Feasibility Study – Wilshire/La Brea Light Rail Transit Extension
Appendix A – Optional LRT Alignment Plan Set
C R E N S H A W T R A N S I T C O R R I D O R P R O J E C T May 2009
APPENDIX A
Optional LRT Alignment Plan Set
Note: Alignment is based on a cut and cover construction approach in this segment. Use of a bored tunneling approachwill require curvature with radius of 800 feet or larger.
Note: Alignment may also proceed west along San Vicente Boulevard in lieu of turning onto La Brea Avenue.
Note: Track alignment and curvature to be defined in the future to minimize easement requirements.
Feasibility Study – Wilshire/La Brea Light Rail Transit Extension
Appendix B – Optional LRT Alignment Profile
C R E N S H A W T R A N S I T C O R R I D O R P R O J E C T May 2009
APPENDIX B
Optional LRT Alignment Profile
Feasibility Study – Wilshire/La Brea Light Rail Transit Extension
Appendix B – Optional LRT Alignment Profile
C R E N S H A W T R A N S I T C O R R I D O R P R O J E C T May 2009 Page B-1