34
WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

  • Upload
    lydat

  • View
    220

  • Download
    2

Embed Size (px)

Citation preview

Page 1: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

WELCAR 2012

Tim TaylorBarlow Lyde & Gilbert LLP

30 September 2011

Page 2: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

Joint Rig Committee

� Project started 2009

� Intention to publish 2010

Page 3: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

JRC WELCAR Sub Committee

� Brian Randall- formerly Watkins

Syndicate (Chairman)

� Steve Dyke-Hiscox

� Steve Warren-Canopius

� David Sharp-AAA/INDECS

� Tim Taylor-BLG

� Paul Dawson-formerly Beazley

� Geoff Jones-Catlin

� Duncan Wilson-QBE

� Dudley Chapman-Lloyd Warwick

Page 4: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

Others who contributed

� Nigel Chapman-Clyde & Co

� Joe McMahon-CTe

� Mark Stronge and Gary Mawditt-

Matthews Daniel

� Nigel Carpenter-Braemar

Steege

� John Harris-Braemar Steege

� IMCA

Page 5: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

What has been going on?

Page 6: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

Progress

� Working on WELCAR revisions for over 2 years

� 2nd Quarter of 2010 was optimistic

� Progress has been made

Page 7: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

Revised Timetable

� Publication Today 30 September 2011

� Consultation Draft

� Brokers

� Assureds

� Adjusters

� IMCA (Contractors)

� Lawyers

� Feedback by 3 November

� Publication January 2012

Page 8: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

What is in it?

Page 9: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

History of CAR Policies

� Wide cover

� 1990’s broad form wordings

� “overdeveloped product in an overheated market”

� Low premiums

� Huge claims

� Need to achieve balance. Align claims to declared values

Page 10: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

Good Things About WELCAR 2001

� Stability

� No litigation

� A lot of settled claims

Page 11: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

Less Good Things

� Schedule B problems

� Change of Risk

� Escalation

� Warranty Surveys

� Contractors

� Who is “boss”

� Access to policy

Page 12: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

� QA/QC uncertainty

� Consequences of breach

� Contractual indemnities/limits

� Does the contractor have enough “skin in the game”

� Contract rates for remedial work (cost v profit)

� Registration of wording

Page 13: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

What does it look like?

Page 14: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

Aim of New Wording

� To reflect 10 years of experience of writing on the basis of

WELCAR 2001

� To improve the quality of the contract wording

� Clearer

� More consistent

� Use of more contemporary language

Page 15: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

Key Changes

� Declarations are more comprehensive as regards limits and

deductibles

� New sub-limits for marine spread, mobilisation and

demobilisation

� Clear distinction between core “all risks” cover and various

optional extensions

� New extensions for leak/damage search costs, denial of access,

excess removal of debris

Page 16: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

� List of deductibles more comprehensive. Section Two deductible

is now an “excess amount”

� Defined terms grouped together. New or clearer definitions for

� Terrorism

� Windstorm

� Occurrence

� Offshore/Onshore

� Physical damage

� Physical loss

Page 17: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

� Scope of Insurance tightened

� Conditions applying to “Other Insureds” have been drawn

together

� Loss notification requirements clarified

� Cancellation provisions added for war and strikes risks

� Premium adjustment provisions clarified

� Insurers can request up to date project costs

� Premium adjustment completely separate from Escalation

Page 18: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

� Contracts (Rights of Third Parties) 1999 Clause

� General Exclusions Section

� Race

� Cyber Attack

� Terrorism and War

� Political Risks Exclusion

� Institute Builders Risk Clauses not incorporated generally

� Sue & Labour (Minimising Losses) capped at 50% of value of

item

Page 19: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

Optional Coverages

� Expediting costs

� Offshore cancellation

� Test and Leak or Damage search costs

� Standby costs

� Denial of Access

� Forwarding Charges

Page 20: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

Optional Coverages Continued

� Excess Removal of Wreck or Debris

� Excess Marine Spread/Mobilisation/Remobilisation

� Defect Write Back

� Watercraft Endorsement (Section Two)

� Existing Property/Contractual Endorsements (Section Two)

Page 21: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

Major Changes

� Warranty Survey Requirements

� QA/QC

Page 22: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

Warranty/Survey Requirements

� Condition precedent to attachment of cover in respect of each

operation that Certificate of Approval issued by MWS

� Duty on all Insureds to comply with the

recommendations/restrictions of MWS

� Breach of duty will lead to non-recovery for loss arising out of the

breach

Page 23: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

QA/QC

� Replaced by modified due diligence clause

� No warranty or condition precedent

� General obligation on all Insureds (Principal and Other) to exercise due diligence including requirement for and compliance with QA/QC systems

� Failure to comply will result in non-recovery attributable to failure

� “Other Insureds” will have no access to benefits of the policy if they fail to comply

� If rights of subrogation against a contractor are prejudiced by contract limitations, the Principal Insured will be subject to an additional deductible

Page 24: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

Defective Part

� Not a major change

� Definitions

� “Physical Damage”

“A change in state or condition of the Property Insured which is

permanent, materially impacts its usefulness and is caused by an

extraneous and fortuitous event.

Property Insured shall not be regarded as Physically Damaged

or physically lost solely by virtue of the existence in such

Property Insured of any defect in design, plan or specification,

defect in workmanship, defect in material or latent defect.”

Page 25: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

Defective Part Definition

“Any part of the Property Insured which is or becomes defective

and/or unfit or unsuitable for its actual or intended purpose or

which will not achieve its intended design life, whether by reason

of defect in design, defect in plan, defect in specification, defect

in material, defect in workmanship, a combination of one or more

of those. The term Defective Part shall also include such

ancillary components which are not themselves defective, but

which would normally be removed and replaced by new

components when the component that is faulty is rectified.”

Page 26: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

Defective Part Exclusions

“The coverage afforded by this Section One shall not apply to:

L. the cost or expense of replacing, repairing or rectifying any

Defective Part which has not suffered Physical Loss or

Physical Damage;

Page 27: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

Defective Part Exclusions

“The coverage afforded by this Section One shall not apply to:

� Physical Loss or Physical Damage to the Defective Part itself

unless

� The loss is suffered during the period of insurance, and

� The loss was a direct result of a cause external to the Defective Part , and

� The defect within the Defective Part did not contribute to the loss

Page 28: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

Resultant Loss or Damage Caused By A

Defective Part

� Is Covered

� If it suffered during the Period of Insurance

Page 29: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

Defective Part Write Back (Optional)

� Similar to WELCAR 2001

� Subject to a new common costs clause

Page 30: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

Common and/or concurrent repair costs:

“This clause applies only to the coverage provided under this Insurance for any

Physical Loss or Physical Damage caused by or arising from any defect in

design, defect in plan, defect in specification, defect in workmanship, defect in

material or Defective Part by virtue of the exceptions within Additional Exclusions

6.M(i) and (ii).

Where all or part of the cost of replacing, repairing or rectifying the defect or

defects giving rise to such Physical Loss or Physical Damage is incurred in

common with or concurrently with all or part of the cost of repairing or replacing

such Physical Loss or Physical Damage, the insurers’ liability for such common

and/or concurrent costs will be limited to a proportionate share of such costs.

Page 31: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

Common Costs Formula

The proportionate share of the common and/or concurrent costs to be borne by the

insurers is to be determined using the following formula:

1 x 3

1 + 2

where

1 = the reasonable and necessary costs to repair or replace the Physical Loss

or Physical Damage (including common and/or concurrent costs), adjusted in

accordance with Additional Condition 5.A; and

2 = the actual cost to replace, repair or rectify the defect (including common

and/or concurrent costs); and

3 = the common and/or concurrent costs.

Page 32: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

What Happens Next?

Page 33: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

What Happens Next?

� http://www.lmalloyds.com/lma/Web/Market_Places/_nbsp__nbsp_M

arine/Joint_Rig/Web/market_places/marine/JRC/Joint_Rig.aspx?hk

ey=61ac5d6b-b48c-467f-bde3-f626a36932aa

� Explanatory note

� Respond to JRC by 3 November

� Further revisions and consultation

� Publication in January 2012

Page 34: AOEC 2011 Tim Taylor 30 September 2011.PPT€¦ · WELCAR 2012 Tim Taylor Barlow Lyde & Gilbert LLP 30 September 2011

WELCAR 2012

Tim TaylorBarlow Lyde & Gilbert LLP

30 September 2011