CIGRE Technical BrochuresCIGRE is continually developing new reference material for the benefit of the industry. The following is an indication of the breadth of technicalsubjects covered as Technical Brochures.
Refer http://www.e-cigre.org/
Individual CIGRE Members or staff of CIGRE Member companies can using the Membership number login.download PDF for free
Note - downloaded PDF files of CIGRE Technical Brochures are subject to Copyright. They are for use by the Individual Member or staff of theCIGRE Member company only and not for further distribution or access.
For CIGRE IEC 61850 references refer here
TechnicalBrochure
NonCIGREMemberCost1
Group Year Title
* 80 € * White Book: ImportantAchievements of CIGRE
0 120 € 19** A Summary of the Reporton Survey of Controlsand Control Performancein HVDC Schemes.
1 100 € 19** 25 CIGRE Sessions(1921-1974 ) - GeneralBibliographic Index
2 80 € 19** Report on Large TurbineGenerator MaintenancePractices.
3 160 € 19** Compendium of HVDCSchemes throughout theWorld.
4 80 € 19** Breakdown of Gases inUniform Fields.
5 80 € 19** Current Ratings ofCables for Cyclic andEmergency Loads.
6 100 € 19** Mechanical Effects ofShort-Circuit Currents inOpen Air Substations.
7 100 € 19** Non-ConventionalCurrent and VoltageTransformers.
8 80 € 19** Harmonisation ofProtection Policies forPower Stations andGenerators and ofProtection Policies for HVNetworks.
9 80 € 19** Final Report onComputer basedProtection and DigitalTechniques inSubstations.
Click column header to sort by that column.
10 80 € 19** Use of Equipment built-inAutomatic Testing:Self-Checking andMonitoring with a View toimproving Reliability.
11 120 € 19** Evaluation ofCharacteristics andPerformance of PowerSystem Protection Relaysand Protective Systems.
12 150 € 19** Teleprotection.
13 100 € 19** Protection Systems UsingTelecommunication.
14 80 € 19** Memorandum on PowerLine Carrier Systems.
15 150 € 19** Guide On Power LineCarrier.
16 80 € 19** Guide for Planning ofPower SystemTelecommunicationNetworks.
17 100 € 19** Guide On Mobile Radiofor the Electricity Utilities.
18 120 € 19** Structure of telecontrolcentres and overallsystems.
19 80 € 19** Overall impact of digitaltechniques fortransmission systems(Substation control).
20 80 € 19** Interferences producedby corona effect ofelectric systems.
21 100 € 19** Electric and magneticfields produced bytransmission systems.
22 50 € 19** Methods of forecastingdemand for electricity.
23 80 € 19** An annotatedbibliography on UHV ACsubstation equipment.(1968-1985).
24 80 € 19** Planning against voltagecollapse.
25 120 € 19** Static var compensators
26 120 € 19** Power system reliabilityanalysis. Applicationguide.Part I.
27 50 € 19** Methods for reactivepower optimisation.
28 80 € 19** Advanced analytical toolsin evaluating powersystem dynamic andsecurity performance.Results of aquestionnaire.
29 150 € 19** An international survey ofthe present status andthe perspective of expertsystems on powersystem analysis andtechniques.
30 100 € 19** Reactive powercompensation analysesand planning procedure.
31 100 € 19** Nuclear power plantperformance in powersystem control. A reviewof international practice.
32 80 € 19** Final report of the UHVAd Hoc Group
33 80 € 19** Methodologies in powersystems operationsplanning
34 80 € 19** Guidelines for theapplications of metaloxide arresters withoutgaps for HVDC converterstations.
35 160 € 19** Monograph on GIS veryfast transients.
36 80 € 19** Control of power systemsduring disturbed andemergency conditions.
37 120 € 19** Guide for planning ofpower utility digitaltelecommunicationsnetworks.
38 120 € 19** Digital protectiontechniques andsubstation functions.
39 80 € 19** Guidelines forrepresentation of networkelements whencalculating transients
40 80 € 19** Guidelines for softwareproject control.
41 80 € 19** New telecontrol systemsarchitecture. Opensystems.
42 120 € 19** Mobile radio systems inpower utilities.
43 100 € 19** Telecommunicationnetwork management inpower utilities.
44 80 € 19** Earthing of GIS. Anapplication guide.
45 100 € 19** Optical fibre planningguide for power utilities.
46 50 € 19** Database managementfor telecontrol systems.
47 80 € 19** Line-charging currentswitching of HV lines.Stresses and testing.Parts 1 & 2.
48 80 € 19** Tower top geometry.
49 100 € 19** Adaptive protections andcontrol.
50 160 € 19** Interruption of smallinductive currents.
51 100 € 19** Load flow control in highvoltage systems usingFACTS controllers.
52 100 € 19** Availability of telecontrolsystems. Questionnaireon availability.
53 80 € 19** Bulk electricity systemoperational performance.Measurement systemsand survey results.
55 100 € 19** Distorsion andattenuation of travellingwaves caused bytransient corona.
56 80 € 19** Environmental aspects oflinks between powersystem planners anddecision makers in theenergy area.
57 80 € 19** Paper-oil insulatedmeasurementtransformer.
58 80 € 19** Evaluation of thequestionnaire : Fibreoptics for power utilitiescommunications.
59 80 € 19** Session 1990 : Dielectricdiagnosis of electricalequipment for ACapplications and itseffects on insulationcoordination. State of theart report.
60 100 € 19** Metal oxide surgearresters in AC systems.
61 100 € 19** Addendum to Doc.20 :Interferences producedby corona effect ofelectric systems.
62 80 € 19** Requirements andperformance of packetswitching networks withspecial reference totelecontrol.
63 100 € 19** Guide to procedures forestimating the lightningperformance oftransmission lines.
64 120 € 19** Application guide onprotection of complextransmission networkconfigurations.
65 80 € 19** AC harmonic filters andreactive compensation forHVDC with particularreference tonon-characteristicharmonics.
66 80 € 19** Statistical analysis ofdielectric test results.
67 80 € 19** Renewal of existingtelecontrol systems.
68 100 € 19** Guide for planning DClinks terminating at AClocations having lowshort-circuit capacities.Part 1. AC/DC interactionphenomena.
69 80 € 19** General guidelines for thedesign of outdoor ACsubstations.
70 140 € 19** Composite power systemreliability evaluation.Vol.II
71 80 € 19** International experiencesin improving the linksbetween power systemplanners, the generalpublic and decisionmakers in the energypolicy area.
72 100 € 19** Guidelines for theevaluation of thedielectric strength ofexternal insulation.
73 120 € 19** An International survey ofthe present status andperspective of long-termdynamics in powersystems.
74 80 € 19** Electric powertransmission and theenvironment. Fields,noise and interference.
75 120 € 19** Modelling of voltagecollapse includingdynamic phenomena.
76 80 € 19** Man machine interfaceusing full graphics.
77 80 € 19** Analysis and optimisationof SVC use intransmission systems.
78 80 € 19** Voltage and currentstresses on thyristorvalves for static varcompensators.
79 80 € 19** The use of the transportlayer in telecontrolsystems.
80 100 € 19** Choice and application oflarge variable speeddrives in power plants.
81 100 € 19** Foundation testing
82 100 € 19** Use of DC converters forVAR control.
83 140 € 19** Final report of the 2ndinternational enquiry onHV circuit-breaker failuresand defects in service.
84 120 € 19** Application of widebandcommunication circuits toprotection. Prospects andbenefits.
85 80 € 19** Ultra high voltagetechnology.
86 80 € 19** Overvoltages on HVDCCables. Final Report.
87 100 € 19** Maintenance andmanagement ofprotection systems.
88 120 € 19** Design and maintenancepractice for substationsecondary systems.
89 120 € 19** Accessories for HVextruded cables. Types ofaccessories andterminology.
90 120 € 19** The use of expertsystems for powersystem restoration.
91 100 € 19** Indices predicting voltagecollapse includingdynamic phenomena.
92 100 € 19** DC side harmonics andfiltering in HVDCtransmission systems
93 80 € 19** Guidelines for testing ofthyristor valves for staticvar compensators.
94 80 € 19** Lightning characteristicsrelevant for electricalengineering: assessmentof sensing, recording andmapping requirements inthe light of presenttechnologicaladvancements.
95 100 € 19** Guide on the influence ofhigh voltage AC powersystems on metallicpipelines.
96 120 € 19** Thermal aspects oftransformers.
97 120 € 19** System tests for HVDCinstallations.
98 80 € 19** Overvoltages andovervoltage protection inthe generator mainelectrical circuit in powerstations.
99 120 € 19** Interaction betweentransmission anddistribution systemplanning.
100 80 € 19** Assessment of practicalfast transient stabilitymethods : performancecomparison.Phase II.
101 100 € 19** Criteria andcountermeasures forvoltage collapse.
102 160 € 19** Long term dynamics.Phase II. Final Report.
103 80 € 19** Commutation failures.Causes andconsequences.
104 80 € 19** Magnetic fields in HVcable systems. 1.Systems withoutferromagneticcomponent.
105 120 € 19** The mechanical effects ofshort circuit currents inopen air substations.(Rigid and flexible busbars). Vol.1. An updatedrevision. Vol. 2. Database of reference tests.
106 80 € 19** New opportunities foroptical fibre technology inelectricity utilities.
107 100 € 19** Power systemcommunication in thehigh speed environment.
108 100 € 19** Business opportunities forpower utilities in thetelecommunicationsmarket.
109 100 € 19** Review of IEC 826 :Loading and strength ofoverhead lines
110 80 € 19** Comparison of highvoltage overhead linesand underground cables.Report and Guidelines.
111 120 € 19** Analysis and control ofpower systemoscillations.
112 100 € 19** Semiconductor powerdevices for use in HVDCand FACTS controllers.
113 100 € 19** Test circuits for HVDCthyristor valves.
114 100 € 19** Circuit-breakers formeshed multiterminalHVDC system. FinalReport.
115 80 € 19** Guide for planning DClinks terminating at ACsystem locations havinglow short-circuitcapacities. Part II :Planning guidelines.
116 140 € 19** Guide for preliminarydesign and specificationof hydro stations withHVDC unit connectedgenerators.
117 80 € 19** SF6 recycling guide.Re-use of SF6 gas inelectrical powerequipment and finaldisposal.
118 80 € 19** Lightning exposure ofstructures andinterception efficiency ofair terminals.
119 80 € 19** Interaction betweenHVDC convertors andnearby synchronousmachines.Final report.
120 100 € 19** Methods and tools fortransmission costs.
121 100 € 19** New trends andrequirements for dynamicsecurity assessment.
122 100 € 19** Application ofoptimisation techniquesto study power systemnetwork performance.
123 80 € 19** Thyristor controlled seriescompensation.
124 120 € 19** Guide on EMC in powerplants and substations.
125 100 € 19** User guide for theapplication ofgas-insulated switchgear(GIS) for rated voltages of72.5 kV and above.
126 100 € 19** Unit commitment
127 80 € 19** Guide for upgradingtransmission systemswith HVDC transmission
128 100 € 19** Protection against voltagecollapse
129 80 € 19** Methods and techniquesfor reliability assessmentof interconnectedsystems.
130 80 € 19** Operational guidelinesand monitoring of HVDCsystems
131 80 € 2000 Wavelength multiplexingfor electricity utilitiesusing optical fibres
132 80 € 2000 Optical fibre cableselection for electricityutilities.
133 80 € 2000 Preventive and correctivemaintenance for opticalcables on overheadpower lines.
134 100 € 2000 Transient recoveryvoltages in mediumvoltage networks.
135 100 € 2000 State of the art ofcircuit-breaker modelling.
136 80 € 2000 Fire aspects of HVDCthyristor valves and valvehalls.
137 80 € 2000 Impact of increasingcontribution of dispersedgeneration on the powersystem.
138 100 € 2000 Exchange of servicesbetween large electricitygenerating plants andhigh voltage electricpower systems.
139 120 € 2000 Guide to the specificationand design evaluation ofAC filters for HVDCsystems.
140 180 € 2000 Reliable fault clearanceand back-up protection.
141 120 € 2000 Refurbishment andupgrading of foundations.
142 80 € 2000 Natural and artificialageing and pollutiontesting of polymericinsulators
143 80 € 2000 Cross-modulation ofharmonics in HVDCschemes
144 140 € 2000 Static synchronouscompensator(STATCOM)
145 100 € 2000 Modeling of powerelectronics equipment(FACTS) in load flow andstability programs : arepresentation guide forpower system planningand analysis
146 80 € 2000 Knowledge basedapplications inSCADA/EMS. A practicalapproach
147 100 € 2000 High voltage overheadlines. Environmentalconcerns, procedures,impacts and mitigations
148 100 € 2000 Analysis and modellingneeds of power systemsunder major frequencydisturbance. Final report.
149 120 € 2000 Coordination of controlsof multiple FACTS/HVDClinks in the same system.
150 120 € 2000 Report on the 2ndinternational survey onhigh voltage gasinsulated substations(GIS) service experience
151 80 € 2000 Guidelines for insulationcoordination in liveworking
152 100 € 2000 An international survey ofmaintenance policies andtrends
153 100 € 2000 The use of IP technologyin the power utilityenvironment.
154 80 € 2000 Techniques for powersystem planning underuncertainties.
155 140 € 2000 Advanced angle stabilitycontrols.
156 80 € 2000 Guide for customersspecifications fortransformers 100 MVAand 123 kV and above.
157 80 € 2000 Effect of particles ontransformer dielectricstrength.
158 120 € 2000 Polluted insulators : areview of currentknowledge.
159 100 € 2000 Analysis and guidelinesfor testing numericalprotection schemes.
160 100 € 2000 Unified power flowcontroller (UPFC)
161 80 € 2000 General guidelines for thedesign of outdoor ACsubstations. (2ndversion).
162 80 € 2000 Questionnaire concerningaspects on planning -design - operation andmaintenance of futuresubstations.
163 80 € 2000 Guide for SF6 gasmixtures.
164 80 € 2000 Report on digital powerline carrier.
165 120 € 2000 Life management ofcircuit-breakers.
166 150 € 2000 Impact of interactionsamong power systemcontrols.
167 120 € 2000 User guide for theapplication of monitoringand diagnostictechniques for switchingequipment for ratedvoltages of 72.5 kV andabove.
168 80 € 2000 Communication conceptsfor control systems.
169 100 € 2000 Advanced materials -Final Report
170 80 € 2000 Static electrification inpower transformers
171 100 € 2000 Long term operationplanning of hydro-thermalpower systems
172 80 € 2000 Characterization oflightning for applicationsin electric power systems.
173 80 € 2000 Use of GSMph2+ asmobile radio system forpower utilities.
174 80 € 2000 Load control devices onoverhead transmissionlines.
175 120 € 2000 Management of existingoverhead transmissionlines.
176 120 € 2000 Ageing of the system.Impact on planning.
177 140 € 2001 Accessories for HVcables with extrudedinsulation
178 100 € 2001 Probabilistic design ofoverhead transmissionlines
179 80 € 2001 Guidelines for fieldmeasurement of iceloadings on overheadpower line conductors
180 100 € 2001 Communicationrequirements in terms ofdata flow withinsubstations
181 80 € 2001 Methods and tools forcontracts in a competitiveframework
182 80 € 2001 Partial dischargedetection in installed HVextruded cable systems
183 100 € 2001 FACTS technology foropen access
184 80 € 2001 Composite insulatorhandling guide
185 120 € 2001 Modelling new forms ofgeneration and storage
186 80 € 2001 Economic assessment ofHVDC links
187 120 € 2001 System protectionschemes in powernetworks
188 80 € 2001 Quality of supply.Customers requirements
189 80 € 2001 Insulation coordination forHVAC underground cablesystems
190 100 € 2001 Methods and tools forcosting ancillary services
191 100 € 2001 Methods to considercustomer interruptioncosts in power systemanalysis
192 120 € 2001 Protection usingtelecommunications
193 80 € 2001 Alarm handlingtechniques
194 100 € 2001 Construction, laying andinstallation techniques forextruded andself-contained fluid filledcable systems.
195 100 € 2001 Portfolio and riskmanagement for powerproducers and traders inan open market.
196 80 € 2001 Diaphragms for LatticeSteel Supports
197 80 € 2002 Design guidelines forpower station auxiliariesand distribution systems
198 100 € 2002 Glossary of terms used inthe electricity supplyindustry.
199 80 € 2002 Superconducting cables.Impact on networkstructure and control.
200 80 € 2002 Isolation and restorationpolicies against powersystem collapse
201 80 € 2002 Maintenance outsourcingguidelines
202 100 € 2002 HVDC stations audiblenoise
203 80 € 2002 Optimal network structurein an open marketenvironment
204 60 € 2002 Guidelines for conductingdesign reviews fortransformers 100 MVAand 123 kV and above.
205 100 € 2002 Custom power - State ofthe art.
206 80 € 2002 The design oftransmission line supportfoundations - anoverview.
207 80 € 2002 Thermal behaviour ofoverhead conductors.
208 80 € 2002 The needs andenvironment of controlcentre operators duringpower system restoration.A benchmarkquestionnaire survey.
209 80 € 2002 The short circuitperformance of powertransformers.
210 60 € 2002 Interfaces in accessoriesfor extruded HV and EHVcables.
211 80 € 2002 General overview onexperience feedbackmethods in the field ofelectrical equipment
212 80 € 2002 Report on survey toestablish protectionperformance during majordisturbances
213 80 € 2002 Engineering guide onearthing systems inpower stations
214 120 € 2002 The mechanical effects ofshort-circuit currents inopen air substations. PartII. Companion brochureto No. 105
215 80 € 2002 HVDC converter stationsfor voltages above +/-600 kV
216 60 € 2002 Joints on transmissionline conductors: fieldtesting and replacementcriteria
217 80 € 2002 The benefits of mobiledata. How can they berealised ?
218 140 € 2003 Gas insulatedtransmission lines (GIL)
219 80 € 2003 Testing DC extrudedcable systems for powertransmission up to 250kV (This TB has beenreplaced by TB 496)
220 120 € 2003 Network planning in aderegulated environment.
221 80 € 2003 Improving the impact ofexisting substations onthe environment
222 80 € 2003 On voltage and powerstability in AC/DCsystems
223 80 € 2003 Active filters in HVDCapplications
224 80 € 2003 Emerging technologiesand material challenges.(Panel 2002)
225 80 € 2003 Electrical power systems2020. (Panel 2002)
226 100 € 2003 Knowledge rules forpartial dischargediagnosis in service
227 80 € 2003 Life managementtechniques for powertransformers.
228 80 € 2003 Service aged insulation.Guidelines on managingthe ageing process.
229 80 € 2003 High temperaturesuperconducting (HTS)cable systems.
230 100 € 2003 Assessment of existingoverhead line supports.
231 80 € 2003 Definition andclassification of powersystem stability.
232 120 € 2003 Optimisation of protectionperformance duringsystem disturbance
233 80 € 2003 Application policy forcomputer-based controlsystems in substations: areview.
234 80 € 2003 SF6 recycling guide.Revised version 2003.
235 80 € 2003 Management oftransmission capacity andaccess : impact onsystem development.
236 80 € 2003 Conformance testingguideline forcommunication insubstations
237 120 € 2003 Static synchronouscompensator(STATCOM) for arcfurnace and flickercompensation
238 100 € 2003 Modeling of gas turbinesand steam turbines incombined cycle powerplants.
239 80 € 2003 Fault current limiters inelectrical medium andhigh voltage systems
240 80 € 2004 Analysis of HVDCthyristor convertertransformer performance
241 80 € 2004 All-optical backbonetechnology
242 80 € 2004 Thyristor controlledvoltage regulators: Parts1 and 2
243 60 € 2004 Improving resilience inpower control centres
244 80 € 2004 Conductors for theuprating of overheadlines
245 80 € 2004 New optical accesstechnology
246 100 € 2004 The automation of newand existing substations:why and how
247 80 € 2004 Optimization of powertransmission capability ofunderground cablesystems using thermalmonitoring
248 100 € 2004 Economics of transformermanagement (Papers +CD)
249 100 € 2004 Integrated servicenetworks for utilities.
250 100 € 2004 Technical andenvironmental issuesregarding the integrationof a new HV undergroundcable system in thenetwork.
251 100 € 2004 The mechanicalbehaviour of conductorsand fittings (CD +Brochure)
252 80 € 2004 Functional specificationand evaluation ofsubstations.
253 80 € 2004 Substations physicalsecurity trends.
254 80 € 2004 Dielectric responsemethods for diagnosticsof power transformers.
255 80 € 2004 Material properties fornon-ceramic outdoorinsulation. State of theart.
256 80 € 2004 Current Practicesregarding frequenciesand magnitude of highintensity winds
257 60 € 2004 EL CID (Electromagnetic- Core ImperfectionDetector) Testing ofLargeSteam-Turbine-DrivenGenerators
258 60 € 2004 Application of On-LinePartial Discharge Tests toRotating Machines
259 80 € 2004 Failure Survey on CircuitBreaker Control Systems
260 80 € 2004 N2/SF6 Mixtures for GasInsulated Systems
261 120 € 2004 Power Quality Indicesand Objectives
262 80 € 2004 Controlled Switching ofHVAC CBs: Benefits &Economic Aspects
263 80 € 2004 Controlled switching ofHVAC CBs - Guidancefor further applicationsincluding unloadedtransformer switching…
264 80 € 2004 Controlled switching ofHVAC CBs -Planning,Specifications &Testing
265 190 € 2005 Life Cycle Assessment(LCA) for overhead lines
266 60 € 2005 Protection measures forradio base stations sitedon power line towers
267 80 € 2005 Strategies for utilitycompanies seeking tomove to improvedmobility.
268 80 € 2005 Transient voltagesaffecting long cables
269 120 € 2005 VSC Transmission
270 100 € 2005 Auto-reclosing and localsystem restoration
271 80 € 2005 Connection of generatorsand other customers -rules and practices
272 100 € 2005 Large cross-sections andcomposite screensdesign.
273 80 € 2005 Overhead conductor safedesign tension withrespect to Aeolianvibrations
274 80 € 2005 Consultation models foroverhead line projects.
275 60 € 2005 Methods for measuringthe earth resistance oftransmission towersequipped of earth wires.
276 80 € 2005 Guide for the preparationof customised “PracticalSF6 handlinginstructions”
277 80 € 2005 State of the art survey onspacers and spacerdampers
278 80 € 2005 The influence of lineconfiguration onenvironment impacts ofelectrical origin
279 100 € 2005 Maintenance for HVcables and accessories
280 80 € 2005 HVDC and FACTS fordistribution systems
281 80 € 2005 Design and Installation ofmicropiles and groundanchors for OHL supportfoudations
282 160 € 2005 Planning issues for newlyindustrialised anddeveloping countries fronASEAN
283 100 € 2005 Special bonding of highvoltage power cables
284 80 € 2005 Use of corona rings tocontrol the electrical fieldalong transmission linecomposite insulators
285 80 € 2005 White paper on mediumvoltage powerlinecommunication (PLC)networks
286 60 € 2005 Instrumentation andmeasurements forin-service monitoring ofhigh voltage insulation
287 80 € 2006 Protection of MV and LVnetworks against lightning– Part 1: Common topics
288 80 € 2006 Guide for space chargemeasurements indielectrics and insulatingmaterials
289 80 € 2006 Reliability Based DesignMethods for OverheadLines Advantages,Applications andComparisons
290 80 € 2006 AC Corrosion on MetallicPipelines due toInterference from ACPower Lines -Phenomenon, Modellingand Countermeasures
291 80 € 2006 Guidelines forMeteorological IcingModels, StatisticalMethods andTopographical Effects
292 80 € 2006 Data Mining Techniquesand Applications in thePower Transmission Field
293 120 € 2006 Electric Power SystemPlanning with theUncertainty of WindGeneration
294 80 € 2006 How overhead lines areredesignd foruprating/upgrading-Analysies of the replies to thequestionnaire.
295 100 € 2006 Relay software modelsfor use withelectromagnetic transientanalysis programs
296 60 € 2006 Recent developments onthe interpretation ofdissolved gas analysis intransformers.
297 60 € 2006 Practical aspects of thedetection and location ofPD in power cables
298 80 € 2006 Guide on transformerlifetime data management
299 50 € 2006 Guide for the selection ofweather parameters forbare overhead conductorratings
300 80 € 2006 Guidelines to anoptimized approach tothe renewal of existing airinsulated sbstations
301 80 € 2006 Congestion managementin liberalized marketenvironment
302 80 € 2006 Digital power line carrierequipment - present useand future applications
303 80 € 2006 Revision of qualificationprocedures for highvoltage and extra highvoltage AC extrudedundergroud cablesystems
304 100 € 2006 Guide for application ofIEC 62271-100 and IEC60694. Part I
305 140 € 2006 Guide for application ofIEC 62271-100 and IEC60694. Part II
306 60 € 2006 Guide for the assessmentof old Cap & Pin andLong-Rod transmissionline insulators made ofporcelain or glass: Whatto and when to replace
307 60 € 2006 Remote on-linemanagement forprotection andautomation
308 160 € 2006 Foundation Installation –An Overview
309 140 € 2006 Asset Management ofTransmission Systemsand Associated CIGREActivities
310 260 € 2007 Coordinated VoltageControl in TransmissionNetworks.
311 60 € 2007 Operating dispersedgeneration with ICT(Information &CommunicationTechnology)
312 200 € 2007 Application and requireddevelopments of dynamicmodels to supportpractical planning
313 150 € 2007 Connection criteria at thedistribution network fordistributed generation
314 50 € 2007 Protocol ConformanceTesting
315 60 € 2007 CommunicationsTechnologyFundamentals for theDesign of ModernProtection and ControlSystems
316 180 € 2007 Defense plan againstextreme contingencies
317 100 € 2007 Security for informationsystems and intranets inelectric power systems
318 80 € 2007 Wi-Fi Protected Accessfor protection andautomation
319 80 € 2007 Circuit-Breaker ControlsFailure: Survey onCircuit-Breaker ControlsSystems
320 80 € 2007 Characterisation of ELFMagnetic Fields
321 50 € 2007 Operational servicesusing IP virtual privatenetworks
322 140 € 2007 State of the art conductorgalloping
323 100 € 2007 Ageing of cellulose inmineral-oil insulatedtransformers
324 100 € 2007 Sag-tension calculationmethods for overheadlines
325 260 € 2007 Review of on-linedynamic securityassessment tools andtechniques
326 150 € 2007 The introduction of IEC61850 and its impact onprotection andautomation withinsubstations
327 90 € 2007 Impact of regulatoryenvironments oninvestment decisions intransmission
328 200 € 2007 Modeling and dynamicbehavior of windgeneration as it relates topower system control anddynamic performance
329 80 € 2007 Guidelines forspecification andevaluation of substationautomation systems
330 180 € 2007 Wide area monitoring andcontrol for transmissioncapability enhancement
331 50 € 2007 Considerations relating tothe use of hightemperature conductors
332 80 € 2007 Fatigue EnduranceCapability ofConductor/ClampSystems - Update ofPresent Knowledge
333 50 € 2007 Guide for theestablishement ofnaturally pollutedinsulator testing stations
334 60 € 2007 Maintenance ofAcceptable Reliability inan UncertainEnvironment
335 70 € 2007 Changing NetworkConditions and SystemRequirements. Part I: TheImpact of DistributedGeneration (DG) onEquipment rated above 1kV.
336 100 € 2007 Changing NetworkConditions and SystemRequirements. Part II:The impact of LongDistance Transmission onHV Equipment.
337 90 € 2007 Increased SystemEfficiency by Use of NewGenerations of PowerSemiconductors
338 120 € 2007 Statistics of ACUnderground Cables inPower Networks
339 50 € 2008 Guideline on the Impactsof Fault Current LimitingDevices on ProtectionSystem
340 50 € 2008 Utilities Practices towardSustainable Development
341 50 € 2008 Integrated ManagementInformation in Utilities
342 100 € 2008 Mechanical-ConditionAssessment ofTransformer Windingsusing FrequencyResponse Analysis (FRA)
343 80 € 2008 Recommendations forCondition Monitoring andCondition AssessmentFacilities forTransformers
344 100 € 2008 Big Storm Events - Whatwe have learned
345 90 € 2008 Alternating Current (AC)Resistance of helicallystranded Conductors
346 50 € 2008 Protocol for reporting theOperational Performanceof HVDC TransmissionSystems
347 120 € 2008 Earth Potential Rises inspecially bonded ScreenSystems
348 70 € 2008 Tower Top Geometry andMid Span Clearances
349 80 € 2008 Moisture Equilibrium andMoisture Migration withinTransformer InsulationSystems
350 60 € 2008 How Overhead Lines(OHL) Respond toLocalized High IntensityWinds - BasicUnderstanding
351 80 € 2008 Application of Long HighCapacity Gas InsulatedLines
352 260 € 2008 Capacitor CommutatedConverted (CCC) HVDCInterconnections: Digitalmodeling and BenchmarkCircuit
353 130 € 2008 Guidelines for increasedUtilization of existingOverhead TransmissionLines
354 180 € 2008 Guidelines to CostReduction of Air InsulatedSubstations
355 50 € 2008 Fault and DisturbanceData Analysis includingintelligent Systems
356 90 € 2008 Data Exchange Issueswithin the Power SystemOperation and ControlEnvironment - ABenchmarkQuestionnaire Survey
357 70 € 2008 Managing the Complexityand Uncertainties ofLoad, Generation andMarkets in SystemDevelopment Planning
358 80 € 2008 Remaining LifeManagement of existingAC Underground Lines
359 150 € 2008 Modern DistanceProtection Functions andApplications
360 60 € 2008 Insulation Co-Ordinationrelated to InternalInsulation of GasInsulated Systems withSF6 and N2/SF6 GasMixtures under ACCondition
361 50 € 2008 Outdoor Insulation inpolluted Conditions:Guidelines for Selectionand dimensioning - Part1: General Principles andthe A.C. Case
362 180 € 2008 Technical Requirementsfor Substation Equipmentexceeding 800 kV AC
363 80 € 2008 Reliability basedCalibration of FoundationStrength Factor usingfull-scale Test Data - AGuide for DesignEngineers
364 100 € 2008 Systems with multiple DCInfeed
365 60 € 2008 On the Use of Power ArcProtection Devices forcomposite Insulators onTransmission Lines
366 60 € 2008 Guide for electrical PartialDischarge Measurementsin compliance to IEC60270
367 50 € 2009 Asset ManagementPerformanceBenchmarking
368 50 € 2009 Operating Environment ofVoltage gradingCapacitors applied toHigh VoltageCircuit-Breakers
369 80 € 2009 New Developments in theUse of GeographicInformation as applied toOverhead Power Lines
370 120 € 2009 Integration of large ScaleWind Generation usingHVDC and PowerElectronics
371 120 € 2009 Static SynchronousSeries Compensator(SSSC)
372 60 € 2009 Voltage dip Evaluationand Prediction Tools
373 140 € 2009 Mitigation Techniques ofPower FrequencyMagnetic Fieldsoriginated from ElectricPower Systems
374 60 € 2009 Review of Structures forthe System DevelopmentActivity
375 60 € 2009 Technical Guide forMeasurement of LowFrequency Electric andMagnetic Fields nearOverhead Power Lines
376 100 € 2009 Cloud-to-GroundLightning Parametersderived from LightningLocation Systems. TheEffects of SystemPerformance.
377 50 € 2009 New Mobile Solutions inthe Utility Sectors
378 60 € 2009 Copper Sulphide inTransformer Insulation
379 120 € 2009 Update of ServiceExperience of HVUnderground andSubmarine CableSystems
380 200 € 2009 The Impact of NewFunctionalities onSubstation Design
381 100 € 2009 GIS: State of the Art 2008
382 80 € 2009 Broadband PLCApplications
383 50 € 2009 Sustainable DevelopmentPerformance Indicatorsfor Transmission SystemOperators
384 160 € 2009 Comparison of GeneralIndustry Practices forLattice Tower Design andDetailing
385 50 € 2009 Management of Risksdue to Load-FlowIncreases inTransmission OHL
386 50 € 2009 Generator Maintenance,Inspection and TestProgrammes
387 250 € 2009 INFLUENCE OF THEHYPERSTATICMODELING ON THEBEHAVIOR OFTRANSMISSION LINELATTICE STRUCTURES
388 140 € 2009 IMPACTS OF HVDCLINES ON THEECONOMICS OF HVDCPROJECTS
389 180 € 2009 Combining Innovationwith Standardization
390 110 € 2009 Evaluation of differentswitchgear technologies(AIS, MTS, GIS) for ratedvoltages of 52 kV andabove
391 130 € 2009 Guide for measurementof radio frequencyinterference from HV andMV substations
392 50 € 2009 Survey of HydrogeneratorFailures
393 90 € 2009 Thermal Performance ofTransformers
394 80 € 2009 State of the Art ofInstrument Transformers
395 60 € 2009 Investigation on theStructural Interactionbetween TransmissionLine Towers andFoundations
396 50 € 2009 Large Overhead Lines(OVHL) Crossings
397 40 € 2009 Guide for minimizing thedamage from statorwinding grounds onturbogenerators
398 110 € 2009 Third-Party Damage toUnderground andSubmarine Cables
399 90 € 2009 Improvement on theTower TestingMethodology
400 170 € 2009 Technical requirementsfor substations exceeding800 kV
401 100 € 2009 Functional Testing of IEC61850 Based Systems
402 50 € 2009 High Impedance Faults
403 200 € WG B1.08 - 2010 Cable Systems inmultipurpose and sharedstructures
404 WG B5.13 2010 Acceptable FunctionalIntegration in HVsubstations
405 WG C2.11 2010 System Control in Light ofRecent Developments inSubstation Control (IECStandards)
406 JWG A2/B4.28 2010 HVDC ConverterTransformers, DesignReview, Test Procedures,Ageing Evaluation andReliability in Service
407 JWG A2/B4.28 2010 HVDC ConverterTransformers, Guidelinesfor Conducting DesignReviews for HVDCConverter Transformers
408 WG A3.19 2010 Line fault phenomenaand their implications for3-phase short- andlong-line fault clearing
409 WG D1.01 TF 15 2010 Report on Gas Monitorsfor Oil-Filled ElectricalEquipment
410 WG B2.16 - 2010 Local Wind Speed-Up onOverhead Lines forSpecific Terrain Features
411 WG B5.10 2010 Protection, Control andMonitoring of SeriesCompensated Network
412 WG C4.110 2010 Voltage Dip Immunity ofEquipment andInstallations
413 WG D1.01 (TF 12) 2010 Insulating OilRegeneration andDehalogenation
414 WG D1.01 (TF14) 2010 Dielectric ResponseDiagnoses forTransformer Windings
415 WG B1.24 2010 Test Procedures for HVTransition Joints forRated Voltages 30kV(Um = 36kV) up to 500kV(Um = 550kV)
416 WG B2.08 2010 Innovative solutions forOverhead Line Supports
417 WG B4.45 2010 TechnologicalAssessment of 800kvHVDC Applications
418 WGD1.15 2010 Status of Developmentand Field TestExperience withHigh-TemperatureSuperconducting PowerEquipment
419 WG D2.22 2010 Treatment of InformationSecurity for ElectricPower Utilities
420 WG D1.17 2010 Generic Guidelines forLife Time ConditionAssessment of HV Assetsand Related KnowledgeRules
421 WG B5.34 2010 Impact of RenewableEnergy Sources andDistributed Generation onSubstation Protection andAutomation
422 WG C1.16 2010 Transmission Asset RiskManagement
423 WGC6.10 2010 Technical andCommercialStandardization of DER /microGrid Components
424 WG B5.20 2010 New Trends forAutomated Fault andDisturbance Analysis
425 JWG B2/C1.9 2010 Increasing Capacity ofOverhead TransmissionLines; Needs andSolutions
426 WG B2.26 2010 Guide for Qualifying HighTemperature Conductorsfor Use on OverheadTransmission Lines
427 WG B5.38 2010 Impact of ImplementingCyber SecurityRequirements using IEC61850
428 WG B2.08 2010 Effect of Fabrication andErection Tolerances onthe Strength of LatticeSteel TransmissionTower
429 WG B2.30 2010 Engineering GuidelinesRelating to FatigueEndurance Capability ofConductor/ClampSystems
430 WG B3.18 SF6 2010 Tightness Guide
431 WG B5.16 2010 Modern Techniques forProtecting Busbars in HVNetworks
432 WG B5.19 2010 Protection RelayCoordination
433 WG C1.17 2010 Planning to ManagePower Interruption Events
434 WG C4.601 2010 Review of the CurrentStatus of Tools andTechniques forRisk-Based andProbabilistic Planning inPower Systems
435 WG C5.6 2010 Ancillary Services: AnOverview of InternationalPractices
436 WG A2.35 2010 Experiences in Servicewith New InsulatingLiquids
437 WG A1.11 2010 Guide for On-LineMonitoring ofTurbo-Generators
438 WG B2.29 2010 Systems for Predictionand Monitoring of IceShedding, Anti-Icing andDe-Icing for OverheadPower Line Conductorsand Ground Wires
439 WGB3.21 2010 Turnkey Substations
440 WG C4.301 2010 Use of Surge Arrestersfor Lightning Protection ofTransmission Lines
441 WG C4.402 2010 Protection of MediumVoltage and Low VoltageNetworks AgainstLightning
442 WG D1.14 2010 Evaluation of dynamichydrophobicity propertiesof polymeric materials fornon-ceramic outdoorinsulation – Retentionand transfer ofhydrophobicity
443 WG D1.32 2010 DGA in Non-Mineral Oilsand Load Tap Changersand Improved DGADiagnosis Criteria
444 WG D1.33 2010 Guidelines forUnconventional PartialDischarge Measurements
445 WG A2.34 2011 Guide for TransformerMaintenance
446 WG B1.25 2011 Advanced design of metallaminated coverings:recommendation fortests, guide to use,operational feed back
447 WGB4.48 2011 Components Testing ofVSC System for HVDCApplications
448 WG B5.08 2011 Refurbishment Strategiesbased on Life Cycle Costand TechnicalConstraints
449 WG C4.108 2011 Review of FlickerObjectives for LV, MV,and HV Systems
450 WG C6.08 2011 Grid Integration of WindGeneration
451 WG D1.24 2011 PolymerNanocomposites-Fundamentals and possibleapplications to PowerSectors
452 WG D2.24 2011 EMS for the 21st Century– System Requirements
453 2011 Various SC’s Glossary ofterms used in the ElectricIndustry
454A * 2011 Hydrogenerators FireProtection – Update(Annex)
454 250 € 2011 Hydrogenerators FireProtection – Update
455 170 € 2011 Aspects for theApplication of CompositeInsulators to High Voltage(=72kV) Apparatus
456 300 € 2011 Background of TechnicalSpecifications forSubstation Equipmentexceeding 800 kV AC
457 80 € 2011 Development andOperation of ActiveDistribution Networks
458 130 € 2011 Electric Energy StorageSystems
459 148 € 2011 Metering, revenueprotection, billing andCRM/CIS functions
460 230 € 2011 The use of EthernetTechnology in the PowerUtility Environment
461 176 € 2011 TelecommunicationService Provisioning andDelivery in the ElectricalPower Utility
462 260 € 2011 Obtaining Value fromOn-Line SubstationCondition Monitoring
463 230 € 2011 Modern Techniques forProtecting, controllingand monitoring powertransformers
464 66 € 2011 Maintenance Strategiesfor Digital SubstationAutomation Systems
465 400 € 2011 Modern Techniques forProtecting and Monitoringof Transmission Lines
466 76 € 2011 Engineering Guidelinesfor IEC 61850 BasedDigital SAS
467 190 € 2011 Economic Framework forPower Quality
468 114 € 2011 Review of DisturbanceEmission AssessmentTechniques
469 80 € 2011 State of the Art inEfficiency of HydroGeneratorsCommissioned since1990
470 50 € 2011 Life Extension of LargeElectric Motors in NuclearPower Plants
471 116 € 2011 Working Safely whileSupported on AgedOverhead Conductors
472 126 € 2011 Primary / Secondarysysteminterfacemodellingfor total assetperformance optimization
473 80 € 2011 Electric Field and IonCurrent Environment ofHVDC OverheadTransmission Lines
474 64 € 2011 Interface betweenSystem Operators andRegulators
475 170 € 2011 Demand Side Integration(DSI)
476 108 € 2011 Cable AccessoryWorkmanship onExtruded High VoltageCâbles
477 64 € 2011 Evaluation of aged fittings
478 56 € 2011 Important MaterialProperties of RTVSilicone Rubber InsulatorCoatings
479 180 € 2011 International Guide onthe Protection ofSynchronous Generators
480 58 € 2011 Guide on Stator WaterChemistry Management
481 90 € 2011 Guide for theAssessment ofComposite Insulators inthe Laboratory after theirRemoval from Service
482 75 € 2011 State of the Art forTesting Self-DampingCharacteristics ofConductors for OverheadLines
483 500 € 2011 Guidelines for the Designand Construction of ACOffshore Substations forWind Power Plants
484 100 € 2011 Impact of HVDC Stationson Protection of ACSystems
* 35 € 2012 The History of CIGRE
485 66 € 2012 Overhead Line DesignGuidelines for Mitigationof Severe Wind StormDamage
486 110 € 2012 Integral Decision Processfor Substation EquipmentReplacement
487 110 € 2012 Strategic EnvironmentalAssessment for PowerDevelopments
488 70 € 2012 Resistance to Weatheringand UV Radiation ofPolymeric Materials forOutdoor Insulation
489 64 € 2012 Requirements on TestingFlammability of PolymericMaterials for OutdoorInsulation
490 136 € 2012 Recommendations fortesting of long ACsubmarine cables withextruded insulation forsystem voltage above 30(36) to 500 (550) kV (ThisTB replaces electraarticle ELT_189_1)
491 60 € 2012 Generator End-WindingRetaining Rings – ALiterature Survey andCare Guideline
492 168 € 2012 Voltage Source Converter(VSC) HVDC for PowerTransmission - EconomicAspects and Comparisonwith other AC and DCTechnologies
493 126 € 2012 Non destructivewater-tree detection inXLPE cable insulation
494 114 € 2012 Furanic Compounds forDiagnosis
495 110 € 2012 Communications Accessto Electrical EnergyConsumers andProducers
496 100 € 2012 Recommendations forTesting DC ExtrudedCable Systems for PowerTransmission at a RatedVoltage up to 500 kV(This TB replaces TB219)
497 160 € 2012 Application andFeasibility of FaultCurrent Limiters in PowerSystems
498 130 € 2012 Guide for Application ofDirect Real-TimeMonitoring Systems
499 136 € 2012 Residual Life ConceptsApplied to HV GIS
500 100 € 2012 Impact of Market Designson Generation Adequacy
501 80 € 2012 Basic principles todetermine methanecontent in cross-linkedsolid extruded insulationof MV and HV cables
502 116 € 2012 High-Voltage On-SiteTesting with PartialDischarge Measurement
503 60 € 2012 State of the Art andCapacity for RoboticInspection ofTurbogenerators
504 150 € 2012 Voltage and VAr Supportin System Operation
505 88 € 2012 Funding - Generation andTransmission Investment
506 88 € 2012 Gas Insulated System forHVDC: DC Stress at DCand AC Systems
507 290 € 2012 CommunicationArchitecture for IP-basedSubstation Applications
508 80 € 2012 HVDC EnvironmentalPlanning Guidelines
509 200 € 2012 Final Report of the 2004 -2007 InternationalEnquiry on Reliability ofHigh Voltage Equipment -“Part 1 - Summary andGeneral Matters”
510 250 € 2012 Final Report of the 2004 -2007 InternationalEnquiry on Reliability ofHigh Voltage Equipment -“Part 2 - SF6 CircuitBreakers”
511 220 € 2012 Final Report of the 2004 -2007 InternationalEnquiry on Reliability ofHigh Voltage Equipment -“Part 3 - Disconnectorsand Earthing Switches”
512 250 € 2012 Final Report of the 2004 -2007 InternationalEnquiry on Reliability ofHigh Voltage Equipment -Part 4 - InstrumentTransformers”
513 250 € 2012 Final Report of the 2004 -2007 InternationalEnquiry on Reliability ofHigh Voltage Equipment -”Part 5 - Gas InsulatedSwitchgear”
514 100 € 2012 Final Report of the 2004 -2007 InternationalEnquiry on Reliability ofHigh Voltage Equipment”Part 6 - GIS Practices”
515 190 € 2012 Mechanical Security ofOverhead LinesContaining CascadingFailures and MitigatingTheir Effects
516 140 € 2012 Geotechnical Aspects ofOverhead TransmissionLine Routing ~ AnOverview
517 32 € Guide for the Preventionof Overfluxing ofGenerators
518 95 € Outdoor insulation inpolluted conditions:Guidelines for selectionand dimensioning - PART2: THE DC CASE
519 45 € Very Fast TransientOvervoltages (VFTO) inGas-Insulated UHVSubstations
520 32 € Material properties ofsolid HVDC insulationsystems
521 70 € Line and SystemProtection using DigitalCircuit and PacketCommunications
522 325 € Generator Stator WindingStress Grading CoatingProblem
523 150 € System Complexity andDynamic Performance
524 155 € Control Centre OperatorRequirements, Selection,Training and Certification
525 64 € Risk Assessment onDefects in GIS based onPD Diagnostics
526 88 € Oxidation Stability ofInsulating Fluids
527 57 € Performance Coping withLimits for Very HighPenetrations ofRenewable Energy
528 35 € Transformer ProcurementProcess: Guide toPreparation ofSpecifications for PowerTransformers
529 40 € Transformer ProcurementProcess: Guide to DesignReview for PowerTransformers
530 40 € Transformer ProcurementProcess: Guide to theAssessment of theCapability of aTransformerManufacturer
531 90 € Cable Systems ElectricalCharacteristics
532 100 € Substation Uprating andUpgrading
533 100 € HVDC Grid FeasibilityStudy
534 50 € Interaction betweenprinciples of transfercapacity calculation andmarket activity forenhanced systemutilization
535 350 € EMC within power plantsand substations
536 155 € 2013 Influence of EmbeddedHVDC Transmission onSystem Security and ACNetwork Performance
537 2013 Guide for TransformerFire SafetyPractices
538 2013 Recommendations fortesting ofSuperconductingcables
539 42 € WG B5.31 2013 Life-time Management ofRelay Settings
540 136 € WG B5.36 2013 Applications of IEC61850 Standard toProtection Schemes
541 2013 Asset ManagementDecision Makingusing different RiskAssessmentMethodologies
542 2013 Insulation Coordinationfor UHV ACSystems
543 2013 Guideline forNumericalElectromagneticAnalysis Methodand its Applicationto SurgePhenomena
1 Prices are indicative and may vary to that shown here without notice. Actual prices are as quoted on www.e-cigre.org
Contact Me
Skype: (ping even ifshowing offline)
Email Me
A phone call is nearlyalways welcomedepending on the time of
night wherever I am in theworld.Based in Adelaide UTC+9:30 hours e.g.
April-September
Noon UK= 2030Adelaide
October-March:
Noon UK= 2230Adelaide
Office + 61 8 7127 6357 Mobile + 61 8 419 845253
or by post PO Box 757 Blackwood SA 5051 Australia.
Extra Notes:
Disclaimer
No Liability:Rod Hughes Consulting Pty Ltd accepts no direct nor consequential liability in any manner whatsoever toany party whosoever who may rely on or reference the information contained in these pages. Information contained in these pages is provided as general reference only without any specificrelevance to any particular intended or actual reference to or use of this information. Any person ororganisation making reference to this information is at their sole responsibility under their ownor use of skill and judgement.
No Waiver, No Licence:Whilst the information herein is accessible in the public domain, Rod Hughes Consulting Pty Ltd grants no waiver of Copyright norgrant any licence to any party in relation to this information.
-- Guideline for Numerical Electromagnetic Analysis Method and its Application to Surge Phenomena