51
APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document Local Development Framework Monitoring: A Good Practice Guide, March 2005 and the update published in October 2005. Unless specified, figures should be given for the whole local authority area. They should be measured on an annual basis for the period 1st April to 31st March in terms of new development, schemes or production occurring. Whether new means approved or completed/ developed schemes is shown for each indicator. Business Development 1a: employment land type is defined by Use Class Orders (UCOs) B1 a, b & c, B2 and B8. Amounts should be defined in terms of completed sq metres gross floorspace. 1b: measuring amount of completed land (sq metres gross floorspace) developed for employment within employment or regeneration areas defined and allocated in the local development framework. 1a and 1b: gross floorspace should be measured as gross internal floorspace, including all internal areas but excluding external walls. 1c: comparing (in percentage terms) amount of completed land (sq metres gross floorspace) developed for employment upon previously developed land as defined in Annex C of PPG3 (March 2000) against total completed employment gross floorspace (1a). 1d: employment land supply is defined as the total amount of land available for employment use in terms of site areas (hectares). 1e: net loss of employment land (hectares) to non-employment uses in developed/regeneration areas as defined and allocated in the local development framework and across the whole local authority area. 1f: of employment land identified in 1e, amount being developed for residential development (C3). Housing The definition of dwelling (in line with the 2001 Census) is a self-contained unit of accommodation. Self-containment is where all the rooms in a household are behind a door, which only that household can use. Non-self contained household spaces at the same address should be counted together as a single dwelling. Therefore, a dwelling can consist of one self-contained household space or two or more non-self contained spaces at the same address. Net additional dwellings are defined as new dwellings completed, plus gains from conversions less losses from conversions, plus gains from change of use less losses from change of use and less demolitions. 2a (ii) should give figures for net additional and gross dwellings. ‘Current’ means the previous financial year which the AMR is reporting upon. 2a (iii): projected dwellings relate to sources of net additional dwellings to meet the requirement in the relevant development plan document. These must be based upon firm evidence of the contribution of the various components of housing supply that make up the total allocation. This will include: (i) C3 outstanding planning permissions, (ii) adopted allocations (without planning permission) in local development frameworks, and (iii) windfall estimates as well as any other dwelling sources, including those identified in urban housing capacity studies. 1

APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

  • Upload
    others

  • View
    9

  • Download
    0

Embed Size (px)

Citation preview

Page 1: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document Local Development Framework Monitoring: A Good Practice Guide, March 2005 and the update published in October 2005. Unless specified, figures should be given for the whole local authority area. They should be measured on an annual basis for the period 1st April to 31st March in terms of new development, schemes or production occurring. Whether new means approved or completed/ developed schemes is shown for each indicator. Business Development 1a: employment land type is defined by Use Class Orders (UCOs) B1 a, b & c, B2 and B8. Amounts should be defined in terms of completed sq metres gross floorspace. 1b: measuring amount of completed land (sq metres gross floorspace) developed for employment within employment or regeneration areas defined and allocated in the local development framework. 1a and 1b: gross floorspace should be measured as gross internal floorspace, including all internal areas but excluding external walls. 1c: comparing (in percentage terms) amount of completed land (sq metres gross floorspace) developed for employment upon previously developed land as defined in Annex C of PPG3 (March 2000) against total completed employment gross floorspace (1a). 1d: employment land supply is defined as the total amount of land available for employment use in terms of site areas (hectares). 1e: net loss of employment land (hectares) to non-employment uses in developed/regeneration areas as defined and allocated in the local development framework and across the whole local authority area. 1f: of employment land identified in 1e, amount being developed for residential development (C3). Housing The definition of dwelling (in line with the 2001 Census) is a self-contained unit of accommodation. Self-containment is where all the rooms in a household are behind a door, which only that household can use. Non-self contained household spaces at the same address should be counted together as a single dwelling. Therefore, a dwelling can consist of one self-contained household space or two or more non-self contained spaces at the same address. Net additional dwellings are defined as new dwellings completed, plus gains from conversions less losses from conversions, plus gains from change of use less losses from change of use and less demolitions. 2a (ii) should give figures for net additional and gross dwellings. ‘Current’ means the previous financial year which the AMR is reporting upon. 2a (iii): projected dwellings relate to sources of net additional dwellings to meet the requirement in the relevant development plan document. These must be based upon firm evidence of the contribution of the various components of housing supply that make up the total allocation. This will include: (i) C3 outstanding planning permissions, (ii) adopted allocations (without planning permission) in local development frameworks, and (iii) windfall estimates as well as any other dwelling sources, including those identified in urban housing capacity studies.

1

Page 2: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

2a (iv): annual net additional dwelling requirement is the annual rate of housing provision required in the relevant development plan document. As an interim measure, prior to the adoption of a development plan document requirement, an annualised average (i.e. total number of net additional dwellings to be provided by the plan divided by the number of years it covers) or housing requirement as specified in the relevant regional spatial strategy can be used as a proxy. 2a (v): this relates to the number of net additional dwellings required over the remaining plan period to meet the overall housing requirement set out in the relevant development plan document. It should take into account net additional dwelling completions identified in (i) & (ii) and should be expressed as a residual annual average. 2b: comparing (in percentage terms) numbers of completed dwellings (gross) and through conversions of existing buildings, provided on previously developed land (as defined in Annex C of PPG3), against total gross dwellings. 2c: new dwellings (gross) completed in each of the three different net density ranges as a percentage of total dwellings (gross). Definition of net density is set out in Annex C of PPG3 (March 2000). 2d: measuring gross and net additional affordable housing dwellings completed. Affordable housing is defined as: (i) wholly funded through registered social landlord and or local authorities, (ii) wholly funded through developer contribution or (iii) funded through a mix of public subsidy and developer contribution. Transport 3a: comparing (in percentage terms) numbers of completed non-residential development schemes (i.e. UCOs A, B and D) that comply with parking standards against total number of completed non-residential schemes. 3b: comparing (in percentage terms) numbers of completed residential schemes within 30 minutes public transport time (including walking and cycling) of certain key basic services (detailed in indicator) and jobs against total number of completed residential schemes. Local Services 4a: retail, offices and leisure development completed as defined by UCOs B1a, A1, A2 and D2. For office and leisure development, figures should be given as sq metres gross internal floorspace. Gross internal floorspace should include all internal areas but exclude external walls. For retail, the net and gross internal floorspace should be given. Net internal area should be measured as the amount of tradeable sales space which customers have access to (excluding areas like storage) in sq metres. The difference between gross external area and gross internal floorspace is typically between 2.5% and 5%. 4b: comparing (in percentage terms) completed gross floorspace (sq metres) of local services occurring in town centres as defined in the local development framework and proposals map against total gross completed local services development (4a). 4c: comparing (in percentage terms) the amount of open space managed to green flag standards against total open space. Figures should be given in hectares. Open space is defined as all accessible open space, whether public or privately owned. Data for total open spaces should be available from authorities audit of open spaces and recreation facilities as required by PPG17. Eligible open space means areas that are managed to green flag award scheme standards, i.e. they do not have to have the award itself. The award is a marker of excellence in the management and maintenance of green spaces and includes any freely accessible public park or green space. This can include town parks, country parks, formal

2

Page 3: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

gardens, nature reserves, local nature reserves, cemetery and crematoria, water parks, open spaces, millennium greens, sites of special scientific interest and woodlands. Sites need not be in local authority or public ownership but there should not be any charges made, or undue restrictions, on entry to the park or green space. Independent verification of whether a space has reached the standard is made through the award of the green flag or pennant. Awards are made on an annual basis (see www.greenflagaward.org.uk for more details). Minerals (for minerals planning authority only) 5a Production of primary land won aggregates in tonnes. 5b Production of secondary/recycled aggregates in tonnes. Waste (for waste planning authority only) 6a: capacity of new waste management facilities can be measured as either cubic metres or tonnes, reflecting the particular requirements of different types of management facilities e.g. capacity at landfill sites is measured in cubic metres whilst waste to energy plans use tonnes). ‘New’ facilities are defined as those which (i) have planning permission and (ii) are operable. 6b: considering (in percentage terms) how the total amount of municipal waste is dealt with by different management types (e.g. recycling, landfill). Capacity can be measured as either cubic metres or tonnes as above. Flood Protection and Water Quality This is a proxy measure of (i) inappropriate development in the flood plain and (ii), development that adversely affects water quality. Biodiversity ‘Change’ to be considered in terms of impact of completed development, management programmes and planning agreements. Measurement includes additions and subtractions to biodiversity priority habitats (hectares) and numbers of priority species types. Regional targets for biodiversity priorities are compiled by regional biodiversity partnerships, reflecting those in the national biodiversity action plan and those agreed by local biodiversity partnerships at the sub-regional level. Priority habitats and species are found in designated sites and the wider landscape. Areas of environmental value should be measured in hectares. Renewable Energy Renewable energy types include bio fuels, onshore wind, water, solar energy and geothermal energy. Figures should be in megawatts. ‘Installed’ means completed and available for operation.

3

Page 4: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

APPENDIX 2 – A SCHEDULE SHOWING THE USE OF INDIVIDUAL LOCAL PLAN POLICIES AS A REASON FOR REFUSAL.

*Taken from Decision Notices for the period 2004/05 Subject area Adopted

Local Plan Policies (1998)

Use (Refusal)

First Deposit Draft – 2003 & Revised Deposit Draft Policies - 2004

Use (Refusal) First Deposit Draft

Use (Refusal) Revised Deposit Draft

General policy G1 165 STRAT 1 15 35 Infrastructure and services G3 0 STRAT 1, 19,

SUS 3, 4 (as above) (as above)

Access protection G4 0 - - - Development briefs G5 0 SUS 9

(Appraisals) 0 0

Large scale tree planting - SUS 6 0 0 Planning benefits/loss G6 0 SUS 10 0 0 Special policy areas G7 1 STRAT 14

(Mixed use) 0 0

Mixed use - STRAT 14 0 0 Market towns - MT 1 0 0 Backland/tandem Development

G8 10 RES 3 1 1

Settlement breaks G9 STRAT 13 (and Lincoln ‘wedges’)

0 0

Safeguarding allocated sites G10 1 STRAT 20 0 0 Adverts (general) G11 1 CORE 7 0 0 Adverts (roadside) G12 0 CORE 6 0 0 Telecommunications. G13 0 CORE 11 0 0 Overhead lines G14 0 Disabled access G15 1 - Gypsy sites G16 0 RES 16, 17

CRT 19 2 1

Travelling show people G17 0 RES 16, 17 CRT 19

(as above) (as above)

Hazardous development ENV2 0 SUS 13 1 0 Environmental nuisance ENV3 0 NBE 17 0 0 Contaminated land ENV4 0 NBE 19 0 0 Unstable land ENV 5 0 NBE 19 0 0 Derelict land ENV 6 1 SUS 15 0 1 Conversions (in settlements)

ENV7 7 ECON 7, ECON 8

0 0

Conversions (outside settlements) (business)

ENV8 1 ECON 8 0 0

Conversion (outside settlements) (dwellings)

ENV9 4 RES 9 1 1

Landscape conservation ENV10 4 NBE 10 0 1

4

Page 5: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

Subject area Adopted Local Plan Policies (1998)

Use (Refusal)

First Deposit Draft – 2003 & Revised Deposit Draft Policies - 2004

Use (Refusal) First Deposit Draft

Use (Refusal) Revised Deposit Draft

Wildlife conservation ENV11 5 NBE 11, 13 0 0 Edge of settlements ENV12 15 NBE 20 0 2 Protection of open space/frontages

ENV13 1 CORE 9 1 1

O/space and landscaping in development

ENV14 2 CORE 10 1 0

Drainage ENV15 1 NBE 14 0 1 Septic tanks ENV16 1 NBE 14 0 (as above) Polluting uses ENV17 0 NBE 17 0 0 Light pollution - NBE 18 0 0 Water quality and supply ENV17 0 NBE 15 0 0 Flood risk ENV18 3 SUS 14 0 0 River corridors ENV19 0 CRT 20 0 0 Culverting watercourses - NBE 16 1 0 Energy conservation and efficiency

ENV20 0 SUS 7, 8 0 0

Renewable energy ENV21 0 SUS 11 0 0 Recycling ENV22 0 SUS 12 0 0 Conservation areas SA1 14 NBE 1 0 4 Demolition in Conservation Areas

SA2 0 NBE 2 0 0

Other areas of archaeological/historical interest

SA3 1 NBE 6 1 4

Listed building demolition SA4 3 NBE 4 0 0 Listed building alterations SA5 5 NBE 3 0 3 Listed building setting SA6 9 NBE 3 0 (as above) Other buildings of interest demolition

SA7 9 NBE 6 1 4

Ancient monuments and archaeology

SA8 3 NBE 7 0 1

Archaeology mitigation SA8a 0 NBE 7 0 (as above) Historic parks and gardens SA9 2 NBE 8 0 0 AONB harmful SA10 10 NBE 9 1 2 AONB small scale/local SA11 4 NBE 9 (as above) (as above) AGLV SA12 1 NBE 10 0 1 Landscape character - NBE 10 0 (as above) SSSI SA13 0 NBE 11 0 0 SNCI/local nature reserves SA14 0 NBE 12 0 0 Ancient woodland SA15 0 NBE 12 0 0 Wildlife corridors - NBE 13 0 0 Countryside C1 39 STRAT 12 1 7 Views C2 4 STRAT 12, 13 1 7

5

Page 6: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

Subject area Adopted Local Plan Policies (1998)

Use (Refusal)

First Deposit Draft – 2003 & Revised Deposit Draft Policies - 2004

Use (Refusal) First Deposit Draft

Use (Refusal) Revised Deposit Draft

Agriculture C3 3 ECON 2 0 0 Livestock units C4 0 ECON 5 0 0 Rural and farm diversification

C5 2 ECON 4 0 2

Land quality C6 1 ECON 3 0 0 Housing allocations H1 0 STRAT 2 5 6 Settlement hierarchy - STRAT 3 10 18 Housing in settlements H2 15 STRAT 4

STRAT 5 STRAT 6 STRAT 7 STRAT 8

14 20

Phasing - STRAT 9 4 12 Renewal of permissions - STRAT 11 0 1 Longer term options (Lincoln/Bardney)

- STRAT 10 0 0

Housing outside settlements H3 24 STRAT 12 1 7 Agricultural dwellings H4 3 RES 10 0 3 Replacement dwellings in countryside

H5 3 RES 8 1 0

Extensions in settlements - RES 11 0 0 Extensions in countryside H6 14 RES 12 1 1 Family annexes - RES 13 0 0 Range of housing H7 0 RES 2 0 0 Affordable housing H8 2 RES 6 0 4 Rural affordable housing H9 0 RES 7 0 0 Housing layout and design H10 99 RES 1 10 18 LOTS H11 0 RES 15 0 0 HIMOs H12 0 RES 14 0 0 Mobile homes H13 0 RES 16 1 0 Mobile home parks H14 0 RES 17 1 0 Employment general E1 0 ECON 1 0 0 Large scale employment development

E2 0 STRAT 15 0 0

Employment allocations E3 0 STRAT 15 0 0 Retention of employment land

- ECON 9 1 0

Mixed use - STRAT 14 0 0 Employment in settlements E4 0 ECON 1 0 0 Home working - ECON 11 0 0 Rural employment E5 7 ECON 1, 4 0 2 Pet/animal establishments - CORE 8 0 1 Ports and wharves E6 0 ECON 1 0 0

6

Page 7: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

Subject area Adopted Local Plan Policies (1998)

Use (Refusal)

First Deposit Draft – 2003 & Revised Deposit Draft Policies - 2004

Use (Refusal) First Deposit Draft

Use (Refusal) Revised Deposit Draft

Offices E7 0 ECON 10 0 0 Open storage E8 1 ECON 14 0 0 Primary shopping zones S1 0 RTC 1, RTC 2 0 0 Secondary shopping zones S2 0 RTC 1, RTC 2 0 0 Shopping elsewhere S3 0 RTC 3 0 0 Major retail S4 0 RTC 4 0 0 Shopping outside limits S5 0 RTC 7 0 0 Retail (Sudbrooke) S6 0 STRAT 16 0 0 Shop design S7 0 RTC 8 0 0 Takeaways S8 3 RTC 9 0 0 Pubs and licensed premises - RTC 9 0 0 Town centre uses - RTC 5 0 0 Neighbourhood shops S3 0 RTC 6 0 0 Retaining from industrial estates

- RTC 10 0 0

Garden centres - RTC 11 0 0 Rural markets - RTC 12 0 0 Tourism general T1 0 CRT 16 0 0 Touring caravan sites T2, T3 2 CRT 19 0 1 Static vans and chalets T5 1 CRT 19 0 (as above) Holiday accommodation. In settlements

T6 0 CRT 17 1 0

Holiday accommodation. In countryside

T7 1 CRT 17 1 0

Redevelopment of holiday accommodation.

T8 0 CRT 18 0 0

Local recreation/community facilities

RC1 1 CRT 1 0 0

Recreation allocations - STRAT 17 0 0 Standards for open space sports

- CRT 2 0 0

Loss of recreation/community facilities

RC2 3 CRT 3, CRT 4 0 3

Countryside recreation RC3 0 CRT 5 0 0 Riseholme Park campus - CRT 6 0 0 County showground and M Rasen racecourse

- CRT 7 0 0

Water based recreation RC4 0 CRT 8 0 0 Picnic sites RC5 0 - PROW RC6 0 CRT 9 0 0 Golf courses RC7 0 CRT 10 0 0

7

Page 8: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

Subject area Adopted Local Plan Policies (1998)

Use (Refusal)

First Deposit Draft – 2003 & Revised Deposit Draft Policies - 2004

Use (Refusal) First Deposit Draft

Use (Refusal) Revised Deposit Draft

Equestrian facilities - CRT 11 0 0 Environmentally damaging sports

RC8 1 CRT 12 0 0

New recreational facilities in development

RC9, RC10

0 RES 4, RES 5 1 0

Education RC11 0 CRT 13, CRT 6

0 0

Care homes RC12 1 CRT 14 0 0 Day nurseries RC13 0 CRT 15 0 0 Transport and large scale development

TR1 1 -

Sustainable transport - SUS 1 0 0 Transport assessments - SUS 2 0 0 Pedestrian and cycle access

TR2 2 SUS 4 0 0

Cycle parking - SUS 5 0 0 Public transport infrastructure

TR3 0 SUS 3 0 0

New roads TR4 0 ECON 12 ECON 13

0 0

Road design TR5 0 CORE 2 1 0 Traffic calming TR6 0 CORE 2 (as above) 0 Car parks TR7 1 CORE 4,

CORE 5 0 0

Car parking TR8, TR9, TR10

1 CORE 1 0 1

Roadside services TR11 0 STRAT 18 0 0

8

Page 9: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

APPENDIX 3 - WEST LINDSEY HOUSING LAND AVAILABILITY STUDY Assessment of Housing Land Availability – As at the 1st April 2005. The appropriate methodology for assessing housing land availability used to be set out in an Annex of Planning Policy Guidance 3 (PPG3) - Housing, however this is no longer the case. Given the relatively low building rate of the 1990s but higher building rates this decade, in comparison to the level of provision allowed for in the Deposit Draft Structure Plan, examples of land availability is shown in 2 ways. Firstly one based upon Structure Plan Requirement for the District and Sub Areas and secondly based upon past development rates for the District to illustrate the policy shift. Example 1 – Assessment Against Policy Requirements Towns Overall Requirement Structure Plan Requirement 2001 – 2021 3,100 Dwellings (155 per annum) Completions 2001 – 2004/5 (4 Years) 554 Residual Requirement 2005 – 2021 (16 Years) 2,546 Supply Under Construction 272 Outline PP 445 Full PP / ARM 691 Residual Local Plan Allocations 1,346 Estimated Windfall Allowance 2005 – 2021 (16 Years x 17p.a) 272 Total Supply 3,026 Supply in the Towns is 19.5 Years Overall Caistor (10% of Town Figure) Requirement Structure Plan Requirement 2001 – 2021 310 Dwellings (16 per annum) Completions 2001 – 2004/5 (4 Years) 24 Residual Requirement 2005 – 2021 (16 Years) 286 Supply Under Construction 3 Outline PP 12 Full PP / ARM 113 Residual Local Plan Allocations 218 Estimated Windfall Allowance 2005 – 2021 (16 Years x 2p.a) 32 Total Supply 378 Supply in Caistor is 23.6 Years Overall Gainsborough (65% of Town Figure) Requirement Structure Plan Requirement 2001 – 2021 2,015 Dwellings (101 per annum) Completions 2001 – 2004/5 (4 Years) 377 Residual Requirement 2005 – 2021 (16 Years) 1,638 Supply Under Construction 162 Outline PP 417

9

Page 10: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

Full PP / ARM 384 Residual Local Plan Allocations 870 Estimated Windfall Allowance 2005 – 2021 (16 Years x 11p.a) 176 Total Supply 2,009 Supply in Gainsborough is 19.9 Years Overall Market Rasen (25% of Town Figure) [inc. Middle Rasen] Requirement Structure Plan Requirement 2001 – 2021 775 Dwellings (39 per annum) Completions 2001 – 2004/5 (4 Years) 153 Residual Requirement 2005 – 2021 (16 Years) 622 Supply Under Construction 107 Outline PP 16 Full PP / ARM 194 Residual Local Plan Allocations 258 Estimated Windfall Allowance 2005 – 2021 (16 Years x 4p.a) 64 Total Supply 639 Supply in Market & Middle Rasen is 16.4 Years Overall Lincoln Policy Area Requirement Structure Plan Requirement 2001 – 2021 2,900 Dwellings (145 per annum) Completions 2001 – 2004/5 (4 Years) 1,251 Residual Requirement 2005 – 2021 (16 Years) 1,649 Supply Under Construction 207 Outline PP 399 Full PP / ARM 412 Residual Local Plan Allocations 256 Estimated Windfall Allowance 2005 – 2021 (16 Years x 17p.a) 272 Total Supply 1,546 Supply in the Lincoln Policy Area is 10.7 Years Overall Rural Area Requirement Structure Plan Requirement 2001 – 2021 1,000 Dwellings (50 per annum) Completions 2001 – 2004/5 (4 Years) 595 Residual Requirement 2005 – 2021 (16 Years) 405 Supply Under Construction 259 Outline PP 206 Full PP / ARM 395 Residual Local Plan Allocations 65 Estimated Windfall Allowance 2005 – 2021 (16 Years x 15p.a) 240 Total Supply 1,165 Supply in the Rural Area is 23.3 Years Overall

10

Page 11: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

District Wide Requirement Structure Plan Requirement 2001 – 2021 7,000 Dwellings (350 per annum) Completions 2001 – 2004/5 (4 Years) 2,415 Residual Requirement 2005 – 2021 (16 Years) 4,585 Supply Under Construction 727 Outline PP 1,050 Full PP / ARM 1,518 Residual Local Plan Allocations 1,667 Estimated Windfall Allowance 2005 – 2021 (16 Years x 49p.a) 784 Total Supply 5,746 Supply in the District is 16.4 Years Overall Based Upon 350 Dwellings Per Annum Requirement Example 2 – Assessment Against Past Average Build Rates Towns Average Annual Completions Rates 1991-2004/5 (14 Years) have however been 102 dwellings, the supply based upon that average build rate is 29.7 Years Caistor Average Annual Completions Rates 1991-2004/5 (14 Years) have however been 12 dwellings, the supply based upon that average build rate is 31.5 Years Gainsborough Average Annual Completions Rates 1991-2004/5 (14 Years) have however been 64 dwellings, the supply based upon that average build rate is 31.4 Years Market Rasen Average Annual Completions Rates 1991-2004/5 (14 Years) have however been 26 dwellings, the supply based upon that average build rate is 24.6 Years Lincoln Policy Area Average Annual Completions Rates 1991-2004/5 (14 Years) have however been 229 dwellings, the supply based upon that average build rate is 6.8 Years Rural Area Average Annual Completions Rates 1991-2004/5 (14 Years) have however been 110 dwellings, the supply based upon that average build rate is 10.6 Years District Wide Average Annual Completions Rates 1991-2004/5 (14 Years) have however been 441 dwellings, the supply based upon that average build rate is 13.0 Years

11

Page 12: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

Abbreviations A number of abbreviations are used in the tables. These are explained below: Alloc Allocated for housing in the West Lindsey Local Plan First Review. Outline PP Outline Planning Permission ARM Approval of Reserved Matters Full PP Full Planning Permission N/S Not Started U/C Under Construction Ha Hectares TTWA Lincoln Travel to Work Area LPA Lincoln Policy Area

12

Page 13: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

Table 1 – Housing Completions and Settlement Totals 1993 – 2004/05

Settlement 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003/4 2004/5Caistor 7 37 9 16 6 15 5 8 2 2 1 19Gainsborough 78 59 20 28 34 43 13 30 63 30 190 94Market Rasen 3 3 5 60 49 11 27 9 22 48 56Middle Rasen 2 1 1 2 1 5 2 16Towns Total 90 100 30 49 100 109 30 70 76 54 239 185Aisthorpe 1 1 Apley Bardney 4 2 2 1 1 1 2 0 3 3 2Barlings 1 Brattleby 1 1 1 3 2 2 1 Broadholme 1 1 1 1Broxholme 1 1 1 1Bullington 1 1 Burton 1 1 1 1 Burton Waters 15 32 77 4Cammeringham 1 1 1 2 2 1 Cherry Willingham 17 38 20 21 22 6 33 15 3 18 47 102Cold Hanworth Dunholme 16 5 1 45 22 28 29 15 17 27Faldingworth 1 40Fillingham 1 4 11Fiskerton 1 3 13 66 9Friesthorpe Fulnetby Glentworth 2 1 2 4 13Goltho Grange-de-Lings Hackthorn Hawthorn Avenue 1 1 1 2 1 4Holton-cum-Beckering 1 2 Ingham 3 2 14 8 13 19 21 8 1 5 9 9Ingleby Kingthorpe 1 Langworth 3 1 1 2 1 2 1 Lincoln Fringe (N Greetwell) 8Lincoln Fringe (Nettleham) Lincoln Fringe (Riseholme) 3 22 23 18 21 8 Nettleham 35 14 10 31 36 32 26 11 11 1 4New Toft 1 1 1 Newball Newton-by-Toft North Carlton 1 1 2 North Greetwell 1 1 1 5 5 7 2 1 7 1Odder

13

Page 14: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

Table 1 – Housing Completions and Settlement Totals 1993 – 2004/05

Settlement 1993 1994 1995 1996 1998 1999 2000 2001 2002 1997 2003/4 2004/5Rand 1 1 Reasby Reepham 1 5 13 20 12 4 1 7Riseholme 1 1 1 1 Saxilby 11 14 4 13 10 46 104 87 71 87 147 48Scampton 1 2 1 4 4Scothern 1 18 5 19 7 6 1 1Snarford 1 Snelland South Cartlon 1 Southrey 2 1 1 1 1Spridlington 1 1 1 Stainfield Stainton-by-Langworth 1 1 1 3 Sudbrooke 5 1 1 2 1 2 36 31 27 9 4 22Thorpe-in-the-Fallows Toft-next-Newton 1 Welton 20 50 59 52 50 39 63 71 69 39 50 22Wickenby 1 3Lincs Policy Area 129 174 178 182 214 332 310150 247 209 451 344Aisby 1 1Atterby Bigby 1 6 10Bishop Bridge Bishop Norton 1 1 Bleasby Moor 1 1 1 2Blyborough 1 1 1 Blyton 6 1 3 2 4 1 4 3 13Brampton 5 2 2 1Bransby 1 1 1 Brocklesby Brookenby 1 4 1 Buslingthorpe 1Caenby Cabourne 1 Claxby 1 1 1 1 Clixby Coates Corringham 1 1 1 1 1 22Cuxwold East Ferry 1 11 1 East Firsby East Stockwith 3 1Fenton 6 3 4 4 5 4Gate Burton Glentham 1 1 3 2 9 6 1 5 11 15 12Grasby 3 3 1 5 7 5

14

Page 15: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

Table 1 – Housing Completions and Settlement Totals 1993 – 2004/05

Settlement 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003/4 2004/5Grayingham 2 1 2 1 3 2 2Great Limber 4Hardwick 1Harpswell 1 Heapham 1 1 2 1 1 Hemswell 1 1 1 2 1Hemswell Cliff 1 3 10 1 6 1 1Holton-le-Moor 1 1 Keelby 3 2 3 1 Kettlethorpe Kexby 2 1 1 1Kingerby 3 Kirkby 1 2 1 1 3Kirmond-le-Mire 1 Knaith 1 1 1 3Knaith Park 1 1 1 10 Laughterton 1 1 1 1 1 6Laughton 1 3 1 1 3 1 15Lea 12 14 12 3 4 5 2 3 1 3Legsby 1 4 1 Linwood 1 Lissington Marton 6 7 19 1 5 2 3 10Moortown 1 2 1 3 Morton 6 12 1 4 1 1 17 28Nettleton 2 2 1 1 1 4 3Newton-on-Trent 7 1 2 2 3 6 2 13 3 5 4Normanby Normanby-by-Spital 1 1 1 1 1 7 2 5 4 1 4 4Normanby-le-Wold North Kelsey 11 4 3 4 3 3 2 5 2 3 2North Kelsey Moor Northorpe 1 1North Owersby 2 1 1 North Willingham 1 1 1 1Osgodby 2 1 1 1 1 1 3 2 3Owmby Owmby-by-Spital 4 4 3 1 3 1 1Pilham 1 1 1 1 Riby Rothwell 1 2 1 1 3Saxby 1 1 Scotter 5 6 2 5 4 7 7 3 1 3 5 29Scotterthorpe 1 1 1 1 1 1Scotton 1 3 1 1 1 2 1 8

15

Page 16: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

Table 1 – Housing Completions and Settlement Totals 1993 – 2004/05

Settlement 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003/4 2004/5Searby 2 1 1 2 5Sixhills Snitterby 2 1 1 1 Somerby 2 3 2 3 South Owersby South Kelsey 2 3 3 2 2 2 3 8Springthorpe 1 1 1 1 1 1 Stainton-le-Vale Stow 1 1 1 2 Stow Park Sturgate Sturton-by-Stow 10 11 1 8 23 15 18 9 10 11 44 11Susworth Swallow 1 4 2 2 Swinhope Tealby 3 1 6 2 1 1 4 2Thonock Thoresway 1 1 Thorganby 1 Thornton-le-Moor Torksey 2 1 2 1 1 1 5Torksey Lock 1 1 1 Upton 3 7 2 1 1 8 1 1 1 2 2 2Usselby 1 Waddingham 1 3 7 2 2 1 11 12 12Walesby 1 2 1 1 1 2Walkerith 1 1 2 West Firsby West Rasen Wildsworth 1 3 3 Willingham-by-Stow 3 2 2 2 2 4 1 15 5Willoughton 3Yawthorpe Rural Total 106 115 80 61 96 100 73 73 64 78 188 265

District Total 325 389 260 288 378 423 435 453 387 341 878 794

16

Page 17: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

Table 2 – Housing Commitments as of the 1st April 2005

Settlement Under Outline Full Residual Construction Planning Planning Local Plan Permission Permission Allocations Caistor 3 12 113 218 Gainsborough 151 417 404 870 Market Rasen 91 10 191 258 Middle Rasen 16 6 3 Towns Total 261 445 711 1346 Aisthorpe Apley Bardney 6 3 62 144 Barlings Brattleby Broadholme 1 Broxholme Bullington Burton 1 Burton Waters 37 69 Cammeringham 1 Cherry Willingham 8 5 108 10 Cold Hanworth Dunholme 4 1 21 Faldingworth 12 2 38 Fillingham 16 Fiskerton 5 3 Friesthorpe Fulnetby Glentworth Goltho Grange-de-Lings 1 Hackthorn Hawthorn Avenue 46 3 10 Holton-cum-Beckering 5 Ingham 1 5 3 Ingleby Kingthorpe Langworth 2 23 Lincoln Fringe (N Greetwell) 46 87 Lincoln Fringe (Nettleham) 350 Lincoln Fringe (Riseholme) Nettleham 5 1 1 New Toft Newball 1 1 Newton-by-Toft North Carlton 2 4 North Greetwell 4 2 Odder Rand Reasby Reepham 1 4

17

Page 18: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

Table 2 – Housing Commitments as of the 1st April 2005 Settlement

Under Construction

Outline Planning

Permission

Full Planning

Permission

Residual Local Plan Allocations

Riseholme 1 Saxilby 6 9 10 Scampton 3 2 Scothern 5 Snarford Snelland South Cartlon 3 Southrey 1 2 5 Spridlington 2 4 Stainfield Stainton-by-Langworth Sudbrooke 1 4 1 5 Thorpe-in-the-Fallows Toft-next-Newton Welton 11 6 26 Wickenby 1 1 Lincs. Policy Area Total 207 399 412 256 Aisby 1 4 Atterby 3 Bigby 5 1 8 Bishop Bridge Bishop Norton 1 24 6 Bleasby Moor Blyborough 1 Blyton 35 8 17 Brampton 1 Bransby Brocklesby Brookenby 2 18 Buslingthorpe Caenby 1 Cabourne Clixby Claxby 1 Coates Corringham 2 1 3 Cuxwold East Ferry 3 3 1 East Firsby East Stockworth 1 1 Fenton 3 2 15 Gate Burton Glentham 1 1 Grasby 2 4 3 Grayingham 2 Great Limber 1 5 Hardwick 1 Harpswell 4 1 Heapham 1

18

Page 19: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

Table 2 – Housing Commitments as of the 1st April 2005 Settlement

Under Construction

Outline Planning

Permission

Full Planning

Permission

Residual Local Plan Allocations

Hemswell 2 1 17 Hemswell Cliff Holton-le-Moor Keelby 50 1 15 Kettlethorpe 1 2 Kexby 4 Kingerby Kirkby 2 Kirmond-le-Mire Knaith 3 1 3 Knaith Park 7 Laughterton 12 3 Laughton 11 5 Lea 5 Legsby 3 1 Linwood 1 Lissington 3 6 Marton 7 15 Moortown 1 Morton 42 8 16 4 Nettleton 35 Newton-on-Trent 4 3 4 2 Normanby Normanby by Spital 4 Normanby-le-Wold North Kelsey 1 6 5 10 North Kelsey Moor 1 Northorpe 1 North Owersby North Willingham 1 Osgodby 4 4 2 Owmby Owmby-by-Spital Pilham Riby Rothwell 1 Saxby 1 Scotter 45 28 89 Scotterthorpe 1 2 1 Scotton 3 2 22 Searby 2 Sixhills Snitterby 1 12 Somerby South Kelsey 1 23 16 South Owersby Springthorpe 3 2 Spital in the Street 1 Stainton-le-Vale

19

Page 20: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

Table 2 – Housing Commitments as of the 1st April 2005 Settlement

Under Construction

Outline Planning

Permission

Full Residual Local Plan Planning

Permission Allocations Stow 3 2 Stow Park Sturgate Sturton-by-Stow 8 4 Susworth Swallow 1 7 Swinhope Tealby 6 2 Thonock Thoresway Thorganby Thornton-le-Moor Torksey 5 19 Torksey Lock Upton 5 1 5 1 Usselby Waddingham 2 3 12 Walesby 2 3 3 Walkerith 3 West Firsby West Rasen Wildsworth 3 4 1 Willingham-by-Stow 3 3 5 Willoughton 3 1 12 Yawthorpe

20

Page 21: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

ts as of the 1st April 2005

e

Ncco LL BD

Table 2 – Housing Commitmen

Table 3 – Completions by Site Typ

YEAR ALLOCATED WINDFALL

CHANGE OF USE/CONVERSION

Towns TTWA Rural District Towns TTWA Rural District Towns TTWA Rural District 1998 182 241 40 1999 244 11 255 33 104 43 180 6 12 6 24 Towns LPA Rural District Towns LPA Rural District Towns LPA Rural District 2000 12 237 13 262 61 73 57 191 11 5 5 21 2001 25 209 8 242 51 38 56 145 2 2 7 11 2002 43 206 37 286 11 14 30 55 2 0 2 4 2003/4 141 408 94 643 98 43 94 235 57 0 3 60 2004/5 135 302 207 644 50 42 58 150 3 1 1 5 2005 2006 2007 2008 2009 2010

YEAR REPLACEMENT Vacant Previously Developed

Land BROWNFIELD Towns TTWA Rural District Towns TTWA Rural District Towns TTWA Rural District

1998 37 96 1999 5 2 1 8 0 13 3 16 11 27 10 48 Towns LPA Rural District Towns LPA Rural District Towns LPA Rural District 2000 4 3 2 9 25 26 17 68 40 34 24 98 2001 2 2 7 11 8 16 5 29 10 18 12 40 2002 0 2 0 2 21 17 16 54 21 19 16 56 2003/4 2 0 2 4 89 34 67 190 91 34 69 194 2004/5 12 0 1 13 49 1 10 60 61 1 11 73 2005 2006 2007 2008 2009 2010

otes: All completions in the District are either on sites allocated in the West Lindsey Local Plan, or they are ompletions on windfall sites. Figures in the Change of Use/Conversion, Brownfield and Replacement olumns are subset figures drawn from both the allocated and windfall categories for information purposes nly and do not form part of the Housing Land Availability calculation.

PA – Lincoln Policy Area, this differs from the Travel to Work Area and is in line with current work on the incoln Policy Alteration to the Replacement Lincolnshire Structure Plan.

rownfield land is the sum of Completions in the C/O/U/Conversion, Replacement and Vacant Previously eveloped Land Categories.

21

Page 22: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

Table 4 – Planning Status of Residential Allocations as of the 1st April 2005

ALLOCATION PLANNING STATUS AS OF 01/04/05

HOUSING CAPACITY REMAINING

ADDITIONAL COMMENTS

TOWNS CAISTOR: C7 None 176 Dwellings Main Strategic

Allocation for Caistor C9 Reserved Matters Consent

08/02/02 - 9 Dwellings [9 N/S, 0 Built & 0 U/C]

None (Allocated for 9 Dwg’s)

Committed

C10 Full Consent 27/09/02 18 Dwellings [12 N/S, 3 Built & 3 U/C]

None (Allocated for 5 Dwg’s)

Committed

C12 Full Consent 15/04/03 1 Dwelling [1 N/S, 0 Built, 0 U/C]

None (Allocated for 1 Dwg)

Committed

C13 None 3 Dwellings New Brownfield Site C14 Outline Consent 06/02/04

5 Dwellings [5 N/S, 0 Built & 0 U/C]

None (Allocated for 4 Dwg’s)

Committed

C15 Outline Consent 16/04/03 Residential Development (Assumed 7 Dwellings) [7 N/S, 0 Built & 0 U/C]

None (Allocated for 7 Dwg’s)

Committed

C16 Full Consent 18/03/04 91 Dwellings [91 N/S, 0 Built & 0 U/C]

Assumed 39 Dwellings (Allocated for 130 Dwg’s)

Committed (Outline application for 148 dwellings – Not yet determined)

GAINSBOROUGH:G1 Outline Consent 29/12/03 Residential Development (Assumed 240 Dwellings) [240 N/S, 0 Built & 0 U/C]

None (Allocated for 240 Dwg’s)

Committed (Reserved Matters permission for 257 dwellings – Not yet determined)

G3 None 200 Dwellings Strategic High Quality Allocation for Gainsborough

G7 Reserved Matters Consent 31/01/05 39 Dwellings [39 N/S, 0 Built & 0 U/C]

None (Allocated for 40 Dwg’s)

Committed

G8 1 Full Consent 16/03/04 99 Dwellings (Point Bid Site) [33 N/S, 35 Built & 31 U/C] 2 Outline Consent 19/01/04 (Works Site to the north of Point Bid) Residential Development (Assumed 7 Dwellings) [7 N/S, 0 Built & 0 U/C]

267 Dwellings (Allocated for 366 Dwg’s)

First Phase of Site Underway, Other Phases together with the First form the Key Brownfield Regeneration Site for Gainsborough

G10 1 M01/P/0911 Reserved Matters Consent 24/04/02 - 50 Dwellings 2 Reserved Matters Consent 18/11/02 - 3 add Dwellings 3 Full Consent 25/07/03 25 Dwellings 78 Dwellings in Total over a larger site [37 N/S, 22 Built & 10 U/C]

None (Allocated for 30 Dwg’s)

Committed

G11 Outline Consent 20/01/05 Residential Development (Assumed 170 Dwellings)

None (Allocated for 170 Dwg’s)

Committed

22

Page 23: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

Table 4 – Planning Status of Residential Allocations as of the 1st April 2005 ALLOCATION PLANNING STATUS AS OF

01/04/05 HOUSING CAPACITY

REMAINING ADDITIONAL COMMENTS

[170 N/S, 0 Built & 0 U/C] G17 Full Consent 25/06/04

10 Dwellings [10 N/S, 0 Built & 0 U/C]

None (Allocated for 3 Dwg’s)

Committed

G18 Full Consent 13/12/02 2 Dwellings [2 N/S, 0 Built & 0 U/C]

None (Allocated for 1 Dwg)

Committed

G19 None 3 Dwellings New Brownfield Site G21 Full Consent 16/12/04

53 Dwellings [53 N/S, 0 Built & 0 U/C]

None (Allocated for 23 Dwg’s)

Committed

G22 None 15 Dwellings New Brownfield Site G23 Full Consent 07/05/03

2 Dwellings [2 N/S, 0 Built & 0 U/C]

None (Allocated for 1 Dwg)

Committed

G24 Full Consent 25/01/05 Residential Development (Assumed 5 Dwellings) [5 N/S, 0 Built & 0 U/C]

None (Allocated for 5 Dwg’s)

New Brownfield Site

G25 Outline Consent 01/11/04 56 Dwellings (Covering over half of G25) [56 N/S, 0 Built & 0 U/C]

Notional 4 Dwellings *Less than half of the site still to be committed by planning permission (Allocated for 60 Dwg’s)

New Brownfield Site

G26 1Full Consent 28/10/04 9 Dwellings (Area to the South) 2Full Consent 28/10/04 42 Dwellings (Area to the north) 49 Dwellings [45 N/S, 2 Built & 2 U/C]

None (Allocated for 29 Dwg’s)

Committed

G28 None 6 Dwellings None G29 Full Consent 22/01/03

1 Dwelling [1 N/S, 0 Built & 0 U/C]

None (Allocated for 5 Dwg’s)

Committed

G30 None 7 Dwellings New Brownfield Site G31 None 26 Dwellings New Brownfield Site

G(M)1 1Full Consent 05/09/01 14 Dwellings (Baltic Oil Mill) 2Full Consent 19/11/03 54 Dwellings (Whittons Mill) [54 Built] 3Full Consent 21/04/04 11 Dwg’s (90 Bridge Street) [11 U/C] 4Full Consent 23/10/03 9 Dwg’s (92 Bridge Street) [9 Built] 5Full Consent 20/01/05 55 Dwellings (Sandars Yard) [55 U/C] 6Full Consent 03/05/02 1 Dwelling (4 Lea Road) [1 Built] 144 Dwellings Total [24 N/S, 64 Built & 66 U/C]

Estimated 50 Dwellings at least (Allocated for 150 Dwg’s)

Committed

G(M)3 None 14 Dwellings Key Regeneration Site

23

Page 24: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

Table 4 – Planning Status of Residential Allocations as of the 1st April 2005 ALLOCATION PLANNING STATUS AS OF

01/04/05 HOUSING CAPACITY

REMAINING ADDITIONAL COMMENTS

G(M)5 None 100 Dwellings Key Regeneration Site G(M)6 None 6 Dwellings New Brownfield Site

MARKET RASEN: MR3

None

150 Dwellings

LPA has resolved to grant consent subject to the signing of a planning obligation which is under preparation

MR4 Reserved Matters Consent 12/06/03 149 Dwellings [108 N/S, 22 Built & 18 U/C]

None (Allocated for 135 Dwg’s)

Committed

MR5 None 82 Dwellings Residual Phase of a larger site to join existing development to the edge of the Town *(Full Application for 62 Dwellings -Not yet Determined)

MR10 Full Consent 10/06/03 89 Dwellings [27 N/S, 18 Built & 46 U/C]

None (Allocated for 80 Dwg’s)

Committed

MR11 Full Consent 29/03/03 23 Dwellings [23 N/S, 0 Built & 0 U/C]

None (Allocated for 20 Dwg’s)

Committed

MR16 None 2 Dwellings New Brownfield Site MR17 Outline Consent 10/04/03

Residential Development (Assumed 8 Dwellings) [8 N/S, 0 Built & 0 U/C]

None (Allocated for 8 Dwg’s)

Committed

MR(M)3 None 9 Dwellings New Brownfield Site MR(M)4 None 15 Dwellings New Brownfield Site MR(M)5 Outline Consent 29/06/04

4 Dwellings [4 N/S, 0 Built & 0 U/C]

None (Allocated for 5 Dwg’s)

Committed

MIDDLE RASEN: Mi5 Full Consent 31/03/03 23 Dwellings [3 N/S, 4 Built & 16 U/C]

None (Allocated for 17 Dwg’s)

Committed

LINCOLN POLICY AREA BARDNEY:

B1 1Reserved Matters 22/03/04 60 Dwellings (Covers a slightly different area to B1) 2Full Consent 13/01/05 1 Additional Dwelling 3Reserved Matters 07/01/03 1 Dwelling

None (Allocated for 40 Dwg’s)

Committed

24

Page 25: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

Table 4 – Planning Status of Residential Allocations as of the 1st April 2005 ALLOCATION PLANNING STATUS AS OF

01/04/05 HOUSING CAPACITY

REMAINING ADDITIONAL COMMENTS

62 Dwellings [62 N/S, 0 Built & 0 U/C]

B4 None 12 Dwellings B5 None 40 Dwellings B6 None 20 Dwellings B7 None 12 Dwellings B8 None 30 Dwellings

Package of sites to aid the regeneration of Bardney

B9 Full Consent 14/08/02 1 Dwelling [1 N/S, 0 Built & 0 U/C]

None (Allocated for 6 Dwg’s)

Conversion of Grade II Listed ‘Goods Shed’

B10 None 30 Dwellings New Brownfield Site BURTON WATERS:

BW(M)1 Various Consents Up to 350 Dwellings [Final Phase 69 N/S, 3 Built & 37 U/C]

None (Allocated for 280 Dwg’s)

Committed

C WILLINGHAM: CW1

Full Consent 05/09/01 94 Dwellings [94 N/S, 0 Built & 0 U/C]

None (Allocated for 95 Dwg’s)

Committed

CW2 None 10 Dwellings New Site in Heart of Village

DUNHOLME: D2a None 9 Dwellings Residual Site D(M)1 None 12 Dwellings New Brownfield Site

FALDINGWORTH: Fa2

First Phase 50 Dwellings [0 N/S, 38 Built & 12 U/C]

38 Dwellings Residual

Residual Phase

FILLINGHAM: Fi1 Reserved Matters Consent 31/10/02 15 Dwellings [15 N/S, 0 Built & 0 U/C]

None (Allocated for 15 Dwg’s)

Committed

FISKERTON: F1 1Full Consent 11/07/01 6 Dwellings (Western Corner) 2Full Consent 21/09/01 29 Dwellings (Middle Section) 3Full Consent 04/07/02 (Eastern Section) 34 Dwellings 69 Dwellings [0 N/S, 69 Built & 0 U/C]

None (Allocated for 35 Dwg’s)

Committed

F2 Full Consent 20/12/01 5 Dwellings [5 N/S, 0 Built & 0 U/C]

None (Allocated for 6 Dwg’s)

Committed

GLENTWORTH: GH1 Reserved Matters Consent 27/01/03 - 17 Dwellings [0 N/S, 17 Built & 0 U/C]

None (Allocated for 12 Dwg’s)

Committed

HAWTHORN AV: HA1 First Phase 68 Dwellings [3 N/S, 19 Built & 46 U/C]

10 Dwellings Residual Residual Phase of Site already under construction

LANGWORTH: L2 Outline Consent 24/03/04 1 Dwelling on a small self contained section of the site

3 Dwellings Outline consent allowed on appeal as this was thought not to hinder the rest of the site coming forward

L3 None 20 Dwellings Brownfield Site LINCOLN FRINGE: Outline Consent None Committed

25

Page 26: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

Table 4 – Planning Status of Residential Allocations as of the 1st April 2005 ALLOCATION PLANNING STATUS AS OF

01/04/05 HOUSING CAPACITY

REMAINING ADDITIONAL COMMENTS

LF2/3 Residential Development (Assumed 350 Dwellings) [350 N/S, 0 Built & 0 U/C]

LF5 1Full Consent 18/10/99 66 Dwellings (Majority of the site) 2Full Consent 31/07/02 9 Dwellings 75 Dwellings [63 N/S, 8 Built & 4 U/C]

None (Allocated for 66 Dwg’s)

Committed

LF6 Reserved Matters 05/05/04 (Covering most of the site except the Day Care Centre) 62 Dwellings [24 N/S, 0 Built & 42 U/C]

None (Allocated for 70 Dwg’s)

Committed

SAXILBY: S5 Full Consent 03/0703 28 Dwellings [10 N/S, 12 Built & 6 U/C]

None (Allocated for 28 Dwg’s)

Committed

S6 Outline Consent 16/12/04 2 Dwellings [2 N/S, 0 Built & 0 U/C]

None (Allocated for 2 Dwg’s)

Committed

SCOTHERN: Sc3 Outline Consent 12/04/02 2 Dwellings (Covers most of the site except the plot to the south which has been built) Full Consent 16/10/03 1 Dwelling (on part of the Outline permission above) [3 N/S, 0 Built & 0 U/C]

None (Allocated for 3 Dwg’s)

Committed

SOUTHREY: So1 None 5 Dwellings Greenfield & Brownfield

So2 Outline Consent 26/01/05 2 Dwellings [2 N/S, 0 Built & 0 U/C]

None (Allocated for 2 Dwg’s)

Committed

SUDBROOKE: Su2 None 2 Dwellings Brownfield Land Su3 None 3 Dwellings Greenfield Land

WELTON: W6 Full Consent 01/07/02 27 Dwellings [11 N/S, 6 Built, 0 U/C]

None (Allocated for 27 Dwg’s)

Committed

RURAL BISHOP NORTON:

BN1 Outline Consent 10/05/02 5 Dwellings [5 N/S, 0 Built & 0 U/C]

None (Allocated for 8 Dwg’s)

Committed

BN2 Outline Consent 10/05/02 4 Dwellings [4 N/S, 0 Built & 0 U/C]

None (Allocated for 4 Dwg’s)

Committed

BN3 Outline Consent 10/05/02 4 Dwellings [4 N/S, 0 Built & 0 U/C]

None (Allocated for 4 Dwg’s)

Committed

BN5 Outline Consent 10/05/02 4 Dwellings [4 N/S, 0 Built & 0 U/C]

None (Allocated for 4 Dwg’s)

Committed

BN6 Outline Consent 10/05/02 5 Dwellings [5 N/S, 0 Built & 0 U/C]

None (Allocated for 3 Dwg’s)

Committed

26

Page 27: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

Table 4 – Planning Status of Residential Allocations as of the 1st April 2005 ALLOCATION PLANNING STATUS AS OF

01/04/05 HOUSING CAPACITY

REMAINING ADDITIONAL COMMENTS

BROOKENBY: BK8 None 3 Dwellings New Brownfield Site BK(M)1 None 15 Dwellings *Outline permission for

15 Dwellings – Not yet Determined.

FENTON: Fe1 None 15 Dwellings *Outline Consent for 15 dwellings has recently lapsed but renewal was refused by LPA

GRAYINGHAM: Gr2 Full Consent 20/05/01 4 Dwellings [0 N/S, 2 Built & 2 U/C]

None (Allocated for 4 Dwg’s)

Committed

GREAT LIMBER: GL2 Full Consent 06/04/04 2 Dwellings [3 N/S, 0 Built & 0 U/C]

None (Allocated for 3 Dwg’s)

Committed

GL3 Full Consent 06/04/04 3 Dwellings [3 N/S, 0 Built & 0 U/C]

None (Allocated for 3 Dwg’s)

Committed

HARPSWELL: HP(M)1

Outline Consent 12/08/02 To erect Dwellings (4 Dwellings indicated) [4 N/S, 0 Built & 0 U/C]

Unknown (Dwellings to be negotiated)

Committed

HEMSWELL: H4 1Reserved Matters 19/05/95 1 Dwelling (Northern Section) 2Outline Consent 09/02/04 1 Dwelling 2 Dwellings [1 N/S, 1 Built & 0 U/C]

None (Allocated for 2 Dwg’s)

Committed

H5 Full Consent 28/07/03 9 Dwellings (Stud Farm Buildings) [9 N/S, 0 Built & 0 U/C]

None (Allocated for 9 Dwg’s)

Committed

KEELBY: K2 Outline Consent 20/06/03 Residential Development (Assumed 50 Dwellings) [50 N/S, 0 Built & 0 U/C]

None (Allocated for 50 Dwg’s)

Committed

K4 None 15 Dwellings

New Site as part of a new Community Led Sports Proposal which has consent and Sport England funding secured

KEXBY: Kx5 Full Consent 29/05/02 4 Dwellings [0 N/S, 0 Built & 4 U/C]

None (Allocated for 4 Dwg’s)

Committed

KNAITH PARK: KP1 1Full Consent 20/06/01 17 Dwellings [0 N/S, 10 Built & 7 U/C

None (Allocated for 17 Dwg’s)

Committed

LAUGHTERTON: La1 1Full Consent 22/06/03 15 Dwellings 2Full Consent 23/12/03 3 Additional Dwellings 18 Dwellings [0 N/S, 6 Built & 12 U/C]

None (Allocated for 15 Dwg’s)

Committed

LAUGHTON: Ln2 1Full Consent 22/06/01 23 Dwellings (Western Section) 2Full Consent 17/03/03

None (Allocated for 23 Dwg’s)

Committed

27

Page 28: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

Table 4 – Planning Status of Residential Allocations as of the 1st April 2005 ALLOCATION PLANNING STATUS AS OF

01/04/05 HOUSING CAPACITY

REMAINING ADDITIONAL COMMENTS

(Western) 1 Dwelling additional dwelling 3Full Consent 12/10/04 5 Dwellings (Eastern Section) 29 Dwellings [5 N/S, 13 Built & 11 U/C]

LEGSBY: Ly3 1Full Consent 21/10/02 1 Dwelling (Northern Section) 2Full Consent 03/03/03 (Southern) 1 Dwelling 2 Dwellings [1 N/S, 0 Built & 1 U/C]

None (Allocated for 2 Dwg’s)

Committed

LISSINGTON: Li1 Reserved Matters 25/11/04 6 Dwellings [6 N/S, 0 Built & 0 U/C]

None (Allocated for 5 Dwg’s)

Committed

MARTON: Ma1 Reserved Matters 23/07/01 5 Dwellings [0 N/S, 0 Built & 5 U/C]

None (Allocated for 3 Dwg’s)

Committed

Ma3 Full Consent 02/08/02 5 Dwellings [0 N/S, 3 Built & 2 U/C]

None (Allocated for 6 Dwg’s)

Committed

MORTON: Mo5 Full Consent 24/11/02 34 Dwellings [0 N/S, 34 Built & 0 U/C]]

None (Allocated for 25 Dwg’s)

Committed

Mo6 None 4 Dwellings (Allocated for 4 Dwg’s)

None

Mo7 Full Consent 05/11/02 67 Dwellings [16 N/S, 9 Built & 42 U/C]

None (Allocated for 32 Dwg’s)

Committed

NETTLETON: Ne3 Reserved Matters 09/01/01 6 Dwellings [0 N/S, 4 Built & 2 U/C]

None (Allocated for 6 Dwg’s)

Committed

Ne7 Full Consent 1 Dwelling [0 N/S, 1 Built & 0 U/C]

None (Allocated for 1 Dwg)

Committed

Ne8 Reserved Matters 14/03/05 35 Dwellings [35 N/S, 0 Built & 0 U/C]

None (Allocated for 35 Dwg’s)

Committed

NEWTON ON TRENT: NT1

Full Consent 11/08/2000 1 Dwelling (1 Plot to the South of the Site) [0 N/S, 1 Built & 0 U/C]

2 Dwellings (Allocated for 3 Dwg’s)

None

NORTH KELSEY: NK4

None

10 Dwellings

None

OSGODBY: Og2 Full Consent 02/07/04 2 Dwellings [2 N/S, 0 Built & 0 U/C]

None (Allocated for 5 Dwg’s)

Committed

PINGLEY CAMP: PC(M)1

None

10 Dwellings

Brownfield Site

SCOTTER: Sr1 1Full Consent 06/06/01 (Road and Plot Layout – Majority of the site) 23 Dwellings given permission through various consents 2Outline Consent 24/07/03 Residential Development (Western Section). 1

None (Allocated for 40 Dwg’s)

Committed

28

Page 29: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

Table 4 – Planning Status of Residential Allocations as of the 1st April 2005 ALLOCATION PLANNING STATUS AS OF

01/04/05 HOUSING CAPACITY

REMAINING ADDITIONAL COMMENTS

Dwelling Reserved Matters Consent 17/02/05 24 Dwellings [3 N/S, 8 Built & 13 U/C]

Sr3 Full Consent 05/01/04 50 Dwellings [9 N/S, 9 Built & 32 U/C]

None (Allocated for 54 Dwg’s)

Committed

SCOTTON: Sn1 1Reserved Matters 19/10/00 1 Dwelling (Southern Section) 2Outline Consent 28/05/03 (North) 1 Dwelling 2 Dwellings in Total [1 N/S, 1 Built & 0 U/C]

None (Allocated for 2 Dwg’s)

Committed

Sn4 Full Consent 12/06/03 8 Dwellings [3 N/S, 2 Built & 3 U/C]

None (Allocated for 8 Dwg’s)

Committed

Sn5 Reserved Matters 03/08/04 17 Dwellings [17 N/S, 0 Built & 0 U/C]

None (Allocated for 10 Dwg’s)

Committed

Sn6 Reserved Matters 13/09/04 1 Dwelling [1 N/S, 0 Built & 0 U/C]

None (Allocated for 1 Dwg)

Committed

SNITTERBY: Sb1 Reserved Matters 03/11/04 12 Dwellings [12 N/S, 0 Built & 0 U/C]

None (Allocated for 8 Dwg’s)

Committed

SOUTH KELSEY: SK4

Outline Consent 31/03/03 18 Dwellings [18 N/S, 0 Built & 0 U/C]

None (Allocated for 20 Dwg’s)

Committed

SK8 Outline Consent 03/10/01 9 Dwellings of which 6 Dwellings have been given Reserved Matters and Full Consent through several permissions [6 N/S, 0 Built & 0 U/C]

None (Allocated for 11 Dwg’s)

Committed

SK9 Outline Consent 20/06/03 5 Dwellings [5 N/S, 0 Built & 0 U/C]

None (Allocated for 12 Dwg’s)

Committed

SWALLOW: Sw2 Reserved Matters Consent 25/07/03 7 Dwellings [7 N/S, 0 Built & 0 U/C]

None (Allocated for 5 Dwg’s)

Committed

Sw3 1Reserved Matters 24/05/02 1 Dwelling (Western Section) 2Reserved Matters 22/05/02 (Eastern Section) 1 Dwelling 2 Dwellings [0 N/S, 1 Built & 1 U/C]

None (Allocated for 4 Dwg’s)

Committed

UPTON: U1 3 Dwellings have been completed on the Site [0 N/S, 3 Built & 0 U/C]

None (Allocated for 7 Dwg’s)

Committed

U(M)1 None 1 Dwelling

New Site for Mixed Use to bring about Burial Ground

WADDINGHAM: Wa2 Full Consent 17/07/02 13 Dwellings [0 N/S, 12 Built & 1 U/C]

None (Allocated for 12 Dwg’s)

Committed

29

Page 30: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

Table 4 – Planning Status of Residential Allocations as of the 1st April 2005 ALLOCATION PLANNING STATUS AS OF

01/04/05 HOUSING CAPACITY

REMAINING ADDITIONAL COMMENTS

WILLOUGHTON: Wn1

Full Consent 09/03/01 3 Dwellings (Majority of the Site) [3 N/S, 0 Built & 0 U/C]

None (Allocated for 6 Dwg’s)

Committed

Wn3 Full Consent 03/06/03 2 Dwellings [0 N/S, 0 Built & 2 U/C]

None (Allocated for 2 Dwg’s)

Committed

30

Page 31: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

Table 5 – Planning Status of Major Windfall Sites as of the 1st April 2005

Site Description Planning Status Dwellings Not Started

Dwellings Under Construction

Dwellings Completed

TOWNS GAINSBOROUGH:

Corringham Road (South Side Old De Rjike

Site)

M03/P/1266 (Reserved Matters - 07/05/04)

81 43 12

Hawthorn Croft(Off Hawthorn Avenue

Old Slaughterhouse Site)

M04/P/0945 (Full Consent – 01/11/04)

62 5 0

MARKET RASEN: Victoria Road M04/P/1388 (Full

Consent – 10/02/05 8 0 0

Mill Road Expires 09/11/05 16 0 0 Former MR7 & MR8 97/P/0832 (Full

Consent – 07/12/1999) 99/P/0253 (Reserved Matters - 05/07/00) M00/P/0611 (Reserved Matters - 28/09/00) M04/P/1432 (Full Consent - 01/04/05)

25 11 63

LINCOLN POLICY AREA CHERRY WILLINGHAM:

Croft Lane (Adj, No.1) M03/P/1147 (Outline Consent)

5 0 0

Croft Lane (No.44) M03/P/1256 (Full Consent – 16/03/04)

4 8 0

Land East of Church Lane (Final Phase 7)

M00/P/0616 (Full Consent – 26/10/00)

10 0 144

INGHAM High Street

(Adj, Sycamore House)99/P/0772 (Reserved Matters – (17/08/00)

1 0 5

NORTH CARLTON Saxilby Road

(South Side)98/P/0221 (Full Consent - 05/03/99)

4 2 0

SCAMPTON High Street

(Manor Farm)M00/P/0573 (Full Consent – 28/02/01) M02/P/0473 (Full Consent – 27/08/02

0 3 3

RURAL AREA BIGBY

Former By2 M00/P/0212 (Full Consent – 19/06/01) M00/P/0213 – (Full Consent – 19/06/01) M01/P/1122 (Full Consent – 21/02/02 M02/P/0692 – (Full Consent – 17/10/02) M04/P/0993 (Reserved Matters – 20/09/04)

8 5 11

BISHOP NORTON Well Street

(Crossholme Farm)M03/P/1003 (Full Consent – 25/11/03)

6 0 0

31

Page 32: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

Table 5 – Planning Status of Major Windfall Sites as of the 1st April 2005

Site Description Planning Status Dwellings Not Started

Dwellings Under Construction

Dwellings Completed

BLYTON Former Bt 1

(Laughton Road)M04/P/0168 (Reserved Matters – 18/03/04)

17 35 0

BROOKENBY York Road M00/P/0900 (Full

Consent – 22/03/01) 0 0 3

Cambridge Crescent M00/P/0588 (Full Consent – 26/10/00)

0 0 1

Salisbury Avenue M00/P/0791 (Reserved Matters – 06/12/00)

0 0 1

Swinhope Road M00/P/0790 (Reserved Matters – 01/02/01)

0 0 1

GRASBY Former Gy2

(Station Road)Various Consents for 9 Dwellings

1 0 8

Grasby Quarry(Brigg Road)

M02/P/0904 (Full Consent – 17/01/03) M03/P/0117 (Full Consent - 11/03/03) M03/P/1403 (Full Consent – 18/09/03)

2 2 3

HEMSWELL Former H3

(Church Street)M00/P/0503 (Full Consent – 18/12/02)

8 0 0

KNAITH Terrace House Farm

(Knaith Hill)M02/P/0273 (Full Consent – 17/06/02)

3 3 0

LEA Rectory Farm M01/P/0613 (Full

Consent – 10/10/02) 5 0 0

MARTON Former Ma2

(Trent Port Road)M03/P/0731 (Full Consent – 05/10/03)

15 0 0

NEWTON ON TRENT Manor Farm

(Dunham Road)W68/864/92 (Full Consent – 17/03/93

1 2 6

Adj, White Horse Farm(High Street)

M03/P/0410 (Reserved Matters – 24/09/03)

3 2 0

NORMANBY BY SPITAL Private Lane M03/P/1173 (Reserved

Matters – 13/05/04) 0 4 0

SCOTTER Soulby Wood Park

(St. Peters Road)Various Consents 19 0 0

Land off High Street(Adj, Soulby Wood Park)

M00/P/0271 (Outline Consent – 22/05/03)

5 0 0

Former Sr2(West off High Street)

M04/P/1462 (Reserved Matters – 28/02/05)

58 0 0

Former Sr2(East – Holly House

Farm)

M04/P/0129 (Outline Consent – 01/04/04)

23 *Assumed Density 30

dph

0 0

SOUTH KELSEY Mount Pleasant Farm Various Consents 7 1 0

STOW Belle Vue Farm

(Church Road)Various Consents 2 3 1

STURTON BY STOW Former SS5 M02/P/1107 (Full 3 8 52

32

Page 33: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

Table 5 – Planning Status of Major Windfall Sites as of the 1st April 2005

Site Description Planning Status Dwellings Not Started

Dwellings Under Construction

Dwellings Completed

(Stow Road) Consent – 27/12/02) M02/P/0971 (Full Consent – 05/12/02) M02/P/0638 (Full Consent – 21/08/02) M00/P/0974 (Full Consent – 06/06/01)

School Lane W104/528/94 (Full Consent – 16/12/94

1 0 8

TEALBY Springfields

(Phase II Rasen Road)M02/P/0068 (Full Consent – 31/10/02)

0 5 2

TORKSEY Former To1

(Abbey Park)M01/P/0892 (Reserved Matters – 11/02/02)

7 5 2

Caravan Site(Hume Arms)

M02/P/1024 (Reserved Matters – 11/12/02)

12 0 0

UPTON Cade Lane

(Adj, Site U1)M01/P/1196 (Full Consent – 16/07/02)

5 5 0

WADDINGHAM Depot Church Road M02/P/0125 (Reserved

Matters – 26/02/03) 12 2 0

WALKERITH Former Wh1

(Stockwith Road)M04/P/0641 (Reserved Matters – 30/07/04)

3 0 0

WILLOUGHTON Hallowgate Hill M00/P/0453 (Full

Consent – 12/01/01) 9 0 0

33

Page 34: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

APPENDIX 4 - EMPLOYMENT APPLICATIONS GRANTED CONSENT 1st APRIL 2004 – 31st MARCH 2005

APPLICATION NO. ADDRESS GRANTED CONSENT

DESCRIPTION Use Class

Loss/Gain Floorspace (Sq m)

Site Status 2004/05

M03/P/1164 North of Foxby Lane, Gainsborough

22/04/2004 *Outline planning permission to erect buildings for business use (Use Classes A2 and B1)

B1b & B1c

No buildings indicated on the Outline Plans. 3.83 ha

*Outline permission

M04/P/0299 Former NS Milling Site, Sandars Road, Heapham Road Industrial Estate, Gainsborough

27/04/2004 Full planning permission to erect additional industrial units

B1, B2 & B8

+569 Sq m 0.51 ha

Completed 07/01/2005

M04/P/0316 23 High Street, Scampton

20/05/2004 Full planning permission to change the use of mail sorting office to public house and extension to public house

B8 -176 Sq m Completed 28/10/2004

M04/P/0556 Cherry Valley Farms Ltd, Sandbraes Processing Plant, North Kelsey Road, Caistor

14/06/2004 Full planning permission to erect a portal frame lean to building

B2 +48 Sq m Completed 23/09/2004

M04/P/0460 Unit 1, Waterloo Street, Market Rasen

24/06/2004 Full planning permission to erect a storage building

B8 +36 Sq m

Not Started.

M04/P/0112 Unit 6, Newtoft Business Park, Newtoft.

08/07/2004 Full planning permission to change the use of existing building into business and ancillary residential use, plus erect detached garage/workshop

B2 to B1c

None (54 Sq m)

Not Started

M04/P/0467 Manor Farm, Stow Park Road, Stow

05/07/2004 Full planning permission to convert agricultural buildings into 3 workshops, business units and dwellings

B1b +178 Sq m

Not Started

M04/P/0576 Land adjacent to the old crèche, Newtoft Business Park, Newtoft

05/07/2004 Full planning permission to erect single storey building (store unit)

B8 +252 Sq m Not Started

M04/P/0596 East Ferry Timber, 3, Brigg Road, Scotter

09/07/2004 Full planning permission to erect timber storage shed and yard

B8 +446 Sq m Not Started

34

Page 35: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

APPLICATION NO. ADDRESS GRANTED CONSENT

DESCRIPTION Use Class

Loss/Gain Floorspace (Sq m)

Site Status 2004/05

M04/P/0764 Caldicott Road, Heapham Road Industrial Estate, Gainsborough

27/07/2004 Full planning permission to erect extension to existing warehouse facilities

B8 +875 Sq m Not Started

M04/P/0318 Fox Plant Ltd, Caenby Hall, Caenby

01/09/2004 Full planning permission for the redevelopment of existing heavy vehicle plant hire activities, including replacement maintenance and workshop buildings

B1, B2 & B8

+4050 Sq m Not Started

M04/P/0726 Ash Tree Farm, Sudbrooke Lane, Nettleham

24/09/2004 Full planning permission to change the use of agricultural barn to furniture and upholstery business

B8 +272 Sq m Completed 11/02/2005

M04/P/0934 Plot 12, Saxilby Enterprise Park, Saxilby

24/09/2004 Full planning application to erect single storey building with office for haulage company business

B8 +272 Sq m Not Started

M04/P/0880 Land adjacent to Unit 19, Long Wood Road, Corringham Road Industrial Estate, Gainsborough

30/09/2004 Full planning permission to erect 2 industrial buildings for use as builders and timber merchants and suppliers of plumbing & heating supplies and tool hire with ancillary retail sales and offices

B8 +1259 Sq m Under construction 09/11/2004

M04/P/1107 Unit 6A, Gallamore Lane Industrial Estate, Market Rasen

10/11/2004 Full planning permission to demolish existing fire damaged industrial unit (not in use) and rebuild

A1, B1, B2 & B8

+205 Sq m Not Started

M04/P/1248 Cherry Valley Farms Ltd, Usselby Hatchery, Usselby

10/12/2004 Full planning permission to erect a portal frame building to create a secure store for farm egg trolleys

B8 +113 Sq m Completed 23/09/2004

M04/P/1229 Silvertrees Farm, Westmoor Lane, Kettlethorpe

20/12/2004 Full planning permission to change the use of redundant agricultural buildings to employment uses

B1, B2 & B8

+650 Sq m Not Started

M04/P/1335 Plot 15, Saxilby Enterprise Park, Saxilby

12/01/2005 Full planning permission to erect industrial plant sales and workshop building

B2, B8 Missing data Not Started

M04/P/1282 Denby Transport Distribution, The Cliff,

19/01/2005 Full planning permission to erect a distribution warehouse

B8 +2787 Sq m Not Started

35

Page 36: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

APPLICATION NO. ADDRESS GRANTED CONSENT

DESCRIPTION Use Class

Loss/Gain Floorspace (Sq m)

Site Status 2004/05

Ingham M04/P/1451 Park Springs Farm,

Foxby Lane, Gainsborough

14/02/2005 Full planning permission to convert buildings to dwellings and business units

B2 +228 Sq m Not Started

M05/P/0063 Corringham Road Industrial Estate, Longwood Road, Gainsborough

07/03/2005 Full planning permission to erect industrial units (B1 & B8)

B1, B2 +1270 Sq m Not Started

M05/P/0086 Plot 7, Saxilby Industrial Estate, Saxilby

24/03/03 Full planning permission for the erection of units 2, 3 and 4 workshop/storage buildings (Use Classes B1, B2 & B8)

B1, B2 & B8

+480 Sq m Not Started

36

Page 37: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

APPENDIX 5 – PLANNING STATUS ON EMPLOYMENT ALLOCATIONS AS OF THE 1st APRIL 2005

37

ALLOCATION PLANNING STATUS AS OF 01/04/05

PERCENTAGE OF SITE STILL AVAILIBLE (Ha)

ADDITIONAL COMMENTS

TOWNS CAISTOR:C(E)3 1Full Consent – 20/07/87

(W18/397/87) Change the use of agricultural land to industrial estate (3.64 Ha) *2Full Consent – 14/04/89 (W18/119/89) Erect 3 factory units (0.36Ha – Completed) *3Full Consent 03/02/2002 (M01/P/1041) Erect new workshop (0.43Ha – Commenced 30/10/2003) *4Full Consent – 19/12/02 (M02/P/0998) Modify internal structure/form loading bay/office space (0.38Ha – Completed)

*Permissions on land relating to consent No.1

C(E)3 – 11.00 Ha

Minus 1.17 from implemented permissions

9.83 Ha left to be developed or 89% of the land still available for employment uses.

B1, B2, B8 & A2 Uses

GAINSBOROUGH: G(E)2

Full Consent – 25/04/90 W33/287/90 Erect auto repair workshop (0.33Ha – Completed) Full Consent – 25/10/91 W33/582/91 Erect industrial workshop (0.20Ha – Completed) Full Consent – 02/06/92 **W33/238/92 Erect workshop (0.37Ha – Completed) Full Consent – 10/12/93 W33/838/93 Erect industrial building (0.51ha – Completed) Full Consent – 01/03/95 W33/8/95 Erect industrial building (0.53Ha – Completed) Full Consent – 20/06/96 96/P/0249 Erect industrial building (0.51Ha – Completed) Full Consent – 01/11/96 96/P/0678 Erect Industrial building (Same as ** - Completed) Full Consent – 07/02/97 96/P/0953 Erect factory/office accommodation (2.15Ha – Completed)

G(E)2 – 48.10Ha

Minus 6.2Ha from implemented permissions opposite and infrastructure land take

41.9Ha left to be developed or 87% of the land still available for employment uses.

A2, B1, B2 and B8 Uses

Page 38: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

ALLOCATION PLANNING STATUS AS OF 01/04/05

PERCENTAGE OF SITE STILL AVAILIBLE (Ha)

ADDITIONAL COMMENTS

Full Consent – 21/01/99 98/P/0912 Erect new industrial (0.69Ha – Completed) Full Consent – 06/03/01 ***M01/P/0037 Erect 5 industrial units (0.38Ha - Not Started) Full Consent – 25/07/02 M02/P/0611 Erect 2 industrial units (Same as *** – Completed) Full Consent – 12/02/04 M04/P/0016 Erect new bulk warehouse (0.24Ha – Not Started)

Also 16.76 Ha – Outline permission (99/P/1041 – 14/02/01) to use land for industrial development (B1, B2 & B8) and a further 6.55 Ha – Reserved Matters permission (M03/P/0579 -28/08/03) to use land for industrial development (B1, B2 & B8)

G(E)3 Outline Consent 22/04/04 M03/P/1164 Create Business Park including 271m of new road and services (11.00Ha)

G(E)3 – 11.00 Ha

11.00Ha left to be developed or 100% of the land still available for employment uses.

A2 and B1 Uses

G(M)1 Various consents including 144 Dwellings

G(M)1 – 2.17Ha

0.74Ha left to be developed or 34% of the land still available for employment and other uses

A3, B1, B2, C1, C3, D1 & D2

G(M)3 None G(M)3 – 0.80Ha

0.80Ha left to be developed or 100% of the land still available for employment and other uses

Key Regeneration Site A3, B1, C3 & D2 Uses

G(M)4 Full Consent 25/01/05 M04/P/1192 Re-development and partial renovation of former Britannia works for mixed use scheme comprising of A1, A3, B1, D1,hard-soft landscaping, car-parking

G(M)4 – 3.08Ha

No land available for future employment uses as the site is already being

First Phase of Site Underway (Granted permission for partial demolition 16/03/2004) Key regeneration site.

38

Page 39: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

ALLOCATION PLANNING STATUS AS OF 01/04/05

PERCENTAGE OF SITE STILL AVAILIBLE (Ha)

ADDITIONAL COMMENTS

and associated highway works.

developed.

G(M)6 None G(M)6 – 0.35Ha

0.35Ha left to be developed or 100% of the land still available for employment and other uses

B1, C1, C2, C3 D1 & D2 Uses New Brownfield Site

MARKET RASEN: MR(E)1

Full Consent – 08/07/81 W61/505/81 Change use of land from agricultural to industrial (All of MR(E)1) **Full Consent – 04/09/90 W63/498/90 Erect 1 block of factory units (0.33Ha – Completed) Full Consent – 10/11/2004 M04/P/1107 Demolish fire damaged industrial unit and replace (Same as ** - Not Started) Outline Consent – 29/09/03 M03/P/0946 Erect buildings for A2, B1, B2 & B8 Uses (Covers 2.00Ha of MR(E)1

MR(E)1 – 3.62 Ha

Minus 0.44Ha from implemented permissions opposite and infrastructure land take and one existing dwelling on the site

3.18Ha left to be developed or 88% of the land still available for employment uses.

A2, B1, B2 & B8 Uses

MR(M)4 None MR(M)4 – 0.31Ha

0.31Ha left to be developed or 100% of the land still available for employment and other uses

A1, A2, C2 & C3 Uses

LINCOLN POLICY AREA

BARDNEY: B(E)1 Full Consent – 26/11/91 W3/641/91 Erect 7 workshop buildings (0.28Ha – Completed) County Matters – 29/03/96 96/P/0122 Use one on the above buildings (Unit 1B) for a clinical waste transfer station County Matters – 21/06/96 96/P/0396 Use Unit 1B as a waste transfer station

B(E)1 – 0.80 Ha

Minus 0.32Ha from implemented permissions opposite and infrastructure land take

0.48Ha left to be developed or 60% of the land still available for employment uses.

B1,B2 & B8 Uses

DUNHOLME: D(M)1 None D(M)1 – 1.15Ha *The Local Planning Authority is seeking to negotiate a community

39

Page 40: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

ALLOCATION PLANNING STATUS AS OF 01/04/05

PERCENTAGE OF SITE STILL AVAILIBLE (Ha)

ADDITIONAL COMMENTS

1.15Ha left to be developed or 100% of the land still available for a mix of uses

use element to any future development on the site. This may or may not include employment uses

SAXILBY ENTERPRISE PARK:

S(E)1

1Full Consent 08/03/04 Erect workshop/storage building (use class B1, B2 and B8) 2Full Consent 08/03/04 Erect 2 offices adjacent Western Boundary 3Full Consent 12/01/05 Erect industrial plant sales and workshop building

*Site Survey 4.62Ha of the site developed

S(E)1 – 10.18Ha

Minus 4.62Ha from implemented permissions opposite and infrastructure land take

5.56Ha left to be developed or 55% of the land still available for employment uses.

B1, B2 & B8 Uses

RURAL

BLYTON: BT(E)1 None BT(E)1 – 0.43Ha

0.43Ha left to be developed or 100% of the land still available for employment uses.

B1, B2 & B8 Uses

BROOKENBY:

Bk(E)1 Full Consent – 08/10/97 96/P/0065 Change the use of al units on the Technical Park to Class B1, B2, B8 Uses (4.97Ha) Full Consent – 07/05/99 99/P/0134 Change the use of H blocks 48 & 49 to residential/nursing home (0.70 Ha) Full Consent – 07/05/99 Change the use of existing buildings to offices (B1 Use) (0.86Ha)

Bk(E)1 – 4.97Ha

0.00Ha left to be developed or 0% of the land still available for employment uses.

B1, B2 & B8 Uses

GREAT LIMBER: GL(E)1

None GL(E)1 – 0.48Ha

0.43Ha

left to be developed or 100% of the land still available

B1 Uses

HEMSWELL CLIFF: HC(E)1

None HC(E)1 – 4.97Ha

0.00Ha left to be developed or 0% of the land still available for employment uses.

A2, B1, B2 & B8 Uses

40

Page 41: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

ALLOCATION PLANNING STATUS AS OF 01/04/05

PERCENTAGE OF SITE STILL AVAILIBLE (Ha)

ADDITIONAL COMMENTS

HC(M)1 None HC(M)1 – 4.97Ha

0.00Ha left to be developed or 0% of the land still available for employment uses.

A1, A2, A3, B1, B2, C2 & D2 Uses

NETTLEHAM: N(E)1 Outline Consent - 17/03/05

M04/P/1490 Rural Enterprise Park (1.30Ha)

N(E)1 – 1.30Ha

1.30Ha left to be developed or 100% of the land still available

B1, B2 & B8 Uses

N(E)2 Res Matters – 02/10/2000M00/P/0144Erect workshop and associated garage(0.18 – Not Started)

N(E)1 – 0.77Ha

0.77Ha

left to be developed

or 100% of the land still available

B1 Use

OSGODBY: Og(E)1 Agri Determination - 20/06/00 *Erect Extension to Agri Machinery Store (0.23Ha)

Og(E)1 – 0.63Ha

*0.63Ha left to be developed or 100% of the land still availale

Planning Permission Required for B1, B2 & B8 Uses

*Removal of redundant buildings especially those not capable of conversion is a Site Development Requirement

PINGLEY CAMP: PC(M)1

None PC(M)1 – 3.37Ha

3.37Ha left to be developed or 100% of the land still available for a mix of uses

B1 & C3 Uses Brownfield Site

SCOTTER: Sr(E)2 Full Consent – 24/10/97 97/P/0686 Erect portal buildings (Completed) Full Consent – 13/09/2000 M00/P/0728 Erect an office (Completed)

Sr(E)2 – 0.77Ha

Minus 0.13Ha from implemented permissions opposite and infrastructure land take

0.64Ha left to be developed or 83% of the land still available

B1, B2 & B8 Uses

STURTON BY STOW: SS(E)1

Historical Consent – Council Depot (0.65Ha) Historical Consent – Garage (0.37Ha) Full Consent – 21/10/87 W104/755/87

SS(E)1 – 2.61Ha

Minus 1.16Ha from implemented permissions

B1, B2 & B8 Uses

41

Page 42: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

ALLOCATION PLANNING STATUS AS OF 01/04/05

PERCENTAGE OF SITE STILL AVAILIBLE (Ha)

ADDITIONAL COMMENTS

Erect joinery workshop (0.14Ha – Completed Full Consent – 21/05/03) M03/P/0235 Erect a Dutch type barn

opposite

1.45Ha left to be developed or 56% of the land still available

TORKSEY To(E)1 None To(E)1 – 2.48Ha

2.48Ha left to be developed or 100% of the land still available

B1 & B2 Uses

42

Page 43: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

APPENDIX 6 - RETAIL APPLICATIONS GRANTED CONSENT 1st APRIL 2004 – 31ST MARCH 2005 APPLICATION NO. ADDRESS GRANTED

CONSENT DESCRIPTION Use

Class Loss/Gain Floorspace (Sq m)

Site Status 2004/05

M04/P/0131 1, Market Place, Market Rasen

31/03/2004 Full planning permission to change the use from A1 (Retail) to A2 (Financial and Professional Services)

A1 to A2 None (43 Sq m)

Completed 31/03/2004 (No building regulations required)

M03/P/1326 24, High Street, Marton 22/04/2004 *Outline planning permission to demolish existing dwelling and outbuildings and erect village shop (A1)

A1 +140 Sq m (Indicated on the Outline Permission)

*Outline Permission

M03/P/1164 North of Foxby Lane, Gainsborough

22/04/2004 *Outline planning permission to erect buildings for business use (Use Classes A2 and B1)

A2 and B1a

No buildings indicated on the Outline Plans. 3.83 Ha

*Outline Permission

M04/P/0379 2A, Ashcroft Road, Gainsborough

07/05/2004 Full planning permission to convert shop into flat and alter shop front

A1 -121 Sq m Completed 29/11/2004

M04/P/0353 22, Market Place, Gainsborough

19/05/2004 Full planning permission erect 3 storey extension to offices

A2 +135 Sq m Not Started

M04/P/0485 Saxilby Enterprise Park, Skellingthorpe Road, Saxilby

28/05/2004 Full planning permission for office building and associated car parking

B1a +260 Sq m Not Started

M04/P/0551 Hammond House, (Business Centre), East Street, Nettleham

26/06/2004 Full planning permission for extension to offices to form additional office accommodation

A2 +26 Sq m Not Started

M04/P/0619 6, Curtis Walk, Gainsborough

02/07/2004 Full planning permission to change the use from photographers shop (A1) to offices/financial advisors and letting agents (A2)

A1 to A2 None (74 Sq m) Completed 02/07/2004 (No building control regulations required)

M04/P/0677 The Old School, Wragby, Langworth

01/06/2004 Full planning permission for extension to existing office accommodation

B1a +399 Sq m Not Started

M04/P/0739 31, South Street, Caistor

09/08/2004 Full planning permission to extend and convert newsagent and store to form dwelling

A1 -94 Sq m Not Started

M04/P/0669 Wraith 20/08/2004 Full planning permission to erect B1a +520 Sq m Not Started

43

Page 44: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

APPLICATION NO. ADDRESS GRANTED CONSENT

DESCRIPTION Use Class

Loss/Gain Floorspace (Sq m)

Site Status 2004/05

Accommodation, Main Street, Torksey

modular head office block

M04/P/0870 Burton Cliff Farm, Burton

17/09/2004 Full planning permission for the redevelopment of farm buildings to form holiday accommodation and office space

B1a +865 Sq m Not Started

M04/P/0978 280, Ropery Road, Gainsborough

01/10/2004 Full planning permission to change the use of shop to residential dwelling

A1 -29 Sq m Commenced 18/02/2005

M04/P/1023 9, Church Street, Gainsborough

12/10/2004 Full planning permission to use premises (Movietime) as letting agents

A2 36 Sq m Completed (Building regulations maybe required)

M04/P/1101 21/22 Market Place, Market Rasen

10/11/2004 Full planning permission to alter and extend turf accountants premises

A2 +7 Sq m Commenced 08/12/2004

M04/P/1107 Unit 6A, Gallamore Lane Industrial Estate, Market Rasen

10/11/2004 Full planning permission to demolish existing fire damaged industrial unit (not in use) and rebuild

A1, B1, B2 & B8

+205 Sq m Not Started

M04/P/1179 Gainsborough Steel Services Ltd, Spring Gardens, Gainsborough

25/11/2004 Full planning permission to erect new elevated office building

B1a +190 Sq m Commenced 07/03/2005

M04/P/1157 94, High Street, Saxilby

20/12/2004 Full planning permission to change the use from games room above garage to additional salon space for existing ground floor salon

A1 +50 Sq m Not Started

M04/P/1130 2 King Street, Market Rasen

23/12/2004 Full planning permission to change the use of first floor offices to private member’s bar/function room

A2 or B1a

-143 Sq m Not Started

M04/P/1298 Tesco, Trinity Street, Gainsborough

24/12/2004 Full planning permission of car park and erect marquee for the display and retailing of horticultural products

A1 +81 Sq m Completed (Building control regulations maybe required)

M04/P/1284 Cedar Farm, South Carlton, Lincoln, LN1 2RH

11/01/2005 Full planning permission for the conversion of farm barns to business B1 use.

B1a +383 Sq m Not Started

44

Page 45: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

APPLICATION NO. ADDRESS GRANTED CONSENT

DESCRIPTION Use Class

Loss/Gain Floorspace (Sq m)

Site Status 2004/05

M04/P/1323 Burbury House, 2, Morton Terrace, Gainsborough

07/01/2005 Full planning permission to change the use from offices to residential dwelling

A2 or B1a

-310 Sq m Not Started

M04/P/1403 1b, Messingham Road, Scotter

18/01/2005 Full planning permission to change the use of shop to hot food take-away

A1 -34 Sq m Completed 18/01/2005 (No building regulations required)

M04/P/1154 Horse and Groom (Public House) & Former Showrooms/Garage, Beaumont Street/Spring Gardens, Gainsborough

25/01/2005 Full planning permission to demolish buildings and redevelop to provide A1 and A3 retail and C3 residential

A1 +600 Sq m *(Estimate)

Commenced 28/02/2005

M04/P/1192 Britannia Works, Beaumont Street, Gainsborough

25/01/2005 Full planning permission for re-development/partial renovation A1, A3 retail, B1 business, D1 and D2 leisure uses

A1 B1a D2

+10,223 Sq m

Not Started. Demolition occurred under previous application -Commenced 16/03/2004

M04/P/1414 47, Manor Road, Saxilby

31/01/2005 Full planning permission to change the use of retail property (A1) to financial (A2) and non-residential (D1)

A1 None (164 Sq m)

Completed (Building Regulations maybe required)

M04/P/0034 Tesco Stores Ltd, Linwood Road, Market Rasen

18/02/2005 Full planning permission to amend 98/P/0591 and M02/P/0551 to provide foodstore with customer café, tourist information point, transport hub and petrol filling station

A1 +1858 Sq m Under Construction

M05/P/0029 Carr Farm, Bigby High Road, Kettleby

07/03/2005 Full planning permission to change the use/extend barn to form residential units/offices

B1a +46 Sq m Commenced 15/03/2005

M05/P/0072 37, Lord Street, Gainsborough

22/03/2005 Full planning permission to change the use from A2 to A3

A2 -81 Sq m Not Started

M05/P/0167 61, Heaton Street, Gainsborough

23/03/2005 Full planning permission to change the use from offices with flat over to two flats

A2 or B1a

-58 Sq m Not Started

45

Page 46: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

APPENDIX 7 - SERVICES AND FACILITIES AUDIT KEY: PARISH AREA: Hierarchy Definition (Settlement Hierarchy Definition of main settlement(s) within the Parish Area): * - Small Rural Settlements ** - Subsidiary Rural Settlement *** - Primary Rural Settlement Note: G1 & G2 – Denote Parish Groupings (G1 – Bardney Group, G2 – Barlings Group) FACILITIES: DE – Dentist DO – Doctors BA – Bank or Building Society CA – Cashpoint VS – Village Shop/Convenience Store EM – Employment* GA(PE) – Garage (with Petrol) HE – Health Centre L(M) – Library (Mobile) PF – Playing Field PG – Play Ground PH – Public House PO – Post Office PR – Primary School SE – Secondary School PS – Police Station WO – Place of Worship VH – Village Hall Other Services and Facilities (OT): BH – Butcher HS – Hardware Store CH – Chemist TA – Takeaway HA(M) – Hairdresser (Mobile) Ca – Café/Tearooms/Restaurant NA – Newagents OS – Other Shops B&B – Bed & Breakfast Mo – Motel PN – Plant Nursery/Garden Centre UD – Undertaker CS – Caravan Site HO – Hostel YC – Youth Club NS – Children’s Nursery SC – Sports Centre MA – Marina RS – Riding School TC – Tennis Courts BG – Bowling Green Note: Facilities are listed under separate settlements (in brackets) if there is more than one main settlement within the Parish Area. *EM - Employment, P - Provision not mentioned elsewhere or A -Revised Deposit Allocation. PUBLIC TRANSPORT THRESHOLDS (Public TR/TH): Number of daily Bus services that link the major settlement in the Parish Area to an urban area or a town as defined in the Settlement Hierarchy. HIGH – Above 20 MEDIUM – 10 to 20 LOW – Below 10 N/A – No Service Provision POPULATION: 2001 – 2001 Census Figures for the Population of Parish Areas. 1998% - % Change between the 1998 Mid-Year Estimates and the 2001 Census Figures. 1991% - % Change between the 1991 Census and the 2001 Census Population Figures.

46

Page 47: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

FACILITIES POPULATION PARISH AREA (Hierarchy Definition *)

DE

DO

BA

CA

VS

EM

GA(P)

HE

L(M)

PF

PG

PH

PO

PR

SE

PS

WO

VH

OT

Public TR/TH

2001

1998%

1991% AISTHORPE* 0 0 0 0 0 P 1 0 0 0 0 0 0 0 0 0 1 1 0 LOW 96 +20 +17 APLEY (G1) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 LOW 80 0 +8 BARDNEY*** (G1) AND SOUTHREY*

0 1 (B)

0 0 1 (B)

P*

2 (B)

1 (B)

1(M) (B)

1 (B)

1 (B)

4(B) 1(S) 1

(B) 1 (B)

0 0 4(B) 1(S)

1(B) 1(S)

BH/HS CH/TA HA(M)

LOW

1643 -3 -5

BARLINGS (G2) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 N/A 466 +8 +4 BIGBY* 0 0 0 0 0 P 0 0 0 0 0 0 0 0 0 0 1 1 0 LOW 234 +2 -6 BISHOP NORTON* 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 1 0 LOW 233 -7 -12 BLYBOROUGH 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 1 0* 0 LOW 110 +10 +21 BLYTON*** 0 0 0 0 1 P 1 0 1(M) 1 0 2 1 1 0 0 1 1 0 LOW 1086 +8 +11 BRAMPTON* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A 70 -12 +6 BRATTLEBY* 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 1 0 0 N/A 113 +26 +28 BROADHOLME* 0 0 0 0 0 P 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A 88 -27 -20 BROCKLESBY 0 0 0 0 0 P 0 0 0 0 0 0 1 0 0 0 1 1 0 N/A 124 +3 -17 BROOKENBY** 0 0 0 1 1 A 0 0 1(M) 0 1 0 0 0 0 0 0 1 0 LOW 742 N/A N/A BROXHOLME 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A 58 +3 -17 BURTON** 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 SC

MA N/A 190 0 -1

BUSLINGTHORPE 0 0 0 0 0 0 0 0 1(M) 0 0 0 0 0 0 0 1* 0 0 N/A 51 -27 -31 CAENBY 0 0 0 0 0 0 0 0 0 0 0 0* 0 0 0 0 1 0 0 N/A 78 -2 -25 CAMMERINGHAM* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 LOW 123 +37 +34 CHERRY WILLINGHAM***

0 1 0 1 1 P 1 1 1 1 2 2 1 1 1 0 1 0 HA/TAx2/NA OSx2

HIGH 2947 -5 +3

CLAXBY* 0 0 0 0 0 0 0 0 1(M) 1 1 0 0 0 0 1 1 0 HA/CS B&B

LOW 184 -20 -12

CORRINGHAM*** 0 2 0 0 1 P 1(PE) 0 1(M) 1 1 1 1 1 0 0 1 1 OS/NS BU

LOW 430 +2 0

DUNHOLME*** 0 0 0 0 1 P 0 0 1(M) 1 1 1 1 1 0 0* 1 1 HA/TC BG

HIGH 1681 +8 +14

EAST FERRY* 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 0 0 LOW 100 +11 +4 EAST STOCKWITH*

0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 1 1 0 LOW 209 -1 -13

FALDINGWORTH** 0 0 0 0 1 P 0 0 0 1 1 1 1 1 0 0 2 1 OSx2 MED 253 +5 +6 FENTON* 0 0 0 0 0 P 0 0 0 0 0 2 0 0 0 0 0 0 Mo/Ca LOW 297 +10 +22 FILLINGHAM* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 LOW 170 +13 +13

47

Page 48: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

FACILITIES POPULATION PARISH AREA (Hierarchy Definition *)

DE

DO

BA

CA

VS

EM

GA(P)

HE

L(M)

PF

PG

PH

PO

PR

SE

PS

WO

VH

OT

Public TR/TH

2001

1998%

1991% FISKERTON*** 0 0 0 0 1 P 0 0 0 0 0 2 1 1 0 0 1 1* 0 HIGH 932 +7 -2 FRIESTHORPE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 N/A 61 +1 -8 FULNETBY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A 10 0 -29 GATE BURTON 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 N/A 48 -4 -21 GLENTHAM** 0 0 0 0 1 0 1(PE) 0 1(M) 0 1 1 1 0 0 0 2 1 HA(M) LOW 341 -15 +5 GLENTWORTH* 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 1 0 LOW 280 +8 -22 GOLTHO 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A 80 +14 +25 GRANGE-DE-LINGS

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A 44 +10 0

GRASBY* 0 0 0 0 0 0 0 0 0 0 0 1 0 1 0 0 1 1 0 LOW 395 +1 +2 GRAYINGHAM* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 LOW 117 +6 +38 GREAT LIMBER* 0 0 0 0 1 A 0 0 0 0 0 1 1 1 0 0 1 1 0 LOW 261 -3 -5 GREETWELL** 0 0 0 0 1 P 1(PE) 0 1(M) 0 0 1 0 0 0 0 1 0 Ca HIGH 403 -2 +9 HACKTHORN* & COLD HANWORTH

0 0 0 0 1 (H)

0 0 0 0 0 0 0 1 (H)

1 (H)

0 0 1 (H)

1 (H)

0 LOW 180 -10 -6

HARDWICK 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A 44 -12 -26 HARPSWELL* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 PN N/A 65 +8 -39 HEAPHAM* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2 0 0 LOW 106 -4 +12 HEMSWELL** 0 0 0 0 1 0 0 0 1(M) 0 1 0 1 0 0 0 1 1 0 LOW 309 -5% N/A HEMS CLIFF*** 0 0 0 2 2 A 1(PE) 0 1(M) 1 2 0 1 1 0 1* 0 1 Ca/HA LOW 683 -5% N/A HOLTON-cum-BECKERING*

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 LOW 140 +27 +18

HOLTON-le-MOOR* 0 0 0 0 0 0 0 0 1(M) 1 1 1 0 1 0 0 1 1 OSx4 (M)

LOW 202 +19 +7

INGHAM*** 0 1 0 0 1 P 1 1 1(M) 1 1 3 1 1 0 0 2 1 TC/BG LOW 857 +8 +29 KEELBY*** 0 1 0 0 1 P 1(PE) 1 1 1 1 2 1 1 0 0 2 1 TAX2

YC/NA MED 2172 -3 -6

KETTLETHORPE* LAUGHTERTON**

0 0 0 0 1 (L)

P (L)

0 0 1(M) (L)

0 0 1 (L)

1 (L)

0 0 0 1 (K)

1 (K)

0 N/A LOW

378 -1 -4

KEXBY* 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 0 0 1 0S LOW 338 -1 +4 KIRMOND-Le-MIRE 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 N/A 40 0 -7 KNAITH* 0 0 0 0 0 0 0 0 1(M) 0 0 1 0 0 0 0 1 1 0 N/A 277 +10 +12 LANGWORTH*** (G2)

0 0 0 0 1 P 3 0 1(M) 1 0 2 1 0 0 0 1 1 0 HIGH N/A N/A N/A

48

Page 49: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

FACILITIES POPULATION PARISH AREA (Hierarchy Definition *)

DE

DO

BA

CA

VS

EM

GA(P)

HE

L(M)

PF

PG

PH

PO

PR

SE

PS

WO

VH

OT

Public TR/TH

2001

1998%

1991% LAUGHTON* 0 0 0 0 0 P 0 0 0 0 0 1 0 1 0 0 2 1 0 LOW 309 -1 -5 LEA** 0 0 0 0 0 0 0 0 0 1 1 0 0 1 0 0 2 1 0 HIGH 1084 +4 +13 LEGSBY* 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 2 1 0 LOW 210 0 -9 LINWOOD* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A 122 +36 +16 LISSINGTON* 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 1 0 0 LOW 138 -1 -19 MARTON** AND GATE BURTON

0 1 (M)

0 0 0 0 1 (M)

0 0 1 (M)

1 (M)

1 (M)

0 1 (M)

0 0 2 (M)

1 (M)

0 LOW 616 +6 +21

MORTON*** 0 0 0 0 1 P 0 0 0 1 1 2 0 1 0 0 0 1 0 HIGH 1157 +3 +4 NETTLEHAM*** 0 5 0 1 2 A 2(PE) 1 1 2 2 4 1 1 0 1 2 1 HAx3

TA HIGH 3514 +4 +11

NETTLETON*** 0 0 0 0 1 0 1(PE) 0 0 1 1 1 1 1 0 0 2 0 0 HIGH 579 -5 -4 NEWBALL (G2) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A 54 +8 +23 NEWTON-ON-TRENT**

0 0 0 0 1 P 0 0 0 1 1 1 1 1 0 0 2 0 0 LOW 338 +13 +30

NORMANBY-BY-SPITAL**

0 0 0 0 0 0 0 0 0 0 0 1 1 1 0 0 2 1 0 LOW 318 +18 +20

NORMANBY-Le-WOLD

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 N/A 66 +10 -10

NORTH CARLTON* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 LOW 140 0 +5 NORTH KELSEY*** 0 1 0 0 1 0 4* 0 1(M) 1 0 3 1 1 0 0 2 1 BG/TC

TA MED 959 -1 +4

NORTHORPE* 0 0 0 0 0 0 0 0 1(M) 1 1 0 1 0 0 0 2 1 OS(M) LOW 127 -2 -10 NORTH WILLINGHAM*

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 LOW 127 -9 -3

OSGODBY** 0 0 0 0 1 A 0 0 1(M) 1 1 1 1 0 0 1 4 1 HA/Ca NS/RS

LOW 578 +1 +12

OWERSBY 0 0 0 0 0 P 0 0 0 0 0 0 0 0 0 0 1 0 0 N/A 273 -15 -4 OWMBY-BY-SPITAL*

0 0 0 0 0 P 0 0 0 0 0 1 0 0 0 0 1 0 HA(M) LOW 309 +3 +5

PILHAM* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 N/A 76 +8 +19 RAND 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 N/A 44 -27 -24 REEPHAM*** 0 0 0 0 1 P 0 0 0 0 0 1 1 1 0 0 2 1 0 LOW 814 +7 -2 RIBY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 N/A 134 +3 -12 RISEHOLME* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 N/A 408 -17 +198 ROTHWELL* 0 0 0 0 0 0 0 0 0 0 1 1 0 0 0 0 1 1 0 LOW 196 +9 -3

49

Page 50: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

FACILITIES POPULATION PARISH AREA (Hierarchy Definition *)

DE

DO

BA

CA

VS

EM

GA(P)

HE

L(M)

PF

PG

PH

PO

PR

SE

PS

WO

VH

OT

Public TR/TH

2001

1998%

1991% SAXBY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 N/A N/A N/A N/A SAXILBY*** WITH INGLEBY

0 1 0 2 2 A 4 inclu 2PE

1 1 2 2 4 1 1 0 1 2 1 HAx4 OSx6 TAx2

BG/TC

HIGH 3679 +17 +19

SCAMPTON** 0 0 0 0 0 0 0 0 0 1 1 1 1 2 0 0 1 1 TC LOW 825 -30 -38 SCOTHERN*** 0 0 0 0 0 P 0 0 0 1 1 1 0 1 0 0 2 1 NS

OS HIGH 892 +9 +20

SCOTTER*** 0 1 0 1 2 A 2 1 1 2 1 3 1 1 0 0 2 1 HAx2 0Sx3

HIGH 2591 -5 0

SCOTTON** 0 0 0 0 0 P 1 0 0 0 0 1 0 0 0 0 1 1 NS PN

MED 531 -7 +6

SEARBY-cum-OWMBY*

0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 0 1 (S)

0 0 LOW 182 -9 +8

SIXHILLS* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 N/A 47 +18 -11 SNARFORD 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 N/A 47 +18 +7 SNELLAND 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 N/A 91 +30 +17 SNITTERBY* 0 0 0 0 0 0 0 0 1(M) 0 0 1 1 0 0 0 1 1 0 N/A 215 +2 -5 SOMERBY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 N/A 37 +85 +131 SOUTH CARLTON* 0 0 0 0 0 0 0 0 1(M) 0 0 0 0 0 0 0 1 0 0 LOW 93 +3 +8 SOUTH KELSEY** 0 0 0 0 0 0 0 0 0 0 0 1 0 0 0 0 1 1 0 LOW 571 +10 +11 SPRIDLINGTON* 0 0 0 0 0 P 0 0 0 1 0 0 0 0 0 0 1 1 0 LOW 194 +14 +18 SPRINGTHORPE* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 LOW 149 +7 +18 STAINFIELD (G1) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 0 N/A 91 -17 -8 STAINTON-BY-LANGWORTH* (G2)

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 N/A 80 -11 -2

STAINTON-LE-VALE*

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 N/A 62 N/A N/A

STOW* 0 0 0 0 0 0 1 0 1(M) 1 0 1 1 0 0 0 1 0 0 LOW 355 -1 +4 STURTON-BY-STOW**

0 0 0 0 1 A 0 0 0 1 1 2 1 1 0 0 2 1 Ca/OS LOW 1280 +8 +19

SUDBROOKE*** 0 0 0 0 0* 0 1(PE) 0 0 1 1 0 0 0 0 0 1 1 HA HIGH 1604 +14 +15 SWALLOW* 0 0 0 0 0 0 0 0 1(M) 1 1 1 0 0 0 0 2 1 0 MED 200 0 +4 SWINHOPE 0 0 0 0 0 P 0 0 0 0 0 1 0 0 0 0 1 0 0 114 -5 -2 TEALBY** 0 0 0 0 1 P 1(PE) 0 1(M) 1 0 2 1 1 0 0 1 1 BUx2

OS/Ca LOW 535 +9 +3

50

Page 51: APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS · 2016-03-22 · APPENDIX 1 – LOCAL DEVELOPMENT FRAMEWORK CORE OUTPUT INDICATORS *Taken from the ODPM document

FACILITIES POPULATION PARISH AREA (Hierarchy Definition *)

DE

DO

BA

CA

VS

EM

GA(P)

HE

L(M)

PF

PG

PH

PO

PR

SE

PS

WO

VH

OT

Public TR/TH

2001

1998%

1991% TC/BG

THONOCK 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A 44 +47 +47 THORESWAY* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 N/A 101 +12 +11 THORGANBY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 OS N/A 44 -12 0 THORPE in the FALLOWS

0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A 12 +20 -8

TOFT NEWTON* 0 0 0 0 0 P 0 0 0 1 0 0 0 0 0 0 1 0 HA(M) LOW 522 +4 +23 TORKSEY** 0 1 0 0 0 A 0 0 0 0 0 2 1 0 0 0 1 0 0 LOW 551 +12 +9 UPTON** 0 0 0 1 1 P 1(PE) 0 1(M) 1 1 1 1 0 0 0 2 1 HA(M)

TA/UD LOW 404 +4 +5

WADDINGHAM** 0 1 0 0 1 P 0 0 1(M) 1 0 1 1 1 0 0 1 1 0 LOW 548 +10 +6 WALESBY* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 HA(M) LOW 215 -2 -11 WALKERITH* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 LOW 59 -2 -2 WELTON*** 1 4 1 2 3 P 1(PE) 1 1 2 2 2 1 1 1 1 2 1 Ca/BU

NA/TA HAx2

HIGH 3821 +12 +33

WEST FIRSBY 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A 29 -3 -17 WEST RASEN* 0 0 0 0 1 0 0 0 0 0 0 0 1 0 0 0 1 0 0 LOW 68 -15 -30 WICKENBY* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 0 0 LOW 217 -10 -1 WILDSWORTH* 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 LOW 51 +2 +31 WILLINGHAM** 0 2 0 0 0 P 0 0 1(M) 1 1 2 0 0 0 0 2 1 0 LOW 524 +3 +3 WILLOUGHTON** 0 0 0 0 1 P 0 0 1(M) 1 1 1 1 1 0 0 1 1 HA(M) LOW 330 +10 +5

*Bardney and Southrey have Employment Provision. *Blyborough Village Hall has recently been converted for residential use. *Buslingthorpe Church now owned and run by the Redundant Churches Commission. *Caenby, Moncks Arms Public House is now derelict and abandoned. *Fiskerton Village Hall burnt down in 2002, in the process of applying for funding to rebuild the hall. *Hemswell Cliff has a temporary 2 day a week Police Station based in the Community Centre and has several Cafes on the Industrial Estate and the White Heather Restaurant at Caenby Corner. *North Kelsey includes one garage with Petrol. *Sudbrooke, since date of survey it is noted that a Convenience Store and Hairdressers have been built on the land allocated under Policy STRAT 16 – Retail Allocations (Sudbrooke).

51