API 17NSubsea Production System Reliability, Integrity,
and Technical Risk Management
Don WellsHess Corporation
History / Status
• Document released in 2009• Specification contains:– Life Cycle Process (LCP)– Define, Plan, Implement,
Feedback (DPIF) Loop– 12 Key Practices (KP)– Technology Qualification
Process– Technology Readiness Level
Initial Plan / Path Forward
• Process– Split into 5 subgroups (now 6)– Industry Leaders– Common Template
• Introduce IM into the scope of 17N:– Define IM– Expand the Life Cycle Processes– Reassessment through remediation– Define TRL progression
• Expand the Life Cycle Process
Feasibility
Concept Selection
FEED Detailed Design
Manufacturing & Assembly
SIT, Installation, & Commissioning Operation
Decommissioning
Specification Development
Detail
• Change to a Dual-DPIF loop– Add Remediation cycle – Facilitates Integrity Management
Specification Development(Greenfield Projects)
Define Goals and Requirements
KP1
Planning and Organisation
KP2
Design and Deliver for reliability and Integrtity
KP3
Evaluate ResultsKP3
Feedback and AssuranceKP4
Verification and Validation KP6
Project risk managementKP7
Risk and RAM AnalysisKP5
Supply Chain Management
KP10
Management of ChangeKP11
Performance tracking and data management
KP9
Core Processes
Qualification of Technology
KP8
Organisational LearningKP12
Supporting Processes
Defineü SegmentsüRisksüMitigations
Planü Inspections üMonitoring ü Testing
Implementü Data collectionü Data analysisü Performance
evaluation
Evaluate ü Analyse dataü Evaluate against
requirements
Feedback üAssuranceü Lessons Learnt
Are Requirements
met?
DefineüCorrective actions üRemediation actionsüQualification actionsü Intervention actions
PlanüCorrective actionsüRemediation actionsüQualification actionsü Intervention actions
Implementü Interventionü Changesü Performance
improvement
Evaluate ü TestsüChange implementedüAgainst requirements
Operational Reliability and Integrity
Assurance cycle
Remediation and corrective action cycle
Specification Development(Brownfield Projects)
..and acceptance
criterion
Lifecycle Application of DPIEF Cycle .
• DPIEF Assurance Cycle applied at each lifecycle stage– Feasibility through to
decommissioning
• Double DPIEF loop in operations– Normal operations– Corrective action
Feasibility
ConceptSelection
Feed
DetailedDesign
ManufactureAssemblyTestInstall and Commission
Decommissioning
Feedback and Assurance
Define
Plan
ImplementEvaluate
Feedback and Assurance
Define
Plan
ImplementEvaluate
Feedback and Assurance
Define
Plan
ImplementEvaluate
Feedback and Assurance
Define
Plan
ImplementEvaluate
Concept
Feed
Detailed Design
MATIC
Operations
Feedback and Assurance
Define
Plan
ImplementEvaluate
Decommissioning
Feedback and Assurance
Define
Plan
ImplementEvaluate
Feasibility
Define
Requirements met?
Define
YesNo Normal Operations
Loop
Corrective Action Loop
FeedbackPlan
Implement Evaluate Evaluate Implement
Plan
ProgressWinter Meeting
• Workgroups Submitted Input – Using Common Template
• Edited into a Single Document– Astrimar
• Circulated for Comment within 17N Committee– 3 rounds, 1,000+– Last Comments Due Dec 10th – Clarification Discussions at Jan 13th meeting
Key Process Changes
• Kept Same 12 KPs from the First Revision
• Updated Names and Content to Accommodate the inclusion of Integrity Management
Annex Changes• Standardized and Significantly Updated
Annex A – Split into Two Separate Annexes• Annex A -Technical Risk & Uncertainty Categorization• Annex C - Risk Based Scope of Work for Reliability Technical
& Integrity Management
Annex B - Better Explanations and Guidance for Management
Annex D – New This will change to accommodate reincorporation of 17Q stuff
• Integrity Management Data Collection
Issues to be Addressed at High Level
• The following Subjects have been introduced and referenced without Full Fidelity: – Decommissioning– Obsolescence– Field Life Extension– Human Factors– Configuration Management / MOC– Integration with Other Standards / Regulatory
Documents
17Q History• Last meeting, we were asked to consider combining
17Q into 17N
• Work indicated that this was not best approach• Rationale– Different Subjects– Qualification Not Unique to 17N– Expect Revision at a Different Rate
• Qualification /Verification details from 17N will be Incorporated into 17Q– Accepted by Committee 17
17Q Plans/Progress
• Path Forward– 17Q Committee reestablished to Work Plan– Made up of members of both 17Q and 17N– Currently Working Plan
• It was recognized and last Working Meeting that 17N and 17Q can progress at separate paces as long as 17N appropriately defines, references, etc.
17N Progress
• Original Plans included a “Pre-Ballot” Workshop– Change of Plans• Not a New Document• Large Active Committee• Potential to Circulate to Washington Workshop attendees
– OK?
• OTC Paper submitted and Presented– As part of API 17 Session
17N Plans
• Astrimar to Complete incorporation of Comments and 17Q Reference– May require help from Working Committees– Deliver Summary Report on Completion
• Issue Document to API • Format, Ballot, etc.
Question• How do we “Deliver” to Industry
– API University– Industry Training
Schedule
• Being Worked
• Additional Comments
Options
• A – Complete 17N ASAP– Minimum with updates of all but Qualification
• B – Complete 17N fully incorporating Qualification / Validation– Complete incorporation of Qualification where
current 17Q becomes annex of 17N• C – Complete 17N and 17Q– 17N (see A above) which refers to the new 17Q
which will also be developed
Pros / Cons
• A – Complete 17N ASAP– Document Completed with available resources– Qualification will happen when it happens
• B – Complete 17N fully incorporating Qualification / Validation– Complete document delivered– Additional funds / time / resources needed
• C – Complete 17N and 17Q– Complete documents delivered– Benefits described before
• Updatable at separate paces• Different Subjects• Etc.
– More Additional funds / time / resources needed
Explain A-203
• We believe………….• This will be confirmed as part of work….
Question on Definitions
• Questions re definitions of Verification / Validation/ etc. have been raised
• API 17A will take responsibilities for definitions
• API 17N will provide technical input / expertise
Thanks You’s
• To Everyone Involved– Workgroup Leaders– Participants– Workshop Attendees– Astrimar– BSEE
• Large Amount of Effort by everyone• Large amount of detail developed, considered and
Worked• Even with the Growth in Scope, effort continued and
quality maintained• A great deal of quality work was completed!