Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
DISCLAIMER: While every care is taken to ensure the accuracy of this data, the City of Joondalup makes no representations or warranties about its accuracy, completeness or suitability for any particular purpose and disclaims all liability for all expenses, losses, damages and costs which you might incur as a result of the data being inaccurate or incomplete in any way and for any reason.
Beaumaris Community Centre - Aerial Map
Tuesday, 19 November 2013
1:1500
ATTA
CH
MEN
T 1APPENDIX 4
ATTACHMENT 1
ATTA
CH
MEN
T 2ATTACHMENT 2
DISCLAIMER: While every care is taken to ensure the accuracy of this data, the City of Joondalup makes no representations or warranties about its accuracy, completeness or suitability for any particular purpose and disclaims all liability for all expenses, losses, damages and costs which you might incur as a result of the data being inaccurate or incomplete in any way and for any reason.
Iluka Sports Complex - Aerial Map
Tuesday, 19 November 2013
1:2000
ATTA
CH
MEN
T 3ATTACHMENT 3
ATTA
CH
MEN
T 4ATTACHMENT 4
DISCLAIMER: While every care is taken to ensure the accuracy of this data, the City of Joondalup makes no representations or warranties about its accuracy, completeness or suitability for any particular purpose and disclaims all liability for all expenses, losses, damages and costs which you might incur as a result of the data being inaccurate or incomplete in any way and for any reason.
Heathridge Park Clubroom - Aerial Map
Tuesday, 19 November 2013
1:2000
ATTA
CH
MEN
T 5ATTACHMENT 5
HALL
KITC
HEN/
BAR
VERANDAH
KITCHEN/BARSTORE
D 1
D 2
RD 2
D 3
RD 1
D 4
RD 4
RD 3
16 SAIL TERRACE, HEATHRIDGE 1103A001
BUILDING NAME:
DRAWING No:
BUILDING No:
DRAWN:
SCALE:
DATE:DRAWING TITLE: JoondalupCity of Building Asset MngmtPO Box 21, JoondalupWestern Australia, 6919Telephone:Facsimile:
(08) 9400 4000(08) 9400 4501
ADDRESS:
THIS DRAWING IS THE PROPERTY OF THE CITY OF JOONDALUP BUILDING ASSETMANAGEMENT AND MAY NOT BE COPIED OF USED WITHOUT CONSENT.CHECK ALL DIMENSIONS BEFORE FABRICATION AND AGAINST ON SITE DIMENSIONS
JUNE11
1:100
D.W
HEATHRIDGE PARKCLUBROOM
FLOOR PLAN
THIS DRAWING TO BE PLOTTED ON A3 SIZE PAPER - DO NOTSCALE, IF IN DOUBT ENQUIRE WITH ASSET MGT 94004340
SCHEDULE OF AREAS:
KITCHEN/BAR 30m²KITCHEN/BAR STORE 4m²HALL 145m²
TOTAL AREA 179m²
ATTA
CH
MEN
T 6ATTACHMENT 6
Stage 1 Project Initiation
and Planning
Master Planning Process
Stage 2 Site & Needs
Analysis
Stage 4 Feasibility Analysis
Stage 3 Concept Design
Stage 5 Funding & Approvals
Stage 6 Construction
Stage 7 Operations &
Review
Elected Member Engagement
1.8 Review EM pack and complete survey to
provide direction to the overall project
Elected Member Engagement
2.10 Project update on outcome of Commu- nity consultation
Council Actions 4.4 Briefing on outcomes of Feasibility Study 4.5 Endorse project to
proceed to Stage 5 Elected Member Engagement
3.6 Provide comment and feedback on draft
Concept Plan
Community Consultation
6.1 Workshops with clubs/groups for relocation
during construction 6.2 Notify residents of impending construction
Community Consultation
7.4 Inform community of new facilities and booking procedures
Management Actions
1.1 Form a Project Team 1.2 Develop a list of key stakeholders 1.3 Identify key issues and
design outcomes 1.4 Develop a Project Plan 1.5 Research & analysis of community demo- graphics & industry trends 1.6 Undertake a review of other similar projects 1.7 Develop EM pack consisting of discus- sion paper, survey and project plan
Management Actions
2.1 Review condition and life expectancy of site &
existing facilities 2.2 Outline utilisation rates
and capacity of existing facilities
2.3 Develop future usage projections
2.4 Identify future shared use opportunities
2.5 Conduct consultation with State Sporting Associations
2.6 Develop Communica-tions campaign
Management Actions
4.1 Develop detailed de- sign 4.2 Assess financial, social and environmental factors 4.3 Review and assess options available
Management Actions
3.1 Develop draft Concept Plan
3.2 Develop staged con-struction options
3.3 Assess integration of facility opportunities
3.4 Develop a Draft Management Plan for
shared facilities 3.5 Develop a Design Brief
and preliminary costings
Management Actions
5.1 Develop Funding Proposals 5.2 Undertake Planning &
Building Approvals 5.3 Release Tender for capital works 5.4 Develop project timelines Management
Actions 6.3 Relocate hire groups 6.4 Construction process 6.5 Handover of facilities
Management Actions
7.1 Implement Management Plan 7.2 Market new facilities 7.3 Project Evaluation
Community Consultation
2.8 Opportunity for commu- nity to provide com- ment on the project 2.9 Engage with key stakeholders
Elected Member Engagement
2.7 Project update on site review and proposed Community Consulta- tion process
Community Consultation
3.7 Workshop draft Concept Plan with key
Stakeholders 3.8 Opportunity for Com- munity to provide comment on draft Concept Plan
Council Actions 3.9 Endorsement of Concept Plan to pro- ceed to detailed design
4 Months 8 Months 10 Months 4 Months Timeline will be project specific
Council Actions 5.5 Endorse Contractor to undertake construction
ATTA
CH
MEN
T 7ATTACHMENT 7
ATTACHMENT 8
PROJECT: COJ Beaumaris Community CentrePROJECT: COJ Beaumaris Community CentrePROJECT: COJ Beaumaris Community CentrePROJECT: COJ Beaumaris Community CentreOPINION OF PROBABLE COSTOPINION OF PROBABLE COSTOPINION OF PROBABLE COSTOPINION OF PROBABLE COST
Itemised costsItemised costsItemised costsItemised costs
Item Description Rate Total
COJ BEAUMARIS COMMUNITY CENTRECOJ BEAUMARIS COMMUNITY CENTRECOJ BEAUMARIS COMMUNITY CENTRECOJ BEAUMARIS COMMUNITY CENTRE
1 Upgrading to existing kitchen 104,700
2 Painting of Hall and Foyer 12,000
3 Sanding and polishing Floor boards 30,300
4 False ceiling, modifications to evap air-con, existing gas heaters and newlighting (Note: Recycled AC $55,000 extra)
77,300
5 Bin wash down area 2,400
6 New locks and re-keying 4,400
7 Push bars and modifications to gates 6,100
8 Toilet grab rails 1,700
9 Signage 2,100
10 Smoke detectors and alarm system 6,000
ESTIMATED TOTALESTIMATED TOTALESTIMATED TOTALESTIMATED TOTAL 247,000247,000247,000247,000
CostX15/10/2013 9:50:09 AM
Borrell Rafferty Associates Pty LtdProject No. OPC13121
Page 1 of 1
ATTACHMENT 9
²
²
²
²
²
²²
²
² ²
²²
²
²
²²
²
²
²²
²
²
²
²
Hockey Store
8.5m²
Soccer Store
26m²
Wash
Freezer
3.5m²
C/Room
4.5m²
Dry Store
3.5m²
Se
rve
ry
Co
ok
C/Room
15.8m²
²
Kitchen
53m²
FFL
28.05
FFL
28.629
Bin Store
Extension
23m²
²
16.3m²
Pre
p
Service
Entry
New Window
and Roller Shutter
CLEAN & TIDY UP TO
CHANGEROOM 1,2,3 & 4
NEW SKYLIGHT
NEW SKYLIGHT
Remove Existing
Window and
Elec. Roller Shutter
KITCHEN ALTERATIONS / ADDITIONS
EXISTING FUNCTION ROOM
PROPOSED FUNCTION ROOM
DIFFERENCE
PROPOSED KITCHEN
DRY STORE
FREEZER
COOLROOM
STORE 2
PROPOSED EXTENSION AREA
326 sqm
296sqm
30sqm
53sqm
3.5sqm
3.5sqm
4.5sqm
16.3sqm
32.1sqm
STOREROOM ADDITIONS
HOCKEY STORE
SOCCER STORE
PROPOSED EXTENSION AREA
8.5 sqm
26sqm
44sqm
SCOPE OF WORKS
KITCHEN & FUNCTION ROOM:
CLEAR AREA FOR PROPOSED EXTENSION
DEMOLISH EXISTING INTERNAL WALLS AS SHOWN &
REMOVE WINDOWS
IDENTIFY ANY EXISTING SERVICES & RELOCATE
WHERE NECESSARY
CONSTRUCT NEW EXTENSION AS PER DRAWINGS
COORDINATE EXISTING DOWNPIPES, ROOF &
STRUCTURE WITH NEW EXTENSION
MAKE GOOD ANY PATHWAYS & ADJACENT BUILDINGS
/ LANDSCAPING AS PER EXISTING
FUNCTION ROOM / LOBBY STORE:
CLEAR AREA FOR PROPOSED EXTENSION
REMOVE EXISTING WINDOWS & ELEC. ROLLER
SHUTTER
IDENTIFY ANY EXISTING SERVICES & RELOCATE
WHERE NECESSARY
CONSTRUCT NEW EXTENSION AS PER DRAWINGS
PROVIDE NEW WINDOW TO EXISTING OFFICE WITH
NEW ROLLER SHUTTER AS SIMILAR TO EXISTING
MAKE GOOD ANY ADJACENT BUILDING &
LANDSCAPING AS PER EXISTING
SOCCER / HOCKEY STORE:
CLEAR AREA FOR PROPOSED EXTENSION
REMOVE WINDOWS TO CHANGEROOM AND MAKE
GOOD WALLS
IDENTIFY AND EXISTING SERVICES & RELOCATE
WHERE NECESSARY
CONSTRUCT NEW EXTENSION AS PER DRAWINGS
COORDINATE EXISTING DOWNPIPES, GUTTERING,
ROOF & STRUCTURE WITH NEW EXTENSION
MAKE GOOD ANY PATHWAYS & ADJACENT BUILDINGS
/ LANDSCAPING AS PER EXISTING
OTHER:
GENERAL CLEAN & TIDY UP TO EXISTING
CHANGEROOMS.
PROVIDE NEW SKYLIGHTS TO EXISTING
CHANGEROOMS TO EXTENT SHOWN ON DRAWINGS
PAVE AREA AS SHOWN ON PLAN WITH PAVERS TO
MATCH EXISTING.
PROVIDE NEW SHADE SAIL AS SHOWN ON DRAWINGS
TO MATCH EXISTING.
PROVIDE NEW BIN WASH DOWN AREA AS SHOWN ON
DRAWINGS, WITH DRAINAGE
REMOVE ALL EXISTING KITCHEN EQUIPMENT FROM
EXISTING KITCHEN AND MAKE GOOD - NEW USE OF
AREA TO BE A BAR STORE
RELOCATE EXISTING DANCE FLOOR AS SHOWN ON
DRAWINGS AND MAKE GOOD.
PROPOSED FLOOR PLAN
SCALE 1:100 @ A1
ATTACHMENT 10
²
²
²
97
10
61
00
30
00
4500
8.5m²
PROPOSED
HOCKEY STORE
26m²
PROPOSED EXTENSION EXISTING BUILDINGEXISTING BUILDING
PROPOSED EXTENSION EXISTING BUILDING
²
²
Office
12m²
15.8m²
EXTENSION
Store
16.3m²
New
Window
PROPOSED STORE
2400
2400
Freezer
3.5m²
C/Room
4.5m²
Dry Store
3.5m²
Wash
Cook
Prep
Servery
Kitchen
45m²
FFL
28.05
FFL
28.629
Service
Entry
2400
NEW BRICKWORK PARAPET WALLS TO
PROPOSED EXTENSION TO MATCH
EXISTING
NEW 600W.
COLORBOND
BOX GUTTER
NEW COLORBOND
ROOF DECKING TO MATCH EXISTING
NEW BRICKWORK PARAPET WALLS TO
PROPOSED EXTENSION TO MATCH
EXISTING
REMOVE EXISTING WALL
NEW WALL TO KITCHEN
PLASTERBOARD - PAINT FINISH
NEW S/S KITCHEN BENCHES
EXISTING COLORBOND ROOF
EXISTING COLORBOND ROOF
EXISTING COLORBOND ROOF
NEW COLORBOND ROOF
FALL @ 3 DEG. PITCH
NEW
COLORBOND
ROOF
FALL @ 3 DEG.
PITCH
NEW COLORBOND
BOX GUTTER
NEW BRICKWORK PARAPET WALLS TO
PROPOSED EXTENSION TO MATCH
EXISTING
EXISTING BRICKWOR0K WALL
NEW LOCKABLE ROLLER SHUTTER
TO SERVERY
REMOVE EXISTING WINDOW
NEW RENDERED BRICKWORK
PARAPET WALLS TO PROPOSED
EXTENSION TO MATCH EXISTING
FFL
28.629
EXISTING WINDOWS TO BE REMOVED,
BRICK UP OPENINGS
NEW OPENING & DOUBLE DOORS
TO STORE
NEW WINDOW TO EXISTING
BRICKWORK WALL TO OFFICE WITH ELECTRIC
SECURITY ROLLER SHUTTER
EXISTING WALL NEW BRICKWORK WALL
EXISTING
BRICKWORK
PARAPET WALL
FA
LL
FA
LL
FA
LL
FA
LL
NEW RENDERED BRICKWORK PARAPET
WALLS TO PROPOSED EXTENSION
TO MATCH EXISTING
COORDINATE WITH EXISTING
ROOF STRUCTURE &
RELOCATE EXISTING
DOWNPIPES WHERE
NECESSARY
COLORBOND CAPPING TO PARAPET
TO MATCH EXISTING
CUT BACK EXISTING ROOF STRUCTURE &
RELOCATE EXISTING DOWNPIPES WHERE
NECESSARY, COORDINATE WITH NEW ROOF
EXISTING WINDOW & ROLLER SHUTTERTO BE
REMOVED, BRICK UP OPENING,
PLASTERBOARD - PAINT FINISH TO OFFICE
REMOVE EXISTING WALL
FFL 28.629
CL 31.029
EXISTING WINDOWS TO BE RETAINED
NEW STORE
BEYOND
NEW RENDERED BRICKWORK PARAPET
WALLS TO PROPOSED EXTENSION
TO MATCH EXISTING
NEW COLORBOND STEEL
LOCKABLE ROLLER SHUTTERS
NEW COLORBOND CAPPING
TO PARAPET
TO MATCH EXISTING
NEW SKYLIGHT TO
CHANGEROOM 3
NEW SKYLIGHT TO
CHANGEROOM 1
NEW RENDERED BRICKWORK PARAPET
WALLS TO PROPOSED EXTENSION
TO MATCH EXISTING
NEW COLORBOND STEEL
LOCKABLE ROLLER SHUTTERS
REMOVE EXISTING WINDOWS
NEW BRICKWORK TO OPENINGS, MAKE GOOD
REMOVE EXISTING WINDOWS
NEW BRICKWORK TO OPENINGS, MAKE GOOD
PROPOSED
SOCCER STORE
NEW RENDERED BRICKWORK PARAPET
WALLS TO PROPOSED EXTENSION
TO MATCH EXISTING
NEW COLORBOND CAPPING
TO PARAPET
TO MATCH EXISTING
EXISTING CHANGEROOMS
PROPOSED EXTENSIONEXISTING BUILDING
NEW
COLORBOND
ROOF
FALL @ 3 DEG.
PITCH
FALL
FALL
NEW RENDERED BRICKWORK PARAPET
WALLS TO PROPOSED EXTENSION
TO MATCH EXISTING
NEW COLORBOND CAPPING
TO PARAPET
TO MATCH EXISTING
COLORBOND ROOF DECKING
@ 3 DEG. PITCH
TO MATCH EXISTING
NEW COLORBOND BOX GUTTER
COORDINATE EXISTING ROOF WITH
PROPOSED LOWER ROOF
LINE OF ROOF BEYOND
@ 3 DEG. PITCH
NEW 600W. COLORBOND BOX GUTTER
LINE OF EXISTING BUILDING UNDER
LINE OF EXISTING BUILDING UNDER
BOX GUTTER BEYOND
CLEAN & TIDY UP OF
EXISTING CHANGEROOMS GENERALLY
FFL 28.200
CL 30.600
FFL 28.200
CL 30.600
NOTIONAL LOCATION OF KITCHEN EXHAUST
SYSTEM BEHIND PARAPET SHOWN DASHED
4600
GL 28.05
RL 32.650
R
W
D
P
R
W
D
P
R
W
D
P
EXISTING COLORBOND ROOF
EXISTING COLORBOND ROOF
R
W
D
P
EXISTING OPENING TO BE
MADE BIGGER TO SUIT DOOR
MAKE GOOD WALL
72
50
2160
3150
5940
22
65
15
00
12
50
16
00
26
95
93
10
7150
272519152010
22
50
16
50
PROPOSED KITCHEN FLOOR PLAN
1:100 @ A1
PROPOSED STORE FLOOR PLAN
1:100 @ A1
PROPOSED STORE ROOF PLAN
1:100 @ A1
PROPOSED STORE (WEST) ELEVATIONS
1:100 @ A1
PROPOSED KITCHEN (SOUTH ENTRY) ELEVATION
1:100 @ A1
PROPOSED KITCHEN ROOF PLAN
1:100 @ A1
²
²
Office
12m²
15.8m²
EXTENSION
Store
16.3m²
New
Window
Freezer
3.5m²
C/Room
4.5m²
Dry Store
3.5m²
Wash
Cook
Prep
Servery
Kitchen
45m²
FFL
28.05
Service
Entry
NEW BRICKWORK PARAPET WALLS TO
PROPOSED EXTENSION TO MATCH
EXISTING
REMOVE EXISTING WALL
NEW WALL TO KITCHEN
PLASTERBOARD - PAINT FINISH
NEW S/S KITCHEN BENCHES
NEW LOCKABLE ROLLER SHUTTER
TO SERVERY
REMOVE EXISTING WINDOW
NEW RENDERED BRICKWORK
PARAPET WALLS TO PROPOSED
EXTENSION TO MATCH EXISTING
FFL
28.629
EXISTING WINDOWS TO BE REMOVED,
BRICK UP OPENINGS
NEW OPENING & DOUBLE DOORS
TO STORE
NEW WINDOW TO EXISTING
BRICKWORK WALL TO OFFICE WITH ELECTRIC SECURITY ROLLER
SHUTTER
EXISTING WALL NEW BRICKWORK WALL
EXISTING WINDOW & ROLLER SHUTTERTO BE REMOVED, BRICK UP
OPENING,
PLASTERBOARD - PAINT FINISH TO OFFICE
REMOVE EXISTING WALL
EXISTING OPENING TO BE
MADE BIGGER TO SUIT DOOR
MAKE GOOD WALL
72
50
2160
3560
6375
22
65
15
00
12
50
16
00
26
95
93
10
7150
272519152010
22
50
16
50
BIN
DISHWASH
CO
OK
IN
G B
AN
K
BIN
PO
T S
HE
LV
IN
G
UN
DE
RB
EN
CH
CH
ILLE
R
SE
RV
IC
E C
HILLE
R
PLA
TE
WA
RM
ER
PIC
K U
P P
AS
S
HE
AT
ED
RELOCATE DANCE FLOOR TO EXISTING
DIMENSIONS TO EASTERN END OF FUNCTION ROOM
S/S SHELVING S/S SHELVING S/S SHELVING
PROPOSED KITCHEN FLOOR PLAN
1:100 @ A1
KITCHEN EQUIPMENT LOCATIONS SHOWN NOTIONALLY TO
BE CONFIRMED WITH HEALTH STANDARDS &
MANUFACTURER'S SPECIFICATIONS.
Item Description Rate Total
ATTACHMENT 11
ATTACHMENT 12
Item Description Rate Total
ATTACHMENT 13