QUALITY CHECK POINTS
No. STATUS
1 NOT OK
2 NOT OK
3 NOT OK
4 NOT OK
5 NOT OK
6 NOT OK
7 NOT OK
8 NOT OK
tight
antenna
There should not be any object infront of the antenna
O/D JUMPER CABLE
Connection between O/D Jumper and antenna should
be ok (Verified by vswr measurement)
REMARKS
clamp
Tilt of the antenna should be as per the RF plan
Azimuth of the antenna should be as per the RF plan
All the nut bolts of the antenna should be properly
There should be presence of lock nut in the antenna
Labelling should be provided at the back side of
PARTICULARS
ANTENNA
Height of the antenne should be as per the RF plan *Height of the second sector ant
than the rf plan
enna is not as per the rf plan
*Antenna is placed 0.5m above
*Electrical tilt is not as per the rf
plan
*Electrical tilt of the second
sector antenna is less than 2
*second sector antenna is 2
clamps
*lock is not tightly connected
to the antenna clamps
*lock is loosend condition
*labelling is not good
*done at front side
*it is not visible from ground
*particle hanging on the front
more than rf plan
*third sector antenna 1
more than rf plan
*nut bolts are not properly
tight
*some nut bolts missing
*nut bolts are different with
each other
*only one lock in the antenna
*looping is done arround
the bottom of antenna
*not connected tightly to the
to the antenna
8/22/2019 ANTENNA Quality
2/10
9 NOT OK
10 NOT OK
*gaps are there on the taping
11 NOT OK
12 NOT OK
*useless portion of tie is notremoved
13 NOT OK
14 NOT OK
15 NOT OK
Useless portion of cable tie should be properly cut
If loop is required by the operator it should be proper
and individual
In closed loop there should be atleast two cable ties
on thejumper
it down
should be proper
Last hand of pvc taping should be bottom to top
There should be three cable ties on weather proofing
Direction and position of knot of cable ties should be
at the same place
Weather proofing of jumper to antenna connection *last covering is butyl tape*last hand of tape is from
top to bottom
*there is a gap between
*last covering is butyl tape
*last hand of taping from
top to bottom
*weather proofing is not in a
proper antenna
*last covering butyl tape
*last hand of the tape is from
top to bottom
cable tie
*cable ties are only at the bottom
of weather proofing
*sharp edges are remain in the
cable tie
*knot of the cable tie are in
different direction
*their occurred a cross looping
*only two cable tie on weather
proofing
*knot of the cable tie is in
different position
*useless portion is not properly
removed
*knot of the cable ties are in
different position
*sharp edges are remain in the
of cables
*the looping is not individual
*only one cable tie is used
*useless portion cable is not
removed
*there is only one cable tie
*the sharp edge is remain
in the cable tie
8/22/2019 ANTENNA Quality
3/10
16 NOT OK
cable tie*at the bend of routing there is
17 NOT OK
routing
18 NOT OK
in the bend
19
NOT OK
*so the routing is not proper
20 NOT OK
21 NOT OK
22 NOT OK *rf connector is not tightly conn
cable
jumper
Labells should be provided at both end of the O/D
RF Cable on VCT
RF Connectorisation as should be proper(same sohuld
be verified by VSWR)
OD jumper to RF connector connection should be
proper(Verified by VSWR meassuerment)
antenna shouldbe togethr on the tower
For the routing of O/D jumper either cable ties should
be provided at a distance of 500mm
There should not be any sharp bend in O/D jumper
At the bend of the jumper,cable ties should provided
at both touching edge
Routing of both the O/D jumper from the same
*useless portion is not
*there is no cable ties on the
bend
*one cable tie is there but not
*chance for cable damage
*at the bend there is no cable
tie
removed
*only one cable tie is used
on the routing
*sharp edge remain in the
no cable tie
*only one cable tie on the
*useless portion of the cable
is not removed
*there is no any jumper clamp
proofing
ected with o/d jumperf cable
*weather proofing not proper
*chance for cable damage
*labelling is not in a proper
manner
*labelling is not visible
*there is some loosening in the
connection
*last hand of tape is from
top to bottom
*and there is gap on weather
8/22/2019 ANTENNA Quality
4/10
23 NOT OK
24 NOT OK *butyl tape is used last
25 NOT OK
26 NOT OK
27 NOT OK
*routing of rf cable through rf
28 NOT OK
29 NOT OK
manner
30 NOT OK
should be proper
be proper
distance from any one edge
Distance between 2 RF clamp should be in between
1 to 1.5Mit should be uniform
Routing of the RF cable through the RF clamp Should
Grouping of the RF cable through the RF Clamp should
be straight
Weather proofing on O/D jumper to RF connector
Last hand of the PVC tape should be bottom to top
There should be 3 cable ties on the weather proofing
Possision and direction of knot of cable ties should be
at the same place
Placement of RF clamp on VCT should be at same
*butyl tape is used on last
taping
*there is a gap between the
taping
*last hand of the taping is from
different position
*sharp edge of the cable tie is
still there
*useless portion is not removed
*rf clamp on vct is at different
distances
*rf clamp is fixed properly
on vct
top to bottom
*gap between the taping
*rubber tape is not used
*only two cable ties are there
*useless portion is not removed
*knot of the cable tie is not in
a same position
*knot of the cable tie is in a
clamp is not straight
*rf clamps are fixed at different
distances
*rf clamp is not fixed properly
on vct
*no. of rf clamp is not acc.
to the length of rf cable
*there is some variation in the
routing of rf cable
*clamps are placed like a zig zag
*the distance between two
clamp is different
*grouping is not done in a
proper manner
*cant identify rf cables
coming from which sector
8/22/2019 ANTENNA Quality
5/10
31 NOT OK
32 NOT OK *laying of rf cable not good
*rf clamp is not tighted with rf
33 NOT OK
*weather proofing is not proper
34 NOT OK *earthing is done in a zig zag
35 NOT OK
*zig zag manner
36 NOT OK
37 NOT OK
38 NOT OK
39 NOT OK
40 NOT OK
place
Weather proofing on the earthing should be proper
Last hand of the PVC should be bottom to top
There should be 3 cable ties on the weather proofing
Direction and position of knot should be at the same
Earthing cable of earthing kit should be routing along
with the same feeder cable
RF Clamp should be properly tight on the cable tray
RF Cable should be properly tight on the RF clamp
Earthing should be made at the distance of 1.5m from
RF connector
All the earthing should be made at the same place
Direction of the earthing should be towards the ground
*it is in a confused manner
*laying of rf cable is not
proper
*cable is not tighted with
rf clamp
cable
*earthing is done 2m away
from rf connector
manner
*no weather proofing
on earthing
*earthing direction upward
*no weather proofing
*rubber tape not used
*gap on taping
*last hand of pvc top to bottom
*pvvc applied from top to
bottom
*gap on the taping
*only two cable ties
*sharp edge remains in the
cable tie
*useless portion is not
removed
*in different place
*useless portion is not
removed
*sharp edge is there
*earthing cable seperately
routed
*direction of earthing cable
upward
8/22/2019 ANTENNA Quality
6/10
41 NOT OK
42 NOT OK
43 NOT OK
44 NOT OK
45 NOT OK
connected
46 NOT OK
47 NOT OK
48 NOT OK
49 NOT OK
50 NOT OK
51 NOT OK
52 NOT OK
towards the ground
C-clamp
300mm
of RF cable
There should be a dummy clamp used at the bend
Labelling should be provided near o/d jumper and
RF cable connection and above the bend
Label on RF cable above the bend should be visible
from the ground
2-Cable from the same sector should be connected
with 1 -C clamp
There should not be any zig zag and upward routingof earthing cable on the earthing kit
Lugs of earthing cable should be properly tight with
Bending radious of RF cable should be greater than
Routing of the earthing cable should be straight
For the routing of the earthing cable of earthingkit atleast 2,3 cables ties should be use
Paint of the tower body should remove for c clamp
Atleast 3 C-clamp should be ues
C-clamp should be properly tight with tower body
*no weather proofing
*routing of earthing cable is
upward
*zig zag routing
*only one cable tie*sharp edge remains on the
*paint is not removed
*cable from sec 1,sec 2
comes in one c-clamp
*painnt is not removed
*zig zag routing*upward routing
*no weather proofing
*lugs are not tightly connected
cable tie
*useless portion not removed
*paint not removed properly
*c-clamp is not properly tight
on the tower body
*2 c-clamp is used
*clamps are not properly tight
*paint is not removed
*nuts of the clamp not properly
*nuts and bolts are not properly
connected
*bending radius is not provided
*laying of rf cable is not proper
*not used
*laying is not proper
*labelling is only in rf cable
*not visible
*labelling is not visible
*below the cable
8/22/2019 ANTENNA Quality
7/10
53 NOT OK
54 NOT OK
55 NOT OK
56 NOT OK
57 NOT OK
58 NOT OK
59 NOT OK
60 NOT OK
61 NOT OK
62 NOT OK
cable
63 NOT OK *routing is not proper
*not connected to EGB
*laying not proper
Possition of the earthing cable on the RF cable should
be at the bottom
2-3 cable ties should be use for routing of earthing
cable along with RF cable
Earthing cable should be straightly routed towards the
ROXTEC & drop to EGB
RF clamp should be properly tight with RF cable
There should be a proper S- bend in RF cable near
Earthing kit on the RF cable should made at the same
Direction of the earthing kit toward the ROXTEC
Earthing cable should be routed along with the same
RF cabletowards the ROXTEC
the ROXTEC
place
Routing of the RF cable through the RF clamp should
Distance of the RF clamp on the HCT it should be less
than 1 M and it should be uniform
RF clamp should be properly tight with HCT
be straight
RF CABLE ON HCT
*routing through rf clamp is not
straight
*lagying of rf cable through rf
clamp not proper
*rf clamp on hct is at different
distances
*rf clamp is not fixed properly
*not properly tighted
*laying of cable is not proper
*not connected properly
*laying of rf cable through rf
clamp is not proper
*no s bend near the roxtec
*rf cables are entering in a
cross manner
*in different place
*placed in a zig zag manner
*no weather proofing
*only one cable tie used
*sharpe edge remains in the
*useless portion not removed
*no weather proofing
*not towards roxtec
*opposite direction
*earthing cable is not routed
with rf cable
*laying of earthing cable not
proper
*earthing is done above the
the rf cable
8/22/2019 ANTENNA Quality
8/10
63 NOT OK
64 NOT OK
64 NOT OK
65 NOT OK
66 NOT OK
67 NOT OK
68 NOT OK
69 NOT OK
70 NOT OK
71 NOT OK
72 NOT OK
73 NOT OK
74 NOT OK
*no bend near the roxtec
*not properly sealed
*wholes are there
*labelling not visible from the
ground
*labelling is in roxtec only
*not visible
*not visible
*label is on opposite side
*entry is not group
*cant identify the sector
*laying not proper
*no grouping
*cant identify the sector
*laying not proper
*entering is in diffrnt boots
*sector cant identified
*cross routing
*not individually connected
*lugs are not proper
*weather oroofing not proper
*lugs not properly connected
*some lugs are missing
*weather proofing not proper
*butyl tape not used
*last hand of pvc from top to
bottom
*weather proofing not proper
*butyl tape not used
*last hand from top to bottom
*only two cable ties
*sharp edge is there
*useless portion not removed
VCT
proofing
ground
Label should be provided at ROXTEC
Label should be provided on RF cable near ROXTEC
Label on the RF cable should be visible from the
Entry of the RF cable through the ROXTEC should be in
One group of RF cable should be from same sector
each group should enter inside the shelter through one
group of boots
There should not be any cross routing of RF cable near
ROXTEC should be properly sealed
group
ROXTEC
Each earthing cable should be individually connected
Lugs of earthing cable should be properly tighted with
Weather proofing of earthing should be proper
There should be three cable ties on the weather
Last hand of the PVC tape should be from ROXTEC to
with EGB
EGB
8/22/2019 ANTENNA Quality
9/10
75 NOT OK
76 NOT OK
77 NOT OK
78 NOT OK
79 NOT OK
80 NOT OK
81 NOT OK
82 NOT OK
83 NOT OK
84 NOT OK
85 NOT OK
86 NOT OK
*only one cable tie
*useless portion not removed
*not properly connected
*lugs are not proper
*cable missing
*lugs are not proper
*insulation not removed
*groundig cable at diffrnt
*pvc tape not applied
lengths
*last covering is butyl
*last hand of tape from top
to bottom
*not routed properly
arrestor
*labelling not visible
*labelling not proper
*not visible from ground
*not properly connected
*lugs are missing
*not properly crimped
*lugs are not properly connected
*one cable is missing
*length of rf cable is 2m
*laying is not proper
*not proper
*not tightly connected
*at diffrnt place
*connetion not proper
*nuo connected properly
*loosening in connector
*labelling only near the surge
insulation of Grounding cable
PVC tape should be properly wrapped on the lugs
Grounding cable should be properly routed by using
Grounding cable should properly connected with IGB
Labelling should be provided over RF cable near surge
Labelling on RF cable should be visible from ground
Grounding cable should be properly connected with
surge arrestor
Lugs should be properly crimped on the grounding
There should not be any gap with lug and O/D
Arrestor
cable tie
cable
Connection of RF cable Should be proper
(verified by vswr measurement)
All the connectors should be made at same place
Tightness of RF connectors over surge arrestor should
be by hand and proper
Length of the RF cable inside the shelter should be
0.5 to 1M(If the location of BTS is near to roxtec)
RF CABLE INSIDE THE SHELTER
8/22/2019 ANTENNA Quality
10/10
87 NOT OK
88 NOT OK
89 NOT OK
90 NOT OK
91 NOT OK
93 NOT OK
*arranged in differntial manner
*laying not proper
*cross loop of jumper cable
*laying of the cable not proper
*not properly connected
*there is a bend in the jumper
*laying not proper
*labelling only at the one end
*Labeling is not vicible
*Labeling is not vicible
*not tightly connected
*loose in the connection
*routing is not proper
*there is a bend in the cable
Arretor
I/D JUMPER CABLE
Jumper connector should be hand tight with surge
Routing the jumper should be proper over I/D cable
There should be a U loop in jumper cable
Jumper should be properly connected with BTS & it
should be hand tight
Labeling should be provided at both the end of jumper
All the labeling should be at the same place
tray
cable