Apollo 15 Crew Training Log Author: Mike Brzezinski Transcribed from hand written notes by: Matthew Kay ([email protected]) 13 September 2003

Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Apollo 15Crew Training Log

Author: Mike Brzezinski

Transcribed from hand written notes by:Matthew Kay ([email protected])

13 September 2003

Page 2: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

The Apollo 15 crew began training unofficially on 15 Dec 1969. The backup LM pilot started systems training in Oct 1969. The prime and backup crews for Apollo 15 were officiallyannounced on March 27, 1970.

1969Oct-27 Schmitt LM radar brief @ KSC 7Oct-28 Schmitt LM CES brief @ KSC 7Oct-30 Schmitt LM AGS brief @ KSC 2Oct-31 Schmitt LM AGS brief @ KSC 2Nov-01 Schmitt LM AGS brief @ KSC 6Nov-05 Schmitt LM radar brief @ MSC 7Nov-11 Schmitt LM CES brief @ MSC 7Nov-12 Schmitt LM radar brief @ MSC 6 30Nov-13 Schmitt LM radar brief @ MSC 4

LM AGS brief @ MSC 2Nov-18 Schmitt LM AGS brief @ KSC 3Nov-25 Schmitt LM radar brief @ MSC 7 30Nov-26 Schmitt LM radar brief @ MSC 3 30Dec-04 Irwin CMS # 3 5 20Dec-05 Irwin CMS # 3 5 10Dec-08 Worden CMS # 3 2 10Dec-09 Scott CMS # 3 1 50

Worden CMS # 3 3 25Irwin CMS # 3 1 50

Schmitt LM / CMS brief @ MSC 4Dec-10 Schmitt LM / CMS brief @ MSC 6Dec-15 Scott Geology training plan review 4

Irwin Geology training plan review 4Schmitt Geology training plan review 4

Dec-16 and 17 Scott PAO @ GAECIrwin PAO @ GAEC

Dec-18 Scott 1/6 g in rickshaw in centrifuge - no run - couldn't balance 3Irwin 1/6 g mobile pogo 3

1/6 g rickshaw in centrifuge 3Dec-19 Scott Suit fit @ MSC 1Dec-22 Scott 1/6 g rickshaw in centrifuge 3

Worden Leave this weekIrwin Leave this week

Gordon Leave this weekSchmitt CSM / EPS brief @ KSC 3

Dec-23 Brand CMS # 3 6 50Schmitt CMS # 3 4 15Schmitt CSM / EPS brief @ KSC 1 15

Dec-24 Brand CMS # 3 3 5Everyone else on leave the rest of the week

Dec-29 Irwin CMS # 3 4 5Brand CMS # 3 5 40

Page 3: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Schmitt CMS # 3 2 40Scott Leave this week

Worden Leave this weekGordon Leave this week

Dec-30 Everyone on leaveDec-31 Everyone else on leave the rest of the weekJan-05 Scott Habitability study in Antarctic all this week

Worden Leave this weekGordon PAO trip from Apollo 12 this weekBrand CMS # 3 3 20Irwin Apollo 11 rock review 4

Schmitt Apollo 11 rock review 8Jan-06 Brand CMS # 3 4 25

Irwin Apollo 11 rock review 8Schmitt Apollo 11 rock review 8

Jan-07 Irwin Apollo 11 rock review 4Schmitt Apollo 11 rock review 8

Jan-08 Irwin Apollo 11 rock review 8Schmitt Apollo 11 rock review 8

Jan-09 Irwin LMS # 1 1 45Jan-12 Scott Habitability study in Antarctic all this week

Gordon PAO trip from Apollo 12 this weekWorden Sick

Irwin Physical examinationBrand Apollo 13 support

Schmitt CSM / EPS brief @ MSC 2 30Schmitt CMS # 1 30

Jan-13 Worden SickIrwin CMS # 3 6 20Brand CMPS 3 30

Schmitt LMPS 3Jan-14 Worden Sick

Irwin LMS # 2 1CMS # 3 4 10

Schmitt CMS # 3 3 30Brand Apollo 13 support

Jan-15 Brand CMS # 3 5 20Schmitt CMS # 3 2 55

Jan-16 Worden geology brief 3Irwin geology brief 3

Schmitt geology brief 3Brand Apollo 13 support

Worden CSM / EPS brief @ MSC 2 30Irwin CSM / EPS brief @ MSC 2 30

Schmitt CSM / EPS brief @ MSC 2 30Worden Training schedule 30

Jan-19 Worden CMPS 2 30Irwin CMS # 3 2 5Brand CMS # 3 5 50

Schmitt CMS # 3 3 10Scott Habitability study in Antarctic all this week

Gordon PAO trip from Apollo 12 this weekJan-20 Irwin LMS # 2 35

CMS # 3 6 20

Page 4: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Brand Apollo 13 support (emergency egress)Schmitt CMS # 3 3

LMS # 2 3 55Jan-21 Worden CMS # 3 6 55

Irwin CMS # 3 2 15LMS # 2 4

Brand Apollo 13 supportSchmitt CMS # 3 1

LMS # 2 4Jan-22 Worden CMS # 3 5 35

Irwin LMPS 2 30Brand CMS # 3 2 50

Schmitt CMS # 3 3 45Jan-23 Schmitt LMPS 2

Brand DCPS 2Worden geology brief 3

Irwin geology brief 3Brand geology brief 3

Worden Training schedule 30Jan-25 Schmitt Geology LRL 3Jan-26 Gordon PAO trip from Apollo 12 this week

Prime Crew Pilot's meeting 1Training schedule review 2

Scott LMPS 2Worden CMPS 2 30

Irwin LMPS 3Brand CMS # 3 6 15

Schmitt CMS # 3 6 15Jan-27 Worden Flight check

Brand CMS # 3 5 25Schmitt CMS # 3 2 50

Jan-28 Scott LMS # 2 4 30CMS # 3 2 15

Worden CMS # 3 3 20CMS # 2 1 20

Irwin LMS # 2 4 30CMS # 3 1 30

Brand Apollo 13 supportSchmitt CSM / Comm brief @ MSC 3

Mission techniques (FOD) 2Jan-29 Scott CMS # 3 2 15

Worden CMS # 3 2 15Irwin CMS # 3 2 15Brand CMS # 3 1 35

Schmitt LMPS 3 30Jan-30 Scott Training schedule 30Jan-31 Schmitt Geology LRL 2Feb-02 Prime Crew W-Matrix brief 3

geology brief 3Schmitt W-Matrix brief 3Brand CMS # 3 4 50

Gordon PAO trip from Apollo 12 this weekFeb-03 Scott LMS # 2 2 10

Irwin LMS # 2 5 25

Page 5: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Worden Flight physicalBrand CMS # 3 6 20

Schmitt CSM / Comm brief @ MSC 3Feb-04 Scott CMS # 3 5 30

Irwin CMS # 3 6 15Brand CMS # 3 2

Worden Doctor's (physical)Schmitt LMPS 3Brand Launch abort brief @ KSC 2

Feb-05 Scott CMS # 3 1 25Irwin CMS # 3 4 50

Worden geology brief 1Schmitt Scientific meeting 8Brand DCPS 2

CMPS 3 15Feb-06 Scott geology brief 3

Scott Training schedule 30Irwin geology brief 3Brand Apollo 13 supportScott AGS briefing 2Irwin AGS briefing 2

Schmitt AGS briefing 2Feb-09 Worden In hospital this week

Gordon PAO trip from Apollo 12 this weekScott LMS # 2 3 30Irwin LMS # 2 3 30Brand CMS # 3 4 10

Feb-10 Scott LMS # 2 4 10Irwin LMS # 2 4 10Scott CMS # 3 1 20Irwin CMS # 3 2 55Brand Apollo 13 support

Schmitt CSM / SECS brief @ MSCFeb-11 Scott LMS # 2 3 5

Irwin LMS # 2 4Scott CMS # 3 1 25

Schmitt CMS # 3 6 50Brand Apollo 13 support

Feb-12 Scott CMS # 3 1 50Irwin CMS # 3 1 35

Schmitt CMS # 3 6 50Brand CMS # 3 5 40

Feb-13 Scott geology brief 3Irwin geology brief 3Brand geology brief 2Irwin LMPS 3 15Scott Training schedule 30

Feb-16 Scott LLTV ( 1 Flt [Flight] )Irwin CMS # 2 & 3 3 25Brand CMS # 2 & 3 3 30

Gordon PAO trip from Apollo 12 this weekWorden Recovering from hospital through Thursday, Feb 19.Schmitt Leave all this weekScott LLTVS 1

Feb-17 Scott LLTV ( 1 Flt )

Page 6: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

LMS # 2 1Irwin CMS # 3 1

LMS # 2 7 10Brand Apollo 13 support

Feb-18 Scott CMS # 3 2 50LMS # 2 5 50

Irwin CMS # 3 2 15LMS # 2 3 15

Brand CMS # 3 2 5Feb-19 Scott Adm[inistrative] @ KSC

Irwin Adm[inistrative] @ KSCBrand Apollo 13 support

Feb-20 Scott LLTVS 1geology brief 2

Worden geology brief 2Scott Training schedule 30

Worden CMS # 1 2Irwin geology brief 2Brand Apollo 13 support

Feb-23 Brand ME - 109 @ NR 5All the rest - Holiday

Feb-24 Scott LLTVS 45geology brief 3

Worden geology brief 3Irwin LMS # 2 5 15Brand CMS # 3 3 25

Schmitt CMS # 3 6 40Gordon PAO trip from Apollo 12 this week

Feb-25 Scott LMPS 2 30Worden ME - 109 @ NR 6 30

Irwin LLRF @ Langley AFB 8Brand CMS # 3 2 10

Schmitt CMS # 3 4 25LMS # 2 2

Feb-26 Scott ME - 109 @ NR 2Worden ME - 109 @ NR 3

Irwin CMS # 3 2 40Brand CMS # 3 6 10

Schmitt CMS # 3 3 30Feb-27 Scott Training schedule 30

Worden ME - 109 @ NR 2Irwin geology brief 3Brand CMS # 1 2

Schmitt LMPS 4CWG fit check 30

Feb-28 Schmitt Geology LRL 2Mar-02 Scott PAO

Worden ME - 109 @ NR 5Irwin CMS # 3 7

Schmitt CMS # 3 7Brand Apollo 13 support

Gordon PAO trip from Apollo 12 this weekMar-03 Scott LLTVS 1

Worden Administrative @ NRBrand CMS # 3 2 10

Page 7: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Schmitt CMS # 3 2 10Mar-04 Brand CMS # 3 2 45

Schmitt CMS # 3 6 25Mar-05 Scott LLTV ( 1 Flt )

Scott geology brief 3Worden geology brief 3

Irwin geology brief 3Brand CMS # 3 3 20

Schmitt CMS # 3 6 25Mar-06 Scott Training schedule 30

Scott LLTV ( 1 Flt )Worden M = 1 rendezvous brief 3

CMPS 1 30Irwin flight check

Schmitt LMPS 4Mar-09 Scott CMS # 3 4 55

Irwin CMS # 3 5 20Schmitt CMS # 3 5 20Brand Apollo 13 support

Gordon PAO trip from Apollo 12 this weekMar-10 Worden CMS # 3 3

Irwin CMS # 3 6 5Schmitt CMS # 3 3 5Scott CMS # 3 3Brand Apollo 13 support

Mar-11 Scott CMS # 3 2 40Worden CMS # 3 3 45Schmitt CMS # 3 5 45

Irwin LLRF @ Langley AFB 10Brand Apollo 13 support

Mar-12 Scott CMS # 3 2 5Worden CMS # 3 3 20Brand CMS # 3 3 50

Schmitt CMS # 3 7 10Irwin LLRF @ Langley AFB 10

Mar-13 Scott geology brief 2Worden geology brief 2

Irwin geology brief 2suit fit @ ILC 4

Scott Training schedule 30Mar-16 Scott LLTVS 1

Data priority mtg [meeting] 6Worden Data priority mtg [meeting] 6

Irwin Data priority mtg [meeting] 6Brand CMS # 3 6 50

Schmitt LMS # 2 9 45Gordon PAO trip from Apollo 12 this week

Mar-17 Scott LLTV ( 1 Flt )Worden CMS # 3 1 50Brand CMS # 3 6 20

Schmitt CMS # 3 3 5Irwin FEAT, LM-9 @ GAEC

FMES @ GAEC 1Mar-18 Worden CMS # 3 5

Irwin FEAT, LM-9 @ GAEC

Page 8: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

FMES @ GAEC 1Schmitt FEAT, LM-9 @ GAEC

FMES @ GAEC 2Mar-19 Scott LLTV ( 2 Flt )

LMPS 3 30Worden CMS # 3 3

Irwin FEAT, LM-9 @ GAECFMES @ GAEC 1

Schmitt FEAT, LM-9 @ GAECFMES @ GAEC 2

Mar-20 Scott geology planning meeting 2Scott Training schedule 30

Worden geology planning meeting 2Irwin FEAT, LM-9 @ GAEC

FMES @ GAEC 1Schmitt FEAT, LM-9 @ GAEC

FMES @ GAEC 2Mar-23 Scott Flt [Flight] plan review 6

Worden Flt plan review 6Irwin Flt plan review 6

Schmitt FEAT, LM-9 @ GAECFMES @ GAEC 1

Gordon PAO trip from Apollo 12 this weekBrand LMS # 2 4

Mar-24 Scott LMS # 2 4 20Irwin LMPS 3 30Brand CMS # 3 7

Schmitt LLRF @ Langley AFB 8Mar-25 Scott CMS # 3 1 50

Worden CMS # 3 2 35Irwin CMS # 3 3 5Brand Apollo 13 support

Schmitt LLRF @ Langley AFB 8Mar-26 Scott LLTVS 1

Worden CMS # 3 5 35Irwin CMS # 3 5 35

Schmitt CMS # 3 6 5Brand Apollo 13 supportScott Training schedule 30

Mar-27 Scott geology brief 2Worden geology brief 2

Irwin geology brief 2Scott Experiments briefing 3

Worden Experiments briefing 3Irwin Experiments briefing 3

Schmitt Experiments briefing 3Brand Apollo 13 support

Apollo 15 crew officially announced todayMar-30 Worden CMS # 3 2 40

Brand CMS # 3 3Irwin LMPS 2

Gordon PAO trip for Apollo 15 until Thursday, April 2Mar-31 Scott LLTVS 45

Brand CMS # 3 4 30Schmitt CMS # 3 6 10

Page 9: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Irwin LMPS 4Apr-01 Worden CMS # 3 3 15

Irwin CMS # 3 2 45Brand CMS # 3 3 20

Schmitt CMS # 3 3 55Apr-02 Worden CMS # 3 3 50

Irwin CMS # 3 4 50Schmitt CMS # 3 2 35

Apr-03 Irwin PLSS strap fitting 1Scott Training schedule 30

Gordon geology brief 3Schmitt geology brief 3

Apr-04 Brand LMS # 2 4 30Schmitt LMS # 2 8 30

Apr-05 Scott LLTV ( 1 Flt ) short, engine failure problem - didn't completemissionFEAT ( sim flt ) @ GAEC

Irwin FEAT ( sim flt ) @ GAECGordon FEAT ( sim flt ) @ GAECSchmitt FEAT ( sim flt ) @ GAECScott FMES 1Irwin FMES 1

Gordon FMES 1Schmitt FMES 1Brand LMS # 2

Apr-06 Scott FEAT ( sim flt ) @ GAECIrwin FEAT ( sim flt ) @ GAEC

Gordon FEAT ( sim flt ) @ GAECSchmitt FEAT ( sim flt ) @ GAEC

Apr-07 Scott FMES 1Irwin FMES 1

Gordon FMES 30Schmitt FMES 1Worden CMS # 3 1 20Brand CMS # 3 3 25

Apr-08 Scott FEAT ( sim flt ) @ GAECIrwin FEAT ( sim flt ) @ GAEC

Gordon FEAT ( sim flt ) @ GAECSchmitt FEAT ( sim flt ) @ GAECScott FMES 1Irwin FMES 30

Schmitt FMES 1Worden CMS # 3 2 50Brand CMS # 3 3 35

Apr-09 Scott CMS # 3 1 25Worden CMS # 3 1 25

Irwin CMS # 3 1 25Gordon CMS # 3 1 45Brand CMS # 3 1 45

Schmitt CMS # 3 1 45Worden Zero " G" A/C @ Patrick AFB 2 15

Apr-10 Scott CMS # 3 1 30Worden CMS # 3 2

Irwin CMS # 3 1 30Gordon CMS # 3 1 20

Page 10: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Schmitt CMS # 3 1 35Brand Apollo 13 support

Apr-11 All Apollo 13 launchApr-13 Scott LLTVS 1

Mission mtg with McDivittIrwin Mission mtg with McDivitt

Worden CMS # 3 3 40Gordon LMS # 2 4 50Schmitt LMS # 2 7 30Brand Apollo 13 support

Apollo 13 AbortApr-14 Scott Apollo 13 mission

Brand Apollo 13 missionWorden CMS # 3 3 30Gordon LMS # 2 3 15

Irwin LMS # 2 4 45Schmitt suit fit @ ILC 4

Apr-15 Scott Apollo 13 missionBrand Apollo 13 missionIrwin Apollo 13 mission

Worden Apollo 13 missionGordon LMS # 2 1 30Schmitt LMS # 2 7 50

Apr-16 Scott MET sotwage review 1 30Irwin MET sotwage review 1 30

Gordon MET sotwage review 1 30Worden rescue and solo book review 3

Irwin MET, suited in centrifuge 2Brand Apollo 13 mission

Schmitt LMS # 2 4Irwin LMPS 3Scott Training schedule 30

Apr-17 Scott Training schedule 30All Apollo 13 recovery

Scott LLTV ( 1 Flt )Gordon geology review 2Schmitt geology review 2

Apr-18 Scott LLTV ( 1 Flt )Worden suit fit @ ILC 4

Irwin LMPS 4Schmitt LMPS 4Brand CMPS 4 30

Gordon LLTV seat C.G. @ Weber 4Apr-19 Scott LLTV (4 Flts)

Scott EVA procedure 3Worden EVA procedure 3

Irwin EVA procedure 3Gordon geology brief 3Brand geology brief 3

Schmitt geology brief 3Apr-22 All Apollo 13 follow on crew debriefing 5Apr-23 Scott LMS # 1 6 10

Irwin LMS # 1 6Worden CMPS 3 15Gordon CMS # 1 7 15

Page 11: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Brand CMS # 1 7 15Schmitt CMS # 1 7 15Scott Training schedule 30

Apr-24 Worden PAOIrwin suit fit @ ILC 4

Gordon LMS # 1 2 55Schmitt LMS # 1 2 55Brand CMS # 1 7 45

Gordon geology brief 2Schmitt geology brief 2

Irwin LMS # 1 20Scott LMS # 1 3 10

Apr-27 Scott LM /EPS systems brief at GAEC 4Irwin LM /EPS systems brief at GAEC 4

Gordon LM /EPS systems brief at GAEC 4Schmitt LM /EPS systems brief at GAEC 4Scott LM / Telecom & instrumentation brief at GAEC 4Irwin LM / Telecom & instrumentation brief at GAEC 4

Gordon LM / Telecom & instrumentation brief at GAEC 4Schmitt LM / Telecom & instrumentation brief at GAEC 4Worden CSM / Prep & RCS brief 2Brand CSM / Prep & RCS brief 3 30

DCPS 1 50Apr-28 Scott LM / ECS brief at GAEC 4

Irwin LM / ECS brief at GAEC 4Gordon LM / ECS brief at GAEC 4Schmitt LM / ECS brief at GAEC 4Scott LM / prep & RCS brief @ GAEC 4Irwin LM / prep & RCS brief @ GAEC 4

Gordon LM / prep & RCS brief @ GAEC 4Schmitt LM / prep & RCS brief @ GAEC 4Worden PAO @ GAECBrand PAO @ GAEC

Apr-29 Scott LM /CES & PNGS brief @ GAEC 5Irwin LM /CES & PNGS brief @ GAEC 5

Gordon LM /CES & PNGS brief @ GAEC 5Schmitt LM /CES & PNGS brief @ GAEC 5Worden CMS # 1 2 25Brand CMS # 1 2 25

Apr-30 Scott LM / radar brief @ GAEC 5Irwin LM / radar brief @ GAEC 5

Gordon LM / radar brief @ GAEC 5Schmitt LM / radar brief @ GAEC 5Worden CMS # 1 3 30

CM / ECS brief 2 30Brand CM / ECS brief 3

CMS # 1 4May-01 Scott LM / AGS brief @ GAEC 4

Irwin LM / AGS brief @ GAEC 4Schmitt LM / AGS brief @ GAEC 4Worden CM stowage review 3

CMS # 1 3 30Brand CMS # 1 4

Gordon PAO Washington StateMay-04 Scott LMS # 1 2 5

Irwin LMS # 1 3 10

Page 12: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Gordon LMS # 1 3 30Schmitt LMS # 1 3 30Worden Entry briefing 2

CMS # 1 3 15Brand CMS # 1 3

CSM G & N brief 3May-05 Scott LMS # 1 3 30

Irwin LMS # 1 3 30Gordon LMS # 1 3 5Schmitt LMS # 1 3 5Worden CSM G & N brief 3

CMS # 1 3 30Brand CMS # 1 4

Entry briefing 2Scott Training schedule 30

May-06 Scott Field geology - Chocolate Mtns, Calif 10Irwin Field geology - Chocolate Mtns, Calif 10

Gordon Field geology - Chocolate Mtns, Calif 10Schmitt Field geology - Chocolate Mtns, Calif 10Worden DCPS 1 50Brand DCPS 1 20

CMS # 1 4May-07 Scott Field geology - Chocolate Mtns, Calif 10

Irwin Field geology - Chocolate Mtns, Calif 10Gordon Field geology - Chocolate Mtns, Calif 10Schmitt Field geology - Chocolate Mtns, Calif 10Brand CMS # 1 3Brand Physical examination 2

May-08 Scott Field geology - Chocolate Mtns, Calif 10Irwin Field geology - Chocolate Mtns, Calif 10

Gordon Field geology - Chocolate Mtns, Calif 10Schmitt Field geology - Chocolate Mtns, Calif 10Worden FOD entry simulator 2 30Brand FOD entry simulator 2 30

May-11 Scott Field geology - Chocolate Mtns, Calif 10Irwin Field geology - Chocolate Mtns, Calif 10

Gordon Field geology - Chocolate Mtns, Calif 10Schmitt Field geology - Chocolate Mtns, Calif 10Worden Orbital geology - Menlo Park 8Brand Orbital geology - Menlo Park 8

May-12 Scott Field geology - Chocolate Mtns, Calif 10Irwin Field geology - Chocolate Mtns, Calif 10

Gordon Field geology - Chocolate Mtns, Calif 10Schmitt Field geology - Chocolate Mtns, Calif 10Worden Orbital geology - Menlo Park 8Brand Orbital geology - Menlo Park 8

May-13 Scott Field geology - Chocolate Mtns, Calif 10Irwin Field geology - Chocolate Mtns, Calif 10

Gordon Field geology - Chocolate Mtns, Calif 10Schmitt Field geology - Chocolate Mtns, Calif 10Worden CSM @ NR, CalifBrand CSM @ NR, Calif

May-14 Scott LSM # 1 1 35Irwin LSM # 1 2

Gordon LSM # 1 1 55

Page 13: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Schmitt LSM # 1 1 55Worden CMS # 1 2Brand CMS # 1 4 50

May-15 Scott Planetology ( Jim Hayes ) 6Worden Planetology ( Jim Hayes ) 6

Irwin Planetology ( Jim Hayes ) 6Gordon Planetology ( Jim Hayes ) 6Brand Planetology ( Jim Hayes ) 6

Schmitt Planetology ( Jim Hayes ) 6Scott Training schedule 30

May-18 Scott CMS # 1 1 45Worden CMS # 1 3 45

Irwin CMS # 1 3 45Gordon CMS # 1 1 30Brand CMS # 1 4 30

Schmitt CMS # 1 4 30Scott LSM # 1 3 20Irwin LSM # 1 3 20

Gordon LSM # 1 3 15Schmitt LSM # 1 3 15Brand CMPS 3

May-19 All Team meeting 30Scott LSM # 1 2 45Irwin LSM # 1 3 40

Gordon LSM # 1 2 45Schmitt LSM # 1 4Worden CMS # 1 3 45Brand CMS # 1 3Scott EVA /MET on rockpile @ MSC 3Irwin EVA /MET on rockpile @ MSC 3

Gordon EVA /MET on rockpile @ MSC 3Schmitt EVA /MET on rockpile @ MSC 3

May-20 Scott LSM # 1 3Irwin LSM # 1 3

Gordon PAOSchmitt LSM # 1 3 30Worden CMS # 1 4Brand CMS # 1 4

Worden CMPS 1 30Brand DCPS 2

May-21 Scott suit fit @ILC 4Worden Simulator evaluation ( CMS # 2 )

Irwin S-Band antenna deployment 1Schmitt S-Band antenna deployment 1

Irwin LMPS 4 30May-22 Worden Entry simulator (FOD) 1 30

Brand Entry simulator (FOD) 2 30Scott Scheduling meeting 30

Schmitt LMPS 2May-25 Scott Photo brief 2

Irwin Photo brief 2Gordon Photo brief 2Schmitt Photo brief 2Worden CSM / SCS briefing 2Brand Leave

Page 14: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

May-26 Scott LSM # 1 3 20Irwin LSM # 1 3 45

Gordon LSM # 1 3 5Schmitt LSM # 1 3 5Worden CMS # 1 7Brand Leave

May-27 Scott LSM # 1 1 55Irwin LSM # 1 1 35

Schmitt LSM # 1 5 55Worden CMS # 1 3Gordon suit fit @ILC 4

Irwin LMPS 3 30Brand Leave

May-28 Scott LSM # 1 4 15Irwin LSM # 1 4 30

Schmitt LSM # 1 2 55Worden CMS # 1 6Gordon PAOBrand LeaveScott Training schedule 1

May-29 All Memorial Day HolidayJun-01 All Crew meeting 30

Scott Field trip brief 1Irwin Field trip brief 1

Worden CSM / SCS briefing 235mm camera 1CMPS planning meeting 1

Irwin LMPS 4Gordon LSM # 1 1 40Schmitt LSM # 1 1 50Brand CMS # 1 3

CSM / Comm Brief 2 30Jun-02 Scott LSM # 1 2

Irwin LSM # 1 2 40Gordon LSM # 1 1 35Schmitt LSM # 1 1 35Worden CMS # 1 2 30Brand CMS # 1 3 30

Worden CSM / SPS brief 2 45Brand CSM / SPS brief 2 45

Schmitt CMS # 1 1 30Jun-03 Scott Geology field trip, B. Shark (sp?) 8

Irwin Geology field trip, B. Shark (sp?) 8Gordon Geology field trip, B. Shark (sp?) 8Schmitt Geology field trip, B. Shark (sp?) 8Worden CMS # 1 2Brand CMS # 1 4

Worden Orbital geology, H Masursky ( Masursky didn't show! )Brand Orbital geology, H Masursky ( Masursky didn't show! )

Jun-04 All Geology field trip to Flagstaff Arizona (crater processes) 8Jun-05 All Geology field trip to Flagstaff Arizona (crater processes) 5Jun-08 All CSM / Telecomm systems brief at NR 3 30

All CSM / Docking systems brief at NR 1 30Jun-09 All CSM / EPS systems brief at NR 4

Page 15: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

All CSM / SECS systems brief at NR 4Jun-10 All CSM / ECS systems brief at NR 3 30

All CSM / Propulsion systems brief at NR 4Jun-11 All CSM / G & C systems brief at NR 6 30Jun-12 All CSM / Crew System, systems brief at NR 30Jun-15 Scott LMS training mtg 30

Worden LMS training mtg 30Irwin LMS training mtg 30Irwin LMPS 4

Schmitt LMPS 4Brand suit fit @ILC 4

Jun-16 Scott LSM # 1 3 20Irwin LSM # 1 3 35

Gordon LSM # 1 3 15Schmitt LSM # 1 3 15Worden CMS # 1 3

Irwin CMS # 1 3 30Gordon CMS # 1 2Brand CMS # 1 4

Schmitt CMS # 1 4Worden Contingency EVA 2

Jun-17 Scott LSM # 1 1 5Irwin LSM # 1 3 20

Gordon LSM # 1 3 20Schmitt LSM # 1 3 35Brand CMS # 1 7

Gordon CMS # 1 2Schmitt CMS # 1 3 30Scott Geology meeting 2

Worden Orbital geology ( Masursky ) 4Jun-18 Scott LSM # 1 3 45

Irwin LSM # 1 3 45Gordon LSM # 1 3 30Schmitt LSM # 1 3 30Worden CMS # 1 2Brand CMS # 1 5 30Brand CMPS 2 30

Gordon LMPS 1Schmitt LMPS 1

Jun-19 Scott LLTVS 1Scott Trning & scheduling meeting 30

Worden PAOBrand Contingency EVA 2

Schmitt LMPS 3 30Jun-22 Scott LLTV - ( 1 Flt )

Scott Glove hand mould 1Irwin LMPS 4Brand CMPS tng [training] mtg 1

Schmitt PAO (Canada)Jun-23 Scott LSM # 1 6 35

Irwin LSM # 1 6 20Worden CMS # 1 3Brand CMS # 1 4

Schmitt PAOJun-24 Scott LSM # 1 3 15

Page 16: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Irwin LSM # 1 6Schmitt LSM # 1 3 25Worden CMS # 1 8Brand CMS # 1 4

Worden CMS # 2 ( simulator evaluation @ KSC )Jun-25 Scott CMS # 1 4

Irwin CMS # 1 3 30Brand CMS # 1 3

Schmitt CMS # 1 2 30Worden CMS # 2 ( simulator evaluation @ KSC )

Scott Trning & scheduling meeting 30Scott Science experiment brief 1 30Irwin Science experiment brief 1 30

Schmitt Science experiment brief 1 30Jun-26 Scott Geology documentation 2

Irwin Geology documentation 2Schmitt Geology documentation 2Worden CMS # 2 (simulator evaluation @ KSC)Schmitt Flight check

Jun-27 Scott CMS # 1 1 30Worden CMS # 1 1 30Gordon CMS # 1 2 30Brand CMS # 1 2 30

Schmitt CMS # 1 2 30Scott LSM # 1 2 15

Gordon LSM # 1 3 10Schmitt LSM # 1 3 10Brand CMPS 3 30

All Pilots' meeting 1Irwin Leave

Jun-30 Brand CMS # 1 5Schmitt LMS # 1 6 35

Irwin LeaveGordon PAOSchmitt LM / Comm brief 40

Jul-01 Scott PAOWorden Leave

Irwin LeaveGordon PAOBrand CMS # 1 7 15

Schmitt LMS # 1 6 10Schmitt LM / ECS brief 30Schmitt LM / EPS brief 30

Jul-02 No training scheduled todayJul-03 HolidayJul-06 Scott CMS # 1 2 15

Worden CMS # 1 3 15Irwin CMS # 1 3 15Brand CMS # 1 3 30

Schmitt LMS # 1 5 50Brand DCPS 1 30

Gordon PAOJul-07 Gordon LMS # 1 7 15

Schmitt LMS # 1 7 15Brand CMS # 1 7 30

Page 17: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Worden CSM / Comm brief 2 30Jul-08 Scott Flt. Data file mtg 3

Worden Flt. Data file mtg 3Irwin Flt. Data file mtg 3

Gordon Flt. Data file mtg 3Brand Flt. Data file mtg 3

Schmitt Flt. Data file mtg 3Scott Orbital geology ( Trask ) 3

Worden Orbital geology ( Trask ) 3Irwin Orbital geology ( Trask ) 3

Gordon Orbital geology ( Trask ) 3Brand Orbital geology ( Trask ) 3

Schmitt Orbital geology ( Trask ) 3Jul-09 Scott Trning & scheduling meeting 30

Scott Orbital geology ( Trask ) 2Worden Orbital geology ( Trask ) 2

Irwin Orbital geology ( Trask ) 2Gordon Orbital geology ( Trask ) 2Brand Orbital geology ( Trask ) 2

Schmitt Orbital geology ( Trask ) 2Scott Lunar sample documentation 1Irwin Lunar sample documentation 1

Gordon Lunar sample documentation 1Schmitt Lunar sample documentation 1

Jul-10 Scott LMS # 1 3 15Irwin LMS # 1 3 15

Schmitt LMS # 1 3 30Worden CMS # 1 3 45Brand CMS # 1 3 30

CSM /SGS - TVC brief ( not in 15 July rept )Gordon suit fit @ ILC 4

Irwin LMPS 3Jul-13 Scott LMS # 1 1 15

Irwin LMS # 1 2 55Gordon LMS # 1 2 20Schmitt LMS # 1 2 25Worden CMS # 1 2 30Brand CMS # 1 3 30Brand CSM / G & N brief 2 30Scott EMU exercise in Bldg 7 2Irwin EMU exercise in Bldg 7 2

Jul-14 Scott LMS # 1 2 40Irwin LMS # 1 3 20

Gordon LMS # 1 2 55Schmitt LMS # 1 2 20Brand CMS # 1 6 30

Schmitt CMS # 1 3 30Worden LeaveSchmitt Physical exam 1Scott Trning & scheduling meeting 30

Jul-15 All Geology field trip to Flagstaff, Arizona ( B. Sharp ) 8Jul-16 All Geology field trip to Flagstaff, Arizona ( B. Sharp ) 8Jul-17 All Geology field trip to Flagstaff, Arizona ( B. Sharp ) 4Jul-20 Scott LMS # 1 1 30

Irwin LMS # 1 3 30

Page 18: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Gordon LMS # 1 3 40Schmitt LMS # 1 3 45Gordon CMS # 1 4Schmitt CMS # 1 4Brand CMS # 1 8

Worden CMPS 1 40Jul-21 Scott CCB at NR, Calif 8

Irwin CCB at NR, Calif 8Gordon LMS # 1 4Schmitt LMS # 1 4Brand CMS # 1 3 30Brand CMPS 3 30Irwin LMPS 2

Jul-22 Scott Trning & scheduling meeting 30Scott LMS # 1 2Irwin LMS # 1 2

Worden CMS # 1 2 30All Half on geology field trip to Medicine Hat, Canada 4

Jul-23 All Geology field trip to Medicine Hat, Alberta, Canada (500 tonexplosion)

8

Jul-24 All Administration, orbital geology by Masursky cancelledJul-27 Scott LMS # 1 3

Irwin LMS # 1 3 25Gordon LMS # 1 3 15Schmitt LMS # 1 3 15Worden CMS # 1 3 30Brand CMS # 1 4

Gordon LMPS 1 45Schmitt LMPS 3 30Brand CMPS 3 30

Jul-28 Scott LMS # 1 4 30Irwin LMS # 1 4 40

Gordon LMS # 1 3 25Schmitt LMS # 1 3 25Worden CMS # 1 4 30Brand CMS # 1 3 30

Schmitt LMPS 4Irwin Glove mould for new suit 30

Jul-29 All Lunar pictures ( orbital geology ) 2Worden FOD simulator 2Gordon LMS # 1 3Schmitt LMS # 1 2 10Brand CMS # 1 4

Gordon LM / PGNS brief 35Schmitt LM / PGNS brief 15

Jul-30 Worden Rendz and braking briefing 2Brand Rendz and braking briefing 2

Worden Glove mould 30Irwin LMPS 3 30

Schmitt Glove mould 30Gordon PAO

Jul-31 Scott LeaveSchmitt LeaveGordon PAOBrand DCPS 1 45

Page 19: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Aug-03 Scott LeaveWorden Dentist

Irwin LeaveGordon Glove mould 30Schmitt TDY, Academy of Science Meeting

Aug-04 Scott LeaveIrwin Leave

Worden CMS # 1 4Brand CMS # 1 3 30

Gordon LeaveSchmitt TDY, Academy of Science Meeting

Aug-05 Scott LeaveIrwin Leave

Gordon LeaveWorden CMS # 1 4 30Brand CMS # 1 4Brand CMPS 4 15

Worden Flight checkSchmitt TDY, Academy of Science Meeting

Aug-06 Scott LeaveIrwin Leave

Gordon LeaveBrand CMS # 1 3 30

Worden Flight checkSchmitt LMS # 1 1 35

Aug-07 Scott LeaveWorden Leave

Irwin LeaveGordon LeaveBrand Administration

Schmitt AdministrationAug-10 Scott Leave

Gordon LeaveWorden CMS # 1 3 30Brand CMS # 1 3 30Irwin LMS # 1 3 10

Schmitt LMS # 1 3 20Aug-11 All Orbital geology brief ( Masursky ) 2

Worden MINKEY brief 3Brand MINKEY brief 3

Gordon LLTV brief 1Aug-12 All Orbital geology brief ( Masursky ) 3 30

Gordon LMS # 1 2 25Schmitt LMS # 1 1 30Brand CMS # 1 2 30

Gordon LLTV (tie down run) 15Aug-13 Scott LMS # 1 1 40

Irwin LMS # 1 4 5Schmitt LMS # 1 3 25Gordon PAO

Aug-14 Scott Trning & scheduling meeting 30Scott Data priority mtg 1

Worden Data priority mtg 3Irwin Data priority mtg 1

Gordon PAO

Page 20: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Irwin A7LB suit fit 1Irwin geology brief 1

Aug-17 All Pilots' meeting 1Scott LMS # 1 2 5Irwin LMS # 1 4 45

Gordon LMS # 1 2 40Brand CMS # 1 2 30

Worden CMPS 3Schmitt LeaveScott Rover mockup, suited 1Irwin Rover mockup, suited 1

Gordon Helicopter flyingAug-18 All Geology briefing ( El Baz ) 2

Scott Option 5 review for Apollo 14 2Worden Option 5 review for Apollo 14 2

Irwin Option 5 review for Apollo 14 2Brand CMPS 4

Gordon Helicopter flyingSchmitt Leave

Aug-19 Scott LMS # 1 2 55Irwin LMS # 1 3 30Scott SIMBAY brief 2

Worden SIMBAY brief 2Irwin SIMBAY brief 2Brand SIMBAY brief 2

Gordon Helicopter flyingSchmitt Leave

Aug-20 Scott LMS # 1 3 50Irwin LMS # 1 4 55

Gordon LMS # 1 3 25Worden CMS # 1 2Brand CMS # 1 3 30Scott A7LB suit fit 30Scott Trning & scheduling meeting 30Scott FOD lndg site brief 2

Gordon Helicopter flyingSchmitt LeaveBrand CMPS 4

Aug-21 All G & N brief on AOT 1All Geology brief ( Silver ) 1

Scott Rover mockup, suited 1Irwin Rover mockup, suited 1

Gordon Helicopter flyingBrand Leave

Schmitt LeaveWorden Leave

Aug-24 Scott LMS # 1 2 5Irwin LMS # 1 2 5

Gordon LMS # 1 1 30Schmitt LMS # 1 2 30Worden CMS # 1 3 30Brand CMS # 1 3 30Brand CMPS 4

Gordon LLTVS 1Gordon Helicopter flying

Aug-25 Scott LMS # 1 3 15

Page 21: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Irwin LMS # 1 2 45Schmitt LMS # 1 3 25Worden CMPS 2Gordon LLTV briefing 15Gordon LLTVS briefing 1 15Gordon Helicopter flyingBrand CM / SCS briefing

Schmitt Rover mockup, suited 3Scott Trning & scheduling meeting 1

Aug-26 Scott Geology field trip to San Juan Mtns, Colorado ( Silver ) 8Irwin Geology field trip to San Juan Mtns, Colorado ( Silver ) 8

Gordon Geology field trip to San Juan Mtns, Colorado ( Silver ) 8Schmitt Geology field trip to San Juan Mtns, Colorado ( Silver ) 8Brand CMS # 1Brand CMPSBrand CM / G&N flt. software mtg 2

Worden CM / G&N flt. software mtg 2Aug-27 Scott Geology field trip to San Juan Mtns, Colorado ( Silver ) 8

Irwin Geology field trip to San Juan Mtns, Colorado ( Silver ) 8Gordon Geology field trip to San Juan Mtns, Colorado ( Silver ) 8Schmitt Geology field trip to San Juan Mtns, Colorado ( Silver ) 8Worden CMPS 3Worden CM / G&N flt. software mtg 6Brand Geology flying trip to Big Bend County (flying observations) 6

Aug-28 Scott Geology field trip to San Juan Mtns, Colorado ( Silver ) 8Irwin Geology field trip to San Juan Mtns, Colorado ( Silver ) 8

Gordon Geology field trip to San Juan Mtns, Colorado ( Silver ) 8Schmitt Geology field trip to San Juan Mtns, Colorado ( Silver ) 8Worden CM / G&N - TLI cutoff 2

CM - 112 stowage review 2Brand Leave

Aug-31 Scott Data priority mtg 4Worden Data priority mtg 6

Irwin Data priority mtg 4Brand Data priority mtg 4

Schmitt Data priority mtg 4Scott LMS # 1 2 15Irwin LMS # 1 3 15

Gordon LMS # 1 2Schmitt LMS # 1 2Gordon Helicopter flying

All Pilots' meeting 1Sep-01 Scott LMS # 1 0 45

Irwin LMS # 1 3 25All Geology briefing ( Green ) 3 30

Scott Mission review 1Worden Mission review 3Gordon LLTV S 1Gordon Helicopter flyingSchmitt LMPS 3 30

Sep-02 Scott LMS # 1 2 20Irwin LMS # 1 3 15

Gordon LMS # 1 2 15Schmitt LMS # 1 2 15Brand CMPS 3 30Scott Glove mould 30

Page 22: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Irwin Geology brief ( Clanton ) 1Gordon Helicopter flyingScott Trning & scheduling meeting 30

Sep-03 Scott CEIT @ NR 4Worden CEIT @ NR 4Brand CEIT @ NR 4Irwin LMS #2 4 30

Schmitt LMS #2 4 30Gordon Helicopter flying

Sep-04 Scott Docking test 4Worden Docking test 4Brand Docking test 4Irwin LMS #2 4

Schmitt LMS #2 4Gordon Helicopter flying

Sep-07 All Labor Day ( Holiday )Sep-08 Scott EVA, WIF briefing 1

Worden EVA, WIF briefing 1Gordon EVA, WIF briefing 1Brand EVA, WIF briefing 1Scott Flight plan review 4

Worden Flight plan review 4Sep-09 All Geology field trip coordination meeting 1

Scott WIF ( SIMBAY ) 30Worden WIF ( SIMBAY ) 1 30Gordon WIF ( SIMBAY ) 1 30Brand WIF ( SIMBAY ) 1 30

Worden CMS # 1 1 30Brand CMS # 1 3

Gordon LMS # 1 2 35Schmitt LMS # 1 5 50Gordon Helicopter flyingScott FEAT @ GAEC 4Irwin FEAT @ GAEC 4

Sep-10 Scott FEAT @ GAEC 6Irwin FEAT @ GAEC 6Scott FMES @ GAEC 2Irwin FMES @ GAEC 2

Worden FOP mtg 4CMS # 1 1 30

Gordon LMS # 1 8 10Schmitt LMS # 1 8 10Brand Lunar Science Institute mtg 6

Sep-11 Scott Mission review 4Trning & scheduling meeting 30

Worden FOD entry simulator 2DCPS 1 45

Irwin FEAT @ GAEC 6Gordon LeaveBrand CMS # 1 3 30

FOD entry simulator 2Schmitt LMS # 1 6 20Brand SPS braking mtg 2

Sep-14 All Crew mtg 1 30Scott LMS # 1 1 30

Page 23: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Irwin LMS # 1 1 50Gordon LMS # 1 3 15Schmitt LMS # 1 3 15Scott CMS # 1 2 30

Worden CMS # 1 4Irwin CMS # 1 4

Gordon CMS # 1 2 30Brand CMS # 1 2 30

Schmitt CMS # 1 2 30Worden Probe & hatch mockup 2Brand Probe & hatch mockup 1 30

Sep-15 Scott LM-10 mockup 1Irwin LM-10 mockup 1

Gordon LM-10 mockup 1Schmitt LM-10 mockup 1Scott LMS # 1 2 10Irwin LMS # 1 2 10

Gordon LMS # 1 2 30Schmitt LMS # 1 4 15Worden CMS # 1 2 30Brand CMS # 1 4Scott Geology brief ( Clanton ) 1

Sep-16 Scott LRV briefing ( Can ) 1Irwin LRV briefing ( Can ) 1

Gordon LRV briefing ( Can ) 2Schmitt LRV briefing ( Can ) 2Scott ALSEP deployment ( shirtsleeve ) 3Irwin ALSEP deployment ( shirtsleeve ) 3

Gordon LMS # 1 1 35Schmitt LMS # 1 1 40

Note: CDRs & LMPs scheduled to leave at noon for geologyfield tripand CMPs scheduled to leave for NASA HQ for SIMBAY brief. Alldelayed until 1700 because of Hurricane Felice

Sep-17 Scott Geology field trip to Buel Park, Ariz ( Swann, Silver, Hait ) 10Irwin Geology field trip to Buel Park, Ariz ( Swann, Silver, Hait ) 10

Gordon Geology field trip to Buel Park, Ariz ( Swann, Silver, Hait ) 10Schmitt Geology field trip to Buel Park, Ariz ( Swann, Silver, Hait ) 10Worden SIMBAY brief at NASA HQ with El Baz 11Brand SIMBAY brief at NASA HQ with El Baz 11

Sep-18 Scott Geology field trip to Buel Park, Ariz ( Swann, Silver, Hait ) 10Irwin Geology field trip to Buel Park, Ariz ( Swann, Silver, Hait ) 10

Gordon Geology field trip to Buel Park, Ariz ( Swann, Silver, Hait ) 10Schmitt Geology field trip to Buel Park, Ariz ( Swann, Silver, Hait ) 10Worden PAOBrand Travel back from Washington DC

Sep-21 All Lunar samples 2Scott CMS # 1 40

Worden CMS # 1 2Irwin CMS # 1 2

Gordon CMS # 1 2Brand CMS # 1 2

Schmitt CMS # 1 2Scott LCRU & rover mockup 2Irwin LCRU & rover mockup ( suited ) 2

Page 24: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Worden Data priority mtg 3Sep-22 Scott CMS # 1 4 30

Worden CMS # 1 4 30Irwin CMS # 1 4 30

Gordon CMS # 1 4Brand CMS # 1 4

Schmitt CMS # 1 4Scott LMS # 1 2 5Irwin LMS # 1 3

Gordon ALSEP deployment 3Schmitt ALSEP deployment 3Brand LSI orbital PI brief 3

Geology ( Dietrich ) 1 30Sep-23 Scott Scheduling mtg 30

All Saturn V brief 4Worden LM lifeboat brief 2

Irwin LMPS 3Gordon LMS # 1 45Schmitt LMS # 1 3 10Brand CMS # 1 3 30

Sep-24 Scott NASA HQ - site selection board 8Worden NR @ Downey SIMBay 4

Irwin LMS # 1 3 25Brand CMS # 1 3 30

Schmitt CMS # 1 3 30Irwin Geology brief ( Clanton ) 1 30Brand 2TV-2 brief 2

Gordon SETP @ Los Angles 8Sep-25 Scott LMS #2 3 45

Irwin ALSEP deployment ( suited ) 3Schmitt LMPS 3Worden SETP @ Los Angles 8Gordon SETP @ Los Angles 8Brand SETP @ Los Angles 8

Sep-28 All Geology brief ( Ringwood ) 2Scott LMS # 1 1 40Irwin LMS # 1 1 40

Gordon LMS # 1 1 55Schmitt LMS # 1 1 55Worden CMS # 1 1 30Brand CMS # 1 2

Sep-29 All Crew team mtg 4Irwin LMS # 1 1 25

Schmitt LMS # 1 2 20Worden Flt. Plan reiview 2Brand CMS # 1 3 30

Gordon LMS # 1 3 45Sep-30 Scott Trning & scheduling meeting 30

Scott LMS # 1 2 5Irwin LMS # 1 3 20

Gordon LMS # 1 3 35Schmitt LMS # 1 3 50Worden CMS # 1 4 30Brand CMS # 1 3 45

Gordon ALSEP deployment ( shirtsleeve ) 2

Page 25: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Schmitt ALSEP deployment ( shirtsleeve ) 2Oct-01 Scott Descent C2F2 @ GAEC 2

Irwin Descent C2F2 @ GAEC 2Gordon Descent C2F2 @ GAEC 2Schmitt Descent C2F2 @ GAEC 2Worden CMS # 1 3 30Brand CMS # 1 3 30

Worden Camera brief 2Oct-02 Scott Descent C2F2 @ GAEC 2

Irwin Descent C2F2 @ GAEC 2Gordon Descent C2F2 @ GAEC 2Schmitt Descent C2F2 @ GAEC 2Worden CCB 7Brand Leave

Oct-05 All Pilots' meeting 1All SIMBAY ( Eury ) 2 30

Scott LMS # 1 2 20Irwin LMS # 1 2 20

Worden CMS # 1 2 35Gordon Stowage, LM-10 mockup 3Schmitt Stowage, LM-10 mockup 3Brand CMPS 3 30

Oct-06 Scott Trning & scheduling meeting 30Scott LMS # 1 1 20Irwin LMS # 1 1 20

Gordon LMS # 1 2 10Schmitt LMS # 1 3 30Brand CMS # 1 4Scott LM-10 mockup 3Irwin LM-10 mockup 3

Worden Gamma-mission requirements mtg 8Oct-07 Scott Geology field trip, Duluth, Minn. ( Phenney ) 4

Irwin Geology field trip, Duluth, Minn. ( Phenney ) 4Gordon Geology field trip, Duluth, Minn. ( Phenney ) 4Schmitt Geology field trip, Duluth, Minn. ( Phenney ) 4Worden CMS # 1 3 30Brand CMS # 1 3 30

Worden CM / EVA procedures 1 30Oct-08 Scott Geology field trip, Duluth, Minn. ( Phenney ) 8

Irwin Geology field trip, Duluth, Minn. ( Phenney ) 8Gordon Geology field trip, Duluth, Minn. ( Phenney ) 8Schmitt Geology field trip, Duluth, Minn. ( Phenney ) 8Worden SIMBAY brief 1 30Brand SIMBAY brief 1

Worden CMPS 2 30Brand CMPS 2 30

Oct-09 Scott Geology field trip, Duluth, Minn. ( Phenney ) 4Irwin Geology field trip, Duluth, Minn. ( Phenney ) 4

Gordon Geology field trip, Duluth, Minn. ( Phenney ) 4Schmitt Geology field trip, Duluth, Minn. ( Phenney ) 4Worden DCPS 1 20Brand DCPS 1 30Brand IMU alignment brief 3

Oct-12 All Lunar samples 2 30

Page 26: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Scott LMS # 1 3 20Irwin LMS # 1 3 20

Gordon LMS # 1 3 20Schmitt LMS # 1 3 20Worden CMS # 1 4 30Brand CMS # 1 4Scott DCPS 1 10

Oct-13 Scott Lunar drill 2Scott CM / EVA mtg 2

Worden CM / EVA mtg 2Gordon CM / EVA mtg 2Brand CM / EVA mtg 2

Worden CMS # 1 4 30Gordon Instrument check @ EAFB

Irwin -7 PLSS D13196 Windsor Locks 6Schmitt -7 PLSS D13196 Windsor Locks 6

Oct-14 Scott LMS # 1 2 25Worden CM / EPS briefing 2Brand CM / EPS briefing 3 15Irwin FMES @ GAEC 6

Schmitt FMES @ GAEC 6Brand CMPS 4

Gordon physical examScott Scheduling and tng mtg 30

Worden CMS # 1 2Brand CMS # 1 3 15

Oct-15 Scott Landing point meeting 7Worden SIMBAY brief 5Brand SIMBAY brief 5Irwin FMES @ GAEC 5

Schmitt FMES @ GAEC 5Worden Charge board 1Gordon Landing point meeting 7Worden checklist 1

Scott CMS # 1 1 55Worden CMS # 1 1 55

Irwin CMS # 1 1 55Gordon CMS # 1 2 20Brand CMS # 1 4 50

Schmitt CMS # 1 2 20Irwin LMS # 1 4 15

Schmitt LMS # 1 3 15Scott Charge board 2 30

Worden Charge board 2 30Scott Scheduling and tng mtg 15

Oct-17 Schmitt LRV systems and malfunctions 2Oct-19 Scott LMS # 1 3 5

Irwin LMS # 1 3 5Gordon LMS # 1 4 10Schmitt LMS # 1 4 10Worden CMS # 1 4 30Brand CMS # 1 4 30Irwin ALSEP deployment 2 30

Oct-20 Scott LMS # 1 3Irwin LMS # 1 45

Gordon LMS # 1 3 15

Page 27: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Schmitt LMS # 1 3 15Scott CMS # 1 4 30

Worden CMS # 1 4 30Irwin CMS # 1 4 30

Gordon CMS # 1 4 30Brand CMS # 1 4 30

Schmitt CMS # 1 4 30Worden CM / EVA - WIF 2

Irwin CM / EVA - WIF 2Oct-21 All Crew / team mtg 1 30

Scott Boeing mtg LRV 1Worden Boeing mtg LRV 1

Irwin Boeing mtg LRV 1Schmitt LRV review 2

Oct-22 Scott LMS # 1 2Irwin LMS # 1 2

Worden CMS # 1 3 30Brand CMS # 1 3 30

Worden CMPS 2Brand CMS W-matrix briefing 2 30

Schmitt CMS W-matrix briefing 2 30Scott Scheduling and tng mtg 30Irwin lunar surface drill 45

Oct-23 All Crew / team mtg 1 30Worden CM / EVA prep 2 30Brand CM / EVA prep 2 30

Oct-26 Scott LMS # 1 4 45Irwin LMS # 1 4 45

Gordon LMS # 1 3 45Schmitt LMS # 1 3 45Worden CMS # 1 5 30Brand CMS # 1 4 30

Worden FOD entry simulation 2Brand FOD entry simulation 1 30

Gordon A7LB suit fit 1Oct-27 LMS # 1 failed in LMS - MCCH simulation

Worden CMS # 1 4Brand CMS # 1 3 30Irwin PGNS / AGS brief 2Brand FOD simulation 2 30

Schmitt WIF checkout 2 30Oct-28 All PI briefing (soil mech., dust detection, heat flow) 3 30

Gordon LMS # 1 3 45Schmitt LMS # 1 3 40Brand CMS # 1 4

Worden Charge board 5Oct-29 Scott LMS # 1 3 50

Irwin LMS # 1 3 50Worden CMS # 1 3 30Gordon 1/6 g A/C ( 59 parab [parabolas] ) 2 20Schmitt 1/6 g A/C ( 59 parab ) 2 20Worden CM / EVA prep 2 30Brand CM / Comm brief 3Brand CMPS 3Scott Scheduling and tng mtg 2

Page 28: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Oct-30 Scott 1/6 g A/C ( 59 parab ) 2 25Irwin 1/6 g A/C ( 59 parab ) 2 25

Worden CM / SCS brief 3Brand CM / SCS brief 3

Schmitt PAONov-02 Scott Groves @ Flagstaff 4

Irwin Groves @ Flagstaff 4Gordon Groves @ Flagstaff 4Schmitt Groves @ Flagstaff 4Brand Pilots' meeting 1

Worden Pilots' meeting 1Worden CMPS 2Brand Mauer camera brief 1

Nov-03 Scott Groves @ Flagstaff 4Irwin Groves @ Flagstaff 4

Gordon Groves @ Flagstaff 4Schmitt Groves @ Flagstaff 4Worden Flight plan mtg 2Brand CMPS 30

Nov-04 Scott CMS # 1 4Worden CMS # 1 4

Irwin CMS # 1 4Gordon CMS # 1 4 30Brand CMS # 1 4 30

Schmitt CMS # 1 4 30Irwin LMS # 1 2 15

Nov-05 Scott Scheduling and tng mtg 30Irwin LMS # 1 3 35

Gordon LMS # 1 4Schmitt LMS # 1 4Worden CMS # 1 3 30Brand CMS # 1 4 15

Nov-06 Scott LMS # 1 2 25Irwin LMS # 1 3 45

Gordon LMS # 1 3 50Schmitt LMS # 1 3 45Worden CMS # 1 4Brand CMS # 1 3 40Brand WIF ( SIM bay ) 2

Schmitt WIF ( SIM bay ) 2Nov-07 Scott LMS # 1 3 5

Irwin LMS # 1 3 5Gordon LMS # 1 3 35Schmitt LMS # 1 3 35Worden CMS # 1 2Brand CMS # 1 3 30Scott Geophysics ( Brett ) 2 30

Worden Geophysics ( Brett ) 2 30Irwin Geophysics ( Brett ) 2 30

Nov-10 Scott LMS # 1 2 35Irwin LMS # 1 3 35

Gordon LMS # 1 3 20Schmitt LMS # 1 3 20

Irwin CMS # 1 3Schmitt CMS # 1 3Worden ME - 110 @ NR 6

Page 29: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Brand ME - 110 @ NR 6Nov-11 All Veterans' Day ( Holiday )

Worden ME - 110 @ NR 4 30Brand ME - 110 @ NR 2

Nov-12 Scott Mission review 7 30Worden Mission review 7

Irwin Mission review 7 30Irwin 1/6 g in centrifuge 1Scott Scheduling and tng mtg 30

Nov-13 Scott Suit fit at ILC 8Worden CMS # 1 1

Irwin LMS # 1 3 35Schmitt LMS # 1 3Gordon PAO @ Washington DCBrand Leave

Nov-16 Scott photo briefing ( lunar surface ) 1Irwin photo briefing ( lunar surface ) 1

Gordon photo briefing ( lunar surface ) 1Schmitt photo briefing ( lunar surface ) 1Scott LMS # 1 2 45Irwin LMS # 1 3

Gordon LMS # 1 3 30Schmitt LMS # 1 3 30

Irwin AOT on roof bldg IGA 1 30Brand Fuel cell brief 2

Nov-17 Scott PI briefing ( lunar surface ) 3 30Irwin PI briefing ( lunar surface ) 3 30

Gordon PI briefing ( lunar surface ) 3 30Schmitt PI briefing ( lunar surface ) 3 30Scott LM-10 rover mockup stowage 3Irwin LM-10 rover mockup stowage 3

Gordon LM-10 rover mockup stowage 3Schmitt LM-10 rover mockup stowage 3Brand CMS # 1 3 45

Worden CSM 112 testing @ NRScott Scheduling and tng mtg 30

Nov-18 Scott CSM 112 testing @ NRWorden CSM 112 testing @ NR

Irwin CSM 112 testing @ NRBrand CSM 112 testing @ NR

Schmitt LCRU malfunctions 2Nov-19 Scott Geology field trip, San Gabrial Mtns, Calif. ( Silver ) 10

Irwin Geology field trip, San Gabrial Mtns, Calif. ( Silver ) 10Gordon Geology field trip, San Gabrial Mtns, Calif. ( Silver ) 10Schmitt Geology field trip, San Gabrial Mtns, Calif. ( Silver ) 10Worden SC 112 testing @ NRBrand SC 112 testing @ NR

Nov-20 Scott Geology field trip, San Gabrial Mtns, Calif. ( Silver ) 10Irwin Geology field trip, San Gabrial Mtns, Calif. ( Silver ) 10

Gordon Geology field trip, San Gabrial Mtns, Calif. ( Silver ) 10Schmitt Geology field trip, San Gabrial Mtns, Calif. ( Silver ) 10Worden SC 112 testing @ NRBrand SC 112 testing @ NRBrand ME - 110 @ NR 3

Nov-23 All CEIT at NR 7

Page 30: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

All SC 112 testing @ NRNov-24 Scott 1 g rover trainer at Goleta 1

Irwin 1 g rover trainer at Goleta 1Gordon 1 g rover trainer at Goleta 1Schmitt 1 g rover trainer at Goleta 1Worden SC 112 testing @ NRBrand SC 112 testing @ NRBrand ME - 110 @ NR 2 30

Nov-25 Scott Planetarium 3Worden Planetarium 3

Irwin Planetarium 4Gordon Planetarium 4Brand Planetarium 4

Schmitt Planetarium 4Nov-26 All Thanksgiving Day ( holiday )Nov-30 Scott LM 10 mockup & rover stowage 3

Irwin LM 10 mockup & rover stowage 3Worden CMS # 1 4Brand CMS # 1 4

Note: LMS #1 down today - shut down for Thanksgivingweekend

Dec-04 Scott Data priority mtg 5Scott Suit fit at MSC

Worden ME - 110 @ NR 4Brand ME - 110 @ NR 3Irwin Lunar samples 2 30

Gordon Lunar samples 2 30Irwin LMS # 1 3 20

Gordon LMS # 1 3 20Schmitt LMS # 1 3 30

Dec-05 Scott Geology field trip to Hawaii ( Peck & Jackson ) 3Irwin Geology field trip to Hawaii ( Peck & Jackson ) 3

Gordon Geology field trip to Hawaii ( Peck & Jackson ) 3Schmitt Geology field trip to Hawaii ( Peck & Jackson ) 3

Dec-06 Scott Geology field trip to Hawaii ( Peck & Jackson ) 13Irwin Geology field trip to Hawaii ( Peck & Jackson ) 13

Gordon Geology field trip to Hawaii ( Peck & Jackson ) 13Schmitt Geology field trip to Hawaii ( Peck & Jackson ) 13

Dec-07 Scott Geology field trip to Hawaii ( Peck & Jackson ) 10Irwin Geology field trip to Hawaii ( Peck & Jackson ) 10

Gordon Geology field trip to Hawaii ( Peck & Jackson ) 10Schmitt Geology field trip to Hawaii ( Peck & Jackson ) 10

Dec-08 Scott Geology field trip to Hawaii ( Peck & Jackson ) 9Irwin Geology field trip to Hawaii ( Peck & Jackson ) 9

Gordon Geology field trip to Hawaii ( Peck & Jackson ) 9Schmitt Geology field trip to Hawaii ( Peck & Jackson ) 9Worden Menlo Park, Calif. 6Brand Menlo Park, Calif. 4

Dec-09 Scott Geology field trip to Hawaii ( Peck & Jackson ) off dayIrwin Geology field trip to Hawaii ( Peck & Jackson ) off day

Gordon Geology field trip to Hawaii ( Peck & Jackson ) off daySchmitt Geology field trip to Hawaii ( Peck & Jackson ) off dayWorden CMS # 1 2 30Brand CMS # 1 4Brand CMPS 2 30

Page 31: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Dec-10 Scott Geology field trip to Hawaii ( Peck & Jackson ) 9Irwin Geology field trip to Hawaii ( Peck & Jackson ) 9

Gordon Geology field trip to Hawaii ( Peck & Jackson ) 9Schmitt Geology field trip to Hawaii ( Peck & Jackson ) 9Worden Suit fit @ ILCBrand Suit fit @ ILCBrand CMS # 1 1 30

Dec-11 Scott Geology field trip to Hawaii ( Peck & Jackson ) 1 30Irwin Geology field trip to Hawaii ( Peck & Jackson ) 1 30

Gordon Geology field trip to Hawaii ( Peck & Jackson ) 1 30Schmitt Geology field trip to Hawaii ( Peck & Jackson ) 1 30

Dec-14 All Pilots' mtg 30Scott Lunar surface timeline 1

Worden Lunar surface timeline 1Irwin Lunar surface timeline 1Scott LMS # 1 1 50Irwin LMS # 1 2 50

Gordon LMS # 1 3 50Schmitt LMS # 1 3 50

Irwin CMS # 1 3 45Schmitt CMS # 1 2 30Scott Apollo 13 awardsBrand Apollo 13 awards

Schmitt Apollo 13 awardsWorden Suit fit @ MSC 30

Scott Scheduling and tng mtg 30Dec-15 Irwin Mission rules 1 30

Scott Zero g A/C (49 parab) 2 55Worden Zero g A/C (49 parab) 2 55

Irwin Zero g A/C (49 parab) 2 55Brand CMPS 3 30

Schmitt Suit fit @ ILCDec-16 Scott Apollo 15 mission review 8

Worden Apollo 15 mission review 8Irwin Apollo 15 mission review 8Brand Zero g A/C ( 49 parab ) 2 45

Schmitt Zero g A/C ( 49 parab ) 2 45Brand CM / SCS brief 2Brand Flt food 1

Dec-17 Scott LMS # 1 2 45Irwin LMS # 1 2 45

Gordon LMS # 1 2 40Schmitt LMS # 1 2 40Worden CMS # 1 3Brand CMS # 1 3Brand CMPS 3 30

Dec-18 Scott Zero g A/C ( 54 parab ) 3Irwin Zero g A/C ( 54 parab ) 3

Gordon LMS # 1 2 45Schmitt LMS # 1 2 45Worden CMS # 1 3Brand CMS # 1 3Scott Lndg site model PDR 30Irwin Lndg site model PDR 30Scott Flt food 1

Worden Flt food 1

Page 32: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Irwin Flt food 1Scott LMS # 1 1 40Irwin LMS # 1 2 25

Dec-28 All LeaveDec-29 All LeaveDec-30 All LeaveDec-31 All Leave

End of Year / End of Book # 1

Book # 2Apollo 15 Crew Training

1971Jan-01 Happy New YearJan-04 All Administrative

Gordon LLTV systems 4Scott Scheduling and tng mtg 1

Jan-05 All Lunar rocks 4Scott EVA # 1 ( shirtsleeve ) 3Irwin EVA # 1 ( shirtsleeve ) 3

Worden CM / EVA 4Gordon LMS # 1 2 30Schmitt LMS # 1 2 30Gordon LLTVS 1Brand CMS # 1 3 45

Jan-06 All Flt plan review 2Brand CM / SCS brief 2

Jan-07 Scott PAO mtg 2Worden PAO mtg 2

Irwin PAO mtg 2Brand CMS # 1 1Scott McDivitt mtg 1

Simulator power surges due to "ice" on transmission linesJan-08 Scott LMS # 1 2 25

Irwin LMS # 1 2 25Gordon LMS # 1 2 40Schmitt LMS # 1 2 45Worden CMS # 1 2Brand CMS # 1 3Scott Lunar surface timeline with ASPO 3

Worden Lunar surface timeline with ASPO 3Irwin Lunar surface timeline with ASPO 3Scott Camera brief 30Irwin Camera brief 30

Gordon Camera brief 30Schmitt Camera brief 30Brand CMPS review 30Scott Scheduling and tng mtg 30

Jan-11 Scott LMS # 1 3 10Irwin LMS # 1 2 10

Schmitt LMS # 1 3 25Scott Lunar science conference 3

Worden Lunar science conference 3

Page 33: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Irwin Lunar science conference 3Worden CMS # 1 2 30Gordon LLTV ( tie down ) 2Brand CMPS 5 30

Jan-12 Scott LMS # 1 4Irwin LMS # 1 4All EMU brief 3

Worden CMS # 1 4Gordon LLTVS 1Brand Lunar science conference 3

Jan-13 Scott ASPO lunar surface mtg 3 30Irwin ASPO lunar surface mtg 3 30

Worden CCBBrand CMS # 1 6Irwin 1 g rover 1

Gordon LMS # 1 2 50Schmitt LMS # 1 2 50Schmitt Lunar science conference 4Brand CM / EMS brief 1

Jan-14 All PI brief 2Scott CSD 11' alt chamber 4Irwin CSD 11' alt chamber 4

Gordon EVA pre & post ( suited ) 3Schmitt EVA pre & post ( suited ) 3Schmitt LMS # 1 1 40Scott Scheduling and tng mtg 30Brand CMS # 1 3 30

Jan-15 Scott AF academyWorden AF academy

Irwin AF academyGordon CSD 11' alt chamber 4Schmitt CSD 11' alt chamber 4Brand DCPS 1 55Brand CM / G & N brief 2

Gordon LLTV - 1 fltJan-18 Scott Geology field trip, Kilbourne Hole, N.M. ( Lofgren ) 8

Irwin Geology field trip, Kilbourne Hole, N.M. ( Lofgren ) 8Gordon Geology field trip, Kilbourne Hole, N.M. ( Lofgren ) 8Schmitt Geology field trip, Kilbourne Hole, N.M. ( Lofgren ) 8Worden DCPS 1 30Worden FOD entry simulator 2Brand FOD entry simulator 1 30Brand CM / G & N brief 2 30Brand CMPS 4

Jan-19 Scott LMS # 1Irwin LMS # 1

Schmitt LMS # 1Worden Geology fly over- El Paso 4 30Brand Geology fly over- El Paso 4 30Scott EVA pre & post 4Irwin EVA pre & post 4

Jan-20 Scott Lunar drill 1Scott 1 g rover 1

Worden CMS # 1 3 30Brand CMS # 1 3 45

Worden CMPS 3

Page 34: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Gordon LMS # 1 2 50Schmitt LMS # 1 2 50Brand CM / G & N brief (CMPS) 1 30

Jan-21 Scott CSD chamber run 6Irwin CSD chamber run 6Scott Photo ( Nikon vs Haselblad ) 30Irwin Photo ( Nikon vs Haselblad ) 30

Worden CMS # 1 3 15Brand CMS # 1 3 10

Worden MIN key brief 2Brand MIN key brief 2

Gordon LLTV - 1 flt 30Gordon LLTVS 3 15Gordon LMS # 1 3 15Schmitt LMS # 1 3 15Brand Fuel cell brief 2Scott Scheduling and tng mtg 1

Jan-22 Scott LMS # 1 2 45Irwin LMS # 1 3Scott Drill core stems 30Irwin Drill core stems 30Scott Adm @ NR

Worden Adm @ NRIrwin Adm @ NR

Worden CMS # 1 4 10Brand CMS # 1 3 30

Gordon CSD chamber run 6Schmitt CSD chamber run 6

Jan-25 Scott LMS # 1 2 35Irwin LMS # 1 3 5

Worden CMS # 1 3 15Brand CMS # 1 4

Worden DCPS 1 30Schmitt LRV malfunction 4Schmitt LRV 1 g trainer 1Gordon Dentist @ Lockland AFB

Jan-26 Scott LMS # 1 2 35Irwin LMS # 1 3 5

Jan-27 Scott LMS # 1 3 30Irwin LMS # 1 3 30

Gordon LMS # 1 2 50Schmitt LMS # 1 3 40Scott EVA # 1 ( shirtsleeve ) 4 30Irwin EVA # 1 ( shirtsleeve ) 4 30

Worden CMS # 1 3 30Brand CMS # 1 3 45

Worden CMPS 4Gordon LLTV - 1 fltBrand CM rescue book 2 30

Schmitt LRV 1 g trainer 30Jan-28 Scott Traverse brief 3 30

Irwin Traverse brief 3 30Schmitt Traverse brief 3 30Gordon LMS # 1 45Schmitt LMS # 1 2 25Worden CMPS / G & N brief 1 30

Page 35: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Worden FOD entry simulator 2Brand FOD entry simulator 2

Gordon LLTV - 3 fltsBrand CMPS 3Scott Scheduling and tng mtg

Jan-29 Gordon 1/ 6 g A/C @ KSC ( 57 parab ) 2 40Schmitt 1/ 6 g A/C @ KSC ( 57 parab ) 2 40

Jan-30 Scott 1/ 6 g A/C @ KSC ( 37 parab ) 2Irwin 1/ 6 g A/C @ KSC ( 37 parab ) 2

Jan-31 All Apollo 14 launchFeb-01 Worden CMS # 2 @ KSC

Brand CMS # 2 @ KSCScott LMS # 1 2 25Irwin LMS # 1 3

Schmitt LMS # 1 3Irwin Nikon picture eval 30Scott Nikon picture eval 30

Feb-02 Scott LMS # 1 3 30Irwin LMS # 1 3 30

Gordon LMS # 1 2 50Schmitt LMS # 1 2 50Worden CMPS 2 45Worden CMS # 1 3Brand CMS # 1 3 30

All Pilots' meeting 1Feb-03 All Geology briefing with Apollo 12 crew 2

Worden CMS # 1 2 30Brand CMS # 1 1Irwin LMS # 1 3 10Brand EPS contingency brief 1

Gordon EVA # 1 ( shirtsleeve ) 4Schmitt EVA # 1 ( shirtsleeve ) 4

Feb-04 Scott Geology briefing for Apollo 14 2Irwin Geology briefing for Apollo 14 2

Gordon Geology briefing for Apollo 14 2Schmitt Geology briefing for Apollo 14 2Brand FOD entry simulator 1 30

Worden Apollo 14 missionFeb-05 All Apollo 14 mission ( lunar surface activities )Feb-06 All Apollo 14 mission ( lunar surface activities )Feb-08 Scott Pilots' meeting 1 30

Irwin Pilots' meeting 1 30Gordon Pilots' meeting 1 30Schmitt Pilots' meeting 1 30Worden Docking test @ KSC 6Brand Docking test @ KSC 6Scott Lunar equipment management simulation ( EVA # 1 shirtsleeve

)4

Irwin Lunar equipment management simulation ( EVA # 1 shirtsleeve)

4

Gordon Lunar equipment management simulation ( EVA # 1 shirtsleeve)

4

Schmitt Lunar equipment management simulation ( EVA # 1 shirtsleeve)

4

Feb-09 Scott LMS # 1 2 25

Page 36: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Scott LRV 1 g trainer 45Worden CMS # 1 2 30Brand CMS # 1 45

Worden zero g A/C ( SIM bay ) 63 parab 2 50Irwin zero g A/C ( SIM bay ) 63 parab 2 50

Gordon LRV 1 g trainer 1 10Gordon LMS # 1 45Schmitt LMS # 1 45Schmitt Core tube meeting 1Scott Scheduling and tng mtg 30

Feb-10 Scott PAO ( pictures ) 1Worden PAO ( pictures ) 1

Irwin PAO ( pictures ) 1Scott Geology field trip - Ube Hebe craters, Calif. ( Roddy & Lofgren ) 2Irwin Geology field trip - Ube Hebe craters, Calif. ( Roddy & Lofgren ) 2

Gordon Geology field trip - Ube Hebe craters, Calif. ( Roddy & Lofgren ) 2Schmitt Geology field trip - Ube Hebe craters, Calif. ( Roddy & Lofgren ) 2Worden CMS # 1 3Gordon LMS # 1 1 15Brand zero g A/C ( SIM bay ) 58 parab 2 50

Schmitt zero g A/C ( SIM bay ) 58 parab 2 50Feb-11 Scott Geology field trip - Ube Hebe [Ubehebe] craters,

[Death Valley] Calif. ( Roddy & Lofgren )8

Irwin Geology field trip - Ube Hebe craters, Calif. ( Roddy & Lofgren ) 8Gordon Geology field trip - Ube Hebe craters, Calif. ( Roddy & Lofgren ) 8Schmitt Geology field trip - Ube Hebe craters, Calif. ( Roddy & Lofgren ) 8Worden Flt physicalWorden Orbital geology @ NASA HQ ( El Baz ) 1Brand Orbital geology @ NASA HQ ( El Baz ) 1Brand CMS # 1 3 15

Feb-12 Scott Geology field trip - Ube Hebe craters, Calif. ( Roddy & Lofgren ) 6Irwin Geology field trip - Ube Hebe craters, Calif. ( Roddy & Lofgren ) 6

Gordon Geology field trip - Ube Hebe craters, Calif. ( Roddy & Lofgren ) 6Schmitt Geology field trip - Ube Hebe craters, Calif. ( Roddy & Lofgren ) 6Worden Orbital geology @ NASA HQ ( El Baz ) 5Brand Orbital geology @ NASA HQ ( El Baz ) 5

Feb-15 All Holiday - George Washington's birthdayBrand Suit fit @ ILC

Feb-16 All Apollo 14 followon crew debriefing 8Feb-17 All Data priority mtg 6

Irwin LRV 1 g trainer 1Gordon LRV 1 g trainer 1Brand CSM / RCS brief 2

Feb-18 Scott Suit fit @ ILCIrwin Suit fit @ ILC

Worden Altitude chamber refresher course @ MSC 6Brand Altitude chamber refresher course @ MSC 6

Gordon LMS # 2 2 45Schmitt LMS # 2 3 40Gordon CMS # 3 3 20Schmitt CMS # 3 3 10Brand Dentist 1 30

Feb-19 Scott LMS # 2 3 35Irwin LMS # 2 3 35

Gordon LMS # 2 3 55

Page 37: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Schmitt LMS # 2 3 55Scott CMS # 3 2 55

Worden CMS # 3 3 25Irwin CMS # 3 3 20

Gordon CMS # 3 3Brand CMS # 3 3

Schmitt CMS # 3 3Feb-20 Scott Altitude chamber refresher course @ MSC 6

Irwin Altitude chamber refresher course @ MSC 6Gordon Altitude chamber refresher course @ MSC 6Schmitt Altitude chamber refresher course @ MSC 6

All Apollo 14 scientific debrief 3Worden Apollo 14 photo debrief 3Brand Apollo 14 photo debrief 3

Worden Physical 1Worden CSM alt chamber mtg 1Brand CSM alt chamber mtg 1

Feb-23 All Data priority mtg 8Worden Dentist

Feb-24 Scott Traverse briefing 2Irwin Traverse briefing 2

Gordon Traverse briefing 2Schmitt Traverse briefing 2

All Flt plan review 2 30Brand Dentist

Worden CSM / EVA 3Brand CSM / EVA 3

Feb-25 Scott LMS # 2 45Irwin LMS # 2 45

Gordon LMS # 2 3Schmitt LMS # 2 3Scott CMS # 3 2 45

Worden CMS # 3 2 45Irwin CMS # 3 2 45

Gordon CMS # 3 2 40Brand CMS # 3 3 25

Schmitt CMS # 3 2 40Worden Alt chamber mtg 3Brand Alt chamber mtg 3

Feb-26 Scott LMS # 2 4Gordon LMS # 2 3 30Schmitt LMS # 2 3 30Scott Suit fit @ ILC

Gordon CMS # 3 3 35Brand CMS # 3 3 35

Schmitt CMS # 3 3 35Feb-27 Worden Checklist mtg 5

Brand Checklist mtg 5Worden Instrument flight check

Mar-01 Scott Data priority mtg 8Worden Data priority mtg 3

Irwin Data priority mtg 8Gordon Data priority mtg 6Brand Data priority mtg 8

Schmitt Data priority mtg 8Worden CM / Cryo pump mtg 1

Page 38: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Worden Lunar maps 1Brand Lunar maps 1

Schmitt Lunar maps 1Gordon Gen. BogartWorden CM / ECOMM brief 2

Mar-02 Scott LM bench check 3Irwin LM bench check 3

Gordon LM bench check 3Schmitt LM bench check 3Worden CMS # 3 3 50Brand CMS # 3 3 15

All PI briefing (Dr. Hoffman) 1Scott EVA pre & post ( shirtsleeve ) 3Irwin EVA pre & post ( shirtsleeve ) 3

Gordon EVA pre & post ( shirtsleeve ) 3Schmitt EVA pre & post ( shirtsleeve ) 3

Mar-03 Scott EVA pre & post ( suited ) 3Irwin EVA pre & post ( suited ) 3Scott LMS # 2 3 10Irwin LMS # 2 3 30

Gordon LMS # 2 1 25Schmitt LMS # 2 3 15Worden CMS # 3 3 10Gordon CMS # 3 3 25Brand CMS # 3 3 25

Schmitt CMS # 3 3 25Brand CSM / G & N brief 3Scott Scheduling and tng mtg 30

Mar-04 Scott LMS # 2 1 20Irwin LMS # 2 1 45

Gordon LMS # 2 2 15Schmitt LMS # 2 2 15Scott CMS # 3 3 15

Worden CMS # 3 3 15Irwin CMS # 3 3 15Brand CMS # 3 3 40

Gordon EVA pre & post ( suited ) 5Schmitt EVA pre & post ( suited ) 5Brand CSM / G & N brief 1 15

Mar-05 Scott LMS # 2 3 25Irwin LMS # 2 3 25

Schmitt LMS # 2 4Scott CMS # 3 2 30

Worden CMS # 3 3Irwin CMS # 3 3Brand CMS # 3 3 30

Schmitt CMS # 3 3 30Gordon Suit fit @ ILCBrand CSM / G & N brief 1

Mar-06 Worden CM checklist 6Brand CM checklist 7

Mar-08 Scott Crew pictures 1Worden Crew pictures 1

Irwin Crew pictures 1All Data priority mtg 3

Gordon CSM / EVA 3 30

Page 39: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Brand CSM / EVA ( suited ) 3 30Schmitt CSM / EVA 3 30Worden Suit fit @ MSC 1Brand Suit fit @ MSC 1

Schmitt DentistWorden Solo book 2

Mar-09 Scott CSM / EVA 4Worden CSM / EVA ( suited ) 4

Irwin CSM / EVA 4All checklist review 3

Worden Orbital geology ( El Baz ) 3Brand Orbital geology ( El Baz ) 3

Worden Rescue book 1Brand Rescue book 1

Schmitt LCRU malfunction 1Irwin Dentist

Mar-10 All Orbital geology ( Wilhelms ) 3Scott Lunar maps 1Irwin Lunar maps 1

Gordon Lunar maps 1Schmitt Lunar maps 1Worden Solo book 1 30Brand Solo book 1 30Scott CSD suit mtg 1

Worden CSD suit mtg 1Irwin CSD suit mtg 1

Worden CSD chamber brief 2Brand CSD chamber brief 2Brand DentistScott Geology brief for field trip 1Irwin Geology brief for field trip 1

Gordon Geology brief for field trip 1Schmitt Geology brief for field trip 1

Mar-11 Scott Geology field trip, Rio Grande in N.M. ( Muehlberger & Silver ) 10Irwin Geology field trip, Rio Grande in N.M. ( Muehlberger & Silver ) 10

Gordon Geology field trip, Rio Grande in N.M. ( Muehlberger & Silver ) 10Schmitt Geology field trip, Rio Grande in N.M. ( Muehlberger & Silver ) 10Worden CMS # 3 2 30Brand CMS # 3 3 30

Mar-12 Scott Geology field trip, Rio Grande in N.M. ( Muehlberger & Silver ) 5Irwin Geology field trip, Rio Grande in N.M. ( Muehlberger & Silver ) 5

Gordon Geology field trip, Rio Grande in N.M. ( Muehlberger & Silver ) 5Schmitt Geology field trip, Rio Grande in N.M. ( Muehlberger & Silver ) 5Worden CMS # 3 4 10Brand CMS # 3 3 10

Mar-13 Worden checklist review 5Mar-14 Worden Bicycle for CSD chamber run 45

Brand Bicycle for CSD chamber run 45Mar-15 All CSM bench review 2 30

Scott Quad III inspection 1Irwin Quad III inspection 1Scott LMS # 2 4 45Irwin LMS # 2 4 45

Gordon LMS # 2 3 20Schmitt LMS # 2 3 20Worden CMS # 3 4 10

Page 40: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Worden CMS # 3 30Brand CMS # 3 3 15Scott Lunar surface tools 1Irwin Lunar surface tools 1

Gordon Lunar surface tools 1 30Schmitt Lunar surface tools 1 30

Mar-16 All Traverse planning 3 30Scott Unaided egress tng 2

Worden Unaided egress tng 2Irwin Unaided egress tng 2Scott LMS # 2 3 20Irwin LMS # 2 3 20

Gordon LMS # 2 3 25Schmitt LMS # 2 3 25Worden CMS # 3 4

Irwin CMS # 3 1Brand CSD chamber run @ MSC 4

Mar-17 Scott LMS # 2 3 30Irwin LMS # 2 3 30

Gordon LMS # 2 3 30Schmitt LMS # 2 3 30Gordon Unaided egress tng 2Brand Unaided egress tng 2

Schmitt Unaided egress tng 2Brand CMS # 3 2 45

Worden CSD chamber run @ MSC 4Scott Tng & scheduling mtg 30

Mar-18 All Orbital geology 3Scott EVA # 2 ( shirtsleeve ) 3Irwin EVA # 2 ( shirtsleeve ) 3Scott LM ascent C2F2 3Irwin LM ascent C2F2 3

Gordon LM ascent C2F2 3Schmitt LM ascent C2F2 3Scott LMS # 2 1 15Irwin LMS # 2 1 15

Gordon LMS # 2 4 30Schmitt LMS # 2 4 30Worden CMS # 3 3Brand CMS # 3 3 35Brand CM / Comm brief 1Brand CM / rescue brief 1

Mar-19 Scott LM sea level chamber run 7Irwin LM sea level chamber run 7

Gordon EVA # 2 ( shirtsleeve ) 4 30Schmitt EVA # 2 ( shirtsleeve ) 4 30Gordon LMS # 2 2 20Schmitt LMS # 2 2 20Worden CMS # 3 1 15Brand CMS # 3 5 40

Worden Mission review @ MSC 1 30Mar-20 Scott Meeting with McDivitt

Brand checklist review 7Irwin checklist review 4

Schmitt checklist review 4

Page 41: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Mar-22 Scott EVA # 1 ( shirtsleeve ) 4Irwin EVA # 1 ( shirtsleeve ) 4Scott LMS # 2 3 30Irwin LMS # 2 3 30

Worden CMS # 2 (program evaluation)Worden CMS # 3 3 40Brand CMS # 3 3 50

Gordon LM sea level chamber run 6Schmitt LM sea level chamber run 6

Mar-23 Scott LMS # 2 3 30Irwin LMS # 2 3 45

Gordon LMS # 2 3 45Schmitt LMS # 2 3 45Worden CMS # 3 3 15Brand CMS # 3 3 45

Mar-24 Scott LMS # 2 2 25Irwin LMS # 2 3 10

Gordon LMS # 2 3 20Schmitt LMS # 2 3 20Worden CMS # 3 3 40Brand CMS # 3 3 20Scott EVA # 1 # 1 4 30Irwin EVA # 1 # 1 4 30

Gordon Lunar maps 2Brand Lunar maps 2

Schmitt Lunar maps 2Scott Tng & scheduling mtg 30

Mar-25 All CSM C2F2 5Scott Lunar maps 3

Worden Lunar maps 3Irwin Lunar maps 3

Gordon LMS # 2 3 15Schmitt LMS # 2 3 15Brand CMS # 3 2 55

Mar-26 Scott CSM sea level chamber 5Worden CSM sea level chamber 5

Irwin CSM sea level chamber 5Scott LRV C2F2 2Irwin LRV C2F2 2

Gordon LRV C2F2 2Schmitt LRV C2F2 2Gordon LM altitude chamber brief 1Schmitt LM altitude chamber brief 1Gordon LMS # 2 2 30Schmitt LMS # 2 2 30Brand CMS # 3 6 50

Mar-29 Scott LMS # 2 3Irwin LMS # 2 3

Gordon LMS # 2 3 20Schmitt LMS # 2 3 20Worden Geology fly over So Calif 3Brand Geology fly over So Calif 3Scott CMS # 3 1 20Irwin CMS # 3 3 40

Mar-30 Scott LMS # 2 3 30

Page 42: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Irwin LMS # 2 3 30Scott CMS # 3 1 35

Worden CMS # 3 6 40Irwin CMS # 3 2 55Scott Talk to LM workers 1

Worden Talk to LM workers 1Irwin Talk to LM workers 1Scott EVA pre & post (suited slept in LM) 4 30Irwin EVA pre & post (suited slept in LM) 4 30

Gordon CSM sea level chamber 5Brand CSM sea level chamber 5

Schmitt CSM sea level chamber 5Mar-31 Scott EVA # 1 3 30

Irwin EVA # 1 3 30Scott LMS # 2 2 45Irwin LMS # 2 2 45

Worden CMS # 3 3 15Irwin CMS # 3 3 25Brand CSM / SCS-RCS briefing 2 30

Gordon LM altitude chamber run (aborted after 10hrs, Problem: O2regulator failure)

10

Schmitt LM altitude chamber run (aborted after 10hrs, Problem: O2regulator failure)

10

Apr-01 Scott Mission review @ Houston 7Worden Mission review @ Houston 7

Irwin Mission review @ Houston 7Scott PAO 3

Worden PAO 3Irwin PAO 3

Worden CM / EVA (mockup) - suited 4Schmitt LRV malfunction 3 30Brand CM / EVA (mockup) - suited 4Brand CSM / G & N brief ?Scott LM / PLSS commIrwin LM / PLSS comm

Apr-05 All Traverse brief 2 30Scott LMS # 2 2 30Irwin LMS # 2 3 30

Worden CMS # 3 3 30Gordon CSM altitude chamber run (aborted run due to oil in chamber) 1Brand CSM altitude chamber run (aborted run due to oil in chamber) 1

Schmitt CSM altitude chamber run (aborted run due to oil in chamber) 1Gordon LMS # 2 2 30Schmitt LMS # 2 2 30Scott CMS # 3 4Irwin CMS # 3 4Brand CSM / Tel Comm briefing 2 30

Apr-06 Scott LM altitude chamber 9Irwin LM altitude chamber 9

Gordon LMS # 2 3 45Schmitt LMS # 2 3 45Worden CMS # 3 3 50Brand CMS # 3 4 5

Gordon EVA # 1 3 30Schmitt EVA # 1 3 30Worden CSM Q cards 3 30Brand Program evaluator (CSM #2) 2

Page 43: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Apr-07 Scott Tng & scheduling mtg 1Scott LMS # 2 2 50Irwin LMS # 2 2 50Scott CMS # 3 1 5

Worden CMS # 3 3 45Irwin CMS # 3 3 45Brand CMS # 3 3 30Brand CSM / SECS briefing 2 15

Gordon LM altitude chamber 7Schmitt LM altitude chamber 7

Apr-08 Scott CSM altitude chamber 9Worden CSM altitude chamber 9

Irwin CSM altitude chamber 9Gordon LMS # 2 3 5Schmitt LMS # 2 3 5Gordon CMS # 3 3 10Brand CMS # 3 6 25

Schmitt CMS # 3 3 10Apr-09 Scott EVA # 2 & 3 ( suited ) 4

Irwin EVA # 2 & 3 ( suited ) 4Scott LMS # 2 2 30Irwin LMS # 2 2 30

Worden CSM / EVA 5Gordon CSM altitude chamber 7Brand CSM altitude chamber 7

Schmitt CSM altitude chamber 7Apr-10 Scott Bicycle test for CSD chamber at HOU 1

Irwin Bicycle test for CSD chamber at HOU 1All Geology brief 2

Scott LMS # 2 1 45Gordon LMS # 2 5 20Schmitt LMS # 2 3 35Scott CMS # 3 3 10

Worden CMS # 3 3 15Irwin CMS # 3 3 50Brand CMS # 3 3 15Brand CSM / EPS brief 1 10Irwin LM altitude chamber 2 30

Apr-13 Scott ALSEP CF2 4Irwin ALSEP CF2 4

Gordon ALSEP CF2 4Schmitt ALSEP CF2 4Scott EVA pre & post ( suited ) 2Irwin EVA pre & post ( suited ) 2

Worden CMS # 3 3 30Brand CMS # 3 1 50

Gordon LMS # 2 2Schmitt LMS # 2 2Brand Evaluator ( CMS # 2 ) 3

Worden Flight plan review 2Apr-14 All PI briefing 3

Scott CMS # 3 3Worden CMS # 3 1 40

Scott Flight plan review 4Irwin Flight plan review 4

Page 44: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Gordon Flight plan review 4Schmitt Flight plan review 4Worden Flight plan review 4Brand Flight plan review 4

Gordon LMS # 2 2 45Schmitt LMS # 2 2 45Worden Zero g A/C @ Patrick AFB ( SIM bay ) 97 parab 3 35

Irwin Zero g A/C @ Patrick AFB ( SIM bay ) 97 parab 3 35Brand SIM bay brief 2 30Scott Pep talk to 2nd & 3rd shift workers

Worden Pep talk to 2nd & 3rd shift workersIrwin Pep talk to 2nd & 3rd shift workers

Apr-15 Scott Tng & scheduling mtg 1Scott CMS # 3 2 30

Worden CMS # 3 2 35Irwin CMS # 3 2 50Brand CMS # 3 3 10Scott LMS # 2 3 30

Gordon LMS # 2 3Irwin LMS # 2 3 30

Gordon EVA pre & post, stand up 2Schmitt EVA pre & post, stand up 2Brand Zero g A/C @ Patrick AFB ( SIM bay ) 60 parab 2 20

Schmitt Zero g A/C @ Patrick AFB ( SIM bay ) 60 parab 2 20Apr-16 Scott LMS # 2 2

Irwin LMS # 2 2Gordon CMS # 3Worden CMS # 3Schmitt CMS # 3Brand CSM / EVA @ HOU 6Scott Geology brief ( Silver ) 2Irwin Geology brief ( Silver ) 2

Gordon Geology brief ( Silver ) 2Schmitt Geology brief ( Silver ) 2Worden Geology brief ( Silver ) 2

Apr-17 Parkes Display flight MESAScott 1 g LRV in 1/6 g simulation in Houston 1Irwin 1 g LRV in 1/6 g simulation in Houston 1

Gordon 1 g LRV in 1/6 g simulation in Houston 1Schmitt 1 g LRV in 1/6 g simulation in Houston 1

Apr-18 Scott LM descent CF2 2 30Irwin LM descent CF2 2 30Scott LM ∆ CF2 2 30Irwin LM ∆ CF2 2 30

Gordon LM ∆ CF2 2 30Schmitt LM ∆ CF2 2 30

Apr-19 Scott LMS # 2 2 55Irwin LMS # 2 3 20

Gordon LMS # 2 3 15Irwin AGS, radar brief 4

Schmitt AGS, radar brief 4Worden CMS # 3 3 10Brand CMS # 3 3 30Scott Apollo 14 geology results 3Irwin Apollo 14 geology results 3

Page 45: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Gordon Apollo 14 geology results 3Schmitt Apollo 14 geology results 3Worden Orbital geology brief 2Brand Orbital geology brief 4

Gordon LM descent CF2 2 30Schmitt LM descent CF2 2 30Brand Sim evaluator ( CSM # 2 )

Apr-20 Scott LMS # 2 3 10Irwin LMS # 2 3 20

Gordon LMS # 2 3 20Schmitt LMS # 2 3 20Scott CMS # 3 2 15Irwin CMS # 3 3 15

Gordon CMS # 3 3 50Brand CMS # 3 3 50

Schmitt CMS # 3 3 50Worden Orbital geology brief 2Worden SIM bay brief 2Worden TLI brief 1Brand CSM altitude chamber 3

Apr-21 Scott LMS # 2 3 10Irwin LMS # 2 3 20

Gordon LMS # 2 3 20Schmitt LMS # 2 3 20Brand CMS # 3 5 30Brand CMS # 3 40Scott LRV mission simulation 2Irwin LRV mission simulation 2

Gordon LRV mission simulation 2Schmitt LRV mission simulation 2Brand CSM / EVA @ KSC 6Scott Tng & scheduling mtg 1

Apr-22 Scott LMS # 2 3 35Irwin LMS # 2 3 35

Schmitt LMS # 2 3 25Scott CMS # 3 2Irwin CMS # 3 4

Gordon CMS # 3 3 45Brand CMS # 3 3 45

Schmitt CMS # 3 3 45Apr-23 Scott LMS # 2 3 20

Irwin LMS # 2 3 20Gordon LMS # 2 3 20Schmitt LMS # 2 3 20Scott CMS # 3 2 10

Worden CMS # 3 50Irwin CMS # 3 3 20

Gordon CMS # 3 3 15Brand CMS # 3 2 35

Schmitt CMS # 3 3 15Apr-24 Scott LLTVS 1 30Apr-26 Scott LMS # 2 6 50

Irwin LMS # 2 6 50Scott CMS # 3 50

Worden CMS # 3 3 15Gordon CMS # 3 3 10

Page 46: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Brand CMS # 3 3 20Scott AF pictures & interview

Worden AF pictures & interviewIrwin AF pictures & interview

Schmitt ALSEP deployment ( shirtsleeve ) 3Scott Traverse planning 3 30Irwin Traverse planning 3 30

Gordon Traverse planning 3 30Schmitt Traverse planning 3 30Brand CSM / SECS briefing 1 30

Gordon EVA pre & post ( suited ) 3 30Schmitt EVA pre & post ( suited ) 3 30

Apr-27 Scott Standup exercise in LMIrwin Standup exercise in LMScott EVA pre & post ( suited ) 3Irwin EVA pre & post ( suited ) 3

Worden CSM /EVA (CMS # 2) 6Gordon LMS # 2 7Schmitt LMS # 2 7Brand CMS # 3 6 45Brand CMS # 3 10Scott Traverse planning 3Irwin Traverse planning 3

Gordon Traverse planning 3Schmitt Traverse planning 3

Apr-28 Scott LLTV 1 15Scott Travel to China Lake for Geology tripIrwin Travel to China Lake for Geology trip

Gordon Travel to China Lake for Geology tripSchmitt Travel to China Lake for Geology tripWorden Geology fly over @ Cosa Hills, Calif 2Brand Geology fly over @ Cosa Hills, Calif ( Silver ) 2

Apr-29 All Geology field trip @ Cosco Hills, Calif ( Silver ) 7Apr-30 Scott Geology field trip @ Cosco Hills, Calif ( Silver ) 7

Irwin Geology field trip @ Cosco Hills, Calif ( Silver ) 7Gordon Geology field trip @ Cosco Hills, Calif ( Silver ) 7Schmitt Geology field trip @ Cosco Hills, Calif ( Silver ) 7Worden Flt plan review 2 30Worden Mission rules 1 30Worden CSM / EVA - WIF 2 30Brand CSM / EVA - WIF 2 30Brand Flt pan review 2 30Brand Mission rules 1 30

May-01 Scott LLTVS 1May-03 Scott Lunar rocks (Apollo 14) 3

Irwin Lunar rocks (Apollo 14) 3Gordon Lunar rocks (Apollo 14) 3Schmitt Lunar rocks (Apollo 14) 3Scott PI briefing ( Latham & Howard ) 2Irwin PI briefing ( Latham & Howard ) 2

Gordon PI briefing ( Latham & Howard ) 2Schmitt PI briefing ( Latham & Howard ) 2Brand Seconal test

Schmitt Seconal testBrand CSM / docking system 2

May-04 Scott LMS # 2 2 40

Page 47: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Irwin LMS # 2 30Gordon LMS # 2 3Schmitt LMS # 2 3Worden CMS # 3 2 55Gordon CMS # 3 2 55Brand CMS # 3 3 5

Schmitt CMS # 3 2 55Scott Booster walkdown in VAB

Worden Booster walkdown in VABIrwin Booster walkdown in VABIrwin PAO @ KSCScott PAO (HQ interview) & LRV pictures

Worden PAO (HQ interview) & LRV picturesIrwin PAO (HQ interview) & LRV picturesBrand CSM / EVA 4

May-05 Scott LMS # 2 6Irwin LMS # 2 5 45

Worden CMS # 3 2 40Gordon CMS # 3 3Worden CSM / EVA 3 30Brand G & N briefings @ MIT 10

Schmitt G & N briefings @ MIT 10May-06 All G & N briefings @ MIT 9May-07 All G & N briefings @ MIT 5May-08 Scott LLTV ( 3 flts )May-09 Scott LLTV ( 1 flt )May-10 All Pilots' briefing 1

Scott LLTV ( 2 flts )Scott Dentist

Worden CMS # 1 1Brand CMS # 3 7 30Scott WIF contingency transfer 2

Worden WIF contingency transfer 2Irwin WIF contingency transfer 2Scott LRV briefing 4Irwin LRV briefing 4

Gordon LRV briefing 4Schmitt LRV briefing 4Worden CSM / LM comm procedures 1

Irwin CSM / LM comm procedures 1Worden Ecomm - mission rules 2

Scott menu review 15Worden menu review 15

Irwin menu review 15Gordon LLTVS 1 30Gordon LLTV systems brief 1 30

May-11 Scott LMS # 2 2 45Irwin LMS # 2 3

Gordon LMS # 2 3 30Schmitt LMS # 2 3 30Worden CMS # 3 2 40Gordon CMS # 3 1 10Brand CMS # 3 1 10

Schmitt CMS # 3 1 10All Orbital geology 3

Scott Booster rollout

Page 48: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Worden Booster rolloutIrwin Booster rolloutScott EVA # 1 ( suited ) 5Irwin EVA # 1 ( suited ) 5Brand Rendezvous brief 2

May-12 Scott LMS # 2 - 1st SNS 5Irwin LMS # 2 - 1st SNS 5

Gordon LMS # 2 - 1st SNS 2 30Schmitt LMS # 2 - 1st SNS 2 30Scott LMS # 2 - 1st SNS 1 30Irwin LMS # 2 - 1st SNS 1 30

Gordon LMS # 2 - 1st SNS 1Schmitt LMS # 2 - 1st SNS 1Worden CMS # 3 - 1st SNS 5Worden CMS # 3 - 1st SNS 1 20

Scott ALSEP CF2 1Irwin ALSEP CF2 1

Gordon ALSEP CF2 1Schmitt ALSEP CF2 1

All ImmunizationScott Lunar maps 2

Worden Lunar maps 2Irwin Lunar maps 2Brand Lunar maps 2

Gordon EVA # 2 & 3 ( suited ) 4Schmitt EVA # 2 & 3 ( suited ) 4

May-13 Gordon LMS # 2 3Schmitt LMS # 2 3 15Scott CMS # 3 - SNS 3 40

Worden CMS # 3 - SNS 3 40Irwin CMS # 3 - SNS 3 40

Gordon CMS # 3 - SNS 5 15Gordon CMS # 3 - SNS 50Brand CMS # 3 - SNS 5 15Brand CMS # 3 - SNS 50

Schmitt CMS # 3 - SNS 5 15Schmitt CMS # 3 - SNS 50Scott EVA pre & post 3 30Irwin EVA pre & post 3 30

May-14 Scott CSD chamber @ HOU 7Irwin CSD chamber @ HOU 7

Worden Geology fly overs N. Calif. 2 30Brand Geology fly overs N. Calif. 2 30

Gordon EVA # 1 ( suited ) 4 30Schmitt EVA # 1 ( suited ) 4 30

May-15 Scott LLTV ( 3 flts )May-16 Gordon LLTV ( 3 flts )May-17 Scott EVA pre & post 3

Irwin EVA pre & post 3Scott LMS # 2 - SNS 3 45Irwin LMS # 2 - SNS 3 45

Gordon LMS # 2 - SNS 2 45Schmitt LMS # 2 - SNS 2 45Scott LMS # 2 - SNS 30Irwin LMS # 2 - SNS 30

Page 49: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Worden CMS # 3 - SNS 4 25Brand CMS # 3 - SNS 4 25

Worden CMS # 3 - SNS 30Brand CMS # 3 - SNS 50Brand LCG fit check

Schmitt LCG fit checkScott CMS # 3 1Irwin CMS # 3 1

Gordon CMS # 3 1 55Schmitt CMS # 3 1 55Scott CMS # 3 30Irwin CMS # 3 30

Gordon CMS # 3 50Schmitt CMS # 3 50

May-18 Scott LMS # 2 3 10Irwin LMS # 2 3 10

Gordon LMS # 2 3Schmitt LMS # 2 3Scott CMS # 3 3 5

Worden CMS # 3 3 5Irwin CMS # 3 3 5

Gordon CMS # 3 2 30Brand CMS # 3 3 30

Schmitt CMS # 3 3 30Worden Orbital geology ( Whitaker ) 1 30Brand Orbital geology ( Whitaker ) 1 30

May-19 Scott LLTV ( 2 flts )Scott Data priority 1Irwin Data priority 1Scott Lunar rocks 1 30Irwin Lunar rocks 1 30Scott LM food & menu 15Irwin LM food & menu 15

Worden CSM / EVA 6Gordon CSD chamber 5Schmitt CSD chamber 5Gordon LLTVS 45Brand CMS # 3 6 55

May-20 Scott Geology field trip, Nevada Test Site ( Roddy ) 7Irwin Geology field trip, Nevada Test Site ( Roddy ) 7

Gordon Geology field trip, Nevada Test Site ( Roddy ) 7Schmitt Geology field trip, Nevada Test Site ( Roddy ) 7Worden CMS # 3 6Brand CSM / EVA 6

May-21 Geology field trip cancelled due to blowing dust - all classroomtng

Scott Geology field trip, Nevada Test Site ( Roddy ) 5Irwin Geology field trip, Nevada Test Site ( Roddy ) 5

Gordon Geology field trip, Nevada Test Site ( Roddy ) 5Schmitt Geology field trip, Nevada Test Site ( Roddy ) 5Worden CMS # 3Worden mission rules 2Brand mission rules 2Brand Flight check @ Ellington AFB

May-23 Gordon LLTV ( 1 flt )May-24 Gordon LLTV ( 2 flts )

Page 50: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Scott LMS # 2 4Irwin LMS # 2 4Scott EVA # 2 & 3 ( suited ) 4 30Irwin EVA # 2 & 3 ( suited ) 4 30

Worden PAO @ NASA HQGordon Contingency transfer - WIF 2Brand Contingency transfer - WIF 2

Schmitt Contingency transfer - WIF 2Gordon Egress brief and tank egress tng 3Brand Egress brief and tank egress tng 3

Schmitt Egress brief and tank egress tng 3Brand Comm procedures 1 30

Schmitt Comm procedures 1 30May-25 Scott CMS # 3 3 50

Worden CMS # 3 3 50Irwin CMS # 3 3 50

Gordon CMS # 3 1 5Brand CMS # 3 2 45

Schmitt CMS # 3 1 5Scott LMS # 2 - SNS 3 15Irwin LMS # 2 - SNS 3 15

Gordon LMS # 2 - SNS 3 35Schmitt LMS # 2 - SNS 3 35Scott LMS # 2 - SNS 1 30Irwin LMS # 2 - SNS 1 30

Gordon LMS # 2 - SNS 30Schmitt LMS # 2 - SNS 30Scott Traverse brief ( Head ) 2 30Irwin Traverse brief ( Head ) 2 30

Gordon Traverse brief ( Head ) 2 30Schmitt Traverse brief ( Head ) 2 30Gordon 1/6 g A/C @ Patrick AFB ( 49 parab ) 2 25Schmitt 1/6 g A/C @ Patrick AFB ( 49 parab ) 2 25Worden Geology Brief ( El Baz ) 3Brand Geology Brief ( El Baz ) 3Irwin Core handle for ALSEP 1

May-26 Scott CMS # 3 50Worden CMS # 3 4 10

Irwin CMS # 3 50Gordon CMS # 3 - SNS 3 25Brand CMS # 3 - SNS 3 25

Schmitt CMS # 3 - SNS 3 25Gordon CMS # 3 - SNS 30Brand CMS # 3 - SNS 30

Schmitt CMS # 3 - SNS 30Scott LMS # 2 - SNS 4 35Irwin LMS # 2 - SNS 4 35

Gordon LMS # 2 - SNS 3 40Schmitt LMS # 2 - SNS 3 40Gordon LMS # 2 - SNS 1 10Schmitt LMS # 2 - SNS 1 10Scott 1/6 g A/C @ Patrick AFB ( 53 parab ) 2 50Irwin 1/6 g A/C @ Patrick AFB ( 53 parab ) 2 50Scott Traverse brief ( Head ) 2 30Irwin Traverse brief ( Head ) 2 30

Gordon Traverse brief ( Head ) 2 30Schmitt Traverse brief ( Head ) 2 30

Page 51: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Worden Geology Brief ( El Baz ) 5Brand Geology Brief ( El Baz ) 5

May-27 Scott Scheduling & tng mtg 30Scott LMS # 2 1 30Irwin LMS # 2 2 30

Gordon LMS # 2 2 25Schmitt LMS # 2 2 25Worden CMS # 3 - SNS 3Brand CMS # 3 - SNS 5

Worden CMS # 3 - SNS 50Brand CMS # 3 - SNS 50Scott EVA # 1 - SNS 4Irwin EVA # 1 - SNS 4

Gordon EVA # 1 - SNS 5Schmitt EVA # 1 - SNS 5Schmitt Suit fit @ KSC

May-28 Scott Self egress tng 4 30Worden Self egress tng 4 30

Irwin Self egress tng 4 30Gordon EVA # 2 & 3 3 30Schmitt EVA # 2 & 3 3 30Brand CMS # 3 3 25

May-31 All Memorial Day ( Holiday )Jun-01 All Fast moulds for bone demineralization medical experiment 30

Scott CMS # 3 3Worden CMS # 3 3

Irwin CMS # 3 3Gordon CMS # 3 2 55Brand CMS # 3 2 55

Schmitt CMS # 3 2 55Scott EVA prep & post 2 30Irwin EVA prep & post 2 30

Gordon LMS # 2 3 15Schmitt LMS # 2 3 15Brand Rendezvous brief 2

Jun-02 Scott CMS # 3 - SNS 4 45Worden CMS # 3 - SNS 4 45

Irwin CMS # 3 - SNS 4 45Gordon CMS # 3 - SNS 4 15Brand CMS # 3 - SNS 4 15

Schmitt CMS # 3 - SNS 4 15Scott CMS # 3 - SNS 45

Worden CMS # 3 - SNS 45Irwin CMS # 3 - SNS 45

Gordon CMS # 3 - SNS 40Brand CMS # 3 - SNS 40

Schmitt CMS # 3 - SNS 40Gordon EVA # 2 & 3 4 30Schmitt EVA # 2 & 3 4 30Gordon Pad & fire egress, Hyper II 2Brand Pad & fire egress, Hyper II 2

Schmitt Pad & fire egress, Hyper II 2Gordon LMS # 2 1 30Schmitt LMS # 2 1 30

Jun-03 Scott CMS # 3 - SNS 3 20Worden CMS # 3 - SNS 3 20

Page 52: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Irwin CMS # 3 - SNS 3 20Gordon CMS # 3 - SNS 4 15Brand CMS # 3 - SNS 4 15

Schmitt CMS # 3 - SNS 4 15Scott CMS # 3 - SNS 1

Worden CMS # 3 - SNS 1Irwin CMS # 3 - SNS 1

Gordon CMS # 3 - SNS 1Brand CMS # 3 - SNS 1

Schmitt CMS # 3 - SNS 1Irwin LMS # 2 1 55Scott Pad & fire egress, Hyper II 2

Worden Pad & fire egress, Hyper II 2Irwin Pad & fire egress, Hyper II 2

Gordon EVA prep & post 3Schmitt EVA prep & post 3Scott Tng & scheduling mtg 30

Jun-04 Scott LMS # 2 2 15Irwin LMS # 2 2 30

Gordon LMS # 2 3 15Schmitt LMS # 2 3 15Scott EVA # 1 5Irwin EVA # 1 5

Worden Geology fly over, Flagstaff Ariz 2 30Brand Geology fly over, Flagstaff Ariz 2 30

Schmitt CMS # 3 2 45Jun-05 Gordon LLTV ( 3 flts )

Worden Geology fly over, Flagstaff Ariz 2 30Brand Geology fly over, Flagstaff Ariz 2 30Scott CMS # 3 4

Worden CMS # 3 7 30Irwin CMS # 3 4Scott LMS # 2 4 25Irwin LMS # 2 4 25

Gordon LLTV ( 1 flt. - doesn't count )Gordon Gulf egress 3 30Brand Gulf egress 3 30

Schmitt Gulf egress 3 30Gordon Medical brief 2Brand Medical brief 2

Schmitt Medical brief 2Jun-08 Scott LMS # 2 1 50

Irwin LMS # 2 2 10Gordon LMS # 2 3Schmitt LMS # 2 3Scott CMS # 3 - SNS 5 10

Worden CMS # 3 - SNS 5 10Irwin CMS # 3 - SNS 5 10

Gordon CMS # 3 - SNS 4 40Brand CMS # 3 - SNS 4 50

Schmitt CMS # 3 - SNS 4 45Scott CMS # 3 - SNS 1 30

Worden CMS # 3 - SNS 1 30Irwin CMS # 3 - SNS 1 30

Gordon CMS # 3 - SNS 1 30Brand CMS # 3 - SNS 1 30

Schmitt CMS # 3 - SNS 1 30

Page 53: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Worden Dim light photo 4Brand Dim light photo 4Scott LM ascent bench check 1Irwin LM ascent bench check 1

Gordon LM ascent bench check 1Schmitt LM ascent bench check 1

Jun-09 Scott LMS # 2 2 10Irwin LMS # 2 2 10

Gordon LMS # 2 3 5Schmitt LMS # 2 3 5Worden CMS # 3 2 15Brand CMS # 3 3 45

Gordon CMS # 3 10Schmitt CMS # 3 10Scott EVA # 1 ( SNS ) no ALSEP 4Irwin EVA # 1 ( SNS ) no ALSEP 4

Gordon EVA # 2 ( SNS ) 4Schmitt EVA # 2 ( SNS ) 4Scott 1/6 wt LRV deployment 30Irwin 1/6 wt LRV deployment 30

Gordon 1/6 wt LRV deployment 30Schmitt 1/6 wt LRV deployment 30

All Orbital geology brief ( El Baz ) 3Jun-10 Scott Zero g A/C @ Patrick AFB ( 125 parab ) 3 15

Worden Zero g A/C @ Patrick AFB ( 125 parab ) 3 15Irwin Zero g A/C @ Patrick AFB ( 125 parab ) 3 15Scott LM mission sim 2Irwin LM mission sim 2Scott Crew pictures 1 30

Worden Crew pictures 1 30Irwin Crew pictures 1 30Scott Traverse brief ( Swann ) 3Irwin Traverse brief ( Swann ) 3

Gordon Traverse brief ( Swann ) 3Schmitt Traverse brief ( Swann ) 3Worden Orbital geology brief ( El Baz ) 3Brand Orbital geology brief ( El Baz ) 3

Gordon LMS # 2 2 50Schmitt LMS # 2 2 50Gordon CMS # 3 3 15Brand CMS # 3 6 20

Schmitt CMS # 3 3 15Gordon 1/6 wt LRV deployment 30Schmitt 1/6 wt LRV deployment 30

Jun-11 Scott LMS # 2 - SNS 3Irwin LMS # 2 - SNS 3

Gordon LMS # 2 - SNS 2 25Schmitt LMS # 2 - SNS 2 25Gordon LMS # 2 - SNS 55Schmitt LMS # 2 - SNS 55Scott LMS # 2 - SNS 30Irwin LMS # 2 - SNS 30

Worden CMS # 3 5 5Brand CMS # 3 3 5

Worden CMS # 3 1 15Brand CMS # 3 40Brand Zero g A/C @ Patrick AFB ( 71 parab ) 2 15

Page 54: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Scott LLTVS 30Gordon EVA # 1 3 30Schmitt EVA # 1 3 30Scott CMS # 3 1 50Irwin CMS # 3 1 50

Gordon CMS # 3 1 45Schmitt CMS # 3 1 45Scott CMS # 3 1 15Irwin CMS # 3 1 15

Gordon CMS # 3 40Schmitt CMS # 3 40

Jun-12 Scott LLTV ( 2 flts )Gordon LLTV ( 1 Flt )

Jun-14 Scott LM C2F2 2Irwin LM C2F2 2

Gordon LM C2F2 2Schmitt LM C2F2 2Scott LMS # 2 1 20Irwin LMS # 2 1 20

Schmitt LMS # 2 ( suited ) 1 45Scott EVA prep & post 3Irwin EVA prep & post 3

Gordon LLTV ( 2 flts )Schmitt CMS # 3 3 30Worden CM / EVA - WIF 1 15Brand CM / EVA - WIF 1 15

Worden Tunnel mockup 2 30Brand Tunnel mockup 4Brand medical

Worden Gamma spectrometer 45Jun-15 Scott LMS # 2 3 20

Irwin LMS # 2 3 20Scott CSM FRT 1 30

Worden CSM FRT 1 30Irwin CSM FRT 1 30

Gordon CMS # 3 3 15Brand CMS # 3 3 15

Gordon 1/6 wt LRV deployment 30Schmitt 1/6 wt LRV deployment 30Gordon EVA prep & post 3Schmitt EVA prep & post 3Brand CSM FRT 2Scott CMS # 3 1 15

Worden CMS # 3 1 30Irwin CMS # 3 1 40

Jun-16 Scott LMS # 2 - SNS 5Irwin LMS # 2 - SNS 5

Gordon LMS # 2 - SNS 5Schmitt LMS # 2 - SNS 5Gordon LMS # 2 - SNS 1 15Schmitt LMS # 2 - SNS 1 15Worden CMS # 3 - SNS 4 5Brand CMS # 3 - SNS 3 5

Worden CMS # 3 - SNS 1 15Brand CMS # 3 - SNS 40

All Flight plan review 2 30

Page 55: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Worden CM / EVA 3 30Gordon SIM bay brief 1 45Schmitt SIM bay brief 1 45Brand CM / EVA 4

Gordon 1/6 wt LRV deployment 30Schmitt 1/6 wt LRV deployment 30

Irwin LM emergency launch brief 30Schmitt LM emergency launch brief 30Scott Tng & scheduling mtg 30

Jun-17 Scott LM bench review 3Irwin LM bench review 3

Gordon LM bench review 3Schmitt LM bench review 3Scott CMS # 3 - SNS 3 50

Worden CMS # 3 - SNS 3 50Irwin CMS # 3 - SNS 3 50

Gordon CMS # 3 - SNS 4 20Brand CMS # 3 - SNS 4 20

Schmitt CMS # 3 - SNS 4 20Scott CMS # 3 - SNS 35

Worden CMS # 3 - SNS 35Irwin CMS # 3 - SNS 35

Gordon CMS # 3 - SNS 1 10Brand CMS # 3 - SNS 1 10

Schmitt CMS # 3 - SNS 1 10Worden SIM bay @ Pad 1Brand SIM bay @ Pad 1

Gordon 1/6 wt LRV deployment 30Schmitt 1/6 wt LRV deployment 30Brand CSM G & N briefing 1 30

Jun-18 All Mission rules 4Scott PAO 3

Worden PAO 3Irwin PAO 3Scott medical briefing 2

Worden medical briefing 2Irwin medical briefing 2

Gordon LLTV ( 2 flts )Gordon LLTVS 30Gordon Lunar rocks 2Schmitt Lunar rocks 2Brand Tunnel mockup 3

Gordon DCPS 1 40Brand DCPS 1 40

Schmitt DCPS 1 40Jun-19 Scott PAO 4

Worden PAO 4Irwin PAO 4Brand Camera brief 2 30

Jun-21 Scott EVA # 1 - SNS 4Irwin EVA # 1 - SNS 4

Gordon EVA # 1 - SNS 3 15Schmitt EVA # 1 - SNS 3 15Scott LMS # 2 1 30Irwin LMS # 2 3 10

Gordon LMS # 2 2 25Schmitt LMS # 2 2 45

Page 56: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Scott Traverse briefing ( Head & Swann ) 3Irwin Traverse briefing ( Head & Swann ) 3

Gordon Traverse briefing ( Head & Swann ) 3Schmitt Traverse briefing ( Head & Swann ) 3Worden CMS # 3 - SNS 5 30Brand CMS # 3 - SNS 3 10

Worden CMS # 3 - SNS 40Brand CMS # 3 - SNS 40

Worden Camera brief ( 35mm ) 1 30Jun-22 Scott CSM /FRT 3

Worden CSM /FRT 3Irwin CSM /FRT 4Brand CSM /FRT 4Scott Qual unit LRV deployment 1Irwin Qual unit LRV deployment 1

Gordon Qual unit LRV deployment 1Schmitt Qual unit LRV deployment 1Worden UV photo brief 2

Irwin UV photo brief 2Brand UV photo brief 2

Schmitt UV photo brief 2Scoo CMS # 3 2 20

Worden CMS # 3 2 55Irwin CMS # 3 2 55

Gordon CMS # 3 3 40Brand CMS # 3 3 40

Schmitt CMS # 3 3 40Scott Traverse briefing ( Head & Swann ) 3Irwin Traverse briefing ( Head & Swann ) 3

Gordon Traverse briefing ( Head & Swann ) 3Schmitt Traverse briefing ( Head & Swann ) 3Brand CM / EVA 4

Gordon LMS # 2 3 40Schmitt LMS # 2 2 55

Jun-23 Scott LMS # 2 - SNS 5 15Irwin LMS # 2 - SNS 5 15

Gordon LMS # 2 - SNS 3 30Schmitt LMS # 2 - SNS 3 30Gordon LMS # 2 - SNS 1 30Schmitt LMS # 2 - SNS 1 30Worden CMS # 3 - SNS 5Brand CMS # 3 - SNS 3 40Brand CMS # 3 - SNS 1 25Scott Cuff checklist 2Irwin Cuff checklist 2

Worden CM / EVA 4Brand Zero g A/C @ Patrick AFB, SIMBAY ( 69 parab ) 2 35

Schmitt Zero g A/C @ Patrick AFB, SIMBAY ( 69 parab ) 2 35Gordon Qual unit LRV deployment 1Schmitt Qual unit LRV deployment 1

All Dinner with Drs Fletcher & LoweJun-24 Scott Tng & scheduling mtg 30

Scott CMS # 3 - SNS 4 35Worden CMS # 3 - SNS 4 40

Irwin CMS # 3 - SNS 4 35Gordon CMS # 3 - SNS 3 20Brand CMS # 3 - SNS 3 20

Page 57: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Schmitt CMS # 3 - SNS 3 20Scott CMS # 3 - SNS 40

Worden CMS # 3 - SNS 40Irwin CMS # 3 - SNS 40

Gordon CMS # 3 - SNS 1Brand CMS # 3 - SNS 1

Schmitt CMS # 3 - SNS 1Scott LMS # 2 1 40Irwin LMS # 2 1 40

Gordon LMS # 2 2 40Schmitt LMS # 2 2 40Scott Qual unit LRV deployment 1Irwin Qual unit LRV deployment 1

Gordon Qual unit LRV deployment 1Schmitt Qual unit LRV deployment 1Worden Orbital geology brief ( El Baz ) 5 30Brand Orbital geology brief ( El Baz ) 5 30

Jun-25 Scott Geology field trip, Flagstaff, Ariz ( Swann ) - SNS, Voice 8Irwin Geology field trip, Flagstaff, Ariz ( Swann ) - SNS, Voice 8

Gordon Geology field trip, Flagstaff, Ariz ( Swann ) - SNS, Voice 8Schmitt Geology field trip, Flagstaff, Ariz ( Swann ) - SNS, Voice 8Worden CMS # 3 1 50Brand CMS # 3 3 5

Worden Zero g A/C @ Patrick AFB, SIMBAY ( 53 parab ) 1 50Brand medical ( exam ) 1

Jun-26 Scott Field trip debriefing 3Irwin Field trip debriefing 3

Gordon Field trip debriefing 3Schmitt Field trip debriefing 3Gordon LLTV ( 4 flts only 3 sims )Gordon Gamma spectrometer 45Brand Gamma spectrometer 45

Schmitt Gamma spectrometer 45Scott LLTVS 45

Jun-28 Scott LLTV ( 2 flts )Scott Lunar rocks ( Lofgren ) 1Irwin Lunar rocks ( Lofgren ) 1Scott DCPS 1 30Irwin DCPS 1 30Scott Gamma spectrometer 45Irwin Gamma spectrometer 45

Gordon F-30 physical 4Brand F-30 physical 4

Schmitt F-30 physical 4Worden CMS #3 6 20Brand CSM / EPS & cyro 3 45

Gordon EVA prep & post 3Schmitt EVA prep & post 3

Jun-29 Scott F-30 physical 4Worden F-30 physical 4

Irwin F-30 physical 4Scott LMS # 2 - SNS 3 45Irwin LMS # 2 - SNS 3 45

Gordon LMS # 2 - SNS 4 15Schmitt LMS # 2 - SNS 4 15Worden CMS #3 3 10Brand CMS #3 3 50

Page 58: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Brand Rendezvous brief ( CMS # 2 ) 2Worden Voice tape for MFAGordon Zero g A/C @ Patrick AFB, SIMBAY ( 61 parab ) 2 30Schmitt Zero g A/C @ Patrick AFB, SIMBAY ( 61 parab ) 2 30

Irwin 1/6 g A/C @ Patrick AFB, SIMBAY ( 61 parab ) 2 30Scott EMU C2F2 2Irwin EMU C2F2 2

Jun-30 Scott LMS # 2 - SNS 3 50Irwin LMS # 2 - SNS 4 5

Gordon LMS # 2 - SNS 5 15Schmitt LMS # 2 - SNS 5 15Scott LMS # 2 - SNS 1 5Irwin LMS # 2 - SNS 1 5Scott Voice tape for MFAIrwin Voice tape for MFAScott Zero g A/C @ Patrick AFB, SIMBAY ( 56 parab ) 2

Worden CSD chamber 7Gordon EVA # 2 & 3 3Schmitt EVA # 2 & 3 3Brand CMS #3 7 50Irwin 1/6 g A/C @ Patrick AFB, SIMBAY ( 56 parab ) 2

Worden SIM bay thermal brief 45Jul-01 Scott CMS # 3 - SNS 3 55

Worden CMS # 3 - SNS 5 35Irwin CMS # 3 - SNS 5 35

Gordon CMS # 3 - SNS 4 30Brand CMS # 3 - SNS 4 30

Schmitt CMS # 3 - SNS 4 30Worden CMS # 3 - SNS 40

Irwin CMS # 3 - SNS 40Gordon CMS # 3 - SNS 30Brand CMS # 3 - SNS 30

Schmitt CMS # 3 - SNS 30Scott EVA # 1 4Irwin EVA # 1 4

Gordon CM - LM EVT 2 30Brand CM - LM EVT 2 30

Schmitt CM - LM EVT 2 30Worden Orbital geology brief ( El Baz ) 2Brand Orbital geology brief ( El Baz ) 4

Gordon Orbital geology brief ( El Baz ) 4Schmitt Orbital geology brief ( El Baz ) 4

Jul-02 Scott LLTV ( 3 flts. Only 2 count )Scott DCPS 1 40

Worden CMS #3 2 30Gordon CMS #3 1 55Schmitt CMS #3 1 55

Irwin CMS #3 3 45Irwin LMS # 2 3 30

Gordon LMS # 2 3 45Schmitt LMS # 2 3 45Brand CSD chamber 7Brand Entry simulator 2Brand Water glycol contamination test 30Brand SIM bay thermal brief 45

Gordon LRV simulator 2

Page 59: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Schmitt LRV simulator 2Jul-05 All 4th of July HolidayJul-06 Scott Traverse planning 3

Irwin Traverse planning 3Gordon CMS #3 3 35Brand CMS #3 7 25

Schmitt CMS #3 3 35Scott LMS # 2 2 5Irwin LMS # 2 3 15

Gordon LMS # 2 5Schmitt LMS # 2 5Scott CM / EVA ( suited ) 4

Worden CM / EVA ( suited ) 4Irwin CM / EVA ( suited ) 4

Worden EMU CF2 1 30Gordon Traverse planning 3Schmitt Traverse planning 3

Jul-07 All Orbital geology brief ( El Baz ) 2 30Scott LMS # 2 - SNS 4 15Irwin LMS # 2 - SNS 4 15

Gordon LMS # 2 - SNS 3Schmitt LMS # 2 - SNS 3Scott LMS # 2 - SNS 1 30Irwin LMS # 2 - SNS 1 30

Gordon LMS # 2 - SNS 1Schmitt LMS # 2 - SNS 1Scott CM - LM - LM transfer 3

Worden CM - LM - LM transfer 2Irwin CM - LM - LM transfer 3

Worden CMS # 3 - SNS 3 45Brand CMS # 3 - SNS 2 55

Worden CMS # 3 - SNS 1 30Brand CMS # 3 - SNS 1 15

Gordon EVA #2 & 3 ( shirtsleeve ) 4Schmitt EVA #2 & 3 ( shirtsleeve ) 4Brand CM / EVA ( suited ) 4Scott Tng & scheduling mtg 30

Jul-08 Scott CMS # 3 - SNS 4 5Worden CMS # 3 - SNS 4 5

Irwin CMS # 3 - SNS 4 5Gordon CMS # 3 - SNS 4 55Brand CMS # 3 - SNS 4 55

Schmitt CMS # 3 - SNS 4 55Scott CMS # 3 - SNS 30

Worden CMS # 3 - SNS 30Irwin CMS # 3 - SNS 30

Gordon CMS # 3 - SNS 30Brand CMS # 3 - SNS 30

Schmitt CMS # 3 - SNS 30Scott LMS # 2 3 50Irwin LMS # 2 3 50

Gordon LMS # 2 4Schmitt LMS # 2 4Worden CMS # 2 1 10Brand CMS # 2 1

Worden CM - LM - LM transfer 1

Page 60: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Jul-09 Scott LMS # 2 - SNS 3 10Irwin LMS # 2 - SNS 3 45

Gordon LMS # 2 - SNS 3 10Schmitt LMS # 2 - SNS 3 10Scott EVA # 1 - SNS 3 30Irwin EVA # 1 - SNS 3 30

Gordon EVA # 1 - SNS ( no ALSEP ) 4 30Schmitt EVA # 1 - SNS ( no ALSEP ) 4 30Worden CMS # 3 2 50Brand CMS # 3 4 35

Worden CM / EVA 3 30Scott CMS # 3 50

Jul-10 Scott CM bench review 2Worden CM bench review 2

Irwin CM bench review 2Gordon CM bench review 2Brand CM bench review 2

Schmitt CM bench review 2All (exceptGordon)

Fly T-38's @ Patrick AFB

Jul-11 Scott Fly T-38's @ Patrick AFBIrwin Fly T-38's @ Patrick AFB

Gordon Fly T-38's @ Patrick AFBJul-12 Scott CMS # 3 3 15

Worden CMS # 3 3 15Irwin CMS # 3 3 15

Gordon CMS # 3 3 55Brand CMS # 3 3 55

Schmitt CMS # 3 3 55Scott CM - LM - LM transfer ( suited ) 1 30

Worden CM - LM - LM transfer ( suited ) 1 30Irwin CM - LM - LM transfer ( suited ) 1 30Scott LMS # 2 2Irwin LMS # 2 2

Gordon EVA # 1 ( shirtsleeve ) 4Schmitt EVA # 1 ( shirtsleeve ) 4

Jul-13 Scott F-15 physical 4Worden F-15 physical 4

Irwin F-15 physical 4Scott EVA prep & post 3 30Irwin EVA prep & post 3 30

Worden CMS # 3 4 20Gordon CMS # 3 3 35Brand CMS # 3 3 35

Schmitt CMS # 3 3 35Gordon LMS # 2 4Schmitt LMS # 2 4Brand CMS # 2 3

Jul-14 Scott CDDT 5 30Worden CDDT 5 30

Irwin CDDT 5 30Scott CSM C2F2 2

Worden CSM C2F2 2Irwin CSM C2F2 2

Gordon CSM C2F2 2

Page 61: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Brand CSM C2F2 2Schmitt CSM C2F2 2Scott LMS # 2 2 40Irwin LMS # 2 3 20

Worden CMS # 3 2 45Gordon F-15 physical 4Brand F-15 physical 4

Schmitt F-15 physical 4Gordon Pad walkdown 1Brand Pad walkdown 1

Schmitt Pad walkdown 1Jul-15 All G & N program notes briefing 4

Scott CMS # 3 - SNS 4 55Worden CMS # 3 - SNS 4 55

Irwin CMS # 3 - SNS 4 55Gordon CMS # 3 - SNS 4 40Brand CMS # 3 - SNS 4 40

Schmitt CMS # 3 - SNS 4 40Scott CMS # 3 - SNS 30

Worden CMS # 3 - SNS 30Irwin CMS # 3 - SNS 30

Gordon CMS # 3 - SNS 30Brand CMS # 3 - SNS 30

Schmitt CMS # 3 - SNS 30Irwin Geology traverse on L & A model 45

Jul-16 Scott LMS # 2 - SNS 3Irwin LMS # 2 - SNS 3

Gordon LMS # 2 - SNS 3 30Schmitt LMS # 2 - SNS 3 30Scott LMS # 2 - SNS 1 5Irwin LMS # 2 - SNS 1 5

Gordon LMS # 2 - SNS 1 30Schmitt LMS # 2 - SNS 1 30Scott EVA # 1 4Irwin EVA # 1 4

Worden CMS # 3 3 45Gordon CMS # 3 2 55Brand CMS # 3 2 55

Schmitt CMS # 3 2 55Worden Orbital geology ( El Baz ) 4Brand Orbital geology ( El Baz ) 4

Jul-17 Scott CMS # 3 3 10Worden CMS # 3 3 10

Irwin CMS # 3 3 10Brand CMS # 3 4 25

Worden Fly T-38's @ Patrick AFBIrwin Fly T-38's @ Patrick AFBBrand Fly T-38's @ Patrick AFB

Schmitt Fly T-38's @ Patrick AFBJul-18 All Fly T-38's @ Patrick AFBJul-19 Scott CMS # 3 3 15

Worden CMS # 3 3 45Irwin CMS # 3 3 45Brand CMS # 3 3 25Scott EVA # 2 & 3 4 30Irwin EVA # 2 & 3 4 30

Page 62: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Scott Orbital geology ( El Baz ) 2 30Worden Orbital geology ( El Baz ) 6 30

Irwin Orbital geology ( El Baz ) 2 30Gordon Orbital geology ( El Baz ) 2 30Brand Orbital geology ( El Baz ) 6

Schmitt Orbital geology ( El Baz ) 2 30Gordon LMS # 2 6 35Schmitt LMS # 2 6 35

Irwin Geology traverse on L & A model 1Gordon CMS # 3 25Schmitt CMS # 3 25

Jul-20 Scott LMS # 2 - SNS 7 40Irwin LMS # 2 - SNS 7 40

Gordon LMS # 2 - SNS 1 15Schmitt LMS # 2 - SNS 1 15Scott LMS # 2 - SNS 1Irwin LMS # 2 - SNS 1

Worden CMS # 3 - SNS 7 40Brand CMS # 3 - SNS 1

Worden CMS # 3 - SNS 1All (except

Brand)Final suit fit 1

Irwin ALSEP deployment & shadows 1Gordon F-5 physical 4Brand F-5 physical 4

Schmitt F-5 physical 4Gordon EVA prep & post 3Schmitt EVA prep & post 3

Jul-21 Scott F-5 physical 4Worden F-5 physical 4

Irwin F-5 physical 4Scott CMS # 3 - SNS 3 40

Worden CMS # 3 - SNS 3 40Irwin CMS # 3 - SNS 3 40

Gordon CMS # 3 - SNS 5Brand CMS # 3 - SNS 5

Schmitt CMS # 3 - SNS 5Scott CMS # 3 - SNS 50

Worden CMS # 3 - SNS 50Irwin CMS # 3 - SNS 50

Gordon CMS # 3 - SNS 1Brand CMS # 3 - SNS 1

Schmitt CMS # 3 - SNS 1Gordon LMS # 2 3Schmitt LMS # 2 3Brand LM - CM stowage 2 30

All Flt plan & checklist 1 30Scott Drill & 1 g LRV ( drill didn't work ) 30

Jul-22 Scott LMS # 2 2 10Irwin LMS # 2 2 10Scott EVA prep & post 3Irwin EVA prep & post 3

Worden CMS # 3 2 5Gordon CMS # 3 1 10Brand CMS # 3 3 5

Schmitt CMS # 3 2 10Scott Traverse planning ( Swan, Silver etc ) 2 30

Page 63: Apollo 15 Training Log - NASA · CMS # 3 2 15 Worden CMS # 3 3 20 CMS # 2 1 20 Irwin LMS # 2 4 30 CMS # 3 1 30 Brand Apollo 13 support Schmitt CSM / Comm brief @ MSC 3 Mission techniques

Date Crew Member Activity DurationHours Minutes

Irwin Traverse planning ( Swan, Silver etc ) 2 30Gordon Traverse planning ( Swan, Silver etc ) 2 30Schmitt Traverse planning ( Swan, Silver etc ) 2 30Scott Drill on lunar surface 30Irwin Geology traverse on L & A model 1Irwin Drive 1 g LRV 30

Worden CM / EVA 2 30Worden Flight plan ( Gardner ) 1 30Gordon LM /CES briefing 2Schmitt LM /CES briefing 2Scott Deploy 1/6 wt LRV 30Irwin Deploy 1/6 wt LRV 30

Jul-23 Scott CMS # 3 1 45Worden CMS # 3 3 20

Irwin CMS # 3 1 15Scott LMS # 2 1 30Irwin LMS # 2 2

Gordon LMS # 2 2 35Schmitt LMS # 2 2 35

Irwin Geology traverse on L & A model 1 15Worden Orbital geology ( El Baz ) 1 30

Irwin Fly T-38 @ Patrick AFBJul-24 Worden CMS # 3 1 20

Irwin CMS # 3 10Brand CMS # 3 3

Gordon Geology traverse on L & A model 2Schmitt Geology traverse on L & A model 2Gordon LMS # 2 45Schmitt LMS # 2 45Scott Geology traverse on L & A model 1Irwin Geology traverse on L & A model 1Irwin LMS # 2 30Scott Fly T-38 @ Patrick AFB

Worden Fly T-38 @ Patrick AFBIrwin Fly T-38 @ Patrick AFBBrand Fly T-38 @ Patrick AFB

Jul-25 Scott Geology traverse on L & A model 2 40Irwin Geology traverse on L & A model 1 25Irwin Fly T-38 @ Patrick AFB

Gordon Fly T-38 @ Patrick AFBSchmitt Fly T-38 @ Patrick AFBWorden Geology traverse on L & A model 30

Jul-26 Lift off @ 0934 EDT: Scott, Worden & Irwin