Appendix a - Status of Qc Test(Prmf Guide Form)

Embed Size (px)

Citation preview

  • 7/31/2019 Appendix a - Status of Qc Test(Prmf Guide Form)

    1/16

    ITEM NO. UNITS

    Previous Total

    PART C

    DIV.1

    No test

    Inspection Report - 1

    No test

    Inspection Report - 1

    No test

    PE Cert. of Waste - 1

    Grading - 3

    Plasticity - 3

    MDR - 3

    FDT - 134

    Grading - 3

    Plasticity - 3

    MDR - 3

    FDT - 134

    Grading - 1

    Plasticity - 1

    MDR - 1

    FDT - 2

    Grading - 1

    Plasticity - 1

    MDR - 1

    FDT - 1

    Grading - 9

    Plasticity - 9

    MDR - 9

    FDT - 483Grading - 1

    Plasticity - 1

    MDR - 1

    FDT - 35

    Grading - 3

    Plasticity - 3

    MDR - 3

    ` FDT - 118

    DIV.2

    Grading - 23

    Plasticity - 23

    MDR - 5

    Abrasion - 5

    CBR - 3FDT - 276

    DIV.3

    Grading - 10

    Plasticity - 10

    MDR - 2

    Abrasion - 2

    CBR - 2

    FDT - 112

    Grading - 10

    Plasticity - 10

    MDR - 2

    Abrasion - 2

    CBR - 2

    FDT - 112

    DIV.4

    404(1) 2,209.00 kg. 2,209.00 2,209.00 1 Quality test for

    every 10,000 kgs. of

    fraction thereof on

    each size for each

    shipment

    - 1

    SURFACE COURSE

    300 Aggregate Surface Course 2,800.00 cu.m. 2,540.00 260.00 2,800.00

    19,600.00

    SUBBASE COURSE

    200 Aggregate Subbase Course 6,891.00 cu.m. 6,891.00 6,891.00

    105(1) Subgrade Preparation ( Common Materials) 19,600.00 sq.m. 19,600.00

    12,025.70

    104(3) Embankment from Borrow Materials 1,155.40 cu.m. 1,155.40 1,155.40

    104(1) Embankment from Roadway Excavation 12,025.70 cu.m. 6,464.02 5,561.68

    31.70

    103(3) Foundation Fill 5.00 cu.m. 5.00 5.00

    103(1) Structure Excavation(RCBC) 31.70 cu.m. 31.70

    3,007.84

    102(5) Drainage Excavation (include RCPC, Side ditch) 3,341.42 cu.m. 1766.55 1,241.29 3,007.84

    102(2) Surplus Common Excavation 3,341.42 cu.m. 1766.55 1,241.29

    164.00

    101(5) Removal of Existing Pipe Culvert 15.00 ln.m. 15.00 15.00

    100(3) Individual Removal of Trees 164.00 each 164.00

    EARTHWORKS

    100(1) Clearing and Grubbing 14,000.00 sq.m. 14,000.00 14,000.00

    Minimum Test Required

    This

    Month

    CIVIL WORKS

    Opol- Basak-Tingalan Road Weekly Report No.:____________

    Sta. 3 + 500 to 6+ 300

    DESCRIPTION CONTRACT

    QUANTITY

    ACCOMPLISHMENT

    Provincial Road Management Facility Provincial Road

    Rehabilitation and Maintenance Project STATUS OF QUALITY CONTROL TEST

    CONTRACTOR:

    PACKAGE B Report Period:____________ MATERIALS ENGINEER:

    CONCRETE STRUCTURE

    Reinforcing Steel Bars (Gr. 40)

    405(1) Structural Concrete Class "A"

    201 Aggregate Base Course 2,800.00 cu.m. 2,540.00 260.00 2,800.00

  • 7/31/2019 Appendix a - Status of Qc Test(Prmf Guide Form)

    2/16

    ITEM NO. UNITS

    Previous Total

    Minimum Test Required

    This

    Month

    Opol- Basak-Tingalan Road Weekly Report No.:____________

    Sta. 3 + 500 to 6+ 300

    DESCRIPTION CONTRACT

    QUANTITY

    ACCOMPLISHMENT

    Provincial Road Management Facility Provincial Road

    Rehabilitation and Maintenance Project STATUS OF QUALITY CONTROL TEST

    CONTRACTOR:

    PACKAGE B Report Period:____________ MATERIALS ENGINEER:

    24.10 cu.m. 14.60 14.60

    217.00 bags 132.00 132.00 *12.05 cu.m. 7.30 7.30 **

    16.38 cu.m. 9.93 9.93 ***

    - liters - - ****

    24.10 cu.m. 14.60 14.60 1 set consisting of 3

    pcs. - Concrete

    Cylinder Sample shall

    be taken from each

    days pouring and to

    represent not more

    than 75.00 cu.m. of

    concrete or fraction

    thereof.

    - 1

    d. Water

    e. Concrete

    (RCBC)

    a. Portland Cementb. Fine Aggregates (Rounded)

    c. Coarse Aggregates (Angular)

  • 7/31/2019 Appendix a - Status of Qc Test(Prmf Guide Form)

    3/16

    ITEM NO. UNITS

    Previous Total

    Minimum Test Required

    This

    Month

    Opol- Basak-Tingalan Road Weekly Report No.:____________

    Sta. 3 + 500 to 6+ 300

    DESCRIPTION CONTRACT

    QUANTITY

    ACCOMPLISHMENT

    Provincial Road Management Facility Provincial Road

    Rehabilitation and Maintenance Project STATUS OF QUALITY CONTROL TEST

    CONTRACTOR:

    PACKAGE B Report Period:____________ MATERIALS ENGINEER:

    DIV.5

    18.00 lin.m. 18.00 18.00 1 set consisting of 3pcs. - Concrete

    Cylinder Sample for

    every 25 pipes cast in

    the field

    - 1

    Inspection Report - 1

    33.00 bags 33.00 33.00 *

    2.16 cu.m. 2.16 2.16 **

    3.06 cu.m. 3.06 3.06 ***

    liters ****

    254.00 kgs 254.00 254.00 ##

    6.00 bags 6.00 6.00 *

    0.23 cu.m. 0.23 0.23 **- liters - - ****

    72.00 lin.m. 72.00 72.00 1 set consisting of 3

    pcs. - Concrete

    Cylinder Sample for

    every 25 pipes cast in

    the field

    - 3

    Inspection Report - 3

    265.00 bags 265.00 265.00 *

    17.28 cu.m. 17.28 17.28 **

    24.48 cu.m. 24.48 24.48 ***

    - liters ****

    1,368.00 kgs 1,368.00 1,368.00 ##

    33.00 bags 33.00 33.00 *

    1.44 cu.m. 1.44 1.44 **

    - liters - - ****

    DIV.5

    42.00 lin.m. 42.00 42.00 1 set consisting of 3

    pcs. - Concrete

    Cylinder Sample for

    every 25 pipes cast in

    the field

    - 2

    Inspection Report - 2

    368.00 bags 368.00 368.00 *

    24.19 cu.m. 24.19 24.19 **

    34.27 cu.m. 34.27 34.27 ***

    - liters - - ****

    2,441.00 kgs 2,441.00 2,441.00 ##

    34.00 bags 34.00 34.00 *

    1.47 cu.m. 1.47 1.47 **

    - liters - - ****

    1.00 lin.m. 1 set consisting of 3

    pcs. - Concrete

    Cylinder Sample for

    every 25 pipes cast in

    the field

    - 1

    Inspection Report - 1

    2.00 bags *

    0.12 cu.m. **

    0.17 cu.m. ***

    - liters ****

    14.10 kgs ##

    1.00 bags *

    d. Water

    e. Reinforcing Steel Bars

    B. Mortar for RCPC joints

    a. Portland Cement

    a. Portland Cement

    b. Fine Aggregates

    c. Coarse Aggregates

    b. Fine Aggregates

    c. Water

    502(17)a Stone Masonry Headwall,1-610mm

    Straight Type (Gr-HST)

    For RCPC

    a. 610mm

    A. Pipes

    d. Water

    e. Reinforcing Steel Bars

    B. Mortar for RCPC joints

    a. Portland Cement

    DRAINAGE & EROSION WORKS

    500(1)f RCPC, Class II, 1520mm

    A. Pipes

    a. Portland Cement

    b. Fine Aggregates

    c. Coarse Aggregates

    B. Mortar for RCPC joints

    a. Portland Cement

    b. Fine Aggregates

    c. Water

    c. Coarse Aggregates

    d. Water

    e. Reinforcing Steel Bars

    b. Fine Aggregatesc. Water

    500(1)c RCPC, Class II, 910mm

    A. Pipes

    a. Portland Cement

    b. Fine Aggregates

    d. Water

    e. Reinforcing Steel Bars

    B. Mortar for RCPC joints

    a. Portland Cement

    DRAINAGE & EROSION WORKS

    500(1)b RCPC, Class II, 610mm

    A. Pipes

    a. Portland Cement

    b. Fine Aggregates

    c. Coarse Aggregates

  • 7/31/2019 Appendix a - Status of Qc Test(Prmf Guide Form)

    4/16

    ITEM NO. UNITS

    Previous Total

    Minimum Test Required

    This

    Month

    Opol- Basak-Tingalan Road Weekly Report No.:____________

    Sta. 3 + 500 to 6+ 300

    DESCRIPTION CONTRACT

    QUANTITY

    ACCOMPLISHMENT

    Provincial Road Management Facility Provincial Road

    Rehabilitation and Maintenance Project STATUS OF QUALITY CONTROL TEST

    CONTRACTOR:

    PACKAGE B Report Period:____________ MATERIALS ENGINEER:

    0.01 cu.m. **

    - liters ****DIV.5

    0.81 cu.m.

    2.00 bags *

    0.14 cu.m. **

    0.81 cu.m. #

    - liters ****

    11.00 ln.m. 1 set consisting of 3

    pcs. - Concrete

    Cylinder Sample for

    every 25 pipes cast in

    the field

    - 1

    Inspection Report - 1

    41.00 bags *

    A. Pipes

    a. Portland Cement

    c. Stone

    d. Water

    502(19)d Stone Masonry Headwall,1-910mm

    Flared Type (FT-Hw)

    For RCPC

    a. 910mm

    b. Fine Aggregates

    c. WaterDRAINAGE & EROSION WORKS

    For Stone Masonry

    a. Portland Cement

    b.Fine Aggregates

  • 7/31/2019 Appendix a - Status of Qc Test(Prmf Guide Form)

    5/16

    ITEM NO. UNITS

    Previous Total

    Minimum Test Required

    This

    Month

    Opol- Basak-Tingalan Road Weekly Report No.:____________

    Sta. 3 + 500 to 6+ 300

    DESCRIPTION CONTRACT

    QUANTITY

    ACCOMPLISHMENT

    Provincial Road Management Facility Provincial Road

    Rehabilitation and Maintenance Project STATUS OF QUALITY CONTROL TEST

    CONTRACTOR:

    PACKAGE B Report Period:____________ MATERIALS ENGINEER:

    2.64 cu.m. **

    3.74 cu.m. ***- liters ****

    209.00 kgs ##

    5.00 bags *

    0.22 cu.m. **

    - liters ****

    3.98 cu.m.

    8.00 bags *

    0.68 cu.m. **

    3.98 cu.m. #

    - liters ****

    DIV.5

    2.00 ln.m. 1 set consisting of 3

    pcs. - Concrete

    Cylinder Sample for

    every 25 pipes cast in

    the field

    -

    Inspection Report - 1

    8.00 bags *

    0.48 cu.m. **

    0.68 cu.m. ***

    - liters ****

    38.00 kgs ##e. Reinforcing Steel Bars

    b. Fine Aggregates

    c. Coarse Aggregates

    d. Water

    d. Water

    DRAINAGE & EROSION WORKS

    502(19)g Stone Masonry Headwall,2-910mm

    Flared Type (FT-Hw)

    For RCPC

    a. 910mm

    A. Pipes

    a. Portland Cement

    a. Portland Cement

    b.Fine Aggregates

    c. Stone

    b. Fine Aggregates

    c. Water

    For Stone Masonry

    d. Water

    e. Reinforcing Steel Bars

    B. Mortar for RCPC joints

    a. Portland Cement

    b. Fine Aggregates

    c. Coarse Aggregates

  • 7/31/2019 Appendix a - Status of Qc Test(Prmf Guide Form)

    6/16

    ITEM NO. UNITS

    Previous Total

    Minimum Test Required

    This

    Month

    Opol- Basak-Tingalan Road Weekly Report No.:____________

    Sta. 3 + 500 to 6+ 300

    DESCRIPTION CONTRACT

    QUANTITY

    ACCOMPLISHMENT

    Provincial Road Management Facility Provincial Road

    Rehabilitation and Maintenance Project STATUS OF QUALITY CONTROL TEST

    CONTRACTOR:

    PACKAGE B Report Period:____________ MATERIALS ENGINEER:

    1.00 bags *

    0.04 cu.m. **

    - liters ****

    6.00 cu.m.

    12.00 bags *

    1.02 cu.m. **

    6.00 cu.m. #

    - liters ****

    DIV.5

    11.00 ln.m. 1 set consisting of 3pcs. - Concrete

    Cylinder Sample for

    every 25 pipes cast in

    the field

    - 1

    Inspection Report - 1

    41.00 bags *

    2.64 cu.m. **

    3.74 cu.m. ***

    - liters ****

    209.00 kgs ##

    5.00 bags *

    0.22 cu.m. **

    - liters ****

    11.62 cu.m.

    24.00 bags *

    1.98 cu.m. **b.Fine Aggregates

    c. Water

    For Stone Masonry

    a. Portland Cement

    e. Reinforcing Steel Bars

    B. Mortar for RCPC joints

    a. Portland Cement

    b. Fine Aggregates

    b. Fine Aggregates

    c. Coarse Aggregates

    d. Water

    d. Water

    DRAINAGE & EROSION WORKS

    502(22)d Stone Masonry Headwall,Wing Walland Apron, 1-1520mm Flared Type (FT-Hw)

    For RCPC

    a. 910mm

    A. Pipes

    a. Portland Cement

    a. Portland Cement

    b.Fine Aggregates

    c. Stone

    b. Fine Aggregates

    c. Water

    For Stone Masonry

    B. Mortar for RCPC jointsa. Portland Cement

  • 7/31/2019 Appendix a - Status of Qc Test(Prmf Guide Form)

    7/16

    ITEM NO. UNITS

    Previous Total

    Minimum Test Required

    This

    Month

    Opol- Basak-Tingalan Road Weekly Report No.:____________

    Sta. 3 + 500 to 6+ 300

    DESCRIPTION CONTRACT

    QUANTITY

    ACCOMPLISHMENT

    Provincial Road Management Facility Provincial Road

    Rehabilitation and Maintenance Project STATUS OF QUALITY CONTROL TEST

    CONTRACTOR:

    PACKAGE B Report Period:____________ MATERIALS ENGINEER:

    11.62 cu.m. #

    - liters ****1,666.40 cu.m.

    3,333.00 bags *

    283.29 cu.m. **

    1,666.40 cu.m. #

    - liters ****

    508 ? cu.m. Specific Gravity and

    Absorption

    - 1

    DIV.6

    Quality Test - 1

    Inspection Report - 1

    Quality Test - 1

    Inspection Report - 1

    4.62 cu.m.

    44.00 bags *

    2.45 cu.m. **

    3.14 cu.m. ***

    - liters ****

    4.62 cu.m. 1 set consisting of 3

    pcs. - Concrete

    Cylinder Sample shall

    be taken from each

    days pouring and to

    represent not more

    than 75.00 cu.m. of

    concrete or fraction

    thereof.

    - 1

    605(1) ? each Inspection Report - 1

    605(4) Project Information Signs ? each Inspection Report - 1611 ? each Inspection Report - 1

    * 4,483.00 bags 871.00 871.00 Quality Test - 3

    Quality Test - 1

    Grading Test - 5

    Quality Test - 1*** c. Coarse Aggregates 89.66 cu.m. 71.74 71.74

    a. Portland Cement

    ** b. Fine Aggregates 354.75 cu.m. 54.07 54.07

    SUMMARY

    b. Fine Aggregates

    c. Coarse Aggregates

    d. Water

    603(6) Concrete Post Guard Rail

    ( Concrete Class "C")

    a. Portland Cement

    Tree Planting ( Furnishing and

    Transplanting)

    e. Concrete

    Warning Signs

    603(3) Metal Beam Guard Rail 240.00 ln.m.

    603(5) Guard Rail End Piece 8.00 each

    Hand Laid Rock Embankment

    MISCELLANEOUS STRUCTURE

    d. Water505(5) Grouted Riprap Class "A"

    a. Portland Cement

    b.Fine Aggregates

    c. Stone

    d. Water

    c. Stone

  • 7/31/2019 Appendix a - Status of Qc Test(Prmf Guide Form)

    8/16

    ITEM NO. UNITS

    Previous Total

    Minimum Test Required

    This

    Month

    Opol- Basak-Tingalan Road Weekly Report No.:____________

    Sta. 3 + 500 to 6+ 300

    DESCRIPTION CONTRACT

    QUANTITY

    ACCOMPLISHMENT

    Provincial Road Management Facility Provincial Road

    Rehabilitation and Maintenance Project STATUS OF QUALITY CONTROL TEST

    CONTRACTOR:

    PACKAGE B Report Period:____________ MATERIALS ENGINEER:

    Abrasion Test - 1

    Grading Test - 2

    P.E. Certification - 1

    Quality Test (if source

    is questionable)

    - 1

    Specific Gravity and

    Absorption

    - 1

    Inspection Report - 1

    ## 6,742.10 kgs. 1 Quality test for

    every 10,000 kgs. of

    fraction thereof on

    each size for each

    shipment? mm RSB ? kgs. ? ? Quality Test - ?

    ? mm RSB ? kgs. ? ? Quality Test - ?

    ? mm RSB ? kgs. ? ? Quality Test - ?

    1631

    Prepared by: Certified Correct: Submitted

    % Accomplish

    CONTRACTOR'S MATERIALS ENGINEER PEO MATERIALS ENGINEER P

    f. Reinforcing Steel Bars (Assorted sizes) Please

    separate below and group the following rebars

    according to its nominal size diameter with

    corresponding total weight quantity

    INSPECTION:

    Continuous Quality Control Inspection on all items of work should be done as construction of work progresses.Inspection Report to be submitted

    Total No. of Test

    # e. Stone 1,677.19 cu.m.

    **** d. Water - liters - -

    PRMF MATERIALS ENGINEER PR

  • 7/31/2019 Appendix a - Status of Qc Test(Prmf Guide Form)

    9/16

    Previous Total

    1 Inspection Report - 0

    1 Inspection Report - 0

    1 PE Cert. of Waste - 0

    2 1 3 Grading - 0

    2 1 3 Plasticity - 0

    2 1 3 MDR - 0

    71 50 121 FDT - 13

    2 1 3 Grading - 02 1 3 Plasticity - 0

    2 1 3 MDR - 0

    71 50 121 FDT - 13

    1 1 Grading - 0

    1 1 Plasticity - 0

    1 1 MDR - 0

    2 2 FDT - 0

    1 1 Grading - 0

    1 1 Plasticity - 0

    1 1 MDR - 0

    1 1 FDT - 0

    5 4 9 Grading - 0

    5 4 9 Plasticity - 0

    5 4 9 MDR - 0

    483 483 FDT - 0

    1 1 Grading - 0

    1 1 Plasticity - 0

    1 1 MDR - 0

    35 35 FDT - 0

    3 3 Grading - 0

    3 3 Plasticity - 0

    3 3 MDR - 0

    118 118 FDT - 0

    23 23 Grading - 0

    23 23 Plasticity - 0

    5 5 MDR - 0

    5 5 Abrasion - 0

    3 3 CBR - 0276 276 FDT - 0

    9 1 10 Grading - 0

    9 1 10 Plasticity - 0

    2 2 MDR - 0

    2 2 Abrasion - 0

    2 2 CBR - 0

    102 10 112 FDT - 0

    9 1 10 Grading - 0

    9 1 10 Plasticity - 0

    2 2 MDR - 0

    2 2 Abrasion - 0

    2 2 CBR - 0

    102 10 112 FDT - 0

    1 1 1 Quality test for

    every 10,000 kgs. of

    fraction thereof on

    each size for each

    shipment

    - 0

    TEST PERFORMED BALANCE

    This

    Month

  • 7/31/2019 Appendix a - Status of Qc Test(Prmf Guide Form)

    10/16

    Previous Total

    TEST PERFORMED BALANCE

    This

    Month

    1 1 1 set consisting of 3

    pcs. - Concrete

    Cylinder Sample shall

    be taken from each

    days pouring and to

    represent not more

    than 75.00 cu.m. of

    concrete or fraction

    thereof.

    - 1

    see summary

    see summary

    see summarysee summary

  • 7/31/2019 Appendix a - Status of Qc Test(Prmf Guide Form)

    11/16

    Previous Total

    TEST PERFORMED BALANCE

    This

    Month

    1 1 1 set consisting of 3pcs. - Concrete

    Cylinder Sample for

    every 25 pipes cast in

    the field

    - 0

    1 1 Inspection Report - 0

    3 3 1 set consisting of 3

    pcs. - Concrete

    Cylinder Sample for

    every 25 pipes cast in

    the field

    - 0

    3 3 Inspection Report - 0

    2 2 1 set consisting of 3

    pcs. - Concrete

    Cylinder Sample for

    every 25 pipes cast in

    the field

    - 0

    2 2 Inspection Report - 0

    0 1 set consisting of 3

    pcs. - Concrete

    Cylinder Sample for

    every 25 pipes cast in

    the field

    - 1

    Inspection Report - 1

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summarysee summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

  • 7/31/2019 Appendix a - Status of Qc Test(Prmf Guide Form)

    12/16

    Previous Total

    TEST PERFORMED BALANCE

    This

    Month

    1 set consisting of 3

    pcs. - Concrete

    Cylinder Sample for

    every 25 pipes cast in

    the field

    - 1

    Inspection Report - 1

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

  • 7/31/2019 Appendix a - Status of Qc Test(Prmf Guide Form)

    13/16

    Previous Total

    TEST PERFORMED BALANCE

    This

    Month

    1 set consisting of 3

    pcs. - Concrete

    Cylinder Sample for

    every 25 pipes cast in

    the field

    - 1

    1 1 Inspection Report - 1

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

  • 7/31/2019 Appendix a - Status of Qc Test(Prmf Guide Form)

    14/16

    Previous Total

    TEST PERFORMED BALANCE

    This

    Month

    1 set consisting of 3pcs. - Concrete

    Cylinder Sample for

    every 25 pipes cast in

    the field

    - 1

    Inspection Report - 1

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

  • 7/31/2019 Appendix a - Status of Qc Test(Prmf Guide Form)

    15/16

    Previous Total

    TEST PERFORMED BALANCE

    This

    Month

    Specific Gravity and

    Absorption

    - 1

    Quality Test - 1

    Inspection Report - 1

    Quality Test - 1

    Inspection Report - 1

    1 set consisting of 3

    pcs. - Concrete

    Cylinder Sample shall

    be taken from each

    days pouring and to

    represent not more

    than 75.00 cu.m. of

    concrete or fraction

    thereof.

    - 1

    1 1 Inspection Report - 0

    1 1 Inspection Report - 0

    1 1 Inspection Report - 0

    1 1 Quality Test - 2

    1 1 Quality Test - 0

    1 1 Grading Test - 4

    1 1 Quality Test - 0

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

    see summary

  • 7/31/2019 Appendix a - Status of Qc Test(Prmf Guide Form)

    16/16

    Previous Total

    TEST PERFORMED BALANCE

    This

    Month

    1 1 Abrasion Test - 0

    1 1 Grading Test - 1

    1 1 P.E. Certification - 0

    1 1 Quality Test (if source

    is questionable)

    - 0

    Specific Gravity and

    Absorption

    - 1

    Inspection Report - 1

    1 Quality test for

    every 10,000 kgs. of

    fraction thereof on

    each size for each

    shipment? ? Quality Test - ?

    ? ? Quality Test - ?

    ? ? Quality Test - ?

    1404 180 1581 Total Balance 50

    86.0822 11.036 96.93 3.07

    by:

    % Balance

    EO Resident Engineer

    as required.

    MF Resident Engineer