6 Appendix 2
11.1 Concrete overlay connection 315
11.1.1 Application range 315
11.1.2 Advantages of the method 315
11.2 Design of interface 317
11.2.1 Basic considerations 317
11.2.2 Ultimate limit state for shear transfer at the interface 317
11.2.3 Design shear force acting longitudinally at interface, VSd 322
11.2.4 Serviceability limit state 323
11.2.5 Additional rules and detailing provisions 323
11.3 Examples 326
11.3.1 Example: Double-span slab 326
11.3.2 Example: Double-span beam with new slab 329
11.4 Test results 331
11.4.1 Transfer of shear across a concrete crack 331
11.4.2 Laboratory tests by Hilti Corporate Research 331
11.4.3 Working principle of connectors 332
11.4.4 Comparison with international test results 333
11.5 Notations 334
11.6 Reference literature 335
12. Injection mortar Hit HY 150 and HAS rod with nut or headplate 336
12.1 Terms 336
12.2 Data for the calculation 337
12.3 Minimum steel content for Ved 338
12.4 Product Information 342
6
314
Connections for concrete overlays
11.1.1 Application rangeIf a new layer of concrete is applied to existing concrete withthe aim of strengthening or repairing a structure, reference ismade to a composite concrete structure. This overlay isusually cast directly or placed as shotcrete. It functions toaugment the flexural compression or flexural tension zones,depending on the placement. Prior to placement of the over-lay, the surface of the old concrete member is prepared bysuitable means and pre-wetted. Shrinkage of the new con-crete overlay can be reduced by careful selection of the con-crete mix. Forces of constraint caused by differential shrin-kage and, possibly, by differential temperature gradientscannot be avoided, however. Initially, stresses in the bond in-terface result from a combination of external loads and inter-nal forces of constraint. It must be borne in mind that stres-ses due to shrinkage and temperature gradients in the newconcrete typically reach their maximum at the perimeter(peeling forces). The combination of external and internalstresses often exceeds the capacity of the initial bond, thusrequiring the designer to allow for a de-bonded interface.This is particularly true in the case of bridge overlays whichare subject to fatigue stresses resulting from traffic loads. Furthermore, these stresses are dependent on time, and bond failure can take place years after overlayplacement. When this happens, the tensile forces set up must be taken up by reinforcement or connectorspositioned across the interface. Typical examples are shown schematically in Figures 1 and 2.
11.1.2 Advantages of the method➥ Simple and reliable application to a variety of cases➥ Monolithic structural component behavior assured➥ Shear forces are reliably transferred even if the interface is cracked➥ Suitable for use with the most common methods of surface roughening➥ Reduced requirements for anchor embedment
Repairing a bridge pavement
• Removal of damaged concrete layer using high-pressure water jetting
• Anchoring of additional reinforcement using HIT-HY 150
• Installation of shear connectors using HIT-HY 150• Placement of new concrete overlay
✔ Monolithic load-bearing behavior✔ Reliable transfer of shear✔ Stiff connection✔ Reduced anchor embedment
existingconcrete
new concrete
Figure 1: Strengthening a bridge deck
Case A:new concrete overlay
Case B:new concrete with additional tensile reinforcement
Figure 2: Strengthening a building floor
11 Appendix 2
11.1 Concrete overlay connection
315
6
Connections for concrete overlays
316
Strengthening the floor of an industrial building• Removal of covering and any loose overlay• Roughening of surface by shot-blasting• Installation of connectors using HIT-HY 150
according to the engineer's instructions• Inspection, if necessary, of concrete surface for
roughness and pull-away strength, and of connectors for pull-out strength
• Placement of reinforcement and overlay concrete
✔ Monolithic load-bearing behavior✔ Reliable shear transfer; verifiable✔ Adequate connection stiffness✔ Small anchorage depth
Strengthening an industrial building foundation• Exposure of foundation• Installation of connectors using HIT-HY 150 per
design specifications (smooth surface)• Placement of reinforcement and overlay concrete
✔ Reduced labor✔ Monolithic load-bearing behavior✔ Reduced anchor embedment (6 diameters)✔ Reliable shear transfer✔ Ductile connection
Repairing and strengthening a pier• Roughening of concrete surface• Installation of shear connectors using HIT-HY 150
per design specifications• Placement of reinforcement and overlay concrete
✔ Monolithic load-bearing behavior✔ Reliable shear transfer✔ A stiff connection✔ Reduced anchor embedment
Repair and strengthening with shotcrete• Roughening of concrete surface• Installation of shear connectors using HIT-HY 150• Placement of reinforcement and overlay concrete
✔ Monolithic load-bearing behavior✔ Reliable shear transfer✔ A stiff connection✔ Reduced anchor embedment
Section
Connector
Plane
Beam
Tunel
Additionalreinforcement
Connector
Mesh
Connections for concrete overlays
317
11.2 Design of interface
11.2.1 Basic considerationsStructures made of reinforced concrete or prestressed concrete which have a concrete overlay at least40 mm thick ([2], Section 2.5.3.5.8 (109)), or at least 60 mm thick on bridge structures, may be designedas monolithic building components if shear forces at the interface between the new and the old concre-te are resisted in accordance with the following rules:
11.2.2 Ultimate limit state for shear transfer at the interface11.2.2.1 Principle and set-up of the modelActions at the interface between new and old concrete are determined from the overall forces acting onthe entire building component.As a rule for the design, it must be assumed that the interface is de-bonded.Reinforcement or connectors crossing the interface surface must be placed in such a way that shearforces at the interface are transferred in the ultimate limit state.
As a result of the separation of the interface surfa-ces, connectors are subjected to a tensile forceand simultaneously to a bending moment depen-ding on the roughness of the interface surfaces.If the surfaces are roughened, additional in-terlocking effects and cohesion can take up part ofthe shear force at the interface.
11.2.2.2 Design shear resistance at interface, VRd
(1)
Where:
(2)
VRd design shear resistance at interfaceVSd design shear force acting at interface as per section 11.2.3�Rdj design shear strength at interface under consideration as per Formula (3) and Diagrams 1 to 3bj effective width of interface under considerationlj effective length of interface under consideration
“Interlock”(friction, cohesion)
“Pull-out”(friction)
“Dowel”(bending,
shearforce)
VRd >_ VSd
VRd = �Rdj · bj · Ij
6
Connections for concrete overlays
318
11.2.2.3 Design shear strength at interface, �Rdj
Formula (3) is used to calculate the design shear strength at the interface, �Rdj [6]. When doing so, an up-per limit is given by the design strength in the concrete struts:
(3)
Where:�Rd basic design shear strength of concrete as per [1], Section 4.3.2.3 (the smaller value
of new or old concrete), refer also to Table 2.kT cohesion factor as per Table 1� coefficient of friction as per Table 1� coefficient for effective tensile force in the connector as per Table 1� coefficient for effective dowel action as per Table 1� coefficient for effective concrete strength as per Table 1� efficiency factor as per [1], Formula (4.20); also refer to Table 2.� = As / bj lj reinforcing ratio corresponding to connectors of interface under consideration�n _< 0,6 fcd normal stress certainly acting on interface (positive compression)fyd design value of yield strength of connectorfcd design value of cylinder compressive strength of concrete (smaller value of new or old
concrete)Rt mean depth of interface roughness, measured according to the sand-patch method [9]
�Rdj = kT • �Rd + � · (� • � • fyd + �n) + � • � • fyd • fcd _< � • � • fcdcohesion friction dowel action concrete struts
Concrete surface treatment Mean depth of roughness Coefficients �Rt mm� kT � � � fck_>20 fck_>35
High-pressure water jets / Scoring > 3.0 2.3 0.5 0.9 0.4 0.8*) 1.0*)Sandblasting / Chipping hammer > 0.5 0 0.5 1.1 0.3 0.7Smooth: wood or steel forms or no forms – 0 0 1.5 0.2 0.5
Concrete strength class C20/25 C25/30 C30/37 C35/45 C40/50 C45/55 C50/60
fck N/mm2� 20 25 30 35 40 45 50
fcd N/mm2� 13.3 16.7 20.0 23.3 26.7 30.0 33.3
� 0.60 0.58 0.55 0.53 0.50 0.50 0.50
�Rd N/mm2� 0.24 0.26 0.28 0.30 0.31 0.32 0.33
Table 1: Parameters for Formula (3) *) Intermediate values may be linearly interpolated.
Table 2: �Rd and � (as per 1]; Table 4.8).
Connections for concrete overlays
319
Diagram 1: for surfaces roughened with high-pressure water jets or scored(mean roughness Rt > 3 mm, i.e. peaks > approx. 6 mm high)
0.4
0.5
0.6
0.7
0.8
0.9
1.0
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
Reinforcing ratio, � %� Reinforcing steel, fyk = 500 N/mm2
0.00
0.02
0.04
0.06
0.08
0.10
0.12
0.14
0.16
0.18
0.20
0.22
0.24
0.26
0.28
0.30
0.32
0.34
0.36
0.38
0.40
Reinforcing ratio, � %� Reinforcing steel, fyk = 500 N/mm2
6.8
6.5
6.2
5.9
5.6
5.3
5.0
4.7
4.4
4.1
3.8
3.5
3.2
2.9
2.6
2.3
2.0
1.7
1.4
2.1
2.0
1.9
1.8
1.7
1.6
1.5
1.4
1.3
1.2
1.1
1.0
0.9
0.8
0.7
0.6
0.5
� Rd
jN
/mm
2 �� R
djN
/mm
2 �
6
Connections for concrete overlays
320
Diagram 2: for sand-blasted surfaces(mean roughness Rt > 0.5 mm, i.e. peaks > approx. 1.0 mm high)
C5 0 / 6 0C4 5 / 5 5C4 0 / 5 0C3 5 / 4 5C3 0 / 3 7C2 5 / 3 0C2 0 / 2 5
C5 0 / 6 0C4 5 / 5 5C4 0 / 5 0C3 5 / 4 5C3 0 / 3 7C2 5 / 3 0C2 0 / 2 5
0.4
0.5
0.6
0.7
0.8
0.9
1.0
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
Reinforcing ratio, � %� Reinforcing steel, fyk = 500 N/mm2
0.00
0.02
0.04
0.06
0.08
0.10
0.12
0.14
0.16
0.18
0.20
0.22
0.24
0.26
0.28
0.30
0.32
0.34
0.36
0.38
0.40
Reinforcing ratio, � %� Reinforcing steel, fyk = 500 N/mm2
5.0
4.8
4.6
4.4
4.2
4.0
3.8
3.6
3.4
3.2
3.0
2.8
2.6
2.4
2.2
2.0
1.8
1.6
1.4
1.2
1.0
0.8
1.151.101.051.000.950.900.850.800.750.700.650.600.550.500.450.400.350.300.250.20
� Rd
jN
/mm
2 �� R
djN
/mm
2 �
Connections for concrete overlays
321
Diagram 3: for smooth cast surfaces (wood forms, steel forms, no forms)
CC5 0 / 6 0C4 5 / 5 5C4 0 / 5 0C3 5 / 4 5C3 0 / 3 7C2 5 / 3 0C2 0 / 2 5
C5 0 / 6 0C4 5 / 5 5C4 0 / 5 0C3 5 / 4 5C3 0 / 3 7C2 5 / 3 0C2 0 / 2 5
0.4
0.5
0.6
0.7
0.8
0.9
1.0
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
Reinforcing ratio, � %� Reinforcing steel, fyk = 500 N/mm2
0.00
0.02
0.04
0.06
0.08
0.10
0.12
0.14
0.16
0.18
0.20
0.22
0.24
0.26
0.28
0.30
0.32
0.34
0.36
0.38
0.40
Reinforcing ratio, � %� Reinforcing steel, fyk = 500 N/mm2
3.4
3.2
3.0
2.8
2.6
2.4
2.2
2.0
1.8
1.6
1.4
1.2
1.0
0.8
0.6
0.4
0.75
0.70
0.65
0.60
0.55
0.50
0.45
0.40
0.35
0.30
0.25
0.20
0.15
0.10
0.05
0.00
� Rd
jN
/mm
2 �� R
djN
/mm
2 �
6
Connections for concrete overlays
322
11.2.3 Design shear force acting longitudinally at interface, VSd
Normally, VSd is calculated from the bending resistance of the cross-section. (Shear failure of the mem-ber should not govern.)
11.2.3.1 Augmentation of compression zone
(4)
0,8 Reduction factor for non-rectangular stressdistribution
� = 0,85 Reduction factor for sustained compression
for: x > tnew as an approximation:
(5)
11.2.3.2 Augmentation of tension zone
(6)
If the reinforcement is staggered: allow for gradation
11.2.3.3 Shear force to be transferred at overlay perimeterAt the edges of a new concrete overlay, the design must consider a minimum tensile force Fcr. Here, particular attention must be paid to transferring the moment arising from Fcr:
(7)
Fcr tensile force effective in the overlay at the time when the cracks may first beexpected to occur, as per [1], Section 4.4.2.2
k = 0,8 for tnew _< 30 cm coefficient to allow for non-uniform self-equilibrating stressesfct,eff tensile strength of overlay effective at the time when the cracks may first be
expected to occur as per [1], Section 4.4.2.2 (for general cases: fct,eff = 3 N/mm2)
The following values may be used without further verification:
(8)
(9)
Ved shear force at interface derived from FcrNed tensile force resulting from moment of Fcr
Ved may be distributed uniformly over the length le:a) le = 3 tnew for rough surfacesb) le = 6 tnew for sand-blasted surfacesc) le = 9 tnew for smooth surfaces
Vcd = 0,8 · x · bnew · � · fcd + Ase,new · fyd
Vcd = tnew · bnew · � · fcd + Ase,new · fyd
Vtd = Ase, new · fyd
Fcr = tnew · b · k · fct,eff
Ved = Fcr
Ned =Ved c _< 1.5 · tnew––––– ;6
x
tnewAse, newOverlay
Existing concrete
Vtd
tnew
As
Overlay
Existing concrete
Ved
Ved
Ned
c
le
xtnew
As
Ase, new neutral axis
overlay
existing concrete
Vcd
Connections for concrete overlays
323
11.2.3.4 Regions without connectorsFor low shear stresses, connectors need not be used in the field of the overlay if the load is predomi-nantly static and if connectors are positioned around the perimeter in accordance with Section 11.2.3.3.
a) With surfaces blasted with a high-pressure water jet and scored surfaces, for
(10)
b) With clean, sand-blasted surfaces, provided that no tensile stresses set up by external forces per-pendicular to the interface are acting (assuming a non-cracked interface), for:
(11)
11.2.4 Serviceability limit stateAs an approximation for normal cases, the additional deformation of a strengthened bending elementmay be determined using the monolithic cross-section and then increased as follows:
(12)
weff additional deformation calculated for the reinforced section considering the flexibility of theconnectors
wcalc additional deformation calculated for the reinforced section assuming perfect bond factor per Table 3sd displacement of connectors under the mean permanent load (FP ~~ 0.5 Fuk)
The displacement, sd, per Table 3, can be used for more accurate calculations.
Table 3: Coefficients for calculation of deformation dia. = diameter of connectors
11.2.5 Additional rules and detailing provisions
11.2.5.1 Mixed surface treatmentsVariable surface treatments may only be used on the same building component if the different stiffnes-ses of the connections are taken into account. (See also Table 3, displacement sd.) Note that a non-cracked interface, i.e., rigid bond, is assumed for interfaces with small shear stresses not requiring fieldconnectors, as per Section 11.2.3.4.
11.2.5.2 Minimum amount of reinforcement at the interfaceThe following minimum amount of reinforcement passing through the interface must be provided ifconnectors cannot be omitted as described in Section 11.2.3.4:
1) Slabs and other structures in which no shear reinforcement is necessary:a) For rough interface surfaces (high-pressure water jet and scored): � _> 0.08%b) For sand-blasted interface surfaces � _> 0.12%c) For smooth interface surfaces: � _> 0.12%
2) Beams and other structures with shear reinforcement as per [1], Section 5.4.2.2
�Sd _< kT · �Rd + � · �n
�Sd _< �Rd + � · �n
weff = · wcalc
Surface treatment Mean roughness Rt mm� sd mm�
High-pressure water jets / Scoring > 3.0 1.0 ≈ 0.005 dia.Sand-blasting / Chipping hammer > 0.5 1.1 ≈ 0.015 dia.Smooth: wood forms /steel forms/ no forms – 1.2 ≈ 0.030 dia.
6
Connections for concrete overlays
324
11.2.5.3 Layout of connectors
(1) The connectors must be positioned in the load-bearing direction of the building component withrespect to the distribution of the acting shear force in such a way that both the shear force at theinterface can be taken up and de-bonding of the new concrete overlay is prevented.
(2) In sand-blasted and smooth surfaces, the connectors may be equidistantly positioned over the corre-sponding length, lj, between neighboring critical sections when the load is predominantly static. Accor-ding to [3], Section 4.1.2 (4), critical sections are points subject to maximum bending moments, supportpoints, points where concentrated loads are acting and points with sudden changes in cross-section.
(3) If the new concrete overlay is on the tension side of the load-bearing component, the connectorsmust be distributed according to the graduation of the longitudinal reinforcement without makingany allowance for anchorage lengths.
(4) The connector spacing in the load-bearing direction may not be larger than 6 times the thickness ofthe new concrete overlay, or 800 mm.
11.2.5.4 Anchorage of connectors in the old and the new concrete(1) The connectors must be adequately embedded in the old concrete and the new overlay. The ac-
tually anchored tensile force, Nd, may be assumed to be:
(13)
� = coefficient as per Table 1.
(2) The type of application is decisive when determining the anchorage depth in the base material:(2a) Zones with shear reinforcement or other connecting reinforcement (Figure 7):
The basic value of anchorage depth, lb, must be determined according to (Appendix 2). The mini-mum anchorage depth is 10 times the diameter.It must be borne in mind that this generally concerns an overlap of the connector and existing rein-forcement (ls = �1 · lb, see [1], Section 5.2.4).Furthermore, the tensile force from the trussed-frame analogy as per [1], Section 4.3.2.4 must beverified for building components with required shear reinforcement.
(2b) Zones without shear reinforcement (VSd ≤ VRd1) or any other connecting reinforcement (Figure 8):The anchorage depth must be determined as per (Appendix 2). The edge distances and spacing(c1, s) of adhesive anchors must be ascertained according to anchor design.Cracks in concrete generally reduce the tensile loading capacity of adhesive anchors. If cracking isanticipated, the anchorage depth must be increased, e.g., in the case of pure tensile reinforcementor strengthening for bending with high shear force near beam supports or for concentrated loads.
Nd >_ � · AS · f yd
Is
c1 s
Ib
Figure 7: Rebar fastening design Figure 8: Anchor design
(Appendix 1).
(Appendix 1).
Connections for concrete overlays
325
(3) Plates, nuts or forged-on heads can be used to reduce the anchorage depth of connectors in a newconcrete overlay. If such a connector is used, the following checks must be made:a) Concrete cone failure must be checked in accordance with [5], Section 15.1.2.4.Sufficient reinforcement against splitting must be provided to take up splitting forces set up locallyat the top of the connectors. Calculation of the splitting forces may be based on a truss frameworkmodel which has a line of compressive action at an angle of 45º.Normally, the connectors should extend into the upper reinforcement of the concrete overlay andform a truss framework node there.b) The concrete bearing pressure under the head is limited as per [5] Section 15.1.2.3, or [1], Section 5.4.8.1.
(4) If interface surfaces are smooth, connectors must be provided with an embedment of at least 6 diameters (9 diameters recommended).
11.2.5.5 Minimum reinforcement in overlayThe procedure in [1] must be adopted to determine the minimum amount of reinforcement in the con-crete overlay.Beams: [1], Section 5.4.2.1.1 and 5.4.2.4Slabs: [1], Section 5.4.3.2.1
11.2.5.6 Recommendation for overlay placementPre-treatment:A primer consisting of thick cement mortar is recommended.The old concrete should be adequately pre-wetted (24 hours earlier the first time) before applying thecement mortar primer. At the time of placing the primer, the concrete surface should have dried to suchan extent that it has only a dull moist appearance.The mortar used as primer should consist of water and equal parts by weight of Portland cement andsand of particle size 0/2 mm. This mortar is then applied to the prepared concrete surface and brushed in.Overlay:The concrete mix for the overlay should normally be such that a low-shrinkage concrete results (W/C ≤ 0.40). The overlay must be placed on the still fresh primer i.e. wet on wet.Curing:Careful follow-up is necessary to ensure good durability of the overlay. Starting immediately after place-ment, the concrete overlay must be protected for a sufficiently long period, but at least five days,against drying out and excessive cooling.
11.2.5.7 Recommendation for surface treatment specification The roughness of the interface surface has a decisive influence on the shear force that can be transfer-red. In the case of this design process, the dimension to be measured is the mean depth of roughness,Rt, measured according to the sand-patch method [7]. It must be borne in mind that Rt is a mean valueand thus the difference between the peaks and valleys is about 2Rt.It is recommended that a mean depth of roughness, Rt, be stipulated when specifying the interface sur-face treatment. Prior to approving the treatment, a sample surface must be made and this then checkedon the basis of the sand-patch method.
6
Connections for concrete overlays
326
11.3 Examples
11.3.1 Example: Double-span slabGiven:Concrete: Overlay: 70 mm: C 30/37
Old concrete 150 mm: C 25/30Reinforcement: S500, fyk = 500 N/mm2
Span: Ase+ = 1’030 mm2/m
Support: Ase– = 1’420 mm2/m
Cracking tensile force at edge (11.2.3.3):Ved = 70 · 1 · 0.8 · 3 = 168 kN/m
Span:
Neutral axis: xd = 1030 · 0.5 · 1.5 = 33mm___________________1.15 · 30 · 0.85 · 0.80
➥ Vcd = 0.85 · 0.80 · 33 · 30/1.5 = 449 kN/m
Support: Ase = 1420 mm2/mVtd = 1420 · 0,5/1.15 = 617 kN/m
Max. values of shear stress at interface:
�cd max =449 · 2
= 0.38 N/mm2______2360
�td max =(617 + 449) · 2
= 0.58 N/mm2_____________3640
a) Surface treatment: high-pressure water jet
Cohesion �Rdj = 2.3 · 0.26 = 0.60 > 0.55 N/mm2 ➡ no reinforcement required
Cracking tensile force Ved = 168 kN/m (Section 11.2.3.3); Strip width, le = 3 · 70 = 210 mmat edge:
➥ �td = 168’000 = 0.8 N/mm2 ➡ From diagram �req = 0.08%1000 · 210
➥ As = 0.0008 · 210 · 1000 = 168 mm2/m ➡ selected dia. 8 s = 250 mm
Tensile force to betransferred by anchor: Nd = 0.5 · 0.5 · 50.3 = 10.9 kN (Formula 13)
1.15
➥ Anchored in old lb = 100 mm ➡ NRd = 14.6 kN (Appendix 2, Table 10.3.5.1)concrete:selected: edge distance c1 = 100 mm ➡ NRd,red = 14.6 · 100 = 11.2 kN ([6] page 13)
130
➥ Anchored in head dia. = 14 mmoverlay: Transferable bearing force under head ([5], Section 15.1.2.3):
NRd,p = 7.5 ·�
· (142 – 82) · 30 = 15 kN > NRd = 11.2 kN ➡ OK1.5 4
Concrete cone capacity: ([5], Section 15.1.2.4)
NRd,c = 9 · 300.5 · 551.5 = 11.2 kN = NRd = 11.2 kN ➡ OK1.8
MRd:
Qd:
�d: For one span
qd = 27,5kN/m2
+ +
-
- -
+ +
60006000
-105kNm/m
-100kN/m76,5kNm/m
65kN/m
2360 3640
2360 3640
6000
d d
0,58N/mm20,55N/mm2
0,35N/mm2
0,38N/mm2
(Appendix 1), Table 10.3.5.1)
Connections for concrete overlays
327
Tensile force from resisted moment: Ned = 168 = 28.0 kN/m (Formula 9)____6
NRd = 11.2 = 44.8 > 28.0 kN/m; c1 = 100 ≤ 1.5 · 70 = 105 mm ➡ OK_____0.25
Shear force to be anchored: Ved = 168 kN/m: Sirrup-type reinforcement: As = 168 · 1.15 = 386 mm2/m_________0.5
Selected: Pins 8 dia. per connector (lap splice with mesh reinforcement6.5 dia. s = 100 mm)
b) Surface treatment: sand-blasted
Cohesion: �Rdj = 0.26 N/mm2
At edge support: mean shear stress at interface �d = 0.35 + 0.26 = 0.305 N/mm2
2
➥ From diagram: �req = 0.12 % Strip width 745 mm
➥ As = 0.0012 · 1000 · 745 = 894 mm2/m➡ selected: dia. 8 s = 200/200 mm
At intermediate support: mean shear stress at interface �d = 0.55 + 0.26 = 0.405 N/mm2
2
➥ From diagram: �req = 0.16 % Strip width 2015 mm
➥ As = 0.0016 · 10002 = 1600 mm2/m2
➡ selected: dia. 8 s = 200/150 mm
Cracking tensile force at edge: Ved = 168 kN/mm2 Strip width le = 6 · 70 = 420 mm
➥ �d = 168’000 = 0.4 N/mm2 ➡ From diagram: �req = 0.16 %1000 · 420
➥ As = 0.0016 · 420 · 1000 = 672 mm2/m➡ selected: dia. 8 s = 200/150 mm
Forces to be anchored: same as a)
Bond shear stresses at sand-blasted interface surface:
2360 3640
d d
0,58N/mm2
0,55N/mm2
0,35N/mm2
0,38N/mm2
745
0,26N/mm2
20150,26N/mm2
6
Connections for concrete overlays
328
Smooth
Connectors at edge1st row 10 dia. s = 340 mm shear dowel+ 8 dia. s = 340 headed connector10 dia. s = 200 / 170 mm shear dowelEdge strip width: b = 630 mm10 dia. s = 200/250 mm shear dowel Strip width: btot = 2360 mmIntermediate support:10 dia. s = 200 / 170 mm shear dowelStrip width: b G 2 x 3640 mm
60
100
100
70
150
60
100
100 200 200
60
100
100
608 dia s = 250
mesh 6,5 dia. s = 100
pin 8 dia. s = 250
mesh 6,5 dia. s = 100
pin 8 dia.
mesh 6,5 dia. s = 100
pin 8 dia.
8 dia. s=1508 dia. s=150
8 dia. s=340 +10 dia. s=340
10 dia.s =170
60
High-pressure water jet
Connectors only at edge8 dia. s = 250 mm headed connector
Sand-blasted
Connectors at edge:8 dia. s = 200 / 150 mm headedconnectorEdge support:8 dia. s = 200 / 200 mm headedconnectorStrip width: btot = 745 mmIntermediate support:8 dia. s = 200 / 150 mm headedconnectorStrip width: b G 2 x 2015 mm
c) Surface without treatment (smooth)
Edge support/span: Mean shear stress at interface �d = 0.35 = 0.175 N/mm2
2
➥ From diagram: �req = 0.15 % Strip width 2360 mm
➥ As = 0.0015 · 10002 = 1500 mm2/m2
➡ selected dia. 10 s = 200/250 mm
At intermediate support: Mean shear stress at interface �d = 0.55 = 0.275 N/mm2
2
➥ From diagram: �req = 0.23 % half-strip width 3640 mm
➥ As = 0.0023 · 10002 = 2300 mm2/m2
➡ selected dia.10 s = 200/170 mm
Cracking tensile force at edge: Ved = 168 kN/mm2 Strip width le = 9 · 70 = 630 mm
➥ �d = 168’000 = 0.27 N/mm2
1000 · 630
➡ From diagram: �req = 0.23 %
➥ As = 0.0023 · 630 · 1000 = 1449 mm2/m➡ selected dia. 10 s = 200/170 mm
Anchorage of dowel: Ib = (6 times dia.) = 60 mm in new and old concreteForces to be anchored: Every second connector in an edge row should be a headed
connector designed as in a)
NRd = 11.2 = 32.9 > Ned = 28.0 kN0.34
Anchoring against de-bonding: It is recommended, that a suitable number of headed connectors also be installed in appropriate locations to prevent the concrete overlay from de-bonding locally.
Connections for concrete overlays
329
11.3.2 Example: Double-span beam with new slab
1200
0,180
0,600
0,200
6000
+ +
-
- -
+ +
6000
-383kNm
-329kN
230kNm
202kN
qd + gd = 88,5kN/m Cross-section:
2280 3720
6000
d=650
1,53N/mm2 1,10N/mm2
900
e = 90 e = 300 e = 140
1,30N/mm2
2,10N/mm22,50N/mm2
2,06N/mm2
d=650
1,30N/mm2
Given:Concrete: New slab: C 30/37, Beam C 25/30Reinforcement: Rebar S500; Ase
+ = 804 mm2; Ase- = 1340 mm2 fyk = 500 N/mm2
Span: Neutral axis xd = 804 · 0.5 · 1.5 = 21.4 mm1.15 · 0.8 · 0.85 · 1.2 · 30
Vcd = 1.20 · 0.8 · 0.85 · 21.4 · 30 = 349 kN ➡ �cd = 349 · 103 · 2 = 1.53 N/mm2
1.5 2280 · 200
Intermediate Vtd = 1340 · 0.5 = 583 kN ➡ �td = (349 + 583) · 103 · 2 = 2.50 N/mm2
support: 1.15 3720 · 200
Edge: Cracking Ved = 1.2 · 180 · 0.8 · 3 = 518 kN; le ≈ 0.75 b = 900 mm ➡ �ed = 518 · 103
= 2.9 N/mm2
tensile force: 900 · 200
Minimum reinforcement [1], Table 5.5: �min = 0.26 %, smax = 300 mm
2 dia. 10 s = 300 mm As = 523 mm2/m � = 0.26 % �Rd = 1.3 N/mm2
2 dia. 10 s = 140 mm As = 1121 mm2/m � = 0.56 % �Rd = 2.1 N/mm2
2 dia. 10 s = 90 mm As = 1743 mm2/m � = 0.87 % �Rd = 2.9 N/mm2
Notes:● The anchorage length is determined by the existing stirrup-type reinforcement (lap splice).● The shear stresses at the interface are too high for smooth or sand-blasted surfaces.
High-pressure water jet: Sand-blasted: Smooth:
In this case, un-roughenedinterface surfaces cannot beused. The concrete edge at theend face would hinder thenecessary displacement of theconnectors.
11.3.3 Example: Foundation reinforcementGiven:
Concrete: Old C 20/25; New: C 25/30Rebar steel: S500; fyk = 500 N/mm2
Reinforcement existing in foundation:16 dia. s = 150 Ase = 1340 mm2
Neutral axis: xd = 1340 · 500 · 1.5 = 51 mm25 · 0.8 · 0.85 · 1000 · 1.15
➥ Vcd = 0.8 · 51 · 0.85 · 25 = 579 kN/m1.5
➥ �cd,max = 579’000 · 2 = 0.66 N/mm2
1750 · 1000
1. End-face: Shear force on end-face
Vd = 280 · 0.5 = 140 kN/m
➥ �d = Vd = 140’000 = 0.19 N/mm2
d · b 750 · 1000
a) High-pressure water jet or scored�Rdj = 2.3 · 0.24 = 0.55 > �d = 0.19 N/mm2 ➡ no connectors required
b) Sand-blasted (special case: the interface has cracked due to the bending moment)�d = 0.19 N/mm2 ➡ As,req = 486 mm2/m (Formula 3) superimposed tensile force from bending
The minimum reinforcement for flexure governs: Ase,min > As,req + Ase,req
2. Bending
Md = 280 · 0.52 · 1/2 = 35 kNm/m Ase,req = 163 mm2/m
1000 · 600Min. reinforcement ([1], Section 4.4.2.2 (3) and Table 4.11) Ase,min = 0.4 · 0.8 · 3 · = 1285 mm2/m
2 · 280
selected: dia. 16, s = 150 mm (As = 1340 mm2/m) anchorage length, Fd = 201 · 280 = 56.3 kN : Is = 1.4 · 285 = 400 mm
3. Topside
a) High-pressure water jet or scored
Cohesion: �Rdj = 2.3 · 0.24 = 0.55 > �d = 0.38 N/mm2 ➡ no connectors required
b) Sand-blasted�d,max = 0.38 N/mm2 ➡ �req = 0.16 % ➡ As,req = 0.0016 · 10002 = 1600 mm2/m2 selected 12 dia. s = 250 mm
Tensile force per connector Nd = 0.5 · 113 · 0.5 = 24.6 kN ➡ anchorage length, lb = 150 mm (Appendix 2, Section 10.3.5.1)1.15
400
100
ø16 e = 150mm
400
ø16 e = 150mm
125
4 ø12 e = 250/250
3000500 500
4000
700
200
900100
500
1000 d=750 250
0,38N/mm2
0,66N/mm2
Fd = 1120 kN/m
pd = 280 kN/m2
66
Connections for concrete overlays
330
Connections for concrete overlays
331
11.4. Test results
11.4.1 Transfer of shear across a concrete crackReview of the literature revealslittle research into the specificbehavior of reinforced bond in-terfaces between new and oldconcrete. The majority of theexisting studies concentrate onthe transfer of shear forcesacross cracks.The effect on the shear loadingcapacity of subsequent roug-hening the surface of the oldconcrete was first investigatedin 1960 in the United States.
A few years later, the so-called shear-friction theory was developed. This theory attempts to explain thephenomena with the aid of a simple saw-tooth model. According to this, the roughness of surfaces inthe case of relative displacement always leads to a widening of the interface which sets up stresses insteel connectors passing across the interface. They, in turn, create clamping forces across the interfaceand thus also frictional forces.In 1987, Tsoukantas and Tassios [4] presented analytical investigations into the shear resistance ofconnections between precast concrete components. They cover the different contributing mechanismsof friction and dowel action (Figure 9).
11.4.2 Laboratory tests by Hilti Corporate ResearchSpecific shear tests were carried out inthe laboratories of Hilti Corporate Re-search in cooperation with the Univer-sity of Innsbruck (Supervision: Profes-sor Dr. techn. M. Wicke), to investigatethe interrelationships of various degre-es of roughness and transferable shearstresses with various degrees of rein-forcement. Using a unique test frame design, it waspossible to avoid secondary eccentricmoments in the specimen and to achie-ve nearly parallel separation of the inter-face surfaces (Figure 10). The roughe-ned surfaces were treated with a de-bonding agent before the new concretewas placed.
The results clearly demonstrate that a significant increase in load-bearing capacity can be achieved byproper roughening of the surfaces. If the surfaces are very rough, the steel connectors across the bondinterface are primarily stressed in tension, whereas, if the surfaces are smooth, the shear resistance ofthe connectors (dowel action) predominates.When interface surfaces are rough and the amount of reinforcement at the interface is small (low shearstress), cohesion makes a major contribution to transferring the shear force.The general design concept is presented in the thesis by Randl [6].
Figure 9: Transfer of shear across a concrete crack (shear-friction model)
Figure 10: Shear tests
“Interlock”(friction, cohesion)
“Pull-out”(friction)
“Dowel”(bending, shear force)
6
Connections for concrete overlays
332
11.4.3 Working principle of connectors
The test results confirm the stronginfluence of roughness on shearresistance and shear stiffness. If the load-displacement curvesare regarded in conjunction withthe measured displacement, thethree components of cohesion,friction and dowel action can beisolated and determined quantita-tively. They make different contri-butions to the overall resistance(Figures 11, 12 and 13), depen-ding on surface roughness andamount of reinforcement. Hence, the frictional componentpredominates when the surface isblasted with a high-pressure wa-ter jet and larger amounts of rein-forcement are provided. But smallshear stresses can also be trans-ferred even when no reinforce-ment is present, due to the goodinterlocking effect of the interfacesurfaces. In the case of sand-bla-sted surfaces, however, shearstresses are transferred by a com-bination of friction and dowel ac-tion, but the forces that can be re-sisted are generally far smallerthan in the case of high-pressurewater blasting.Investigations were also conduc-ted as to whether the post-instal-led rebar connectors are stressedto yield at ultimate shear transfer.For this purpose, the strain in theconnectors at the level of the in-terface was measured. To avoidany disturbance of the bond, andin order to obtain the strain due totensile loading only, the straingauges were fitted in a centralbore along the longitudinal axis ofthe connectors.These test results clearly showthat, when surfaces have theabove-mentioned degrees ofroughness, the tensile force in the connectors has not reachedthe full connector tensile yieldstrength, contrary to assumpti-
Versuch NNr. 11 8 (( HDW-gest rahlt ; 22 φ1 2 )
D¸ belwirkung
0
2 0
4 0
6 0
8 0
1 0 0
1 2 0
1 4 0
1 6 0
1 8 0
2 0 0
0 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8horizont ale VVerschiebung [[ mm]
Sc
he
rkra
ft [[
kN
]
Verzahnung uund RReibung
Versuch NNr. 44 0 (( sandgest rahlt ; 22 φ1 2 )
D¸ belwirkung
0
2 0
4 0
6 0
8 0
1 0 0
1 2 0
1 4 0
1 6 0
1 8 0
2 0 0
0 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8horizont ale VVerschiebung [[ mm]
Sc
he
rkra
ft [[
kN
]
Versuch NNR. 55 7 (( schalglat t ; 22 φ1 2 )
D¸ belwirkung
0
2 0
4 0
6 0
8 0
1 0 0
1 2 0
1 4 0
1 6 0
1 8 0
2 0 0
0 1 2 3 4 5 6 7 8 9 1 0 1 1 1 2 1 3 1 4 1 5 1 6 1 7 1 8horizont ale VVerschiebung [[ mm]
Sc
he
rkra
ft [[
kN
]
Figure 11: Test example for water-blasted surface
Horizonal displacement [mm]
She
ar f
orc
e [k
N]
She
ar f
orc
e [k
N]
She
ar f
orc
e [k
N]
Horizonal displacement [mm]
Horizonal displacement [mm]
Figure 12: Test example for sand-blasted surface
Figure 13: Test example for smooth surface
friction
dowel action
dowel action
dowel action
friction and surface interlock
Test No. 18 (water-blasted; 2 dia. 12)
Test No. 40 (sand-blasted; 2 dia. 12)
Test No. 57 (formed surface; 2 dia. 12)
Connections for concrete overlays
333
ons for other design models.Tests carried out with connectorsof various lengths confirm this re-sult, as they showed that redu-ced anchorage lengths are suffi-cient to carry the effectiveconnector tensile force at maxi-mum shear transfer capacity. Ad-ditional connector embedment(e. g., as required for theoreticalconnector tensile yield) did notresult in increased shear transfer.
The load-bearing behavior ofsmooth interface surfaces withconnectors was also investiga-ted. As displacement readingsfor the horizontal and vertical di-rections showed, there is in thiscase also a separation of the in-terface under shear loading and,thus, owing to the lack of roughn-ess, a loss of contact betweenthe shear surfaces. In this case,the entire resistance is providedby dowel action.
On the basis of these findings,design approaches are develo-ped which permit separate andrealistic analyses of the variouscomponents of shear resistance.As a result, a standardized levelof safety is ensured with respectto resistance, regardless ofwhether the normal stresses atthe interface are induced by anexternally applied normal force orby internal connectors.
11.4.4 Comparison with inter-national test resultsIn his thesis [6], Randl has proventhrough a study of literature andwith reference to world-wide re-search results that the determi-ned design equations are conser-vative. The results are shown inFigures 14, 15 and 16.
Mat t ock, WWalraven, DDaschner, HHilt i
0 ,0
1 ,0
2 ,0
3 ,0
4 ,0
5 ,0
6 ,0
7 ,0
8 ,0
9 ,0
1 0 ,0
1 1 ,0
1 2 ,0
0 ,0 1 ,0 2 ,0 3 ,0 4 ,0 5 ,0 6 ,0 7 ,0 8 ,0 9 ,0 1 0 ,0 1 1 ,0 1 2 ,0
ρ ff y [[ N/ mm ]
τ [[N
/m
m]
Figure 14: Shear tests, „rough“ interface
0 ,0
0 ,5
1 ,0
1 ,5
2 ,0
2 ,5
3 ,0
3 ,5
4 ,0
4 ,5
5 ,0
5 ,5
0 ,0 1 ,0 2 ,0 3 ,0 4 ,0 5 ,0 6 ,0 7 ,0 8 ,0 9 ,0 1 0 ,0 1 1 ,0 1 2 ,0
ρ ff y [[ N/ mm ]
τ[N
/mm
]
Figure 15: Shear tests, sand-blasted interface
DDaschner,Mat t ock,Paulay ,Hanson, HHilt i
0 ,0
0 ,5
1 ,0
1 ,5
2 ,0
2 ,5
3 ,0
3 ,5
4 ,0
4 ,5
5 ,0
5 ,5
0 ,0 1 ,0 2 ,0 3 ,0 4 ,0 5 ,0 6 ,0 7 ,0 8 ,0 9 ,0 1 0 ,0 1 1 ,0 1 2 ,0ρ f y [ N/ mm ]
τ[N
/ mm
]
Figure 16: Shear tests, „smooth“ interface
Mattock: “rough” ACI(r = 3 mm); fy = 350 N/mm2,fc = 20 – 45 N/mm2
Walraven: cracked concrete; fy = 450 N/mm2,fc = 25 – 32 N/mm2
Daschner: raked surface; fy = 540 N/mm2,fc = 15 N/mm2
Hilti: water-blasted;fy = 508 N/mm2 ;fc = 18 N/mm2
Hilti: water blasted; fy = 508 – 653 N/mm2 ;fc = 36 N/mm2
Design function (charact. values):water-blasted; fck = 30 N/mm2,fyk = 500 N/mm2
Design function (charact. values):water-blasted; fck = 20 N/mm2,fyk = 500 N/mm2
Hi: sand-blasted; fy = 508 N/mm2;fc = 18 N/mm2;Ib = 17dia.
Hi: sand-blasted; fy = 508 – 653 N/mm2,fc = 35 N/mm2;Ib > 8 dia.
Design function (charact.values): sand-blasted;fck = 20 N/mm2,fyk = 500 N/mm2
Design function (charact.values): sand-blasted;fck = 20 N/mm2,fyk = 500 N/mm2
Daschner: trowel;fy = 450 – 1200 N/mm2,fcw = 15 – 22 N/mm2
Daschner: un worked surface;fy = 450 – 1200 N/mm2,fc = 10 – 17 N/mm2
Mattock: trowel;fy = 350 N/mm2,fc = 35 N/mm2
Paulay: trowel;fy = 318 N/mm2,fc = 24 N/mm2
Hanson: trowel;fy = 345 N/mm2,fc = 22 – 29 N/mm2
Hilti [8]: unworked surface;fy = 508 – 653 N/mm2,fc = 33 N/mm2
Hilti [8]: unworked surface;fy = 508 – 653 N/mm2,fc = 40 N/mm2
Hilti [8]: unworked surface;fy = 508 – 653 N/mm2,fc = 17 N/mm2
Design function (charact.values) [8]: smoothfck = 20 N/mm2,fyk = 500 N/mm2
Hilti tests
Mattlock, Walraven, Daschner, Hilti
Mattlock, Walraven, Daschner, Hilti
2
2
2
22
2
6
Connections for concrete overlays
334
11.5 Notations
Lengths:bj effective width of interface in the area under considerationc1 anchor edge distancelb anchorage depth of connector in base material as per Appendix 1ls splice length of reinforcement, as per [1], Section 5.2.4le length over which tensile cracking force is introducedlj effective length of interface under considerationRt mean depth of interface roughness, measured according to the san-patch methods spacing of connectors or rebarsd displacement of connectors under the mean of permanent load (Fp ≈ 0.5 Fuk)tnew thickness of concrete overlayweff additional deformation calculated for the reinforced section considering the flexibility of the
connectorswcalc additional deformation calculated for the reinforced section assuming perfect bondx distance of neutral axis from compressed edge (bending)
Areas:As cross-sectional area of interface reinforcement (connectors)Ase cross-sectional area of bending reinforcement
Forces:Fcr tensile force, effective in the overlay at the time when the cracks may first be expected to occur, as
per [1], Section 4.4.2.2Nd design value of tensile force in connectorNed tensile force resulting from moment of Fcr
VRd design shear resistance at interfaceVsd design shear force acting at interfaceVed shear force at interface derived from FcrVcd design shear force acting at interface in compression zoneVtd design shear force acting at interface in tension zone
Stresses:fcd design value of cylinder compressive strength of concretefyd design value of yield strength of connectorfct,eff tensile strength of overlay effective at the time when the cracks may first be
expected to occur, as per [1], Section 4.4.2.2σn normal stress (positive compression) certainly acting at interfaceτRd basic design shear strength of concrete as per [1], Section 4.3.2.3τTdj design shear strength at interface under consideration
Factors and coefficients:k Coefficient to allow for non-uniform self-equilibrating stresseskT cohesion factor as per Table 1α coefficient for effective dowel action as per Table 1β coefficient for effective concrete strength as per Table 1γ Increasing factor for deformation as per Table 3µ coefficient of friction as per Table 1ν efficiency factor as per [1], Formula (4.20); also refer to Table 2κ coefficient for effective tensile force in the connector as per Table 1ρ= As/bjlj reinforcing ratio corresponding to connectors at interface under consideration
Connections for concrete overlays
335
11.6 Reference literature
[1] EC2; Design of concrete structures: ENV 1992-1-1:1991;
Part 1. General rules and rules for buildings
[2] EC2; Design of concrete structures: ENV 1992-1-3:12/94
Part 1-3. General rules-Precast concrete elements and structures
[3] EC4; Design of composite steel and concrete structures: ENV 1994-1-1:1992;
Part 1-1. General rules and rules for buildings
[4] Tsoukantas S. G., Tassios T.P.; Shear Resistance of Connections between
Reinforced Concrete Linear Precast Elements. ACI Journal, May-June 1989.
[5] CEB-Guide; Design of Fastenings in Concrete, Part III, January 1997
Characteristic Resistance of Fastenings with Cast-in-Place Headed Anchors.
[6] Randl, N, Untersuchungen zur Kraftübertragung zwischen Neu- und Altbeton bei unterschiedli-
chen Fugenrauhigkeiten; Dissertation in Vorbereitung, Universität Innsbruck
(Investigation into the transfer of forces between new concrete and old concrete with different
interface surface roughnesses); thesis being prepared, University of Inssbruck, Austria.
[7] Kaufmann, N: Sandflächenverfahren (Sand-patch method), Strassenbautechnik 24, (1971,
Germany), no. 3, pages 131-135
Connection for concrete overlays
336
12. Injection mortar HIT HY 150
and HAS rod 5.8 with nut or headplate
Features : - Base material: concrete, concrete overlays
- No splitting forces in the base material
- Easy handling, injection
- Adjustable anchor head
- plate can be used as rebar holder
Material: Anchor rod: HAS: 5.8, ISO 898 T1, galvanised to 5 microns
Anchor plate: FeE 235, galvanised to 5 microns
Foil pack : Hilti HIT HY 150: standard size 330 ml
Hilti HIT HY 150: jumbo cartridge 1100 ml
Dispenser: MD 2000, P 5000 HY.
A4316
Corrosion resistance (by request)
HCRhighMo
Special Corrosion resistance
(by request)
Close edge distance / spacing
N
s
ch
12.1 Terms:
a) with nut b) with plate
Note: Nut and plate have to be marked after adjusting!hu anchoring depth in existing concrete ho height in the concrete overlay hef actual anchorage depth cü cover d0 drill bit diameter l anchor length m height of the nut axb lenght x width of the plate tp thickness of the platetnew thickness of the concrete overlay
concreteoverlay
existingconcrete
cü
m
ho hohefhef
d0
hu
a x b
tp
l
d0
cü
hu
l
existingconcrete
concreteoverlay
tnewtnew
6
Connection for concrete overlays
337
12.2 Data for the calculation
Calculation details (cp. also [1], page 294 to 298):
1. Bond stress Sd is calculated using the available area in the connection.
2. The necessary reinforcement content can be obtained from Diagram 1, 2 and 3, the Rd Sd must be satisfied.
3. Minimum steel content is given in section 12.3. 4. Anchor rod choice should be compared to the existing geometrical conditions.
5. Calculate number of rods s
jj
A
bln , control edge distances and spacings cmin, resp. smin
1) fyd = fyk/ Ms Ms = 1.2, cp. [2], equation. (6a)]
2)N A fd ds yd , cp. [1], section 11.2.5.4, equation (13) for rough and sandblasted surfaces
3) Cp. [1], page 195 - 203 (Valid for rough, clean, hammer or with compressed air drilled holes)
Cp. [1]. section 11.2.5.4 (2b): Cracks in in concrete reduce the capacity of rebar. In these cases a longer embedment lenght must be used. (e.g. for overlays or under tensile or bending loading with high shear component in the vicinity of the beam connection or of the acting loads).
4)N
kf hRd c
Mcck ef,
. .1 0 5 15 ; k1= 9.0; Mc = 1.8, cp. [2], section 15.1.2.4
5) NRd,c experimental (internal report A-IF-2/98)
6) For 16 mm and 32 mm aggregate diameter in concrete: h0,min = 50 mm
[1] Hilti Fastening Technology Manual
[2] Design of fastenings in concrete, CEB Bulltin 233, January 1997
HAS 5.8 M8 M10 M12 M16 M20
d0 [mm] Drill bit diameter 10 12 14 18 22
As [mm²] Stressed cross-sectional area of the slot
32.8 52.3 76.2 144 225
sw x m [mm] nut 13 x 6.5 17 x 8 19 x 10 24 x 13 30 x16
a x b x tp [mm] Anchor plate 35 x 28 x 6.5
33 x 23 x 6.5
40 x 40 x 6 40x40x8 -
Material properties
fuk [N/mm²] Nominal tensile strength 500 500 500 500 500
fyk [N/mm²] Nominal yield strength yield strength 400 400 400 400 400 1)fyd [N/mm²] Design value of the 333 333 333 333 333
2)Nd [kN] Design value of the tensile force 5.5 8.7 12.7 24.0 37.5
3)Embedment in the in the existing concrete (HIT-HY 150)
hu,min [mm] B 30/20 C 20/25 80 95 110 185 240
B 35/25 C 25/30 80 90 110 180 230
cmin [mm] Min. edge distance 80 90 110 125 170
smin [mm] Min. spacing 120 135 165 190 255
4)Minimum embedment in overlay concrete using a nut type head
ho,min [mm] B 30/20 C 20/25 45 60 75 110 150
B 35/25 C 25/30 45 55 70 105 140
B 45/35 C 30/37 45 50 65 100 130
B 50/40 C 35/45 45 50 65 95 125
B 55/45 C 40/50 45 50 60 95 120
cmin [mm] Min. edge distance 55 70 90 135 185
smin [mm] Min. spacing 110 140 180 270 370
5)Minimum embedment in overlay concrete using a plate type head
ho,min [mm] B 30/20 C 20/25 6)40 50 60 100
B 35/25 C 25/30 6)35
6)45 55 95
cmin [mm] Min. edge distance 55 70 90 135
smin [mm] Min. spacing 110 140 180 270
Connection for concrete overlays
338
Exampel: hd-high pressure water cleaning, B35/25 (C25/30)
tneu [mm] 60 70 80 90 100 130 150 180 200 250
Ved [kN] 144 168 192 216 240 312 360 432 480 600
Ned [kN] 24 28 32 36 40 52 60 72 80 100
le [mm] 180 210 240 270 300 390 450 540 600 750
ed [N/mm2] 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8
1)As,erf [mm
2] 180 210 240 270 300 390 450 540 600 750
Nut
nerf HAS 5.5 M8 6.4 M8 4.6M10 3.5M12 3.9M12 2.7M16 3.1M16 2.4M20 2.7M20 3.3M20
NRd kN 6.7 6.7 8.8 13.3 13.3 24.0 24.0 37.5 37.5 37.5
cü,max [mm] 15 25 25 20 30 25 45 40 2)60
2)110
ho,min [mm] 45 45 55 70 70 105 105 140 140 140
hu,min [mm] 80 80 90 110 110 180 180 230 230 230
cmin [mm] 80 80 90 110 110 135 135 185 185 185
s1 [mm] 180 150 210 280 250 370 320 410 370 600
s2 [mm] - - - - - - - - - 370
Anchor plate
nerf HAS 5.5M8 6.4M8 4.6M10 3.5M12 3.9M12
cü,max [mm] 25 35 35 35 45 1) erf = 0.10% (cp. diagram 1)
ho,min [mm] 3)35
3)35
3)45 55 55
2) head of shear connector and reinforcement
hu,min [mm] 80 80 90 110 110 must ensure a good load distribution.
cmin [mm] 80 80 90 110 110 3
) concrete with max 16 mm aggregate size
s1 [mm] 180 150 210 280 250
s2 [mm] - - - - -
Example: sandblasted B35/25 (C25/30)
tneu [mm] 60 70 80 90 100 130 150 180 200 250
Ved [kN] 144 168 192 216 240 312 360 432 480 600
Ned [kN] 24 28 32 36 40 52 60 72 80 100
le [mm] 360 420 480 540 600 780 900 1080 1200 1500
ed [N/mm2] 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4 0.4
1)As,erf [mm
2/m] 720 840 960 1080 1200 1740 1800 2160 2400 3000
nut
Anzahlerf HAS 22 M8 26 M8 18 M10 15 M12 16 M12 23 M12 24 M12 15 M16 17 M16 21 M16
NRd kN 6.7 6.7 8.8 13.3 13.3 13.3 13.3 24.0 24.0 24.0
cü,max [mm] 15 25 25 20 30 2)60
2)80
2)75
2)95
2)145
ho,min [mm] 45 45 55 70 70 70 70 105 105 105
hu,min [mm] 80 80 90 110 110 110 110 180 180 180
cmin [mm] 80 80 90 110 110 110 110 135 135 135
s1 [mm] 140 120 160 200 190 180 200 270 300 290
s2 [mm] 2x120 2x120 2x150 2x180 2x200 3x200 4x180 3x270 4x270 5x270
Nnchor plate
nerf HAS 22 M8 16 M10 18 M10 15 M12 16 M12 1) erf = 0.20% (cp. diagram 2)
cü,max [mm] 25 25 35 35 45 2) head of shear connector and reinforcement
ho,min [mm] 3)35
3)45 45 55 55 must ensure a good load distribution.
hu,min [mm] 80 90 90 110 110 3
) concrete with max 16 mm aggregate size
cmin [mm] 80 90 90 110 110
s1 [mm] 140 180 160 200 190
s2 [mm] 2x120 2x140 2x150 2x180 2x200
12.3 Minimum steel content for VedA Anchoring of Ved in the overlay should contain additional safety elements, such as stirrups.
tnew thickness of the overlay concrete
efctk,newcred fkbtFV (vgl. [1], section. 11.2.3.3, (7))
NV
eded
6 (vgl. [1], section. 11.2.3.3, (9))
cü,max max . possible conrete cover (cp. page 304) le length over which tensile force is introduced equation
[1], section 11.2.3.3 As,erf necessary steel area of the rebar nerf number of bond anchors necessary per meter
NRd necessary steel area of the rebars (cp. [1] page 195) c edge distance s1 rebar spacing prallel to the edge s2 spacing of rebar rows
tnew
le
cs2
VedNed
c
6
Connection for concrete overlays
339
Diagram 1: for surfaces roughened with high pressure water jets or scored (mean roughness Rt > 3 mm, i.e. peaks > approx. 6 mm high)
0.5
0.6
0.7
0.8
0.9
1.0
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
0.0
0
0.0
2
0.0
4
0.0
6
0.0
8
0.1
0
0.1
2
0.1
4
0.1
6
0.1
8
0.2
0
0.2
2
0.2
4
0.2
6
0.2
8
0.3
0
0.3
2
0.3
4
0.3
6
0.3
8
0.4
0
Reinforcing ratio [%] HAS 5.8 fyk = 400 N/mm2
fyd = 333 N/mm2
Rd
j
[N/m
m2]
B55/45 (C40/50)
B50/40 (C35/45)
B45/35 (C30/37)
B35/25 (C25/30)
B30/20 (C20/25)
1.2
1.4
1.6
1.8
2.0
2.2
2.4
2.6
2.8
3.0
3.2
3.4
3.6
3.8
4.0
4.2
4.4
4.6
4.8
5.0
5.2
0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8
Reinforcing ratio [%] HAS 5.8 fyk = 400 N/mm2
fyd = 333 N/mm2
Rd
j [
N/m
m2]
B55/45 (C40/50)
B50/40 (C35/45)
B45/35 (C30/37)
B35/25 (C25/30)
B30/20 (C20/20)
recommendedreinforcement content (minimum)
Connection for concrete overlays
340
0.6
0.8
1.0
1.2
1.4
1.6
1.8
2.0
2.2
2.4
2.6
2.8
3.0
3.2
3.4
3.6
3.8
4.0
0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8
Reinforcing ratio [%] HAS 5.8 f yk = 400 N/mm2
fyd = 333 N/mm2
Rd
j [
N/m
m2]
B55/45 (C40/50)
B50/40 (C35/45)
B45/35 (C30/37)
B35/25 (C25/30)
B30/20 (C20/25)
Diagram 2: for sand-blasted surfaces (mean roughness Rt > 0.5 mm, i.e.peaks > approx. 1.0 mm high)
0.20
0.25
0.30
0.35
0.40
0.45
0.50
0.55
0.60
0.65
0.70
0.75
0.80
0.85
0.90
0.0
0
0.0
2
0.0
4
0.0
6
0.0
8
0.1
0
0.1
2
0.1
4
0.1
6
0.1
8
0.2
0
0.2
2
0.2
4
0.2
6
0.2
8
0.3
0
0.3
2
0.3
4
0.3
6
0.3
8
0.4
0
Reinforcing ratio [%] HAS 5.8 fyk = 400 N/mm2
fyd = 333 N/mm2
Rd
j [
N/m
m
2 ]
B55/45 (C40/50)
B50/40 (C35/45)
B45/35 (C30/37)
B35/25 (C25/30)
B30/20 (C20/25)
Recommendedreinforcement content (minimum)
6
Connection for concrete overlays
341
Diagram 3: for smooth cast surfaces
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
0.40
0.45
0.50
0.55
0.60
0.0
0
0.0
2
0.0
4
0.0
6
0.0
8
0.1
0
0.1
2
0.1
4
0.1
6
0.1
8
0.2
0
0.2
2
0.2
4
0.2
6
0.2
8
0.3
0
0.3
2
0.3
4
0.3
6
0.3
8
0.4
0
B55/45 (C40/50)
B50/40 (C35/45)
B45/35 (C30/37)
B35/25 (C25/30)
B30/20 (C20/25)
Reinforcing ratio [%] HAS 5.8 fyk = 400 N/mm2 fyd = 333 N/mm
2
Rd
j [
N/m
m2]
Recommendedreinforcementcontent (minimum)
0.4
0.5
0.6
0.7
0.8
0.9
1.0
1.1
1.2
1.3
1.4
1.5
1.6
1.7
1.8
1.9
2.0
2.1
2.2
2.3
2.4
2.5
2.6
0.4 0.5 0.6 0.7 0.8 0.9 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8
Reinforcing ratio [%] HAS 5.8 fyk = 400 N/mm2 fyd = 333 N/mm2
Rd
j
[N/m
m2]
B55/45 (C40/50)
B50/40 (C35/45)
B45/35 (C30/37)
B35/25 (C25/30)
B30/20 (C20/25)
Connection for concrete overlays
342
12.4 Product Information
Hilti HIT-HY 150 for concrete
Foil pack HY 150
330ml 1100ml
Setting details
Drill hole. Brush. Blow out. Inject mortar. Insert rod. Wait for curing. Pave over.
HAS rod galvanised Anchor plate galvanised Steel, grade 5.8 Fe E 235 (St 37)
Ordering Designation Ordering Designation
HAS M8x110 HAS M16x190 SR-SMA SR-SMA-L
HAS M8x150 HAS M16x260 HAS M16x300 Ordering D. a b Tp Thread Size HAS M10x130 HAS M16x350 mm mm mm HAS M10x170 HAS M16x500 HAS M10x190 SR-SMA 8 35 28 6.5 M8 HAS M20x240 SR-SMA 10 33 23 6.5 M10 HAS M12x160 HAS M20x260 SR-SMA 12* 40 40 6 M12 HAS M12x220 HAS M20x300 SR-SMA 16* 40 40 8 M16 HAS M12x260 HAS M20x350 HAS M12x300 HAS M20x400 SR-SMA-L 12* 60 30 6 M12
Other lenghth and steel qualities are possible Other lenghth and steel qualities are possible
Text of tender offer
Providing and setting of injection anchors consisting of : Injection mortar Hilti HIT-HY 150 with HAS rod, steel, grade 5.8, M ..... x length ..... mm with anchor plateSR-SMA M .... x length ...... mm x width ...... mm x thickness ...... mm.
Drilling and cleaning of the borehole ..... mm, Tiefe .......mm according to the directions of the supplier As well as the hight adjustment of the plate, cutting of the overlong rebars and marking .
b
Tp
a
b
6