22
Appendix A: Dam and Water Network Drawings

Appendix A: Dam and Water Network Drawings - … · DAM SECTIONS 6 27690-DA-201 ... tunnel roof Longitudinal construction joint Internal radius 2.0m ... Upstream Water Intake Radial

  • Upload
    lytram

  • View
    216

  • Download
    0

Embed Size (px)

Citation preview

Appendix A: Dam and Water Network Drawings

HAWKE'S BAY REGIONAL INVESTMENT COMPANYRUATANIWHA WATER STORAGE SCHEMEProject Description IssueDRAWING Rev Title

APPLICATION DESIGN

DRAWING Rev Title

227690-DA-000 Drawing List

DRAWING Rev Title

827690-DA-100 Dam General Arrangement

DRAWING Rev Title

727690-DA-104 Reservoir Arrangement (1 of 2)

DRAWING Rev Title

927690-DA-105 Reservoir Arrangement (2 of 2)

DRAWING Rev TitleDRAWING Rev Title

DAM SECTIONS

DRAWING Rev Title

627690-DA-201 Embankment Cross Section

DRAWING Rev Title

627690-DA-203 Cross Valley Section

DRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev Title

SPILLWAY

DRAWING Rev Title

527690-DA-300 Spillway & Outlet Works Arrangement

DRAWING Rev Title

627690-DA-301 Spillway Longsection

DRAWING Rev Title

527690-DA-302 Section Across Spillway & Diversion Cut

DRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev Title

DIVERSION & OUTLET WORKS

DRAWING Rev Title

627690-DA-401 Diversion & Outlet Works Longsection

DRAWING Rev Title

527690-DA-402 Tunnel Cross Sections

DRAWING Rev Title

627690-DA-403 Powerstation Arrangement327690-DA-404 Intake Tower

CONSTRUCTION627690-DA-502 Diversion Staging

Denotes drawing this issue: May 2013

105 Carlton Gore Road, Newmarket, AucklandTel. (09) 355-6000 Fax. (09) 307-0265

www.tonkin.co.nz

Tonkin & TaylorEnvironmental and Engineering

Consultants

DRAWING STATUS: PROJECT DESCRIPTION

L:\2

7690

\Wor

king

\CAD

\DW

G\3

50\D

A\27

690-

DA-

000.

dwg,

00,

30/

04/2

013

10:0

2:23

a.m

., ja

tg, 1

:1

105 Carlton Gore Road, Newmarket, AucklandTel. (09) 355 6000 Fax. (09) 307 0265

www.tonkin.co.nz

Tonkin & TaylorEnvironmental and Engineering

Consultants

DRAWING STATUS: PROJECT DESCRIPTION

L:\2

7690

\Wor

king

\CAD

\DW

G\3

50\D

A\27

690-

DA-

201.

dwg,

201

, 14/

02/2

013

9:48

:17

a.m

., ja

tg, 1

:1

105 Carlton Gore Road, Newmarket, AucklandTel. (09) 355 6000 Fax. (09) 307 0265

www.tonkin.co.nz

Tonkin & TaylorEnvironmental and Engineering

Consultants

DRAWING STATUS: PROJECT DESCRIPTION

L:\2

7690

\Wor

king

\CAD

\DW

G\3

50\D

A\27

690-

DA-

203.

dwg,

203

, 14/

02/2

013

9:48

:23

a.m

., ja

tg, 1

:1

ORIGINAL IN COLOUR

105 Carlton Gore Road, Newmarket, AucklandTel. (09) 355 6000 Fax. (09) 307 0265

www.tonkin.co.nz

Tonkin & TaylorEnvironmental and Engineering

Consultants

DRAWING STATUS: PROJECT DESCRIPTION

L:\2

7690

\Wor

king

\CAD

\DW

G\3

50\D

A\27

690-

DA-

300.

dwg,

300

, 14/

02/2

013

9:48

:32

a.m

., ja

tg, 1

:1

105 Carlton Gore Road, Newmarket, AucklandTel. (09) 355 6000 Fax. (09) 307 0265

www.tonkin.co.nz

Tonkin & TaylorEnvironmental and Engineering

Consultants

DRAWING STATUS: PROJECT DESCRIPTION

L:\2

7690

\Wor

king

\CAD

\DW

G\3

50\D

A\27

690-

DA-

301.

dwg,

301

, 14/

02/2

013

9:48

:50

a.m

., ja

tg, 1

:1

105 Carlton Gore Road, Newmarket, AucklandTel. (09) 355 6000 Fax. (09) 307 0265

www.tonkin.co.nz

Tonkin & TaylorEnvironmental and Engineering

Consultants

DRAWING STATUS: PROJECT DESCRIPTION

L:\2

7690

\Wor

king

\CAD

\DW

G\3

50\D

A\27

690-

DA-

302.

dwg,

302

, 14/

02/2

013

9:48

:57

a.m

., ja

tg, 1

:1

105 Carlton Gore Road, Newmarket, AucklandTel. (09) 355 6000 Fax. (09) 307 0265

www.tonkin.co.nz

Tonkin & TaylorEnvironmental and Engineering

Consultants

DRAWING STATUS: PROJECT DESCRIPTION

L:\2

7690

\Wor

king

\CAD

\DW

G\3

50\D

A\27

690-

DA-

401.

dwg,

401

, 14/

02/2

013

9:49

:02

a.m

., ja

tg, 1

:1

Internal radius 2.0m

Permanent steel rib support200 UC at 1.0 m spacing

Min excavation line

5.0

2.3

External radius 2.5

600 mm cement lined bypass pipe

Reinforce water face with24mm bars on 300mm grid

Overbreak grout fortunnel roof

Longitudinal constructionjoint

Internal radius 2.0m

Min excavation line

2.3

External radius 2.3

600 mm cement lined bypass pipe

Reinforce water face with24mm bars on 300mm grid

Overbreak grout fortunnel roof

Longitudinal constructionjoint

4.6

Internal radius 2.0m

Min excavation line

2.3

600 mm cement lined bypass pipe in

200 mm floor slab

Tunnel Section fromCh 185 to Ch 315

(Grout Curtain from plinthassumed at CH 305

Tunnel Section fromU/S Portal at Ch 175 to Ch 185Ch 460 to D/S portal at Ch 470

300 mm min concretelining

200 mm min shotcreteWater face reinforcedwith steel mesh

Drain holes at 2 m centres drilled 2m into rockWalls anchored to rock with 2.4m anchor bars

External radius 2.2 m

Tunnel Section fromCh 315 to Ch 460

Internal radius 2.0m

2.3

External radius 2.3

Overbreak grout fortunnel roof

4.6

Outlet Penstock fromCh 300 to Ch 315

(Grout Curtain from plinthassumed at CH 305

300 mm min concretelining

20 overbreak grout holesdrilled 5 m into rock around

circumference at Ch 305to intersect with main

grout curtain

2100 steel penstockwith interface groutingbetween penstock and

concrete surround

2nd Stage concrete surround

Internal radius 2.0m

2.3

200 mm floor slab

External radius 2.2 m

Outlet Penstock fromCh 315 to Ch 470

2nd Stage concrete surround

2100 steel penstockwith interface groutingbetween penstock and

concrete surround

concrete surround

at 1.5m c/c

ORIGINAL IN COLOUR

105 Carlton Gore Road, Newmarket, AucklandTel. (09) 355 6000 Fax. (09) 307 0265

www.tonkin.co.nz

Tonkin & TaylorEnvironmental and Engineering

Consultants

DRAWING STATUS: PROJECT DESCRIPTION

L:\2

7690

\Wor

king

\CAD

\DW

G\3

50\D

A\27

690-

DA-

402.

dwg,

402

, 14/

02/2

013

9:49

:08

a.m

., ja

tg, 1

:1

105 Carlton Gore Road, Newmarket, AucklandTel. (09) 355 6000 Fax. (09) 307 0265

www.tonkin.co.nz

Tonkin & TaylorEnvironmental and Engineering

Consultants

DRAWING STATUS: PROJECT DESCRIPTIONORIGINAL IN COLOUR

L:\2

7690

\Wor

king

\CAD

\DW

G\3

50\D

A\27

690-

DA-

403.

dwg,

403

, 14/

02/2

013

9:49

:13

a.m

., ja

tg, 1

:1

ORIGINAL IN COLOUR

2600 dia Raise Bore Shaftwith 2100 steel liner in

concrete surround

Intake Tower, 4000 int diameter

3000 thick base slab

FSL RL 469.5

Parapet crest Level RL 475.5

1

2

3

4

RL 473.0

RL 440.0

RL 443.0

4.0 m dia concreteconcrete lined tunnel

with 4 ports600 wall thickness

Trashracks & baulk slot

RL 417.0

Low Level IntakeBox structure with

trash bars

Trashbars

2.1 m square verticalslide gate, hydraulically

operated

6 tonne travelling craneon portal frame

5.0

for lower ports 1 & 2

Trashracks & baulk slotfor upper ports 3 & 4

Top of of lower ports RL447.532% of total storaage

External stairs for access not shown

Concrete Stoplogs

3.0

1.8

Section Through Port 4

Trashracks & baulk slot

for upper ports 3 & 4

Trashracks & baulk slotfor lower ports 1 & 2

105 Carlton Gore Road, Newmarket, AucklandTel. (09) 355 6000 Fax. (09) 307 0265

www.tonkin.co.nz

Tonkin & TaylorEnvironmental and Engineering

Consultants

DRAWING STATUS: PROJECT DESCRIPTION

L:\2

7690

\Wor

king

\CAD

\DW

G\3

50\D

A\27

690-

DA-

404.

dwg,

404

, 14/

02/2

013

9:49

:18

a.m

., ja

tg, 1

:1

ORIGINAL IN COLOUR

105 Carlton Gore Road, Newmarket, AucklandTel. (09) 355 6000 Fax. (09) 307 0265

www.tonkin.co.nz

Tonkin & TaylorEnvironmental and Engineering

Consultants

DRAWING STATUS: PROJECT DESCRIPTION

L:\2

7690

\Wor

king

\CAD

\DW

G\3

50\D

A\27

690-

DA-

502.

dwg,

502

, 14/

02/2

013

9:49

:22

a.m

., ja

tg, 1

:1

Denotes drawing this issue: May 2013

DRAWING Rev Title

General

DRAWING Rev Title

527690-DN-000 Drawing List

DRAWING Rev Title

627690-DN-001 Distribution Works General Arrangement

DRAWING Rev Title

627690-DN-002 Zone A General Arrangement

DRAWING Rev Title

627690-DN-003 Zone B General Arrangement

DRAWING Rev Title

627690-DN-004 Zones C and D General Arrangement

DRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev Title

INTAKES

DRAWING Rev Title

327690-DN-100 Upstream Water Intake General Arrangement

DRAWING Rev Title

327690-DN-101 Upstream Water Intake Plan

DRAWING Rev Title

327690-DN-102 Upstream Water Intake Typical Section

DRAWING Rev Title

327690-DN-103 Upstream Water Intake Radial Gate Plan

DRAWING Rev Title

327690-DN-104 Upstream Water Intake Radial Gate Details

DRAWING Rev Title

HEADRACE CANAL

DRAWING Rev TitleDRAWING Rev TitleDRAWING Rev Title

427690-DN-232 Headrace Canal Layout (Sheet 1 of 9)

DRAWING Rev Title

427690-DN-233 Headrace Canal Layout (Sheet 2 of 9)

DRAWING Rev Title

427690-DN-234 Headrace Canal Layout (Sheet 3 of 9)

DRAWING Rev Title

427690-DN-235 Headrace Canal Layout (Sheet 4 of 9)

DRAWING Rev Title

427690-DN-236 Headrace Canal Layout (Sheet 5 of 9)

DRAWING Rev Title

427690-DN-237 Headrace Canal Layout (Sheet 6 of 9)

DRAWING Rev Title

427690-DN-238 Headrace Canal Layout (Sheet 7 of 9)

DRAWING Rev Title

427690-DN-239 Headrace Canal Layout (Sheet 8 of 9)

DRAWING Rev Title

427690-DN-240 Headrace Canal Layout (Sheet 9 of 9)

DRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev Title DRAWING Rev Title

DROP STRUCTURES

DRAWING Rev Title

327690-DN-300 Drop Structure Typical Plan

DRAWING Rev Title

327690-DN-301 Drop Structure Typical Section

DRAWING Rev TitleDRAWING Rev Title

SIPHONS

DRAWING Rev Title

327690-DN-400 Siphons Typical Plan

DRAWING Rev Title

427690-DN-401 Siphon Longsections

DRAWING Rev Title

327690-DN-402 Waipawa Siphon Offtake

DRAWING Rev Title

CROSSINGS

DRAWING Rev Title

327690-DN-500 Minor Stormwater Crossings

DRAWING Rev Title

327690-DN-501 Typical Bridges

DRAWING Rev Title

TURNOUTS

DRAWING Rev Title

327690-DN-600 Secondary Works Offtake Details

DRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev TitleDRAWING Rev Title

227690-DN-110 Downstream Water Intake Waipawa General Arrangement

STREAM DISCHARGES227690-DN-700 Typical Outlet227690-DN-701 Kahahakuri Stream Plunge Pool

427690-DN-217 Typical Canal Cross-Section Details

HAWKE'S BAY REGIONAL INVESTMENT COMPANYRUATANIWHA WATER STORAGE SCHEMEProject Description Issue

33 Parkhouse Road, Wigram, ChristchurchTel. (03) 363-2440 Fax. (03) 363-2441

www.tonkin.co.nz

Tonkin & TaylorEnvironmental and Engineering

Consultants

DRAWING STATUS: PROJECT DESCRIPTION

T:\C

hris

tchu

rch\

TT C

AD\2

7690

\Wor

king

\CAD

\DW

GS\

2769

0-D

N-0

00.d

wg,

000

, 30/

04/2

013

4:39

:44

p.m

., ja

tg, 1

:1

!Zone M

ProposedMakaroro Dam

Upstream Water Intake

Zone A

Zone B

Zone D

Zone C

Waipawa River

Makar etu River

Tukituki River

Proposed Kahahakurioutfall structure

Proposed Mangaonukuoutlet structure

Downstream Water Intake

¥50

¥2

Takapau

Ongaonga

Tikokino

Waipukurau

27690-DN-002

27690-DN-003

27690-DN-004

60 2 4 6 8 10 (km)

Sources: Esri, DeLorme,NAVTEQ, TomTom, Intermap,

A3 SCALE

Drawing 27960-DN-001

HAWKE'S BAY REGIONAL INVESTMENT COMPANYRUATANIWHA WATER STORAGE SCHEME

DISTRIBUTION WORKSDistribution Works General Arrangement

Key Plan

1:175,000

27690.45033 Parkhouse Road, PO Box 13055, Christchurch

1:175,000 27690-DN-0015.mxd

JSD May.13

Path

: T:\C

hris

tchu

rch\

TT C

AD

\276

90\W

orki

ng\G

IS\2

7690

-DN

-001

5.m

xd D

ate:

30/

04/2

013

Tim

e: 4

:22:

09 p

.m.

DRAWING STATUS: PROJECT DESCRIPTION1. Aerial photography supplied by Hawke's Bay Regional Council Date of photography: 3 March 2011

LegendZone M PrimaryDistribution Channel

Primary WaterDistribution Network

Primary Pipe WaterDistribution Network

Secondary PipeWater DistributionNetwork

Reservoir

ZoneBoundaryZones

Zone A

Zone B

Zone C

Zone D

Zone M

Tonkin & Taylor

Notes:

Environmental and Engineering ConsultantsSCALE (AT A3 SIZE)

PROJECT No.

ARCFILE

DRAWNCHECKEDAPPROVED

FIGURE No. Rev.

_̂̂_

Pump B-2(Caldwell Road PS)

Pump A-1(Sedgwick Street PS)

Pump A-8-1(Matheson Road PS)

Pump A-8-2(Richardsons Bridge PS)

Pump B-1(Springhill PS)

Pump A-HR(Tikokino PS)

Te Papa

Tikokino East

Butler Road

Makaroro Road

Tikokino Road

Wakarara Road East

Smedley Road

Wakarara Road West

SH50

- W

aipa

wa

Riv

er

Mangaoho Stream

Cal

dwel

l Roa

dSprin

ghill

Matheson Road

Ongaonga Stream

Tikokino Road

SH50

- M

anga

mau

ku S

tream

Glenalvon Road North

Wakarara Road East

Tikokino Road East

SH 50 - Mangamat

eS

tream !

60 0.5 1 1.5 2 2.5 (km) Sources: Esri, DeLorme,

NAVTEQ, TomTom, Intermap,

A3 SCALE

Drawing 27690-DN-002

HAWKE'S BAY REGIONAL INVESTMENT COMPANYRUATANIWHA WATER STORAGE SCHEME

DISTRIBUTION WORKS FEASIBILITYZone A & B General Arrangement

Key Plan

1:60,000

27690.45033 Parkhouse Road, PO Box 13055, Christchurch

1:60,00027690-DN-002.mxd

MAB May.13

Path

: T:\C

hris

tchu

rch\

TT C

AD

\276

90\W

orki

ng\G

IS\2

7690

-DN

-002

.mxd

Dat

e: 3

0/04

/201

3 Ti

me:

4:3

1:12

p.m

.

DRAWING STATUS: PROJECT DESCRIPTION1. Aerial photography supplied by Hawke's Bay Regional Council Date of photography: 3 March 2011

LegendPrimary Water Distribution Network

_̂ Pumping Stations

Primary Pipe Water Distribution Network

Secondary Pipe Water Distribution Network

Gas Pipeline

ZonesZone A

Zone B

Zone C

Zone D

Zone M

Tonkin & Taylor

Notes:

Environmental and Engineering Consultants SCALE (AT A3 SIZE)

PROJECT No.

ARCFILE

DRAWNCHECKEDAPPROVED

FIGURE No. Rev.

ARG

YLL

ROAD

TUKITUKI ROAD

ONGAONGA ROAD

BLACKBURN ROAD

SPEEDY ROAD

RANG

E RO

AD

MAH

ARAK

EKE

ROAD

BIBBY ROAD

LINDSAY ROAD

ASHLEY CLINTON ROAD

PETTIT VALLEY ROAD

MCLEOD ROAD

EAST

WO

OD

RO

AD

SPEEDY SIDE ROAD

STOCKADE ROAD

TAKAPAU ROAD

FORD ROAD

KYLE ROAD

AND

ER

SON

RO

AD

Pump B-2(Caldwell Road PS)

Pump B-9(Pettit Valley Road PS)

Pump C-3(Ashcott Road West PS)

Pump B-7(Ngaruru Road PS)

Pump B-10(SH50 West PS)

Zone B

Zone A

Zone C

Tukituki River

Waipawa River

Tukituki RiverSiphon

Proposed Mangaonukuoutlet structure

Proposed Kahahakurioutfall structure

SH2 East

Speedy Road

Ashcott Road East

Tikokino Road

Hobin Road

Wakarara Road East

Makaroro Road

Taylor Road

Te Papa

Sprin

ghill

Ashcott Road West

Tukituki River

Purinui

Swam

p R

oad

Balfour Road

Plan

tatio

n R

oad

Fairfield Road West

SH2 West

Cal

dwel

l Roa

d

Burnside Road West

SH50 - Ongaonga West

Ongaonga Waipukurau Road

SH50

- W

aipa

wa

Riv

er

Pettit Valley Road

Ongaonga Road South

OngaongaStream

Fairfield Road East

Burnsid

e Roa

d

North

Ongaonga

!

60 0.5 1 1.5 2 2.5 (km) Sources: Esri, DeLorme,

NAVTEQ, TomTom, Intermap,

A3 SCALE

Drawing 27690-DN-003

HAWKE'S BAY REGIONAL INVESTMENT COMPANYRUATANIWHA WATER STORAGE SCHEME

DISTRIBUTION WORKS FEASIBILITYZone A, B & C General Arrangement

Key Plan

1:60,000

27690.45033 Parkhouse Road, PO Box 13055, Christchurch

1:60,00027690-DN-003.mxd

JSD May.13

Path

: T:\C

hris

tchu

rch\

TT C

AD

\276

90\W

orki

ng\G

IS\2

7690

-DN

-003

.mxd

Dat

e: 3

0/04

/201

3 Ti

me:

4:3

4:36

p.m

.

DRAWING STATUS: PROJECT DESCRIPTION1. Aerial photography supplied by Hawke's Bay Regional Council Date of photography: 3 March 2011

LegendPrimary Water Distribution Network

Primary Pipe Water Distribution Network

Secondary Pipe Water Distribution Network

_̂ Pumping Stations

Gas Pipeline

Zone A

Zone B

Zone C

Zone D

Zone M

Tonkin & Taylor

Notes:

Environmental and Engineering Consultants SCALE (AT A3 SIZE)

PROJECT No.

ARCFILE

DRAWNCHECKEDAPPROVED

FIGURE No. Rev.

_̂_̂

_̂PAGET ROAD

NIC

HO

LLS

RO

AD

NGAH

APE

ROAD

TOURERE ROAD

PAUL

SEN

ROAD

HATUMA ROAD

MAH

ARAK

EKE

ROAD

LINDSAY ROAD

OTAWHAO ROAD

WO

BU

RN

RO

AD

WAIOU ROAD

NELSONS ROAD

TAKAPAU ORMONDVILLE ROAD

SCHOOL ROAD

DEA

N R

OAD

TAKAPAU ROADKYLE ROAD

GRO

OM

E RO

AD

SH 2 R

ACE

CO

UR

SE

RO

AD

Pump C-4-B(Burnside Road PS)

Pump D-5(Awanui PS)

Pump D-2(SH2 PS)

Pump D-HR(Fraser Road PS)

Pump C-4-A(Balfour Road PS)

Zone D

Makaretu River

Zone C

SH2 East

Speedy Road

Maharakeke

Oruawhara Road

SH2 West

Seeforth

Hinerangi Road

Burnside Road West

Awanui S

tream

Burn

side

Roa

d So

uth

Takapau

!

60 0.5 1 1.5 2 2.5 (km) Sources: Esri, DeLorme,

NAVTEQ, TomTom, Intermap,

A3 SCALE

Drawing 27690-DN-004

HAWKE'S BAY REGIONAL INVESTMENT COMPANYRUATANIWHA WATER STORAGE SCHEME

DISTRIBUTION WORKS FEASIBILITYZone C & D General Arrangement

Key Plan

1:60,000

27690.45033 Parkhouse Road, PO Box 13055, Christchurch

1:60,00027690-DN-004.mxd

JSD May.13

Path

: T:\C

hris

tchu

rch\

TT C

AD

\276

90\W

orki

ng\G

IS\2

7690

-DN

-004

.mxd

Dat

e: 3

0/04

/201

3 Ti

me:

4:3

1:03

p.m

.

DRAWING STATUS: PROJECT DESCRIPTION1. Aerial photography supplied by Hawke's Bay Regional Council Date of photography: 3 March 2011

LegendPrimary Water Distribution Network

Primary Pipe Water Distribution Network

Secondary Pipe Water Distribution Network

_̂ Pumping Stations

Gas Pipeline

Rail

ZonesZone A

Zone B

Zone C

Zone D

Zone M

Tonkin & Taylor

Notes:

Environmental and Engineering Consultants SCALE (AT A3 SIZE)

PROJECT No.

ARCFILE

DRAWNCHECKEDAPPROVED

FIGURE No. Rev.

t:\c

hris

tchu

rch\

TT C

AD\2

7690

\Wor

king

\CAD

\DW

GS\

2769

0-D

N-1

00.d

wg,

100

, 15/

02/2

013

2:15

:09

p.m

., ja

tg, 1

:1

33 Parkhouse Road, Wigram, ChristchurchTel. (03) 363-2440 Fax. (03) 363-2441

www.tonkin.co.nz

Tonkin & TaylorEnvironmental and Engineering

Consultants

DRAWING STATUS: PROJECT DESCRIPTION

t:\c

hris

tchu

rch\

TT C

AD\2

7690

\Wor

king

\CAD

\DW

GS\

2769

0-D

N-1

01.d

wg,

101

, 15/

02/2

013

2:15

:21

p.m

., ja

tg, 1

:1

33 Parkhouse Road, Wigram, ChristchurchTel. (03) 363-2440 Fax. (03) 363-2441

www.tonkin.co.nz

Tonkin & TaylorEnvironmental and Engineering

Consultants

DRAWING STATUS: PROJECT DESCRIPTION