STRENGTH CALCULATION Sheet 01 Rev. 00 Equip. BLOW DOWN PIPING SES\001\14 STRENGTH CALCULATION EQUIPMENT : BLOW DOWN PIPING CLIENT : NASH ENGINEERING FZCO ENGINEERING : SUPER ENGINEERING SERVICES DESIGN & CONSTRUCTION CODE : ASME B31.1, 2012 EDITION MANUFACTURER : SUPER ENGINEERING SERVICES DUBAI REV.NO. DESCRIPTION PREPARED CHECKED APPROVED AKS PANDIAN UDK SES-CAL-168-001 14.05.14 SUPER ENGINEERING SERVICES MFR'S SERIAL No.

API Tube Thickness Calculation1

Embed Size (px)

DESCRIPTION

CAL

Citation preview

Page 1: API Tube Thickness Calculation1

STRENGTH CALCULATIONSheet 01

Rev. 00

Equip. BLOW DOWN PIPING SES\001\14

STRENGTH CALCULATION

EQUIPMENT : BLOW DOWN PIPING

CLIENT : NASH ENGINEERING FZCO

ENGINEERING : SUPER ENGINEERING SERVICES

DESIGN & CONSTRUCTION CODE : ASME B31.1, 2012 EDITION

MANUFACTURER : SUPER ENGINEERING SERVICES

DUBAI

REV.NO. DESCRIPTION PREPARED CHECKED APPROVED

AKS PANDIAN UDKSES-CAL-168-001 14.05.14

SUPER ENGINEERING SERVICES MFR'S

SERIAL No.

Page 2: API Tube Thickness Calculation1

PREPARED CHECKED APPROVED DOCUMENT NO. DATE

Page 3: API Tube Thickness Calculation1

STRENGTH CALCULATIONSheet 02

Rev. 00

Equip. BLOW DOWN PIPING SES\001\14

Index

S.No. Description Sheet No.

01 Cover Sheet 01

02 Index 02

03 Revision Status - Drawing 03

04 Revision Status - STRENGTH CALCULATION sheet 04

05 List of Standards/Codes 05

06 Design Data 06

07 Hydrostatic Test Pressure 07

08 Material Constructions 08

09 Allowable Stress 09

10 Radiographic Examinations 10

11 Heat Treatment 11

PIPING CALCULATIONS

12 Pipe thickness calculation 12 to 14

REV.NO. DESCRIPTION PREPARED CHECKED APPROVED

AKS PANDIAN UDKSES-CAL-168-001 14.05.14

PREPARED CHECKED APPROVED DOCUMENT NO. DATE

SUPER ENGINEERING SERVICES MFR'S

SERIAL No.

Page 4: API Tube Thickness Calculation1

STRENGTH CALCULATIONSheet 03

Rev. 00

Equip. BLOW DOWN PIPING SES\001\14

STATUS OF CALCULATION DUE TO REVISION IN DRAWING

Drawing No. Reason For Revision Prepared Checked

REV.NO. DESCRIPTION PREPARED CHECKED APPROVED

SES-CAL-168-001 14.05.14

DOCUMENT NO. DATE

SUPER ENGINEERING SERVICES MFR'S SERIAL

No.

S.No

Rev.

Page Of Calculation

Pages Affected

Approved

Page 5: API Tube Thickness Calculation1

STRENGTH CALCULATIONSheet 04

Rev. 00

Equip. BLOW DOWN PIPING SES\001\14

REVISION STATUS FOR STRENGTH CALCULATIONS

Sheet REV. No. Sheet REV. No. Sheet REV. No.

No. 0 1 2 3 4 No. 0 1 2 3 4 No. 0 1 2 3 4

1 P

2 P

3 P

4 P

5 P

6 P

7 P

8 P

9 P

10 P

11 P

12 P

13 P

14 P

Rev. No. Description PREPARED CHECKED APPOVED

SES-CAL-168-001 14.05.14

DOCUMENT NO. DATE

SUPER ENGINEERING

SERVICES MFR'S SERIAL No.

Page 6: API Tube Thickness Calculation1

STRENGTH CALCULATIONSheet 1

Rev. 00

Vessel HEATER TREATER N-484

Pipe thickness calculation - As per API 12K - 5.1.1

S.No. DESCRIPTION Units DATA

01 Item Return Pipe

02 Drg. No. CPSF-21-V-102 E

03 Item No. 2

04 Material specification SA 106 GR.B

05 P = Internal design pressure bar(g) 6.200 89.924 psig

06 Design temperature ° C 85 185 F

07 mm 219.100 8.626 in

08 Nominal thickness mm 12.700 0.500 in

09 mm 11.112 0.438 in

10 S = Max. allowable stress as per 5.3 bar(g) 1378.9 20000 psig

11 mm 1.500 0.059 in

12 y = coefficient when T is less than D/6 0.4

13

Minimum required thickness

mm 2.483 0.098 in

14 mm 11.112 0.438 in

15 Hence Satisfactory

16

Maximum Internal working pressure

bar(g) 125.4 1818.7 psig

As per table-2 - Max. Working Pressure bar(g) 146.169 2120 psig

17 Operating Temperature ° C 85 185 F

° C 121 250 F

Hence Satisfactory

API-12K-0003 10.06.14GV PANDIAN UDK

PREPARED CHECKED APPROVED DOCUMENT NO. DATE

MFR'S SERIAL NO.

D = Outside diameter of pipe

tm = Minimum thickness available

C = Additional thickness (For corrosion, thread depth)

tm = Minimum thickness available

Minimum available is grater than minimum required

Maximum allowable design temperature as per 5.1.2

Vessel operating temperature is less than the max. allowable design temperature

t r=PD

2(S+PY )+C

P=2S( tm−C )

D−2Y ( tm−C )