APPENDIX C
PLANS AND DRAWINGS
1
Clifford A. Phaneuf Environmental CenterForest Park 100 Park Drive Springfield, MA 01106
CLIENT
The Springfield Department of Capital Asset Construction andThe Springfield Department of Parks, Buildings & Recreation Management
ARCHITECTJ A B L O N S K I | D E V R I E S E
A R C H I T E C T S
29 Elliot StreetSpringfield, MA 01105
p. 4 1 3 7 4 7 5 2 8 5 f. 4 1 3 7 4 7 0 2 9 7
LANDSCAPE DESIGNGZAGZA GeoEnvironmental, GeoEnvironmental, Inc IncEngineersEngineers and and Scientists Scientists
13501350 Main Main Street, Street, Suite 1400 Suite 1400Springfield,Springfield, MA MA 01103 01103
p.p. 4 4 1 1 3 3 7 7 2 2 7 7 2 2 1 1 0 0 0 0 f.f. 4 4 1 1 3 3 7 7 3 3 2 2 1 1 2 2 4 4 9 9
MECH, ELEC, PLUMB Gaskell Associates Consulting Engineers
120 Maple Street, Suite 304Springfield, MA 01103
p. 4 1 3 5 1 9 7 5 4 2 f. 4 1 3 7 3 6 1 2 9 4
STRUCTURAL ENG Ryan S. Hellwig, PE
28 Aldrich StreetNorthampton, MA 01083
p. 4 1 3 5 8 4 4 5 9 4
FIRE PROTECTION Rybak Engineering Inc
132 Forest AveWarren, MA 01083
p. 4 1 3 4 3 6 5 5 0 0 f. 4 1 3 4 3 6 5 5 6 3
19 Dec. 2011
List of DrawingsARCHITECTURALD1.1- D1.3 Demolition PlansA1.1- A1.5 Building PlansA2.0- A2.1 Exterior ElevationA3.0- A3.2 Interior ElevationsA4.0 SectionsA5.0- A5.2 DetailsA6.0- A6.1 Acoustical Plans
LANDSCAPEEX-1 Existing Conditions Survey PlanC-1 - C-7 PlansC-8 - C-10 DetailsL-1 Landscape Plan
MECHANICAL, ELECTRICAL, PLUMBINGE0.1, E1.1, E21.1, E3.1,ES.1 ElectricalM0.1, M1.1, M1.2, M2.1,M3.1, M4.1 & ME.1 MechanicalP0.1 - P0.2, P1.1 Plumbing
STRUCTURALS1 - S3 Structural Plans
FIRE PROTECTION
FP1.0-FP4.0 Site Plan, Sections, DetailsPlans
LOCUS MAP
Con
nect
icut
Riv
er
PROJECT LOCATION
FEMA SET 7/8/13
5
9
10
8
6
7
4
1
2
3
11
11.1
12
13
MECHANICAL ROOM103
CLOSET105
EX. STAIR107
VESTIBULE110
MEN'S W/C113
CATERINGKITCHEN
116
1 D 13 C 2
6 C 2 12 E
4 C 2
7 C 3
HALLWAY112
1 C 3
5 B 1
WOMEN'SW/C111
1B5
1A
4.0
1A
4.0
3 C 2
008
009
010 011
012
006
007
004003
002
001
013
014
015
016
018
LIFT104
PORCH101
NEWSTAIR
1149 E 4
2A
4.0
2A
4.0
017
STORAGE115
GREAT ROOM/ CLASSROOM102
CLASSROOM109
Infill Ex. door open'g, wall finish to be salvaged bead bd, patched and ptd as req'd.
Infill Ex. dooropen'g, wall finish
to be salvagedbead bd, patchedand ptd as req'd.
Infill Ex. dooropen'g, wall finish
to be salvagedbead bd, patchedand ptd as req'd.
Infill Ex. Boiler Room floor withcompacted soil, 8" gravel andpoured concrete floor level &doweled to adjacent flooring
Retain Ex. woodbracket, patch &replace wood asneeded, stain tomatch Ex. wood.
Retain Ex. woodbracket, patch and
replace wood asneeded, stain tomatch Ex. wood.
Walk off mat inset to be flush with floor finish. 6' wide and continuous between door thresholds. .
6'-6" x 36" opening in concrete slab, open to grade below, with ledge to except 1" deep inset metal grating .
6'-6" x 36" opening in concrete slab, open to grade below, with ledge toexcept 1" deep inset metal grating
6'-6" x 36" opening in concrete slab,open to grade below, with ledge toexcept 1" deep inset metal grating
6'-6" x 36" opening in concrete slab,open to grade below, with ledge to except 1" deep inset metal grating
Inset Wood Display Cabinet, see Interior Elevation
(N) 4
2"ca
sed
open
'g
(N) 4
2"ca
sed
open
'g
8 A 5
Curtain track attached to existing ceiling, see detail 9/A5.1
Install 5/8" gyp. bd on Ex. studs- ptd.
Install 5/8" gyp. bd on Ex.studs- ptd.
Install 5/8" gyp. bd onEx. studs- ptd.
Install 5/8" gyp. bd on Ex. studs- ptd.
Install (2) 5/8" gyp.bd on Ex. studs @Lift Enclosure- ptd.
Wd Handrail #2, typExtend exist'g newel post to except 42" guardrails, w/ 1.5" wd cap, ptd- typ @ Exist'g Stair
.
7 A 1
CLOSET106
6 A 5
005
A3.0
3
2
A3.14 3A3.12 1A3.0
3
1
A3.114 12
11
13
A3.118 16
15
17
4A
4.0
4A
4.0
5A
4.0
5A
4.0
11A5.0
9A5.1
14A5.0
8A5.0
10A5.1
13A5.0 /typ.
7A5.0
15A5.0 /typ. @
Ex. Wall
8A5.1 /typ. @
Column
7A5.1
9A5.0
5A5.1
12A5.0
13A5.0 /typ.
1A5.0
/typ. unless otherwise noted
2A5.0
34'-0
"
6'-4"
16A5.0 /typ. @
New Wall
6'-4"
26'-9
1/2
"7'
-2 1
/2"
4'-7
"4'
-7"
9'-2 1/2"5'-7 1/2"
10'-8"
6'-4 1/2"15'-9"
2A5.0
6'-4 1/2"
10'-8"
11'-4
1/2
"6'
-10
1/2"
9'-9
"13
'-4"
4'-7"11'-7"
Align Door Opening'sat right edge
.Align Door Opening's at left edge
.
5'-6"5'-6"
5'-1
"2'
-10
3/4"
5'-6"
5'-1
"2'
-10
3/4"7'
-11
3/4"
35'-1
0"
7'-7
1/2
"
17'-6
"
6'-3
"
6'-0
1/2
"8'
-2 1
/2"
8'-2
1/2
"13
'-4 1
/2"
6'-6" 15'-11"
Align
22'-3 1/8"
6'-6 3/4" 8'-7 3/4" 4'-8"8'-7 3/4"28'-6"
28'-6"
12'-8"
125'-7 3/4"
43'-1
1/4
"
5'-6 3/4" 10'-2 1/2" 9'-1 3/4" 5'-6 3/4"10'-2 1/2"9'-1 3/4"
6"
44'-8"
8'-7
1/4
"8'
-5 1
/4"
8'-5
1/4
"8'
-5 1
/4"
8'-5
1/4
"
8'-8 3/4" 8'-8 3/4" 8'-8 3/4" 8'-9 1/4"
3A4.0
3A4.0
6'-7 1/2"
6'-9
3/4
"
F.D.
F.D.
OFFICE108
2 A 3
4" thick concrete housekeeping pads.G.C. coordinate locations with HVACsubcontractor
Duct in wall with R/A grilleCoordinate with HVACFurr wall to conceal duct.
Duct in wall with R/A grilleCoordinate with HVACFurr wall to conceal duct.
A1.1
Clifford A. Phaneuf Environmental Center
Forest Park
100 Park Drive Springfield, MA 01106
Consultants
Drawing No.
Revisions:
Scale
File Name
Drawn By
Reviewed By
1/8" = 1'-0"
plsh_plan_12.08.11SS, LPLP
12/19/11Date
First Floor Plan
Revision 1Revision 2Revision 3Revision 4Revision 5
FIRST FLOOR PLANscale: 3/16"=1'-0"1
New door
New wall
KEY
Existing door
Existing wall
ROOM FINISH SCHEDULE
The finish in each room is indicated by a three digit code.The code is indicated in a block under the room title.- The first digit, a number, indicates the finish for the floorsurfaces.- The second digit, a letter, represents the finish treatment of the wall surfaces.- The third digit, a number, indicates the ceiling finish.
FLOOR SCHEDULE
1. PATCH & SEAL EX. CONCRETE ADD FLOORSCORE CERT. TILE (T-1)
2. PATCH & SEAL EX. CONCRETE, ADD FLOORSCORE CERT. LINOLEUM SHEET FLOOR'G
3. NEW SEALED CONCRETE, NEW FLOORSCORECERT. TILE (T-1)
4. NEW SEALED CONCRETE, NEW FLOORSCORE CERT. TILE (T-3)
5. PATCH & SEAL EX. CONCRETE ADD FLOORSCORECERT. TILE (T-2)
6. NEW SEALED CONCRETE7. PATCH & SEAL EX. CONCRETE8. REFINISH & PAINT EX. WD TREADS & RISERS9. NEW FLOORSCORE CERTIFIED LINOLEUM TREADS
& RISERS, VINYL NOSING10.REMOVE EX. FLOOR'G TO SUBFLOOR. CLEAN AND LEVEL TO ACCEPT FLOORSCORE CERT. SHEET LINOLEUM11. REMOVE EX. FLOOR'G TO SUBFLOOR. CLEAN AND LEVEL TO ACCEPT FLOORSCORE CERT.TILE (T-2)12. FLOORSCORE CERT. LINOLEUM SHEET 13. NEW SUBFLOOR
WALL SCHEDULE
A. REMOVE EX. BEAD BOARD WALLS, REPLACE W/ PTD. (ZERO VOC) GYP. BD.
B. REMOVE EX. BEAD BOARD, REPLACE W/ GYP. BD., TILE TO HT. 4'-6" AFF, WALL ABOVE PTD. (ZERO VOC) GYP. BD.
C. NEW PTD. (ZERO VOC) GYP. BD.D. REMOVE EX. BEAD BOARD WALLS, REPLACE
W/ PTD. (ZERO VOC) GYP. BD. EAST & WEST WALLS TO HAVE SALVAGED (LOW VOC) PTD.BEAD BOARD.
E. NEW PTD. (ZERO VOC) GYP. BD.- 2 LAYERS
CEILING SCHEDULE
1. PATCH & PTD. (ZERO VOC) EX. BEAD BOARD2. NEW PTD. (ZERO VOC) GYP. BD.3. REMOVE EX. CEIL'G REPLACE W/ NEW PTD.
(ZERO VOC) GYP. BD.4. NEW PTD. (ZERO VOC) GYP. BD.- 2 LAYERS5. REMOVE EX. CEIL'G REPLACE W/ NEW PTD. (ZERO VOC) GYP. BD.- 2 LAYER
FEMA SET 7/8/13
EX. STAIR201
W/C204
CLASSROOM203
STORAGE205
Open To Below
10 A 5
3B11
10 A 3
10 A 3
1A
4.0
1A
4.0
NEWSTAIR
2069 E 4
022020
021
023
024
LIFT202
2A
4.0
2A
4.0
Shelving unit. See Det. 3/A5.2
.
New wood covered beams, see detail 16/A5.1
Exist'g staircase treads and risers sand and ptd, handrail to be removed and replaced with 1' sq painted wood ballustrade @3.5" oc, wood guardrail & wood handrail (both sides) and extend, or replace with similar, newl posts to except guardrail
New 48"cabinetry & sink
New 30" Refrigerator and full height shelves beside, see Interior Elevations for details.
12 E 4
New window seat, seedetail 17/A5.1
New window seat, seedetail 17/A5.1
.
025
A3.110 8
7
9
A3.1 6
5
3A4.0
3A4.0
5A
4.0
5A
4.0
MECHANICALSPACE
207
13 C 2
T-2
1A5.0
/typ. unless otherwise noted
Install (2) 5/8" gyp.bd on Ex. studs @Lift Enclosure- ptd.
8A5.1 /typ. @
Column
7A5.1
5A5.0
13A5.0
15A5.0 /typ. @
Ex. Wall
6A5.1
13A5.0
14A5.0
10A5.1
4A5.1
Sloped Metal Standing Seam Roof
Sloped Metal Standing Seam Roof
2A5.1
3A5.1
3A5.0
Sloped MetalStanding Seam Roof
Half Round prefinishedaluminum gutter and
downspouts
3A5.1
4A5.1
4A5.1
(N) 60" casedopen'g
14A5.0
14 A5.
0
6A5.0 /typ. @
Ex. Wall
6A5.0 /typ. @
Ex. Wall
A-1.2
Clifford A. Phaneuf Environmental Center
Forest Park
100 Park Drive Springfield, MA 01106
Consultants
Drawing No.
Revisions:
Scale
File Name
Drawn By
Reviewed By
1/8" = 1'-0"
plsh_plan_12.08.11SS, LPSJ
12/19/11Date
Second Floor Plan
Revision 1Revision 2Revision 3Revision 4Revision 5
SECOND FLOOR PLANscale: 3/16"=1'-0"1
New door
New wall
KEY
Existing door
Existing wall
ROOM FINISH SCHEDULE
The finish in each room is indicated by a three digit code.The code is indicated in a block under the room title.- The first digit, a number, indicates the finish for the floorsurfaces.- The second digit, a letter, represents the finish treatment of the wall surfaces.- The third digit, a number, indicates the ceiling finish.
FLOOR SCHEDULE
1. PATCH & SEAL EX. CONCRETE ADD FLOORSCORE CERT. TILE (T-1)
2. PATCH & SEAL EX. CONCRETE, ADD FLOORSCORE CERT. LINOLEUM SHEET FLOOR'G
3. NEW SEALED CONCRETE, NEW FLOORSCORECERT. TILE (T-1)
4. NEW SEALED CONCRETE, NEW FLOORSCORE CERT. TILE (T-3)
5. PATCH & SEAL EX. CONCRETE ADD FLOORSCORECERT. TILE (T-2)
6. NEW SEALED CONCRETE7. PATCH & SEAL EX. CONCRETE8. REFINISH & PAINT EX. WD TREADS & RISERS9. NEW FLOORSCORE CERTIFIED LINOLEUM TREADS
& RISERS, VINYL NOSING10.REMOVE EX. FLOOR'G TO SUBFLOOR. CLEAN AND LEVEL TO ACCEPT FLOORSCORE CERT. SHEET LINOLEUM11. REMOVE EX. FLOOR'G TO SUBFLOOR. CLEAN AND LEVEL TO ACCEPT FLOORSCORE CERT.TILE (T-2)12. FLOORSCORE CERT. LINOLEUM SHEET 13. NEW SUBFLOOR
WALL SCHEDULE
A. REMOVE EX. BEAD BOARD WALLS, REPLACE W/ PTD. (ZERO VOC) GYP. BD.
B. REMOVE EX. BEAD BOARD, REPLACE W/ GYP. BD., TILE TO HT. 4'-6" AFF, WALL ABOVE PTD. (ZERO VOC) GYP. BD.
C. NEW PTD. (ZERO VOC) GYP. BD.D. REMOVE EX. BEAD BOARD WALLS, REPLACE
W/ PTD. (ZERO VOC) GYP. BD. EAST & WEST WALLS TO HAVE SALVAGED (LOW VOC) PTD.BEAD BOARD.
E. NEW PTD. (ZERO VOC) GYP. BD.- 2 LAYERS
CEILING SCHEDULE
1. PATCH & PTD. (ZERO VOC) EX. BEAD BOARD2. NEW PTD. (ZERO VOC) GYP. BD.3. REMOVE EX. CEIL'G REPLACE W/ NEW PTD.
(ZERO VOC) GYP. BD.4. NEW PTD. (ZERO VOC) GYP. BD.- 2 LAYERS5. REMOVE EX. CEIL'G REPLACE W/ NEW PTD. (ZERO VOC) GYP. BD.- 2 LAYER
FEMA SET 7/8/13
Sloped Metal Standing Seam Roof
.
(LINE OF FLOOR BELOW)
(LINE OF FLOOR BELOW)
Sloped Metal Standing Seam Roof
Sloped Metal Standing Seam Roof
Half Round prefinished aluminum gutterand downspouts at courtyard overhangs
.
Sloped Metal Standing Seam Roof
HotWaterPanel
HotWaterPanel
PVPanel
PVPanel
PVPanel
PVPanel
PVPanel
PVPanel
PVPanel
Half Round gutter and downspouts
4A5.1
3A5.0
3A5.1
4A5.1
3A5.1
3A5.1
3A5.1
4A5.1
4A5.0
4A5.0
VTR
VTR
FLUE VENT
VENT CAP
A-1.3
Clifford A. Phaneuf Environmental Center
Forest Park
100 Park Drive Springfield, MA 01106
Consultants
Drawing No.
Revisions:
Scale
File Name
Drawn By
Reviewed By
1/8" = 1'-0"
plsh_plan_12.08.11SS, LPSJ
12/19/11Date
Roof Plan
Revision 1Revision 2Revision 3Revision 4Revision 5
ROOF PLANscale: 3/16"=1'-0"1
New door
New wall
KEY
Existing door
Existing wall
FEMA SET 7/8/13
EX-1