKOL CAPITAL PARTNERS   

   

   

   

   

      

NO C

HANG

ES A

RE T

O BE

MAD

E TO

THI

S DR

AWIN

G W

ITHO

UT W

RITT

EN P

ERMI

SSIO

N OF

HAR

RIS

KOCH

ER S

MITH

.

0

SCALE: 1" =

40 40 80

40'

P

R

E

L

I

M

I

N

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

MATC

HLIN

E ST

A: 22

+50 -

SEE

SHE

ET 13

6

MATC

HLIN

E ST

A: 11

+50 -

SEE

SHE

ET 13

4

MATC

HLIN

E ST

A: 22

+50 -

SEE

SHE

ET 13

6

CAMPUS DR

HWY 36

NORT

HWES

T PA

RKW

AYS

96TH

ST

PARADISE LN

STORAGE TEK DRIVE

STRE

ET A

KEY MAPSCALE: 1"=2000'

STRE

ET B

DILLON RD DILLON RD

N 96

TH S

TCO

UNTY

RD

LINK ST

BELLA VISTA DR

LOCK ST

N 96

TH S

T

MATC

HLIN

E ST

A: 11

+50 -

SEE

SHE

ET 13

4

Page 63: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

SANITARY LINE FORCE MAIN-F1 PROFILEHORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 5'

5340

5345

5350

5355

5360

5365

5370

5375

5380

5340

5345

5350

5355

5360

5365

5370

5375

5380

FILE

PATH

: P:\1

9010

8\ENG

INEE

RING

\UTI

LITIE

S\SA

NITA

RY\F

ILING

1\SA

NITA

RY P

&P -

FORC

E MA

IN 1

- F1.D

WG

LAYO

UT: L

AYOU

T 3

8 XRE

Fs: c

cd -

f1 - s

tamp,

e-ba

se, e

-lega

l, e-u

til, ke

y map

- gd

p san

itary,

p-ba

se-f1

, p-le

gal-f1

, p-u

til[U]

R

Know what's below.

Call before you dig.

CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE,

OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER

UTILITIES.

ISSUE DATE:DATE REVISION COMMENTS

SHEET NO.

DESIGNED BY:CHECKED BY:DRAWN BY:

PROJECT #:

PLOT

TED:

THU

11/14

/19 4:

58:25

P B

Y: M

ATT

LONG

1120 Lincoln Street, Suite 1000

Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311

HarrisKocherSmith.com

136136 OF 190

11-15-2019

MMLMSMMML

190108

NAWATNY RIDGE FILING #1SANITARY LINE F PLAN & PROFILE

BRUE BAUKOL CAPITAL PARTNERS   

   

   

   

   

      

NO C

HANG

ES A

RE T

O BE

MAD

E TO

THI

S DR

AWIN

G W

ITHO

UT W

RITT

EN P

ERMI

SSIO

N OF

HAR

RIS

KOCH

ER S

MITH

.

0

SCALE: 1" =

40 40 80

40'

P

R

E

L

I

M

I

N

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

MATC

HLIN

E ST

A: 22

+50 -

SEE

SHE

ET 13

5

MATC

HLIN

E ST

A: 33

+50 -

SEE

SHE

ET 13

7

CAMPUS DR

HWY 36

NORT

HWES

T PA

RKW

AYS

96TH

ST

PARADISE LN

STORAGE TEK DRIVE

STRE

ET A

KEY MAPSCALE: 1"=2000'

STRE

ET B

DILLON RD DILLON RD

N 96

TH S

TCO

UNTY

RD

LINK ST

BELLA VISTA DR

LOCK ST

N 96

TH S

T

MATC

HLIN

E ST

A: 33

+50 -

SEE

SHE

ET 13

7

MATC

HLIN

E ST

A: 22

+50 -

SEE

SHE

ET 13

5

Page 64: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

SANITARY LINE FORCE MAIN-F1 PROFILEHORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 5'

5330

5335

5340

5345

5350

5355

5360

5365

5370

5330

5335

5340

5345

5350

5355

5360

5365

5370

FILE

PATH

: P:\1

9010

8\ENG

INEE

RING

\UTI

LITIE

S\SA

NITA

RY\F

ILING

1\SA

NITA

RY P

&P -

FORC

E MA

IN 1

- F1.D

WG

LAYO

UT: L

AYOU

T 4

8 XRE

Fs: c

cd -

f1 - s

tamp,

e-ba

se, e

-lega

l, e-u

til, ke

y map

- gd

p san

itary,

p-ba

se-f1

, p-le

gal-f1

, p-u

til[U]

R

Know what's below.

Call before you dig.

CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE,

OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER

UTILITIES.

ISSUE DATE:DATE REVISION COMMENTS

SHEET NO.

DESIGNED BY:CHECKED BY:DRAWN BY:

PROJECT #:

PLOT

TED:

THU

11/14

/19 4:

58:40

P B

Y: M

ATT

LONG

1120 Lincoln Street, Suite 1000

Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311

HarrisKocherSmith.com

137137 OF 190

11-15-2019

MMLMSMMML

190108

NAWATNY RIDGE FILING #1SANITARY LINE F PLAN & PROFILE

BRUE BAUKOL CAPITAL PARTNERS   

   

   

   

   

      

NO C

HANG

ES A

RE T

O BE

MAD

E TO

THI

S DR

AWIN

G W

ITHO

UT W

RITT

EN P

ERMI

SSIO

N OF

HAR

RIS

KOCH

ER S

MITH

.

0

SCALE: 1" =

40 40 80

40'

P

R

E

L

I

M

I

N

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

MATC

HLIN

E ST

A: 33

+50 -

SEE

SHE

ET 13

6

MATC

HLIN

E ST

A: 44

+50 -

SEE

SHE

ET 13

8

CAMPUS DR

HWY 36

NORT

HWES

T PA

RKW

AYS

96TH

ST

PARADISE LN

STORAGE TEK DRIVE

STRE

ET A

KEY MAPSCALE: 1"=2000'

STRE

ET B

DILLON RD DILLON RD

N 96

TH S

TCO

UNTY

RD

LINK ST

BELLA VISTA DR

LOCK ST

N 96

TH S

T

MATC

HLIN

E ST

A: 44

+50 -

SEE

SHE

ET 13

8

MATC

HLIN

E ST

A: 33

+50 -

SEE

SHE

ET 13

6

Page 65: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

SANITARY LINE FORCE MAIN-F1 PROFILEHORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 5'

5340

5345

5350

5355

5360

5365

5370

5375

5380

5340

5345

5350

5355

5360

5365

5370

5375

5380

FILE

PATH

: P:\1

9010

8\ENG

INEE

RING

\UTI

LITIE

S\SA

NITA

RY\F

ILING

1\SA

NITA

RY P

&P -

FORC

E MA

IN 1

- F1.D

WG

LAYO

UT: L

AYOU

T 5

8 XRE

Fs: c

cd -

f1 - s

tamp,

e-ba

se, e

-lega

l, e-u

til, ke

y map

- gd

p san

itary,

p-ba

se-f1

, p-le

gal-f1

, p-u

til[U]

R

Know what's below.

Call before you dig.

CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE,

OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER

UTILITIES.

ISSUE DATE:DATE REVISION COMMENTS

SHEET NO.

DESIGNED BY:CHECKED BY:DRAWN BY:

PROJECT #:

PLOT

TED:

THU

11/14

/19 4:

58:55

P B

Y: M

ATT

LONG

1120 Lincoln Street, Suite 1000

Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311

HarrisKocherSmith.com

138138 OF 190

11-15-2019

MMLMSMMML

190108

NAWATNY RIDGE FILING #1SANITARY LINE F PLAN & PROFILE

BRUE BAUKOL CAPITAL PARTNERS   

   

   

   

   

      

NO C

HANG

ES A

RE T

O BE

MAD

E TO

THI

S DR

AWIN

G W

ITHO

UT W

RITT

EN P

ERMI

SSIO

N OF

HAR

RIS

KOCH

ER S

MITH

.

0

SCALE: 1" =

40 40 80

40'

P

R

E

L

I

M

I

N

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

MATC

HLIN

E ST

A: 44

+50 -

SEE

SHE

ET 13

7

CAMPUS DR

HWY 36

NORT

HWES

T PA

RKW

AYS

96TH

ST

PARADISE LN

STORAGE TEK DRIVE

STRE

ET A

KEY MAPSCALE: 1"=2000'

STRE

ET B

DILLON RD DILLON RD

N 96

TH S

TCO

UNTY

RD

LINK ST

BELLA VISTA DR

LOCK ST

N 96

TH S

T

MATC

HLIN

E ST

A: 55

+50 -

SEE

SHE

ET 13

9

MATC

HLIN

E ST

A: 44

+50 -

SEE

SHE

ET 13

7

MATC

HLIN

E ST

A: 55

+50 -

SEE

SHE

ET 13

9

Page 66: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

SANITARY LINE FORCE MAIN-F1 PROFILEHORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 5'

5340

5345

5350

5355

5360

5365

5370

5375

5380

5385

5390

5340

5345

5350

5355

5360

5365

5370

5375

5380

5385

5390

FILE

PATH

: P:\1

9010

8\ENG

INEE

RING

\UTI

LITIE

S\SA

NITA

RY\F

ILING

1\SA

NITA

RY P

&P -

FORC

E MA

IN 1

- F1.D

WG

LAYO

UT: L

AYOU

T 6

8 XRE

Fs: c

cd -

f1 - s

tamp,

e-ba

se, e

-lega

l, e-u

til, ke

y map

- gd

p san

itary,

p-ba

se-f1

, p-le

gal-f1

, p-u

til[U]

R

Know what's below.

Call before you dig.

CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE,

OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER

UTILITIES.

ISSUE DATE:DATE REVISION COMMENTS

SHEET NO.

DESIGNED BY:CHECKED BY:DRAWN BY:

PROJECT #:

PLOT

TED:

THU

11/14

/19 4:

59:11

P B

Y: M

ATT

LONG

1120 Lincoln Street, Suite 1000

Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311

HarrisKocherSmith.com

139139 OF 190

11-15-2019

MMLMSMMML

190108

NAWATNY RIDGE FILING #1SANITARY LINE F PLAN & PROFILE

BRUE BAUKOL CAPITAL PARTNERS   

   

   

   

   

      

NO C

HANG

ES A

RE T

O BE

MAD

E TO

THI

S DR

AWIN

G W

ITHO

UT W

RITT

EN P

ERMI

SSIO

N OF

HAR

RIS

KOCH

ER S

MITH

.

0

SCALE: 1" =

40 40 80

40'

P

R

E

L

I

M

I

N

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

MATC

HLIN

E ST

A: 55

+50 -

SEE

SHE

ET 13

8

CAMPUS DR

HWY 36

NORT

HWES

T PA

RKW

AYS

96TH

ST

PARADISE LN

STORAGE TEK DRIVE

STRE

ET A

KEY MAPSCALE: 1"=2000'

STRE

ET B

DILLON RD DILLON RD

N 96

TH S

TCO

UNTY

RD

LINK ST

BELLA VISTA DR

LOCK ST

N 96

TH S

T

MATC

HLIN

E ST

A: 55

+50 -

SEE

SHE

ET 13

8

MATC

HLIN

E ST

A: 66

+50 -

SEE

SHE

ET 14

0

MATC

HLIN

E ST

A: 66

+50 -

SEE

SHE

ET 14

0

Page 67: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

SANITARY LINE FORCE MAIN-F1 PROFILEHORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 5'

5310

5315

5320

5325

5330

5335

5340

5345

5350

5355

5360

5365

5370

5375

5380

5310

5315

5320

5325

5330

5335

5340

5345

5350

5355

5360

5365

5370

5375

5380

FILE

PATH

: P:\1

9010

8\ENG

INEE

RING

\UTI

LITIE

S\SA

NITA

RY\F

ILING

1\SA

NITA

RY P

&P -

FORC

E MA

IN 1

- F1.D

WG

LAYO

UT: L

AYOU

T 7

8 XRE

Fs: c

cd -

f1 - s

tamp,

e-ba

se, e

-lega

l, e-u

til, ke

y map

- gd

p san

itary,

p-ba

se-f1

, p-le

gal-f1

, p-u

til[U]

R

Know what's below.

Call before you dig.

CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE,

OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER

UTILITIES.

ISSUE DATE:DATE REVISION COMMENTS

SHEET NO.

DESIGNED BY:CHECKED BY:DRAWN BY:

PROJECT #:

PLOT

TED:

THU

11/14

/19 4:

59:27

P B

Y: M

ATT

LONG

1120 Lincoln Street, Suite 1000

Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311

HarrisKocherSmith.com

140140 OF 190

11-15-2019

MMLMSMMML

190108

NAWATNY RIDGE FILING #1SANITARY LINE F PLAN & PROFILE

BRUE BAUKOL CAPITAL PARTNERS   

   

   

   

   

      

NO C

HANG

ES A

RE T

O BE

MAD

E TO

THI

S DR

AWIN

G W

ITHO

UT W

RITT

EN P

ERMI

SSIO

N OF

HAR

RIS

KOCH

ER S

MITH

.

0

SCALE: 1" =

40 40 80

40'

P

R

E

L

I

M

I

N

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

CAMPUS DR

HWY 36

NORT

HWES

T PA

RKW

AYS

96TH

ST

PARADISE LN

STORAGE TEK DRIVE

STRE

ET A

KEY MAPSCALE: 1"=2000'

STRE

ET B

DILLON RD DILLON RD

N 96

TH S

TCO

UNTY

RD

LINK ST

BELLA VISTA DR

LOCK ST

N 96

TH S

T

MATC

HLIN

E ST

A: 66

+50 -

SEE

SHE

ET 13

9

MATC

HLIN

E ST

A: 77

+50 -

SEE

SHE

ET 14

1

MATC

HLIN

E ST

A: 66

+50 -

SEE

SHE

ET 13

9

MATC

HLIN

E ST

A: 77

+50 -

SEE

SHE

ET 14

1

Page 68: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

SANITARY LINE FORCE MAIN-F1 PROFILEHORIZONTAL SCALE: 1" = 40' VERTICAL SCALE: 1" = 5'

5305

5310

5315

5320

5325

5330

5335

5340

5345

5305

5310

5315

5320

5325

5330

5335

5340

5345

FILE

PATH

: P:\1

9010

8\ENG

INEE

RING

\UTI

LITIE

S\SA

NITA

RY\F

ILING

1\SA

NITA

RY P

&P -

FORC

E MA

IN 1

- F1.D

WG

LAYO

UT: L

AYOU

T 8

8 XRE

Fs: c

cd -

f1 - s

tamp,

e-ba

se, e

-lega

l, e-u

til, ke

y map

- gd

p san

itary,

p-ba

se-f1

, p-le

gal-f1

, p-u

til[U]

R

Know what's below.

Call before you dig.

CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE,

OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER

UTILITIES.

ISSUE DATE:DATE REVISION COMMENTS

SHEET NO.

DESIGNED BY:CHECKED BY:DRAWN BY:

PROJECT #:

PLOT

TED:

THU

11/14

/19 4:

59:41

P B

Y: M

ATT

LONG

1120 Lincoln Street, Suite 1000

Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311

HarrisKocherSmith.com

141141 OF 190

11-15-2019

MMLMSMMML

190108

NAWATNY RIDGE FILING #1SANITARY LINE F PLAN & PROFILE

BRUE BAUKOL CAPITAL PARTNERS   

   

   

   

   

      

NO C

HANG

ES A

RE T

O BE

MAD

E TO

THI

S DR

AWIN

G W

ITHO

UT W

RITT

EN P

ERMI

SSIO

N OF

HAR

RIS

KOCH

ER S

MITH

.

0

SCALE: 1" =

40 40 80

40'

P

R

E

L

I

M

I

N

A

R

Y

N

O

T

F

O

R

C

O

N

S

T

R

U

C

T

I

O

N

CAMPUS DR

HWY 36

NORT

HWES

T PA

RKW

AYS

96TH

ST

PARADISE LN

STORAGE TEK DRIVE

STRE

ET A

KEY MAPSCALE: 1"=2000'

STRE

ET B

DILLON RD DILLON RD

N 96

TH S

TCO

UNTY

RD

LINK ST

BELLA VISTA DR

LOCK ST

N 96

TH S

T

MATC

HLIN

E ST

A: 77

+50 -

SEE

SHE

ET 14

0

MATC

HLIN

E ST

A: 77

+50 -

SEE

SHE

ET 14

0

Page 69: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

FILE

PATH

: P:\1

9010

8\ENG

INEE

RING

\UTI

LITIE

S\SA

NITA

RY\F

ILING

1\SA

NITA

RY D

ETAI

LS.D

WG

LAYO

UT: L

AYOU

T1NO

XRE

Fs

R

Know what's below.

Call before you dig.

CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE,

OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER

UTILITIES.

ISSUE DATE:DATE REVISION COMMENTS

SHEET NO.

DESIGNED BY:CHECKED BY:DRAWN BY:

PROJECT #:

PLOT

TED:

THU

11/14

/19 4:

59:49

P B

Y: M

ATT

LONG

1120 Lincoln Street, Suite 1000

Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311

HarrisKocherSmith.com

142142 OF 190

11-15-2019 190108

NAWATNY RIDGE FILING #1SANITARY DETAILS

BRUE BAUKOL CAPITAL PARTNERS   

   

   

   

   

      

NO C

HANG

ES A

RE T

O BE

MAD

E TO

THI

S DR

AWIN

G W

ITHO

UT W

RITT

EN P

ERMI

SSIO

N OF

HAR

RIS

KOCH

ER S

MITH

.

Page 70: APPENDIX E – Water System Calculations and Model · Nawatny Ridge Final Master Utility Report Page 20 APPENDIX E – Water System Calculations and Model . NAWATNY RIDGE ... Retirement

FILE

PATH

: P:\1

9010

8\ENG

INEE

RING

\UTI

LITIE

S\SA

NITA

RY\F

ILING

1\SA

NITA

RY D

ETAI

LS.D

WG

LAYO

UT: L

AYOU

T2NO

XRE

Fs

R

Know what's below.

Call before you dig.

CALL 3 BUSINESS DAYS IN ADVANCE BEFORE YOU DIG, GRADE,

OR EXCAVATE FOR THE MARKING OF UNDERGROUND MEMBER

UTILITIES.

ISSUE DATE:DATE REVISION COMMENTS

SHEET NO.

DESIGNED BY:CHECKED BY:DRAWN BY:

PROJECT #:

PLOT

TED:

THU

11/14

/19 4:

59:51

P B

Y: M

ATT

LONG

1120 Lincoln Street, Suite 1000

Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311

HarrisKocherSmith.com

143143 OF 190

11-15-2019 190108

NAWATNY RIDGE FILING #1SANITARY DETAILS

BRUE BAUKOL CAPITAL PARTNERS   

   

   

   

   

      

NO C

HANG

ES A

RE T

O BE

MAD

E TO

THI

S DR

AWIN

G W

ITHO

UT W

RITT

EN P

ERMI

SSIO

N OF

HAR

RIS

KOCH

ER S

MITH

.