Upload
jin-li
View
175
Download
0
Tags:
Embed Size (px)
Citation preview
WE POWER TRAVELWE POWER TRAVEL
WE POWER TRAVELWE POWER TRAVEL
Agency Performance Monitoring (APM) – Revised Edition
Product Operations & Enterprise DataARC
WE POWER TRAVELWE POWER TRAVEL
Risk Quotation
2
Confidential. © 2012 Airlines Reporting Corporation, All Rights Reserved.
Risk comes from not knowing what you’re doing and thus vary inversely with knowledge --Warren Buffett, American Investment Entrepreneur
WE POWER TRAVELWE POWER TRAVEL
Agency Performance Monitoring (APM)
- Agency performance monitoring (APM) is designed to capture the end to end view of agency KPIs to reflect transaction based performance rating for all ARC agents over 12 months time period.
Measure : Risk = Probability X Impact
3
WE POWER TRAVELWE POWER TRAVEL
Background of APM
APM was created in 2011 to validate END-to-END risk monitoring concept for fraud prevention.
APM prototype was a great success, but since it was proof of concept, back end process was not optimized to keep it refreshed at specific time interval.
Old process would require running several SQLs and crunching formulas in EXCEL to update APM dashboard and typical cycle was monthly for about 4 - 6 hrs.
4
WE POWER TRAVELWE POWER TRAVEL
APM Dashboard (Old Version)
5
WE POWER TRAVELWE POWER TRAVEL
NEW REVISED APM
We created new APM metadata back end process (taking a leaf from Agentelligence tool) to pull together various sources of the data.
Macros have been created to automate weekly data generation.
Metadata layer takes only15-20 min to update all tables on a weekly basis.
All risk calculations are designed in the tool itself to save computing .
UI Dashboards are revised to make it look cool.
6
WE POWER TRAVELWE POWER TRAVEL
Process Overview Diagram
7
Confidential. © 2012 Airlines Reporting Corporation, All Rights Reserved.
Source Table APM Metadata User Interface User
Tableau DashboardAPM
Master Database
WE POWER TRAVELWE POWER TRAVEL
Load Source Tables
8
Teradata Access Metadata Table
WE POWER TRAVELWE POWER TRAVEL
APM Metadata Update Forms
Step-wise version One-click version
9
Confidential. © 2012 Airlines Reporting Corporation, All Rights Reserved.
WE POWER TRAVELWE POWER TRAVEL
New KPIs
10
WE POWER TRAVELWE POWER TRAVEL
Tableau Dashboard Map View (Demo)
11
WE POWER TRAVELWE POWER TRAVEL
Tableau Dashboard Reporting View (Demo)
12
WE POWER TRAVELWE POWER TRAVEL
Improvements (Before/After)
13
Comparative Metrics Older Version New Version
# of Process Steps 12 3
Total Run-Time for Update 4 – 6 hr 15 – 20 min
Update Cycle Monthly Weekly
Performance Same Same
Aggregation by HOL No Yes
Dashboard -- Improved
WE POWER TRAVELWE POWER TRAVEL
Question/Feedback
14
WE POWER TRAVELWE POWER TRAVEL
Appendix
15
Ranking Each KPI RANK(X1, X1:Xn) Weighting Top KPIs
Risk KPIs Weighting %
Manual Void/saleIf <100, then 0.20If >100, then 0.30
Rd/ RD_AMT If <2, then 0.40If > 2, then 0.50
DM Count 0.05Bond amt/sale 0.05
Refund 0.10Commission 0.05
Mega Constant
Mathematical Risk Calculation = ( 1-(Xn-X1/Xn))*100