Appendix 11: Planning Maps
Mauao Base Track Remediation Project | Application for Resource Consent and Assessment of Environmental Effects
Appendix 11: Planning Maps
MAUAO BASE TRACK REMEDIATION
BOP Regional Natural Resources PlanDate: 25 June 2018 | Revision: C
Plan prepared for Tauranga City Council by Boffa Miskell LimitedProject Manager: [email protected] | Drawn: JWa | Checked: SGrwww.boffamiskell.co.nz
File Ref: T17136_01_MHWSBuffer_RevC.mxd
0 40 m
1:1,000 @ A3
Projection: NZGD 2000 New Zealand Transverse MercatorData Sources: Lysaghts Ltd, GHD Ltd, Tauranga City Council.
°This plan has been prepared by Boffa Miskell Limited on thespecific instructions of our Client. It is solely for our Clients usein accordance with the agreed scope of work. Any use orreliance by a third party is at that partys own risk. Whereinformation has been supplied by the Client or obtained fromother external sources, it has been assumed that it is accurate.No liability or responsibility is accepted by Boffa MiskellLimited for any errors or omissions to the extent that theyarise from inaccurate information provided by the Client orany external source.
Lege
nd
Natural Spring
Natural Spring
Mean High Water Springs [TCC CP]Slope >35° - approximate
Existing Temporary TrackExisting Track Alignment
MHWS 40 metre offsetMHWS 20 metre offsetProposed Base Track Alignment
Proposed Boardwalk AlignmentProposed Corridor
MAUAO BASE TRACK REMEDIATION
Proposed BOP Regional Coastal Environment PlanDate: 25 June 2018 | Revision: C
Plan prepared for Tauranga City Council by Boffa Miskell LimitedProject Manager: [email protected] | Drawn: JWa | Checked: SGrwww.boffamiskell.co.nz
File Ref: T17136_02_RPSLayers_RevC.mxd
0 40 m
1:1,000 @ A3
Projection: NZGD 2000 New Zealand Transverse Mercator
Data Sources: Lysaghts Ltd, GHD Ltd, Tauranga City Council,Bay of Plenty Regional Council.
°This plan has been prepared by Boffa Miskell Limited on thespecific instructions of our Client. It is solely for our Clients usein accordance with the agreed scope of work. Any use orreliance by a third party is at that partys own risk. Whereinformation has been supplied by the Client or obtained fromother external sources, it has been assumed that it is accurate.No liability or responsibility is accepted by Boffa MiskellLimited for any errors or omissions to the extent that theyarise from inaccurate information provided by the Client orany external source.
Proposed Base Track Alignment
Proposed Boardwalk Alignment
Proposed Corridor
Existing Temporary Track
Existing Track Alignment
Historic Heritage Inventory Coastal (Proposed)
Area Occupied by Port of Tauranga (Proposed)
Areas of Significant Cultural Value (Proposed)
Coastal Environment Zone (Proposed)
Harbour Development Zone (Proposed)
Indigenous Biological Diversity Area A (Proposed)
Indigenous Biological Diversity Area B (Proposed)
Mooring Area (Proposed)
(ONFL) Outstanding Natural Features and Landscapes (Proposed)
Personal Water Craft Area
Tauranga Port Zone (Proposed)
")
")")Kinonui Pa
Waipatukakahu
Kinonui
MAUAO BASE TRACK REMEDIATION
Tauranga City PlanDate: 25 June 2018 | Revision: C
Plan prepared for Tauranga City Council by Boffa Miskell LimitedProject Manager: [email protected] | Drawn: JWa | Checked: SGrwww.boffamiskell.co.nz
File Ref: T17136_04_TCCLayers_RevC.mxd
0 40 m
1:1,500 @ A3
Projection: NZGD 2000 New Zealand Transverse Mercator
Data Sources: Lysaghts Ltd, GHD Ltd, Tauranga City Council,Bay of Plenty Regional Council.
°This plan has been prepared by Boffa Miskell Limited on thespecific instructions of our Client. It is solely for our Clients usein accordance with the agreed scope of work. Any use orreliance by a third party is at that partys own risk. Whereinformation has been supplied by the Client or obtained fromother external sources, it has been assumed that it is accurate.No liability or responsibility is accepted by Boffa MiskellLimited for any errors or omissions to the extent that theyarise from inaccurate information provided by the Client orany external source.
Proposed Base Track AlignmentRecorded Archaeological SiteHistoric Place [NZHPT]
Proposed Boardwalk AlignmentProposed CorridorSignificant Archaelogical AreasSignificant Maori AreasOutstanding Natural Features And Landscapes Plan AreaImportant Amenity Landscapes Plan AreaSpecial Ecological Area Category 1Special Ecological Area Category 2Conservation Zone
Appendix 12: Annotated Planning Maps
Mauao Base Track Remediation Project | Application for Resource Consent and Assessment of Environmental Effects
Appendix 12: Annotated Planning Maps
MAUAO BASE TRACK REMEDIATION
BOP Regional Natural Resources Plan with Rule AnnotationsDate: 12 July 2018 | Revision: 0
Plan prepared for Tauranga City Council by Boffa Miskell LimitedProject Manager: [email protected] | Drawn: JWa | Checked: SGrwww.boffamiskell.co.nz
File Ref: T17136_08_BOPRegNatRes_Anno.mxd
0 40 m
1:1,000 @ A3
Projection: NZGD 2000 New Zealand Transverse MercatorData Sources: Lysaghts Ltd, GHD Ltd, Tauranga City Council.
°This plan has been prepared by Boffa Miskell Limited on thespecific instructions of our Client. It is solely for our Clients usein accordance with the agreed scope of work. Any use orreliance by a third party is at that partys own risk. Whereinformation has been supplied by the Client or obtained fromother external sources, it has been assumed that it is accurate.No liability or responsibility is accepted by Boffa MiskellLimited for any errors or omissions to the extent that theyarise from inaccurate information provided by the Client orany external source.
Lege
nd
Natural Spring
Natural Spring
Mean High Water Springs [TCC CP]
Slope >35° - approximate
Existing Temporary TrackExisting Track Alignment
MHWS 40 metre offsetMHWS 20 metre offset
Proposed Base Track AlignmentProposed Boardwalk AlignmentProposed Corridor
LM R4 Rule 1C - Discretionary
LM R4 Rule 2C - Discretionary
MAUAO BASE TRACK REMEDIATION
Proposed BOP Regional Coastal Environme nt Plan w ith Rule AnnotationsDate: 12 July 2018 | Revision: 0
Plan pre pared for Tauranga City Council by Boffa Misk e ll LimitedProject Manager: [email protected] | Drawn: JWa | Checked: SGrw w w.boffamisk e ll.co.nz
File Ref: T17136_09_PropBOPRCEP_Anno.mxd
0 40m
1:1,000@ A3
Projection:NZGD 2000 Ne w Zealand T ransve rse Me rcator
Data Sources: Ly saghts Ltd, GHD Ltd, Tauranga City Council,Bay of Ple nty Regional Council.
°T his plan has be e n pre pared by Boffa Misk e ll Limited on thespecific instructions of our Clie nt. It is sole ly for our Clie nts usein accordance w ith the agre ed scope of w ork. Any use orre liance by a third party is at that party s ow n risk. Whe reinformation has be e n supplie d by the Clie nt or obtained fromothe r exte rnal source s, it has be e n assumed that it is accurate.No liability or re sponsibility is acce pted by Boffa Misk e llLimited for any e rrors or omissions to the exte nt that the yarise from inaccurate information provided by the Clie nt orany exte rnal source.
Propose dBase T rack Alignme nt
Propose dBoardw alk Alignme nt
Propose dCorridor
ExistingT e mporary T rack
ExistingT rack Alignme nt
HistoricHe ritage Inve ntory Coastal (Propose d)
AreaOccupie dby Portof T auranga(Propose d)
Areasof SignificantCultural Value (Propose d)
Coastal Environme ntZone (Propose d)
HarbourDeve lopme ntZone (Propose d)
Indige nousBiological Dive rsity Are aA(Propose d)
Indige nousBiological Dive rsity Are aB(Propose d)
MooringAre a(Propose d)
(ONFL)OutstandingNatural Feature sandLandscape s(Propose d)
Pe rsonal Wate rCraftAre a
TaurangaPortZone (Propose d)
Rule CD8 - Discretionary
Rule PZ 10 – Discretionary
Rule SO11 - Discretionary, Rule DD14 - Discretionary, Rule RM2 - Discretionary
")
")")Kinonui Pa
Waipatukakahu
Kinonui
MAUAO BASE TRACK REMEDIATION
Tauranga City Plan with Rule Annotations - Rule 4C.5(c)Date: 12 July 2018 | Revision: 0
Plan prepared for Tauranga City Council by Boffa Miskell LimitedProject Manager: [email protected] | Drawn: JWa | Checked: SGrwww.boffamiskell.co.nz
File Ref: T17136_10_TCCCP_Rule4C_Anno.mxd
0 40 m
1:1,500 @ A3
Projection: NZGD 2000 New Zealand Transverse Mercator
Data Sources: Lysaghts Ltd, GHD Ltd, Tauranga City Council,Bay of Plenty Regional Council.
°This plan has been prepared by Boffa Miskell Limited on thespecific instructions of our Client. It is solely for our Clients usein accordance with the agreed scope of work. Any use orreliance by a third party is at that partys own risk. Whereinformation has been supplied by the Client or obtained fromother external sources, it has been assumed that it is accurate.No liability or responsibility is accepted by Boffa MiskellLimited for any errors or omissions to the extent that theyarise from inaccurate information provided by the Client orany external source.
Proposed Base Track AlignmentRecorded Archaeological SiteHistoric Place [NZHPT]
Proposed Boardwalk AlignmentProposed CorridorSignificant Archaelogical AreasSignificant Maori AreasOutstanding Natural Features And Landscapes Plan AreaImportant Amenity Landscapes Plan AreaSpecial Ecological Area Category 1Special Ecological Area Category 2Conservation Zone
Rule 4C.5(c) - Non-complying
")
")")Kinonui Pa
Waipatukakahu
Kinonui
MAUAO BASE TRACK REMEDIATION
Tauranga City Plan with Rule Annotations - Rule 5A.6(b)Date: 12 July 2018 | Revision: 0
Plan prepared for Tauranga City Council by Boffa Miskell LimitedProject Manager: [email protected] | Drawn: JWa | Checked: SGrwww.boffamiskell.co.nz
File Ref: T17136_10_TCCCP_Rule5A_Anno.mxd
0 40 m
1:1,500 @ A3
Projection: NZGD 2000 New Zealand Transverse Mercator
Data Sources: Lysaghts Ltd, GHD Ltd, Tauranga City Council,Bay of Plenty Regional Council.
°This plan has been prepared by Boffa Miskell Limited on thespecific instructions of our Client. It is solely for our Clients usein accordance with the agreed scope of work. Any use orreliance by a third party is at that partys own risk. Whereinformation has been supplied by the Client or obtained fromother external sources, it has been assumed that it is accurate.No liability or responsibility is accepted by Boffa MiskellLimited for any errors or omissions to the extent that theyarise from inaccurate information provided by the Client orany external source.
Proposed Base Track AlignmentRecorded Archaeological SiteHistoric Place [NZHPT]
Proposed Boardwalk AlignmentProposed CorridorSignificant Archaelogical AreasSignificant Maori AreasOutstanding Natural Features And Landscapes Plan AreaImportant Amenity Landscapes Plan AreaSpecial Ecological Area Category 1Special Ecological Area Category 2Conservation Zone
Rule 5A.6(b) - Restricted Discretionary
")
")")Kinonui Pa
Waipatukakahu
Kinonui
MAUAO BASE TRACK REMEDIATION
Tauranga City Plan with Rule Annotations - Rule 6A.4(b)Date: 12 July 2018 | Revision: 0
Plan prepared for Tauranga City Council by Boffa Miskell LimitedProject Manager: [email protected] | Drawn: JWa | Checked: SGrwww.boffamiskell.co.nz
File Ref: T17136_10_TCCCP_Rule6A_Anno.mxd
0 40 m
1:1,500 @ A3
Projection: NZGD 2000 New Zealand Transverse Mercator
Data Sources: Lysaghts Ltd, GHD Ltd, Tauranga City Council,Bay of Plenty Regional Council.
°This plan has been prepared by Boffa Miskell Limited on thespecific instructions of our Client. It is solely for our Clients usein accordance with the agreed scope of work. Any use orreliance by a third party is at that partys own risk. Whereinformation has been supplied by the Client or obtained fromother external sources, it has been assumed that it is accurate.No liability or responsibility is accepted by Boffa MiskellLimited for any errors or omissions to the extent that theyarise from inaccurate information provided by the Client orany external source.
Proposed Base Track AlignmentRecorded Archaeological SiteHistoric Place [NZHPT]
Proposed Boardwalk AlignmentProposed CorridorSignificant Archaelogical AreasSignificant Maori AreasOutstanding Natural Features And Landscapes Plan AreaImportant Amenity Landscapes Plan AreaSpecial Ecological Area Category 1Special Ecological Area Category 2Conservation Zone
Rule 6A.4(b) - Restricted Discretionary
")
")")Kinonui Pa
Waipatukakahu
Kinonui
MAUAO BASE TRACK REMEDIATION
Tauranga City Plan with Rule Annotations - Rule 7C.7(b)Date: 12 July 2018 | Revision: 0
Plan prepared for Tauranga City Council by Boffa Miskell LimitedProject Manager: [email protected] | Drawn: JWa | Checked: SGrwww.boffamiskell.co.nz
File Ref: T17136_10_TCCCP_Rule7C_Anno.mxd
0 40 m
1:1,500 @ A3
Projection: NZGD 2000 New Zealand Transverse Mercator
Data Sources: Lysaghts Ltd, GHD Ltd, Tauranga City Council,Bay of Plenty Regional Council.
°This plan has been prepared by Boffa Miskell Limited on thespecific instructions of our Client. It is solely for our Clients usein accordance with the agreed scope of work. Any use orreliance by a third party is at that partys own risk. Whereinformation has been supplied by the Client or obtained fromother external sources, it has been assumed that it is accurate.No liability or responsibility is accepted by Boffa MiskellLimited for any errors or omissions to the extent that theyarise from inaccurate information provided by the Client orany external source.
Proposed Base Track AlignmentRecorded Archaeological SiteHistoric Place [NZHPT]
Proposed Boardwalk AlignmentProposed CorridorSignificant Archaelogical AreasSignificant Maori AreasOutstanding Natural Features And Landscapes Plan AreaImportant Amenity Landscapes Plan AreaSpecial Ecological Area Category 1Special Ecological Area Category 2Conservation Zone
Rule 7C.7(b) - Restricted Discretionary
")
")")Kinonui Pa
Waipatukakahu
Kinonui
MAUAO BASE TRACK REMEDIATION
Tauranga City Plan with Rule Annotations - Rule 7E.4(a)Date: 12 July 2018 | Revision: 0
Plan prepared for Tauranga City Council by Boffa Miskell LimitedProject Manager: [email protected] | Drawn: JWa | Checked: SGrwww.boffamiskell.co.nz
File Ref: T17136_10_TCCCP_Rule7E_Anno.mxd
0 40 m
1:1,500 @ A3
Projection: NZGD 2000 New Zealand Transverse Mercator
Data Sources: Lysaghts Ltd, GHD Ltd, Tauranga City Council,Bay of Plenty Regional Council.
°This plan has been prepared by Boffa Miskell Limited on thespecific instructions of our Client. It is solely for our Clients usein accordance with the agreed scope of work. Any use orreliance by a third party is at that partys own risk. Whereinformation has been supplied by the Client or obtained fromother external sources, it has been assumed that it is accurate.No liability or responsibility is accepted by Boffa MiskellLimited for any errors or omissions to the extent that theyarise from inaccurate information provided by the Client orany external source.
Proposed Base Track AlignmentRecorded Archaeological SiteHistoric Place [NZHPT]
Proposed Boardwalk AlignmentProposed CorridorSignificant Archaelogical AreasSignificant Maori AreasOutstanding Natural Features And Landscapes Plan AreaImportant Amenity Landscapes Plan AreaSpecial Ecological Area Category 1Special Ecological Area Category 2Conservation Zone
Rule 7E.4(a) - Restricted Discretionary