239
ANNUAL REPORT ANNUAL REPORT 2015/2016 2015/2016

ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

ANNUAL REPORTANNUAL REPORT

2015/20162015/2016

Page 2: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

Annual Report for 2015/16

Department of Rural, Environment and Agricultural Development

1

Contents

PART A:GENERAL INFORMATION ................................ .................................................... 3

1.DEPARTMENT GENERAL INFORMATION .......................................................................................... 4

2.LIST OF ABBREVIATIONS/ACRONYMS .............................................................................................. 5

3.FOREWORD BY THE MEMBER OF EXECUTIVE COUNCIL(MEC) ......................................................... 9

4.REPORT OF THE ACCOUNTING OFFICER ................................................................ ........................ 12

5.STATEMENT OF RESPONSIBILITY AND CONFIRMATION OF ACCURACY FOR THE ANNUAL REPORT 29

6.STRATEGIC OVERVIEW ................................................................................................. ................. 30

6.2. Mission ................................................................ ......................................................... 30

6.3. Values ........................................................................................................................... 30

7.LEGISLATIVE AND OTHER MANDATES ............................................................................................ 31

7.1.Constitutional mandates ................................................................................................. ........... 31

8.DEPARTMENTAL EXECUTIVE MANAGEMENT ................................................................................. 35

9.ENTITIES REPORTING TO THE MEC ................................................................ ............................... 36

PART B:PERFORMANCE INFORMATION ................................ ........................................ 37

1.AUDITOR GENERAL’S REPORT: PREDETERMINED OBJECTIVES ....................................................... 38

2.OVERVIEW OF DEPARTMENTAL PERFORMANCE ............................................................................ 38

2.1 Service Delivery Environment ........................................................................................ 38

2.2 Service Delivery Improvement Plan ............................................................................... 41

2.3 Organisational environment ....................................................................................... 73

2.4 Key policy developments and legislative changes .................................................. 75

3.STRATEGIC OUTCOME ORIENTED GOALS ....................................................................................... 76

4.PERFORMANCE INFORMATION BY PROGRAMME .......................................................................... 78

4.1 Programme 1: Administration.......................................................................................... 78 4.2 Programme 2: Sustainable Resource Management.......................................................... . 96

4.3 Programme 3: Farmer Support and Development............................................................100

4.4 Veterinary Services...................................................................................................... ......104

4.5 Research and Technology Development...........................................................................108

4.6 Agricultural Economics Services........................................................................................111

4.7 Structured Agricultural Education and Training................................................................114

4.8 Rural Development Coordination......................................................................................117

4.9 Environmental Services.....................................................................................................121

5.TRANSFER PAYMENTS .................................................................................................................. 133

5.1.Transfer payments to public entities ................................................................................... 133

6.CONDITIONAL GRANTS ................................................................................................................. 133

Page 3: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

Annual Report for 2015/16

Department of Rural, Environment and Agricultural Development

2

6.1. Conditional grants and earmarked funds paid ............................................................ 133

6.2. Conditional grants and earmarked funds received ...................................................... 134

7.DONOR FUNDS ............................................................................................................................. 136

7.1. Donor Funds Received .............................................................................................................. 136

8.CAPITAL INVESTMENT .................................................................................................................. 136

8.1. Capital investment, maintenance and management plan................................................ 136

8.1.1Capital Investment ............................................................................................................... 136

The department did not have any capital projects for the year under review. ..................... 136

8.1.2. Maintenance ....................................................................................................................... 136

PART C: GOVERNANCE ................................ .................................................................. 138

1. INTRODUCTION ................................................................................................. ................. 139

2. RISK MANAGEMENT ............................................................................................................ 139

3. FRAUD AND CORRUPTION ................................................................................................. . 142

4. MINIMISING CONFLICT OF INTEREST .................................................................................. 145

5. CODE OF CONDUCT ............................................................................................................. 145

6. HEALTH SAFETY AND ENVIRONMENTAL ISSUES .................................................................. 146

7. PORTFOLIO COMMITTEES .................................................................................................... 147

8. SCOPA RESOLUTIONS........................................................................................................... 147

9. PRIOR MODIFICATIONS TO AUDIT REPORTS ........................................................................ 148

10. INTERNAL CONTROL UNIT .................................................................................................... 148

11. INTERNAL AUDIT AND AUDIT COMMITTEES ........................................................................ 148

12. PROVINCIAL AUDIT COMMITTEE REPORT .......................................................................... 149

PART D: HUMAN RESOURCE MANAGEMENT ................................ .............................. 154

Employment and vacancies.......................................................................................................... 155

Job evaluation ............................................................................................................................... 156

Employment equity ......................................................................................................................... 159

Employment equity ....................................................................................................................... 160

Foreign workers ............................................................................................................................ 164

Leave utilisation for the period 01 January 2015 to 31 December 2015 ............................... 164

Labour relations ............................................................................................................................ 166

PART E: FINANCIAL INFORMATION ................................ .............................................. 168

Page 4: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

3

PART A: GENERAL INFORMATION

Page 5: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

4

1. DEPARTMENT GENERAL INFORMATION

PHYSICAL ADDRESS: AgriCentre Building

Cnr. Dr. James Moroka and Stadium Rd

Mmabatho 2735

POSTAL ADDRESS: Private Bag X2039

Mmabatho

2735

TELEPHONE NUMBER/S: +27(18) 389 5111

FAX NUMBER: +27 (86) 536 8496

EMAIL ADDRESS: [email protected]

WEBSITE ADDRESS: www.gov.za/agriculture

Page 6: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

5

2. LIST OF ABBREVIATIONS/ACRONYMS

ABET Adult Basic Education and Training

AEPIS Agricultural Economics Project Information System

AGSA Auditor General South Africa

AGRIBEE Agricultural Black Economic Empowerment

AHRS Animal Health Rating Scheme

AI Avian Influenza

AMP Agricultural Master Plan

APP Annual Performance Plan

BPDM Bojanala Platinum District

BSE Bovine Spongiform Encephalopathy

CA Contagious Abortion

CAADP Comprehensive Africa Agriculture Development Programme

CASP Comprehensive Agricultural Support Programme

CRDP Comprehensive Rural Development Programme

CSF Classical Swine Fever

DAFF Department of Agriculture, Forestry and Fisheries

DARD Department of Agriculture and Rural Development

DBSA Development Bank of Southern Africa

DMC Departmental Management Committee

DORA Division Of Revenue Act

DPSA Department of Public Service and Administration

EAP Employee Assistance Programme

EDMC Extended Departmental Management Committee

EIA Environmental Impact Assessment

EID Economic and Infrastructure Development Cluster

EMI Environmental Management Inspections

EMP Environmental Management Plan

Page 7: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

6

EPWP Expanded Public Works Programme

FET Further Education and Training

FTE Full Time Equivalents

GIS Geographic Information System

HEQF Higher Education Qualification Framework

HET Higher Education and Training

HIV/AIDS Human Immunodeficiency Virus/ Acquired Immune Deficiency Syndrome

HOD Head of Department

HR Human Resource

HRM Human Resource Management

ICT Information and Communication Technology

IDC Industrial Development Corporation

IFS Interim Financial Statements

IMP Integrated Management Plan

IPMP Infrastructure Programme Management Plan

IRM Infrastructure Reporting Model

IT Information Technology

IT Information Technology Master System Plan

IYM In-Year Monitoring

KKDM Dr Kenneth Kaunda District

LIP Labour Intensive Programme

M&E Monitoring and Evaluation

MEC Member of Executive Council

MoU Memorandum of Understanding

MSP Master Systems Plan

MTEF Medium Term Expenditure Framework

MTSF Medium Term Strategic Framework

MPAT Management Performance Assessment Tool

MRRRP Mahikeng Revitalisation, Repositioning, and Renewal Programme

Page 8: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

7

NMMDM NgakaModiriMolema District

NPI New Performance Indicator

NWP North West Province

OHS Occupational Health and Safety

PA Performance Agreement

PAHC Primary Animal Health Care

PFMA Public Finance Management Act

PI Performance Indicator

PMDS Performance Management and Development System

R&D Research and Development

RC Resource Centre

RRR Rebrand, Reposition and Renew

RSA Republic of South Africa

RSMDM Dr Ruth SegomotsiMompati District

SADC Southern African Development Community

SCM Supply Chain Management

SDIP Service Delivery Improvement Programme

SG Strategic Goal

SIP Strategic Integrated Project

SLA Service Level Agreement

SMART Specific Measureable Accurate Reliable Time bound Act

SMS Senior Management Service

SO Strategic Objective

SSA Social Security Administration

StatsSA Statistics South Africa

TB Tuberculosis

ToR Terms of Reference

U-AMP User Asset Management Plan

UNISA University of Southern Africa

Page 9: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

8

WO Work Opportunities

WSP Workplace Skills Plan

YARD Youth in Agriculture and Rural Development

Page 10: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

9

3. FOREWORD BY THE MEMBER OF EXECUTIVE COUNCIL(MEC)

I take pleasure in presenting the Departmental Annual Report for

the financial year 2015/16, satisfied by the achievements

realized by this Department despite encountered service delivery

and organisational challenges.The agricultural sector in recent

times, on the back of severely sub-normal rainfall and heat

waves has met head-on with the drought. Having to see animals

die of hunger and fertile soil disappears in storms requires resilience and emotional

strength of a very special kind. The current drought is of such intensity and

magnitude that it was beyond the planning ability of any farmer, regardless of his

or her resource-base. While South African farmers compete in a fierce global

environment and have often been described as some of the best in the world, both

in terms of planning and production, the disaster that we now face is such that

farmers cannot and could not cope with it as part of normal risk-planning.

Statistics South Africa 2015 report stated that at least 14 million poverty stricken

families do not know where their next meal is going to come from. The year

2015/16 was declared the driest year in South Africa over a century and this has

adversely affected the state of food security. For the period under review, the

National Crop Estimates Committee anticipated harvest of just over 7 million tons

which is 29% lower than the previous year.

Furthermore, the Department marshalled a rewarding Provincial Dialogue with the

financial institutions with the aim of finding solutions to the current drought crisis.

Emanating from the Provincial Dialogue, a Provincial Task Team on Financing

Agriculture was established to examine and advance concrete remedial options that

will prepare farmers in the province the next planting season. The Dialogue further

highlighted the plight of South African farmers and brought to light the dire

consequences of an ailing agricultural sector.This was a reaffirmation by the

Hon M. Tlhape Executive Authority

Page 11: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

10

department that immense work is at hand for the department in sustaining food

security.

The agricultural sector is an important purchaser of the products and services of

other sectors, which contribute to the manufacturing aspect of GDP. The decline in

agricultural production as a result of drought will inevitably influence activity in

these input sectors. The South African Agricultural Machinery Association (SAAMA)

has already reported that as at January 2016, yearly tractor sales were down 11%

and sales of combine harvesters declined by 30% as a result of drought.

Producers of seed have also reported severe increases in unsold maize seed stocks

that will not be fit for resale in the next production season.

The role of environmental development and management is precarious in our

province. It calls for a delicate balancing act as we ensure maximum and

sustainable use of our already strained resources. It is through this responsibility

that we aim to transform approaches on environmental protection while retaining

the balance for socio-economic development.

As one of the key players in the sector, we have been touched by the outpouring of

support from all corners of South Africa. We are propelled by the belief that the

agricultural sector belongs not only to the farmers of our country, but to every

South African. It is with this in mind that we urge our key players in government

and business to carry on with their support efforts and to continue to work closely

with the farmers as we recover from this disaster.

I wish to thank all stakeholders that have participated in compiling this Annual

Report and trust that we will, in the coming financial year, be able to devise

suitable remedial measures to deal with the after effects of the drought.

Page 12: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

11

I hope this report shall meet the expectations of the public we serve, and shall

serve as a record of our contribution to halve poverty and create employment to

our people.

MANKETSI TLHAPE

MEC of the Department of Rural, Environment and Agricultural Development

29 August 2016

Page 13: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

12

4. REPORT OF THE ACCOUNTING OFFICER

Overview of the operations of the department

Our organisational goal to achieve clean governance is still on track

for the issues that were raised by the Auditor General. The audit

action plan has been developed as per the timelines and programme

managers implemented their projects according the prescripts and

regulations.

As one of our three key mandates, Rural Development is about enabling rural people

to take control of their destiny, thereby dealing effectively with rural poverty through the

optimal use and management of natural resources. The department continued the roll

out of the CRDP to bridge the false dichotomy between the urban and rural space as well

as empowering vulnerable groups which included women, youth, unemployed, people

living with HIV/AIDS, people living with disabilities, child-headed households, and older

persons. Department facilitated Integrated development and social cohesion as part of

the CRDP through participatory approaches in partnership with all sectors of society.

In pursuit of the Rural Development mandate, department further ensured at least fifty

percent (50%) of both internal and external stakeholders contributed to the

implementation of the rural development programme in line with the Rural Development

Plan (technical and financial resources) during the 2015/16 financial year.

As per the published 2013 North West Environment Outlook report, the state of the

environment in the North West has unfortunately not shown much improvement over the

past five years. Although a range of policies, guidelines and regulations have been

published, effective change still needs to manifest.

Dr P.J. Mokaila Head Of Department

Page 14: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

13

The identified „Tipping points‟ currently facing the North West Province to achieving

sustainability in the North West Province are:

A future without water

Competition for land by different land uses, which could comprise the “wise use”

of land

Climate Change impacts

Inadequate Waste management practices

The Environmental Services programme in NW READ responded to these challenges and

„tipping points‟ through implementing the gazetted NW Environmental Implementation

Plan (EIP) 2015-2020, which is required in terms of Chapter 3 of the National

Environmental Management Act (Act 107 of 1998). The North West Environmental

Implementation Plan 2015-2020 contains specific targets and outcomes to be achieved

by different departments. It also specifies responsibilities and timeframes for the

implementation of the different actions identified. Furthermore, the targeted actions in

the NW EIP 2015-2020 are aligned with Outcome 10 Delivery Agreement.

The drought experienced during the period under review had a devastating effect on

South African agriculture. The existence of drought-induced recessionary pressures on

the agricultural sector during 2015 was confirmed by Statistics South Africa which

reported year-on-year declines in seasonally adjusted sectoral Gross Domestic Product

(GDP) for all of the first three quarters of 2015 (-18% in Q1; -19.7% in Q2 and -12.6%

in Q3).

The maize crop having been reported at a level of 9.9 million tons in 2015 (a tonnage

already significantly below the norm) contributed greatly to the reported decline in

sectoral value-add.

The severe drought has fastened its grip on the agricultural sector resulting in:

Natural grazing becoming seriously depleted leading to the forced slaughtering of

livestock, livestock deaths due to fodder unavailability and increasingly questionable

prospects for veld recovery in 2016

Page 15: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

14

Reduced plantings of summer cash crops, particularly in the western regions. The

Crop Estimates Committee (CEC) has estimated that the area of maize planted for the

2015/16 season could total approximately 2 million hectares, 25% lower than the

area planted in the 2014/15 season

Extremely high temperatures especially in December 2015 and January 2016. These

above – normal temperatures have affected pollination in a number of areas

(including irrigation areas) and will likely result in lower yields

A looming grain deficit especially toward the second half of 2016 resulting in maize

import requirements of up to 3-5 million tons. This will undoubtedly place pressure on

South Africa‟s balance of payments.

A total of 21 717 farmers were assessed following the declaration of the disaster by Hon

Premier. Twenty five million (R25m) was appropriated for this program through funds

reprioritisation process. To date, 15 915 qualifying farmers emergency received fodder

relief assistance across the all affected areas in the province, 23 boreholes were sighted,

drilled and equipped, over 500 000 litres of water tankered to distress farms for

livestock. Besides this, 1 324 households were bolstered up on food security programs

and ninety six (96) awareness events were conducted on drought mitigation to our

farmers.

In consonance with the “Food and Nutrition Security Strategy”, the department created

ways for the North West people to feed themselves and ensured that the province is

food and nutrition secure. The Department has once more established 48 vegetable

tunnels in NgakaModiriMolema District through this programme.

Department‟s visibility in the Tswaing Local Municipality during March to extend food

security efforts and launch the Community Seedbank Project as part of our Annual

Extension and Advisory Services Conference did not go unnoticed. Work has been done

to erect food garden tunnels for the 67 households who are mainly elderly people,

orphans and child headed families and 11 institutions to the tune of R3 million. The

programme will be extended to supply an additional 126 households with vegetable seed

packets in order for food security efforts to bear fruits.

Page 16: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

15

The commitment by the department to put into production 20 000 hectares of the

unused communal land still remains on course although not short of challenges. To

date, R14 million was spent on the 16 118ha of cropping lands in areas of Tswaing,

Mahikeng and Ditsobotla. The impact of drought limited our progress, and we salute our

farmers for their remarkable persistence to plant crop that suits the weather conditions

as well as rain patterns.

In the expansion of irrigation schemes across the province, 60 hectares in Taung

and Disaneng have been developed under irrigation and the provincial comprehensive

strategy was developed during the period under review.

Four sites have been identified to establish AgriParks. These areas include

Springbokpan, Vryburg, Moretele and Maquassi Hills (Klerksdorp). The infrastructural and

mechanical refurbishment of the Springbokpan Grain Value Chain AgriPark, have been

accomplished and the facility will be operational during this harvest period. In Dr. Ruth

SegomotsiMompati, stakeholder mobilization has taken place, and a site for the

establishment of the AgriPark has been identified. For the Bojanala AgriPark, a business

plan has been developed as well as identifying of key anchor projects to support it, while

Maquasie Hills consultations with key stakeholders is ensuing.

A total of twenty eight (28) Magosi in the Bokone Bophirima Province have benefitted

from the TshimoYaKgosi programme during the period under review. Benefits included

livestock and crop production mechanization packages to the tune of R11.2 million.

For the North West Nguni Cattle Development Program, 13 applications

benefitting five projects were approved during 2015/16 year. To date we have 89 project

sites with 196 beneficiaries and these include 64 women and 34 young people. Since its

inception, an estimated amount of R24 million has been invested into the project. We

treasure some beneficiaries who stood out amongst the rest and these include a family

of Medupe in Ventersdorp as well Moeketsi in Driehoek. Both Families have long returned

their loans but are still striving as Nguni Breeders. This has paid off handsomely, when

they prestigiously won the ARC Nguni Beef cattle Improvements Awards during 2015.

We greatly congratulate the two for their farming excellence.

Page 17: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

16

As part of Departmental Livestock Improvement Plan anchored by quality tested

genetic material in partnership the Agricultural Research Council, a total of 52 bulls and

142 cows and heifers were distributed to farmers in Bojanala District, 41 bucks & 23

ewes for Dr Ruth SegomotsiMompati District.

The department successful embarked a third farmers’ Market in Mogwase, Bojanala

Platinum District as an effort to facilitate the survival of the small holder producers, who

might, when well-organised, share the envisaged market infrastructure and transport,

resulting in some economies of scale to their advantage.

Department has in the past year brought about the Driefontein Livestock Auction at

a cost of R1, 5 million. This is a first auction initiative in the rural communities and came

as result of continuous enormous challenges faced by communities in relation to market

access. The turnover in the very first auction was R1 548 365.00 (One million, five

hundred and forty eight thousand, three hundred and sixty five Rands). We appreciate

the role played by communities of Morokweng, Bona-Bona as well as Tseoge.

The year under review witnessed a very triumphant Bokone Bophirima Annual

Agricultural Show that was held at Kgora Farmer Training Centre with a total cost of

R6 million. The momentous event provided a golden opportunity for smallholder

producers to exhibit their products, knowledge and technologies. In branding the show,

an Agribusiness Legacy Development Project was launched to catalyse partnerships with

the private sector on the establishment of various Agricultural Business Enterprises for

Women and Youth. The show is geared to expand and diversify into a world class

Agricultural Growth and Investment Initiative for the coming season.

A call by our Premier during the SOPA 2016 address on the reviving of the VTSD

economies remains one of our priorities. Out of the 60% procurement target towards

these sites, we proudly report that 74% was achieved through goods and services

provision, key departmental events capital projects.

Page 18: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

17

Department has in the past financial year initiated several agro-processing projects,

these include abattoirs, milling and feedlots in line with the Agripark approach and the

Provincial Agro-processing Strategy. Of the total amount of R58 million that was

budgeted for the projects, most of the funds were redirected to the drought relief

initiative. Despite the drought challenges, excellent progress was registered in the

implementation of the Bokone Meats and Monontsha Agro Projects in Klerksdorp and

near Magaliesberg in Bokone Bophirima respectively. These agro business enterprises

are meant to become game changers and catalysts in the area of commercial primary

livestock production and processing in the Province.The projects affected by drought will

continue into the new financial year and an amount of R43 million has been aside for

their implementation.

A total of R7.3 million was spent on three landcare projectscreating 369 green jobs for

the year under review in RamotshereMoiloa, Kagisano Molopo and Greater Taung Local

Municipalities. Work is still ongoing at the Comprehensive Rural Development

Programme sites (CRDP sites) with the cooperation of sister Departments and other

stakeholders.Department has as part of the Youth and Women sectors transformation

re-launched Women in Agriculture and Rural Development (WARD) as well as Youth in

Agriculture and Rural Development (YARD) structures.

Taung and Potchefstroom Colleges of Agriculture as well as Kgora Farmer Training

Centre are strategically placed to enhance the performance of our Province on the ideals

of the National Development Plan. As part of our expansion of farmer agricultural

training, we have established a Satellite Farmer Training Centre at Moretele. The Taung

Agricultural College and the Kgora Farmer Training Centre continues to enjoy its

accreditation status. Through the Danish HaldorTopsoe donation to Taung Agricultural

College towards it being a centre of excellence in irrigation agriculture, work on the soil

and water laboratory and the water reticulation system is at an advanced stage.

As part of maintaining our accreditation status we will continue with infrastructural and

other developments to the three sites which ensured that 50 students graduated at

Potchefstroom Agricultural College on mixed farming and 750 farmers were trained

Page 19: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

18

during 2015/16. Further the first graduation ceremony for Taung Agricultural College will

take place in the month of May following the new accreditation curriculum on irrigation

agriculture.

As spelled out during the President‟s State of the Nation‟s address on Phakisa, the

province has made its mark through continued development of aquaculture and

inland fisheries. A provincial hatchery has been established in Disaneng. The facility

will be strengthened to meet the needs of the province.

As announced by the National Minister during the budget speech, the department has

signed into law the Compulsory Community Service throughout the rural areas for newly

qualified veterinarians. This saw a total of 11 newly qualified Veterinarians deployed with

the intention in increasing access of Veterinary Services to the Villages, Townships and

Small Dorpies.

Regarding veterinary interventions, department visited 12431 epidemiological units

throughout the province. This action was achieved through conducting 151 000 tests in

line with ISO 17025 standards. In facilitating exports, a total of 3 460 clients were

serviced for animal and animal products export control.

One of department‟s key achievements of note in the Environmental sector is the

publication of the North West Air Quality Management Plan (AQMP) 2015. Air

quality is one of the pressures leading to climate change. In our attempt to make a

meaningful contribution towards the mitigation initiatives, the department in partnership

with the national Department of Environmental Affairs (DEA), hosted a provincial

stakeholder consultation workshop in September 2015 in preparation for South

Africa‟s participation in the climate change negotiations at the United Nations Framework

Convention on Climate Change (UNFCCC) COP 21 in Paris, France.

Stakeholders were consulted on South Africa‟s Intended National Determined

Contribution(INDC). To date, the department managed to develop the North West

Vulnerability Assessment and Adaptation strategies for the most vulnerable

Page 20: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

19

sectors in the province. This work will culminate into an overall North West Climate

Change Response Strategy, which will be developed within the next two years.

The NW Environmental Implementation Plan EIP 2015-2020 was finalized and

gazetted in May 2015, as required by the National Environmental Management Act,

1998. It is worth noting that the North West province was the only province that

managed to achieve this milestone within the required timeframe in the country. This is

another effort in contributing towards the SaamwerkSaamtrek approach.

READ has successfully launched one momentous game transformation project in

partnership with the South African Rare Game Breeding Holdings in Kgetleng River Local

Municipality.

The management of tuberculosis in buffaloes within the Madikwe Game Reserve

has taken an absolute new turn through the approval of the plan by DAFF to pursue

cleansing option rather than direct culling which has vast consequences. The plan is set

to roll out from the 16th May 2016 through a team of experts for the next eighteen

months.

The work of the department on the restoration of the Taung Skull World Heritage

site is quite satisfactory. An amount of R33 million was spent on key deliverables

including construction of the road to Thomeng, water works at Buxton, Draaihoek,

Mokassa and Tamasikwa; protection of the core area to ensurethat the open and

sensitive caves that house historic information about the origins life are not destroyed by

animals.

Magaliesberg area has been declared a Biosphere Reserve by the United Educational

Scientific and Cultural Organisation (UNESCO) during the period under review. This

declaration means that we will have improved management of landscapes, ecosystems

approaches for integrating the management of land, water and biodiversity for

conservation for a fair and sustainable use. Institutions and landowners will be

Page 21: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

20

empowered on promoting sustainable development for socio-economic upliftment around

Biosphere.

The Department has also declared Molopo Oog and Rasoord as nature reserves and

these areas will be monitored for compliance.Furthermore,Groot Marico was declared

as a protected environmental site and the application process for listing it as a biosphere

is planned to commence this year.

Department has made strides in ensuring that the North West Biodiversity Bill is

developed. Further to this, we managed to develop and publish the NW Biodiversity

Sector Plan 2015 which will be used to inform spatial planning and decision-making on

developments in the province.In pursuit of the healthy and sound environment,

Department conducted 1 845 compliance inspections and 112 enforcement actions

were undertaken.

Regarding job creation efforts, department created a total of 484 EPWP Work

opportunities and 416 Full Time Equivalents (FTEs) through implementation of 16

projects during the 2015/16 financial year.

Amid delivery of services,the department also has a system to continually reflect on

accountability, fairness, and transparency in it‟s relationship with all stakeholders.

Department continued to reflect on its milestones in the commitments that we make on

procedures for proper supervision, control, and information-flows to serve as a system of

checks-and-balances.

Employment Equity statistics in relation to women at the Senior Management Service

(SMS) level have improved since last year and now stands at 39% to 61% males, as

compared to 34.7% females and 65.3% males in the previous reporting. It is the

intention of this department to continue ensuring that suitably qualified women are

employed in all vacant SMS positions. In our endeavour to ensure that this department

Page 22: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

21

becomes representative of the population of this province, the department intends

prioritising women and people with disabilities when filling vacant posts.

The Internship and Learnership programmes are an integral part of our

department. Department has tailored departmental programs to offer our students

personal exposure to the real world and actual working life experience as an experiential,

foundation to their career choices. READ managed to train 20 interns who have

completed their 12 months in February 2016. In 2015/16 department had 12 full time

employees on learnership, 40 unemployed youth on learnership and 23 bursars.

4.1. Overview of the financial results of the department

4.1.1. Departmental receipts

Revenue item sale of goods and services other than capital assets has the following main

categories;

Departmental receipts Actual Actual

Amount

CollectedAmount

Collected

R’000 R’000 R’000 R’000 R’000 R’000

Dividends - - - - - -

Sale of goods and services other than

capital assets 11 345 8 453 -2 892 15 482 8 785 6 697

Fines, penalties and forfeits 850 351 -499 686 350 336

Sale of Scrap - - - - - -

Interest, dividends and rent on land 22 - -22 27 - 27

Sale of capital assets 2 100 2 680 580 1 010 3 868 -2 858

Financial transactions in assets and

liabilities 800 380 -420 993 501 492

Total 15 117 11 864 -3 253 18 198 13 504 4 694

2014/15 2015/16

Estimate(Over)/Und

er Collection Estimate

(Over)/Unde

r Collection

Page 23: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

22

4.1.2. Programme Expenditure

4.1.3. Unauthorised, fruitless and wasteful expenditure

o Unauthorised expenditure:- The department has been allocated funds

through the provincial legislature to finance the write-off of the

unauthorised expenditure amount reported in the financial statements.

o Irregular expenditure:- The department closed the financial year with

irregular expenditure of R157 million during the financial year with R154

millions of this amount arising out of transactions with the contractor to

carry out infrastructure projects for the department. The irregularity arose

out of gaps in the contract with no losses suffered by the department.

o Fruitless expenditure:- A total of R111 000 was reported as fruitless

during the financial year. The nature of these expenditures were such that

no official could be apportioned any wrong doing thereon and HOD granted

affected offices authority to have these expenditures written off.

Programme Name Final Actual Final Actual

Appropriat

ionExpenditure Appropriation Expenditure

R’000 R’000 R’000 R’000 R’000 R’000

Administration 190 655 183 867 6 788 227 409 227 352 57

Sustainable Resource Management 94 178 93 956 222 37 376 36 703 673

Farmer Support and Development 367 891 357 363 10 528 396 924 392 924 4 000

Veterinary Services 100 493 99 297 1 197 100 785 100 778 7

Research and Technology

Development 48 001 45 467 2 534 48 875 48 818 57

Agricultural Economics Services 10 974 10 691 283 10 833 10 819 14

Structured Agricultural Education

and Training 73 075 70 250 2 825 91 903 91 892 12

Rural Development Coordination 39 063 38 382 681 49 486 49 460 26

Environmental Services 179 356 172 787 6 569 128 395 128 313 82

Total 1 103 687 1 072 060 31 627 1 091 988 1 087 059 4 929

2014/15 2015/16

(Over)/

Under

Expenditure

(Over)/Unde

r

Expenditure

Page 24: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

23

4.2. Future plans of thedepartment

The following are the key future plans and upcoming programmes and projects of the

department:

Intervention/Action Key deliverables

1. Extension of food garden projects and Community seedbank

Supply 126 households with vegetable seed packets

2. Mazista Food Security Project in the Kgetleng Local municipality

Communal vegetable garden Indigenous chickens initiative which will benefit

20 households 3. Provincial Food Security Programme 200 tunnels established throughout the province to

include MKVAbeneficiaries

4. Crop MassificationProgamme Cultivate 12 000 hectares for food production in

communal and land reform areas

Refurbishment of Vryhof and Kraaipan Silos

5. Expansion of Irrigation Schemes Development of the Provincial comprehensive

Irrigation strategy Irrigation infrastructure development for

maintenance and expansion of the Taung, Molatedi and Disaneng Irrigation Schemes

6. Grain Value Chain Investigate possible partnership with Noord-Wes

Koporasie through consultation with the Provincial Treasury

7. Agri-Parks OperationaliseSpringbokpan Grain Value Chain

Agri-Park during May 2016 Finalise Business Plans for Vryburg,

Moretele&Maquassi Hills Agri-Parks

8. TshimoYaKgosi 11 Dikgosi to receive livestock and crop production support

9. SANDAF Smallholder Producers Market

Access Programme

Implement the program for smallholder producers

to have market access opportunity for agricultural

products through rigorous supply and support

10. Livestock Auction Initiative Establishment of the Livestock Auction pens in Greater Taung Local Municipality

11. Agricultural Growth and Investment

Initiative

Hosting Agricultural Growth & Investment Show

Page 25: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

24

Intervention/Action Key deliverables

12. VTSD Economic Contribution 70% Procurement target towards VTSD

13. Agro-processing Establishment of partnership hub on herbal

production and processing with Indian investor as

part of Monontsha project

14. Landcare Junior Land-carers to attend the 7th Biennial Landcare Conference in Kimberley, Northern Cape

Five landcare projects to be implemented in Ratlou, Tswaing and Moretele Local

Municipalities.

15. Comprehensive Rural Development Programme (CRDP) Sites

Addressing basket of service needs identified by

communities in all 8 declared CRDP sites.

16. Women and Youth Building the capacity of YARD & WARD institutions

Hosting Youth in Agriculture Awards 17. Agricultural Training and capacity

building

Infrastructural and other developments to Taung

Agricultural College, Potchesfstroom Agricultural College & Kgora Farmer Training Centre

First graduation ceremony for Taung Agricultural College will take place in the month of May

following the new accreditation curriculum on irrigation agriculture.

18. Aquaculture and Fisheries Strengthening provincial hatchery in Disaneng.

Training emerging Farmers and extension

officers in aquaculture. Providing necessary support and resources to

small-scale fishers Leveraging Malaysian partnership for technical

exchange, research, capacity building Seeking international donor funding for the Aquaculture and fisheries programs

19. Veterinary Services

Visit 12920 epidemiological units

Conducting 145 000 tests in line with ISO 17025

standards

2815 clients serviced for animal and animal

products export control

20. Climate Change North West Climate Change Response Strategy

Page 26: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

25

Intervention/Action Key deliverables

21. Game transformation project Monitoring and implementation of the

mentorship programme Hosting Wildlife Indaba

22. Management of tuberculosis in buffaloes within the Madikwe Game

Reserve

Roll out tuberculosis cleansing programme from the

16th May 2016 through a team of experts for the

next eighteen months

23. Taung SkullWorld Heritage Site Restoration of the Powerhouse, Mine manager‟s

office, Trail Paths and Signage

Designs and approval for the development of the

Taung Skull Museum and exhibition

Implementation of the necessary infrastructure for water and energy services for the TSWHS.

24. Magaliesberg Biosphere Reserve Functional Board Appointed Signing of implementation protocol with Gauteng

province Business plan development

25. Nature reserves Compliance monitoring of Molopo Oog and Rasoord

nature reserves

26. Protected Environmental sites Commencing application process for listing of Groot

Marico as a biosphere

27. North West Biodiversity Bill Development of the regulations and the enactment

of the Bill

28. EIA applications processes Conducting workshops on EIA process,

Encouraging pre-consultation meetings Screening of applications being Lodged

Development and distribution of guideline material

Implementation protocol to all organs of state

29. Environmental Management Licensing Environmental Impact Assessment, Waste

Management and Atmospheric Emission Licence

applications received finalised within legislated

timeframes

30. Monitoring compliance and enforcement to environmental legislation

Conducting 1300 Inspections

Undertaking 54 enforcement actions

31. Job Creation Creating 800 EPWP Work Opportunities

Page 27: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

26

Intervention/Action Key deliverables

32. Internship & Learnership programmes Training of 30 interns

Continue with 22 bursars

4.3. Public Private Partnerships

The Department established strategic partnerships to assist service delivery and for

mutual benefit of the parties. These are not private public partnerships as envisaged

by the Treasury Regulations but rather joint projects undertaken.

4.4. Discontinued activities / activities to be discontinued

There were no key activities discontinued during the period under review

4.5. New or proposed activities

The following are the new or proposed interventions by the Department over the next

MTEF period:

1. Improving land administration and spatial planning for integrated development in

rural areas

2. Improving food security through FetsaTlala programme

3. Smallholder farmer development and support (technical, financial, infrastructure) for

agrarian transformation

4. Development of Villages, Townships and Small Dorpies (VTSD) economies by growing

sustainable rural enterprises, cooperatives and industries characterised by strong

rural-urban linkages, increased investment in agro-processing, access to markets and

financial services– resulting in rural job creation

Page 28: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

27

5. Growing the share of production and employment of the agricultural productive

sectors through implementation of SONA transversal programmes and APAP Strategic

Commodities

6. Workers‟ education and skills increasingly meeting economic needs

7. Addressing Spatial imbalances in economic opportunities through expanded

employment in agriculture

8. Sustaining Ecosystems and using natural resources efficiently

9. Development and implementation of effective climate change mitigation and

adaptation response

10. An environmentally sustainable, low-carbon economy resulting from a well-managed

just transition

11. Enhanced environmental governance systems and capacity

4.6. Supply chain management

4.6.1. List of unsolicited bid proposals concluded for the year under review

The Department followed prescribed supply chain management procedures for the

appointment of service providers. There were no unsolicited bids for the year under

review.

4.6.2. Supply Chain Management processes and systems to prevent irregular

expenditure

There are clear SCM processes and systems in place to prevent irregular expenditure.

The delegations were rolled out with clear guidelines. Bid Committees were also

operational which assisted the Department in the curbing of irregular expenditure. The

reopening of the Internal Control Unit also ensures that the expenditure incurred is in

line with the Departmental policies and procedures.

Page 29: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

28

4.6.3. Challenges experienced in Supply Chain Management

There were no major challenges for the year under review.

4.7. Gifts and Donations received in kind from non related parties

The Department has not received any donor funding during the period under review.

4.9. Exemptions and deviations received from Treasury No exemption from the PFMA or TR or deviation from the financial reporting

requirements received for the current and/or previous financial year.

4.10. Events after the reporting date

No events after the reporting date

4.11. Other

No any other material fact or circumstances, which may have an effect on the

understanding of the financial state of affairs, not addressed elsewhere in this report.

4.12. Acknowledgement/s or Appreciation The department wish to acknowledge Mme TlameloMfaladi from Tlamelo Fresh Produce

for being the overall winner of the North West Female Entrepreneurial Awards. Tlamelo

Fresh Produce supplies vegetables to Pick „n Pay, Choppies Supermarkets, Klerksdorp

Fresh Produce Market, schools, restaurants, several fruit and vegetable stores, hawkers

as well as individuals and caterers.

4.13. Conclusion

The report generally shows that departmental performance for the period under review

is at 89% with most of the commitments made by the department achieved.

4.14. Approval and sign off

_________________ Dr P.J. Mokaila Accounting Officer Department of Rural, Environment and Agricultural Development Date: 29 August 2016

Page 30: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

29

5. STATEMENT OF RESPONSIBILITY AND CONFIRMATION OF ACCURACY FOR

THE ANNUAL REPORT

To the best of my knowledge and belief, I confirm the following:

All information and amounts disclosed throughout the annual report are consistent.

The annual report is complete, accurate and is free from any omissions.

The annual report has been prepared in accordance with the guidelines on the annual

report as issued by National Treasury.

The Annual Financial Statements (Part E) have been prepared in accordance with the

modified cash standard and the relevant frameworks and guidelines issued by the

National Treasury.

The Accounting Officer is responsible for the preparation of the annual financial

statements and for the judgements made in this information.

The Accounting Officer is responsible for establishing, and implementing a system of

internal control that has been designed to provide reasonable assurance as to the

integrity and reliability of the performance information, the human resources

information and the annual financial statements.

The external auditors are engaged to express an independent opinion on the annual

financial statements.

In my opinion, the annual report fairly reflects the operations, the performance

information, the human resources information and the financial affairs of the

department for the financial year ended 31 March 2016.

Yours faithfully

___________________

Dr P.J. Mokaila Accounting Officer Department of Rural, Environment and Agricultural Development Date: 29 August 2016

Page 31: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

30

6. STRATEGIC OVERVIEW

6.1. Vision

Vibrant and prosperous society in harmony with our natural resources

6.2. Mission

Working together with our partners to provide sustainable agricultural, environmental

management and comprehensive integrated rural development

6.3. Values

Client focused We promise to be client orientated and responsive by displaying

a positive and helpful attitude to our clients. We undertake to be

accessible, approachable, friendly and sensitive and always show

empathy towards our clients.

Dedicated We resolve to be committed and motivated by approaching our

work with passion and diligence, be disciplined and take

ownership of everything we do. Of utmost significance, we

commit to be punctual.

Integrity We undertake to be ethical, transparent, honest and approach

our work with openness and fairness. We pledge to be always

trustworthy and reliable.

Productivity We must be results oriented and output driven so as to attain

absolute production.

Page 32: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

31

Cooperative

Governance The department will engage through joint planning and

coordination of stakeholders, government departments and state-

owned entities in order to ensure holistic, integrated and

coherent government programmes

.

7. LEGISLATIVE AND OTHER MANDATES 7.1. Constitutional mandates

The Department is governed by certain mandates that are enshrined in the Constitution of

South Africa. These relevant sections of the constitution are stipulated below.

Section 27b of the Constitution of South Africa, Act 108 of 1996 states that everyone has

the right to have access to sufficient food and the state must take reasonable legislative

and other measures within its available resources, to achieve the progressive realisation of

this right.

Section 24a states that everyone has the right to an environment that is not harmful to

their health or well being and Section 24b states that everyone has the right to have the

environment protected for the benefit of present and future generations through

reasonable legislative and other measures that-

prevent pollution and ecological degradation

promote conservation and secure ecological sustainable development and use

ofnatural resources while promoting justifiable economic and social development

Page 33: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

32

7.2. Legislative mandates

The following list of Acts reflects the National legislation to be implemented by the

Provincial Department of Rural, Environment and Agricultural Development:

Accelerated Shared Growth Initiative Of South Africa (ASGISA)

Agricultural Debt Management Act, No. 45 of 2001

Agricultural Pests Act, No 36 of 1983 Animal Health Act, No7 of 2002 (To replace the Animal Diseases Act, 1984)

Animal Identification Act, No 6 of 2002 Animal Improvement Act No 62 of 1998

Atmospheric Pollution Prevention Act, No 45 of 1965

Bophuthatswana Nature Conservation Act, No. 3 of 1973 Cape Nature and Environmental Conservation Ordinance (No 19 of 1974)

Cape Nature Conservation Ordinance, No. 19 of 1974 Cape Problem Animal Control Ordinance (No. 26 of 1957)

Communal Property Association Act, No. 28 of 1996

Conservation of Agricultural Resources Act, No 43 of 1983 Development Facilitation Act, No 67 of 1995

Environment Conservation Amendment Act, No 50 of 2003 as amended Environmental Conservation Act, No. 73 0f 1989 as amended

Extension of Security of Tenure Act, No. 62 of 1997 Hazardous Substances Act, No 15 of 1973

Land and Agricultural Development Bank Act, No 15 of 2002

Marketing of Agricultural Products Act, No 47 of 1996 Meat Safety Act, No 40 of 2002

Mineral and Petroleum Resources Development Act, No 28 of 2002 National Environment Laws Amendment Act (No. 44 of 2008)

National Environment Laws Amendment Act (No. 14 of 2009)

National Environmental Management Act, No 107 of 1998 National Environmental Management Air Quality Act, No 39 of 2004

National Environmental Management Amendment Act (No 46 of 2003) National Environmental Management Amendment Act (No 62 of 2008)

National Environmental Management Amendment Act (No 8 of 2004)

National Environmental Management Biodiversity Act, No. 10 of 2004 National Environmental Management Laws Amendment Act, 2013 (Act No. 14 of

2013) National Environmental Management Protected Areas Act, No. 57 of 2003

National Environmental Management: Protected Areas Act (No. 57 of 2003) NationalEnvironmental Management: Protected Areas Amendment Act (No. 31 of

2004) National Environmental Management: Protected Areas Amendment Act (No. 15 of

2009) National Environmental Management: Waste Act (No. 59 of 2008)

National Forests Act, (No. 84 of 1998)

Page 34: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

33

National Heritage Resources Act. No 25 of 1999

National Veld and Forest Fire Act (No 101 of 1998) National Water Act (No 36 of 1998)

Nature and Environmental Conservation Ordinance, No 19 of 1974

Nature Conservation Ordinance, No 12 of 1983 North West Entrepreneurial Development and Sustainable Resources

North West Land Administration Act, No. 4 of 2001 North West Parks and Tourism Board Act, 1997 (Act No. 4 of 1997)

Prevention of Illegal Eviction from Unlawful Occupation of Land Act, No.19 of 1998

Problem Animal Control Ordinance, No 26 of 1957 Provincial Growth and Development Strategy

Subdivision of Agricultural Land Act, No 70 of 1970 as amended Taung Agricultural College Amendment Act, No 16 of 1994

Transvaal Nature Conservation Ordinance (No. 12 of 1983)

World Heritage Convention Act, No 49 of 1999

7.3. Policy mandates

The Department work is guided by the following government policies, strategies and

frameworks:

• Comprehensive Rural Development Strategy, 2009

• Integrated and Sustainable Rural Development Programme

• Integrated Food Security Strategy, (2002

• Land Redistribution Policy for Agricultural Development

• National Climate Change Response White Paper 2011

• National Spatial Development Perspective (NSDP)

• National Strategy for Sustainable Development and Action Plan (NSSD1)

• New Growth Path

• North West Environmental Outlook Report, 2008

• North West Renewable Energy Strategy and Action Plan 2013

• Provincial Growth and Development Strategy, 2004

• South Africa‟s National Biodiversity Framework (NBF)

• South Africa‟s National Biodiversity Strategy and Action Plan (NBSAP) 2005South Africa‟s National Biodiversity Framework (NBF)

• White Paper on Conservation and Sustainable Use of South Africa‟s Biological Diversity (July

1997)

• White Paper on Integrated Pollution and Waste Management for South Africa ( May 2000)

• White Paper on National Environmental Management Policy (April 1999)

• World Summit on Sustainable Development: Johannesburg Plan of Implementation (September 2002)

Page 35: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

34

7.4. International Treaties

South Africa is a signatory to a range of international treaties that impact on the

environment. Some of the treaties include:

a) Agenda 21 – Rio Convention

b) Convention on Biological Diversity (CBD)

c) Convention on International Trade in Endangered Species(CITES)

d) Convention on Wetlands of international importance (RAMSAR)

e) World Heritage Convention

f) Convention on the control of trans-boundary movements of hazardous waste and

disposals (Basel convention).

g) Kyoto Protocol

h) Stockholm Convention on Persistent Organic Pollutants (POP‟s)

i) United Nations Framework Convention on Climate Change (UNFCC)

j) Convention on Human Settlements (HABITAT)

k) SADEC Convention on Conservation

l) United Nations Convention to Combat Desertification (UNCCD)

m) Convention for the Protection of the Ozone Layer

n) Montreal Protocol on Substances that Deplete the Ozone Layer

o) Convention on the Conservation of Migratory Species of Wild Animals (Bonn

Convention)

7.5. Relevant court rulings

There are no any specific court rulings that have a significant, ongoing impact on

operations or service delivery obligations.

Page 36: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

Annual Report for 2015/16

Department of Rural, Environment and Agricultural Development

8. DEPARTMENTAL EXECUTIVE MANAGEMENT

MECHon. M. Tlhape

ACTING CFO: Financial Management ServicesMs Sophy Koikanyang

HODDr P.J. Mokaila

CD: Corporate ServicesMs Olivia Bodigelo

CD: Farmer Support and Development

Ms Bothoboile Pule

CD: Rural DevelopmentMr Patrick Leteane

CD: Environmental ServicesMr Mafu Nkosi

35

Page 37: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

Annual Report for 2015/16

Department of Rural, Environment and Agricultural Development

36

9. ENTITIES REPORTING TO THE MEC

The North West Parks Board is the only Public Entity reporting to the Member of

Executive Council during the period under review. The entity led key programmes on

game transformation, enhancing the economic potential of the protected areas to

benefit the communities on the restored land.

Page 38: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

37

PART B:PERFORMANCE INFORMATION

Page 39: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

38

1. AUDITOR GENERAL’S REPORT: PREDETERMINED OBJECTIVES

The AGSA currently performs certain audit procedures on the performance

information to provide reasonable assurance in the form of an audit conclusion. The

audit conclusion on the performance against predetermined objectives is included in

the report to management, with material findings being reported under the

Predetermined Objectives heading in the Report on other legal and regulatory

requirements section of the auditor‟s report.

Refer to page 173 of the Report of the Auditor General, published as Part E:

Financial Information.

2. OVERVIEW OF DEPARTMENTAL PERFORMANCE

2.1 Service Delivery Environment

Guided by the various assessments conducted by the province, major socio-economic

threats to sustainability in the North West were identified. These socio-economic

threats have great potential, if not addressed, to result in potentially adverse

consequences. The prevailing economic conditionsonly allowed us to prioritize and

direct resources to high impact government programmes during the period under

review.

As one of our three key mandates, Rural Development is about enabling rural

people to take control of their destiny, thereby dealing effectively with rural poverty

through the optimal use and management of natural resources. The department

continued the roll out of the CRDP to bridge the false dichotomy between the urban

and rural space as well as empowering vulnerable groups which included women,

youth, unemployed, people living with HIV/AIDS, people living with disabilities, child-

headed households, and older persons. Department facilitated Integrated

development and social cohesion as part of the CRDP through participatory

approaches in partnership with all sectors of society.

Page 40: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

39

In pursuit of the Rural Development mandate, department further ensured at least

fifty percent (50%) of both internal and external stakeholders contributed to the

implementation of the rural development programme in line with the Rural

Development Plan (technical and financial resources) during the 2015/16 financial

year.

As per the published 2013 North West Environment Outlook report, the state of the

environment in the North West has unfortunately not shown much improvement over

the past five years. Although a range of policies, guidelines and regulations have been

published, effective change still needs to manifest.

The identified „Tipping points‟ currently facing the North West Province to achieving

sustainability in the North West Province are:

o A future without water

o Competition for land by different land uses, which could comprise the “wise use” of

land

o Climate Change impacts

o Inadequate Waste management practices

The Environmental Services programme in NW READ responded to these challenges

and „tipping points‟ through implementing the gazetted NW Environmental

Implementation Plan (EIP) 2015-2020, which is required in terms of Chapter 3 of the

National Environmental Management Act (Act 107 of 1998). The North West

Environmental Implementation Plan 2015-2020 contains specific targets and outcomes

to be achieved by different departments. It also specifies responsibilities and

timeframes for the implementation of the different actions identified. Furthermore, the

targeted actions in the NW EIP 2015-2020 are aligned with Outcome 10 Delivery

Agreement.

Despite the declining contribution of the Agricultural Sector to South Africa‟s GDP over

the past four decades, the agricultural sector remains a key player in the country‟s

economy. While a decline in rainfall has had an initial adverse physical impact on

primary agricultural production, drought shocks also have a range of second-round

effects given the strong linkages that exist between the agricultural sector and other

sectors of the economy.

Page 41: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

40

South Africa is particularly vulnerable to the effects of drought as a result of the

importance of dry-land agricultural production. It is estimated that 83% of South

Africa‟s maize, 53% of the country‟s wheat crop and 73% of sugarcane are produced

under dry-land conditions. Commodities that comprise the agricultural sector have

been affected by the drought to varying degrees depending on their dominant

geographical locations and commodity-specific physiological requirements.

The drought experienced during the period under review had a devastating effect on

South African agriculture. The existence of drought-induced recessionary pressures

on the agricultural sector during 2015 was confirmed by Statistics South Africa which

reported year-on-year declines in seasonally adjusted sectoral Gross Domestic Product

(GDP) for all of the first three quarters of 2015 (-18% in Q1; -19.7% in Q2 and -

12.6% in Q3).The maize crop having been reported at a level of 9.9 million tons in

2015 (a tonnage already significantly below the norm) contributed greatly to the

reported decline in sectoral value-add.

The severe drought has fastened its grip on the agricultural sector resulting in:

o Natural grazing becoming seriously depleted leading to the forced slaughtering of

livestock, livestock deaths due to fodder unavailability and increasingly

questionable prospects for veld recovery in 2016

o Reduced plantings of summer cash crops, particularly in the western regions. The

Crop Estimates Committee (CEC) has estimated that the area of maize planted for

the 2015/16 season could total approximately 2 million hectares, 25% lower than

the area planted in the 2014/15 season

o Extremely high temperatures especially in December 2015 and January 2016.

These above – normal temperatures have affected pollination in a number of

areas (including irrigation areas) and will likely result in lower yields

o A looming grain deficit especially toward the second half of 2016 resulting in

maize import requirements of up to 3-5 million tons. This will undoubtedly place

pressure on South Africa‟s balance of payments.

Page 42: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

41

In addition to the direct impact of the drought situation on the agricultural sector,

general economic indicators also currently point to an aggravated situation.

Upstream economic activity i.e. input providers have already been hard hit due to

the lack of purchasing power in the agricultural sector; a situation that is likely to

worsen given the import propensity of suppliers and a depreciating local currency.

Inflationary pressures inter alia resulting from drastic increases in food prices

could result in further increases in interest rates impacting negatively on the debt

service costs of farming enterprises and further restricting access to credit in the

sector.

The agricultural sector, as the main employer in rural areas, employs 897 000

people, which represents 4.2% of the South African labour force. The sector is

considered to be labour intensive as agriculture in South Africa employs more

people per unit of value created than the mining and manufacturing sectors.

While this bodes well for job creation in good production years, it also means that

the sector will shed more labour per unit decrease in the value of production.

While some shedding of labour by maize farmers can be expected due to reduced

farm incomes, the impact of this on overall employment levels is unlikely to be

significant. No significant job losses are expected in the horticultural and wine

producing industries provided that irrigation requirements are sustained.

2.2 Service Delivery Improvement Plan

The Service Delivery Improvement Plan (SDIP, 2015 - 2018) for the Department of

Rural, Environment and Agricultural Development is informed by 2015/20

StrategicPlanand is aligned to the Annual Performance Plan for 2015/2016. This SDIP

sets out the primary services areas that the READ intents to deliver on for the period

of the next three years.

INTRODUCTION

Page 43: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

42

Key Service: Managing Brucellosis:

Bacterial disease of cattle caused by Brucellaabortus, which may cause abortions.

The disease is most commonly spread between herds by the movement of infected

animals and between animals by contact of susceptible animals with infective

discharges at the time of calving or abortion of infected animals, and for up to 1

month thereafter. Other less common means of spread occur.

In cattle the disease is controlled in terms of the Animal Diseases Act, 1984 (Act 35 of

1984) and by the Director of Animal Health.

A 10% abortion rate in a 100 cow herd can easily result in an annual loss of R600 000

plus to the dairy farmer and R240 000 plus to the commercial beef farmer. The loss in

an infected herd where no or few abortions occur will be as a result of decreased milk

production, extended inter-calving period and reduced sale value ofbreeding stock.

Key Service: Mitigating Drought

The Bokone Bophirima experienced frequency of drought in the recent years

The current drought started since 2002-03 until 2013-14, that left most of the farmers

devastated.

During the outlined drought period the national and provincial government assisted

with fodder.

Rainfall: From the previous report, the rainfall drastically reduced against average

precipitation andmost of the Province experience abnormal dry conditions.

Temperature: Province experienced extremely high temperature, minimum temp

ranging from 16°C- 22°Cand maximum 32°C - 43°C

The Impact Of Drought

Economic costs and losses to agricultural produces, annual and perennial crop

losses, damage to crop quality and Income loss to farmers due to reduced crop

yield.

Page 44: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

43

Costs and losses to livestock producers

Reduced productivity of grazing lands,high costs/unavailability of water for

livestock,high costs/unavailability of feed for livestock mortality rate.

Mitigation and Remedial Factors to Drought

Pre-Disaster: Early Warning (Veld Fires, Floods) and awareness campaigns

Post-Disaster: Fodder supply, Water reticulation, Fire belts

Step 1

A departmental cross cutting – team was constituted which had representatives from

all branches within the department:

Name and

Surname

Roles Telephone

Numbers

Programmes

J.Letlojane Chairperson 018 389 5686 Director Human Resource Dev

T.O.Gada Secretariat 018 389 5633 Human Resource Development

D. Ramose Member 018 389 5473 Human Resource Development

M.E. Mohlala Member 018 398 5463 Security Services

E.Botha Member 018 299 6674 Finance

A.J.Mokgobi Member 018 389 5001

B.L.Moitshwanetsi Member 018 3361121 Veterinary

B.L.Mahlangu Member 0836217338 MEC‟s office

M.M.Sikokope Member 018 389 5642 Organisational Development

K.Matheolane Member 018 384 1498 Human Resource Management

T.T.T.Molema Member 071 8624279 Extension

M.I.Mokaila Member 018 243 3159 Veterinary

N.P.Kitchin Member 0827428614 Finance

K.S.Mmusi Member 018 2996500 Animal science

APPROACH IN DEVELOPING THE SDIP

Page 45: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

44

Name and

Surname

Roles Telephone

Numbers

Programmes

M.I.Maponyane Member 0768947416 Human Resource Management

T.T. Kepadisa Member 083 766 5762 Human Resource Management

T.O.Thubisi Member 053 9273971 Extension Services

S.M.B.Mosenogi Member 082 3367390 Veterinary Services

The representatives are from the middle management, Assistant directors, the

Director is the chairperson of the committee, and Scientists, thearrangement

maintains continuity and consistent representation.

Step2

Aletter was written to line managers requesting them to submit or identify key

services that neededimprovement.Key services were sent and team members were

nominated from each directorateto help in developing the document.

Step3

Arrange meeting with Committee members to deliberate on the plan.

Consult Veterinary management and Veterinary scientists.

Deliberations with the disaster management and other team members from disaster

unit and process mapping were developed.

Step 4

Service Delivery Improvement Plans and the information were consolidated to finalise

the Departmental plan and consultation with concerned components for quality

assurance was done.

Step 5

Present and explain the Batho Pele and Service Delivery Improvement plan process to

DMC for endorsement.

Step 6

Submit to the Executive Authority for approval and then to both the Premiers‟ Office

and the DPSA.

Page 46: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

45

Step 7 The SDIP will be monitored through quarterly performance and reporting.

The key client and partners of the department are:

Client – direct receivers of the departments product and services

o Communities

o Governmental structures

o Beneficiaries

o User of natural resources

Service providers to the Department – inbound

o Funds

o Expertise

o Information

o Infrastructure and related facilities

o Materials

o stakeholder

Service providers stakeholders providing service on behalf of the Department to

the client of the Department

o Consultants

o Contractors

Regulators

o International

o National

o Provincial

o Local

STAKEHOLDERS

Page 47: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

46

Partners

o Public – public partners

o Public private partners- farmer unions, associations, societies, cooperatives,

mentors and organized Labour

The budgetstructureof the department comprises of nine (9) programmes and thirty

(30) sub-programmes as outlined below:

1. Administration

The aim of this programme is to manage and formulate policy directives and

priorities and, to ensure there is appropriate support service to all other

programmes with regard to finance, personnel, information, communication and

procurement.

Programme consists of the following three sub-programmes:

1.1. Office of the MEC

1.2. Senior Management

1.3. Corporate Services

1.4. Financial Management and

1.5. Communication

2. Sustainable Resources Management

The programme objective is to provide agricultural support services to farmers in

order to ensure sustainable development and management of agricultural resources

The programme consists of the following sub-programmes:

2.1.Engineering Services

2.2. Land Care

2.3.Land Use Management and

2.4.Disaster Risk Management

LIST OF SERVICE PROVIDED BY READ

Page 48: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

47

3. Farmer Support and Development

The programme provides support to farmers through agricultural development

programmes which consists of the following three sub-programmes:

3.1.Farmer Settlement and Support

3.2.Extension and Advisory Services

3.3.Food Security

4. Veterinary Services

The programme provides veterinary services to clients in order to ensure healthy

animals, safe animal products and welfare of people of South Africa which consists

of the following four sub-programmes:

4.1. Animal health

4.2. Export Control

4.3.Veterinary Public health

5. Research and Technology Development Services

The programme renders expert and needs based research, development and

technology transfer services impacting on development objectives.

Programme consists of the following four sub-programmes:

5.1. Research

5.2. Technology transfer Service

5.3. Infrastructure Support Services

6. Agricultural Economics Service

The programme provides timely and relevant agricultural economic services to the

sector in support of sustainable agricultural and agri-business development to

increase economic growth.

Programme consists of the following four sub-programmes:

6.1. Agribusiness Support and development

6.2. Microeconomic Support

Page 49: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

48

7. Structural Agricultural Education and training

The programme facilitates and provides structured agricultural education and

training in line with the Agricultural Education and Training Strategy to

allparticipants in the agricultural sector in order to establish a knowledgeable,

prosperous and competitive sector.

Programme consists of the following four sub-programmes:

7.1. Higher Education and Training (HET)

7.2. Further Education and training (FET)

8. Rural Development

The programme coordinates the development programme by stakeholders in rural

areas.

Programme consists of the following two sub-programmes:

8.1. Development Planning and Monitoring

8.2. Social Facilitation

9. Environmental Services

This programme is responsible for contributing to a safe and healthy living

environment, within a regulatory framework for promoting sustainable use and the

conservation of natural processes and biological diversity.

Programme consists of the following five sub-programmes:

9.1. Environmental Planning and Coordination

9.2. Compliance and Enforcement

9.3. Environmental Quality Management

9.4. Biodiversity Management

9.5. Environmental Empowerment Services

Page 50: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

49

PART B: PROGRAMMES AND SUB PROGRAMME PLANS

PROGRAMME 2: SUSTAINABLE RESOURCE MANAGEMENT

QUARTERLY TARGET REPORTS FOR 2015/16

2. Sustainable Resource Management

Performance Indicator Reporting period

Annual target Quarterly targets

2015/16 1st 2nd 3rd 4th

2.1 Engineering Services

Outcome 7: Sub-Outcome 4: Smallholder producers' development and support (technical, financial, infrastructure) for agrarian transformation

MTSF Action: Provide support to smallholder producers in order to ensure production efficiencies

4.2.1 Number of agricultural infrastructure established

Quarterly 60 0 20 20 20

2.2. Land Care

Outcome 10: Sub-Outcome 1: Ecosystems are sustained and natural resources are used efficiently

MTSF Action: Combat land degradation

8.1.2 Number of hectares protected / rehabilitated to improve

agricultural production

Quarterly 1600 0 533 533 534

8.1.3 Number of Green jobs created Quarterly 500 0 200 150 150

2.3. Land Use Management

Outcome 7: Sub-Outcome 1: Improved land administration and spatial planning for integrated development in rural areas

MTSF Action: Institutionalise regulatory framework for land use to guide and support development initiatives

2.1.4 Number of hectares of agricultural land protected

through subdivision/ rezoning/change of agricultural land use

Quarterly 32 000 0 10 560 11 200 10240

2.4. Disaster Risk Management

Outcome 10: Sub-Outcome 1: Ecosystems are sustained and natural resources are used efficiently

MTSF Action: Development and Implementation of sector adaptation strategies/plans

4.2.5 Number of disaster relief schemes managed

Annually 2 0 0 0 2

Page 51: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

50

PROGRAMME 4: VETERINARY SERVICES

QUARTERLY TARGETS FOR 2015/16 FOR VETERINARY SERVICES

4. Veterinary Services

Performance Indicator Reporting period

Annual target

Quarterly targets

2015/16 1st 2nd 3rd 4th

4.1. Animal Health

Outcome 7: Sub-Outcome 4: Smallholder producers' development and support (technical, financial, infrastructure) for agrarian transformation

MTSF Action: Provide support to smallholder producers in order to ensure production efficiencies

4.2.1 Number of epidemiological units visited for veterinary interventions

Quarterly 12 920 3 230 3 230 3 230 3 230

4.2. Export Control

Outcome 4: Sub-Outcome 2: The productive sectors account for a growing share of production and employment

MTSF Action: Agricultural Policy Action Plan (APAP) developed, implemented and reviewed regularly in terms of impact on growth, employment, rural incomes, investment, output, exports and African regional development

6.1.2 Number of clients serviced for animal and animal products export control

Quarterly 2 415 603 605 604 603

4.3. Veterinary Public Health

Outcome 7: Sub-Outcome 3: Improved food security

MTSF Action: Implement the comprehensive food security and nutrition strategy

3.1.3 % level of abattoir compliance to meat safety legislation

Annually 0 0 0 0 60

4.4. Veterinary Laboratory Services

Outcome 7: Sub-Outcome 4: Smallholder producers' development and support (technical, financial, infrastructure) for agrarian transformation

MTSF Action: Provide support to smallholder producers in order to ensure production efficiencies

4.2.4 Number of tests performed the quality of which meets the ISO 17025 standard and OIE requirements

Quarterly 220 000 55 000 55 000 55 000 55 000

Page 52: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

De

part

ment of R

ura

l, E

nvi

ronm

ent and

Agricu

ltura

l Deve

lopm

ent

An

nu

al R

ep

ort

fo

r 2015/1

651

KEY

SERV

ICE

SERV

ICE

BENE

FICI

ARIE

S

CURR

ENT

STAN

DARD

DE

SIRE

D ST

ANDA

RD

2014

/15

2015

/16

2016

/17

2017

/18

Miti

gate

prod

uctio

n

risk

farm

ers

and

all

farm

ing

com

mun

itie

s in

s

Quan

tity

1600

0 fa

rmer

s

Farm

ers

are

not

man

agin

g dr

ough

t

risk.

They

rel

y to

o

muc

h on

Gove

rnm

ent t

o ba

il

them

out

whe

n th

e

drou

ght s

trike

s

Drou

ght R

elie

f for

2200

0

Farm

ers

to b

e

assi

sted

. with

fodd

er.

Crop

farm

ers

to

be a

ssis

ted

with

com

pens

atio

n of

thei

r in

puts

(see

ds, d

iese

l)

Cons

truc

tion

of

fire-

brea

ks in

600

farm

ers

Farm

ers

mus

t, af

ter

the

inte

rven

tion,

be

mor

e aw

are

of

the

risks

(how

and

why

) of d

roug

ht to

bee

f cat

tle a

nd s

mal

l

stoc

k

Drou

ght R

elie

f for

220

00

Farm

ers

to b

e as

sist

ed. w

ith fo

dder

.

Crop

far

mer

s to

be

assi

sted

with

com

pens

atio

n of

the

ir

inpu

ts (s

eeds

, die

sel)

Cons

truc

tion

of f

ire-b

reak

s in

vol

atile

are

as t

hrou

ghou

t

the

prov

ince

800

farm

ers

Farm

ers

mus

t, af

ter

the

inte

rven

tion,

be

equi

pped

kno

wle

dge

and

skill

s on

how

to m

anag

e

the

risks

(fro

m a

nat

ural

reso

urce

man

agem

ent

,con

tinge

ncy

fund

s

,fodd

er b

ank

Drou

ght R

elie

f for

2200

0

Farm

ers

to b

e as

sist

ed.

with

fodd

er.

Crop

farm

ers

to b

e

assi

sted

with

com

pens

atio

n of

thei

r

inpu

ts (s

eeds

, die

sel)

Cons

truc

tion

of fi

re-

brea

ks in

vol

atile

are

as

thro

ugho

ut th

e pr

ovin

ce

900

farm

ers

Farm

ers

mus

t, af

ter

the

inte

rven

tion,

be

equi

pped

with

know

ledg

e an

d sk

ills

on

how

to m

anag

e th

e

risks

(fro

m a

live

stoc

k

man

agem

ent p

oint

of

view

) con

tinge

ncy

fund

, fod

der

bank

Drou

ght R

elie

f for

2200

0

Farm

ers

to b

e as

sist

ed

with

fodd

er.

Crop

farm

ers

to b

e

assi

sted

with

com

pens

atio

n of

thei

r

11. K

EY S

ERVI

CE:

EXTE

NTIO

N SE

RVIC

ES: M

ITIG

ATIN

G PR

ODUC

TION

Page 53: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

De

part

ment of R

ura

l, E

nvi

ronm

ent and

Agricu

ltura

l Deve

lopm

ent

52

KEY

SERV

ICE

SERV

ICE

BENE

FICI

ARIE

S

CURR

ENT

STAN

DARD

DE

SIRE

D ST

ANDA

RD

2014

/15

2015

/16

2016

/17

2017

/18

vola

tile

area

s

thro

ugho

ut th

e

prov

ince

Cons

truc

tion

of

eart

h da

ms

in

drou

ght s

tric

ken

area

s

Cons

truc

tion

of e

arth

dam

s in

dro

ught

str

icke

n ar

eas

Cons

truc

tion

of e

arth

dam

s in

dro

ught

str

icke

n

area

s

inpu

ts (s

eeds

, die

sel)

Cons

truc

tion

of fi

re-

brea

ks in

vol

atile

area

s th

roug

hout

the

prov

ince

Cons

truc

tion

of e

arth

dam

s in

dro

ught

stric

ken

area

s

An

nu

al R

ep

ort

fo

r 2015/1

6

Page 54: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

De

part

ment of R

ura

l, E

nvi

ronm

ent and

Agricu

ltura

l Deve

lopm

ent

53

KEY

SERV

ICE

SERV

ICE

BENE

FICI

ARIE

S

CURR

ENT

STAN

DARD

DE

SIRE

D ST

ANDA

RD

2014

/15

2015

/16

2016

/17

2017

/18

Qual

ity

(Con

form

s to

spec

ific

requ

irem

ents

)

Disa

ster

Act

OF

57

of 2

002

Natio

nal V

eld

Fore

st F

ire A

ct o

f

1998

CARA

Fram

ewor

ks o

f

Disa

ster

Clim

ate

Chan

ge

Pres

crip

ts

Sout

h Af

rica

Wea

ther

Ser

vice

pres

crip

ts

Agric

ultu

re

Rese

arch

Cou

ncil

Pres

crip

ts

Disa

ster

Act

OF

57 o

f 200

2

Natio

nal V

eld

Fore

st F

ire

Act o

f 199

8

CARA

Fram

ewor

ks o

f Dis

aste

r

Clim

ate

Chan

ge P

resc

ripts

Sout

h Af

rica

Wea

ther

Ser

vice

pre

scri

pts

Agric

ultu

re R

esea

rch

Coun

cil P

resc

ript

s

Disa

ster

Act

OF

57 o

f

2002

Natio

nal V

eld

Fore

st F

ire

Act o

f 199

8

CARA

Fram

ewor

k of

Dis

aste

r

Clim

ate

Chan

ge

Pres

crip

ts

Sout

h Af

rica

Wea

ther

Serv

ice

pres

crip

ts

Agric

ultu

re R

esea

rch

Coun

cil P

resc

ript

s

Disa

ster

Act

OF

57 o

f

2002

Natio

nal V

eld

Fore

st

Fire

Act

of 1

998

CARA

Fram

ewor

k of

Dis

aste

r

Clim

ate

Chan

ge

Pres

crip

ts

Sout

h Af

rica

Wea

ther

Serv

ice

pres

crip

ts

Agric

ultu

re R

esea

rch

Coun

cil P

resc

ript

s

An

nu

al R

ep

ort

fo

r 2015/1

6

Page 55: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

De

part

ment of R

ura

l, E

nvi

ronm

ent and

Agricu

ltura

l Deve

lopm

ent

54

KEY

SERV

ICE

SERV

ICE

BENE

FICI

ARIE

S

CURR

ENT

STAN

DARD

DE

SIRE

D ST

ANDA

RD

2014

/15

2015

/16

2016

/17

2017

/18

Co

nsul

tatio

n (H

ow d

o w

e

cons

ult o

ur

serv

ice

bene

ficia

ries

)

24 c

ampa

igns

and

wor

ksho

ps p

er

mon

th o

n cl

imat

e

and

wea

ther

.

Duri

ng fa

rmer

s

days

and

info

rmat

ion

days

24 c

ampa

igns

and

wor

ksho

ps p

er m

onth

on

clim

ate

and

wea

ther

. Dur

ing

farm

ers

days

and

info

rmat

ion

days

24 c

ampa

igns

and

wor

ksho

ps p

er m

onth

on

clim

ate

and

wea

ther

.

Duri

ng fa

rmer

s da

ys a

nd

info

rmat

ion

days

24 c

ampa

igns

and

wor

ksho

ps p

er m

onth

on c

limat

e an

d

wea

ther

. Dur

ing

farm

ers

days

and

info

rmat

ion

days

Ac

cess

(H

ow d

o ou

r se

rvic

e be

nefic

iari

es

acce

ss u

s)

Visi

ts to

farm

s.

Thos

e w

ho h

ave

the

mea

ns d

o

com

e to

our

offic

es.

Radi

o Ta

lk Sh

ow

A m

ix of

app

roac

hes

will

be

used

, whi

ch c

ell p

hone

s)

Visi

ts to

farm

s pe

r

calli

ng ,a

nd fa

rmer

s

com

e to

loca

l offi

ces

and

also

tap

ping

on

tech

nolo

gy (e

.g. c

ell

phon

es)

Visi

t to

farm

s pe

r

calli

ng a

nd fa

rmer

s

com

ing

to lo

cal o

ffice

s

of A

gric

ultu

re a

nd

tapp

ing

on te

chno

logy

(e.g

. cel

l pho

nes)

Co

urte

sy

(How

do

we

mea

sure

co

urte

sy:

Com

plai

nts

Desk

, Cus

tom

er

Satis

fact

ion

Surv

eys)

Com

plai

n re

gist

er

curr

ently

do

not

have

a c

ompl

aint

s

regi

ster

for

farm

ers,

Com

plai

n re

gist

er a

nd s

ugge

stio

n bo

xes

A co

mpl

aint

reg

iste

r

,sug

gest

ion

boxe

s

Pres

iden

tial

A co

mpl

aint

reg

iste

r

sugg

estio

n bo

xes,

Pres

iden

tial h

otlin

e

Depa

rtm

enta

l

cust

omer

car

e ho

t lin

e.

Op

enne

ss &

Tr

ansp

aren

Thro

ugh

loca

l

offic

es b

ased

in

Thro

ugh

loca

l offi

ces

base

d in

Mun

icip

ality

Th

roug

h lo

cal o

ffice

s Th

roug

h lo

cal o

ffice

s

base

d in

Mun

icip

ality

,

An

nu

al R

ep

ort

fo

r 2015/1

6

Page 56: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

De

part

ment of R

ura

l, E

nvi

ronm

ent and

Agricu

ltura

l Deve

lopm

ent

55

KEY

SERV

ICE

SERV

ICE

BENE

FICI

ARIE

S

CURR

ENT

STAN

DARD

DE

SIRE

D ST

ANDA

RD

2014

/15

2015

/16

2016

/17

2017

/18

cy

(How

do

we

gaug

e w

heth

er

we

are

open

and

tran

spar

ent)

Mun

icip

ality

base

d in

Mun

icip

ality

and

Ci

tizen

Rep

orts

In

form

atio

n (W

hat

info

rmat

ion

do

we

prov

ide

on

our

serv

ices

and

how

do

we

prov

ide

it)

Pam

phle

ts’,

Publ

icat

ions

, Ra

dio

Prog

ram

me,

Farm

er’s

day

s, a

nd

dem

onst

ratio

ns

Pam

phle

ts’,P

ublic

atio

ns,R

adio

Prog

ram

me,

Farm

er’s

Days

,de

mon

stra

tions

Pam

phle

ts’ ,

Publ

icat

ions

,

Radi

o Pr

ogra

mm

e

Farm

er’s

Day

s

,dem

onst

ratio

ns 4

per

year

ser

vice

cha

rter

s,

trib

al a

utho

rity

slo

ts

Pam

phle

ts’

,Pub

licat

ions

, Rad

io

Prog

ram

me,

one

s

wee

kly

Farm

er’s

,dem

onst

ratio

ns4

even

ts p

er y

ear

Serv

ice

Char

ters

,

trib

al a

utho

rity

slo

ts

and

serv

ice

stan

dard

s.

An

nu

al R

ep

ort

fo

r 2015/1

6

Page 57: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

De

part

ment of R

ura

l, E

nvi

ronm

ent and

Agricu

ltura

l Deve

lopm

ent

56

KEY

SERV

ICE

SERV

ICE

BENE

FICI

ARIE

S

CURR

ENT

STAN

DARD

DE

SIRE

D ST

ANDA

RD

2014

/15

2015

/16

2016

/17

2017

/18

Re

dres

s (W

hat

mec

hani

sms

are

in p

lace

to

ensu

re

redr

ess)

Peop

le a

re

enco

urag

ed to

use

exis

ting

lines

of

prot

ocol

and

to

utili

ze b

oth

Prem

ier’s

as

wel

l

as th

e Pr

esid

entia

l

Hot l

ines

Peop

le a

re e

ncou

rage

d to

use

exis

ting

lines

of

both

Prem

ier’s

as

wel

l as

the

Pres

iden

tial H

ot li

nes

Peop

le a

re e

ncou

rage

d

to u

se e

xistin

g lin

es o

f

prot

ocol

and

to u

tilize

both

Pre

mie

r’s a

s w

ell

as th

e Pr

esid

entia

l Hot

lines

, Dep

artm

enta

l

Cust

omer

Car

e lin

e

Peop

le a

re e

ncou

rage

d

to u

se e

xistin

g lin

es o

f

prot

ocol

and

to u

tilize

both

Pre

mie

r’s a

s w

ell

as th

e Pr

esid

entia

l Hot

lines

, MEC

hot

line

or

Depa

rtm

enta

l,

Cust

omer

Car

e Lin

e

and

sugg

estio

n bo

xes.

Va

lue

for

mon

ey

(How

do

we

gaug

e va

lue

for

mon

ey)

Mon

itori

ng a

nd

eval

uatio

n an

d

audi

t

Mon

itori

ng a

nd e

valu

atio

n an

d au

dit

Mon

itori

ng a

nd

eval

uatio

n an

d au

dit

Mon

itori

ng a

nd

eval

uatio

n an

d au

dit

Tim

e

(A s

peci

fied

peri

od,

dura

tion,

dead

line)

Curr

ent

inte

rven

tions

hav

e

been

onl

y fo

r th

e

dura

tion

whic

h th

e

impl

emen

tatio

n of

the

drou

ght s

chem

e

is ta

king

pla

ce

The

inte

rven

tions

w

ill

be

inco

rpor

ated

in

to

exte

nsio

n

prog

ram

mes

, whi

ch c

an r

un fo

r th

ree

to fi

ve y

ears

, but

will

be m

easu

red

on a

yea

rly

basi

s in

ter

ms

of t

he w

ork

plan

agre

emen

ts

The

inte

rven

tions

will

be

inco

rpor

ated

into

ex

tens

ion

prog

ram

mes

, w

hich

can

run

for

thre

e to

fiv

e ye

ars,

but

will

be

mea

sure

d on

a y

earl

y ba

sis

in te

rms

of th

e w

ork

plan

agr

eem

ents

The

inte

rven

tions

will

be

inco

rpor

ated

into

ex

tens

ion

prog

ram

mes

, w

hich

can

run

for

thre

e ye

ars,

but

will

be

mea

sure

d on

a y

earl

y ba

sis

in te

rms

of th

e w

ork

plan

agr

eem

ents

An

nu

al R

ep

ort

fo

r 2015/1

6

Page 58: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

De

part

ment of R

ura

l, E

nvi

ronm

ent and

Agricu

ltura

l Deve

lopm

ent

57

KEY

SERV

ICE

SERV

ICE

BENE

FICI

ARIE

S

CURR

ENT

STAN

DARD

DE

SIRE

D ST

ANDA

RD

2014

/15

2015

/16

2016

/17

2017

/18

Cost

(Som

ethi

n

g m

easu

red

in

mon

ey o

r

time)

Oper

atio

nal b

udge

t

and

Disa

ster

fund

s

Oper

atio

nal b

udge

t and

Dis

aste

r fu

nd

Disa

ster

fund

and

oper

atio

nal b

udge

t

Disa

ster

fund

and

oper

atio

nal b

udge

t

Hum

an

Reso

urce

s

(How

man

y

hum

an

reso

urce

s ar

e

used

to r

ende

r

the

Serv

ice)

79

108

119

114

An

nu

al R

ep

ort

fo

r 2015/1

6

Page 59: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

De

part

ment of R

ura

l, E

nvi

ronm

ent and

Agricu

ltura

l Deve

lopm

ent

Dev

elo

p d

isas

ter

pla

n

5 d

ays

EXC

O R

eso

luti

on

10

day

s

Sub

mis

sio

n t

o H

OD

, MEC

an

d

PD

MC

Req

ues

t fu

nd

ing

10

Day

s C

on

sult

th

e p

lan

wit

h

stak

eho

lder

s 1

day

Pre

mie

r d

ecla

re a

dis

aste

r 1

0 d

ays

Clo

sure

of

the

relie

f

sch

eme

15

day

s

Cla

ssif

icat

ion

of

dis

aste

r

wit

h N

DM

C 1

5 d

ays

Nat

ion

al T

reas

ury

an

d D

AFF

pre

par

e su

bm

issi

on

to

Cab

inet

for

fun

din

g 3

0 d

ays

SCM

ap

po

int

serv

ice

pro

vid

ers

for

dis

trib

uti

on

of

fod

de

r30

day

s

Fram

ewo

rk d

evel

op

fo

r

dis

trib

uti

on

of

relie

f e.

g.

fod

der

60

day

s

Mit

igat

ing

stra

tegi

es (

Cro

p)

Ch

oo

se t

he

corr

ect

soil

typ

e fo

r p

lan

tin

g

Ch

oo

se f

ield

s w

ith

few

er

grad

ien

ts t

o

min

imis

e w

ater

ru

no

ff

Co

arse

so

il ca

n m

inim

ise

evap

ora

tio

n

Pra

ctic

e cr

op

ro

tati

on

(Liv

est

ock

) re

tain

yo

un

g b

est

fem

ales

an

d

cull

po

or

old

an

d

Pro

vid

e s

uit

able

lick

s an

d o

the

r su

itab

le

sup

ple

men

tary

fe

ed

to

mai

nta

in n

utr

itio

n

Po

stp

on

e t

he

bre

ed

ing

pe

rio

d d

uri

ng

ext

rem

e d

ry c

on

dit

ion

s

2. P

ROCE

SS M

APPI

NG F

OR M

ITIG

ATIN

G PR

ODUC

TION

58

An

nu

al R

ep

ort

fo

r 2015/1

6

Page 60: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

FINANCIAL IMPLICATIONS

ITEM 2014/15 2015/16 2016/17 2017/18

TRAVELLING 500 000 600 000 700 000 800 000

MITIGATION 4 484 000 15 000 000 20 000 000 25 000 000

REHABILITATION 0 100 000 000 80 000 000 60 000 000

ADMINISTRATION 100 000 120 000 140 000 160 000

TOTAL 5 084 000 115 720 000 100 840 000 85 960 000

GRAND TOTAL 307 604 000

Annual Report for 2015/16

Department of Rural, Environment and Agricultural Development

59

Page 61: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

De

part

ment of R

ura

l, E

nvi

ronm

ent and

Agricu

ltura

l Deve

lopm

ent

60

KEY

SERV

ICE

SERV

ICE

BENE

FICI

ARIE

S

CURR

ENT

STAN

DARD

DE

SIRE

D ST

ANDA

RD

2014

/15

2015

/16

2016

/17

2017

/18

Man

agin

g an

d

Cont

rol o

f Bov

ine

Bruc

ello

sis

in

Ngun

i Cat

tle

Proj

ects

.

- Ngu

ni P

roje

cts

Catt

le F

arm

ers

- Co

mm

erci

al

Farm

ers

- Liv

esto

ck P

roje

cts

Com

mun

al F

arm

ers

Quan

tity

Bov

ines

test

ed fo

r bo

vine

Bruc

ello

sis

at 7

Ngu

ni

proj

ect f

arm

s in

volv

ing

425

anim

als

-50%

Vac

cina

tion

of

heife

rs a

t 4-8

mon

ths

with

S19

vacc

ine.

- Co

nduc

ting

awar

enes

s on

usef

ulne

ss o

f CA3

cert

ifica

te to

Ngu

ni b

oard

whi

ch p

urch

ase

stoc

k an

d

refr

ain

from

pur

chas

ing

at

auct

ions

- Te

stin

g of

all

fem

ale

anim

als

18m

onth

s an

d

abov

e

- 55%

Vac

cina

tion

of

heife

rs a

t 4-8

mon

ths

with

S19

vac

cine

-Era

dica

tion

Sche

me

to

be s

uppo

rted

targ

eted

farm

er tr

aini

ng a

nd

educ

atio

n on

asp

ects

of (1

) ins

istin

g on

test

ing

cert

ifica

te o

n

purc

hasi

ng a

nim

als

at

an a

uctio

n (2

)

Prac

ticin

g co

ntro

lled

bree

ding

eve

n in

com

mun

al a

reas

- fol

low

-ups

on

the

C-

bran

ded

cow

s

- Ef

fect

ive

and

Effic

ient

- Te

stin

g of

all

fem

ale

anim

als

18m

onth

s an

d

abov

e

- 55%

Vac

cina

tion

of

heife

rs a

t 4-8

mon

ths

with

S19

vac

cine

-Era

dica

tion

Sche

me

to

be s

uppo

rted

targ

eted

farm

er tr

aini

ng a

nd

educ

atio

n on

asp

ects

of (1

) ins

istin

g on

test

ing

cert

ifica

te o

n

purc

hasi

ng a

nim

als

at

an a

uctio

n (2

)

Prac

ticin

g co

ntro

lled

bree

ding

eve

n in

com

mun

al a

reas

- fol

low

-ups

on

the

C-

bran

ded

cow

s

- Ef

fect

ive

and

Effic

ient

- -

Test

ing

of a

ll fe

mal

e an

imal

s 18

mon

ths

and

abov

e

- 55

%

Vacc

inat

ion

of h

eife

rs a

t 4-

8 m

onth

s w

ith

S19

vacc

ine

-Era

dica

tion

Sche

me

to b

e su

ppor

ted

targ

eted

farm

er tr

aini

ng a

nd e

duca

tion

on a

spec

ts o

f (1)

insi

stin

g on

test

ing

cert

ifica

te o

n pu

rcha

sing

anim

als

at a

n au

ctio

n (2

) Pra

ctic

ing

cont

rolle

d

bree

ding

eve

n in

com

mun

al a

reas

- fol

low

-ups

on

the

C-br

ande

d co

ws

- Ef

fect

ive

and

Effic

ient

mon

itorin

g of

the

lives

tock

auct

ions

.

13. K

EY S

ERVI

CE: V

ETER

INAR

Y SE

RVIC

ES: M

ANAG

ING

AND

CONT

ROL

OF B

OVIN

E BR

UCEL

LOSI

S

An

nu

al R

ep

ort

fo

r 2015/1

6

Page 62: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

De

part

ment of R

ura

l, E

nvi

ronm

ent and

Agricu

ltura

l Deve

lopm

ent

61

KEY

SERV

ICE

SERV

ICE

BENE

FICI

ARIE

S

CURR

ENT

STAN

DARD

DE

SIRE

D ST

ANDA

RD

2014

/15

2015

/16

2016

/17

2017

/18

mon

itori

ng o

f the

lives

tock

auc

tions

.

mon

itori

ng o

f the

lives

tock

auc

tions

.

Qual

ity

Bovi

ne B

ruce

llosi

s

Erad

icat

ion

sche

me

guid

ed

by th

e(i)

Anim

al d

isea

se

act :

Act 3

5 of

1984

ii) M

eat S

afet

y Ac

t: Ac

t

40 o

f 200

0

Bovi

ne B

ruce

llosi

s

Erad

icat

ion

sche

me

guid

ed b

y th

e(i)

Anim

al

dise

ase

act :

Act 3

5 of

1984

ii) M

eat S

afet

y Ac

t:

Act 4

0 of

200

0

-Wha

t the

Act

stip

ulat

es r

egar

ding

Bovi

ne B

ruce

llosi

s an

d

its c

ontr

ol n

eeds

to b

e

amen

ded

to a

llow

and

acco

mm

odat

e of

ficia

ls

to h

ave

full

acce

ss a

nd

cont

rol o

ver

lives

tock

sale

s an

d m

ovem

ent,

and

stro

ngly

bac

k th

em

Bovi

ne B

ruce

llosi

s

Erad

icat

ion

sche

me

guid

ed b

y th

e(i)

Anim

al

dise

ase

act :

Act 3

5 of

1984

ii) M

eat S

afet

y Ac

t:

Act 4

0 of

200

0

-Dev

elop

a p

olic

y OR

any

othe

r w

ay o

f

man

agem

ent s

trat

egy

of th

e di

seas

e as

a w

ay

of c

ontr

ollin

g w

hich

will

be

effe

ctiv

e to

our

Prov

ince

(NW

)

Bovi

ne B

ruce

llosi

s Er

adic

atio

n sc

hem

e gu

ided

by

the(

i)An

imal

dis

ease

act

:Act

35

of 19

84

ii) M

eat S

afet

y Ac

t: Ac

t 40

of 2

000

-Impl

emen

t the

dev

elop

ed P

olic

y/ M

anag

emen

t

stra

tegy

.

An

nu

al R

ep

ort

fo

r 2015/1

6

Page 63: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

De

part

ment of R

ura

l, E

nvi

ronm

ent and

Agricu

ltura

l Deve

lopm

ent

62

KEY

SERV

ICE

SERV

ICE

BENE

FICI

ARIE

S

CURR

ENT

STAN

DARD

DE

SIRE

D ST

ANDA

RD

2014

/15

2015

/16

2016

/17

2017

/18

up.

Co

nsul

tatio

n (H

ow d

o w

e

cons

ult o

ur

serv

ice

bene

ficia

ries

)

-Con

sulta

tion

with

the

farm

ers,

Tri

bal a

utho

ritie

s,

Farm

ers

unio

n, a

nd

Com

mun

ity

-Con

sult

with

farm

ers

and

Farm

er’s

For

ums

quar

terl

y an

d sh

ould

also

let t

hem

mak

e an

inpu

ts in

the

polic

y an

d

also

abo

ut th

e is

sues

of c

ontr

ollin

g an

d

erad

icat

ing

the

dise

ase

in th

eir

farm

s

-Con

sulta

tion

done

thro

ugh

Info

rmat

ion

Days

hel

d on

a m

onth

ly

basi

s in

eac

h an

d

ever

y fa

rm

-Con

sulta

tion

done

thr

ough

Info

rmat

ion

Days

hel

d

on a

mon

thly

bas

is in

eac

h an

d ev

ery

farm

Ac

cess

(H

ow d

o ou

r

serv

ice

bene

ficia

ries

acce

ss u

s)

- Di

stric

t Offi

ce

- St

ate

Vet O

ffice

-

Mon

thly

farm

vi

sits

-

Tele

phon

es

-Mon

thly

farm

vis

its to

all f

arm

s ne

gativ

ely

test

ed a

nd n

ot te

sted

- Mon

thly

live

stoc

k

Cens

us to

be

done

and

mor

e Ki

lom

etre

s to

be

allo

cate

d fo

r th

is d

uty.

-Dis

tric

t Offi

ce

-Sta

te V

et O

ffice

-Mon

thly

farm

vis

its to

all f

arm

s ne

gativ

ely

test

ed a

nd n

ot te

sted

-Mon

thly

live

stoc

k

Cens

us to

be

done

and

mor

e Ki

lom

etre

s to

be

allo

cate

d fo

r th

is d

uty

and

Bruc

ello

sis

(300

0km

to b

e

trav

elle

d)

-Dis

tric

t Offi

ce

-Mon

thly

farm

vis

its to

all

farm

s ne

gativ

ely

test

ed

and

not t

este

d

- Mon

thly

live

stoc

k Ce

nsus

to b

e do

ne a

nd m

ore

Kilo

met

res

to b

e al

loca

ted

for

this

dut

y an

d

Bruc

ello

sis

(300

0km

to b

e tr

avel

led)

-Dis

tric

t Offi

ce

-Sta

te V

et O

ffice

-Tel

epho

nes

-Cel

l pho

nes

An

nu

al R

ep

ort

fo

r 2015/1

6

Page 64: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

De

part

ment of R

ura

l, E

nvi

ronm

ent and

Agricu

ltura

l Deve

lopm

ent

63

KEY

SERV

ICE

SERV

ICE

BENE

FICI

ARIE

S

CURR

ENT

STAN

DARD

DE

SIRE

D ST

ANDA

RD

2014

/15

2015

/16

2016

/17

2017

/18

-Tel

epho

nes

-Cel

l pho

nes

-Med

ia-

loca

l rad

io

stat

ions

-Sta

te V

et O

ffice

-Mon

thly

farm

vis

it

farm

s. to

all

infe

cted

farm

s an

d no

n in

fect

ed

-Tel

epho

nes

-Cel

l pho

nes

-Med

ia-

loca

l rad

io

stat

ions

-Med

ia –

loca

l rad

io s

tatio

n

-Inte

rnet

-Use

r fr

iend

ly e

ntra

nces

for

disa

bled

peo

ple

into

our

offic

es fo

r ea

sy a

cces

s

Co

urte

sy

(How

do

we

mea

sure

cour

tesy

:

Com

plai

nts

Desk

,

Cust

omer

Satis

fact

ion

Surv

eys)

-Sug

gest

ion

boxe

s

-Fie

ld o

ffice

r’s g

reen

log

book

whe

re fa

rmer

’s

com

men

ts

-Com

men

ts to

be

chec

ked

ever

y af

ter

two

wee

ks w

ith

feed

back

afte

r a

wee

k.

-Sug

gest

ion

boxe

s to

be o

pene

d an

d

mes

sage

s vi

ewed

on

a

mon

thly

bas

is

-Com

men

ts to

be

chec

ked

ever

y af

ter

two

wee

ks w

ith

feed

back

afte

r a

wee

k.

-cel

l pho

nes

alw

ays

avai

labl

e

-offi

cial

’s m

onth

ly

mee

tings

to b

e he

ld to

disc

uss

the

farm

er’s

com

men

ts a

nd a

lso

to

know

the

prob

lem

s

enco

unte

red

at th

e

field

for

solu

tions

- of

ficia

l’s n

ame

tags

for

iden

tific

atio

n

-offi

cial

s ce

ll ph

one

alw

ays

avai

labl

e w

hen

-of

ficia

l’s m

onth

ly m

eetin

gs to

be

held

to d

iscu

ss

the

farm

er’s

com

men

ts a

nd a

lso

to k

now

the

prob

lem

s en

coun

tere

d at

the

field

for

solu

tions

-offi

cial

s ce

ll ph

one

alw

ays

avai

labl

e w

hen

need

ed

- un

iform

wor

n ev

eryd

ay

- cus

tom

er s

ervi

ce li

ne-w

orks

dur

ing

offic

e ho

urs.

An

nu

al R

ep

ort

fo

r 2015/1

6

Page 65: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

De

part

ment of R

ura

l, E

nvi

ronm

ent and

Agricu

ltura

l Deve

lopm

ent

64

KEY

SERV

ICE

SERV

ICE

BENE

FICI

ARIE

S

CURR

ENT

STAN

DARD

DE

SIRE

D ST

ANDA

RD

2014

/15

2015

/16

2016

/17

2017

/18

need

ed

- un

iform

wor

n

ever

yday

- cus

tom

er s

ervi

ce li

ne

Op

enne

ss &

Tr

ansp

aren

cy

(How

do

we

gaug

e

whe

ther

we

are

open

and

tran

spar

ent)

Clie

nts

wel

l inf

orm

ed

and

expl

aine

d in

deta

ils c

once

rnin

g th

e

subj

ect ,

expl

ain

diffe

rent

sch

emes

com

plet

e an

d si

gn th

e

ca/t

b fo

rm a

s an

agre

emen

t for

the

cond

ition

s of

the

sche

me.

Clie

nts

wel

l

info

rmed

and

expl

aine

d in

deta

ils c

once

rnin

g

the

subj

ect

,exp

lain

diff

eren

t

sche

mes

com

plet

e an

d si

gn

the

ca/t

b fo

rm a

s

an a

gree

men

t for

the

cond

ition

s of

the

sche

me.

Clie

nts

wel

l

info

rmed

and

expl

aine

d in

deta

ils c

once

rnin

g

the

subj

ect

,exp

lain

diff

eren

t

sche

mes

com

plet

e an

d si

gn

the

ca/t

b fo

rm a

s

an a

gree

men

t for

the

cond

ition

s of

the

sche

me.

Clie

nts

wel

l inf

orm

ed a

nd e

xpla

ined

in d

etai

ls

conc

erni

ng th

e su

bjec

t ,ex

plai

n di

ffere

nt

sche

mes

com

plet

e an

d si

gn th

e ca

/tb

form

as

an a

gree

men

t for

the

cond

ition

s of

the

sche

me.

In

form

atio

n (W

hat

info

rmat

ion

do w

e pr

ovid

e

on o

ur

serv

ices

and

Pam

phle

ts, R

adio

talk

show

, Inf

orm

atio

n

days

, inf

orm

atio

n to

the

com

mun

ities

and

orga

nize

d ag

ricul

tura

l

-Pam

phle

ts to

be

avai

labl

e al

l the

tim

e,

- Ra

dio

talk

show

s at

leas

t onc

e ev

ery

wee

k,

-Info

rmat

ion

days

,

-Pam

phle

ts to

be

avai

labl

e al

l the

tim

e,

- Ra

dio

talk

show

s at

leas

t onc

e ev

ery

wee

k,

-Info

rmat

ion

days

,

-Pam

phle

ts to

be

avai

labl

e al

l the

tim

e,

- Ra

dio

talk

show

s at

leas

t onc

e ev

ery

wee

k,

-Info

rmat

ion

days

, inf

orm

atio

n to

the

com

mun

ities

and

orga

nize

d ag

ricu

ltura

l for

ums

once

in a

mon

th

An

nu

al R

ep

ort

fo

r 2015/1

6

Page 66: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

De

part

ment of R

ura

l, E

nvi

ronm

ent and

Agricu

ltura

l Deve

lopm

ent

65

KEY

SERV

ICE

SERV

ICE

BENE

FICI

ARIE

S

CURR

ENT

STAN

DARD

DE

SIRE

D ST

ANDA

RD

2014

/15

2015

/16

2016

/17

2017

/18

how

do

we

prov

ide

it)

foru

ms.

in

form

atio

n to

the

com

mun

ities

and

orga

nize

d ag

ricul

tura

l

foru

ms

once

in a

mon

th

info

rmat

ion

to th

e

com

mun

ities

and

orga

nize

d ag

ricul

tura

l

foru

ms

once

in a

mon

th

- aw

aren

ess

at le

ast

thre

e tim

es in

a

quar

ter

to b

oth

Com

mer

cial

and

Com

mun

al fa

rmer

s

- In

crea

se a

war

enes

s to

Com

mer

cial

farm

ers

from

quar

terl

y to

mon

thly

Re

dres

s (W

hat

mec

hani

sms

are

in p

lace

to

ensu

re

redr

ess)

-Com

mun

ity

enga

gem

ents

(fol

low

up

on

mee

tings

)

-Far

mer

s en

cour

aged

to

use

exis

ting

line

of p

roto

col

for

repo

rtin

g, fr

om A

HT,

SV, D

D(AH

), Di

rect

or(A

H),

-Com

mun

ity

enga

gem

ents

(fol

low

up o

n m

eetin

gs)

-Far

mer

s en

cour

aged

to u

se e

xistin

g lin

e of

prot

ocol

for

repo

rtin

g,

from

AHT

, SV,

DD(

AH),

Dire

ctor

(AH)

,

-Dea

l with

com

plai

nts

-Com

mun

ity

enga

gem

ents

(fol

low

up o

n m

eetin

gs)

-Far

mer

s en

cour

aged

to u

se e

xistin

g lin

e of

prot

ocol

for

repo

rtin

g,

from

AHT

, SV,

DD(

AH),

Dire

ctor

(AH)

,

- Ack

now

ledg

emen

t of

rece

ipt o

f com

plai

nts

-Com

mun

ity e

ngag

emen

ts(f

ollo

w u

p on

mee

tings

)

-Far

mer

s en

cour

aged

to

us

e ex

istin

g lin

e of

prot

ocol

fo

r re

port

ing,

fr

om

AHT,

SV,

DD(A

H),

Dire

ctor

(AH)

,

- Ac

know

ledg

emen

t of

rec

eipt

of

com

plai

nts

give

n

to fa

rmer

s w

ithin

3 d

ays

afte

r lo

dgin

g.

An

nu

al R

ep

ort

fo

r 2015/1

6

Page 67: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

An

nu

al R

ep

ort

fo

r 2015/1

6

De

part

ment of R

ura

l, E

nvi

ronm

ent and

Agricu

ltura

l Deve

lopm

ent

66

KEY

SERV

ICE

SERV

ICE

BENE

FICI

ARIE

S

CURR

ENT

STAN

DARD

DE

SIRE

D ST

ANDA

RD

2014

/15

2015

/16

2016

/17

2017

/18

with

in fo

urte

en d

ays

give

n to

farm

ers

with

in

4 da

ys a

fter

lodg

ing.

Va

lue

for

mon

ey

(How

do

we

gaug

e va

lue

for

mon

ey)

-Red

uce

the

3961

num

ber

of in

fect

ion

on

posi

tive

case

s

- pr

even

t an

infe

ctio

n

on th

e 28

628

nega

tivel

y te

sted

catt

le

-Red

uctio

n of

posi

tive

case

s by

40%

- in

crea

se th

e

nega

tivel

y te

sted

catt

le n

umbe

r by

30%

-Red

uctio

n of

posi

tive

case

s by

50%

- in

crea

se th

e

nega

tivel

y te

sted

catt

le n

umbe

r by

40%

-

-Red

uctio

n of

pos

itive

cas

es b

y 60

%

- -

incr

ease

the

nega

tivel

y te

sted

cat

tle

num

ber

by 5

0%

Tim

e (A

spec

ified

peri

od,

dura

tion,

dead

line)

Impr

ove

the

turn

arou

nd

time

on fe

edba

ck o

f res

ults

whi

ch is

28

days

.

Impr

ove

the

turn

arou

nd ti

me

on

feed

back

of r

esul

ts to

21 d

ays

Impr

ove

the

turn

arou

nd ti

me

on

feed

back

of r

esul

ts to

18 d

ays

Impr

ove

the

turn

arou

nd

time

on

feed

back

of

resu

lts to

14 d

ays

Cost

(Som

ethi

ng

mea

sure

d in

mon

ey o

r

time)

10%

abo

rtio

n ra

te in

a 10

0 co

w h

erd

resu

lts in

ann

ual

loss

of R

60 0

00 fo

r da

iry

farm

er a

nd R

24 0

00 fo

r be

ef fa

rmer

Redu

ce a

bort

ion

rate

to

6%

Km m

oney

be

allo

cate

d

Vacc

ine

mon

ey

Ad

min

mon

ey

La

b co

sts

(ant

igen

to

test

for

dise

ase)

be

Redu

ce a

bort

ion

rate

to 5

%

K

m m

oney

be

allo

cate

d

Enou

gh V

acci

ne

mon

ey

Ad

min

mon

ey

La

b co

sts

(ant

igen

to

test

for

Redu

ce a

bort

ion

rate

to 4

%

Km

mon

ey b

e al

loca

ted

En

ough

Vac

cine

mon

ey

Ad

min

mon

ey

- La

b co

sts

(an

tigen

to te

st fo

r di

seas

e)

be p

rese

nt a

t all

times

-

Equi

pmen

ts, e

tc

Page 68: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

De

part

ment of R

ura

l, E

nvi

ronm

ent and

Agricu

ltura

l Deve

lopm

ent

KEY

SERV

ICE

SERV

ICE

BENE

FICI

ARIE

S

CURR

ENT

STAN

DARD

DE

SIRE

D ST

ANDA

RD

2014

/15

2015

/16

2016

/17

2017

/18

avai

labl

e at

all

times

EQUI

PMEN

TS, E

TC

dise

ase)

be

pres

ent a

t all

times

-

EQUI

PMEN

TS,

ETC

Hum

an

Reso

urce

s

(How

man

y

hum

an

reso

urce

s ar

e

used

to

rend

er th

e

serv

ice)

-Sta

te V

eter

inar

ians

(18)

,-Ani

mal

hea

lth

tech

nici

ans(

78),

-Vet

erin

ary

tech

nolo

gist

(3)

-Vet

erin

ary

Publ

ic H

ealth

Offic

ers(

7)

-Sta

te V

eter

inar

ians

(20)

-Ani

mal

hea

lth

tech

nici

ans(

10)

-Vet

erin

ary

tech

nolo

gist

s(2)

-Vet

erin

ary

Publ

ic

Heal

th O

ffice

rs(3

)

-Sta

te V

eter

inar

ians

(22)

,-Ani

mal

hea

lth

tech

nici

ans(

10)

-Vet

erin

ary

tech

nolo

gist

s,

(1)

-Vet

erin

ary

Publ

ic

Heal

th O

ffice

rs(3

)

-Sta

te V

eter

inar

ians

(25)

-Ani

mal

hea

lth te

chni

cian

s(9)

-Vet

erin

ary

tech

nolo

gist

s(1)

-Vet

erin

ary

Publ

ic H

ealth

Offi

cers

(2)

67

An

nu

al R

ep

ort

fo

r 2015/1

6

Page 69: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

De

part

ment of R

ura

l, E

nvi

ronm

ent and

Agricu

ltura

l Deve

lopm

ent

68

An

nu

al R

ep

ort

fo

r 2015/1

6

Page 70: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

69

UNIT COSTING

FINANCIAL IMPLICATIONS

ITEM COST 2014/15 2015/16 2016/17

TRAVELLING R 1 000 000 R1 500 000 R2 000 000 R2 500 000

LAORATORY

CONSUMABLES

R500 000 R500 000 R500 000 R500 000

VACCINES (RB51 &

S19)

R 1000 000 R 1000 000 R 1000 000 R 1000 000

ADMINISTRATION R100 000 R100 00 R100 000 R100 000

TOTAL R 2600 000 R 3100 000 R 3600 000 R 4100 000

GRAND TOTAL R 13 400 000

LEGAL FRAMEWORK FOR SDIP

The development of SDIP is formed by Section 195(5) OF THE South African

Constitution (1996) which states that the Public administration

Must be governed by the democratic values and principles, these principles are as

follows:

A high standard of professional ethics must be promoted and maintained

Efficient ,economic and effective use of resources must be promoted

Public administration must be development – oriented

Service must be provided impartially ,fairly, equitable and without bias

People’s needs must be responded to ,and the public must be encouraged to

participate in policy – making

Public barriers must be accountable

Transparency must be fosteredby providing the public with timely, accessible

and accurate information

Good human resource management and career – development practices to

maximise human potential, must be cultivated

Page 71: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

70

Administration must be broadly representative of the South African people,

with employment and personnel management

Practices based on ability, objectivity, fairness and the need to redress the

imbalances of the past to achieve broad representation.

The implementation of these principles is governed by a regulatory framework,

which includes the following (but not limited to)

Public Service Act, 1994(Act no 103 of 1994)

Public Service Amendment Act, 1999 (Act no. 5 of 1999)

Public Service Commission Act 1997 (Act no, 46 of 1997)

Promotion of Administrative Justice act, 2000 (Act no 3 of 2000)

White paper on the Transforming Public Service delivery (Batho Pele),1997

Service delivery improvement plan (SDIP) objectives

THE SDIP AIMS 2015/2018 TO:

Outline the key service that the Department provides

Identify the service beneficieries along with the key services

Identify the key service that the department will focus on improving

Provide the current standards for the focus service

EXTENSION SERVICES

The Province experienced frequency of drought in the recent years. The current

drought started since 2002- 03 until 2013-14, that left most of the farmers

devastated

Rainfall : From the previous report, the rainfall drastically reduced against

average precipitation and most of the Province experience abnormal dry

PROBLEM STATEMENT

Page 72: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

71

conditions. So the impact of drought is very heavy on farmers and the

department.

The Loss caused by drought

Crop (940 000 Ha)

Livestock (970 000 LSU’s)

VETERINARY SERVICES

Bovine Brucellosis

Providing the introduction of Bovine Brucellosis Schemes as a measure to

mitigate the economic consideration and public health hazard implications it

imposes to the farmers and community as a whole, whereby10% abortion rate in

100 cow herd results in an annual loss of R600 000 in a dairy farmer and

R240 000 loss in a beef herd.

Infected herds where no or few abortions occur will be as a result of decrease in

milk production, extended inter-calving period and reduced sale value of breeding

stock, as well as inter-fertility, loss of genetically superior, adapted replacement

heifers (50% of all calves aborted are heifers), loss of all maintenance costs (

nutrition, health management, etc.) whereby an aborted cow has to be

slaughtered and not sold for auction and the public health danger of which its

prevalence in humans is unknown.

AREA OF EMPROVEMENT

KEY SERVICE – Nguni Projects -Communal Farmers (to detect a

plan/policy in the Province to deal with disease status) - Commercial

Farmers (to find a way to reduce the infection rate in the farms)

Develop a Policy for Brucella control within the Province - (Test all animals

before Auctions and movement of animals be restricted even within

Page 73: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

72

theprovince– farmers should be work-shopped about the Animal Disease Act, Act

no. 35 of 1984, have their own copies especially the section which stipulates the

livestock owner’s responsibilities and the prosecution part from the Act regarding

farmer who does not comply with the Act. Special workshop be arranged to

educate farmers.).

All farms have to be Accessed and No Voluntary Scheme Joining. all farms

to be tested annually- Only farmers who has joined the Brucellosis and

Tuberculosis Schemes are entitled to be tested by Government only one time when

they enter the Scheme and from there it is up to a farmer to carry on with the tests

and mostly they are the Dairy and Beef farmers, so other livestock owners who do

not farm for business, don’t deem it necessary to join and they are mostly the ones

who comes up with such problems. Therefore all farmers must be forced to join

the schemes regardless of farming for business or not

According to the Policy, Testing and Culling is the only way to Control- If

there could atleast be Compensation for Culling process, if one cow culled could be

replaced by another CA free cow brought by the Department to the farmer.

If all herds of cattle brought in for the projects to farmers for their own

benefit- If all the herds brought could firstly produce their FREE Herd Certificate

before being transported to the farmers and if not, then have to be tested by our

AHTs before they brought to the farmers to put them together with their livestock.

STRATEGIES FOR MITIGATING PRODUCTION

CROP PRODUCTION

Choose the correct soil type for the crop being planted.

Choose fields with fewer gradients to minimize water runoff.

Coarse soil surface can minimize evaporation.

Choose drought resistant cultivars.

Practice crop rotation.

Page 74: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

73

LIVESTOCK PRODUCTION

Retain young best females and cull poor old and unproductive animals.

Provide suitable licks, and other suitable supplementary feed to maintain

nutrition.

Postpone the breeding periods during extreme dry conditions.

Spread water points in camps to avoid over grazing.

Eradicate invader plants.

Avoid over-stocking and over grazing.

Firebreaks must be constructed and be maintained.

MONITORING AND EVALUATION

The document will be monitored through inspections, be part of them same times

when they do awareness campaigns and quarterly submission of reports.

2.3 Organisational environment

As in the past, the department has strong communication linkages with key

stakeholders. The need to deepen integration and cooperation with other

Departments, as well as district and local municipalities, remains a vital ingredient

towards the ultimate and effective development of the agricultural and rural

development sectors.

The total number of approved posts is 2 148 with 1 635 posts filled and 514

vacancies. The current vacancy rate is at 24%. The department requires robust

recruitment and retention strategies so as to employ and retain proficient personnel

possessing scarce and critical skills necessary to deliver quality services to

departmental clients.

Page 75: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

74

Departmental organogram is currently being reviewed to align to sector priorities

and envisaged to be concluded by the end of March 2017. Posts must be widely

advertised so as reach an adequate pool of both external applicants as well as

internal employees without exception due to the principle of open competition.

Vacancies took on the average more than 3 months to fill and the departmental

retention policy is being implemented.

In order to professionalise the department, there is a need for stability in leadership,

sound human resource policies and systems, skilled workers, clear lines of

accountability, appropriate systems and strategies to upgrade skills and improve

coordination. To solve technical skills shortage, the department must also develop

skills it needs through career-pathing and mentoring. This was identified as a major

priority in both Outcome 12 Delivery Agreement for 2009-2014 and the NDP. The

2015-2020 MTSF therefore builds on both these documents in identifying how

departments covered by Outcome 12 can provide effective support to sector

departments.

A number of changes are envisaged to improve capacity and enhance service

delivery as outlined in the Delivery Agreements for Outcomes 4,7,10 and 12 of

Government’s Programme of Action.The envisaged revised organisational structure

will of course increase department’s capacity to support government’s strategic

thrust of comprehensive rural development programme and to address the identified

challenges in the rural, environment and agriculture sectors. This organisational

structure will further reinforce the systems and processes of the Department and

management structures at all levels.

Other management related issues which will be prioritized during the next financial

year include employment of skilled personnel, ensuring compliance to government

prescripts as a whole and improve our capacity to serve our client base.

Page 76: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

75

As part of the Departmental Risk Management Plan, department currently has

identified the following high priority risks with potential to hinder achievement of

predetermined objectives and targets set out in the Annual Performance Plan:

2.4 Key policy developments and legislative changes

Rebranding, Repositioning and Renewal (RRR) is the policy thrust adopted by the 5th

administration to support the realization of the NDP objectives. It is anchored on the

following five (5) developmental concretes:

1. Agriculture, Culture and Tourism (ACT):- three anchors of economic

growth (6%) especially in rural areas where poverty, unemployment and

inequality is very high.

2. Villages, Townships and Small Dorpies (VTSD) :- to address the skewed

economic landscape in the province by ensuring that the previously

marginalized villages, townships and small dorpies are developed and

economically vibrant

No Risks description Programmes

1 Inadequate compliance to Policy and Planning framework.

All Programmes

2 Non responsive organisational structure to the strategy.

All Programmes

3 Inadequate infrastructure project management 2;3;4;5;6;7;8 & 9

4 Poor financial planning and budget management. 2;3;4;5;6;7;8 & 9

5 Inadequate implementation of the CGICTPF requirements.

Risk management and Information Technology (Programme 1)

6 Inability of the Department to provide sufficient and rapid response /assistance on Natural Disaster to Departmental Clients.

2;3;4;5;6;7;8 & 9

7 Lack of integrated planning of climate change aspects into Provincial and Local plans.

2;3;4;5;6;7;8 & 9

Page 77: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

76

3. Reconciliation, Healing and Renewal (RHR): - The RHR seeks to bring

together the people of the Bokone-Bophirima (Black and White) and to

engage and deal with issues of moral and social cohesion, past experiences

and pains emanating from the past era of oppression, conflict and racial

hatred

4. Setsokotsane: - Setsokotsane is an approach to service delivery that

promotes comprehensive, quality, effective and efficient delivery of services

that contributes to a self-reliant society

5. SaamtrekSaamwerk Philosophy:- collaboration with the religious,

business and other critical sectors of our society to pull our resources

together for the common good of the province

3. STRATEGIC OUTCOME ORIENTED GOALS

The Department contributed directly to five key outputs towards the realisation of

Outcome 7 on vibrant, equitable and sustainable rural communities and food

security for all; and these outputs include:

Sustainable agrarian reform with thriving farming

Improved access to affordable and diverse food

Improved services to support livelihoods

Rural job creation and promoting economic livelihoods

Enabling institutional environment for sustainable and inclusive growth

Page 78: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

77

The Table below highlights significant achievements with regard to the five key

outputs of Outcome 7 announced by the Department of Performance Monitoring and

Evaluation in the Presidency:

Outcome Outputs/Goals Achievements

SG 2:Integrated rural development

50%Technical and financial contribution of both internal and

external stakeholders towards the implementation of the rural

development programme

SG3: Improved food security 1324 Households benefitted from agricultural food security

initiatives

A total of 16 118 Hectares of land have been cultivated for

food production in communal areas and land reform

projects

SG4: Agrarian transformation

123 Smallholder producers received support

A total of 8 405 Smallholder producers were supported with

agricultural advice

SG5: Growth of sustainable rural enterprises and industries – resulting in rural job creation

18 Enterprises in rural district municipalities were established and 90 people employed in these enterprises

SG9: Sustained ecosystems and efficient natural resources use

1 845 Compliance inspections conducted

112 Enforcement actions finalised for non-compliance with

environmental management legislation

92% Compliance with National Annual Ambient Air Quality

Standards

92% Facilities with Atmospheric Emission Licenses reporting

to National Atmospheric Emissions inventory system

(NAEIS)

92% Waste license applications finalised within legislated

timeframes

5 687 permits issued within legislated time-frames

SG11: Environmentally sustainable, low- carbon economy resulting from a well- managed just transition

28 environmental awareness activities conducted

Department also contributed to outcomes 4, 5, 10 and 12 outputs dealing with cross

cutting issues impacting on the achievement of the outcome 7.

Page 79: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

78

4. PERFORMANCE INFORMATION BY PROGRAMME

4.1 Programme 1: Administration

4.1.1. Purpose

The aim of this programme is to manage and formulate policy directives and

priorities, and provides appropriate professional support service to all other

programmes with regard to finance, information, legal, human resources,

communication and other corporate related services.

4.1.2. Sub-programmes

The programme consists of the following five sub-programmes:

1.1. Office of the MEC

1.2. Senior Management

1.3 .Corporate Services

1.4. Financial Management

1.5. Communication Services

4.1.3. Strategic objectives for the financial year under review

The following is the list the strategic objectives for the programme during the

financial year under review:

Ensure stable political-administrative interface

Implement efficient and effective management and operations systems Implementation of the Comprehensive Africa Agriculture Development

Programme (CAADP) Implement improved mechanisms to promote ethical behaviour in the public

service Facilitate personnel training and capacity building interventions

Enhance responsiveness and accountability to citizens

Implement Procurement systems that deliver value for money

Page 80: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

79

4.1.4. Achievements of targets for the Strategic Objectives

Strategic objective Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target

to Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

Programme 1.1. Office of the MEC

Outcome 12: Sub-Outcome 1: A stable political-administrative interface

1.1 Ensure stable

political-

administrative

interface

4 Established

stakeholder forum

engaged

3 Stakeholder

forums

supported

3 0 None

12 Reports

submitted to

Legislature

3 Reports

submitted to

Legislature

within

stipulated

timeframes

3 0 None

1.2.1. HOD Support Services

Outcome 12: Sub-Outcome 4: Efficient and effective management and operations systems

1.2 Efficient and effective

management and

operations systems

12 Reports

submitted to

Governance

structures

12

departmental

performance

reports

submitted to

Governance

structures

within

stipulated

timeframes

12 0 None

2 Extended

Departmental Management Committee meetings held

1

Departmental Strategic Planning

Sessions held

within stipulated timeframes

1 0 None

1.2.2. Planning, Monitoring and Evaluation

Outcome 12: Sub-Outcome 4: Efficient and effective management and operations systems

1.2 Implement efficient and effective management and operations systems

NPI 600 Clients use of GIS services

999 399 Additional clients

referred to READ through Provincial GIS Forum and these include

Municipalities, OTP, DPWR& Dept. Of Education

Page 81: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

80

Strategic objective Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target

to Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

1435 Farmers registered

900 Registered farmers supported

4 695 3 795 Additional farmers

supported as part of the Departmental

Drought intervention programme – Drought database

NPI 4800 Clients who benefitted from the use of Resource

Centres

6 851 2 051 Increased clients

linked to the roll

out of the

Setsokotsane

Programme

13 Contracts Drafted

15 Contracts developed

15 0 None

33 Verified contracts

30 Verified contracts

30 0 None

NPI 18

Programmes receiving strategic planning

support

18 0 None

150 EPWP projects reported

99 EPWP Mode projects reported

48 51 Projects

Outsourced to

Implementing

Agent

9 084 EPWP Work Opportunities reported

1000 EPWP Work Opportunities reported

1 244 244 Number of participants increased in

MagogongLandcare project as well as Madikwe Waste Collection Project

and other projects

441 EPWP Full

time equivalents

reported

490 EPWP Full

Time

Equivalents reported

970 480 Number of

participants

increased in MagogongLandcare project as well as Madikwe Waste

Collection Project and other projects. Duration of the MagogongLandcare

was also extended by two months

8 SIP projects

progress reports

submitted

8 SIP projects

progress reports submitted

8 0 None

8 Outcome-based Reports

submitted

8 National outcome based

reports

8 0 None

Page 82: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

81

Strategic objective Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target

to Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

submitted within stipulated timeframes

NPI 10 Project

assessment

reports

completed

0 (10) Shortage of M & E

practioners

13 Compliance

performance

reports submitted

9 Compliance

reports

submitted

within

legislative

timeframes

9 0 None

NPI 60% Strategic

management

standards with

MPAT score of

at least 3

100% 40%) Improved

performance in the

3 KRAs with 1

score of 4 and 2

with scores of 3

14 EID

Governance

Cluster reports

submitted

4 EID

Governance

Cluster reports

submitted

within

stipulated

timeframes

4 0 None

Outcome 4: SUB-OUTCOME 2: The productive sectors account for a growing share of production and employment

6.2 Implementation of the Comprehensive Africa Agriculture Development

Programme (CAADP)

6 CAADP

Investment Plan

Implementation

activities

coordinated

1 CAADP

Investment

Plan developed

1 0 None

1.2.3. Risk Management and Information Technology

Outcome 12: Sub-Outcome 4: Efficient and effective management and operations systems

1.2 Implement efficient and effective management and operations systems

NPI 400 Departmental ICT users benefiting from

ICT training programmes

545 145 Increased attendance than planned – More users turn over for

the training

NPI 100 % of ICT risk

contingency measures implemented

100% 0 None

NPI 3000 Departmental Users

benefitting

3 615 615 Increase in Official

Calls for the

Internal ICT

Page 83: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

82

Strategic objective Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target

to Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

from internal ICT support services

support service

NPI 100% of Risk contingency

measures introduced.

100% 0 None

1 Top 10 Register developed

10 Prioritised departmental risks

7 3 Prioritised

Dept.Risk

minimised to 7

Outcome 12: Sub-Outcome H: Improved mechanisms to promote ethical behaviour in the public service

1.7 Implement improved

mechanisms to

promote ethical

behaviour in the

public service

NPI 400 Officials

benefiting from Governance programmes

408 8 Higher number of

attendees than

planned

Sub – Programme 1.1.4: Security Services

Outcome 12: Sub-Outcome 4: Efficient and effective management and operations systems

1.2 Efficient and effective

management and

operations systems

NPI 600 Employees

benefitting

from physical

protection

services of

premises

600 0 None

NPI 20% Reduction

of exposure to

risk at

departmental

events

20% 0 None

NPI 8% Employees

submitting

Z204 forms to

State Security

Agency

8% 0 None

NPI 8% Shortlisted

service

providers

submitted to

State Security

Agency for

screening

8% 0 None

Sub – Programme 1.3: Corporate Services

1.3.1. Human Resource Management

Outcome 12: Sub-Outcome 2: A public service that is a career of choice

Page 84: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

83

Strategic objective Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target

to Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

1.2 Implement efficient

and effective

management and

operations systems

NPI 1 MTEF Human Resource Plan implemented

1 0 None

NPI 40% Increase in the employment

percentages of representivity of previously disadvantaged groups in line with EE Act

40% 0 None

Outcome 12: Sub-outcome 4: Efficient and effective management and operations systems

Implement efficient

and effective management and operations systems

NPI 8 Human

Resource business process maps developed

6 (2) Personnel shortage

NPI 20% Disciplinary

cases finalised within 90 days

5% (15%) Shortage of

personnel in the

Labour Relations

Unit – Component

staffed only with

DD

NPI 24% Grievance cases finalised within 30 days

21% (3%) Shortage of

personnel in the

Labour Relations

Unit – Component

staffed only with

DD

Outcome 12: Sub-outcome 3: Sufficient technical and specialist professional skills

Implement efficient and effective management and operations systems

NPI 18% Reduction in percentage of the vacancy rate

18% 0 None

1.4 Facilitate personnel

training and

development

interventions

NPI 23 Empowered

youth through Bursary Scheme

23 0 None

Page 85: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

84

Strategic objective Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target

to Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

NPI 20 Empowered youth through Internship Programme

20 0 None

NPI 150 Personnel

trained on as per approved departmental Annual Training Plan

150 0 None

Outcome 12: Sub-outcome 6: Strengthened accountability to citizens

1.3 Enhance responsiveness and

accountability to citizens

NPI 1 Service Delivery

Improvement Plan implemented

1 0 None

Outcome 12: Sub-Outcome 2: A public service that is a career of choice

1.3 Enhance responsiveness and accountability to citizens

NPI Reduction of Employee Health and Wellness cases by 68

68% 0 None

NPI Reduction of Occupational Health and Safety incidents by 20

20% 0 None

Sub – Programme 1.3: Financial Management Services 1.3.1. Financial Administration

Outcome 12: Sub-Outcome 4: Efficient and effective management and operations systems

1.2 Implement efficient and effective management and

operations systems

NPI 5% of legitimate invoices from

suppliers not

paid within 30 days

3% 2% Officials worked

extra hours to

perform beyond

target

NPI 36 Financial

reports issued within stipulated timeframes

36 0 None

NPI 90% allocated

budget spent

during the

financial year

100% 10% All invoices for

contracted services paid during the year with no accruals. All DORA funds transferred

in line with the SLA to IA.

Page 86: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

85

Strategic objective Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target

to Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

NPI 78% number

of programmes

supported with

Budgetary

support within

stipulated

timeframes

100% 22% All Directorates

had two strategic

sessions on budget

management.

Budget loading in

Q1 and Budget

adjustment in Q3,

ensuring that the

department achive

100% utilsation of

the allocated

budget for the

financial year

NPI 67% MPAT

KRA standards

achieving score

of at least 3

75% 8% Improved

performance in 3

of the 4 KRAs

Sub – Programme 1.4: Financial Management

1.4.2. Supply Chain Management

Outcome 12: Sub-Outcome 5: Procurement systems that deliver value for money

1.6 Implement

Procurement systems

that deliver value for

money

NPI 3 Plans submitted within

legislated timeframe

2 (1) Non- submission of

the IPMP due to

late finalisation of

the Departmental

Project list

NPI 5 Reappointed SCM

Committees within stipulated timeframe

5 0 None

NPI 28 Compliance reports

submitted

within stipulated timeframe

28 0 None

NPI 1 Financial

Management delegations implemented within stipulated

timeframe

1 0 None

NPI 70% SCM standards with

MPAT score of at least level 3

100% 30% Improved

performance in all

the 5 MPAT KRAs

attaining

moderated scores

of 3 and above

Page 87: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

86

Strategic objective Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target

to Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

Sub – Programme 1.4: Financial Management

1.4.3. Internal Control

Outcome 12: Sub-Outcome 4: Efficient and effective management and operations systems

1.2 Implement efficient and effective management and operations systems

NPI 4 systems of

control

breakdown

case reviews

per year

4 0 None

NPI 60% Reduction

in the number

of Internal

Audit’s audit

findings

60% 0 None

NPI 60% Reduction

of Auditor-

General’s

audit findings

60% 0 None

NPI 80% Reduction

in the number

of programmes

recording

irregular

expenditure

80% 0 None

Programme 1.2: Corporate Services

Sub – Programme 1.1.2: Communication Services

Outcome 12: Sub-Outcome 6: Increased responsiveness of public servants and accountability to citizens

1.3 Enhance

responsiveness of public servants and accountability to citizens

161 Broadcasts of

the structured radio interviews

200 Corporate

Identity Items and Designs produced

200 0 None

56 Publication

materials produced

100 Media

Publications produced and Interviews conducted

99 (1) Shortage of

personnel in the

Directorate

179 Media Statements produced

100 Developmental communication initiatives

100 0 None

0 Reviewed Departmental

Communication Strategy

1 Departmental

Communication Strategy Developed

1 0 None

Page 88: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

87

4.1.5. Achievements of targets for the Performance Indicators

Programme 1.1. Office of the MEC

Performance Indicator Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target to

Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

Outcome 12: Sub-Outcome 1: A stable political-administrative interface

Number of engagements with Stakeholders forum

4 Established

stakeholder forum

engaged

3 Stakeholder

forums supported

3 0 None

Number of reports

submitted to Legislature

within stipulated timeframes

12 Reports

submitted to

Legislature

3 Reports

submitted to

Legislature within

stipulated

timeframes

3 0 None

Sub – Programme 1.2: Senior Management

1.2.1. HOD Support Service

Performance Indicator Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target to

Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

Outcome 12: Sub-Outcome 4: Efficient and effective management and operations systems

Number of Stakeholder forums supported

12 Reports

submitted to

Governance

structures

12 departmental

performance

reports submitted

to Governance

structures within

stipulated

timeframes

12 0 None

Number of reports submitted to Legislature within stipulated timeframes

2 Extended

Departmental Management Committee meetings held

1 Departmental

Strategic Planning Sessions held within stipulated timeframes

1 0 None

Page 89: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

88

Sub – Programme 1.2: Senior Management 1.2.2. Planning, Monitoring and Evaluation

Performance Indicator

Actual Performance

Planned Targets

Actual Achievement

Deviation from planned target to

Actual

Achievement

Comment on deviation

2014/15 2015/16 2015/16 2015/16

Outcome 12: Sub-Outcome 4: Efficient and effective management and operations systems

Number of clients

benefitting from the use of GIS services

NPI 600 Clients use

of GIS services

999 399 Additional clients

referred to READ through Provincial GIS Forum and these include Municipalities,

OTP, DPWR & Dept. of Education

Number of registered farmers supported

1435 Farmers registered

900 Registered farmers supported

4 695 3 795 Additional farmers supported as part

of the Departmental Drought intervention

programme – Drought database

Number of clients who benefitted from the use of Resource Centres

NPI 4800 Clients who benefitted from

the use of Resource Centres

6 851 2 051 Increased clients linked to the roll

out of the Setsokotsane Programme

Number of compliant contracts drafted

13 Contracts Drafted

15 Contracts developed

15 0 None

Number of verified Compliant contracts

33 Verified contracts 30 Verified contracts

30 0 None

Number of legislative instruments developed

1 Legislative instruments developed

1 Legislative instruments developed

1 0 None

Number of programmes

receiving strategic planning support

NPI 18 Programmes

receiving strategic planning support

18 0 None

Number of EPWP mode

projects reported

150 EPWP projects

reported

99 EPWP Mode

projects reported

48 (51) Projects

Outsourced to Implementing Agent

Number EPWP Work

Opportunities reported

9 084 EPWP Work

Opportunities reported

1000 EPWP Work

Opportunities reported

1 244 244 Number of

participants increased in MagogongLandcare project as well as

Madikwe Waste Collection Project and other projects

Number of EPWP Full Time

Equivalents reported

441 EPWP Full time

equivalents reported

490 EPWP Full

Time Equivalents reported

970 480 Number of

participants increased in MagogongLandcare project as well as Madikwe Waste

Collection Project and other projects

Number of SIPs projects

supported

8 SIP projects

progress reports submitted

8 SIP projects

progress reports submitted

8 0 None

Page 90: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

89

Sub – Programme 1.2: Senior Management 1.2.2. Planning, Monitoring and Evaluation

Performance Indicator

Actual Performance

Planned Targets

Actual Achievement

Deviation from planned target to

Actual

Achievement

Comment on deviation

2014/15 2015/16 2015/16 2015/16

Number of National outcome based reports submitted within stipulated

timeframes

8 Outcome-based Reports submitted

8 National outcome based reports submitted

within stipulated timeframes

8 0 None

Number of project assessment reports completed

NPI 10 Project assessment

reports completed

0 (10) Shortage of M & E practioners

Number of compliance reports submitted within legislative timeframes

13 Compliance performance reports submitted

9 Compliance reports submitted within legislative timeframes

9 0 None

% of strategic management standards with MPAT score

of at least 3

NPI 60% Strategic management

standards with MPAT score of at least 3

100% 40% Improved performance in the

3 KRAs with 1 score of 4 and 2 with scores of 3

Number of EID Governance Cluster reports submitted within stipulated timeframes

13 Compliance performance reports submitted

9 Compliance reports submitted within legislative timeframes

4 0 None

Outcome 4: SUB-OUTCOME 2: The productive sectors account for a growing share of production and employment

Number of CAADP Investment Plan projects implemented

6 CAADP Investment Plan

Implementation activities coordinated

1 CAADP Investment Plan

developed

1 0 None

Sub – Programme 1.2: Senior Management

1.2.3. Risk Management and Information Technology

Performance

Indicator

Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target to

Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

Outcome 12: Sub-Outcome 4: Efficient and effective management and operations systems

Number of departmental

ICT users benefiting from ICT training programmes

NPI 400

Departmental ICT users benefiting from ICT training programmes

545 145 Increased

attendance than

planned – More

users turn over

for the training

Percentage of ICT risk contingency measures implemented

NPI 100 % of ICT risk contingency measures implemented

100% 0 None

Page 91: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

90

Sub – Programme 1.2: Senior Management

1.2.3. Risk Management and Information Technology

Performance

Indicator

Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target to

Actual

Achievement

Comment on

deviation

Number of Departmental Users benefitting from internal ICT support services

NPI 3000 Departmental Users benefitting

from internal ICT support services

3 615 615 Increase in

Official Calls for

the Internal ICT

support service

Percentage of Risk contingency measures introduced.

NPI 100% of Risk contingency

measures introduced.

100% 0 None

Number of prioritised departmental risks

1 Top 10 Register developed

10 Prioritised departmental risks

7 3 Prioritised

Dept.Risk

minimised to 7

Outcome 12: Sub-Outcome H: Improved mechanisms to promote ethical behaviour in the public service

Number of officials benefiting from Governance training programmes

NPI 400 Officials benefiting from Governance

programmes

408 8 Higher number of

attendees than

planned

Sub – Programme 1.2: Senior Management Sub – Programme 1.1.4: Security Services

Performance

Indicator

Actual

Performance

Planned Targets Actual

Achievement

Deviation from

planned target to

Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

Outcome 12: Sub-Outcome 4: Efficient and effective management and operations systems

Number of employees

benefitting from physical

protection services of

premises

NPI 600 Employees benefitting from physical protection services of premises

600 0 None

Percentage reduction of

exposure to risk at

departmental events

NPI 20% Reduction of

exposure to risk at

departmental

events

20% 0 None

Proportion of employees

submitting Z204 forms to

State Security Agency

NPI 8% Employees

submitting Z204

forms to State

Security Agency

8% 0 None

Proportion of shortlisted

service providers submitted

to State Security Agency for

screening

NPI 8% Shortlisted

service providers

submitted to State

Security Agency for

screening

8% 0 None

Page 92: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

91

Sub – Programme 1.3: Corporate Services

1.3.1. Human Resource Management

Performance

Indicator

Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target to

Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

Outcome 12: Sub-Outcome 2: A public service that is a career of choice

MTEF Human Resource Plan implemented

NPI 1 MTEF Human Resource Plan implemented

1 0 None

Percentage increase in the representivity of previously disadvantaged groups in line with EE Act

NPI 40% Increase in the employment percentages of representivity of previously

disadvantaged

groups in line with EE Act

40% 0 None

Outcome 12: Sub-outcome 4: Efficient and effective management and operations systems

Number of Human Resource business process maps developed

NPI 8 Human Resource business process maps developed

6 (2) Personnel

shortage

Percentage of Disciplinary cases finalised within 90 days

NPI 20% Disciplinary cases finalised within 90 days

5% (15%) Shortage of personnel in the Labour Relations Unit – Component staffed only with

DD

Percentage of Grievance

cases finalised within 30 days

NPI 24% Grievance

cases finalised within 30 days

21% 3% Shortage of

personnel in the Labour Relations Unit – Component staffed only with DD

Outcome 12: Sub-outcome 3: Sufficient technical and specialist professional skills

Percentage reduction in the vacancy rate

NPI 18% Reduction in percentage of the vacancy rate

18% 0 None

Number of youth

empowered through

Bursary

NPI 23 Empowered youth through Bursary Scheme

23 0 None

Number of youth empowered through Internship Programme

NPI 20 Empowered youth through

Internship Programme

20 0 None

Number of Personnel trained as per approved departmental Annual Training Plan

NPI 150 Personnel trained on as per approved departmental

Annual Training Plan

150 0 None

Page 93: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

92

Sub – Programme 1.3: Corporate Services

1.3.1. Human Resource Management

Performance

Indicator

Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target to

Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

Outcome 12: Sub-outcome 6: Strengthened accountability to citizens

Implementation of Service Delivery Improvement Plan

NPI 1 Service Delivery Improvement Plan implemented

1 0 None

Outcome 12: Sub-Outcome 2: A public service that is a career of choice

Reduction in the number of Employee Assistance

Programme cases of departmental personnel

NPI Reduction of Employee Health

and Wellness cases by 68

68% 0 None

Reduction in the number of Occupational Health and

Safety incidents

NPI Reduction of Occupational

Health and Safety incidents by 20

20% 0 None

Sub – Programme 1.3: Financial Management Services 1.3.1. Financial Administration

Performance

Indicator

Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target to

Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

Outcome 12: Sub-Outcome 4: Efficient and effective management and operations systems

% of legitimate invoices

from suppliers not paid within 30 day

NPI 5% of legitimate

invoices from suppliers not paid within 30 days

3% 2% Officials worked

extra hours to

perform beyond

target

Number of financial reports

issued within stipulated timeframes

NPI 36 Financial

reports issued

within stipulated

timeframes

36 0 None

% allocated budget spent during the financial year

NPI 90% allocated budget spent

during the financial year

100% 10% All invoices for

contracted

services paid

during the year

with no accruals.

All DORA funds

transferred in line

with the SLA to

IA.

Page 94: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

93

Sub – Programme 1.3: Financial Management Services 1.3.1. Financial Administration

Performance

Indicator

Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target to

Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

Outcome 12: Sub-Outcome 4: Efficient and effective management and operations systems

% of legitimate invoices from suppliers not paid

within 30 day

NPI 5% of legitimate invoices from

suppliers not paid within 30 days

3% 2% Officials worked

extra hours to

perform beyond

target

Number of financial reports issued within stipulated

timeframes

NPI 36 Financial

reports issued

within stipulated

timeframes

36 0 None

% allocated budget spent during the financial year

NPI 90% allocated budget spent during the financial year

100% 10% All invoices for

contracted

services paid

during the year

with no accruals.

All DORA funds

transferred in line

with the SLA to

IA.

% of programmes supported with Budgetary

support within stipulated timeframes

NPI 78% number of

programmes

supported with

Budgetary

support within

stipulated

timeframes

100% 22% All Directorates

had two strategic

sessions on

budget

management.

Budget loading in

Q1 and Budget

adjustment in Q3,

ensuring that the

department

achieve 100%

utilisation of the

allocated budget

for the financial

year

% MPAT KRA standards

achieving score of at least 3

NPI 67% MPAT KRA

standards

achieving score

of at least 3

75% 8% Improved

performance in 3

of the 4 KRAs

Page 95: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

94

Sub – Programme 1.4: Financial Management

1.4.2. Supply Chain Management

Performance

Indicator

Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target to

Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

Outcome 12: Sub-Outcome 5: Procurement systems that deliver value for money

Number of plans submitted within legislated timeframe

NPI 3 Plans submitted within legislated

timeframe

2 (1) Non- submission

of the IPMP due

to late finalisation

of the

Departmental

Project list

Number of reappointed SCM

Committees within stipulated timeframe

NPI 5 Reappointed

SCM Committees within stipulated timeframe

5 0 None

Number of Compliance reports submitted within stipulated timeframe

NPI 28 Compliance reports submitted within stipulated timeframe

28 0 None

Number of Financial Management

delegations implemented within stipulated timeframe

NPI 1 Financial Management

delegations implemented within stipulated timeframe

1 0 None

% of SCM standards with MPAT score of at least level 3

NPI 70% SCM standards with MPAT score of at

least level 3

100% 30% Improved

performance in all

the 5 MPAT KRAs

attaining

moderated scores

of 3 and above

Sub – Programme 1.4: Financial Management

1.4.3. Internal Control

Performance

Indicator

Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target to

Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

Outcome 12: Sub-Outcome 4: Efficient and effective management and operations systems

Number of systems of

control breakdown case reviews per year

NPI 4 systems of

control

breakdown case

reviews per year

4 0 None

Page 96: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

95

Sub – Programme 1.4: Financial Management

1.4.3. Internal Control

Performance

Indicator

Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target to

Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

%Reduction in the number of Internal Audit’s audit findings

NPI 60% Reduction in

the number of

Internal Audit’s

audit findings

60% 0 None

% Reduction of Auditor-

General’s audit findings

NPI 60% Reduction

of Auditor-

General’s audit

findings

60% 0 None

% Reduction in the number

of programmes recording

irregular expenditure

NPI 80% Reduction in

the number of

programmes

recording

irregular

expenditure

80% 0 None

Programme 1.2: Corporate Services

Sub – Programme 1.1.2: Communication Services

Performance

Indicator

Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target to

Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

Outcome 12: Sub-Outcome 6: Increased responsiveness of public servants and accountability to citizens

Number of managed

departmental corporate Identify products

161 Broadcasts of

the structured radio interviews

200 Corporate

Identity Items and Designs produced

200 0 None

Number of sustainable Media Relations established

in ensuring information rich citizenry

56 Publication materials produced

100 Media Publications

produced and Interviews conducted

99 (1) Shortage of

personnel in the

Directorate

Number of Developmental

Communication programmes/ initiatives supported

179 Media

Statements produced

100

Developmental communication initiatives

100 0 None

Number of aligned communication strategies that links business operations

0 Reviewed Departmental Communication Strategy

1 Departmental Communication Strategy Developed

1 0 None

Page 97: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

96

4.1.6. Strategy to overcome areas of under performance

Review targets in the next financial year and ensure adequate human and

financial resources.

. 4.1.7. Changes to planned targets

The performance indicators and targets for the programme were not changed

during the reporting period.

4.1.8. Linking performance with budgets

4.2. Programme 2: Sustainable Resource Management

4.2.1. Purpose

The programme objective is to provide agricultural support services to farmers in

order to ensure sustainable development and management of agricultural resources.

4.2.2. Sub-programmes

Programme consists of the following four sub-programmes:

2.1. Engineering Services

2.2. Land Care

Programme 1: Administration2014/15 2013/14

Adjusted Appropriati

on

Shifting of Funds

Virement Final Appropriation

Actual Expenditure

Variance Expenditure as

% of final appropriation

Final Appropriation

Actual Expenditure

R'000 R'000 R'000 R'000 R'000 R'000 % R'000 R'000

1. MEC's Office 5 377 857 - 6 234 6 026 208 96.7% 10 360 9 976 2. Senior Management 27 185 869 - 28 054 27 680 374 98.7% 25 169 24 682 3. Corporate Services 36 666 (4 791) (300) 31 575 28 615 2 960 90.6% 28 676 27 231 4. Financial Management 113 097 3 919 - 117 016 115 105 1 911 98.4% 116 150 114 886 5. Communication Services 8 630 (854) - 7 776 6 441 1 335 82.8% 6 588 6 563

190 955 - (300) 190 655 183 867 6 788 96.4% 186 943 183 338

Sub programme

Page 98: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

97

2.3. Land Use Management

2.4. Disaster Risk Management

4.2.3. Strategic objectives for the financial year under review

The following is the list the strategic objectives for the programme during the

financial year under review:

Provide support to smallholder producers in order to ensure production

efficiencies Combat land degradation

Institutionalise regulatory framework for land use to guide and support development initiatives

4.2.4. Achievements of targets for the Strategic Objectives

2. Sustainable Resource Management

Strategic objective Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target

to Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

2.1: Engineering Services

Outcome 7: Sub-Outcome 4: smallholder producers' development and support (technical, financial, infrastructure) for agrarian

transformation

MTSF Action: Provide support to smallholder producers in order to ensure production efficiencies

Provide support to smallholder producers in order to ensure production efficiencies

32 60 Agricultural infrastructure established

60 0 None

2.2. Land Care

Outcome 10: Sub-Outcome 1: Ecosystems are sustained and natural resources are used efficiently

MTSF Action: Combat land degradation

Combat land degradation 1 600 Hectares protected /

rehabilitated to improve agricultural production

1 600 Hectares protected /

rehabilitated to improve agricultural production

1600 0 None

340 Green jobs created

500 Green jobs created

369 (131) Unavailability of funds and areas focused on are too small to

accommodate bigger numbers or workers

2.3. Land Use Management

Outcome 7: Sub-Outcome 1: Improved land administration and spatial planning for integrated development in rural areas

MTSF Action: Institutionalise regulatory framework for land use to guide and support development initiatives

Institutionalise regulatory framework for land use to guide and support

development initiatives

NPI 32 000 Hectares of agricultural land protected

through

subdivision/

0 (32000) Land owners are adamant to give away their land

for other

production

Page 99: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

98

2. Sustainable Resource Management

Strategic objective Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target

to Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

rezoning/change

of agricultural land

systems due to

persistent drought

2.4. Disaster Risk Management

Outcome 10: Sub-Outcome 1: Ecosystems are sustained and natural resources are used efficiently

MTSF Action: Development and Implementation of sector adaptation strategies/plans

Provide support to smallholder producers in order to ensure production efficiencies

2 Disaster relief schemes managed

2 Disaster relief schemes managed

2 0 None

4.2.5. Achievements of targets for the Performance Indicators

2. Sustainable Resource Management

Performance

Indicator

Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target

to Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

2.1: Engineering Services

Outcome 7: Sub-Outcome 4: smallholder producers' development and support (technical, financial, infrastructure) for agrarian

transformation

MTSF Action: Provide support to smallholder producers in order to ensure production efficiencies

Number of agricultural infrastructure established

32 60 Agricultural infrastructure established

60 0 None

2.2. Land Care

Outcome 10: Sub-Outcome 1: Ecosystems are sustained and natural resources are used efficiently

MTSF Action: Combat land degradation

Number of hectares protected/ rehabilitated to

improve agricultural production

1 600 Hectares

protected / rehabilitated to improve agricultural production

1 600 Hectares

protected / rehabilitated to improve agricultural production

1600 0 None

Number of Green jobs created

340 Green jobs created

500 Green jobs created

369 (131) Unavailability of

funds and areas

focused on are

too small to

accommodate

bigger numbers

or workers

2.3. Land Use Management

Outcome 7: Sub-Outcome 1: Improved land administration and spatial planning for integrated development in rural areas

MTSF Action: Institutionalise regulatory framework for land use to guide and support development initiatives

Page 100: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

99

2. Sustainable Resource Management

Performance

Indicator

Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target

to Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

Number of hectares of

agricultural land protected through subdivision/ rezoning/change of agricultural land use

NPI 32 000 Hectares

of agricultural land protected through subdivision/

rezoning/change of agricultural land

0 (32000) Land owners are

adamant to give

away their land

for other

production

systems due to

persistent

drought

2.4. Disaster Risk Management

Outcome 10: Sub-Outcome 1: Ecosystems are sustained and natural resources are used efficiently

MTSF Action: Development and Implementation of sector adaptation strategies/plans

Number of disaster relief

schemes managed

2 Disaster relief

schemes managed

2 Disaster

relief schemes managed

2 0 None

Number of disaster risk reduction programmes managed

100 Disaster risk reduction programmes managed

96 Disaster risk reduction programmes managed

96 0 None

4.2.6. Strategy to overcome areas of under performance

Review some of the targets in the next financial year to align to the available

resources as well as improving planning.

4.2.7. Changes to planned targets

The performance indicators and targets for the programme were not changed

during the period under review.

Page 101: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

100

4.2.8. Linking performance with budgets

4.3. Programme3: Farmer Support and Development

4.3.1. Purpose

The programme facilitates, coordinate and provide support to smallholder and

commercial farmers through sustainable agricultural development within agrarian

reform initiatives

Significant achievements of targets for strategic objectives and performance

indicators for the programme during the period under review include:

123 Smallholder producers received support

A total of 8 405 Smallholder producers were supported with agricultural advice

1 324 Households benefitted from agricultural food security initiatives

A total of 16 118 Hectares of land have been cultivated for food production in

communal areas and land reform projects

Through the above significant achievements of targets, the programme contributed

directly to Sub-Outcome 3 (Improved food security) and sub-outcome 4 (Agrarian transformation) of Outcome 7.

Programme 2: SUSTAINABLE RESOURCE MANAGEMENT 1 2 3 4 5 6 7 8 92015/16 2014/15

Adjusted Appropriation

Shifting of Funds

Virement Final Appropriation

Actual Expenditure

Variance Expenditure as % of

final appropria

tion

Final Appropriation

Actual Expenditure

R'000 R'000 R'000 R'000 R'000 R'000 % R'000 R'000

1. ENGINEERING SERVICES 24 949 - - 24 949 24 111 838 96.6% 34 765 34 379 2. LAND CARE 7 971 - - 7 971 7 346 625 92.2% 8 140 7 653 3. LAND USE MANAGEMENT 4 456 - - 4 456 5 246 (790) 117.7% 51 273 51 924

37 376 - - 37 376 36 703 673 98.2% 94 178 93 956

Sub programme

Page 102: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

101

4.3.2. Sub-programmes

Programme consists of the following three sub-programmes:

3.1. Farmer Settlement and Support

3.2. Extension and Advisory Services

3.3. Food Security

4.3.3. Strategic objectives for the financial year under review

The following is the list the strategic objectives for the programme during the

financial year under review:

Provide support to smallholder producers in order to ensure production

efficiencies Expand land under irrigation

Implement the comprehensive food security and nutrition Strategy

4.3.4. Achievements of targets for the Strategic Objectives

3. Farmer Support and Development

Strategic

objective

Actual

Performance

Planned Targets Actual

Achievement

Deviation from

planned target to

Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

3.1. Farmer Settlement and Support

Outcome 7: Sub-Outcome 4: Smallholder producers' development and support (technical, financial, infrastructure) for agrarian

transformation

MTSF Action: Provide support to smallholder producers in order to ensure production efficiencies

Provide support to smallholder producers in order to ensure production efficiencies

99 Smallholder producers receiving support

94 Smallholder producers receiving support

123 29 Roll-out of TshimoYaKgosi and Nguni projects

Outcome 7: Sub-Outcome 4: Smallholder producers' development and support (technical, financial, infrastructure) for agrarian

transformation

MTSF Action: Expand land under irrigation

Expand land under irrigation

25 Hectares

under irrigation

60 Hectares under

irrigation 60 0 None

3.2. Extension and Advisory Services

Outcome 7: Sub-Outcome 4: Smallholder producers' development and support (technical, financial, infrastructure) for agrarian

transformation

MTSF Action: Provide support to smallholder producers in order to ensure production efficiencies

Provide support to

smallholder producers in order to ensure production efficiencies

NPI 6 074 Smallholder

producers supported with agricultural advice

8405 2331 Roll-out of

Setsokotsane in the Province.

Page 103: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

102

3. Farmer Support and Development

Strategic

objective

Actual

Performance

Planned Targets Actual

Achievement

Deviation from

planned target to

Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

3.3. Food Security

Outcome 7: Sub-Outcome 3: Improved food security

MTSF Action: Implement the comprehensive food security and nutrition strategy

Implement the

comprehensive food security and nutrition Strategy

582 Households

benefiting from agricultural food security initiatives

1 240 Households

benefiting from agricultural food security initiatives

1324 84 Adequate rainfall

received during the 4th Quarter.

9 186 Hectares cultivated for

food production in communal areas and land reform projects

1 2226 Hectares cultivated for food

production in communal areas and land reform

projects

16118 3892 Adequate rainfall received during

the 4th Quarter, as such managed to

cultivate more

than planned

4.3.5. Achievements of targets for the Performance Indicators

3. Farmer Support and Development

Performance

Indicator

Actual

Performance

Planned

Targets

Actual

Achievement

Deviation

from planned

target to

Actual

Achievement

Comment

on

deviation

2014/15 2015/16 2015/16 2015/16

3.1. Farmer Settlement and Support

Outcome 7: Sub-Outcome 4: Smallholder producers' development and support (technical, financial, infrastructure) for agrarian

transformation

MTSF Action: Provide support to smallholder producers in order to ensure production efficiencies

Number of smallholder producers receiving

support

99 Smallholder producers receiving support

94 Smallholder

producers receiving support

123 29 Roll-out of TshimoYaKgosi

and Nguni projects

Outcome 7: Sub-Outcome 4: Smallholder producers' development and support (technical, financial, infrastructure) for agrarian

transformation

MTSF Action: Expand land under irrigation

Number of hectares under irrigation

25 Hectares

under irrigation

60 Hectares under

irrigation 60 0 None

3.2. Extension and Advisory Services

Outcome 7: Sub-Outcome 4: Smallholder producers' development and support (technical, financial, infrastructure) for agrarian

transformation

MTSF Action: Provide support to smallholder producers in order to ensure production efficiencies

Page 104: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

103

3. Farmer Support and Development

Performance

Indicator

Actual

Performance

Planned

Targets

Actual

Achievement

Deviation

from planned

target to

Actual

Achievement

Comment

on

deviation

2014/15 2015/16 2015/16 2015/16

Number of smallholder producers supported with agricultural advice

NPI 6 074 Smallholder

producers supported

with agricultural

advice

8405 2331 Roll-out of

Setsokotsane in

the Province.

3.3. Food Security

Outcome 7: Sub-Outcome 3: Improved food security MTSF Action: Implement the comprehensive food security and nutrition strategy

Number of households benefiting from

agricultural food security

initiatives

582 Households benefiting from

agricultural food security initiatives

1 240Households benefiting from

agricultural food

security initiatives

1324 84 Adequate rainfall

received during

the 4th Quarter.

Number of hectares cultivated for food production in communal areas and land reform projects

9 186 Hectares cultivated for food production in communal

areas and land reform projects

1 2226 Hectares

cultivated for food

production in

communal areas

and land reform

projects

16118 3892 Adequate rainfall

received during

the 4th Quarter,

as such

managed to

cultivate more

than planned

4.3.6. Strategy to overcome areas of under performance

Programme managed to successfully achieve all the predetermined targets during

the period under review.

4.3.7. Changes to planned targets

The performance indicators and targets for the programme were not changed during

the period under review.

Page 105: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

104

4.3.8. Linking performance with budgets

4.4. Programme4: Veterinary Services

4.4.1. Purpose

The programme provides veterinary services to clients in order to ensure healthy

animals, safe animal products and welfare of people of South Africa.

Significant achievements of targets for strategic objectives and performance

indicators for the programme during the period under review include:

3 460 Clients were serviced for animal and animal products export control

81% Level of abattoir compliance to meat safety legislation attained, which is

far above the 60% compliance level set by National department

Through the two above significant achievements of targets, the programme

contributed directly to Sub-Outcome 2 (Productive sectors account for a growing share of production and employment) of Outcome 4 and sub-outcome 3 (Improved food security) of Outcome 7.

Programme 3: FARMER SUPPORT AND DEVELOPMENT 1 2 3 4 5 6 7 8 92015/16 2014/15

Adjusted Appropriation

Shifting of Funds

Virement Final Appropriation

Actual Expenditure

Variance Expenditure as % of

final appropria

tion

Final Appropriation

Actual Expenditure

R'000 R'000 R'000 R'000 R'000 R'000 % R'000 R'000

1. FARMER-SETTLEMENT AND DEVELOPMENT 396 924 - - 396 924 392 924 4 000 99.0% 367 891 357 363 396 924 - - 396 924 392 924 4 000 99.0% 367 891 357 363

Sub programme

Page 106: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

105

4.4.2. Sub-programmes

Programme consists of the following four sub-programmes:

1.1. Animal Health

1.2. Export Control

1.3. Veterinary Public Health

1.4. Veterinary Laboratory Services

4.4.3. Strategic objectives for the financial year under review

The following is the list the strategic objectives for the programme during the

financial year under review:

o Provide support to smallholder producers in order to ensure production

efficiencies o Implementing Agricultural Policy Action Plan (APAP) developed, implemented

and reviewed regularly in terms of impact on growth, employment, rural

incomes, investment, output, exports and African regional development o Implement the comprehensive food security and nutrition Strategy

4.4.4. Achievements of targets for the Strategic Objectives

4. Veterinary Services

Strategic

objective

Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target to Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

4.1. Animal Health

Outcome 7: Sub-Outcome 4: Smallholder producers' development and support (technical, financial, infrastructure) for agrarian transformation

MTSF Action: Provide support to smallholder producers in order to ensure production efficiencies

Provide support to smallholder producers in order to ensure production efficiencies

NPI 12 920 Epidemiological units visited for veterinary

interventions

12431 (489) Retirement of key personnel which include State Veterinarian in

Ventersdorp and Animal Health Technicians in Madibeng and kagisano-Molopo

Page 107: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

106

4. Veterinary Services

Strategic objective

Actual Performance

Planned Targets

Actual Achievement

Deviation from planned target to

Actual

Achievement

Comment on deviation

2014/15 2015/16 2015/16 2015/16

4.2. Export Control

Outcome 4: Sub-Outcome 2: The productive sectors account for a growing share of production and employment

MTSF Action: Agricultural Policy Action Plan (APAP) developed, implemented and reviewed regularly in terms of impact on growth, employment, rural incomes, investment, output, exports and African regional development

Implementing Agricultural Policy

Action Plan (APAP) developed, implemented and reviewed

regularly in terms of impact on growth, employment, rural incomes, investment, output, exports and

African regional

development

3 189 Clients serviced for

animal and animal products export control

2 415 Clients serviced for

animal and animal products export control

3 460 1045 Target exceeded due to an increase in the

number of exporting activities during the 4th quarter

4.3. Veterinary Public Health

Outcome 7: Sub-Outcome 3: Improved food security

MTSF Action: Implement the comprehensive food security and nutrition strategy

Implement the

comprehensive food security and nutrition Strategy

NPI 60% Level of

abattoir compliance to meat safety legislation

81% 21% Increased number of

awareness activities as well as increased monitoring of abattoirs through inspections

led to increased level of compliance

3.3. Food Security

Outcome 7: Sub-Outcome 3: Improved food security

MTSF Action: Implement the comprehensive food security and nutrition strategy

Provide support to smallholder producers

in order to ensure production efficiencies

238 618 Tests performed

the quality of which meets the ISO 17025 standard and OIE

requirements

220 000 Tests performed

the quality of which meets the ISO 17025 standard and OIE

requirements

151000 (69000) Underperformance due to a shrinkage in

the number of samples because of the effect of the PMP as it was mentioned in the

corrective report

4.4.5. Achievements of targets for the Performance Indicators 4. Veterinary Services

Performance Indicator

Actual Performance

Planned Targets Actual Achievement

Deviation from planned target to

Actual Achievement

Comment on deviation

2014/15 2015/16 2015/16 2015/16

4.1. Animal Health

Outcome 7: Sub-Outcome 4: Smallholder producers' development and support (technical, financial, infrastructure) for agrarian transformation

MTSF Action: Provide support to smallholder producers in order to ensure production efficiencies

Number of epidemiological units visited for veterinary interventions

9 314 Epidemiological units visited for veterinary

interventions

12 920 Epidemiological units visited for veterinary

interventions

12431 (489) Retirement of key personnel which include State Veterinarian in

Ventersdorp and Animal Health

Technicians in

Page 108: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

107

4. Veterinary Services

Performance Indicator

Actual Performance

Planned Targets Actual Achievement

Deviation from planned target to

Actual

Achievement

Comment on deviation

2014/15 2015/16 2015/16 2015/16

Madibeng and kagisano-Molopo

4.2. Export Control

Outcome 4: Sub-Outcome 2: The productive sectors account for a growing share of production and employment

MTSF Action: Agricultural Policy Action Plan (APAP) developed, implemented and reviewed regularly in terms of impact on growth,

employment, rural incomes, investment, output, exports and African regional development

Number of clients serviced for animal and animal

products export control

3 189 Clients serviced for animal and animal

products export control

2 415 Clients serviced for animal and animal

products export control

3 460 1045 Target exceeded due to an increase in the number of exporting

activities during the 4th quarter

4.3. Veterinary Public Health

Outcome 7: Sub-Outcome 3: Improved food security

MTSF Action: Implement the comprehensive food security and nutrition strategy

% level of abattoir compliance to meat

safety legislation

NPI 60% Level of abattoir

compliance to

meat safety legislation

81% 21% Increased number of awareness activities as

well as increased

monitoring of abattoirs through inspections led to increased level of

compliance

3.3. Food Security

Outcome 7: Sub-Outcome 3: Improved food security

MTSF Action: Implement the comprehensive food security and nutrition strategy

Number of tests performed the quality of which meets the ISO

17025 standard and OIE requirements

220 000 Tests performed the quality of

which meets the ISO 17025 standard and OIE requirements

220 000 Tests performed the quality of

which meets the ISO 17025 standard and OIE requirements

151000 (69000) Underperformance due to a shrinkage in the number of samples

because of the effect of the PMP as it was mentioned in the corrective report

4.4.6. Strategy to overcome areas of under performance

Fast –track the filling of the vacant posts created by the retirement of key personnel

which include State Veterinarian in Ventersdorp and Animal Health Technicians in

Madibeng and kagisano-Molopo

4.4.7. Changes to planned targets

The performance indicators and targets for the programme were not changed during

the period under review.

Page 109: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

108

4.4.8. Linking performance with budgets

4.5. Programme5: Research and Technology Development Services

4.5.1. Purpose

The programme render expert and needs based research, development and

technology transfer services impacting on development objectives.

There were no significant achievements of targets for strategic objectives and

performance indicators for the programme during the period under review. The

performance level of the programme for the period under review is at 50%.

The programme contributed directly to Sub-Outcome 4 (Agrarian Transformation) of Outcome 7 during the period under review.

4.5.2. Sub-programmes

Programme consists of the following three sub-programmes:

1.1 Research

1.2 Technology Transfer Services

1.3 Infrastructure Support Services

Programme 4: VETERINARY SERVICES 1 2 3 4 5 6 7 8 92015/16 2014/15

Adjusted Appropriation

Shifting of Funds

Virement Final Appropriation

Actual Expenditure

Variance Expenditure as % of

final appropria

tion

Final Appropriation

Actual Expenditure

R'000 R'000 R'000 R'000 R'000 R'000 % R'000 R'000

1. ANIMAL HEALTH 84 680 - - 84 680 83 384 1 296 98.5% 100 493 99 297 2. EXPORT CONTROL 2 150 - - 2 150 1 448 702 67.3% - - 3. VETERINARY PUBLIC HEALTH 5 665 - - 5 665 6 009 (344) 106.1% - - 4. VETERINARY LABORATORY SERVICES 8 290 - - 8 290 9 937 (1 647) 119.9% - -

100 785 - - 100 785 100 778 7 100.0% 100 493 99 297

Sub programme

Page 110: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

109

4.5.3. Strategic objectives for the financial year under review

The following is the list the strategic objective for the programme during the

financial year under review:

o Provide support to smallholder producers in order to ensure production efficiencies

4.5.4. Achievements of targets for the Strategic Objectives 5. Research and Technology Development Services

Strategic

objective

Actual

Performance

Planned Targets Actual

Achievement

Deviation from

planned target to

Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

5.1. Research

Outcome 7: Sub-Outcome 4: Smallholder producers' development and support (technical, financial, infrastructure) for agrarian transformation

MTSF Action: Provide support to smallholder producers in order to ensure production efficiencies

Provide support to smallholder producers in order to ensure

production efficiencies

27 Research and technology development projects

implemented to improve agricultural production

28 Research and technology development projects

implemented to improve agricultural production

28 0 None

5.2. Technology Transfer Services

Outcome 7: Sub-Outcome 4: Smallholder producers' development and support (technical, financial, infrastructure) for agrarian transformation

MTSF Action: Provide support to smallholder producers in order to ensure production efficiencies

Provide support to smallholder producers in

order to ensure production efficiencies

4 Research presentations made nationally or internationally

4 Research presentations made nationally or

internationally

3 (1) Less requests for

research presentations

were received

4 Scientific papers

published nationally or

internationally

4 Scientific papers

published

nationally or

internationally

2 (2) Scientific papers take

long to publish and

normally does not

agree to reporting

period.

5.3. Infrastructure Support Services

Outcome 7: Sub-Outcome 4: Smallholder producers' development and support (technical, financial, infrastructure) for agrarian transformation

MTSF Action: Provide support to smallholder producers in order to ensure production efficiencies

Provide support

to smallholder producers in order to ensure production

efficiencies

5 Research

infrastructure managed

5 Research

infrastructure

managed

5 0 None

Page 111: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

110

4.5.5. Achievements of targets for the Performance Indicators

5. Research and Technology Development Services

Performance

Indicator

Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target

to Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

5.1. Research

Outcome 7: Sub-Outcome 4: Smallholder producers' development and support (technical, financial, infrastructure) for agrarian transformation

MTSF Action: Provide support to smallholder producers in order to ensure production efficiencies

Number of research and technology development

projects implemented to improve agricultural production

27 Research and technology

development projects implemented to improve agricultural

production

28 Research and technology

development projects implemented to improve agricultural

production

28 0 None

5.2. Technology Transfer Services

Outcome 7: Sub-Outcome 4: Smallholder producers' development and support (technical, financial, infrastructure) for agrarian

transformation

MTSF Action: Provide support to smallholder producers in order to ensure production efficiencies

Number of research presentations made

nationally or internationally

5 Research presentations

made nationally or internationally

4 Research presentations

made nationally or internationally

3 (1) Less requests for

research

presentations were

received

Number of scientific

papers published

nationally or

internationally

3 Scientific papers

published nationally or internationally

4 Scientific papers

published nationally or internationally

2 (2) Scientific papers take

long to publish and normally do not agree to reporting period.

5.3. Infrastructure Support Services

Outcome 7: Sub-Outcome 4: Smallholder producers' development and support (technical, financial, infrastructure) for agrarian

transformation

MTSF Action: Provide support to smallholder producers in order to ensure production efficiencies

Number of research infrastructure managed

5 Research infrastructure

managed

5 Research

infrastructure

managed

5 0 None

4.5.6. Strategy to overcome areas of under performance

Review some of the targets in the next financial year to align to the reporting period.

4.5.7. Changes to planned targets The performance indicators and targets for the programme were not changed during

the period under review.

Page 112: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

111

4.5.8. Linking performance with budgets

4.6. Programme6: Agricultural Economics Services

4.6.1. Purpose

The programme provides timely and relevant agricultural economic services to the

sector in support of sustainable agricultural and agri-business development to

increase economic growth.

The programme successfully managed to achieve 100% level of performance during

the period under review. The programme contributed directly to Sub-Outcome 2

(Productive sectors account for a growing share of production and employment) and

Sub-Outcome 5 (Spatial imbalances in economic opportunities are addressed

through expanded employment in agriculture, the build programme and densification

in the metros) of Outcome 4 and sub-outcome 4 (Agrarian Transformation) of

Outcome 7.

4.6.2. Sub-programmes

Programme consists of the following two sub-programmes:

6.1. Agribusiness Support and Development

6.2. Macroeconomics Support

Programme 5: RESEARCH AND TECHNOLOGY DEVELOPMENT SERVICES1 2 3 4 5 6 7 8 92015/16 2014/15

Adjusted Appropriation

Shifting of Funds

Virement Final Appropriation

Actual Expenditure

Variance Expenditure as % of

final appropria

tion

Final Appropriation

Actual Expenditure

R'000 R'000 R'000 R'000 R'000 R'000 % R'000 R'000

1. RESEARCH 48 875 - - 48 875 48 818 57 99.9% 48 001 45 467 48 875 - - 48 875 48 818 57 99.9% 48 001 45 467

Sub programme

Page 113: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

112

4.6.3. Strategic objectives for the financial year under review

The following is the list the strategic objectives for the programme during the

financial year under review:

o Provide support to smallholder producers in order to ensure production

efficiencies

4.6.4. Achievements of targets for the Strategic Objectives

6. Agricultural Economics Services

Strategic objective

Actual Performance

Planned Targets Actual Achievement

Deviation from planned target to

Actual Achievement

Comment on deviation

2014/15 2015/16 2015/16 2015/16

6.1. Agribusiness support and development

Outcome 7: Sub-Outcome 4: Smallholder producers' development and support (technical, financial, infrastructure) for agrarian transformation

MTSF Action: MTSF Action: Provide support to smallholder producers in order to ensure production efficiencies

Provide support to smallholder producers in order to ensure

production efficiencies

705 Clients who have benefitted from agricultural economic advice

provided

750 Clients who have benefitted from agricultural economic advice

provided

750 0 None

8 Agri-Businesses supported with

agricultural economic services towards accessing markets

110 Agri-Businesses

supported with agricultural economic services to access markets

110 0 None

6.2 Macroeconomics Support

Outcome 7: Sub-Outcome 4: Smallholder producers' development and support (technical, financial, infrastructure) for agrarian transformation

MTSF Action: Provide support to smallholder producers in order to ensure production efficiencies

Provide support to smallholder producers in

order to ensure production

efficiencies

799 Agricultural economic information

responses provided

400 Agricultural economic information

responses provided

400 0 None

Page 114: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

113

4.6.5. Achievements of targets for the Performance Indicators

6. Agricultural Economics Services

Performance

Indicator

Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target

to Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

6.1. Agribusiness support and development

Outcome 7: Sub-Outcome 4: Smallholder producers' development and support (technical, financial, infrastructure) for agrarian transformation

MTSF Action: MTSF Action: Provide support to smallholder producers in order to ensure production efficiencies

Number of clients who have benefitted from

agricultural economic advice provided

705 Clients who have benefitted

from agricultural economic advice provided

750 Clients who have benefitted

from agricultural economic advice provided

750 0 None

Number of Agri-

Businesses supported with agricultural economic services to access markets

8 Agri-Businesses

supported with agricultural economic services towards accessing

markets

110 Agri-

Businesses supported with agricultural economic services

to access markets

110 0 None

6.2 Macroeconomics Support

Outcome 7: Sub-Outcome 4: Smallholder producers' development and support (technical, financial, infrastructure) for agrarian

transformation

MTSF Action: Provide support to smallholder producers in order to ensure production efficiencies

Number of agricultural economic information

responses provided

799 Agricultural economic

information responses provided

400 Agricultural economic

information responses provided

400 0 None

Number of economic reports compiled

2 Economic reports compiled

2 Economic reports compiled

2 0 None

4.6.6. Strategy to overcome areas of under performance

Programme managed to successfully achieve all the predetermined targets during

the period under review.

4.6.7. Changes to planned targets

The performance indicators and targets for the programme were not changed during

the period under review.

Page 115: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

114

4.6.8. Linking performance with budgets

4.7. Programme7: Structured Agricultural Education and Training

4.7.1. Purpose

The programmes facilitate and provide structured agricultural education and training

in line with the Agricultural Education and Training Strategy to all participants in the

agricultural sector in order to establish a knowledgeable, prosperous and competitive

sector.

The programme significantly managed to train 455 participants in agricultural skills

development programmes and successfully managed to achieve 100% level of

performance during the period under review. The programme contributed directly to

Sub-Outcome 4 (Workers’ education and skills increasingly meet economic needs) of

Outcome 4.

4.7.2. Sub-programmes

Programme consists of the following two sub-programmes:

7.1. Higher Education and Training(HET)

7.2. Further Education and Training(FET)

Programme 6: AGRICULTURAL ECONOMICS SERVICES 1 2 3 4 5 6 7 8 92015/16 2014/15

Adjusted Appropriation

Shifting of Funds

Virement Final Appropriation

Actual Expenditure

Variance Expenditure as % of

final appropria

tion

Final Appropriation

Actual Expenditure

R'000 R'000 R'000 R'000 R'000 R'000 % R'000 R'000

1. AGRI-BUSINESS SOPPORT AND DEVELOPMENT 10 833 - - 10 833 10 819 14 99.9% 10 974 10 691 10 833 - - 10 833 10 819 14 99.9% 10 974 10 691

Sub programme

Page 116: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

115

4.7.3. Strategic objectives for the financial year under review

The following is the list the strategic objectives for the programme during the

financial year under review:

Development and implementation of demand-side planning system for skills in

collaboration with DHET

4.7.4. Achievements of targets for the Strategic Objectives

7. Structured Agricultural Education and Training

Strategic

objective

Actual

Performance

Planned Targets Actual

Achievement

Deviation from

planned target to

Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

7.1.Higher Education and Training(HET)

Outcome 4: Sub-Outcome 4: Workers’ education and skills increasingly meet economic needs

MTSF Action: Development and implementation of demand-side planning system for skills in collaboration with DHET

Development and implementation of demand-side

planning system for skills in collaboration with DHET

NPI 50 Agricultural Higher Education and Training

graduates

50 0 None

7.2. Further Education and Training(FET)

Outcome 4: Sub-Outcome 4: Workers’ education and skills increasingly meet economic needs

MTSF Action: Development and implementation of demand-side planning system for skills in collaboration with DHET

Provide support to smallholder producers in order to ensure

production efficiencies

NPI 400 Participants trained in agricultural skills

development programmes

455 55 Additional trainees

were added to balance

practical training

groups of minimum 12

and maximum of 15

per class

Page 117: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

116

4.7.5. Achievements of targets for the Performance Indicators

7. Structured Agricultural Education and Training

Performance

Indicator

Actual

Performance

Planned Targets Actual

Achievement

Deviation from

planned target to

Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

7.1.Higher Education and Training(HET)

Outcome 4: Sub-Outcome 4: Workers’ education and skills increasingly meet economic needs

MTSF Action: Development and implementation of demand-side planning system for skills in collaboration with DHET

Number of agricultural Higher Education and

Training graduates

NPI 50 Agricultural Higher Education and Training

graduates

50 0 None

7.2. Further Education and Training(FET)

Outcome 4: Sub-Outcome 4: Workers’ education and skills increasingly meet economic needs

MTSF Action: Development and implementation of demand-side planning system for skills in collaboration with DHET

Number of

participants trained in agricultural skills development

programmes

NPI 400

Participants trained in agricultural skills

development programmes

455 55 Additional trainees

were added to balance

practical training

groups of minimum 12

and maximum of 15

per class

4.7.6. Strategy to overcome areas of under performance

Programme managed to successfully achieve all the predetermined targets

during the period under review.

4.7.7. Changes to planned targets

The performance indicators and targets for the programme were not changed

during the period under review.

Page 118: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

117

4.7.8. Linking performance with budgets

4.8. Programme8: Rural Development Coordination

4.8.1. Purpose

The programme renders planning and coordination services to ensure sustainable

and vibrant rural communities.

The programme successfully managed to achieve 100% level of performance during

the period under review. The programme contributed directly to Sub-Outcomes 1

(Improved land administration and spatial planning for integrated development in

rural areas); 3 (Improved food security) and 6 (Growth of sustainable rural

enterprises and industries – resulting in rural job creation) of Outcome 7.

4.8.2. Sub-programmes

Programme consists of the following two sub-programmes:

8.1. Development Planning and Monitoring

8.2. Social Facilitation

Programme 7: STRUCTURED AGRICULTURAL EDUCATION AND TRAINING1 2 3 4 5 6 7 8 92015/16 2014/15

Adjusted Appropriation

Shifting of Funds

Virement Final Appropriation

Actual Expenditure

Variance Expenditure as % of

final appropria

tion

Final Appropriation

Actual Expenditure

R'000 R'000 R'000 R'000 R'000 R'000 % R'000 R'000

1. HIGHER EDUCATION AND TRAINING 67 248 - - 67 248 64 987 2 261 96.6% 73 075 70 250 2. FURTHER EDUCATION AND TRAINING(FET) 24 655 - - 24 655 26 904 (2 249) 109.1% - -

91 903 - - 91 903 91 891 12 100.0% 73 075 70 250

Sub programme

Page 119: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

118

4.8.3. Strategic objectives for the financial year under review

The following is the list the strategic objectives for the programme during the

financial year under review:

o Implement the comprehensive food security and nutrition Strategy o Promote sustainable rural enterprises and industries in areas with economic

development potential

o Strengthen coordination across the three spheres of government and external stakeholders to implement the Comprehensive Rural Development Programme (CRDP) in line with the spatial development plans

4.8.4. Achievements of targets for the Strategic Objectives

8. Rural Development Coordination

Strategic

objective

Actual

Performance

Planned Targets Actual

Achievement

Deviation from

planned target to

Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

8.1. Development Planning and Monitoring

Outcome 7: Sub-Outcome 3: Improved food security

MTSF Action: Implement the comprehensive food security and nutrition strategy

Implement the comprehensive food security and

nutrition strategy

3 War on poverty

reports compiled

5 War on poverty

reports compiled 5 0 None

5 Food security

status reports

compiled

5 Food security

status reports

compiled

5 0 None

14 Special

Programmes implemented

14 Special

Programmes implemented

14 0 None

NPI 1 Strategies

developed for

designated groups

1 0 None

5 Established designated formations

5 Established designated formations

5 0 None

5 Designated

Groups status

reports compiled

5 Designated

Groups status

reports compiled

5 0 None

OUTCOME 7: SUB-OUTCOME 6: Growth of sustainable rural enterprises and industries – resulting in rural job creation

MTSF Action: Promote sustainable rural enterprises and industries in areas with economic development potential

Promote sustainable

rural enterprises and industries in areas with economic development

potential

9 Enterprises in

rural district municipalities established

18 Enterprises in

rural district municipalities established

18 0 None

Page 120: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

119

8. Rural Development Coordination

Strategic

objective

Actual

Performance

Planned Targets Actual

Achievement

Deviation from

planned target to

Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

150 People

employed in rural enterprises

90 People

employed in rural enterprises

90 0 None

1 AgriBEE Sector code implemented

1 AgriBEE Sector code implemented

1 0 None

8.2. Social Facilitation

Outcome 7: Sub-Outcome 1: Improved land administration and spatial planning for integrated development in rural areas

MTSF Action: Strengthen coordination across the three spheres of government and external stakeholders to implement the

Comprehensive Rural Development Programme (CRDP) in line with the spatial development plans

Strengthen coordination across the three spheres of

government and external stakeholders to implement the

Comprehensive Rural Development Programme (CRDP) in line with the

spatial development plans

NPI 50% Technical and

financial

contribution of

both internal and

external

stakeholders

towards the

implementation of

the rural

development

programme

50% 0 None

4.8.5. Achievements of targets for the Performance Indicators

8. Rural Development Coordination

Performance Indicator

Actual Performance

Planned Targets

Actual Achievement

Deviation from planned target

to Actual

Achievement

Comment on deviation

2014/15 2015/16 2015/16 2015/16

8.1. Development Planning and Monitoring

Outcome 7: Sub-Outcome 3: Improved food security

MTSF Action: Implement the comprehensive food security and nutrition strategy

Number of War on poverty reports compiled

3 War on poverty reports compiled

5 War on poverty reports compiled

5 0 None

Number of food security status reports compiled

5 Food security status reports compiled

5 Food security status reports

compiled

5 0 None

Number of Special Programmes implemented

14 Special Programmes implemented

14 Special Programmes implemented

14 0 None

Number of strategy

developed for designated groups

NPI 1 Strategies

developed for designated groups

1 0 None

Number of established designated formations

5 Established designated formations

5 Established designated formations

5 0 None

Page 121: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

120

8. Rural Development Coordination

Performance Indicator

Actual Performance

Planned Targets

Actual Achievement

Deviation from planned target

to Actual

Achievement

Comment on deviation

2014/15 2015/16 2015/16 2015/16

Number of Designated Groups status reports compiled

5 Designated Groups status reports compiled

5 Designated Groups status reports compiled

5 0 None

OUTCOME 7: SUB-OUTCOME 6: Growth of sustainable rural enterprises and industries – resulting in rural job creation

MTSF Action: Promote sustainable rural enterprises and industries in areas with economic development potential

Number of enterprises in rural district municipalities

established

9 Enterprises in rural district municipalities

established

18 Enterprises in rural district municipalities

established

18 0 None

Number of people employed in rural

enterprises

150 People employed in rural enterprises

90 People employed in rural

enterprises

90 0 None

Number of AgriBEE Sector code implemented

1 AgriBEE Sector code implemented

1 AgriBEE Sector code implemented

1 0 None

8.2. Social Facilitation

Outcome 7: Sub-Outcome 1: Improved land administration and spatial planning for integrated development in rural areas

MTSF Action: Strengthen coordination across the three spheres of government and external stakeholders to implement the Comprehensive Rural Development Programme (CRDP) in line with the spatial development plans

% of Technical and

financial contribution of both internal and external stakeholders towards the

implementation of the rural development programme

NPI 50% Technical

and financial contribution of both internal and external

stakeholders towards the implementation of the rural development

programme

50% 0 None

4.8.6. Strategy to overcome areas of under performance

Programme managed to successfully achieve all the predetermined targets during the

period under review

4.8.7. Changes to planned targets

The performance indicators and targets for the programme were not changed during

the period under review.

Page 122: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

121

4.8.8. Linking performance with budgets

4.9. Programme 9: Environmental Services

4.9.1. Purpose

This programme is responsible for contributing to a safe and healthy living environment,

within a regulatory framework for promoting sustainable use and the conservation of natural

processes and biological diversity.

Significant achievements of targets for strategic objectives and performance

indicators for the programme during the period under review include:

7 Inter-governmental sector tools reviewed

1 845 Compliance inspections conducted

112 Enforcement actions finalised for non-compliance with environmental

management legislation

15 Joint Partnerships with external role players

6 S24G fines paid

92% Compliance with National Annual Ambient Air Quality Standards

Programme 8: RURAL DEVELOPMENT COORDINATION 1 2 3 4 5 6 7 8 92015/16 2014/15

Adjusted Appropriation

Shifting of Funds

Virement Final Appropriation

Actual Expenditure

Variance Expenditure as % of

final appropria

tion

Final Appropriation

Actual Expenditure

R'000 R'000 R'000 R'000 R'000 R'000 % R'000 R'000

1. SOCIAL FACILITATION 31 900 - - 31 900 32 934 (1 034) 103.2% 28 150 28 033 2. DEVELOPMENT PLANNING AND MONITORING 17 586 - - 17 586 16 526 1 060 94.0% 10 913 10 349

49 486 - - 49 486 49 460 26 99.9% 39 063 38 382

Sub programme

Page 123: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

122

92% Facilities with Atmospheric Emission Licenses reporting to National

Atmospheric Emissions inventory system (NAEIS)

92% Waste license applications finalised within legislated timeframes

5 687 permits issued within legislated time-frames

200 Work opportunities created through environmental programmes

28 environmental awareness activities conducted

Through the above significant achievements of targets, the programme contributed directly to the following Outcomes and Sub-Outcomes during the period under

review:

Outcome 12: Sub-Outcome 7: Improved inter-departmental coordination

and institutionalisation of long-term planning

Outcome 10: Sub-Outcome 4: Enhanced Governance Systems And

Capacity

Outcome 10: Sub-Outcome 1: Ecosystems Are Sustained And Natural

Resources Are Used Efficiently

Outcome 10: Sub-Outcome 4: Enhanced Governance Systems And

Capacity

Outcome 10: Sub-Outcome 3: An environmentally sustainable, low-carbon

economy resulting from a well-managed just transition

The overall performance level for the programme during the period under review is

at 92%.

4.9.2. Sub-programmes

Programme consists of the following five sub-programmes:

4.9. Environmental Planning and Coordination

Page 124: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

123

4.10. Compliance and Enforcement

4.11. Environmental Quality Management

4.12. Biodiversity Management

4.13. Environmental Empowerment Services

4.9.3. Strategic objectives for the financial year under review

The following is the list the strategic objectives for the programme during the

financial year under review:

o Implement efficient and effective management and operations systems

o Strengthen inter-departmental coordination and institutionalisation of long-term

planning

o Coordinate provincial climate change responses and initiatives

o Enhance compliance monitoring and enforcement capacity within the

environmental sector

o Integration of ecological infrastructure considerations into land-useplanning and

decision-making about new developments

o Ensure improvement in air quality

o Implement better waste management programmes

o Implement water resources protection programmes

o Expand the conservation area estate through declaration of state owned

protected areas, MPAs and biodiversity stewardship

o Develop management interventions for reducing species loss

o Enhance environmental education and empowerment (including skills

development)

4.9.4. Achievements of targets for the Strategic Objectives 4.9.1 Environmental Policy, Planning and Coordination

Strategic

objective

Actual

Performance

Planned Targets Actual

Achievement

Deviation from

planned target to

Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

Outcome 12: Sub-Outcome 4: Efficient and effective management and operations systems

Implement efficient and effective management and

operations systems

5 5 Legislative tools developed

5 0 None

1 8 Environmental research projects undertaken

8 0 None

Page 125: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

124

4.9.1 Environmental Policy, Planning and Coordination

Strategic

objective

Actual

Performance

Planned Targets Actual

Achievement

Deviation from

planned target to

Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

2 3 Functional

environmental information management systems

3 0 None

Outcome 12: Sub-Outcome 7: Improved inter-departmental coordination and institutionalisation of long-term planning

Strengthen inter-departmental coordination and

institutionalisation of long-term

planning

6 5 Inter-governmental sector tools reviewed

7 2 2 additional priority

Local municipal

(Mamusa and

Tswaing) IDPs were

reviewed for

environmental content.

Outcome 10: Sub-Outcome 2: An Effective Climate Change Mitigation And Adaptation Response

Coordinate provincial climate change responses and initiatives

0 1 Climate change response tool developed

1 0 None

4.9.5. Achievements of targets for the Performance Indicators

4.9.1 Environmental Policy, Planning and Coordination

Strategic

objective

Actual

Performance

Planned Targets Actual

Achievement

Deviation from

planned target to

Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

Outcome 12: Sub-Outcome 4: Efficient and effective management and operations systems

Number of

legislative tools developed

5 5 Legislative tools developed

5 0 None

Number of environmental research projects undertaken

1 8 Environmental research projects undertaken

8 0 None

Number of functional environmental information

management systems

2 3 Functional environmental information management systems

3 0 None

Page 126: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

125

4.9.1 Environmental Policy, Planning and Coordination

Strategic

objective

Actual

Performance

Planned Targets Actual

Achievement

Deviation from

planned target to

Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

Outcome 12: Sub-Outcome 7: Improved inter-departmental coordination and institutionalisation of long-term planning

Number of inter-governmental sector tools reviewed

6 5 Inter-governmental sector tools reviewed

7 2 The targeted 5 district

municipal IDPs, as well

as 2 additional priority

Local municipal

(Mamusa and

Tswaing) IDPs were

reviewed for

environmental content.

Outcome 10: Sub-Outcome 2: An Effective Climate Change Mitigation And Adaptation Response

Number of climate change response tools developed

0 1 Climate change response tool developed

1 0 None

4.9.6. Achievements of targets for the Strategic Objectives 4.9.2 Compliance And Enforcement

Strategic objective

Actual Performance

Planned Targets Actual Achievement

Deviation from planned target to

Actual Achievement

Comment on deviation

2014/15 2015/16 2015/16 2015/16

Outcome 10: Sub-Outcome 4: Enhanced Governance Systems And Capacity

Enhance compliance

monitoring and enforcement capacity within the sector

1 766 1 250 Compliance inspections

conducted

1845 595 Extra inspections in response to joint

operational needs, and more of reactive nature were conducted

28 54 Enforcement actions finalised for non-compliance

with environmental

management legislation

112 58 More inspections warranted enforcement actions to

be increased

NPI 9 Joint Partnerships with external role players

15 6 Reactional from invitations from other law enforcement agencies such as SAPS

4 4 S24G applicationsreceived

11 7 Reactional to rectify

unlawful developments

NPI 4 S24G fines paid 6 2 Reactional to rectify unlawful developments

Page 127: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

126

4.9.7. Achievements of targets for the Performance Indicators

4.9.2 Compliance And Enforcement

Performance

Indicator

Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target

to Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

Outcome 10: Sub-Outcome 4: Enhanced Governance Systems And Capacity

Number of compliance

inspections conducted

1 766 1 250 Compliance

inspections

conducted

1845 595 Extra inspections in

response to joint

operational needs,

and more of reactive

nature were

conducted

Number of

enforcement actions

finalised for non-

compliance with

environmental

management legislation

28 54 Enforcement

actions finalised

for non-

compliance with

environmental

management

legislation

112 58 More inspections

warranted

enforcement actions

to be increased

Number of Joint

Partnerships with

external role players

NPI 9 Joint

Partnerships with

external role

players

15 6 Reactional from

invitations from other

law enforcement

agencies such as

SAPS

Number of S24G

applications received

4 4 S24G

applications

received

11 7 Reactional to rectify

unlawful

developments

Number of S24G fines

paid

NPI 4 S24G fines paid 6 2 Reactional to rectify

unlawful

developments

Page 128: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

127

4.9.8. Achievements of targets for the Strategic Objectives

4.9.3 Environmental Quality Management

Strategic

objective

Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target

to Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

Outcome 10: Sub-Outcome 1: Ecosystems Are Sustained And Natural Resources Are Used Efficiently

Integration of ecological infrastructure considerations into land-useplanning and

decision-making about new developments

NPI 98%

Environmental

impact

assessment

applications

finalised within

legislated

timeframes

100% 2% EAPs submitted all

required information

on time

Outcome 10: Sub-Outcome 4: Enhanced Governance Systems And Capacity

Ensure improvement in

air quality

NPI 100%

Atmospheric

Emission Licenses

with complete

applications

issued within

legislated

timeframe

100% 0 None

NPI 60% Compliance with National Annual Ambient Air Quality

Standards

92% 32% 13 Parameters were

measured at 7

stations and only 1

parameter was non-

compliant

NPI 50% Facilities

with Atmospheric

Emission Licenses

reporting to

National

Atmospheric

Emissions

inventory system

(NAEIS)

92% 42% It is a new system at

DEA as such

challenges were

anticipated but none

were encountered

NPI 1 Designated

state of organs

with approved

AQMPs

1 0 None

Outcome 10: Sub-Outcome 4: Enhanced Governance Systems And Capacity

Implement better waste

managementprogrammes

NPI 80% Waste

license

applications

finalised within

legislated

timeframes

92% 12% DWS and EAPs

submitted reports on

time

Page 129: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

128

4.9.9. Achievements of targets for the Performance Indicators

4.9.3 Environmental Quality Management

Performance

Indicator

Actual

Performance

Planned

Targets

Actual

Achievement

Deviation from

planned target

to Actual Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

Outcome 10: Sub-Outcome 1: Ecosystems Are Sustained And Natural Resources Are Used Efficiently

Percentage of environmental impact assessment applications finalised within

legislated timeframes

NPI 98% Environmental impact assessment

applications finalised within legislated timeframes

100% 2% EAPs submitted all required information on time

Outcome 10: Sub-Outcome 4: Enhanced Governance Systems And Capacity

Percentage of

Atmospheric Emission

Licenses with complete applications issued within legislated timeframe

NPI 100%

Atmospheric

Emission Licenses with complete applications

issued within legislated timeframe

100% 0 None

Percentage of

compliance with National Annual Ambient Air Quality Standards

NPI 60% Compliance

with National Annual Ambient Air Quality Standards

92% 32% 13 Parameters were

measured at 7 stations and only 1 parameter was non-compliant

Percentage of facilities with Atmospheric Emission Licenses reporting to National

Atmospheric Emissions Inventory System (NAEIS)

NPI 50% Facilities with Atmospheric Emission Licenses reporting to

National Atmospheric Emissions inventory system (NAEIS)

92% 42% It is a new system at DEA as such challenges were anticipated but none

were encountered

Number of designated organs of state with approved and implemented AQMP’s

2 1 Designated state of organs with approved AQMPs

1 0 None

Outcome 10: Sub-Outcome 4: Enhanced Governance Systems And Capacity

Percentage of waste

license applications

finalised within legislated timeframes

NPI 80% Waste

license

applications finalised within legislated

timeframes

92% 12% DWS and EAPs

submitted reports on

time

Page 130: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

129

4.9.10. Achievements of targets for the Strategic Objectives

4.9.4. Biodiversity Management

Strategic

objective

Actual

Performance

Planned Targets Actual

Achievement

Deviation from

planned target to

Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

Outcome 10: Sub-Outcome 1: Ecosystems Are Sustained And Natural Resources Are Used Efficiently

Implement water resources protection

programmes

NPI 80 Sites with River

Health Programme

implemented

80 0 None

Outcome 10: Sub-Outcome 1: Ecosystems Are Sustained And Natural Resources Are Used Efficiently

Expand the conservation area estate through

declaration of state owned protected

areas, MPAs and biodiversity stewardship

236 194 307 500 ha in the

conservation

estate

393249 85749 Overachievement

attributed to Private

Nature Reserves on

DEA’s Protected Area

Database (SAPAD),

being included in the

“Conservation Estate”

NPI 1 Biodiversity

stewardship sites 1 0 None

Outcome 10: Sub-Outcome 1: Ecosystems Are Sustained And Natural Resources Are Used Efficiently

Develop

management interventions for reducingspecies loss

1 6 Provincial

protected areas

with approved

management plans

0 (6) Lack of funding by

Parks Board for

stakeholder

engagement on all 6

drafts management

plans developed.

NPI 80 % of area of

state managed

protected areas

assess with a

METT score above

67%

29% (51%) Change in evaluation

criteria

NPI 5 000 permits

issued within

legislated time-

frames

5687 687 More application were

received than planned.

Indicator is based on

number of applications

received.

Page 131: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

130

4.9.11. Achievements of targets for the Performance Indicators

4.9.4. Biodiversity Management

Strategic

objective

Actual

Performance

Planned Targets Actual

Achievement

Deviation from

planned target to

Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

Outcome 10: Sub-Outcome 1: Ecosystems Are Sustained And Natural Resources Are Used Efficiently

Number of sites with River Health

Programme implemented

NPI 80 Sites with River

Health Programme

implemented

80 0 None

Outcome 10: Sub-Outcome 1: Ecosystems Are Sustained And Natural Resources Are Used Efficiently

Number of hectares

in the conservation

estate

236 194 307 500 ha in the

conservation

estate

393249 85749 Overachievement

attributed to Private

Nature Reserves on

DEA’s Protected Area

Database (SAPAD),

being included in the

“Conservation Estate”

Number of

biodiversity

stewardship sites

NPI 1 Biodiversity

stewardship sites 1 0 None

Outcome 10: Sub-Outcome 1: Ecosystems Are Sustained And Natural Resources Are Used Efficiently

Number of

provincial protected

areas with approved

management plans

1 6 Provincial

protected areas

with approved

management plans

0 (6) Lack of funding by

Parks Board for

stakeholder

engagement on all 6

drafts management

plans developed.

% of area of state

managed protected

areas assess with a

METT score above

67%

NPI 80 % of area of

state managed

protected areas

assess with a

METT score above

67%

29% (51%) Change in evaluation

criteria

Number of permits

issued within

legislated time-

frames

NPI 5 000 permits

issued within

legislated time-

frames

5687 687 More application was

received than planned.

Indicator is based on

number of applications

received.

Page 132: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

131

4.9.12. Achievements of targets for the Strategic Objectives

4.9.5. Environmental Empowerment Services

Strategic

objective

Actual

Performance

Planned Targets Actual

Achievement

Deviation from

planned target to

Actual

Achievement

Comment on

deviation

2014/15 2015/16 2015/16 2015/16

Outcome 10: Sub-Outcome 3: An environmentally sustainable, low-carbon economy resulting from a well-managed just transition

MTSF Action: Enhanced environmental education and empowerment (including skills development)

Enhance

environmental education and empowerment (including skills

development)

2665 200 Work

opportunities

created through

environmental

programmes

212 12 Additional

appointments made in

the 4th quarter to cover

allocated quotas and

late start of the

infrastructure project

12 28 environmental

awareness

activities

conducted

34 6 Agricultural Extension

Conference required

additional awareness

activity

17 40 Environmental

capacity building

activities

conducted

41 1 Additional budget was

allocated which

allowed additional

activity in preparation

for 2016/17 targets

NPI 3 Quality

environmental

education resource

materials

developed

3 0 None

4.9.13. Achievements of targets for the Performance Indicators

4.9.5. Environmental Empowerment Services

Strategic objective

Actual Performance

Planned Targets Actual Achievement

Deviation from planned

target to Actual

Achievement

Comment on deviation

2014/15 2015/16 2015/16 2015/16

Outcome 10: Sub-Outcome 3: An environmentally sustainable, low-carbon economy resulting from a well-managed just transition

MTSF Action: Enhanced environmental education and empowerment (including skills development)

Number of work

opportunities created through environmental programmes

2665 200 Work

opportunities created through environmental programmes

212 12 Additional appointments

made in the 4th quarter to cover allocated quotas and late start of the infrastructure project

Page 133: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

132

4.9.5. Environmental Empowerment Services

Strategic objective

Actual Performance

Planned Targets Actual Achievement

Deviation from planned

target to

Actual

Achievement

Comment on deviation

2014/15 2015/16 2015/16 2015/16

Number of environmental

awareness activities conducted

12 28 environmental awareness activities conducted

34 6 Agricultural Extension Conference required

additional awareness activity

Number of environmental capacity building activities conducted

17 40 Environmental capacity building activities conducted

41 1 Additional budget was allocated which allowed additional activity in preparation for 2016/17 targets

Number of quality environmental

education resource materials developed

NPI 3 Quality environmental

education resource materials developed

3 0 None

4.9.14. Strategy to overcome areas of under performance

Strengthening and formalising working relationships with the North West Parks

Board, especially on the planning and reporting of the shared performance

indicatorse.

4.9.15. Changes to planned targets

The performance indicators and targets for the programme were not changed during

the period under review.

Page 134: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

133

4.9.16. Linking performance with budgets

5. TRANSFER PAYMENTS

5.1. Transfer payments to public entities

There were no transfer payments made to public entities during the period under

review

5.2. Transfer payments to all organisations other than public entities

There were no transfer payments made to any organisations other than public

entities during the period under review.

6. CONDITIONAL GRANTS

6.1. Conditional grants and earmarked funds paid

The Department did not make any conditional grants and earmarked funds

payments during the period under review.

Programme 9: ENVIRONMENTAL SERVICES 1 2 3 4 5 6 7 8 92015/16 2014/15

Adjusted Appropriation

Shifting of Funds

Virement Final Appropriation

Actual Expenditure

Variance Expenditure as % of

final appropria

tion

Final Appropriation

Actual Expenditure

R'000 R'000 R'000 R'000 R'000 R'000 % R'000 R'000

1. ENVIRONMENTAL POLICY, PLANNING AND COORDINATION 10 886 - - 10 886 10 909 (23) 100.2% 15 473 14 759 2. COMPLIANCE AND ENFORCEMENT 8 398 - - 8 398 8 190 208 97.5% - - 3. ENVIRONMENTAL QUALITY MANAGEMET 20 154 - - 20 154 18 807 1 347 93.3% 19 922 19 807 4. BIODIVERSITY MANAGEMENT 32 539 - - 32 539 33 497 (958) 102.9% 28 022 27 881 5. ENVIRONMENTAL EMPOWERMENT SERVICES 56 418 - - 56 418 56 910 (492) 100.9% 115 939 110 340

128 395 - - 128 395 128 313 82 99.9% 179 356 172 787

Sub programme

Page 135: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

134

6.2. Conditional grants and earmarked funds received

The table/s below details the conditional grants and ear marked funds received

during for the period 1 April 2015 to 31 March 2016.

Conditional Grant 1: Comprehensive Agricultural Support Programme

Department who transferred the grant

Department of Agriculture, Forestry and Fisheries

Purpose of the grant

The primary aim of the CASP is to make provision for agricultural support to

targeted beneficiaries of the land reform and agrarian reform programme

within six priority areas namely information and knowledge management;

technical and advisory assistance, and regulatory services; training and

capacity building; marketing and business development; on-farm and off-farm

infrastructure and production inputs; and financial assistance.

Expected outputs of the grant

The expected outcomes will be reduced poverty and inequalities in enterprise

and ownership; increased wealth creation and sustainable employment

especially in the rural areas; improved household food security; improved

farming efficiency; stimulate the broadening of financial markets; promote the

development of participating financial intermediaries (e.g. village banks);

stimulate economic growth through improved access to financial services;

improved investor confidence leading to increased domestic and foreign

investment in agricultural activities in rural areas through the provision of

enabling financial products, risk mitigation products (e.g. transaction cost

subsidy funds, credit guarantee scheme and equity fund.

Actual outputs achieved

123 Smallholder producers received support

A total of 8 405 Smallholder producers were supported with agricultural advice

1 324 Households benefitted from agricultural food security initiatives

A total of 16 118 Hectares of land have been cultivated for food production in communal areas and land reform projects

Amount per amended DORA 195,066

Amount received (R’000) 202,733

Reasons if amount as per DORA was not

received

None

Amount spent by the department (R’000) 202,732

Reasons for the funds unspent by the entity None

Reasons for deviations on performance None

Measures taken to improve performance None

Monitoring mechanism by the receiving

department

Onsite project visits conducted on regular basis & Quarterly reports compiled

and submitted to the transferring Department - DAFF

Page 136: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

135

Conditional Grant 2: Landcare

Department who transferred the grant Department of Agriculture, Forestry and Fisheries

Purpose of the grant To optimize productivity and sustainable use of natural resource to ensure

greater productivity ,food security , job creation and better quality of life for all

Expected outputs of the grant Awareness Campaigns on landcare, capacity building exercises conducted

within approved Land care projects, green jobs created through land care and

farm land hectares improved through conservation measures

Actual outputs achieved 1600 Farm land hectares improved through conservation measures and369

Green jobs created through land care

Amount per amended DORA 7,971

Amount received (R’000) 7,971

Reasons if amount as per DORA was not

received

None

Amount spent by the department (R’000) 7,346

Reasons for the funds unspent by the entity

None

Reasons for deviations on performance Unavailability of funds and areas focused on are too small to accommodate

bigger numbers or workers Measures taken to improve performance Ensure availability of funds in the next financial year

Monitoring mechanism by the receiving department

Onsite project visits conducted on regular basis Quarterly reports compiled and

submitted to the transferring Department – DAFF

Conditional Grant 3: IlimaLetsema

Department who transferred the grant Department of Agriculture, Forestry and Fisheries

Purpose of the grant To achieve 10 – 15% increase in agricultural production by the farming

communities, with special focus to vulnerable groups in South Africa Expected outputs of the grant The expected outcome will be increased family and community food

production, increase production within agricultural development corridors,

improved productivity of fallow lands for emerging farmers and

households, rehabilitate and expand existing Taung Irrigation scheme

Actual outputs achieved 1 324 Households benefitted from agricultural food security initiatives

A total of 16 118 Hectares of land have been cultivated for food production in communal areas and land reform projects

Amount per amended DORA 50,337

Amount received (R’000) 50,337

Reasons if amount as per DORA was not received None

Amount spent by the department (R’000) 46,296

Reasons for the funds unspent by the entity None

Reasons for deviations on performance None

Measures taken to improve performance None

Monitoring mechanism by the receiving department Onsite project visits conducted on regular basis

Quarterly reports compiled and submitted to the transferring Department -

DAFF

Page 137: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

136

Conditional Grant 4: Expanded Public Works Programme

Department who transferred the grant Department of Public Works

Purpose of the grant Create job opportunities and skilled labour force

Expected outputs of the grant Creation of Work Opportunities and Full Time equivalents and skilled

beneficiariesof the EPWP beneficiaries

Actual outputs achieved Created 1244 Work Opportunities translating into 970 Full Time Equivalents

Amount per amended DORA 6,077

Amount received (R’000) 5,678

Reasons if amount as per DORA was not

received

None

Amount spent by the department (R’000) 6,146

Reasons for the funds unspent by the entity

None

Reasons for deviations on performance None

Measures taken to improve performance None

Monitoring mechanism by the receiving

department

Onsite project visits conducted on regular basis

Quarterly reports compiled and submitted to the transferring Department –

Department of Public Works

7. DONOR FUNDS

7.1. Donor Funds Received

Department received R10 million 3 year donor funding by DannishHaldorTopsee

during the period under review.

8. CAPITAL INVESTMENT

8.1. Capital investment, maintenance and management plan

8.1.1Capital Investment

The department did not have any capital projects for the year under review.

8.1.2. Maintenance

The Department does not own any immovable properties. Ownership of all

government immovable properties in the North West Province falls under the

Department of Public Works, Roads and Transport.

Majority of the buildings occupied by the Department are leased and therefore all maintenance related issues are the responsibility of the Landlord.

Page 138: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

137

8.1.3. Asset Management Plan

All departmental assets are maintained on an electronic asset register which was

implemented in 2002/03 financial year. All departmental assets are being managed and monitored in line with the Provincial Asset Management Policy and Policy Manual. Assets are being reconciled on a monthly basis to ensure that the asset

register remained up-to-date during the period under review. Asset verification were carried out in the second and fourth quarter.65% of the departmental assets are in good condition, 15% in fair condition while 20% in poor / redundant state.

Page 139: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

138

PART C: GOVERNANCE

Page 140: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

139

1. INTRODUCTION

Corporate governance embodies processes and systems by which public entities are

directed, controlled and held to account. In addition to legislative requirements

based on a public entity’s enabling legislation, and the Companies Act, corporate

governance with regard to public entity’s is applied through the precepts of the

Public Finance Management Act (PFMA) and run in tandem with the principles

contained in the King’s Report on Corporate Governance.

Parliament, the Executive and the Accounting Authority of the public entity are

responsible for corporate governance.

2. RISK MANAGEMENT

Departmental Risk Management Policy and Strategy:- The department

has an approved risk management policy and approved risk management

strategy, which is regularly reviewed to oversee the relevance of operations and

appropriate compliance with the risk management strategy. The Centralised

Internal Audit section in the Province is requested by the Department, to conduct

bi-annual audits on the level of compliance against the risk management policy

and strategy to ensure that the department is consistently compliant with its

requirements of which both internal and external audit results are communicated

to the EID Cluster Audit Committee and Centralised Audit Committee of the

Province as a management oversight function and appropriate checks and

balances in risk operations.

Departmental Regular Risk Assessments to determine the effectiveness of

its risk management strategy and to identify new and emerging risks:- The

department is conducting regular risk assessments which commence at operational

level per business unit, and then result in a collective risk database of

information(incorporating strategic risks, operational risks, ethic risks, fraud risks,

Page 141: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

140

project risks etc.) which is used at a strategic risk assessment exercise where

management analyse the information from an informed decision making basis and

collectively decide on the top 10 risks or top high risk priority levelsof the

department. This risk database information, incorporating the MPAT Improvement

plan and the final top 10 risk register or top high risk prioritiesof the department;

including the entire process that unfolded to collect the information is compiled

within the risk profile of the department which is approved for implementation by

the Accounting Officer.

The top 10 risk register or top high risk prioritiesare used to monitor and track

progress of implementation and to analyse the mitigation trend in the department.

Progress and action against the top 10 risk registerof top high risk priorities is

monitored on monthly basis and the results are communicated on quarterly basis to

the Accounting Officer, Provincial Risk Management Forum, Provincial Internal Audit,

the EID Cluster Audit Committee and Centralised Audit Committee of the Province.

Any recommendations emanating from these structures are immediately

implemented to ensure compliance with operations, regulations and the applied risk

management strategy within the department.

Risk Management Committee that advises management on the overall

system of risk management, especially the mitigation of unacceptable

levels of risk:- The Department reviewed its Risk Management Committee

extensively to establish a Governance Risk Management Committee (GRMC) that will

host all fragmented governance operations (such as Risk Management, Professional

Ethics, Fraud Prevention, ICT Governance, PAIA, Internal and External Audit

recommendations etc.) and establish an integrated cooperative governance system

within the Department. The Governance Risk Management Committee was

appointed by the Executive Authority with the Chairperson being an independent

external memberwith 2 additional External Members. The Committee’s membership

comprise of both internal and external members to ensure an objective oversight

body over the risk and governance operations within the department for sound

corporative governance within the department. The concept strategy of the GRMC

Page 142: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

141

was approved by the Accounting Officer and the following inception documents were

developed for the establishment of the committee operations:

Terms of Reference / Constitution of the Governance Risk Management

Committee;

Service Level Agreement for the External Chairperson appointment;

Service Level Agreement for the two External Committee members appointments;

Standard appointment letters for the normal internal and external membership of

the Committee;

Declaration of interest and confidentiality forms for disclosures;

High level Action plan for the execution of the committeedeliverables;

Standard Operating Procedure Manual for the secretariat and committee

operations;

All Committee members were formally appointed with a proper job description in

terms of their roles and responsibilities that should be executed in line with the

Committee Charter.

All the various Risk, Fraud, Ethics, Governance, ICT Champions etc. were formally

appointed with proper job descriptions in terms of their roles and responsibilities

that should be executed in line with the Committee Charter.

Meetings were hosted.

Resolution registers were compiled to track progress on operations.

In addition, the Department is reporting its risk operations on quarterly basis to the

Accounting Officer, Provincial Risk Management Forum, Provincial Internal Audit,

EMC, DMC, EDMC,EID Cluster Audit Committee and the Centralised Audit Committee

in the Province for appropriate management oversight, to assess compliance and to

advice or make recommendations to the department for immediate implementation

and adherence of which results are monitored and assessed at these structures at

the next upcoming meeting.

Audit Committee advises the department on risk management and

independently monitors the effectiveness of the system of risk

management:- On quarterly basis the Accounting Officer reports to the Audit

Page 143: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

142

Committee on its governance and risk operations, of which the Audit committee is

making recommendations for immediate implementation by the department, after

which progress is monitored and assess by the Audit Committee at the next

upcoming Audit Committee meeting.The department is fully compliant as per the

outcomes.

Progress in the management of risks, whether this has transmitted into

improvements in the department’s performance, and if not, what it plans

on doing to address this problem:- Tremendous progress had been assessed by

the Department, as the governance and control environment had been extensively

strengthened, so much so that the Department is on annual basis improving on its

internal and external audit reports with lessor audit findings and control deficiencies,

and the department is also on the verge of obtaining a clean audit opinion through

the Auditor-General. In addition the Department are the best performing

Department within the recent MPAT audit in the North West Province for the past

two consecutive years and the leader on Governance, Risk Management, Fraud

Prevention, ProfessionalEthicsand ICT Governance. The department also received

several level 4 compliance scores in terms of Supply Chain Management, Financial

performance, employee wellness and the pilot project in terms of the

Implementation of the Promotion to Administrative Justice Act (PAJA). The

Department performance were also acknowledged by DPSA as one of six (6)

Departments in the Country being part of the 5.38% that are fully compliant with

the Auditor General’s requirements on ICT Governance, whereby 94.62% of

departments are failing.

3. FRAUD AND CORRUPTION

The department’s fraud prevention plan and the progress made in

implementing the fraud prevention plan:- The Department has an

approved Fraud Prevention Plan and Strategy which is regularly reviewed.

Specific policies had also been approved for Whistle-Blowing, Ethics

Management, Gifts, donations, hospitality and sponsorship to ensure appropriate

compliance.

Page 144: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

143

The department is regularly hosting Governance awareness campaigns to

educate officials on risk management, fraud prevention, professional ethics,

information management, information privacy, information security, ICT

Governance and Cyber Crime. Flyers, brochures and newsletter articles are

circulated with case studies to officials to educate and serve as elimination to the

risk of potential fraud incidents.

Circulars are issued and random assessments are conducted on financial

disclosures and possible 3rd party transactions to identify potential business

conflict of interests. Incidents are investigated and disciplined in accordance and

reports are provided to the Accounting Officer and relevant structures such as

the Office of the Premier and the Public Service Commission. There were a

tremendous improvement on the systems established as the general internal

control environment, governance control environment, risk and ethics culture had

improved as the level of conflict of interests had declined including the number of

misconduct cases and hotline case incidents which are a tremendous

improvement on the ethical control environment.

A register of the Code of Conduct circulation within the department is kept. A

survey questionnaire is developed to assess the level of understanding of officials

on anti-corruption aspects and to assess the governance compliance level in the

organisation. These survey results are incorporated into the Risk Profile of the

organisation of which fraud risks and ethics risks are incorporated for appropriate

mitigation strategies. The level of education of officials between what is right and

what is wrong had tremendously improved based on the governance programme,

including the level of volunteered participation towards the governance

questionnaire had improved.

The department encourages key fraud prevention initiatives as it tend to

minimise the impact, number of incidents, nature, type and seriousness of a case

reported including the cost implications to recover after an incident had been

Page 145: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

144

identified. This approached had healed positive results, as the number and

incidents had declined within the department and most incidents reported deals

with petty matters that are not corruption related, which also declined. In

addition the Department were the best performer in the North West Province for

the part 3 consecutive years on the MPAT audit including various programmes in

Financial Management, Governance, Risk Management, Fraud Prevention,

Professional Ethics and ICT Governance.

The department also received clean audit reports on Fraud Prevention, ethics,

risk and governance from Provincial Internal Audit as the shared Internal Audit

division in the Province.

Mechanisms in place to report fraud and corruption and how these

operate.eg: Whistle blowing - The need for officials to make

confidential disclosure about suspect fraud and corruption:- Whistle-

blowers are encouraged to use the listed agencies available for whistle-blowing

operations to encourage openness, transparency, un-biased objectivity and to

ensure protection on disclosures at all times. Internal structures within the

department are also available if preferred by the Whistle-blower to be used. The

Department also established a customer call centre were customer complaints

can be raised, to ensure that quality services are rendered to the public.

How are cases reported and what action is taken:- Cases or incidents are

reported to the listed agencies and referred to the department or an alternative

agent for investigation depending the nature and seriousness of the incident or

case that was reported. Each case or incident receives a unique case number or

reference.

The Public Service Commission and the Office of the Premier enquires regular

progress on these cases through reports until the case had been finalised for which

the Accounting Officer is the responsible official to issue account of its case

operations. Feedback is communicated by the Public Service Commission back to the

relevant agent that reported the case or incident to the Public Service Commission.

Page 146: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

145

The Department takes appropriate disciplinary measures in accordance with the

type, the nature and seriousness of the transgression. In the past years and for the

period under review the Department took drastic action against officials in conduct in

relation to the type, seriousness and nature of the transgression at the time.This

resulted in a tremendous decline in case incidents.

4. MINIMISING CONFLICT OF INTEREST

To encourage transparency with regards to conflict of interest, all Departmental Bid

Committee members make verbal and written declaration of interests before each

meeting on the submissions to be tabled. All members of the bid committees subscribe

to a code of conduct of Bid Committees which is issued to each member upon

appointment to refrain from transactions that could lead to conflicts of interest while they

hold that office. Furthermore, the Department has adopted the Code of Conduct for SCM

practitioners issued by the National Treasury which all SCM practitioners have signed.

The Department recorded no conflicts for the year under review.

In addition, at the beginning of each financial year, all senior managers in the

Department sign a financial disclosure form declaring all their financial interests to the

Executive Authority.100% of SMS members are compliant towards their disclosures for

the past three consecutive years.

Policies on Fraud Prevention, Ethics Management, Gifts, donation, hospitality and

sponsorships, Whistle-blowing and Admin Circular directives were issued to manage

conflict of interests in the department. A gift register were also introduced to ensure

that officials comply and adhere to the Public Service Act and Regulations.

5. CODE OF CONDUCT

The Department is enforcing the Code of Conduct of the Public Service in the

Department, as it is regularly circulated in a pocket seize booklet format and

educated to officials through road shows, campaigns and brochures. A register is

kept of officials in acceptance of the Code of Conduct as a pledge.

Page 147: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

146

Professional Ethics behaviour in the workplace had been educated to officials

through Governance Awareness campaigns and brochures on Professional Ethics.

The department considers ethics risks within its risk profile as part of its mitigation

strategies to minimise and limit the exposure. With the Professional Ethics methods

used in the department, the governance - and control environment had

tremendously improved with lessor control deficiencies detected by the Auditor-

General in its audit report and a general decline in the reported incidents of corrupt

practices in the workplace. This approach further assisted the department to start

building integrity in business dealings of which the department is on a verge of

obtaining a clean audit opinion to build on its reputation.

In addition the Department were also the best performing Department for the past

three consecutive years on the MPAT audit in the North West Province including

various Key Performance Areas. If a serious breach is identified with the contractual

agreement of the employer or in accordance with any of the provisions listed within

the Code of Conduct, such cases are referred for investigation and disciplinary

measures are taken in accordance with the type, nature and seriousness of the

transgression. In the past dismissals were affected or a final written warning.

6. HEALTH SAFETY AND ENVIRONMENTAL ISSUES

Occupational Health and Safety (OHS) inspections were conducted in the

Department to eliminate hazards and occupational health risks in the Department.

First aid cases were attended to, to assist clients who sustained minor injuries at

work. COIDA cases were handled and taken to compensation houses.

There is a challenge of non compliance on OHS inspection reports/recommendations

in the Department. Poor maintenance of Departmental buildings is also a long

standing challenge. The Department is experiencing backlog of COIDA due to slow

responses from the Compensation House.

Page 148: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

147

The state of the compliance of the Agricentre building is still unresolved, however

the department attended to these anomalies on a case by case to avert worsening of

the conditions. Department of Public Works has initiated a process for seeking

alternative office accommodation.

7. PORTFOLIO COMMITTEES

All the scheduled dates and meetings of the Portfolio Committee on Agriculture and

Rural Development were honoured by the Department. This also included the

submission of all the reports requested by the Portfolio Committee

8. SCOPA RESOLUTIONS

There were no scopa resolutions during 2015/16 financial year.

Page 149: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

148

9. PRIOR MODIFICATIONS TO AUDIT REPORTS

There were no prior modifications to Audit reports

10. INTERNAL CONTROL UNIT

The unit is located in Office of the Chief Financial Officer, due to the compliance

challenges experienced in the past a focal point for the year under review was

internal control measures. All transactions are tested at the point of entry or

transaction level for compliance test.

Furthermore, a committee was established to assess all irregular expenditure

incurred for recommendation to the Accounting Officer to either regularise, refer for

further investigation and/or institute necessary disciplinary actions. The process has

yielded positive results as the prior years’ irregular expenditure has reduced

significantly, and the current year was curbed at a minimal level.

11. INTERNAL AUDIT AND AUDIT COMMITTEES

Key activities and objectives of the internal audit

Key activities:

Internal auditing is an independent, objective assurance and consulting activity

designed to add value and improve an organization's operations. It helps an

organization accomplish its objectives by bringing a systematic, disciplined approach

to evaluate and improve the effectiveness of risk management, control, and

governance processes.

Key objectives:

Provide a value add risk based internal audit service to the department.

Page 150: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

149

Summary of audit work done

For the financial year under review 26 assurance and advisory reports were issued to

the Department. Work performed was based on a risk based internal audit plan and

included audits of: risk management; supply chain management; financial

statements; report on pre-determined objectives; IT governance; and audit action

plans (both internal and external). The audit work performed indicated that in

certain audit areas deficiencies in internal control, risk management and governance

processes exist and that this will require improvement on by the Department

through timely and adequate implementation of agreed upon audit action

plans.

12. PROVINCIAL AUDIT COMMITTEE REPORT

Final Report of the Provincial Audit Committee

We are pleased to present our final report for the financial year ended 31 March

2016.

Audit Committee Members and Attendance

The Audit Committee consists of the members listed hereunder and should meet at

least four times per annum as the Central Audit Committee and also four times per

annum as the Cluster Audit Committee as per its approved terms of reference.

During the current year four meetings were held by the Central Audit Committee and

six meetings were held by the Cluster Audit Committee.

Page 151: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

150

Central Audit Committee

Scheduled Meetings

Special Meetings

Name Role Held Attended Held Attended

Mr. M.

Mohohlo Chairperson 4 4 3 3

Ms. P. Mzizi External Member 4 2 3 3

Ms. N. Mtebele External Member 4 3 3 3

Mr. P. Tjie External Member 4 4 3 3

Mr. F. Gondwe External Member 4 4 3 2

Mr. M.

Mokgobinyane

External Member

4 1* 3 Na

Ms. O.

Bodigelo-Nyezi

Internal Member

4 1* 3 Na

Mr. N. Kunene Ex Officio Member 4 3 3 Na

Mr. G. Paul Ex Officio Member 4 1 3 Na

Mr. M. Bogosi Ex Officio Member 4 1** 3 Na

Ms. H. Kasirivu Ex Officio Member 4 1** 3 Na

*Co-opted for specific meetings.

**On behalf of Ex Officio Members. Cluster Audit Committee

Scheduled Meetings

Name Role Held Attended

Mr. P. Tjie Chairperson and

External Member 6 6

Ms. J. Brown External Member 6 3

Mr. P. Zwane External Member 6 1

Mr. F. Gondwe External Member 6 5*

Dr. A. Robinson

Internal Member 6 4

Ms. B. Mofokeng

Internal Member 6 0

*Co-opted for specific meetings.

Audit Committee Responsibility

Page 152: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

151

The Audit Committee reports that it has complied with its responsibilities arising

from section 38(1) (a) (ii) of the PFMA and Treasury Regulation 3.1.

The Audit Committee also reports that it has adopted appropriate formal terms of

reference as its Audit Committee Charter, has regulated its affairs in compliance with

this charter and has discharged all its responsibilities as contained therein.

The effectiveness of internal control

In line with the PFMA, Internal Audit provides the Audit Committee and management

with assurance that the internal controls are appropriate and effective. This is

achieved by evaluating internal controls to determine their effectiveness and

efficiency, and by developing recommendations for enhancement or improvement.

From the various reports of the Internal Auditors and audit report of the AGSA it was

noted that matters were reported indicating deficiencies in the system of internal

controls in areas pertaining to reporting on pre-determined objectives and

compliance with laws and regulations

Through our analysis of audit reports and engagement with the Department we can

report that the system on internal control for the period under review was adequate

and effective except for the above mentioned

A matter of concern for the Audit Committee is that the department is currently not

timely implementing all Internal Audit action plans agreed upon.

Based on the quarterly reviews performed, the departmental fraud and risk

management system is adequate but not effective.

In-Year Management and Quarterly Reporting

The Provincial Treasury has confirmed that the department has reported to the

Treasury as is required by the PFMA. The quality of the in-year performance

reporting including interim financial statements are however a concern to the Audit

Committee.

Page 153: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

152

Evaluation of Financial Statements

The Audit Committee reviewed the draft annual financial statements prepared by the

department and advised the accounting officer to ensure that all the review notes

and comments of the Internal Audit and Audit Committee are fully addressed prior to

submission of the annual financial statements to the Auditor General South Africa.

The Audit Committee has:

reviewed and discussed the external audit outcomes on the audited annual

financial statements to be included in the annual report, with the Auditor

General South Africa and the Accounting Officer,

reviewed the Auditor General South Africa’s management report and

management’s responses thereto, and

reviewed significant adjustments resulting from the audit.

Evaluation of reporting on pre-determined objectives

The Audit Committee reviewed the draft annual report prepared by the department

and advised the accounting officer to ensure that all the review notes and comments

of the Internal Audit and Audit Committee are fully addressed prior to submission of

the annual report to the Auditor General South Africa.

The Audit Committee has discussed the external audit outcomes on the reporting on

pre-determined objectives to be included in the annual report with the Auditor

General South Africa and the Accounting Officer.

Internal Audit

Page 154: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

153

The Audit Committee is satisfied that the Internal Audit function operated effectively

during the year under review. The Audit Committee also notes that the deficiencies

in the risk management system mentioned above impact on the implementation of

the risk based audit approach.

Auditor General South Africa

We have reviewed the department’s implementation plan for audit issues raised in

the previous year and we are satisfied that all the matters except irregular

expenditure have been adequately resolved.

The Audit Committee is not aware of any unresolved issues with respect to the

current audit.

The Audit Committee concurs with the Auditor General South Africa's opinion on the

annual financial statements.

General

Signed on behalf of the Cluster Audit Committee by: Chairperson of the ............M P Tjie.................

Cluster Audit Committee M.P Tjie Date 31 July 2016

The above report was presented to, considered and approved by the Central Audit

Committee at a meeting held on 31 July 2016 and is signed by:

Chairperson of the …………M Mohohlo……………

Provincial Audit Committee M Mohohlo

Date 31 July 2016

Page 155: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

154

PART D: HUMAN RESOURCE MANAGEMENT

Page 156: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

155

Employment and vacancies TABLE 3.1 – Employment and vacancies by programme, 31 March 2016

Programme Number of posts

Number of posts filled

Vacancy Rate

Number of posts filled additional to the establishment

Administration 519 385 26 6

Agriculture and Economics 25 21 16 0

Farmer Support and Development 485 344 29 1

Research and Technology Development 190 130 32 0

Rural Development 44 38 14 0

Structured Agriculture Training 254 196 23 6

Sustainable Resource Management 58 36 38 0

Veterinary Services 260 202 22 0

Environmental Services 214 179 16 0

Total 2049 1531 25 13 TABLE 3.2 – Employment and vacanciesby salary bands, 31 March 2016

Salary band Number of posts

Number of posts filled

Vacancy Rate

Number of posts filled additional to the establishment

Lower skilled (Levels 1-2) 296 128 57 0

Skilled (Levels 3-5) 586 488 17 5

Highly skilled production(Levels 6-8) 752 582 23 1

Highly skilled supervision (Levels 9-12) 384 307 20 7

Senior management (Levels 13-16) 31 26 16 0

Total 2049 1531 25 13 TABLE 3.3 – Employment and vacancies by critical occupation, 31 March 2016

Critical occupations Number of posts

Number of posts filled Vacancy Rate

Number of posts filled additional to the establishment

Veterinarian 23 17 26 0

Scientist Production 24 21 13 0

Economist 16 13 19 0

Agro-meteorologist 1 1 0 0

Engineer 1 1 0 1

Engineering Technician 5 3 40 0

Total 70 56 20 1

Page 157: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

156

Job evaluation TABLE 4.1 – Job Evaluation, 01 April 2015 to 31 March 2016

Salary band Number of posts

Number of Jobs

Evaluated

% of posts

evaluated by salary

bands

Posts Upgraded Posts downgraded

Number % of posts

evaluated Number

% of posts

evaluated

Lower skilled (Levels 1-2)

296 0 0 0 0 0 0

Skilled (Levels 3-5) 586 0 0 0 0 0 0

Highly skilled production (Levels 6-8)

752 0 0 0 0 0 0

Highly skilled supervision (Levels 9-12)

384 0 0 0 0 0 0

Senior Management Service Band A

23 0 0 0 0 0 0

Senior Management Service Band B

6 0 0 0 0 0 0

Senior Management Service Band C

1 0 0 0 0 0 0

Senior Management Service Band D

1 0 0 0 0 0 0

Total 2049 0 0 0 0 0 0 TABLE 4.2 – Profile of employees whose salary positions were upgraded due to their posts being

upgraded, 01 April 2015 to 31 March 2016

Beneficiaries African Asian Coloured White Total

Female 0 0 0 0 0

Male 0 0 0 0 0

Total 0 0 0 0 0 Employees with a disability 0

TABLE 4.3 – Employees whose salary level exceed the grade determined by job evaluation, 01 April 2015 to 31 March 2016 (in terms of PSR 1.V.C.3)

Total Number of Employees whose salaries exceeded the grades determined by job evaluation in 2015/16 0

Page 158: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

157

Employment changes

TABLE 5.1 – Annual turnover rates by salary band for the period 01 April 2015 to 31 March 2016

Salary Band Number of

employees per band as on 01

April 2015

Appointments and transfers

into the department

Terminations and transfers

out of the department

Turnover rate

Lower skilled (Levels 1-2) 190 0 12 6

Skilled (Levels 3-5) 500 21 69 14

Highly skilled production(Levels 6-8)

587 11 51 9

Highly skilled supervision(Levels 9-12)

324 3 25 8

Senior Management Service Band A

20 2 2 10

Senior Management Service Band B

3 0 0 0

Senior Management Service Band C

1 0 0 0

Senior Management Service Band D

1 0 0 0

Total 1626 37 159 10 TABLE 5.2 – Annual turnover rates by critical occupation for the period 01 April 2015 to 31 March 2016

Occupation: Number of employees per

occupation as on 01 April 2015

Appointments and transfers

into the department

Terminations and transfers

out of the department

Turnover rate

Veterinarian 19 0 0 0

Scientist 24 0 0 0

Economist 14 0 1 7

Agro-meteorologist 1 0 0 0

Engineer 1 0 0 0

Engineering Technician 3 0 0 0

Total 62 0 1 2

Table 5.3 – Reasons why staff are leaving the department

Termination Type Number % of total

Death 14 9

Resignation 38 24

Expiry of contract 39 25

Dismissal – operational changes 0 0

Dismissal – misconduct 3 2

Page 159: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

158

Termination Type Number % of total

Dismissal – inefficiency 0 0

Dismissal – desertion 0 0

Discharged due to ill-health 3 2

Retirement 52 33

Transfers to other Public Service Departments 10 6

Other 0 0

Total 159 100 Total number of employees who left as a % of the total employment 10

Table 5.4 – Promotions by critical occupation

Occupation Employees

as at 01 April 2015

Promotions to another salary level

Salary level promotions

as a % of employees by

occupation

Progressions to another

notch within a salary level

Notch progressions

as a % of employees by

occupation Veterinarian 19 0 0 0 0

Scientist 24 0 0 0 0

Economist 14 0 0 0 0

Agro-meteorologist 1 0 0 0 0

Engineer 1 0 0 0 0

Engineering Technician

3 0 0 0 0

Total 62 0 0 0 0 Table 5.5 – Promotions by salary band

Salary Band Employees

01 April 2015

Promotions to another salary level

Salary bands promotions

as a % of employees by

salary level

Progressions to another

notch within a salary level

Notch progressions

as a % of employees by salary band

Lower skilled (Levels 1-2) 190 0 0 0 0

Skilled (Levels 3-5) 500 0 0 0 0

Highly skilled production (Levels 6-8)

587 1 0 0 0

Highly skilled supervision (Levels9-12)

324 0 0 0 0

Senior management (Levels13-16)

25 0 0 0 0

Total 1626 1 0 0 0

Page 160: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

159

Employment equity The tables in this section are based on the formats prescribed by the Employment Equity Act, 55 of 1998.

6.1 – Total number of employees (including employees with disabilities) in each of the following

occupational categories as on 31 March 2016

Occupational categories (SASCO)

Male Female Total

African Coloured Indian White African Coloured Indian White

Legislators, senior officials and managers

12 0 1 0 7 0 0 1 21

Professionals 167 0 1 31 134 1 1 11 346

Technicians and associate professionals

278 3 0 24 165 1 0 15 486

Clerks 70 1 0 0 189 1 0 24 285

Service and sales workers

14 0 0 1 1 0 0 0 16

Skilled agriculture and fishery workers

0 0 0 0 0 0 0 0 0

Craft and related trades workers

2 0 0 5 0 0 0 0 7

Plant and machine operators and assemblers

12 0 0 0 2 0 0 0 14

Elementary occupations

0 0 0 0 0 0 0 0 0

Labourers and related workers

239 7 0 0 109 2 0 0 357

Total 876 11 2 66 621 5 1 56 1532

Employees with disabilities

8 0 0 2 14 0 0 1 25

6.2 – Total number of employees (including employees with disabilities) in each of the following

occupational bands as on 31 March 2016

Occupational Bands Male Female

African Coloured Indian White African Coloured Indian White Total

Top Management 1 0 0 0 1 0 0 0 2

Senior Management 13 0 1 1 7 0 0 2 24

Professionally qualified and experienced specialists and mid-management

95 0 0 30 50 2 1 12 190

Page 161: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

160

Occupational Bands Male Female

African Coloured Indian White African Coloured Indian White Total

Skilled technical and academically qualified workers, junior management, supervisors, foreman and superintendents

338 1 1 29 293 1 0 36 699

Semi-skilled and discretionary decision making

284 6 0 1 195 1 0 1 488

Unskilled and defined decision making

63 2 0 0 62 1 0 0 128

Total 794 9 2 61 608 5 1 51 1531

Employment equity 6.3 – Recruitment for the period 01 April 2015 to 31 March 2016

Occupational Bands Male Female

African Coloured Indian White African Coloured Indian White Total Top Management 0 0 0 0 0 0 0 0 0 Senior Management 0 0 0 0 2 0 0 0 2 Professionally qualified and experienced specialists and mid-management

2 0 0 0 1 0 0 0 3

Skilled technical and academically qualified workers, junior management, supervisors, foreman and superintendents

2 0 0 0 9 0 0 0 11

Semi-skilled and discretionary decision making

5 0 0 0 16 0 0 0 21

Unskilled and defined decision making

0 0 0 0 0 0 0 0 0

Total 9 0 0 0 28 0 0 0 37 Employees with disabilities

0 0 0 0 0 0 0 0 0

6.4 – Promotions for the period 01 April 2015 to 31 March 2016

Occupational Bands

Male Female

African Coloured Indian White African Coloure

d Indian White Total

Top Management

0 0 0 0 0 0 0 0 0

Senior Management

0 0 0 0 0 0 0 0 0

Professionally qualified and

0 0 0 0 0 0 0 0 0

Page 162: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

161

Occupational Bands

Male Female

African Coloured Indian White African Coloure

d Indian White Total experienced specialists and mid-management Skilled technical and academically qualified workers, junior management, supervisors, foreman and superintendents

1 0 0 0 0 0 0 0 1

Semi-skilled and discretionary decision making

0 0 0 0 0 0 0 0 0

Unskilled and defined decision making

0 0 0 0 0 0 0 0 0

Total 1 0 0 0 0 0 0 0 1 Employees with disabilities

0 0 0 0 2 0 0 0 0

6.5 – Terminations for the period 01 April 2015 to 31 March 2016

Occupational Bands

Male Female African Coloured Indian White African Coloured Indian White Total

Top Management 0 0 0 0 0 0 0 0 0 Senior Management 0 0 0 1 1 0 0 0 2 Professionally qualified and experienced specialists and mid-management

17 0 0 3 4 0 0 1 25

Skilled technical and academically qualified workers, junior management, supervisors, foreman and superintendents

23 0 0 2 22 0 0 4 51

Semi-skilled and discretionary decision making

43 1 0 0 25 0 0 0 69

Unskilled and defined decision making

8 0 0 0 4 0 0 0 12

Total 91 1 0 6 56 0 0 5 159 Employees with disabilities

0 0 0 1 0 0 0 1 0

Page 163: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

162

6.6 – Disciplinary action for the period 01 April 2015 to 31 March 2016

Male Female African Coloured Indian White African Coloured Indian White Total

Disciplinary action

4 0 0 1 4 0 0 0 4

7.1 Filling of SMS Posts

Table 7.1.1 SMS post information as on 31 March 2016

SMS Level Total number of

funded SMS posts

Total number of SMS posts

filled

% of SMS posts filled

Total number of SMS posts vacant

% of SMS posts vacant

Director-General/ Head of Department

Salary Level 16 1 1 100 0 0

Salary Level 15 1 1 100 0 0

Salary Level 14 6 5 83 1 17

Salary Level 13 23 19 83 4 17

Total 31 26 84 5 16

Table 7.1.2 SMS post information as on 30 April 2015

SMS Level Total number of

funded SMS posts

Total number of SMS posts

filled

% of SMS posts filled

Total number of SMS posts vacant

% of SMS posts vacant

Director-General/ Head of Department

Salary Level 16 1 1 100 0 0

Salary Level 15 1 1 100 0 0

Salary Level 14 6 3 50 3 50

Salary Level 13 23 20 87 3 13

Total 31 25 81 6 19

Table 7.1.3 Advertising and filling of SMS posts for the period 1 April 2015 and 31 March 2016

SMS Level Total number of

funded SMS posts

Total number of SMS posts

filled

% of SMS posts filled

Total number of SMS posts vacant

% of SMS posts vacant

Director-General/ Head of Department

Salary Level 16 0 0 0 0 0

Salary Level 15 0 0 0 0 0

Page 164: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

163

SMS Level Total number of

funded SMS posts

Total number of SMS posts

filled

% of SMS posts filled

Total number of SMS posts vacant

% of SMS posts vacant

Salary Level 14 1 1 100 1 17

Salary Level 13 3 0 0 4 17

Total 4 1 25 5 16

Table 7.1.4 Reasons for not having complied with the filling of funded vacant SMS -

Advertised within 6 monthsand filled within 12 months after becoming vacant for the

period 1 April 2015 and 31 March 2016

Reasons for vacancies not advertised within six months Provincial moratorium over filling of posts affected filling of posts within stipulated timeframe.

Reasons for vacancies not filled within six months Provincial moratorium over filling of posts affected filling of posts within stipulated timeframe.

Table 7.1.5 Disciplinary steps taken for not complying with the prescribed timeframes for

filling SMS posts within 12 months for the period 1 April 2015 and 31 March 2016

Reasons for vacancies not advertised within six months Disciplinary measure n/a

Reasons for vacancies not filled within six months Provincial moratorium over filling of posts affected filling of posts within stipulated timeframe.

Page 165: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

164

Foreign workers

TABLE 8.1 – Foreign Workers, 01 April 2015 to 31 March 2016, by salary band

Salary Band 01 April 2015 31 March 2016 Change

Number % of total Number % of

total Number % change

Lower skilled (Levels 1-2) 0 0 0 0 0 0

Skilled (Levels 3-5) 1 8 1 9 0 0

Highly skilled production (Levels 6-8)

3 25 2 18 0 0

Highly skilled supervision (Levels 9-12)

8 67 8 72 0 0

Senior management (Levels 13-16)

0 0 0 0 0 0

Total 12 100 11 100 0 0 TABLE 8.2 – Foreign Worker, 01 April 2015 to 31 March 2016, by major occupation

Major Occupation 01 April 2015 31 March 2016 Change

Number % of total Number % of

total Number % change

Veterinarians 6 50 6 55 0 0

Lecturer 2 17 1 9 0 0

Engineer 1 8 1 9 0 0

Assistant director Administration

1 8 1 9 0 0

Agricultural Advisor 1 8 1 9 0 0

Secretary 1 8 1 9 0 0

Total 12 100 11 100 0 0

Leave utilisation for the period 01 January 2015 to 31 December 2015 TABLE 9.1 – Sick leave, 01 January 2015 to 31 December 2015

Salary Band Total days

% days with medical

certification

Number of Employee

s using sick leave

% of total employees using sick

leave

Average days per employee

Estimated Cost

(R’000)

Lower skilled (Levels 1-2) 733 95 109 12 7 343529.60

Skilled (Levels 3-5) 2148 90 304 32 7 1407233.20

Highly skilled production (Levels 6-8)

2301 91 330 35 7 2851693.70

Page 166: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

165

Salary Band Total days

% days with medical

certification

Number of Employee

s using sick leave

% of total employees using sick

leave

Average days per employee

Estimated Cost

(R’000)

Highly skilled supervision (Levels9-12)

1203 89 182 19 7 2516771.80

Senior management (Levels 13-16)

79 91 12 1 7 275213.00

Total 6464 91 937 100 7 7394441.30 TABLE 9.2 – Disability leave (temporary and permanent), 01 January 2015 to 31 December 2015

Salary Band Total days taken

% days with

medical certificatio

n

Number of Employee

s using disability

leave

% of total employees

using disability

leave

Average days per employee

Estimated Cost

(R’000)

Lower skilled (Levels 1-2) 145 100 7 8 21 64965.14

Skilled (Levels 3-5) 1047 100 30 35 35 712487.55

Highly skilled production (Levels 6-8)

629 100 31 37 20 709115.93

Highly skilled supervision (Levels 9-12)

570 100 16 19 36 1143688.07

Senior management (Levels 13-16)

41 100 1 1 41 134702.10

Total 2432 100 85 100 29 2764958.79 TABLE 9.3 – Annual Leave, 01 January 2015 to 31 December 2015

Salary Bands Total days taken Average per employee

Lower skilled (Levels 1-2) 3571 20

Skilled Levels 3-5) 13381 29

Highly skilled production (Levels 6-8) 15194 27

Highly skilled supervision(Levels 9-12) 8129 25

Senior management (Levels 13-16) 649 27

Total 37946 26 TABLE 9.4 – Capped leave, 01 January 2014 to 31 December 2014

Salary Bands Total days of capped leave

taken

Average number of days taken per employee

Average capped leave per

employee as at 31 March 2016

Lower skilled (Levels 1-2) 3 3 2

Skilled Levels 3-5) 31 5 20

Page 167: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

166

Salary Bands Total days of capped leave

taken

Average number of days taken per employee

Average capped leave per

employee as at 31 March 2016

Highly skilled production (Levels 6-8) 32.3 4 15

Highly skilled supervision(Levels 9-12) 42 8 16

Senior management (Levels 13-16) 0 0 14

Total 108.3 5 16 TABLE 9.5 – Leave payouts for the period 01 April 2015 to 31 March 2016

The following table summarises payments made to employees as a result of leave that was not taken.

REASON Total Amount (R’000)

Number of Employees

Average payment per

employee

Leave payout for 2012/13 due to non-utilisation of leave for the previous cycle

595195.20 73 8153.35

Capped leave payouts on termination of service for 2010/11

2018473.00 53 38084.39

Current leave payout on termination of service for 2010/11

972056.68 103 9437.44

Total 3585724.88 229 15658.18

Labour relations The following collective agreements were entered into with trade unions within the department.

Total collective agreements None

The following table summarises the outcome of disciplinary hearings conducted within the department for the year under review.

TABLE 11.2 – Misconduct and disciplinary hearings finalised, 01 April 2015 to 31 March 2016

Outcomes of disciplinary hearings Number % of total Correctional counselling 0 0 Verbal warning 0 0 Written warning 0 0 Final written warning 0 0 Suspended without pay 4 100 Fine 0 0 Demotion 0 0 Dismissal 0 0 Not guilty 0 0 Case withdrawn 0 0 Total 4 100

Page 168: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

167

TABLE 11.3 – Types of misconduct addressed at disciplinary hearings

Type of misconduct Number % of total

Fraud / theft / corruption 0 0

Failure to disclose financial interests 0 0

Misuse of state vehicle 3 75

Insubordination / insolence / improper conduct 1 25

Poor work performance 0 0

Absenteeism 0 0

Negligence 0 0

Total 4 100 TABLE 11.4 – Grievances lodged for the period 01 April 2015 to 31 March 2016

Number % of Total Number of grievances resolved 32 65

Number of grievances not resolved 17 35

Total number of grievances lodged 49 100 TABLE 11.5 – Disputes lodged with Councils for the period 01 April 2015 to 31 March 2016

Number % of Total Number of disputes upheld (pending) 9 56

Number of disputes dismissed 7 44

Total number of disputes lodged 16 100

TABLE 11.6 – Strike actions for the period 01 April 2015 to 31 March 2016

Total number of person working days lost 0

Total cost (R’000) of working days lost 0

Amount (R’000) recovered as a result of no work no pay 0

TABLE 11.7 – Precautionary suspensions for the period 01 April 2015 to 31 March 2016 Number of people suspended 0

Number of people whose suspension exceeded 30 days 0

Average number of days suspended 0

Cost (R’000) of suspensions 0

Page 169: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

168

PART E: FINANCIAL INFORMATION

Page 170: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

169

INDEX

1. Report of the Auditor-General……………………………………………………………170

2. Appropriation Statement.....................................................................176

3. Notes to the Appropriation Statement..................................................188

4. Statement of Financial Performance....................................................189

5. Statement of Financial Position...........................................................190

6. Cash Flow Statement.........................................................................191

7. Notes to the Annual Financial Statements............................................192

8. Disclosure Notes to the Annual Financial Statements............................230

9. Statement of Conditional Grants Received...........................................230

10. Annexures.........................................................................................230

Page 171: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

170

1. REPORT OF THE AUDITOR GENERAL

Report of the auditor-general to the North West provincial legislature

on vote no. 13:the Department of Rural, Environment and Agricultural

Development

Report on the financial statements

Introduction

1. I have audited the financial statements of the Department of Rural, Environment and

Agricultural Development set out on pages 176 to 230 which comprise the appropriation

statement, the statement of financial position as at 31 March 2016, the statement of

financial performance, statement of changes in net assets, and cash flow statement,

comprising a summary of significant accounting policies and other explanatory

information.

Accounting officer’s responsibility for the financial statements

2. The accounting officer is responsible for the preparation and fair presentation of these

financial statements in accordance with the Modified Cash Standard (MCS) prescribed

bythe National Treasury and the requirements of the Public Finance Management Act of

South Africa, 1999 (Act No. 1 of 1999) (PFMA) and the Division of Revenue Act of South

Africa, 2015 (Act No. 1 of 2015) (DoRA)and for such internal control as the accounting

officer determines is necessary to enable the preparation of financial statements that are

free from material misstatement, whether due to fraud or error.

Page 172: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

171

Auditor-general’s responsibility

3. My responsibility is to express an opinion on these financial statements based on my

audit. I conducted my audit in accordance with International Standards on Auditing.

Those standards require that I comply with ethical requirements, and plan and perform

the audit to obtain reasonable assurance about whether the financial statements are free

from materialmisstatement.

4. An audit involves performing procedures to obtain audit evidence about the amounts and

disclosures in the financial statements. The procedures selected depend on the auditor’s

judgement, including the assessment of the risks of material misstatement of the

financial statements, whether due to fraud or error. In making those risk assessments,

the auditor considers internal control relevant to the entity’s preparation and fair

presentation of the financial statements in order to design audit procedures that are

appropriate in the circumstances, but not for the purpose of expressing an opinion on

the effectiveness of the entity’s internal control. An audit also includes evaluating the

appropriateness of accounting policies used and the reasonableness of accounting

estimates made by management, as well as evaluating the overall presentation of the

financial statements. 5. I believe that the audit evidence I have obtained is sufficient and appropriate to provide a

basis for my audit opinion.

Opinion

6. In my opinion, the financial statements present fairly, in all material respects, the

financial position of the Department of Rural, Environment and Agricultural Development

as at 31 March 2016 and its financial performance and cash flows for the year then

ended, in accordance with the MCS prescribed by the National Treasuryand the

requirements of the PFMAand theDoRA.

Emphasis of matter

7. I draw attention to the matter below. My opinion is not modified in respect of this matter.

Page 173: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

172

Irregular expenditure

8. As disclosed in note 31 to the financial statements, irregular expenditure of

R157 452 000 was incurred in the current year.

Additional matter

9. I draw attention to the matter below. My opinion is not modified in respect of this matter.

Unaudited supplementary schedules

10. The supplementary information set out on pages 230 to 237 does not form part of the

financial statements and is presented as additional information. I have not audited these

schedules and accordingly I do not express an opinion thereon.

Report on other legal and regulatory requirements

11. In accordance with the Public Audit Act of South Africa, 2004 (Act No. 25 of 2004) (PAA)

and the general notice issued in terms thereof, I have a responsibility to report findings

on the reported performance information against predetermined objectives for selected

programmes presented in the annual performance report, compliance with legislation

and internal control. The objective of my tests was to identify reportable findings as

described under each subheading but not to gather evidence to express assurance on

these matters. Accordingly, I do not express an opinion or conclusion on these matters.

Predetermined objectives

12. I performed procedures to obtain evidence about the usefulness and reliability of the

reported performance information for the following selected programmes presented in

the annual performance report of the department for the year ended 31 March 2016:

Programme 3: Farmers support and development on pages 100 to 104

Programme 8: Rural development coordination on pages 117 to 121

Programme 9: Environmental service on pages 121 to 132

13. I evaluated the usefulness of the reported performance information to determine whether

it was presented in accordance with the National Treasury’s annual reporting principles

Page 174: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

173

and whether the reported performance was consistent with the planned programmes. I

further performed tests to determine whether indicators and targets were well defined,

verifiable, specific, measurable, time bound and relevant, as required by the National

Treasury’s Framework for managing programme performance information (FMPPI).

14. I assessed the reliability of the reported performance information to determine whether it

was valid, accurate and complete.

15. The material findings in respect of the selected programmes are as follows:

Programme 3: Farmers support and development

Reliability of reported performance information

16. The FMPPI requires auditees to have appropriate systems to collect, collate, verify and

store performance information to ensure valid, accurate and complete reporting of actual

achievements against planned objectives, indicators and targets. Significantly important

targets were not reliable when compared to the source information or evidence provided.

This was due to limited review and monitoring of the completeness of source

documentation in support of actual achievements and frequent review of the validity of

reported achievements against source documentation.

Programme 8: Rural development coordination

Usefulness of reported performance information

17. A total of 30%indicators did not relate logically and directly to an aspect of the auditee’s

mandate and the realisation of strategic goals and objectives as per the five year

strategicplanas required by the FMPPI.

Programme 9: Environmental services

18. I did not identify any material findings on the usefulness and reliability of the reported

performance information for this programme.

Additional matter

19. I draw attention to the following matter:

Page 175: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

174

Achievement of planned targets

20. Refer to the annual performance report on pages 78 to 132 for information on the

achievement of the planned targets for the year. This information should be considered

in the context of the material findings on the reliability of the reported performance

information for the selected programmes reported in paragraphs 17 to 19 of this report.

Compliance with legislation

21. I performed procedures to obtain evidence that the department had complied with

applicable legislation regarding financial matters, financial management and other

related matters. My findings on material compliance with specific matters in key

legislation, as set out in the general notice issued in terms of the PAA, are as follows:

Expenditure management

22. Effective steps were not taken to prevent irregular expenditure as required by section

38(1)(c)(ii) of the PFMA and Treasury Regulation 9.1.1

Procurement and contract management

23. Goods and services of a transaction value above R500 000 were procured without

inviting competitive bids, as required by Treasury Regulation 16A6.1.

Internal control

24. I considered internal control relevant to my audit of the financial statements, the annual

performance report and compliance with legislation. The matters reported below are

limited to the significant internal control deficiencies that resulted in the findings on the

annual performance reportand the findings on compliance with legislation included in this

report.

Leadership

25. The leadership of the department has established effective internal controls however, the

oversight practices of leadership were not able to prevent, detect and correct all the

Page 176: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

175

possible irregular expenditure or the reportable matters on predetermined objectives and

the consequential compliance findings.

Financial and performance management

26. Managements’ monitoring and oversight over daily controls did not prevent all the

material misstatements in compliance with laws and regulations and did not prevent,

detect and report all the possible irregular expenditure. This includes establishing

sufficient controls over the collection, collation, verification, storing and reporting of

actual performance information.

Governance

27. The audit committee and internal audit fulfilled their legislative function and provided

support to the department by monitoring key areas that is applicable to the external

auditors. Future focus can be directed towards helping the department to address

significant findings relating to procurement and contract management and predetermined

objectives.

Rustenburg

31 July 2016

Page 177: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

176

Adjusted Appropriation

Shifting of Funds

Virement Final Appropriation

Actual Expenditure

Variance Expenditure as % of

final appropria

tion

Final Appropriation

Actual Expenditure

R'000 R'000 R'000 R'000 R'000 R'000 % R'000 R'000

Programmes1. ADMINISTRATION 227 409 - - 227 409 227 352 57 100.0% 190 655 183 867 2. SUSTAINABLE RESOURCE MANAGEMENT 37 376 - - 37 376 36 703 673 98.2% 94 178 93 956 3. FARMER SUPPORT AND DEVELOPMENT 396 924 - - 396 924 392 924 4 000 99.0% 367 891 357 363 4. VETERINARY SERVICES 100 785 - - 100 785 100 778 7 100.0% 100 493 99 297 5. RESEARCH AND TECHNOLOGY DEVELOPMENT SERVICES 48 875 - - 48 875 48 818 57 99.9% 48 001 45 467 6. AGRICULTURAL ECONOMICS SERVICES 10 833 - - 10 833 10 819 14 99.9% 10 974 10 691 7. STRUCTURED AGRICULTURAL EDUCATION AND TRAINING 91 903 - - 91 903 91 891 12 100.0% 73 075 70 250 8. RURAL DEVELOPMENT COORDINATION 49 486 - - 49 486 49 460 26 99.9% 39 063 38 382 9. ENVIRONMENTAL SERVICES 128 395 - - 128 395 128 313 82 99.9% 179 356 172 787

Programme sub total 1 091 988 - - 1 091 988 1 087 059 4 929 99.5% 1 103 687 1 072 060

Statutory Appropriation - - - - - - - - -

- - - - - - - - -

- - - - - - - - - TOTAL 1 091 988 - - 1 091 988 1 087 059 4 929 99.5% 1 103 687 1 072 060

Add:- - - - - -

1 091 988 1 103 687 Add: - -

1 087 059 1 072 060

NORTH WEST: RURAL, ENVIRONMENT AND AGRICULTURAL DEVELOPMENT

Appropriation per programme

Voted funds and Direct charges

Reconciliation with Statement of Financial Performance

for the year ended 31 March 2016Appropriation Statement

Departmental receipts NRF Receipts Aid assistance

Actual amounts per Statement of Financial Performance (Total Revenue)

Aid assistance Prior year unauthorised expenditure approved without funding

Actual amounts per Statement of Financial Performance Expenditure

2015/16 2014/15

Page 178: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

177

2015/16 2014/15 Adjusted

Appropriation Shifting of Funds

Virement Final Appropriation

Actual Expenditure

Variance Expenditure as % of

final appropria

tion

Final Appropriation

Actual Expenditure

R'000 R'000 R'000 R'000 R'000 R'000 % R'000 R'000Current payments 749 499 - - 749 499 748 540 959 99.9% 787 678 782 004

Compensation of employees 526 395 - - 526 395 521 558 4 837 99.1% 584 951 583 091 Salaries and wages 448 083 - - 448 083 447 226 857 99.8% 514 280 514 963 Social contributions 78 312 - - 78 312 74 332 3 980 94.9% 70 671 68 128

Goods and services 222 997 - - 222 997 226 887 (3 889) 101.7% 202 652 198 888 Administrative fees 3 252 - - 3 252 4 136 (884) 127.2% 3 329 3 144 Advertising 3 848 - - 3 848 3 959 (111) 102.9% 3 416 2 757 Minor assets 3 743 - - 3 743 3 491 252 93.3% 1 944 1 122 Audit costs: External 5 846 - - 5 846 5 985 (139) 102.4% 3 078 3 038 Bursaries: Employees - - - - - - - - - Catering: Departmental activities 4 408 - - 4 408 4 137 271 93.9% 2 841 2 498 Communication (G&S) 10 959 - - 10 959 9 832 1 127 89.7% 12 268 12 146 Computer services 1 266 - - 1 266 1 245 21 98.3% 127 105 Consultants: Business and advisory services 4 585 - - 4 585 4 586 (1) 100.0% 12 395 16 061 Infrastructure and planning services 5 001 - - 5 001 5 165 (164) 103.3% 3 310 3 318 Laboratory services 40 - - 40 40 - 100.0% 300 220 Scientific and technological services - - - - - - - - - Legal services 1 678 - - 1 678 1 746 (68) 104.1% 4 040 2 709 Contractors 7 174 - - 7 174 6 593 581 91.9% 7 379 7 125 Agency and support / outsourced services 719 - - 719 671 48 93.3% 868 548 Entertainment - - - - - - - - - Fleet services (including government motor transport) 18 224 - - 18 224 20 953 (2 729) 115.0% 10 927 11 056 Housing - - - - - - - - - Inventory: Clothing material and accessories 1 077 - - 1 077 1 738 (661) 161.4% 815 1 755 Inventory: Farming supplies 4 382 - - 4 382 4 099 283 93.5% 4 521 4 068 Inventory: Food and food supplies 3 - - 3 - 3 - 20 - Inventory: Fuel, oil and gas 72 - - 72 62 10 86.1% 144 148 Inventory: Learner and teacher support material 33 - - 33 33 - 100.0% 49 219 Inventory: Materials and supplies 990 - - 990 917 73 92.7% 2 077 2 861 Inventory: Medical supplies 252 - - 252 262 (10) 104.0% 242 203 Inventory: Medicine 1 027 - - 1 027 1 376 (349) 133.9% 1 952 1 794 Medsas inventory interface - - - - - - - - - Inventory: Other supplies 2 052 - - 2 052 1 969 83 96.0% 1 149 1 089 Consumable supplies 4 908 - - 4 908 4 728 180 96.3% 7 183 6 039 Consumable: Stationery, printing and office supplies 4 315 - - 4 315 3 647 668 84.5% 5 148 4 144 Operating leases 38 861 - - 38 861 39 194 (333) 100.9% 20 882 20 305 Property payments 39 807 - - 39 807 36 910 2 897 92.7% 30 027 29 027 Transport provided: Departmental activity 28 - - 28 27 1 96.4% 60 65 Travel and subsistence 41 914 - - 41 914 47 224 (5 310) 112.7% 50 271 49 245 Training and development 2 901 - - 2 901 2 464 437 84.9% 4 995 4 164 Operating payments 5 566 - - 5 566 5 691 (125) 102.2% 5 193 6 322 Venues and facilities 1 287 - - 1 287 1 270 17 98.7% 1 307 1 242 Rental and hiring 2 778 - - 2 778 2 736 42 98.5% 395 350

Interest and rent on land 106 - - 106 95 11 89.6% 75 25 Interest (Incl. interest on unitary payments (PPP)) 106 - - 106 95 11 89.6% 75 25 Rent on land - - - - - - - - -

Transfers and subsidies 289 758 - - 289 758 285 077 4 681 98.4% 252 723 235 608 Provinces and municipalities - - - - - - - - -

Provinces - - - - - - - - - Provincial Revenue Funds - - - - - - - - - Provincial agencies and funds - - - - - - - - -

Municipalities - - - - - - - - - Municipal bank accounts - - - - - - - - - Municipal agencies and funds - - - - - - - - -

Departmental agencies and accounts - - - - - - - 1 320 1 320 Social security funds - - - - - - - - - Departmental agencies (non-business entities) - - - - - - - 1 320 1 320

Higher education institutions - - - - - - - - - Foreign governments and international organisations - - - - - - - - - Public corporations and private enterprises - - - - - - - - -

Public corporations - - - - - - - - - Subsidies on products and production (pc) - - - - - - - - - Other transfers to public corporations - - - - - - - - -

Private enterprises - - - - - - - - - Subsidies on products and production (pe) - - - - - - - - - Other transfers to private enterprises - - - - - - - - -

Non-profit institutions - - - - - - - - - Households 289 758 - - 289 758 285 077 4 681 98.4% 251 403 234 288

Social benefits 2 297 - - 2 297 4 665 (2 368) 203.1% 2 586 2 893 Other transfers to households 287 461 - - 287 461 280 412 7 049 97.5% 248 817 231 395

Payments for capital assets 52 731 - - 52 731 53 203 (471) 100.9% 63 286 54 448 Buildings and other fixed structures 33 749 - - 33 749 33 725 24 99.9% 53 282 47 256

Buildings - - - - - - - - - Other fixed structures 33 749 - - 33 749 33 725 24 99.9% 53 282 47 256

Machinery and equipment 18 245 - - 18 245 18 790 (544) 103.0% 9 504 6 693 Transport equipment 10 275 - - 10 275 10 695 (420) 104.1% 353 - Other machinery and equipment 7 970 - - 7 970 8 095 (124) 101.6% 9 151 6 693

Heritage assets 97 - - 97 97 - 100.0% - - Specialised military assets - - - - - - - - - Biological assets 640 - - 640 591 49 92.3% 500 499 Land and sub-soil assets - - - - - - - - - Software and other intangible assets - - - - - - - - -

Payment for financial assets - - - - 240 (240) - - - 1 091 988 - - 1 091 988 1 087 059 4 929 99.5% 1 103 687 1 072 060

Appropriation per economic classification

Page 179: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

178

Programme 1: ADMINISTRATION 2015/16 2014/15

Adjusted Appropriation

Shifting of Funds

Virement Final Appropriation

Actual Expenditure

Variance Expenditure as % of

final appropria

tion

Final Appropriation

Actual Expenditure

R'000 R'000 R'000 R'000 R'000 R'000 % R'000 R'000

1. MEC'S OFFICE 5 272 - - 5 272 6 925 (1 653) 131.4% 6 234 6 026 2. SENIOR MANAGEMENT 32 022 - - 32 022 34 841 (2 819) 108.8% 28 054 27 680 3. CORPORATE SERVICES 37 908 - - 37 908 29 283 8 625 77.2% 31 575 28 615 4. FINANCIAL MANAGEMENT 145 703 - - 145 703 150 782 (5 079) 103.5% 117 016 115 105 5. COMMUNICATION SERVICES 6 504 - - 6 504 5 521 983 84.9% 7 776 6 441

227 409 - - 227 409 227 352 57 100.0% 190 655 183 867

Economic classificationCurrent payments 220 998 - - 220 998 218 808 2 190 99.0% 186 609 180 294

Compensation of employees 124 852 - - 124 852 124 140 712 99.4% 123 839 120 334 Salaries and wages 107 340 - - 107 340 106 448 892 99.2% 107 451 104 075 Social contributions 17 512 - - 17 512 17 692 (180) 101.0% 16 388 16 259

Goods and services 96 066 - - 96 066 94 589 1 477 98.5% 62 746 59 946 Administrative fees 681 - - 681 537 144 78.9% 1 267 1 230 Advertising 2 715 - - 2 715 2 689 26 99.0% 1 775 1 705 Minor assets 772 - - 772 598 174 77.5% 297 216 Audit costs: External 5 846 - - 5 846 5 985 (139) 102.4% 3 066 3 038 Bursaries: Employees - - - - - - - - - Catering: Departmental activities 1 795 - - 1 795 1 654 141 92.1% 1 105 1 020 Communication (G&S) 6 602 - - 6 602 6 484 118 98.2% 5 424 5 377 Computer services 213 - - 213 213 - 100.0% 3 3 Consultants: Business and advisory services 692 - - 692 797 (105) 115.2% 365 310 Infrastructure and planning services - - - - - - - - - Laboratory services - - - - - - - - - Scientific and technological services - - - - - - - - - Legal services 1 620 - - 1 620 1 688 (68) 104.2% 2 675 2 448 Contractors 387 - - 387 387 - 100.0% 166 136 Agency and support / outsourced services - - - - - - - 286 - Entertainment - - - - - - - - - Fleet services (including government motor transport) 7 277 - - 7 277 8 118 (841) 111.6% 4 019 3 685 Housing - - - - - - - - - Inventory: Clothing material and accessories 42 - - 42 35 7 83.3% 80 80 Inventory: Farming supplies 21 - - 21 2 19 9.5% - - Inventory: Food and food supplies - - - - - - - - - Inventory: Fuel, oil and gas 40 - - 40 32 8 80.0% 1 1 Inventory: Learner and teacher support material - - - - - - - - - Inventory: Materials and supplies 100 - - 100 77 23 77.4% 21 14 Inventory: Medical supplies 8 - - 8 - 8 - - - Inventory: Medicine - - - - - - - - - Medsas inventory interface - - - - - - - - - Inventory: Other supplies - - - - - - - - - Consumable supplies 945 - - 945 823 122 87.1% 1 171 1 132 Consumable: Stationery, printing and office supplies 1 618 - - 1 618 1 264 354 78.1% 1 693 1 540 Operating leases 31 071 - - 31 071 30 949 122 99.6% 10 763 10 679 Property payments 21 825 - - 21 825 21 181 644 97.0% 15 387 15 288 Transport provided: Departmental activity - - - - - - - - - Travel and subsistence 7 360 - - 7 360 6 853 507 93.1% 6 675 6 433 Training and development 2 618 - - 2 618 2 446 172 93.4% 4 842 4 028 Operating payments 1 080 - - 1 080 1 033 47 95.6% 1 187 1 145 Venues and facilities 533 - - 533 548 (15) 102.8% 417 386 Rental and hiring 205 - - 205 195 10 95.1% 61 51

Interest and rent on land 80 - - 80 79 1 98.8% 24 14 Interest (Incl. interest on unitary payments (PPP)) 80 - - 80 79 1 98.8% 24 14 Rent on land - - - - - - - - -

Transfers and subsidies 3 313 - - 3 313 5 344 (2 031) 161.3% 2 824 2 676 Provinces and municipalities - - - - - - - - -

Provinces - - - - - - - - - Provincial Revenue Funds - - - - - - - - - Provincial agencies and funds - - - - - - - - -

Municipalities - - - - - - - - - Municipal bank accounts - - - - - - - - - Municipal agencies and funds - - - - - - - - -

Departmental agencies and accounts - - - - - - - - - Social security funds - - - - - - - - - Departmental agencies (non-business entities) - - - - - - - - -

Higher education institutions - - - - - - - - - Foreign governments and international organisations - - - - - - - - - Public corporations and private enterprises - - - - - - - - -

Public corporations - - - - - - - - - Subsidies on products and production (pc) - - - - - - - - - Other transfers to public corporations - - - - - - - - -

Private enterprises - - - - - - - - - Subsidies on products and production (pe) - - - - - - - - - Other transfers to private enterprises - - - - - - - - -

Non-profit institutions - - - - - - - - - Households 3 313 - - 3 313 5 344 (2 031) 161.3% 2 824 2 676

Social benefits 605 - - 605 1 308 (703) 216.2% 709 731 Other transfers to households 2 708 - - 2 708 4 036 (1 328) 149.0% 2 115 1 945

Payments for capital assets 3 098 - - 3 098 2 961 137 95.6% 1 222 898 Buildings and other fixed structures - - - - - - - 20 20

Buildings - - - - - - - - - Other fixed structures - - - - - - - 20 20

Machinery and equipment 3 098 - - 3 098 2 961 137 95.6% 1 202 878 Transport equipment 2 002 - - 2 002 2 001 1 100.0% 353 - Other machinery and equipment 1 096 - - 1 096 960 136 87.6% 849 878

Heritage assets - - - - - - - - - Specialised military assets - - - - - - - - - Biological assets - - - - - - - - - Land and sub-soil assets - - - - - - - - - Software and other intangible assets - - - - - - - - -

Payment for financial assets - - - - 240 (240) - - - 227 409 - - 227 409 227 352 57 100.0% 190 655 183 867

Sub programme

Page 180: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

179

Programme 2: SUSTAINABLE RESOURCE MANAGEMENT 2015/16 2014/15

Adjusted Appropriation

Shifting of Funds

Virement Final Appropriation

Actual Expenditure

Variance Expenditure as % of

final appropria

tion

Final Appropriation

Actual Expenditure

R'000 R'000 R'000 R'000 R'000 R'000 % R'000 R'000

1. ENGINEERING SERVICES 24 949 - - 24 949 24 111 838 96.6% 34 765 34 379 2. LAND CARE 7 971 - - 7 971 7 346 625 92.2% 8 140 7 653 3. LAND USE MANAGEMENT 4 456 - - 4 456 5 246 (790) 117.7% 51 273 51 924

37 376 - - 37 376 36 703 673 98.2% 94 178 93 956

Economic classificationCurrent payments 18 531 - - 18 531 18 118 413 97.8% 67 788 68 649

Compensation of employees 13 157 - - 13 157 12 452 705 94.6% 58 773 59 844 Salaries and wages 10 889 - - 10 889 10 723 166 98.5% 56 919 58 144 Social contributions 2 268 - - 2 268 1 729 539 76.2% 1 854 1 700

Goods and services 5 374 - - 5 374 5 666 (292) 105.4% 9 013 8 804 Administrative fees 2 113 - - 2 113 3 121 (1 008) 147.7% 67 33 Advertising - - - - - - - - 12 Minor assets 64 - - 64 8 56 12.5% 170 73 Audit costs: External - - - - - - - - - Bursaries: Employees - - - - - - - - - Catering: Departmental activities - - - - - - - 110 103 Communication (G&S) 80 - - 80 79 1 98.8% 939 905 Computer services 20 - - 20 - 20 - 16 17 Consultants: Business and advisory services - - - - - - - - - Infrastructure and planning services - - - - - - - - - Laboratory services - - - - - - - - - Scientific and technological services - - - - - - - - - Legal services - - - - - - - - - Contractors 31 - - 31 29 2 93.5% 312 770 Agency and support / outsourced services - - - - - - - - - Entertainment - - - - - - - - - Fleet services (including government motor transport) 151 - - 151 150 1 99.3% 555 423 Housing - - - - - - - - - Inventory: Clothing material and accessories - - - - - - - 50 - Inventory: Farming supplies 190 - - 190 165 25 86.8% 445 468 Inventory: Food and food supplies - - - - - - - - - Inventory: Fuel, oil and gas - - - - - - - 99 91 Inventory: Learner and teacher support material - - - - - - - - - Inventory: Materials and supplies 2 - - 2 2 - 100.0% 1 332 1 933 Inventory: Medical supplies - - - - - - - - - Inventory: Medicine - - - - - - - - 3 Medsas inventory interface - - - - - - - - - Inventory: Other supplies - - - - - - - - - Consumable supplies 127 - - 127 121 6 95.3% 640 347 Consumable: Stationery, printing and office supplies 189 - - 189 53 136 28.0% 160 107 Operating leases 86 - - 86 33 53 38.4% 194 201 Property payments 514 - - 514 484 30 94.2% 1 307 1 100 Transport provided: Departmental activity - - - - - - - - - Travel and subsistence 1 638 - - 1 638 1 361 277 83.1% 2 533 2 104 Training and development 100 - - 100 - 100 - - 37 Operating payments 69 - - 69 60 9 87.0% 84 76 Venues and facilities - - - - - - - - - Rental and hiring - - - - - - - - -

Interest and rent on land - - - - - - - 2 1 Interest (Incl. interest on unitary payments (PPP)) - - - - - - - 2 1 Rent on land - - - - - - - - -

Transfers and subsidies 8 271 - - 8 271 7 637 634 92.3% 23 140 22 663 Provinces and municipalities - - - - - - - - -

Provinces - - - - - - - - - Provincial Revenue Funds - - - - - - - - - Provincial agencies and funds - - - - - - - - -

Municipalities - - - - - - - - - Municipal bank accounts - - - - - - - - - Municipal agencies and funds - - - - - - - - -

Departmental agencies and accounts - - - - - - - - - Social security funds - - - - - - - - - Departmental agencies (non-business entities) - - - - - - - - -

Higher education institutions - - - - - - - - - Foreign governments and international organisations - - - - - - - - - Public corporations and private enterprises - - - - - - - - -

Public corporations - - - - - - - - - Subsidies on products and production (pc) - - - - - - - - - Other transfers to public corporations - - - - - - - - -

Private enterprises - - - - - - - - - Subsidies on products and production (pe) - - - - - - - - - Other transfers to private enterprises - - - - - - - - -

Non-profit institutions - - - - - - - - - Households 8 271 - - 8 271 7 637 634 92.3% 23 140 22 663

Social benefits 300 - - 300 291 9 97.0% - 10 Other transfers to households 7 971 - - 7 971 7 346 625 92.2% 23 140 22 653

Payments for capital assets 10 574 - - 10 574 10 948 (374) 103.5% 3 250 2 645 Buildings and other fixed structures - - - - - - - 1 995 1 995

Buildings - - - - - - - - - Other fixed structures - - - - - - - 1 995 1 995

Machinery and equipment 10 574 - - 10 574 10 948 (374) 103.5% 1 255 650 Transport equipment 8 221 - - 8 221 8 606 (385) 104.7% - - Other machinery and equipment 2 353 - - 2 353 2 342 11 99.5% 1 255 650

Heritage assets - - - - - - - - - Specialised military assets - - - - - - - - - Biological assets - - - - - - - - - Land and sub-soil assets - - - - - - - - - Software and other intangible assets - - - - - - - - -

Payment for financial assets - - - - - - - - - 37 376 - - 37 376 36 703 673 98.2% 94 178 93 956

Sub programme

Page 181: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

180

Programme 3: FARMER SUPPORT AND DEVELOPMENT 2015/16 2014/15

Adjusted Appropriation

Shifting of Funds

Virement Final Appropriation

Actual Expenditure

Variance Expenditure as % of

final appropria

tion

Final Appropriation

Actual Expenditure

R'000 R'000 R'000 R'000 R'000 R'000 % R'000 R'000

1. FARMER-SETTLEMENT AND DEVELOPMENT 396 924 - - 396 924 392 924 4 000 99.0% 367 891 357 363 396 924 - - 396 924 392 924 4 000 99.0% 367 891 357 363

Economic classificationCurrent payments 160 620 - - 160 620 162 205 (1 585) 101.0% 155 491 162 880

Compensation of employees 126 566 - - 126 566 124 767 1 799 98.6% 110 532 116 938 Salaries and wages 106 210 - - 106 210 106 935 (725) 100.7% 94 626 100 793 Social contributions 20 356 - - 20 356 17 832 2 524 87.6% 15 906 16 145

Goods and services 34 047 - - 34 047 37 435 (3 388) 110.0% 44 955 45 939 Administrative fees 62 - - 62 25 37 40.3% 507 422 Advertising 361 - - 361 269 92 74.5% 583 156 Minor assets 2 341 - - 2 341 2 421 (80) 103.4% 324 338 Audit costs: External - - - - - - - - - Bursaries: Employees - - - - - - - - - Catering: Departmental activities 982 - - 982 951 31 96.8% 157 119 Communication (G&S) 2 135 - - 2 135 1 489 646 69.7% 4 198 4 118 Computer services 969 - - 969 969 - 100.0% - - Consultants: Business and advisory services 207 - - 207 206 1 99.5% 8 991 12 322 Infrastructure and planning services - - - - - - - 599 599 Laboratory services - - - - - - - - - Scientific and technological services - - - - - - - - - Legal services - - - - - - - - - Contractors 1 408 - - 1 408 1 484 (76) 105.4% 143 114 Agency and support / outsourced services - - - - - - - - - Entertainment - - - - - - - - - Fleet services (including government motor transport) 2 857 - - 2 857 1 399 1 458 49.0% 3 375 3 628 Housing - - - - - - - - - Inventory: Clothing material and accessories 14 - - 14 20 (6) 142.9% 49 14 Inventory: Farming supplies 100 - - 100 100 - 100.0% - - Inventory: Food and food supplies - - - - - - - 20 - Inventory: Fuel, oil and gas - - - - - - - - - Inventory: Learner and teacher support material - - - - - - - - - Inventory: Materials and supplies 49 - - 49 26 23 53.1% 18 7 Inventory: Medical supplies - - - - - - - 1 - Inventory: Medicine - - - - - - - - - Medsas inventory interface - - - - - - - - - Inventory: Other supplies - - - - - - - - - Consumable supplies 973 - - 973 969 4 99.6% 663 468 Consumable: Stationery, printing and office supplies 546 - - 546 527 19 96.5% 800 514 Operating leases 3 698 - - 3 698 4 299 (601) 116.3% 6 455 6 246 Property payments 6 021 - - 6 021 5 833 188 96.9% 4 016 4 080 Transport provided: Departmental activity - - - - - - - - - Travel and subsistence 7 590 - - 7 590 12 624 (5 034) 166.3% 12 701 11 500 Training and development 90 - - 90 (93) 183 (103.3%) 43 11 Operating payments 1 597 - - 1 597 1 866 (269) 116.8% 1 282 1 253 Venues and facilities 724 - - 724 717 7 99.0% 30 30 Rental and hiring 1 323 - - 1 323 1 334 (11) 100.9% - -

Interest and rent on land 7 - - 7 3 4 42.9% 4 3 Interest (Incl. interest on unitary payments (PPP)) 7 - - 7 3 4 42.9% 4 3 Rent on land - - - - - - - - -

Transfers and subsidies 235 089 - - 235 089 229 333 5 756 97.6% 209 292 191 834 Provinces and municipalities - - - - - - - - -

Provinces - - - - - - - - - Provincial Revenue Funds - - - - - - - - - Provincial agencies and funds - - - - - - - - -

Municipalities - - - - - - - - - Municipal bank accounts - - - - - - - - - Municipal agencies and funds - - - - - - - - -

Departmental agencies and accounts - - - - - - - - - Social security funds - - - - - - - - - Departmental agencies (non-business entities) - - - - - - - - -

Higher education institutions - - - - - - - - - Foreign governments and international organisations - - - - - - - - - Public corporations and private enterprises - - - - - - - - -

Public corporations - - - - - - - - - Subsidies on products and production (pc) - - - - - - - - - Other transfers to public corporations - - - - - - - - -

Private enterprises - - - - - - - - - Subsidies on products and production (pe) - - - - - - - - - Other transfers to private enterprises - - - - - - - - -

Non-profit institutions - - - - - - - - - Households 235 089 - - 235 089 229 333 5 756 97.6% 209 292 191 834

Social benefits 350 - - 350 1 683 (1 333) 480.9% 730 728 Other transfers to households 234 739 - - 234 739 227 650 7 089 97.0% 208 562 191 106

Payments for capital assets 1 215 - - 1 215 1 386 (171) 114.1% 3 108 2 649 Buildings and other fixed structures - - - - - - - - -

Buildings - - - - - - - - - Other fixed structures - - - - - - - - -

Machinery and equipment 1 215 - - 1 215 1 386 (171) 114.1% 3 108 2 649 Transport equipment 52 - - 52 31 21 59.6% - - Other machinery and equipment 1 163 - - 1 163 1 355 (192) 116.5% 3 108 2 649

Heritage assets - - - - - - - - - Specialised military assets - - - - - - - - - Biological assets - - - - - - - - - Land and sub-soil assets - - - - - - - - - Software and other intangible assets - - - - - - - - -

Payment for financial assets - - - - - - - - - 396 924 - - 396 924 392 924 4 000 99.0% 367 891 357 363

Sub programme

Page 182: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

181

Programme 4: VETERINARY SERVICES 2015/16 2014/15

Adjusted Appropriation

Shifting of Funds

Virement Final Appropriation

Actual Expenditure

Variance Expenditure as % of

final appropria

tion

Final Appropriation

Actual Expenditure

R'000 R'000 R'000 R'000 R'000 R'000 % R'000 R'000

1. ANIMAL HEALTH 84 680 - - 84 680 83 384 1 296 98.5% 100 493 99 297 2. EXPORT CONTROL 2 150 - - 2 150 1 448 702 67.3% - - 3. VETERINARY PUBLIC HEALTH 5 665 - - 5 665 6 009 (344) 106.1% - - 4. VETERINARY LABORATORY SERVICES 8 290 - - 8 290 9 937 (1 647) 119.9% - -

100 785 - - 100 785 100 778 7 100.0% 100 493 99 297

Economic classificationCurrent payments 100 752 - - 100 752 100 555 197 99.8% 98 155 96 904

Compensation of employees 80 807 - - 80 807 80 195 612 99.2% 74 976 74 355 Salaries and wages 69 702 - - 69 702 69 303 399 99.4% 64 844 64 824 Social contributions 11 105 - - 11 105 10 892 213 98.1% 10 132 9 531

Goods and services 19 944 - - 19 944 20 359 (415) 102.1% 23 161 22 548 Administrative fees 85 - - 85 59 26 69.9% 179 125 Advertising 87 - - 87 66 21 75.9% 109 70 Minor assets 123 - - 123 92 31 74.8% 568 267 Audit costs: External - - - - - - - - - Bursaries: Employees - - - - - - - - - Catering: Departmental activities 107 - - 107 93 14 86.9% 201 168 Communication (G&S) 547 - - 547 622 (75) 113.7% 578 535 Computer services 9 - - 9 9 - 100.0% 80 57 Consultants: Business and advisory services - - - - - - - - - Infrastructure and planning services - - - - - - - - - Laboratory services - - - - - - - 220 160 Scientific and technological services - - - - - - - - - Legal services - - - - - - - - - Contractors 573 - - 573 336 237 58.6% 643 545 Agency and support / outsourced services 179 - - 179 177 2 98.9% 145 128 Entertainment - - - - - - - - - Fleet services (including government motor transport) 1 161 - - 1 161 1 018 143 87.7% 1 124 1 004 Housing - - - - - - - - - Inventory: Clothing material and accessories 35 - - 35 64 (29) 182.9% 74 59 Inventory: Farming supplies 58 - - 58 11 47 19.0% 140 152 Inventory: Food and food supplies - - - - - - - - - Inventory: Fuel, oil and gas - - - - - - - 34 30 Inventory: Learner and teacher support material - - - - - - - 16 1 Inventory: Materials and supplies 1 - - 1 25 (24) 2500.0% 103 83 Inventory: Medical supplies 240 - - 240 258 (18) 107.5% 234 199 Inventory: Medicine 864 - - 864 1 235 (371) 142.9% 1 714 1 602 Medsas inventory interface - - - - - - - - - Inventory: Other supplies 2 052 - - 2 052 1 969 83 96.0% 1 149 1 089 Consumable supplies 314 - - 314 309 5 98.4% 524 428 Consumable: Stationery, printing and office supplies 649 - - 649 499 150 76.9% 524 447 Operating leases 2 111 - - 2 111 2 151 (40) 101.9% 1 929 1 849 Property payments 1 188 - - 1 188 1 068 120 89.9% 2 947 2 651 Transport provided: Departmental activity - - - - - - - - - Travel and subsistence 8 204 - - 8 204 9 007 (803) 109.8% 8 563 9 424 Training and development 3 - - 3 - 3 - 45 22 Operating payments 1 346 - - 1 346 1 291 55 95.9% 1 082 1 238 Venues and facilities - - - - - - - 77 67 Rental and hiring 8 - - 8 - 8 - 159 148

Interest and rent on land 1 - - 1 1 - 100.0% 18 1 Interest (Incl. interest on unitary payments (PPP)) 1 - - 1 1 - 100.0% 18 1 Rent on land - - - - - - - - -

Transfers and subsidies - - - - 223 (223) - 550 549 Provinces and municipalities - - - - - - - - -

Provinces - - - - - - - - - Provincial Revenue Funds - - - - - - - - - Provincial agencies and funds - - - - - - - - -

Municipalities - - - - - - - - - Municipal bank accounts - - - - - - - - - Municipal agencies and funds - - - - - - - - -

Departmental agencies and accounts - - - - - - - - - Social security funds - - - - - - - - - Departmental agencies (non-business entities) - - - - - - - - -

Higher education institutions - - - - - - - - - Foreign governments and international organisations - - - - - - - - - Public corporations and private enterprises - - - - - - - - -

Public corporations - - - - - - - - - Subsidies on products and production (pc) - - - - - - - - - Other transfers to public corporations - - - - - - - - -

Private enterprises - - - - - - - - - Subsidies on products and production (pe) - - - - - - - - - Other transfers to private enterprises - - - - - - - - -

Non-profit institutions - - - - - - - - - Households - - - - 223 (223) - 550 549

Social benefits - - - - 223 (223) - 550 549 Other transfers to households - - - - - - - - -

Payments for capital assets 33 - - 33 - 33 - 1 788 1 844 Buildings and other fixed structures - - - - - - - - -

Buildings - - - - - - - - - Other fixed structures - - - - - - - - -

Machinery and equipment 33 - - 33 - 33 - 1 788 1 844 Transport equipment - - - - - - - - - Other machinery and equipment 33 - - 33 - 33 - 1 788 1 844

Heritage assets - - - - - - - - - Specialised military assets - - - - - - - - - Biological assets - - - - - - - - - Land and sub-soil assets - - - - - - - - - Software and other intangible assets - - - - - - - - -

Payment for financial assets - - - - - - - - - 100 785 - - 100 785 100 778 7 100.0% 100 493 99 297

Sub programme

Page 183: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

182

Programme 5: RESEARCH AND TECHNOLOGY DEVELOPMENT SERVICES 2015/16 2014/15

Adjusted Appropriation

Shifting of Funds

Virement Final Appropriation

Actual Expenditure

Variance Expenditure as % of

final appropria

tion

Final Appropriation

Actual Expenditure

R'000 R'000 R'000 R'000 R'000 R'000 % R'000 R'000

1. RESEARCH 48 875 - - 48 875 48 818 57 99.9% 48 001 45 467 48 875 - - 48 875 48 818 57 99.9% 48 001 45 467

Economic classificationCurrent payments 46 619 - - 46 619 46 588 31 99.9% 46 988 44 121

Compensation of employees 37 239 - - 37 239 37 469 (230) 100.6% 36 855 35 448 Salaries and wages 31 682 - - 31 682 31 778 (96) 100.3% 31 433 30 233 Social contributions 5 557 - - 5 557 5 691 (134) 102.4% 5 422 5 215

Goods and services 9 379 - - 9 379 9 119 260 97.2% 10 133 8 673 Administrative fees 74 - - 74 72 2 97.3% 112 89 Advertising - - - - - - - - - Minor assets 64 - - 64 57 7 89.1% 111 73 Audit costs: External - - - - - - - - - Bursaries: Employees - - - - - - - - - Catering: Departmental activities 50 - - 50 46 4 92.0% 50 44 Communication (G&S) 272 - - 272 271 1 99.6% 269 268 Computer services - - - - - - - - - Consultants: Business and advisory services - - - - - - - - - Infrastructure and planning services 4 - - 4 4 - 100.0% 25 - Laboratory services 40 - - 40 40 - 100.0% 80 60 Scientific and technological services - - - - - - - - - Legal services - - - - - - - - - Contractors 900 - - 900 896 4 99.6% 1 170 1 017 Agency and support / outsourced services - - - - - - - - - Entertainment - - - - - - - - - Fleet services (including government motor transport) 120 - - 120 95 25 79.2% 167 131 Housing - - - - - - - - - Inventory: Clothing material and accessories - - - - - - - - - Inventory: Farming supplies 1 591 - - 1 591 1 587 4 99.7% 1 666 1 536 Inventory: Food and food supplies - - - - - - - - - Inventory: Fuel, oil and gas - - - - - - - - - Inventory: Learner and teacher support material - - - - - - - - - Inventory: Materials and supplies 344 - - 344 323 21 93.9% 283 266 Inventory: Medical supplies 2 - - 2 2 - 100.0% 5 2 Inventory: Medicine 92 - - 92 86 6 93.5% 149 115 Medsas inventory interface - - - - - - - - - Inventory: Other supplies - - - - - - - - - Consumable supplies 1 135 - - 1 135 1 338 (203) 117.9% 1 753 1 668 Consumable: Stationery, printing and office supplies 139 - - 139 119 20 85.6% 118 109 Operating leases - - - - - - - - - Property payments 1 308 - - 1 308 1 305 3 99.8% 704 534 Transport provided: Departmental activity - - - - - - - - - Travel and subsistence 2 758 - - 2 758 2 460 298 89.2% 3 148 2 455 Training and development - - - - - - - - - Operating payments 439 - - 439 372 67 84.7% 282 278 Venues and facilities - - - - - - - - - Rental and hiring 47 - - 47 46 1 97.9% 41 28

Interest and rent on land 1 - - 1 - 1 - - - Interest (Incl. interest on unitary payments (PPP)) 1 - - 1 - 1 - - - Rent on land - - - - - - - - -

Transfers and subsidies 456 - - 456 451 5 98.9% - 359 Provinces and municipalities - - - - - - - - -

Provinces - - - - - - - - - Provincial Revenue Funds - - - - - - - - - Provincial agencies and funds - - - - - - - - -

Municipalities - - - - - - - - - Municipal bank accounts - - - - - - - - - Municipal agencies and funds - - - - - - - - -

Departmental agencies and accounts - - - - - - - - - Social security funds - - - - - - - - - Departmental agencies (non-business entities) - - - - - - - - -

Higher education institutions - - - - - - - - - Foreign governments and international organisations - - - - - - - - - Public corporations and private enterprises - - - - - - - - -

Public corporations - - - - - - - - - Subsidies on products and production (pc) - - - - - - - - - Other transfers to public corporations - - - - - - - - -

Private enterprises - - - - - - - - - Subsidies on products and production (pe) - - - - - - - - - Other transfers to private enterprises - - - - - - - - -

Non-profit institutions - - - - - - - - - Households 456 - - 456 451 5 98.9% - 359

Social benefits 456 - - 456 451 5 98.9% - 359 Other transfers to households - - - - - - - - -

Payments for capital assets 1 800 - - 1 800 1 779 21 98.8% 1 013 987 Buildings and other fixed structures - - - - - - - - -

Buildings - - - - - - - - - Other fixed structures - - - - - - - - -

Machinery and equipment 1 160 - - 1 160 1 188 (28) 102.4% 513 488 Transport equipment - - - - 57 (57) - - - Other machinery and equipment 1 160 - - 1 160 1 131 29 97.5% 513 488

Heritage assets - - - - - - - - - Specialised military assets - - - - - - - - - Biological assets 640 - - 640 591 49 92.3% 500 499 Land and sub-soil assets - - - - - - - - - Software and other intangible assets - - - - - - - - -

Payment for financial assets - - - - - - - - - 48 875 - - 48 875 48 818 57 99.9% 48 001 45 467

Sub programme

Page 184: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

183

Programme 6: AGRICULTURAL ECONOMICS SERVICES 2015/16 2014/15

Adjusted Appropriation

Shifting of Funds

Virement Final Appropriation

Actual Expenditure

Variance Expenditure as % of

final appropria

tion

Final Appropriation

Actual Expenditure

R'000 R'000 R'000 R'000 R'000 R'000 % R'000 R'000

1. AGRI-BUSINESS SOPPORT AND DEVELOPMENT 10 833 - - 10 833 10 819 14 99.9% 10 974 10 691 10 833 - - 10 833 10 819 14 99.9% 10 974 10 691

Economic classificationCurrent payments 10 823 - - 10 823 10 804 19 99.8% 10 930 10 655

Compensation of employees 9 088 - - 9 088 9 225 (137) 101.5% 9 289 9 151 Salaries and wages 7 794 - - 7 794 7 952 (158) 102.0% 8 062 7 920 Social contributions 1 294 - - 1 294 1 273 21 98.4% 1 227 1 231

Goods and services 1 735 - - 1 735 1 579 156 91.0% 1 641 1 504 Administrative fees 95 - - 95 - 95 - 33 27 Advertising 29 - - 29 - 29 - 91 76 Minor assets 25 - - 25 19 6 76.0% 5 5 Audit costs: External - - - - - - - - - Bursaries: Employees - - - - - - - - - Catering: Departmental activities - - - - - - - - - Communication (G&S) - - - - - - - - - Computer services - - - - - - - - - Consultants: Business and advisory services - - - - - - - - - Infrastructure and planning services - - - - - - - - - Laboratory services - - - - - - - - - Scientific and technological services - - - - - - - - - Legal services - - - - - - - - - Contractors - - - - - - - - - Agency and support / outsourced services - - - - - - - - - Entertainment - - - - - - - - - Fleet services (including government motor transport) - - - - - - - - - Housing - - - - - - - - - Inventory: Clothing material and accessories - - - - - - - - - Inventory: Farming supplies - - - - - - - - - Inventory: Food and food supplies - - - - - - - - - Inventory: Fuel, oil and gas - - - - - - - - - Inventory: Learner and teacher support material - - - - - - - - - Inventory: Materials and supplies - - - - - - - - - Inventory: Medical supplies - - - - - - - - - Inventory: Medicine - - - - - - - - - Medsas inventory interface - - - - - - - - - Inventory: Other supplies - - - - - - - - - Consumable supplies 14 - - 14 3 11 21.4% 7 7 Consumable: Stationery, printing and office supplies 34 - - 34 31 3 91.2% 32 22 Operating leases 60 - - 60 49 11 81.7% 49 45 Property payments - - - - - - - - - Transport provided: Departmental activity - - - - - - - - - Travel and subsistence 1 361 - - 1 361 1 392 (31) 102.3% 1 339 1 242 Training and development - - - - - - - - - Operating payments 117 - - 117 85 32 72.6% 85 80 Venues and facilities - - - - - - - - - Rental and hiring - - - - - - - - -

Interest and rent on land - - - - - - - - - Interest (Incl. interest on unitary payments (PPP)) - - - - - - - - - Rent on land - - - - - - - - -

Transfers and subsidies - - - - - - - - - Provinces and municipalities - - - - - - - - -

Provinces - - - - - - - - - Provincial Revenue Funds - - - - - - - - - Provincial agencies and funds - - - - - - - - -

Municipalities - - - - - - - - - Municipal bank accounts - - - - - - - - - Municipal agencies and funds - - - - - - - - -

Departmental agencies and accounts - - - - - - - - - Social security funds - - - - - - - - - Departmental agencies (non-business entities) - - - - - - - - -

Higher education institutions - - - - - - - - - Foreign governments and international organisations - - - - - - - - - Public corporations and private enterprises - - - - - - - - -

Public corporations - - - - - - - - - Subsidies on products and production (pc) - - - - - - - - - Other transfers to public corporations - - - - - - - - -

Private enterprises - - - - - - - - - Subsidies on products and production (pe) - - - - - - - - - Other transfers to private enterprises - - - - - - - - -

Non-profit institutions - - - - - - - - - Households - - - - - - - - -

Social benefits - - - - - - - - - Other transfers to households - - - - - - - - -

Payments for capital assets 10 - - 10 15 (5) 144.2% 44 36 Buildings and other fixed structures - - - - - - - - -

Buildings - - - - - - - - - Other fixed structures - - - - - - - - -

Machinery and equipment 10 - - 10 15 (5) 144.2% 44 36 Transport equipment - - - - - - - - - Other machinery and equipment 10 - - 10 15 (5) 144.2% 44 36

Heritage assets - - - - - - - - - Specialised military assets - - - - - - - - - Biological assets - - - - - - - - - Land and sub-soil assets - - - - - - - - - Software and other intangible assets - - - - - - - - -

Payment for financial assets - - - - - - - - - 10 833 - - 10 833 10 819 14 99.9% 10 974 10 691

Sub programme

Page 185: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

184

Programme 7: STRUCTURED AGRICULTURAL EDUCATION AND TRAINING 2015/16 2014/15

Adjusted Appropriation

Shifting of Funds

Virement Final Appropriation

Actual Expenditure

Variance Expenditure as % of

final appropria

tion

Final Appropriation

Actual Expenditure

R'000 R'000 R'000 R'000 R'000 R'000 % R'000 R'000

1. HIGHER EDUCATION AND TRAINING 67 248 - - 67 248 64 987 2 261 96.6% 73 075 70 250 2. FURTHER EDUCATION AND TRAINING(FET) 24 655 - - 24 655 26 904 (2 249) 109.1% - -

91 903 - - 91 903 91 891 12 100.0% 73 075 70 250

Economic classificationCurrent payments 73 591 - - 73 591 73 653 (62) 100.1% 71 353 69 837

Compensation of employees 50 550 - - 50 550 49 600 950 98.1% 48 229 47 717 Salaries and wages 42 478 - - 42 478 41 729 749 98.2% 41 117 40 478 Social contributions 8 072 - - 8 072 7 871 201 97.5% 7 112 7 239

Goods and services 23 033 - - 23 033 24 047 (1 014) 104.4% 23 106 22 120 Administrative fees 48 - - 48 258 (210) 537.5% 506 580 Advertising 296 - - 296 567 (271) 191.6% 420 386 Minor assets 57 - - 57 65 (8) 114.0% 389 112 Audit costs: External - - - - - - - - - Bursaries: Employees - - - - - - - - - Catering: Departmental activities 645 - - 645 602 43 93.3% 426 465 Communication (G&S) 881 - - 881 462 419 52.4% 392 372 Computer services - - - - - - - 3 3 Consultants: Business and advisory services 1 079 - - 1 079 992 87 91.9% 807 820 Infrastructure and planning services 919 - - 919 1 033 (114) 112.4% - - Laboratory services - - - - - - - - - Scientific and technological services - - - - - - - - - Legal services - - - - - - - - - Contractors 3 266 - - 3 266 2 900 366 88.8% 4 374 4 177 Agency and support / outsourced services 497 - - 497 449 48 90.3% 409 405 Entertainment - - - - - - - - - Fleet services (including government motor transport) 2 167 - - 2 167 2 761 (594) 127.4% 1 687 2 183 Housing - - - - - - - - - Inventory: Clothing material and accessories 956 - - 956 1 617 (661) 169.1% 562 506 Inventory: Farming supplies 2 422 - - 2 422 2 234 188 92.2% 1 930 1 559 Inventory: Food and food supplies - - - - - - - - - Inventory: Fuel, oil and gas 30 - - 30 29 1 96.7% 10 6 Inventory: Learner and teacher support material - - - - - - - - 218 Inventory: Materials and supplies 467 - - 467 450 17 96.4% 225 - Inventory: Medical supplies 2 - - 2 2 - 100.0% 2 2 Inventory: Medicine 71 - - 71 55 16 77.5% 89 74 Medsas inventory interface - - - - - - - - - Inventory: Other supplies - - - - - - - - - Consumable supplies 1 202 - - 1 202 1 002 200 83.4% 1 216 1 030 Consumable: Stationery, printing and office supplies 530 - - 530 534 (4) 100.8% 710 639 Operating leases 469 - - 469 457 12 97.4% 585 479 Property payments 4 265 - - 4 265 3 979 286 93.3% 4 112 3 962 Transport provided: Departmental activity - - - - - - - - - Travel and subsistence 2 295 - - 2 295 3 028 (733) 131.9% 3 590 3 579 Training and development 29 - - 29 50 (21) 172.4% 18 (7)Operating payments 390 - - 390 492 (102) 126.2% 583 522 Venues and facilities - - - - - - - 11 10 Rental and hiring 50 - - 50 29 21 58.0% 50 38

Interest and rent on land 8 - - 8 6 2 75.0% 18 - Interest (Incl. interest on unitary payments (PPP)) 8 - - 8 6 2 75.0% 18 - Rent on land - - - - - - - - -

Transfers and subsidies 17 854 - - 17 854 17 823 31 99.8% 368 368 Provinces and municipalities - - - - - - - - -

Provinces - - - - - - - - - Provincial Revenue Funds - - - - - - - - - Provincial agencies and funds - - - - - - - - -

Municipalities - - - - - - - - - Municipal bank accounts - - - - - - - - - Municipal agencies and funds - - - - - - - - -

Departmental agencies and accounts - - - - - - - - - Social security funds - - - - - - - - - Departmental agencies (non-business entities) - - - - - - - - -

Higher education institutions - - - - - - - - - Foreign governments and international organisations - - - - - - - - - Public corporations and private enterprises - - - - - - - - -

Public corporations - - - - - - - - - Subsidies on products and production (pc) - - - - - - - - - Other transfers to public corporations - - - - - - - - -

Private enterprises - - - - - - - - - Subsidies on products and production (pe) - - - - - - - - - Other transfers to private enterprises - - - - - - - - -

Non-profit institutions - - - - - - - - - Households 17 854 - - 17 854 17 823 31 99.8% 368 368

Social benefits 311 - - 311 338 (27) 108.7% 368 368 Other transfers to households 17 543 - - 17 543 17 485 58 99.7% - -

Payments for capital assets 458 - - 458 415 43 90.6% 1 354 45 Buildings and other fixed structures - - - - - - - - -

Buildings - - - - - - - - - Other fixed structures - - - - - - - - -

Machinery and equipment 458 - - 458 415 43 90.6% 1 354 45 Transport equipment - - - - - - - - - Other machinery and equipment 458 - - 458 415 43 90.6% 1 354 45

Heritage assets - - - - - - - - - Specialised military assets - - - - - - - - - Biological assets - - - - - - - - - Land and sub-soil assets - - - - - - - - - Software and other intangible assets - - - - - - - - -

Payment for financial assets - - - - - - - - - 91 903 - - 91 903 91 891 12 100.0% 73 075 70 250

Sub programme

Page 186: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

185

Programme 8: RURAL DEVELOPMENT COORDINATION 2015/16 2014/15

Adjusted Appropriation

Shifting of Funds

Virement Final Appropriation

Actual Expenditure

Variance Expenditure as % of

final appropria

tion

Final Appropriation

Actual Expenditure

R'000 R'000 R'000 R'000 R'000 R'000 % R'000 R'000

1. SOCIAL FACILITATION 31 900 - - 31 900 32 934 (1 034) 103.2% 28 150 28 033 2. DEVELOPMENT PLANNING AND MONITORING 17 586 - - 17 586 16 526 1 060 94.0% 10 913 10 349

49 486 - - 49 486 49 460 26 99.9% 39 063 38 382

Economic classificationCurrent payments 24 339 - - 24 339 24 892 (553) 102.3% 23 744 22 507

Compensation of employees 14 739 - - 14 739 14 633 106 99.3% 14 282 14 080 Salaries and wages 12 960 - - 12 960 12 897 63 99.5% 12 655 12 312 Social contributions 1 779 - - 1 779 1 736 43 97.6% 1 627 1 768

Goods and services 9 600 - - 9 600 10 259 (659) 106.9% 9 462 8 427 Administrative fees 38 - - 38 16 22 42.1% 418 395 Advertising 206 - - 206 255 (49) 123.8% 346 315 Minor assets 76 - - 76 34 42 44.7% 60 35 Audit costs: External - - - - - - - - - Bursaries: Employees - - - - - - - - - Catering: Departmental activities 504 - - 504 471 33 93.5% 518 408 Communication (G&S) - - - - - - - - - Computer services - - - - - - - - - Consultants: Business and advisory services - - - - - - - - - Infrastructure and planning services 1 225 - - 1 225 1 224 1 99.9% 1 105 1 048 Laboratory services - - - - - - - - - Scientific and technological services - - - - - - - - - Legal services - - - - - - - - - Contractors 364 - - 364 337 27 92.6% 322 267 Agency and support / outsourced services - - - - - - - - - Entertainment - - - - - - - - - Fleet services (including government motor transport) 1 290 - - 1 290 1 863 (573) 144.4% - - Housing - - - - - - - - - Inventory: Clothing material and accessories 30 - - 30 2 28 6.7% - - Inventory: Farming supplies - - - - - - - 340 338 Inventory: Food and food supplies - - - - - - - - - Inventory: Fuel, oil and gas - - - - - - - - 1 Inventory: Learner and teacher support material 33 - - 33 33 - 100.0% - - Inventory: Materials and supplies 12 - - 12 12 - 100.0% 44 44 Inventory: Medical supplies - - - - - - - - - Inventory: Medicine - - - - - - - - - Medsas inventory interface - - - - - - - - - Inventory: Other supplies - - - - - - - - - Consumable supplies 32 - - 32 13 19 40.6% 466 408 Consumable: Stationery, printing and office supplies 132 - - 132 68 64 51.5% 293 139 Operating leases 247 - - 247 121 126 49.0% 130 75 Property payments 680 - - 680 625 55 91.9% 2 - Transport provided: Departmental activity - - - - - - - - - Travel and subsistence 3 532 - - 3 532 4 017 (485) 113.7% 4 361 3 972 Training and development 27 - - 27 27 - 100.0% 47 37 Operating payments 186 - - 186 168 18 90.3% 232 193 Venues and facilities - - - - - - - 746 719 Rental and hiring 986 - - 986 973 13 98.7% 32 32

Interest and rent on land - - - - - - - - - Interest (Incl. interest on unitary payments (PPP)) - - - - - - - - - Rent on land - - - - - - - - -

Transfers and subsidies 24 602 - - 24 602 24 020 582 97.6% 15 079 15 770 Provinces and municipalities - - - - - - - - -

Provinces - - - - - - - - - Provincial Revenue Funds - - - - - - - - - Provincial agencies and funds - - - - - - - - -

Municipalities - - - - - - - - - Municipal bank accounts - - - - - - - - - Municipal agencies and funds - - - - - - - - -

Departmental agencies and accounts - - - - - - - - - Social security funds - - - - - - - - - Departmental agencies (non-business entities) - - - - - - - - -

Higher education institutions - - - - - - - - - Foreign governments and international organisations - - - - - - - - - Public corporations and private enterprises - - - - - - - - -

Public corporations - - - - - - - - - Subsidies on products and production (pc) - - - - - - - - - Other transfers to public corporations - - - - - - - - -

Private enterprises - - - - - - - - - Subsidies on products and production (pe) - - - - - - - - - Other transfers to private enterprises - - - - - - - - -

Non-profit institutions - - - - - - - - - Households 24 602 - - 24 602 24 020 582 97.6% 15 079 15 770

Social benefits 102 - - 102 125 (23) 122.5% 79 78 Other transfers to households 24 500 - - 24 500 23 895 605 97.5% 15 000 15 692

Payments for capital assets 545 - - 545 548 (3) 100.6% 240 106 Buildings and other fixed structures - - - - - - - - -

Buildings - - - - - - - - - Other fixed structures - - - - - - - - -

Machinery and equipment 545 - - 545 548 (3) 100.6% 240 106 Transport equipment - - - - - - - - - Other machinery and equipment 545 - - 545 548 (3) 100.6% 240 106

Heritage assets - - - - - - - - - Specialised military assets - - - - - - - - - Biological assets - - - - - - - - - Land and sub-soil assets - - - - - - - - - Software and other intangible assets - - - - - - - - -

Payment for financial assets - - - - - - - - - 49 486 - - 49 486 49 460 26 99.9% 39 063 38 382

Sub programme

Page 187: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

186

Programme 9: ENVIRONMENTAL SERVICES 2015/16 2014/15

Adjusted Appropriation

Shifting of Funds

Virement Final Appropriation

Actual Expenditure

Variance Expenditure as % of

final appropria

tion

Final Appropriation

Actual Expenditure

R'000 R'000 R'000 R'000 R'000 R'000 % R'000 R'000

1. ENVIRONMENTAL POLICY, PLANNING AND COORDINATION 10 886 - - 10 886 10 909 (23) 100.2% 15 473 14 759 2. COMPLIANCE AND ENFORCEMENT 8 398 - - 8 398 8 190 208 97.5% - - 3. ENVIRONMENTAL QUALITY MANAGEMET 20 154 - - 20 154 18 807 1 347 93.3% 19 922 19 807 4. BIODIVERSITY MANAGEMENT 32 539 - - 32 539 33 497 (958) 102.9% 28 022 27 881 5. ENVIRONMENTAL EMPOWERMENT SERVICES 56 418 - - 56 418 56 910 (492) 100.9% 115 939 110 340

128 395 - - 128 395 128 313 82 99.9% 179 356 172 787

Economic classificationCurrent payments 93 224 - - 93 224 92 916 308 99.7% 126 619 126 155

Compensation of employees 69 397 - - 69 397 69 077 320 99.5% 108 175 105 223 Salaries and wages 59 028 - - 59 028 59 461 (433) 100.7% 97 172 96 183 Social contributions 10 369 - - 10 369 9 616 753 92.7% 11 003 9 040

Goods and services 23 818 - - 23 818 23 833 (15) 100.1% 18 435 20 926 Administrative fees 56 - - 56 47 9 83.9% 240 244 Advertising 154 - - 154 113 41 73.4% 92 37 Minor assets 221 - - 221 197 24 89.1% 20 3 Audit costs: External - - - - - - - 12 - Bursaries: Employees - - - - - - - - - Catering: Departmental activities 325 - - 325 320 5 98.5% 274 171 Communication (G&S) 442 - - 442 425 17 96.2% 468 571 Computer services 55 - - 55 54 1 98.2% 25 25 Consultants: Business and advisory services 2 607 - - 2 607 2 591 16 99.4% 2 232 2 609 Infrastructure and planning services 2 853 - - 2 853 2 904 (51) 101.8% 1 581 1 671 Laboratory services - - - - - - - - - Scientific and technological services - - - - - - - - - Legal services 58 - - 58 58 - 100.0% 1 365 261 Contractors 245 - - 245 224 21 91.4% 249 99 Agency and support / outsourced services 43 - - 43 45 (2) 104.7% 28 15 Entertainment - - - - - - - - - Fleet services (including government motor transport) 3 201 - - 3 201 3 849 (648) 120.2% - - Housing - - - - - - - - - Inventory: Clothing material and accessories - - - - - - - - 1 096 Inventory: Farming supplies - - - - - - - - 15 Inventory: Food and food supplies 3 - - 3 - 3 - - - Inventory: Fuel, oil and gas 2 - - 2 1 1 50.0% - 19 Inventory: Learner and teacher support material - - - - - - - 33 - Inventory: Materials and supplies 15 - - 15 2 13 13.3% 51 514 Inventory: Medical supplies - - - - - - - - - Inventory: Medicine - - - - - - - - - Medsas inventory interface - - - - - - - - - Inventory: Other supplies - - - - - - - - - Consumable supplies 166 - - 166 150 16 90.4% 743 551 Consumable: Stationery, printing and office supplies 478 - - 478 552 (74) 115.4% 818 625 Operating leases 1 119 - - 1 119 1 135 (16) 101.4% 777 731 Property payments 4 006 - - 4 006 2 435 1 571 60.8% 1 552 1 412 Transport provided: Departmental activity 28 - - 28 27 1 96.4% 60 65 Travel and subsistence 7 176 - - 7 176 8 182 (1 006) 114.0% 7 361 8 536 Training and development 34 - - 34 34 - 100.0% - 36 Operating payments 342 - - 342 324 18 94.7% 376 1 537 Venues and facilities 30 - - 30 5 25 16.7% 26 30 Rental and hiring 159 - - 159 159 - 100.0% 52 53

Interest and rent on land 9 - - 9 6 3 66.7% 9 6 Interest (Incl. interest on unitary payments (PPP)) 9 - - 9 6 3 66.7% 9 6 Rent on land - - - - - - - - -

Transfers and subsidies 173 - - 173 246 (73) 142.2% 1 470 1 391 Provinces and municipalities - - - - - - - - -

Provinces - - - - - - - - - Provincial Revenue Funds - - - - - - - - - Provincial agencies and funds - - - - - - - - -

Municipalities - - - - - - - - - Municipal bank accounts - - - - - - - - - Municipal agencies and funds - - - - - - - - -

Departmental agencies and accounts - - - - - - - 1 320 1 320 Social security funds - - - - - - - - - Departmental agencies (non-business entities) - - - - - - - 1 320 1 320

Higher education institutions - - - - - - - - - Foreign governments and international organisations - - - - - - - - - Public corporations and private enterprises - - - - - - - - -

Public corporations - - - - - - - - - Subsidies on products and production (pc) - - - - - - - - - Other transfers to public corporations - - - - - - - - -

Private enterprises - - - - - - - - - Subsidies on products and production (pe) - - - - - - - - - Other transfers to private enterprises - - - - - - - - -

Non-profit institutions - - - - - - - - - Households 173 - - 173 246 (73) 142.2% 150 71

Social benefits 173 - - 173 246 (73) 142.2% 150 71 Other transfers to households - - - - - - - - -

Payments for capital assets 34 998 - - 34 998 35 151 (153) 100.4% 51 267 45 241 Buildings and other fixed structures 33 749 - - 33 749 33 725 24 99.9% 51 267 45 241

Buildings - - - - - - - - - Other fixed structures 33 749 - - 33 749 33 725 24 99.9% 51 267 45 241

Machinery and equipment 1 152 - - 1 152 1 329 (177) 115.4% - - Transport equipment - - - - - - - - - Other machinery and equipment 1 152 - - 1 152 1 329 (177) 115.4% - -

Heritage assets 97 - - 97 97 - 100.0% - - Specialised military assets - - - - - - - - - Biological assets - - - - - - - - - Land and sub-soil assets - - - - - - - - - Software and other intangible assets - - - - - - - - -

Payment for financial assets - - - - - - - - - 128 395 - - 128 395 128 313 82 99.9% 179 356 172 787

Sub programme

Page 188: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

187

Direct charges 2015/16 2014/15

Adjusted Appropriation

Shifting of Funds

Virement Final Appropriation

Actual Expenditure

Variance Expenditure as % of

final appropria

tion

Final Appropriation

Actual Expenditure

R'000 R'000 R'000 R'000 R'000 R'000 % R'000 R'000

- - - - -

- - - - - - - - -

Economic classificationCurrent payments - - - - - - - - -

Compensation of employees - - - - - - - - - Salaries and wages - - - - - - - - - Social contributions - - - - - - - - -

Goods and services - - - - - - - - - Administrative fees - - - - - - - - - Advertising - - - - - - - - - Minor assets - - - - - - - - - Audit costs: External - - - - - - - - - Bursaries: Employees - - - - - - - - - Catering: Departmental activities - - - - - - - - - Communication (G&S) - - - - - - - - - Computer services - - - - - - - - - Consultants: Business and advisory services - - - - - - - - - Infrastructure and planning services - - - - - - - - - Laboratory services - - - - - - - - - Scientific and technological services - - - - - - - - - Legal services - - - - - - - - - Contractors - - - - - - - - - Agency and support / outsourced services - - - - - - - - - Entertainment - - - - - - - - - Fleet services (including government motor transport) - - - - - - - - - Housing - - - - - - - - - Inventory: Clothing material and accessories - - - - - - - - - Inventory: Farming supplies - - - - - - - - - Inventory: Food and food supplies - - - - - - - - - Inventory: Fuel, oil and gas - - - - - - - - - Inventory: Learner and teacher support material - - - - - - - - - Inventory: Materials and supplies - - - - - - - - - Inventory: Medical supplies - - - - - - - - - Inventory: Medicine - - - - - - - - - Medsas inventory interface - - - - - - - - - Inventory: Other supplies - - - - - - - - - Consumable supplies - - - - - - - - - Consumable: Stationery, printing and office supplies - - - - - - - - - Operating leases - - - - - - - - - Property payments - - - - - - - - - Transport provided: Departmental activity - - - - - - - - - Travel and subsistence - - - - - - - - - Training and development - - - - - - - - - Operating payments - - - - - - - - - Venues and facilities - - - - - - - - - Rental and hiring - - - - - - - - -

Interest and rent on land - - - - - - - - - Interest (Incl. interest on unitary payments (PPP)) - - - - - - - - - Rent on land - - - - - - - - -

Transfers and subsidies - - - - - - - - - Provinces and municipalities - - - - - - - - -

Provinces - - - - - - - - - Provincial Revenue Funds - - - - - - - - - Provincial agencies and funds - - - - - - - - -

Municipalities - - - - - - - - - Municipal bank accounts - - - - - - - - - Municipal agencies and funds - - - - - - - - -

Departmental agencies and accounts - - - - - - - - - Social security funds - - - - - - - - - Departmental agencies (non-business entities) - - - - - - - - -

Higher education institutions - - - - - - - - - Foreign governments and international organisations - - - - - - - - - Public corporations and private enterprises - - - - - - - - -

Public corporations - - - - - - - - - Subsidies on products and production (pc) - - - - - - - - - Other transfers to public corporations - - - - - - - - -

Private enterprises - - - - - - - - - Subsidies on products and production (pe) - - - - - - - - - Other transfers to private enterprises - - - - - - - - -

Non-profit institutions - - - - - - - - - Households - - - - - - - - -

Social benefits - - - - - - - - - Other transfers to households - - - - - - - - -

Payments for capital assets - - - - - - - - - Buildings and other fixed structures - - - - - - - - -

Buildings - - - - - - - - - Other fixed structures - - - - - - - - -

Machinery and equipment - - - - - - - - - Transport equipment - - - - - - - - - Other machinery and equipment - - - - - - - - -

Heritage assets - - - - - - - - - Specialised military assets - - - - - - - - - Biological assets - - - - - - - - - Land and sub-soil assets - - - - - - - - - Software and other intangible assets - - - - - - - - -

Payment for financial assets - - - - - - - - - - - - - - - - - -

1

Sub programme

Page 189: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

188

Page 190: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

189

Page 191: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

190

2015/16 2014/15Note R'000 R'000

ASSETSCurrent Assets 25 126 33 375

Unauthorised expenditure 11 20 679 20 679 Cash an cash equivalents 12 - 8 185 Other financial assets 13 - - Prepayments and advances 14 - - Receivables 15 4 447 4 511 Loans 17 - - Aid assistance prepayments 4 - - Aid assistance receivable 4 - -

Non-Current Assets - - Investments 16 - - Receivables 15 - - Loans 17 - - Other financial assets 13 - -

TOTAL ASSETS 25 126 33 375

LIABILITIES

Current Liabilities 25 126 33 375 Voted funds to be surrendered to the Revenue Fund 18 4 530 31 626 Departmental revenue and NRF Receipts to be surrendered to the Revenue Fund 19 2 002 47 Bank overdraft 20 18 275 - Payables 21 319 1 702 Aid assistance repayable 4 - - Aid assistance unutilised 4 - -

Non-Current LiabilitiesPayables 22 - -

TOTAL LIABILITIES 25 126 33 375

NET ASSETS - -

Represented by:Capitalisation reserve - - Recoverable revenue - - Retained funds - - Revaluation reserves - -

TOTAL - -

Well done, Pos balances

Well done, Pos balances

NORTH WEST: RURAL, ENVIRONMENT AND AGRICULTURAL DEVELOPMENT

Statement of Financial Position

Page 192: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

191

Page 193: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

192

1

1.1 Annual AppropriationFunds not

Final Actual Funds requested/ Final AppropriationAppropriation Received not received Appropriation Received

Programmes R'000 R'000 R'000 R'000 R'000227 409 227 409 - 190 655 190 655 37 376 37 376 - 94 178 94 178

396 924 396 525 399 367 891 367 891 100 785 100 785 - 100 493 100 493 48 875 48 875 - 48 001 48 001 10 833 10 833 - 10 974 10 974 91 903 91 903 - 73 075 73 075 49 486 49 486 - 39 063 39 063

128 395 128 395 - 179 356 179 356 Total 1 091 988 1 091 589 399 1 103 686 1 103 686

Provide an explanation for funds not requested/not received

2015/16 2014/15Note R'000 R'000

1.2 Conditional grants** Total grants received 47 266 719 239 354

Provincial grants included in Total Grants received -

2015/16 2014/15R'000 R'000

2 Statutory Appropriation0 - - 0 - -

- -

Actual Statutory Appropriation received -

NORTH WEST: RURAL, ENVIRONMENT AND AGRICULTURAL DEVELOPMENTNotes to the Annual Financial Statements

2015/16 2014/15

ADMINISTRATIONSUSTAINABLE RESOURCE MANAGEMENTFARMER SUPPORT AND DEVELOPMENTVETERINARY SERVICESRESEARCH AND TECHNOLOGY DEVELOPMENT SERVICESAGRICULTURAL ECONOMICS SERVICESSTRUCTURED AGRICULTURAL EDUCATION AND TRAININGRURAL DEVELOPMENT COORDINATIONENVIRONMENTAL SERVICES

The funds not received R399 thousand relate to the EPWP funds balance that was not received by Treasury from Public Works.

( ** It should be noted that the Conditional grants are included in the amounts per the Final Appropriation in Note 1.1)

The following conditional grants were allocated to the department for the financial year under review; CASP, Ilima Letsema, Land Care and EPWP

The department was not allocated any Statutory Appropriation for the financial year under review

Page 194: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

193

2015/16 2014/15Note R'000 R'000

3 Departmental RevenueTax revenue - - Sales of goods and services other than capital assets 3.1 8 785 8 453 Fines, penalties and forfeits 3.2 350 351 Interest, dividends and rent on land 3.3 - - Sales of capital assets 3.4 3 868 2 680 Transactions in financial assets and liabilities 3.5 501 380 Transfer received 3.6 - - Total revenue collected 13 504 11 864 Less: Own revenue included in appropriation 19 13 504 11 864 Departmental revenue collected - -

2015/16 2014/15Note R'000 R'000

3.1 Sales of goods and services other than capital assets 3Sales of goods and services produced by the department 8 783 8 243

Sales by market establishment 433 765 Administrative fees 2 476 2 579 Other sales 5 874 4 899

Sales of scrap, waste and other used current goods 2 210 Total 8 785 8 453

2015/16 2014/15Note R'000 R'000

3.2 Fines, penalties and forfeits 3Fines 350 351 Penalties - - Forfeits - - Total 350 351

2015/16 2014/15Note R'000 R'000

3.3 Interest, dividends and rent on land 3Interest - - Dividends - - Rent on land - - Total - -

2015/16 2014/15Note R'000 R'000

3.4 Sales of capital assets 3Tangible assets 3 868 2 680 Buildings and other fixed structures 41 - - Machinery and equipment 39 - - Heritage assets 39 - - Specialised military assets 39 - - Land and subsoil assets 41 - - Biological assets 39 3 868 2 680

Intangible assets - - Software 40 - - Mastheads and publishing titles 40 - - Patents, licences, copyright, brand names, trademarks 40 - - Recipes, formulae, prototypes, designs, models 40 - - Services and operating rights 40 - -

Total 3 868 2 680 2015/16 2014/15

Note R'000 R'0003.5 Transactions in financial assets and liabilities 3

Loans and advances - - Receivables - - Forex gain - - Stale cheques written back - - Other Receipts including Recoverable Revenue 501 380 Gains on GFECRA - - Total 501 380

All revenue received was recognised as part of Departmental Revenue

Page 195: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

194

2015/16 2014/15Note R'000 R'000

3.6 Transfers received 3Other governmental units - - Higher education institutions - - Foreign governments - - International organisations - - Public corporations and private enterprises - - Households and non-profit institutions - - Total - -

3.7 Cash received not recognised (not included in the main note) - 2015/16

Name of entity Amount received

Amount paid to Revenue

Fund Balance R'000 R'000 R'000

- -

Total - - -

Cash received not recognised (not included in the main note) - 2014/15

Name of entity Amount received

Amount paid to Revenue

Fund Balance R'000 R'000 R'000

- - - - - -

Total - - -

2015/16 2014/15Note R'000 R'000

4 Aid AssistanceOpening Balance - - Prior period error - As restated - - Transferred from statement of financial performance - - Transferred to/from retained funds - Paid during the year - Closing Balance - -

2015/16 2014/15Note R'000 R'000

4.1 Analysis of balance by source 4Aid assistance from RDP - Aid assistance from other sources - CARA - Closing Balance - -

2015/16 2014/15Note R'000 R'000

4.2 Analysis of balance 4Aid assistance receivable - Aid assistance prepayments - Aid assistance unutilised - Aid assistance repayable - Closing balance - -

Aid assistance not requested/not received -

4.3 Prior period error Note 2014/15R'000

Nature of prior period error

-

Relating to 2014/15 -

Total prior period errors -

Relating to 20WW/XX (affecting the opening balance)

Page 196: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

195

2015/16 2014/15Note R'000 R'000

5 Compensation of Employees5.1 Salaries and wages

Basic salary 356 283 344 317 Performance award 10 697 14 610 Service Based 205 279 Compensative/circumstantial 3 199 2 938 Periodic payments 7 503 89 562 Other non-pensionable allowances 69 337 63 257 Total 447 224 514 963

2015/16 2014/15Note R'000 R'000

5.2 Social ContributionsEmployer contributionsPension 45 710 44 061 Medical 28 456 23 457 UIF 54 501 Bargaining council 114 109 Official unions and associations - - Insurance - - Total 74 334 68 128

Total compensation of employees 521 558 583 091

Average number of employees 1 809 2 210

2015/16 2014/15Note R'000 R'000

6 Goods and servicesAdministrative fees 4 137 3 147 Advertising 3 960 2 757 Minor assets 6.1 3 491 1 122 Bursaries (employees) - - Catering 4 137 2 500 Communication 9 832 12 146 Computer services 6.2 1 244 105 Consultants: Business and advisory services 4 588 16 062 Infrastructure and planning services 5 164 3 319 Laboratory services 40 220 Scientific and technological services - - Legal services 1 746 2 709 Contractors 6 594 7 127 Agency and support / outsourced services 671 548 Entertainment - - Audit cost – external 6.3 5 985 3 038 Fleet services 19 251 11 056 Inventory 6.4 10 456 12 135 Consumables 6.5 8 375 10 181 Housing - - Operating leases 39 197 20 304 Property payments 6.6 36 913 29 024 Rental and hiring - - Transport provided as part of the departmental activities - - Travel and subsistence 6.7 48 921 49 307 Venues and facilities 1 269 1 243 Training and development 2 464 4 166 Other operating expenditure 6.8 8 451 6 672 Total 226 886 198 888

2015/16 2014/15Note R'000 R'000

6.1 Minor assets 6Tangible assets 3 491 1 122 Buildings and other fixed structures - - Biological assets 38 105 Heritage assets - - Machinery and equipment 3 453 1 017 Transport assets - - Specialised military assets - -

Intangible assets - - Software - - Mastheads and publishing titles - - Patents, licences, copyright, brand names, trademarks - - Recipes, formulae, prototypes, designs, models - - Services and operating rights - - Total 3 491 1 122

Number of employees include over 400 periodic workers for Extended Public Works Programme

Page 197: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

196

2015/16 2014/15Note R'000 R'000

6.2 Computer services 6SITA computer services - - External computer service providers 1 244 105 Total 1 244 105

2015/16 2014/15Note R'000 R'000

6.3 Audit cost – external 6Regularity audits 5 985 3 038 Performance audits - - Investigations - - Environmental audits - - Computer audits - -

5 985 3 038

2015/16 2014/15Note R'000 R'000

6.4 Inventory 6Clothing material and accessories 1 739 1 755 Farming supplies 4 099 4 067 Food and food supplies - - Fuel, oil and gas 61 148 Learning and teaching support material 33 1 Materials and supplies 918 3 079 Medical supplies 262 202 Medicine 1 375 1 794 Medsas inventory interface - - Other supplies 6.4.1 1 969 1 089 Total 10 456 12 135

6.4.1 Other SuppliesAmmunition and security supplies - - Assets for distribution - -

Machinery and equipment - - School furniture - - Sports and recreation - - Library material - - Other assets for distribution - -

Other 1 969 1 089 Total 1 969 1 089

2015/16 2014/15Note R'000 R'000

6.5 Consumables 6Consumable supplies 4 729 6 037

Uniform and clothing 827 415 Household supplies 1 446 2 615 Building material and supplies 806 1 036 Communication accessories - - IT consumables 170 198 Other consumables 1 480 1 773

Stationery, printing and office supplies 3 646 4 144 Total 8 375 10 181

2015/16 2014/15Note R'000 R'000

6.6 Property payments 6Municipal services 13 587 10 128 Property management fees - - Property maintenance and repairs - - Other 23 326 18 896 Total 36 913 29 024

2015/16 2014/15Note R'000 R'000

6.7 Travel and subsistence 6Local 48 026 49 048 Foreign

895 259 Total 48 921 49 307

Total

Page 198: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

197

2015/16 2014/15Note R'000 R'000

6.8 Other operating expenditure 6Professional bodies, membership and subscription fees 557 1 511 Resettlement costs 37 390 Other 7 857 4 771 Total 8 451 6 672

2015/16 2014/15Note R'000 R'000

7 Interest and Rent on LandInterest paid 95 25 Rent on land - - Total 95 25

2015/16 2014/15Note R'000 R'000

8 Payments for financial assetsMaterial losses through criminal conduct - -

Theft 8.4 - - Other material losses 8.1 - -

Purchase of equity - - Extension of loans for policy purposes - - Other material losses written off 8.2 - - Debts written off 8.3 240 - Forex losses 8.5 - - Debt take overs - - Losses on GFECRA - - Total 240 -

2015/16 2014/15Note R'000 R'000

8.1 Other material losses 8Nature of other material losses(Group major categories, but list material items)

- - -

Total - -

2015/16 2014/15Note R'000 R'000

8.2 Other material losses written off 8Nature of losses(Group major categories, but list material items)

- - -

Total - -

2015/16 2014/15Note R'000 R'000

8.3 Debts written off 8Nature of debts written off

- - -

- -

- - -

- -

202 - 38 -

- 240 -

Total debt written off 240 -

The above amount relates to debts whose attempts to recover would not comply to TR 11.4.1(b)(ii)

IncidentDisciplinary Steps taken/ Criminal proceedings

(Group major categories, but list material items: (debt written off relating to irregular expenditure, debt written off relating to

Irregular expenditure written off

TotalRecoverable revenue written off

Total

Total

Other debt written offSalary ReversalsTax Debt

Salary Reversal: Former MEC - R171K : Other Staff - R 31KTax Debt : EPWP - R 26K : Other Staff - R 12K

Page 199: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

198

2015/16 2014/15Note R'000 R'000

8.4 Details of theft 8Nature of theft

- - - - - -

Total - -

2015/16 2014/15Note R'000 R'000

8.5 Forex losses 8Nature of losses

- - -

Total - -

2015/16 2014/15Note R'000 R'000

9 Transfers and SubsidiesProvinces and municipalities 48, 49 - Departmental agencies and accounts ANNEXURE 1B - 1 320 Higher education institutions ANNEXURE 1C - - Foreign governments and international organisations ANNEXURE 1E - - Public corporations and private enterprises ANNEXURE 1D - - Non-profit institutions ANNEXURE 1F - - Households ANNEXURE 1G 285 076 234 288 Total 285 076 235 608

Unspent funds transferred to the above beneficiaries 57 604 50 805

2015/16 2014/15Note R'000 R'000

10 Expenditure for capital assetsTangible assets 53 203 54 448

Buildings and other fixed structures 41 33 725 47 256 Heritage assets 39,41 97 - Machinery and equipment 39 18 790 6 693 Specialised military assets 39 - - Land and subsoil assets 41 - - Biological assets 39 591 499

Intangible assets 40 - -

Software - - Mastheads and publishing titles - - Patents, licences, copyright, brand names, trademarks - - Recipes, formulae, prototypes, designs, models - - Services and operating rights - -

Total 53 203 54 448

Compensation of employees - Goods and services -

Total - -

10.1 Analysis of funds utilised to acquire capital assets - 2015/16

Voted FundsAid

assistance TOTALR'000 R'000 R'000

Tangible assets 53 203 - 53 203 Buildings and other fixed structures 33 725 33 725 Heritage assets 97 97 Machinery and equipment 18 790 18 790 Specialised military assets - Land and subsoil assets - Biological assets 591 591

Intangible assets - - - Software - Mastheads and publishing titles -

- -

Services and operating rights -

Total 53 203 - 53 203

(Group major categories, but list material items)

(Group major categories, but list material items)

Household includes; Farmers, Social Benefits for Staff as well as Staff claims against the department

The following amounts have been included as project costs in Expenditure for capital assets:

Patents, licences, copyright, brand names, trademarksRecipes, formulae, prototypes, designs, models

Page 200: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

199

10.2 Analysis of funds utilised to acquire capital assets - 2014/15

Voted FundsAid

assistance TOTALR'000 R'000 R'000

Tangible assets 54 448 - 54 448 Buildings and other fixed structures 47 256 - 47 256 Heritage assets - - - Machinery and equipment 6 693 - 6 693 Specialised military assets - - - Land and subsoil assets - - - Biological assets 499 - 499

Intangible assets - - - Software - - - Mastheads and publishing titles - - -

- - - - - -

Services and operating rights - - - - -

Total 54 448 - 54 448

2015/16 2014/1510.3 Finance lease expenditure included in Expenditure for capital assets R'000 R'000

Tangible assetsBuildings and other fixed structures - Heritage assets - Machinery and equipment - Specialised military assets - Land and subsoil assets - Biological assets -

Total - -

2015/16 2014/15Note R'000 R'000

11 Unauthorised Expenditure11.1 Reconciliation of unauthorised expenditure

Opening balance 20 679 20 679 Prior period error 11.5 - As restated 20 679 20 679 Unauthorised expenditure - discovered in the current year (as restated) -

- - -

Current - Capital - Transfers and subsidies -

-

Less: Amounts transferred to receivables for recovery 15 - 20 679 20 679

2015/16 2014/15

11.2 R'000 R'000Current 20 679 20 679 Capital - - Transfers and subsidies - - Total 20 679 20 679

11.3 Analysis of unauthorised expenditure awaiting authorisation per type R'000 R'00020 679 20 679

- - Total 20 679 20 679

11.4 Details of unauthorised expenditure - current year 2015/16

R’000

Total -

11.5 Prior period error Note 2014/15R'000

Nature of prior period error

-

Relating to 2014/15 -

Total -

Patents, licences, copyright, brand names, trademarksRecipes, formulae, prototypes, designs, models

Less: Amounts approved by Parliament/Legislature with fundingLess: Amounts approved by Parliament/Legislature without funding and written off in the Statement of Financial

Closing balance

Unauthorised Expenditure has been approved by the relevant provincial legislature, the

Analysis of unauthorised expenditure awaiting authorisation per economic classification

department could not process any accounting entries as cashflow could not be secured before end of the financial year. The expenditure will be cleared during 2016/17 financial year.

Unauthorised expenditure relating to overspending of the vote or a main division within the voteUnauthorised expenditure incurred not in accordance with the purpose of the vote or main division

Incident Disciplinary steps taken/criminal

proceedings

Relating to 20WW/XX (affecting the opening balance)

Page 201: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

200

2015/16 2014/15Note R'000 R'000

12 Cash and Cash EquivalentsConsolidated Paymaster General Account - 8 185 Cash receipts - - Disbursements - - Cash on hand - - Investments (Domestic) - - Investments (Foreign) - - Total - 8 185

2015/16 2014/15Note R'000 R'000

13 Other Financial AssetsCurrent

Local- - - - -

Total - -

Foreign- - - -

Total - -

Total Current other financial assets - -

2015/16 2014/15Note R'000 R'000

Non-CurrentLocal

- - -

Total - -

- - - -

Total - -

Total Non-Current other financial assets - -

2015/16 2014/15Note R'000 R'000

14 Prepayments and AdvancesStaff advances - - Travel and subsistence - - Prepayments (Not expensed) 14.2 - - Advances paid 14.1 - - SOCPEN advances - - Total - -

2015/16 2014/1514.1 Advances paid Note R'000 R'000

National departments Annex 8A - Provincial departments Annex 8A - Public entities Annex 8A - Other institutions Annex 8A - Total - -

2015/16 2014/1514.2 Prepayments (Not expensed) R'000 R'000

Listed by economic classificationGoods and services - Interest and rent on land - Transfers and subsidies - Capital assets - Other - Total - -

2015/16 2014/1514.3 Prepayments (Expensed) R'000 R'000

Listed by economic classificationGoods and services - Interest and rent on land - Transfers and subsidies 57 604 - Capital assets - Other - Total 57 604 -

The above amount relates to payments made to the contractor for work to be completed during first quarter of 2016/17

Page 202: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

201

Current Non-current Total Current Non-current TotalNote R’000 R’000 R’000 R’000 R’000 R’000

15 Receivables15.1

Trade receivables 15.2 - - - - Recoverable expenditure 15.3 - - - - Staff debt 15.4 227 227 520 - 520

15.6 - - - - Other debtors 15.5 4 001 4 001 3 985 - 3 985

Total 4 447 - 4 447 4 511 - 4 511

2015/16 2014/15Note R'000 R'000

15.1 Claims recoverable 15National departments 6 6 Provincial departments 213 - Foreign governments - Public entities - Private enterprises - Higher education institutions - Households and non-profit institutions - Local governments - Total 219 6

2015/16 2014/15Note R'000 R'000

15.2 Trade receivables 15(Group major categories, but list material items)

- - - - - - -

Total - -

2015/16 2014/15Note R'000 R'000

15.3 Recoverable expenditure (disallowance accounts) 15(Group major categories, but list material items)

- - - -

Total - -

2015/16 2014/15

Claims recoverable219 219 6 - 6

Fruitless and wasteful expenditure

Included in other debtors is an amount of R3,985M due from a Service Provider taken to court by the department to claim for sub-standard work on awarded contract. Debt retained in line with Prescription Act provisions

Page 203: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

202

2015/16 2014/15Note R'000 R'000

15.4 Staff debt 15(Group major categories, but list material items)

- - - - - -

227 520 - - - - - -

Total 227 520

2015/16 2014/15Note R'000 R'000

15.5 Other debtors 15(Group major categories, but list material items)

- - 3 985 3 985

16 - - - - -

- - -

Total 4 001 3 985

2015/16 2014/15Note R'000 R'000

15.6 Fruitless and wasteful expenditure 15- -

Less amounts recovered - Less amounts written off -

- -

Total - -

2015/16 2014/15Note R'000 R'000

15.7 Impairment of receivablesEstimate of impairment of receivables 4 025 4 001 Total 4 025 4 001

Tax DebtSalary ReversalSalary DisallowanceDebt AccountT&S AdvanceDebt Receivable InterestDebt Receivable income

Salary Pension FundDisallowance Control AccountInsurance DeductionsSalary Reversal Control AccountSalary AdvanceMiscellenous DebtDebt Implementation

Opening balance

Transfers from note 32 Fruitless and Wasteful expenditureInterest

Staff debts impaired for R40K and Trade Receivable impaired for full amount R3,985K i.l.w prescription act chapter 3.11(b)

Page 204: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

203

2015/16 2014/15Note R'000 R'000

16 InvestmentsNon-Current

Shares and other equity(List investments at cost)

- -

Total - -

2015/16 2014/15Note R'000 R'000

Securities other than shares Annex 2A(List investments at cost)

- -

Total - -

Total non-current - -

2015/16 2014/15Note R'000 R'000

Analysis of non current investmentsOpening balance - - Additions in cash - Disposals for cash - Non-cash movements - Closing balance - -

2015/16 2014/15Note R'000 R'000

16.1 Impairment of investmentsEstimate of impairment of investments - Total - -

2015/16 2014/15Note R'000 R'000

17 LoansPublic corporations - - Higher education institutions - - Foreign governments - - Private enterprises - - Non-profit institutions - - Staff loans - - Total - -

2015/16 2014/15Note R'000 R'000

Analysis of BalanceOpening balance - - New Issues - Repayments - Write-offs - Closing balance - -

2015/16 2014/15Note R'000 R'000

17.1 Impairment of loansEstimate of impairment of loans -

Total - -

Page 205: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

204

2015/16 2014/15Note R'000 R'000

18 Voted Funds to be Surrendered to the Revenue FundOpening balance 31 626 9 665

18.2 - As restated 31 626 9 665 Transfer from statement of financial performance (as restated) 4 929 31 627 Add: Unauthorised expenditure for current year 11 - Voted funds not requested/not received 1.1 (399) -

18.1 - Paid during the year (31 626) (9 666) Closing balance 4 530 31 626

2015/16 2014/15Note R'000 R'000

18.1 Voted funds/(Excess expenditure) transferred to the retained funds (Parliament/Legislatures ONLY)18Opening balance - Transfer from the statement of financial performance - Transfer from Departmental Revenue to defray excess expenditure 19 - Closing balance - -

18.2 Prior period error Note 2014/15R'000

Nature of prior period error 18-

Relating to 2014/15 -

Total -

2015/16 2014/15Note R'000 R'000

19 Departmental revenue and NRF Receipts to be surrendered to the Revenue FundOpening balance 47 455

- As restated 19.1 47 455 Transfer from Statement of Financial Performance (as restated) - - Own revenue included in appropriation 13 504 11 864 Transfer from aid assistance 4 -

18.1 - Paid during the year (11 549) (12 272) Closing balance 2 002 47

Prior period error

Transferred to retained revenue to defray excess expenditure (Parliament/Legislatures ONLY)

Relating to 20WW/XX (affecting the opening balance)

Prior period error

Transfer to voted funds to defray expenditure (Parliament/Legislatures ONLY)

Page 206: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

205

19.1 Prior period error Note 2014/15R'000

Nature of prior period error 19

-

Relating to 2014/15 19 -

Total -

2015/16 2014/15Note R'000 R'000

20 Bank OverdraftConsolidated Paymaster General Account 13 879 - Fund requisition account - Overdraft with commercial banks (Local) 4 396 - Overdraft with commercial banks (Foreign) - Total 18 275 -

2015/16 2014/15Note R'000 R'000

21 Payables - currentAmounts owing to other entities - - Advances received 21.1 - - Clearing accounts 21.2 - - Other payables 21.3 319 1 702 Total 319 1 702

2015/16 2014/15Note R'000 R'000

21.1 Advances received 21

Annex 8B - Annex 8B - Annex 8B - Annex 8B -

Total - -

2015/16 2014/15Note R'000 R'000

21.2 Clearing accounts 21(Identify major categories, but list material amounts)

- -

Total - -

Relating to 20WW/XX (affecting the opening balance)

National departmentsProvincial departmentsPublic entitiesOther institutions

Page 207: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

206

2015/16 2014/15Note R'000 R'000

21.3 Other payables 21(Identify major categories, but list material amounts)

55 238 -

Sal: Bargaining Council 2 - Debt Receivable Income 77 87 Debt Receivable Interest -

126 43 Sal: UIF 2 1 Sal: Pension Fund 16 1

- 41 1 332

Total 319 1 702

2014/15One to two

yearsTwo to three

yearsMore than three years Total Total

Note R'000 R'000 R'000 R'000 R'00022 Payables – non-current

- - Advances received 22.1 - - Other payables 22.2 - - Total - - - - -

2015/16 2014/15Note R'000 R'000

22.1 Advances received 22

Annex 8B - Annex 8B - Annex 8B - Annex 8B -

Total - -

2015/16 2014/15Note R'000 R'000

22.2 Other payables 22(Identify major categories, but list material amounts)

- - - -

Total - -

Sal: ACB RecallsSal: Persal EBT Control

Sal: Income Tax

Debt Receivable IncomePayable: AD/p Dept

2015/16

Amounts owing to other entities

National departmentsProvincial departmentsPublic entitiesOther institutions

Page 208: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

207

2015/16 2014/15Note R'000 R'000

23 Net cash flow available from operating activitiesNet surplus/(deficit) as per Statement of Financial Performance 4 929 31 627 Add back non cash/cash movements not deemed operating activities 17 946 43 691 (Increase)/decrease in receivables – current 64 441 (Increase)/decrease in prepayments and advances - - (Increase)/decrease in other current assets - - Increase/(decrease) in payables – current (1 383) 1 556 Proceeds from sale of capital assets (3 868) (2 680) Proceeds from sale of investments - (Increase)/decrease in other financial assets - - Expenditure on capital assets 53 203 54 448 Surrenders to Revenue Fund (43 175) (21 938) Surrenders to RDP Fund/Donor - Voted funds not requested/not received (399) - Own revenue included in appropriation 13 504 11 864 Other non-cash items - Net cash flow generated by operating activities 22 875 75 318

2015/16 2014/15Note R'000 R'000

24 Reconciliation of cash and cash equivalents for cash flow purposesConsolidated Paymaster General account (13 879) 8 185 Fund requisition account - - Cash receipts - - Disbursements - - Cash on hand - - Cash with commercial banks (Local) (4 396) - Cash with commercial banks (Foreign) - - Total (18 275) 8 185

2015/16 2014/15Note R'000 R'000

25 Contingent liabilities and contingent assets25.1 Contingent liabilities

Liable to NatureMotor vehicle guarantees Employees Annex 3A - Housing loan guarantees Employees Annex 3A 24 64 Other guarantees Annex 3A - Claims against the department Annex 3B 3 750 3 750 Intergovernmental payables (unconfirmed balances) Annex 5 2 181 5 489 Environmental rehabilitation liability Annex 3B - - Other Annex 3B - - Total 5 955 9 303

Contingent assets 2015/16 2014/15Nature of contingent asset Note R'000 R'000

- -

Total - -

Claims against dept. relate to Litigations for breach of contract. Matter in the hands of State Attorney.

Part of IP relates to DED, Treasury & DPW&R outstanding tenants payments and salary paid to an official on behalf of READ by Department of Social Development

Page 209: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

208

2015/16 2014/15Note R'000 R'000

26 CommitmentsCurrent expenditureApproved and contracted 199 921 23 188 Approved but not yet contracted 1 034 22 640

200 955 45 828 Capital ExpenditureApproved and contracted 115 792 45 087 Approved but not yet contracted - 1 722

115 792 46 809 Total Commitments 316 747 92 637

2015/16 2014/15R'000 R'000

27 Accruals and payables not recognised27.1 Accruals

Listed by economic classification 30 days 30+ days Total TotalGoods and services 1 471 251 1 722 17 737 Interest and rent on land - - Transfers and subsidies 3 995 3 995 4 814 Capital assets - - Other 68 13 81 - Total 5 534 264 5 798 22 551

2015/16 2014/15Listed by programme level Note R'000 R'000

594 15 635 Sustainable Resource Management 28 960 Farmer Support and Development 3 027 5 470 Veterinary Services 251 65 Research and Technology Development Services 137 129 Agricultural Economics Service 7 17 Structured Agricultural Education and Training 1 236 - Rural Development 160 48

358 227

Total 5 798 22 551

27.2 Payables not recognisedListed by economic classification 30 days 30+ days Total TotalGoods and services 1 963 70 2 033 - Interest and rent on land - - Transfers and subsidies 412 37 449 - Capital assets - - Other 347 347 - Total 2 722 107 2 829 -

2015/16 2014/15Listed by programme level Note R'000 R'000

1 891 - Sustainable Resource Management - - Farmer Support and Development 352 - Veterinary Services 15 - Research and Technology Development Services 2 - Agricultural Economics Service 13 - Structured Agricultural Education and Training 442 - Rural Development 42 -

72 -

Total 2 829 -

2015/16 2014/15Included in the above totals are the following: Note R'000 R'000Confirmed balances with departments Annex 5 - Confirmed balances with other government entities Annex 5 - Total - -

Indicate whether a commitment is for longer than a yearR1.2M of R24M relates to the current commitments longer than a year.The increase is as a result of transferrable projects amounting to R292 325 M to the implementing Agent included in the B5 project for the year 2016/17.

Administration

Environmental Services

Administration

Environmental Services

Other payables relate to employee benefits like acting allowances and salaries

Page 210: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

209

2015/16 2014/15Note R'000 R'000

28 Employee benefitsLeave entitlement 31 109 28 081 Service bonus (Thirteenth cheque) 15 250 15 099 Performance awards 9 068 8 706 Capped leave commitments 21 002 21 492 Other 4 094 264 Total 80 523 73 642

Negative leave credits on capped leave for R8K as well as R118K on current and previous

determined by DPSA in 2016.29 Lease commitments

29.1 Operating leases expenditure

2015/16

Specialised military assets Land

Buildings and other fixed structures

Machinery and

equipment TotalR'000 R'000 R'000 R'000 R'000

Not later than 1 year 42 764 659 43 423 Later than 1 year and not later than 5 years - 579 579 Later than five years - Total lease commitments - - 42 764 1 238 44 002

2014/15

Specialised military assets Land

Buildings and other fixed structures

Machinery and

equipment TotalR'000 R'000 R'000 R'000 R'000

Not later than 1 year - - 38 920 1 478 40 398 Later than 1 year and not later than 5 years - - 93 259 352 Later than five years - - - - - Total lease commitments - - 39 013 1 737 40 750

2015/16 2014/15R'000 R'000

Rental earned on sub-leased assets 3 - Total - -

cycles have been excluded from the leave entitlement calculations.Performance awards are calculated at 1.5% of the total COE budget of R604,512. Other benefits are made up of Long Service awards for qualifying officials at the rate

Page 211: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

210

29.2 Finance leases expenditure **

2015/16

Specialised military assets Land

Buildings and other fixed structures

Machinery and

equipment TotalR'000 R'000 R'000 R'000 R'000

Not later than 1 year 821 821 Later than 1 year and not later than 5 years 826 826 Later than five years - Total lease commitments - - - 1 647 1 647

2014/15

Specialised military assets Land

Buildings and other fixed structures

Machinery and

equipment TotalR'000 R'000 R'000 R'000 R'000

Not later than 1 year - - - 1 112 1 112 Later than 1 year and not later than 5 years - - - 495 495 Later than five years - - - - - Total lease commitments - - - 1 607 1 607

** This note excludes leases relating to public private partnerships as they are separately disclosed to note no. 35.

2015/16 2014/15R'000 R'000

Rental earned on sub-leased assets 3 - Total - -

29.3 Operating lease revenue

2015/16

Specialised military assets Land

Buildings and other fixed structures

Machinery and

equipment TotalR'000 R'000 R'000 R'000 R'000

Not later than 1 year - Later than 1 year and not later than 5 years - Later than five years - Total operating lease revenue receivable - - - - -

2014/15

Specialised military assets Land

Buildings and other fixed structures

Machinery and

equipment TotalR'000 R'000 R'000 R'000 R'000

Not later than 1 year - - - - - Later than 1 year and not later than 5 years - - - - - Later than five years - - - - - Total operating lease revenue receivable - - - - -

Page 212: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

211

2015/16 2014/15Note R'000 R'000

30 Accrued departmental revenueTax revenue - Sales of goods and services other than capital assets 7 941 7 051 Fines, penalties and forfeits - Interest, dividends and rent on land - Sale of capital assets - Transactions in financial assets and liabilities - Transfers received - Other - Total 7 941 7 051

2015/16 2014/15Note R'000 R'000

30.1 Analysis of accrued departmental revenueOpening balance 7 051 6 221 Less: Amounts received 2 638 1 509 Add: Amounts recognised 3 528 2 339 Less: Amounts written-off/reversed as irrecoverable - Closing balance 7 941 7 051

2015/16 2014/15R'000 R'000

30.2 Accrued department revenue written offNature of losses

- - -

Total - -

2015/16 2014/15Note R'000 R'000

30.3 Impairment of accrued departmental revenueEstimate of impairment of accrued departmental revenue 7 077 6 157 Total 7 077 6 157

Impairment relate to former untraceable students

(Group major categories, but list material items)

Taung 3rd year : R 21K Potch 1st year : R 229K Potch 1st year repeaters : R 191K Potch 2nd year : R 54K Potch 3rd year : R 95K Potch Former Students : R 7,077M

The above amounts relates to the outstanding student fees at reporting period made up as follows: Taung 1st year : R 51K Taung 1st year repeaters : R 98K Taung 2nd year : R 125K

Page 213: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

212

2015/16 2014/15Note R'000 R'000

31 Irregular expenditure31.1 Reconciliation of irregular expenditure

Opening balance 12 423 123 -

As restated 12 423 123 Add: Irregular expenditure - relating to prior year - - Add: Irregular expenditure - relating to current year 158 855 13 419 Less: Prior year amounts condoned - - Less: Current year amounts condoned (1 065) - Less: Amounts not condoned and recoverable - Less: Amounts not condoned and not recoverable (12 761) (1 119) Irregular expenditure awaiting condonation 157 452 12 423

Analysis of awaiting condonation per age classificationCurrent year 157 452 12 423 Prior years - Total 157 452 12 423

2015/1631.2 Details of irregular expenditure - current year R'000

Incident Disciplinary steps taken/criminal proceedingsSingle quote instead of three None 54Service before order None 79Split Order None 3Expired BBBEE certificate None 257Non compliance to CIDB requirements None 2837

None 819None 10

Order variation None 103Lowest quote not recommended None 81Non compliance: Cost containment None 15Non-compliance to SCM Policy None 154597Total 158 855

2015/1631.3 Details of irregular expenditure condoned R'000

Incident Condoned by (condoning authority)

HOD 819 HOD 10 HOD 103 HOD 54 HOD 79

Total 1 065

2015/1631.4 Details of irregular expenditure recoverable (not condoned) R'000

Incident Condoned by (condoning authority)

Total -

Exceeding delegated amountOrder variationSingle quote instead of threeService before order

Prior period error

Breakdown of the amount awaiting condonement;

Non compliance: Exceeding deelegated amountNon compliance to SCM prescripts

> Procuremnet by Departmental Agent done in line with SLA but not complying to SCM prescripts : R154,598M> Other non compliance findings : R 2,854M

Relating to current yearNon compliance to SCM prescripts

Page 214: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

213

2015/1631.5 Details of irregular expenditure not recoverable (not condoned) R'000

Incident Not condoned by (condoning authority)2 827 1 228 8 368

81 -

257 Total 12 761

2015/1631.6 Details of irregular expenditure under investigation (not included in the main note)R'000

Incident

Total -

31.7 Prior period error Note 2014/15R'000

Nature of prior period error

-

Relating to 2014/15 -

Total -

2015/16

31.8 R'000Incident

Total

2015/16 2014/1532 Fruitless and wasteful expenditure R’000 R’000

32.1 Reconciliation of fruitless and wasteful expenditureOpening balance - -

-

As restated - - Fruitless and wasteful expenditure – relating to prior year - Fruitless and wasteful expenditure – relating to current year 111 27 Less: Amounts resolved (111) (27) Less: Amounts transferred to receivables for recovery 15.6 - Closing balance - -

32.2 Analysis of awaiting resolution per economic classificationCurrent - Capital - Transfers and subsidies -

Total - -

Prior period error

Details of the non-compliance where an institution was not represented in a bid committee for contracts arranged by other institutions

Relating to 20WW/XX (affecting the opening balance)

Expired BBBEE certificate

Lowest quote not recommendedNon compliance Cost containment

Incorrect CIDB gradingExpired JV CIDB Certificate Contract incorrectly awarded

Page 215: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

214

32.3 Analysis of Current Year's Fruitless and wasteful expenditure 2015/16

R’0009

65 8 7 5 1

16 Total 111

32.4 Prior period error Note 2014/15R'000

Nature of prior period error-

Relating to 2014/15 -

Total -

2015/1632.5 Details of fruitless and wasteful expenditure under investigation (not in the main note)R'000

Incident

Total -

2015/16 2014/15Note R'000 R'000

33 Related party transactionsRevenue receivedTax revenue - Sales of goods and services other than capital assets - Fines, penalties and forfeits - Interest, dividends and rent on land - Sales of capital assets - Transactions in financial assets and liabilities - Transfers received - Total - -

Payments madeGoods and services - Interest and rent of land - Expenditure for capital assets - Payments for financial assets - Transfers 1 320 Total - 1 320

Relating to 20WW/XX (affecting the opening balance)

Doctors AccountsNo Shows

Dept. of Comm Safety & TranspTelkomMunicipalities

Incident Disciplinary steps taken/criminal

proceedingsEskomAuditor General

Page 216: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

215

2015/16 2014/15Note R'000 R'000

Year end balances arising from revenue/paymentsReceivables from related parties - Payables to related parties - Total - -

2015/16 2014/15Note R'000 R'000

Loans to/from related partiesNon-interest bearing loans to/(from) - Interest bearing loans to/(from) - Total - -

2015/16 2014/15Note R'000 R'000

OtherGuarantees issued/received - List other contingent liabilities between department and related party

- - - -

Total - -

2015/16Note R'000

In kind goods and services provided/received

List in kind goods and services between department and related party

Total -

List related party relationships

NORTH WEST PARKS BOARD AND DIRECTORATE OF ENTREPRENEURAL DEVELOPMENT

PROVINCIAL DEPARTMENTS

FINANCE, ECONOMY & ENTREPRISE DEVELOPMENT, PUBLIC WORKS & ROADS, COMMUNITY SAFETY & TRANSPORT, SOCIAL DEVELOPMENT, LOCAL GOVERNMENT& HUMAN SETTLEMENT, HEALTH, PREMIER, EDUCATION, TOURISM AND LEGISLATURE

PUBLIC ENTITIES

Page 217: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

216

2015/16 2014/15No. of R'000 R'000

34 Key management personnel IndividualsPolitical office bearers (provide detail below) 1 1 878 1 725 Officials: -

1 1 645 1 629 8 5 859 4 134

- Family members of key management personnel 2 955 - Total 10 337 7 488

2015/16 2014/15No. of R'000 R'000

IndividualsKey management personnel (Parliament/Legislatures)Speaker to Parliament/the Legislature - Deputy Speaker to Parliament/the Legislature - Secretary to Parliament/ the Legislature - Deputy Secretary - Chief Financial Officer - Legal Advisor - Other - Total - -

35 Public Private Partnership

2015/16 2014/15Note R'000 R'000

Concession fee received - - - - - - - -

Unitary fee paid - - Fixed component - Indexed component -

Analysis of indexed component - - Compensation of employees - Goods and Services(excluding lease payments) - Operating leases - Interest -

Capital/(Liabilities) - - Tangible rights - Intangible rights - Property - Plant and equipment - Loans -

Other - - Prepayments and advances - Pre-production obligations - Other obligations -

Any guarantees issued by the department are disclosed in Note 25.1

2015/16 2014/15Note R'000 R'000

36 Impairment (Other than receivables, accrued departmental revenue, loans and investments) 16 6 157 -

Total - 6 173

2015/16 2014/15Note R'000 R'000

37 Provisions188 492 864 894

- -

Total 1 052 1 386

Student fees provided for all currently registered students

Staff DebtsStudent Fees

Staff Debts provided for debts arising at year end and currently serviced through deductions or claimed from exit benefits.

Staff DebtsStudent Fess

Level 14 (incl CFO if at a lower level)

Base fee receivedVariable fee receivedOther fees received… please specify

Level 15 to 16

Page 218: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

217

37.1 Reconciliation of movement in provisions - 2015/16

Provision 1 Provision 2 Provision 3 Provision 4 Total

provisions R'000 R'000 R'000 R'000 R'000

Opening balance 492 894 1 386 Increase in provision 103 1 983 2 086 Settlement of provision (407) (2 013) (2 420)Unused amount reversed -

- -

Closing balance 188 864 - - 1 052

Reconciliation of movement in provisions - 2014/15

Provision 1 Provision 2 Provision 3 Provision 4 Total

provisions R'000 R'000 R'000 R'000 R'000

Opening balance 464 6 221 15 - 6 700 Increase in provision 136 2 339 - - 2 475 Settlement of provision (108) (1 509) (15) - (1 632)Unused amount reversed - - - - -

- - - - - - (6 157) - - (6 157)

Closing balance 492 894 - - 1 386

38 Non-adjusting events after reporting date 2015/16R'000

Total -

39 Movable Tangible Capital Assets

Opening balance

Value adjustments Additions Disposals

Closing balance

R'000 R'000 R'000 R'000 R'000HERITAGE ASSETS - - 97 - 97 Heritage assets - 97 - 97

MACHINERY AND EQUIPMENT 95 405 - 26 571 11 407 110 569 Transport assets 25 946 10 724 10 547 26 123 Computer equipment 27 592 5 310 176 32 726 Furniture and office equipment 7 150 1 464 - 8 614 Other machinery and equipment 34 717 9 073 684 43 106

- - - - - Specialised military assets - - - -

6 437 - 4 554 5 251 5 740 Biological assets 6 437 4 554 5 251 5 740

-

101 842 - 31 222 16 658 116 406

SPECIALISED MILITARY ASSETS

BIOLOGICAL ASSETS

Capital Work-in-progress (Effective 1 April 2016)

TOTAL MOVABLE TANGIBLE CAPITAL ASSETS

Provision 1- Staff Debts provided for on basis of cases being persued with relevant authorityProvision 2- Student fees provided for all currently enrolled students.

Include an estimate of the financial effect of the subsequent non-adjusting events or a statement that such an estimate cannot be made.

Reimbursement expected from third partyChange in provision due to change in estimation of inputs

Reimbursement expected from third partyChange in provision due to change in estimation of inputs

2015/16

MOVEMENT IN MOVABLE TANGIBLE CAPITAL ASSETS PER ASSET REGISTER FOR THE YEAR ENDED 31 MARCH 2016

Page 219: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

218

Movable Tangible Capital Assets under investigationNumber Value

R'000Heritage assetsMachinery and equipmentSpecialised military assetsBiological assets

Additions

39.1

Cash Non-cash

(Capital work-in-progress

current costs and finance

lease payments)

Received current, not paid (Paid

current year, received prior

year TotalR'000 R'000 R'000 R'000 R'000

HERITAGE ASSETS 97 - - - 97 Heritage assets 97 97

MACHINERY AND EQUIPMENT 18 790 7 781 - - 26 571 Transport assets 10 694 30 10 724 Computer equipment 2 697 2 613 5 310 Furniture and office equipment 1 091 373 1 464 Other machinery and equipment 4 308 4 765 9 073

- - - - - Specialised military assets -

591 4 099 - - 4 554 Biological assets 591 3 963 4 554

19 478 11 744 - - 31 222

Disposals

39.2

Sold for cash

Non-cash disposal Total disposals

Cash received Actual

R'000 R'000 R'000 R'000HERITAGE ASSETS - - - - Heritage assets -

MACHINERY AND EQUIPMENT - 11 407 11 407 - Transport assets 10 547 10 547 Computer equipment 176 176 Furniture and office equipment - Other machinery and equipment 684 684

- - - - Specialised military assets -

- 5 251 5 251 - Biological assets 5 251 5 251

- 16 658 16 658 -

SPECIALISED MILITARY ASSETS

BIOLOGICAL ASSETS

TOTAL DISPOSAL OF MOVABLE TANGIBLE CAPITAL ASSETS

TOTAL ADDITIONS TO MOVABLE TANGIBLE CAPITAL ASSETSNon cash additions is made up of Assets transferred from DPW&R and EED, also assets which were previously retired and reinstated in the current financial year.Some Assets, especially at Taung College were acquired through the nationally fundedEconomic Competitive Support Package for the colleges nationally, with the other partof the donations received from Danish supported Haldor Topsoe programme

DISPOSALS OF MOVABLE TANGIBLE CAPITAL ASSETS PER ASSET REGISTER FOR THE YEAR ENDED 31 MARCH 2016

Included in the above total of the movable tangible capital assets per the asset register are assets that are under investigation:

ADDITIONS TO MOVABLE TANGIBLE CAPITAL ASSETS PER ASSET REGISTER FOR THE YEAR ENDED 31 MARCH 2016

SPECIALISED MILITARY ASSETS

BIOLOGICAL ASSETS

Page 220: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

219

39.3 Movement for 2014/15

Opening balance

Prior period error Additions Disposals

Closing balance

R'000 R'000 R'000 R'000 R'000

HERITAGE ASSETS - - - - - Heritage assets - - - -

MACHINERY AND EQUIPMENT 88 659 (322) 17 697 10 629 95 405 Transport assets 27 190 930 2 174 25 946 Computer equipment 27 351 10 3 230 2 999 27 592 Furniture and office equipment 6 306 996 152 7 150 Other machinery and equipment 27 812 (332) 12 541 5 304 34 717

- - - - - Specialised military assets - - - -

6 713 - 2 018 2 294 6 437 Biological assets 6 713 2 018 2 294 6 437

- - - -

95 372 (322) 19 715 12 923 101 842

39.3.1 Prior period error Note 2014/15R'000

Nature of prior period error

(322) 10

(332)

Relating to 2014/15 -

Total (322)

39.4 Minor assets

Specialise

d milita

ry asset

s Intangible

assets Heritage

assets Machinery and

equipment Biological

assets Total R'000 R'000 R'000 R'000 R'000 R'000

Opening balance - - - 61 074 59 61 133 Value adjustments 19 19 Additions 7 061 524 7 585 Disposals 22 345 367 TOTAL MINOR ASSETS - - - 68 113 238 68 351

Specialise

d milita

ry asset

s Intangible

assets Heritage

assets Machinery and

equipment Biological

assets Total -

40 418 487 40 905

- - - 40 418 487 40 905

Number of R1 minor assets Number of minor assets at cost

TOTAL NUMBER OF MINOR ASSETS

Computer equipement and other Machinery & Equipment procured in 2014/15 financial year that was not included in the relevant AFS Note but was in the Asset Register

MOVEMENT IN MINOR ASSETS PER THE ASSET REGISTER FOR THE YEAR ENDED 31 MARCH 2016

BIOLOGICAL ASSETS

Capital Work-in-progress (Effective 1 April 2016)

TOTAL MOVABLE TANGIBLE CAPITAL ASSETS

Relating to 2014/15(affecting the opening balance)Computer Hardware & SystemsOther Machiner & Equipment

MOVEMENT IN MOVABLE TANGIBLE CAPITAL ASSETS PER ASSET REGISTER FOR THE YEAR ENDED 31 MARCH 2015

SPECIALISED MILITARY ASSETS

Page 221: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

220

Minor Capital Assets under investigationNumber Value

R'000Specialised military assetsIntangible assetsHeritage assetsMachinery and equipmentBiological assets

Minor assets

Specialise

d milita

ry asset

s Intangible

assets Heritage

assets Machinery and

equipment Biological

assets Total R'000 R'000 R'000 R'000 R'000 R'000

Opening balance - - - 61 055 51 61 106

- - - (49) - (49) Additions - - - 6 195 32 6 227 Disposals - - - 6 127 24 6 151

- - - 61 074 59 61 133

Specialise

d milita

ry asset

s Intangible

assets Heritage

assets Machinery and

equipment Biological

assets Total

- - - - - -

- - - - - -

- - - - - -

39.4.1 Prior period error Note 2014/15R'000

Nature of prior period error (49)

(49)

Relating to 2014/15 -

Total (49)

TOTAL MINOR ASSETS

Equipment <R5000 : Other Machinery & Equipment

Prior period error

Number of R1 minor assets

Number of minor assets at cost

TOTAL NUMBER OF MINOR ASSETS

Error relating to 2014/15 closing balances

Included in the above total of the minor capital assets per the asset register are assets that are under investigation:

MOVEMENT IN MINOR ASSETS PER THE ASSET REGISTER FOR THE YEAR ENDED 31 MARCH 2015

Page 222: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

221

39.5MOVABLE ASSETS WRITTEN OFF FOR THE YEAR ENDED 31 MARCH 2016

Specialised milita

ry asset

s Intangible

assets Heritage

assets Machinery and

equipment Biological

assets Total R'000 R'000 R'000 R'000 R'000 R'000

Assets written off 11 407 5 251 16 658

- - - 11 407 5 251 16 658

MOVABLE ASSETS WRITTEN OFF FOR THE YEAR ENDED 31 MARCH 2015

Specialis-ed

military

assets

Intangible assets

Heritage assets

Machinery and equipment

Biological assets Total

R'000 R'000 R'000 R'000 R'000 R'000Assets written off - - - 10 666 2 294 12 960

- - - 10 666 2 294 12 960

39.6 S42 Movable Capital Assets

Specialise

d milita

ry asset

s Intangible

assets Heritage

assets Machinery and

equipment Biological

assets Total -

-

Specialise

d milita

ry asset

s Intangible

assets Heritage

assets Machinery and

equipment Biological

assets Total -

-

Specialise

d milita

ry asset

s Intangible

assets Heritage

assets Machinery and

equipment Biological

assets Total - - - - - - - - - - - -

Specialise

d milita

ry asset

s Intangible

assets Heritage

assets Machinery and

equipment Biological

assets Total - - - - - -

- - - - - -

No of Assets Value of the asset (R'000)

MAJOR ASSETS SUBJECTED TO TRANSFER IN TERMS OF S42 OF THE PFMA - 31 MARCH 2015

No of Assets Value of the asset (R'000)

MINOR ASSETS SUBJECTED TO TRANSFER IN TERMS OF S42 OF THE PFMA - 31 MARCH 2015

No of Assets

Value of the asset (R'000)

MINOR ASSETS SUBJECTED TO TRANSFER IN TERMS OF S42 OF THE PFMA - 31 MARCH 2016

No of Assets Value of the asset (R'000)

Movable assets written off

TOTAL MOVABLE ASSETS WRITTEN OFF

TOTAL MOVABLE ASSETS WRITTEN OFF

MAJOR ASSETS SUBJECTED TO TRANSFER IN TERMS OF S42 OF THE PFMA - 31 MARCH 2016

Page 223: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

222

40 Intangible Capital Assets

Opening balance

Value adjustments Additions Disposals

Closing balance

R'000 R'000 R'000 R'000 R'000SOFTWARE - - - -

- - - -

- - - -

- - - -

- - - -

-

- - - - -

Intangible Capital Assets under investigationNumber Value

R'000SoftwareMastheads and publishing titles Patents, licences, copyright, brand names, trademarks Recipes, formulae, prototypes, designs, modelsServices and operating rights

40.1

Cash Non-cash

(Development work-in-progress

current costs )

Received current, not paid (Paid

current year, received prior

year Total

R'000 R'000 R'000 R'000 R'000

SOFTWARE -

-

-

-

-

- - - - -

Disposals

40.2

Sold for cashNon-cash disposal Total disposals

Cash received Actual

R'000 R'000 R'000 R'000

SOFTWARE -

-

-

-

-

- - - - TOTAL DISPOSAL OF INTANGIBLE CAPITAL ASSETS

DISPOSALS OF INTANGIBLE CAPITAL ASSETS PER ASSET REGISTER FOR THE YEAR ENDED 31 MARCH 2016

MASTHEADS AND PUBLISHING TITLES

PATENTS, LICENCES, COPYRIGHT, BRAND NAMES, TRADEMARKS

RECIPES, FORMULAE, PROTOTYPES, DESIGNS, MODELS

SERVICES AND OPERATING RIGHTS

ADDITIONS TO INTANGIBLE CAPITAL ASSETS PER ASSET REGISTER FOR THE YEAR ENDED 31 MARCH 2016

MASTHEADS AND PUBLISHING TITLES PATENTS, LICENCES, COPYRIGHT, BRAND NAMES, TRADEMARKS

RECIPES, FORMULAE, PROTOTYPES, DESIGNS, MODELS

SERVICES AND OPERATING RIGHTS

TOTAL ADDITIONS TO INTANGIBLE CAPITAL ASSETS

SERVICES AND OPERATING RIGHTS

Capital Work-in-progress (Effective 1 April 2016)

TOTAL INTANGIBLE CAPITAL ASSETS

Included in the above total of the intangible capital assets per the asset register are assets that are under investigation:

MOVEMENT IN INTANGIBLE CAPITAL ASSETS PER ASSET REGISTER FOR THE YEAR ENDED 31 MARCH 2016

MASTHEADS AND PUBLISHING TITLES

PATENTS, LICENCES, COPYRIGHT, BRAND NAMES, TRADEMARKS

RECIPES, FORMULAE, PROTOTYPES, DESIGNS, MODELS

Page 224: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

223

Movement for 2014/15

40.3

Opening balance

Prior period error Additions Disposals

Closing balance

R'000 R'000 R'000 R'000 R'000

SOFTWARE - - - - -

- - - - -

- - - - -

- - - - -

- - - - -

- -

- - - - -

40.3.1 Prior period error Note 2014/15R'000

Nature of prior period error

-

Relating to 2014/15 -

Total -

41 Immovable Tangible Capital Assets

Opening balance

Value adjustments Additions Disposals

Closing balance

R'000 R'000 R'000 R'000 R'00047 256 - 1 539 - 48 795

Dwellings - - - - Non-residential buildings - - - - Other fixed structures 47 256 1 539 - 48 795

HERITAGE ASSETS - - - - - Heritage assets - - - -

LAND AND SUBSOIL ASSETS - - - - - Land - - - -

- - - -

(32 186) (32 186)

47 256 - (30 647) - 16 609

Immovable Tangible Capital Assets under investigationNumber Value

R'000Buildings and other fixed structuresHeritage assetsLand and subsoil assets

Mineral and similar non-regenerative resources

Capital Work-in-progress (Effective 1 April 2016)

TOTAL IMMOVABLE TANGIBLE CAPITAL ASSETS

The Work in Progress includes R 7,574M for contractors fees with the balance of R 24,612M for fixed structures at TSWHS with R8,116M of the WIP relating to a road construction in Thomeng Village

Included in the above total of the immovable tangible capital assets per the asset register are assets that are under investigation:

MOVEMENT IN IMMOVABLE TANGIBLE CAPITAL ASSETS PER ASSET REGISTER FOR THE YEAR ENDED 31 MARCH 2016

BUILDINGS AND OTHER FIXED STRUCTURES

RECIPES, FORMULAE, PROTOTYPES, DESIGNS, MODELS

SERVICES AND OPERATING RIGHTS

Capital Work-in-progress (Effective 1 April 2016)

TOTAL INTANGIBLE CAPITAL ASSETS

Relating to 20WW/XX (affecting the opening balance)

MOVEMENT IN INTANGIBLE CAPITAL ASSETS PER ASSET REGISTER FOR THE YEAR ENDED 31 MARCH 2015

MASTHEADS AND PUBLISHING TITLES

PATENTS, LICENCES, COPYRIGHT, BRAND NAMES, TRADEMARKS

Page 225: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

224

Additions

41.1

Cash Non-cash

(Capital work-in-progress

current costs and finance

lease payments)

Received current, not paid (Paid

current year, received prior

year Total

R'000 R'000 R'000 R'000 R'00033 725 - (32 186) - 1 539

Dwellings - Non-residential buildings - Other fixed structures 33 725 - (32 186) 1 539

HERITAGE ASSETS - - - - - Heritage assets -

LAND AND SUBSOIL ASSETS - - - - - Land -

-

33 725 - (32 186) - 1 539

Disposals41.2

Sold for cash Non-cash disposal Total disposals Cash received

Actual

R'000 R'000 R'000 R'000- - - -

Dwellings - Non-residential buildings - Other fixed structures -

HERITAGE ASSETS - - - - Heritage assets -

LAND AND SUBSOIL ASSETS - - - - Land -

-

- - - -

Movement for 2014/15

41.3 Opening balance

Prior period error Additions Disposals

Closing balance

R'000 R'000 R'000 R'000 R'000

- - 47 256 - 47 256 Dwellings - - - - Non-residential buildings - - - - Other fixed structures - 47 256 - 47 256

HERITAGE ASSETS - - - - - Heritage assets - - - -

LAND AND SUBSOIL ASSETS - - - - - Land - - - -

- - - -

- - - -

- - 47 256 - 47 256

Mineral and similar non-regenerative resources

Capital Work-in-progress (Effective 1 April 2016)

TOTAL IMMOVABLE TANGIBLE CAPITAL ASSETS

BUILDINGS AND OTHER FIXED STRUCTURES

Mineral and similar non-regenerative resources

TOTAL DISPOSAL OF IMMOVABLE TANGIBLE CAPITAL ASSETS

MOVEMENT IN IMMOVABLE TANGIBLE CAPITAL ASSETS PER ASSET REGISTER FOR THE YEAR ENDED 31 MARCH 2015

BUILDINGS AND OTHER FIXED STRUCTURES

ADDITIONS TO IMMOVABLE TANGIBLE CAPITAL ASSETS PER ASSET REGISTER FOR THE YEAR ENDED 31 MARCH 2016

BUILDINGS AND OTHER FIXED STRUCTURES

Mineral and similar non-regenerative resources

TOTAL ADDITIONS TO IMMOVABLE TANGIBLE CAPITAL ASSETS

The Work in Progress includes R 7,574M for contractors fees with the balance of R 24,612M for fixed structures at TSHW, with R8,116M of the WIP relating to road contruction in Thomeng Village

DISPOSALS OF IMMOVABLE TANGIBLE CAPITAL ASSETS PER ASSET REGISTER FOR THE YEAR ENDED 31 MARCH 2016

Page 226: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

225

41.3.1 Prior period error Note 2014/15R'000

Nature of prior period error

-

Relating to 2014/15 -

Total -

Immovable assets valued at R1

41.4

Buildings and other

fixed structures

Heritage assets

Land and subsoil assets Total

R R R RR1 Immovable assets -

- - - -

Buildings and other

fixed structures

Heritage assets

Land and subsoil assets Total

R R R RR1 Immovable assets - - - -

- - - -

Immovable assets written off41.5 IMMOVABLE ASSETS WRITTEN OFF FOR THE YEAR ENDED 31 MARCH 2016

Buildings and other

fixed structures

Heritage assets

Land and subsoil assets Total

R'000 R'000 R'000 R'000Immovable assets written off -

- - - -

IMMOVABLE ASSETS WRITTEN OFF FOR THE YEAR ENDED 31 MARCH 2015

Buildings and other

fixed structures

Heritage assets

Land and subsoil assets Total

R'000 R'000 R'000 R'000Immovable assets written off - - - -

- - - -

S42 Immovable assets

41.6 No of Assets Value of AssetsR'000

BUILDINGS AND OTHER FIXED STRUCTURES - - DwellingsNon-residential buildingsOther fixed structures

HERITAGE ASSETS - - Heritage assets

LAND AND SUBSOIL ASSETS - - LandMineral and similar non-regenerative resources

TOTAL - -

Assets subjected to transfer in terms of S42 of the PFMA - 2015/16

TOTAL

IMMOVABLE ASSETS VALUED AT R1 IN THE ASSET REGISTER AS AT 31 MARCH 2015

TOTAL

TOTAL IMMOVABLE ASSETS WRITTEN OFF

TOTAL IMMOVABLE ASSETS WRITTEN OFF

IMMOVABLE ASSETS VALUED AT R1 IN THE ASSET REGISTER AS AT 31 MARCH 2016

Relating to 20WW/XX (affecting the opening balance)

Page 227: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

226

2015/16 2014/1541.7 Immovable assets additional information Note

a Unsurveyed land

Estimated completion date Annexure 9 Area Area

-

b Properties deemed vested Annexure 9 Number NumberLand parcels - Facilities

- - - - - - -

c Facilities on unsurveyed landDuration of use Annexure 9 Number Number

- - - - - - -

d Facilities on right to use landDuration of use Annexure 9 Number Number

- - - - - - -

e Agreement of custodianship Annexure 9 Number NumberLand parcels - Facilities -

- - - - - - -

Storage facilitiesOther

Other

SchoolsClinicsHospitalsOffice buildingsDwellings

SchoolsClinicsHospitalsOffice buildingsDwellingsStorage facilities

ClinicsHospitalsOffice buildingsDwellingsStorage facilitiesOther

HospitalsOffice buildingsDwellingsStorage facilitiesOther

Schools

SchoolsClinics

Page 228: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

227

42 Principal-agent arrangements2015/16 2014/15

42.1 Department acting as the principal Fee paidR'000 R'000

222 043 78 174 - -

Total 222 043 78 174

42.2 Department acting as the agent

42.2.1 Revenue received for agency activities 2015/16 2014/15R'000 R'000

- - -

Total - -

42.2.2 Reconciliation of funds and disbursements - 2015/16

Total funds received

Expenditure incurred

against fundsR'000 R'000

Total - -

42.2.3 Reconciliation of carrying amount of receivables and payables - 2015/16Receivables

Opening balance

Revenue principal is entitled to

Less: Write-offs/settlement

s/waivers

Cash received on

behalf of principal

Closing balance

R'000 R'000 R'000 R'000 R'000

- - -

- - - - -

Payables

Opening balance

Expenses incurred on

behalf of principal

Cash paid on behalf of principal

Closing balance

R'000 R'000 R'000 R'000

- - -

- - - - TOTAL

TOTAL

Name of entity

Name of entity

The department entered into a bindng agreement with the contractor to provide services to the farmers of the department. The contractor does own procurement using READ. provided supplier database as well as own suppliers. Contractor is not exposed to any variability in terms of the agreement and claims at a fixed rate as agreed in the contract. Part of the funds received by the contractor will realise inmto goods or services during the financial year 2016/17.

Include a list of the entities for which the department acts as an agent and the amounts received for these agency duties

AgriDelight

Category of revenue/expenditure per arrangement

Page 229: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

228

43 Change in accounting estimate

Value derived using the original estimate

Value derived using the amended estimate

R-value impact of change in estimate

Value derived using the original estimate

Value derived using the amended estimate

R-value impact of change in estimate

Value derived using the original estimate

Value derived using the amended estimate

R-value impact of change in estimate

Accounting estimate change 3: Provide a description of the change in estmate

Line item 1 affected by the change

Line item 2 affected by the change

Line item 3 affected by the change

Line item 4 affected by the change

Line item 5 affected by the change

Line item 1 affected by the change

Line item 2 affected by the change

Line item 3 affected by the change

Line item 4 affected by the change

Line item 5 affected by the change

Line item 2 affected by the change

Line item 3 affected by the change

Line item 4 affected by the change

Line item 5 affected by the change

Accounting estimate change 2: Provide a description of the change in estmate

During the year the following changes were made to the estimations employed in the accounting for transactions,assets, liabilities, events and circumstances

Accounting estimate change 1: Provide a description of the change in estmate

Line item 1 affected by the change

Page 230: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

229

44 Prior period errors

44.1 Correction of prior period errors 2014/15Note R'000

Net effect -

Net effect -

Net effect -

Net effect -

45 INVENTORY (Effective 1 April 2017) 2015/16 2014/15Note R'000 R'000

Inventory Annexure 6Opening balance - Add/(Less): Adjustments to prior year balances - Add: Additions/Purchases - Cash - Add: Additions - Non-cash - (Less): Disposals - (Less): Issues - Add/(Less): Adjustments - Closing balance - -

Liabilities: (e.g. Payables current, Voted funds to be surrendered, Commitments, Provisions, etc.)

Assets: (e.g. Receivables, Investments, Accrued departmental revenue, Movable tangible capital assets, etc.)

Revenue: (e.g. Annual appropriation, Departmental revenue, Aid assistance, etc.)

Expenditure: (e.g. Compensation of employees, Goods and services, Tangible capital assets, etc.)

Page 231: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

230

47 STATEMENT OF CONDITIONAL GRANTS RECEIVED

NAME OF GRANT

Division of Revenue

Act/Provincial Grants

Roll Overs DORA Adjustments

Other Adjustment

s

Total Available

Amount received by department

Amount spent by department

Under / (overspending)

% of available funds spent

by dept

Division of Revenue Act

Amount spent by department

R'000 R'000 R'000 R'000 R'000 R'000 R'000 R'000 % R'000 R'000 LAND CARE 7 971 7 971 7 971 7 346 625 92% 8 140 7 655 CASP 195 066 7 667 202 733 202 733 202 732 1 100% 180 215 169 379 ILLIMA/LETSEMA 50 337 50 337 50 337 46 296 4 041 92% 46 388 43 457 EPWP 6 077 6 077 5 678 6 146 (69) 108% 4 611 4 212

- - - - - - - - - - - -

259 451 7 667 - - 267 118 266 719 262 520 4 598 239 354 224 703

NORTH WEST: RURAL, ENVIRONMENT AND AGRICULTURAL DEVELOPMENTNotes to the Annual Financial Statements

GRANT ALLOCATION SPENT 2014/15

Departments are reminded of the DORA requirement to certify that all transfers in terms of this Act were deposited into the primary bank account of the province or, where appropriate, into the CPD account of a province.

ANNEXURE 1BSTATEMENT OF TRANSFERS TO DEPARTMENTAL AGENCIES AND ACCOUNTS

2014/15

DEPARTMENT/AGENCY/ACCOUNT

Adjusted appropriation

Roll Overs Adjustments Total Available

Actual Transfer

% of Available funds

transferred

Appro-priation Act

R'000 R'000 R'000 R'000 R'000 % R'000NWP&TB - - - - - 1 320

- - - - - - - - -

Total - - - - - 1 320

NORTH WEST: RURAL, ENVIRONMENT AND AGRICULTURAL DEVELOPMENTAnnexures to the Annual Financial Statements

TRANSFER ALLOCATION TRANSFER

Page 232: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

231

ANNEXURE 1GSTATEMENT OF TRANSFERS TO HOUSEHOLDS

2014/15

HOUSEHOLDS

Adjusted appropriation

Act

Roll Overs Adjustments

Total Available

Actual Transfer

% of Available

funds transferred

Appro-priation Act

R'000 R'000 R'000 R'000 R'000 % R'000TransfersFarmers 240 357 7 667 248 024 276 376 111% 229 450

Social Benefit 3 323 3 323 5 849 176% 4 838

Claim against the state - - 2 851 -

243 680 7 667 - 251 347 285 076 234 288

Subsidies- - - -

- - - - - -

Total 243 680 7 667 - 251 347 285 076 234 288

NORTH WEST: RURAL, ENVIRONMENT AND AGRICULTURAL DEVELOPMENTAnnexures to the Annual Financial Statements

TRANSFER ALLOCATION EXPENDITURE

Page 233: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

232

ANNEXURE 3ASTATEMENT OF FINANCIAL GUARANTEES ISSUED AS AT 31 MARCH 2016 - LOCAL

GUARANTOR INSTITUTION

Guarantee in respect of Original guaranteed

capital amount

Opening balance 1 April 2015

Guarantees draw downs during the

year

Guaranteed repayments/ cancelled/ reduced/ released

during the year

Revaluations

Closing balance 31 March 2016

Guaranteed interest for

year ended 31 March 2016

Realised losses not

recoverable i.e. claims paid out

R'000 R'000 R'000 R'000 R'000 R'000 R'000 R'000Motor vehicles

-

-

Subtotal - - - - - - - -

HousingABSA Molatlhegi KS 24 24

NEDBANK Mutlaneng RD 40 40 -

-

-

Subtotal - 64 - 40 - 24 - -

Other-

-

-

Subtotal - - - - - - - -

Total - 64 - 40 - 24 - -

STATEMENT OF FINANCIAL GUARANTEES ISSUED AS AT 31 MARCH 2016 - FOREIGN

GUARANTOR INSTITUTION

Guarantee in respect of Original guaranteed

capital amount

Opening balance 1 April 2015

Guarantees draw downs during the

year

Guaranteed repayments/ cancelled/ reduced/ released

during the year

Revaluations

Closing balance 31 March 2016

Guaranteed interest for

year ended 31 March 2016

Realised losses not

recoverable i.e. claims paid out

R'000 R'000 R'000 R'000 R'000 R'000 R'000 R'000Motor vehicles

-

-

-

-

-

Subtotal - - - - - - - -

Housing-

-

-

-

-

Subtotal - - - - - - - -

Other-

-

-

-

-

-

Subtotal - - - - - - - -

Total - - - - - - - -

NORTH WEST: RURAL, ENVIRONMENT AND AGRICULTURAL DEVELOPMENTAnnexures to the Annual Financial Statements

ANNEXURE 3A (continued)

Page 234: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

233

ANNEXURE 3BSTATEMENT OF CONTINGENT LIABILITIES AS AT 31 MARCH 2016

NATURE OF LIABILITY Opening balance 1

April 2015

Liabilities incurred during

the year

Liabilities paid/ cancelled/

reduced during the year

Liabilites recoverable

(Provide details

hereunder)

Closing balance

31 March 2016

R'000 R'000 R'000 R'000 R'000Claims against the departmentSeasons Find 3 000 3 000

Catherine Janse van Rensberg 750 750

-

Subtotal 3 750 - - - 3 750

Environmental liability-

-

Subtotal - - - - -

Other-

-

-

Subtotal - - - - -

TOTAL 3 750 - - - 3 750

ANNEXURE 3B (continued)STATEMENT OF CONTINGENT LIABILITIES AS AT 31 MARCH 2016

Nature of liabilities recoverableMovement

during the year

Closing balance

31 March 2016R'000 R'000 R'000

-

-

-

-

-

-

Total - - -

NORTH WEST: RURAL, ENVIRONMENT AND AGRICULTURAL DEVELOPMENT

Annexures to the Annual Financial Statements

Details of liability and recoverablity

Page 235: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

234

ANNEXURE 4CLAIMS RECOVERABLE

GOVERNMENT ENTITY 31/03/2016 31/03/2015 31/03/2016 31/03/2015 31/03/2016 31/03/2015

Receipt date up to six (6) working

days after year end Amount

R'000 R'000 R'000 R'000 R'000 R'000 R'000DEPARTMENTSSASSA - Molakeng K.J 6 6 6 6

Dept. of Econ Dev, Tourism & Env Affairs (FS) - Moroke T.M 6 6 -

Agric & Rual Development (Gauteng) - Talakasi A.V 9 9 -

Dept. of Public Works & Transport (NW) - Mothupi P.J 197 197 -

- -

- -

- - 218 6 218 6 -

OTHER GOVERNMENT ENTITIES- -

- -

- -

- -

- - - - - -

Total - - 218 6 218 6

Cash in transit at year end 2015/16*

NORTH WEST: RURAL, ENVIRONMENT AND AGRICULTURAL DEVELOPMENTAnnexures to the Annual Financial Statements

Confirmed balance outstanding

Unconfirmed balance outstanding

Total

Page 236: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

235

ANNEXURE 5INTER-GOVERNMENT PAYABLES

GOVERNMENT ENTITY 31/03/2016 31/03/2015 31/03/2016 31/03/2015 31/03/2016 31/03/2015

Payment date up to six (6)

working days before year end Amount

R'000 R'000 R'000 R'000 R'000 R'000 R'000DEPARTMENTSCurrentDCS&TM(NW) 4 199 - - 4 199

Provincial Treasury (NW) 63 2 002 2 002 63

Public Works(NW) 67 10 10 67

Provincial Treasury (NW) 1 160 - - 1 160

Social Development (NW) 70 70 -

Agriculture and Rural Development (FS) 68 68

- -

Subtotal - 5 489 2 151 - 2 151 5 489 -

Non-current- -

- -

- -

- -

- -

- -

Subtotal - - - - - - -

Total Departments - 5 489 2 151 - 2 151 5 489 -

OTHER GOVERNMENT ENTITYCurrentDED 31 31 -

- -

- -

- -

- -

- -

- -

- -

- -

- -

Subtotal - - 31 - 31 -

Non-current- -

- -

- -

- -

- -

- -

- -

- -

- -

- -

Subtotal - - - - - -

Total Other Government Entities - - 31 - 31 -

TOTAL INTERGOVERNMENTAL - 5 489 2 181 - 2 181 5 489

Cash in transit at year end 2015/16*

NORTH WEST: RURAL, ENVIRONMENT AND AGRICULTURAL DEVELOPMENTAnnexures to the Annual Financial Statements

Confirmed balance outstanding

Unconfirmed balance outstanding

Total

Page 237: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

236

ANNEXURE 7

Movement in Capital Work-in-Progress

Opening balance

Current Year Capital WIP

Completed Assets

Closing balance

R'000 R'000 R'000 R'000- - - -

Heritage assets -

- - - -

Transport assets -

Computer equipment -

Furniture and office equipment -

Other machinery and equipment -

- - - -

Specialised military assets -

- - - -

Biological assets -

10 000 32 186 8 584 50 770 Dwellings - Non-residential buildings - Other fixed structures 10 000 32 186 8 584 50 770

- - - -

Land -

-

- - - -

Computer Software -

- - - -

Mastheads and publishing titles -

- - - -

Patents, Licences, Copyright, Brand names, Trademarks -

- - - -

Recipes, formulae, prototypes, designs, models -

- - - -

Services and operating rights -

10 000 32 186 8 584 50 770

MOVEMENT IN CAPITAL WORK-IN-PROGRESS FOR THE YEAR ENDED 31 MARCH 2016

HERITAGE ASSETS

MACHINERY AND EQUIPMENT

SPECIALISED MILITARY ASSETS

BIOLOGICAL ASSETS

BUILDINGS AND OTHER FIXED STRUCTURES

LAND AND SUBSOIL ASSETS

Mineral and similar non-regenerative resources

COMPUTER SOFTWARE

MASTHEADS AND PUBLISHING TITLES

PATENTS, LICENCES, COPYRIGHT, BRAND NAMES, TRADEMARKS

RECIPES, FORMULAE, PROTOTYPES, DESIGNS, MODELS

SERVICES AND OPERATING RIGHTS

TOTAL

Page 238: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

237

Opening balance

Prior period errors

Current Year Capital WIP

Completed Assets

Closing balance

R'000 R'000 R'000 R'000 R'000- - - - -

Heritage assets -

- - - - -

Transport assets -

Computer equipment -

Furniture and office equipment -

Other machinery and equipment -

- - - - -

Specialised military assets -

- - - - -

Biological assets -

- - - - -

Dwellings -

Non-residential buildings -

Other fixed structures -

- - - - -

Land -

-

- - - - -

Computer Software -

- - - - -

Mastheads and publishing titles -

- - - - -

Patents, Licences, Copyright, Brand names, Trademarks -

- - - - -

Recipes, formulae, prototypes, designs, models -

- - - - -

Services and operating rights -

- - - - -

MOVEMENT IN CAPITAL WORK-IN-PROGRESS FOR THE YEAR ENDED 31 MARCH 2015

HERITAGE ASSETS

MACHINERY AND EQUIPMENT

SPECIALISED MILITARY ASSETS

BIOLOGICAL ASSETS

BUILDINGS AND OTHER FIXED STRUCTURES

LAND AND SUBSOIL ASSETS

Mineral and similar non-regenerative resources

COMPUTER SOFTWARE

MASTHEADS AND PUBLISHING TITLES

PATENTS, LICENCES, COPYRIGHT, BRAND NAMES, TRADEMARKS

RECIPES, FORMULAE, PROTOTYPES, DESIGNS, MODELS

SERVICES AND OPERATING RIGHTS

TOTAL

Page 239: ANNUAL REPORT - Provincial Government€¦ · AMP Agricultural Master Plan APP Annual Performance Plan BPDM ... GIS Geographic Information System HEQF ... Agriculture was established

ANNUAL REPORTANNUAL REPORT

2015/20162015/2016

“Together we move Bokone Bophirima Forward”

Rural Environment and Agricultural Development - Nw_read

Layout and Design: Communication Services, Read

AGRICENTRE BUILDING Cnr Dr. James Moroka Drive & Stadium Road

Private Bag x 2039, Mmabatho, 2735

Tel: (018) 389 5111www.nwpg.gov.za / agriculture

PR291/2016ISBN: 978-0-621-44863-4