46
Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4 th PHASE, BOMMASANDRA INDUSTRIAL AREA, JIGINI LINK ROAD, ANEKAL TALUK, BANGALORE DISTRICT, KARNATAKA STATE FORM I Project No. 04172102 April 2017 M/s. Apotex Pharmachem India Pvt.Ltd. Plot No: 1 A,4 th Phase, Bommasandra Industrial Area Anekal Taluk, Bangalore560099 Fax No: 08022891034 Email: [email protected] STUDIES AND DOCUMENTATION BY TEAM Labs and Consultants B115117 & 509, Annapurna Block, Aditya Enclave, Ameerpet, Hyderabad500 038. Phone: 04023748 555/23748616, Telefax: 04023748666 SUBMITTED TO MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE GOVERNMENT OF INDIA INDIRA PARYAVARAN BHAWAN, JOR BAGH ROAD, NEW DELHI

Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

Embed Size (px)

Citation preview

Page 1: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA INDUSTRIAL AREA,  JIGINI LINK ROAD, ANEKAL TALUK, BANGALORE DISTRICT, 

KARNATAKA STATE  

  

   

FORM I      

      

 

  

Project No. 0417‐21‐02 April  2017 

 

M/s. Apotex Pharmachem India Pvt.Ltd. Plot No: 1 A,4th Phase, Bommasandra Industrial Area   Anekal Taluk, Bangalore‐560099 Fax No: 080‐22891034 E‐mail: [email protected] 

STUDIES AND DOCUMENTATION BY TEAM Labs and Consultants B‐115‐117 & 509, Annapurna Block,  Aditya Enclave, Ameerpet,  Hyderabad‐500 038. Phone: 040‐23748 555/23748616, Telefax: 040‐23748666      

 

SUBMITTED TO MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE 

GOVERNMENT OF INDIA INDIRA PARYAVARAN BHAWAN, JOR BAGH ROAD, NEW DELHI

Page 2: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

Form I        Page 1 

APPENDIX – I (See Paragraph – 6) 

FORM I I)  Basic Information S.No.  Item  Details 1  Name of the Project/s  M/s. Apotex Pharmachem India Pvt. Ltd. 2  S. No in the Schedule   5 (f) – B category (Synthetic Organic Chemicals) 3  Proposed capacity/area/length/tonnage to 

be handled/command area/lease area/number of wells to be drilled 

Area Existing: 5.23 Acres Permitted Production Capacity: 49.6 TPA Capacity after Expansion: 54.74 TPA  Environmental Clearance. 1. File No. J‐1011/181/2006‐IA II (I) dt: 31.08.2006.  Capital Cost for proposed expansion: R. 25 crores 

4  New/Expansion/Modernization  Expansion 5  Existing Capacity/Area etc.  Existing Capacity: 49.6 TPA   

Area Existing: 5.23 Acres 6  Category of Project i.e 'A' or 'B'  “B” 7  Does it attract the general condition? If yes, 

please specify No 

8  Does it attract the Specific condition? If yes, please specify. 

No 

9  Location      Plot/Survey/Khasra No.  Plot No. 1A, Bommasandra Industrial Area, 4th  Phase   Village  Yeranda Halli   Tehsil  Jigani Hobli of Anekal    District  Bangalore     State  Karnataka 

10  Nearest railway station/airport along with distance in km. 

Bangalore Railway station ‐ 27 km Bangalore airport ‐ 58 km 

11  Nearest Town, City, District Headquarters along with distance in kms. 

Bangalore Urban District Headquarters ‐  21 km 

12  Village Panchayats, Zilla Parishad, Municipal Corporation, Local body (complete postal address with telephone nos. to be given)

Yeranda Halli 

13  Name of the Applicant  P. Yoganjaneya Reddy Vice President and Site Head

14  Registered Address  M/s Apotex Pharmachem India Pvt. Ltd. Plot no. 1A, Bommasandra Indl. Area, 4th Phase,  Yeranda Halli Village, Jigani Hobli of Anekal Taluk, Bangalore.

15  Address for Correspondence:     Name  P. Yoganjaneya Reddy   Designation(Owner/Partner/CEO)  Vice President and Site Head   Address  M/s Apotex Pharmachem India Pvt. Ltd. 

Plot no. 1A, Bommasandra Indl. Area, 4th Phase,  Yeranda Halli Village, Jigani Hobli of Anekal Taluk, Bangalore.

Page 3: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

Form I        Page 2 

  Pin Code  560 099   E‐mail  [email protected]    Telephone Number  080 – 22891000 / 1014   Fax No.  080 ‐ 2289 1034 

16  Details of alternative Sites examined, if any. Location of these sites should be shown on a topo sheet. 

Not Applicable 

17  Interlinked Projects  Not applicable 18  Whether separate application of interlinked 

project has been submitted?  ‐NA‐ 

19  If yes, date of submission   ‐NA‐ 20  If no, reason    21  Whether the proposal involves 

approval/clearance under: if yes, details of the same and their status to be given.                (a) The Forest (Conservation) Act, 1980?           (b) The Wildlife (Protection) Act, 1972?             (c) The C.R.Z Notification, 1991? 

‐NA‐ 

22  Whether there is any Government Order/Policy relevant/relating to the site? 

 No 

23  Forest land involved (hectares)   No 24  Whether there is any location pending 

against the project and /or land in which the project is propose to be set up?                           (a) Name of the Court                                            (b) Case No                                                         (c) Orders/directions of the Court, if any and its relevance with the proposed project. 

 No 

Page 4: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

Form I        Page 3 

(II)  Activity  1.  Construction,  operation  or  decommissioning  of  the  Project  involving  actions,  which  will  cause  physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No.  Information/Checklist confirmation  Yes/No  Details thereof (with approximate quantities /rates, 

wherever possible) with source of information data 1.1  Permanent or temporary change in 

land use, land cover or topography including increase in    intensity of land use (with respect to local     land use plan)   

NO  The proposal is for expansion of existing bulk drug and intermediate manufacturing unit with existing site are of 5.23 acres. 

1.2  Clearance  of  existing  land, vegetation and buildings? 

NO  The proposal is for expansion of existing bulk drug and intermediate manufacturing unit with existing site are of 5.23 acres. 

1.3  Creation of new land uses?  NO  Existing – industrial  

1.4  Pre‐construction investigations e.g. bore houses, soil testing? 

YES  Soil  test  done  and  soil  load  bearing  capacity established 

1.5  Construction works?      YES  Construction activity involves creation of enhancement of  production  block,  Utilities,  enhancement  of  ZLD system. 

1.6  Demolition works?  NO  The proposal is for expansion of existing bulk drug and intermediate  manufacturing  unit.  The  proposed expansion activity involves creation of enhancement of production block, Utilities, enhancement of ZLD system

1.7  Temporary  sites  used  for construction  works  or  housing  of construction workers? 

NO  Construction  labor  from  local  villages  shall  be employed. 

1.8  Above  ground  buildings,  structures or  earthworks  including  linear structures, cut and fill or excavations 

YES  Storage  facilities  shall be  constructed.     No major  cut and fill or excavation is anticipated. 

1.9  Underground works including mining or     tunneling? 

NO  No underground works like mining and tunneling.  

1.10  Reclamation works?  NO   1.11  Dredging?   NO   1.12  Offshore structures?  NO   1.13  Production  and  manufacturing 

processes? YES  Enclosed in Annexure – I 

1.14  Facilities for storage of goods or materials? 

NO  Raw  materials  and  solvents  shall  be  stored  with  in factory premises. Materials  in bags and drums will be stored in flame proof ware houses.  

1.15  Facilities for treatment or disposal of solid waste or liquid effluents? 

YES  High  TDS  and  low  TDS  effluents  are  treated  in  ZLD system. Organic  waste  is  sent  to  cement  plants  for  co‐ processing or to TSDF.  Details  of    waste  treatment  facilities    presented  in Annexure II   

1.16  Facilities for long term housing of operational workers?

NO  Operational workers stay in surrounding villages. 

Page 5: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

Form I        Page 4 

1.17   New road, rail or sea traffic during construction or operation? 

YES  Construction materials shall be transported to the site.  The  traffic  density  of  the  existing  connecting  road  is negligible. 

1.18   New  road,  rail,  air  waterborne  or other  transport  infrastructure including new or altered  routes  and stations, ports, airports etc? 

NO   

1.19   Closure  or  diversion  of  existing transport  routes  or  infrastructure leading  to  changes  in  traffic movements? 

NO   

1.20  New or diverted  transmission  lines opipelines? 

NO   

1.21  Impoundment, damming,  culverting, realignment or other changes to the hydrology      of  watercourses  or aquifers? 

NO   

1.22  Stream crossings?  NO  All  raw  materials,  solvents  and  waste  streams  are pumped through pipe lines above ground level.  

1.23  Abstraction  or  transfers  of  water form ground or surface waters? 

YES  Total  water  required  shall  be  met  from  KIADB Industrial water supply.   Permitted water consumption  is 145 KLD. Total water required after expansion shall be 285 KLD out of which 175  KLD  is  fresh  water  requirement  and  balance  is recycled water.

1.24  Changes in water bodies or the land surface affecting drainage or run‐off?

NO   

1.25  Transport  of  personnel  or materials for  construction,  operation  or decommissioning? 

YES  The  construction material  shall  be  drawn  from  local sources  within  10  km.    There  is  no  transport  of personnel, as the construction workers shall be drawn from local villages. 

1.26  Long‐term dismantling or decommissioning or restoration works? 

NO   

1.27  Ongoing activity during decommissioning which could have an impact on the environment? 

NO   

1.28  Influx of people to an area in either temporarily or permanently? 

YES  The  proposed  project  shall  increase  the  employment potential. 

1.29  Introduction of alien species?  NO1.30  Loss of native species or genetic 

diversity? NO  There are no major losses of tree/shrub species. 

1.31  Any other actions?  NO   

Page 6: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

Form I        Page 5 

2.   Use  of Natural  resources  for  construction  or  operation  of  the  Project  (such  as  land, water, materials  or energy, especially any resources which are non‐renewable or in short supply): S.No.  Information/checklist 

confirmation Yes/No  Details thereof (with approximate quantities /rates, 

wherever possible) with source of information data 2.1  Land especially undeveloped or 

agricultural land (ha) YES  Existing Site area: 5.23 acres 

Located at  Plot no. 1A, Bommasandra Indl. Area, 4th Phase,  Yeranda Halli Village, Jigani Hobli of Anekal Taluk, Bangalore.

2.2   Water (expected source & competing users) unit: KLD 

YES  Total  water  required  shall  be  met  from  KIADB  Industrial water supply.   Permitted  water  consumption  is  145  KLD.  Total  water required after expansion shall be 285 KLD out of which 175 KLD  is  fresh  water  requirement  and  balance  is  recycled water. (Water Balance Enclosed in Annexure III) 

2.3  Minerals (MT)  NA   2.4  Construction material – stone, 

aggregates, sand / soil (expected source – MT) 

YES  Shall be sourced from the local villages. 

2.5  Forests and timber (source – MT) 

NO   

2.6  Energy including electricity and fuels (source, competing users) Unit: fuel (T), energy (MW) 

YES  The  required  energy  shall  be  drawn  from  BESCOM.  No additional  DG  sets  are  proposed  for  expansion.  Existing Standby DG sets of 2 x 1010 KVA, 1 X 625 KVA and 2 x 500 KVA will be used during load shut down by BESCOM.   It  is proposed to establish 1 x 3 TPH and 1 x 2 TPH PNG/Oil fired  boilers.  Proposed  1  x  2  TPH  boiler  will  be  kept  as standby. PNG consumption after expansion is 5000 cum/hr. 

Existing  boilers  of  capacity  0.6  TPH  and  1.5  TPH  Oil  fired fired boilers shall be dismantled after expansion.  

2.7  Any other natural resources (use appropriate standard units) 

NA   

Page 7: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

Form I        Page 6 

3.   Use,  storage,  transport, handling or production of  substances       or materials, which  could be harmful  to human health or the environment or raise concerns about   actual or perceived risks to human health. S.No.  Information/Checklist confirmation  Yes/No Details thereof (with approximate quantities/rates, 

wherever possible) with source of information data 3.1  Use of substances or materials, which 

are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and  water supplies) 

YES  Hazardous chemicals shall be used for manufacturing of  Synthetic  Organic  Chemicals  and  intermediates. MSIHC  rules  shall  be  followed  during  storage, transportation  and  handling  of  raw  materials. Hazardous chemicals and solvent shall be stored and handled in closed systems. 

3.2  Changes in occurrence of disease or affect disease vectors (e.g. insect or water borne diseases). 

NO   

3.3  Affect the welfare of people e.g. by changing living conditions? 

YES  Shall  increase  the  employment  potential  for  locals and affect the living conditions for betterment. 

3.4  Vulnerable groups of people who could be affected by the project e.g. hospital patients, children, the elderly etc., 

NO  No sensitive receptors are present  in the  immediate vicinity  of  the  site.  The  project  shall  not  have  any significant impact on vulnerable groups of people.  

3.5  Any other causes  NO    

4. Production of solid wastes during construction or operation or decommissioning (MT/month) S.No.  Information/Checklist confirmation  Yes/No Details thereof (with approximate quantities/rates, 

wherever possible) with source of information data 4.1  Spoil, overburden or mine wastes  NO   4.2  Municipal waste (domestic and or 

commercial        wastes) NO  Wastes  from  canteen,  other  commercial wastes  like 

paper, empty containers etc.    4.3  Hazardous wastes (as per Hazardous 

Waste  Management Rules) YES  Hazardous waste generation during construction shall 

be  limited  to waste  oils,  batteries  and  containers  of paints  etc.    The  quantity  of  hazardous  wastes generated  during  operation  contain  salts  from evaporators,  process  residue,  and  solvent  residues, ETP sludge and filtration media etc.   

4.4  Other industrial process wastes  YES  Enclosed at Annexure IV 4.5  Surplus product  NO   4.6  Sewage sludge or other sludge from 

effluent  treatment YES  Sludge from Effluent treatment plant and evaporation 

salts shall be sent to TSDF.  4.7  Construction or demolition wastes  NO  Construction  activities  involve  creation  of 

enhancement  of  production  blocks,  Utilities  and enhancement of ZLD system. 

4.8  Redundant machinery or equipment  NO   4.9  Contaminated soils or other materials  NO  All pipe  lines  including pipe  lines of     waste  streams 

are above ground  level  to eliminate  the possibility of any  contamination  due  to  seepage  and  for  ease  of maintenance. 

4.10  Agricultural wastes  NO   4.11  Other solid wastes  YES    

 

Page 8: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

Form I        Page 7 

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr) S.No.  Information/Checklist confirmation  Yes/No Details thereof (with approximate quantities/rates, 

wherever possible) with source of information data 5.1  Emissions from combustion of fossil 

fuels from stationary or mobile sourcesYES  Coal  Shall  be  used  as  fuel.  Emissions  details  are 

enclosed in Annexure V5.2  Emissions from production processes  YES  Gaseous  emissions  from  process  are  ammonia,  HCl, 

SO2,  are  scrubbed  in  two  stage  scrubbers  while carbondioxide  gas  is  let  out  into  atmosphere  using standard  operating  procedure. Hydrogen  gas  let  out into atmosphere through water column.   

5.3  Emissions from materials handling including storage or transport 

NO  Material  transfer  takes  place  in  closed  pipeline systems using pumps with mechanical seals. 

5.4  Emissions from construction activities including plant and equipment 

YES  Dust  may  rise  during  transport  of  material  and construction  activity.    The  dust  emissions  shall  be mitigated by water  spraying on  the  roads within  the premises.  

5.5  Dust  or  odors  from  handling  of materials  including  construction materials, sewage and  waste 

NO  Domestic wastewater sent to Sewage Treatment Plant and treated wastewater reused for gardening. 

5.6  Emissions from incineration of waste  NO  Organic waste  streams are sent  to cement plants  for co‐incineration. 

5.7  Emissions from burning of waste in open air (e.g. slash materials, construction debris) 

NO   

5.8  Emissions from any other sources  NO   

Page 9: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

Form I        Page 8 

6. Generation of Noise and Vibration, and Emissions of Light and Heat: S.No.  Information/Checklist confirmation Yes/No  Details thereof (with approximate quantities/rates, 

wherever possible) with source of information data with source of information data 

6.1  From operation of equipment e.g. engines, ventilation plant, crushers 

YES  Material transport and construction equipment shall be source  of  noise,  while  transfer  pumps,  vacuum systems,  DG  sets  are  the  sources  of  noise  during operation.   

6.2  From industrial or similar processes  YES   DG sets controlled by providing Acoustic Enclosures. 6.3  From construction or demolition  YES  Noise during construction shall be due to construction 

equipment and emergency DG sets.    6.4  From blasting or piling  NO   6.5  From construction or operational 

traffic NO  The  increased  traffic  shall  not  have  any  significant 

impact.  6.6  From lighting or cooling systems  NO   6.7  From any other sources  NO   

  7.Risks of contamination of land or water from releases of    pollutants into the ground or into sewers,   surface     waters, groundwater, coastal waters or the sea: S.No.  Information/Checklist confirmation Yes/No  Details thereof (with approximate quantities/rates, 

wherever possible) with source of information data 7.1  From handling, storage, use or 

spillage of hazardous materials NO  All the hazardous materials will be stored in MS drums, 

in  a  covered  shed  and  no  contamination  of  soil  is expected.  Same  philosophy  will  be  followed  for  the after expansion 

7.2  From discharge of sewage or other effluents to water or the land (expected mode and place of discharge) 

NO  All the waste from domestic operations sent to Sewage Treatment  Plant  and  treated  wastewater  reused  for gardening 

7.3  By deposition of pollutants emitted to air into the land or into water 

NO  All  the  emissions  from  process  are  controlled  by providing control equipment like scrubbers.  

7.4  From any other sources  NO   7.5  Is there a risk of long term build up 

of pollutants in environment from these     sources? 

NO  

 

Page 10: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

Form I        Page 9 

8.Risk of  accidents during  construction or operation of  the Project, which  could  affect human health or  the environment 

S.No.  Information/Checklist confirmation  Yes/No  Details thereof (with approximate quantities/rates, wherever possible) with source of information data 

8.1  From explosions, spillages, fires etc from storage, handling, use or production of hazardous substances 

YES  All  Inbuilt  Safety  precautions  will  be adopted  and  there  will  not  be  any damage  to  environment  or  human health  

8.2  From any other causes  NA   8.3  Could the project be affected by natural disasters 

causing environmental damage (e.g.     Floods, earthquakes, landslides, cloudburst etc)? 

NO   

 9.Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts  with  other existing or planned activities in the locality S. No.  Information/Checklist confirmation  Yes/No  Details thereof (with approximate 

quantities/rates, wherever possible) with source of information data 

9.1  Lead to development of supporting.   facilities, ancillary development or development stimulated by the project which could have impact on the environment e.g.: • Supporting infrastructure (roads, power supply, waste or waste water treatment, etc.) •      housing development •      extractive industries •      supply industries •      other 

YES  The  project  shall  enhance  the  socio economic  status  of  the  area  by increasing  the  demand  for  housing, improving the employment.  

9.2  Lead to after‐use of the site, which could haven impact on the environment 

NO   

9.3  Set a precedent for later developments  NO   

9.4  Have cumulative effects due to proximity to other existing or planned projects with similar    effects 

NO  The  baseline  environmental  status  of the  surrounding  areas  is  within  the prescribed  limits as observed  from the Secondary data. 

 

           

Page 11: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

Form I        Page 10 

(III)  Environmental Sensitivity S.No.  Areas  Name/ 

Identity Aerial  distance  (within  15  km.) Proposed project location boundary 

1   Areas  protected  under  international  conventions,  national  or  local  legislation  for  their  ecological,  landscape, cultural or other related value 

NA   

2  Areas  which  are  important  or  sensitive  for ecological  reasons  ‐  Wetlands,  watercourses  or other  water  bodies,  coastal  zone,  biospheres, mountains, forests 

YES  Ragihalli RF – SW – 7.6 km Kakere RF – NW – 8.7 km Bannerghatta National Park – SW – 7.6 km from plant boundary. 

3  Areas  used  by  protected,  important  or  sensitive  species  of  flora  or  fauna  for  breeding,  nesting, foraging, resting, over wintering, migration 

NA     

4   Inland, coastal, marine or underground waters  NO   5   State, National boundaries  NO   6   Routes or facilities used by the public for access to 

recreation or other tourist, pilgrim areas NO   

7   Defense installations  NO   8   Densely populated or built‐up area  YES  Nearest  habitation  from  the  site  is 

Bommasandra at a distance of 4 Km  in NE direction 

9   Areas  occupied  by  sensitive man‐made  land  uses  (hospitals,  schools,  places  of  worship,  community facilities) 

NA   

10  Areas  containing  important,  high  quality  or  scarce resources  (ground  water  resources,  surface resources,  forestry,  agriculture,  fisheries,  tourism, minerals) 

NO   

11  Areas  already  subjected  to  pollution  or  environmental  damage.  (those where  existing  legal environmental standards     are exceeded) 

NO   

12   Areas  susceptible  to  natural  hazard  which  could  cause  the  project  to  present  environmental problems  (earthquakes,  subsidence,  landslides, erosion,  flooding  or  extreme  or  adverse  climatic conditions) 

NO       

           

Page 12: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA
Page 13: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA INDUSTRIAL AREA,  JIGINI LINK ROAD, ANEKAL TALUK, BANGALORE DISTRICT, 

KARNATAKA STATE  

  

   

 ANNEXURES 

    

   

 

  

  

      

   

  

      

Project No. 0417‐21‐02 April  2017 

M/s. Apotex Pharmachem India Pvt.Ltd. Plot No: 1 A,4th Phase, Bommasandra Industrial Area   Anekal Taluk, Bangalore‐560099 Fax No: 080‐22891034 E‐mail: [email protected] 

STUDIES AND DOCUMENTATION BYTEAM Labs and Consultants B‐115‐117 & 509, Annapurna Block,  Aditya Enclave, Ameerpet,  Hyderabad‐500 038. Phone: 040‐23748 555/23748616, Telefax: 040‐23748666      

 

SUBMITTED TO MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE 

GOVERNMENT OF INDIA INDIRA PARYAVARAN BHAWAN, JOR BAGH ROAD, NEW DELHI

Page 14: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

Form I Annexures

            Page 1

Fig

A.1

Loc

atio

n M

ap o

f M /

s. H

indy

s La

b Pv

t. Lt

d.,

Page 15: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

Form I Annexures

            Page 2

ENTRY

ADMINISTRATION

BLOCK

STORES

DRIVE WAY

GATE-1

HYD

ROG

ENA

TOR

FINISHED PRODUCTAREA

C HANGEROOM

PASS BOX

CORRIDOR

MILL ING, SIFTING &PULVERIZING ROOM

CF/103ROOM

AIRLOCK

CF/102ROOM

MATERIALEXIT ROOM

STAGINGROOM

SERVICE CORRIDOR

FBD/103ROOM

RCVD/101ROOM

RCVD/102ROOM

ROOMSAMPLING

VTD/104ROOM

UP

HOIST

65

4

3

21

8 710 912 11141316 15

1917 18 21 22 24 2726252320

CORRIDOR

R.M.QUARANTINEAREA

APPR OVE D RAWMATERIAL STORAGE

AREA

SAM PLINGROOM

DISP ENSINGROOM

O FFICE

CO

RRID

OR

STAGING

UP1 3 5 7 9 11 13 15

CORRIDOR

C

O R

R

I

D O

R

ENTRANCE

CHANGE ROOM

1

3

5

7

9 10 12 14 16

18

20

22

24

duct

C O R R I D O R

C O

R

R I

D

O R

LAND SCAPE

UP1

3

5

79

14

12

17 19

10

16

21 2 3

r a m

p

12

3

12 14 16 18 20

2224

10

1

4

6

8

COLD RO OM

YOU ARE HERE

QUALITY BLOCK

UP

UP

DU

CT

DU

CTD

UC

T2 6

1 3 12 1 1 9 8 7 6 5 4 3 2 1

UP

1 4 1 5 1 6 1 7 1 9 2 0 2 1 22 2 3 2 4 2 5

LIFT LO BBY

FOYE

REN

TRAN

CE

DU

CT

DG FOUNDATION

UTILITY BLOCK

LAND SCAPE

TRAINING ROOM

MEETING ROOM

RECEPTION

CABIN

CHANGEROOM

C O R R I D O R

F.GINSPECTION / LABELING

ROOM

F.GDISPENSING

ROOM

AIRLOCK

LIFT GENTSTOILET

LADIESTOILET

TOILET

TOILET

TOILET

W ASH AREAENT RY

W ASH AREAEXIT

CHIMNEY

UP

MEETING

ROOM

MEETING

ROOM

DO

CUM

ENTA

TION

RAC

KS

DOCUMENTATIONRACKS

DOCUMENTATIONRACKS

DOCUMENTATIONRACKS

DO

CUM

ENTA

TION

RAC

KSD

OC

UMEN

TATIO

NR

AC

KS

FLP MOTOR WITHPUMP

ETP & STP AREA

TANK #1

TANK #2

TANK #3

TANK #4

TANK #5

TANK #6

RAMP

ROFEED

T ANK-1

ROFEED

T ANK-2

ROFEED

TANK-3

ROPERM EATE

LIFT

RAMP HAZARDOUSW ASTE

STORAGE

N

INCINERATORROOM

STP-01

ETP-01

SOLVENT YARD

COURT YARDOPEN TO SKY

GRA NI TE C OU NTER

S INK

WAS

H RO

OM

ROOMDO CTOR

GCM S ROOMB ALA NCEROOM

OFFICE ROOM DOC UMENTATIONROOM

SAMPLEPREPARATION

LAB-1

CONFERENCEROOM-1

PSDROOM OFFIC E 02OFFICE 01 OHC

ROOM

SCA

LE U

P LA

B.

SYNTHETICCHEMISTRY

LAB-01

ANALITICALSERVICES LAB-02

ANALITICALSERVICES LAB-01

ANALYTICAL R&DLAB-1

(WET CHEMISTRY)

GAS C YLINDERROOM

ELECTRICALPANEL ROOM N.M.R ROOM

STABILITYC HAMBER

ROOM

DATACENTERROOM

HO

T A

REA

AR&

D W

ASH

ING

ARE

A

PRE ACTIONUNIT

PXRD ROOM

C HILLERROOM

DOC UMENTSR OOM

PROCESS & ANALYTICAL LAB

SERV

ICE

ARE

A

SERV

ICE

ARE

A

SERV

ICE

ARE

A

SERV

ICE

ARE

A

C O R R I D O R

ICP-MSROOM

LCMSROOM

SERVICESAREA

EE

GATE-1A

DG CH IM NEY

CORR IDOR

11 K

V M

ETER

ING

CUBI

CLE

YARD

APPR OVEDFINISHED GOODSSTORAGE AREA-1

APPR OVEDFINISHED GOODSSTORAGE AREA-2

Q UARANTINEFINISHED GOODSSTORAGE AREA-2

P ROPOSEDPASSENGER

LIFTHOUSE

KEEP INGSTORAGE

AREA

O FFICE AREA M AT ERIALEXIT

RAMP

DE DUSTINGCHAMBER

M AT ERIALLIFT M AT ERIAL

AIRLOCK

CO

RRID

OR

WASH AREA

PALLET ING AREA

RECEIVINGBAY

UTIL

ITY S

HAF

T

CORRIDOR

UP

MATER IAL EXITST/1065

HYD

ROG

ENA

TOR

SERV

ICES

ARE

A

NEUTRALISINGSYSTEM

T REAT EDWAT ERTANK

TREATEDWATERT ANK

S TRIA CASELA NDING

A MBULANCE

R EJECTEDFINISHED GOODSSTORAGE AREA

SPENT SOLVENT STORAGEAREA

SCRAP YARD

POTENT LAB AREA

CHA NGEROOM

W ASH AREAE X IT AIRLOCK-1

ANALYTICAL AREA

E X IT AIRLOCK-2

E NTRYA IR

LOCK-1

E NTRYA IR

LOCK-2

DOCUMENTATION ROOM

R ETAINEDSAMPLESROOM-2

MDC TANK

LPG

GA

S C

YLIN

DER

STO

RAG

E A

REA

1010

KVA

DG

DIESELTANK

PROPOSEDPRODUCTIONBLOCK-2 Extn.

LIQ UIDNITROGEN

TANK

HTDS & LTDSTANKS

STO RAGET ANKS

FLASHM IXERFLOC.

PRIM ARYSETTLING

TANK

Fig A.2 Plant Layout after Expansion of M/s. Hindys Lab Pvt. Ltd.,

Page 16: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

Form I Annexures

            Page 3

ANNEXURE - I

M/s. Apotex Pharmachem India Pvt. Ltd., located at Plot No.1 A, 4th Phase, Bommasandra

Industrial Area, Jigin Link Road, Anekal Taluk, Bangalore Urban District, Karnataka. The

unit environmental clearance vide letter no. F. No. J-1011/181/2006-IA II (I) dt: 31.08.2006.

The unit had renewed consent for operation (CFO) vide Letter No. PCB/055/HPI/2015-

16/H1189 dated 17.12.2015. It is proposed to increase the manufacturing capacity from

49.6 TPA to 54.74 TPA within the Existing land of 5.23 acres. Expansion includes

enhancement of production block, facility for utility proposed and enhancement of ZLD

system. Capacity before and after expansion is presented in Table A-1 and A-2.

Table A-1 Manufacturing Capacity - Permitted S.No Name of Product Capacity

(TPA) 1 Enalapril Maleate 2 2 Torsemide USP 0.2 3 Candesartan Cilexetil 0.2 4 Olmesartan medoxomil 1 5 Perindopril Arginine 0.2 6 Ramipril 0.5 7 Perindopril 2 8 Pantoprazole sodium 2 9 Lansoprazole 3 10 Esomeprazole Magnesium 0.5 11 Voriconazole 0.2 12 Eletriptan HBr 0.3 13 Naratriptan 0.1 14 Zolmitriptan 0.2 15 Rizatriptan Benzoate 0.2 16 Almotriptan Malate 0.2 17 Finasteride Intermediate 0.05 18 Ranolazine 2 19 Tolteridone 0.2 20 Trospium Chloride 0.5 21 Varenicline Tartrate 0.2 22 Fesoterodine fumarate 0.2 23 Pramipexol 0.1 24 Dolasetron Mesylate 0.2 25 Raloxifene 1 26 Exemestane 0.1 27 Letrozole 0.05 28 Capecitabine 0.2

Page 17: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

Form I Annexures

            Page 4

29 Paliperidone 0.2 30 Risperidone 0.2 31 Etravirine 0.2 32 Raltregravir 0.2 33 Valganciclovir 3 34 Entecavir 0.005 35 Eszopiclone 0.2 36 Gatifloxacine hydrochloride 0.1 37 Levothyroxine sodium 0.2 38 Mycophenolate Mofetil 25 39 Tizanidine 1.2 40 Rasagiline Mesylate 0.05 41 Riluzole 0.3 42 Cabergolin 0.05 43 Alprazolam 0.5 44 Donepezil HCl 0.3 45 Linezolid 0.2 46 Febuxostat 0.1

Total 49.605

Page 18: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

Form I Annexures

            Page 5

Table A-2 Manufacturing Capacity –After Expansion Sl.No Product Capacity

(TPA) 1 Alcaftadine 0.05 2 Almotriptan Maleate 0.15 3 Alprazolam 0.1 4 Apixaban 0.05 5 Atomoxitine Hydrochloride 0.1 6 Azelastine 0.03 7 Cabergoline 0.05 8 Canagliflozin 0.2 9 Candesartan Cilexetil 1.5

10 Carvidelol 1 11 Dabigatron Etexilate Mesilate 2 12 Deferasirox 1.5 13 Donepezil hydrochloride 0.3 14 Dronedarone Hydrochloride 1 15 Eletriptan Hydrobromide 0.6 16 Enalapril Maleate 1.5 17 Entecavir 0.01 18 Esomeprazole Magnesium 0.5 19 Eszopiclone 0.07 20 Etravirine 0.2 21 Exemestane 0.05 22 Febuxostat 0.1 23 Fesoterodine Fumerate 0.1 24 Fingolimod Hydrochloride 0.03 25 Gatifloxacin Hemihydrate 0.05 26 Ivacaftor 0.05 27 Lansoprazole 3 28 Letrozole 0.01 29 Levothyroxine Sodium 0.05 30 Linagliptin 0.05 31 Linezolid 1 32 Liothyronine Sodium 0.03 33 Lurasidone Hydrochloride 0.3 34 Mycophenolate Mofetil 20 35 Mycophenolate Sodium 1 36 Naratriptan Hydrochloride 0.1 37 Olmesartan Medoxomil 3 38 Olopatadine Hydrochloride 0.03 39 Paliperidone 0.1 40 Perampanel 0.01 41 Perindopril Arginine 0.5 42 Perindopril tert. Butylamine 1.5 43 Pramipexole Dihydrochloride 0.03

Page 19: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

Form I Annexures

            Page 6

44 Prasugrel Base 0.1 45 Prasugrel Hydrochloride 0.3 46 Raloxifene Hydrochloride 2 47 Raltegravir Potassium 0.2 48 Ramipril 0.5 49 Ranolazine 5 50 Rasagiline Mesylate 0.05 51 Riluzole 0.15 52 Risperidone 0.05 53 Rivaroxaban 0.1 54 Rizatriptan Benzoate 0.1 55 Saxagliptin Hydrochloride 0.1 56 Tetrabenazine 0.1 57 Tizanidine Hydrochloride 0.3 58 Tolterodine Tartrate 0.1 59 Tolvaptan 0.05 60 Torsemide 0.2 61 Trospium chloride 0.15 62 Valgancyclovir Hydrochloride 2 63 Varenicline Tartrate 0.05 64 Voriconazole 0.5 65 Zolmitriptan 0.04 66 Atorvastatin Calcium 0.2 67 Dolutegravir 0.4

Total 54.74

Page 20: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

Form I Annexures

            Page 7

Reaction Schemes of Atorvastatin Calcium  

O

OCH 3

CH 3

OC H 3

C H 3

C H 3

O

N H 2

O

OCH 3

CH 3

OC H 3

C H 3

C H 3

O

N C

O

OCH 3

CH 3

OC H 3

C H 3

C H 3

O

N H 2

O

O

N

NH

OC H 3

C H 3

OH

OH

F

2

C a2 +

O

F

C H 3

C H 3

O N H

O

S T A G E - I

( 4 R , 6 R ) - 2 - [ 6 - ( 2 - a m in o e t h y l ) - 2 , 2 -d im e t h y l - 1 , 3 - d io x a n - 4 - y l ] a c e t i ca c id t e r t - b u t y l e s t e r

M . W t : 2 7 3

( 4 R - c is ) - 1 , 1 , - d im e t h y le t h y l - 6 -c y n o m e t h y l - 2 , 2 - d im e t h y l - 1 , 3 -d io x a n e - 4 - a c e t a t e

2 H 2 , R a n e y N i

M e t h a n o l

M . W t : 2 6 9

( 4 R , 6 R ) - 2 - [ 6 - ( 2 - a m in o e t h y l ) - 2 , 2 -d im e t h y l - 1 , 3 - d io x a n - 4 - y l ] a c e t i ca c id t e r t - b u t y l e s t e r

+

2

4 H 2 O

2 N a C I

2 C H 3 C O O H

A t o r v a s a t i n C a l c i u m ( P h a r m a )

2 H C I M . W t : 3 6 . 5 ( x 2 )6 N a O H

M W t : 1 1 5 4

M W t : 1 8 ( x 4 )

M W t : 5 8 . 5 ( x 2 )

A c e t i c a c idM W t : 6 0 ( x 2 )

M W t : 7 4 ( x 2 )t e r t - B u t a n o l

T e t r a h y d r o f u r a nC a lc iu m a c e t a t e ( M . W t : 1 5 8 )

+ +2 ( C H 3 ) 3 O H

2 ( C H 3 ) 2 C ( O N a ) 2

M . W t : 1 2 0 ( x 2 )

2 , 2 - D is o d iu m p r o p o x id e

S T A G E - I I

4 - ( 4 - f l u o r o p h e n y l - 2 - i s o b u t y r y l - o x o -N - p h e n y l - B u t y r a m id e

2

M W t : 4 1 7 ( x 2 ) M W t : 2 7 3 ( x 2 )

M W t : 2 7 3 ( x 6 )

Process Description of Atorvastatin Calcium:

Stage I: (4R-cis)-1,1,-dimethylethyl-6-cynomethyl-2,2-dimethyl-1,3-dioxane-4-acetate is

reduced in the presence of Raney nickel in methanol and in sodium hydroxide used to

yield (4R,6R)-2-[6-(2-aminoethyl)-2,2-dimethyl-1,3-dioxan-4-yl]aceticacid tert-butyl ester.

Stage II: 4-(4-flurophenyl-2-isobutyryl-oxo-N-phenyl-butyramide is reacted with (4R,6R)-

2-[6-(2-aminoethyl)-2,2-dimethyl-1,3-dioxane-4yl]aceticacid tert-butylester in the presence

of Sodium hydroxide and Hydrochloricacid followed by treated with Calciumacetate in

tetrahydrofuran and ethyl acetate to yield Atorvastatin calcium (Pharma).

Page 21: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

Form I Annexures

            Page 8

 

A t o r v a s t a t i n c a l c i u m ( P h a r m a )

W a t e r

W a s t e w a t e r

S o d i u m h y d r o x i d e

( 4 R ,6 R ) - 2 - [ 6 - ( 2 - a m i n o e t h y l ) - 2 ,2 -d i m e t h y l - 1 ,3 - d i o x a n - 4 - y l ] a c e t i ca c i d t e r t - b u t y l e s t e r

4 - ( 4 - f l u o r o p h e n y l - 2 - i s o b u t y r y l -o x o - N - p h e n y l - B u t y r a m i d e

H y d r o c h l o r i c a c i d

t e r t - b u t a n o l

A c e t i c a c i d

t - B u t y l a c e t i c a c i d

T e t r a h y d r o f u r a n

C a l c i u m a c e t a t e

2 ,2 - D i s o d i u m p r o p o x i d e

A c t i v a t e d c a r b o n

E t h y l a c e t a t e

n - H e x a n e

S o d i u m c h l o r i d e

T e t r a h y d r o f u r a n

S p e n t c a r b o n

E t h y l a c e t a t e

n - H e x a n e

( 4 R - c i s ) - 1 ,1 , - d i m e t h y l e t h y l -6 - c y n o m e t h y l - 2 ,2 - d i m e t h y l -1 ,3 - d i o x a n e - 4 - a c e t a t e

R a n e y n i c k e l

( 4 R ,6 R ) - 2 - [ 6 - ( 2 - a m i n o e t h y l ) - 2 ,2 - d im e t h y l - 1 ,3 - d i o x a n - 4 - y l ] a c e t i c a c i dt e r t - b u t y l e s t e r

M e t h a n o l

S T A G E - I

S T A G E - I I

R a n e y n i c k e l

M e t h a n o lS o d i u m h y d r o x i d e

W a t e r W a s t e w a t e r

Fig A.3 Process Flow Diagram of Atorvastatin Calcium 

Table A-3 Material Balance of Atorvastatin Calcium Stage I Input Quantity

(Kg/day) Output Quantity

(Kg/day) Remarks

(4R-cis)-1,1,-dimethylethyl-6-cynomethyl-2,2-dimethyl-1,3-dioxane-4-acetate

0.4 Stage I Product 0.4 To Stage II

Raney Nickel 21 Methanol Recovered 723.5 Recovered & Reused Sodium Hydroxide 36 Methanol Loss 2.6 Fugitive Loss Methanol 750 Methanol to Wastewater 7.5 To Wastewater Hydrogen 0.0 Methanol to Residue 16.1 Solvent in Residue Water 179 (4R-cis)-1,1,-

dimethylethyl-6-cyno methyl-2,2-dimethyl-1,3-dioxane-4-acetate

0.0 Organic Residue

Raney Nickel 21.4 Inorganic Residue Sodium Hydroxide 35.7 To Waste water Water 178.5 To Waste water Total Input 985.7 Total Output 985.7

Page 22: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

Form I Annexures

            Page 9

Stage II Input Quantity

(Kg/day) Output Quantity

(Kg/day) Remarks

Stage I Product 0.4 Atorvastatin Calcium 0.5 Final Product 4-(4-flurophenyl-2-isobutyryl-oxo-N-phenyl-butyramide

1 t-Butanol 0.1 To Wastewater

Sodium Hydroxide 0 Sodium Chloride 0.1 To Wastewater Hydrochloric acid 0.1 Acetic acid 0.1 To Wastewater Pivalic acid 29 2,2 - Di Sodium

Propoxide 0.1 To Wastewater

Toluene 321 Toluene Recovered 311.7 Recovered & Reused Cyclo Hexane 1121 Toluene Loss 1.3 Fugitive Loss Isopropyl Alcohol(IPA) 1964 Toluene to Residue 8.4 Solvent in Residue Calcium Acetate 0.1 Cyclo Hexane Recovered 1087.4 Recovered & Reused Ethyl Acetate 1714 Cyclo Hexane Loss 4.5 Fugitive Loss Sodium Carbonate 25.0 Cyclo Hexane to

Residue 29.1 Solvent in Residue

Water 7568 IPA Recovered 1894.8 Recovered & Reused Activated Carbon 14 IPA Loss 9.8 Fugitive Loss IPA to Wastewater 23.6 To Wastewater IPA to Residue 35.3 Solvent in Residue Ethyl Acetate Recovered 1653.6 Recovered & Reused Ethyl Acetate Loss 6.9 Fugitive Loss Ethyl Acetate to

Wastewater 8.6 To Wastewater

Ethyl Acetate to Residue 44.6 Solvent in Residue Stage I Product 0.2 Organic residue 4-(4-flurophenyl-2-

isobutyryl-oxo-N-phenyl-butyramide

0.3 Organic residue

Pivalic acid 28.6 To Wastewater Activated Carbon 14.3 Organic residue Calcium Acetate 0.0 To Wastewater Sodium Carbonate 25.0 To Wastewater Water 7568.4 To Wastewater Total Input 12757 Total Output 12757.0

Page 23: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

Form I Annexures

            Page 10

ANNEXURE – II: Wastewater Treatment Facilities

The main sources of effluent generation from the plant are from process, washings,

scrubber effluent, blow downs from boiler and cooling tower, and domestic effluents. The

effluents generated in the process, separation techniques and during purification contain

organic residues of raw materials, solvents, and products. Some of the raw materials used

in the process are also inorganic in nature. Hence the effluents contain both organics and

in-organics in various quantities leading to high COD and TDS levels respectively. The

quantity of effluents generated and mode of treatment is presented in Table A-4.

Table A-4 Quantity of Effluent Generated and Mode of Treatment Description Quantity (KLD) Mode of Treatment

Permitted After Expansion

HTDS Effluents Process

6.5 8 Sent to Stripper followed by MEE and ATFD. Stripper Condensate sent to Cement Plants for Co-Incineration. MEE and ATFD Condensate sent to Biological treatment plant followed by RO. RO rejects sent to MEE and permeate is reused in cooling towers make-up.

RO Rejects 4 Sent to MEE followed by ATFD, Biological Treatment plant and RO.

Total I 6.5 12 LTDS Effluents

Washings 45.5 40 Sent to Biological Treatment System followed by RO. RO permeate reused for cooling tower makeup. RO rejects sent to MEE.

Scrubbers -- 4 Boiler Blow downs 2.2 10 Cooling Tower Blow downs

5.5 20

Domestic 14.8 26 Sent to Sewage Treatment Plant and treated wastewater reused for green belt development.

Total II 68 100 Grand Total (I+II) 74.5 112

Page 24: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

Form I Annexures

            Page 11

ANNEXURE – III: Water Balance

Water is required for process, scrubbers, washing, cooling tower makeup, steam

generation and domestic purposes. The required water shall be drawn from KIADB

industrial water supply sources in addition to reuse of treated wastewater. The total

water requirement after expansion is in the order of 285 KLD consisting of 175 KLD fresh

water and the remaining of recycled water. Total water balance after expansion is

presented in Table A-5.

Table A-5 Total Water Balance – After Expansion Purpose INPUT (KLD) OUTPUT (KLD)

Fresh Water Recycled Water Loss Effluent Process 8 8 Washings 40 40 Scrubber 4 4 Boiler Feed 40 30 10 Cooling Tower 39 84 103 20 RO/DM Plant 4 4 Domestic 30 4 26 Gardening 10 26 10 Gross Total 175.0 110 147.0 112.0 Total 285.0 259

Page 25: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

Form I Annexures

            Page 12

ANNEXURE – IV: Solid Waste

Solid wastes are generated from the process shall be sent to TSDF/ Cement Industries for

Co-incineration. The inorganic residue, evaporation salts from MEE and ATFD and ETP

Sludge shall be sent to TSDF. Total solid waste generated and mode of disposal is

presented in Table A-6.

Table A-6 Total Solid Waste Generated and Mode of Disposal S.

No Description Quantity Unit Method of disposal

Permitted After Expansion

1 Used or Spent Oil 4 10 KL/A Disposed to KSPCB authorized party for Reprocess

2 Wastes or residue containing Oil

0.1 4 MT/A

3 Process Residue 6 25 MT/A 4 Spent carbon 35.5 36 MT/A 5 Off specification

products 25 MT/A

6 Date expired products 25 MT/A 7 Spent catalyst

3 MT/A Disposed to KSPCB

authorized Party Recycling/Reused

8 Spent Solvents 1716 2300 KL/A Disposed to KSPCB authorized party for Reprocess

9 Empty barrels/ containers/ liners contaminated with hazardous chemicals/ wastes

6000 6000 No’s/A Disposed to authorized handler after through washing

10 Exhaust Air or Gas cleaning residue

3

3 MT/A Disposed to KSPCB authorized party for TSDF 11 Chemical sludge from

waste water treatment

9 100 MT/A

12 Evaporation salts 110 150 MT/A 13 Miscellaneous items

(Please specify) Such as used polybags, syringes and needles used PPE, etc.)

10 MT/A Disposed to KSPCB authorized Party for Incineration

14 Electronic Waste As Actual generated No’s/A Disposed to KSPCB authorized party for Reprocess

15 Battery Waste As Actual generated No’s/A

Page 26: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

Form I Annexures

            Page 13

ANNEXURE – V: Stack Emissions Details

Existing Standby DG sets of 2 x 1010 KVA, 1 X 625 KVA and 2 x 500 KVA will be used during

load shut down by BESCOM. It is proposed to establish 1 x 3 TPH and 1 x 2 TPH PNG/Oil

fired boilers. Proposed 1 x 2 TPH boiler will be kept as standby. PNG consumption after

expansion is 5000 cum/hr. Existing boilers of capacity 0.6 TPH and 1.5 TPH Oil fired /PNG

fired boilers shall be dismantled after expansion. DG sets shall be provided with stack heights

based on the CPCB formula for effective stack height.

Stack Emission Details

S. No

Stack Connected to

Stack Ht (m)

Dia of stack at top(m)

Temp. of exhaust

gases (0C)

Exit Velocity (m/sec)

Pollutant Emission Rate (g/sec)

PM SO2 NOx Existing

1 1.5TPH Oil Fired Boiler *

21 0.3 140 6 -- 0.03 0.12

2 0.6 TPH Oil Fired Boiler*

21 0.3 140 6 -- 0.002 0.005

3 2 x 1010 kva** 7 0.2 170 10 0.09 0.25 0.38 4 1 x 625 kva** 5 0.2 200 7.0 0.002 0.031 0.04 5 2 x 500 kva** 5 0.2 200 6.8 0.002 0.025 0.04

Proposed 1 1 x 3 TPH

PNG/Oil Fired Boiler

30 0.8 160 8.5 -- 0.4 0.21

2 1 x 2 TPH PNG/Oil Fired Boiler #

30 0.4 160 7.0 -- 0.08 0.28

* Will be dismantled after expansion ** DG sets will be used during load shut down. # Shall be kept as standby

Page 27: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA
Page 28: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA
Page 29: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA
Page 30: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA
Page 31: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA
Page 32: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

~ I•• ..

-e

/No. :(fR = q~fq'(OI, ~

Telegram: PARYAVARANBANGALORE

~:Telephone:

~~

\tffi{ ~~ . .

Ii" ~iJili ~ CFJ ~

GOVERNMENT OF INDIAMINISTRY OF ENVIRONMENT & FORESTS

~ cf)\~k1~ (~ ~)

Regional Office (Southern Zone)Kendriya Sadan, 4th Floor, E&F Wings, 17th Main Road,

2nd Block, Koramangala, Bangalore - 560 034.

F. No. EP112.11350 IKarnataka

28th April 2017

To

Mr. Yoganjaneya Reddy, Site Head,Apotex Pharmachem India Private LtdPlot No 1 A, Bommasandra Industrial Area,4th Phase, Jigani Link Road,Bangalore 560 099,

Sub: Expansion of bulk drug unit located at Bommasandra by Mis Apotex Pharma India Ltd.Environmental Clearance issued vide Ref No. J- 110 I 1I18112006-IA.II (I) dt: 31.08.2006 --Request for certified compliance report -regarding.

Sir,

This is in response to your letter Ref APIPLIEHS/007/20 17-2018 dated 2ih April 2017 requestingfor a certified copy of the compliance report, I am to state that the project was recently monitoredby this office on 28th October 2016 and it has been noted that this project is complying with theconditions of the above said environmental clearance. Detailed monitoring report for this project isuploaded in the Ministry's environmental clearance website and is available athttp://environmentclearance.nic.in/.

~r~c

(Dr U Sridharan)Scientist "0"

..

Page 33: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA
Page 34: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA
Page 35: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA
Page 36: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA
Page 37: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA
Page 38: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA
Page 39: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA
Page 40: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA
Page 41: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA
Page 42: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA
Page 43: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA
Page 44: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA
Page 45: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA
Page 46: Apotex Pharmachem India Pvt. Ltd., - Welcome to …environmentclearance.nic.in/writereaddata/Online/TOR/28...Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA

Apotex Pharmachem India Pvt. Ltd., PLOT NO. 1 A, 4th PHASE, BOMMASANDRA INDUSTRIAL AREA,  JIGINI LINK ROAD, ANEKAL TALUK, BANGALORE DISTRICT, 

KARNATAKA STATE  

  

    

    

  

    

  

  

 

 

 

 

 

 

  

 

 

 

STUDIES AND DOCUMENTATION BY TEAM Labs and Consultants   QCI: MoE&F OM, List A‐1, S.No.25.   (An ISO 9001:2008, ISO 14001:2004 &  OHSAS 18001:2007 Certified Organization) B‐115, Annapurna Block, Aditya Enclave Ameerpet, Hyderabad‐500 038. Phone: 040‐23748 555/616, Telefax: 040‐23748666 Email: [email protected]