Upload
colleen-poole
View
212
Download
0
Embed Size (px)
Citation preview
APACHE COUNTY ENGINEERING
2008 -2009
PROJECTS
PROJECT LISTPROJECT LIST
#1 Development of Storm Water #1 Development of Storm Water
Pollution PlansPollution Plans
#2 Tsaile Trail#2 Tsaile Trail
#3 Maintenance Projects #3 Maintenance Projects
#4 Apache County GIS Base Map #4 Apache County GIS Base Map
Preparation Preparation Project Project
DEVELOPMENT OF STORM WATER DEVELOPMENT OF STORM WATER POLLUTION PLANSPOLLUTION PLANS
For County Road YardsFor County Road Yards
For Sand and Gravel OperationsFor Sand and Gravel Operations
Develop Post Mine Reclamation Develop Post Mine Reclamation Plans Plans
TSAILE TRAILTSAILE TRAIL
Transportation Enhancement ProjectTransportation Enhancement Project
Fitness/walking trailFitness/walking trail
Benefit students of Dine CollegeBenefit students of Dine College
Health promotionHealth promotion
MAINTENANCE PROJECTSMAINTENANCE PROJECTS
1. Vernon – CR3148/3144 pavement1. Vernon – CR3148/3144 pavement
2. Alpine/Concho – chip seal projects2. Alpine/Concho – chip seal projects
3. New Administration Building in 3. New Administration Building in Ganado Ganado and Chinle, New Road and Chinle, New Road Yard and Yard and Building in Chambers.Building in Chambers.
Apache Co. GIS Base Map Apache Co. GIS Base Map Preparation ProjectPreparation Project
1. Maps with accuracy and precision1. Maps with accuracy and precision 2. Maps to tie in to existing maps2. Maps to tie in to existing maps 3. Maps used for generating hardcopies3. Maps used for generating hardcopies 4. Electronic files4. Electronic files 5. Maps to be built in a consistent format5. Maps to be built in a consistent format 6. Maps to be consistent with others using 6. Maps to be consistent with others using
GISGIS 7. Conversion of older, paper maps into a 7. Conversion of older, paper maps into a
digital formatdigital format
EMPLOYEE RELATEDEMPLOYEE RELATED
BudgetBudget– We held harmless on increase of We held harmless on increase of
insurance and retirement.insurance and retirement.– General fund cut by 5% and no cost of General fund cut by 5% and no cost of
living increase.living increase.– No new positions available at this time.No new positions available at this time.