41
Report on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

Report on the

ANNUAL REVIEW

ON THE WORKING OF

PUBLIC WORKS DIVISIONS OF ASSAM

for the Year 2012-13

PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

Page 2: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

ii

Table of contents

Para

DETAILED OBSERVATIONS

Page No

A. PREFACE iii

B REVIEW

PART I

(A&E) WING

iv

PARA.1

GENERAL iv

PARA.2 A. Delay in submission of Divisional

monthly accounts of PWD

B. Accounts of PWD Divisions entrusted to

Karbi Anglong, North Cacher Hills and

Bodoland Territorial Councils.

v-vi

PARA.3 Defects in preparation of monthly accounts vii-viii PARA.4 Verification & reconciliation of Departmental

figures and their incorporation in the books of

PAG

ix

PARA.5 Cash Settlement Suspense Accounts x PARA.6 Adjustment of WMC Memos x PARA.7 Non-submission of Form-51 SST xi PARA.8 Expenditure on construction & maintenance

of National Highways and reimbursement

thereof

xii

C. REVIEW PART-II

AUDIT WING xiii-xv

ANNEXURES xvi-xxxviii

Page 3: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

iii

PREFACE

This is a review on the working of various Work Divisions in Assam for the year

2012-13. This review is prepared to bring out among other things, common and

persistent defects and omission in the maintenance of initial accounts, and also other

financial irregularities noticed during Central and Local Audit.

The irregularities and omissions highlighted in the review are illustrative and not

exhaustive. These are being brought to the notice of the Government and concerned

Heads of Department from time to time for their necessary guidance and effective

remedial measure so that the same things are not repeated subsequently.

The review consists of two parts. Part-I incorporates the irregularities, defects and

omissions noticed during checking and booking of expenditure reflected in monthly

accounts received from various Work Divisions. Part-II depicts common types of

irregularities observed during Central Audit, Details of Audit Notes and Inspection

Report and important irregularities noticed in the local inspection.

The Government may consider taking appropriate measures to rectify the

deficiencies pointed out in the review and implement the best accounting practices to

enable increase efficiency and accuracy of accounts being maintained by the

Divisions.

Guwahati

25th

August‟2014 ( SHANTANU BASU )

Principal Accountant General (A&E)

Assam

Page 4: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

iv

B.REVIEW PART-I

PARA.1 GENERAL.

There were 263 Works Divisions in the state of Assam during 2012-13.

Out of these 263 Work Divisions, 54 Divisions located in 3 District Council Areas

comprising Karbi Anglong, Dima Hasao and Bodoland furnished 2(two) sets of

accounts one for the fund received from the Council Secretariat and the other against

the F.O.C. received from the State Government against NTA Budget. Thus,

317(263+54) monthly accounts were received per month from those Work Divisions

during 2012-13. The number of Divisional accounts department wise at the end of

March 2013 were as follows:-

SL No. Department Number of Division

1 PWD Roads (NTA) 92

2 PWD Border Road(NTA) 1

3 PWD Building(NTA) 20

4 PWD(R&B) Hills(TA) 21

5 Inland Water Transport(NTA) 3

6 Public Health Engineering(NTA) 44

7 Public Health Engineering(TA) 12

8 Water Resource(NTA) 36

9 Water Resource(TA) 5

10 Irrigation(NTA) 67

11 Irrigation(TA) 16

Total 317

Page 5: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

v

PARA.2(A) Delay in submission of Monthly Accounts

As per provision of para 22.4.15 of the CPWA Code read with Article 230 of the

Account Code Vol.-III adopted by the Government of Assam, the monthly accounts of

Work Divisions are due to submit to the Principal Accountant General(A&E)‟s Office

within 10th

of the following month to which the transactions relate.

It is noticed that except a very few divisions most of the divisions did not adhere

to the target in submission of their monthly accounts to the Principal Accountant

General(A&E) Assam. The delays ranged between 02 to 136 days. The delay in receipt of

monthly accounts adversely affected the time schedules fixed for compilation and closing

of accounts, and also led to exclusion of a number of accounts from the Civil Accounts

rendered to the State Government each month. In addition, due to delay in receipt of

monthly accounts from accounts rendering units, the actual financial position of the State

Government could not be reflected in the Monthly Civil Accounts which ultimately

affected the timely finalization of the Finance and Appropriation Accounts of the State

Government for the F.Y. 2012-13.

It is observed that the position was not improved despite the fact had been

repeatedly commented in the previous Annual Reviews on the failure of the Heads of

Departments and the Divisions of works in timely submission of Monthly accounts. The

Principal Accountant General (A&E) Assam had also been periodically reminding the

Principal Secretary of the concerned departments in this regard. But hardly any

accountability of the management and government in respect of public funds spent by

those Divisions was observed.

It is therefore, suggested that effective steps need to be taken so that the

submission of monthly accounts to the Principal Accountant General (A&E) be

streamlined and monitored, and necessary administrative action be initiated against the

defaulting divisions most urgently. A list of defaulting divisions shown in ANNEXUE-I

below.

Page 6: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

vi

ANNEXUE-I

Statement showing month-wise and number of days-wise delay in submission of

Monthly Accounts in respect a few defaulting divisions:

Sl

No

Divisions 4/12 5/12 6/12 7/12 8/12 9/12 10/12 11/12 12/12 1/13 2/13 3/13

1 Goalpara Invest (IRR) 56 25 51 20 23 54 25 4 54 23 112 82

2 Silchar (IRR) 104 73 43 12 28 20 13 56 25 92 66 33

3 Biswanath (IRR) 120 89 59 28 20 36 100 70 91 94 59 28

4 Jorhat Invest(IRR) 32 15 8 12 11 48 17 136 105 74 46 15

5 Bokajan (IRR) 41 10 29 32 52 22 135 105 74 43 86 55

6 Store&Work PHE 57 27 27 52 43 64 28 54 20 7 20 29

7 Sivsagar PHE 42 11 82 59 20 95 64 34 65 6 2 37

8 Lakhimpur PHE 110 80 50 20 5 109 74 44 14 12 57 31

9 Dhakuwakhana WR 84 54 24 63 32 95 32 62 65 34 6 66

10 Silchar WR 34 3 29 35 13 38 18 33 43 74 17 23

11 Barpeta PHE 9 12 15 64 36 65 44 44 19 19 58 56

12 Dibrugarh IWT 48 17 53 22 51 20 16 16 39 40 32 47

13 Karimganj NEC 39 55 74 38 51 21 20 133 102 71 43 42

14 Chirang PWD(R&B) 35 46 29 71 66 11 59 28 28 19 29 22

15 Diphu Road 33 74 18 46 68 37 26 79 48 17 24 77

16 Bokulia Road 77 29 38 46 50 20 16 38 7 22 20 9

17 Maibang Roads 29 54 66 111 134 104 73 57 26 57 29 47

(B) Monthly Accounts of District Autonomous Councils of Karbi Anglong, Dima

Hasao and Boroland.

As per arrangement with Government, the Principal Accountant General (A&E)

compiles 54 Divisional Monthly Accounts entrusted to three District Councils namely

Karbi Anglong =19 divisions, Dimahasao=10 divisions and Boroland Territorial

Council=25. The Divisional Officers under the three District Councils submit 2(two) sets

of monthly accounts each - one for the expenditure incurred against F.O.C. released by

the State Government from NTA General Budget called State Sector Accounts and

another for the expenditure incurred against fund released by respective council from

Council Budget called council accounts.

Page 7: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

vii

The submission of monthly accounts by the divisions under District Councils

has been observed most irregular that had caused inordinate delay in closing and

submission of annual accounts to the State Government for 2012-13.

There is an urgent need for the Government to take effective measures for

ensuring timely submission of monthly accounts by the District Councils so as to enable

the Principal Accountant General(A&E) Assam to incorporate the council accounts in the

month to which such accounts actually relate.

Para 3 Defects in preparation of Monthly Accounts.

As per prescribed forms given in Account Code Volume-III and Book of

CPWA Code, the monthly accounts rendered to the Principal Accountant General (A&E)

for incorporation in State Account for submission to the State Government every month

should invariably be complete and correct in all respects.

It was observed that the accounts received from Divisional Officers contained

many common omissions and mistakes. A few common defects appeared in the monthly

accounts were as follows:-

1. Whether the expenditure incurred belonged to charged or voted was not shown.

2. The classification shown in Classified Abstract(s) i.e. Form-74 and in the

Schedule of Work Expenditure i.e. Form-64 were either incomplete or incorrect.

3. Expenditures were booked without any reference to Sanctioned Estimate and

Budget Grant, and in Schedule of Work Expenditure i.e. Form-64 details

description of works and progressive expenditures were not shown in complete

shape.

4. Current year allotment of funds was not shown in the schedule of work

expenditure against each work, resulting in lack of control and watch over

progress of expenditure at divisional level.

5. Part-II of Schedule of Deposit was not submitted causing inconvenient to

ascertain/check plus-minus of the deposit fund under various classes of deposit

with reference to the item of Deposit Register.

6. Payee‟s acknowledgement against the payment made through work bill/vouchers

was not obtained from contractor‟s concerned in many cases in contravention of

codel provision.

Page 8: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

viii

7. Head of accounts under which payments have been made were not shown on the

body of the bills/vouchers submitted along with the monthly accounts.

8. Schedule of Settlement with Treasuries-SST (Form-51) were not submitted even

after closure of divisional monthly accounts.

9. Details of Memo of Miscellaneous Cash Receipt paid into treasuries and

certificate of Cash Balance were not noted in the appropriate column in Form-80.

10. Security Deposit Money against on going work was not deducted from contractor

bills and credited under Class-II deposit in terms of ClauseI(B) of Conditions of

Contracts of APWM & Rule 260 of AFR.

11. Part payment of Running Accounts bill was made on photo copy of the said bill

without preparing proportionate bill showing quantity of work done multiplied by

the rate equal to amount of the proportionate bill to be paid.

12. Regular work of PWD Road divisions were quite often shown under deposit

works by funding from outside of PWD Budget (Finance-Entry Tax) which is not

familiar to PWD system of accounts.

13. In some cases, lump sum money received from other than Government sources

were not bought into accounts of the PWD Division in the month in which it was

received. Sometime the funds for deposit works were being received from

Government sources even after completion of the deposit work, which is not

permissible as per PW Code.

14. At the end of 2012-13 there was a closing balance under Major Head-8671

Departmental Balances amounting to Rs18,32.42 Lakhs which indicate that some

payments items were not reflected against respective Major heads in the Finance

Accounts of the State for 2012-13.

15. Transfer of fund from PW work head without furnishing name of work and

sanctioned estimate as per requirement of Form-64; but charged to final work

head.

Some of these omissions and defects had been pointed out in earlier annual

reviews also, but no action appeared to have been taken to regularize the same. It is

suggested that the Divisional Head and the Divisional Accounts Officers are to be

suitably instructed to rectify the aforesaid persistent defects in accounts.

Page 9: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

ix

Para.4 Verification and Reconciliation of Departmental figures with PAG’s figures.

As per rules, all Heads of the Works Departments are required to verify and

reconcile of their departmental figures of receipt and expenditure with the figures booked

by the Principal Accountant General (A&E) before closure of the accounts for a

particular year to ensure correctness.

But it is regular phenomena that except a few, most of the departments did not

come forward for verification and reconciliation of their departmental figures with the

figures booked by the Principal Accountant General (A&E). The position of verification

& reconciliation during 2012-13 is as stated below:-

Fully reconciled Partially Reconciled Not reconciled

l. Chief

Engineer PHE

1.Chief Engineer PWD(Roads)

2.Chied Engineer PWD(Building)

1.Chief Engineer WR

2.Addl. C.E. PWD(R&B),Diphu

3.Addl C.E. PWD(R&B) Halflong

4.Director Of IWT

5.Chief Engineer PWD( Boarder )

6.Chief Engineer Irrigation

1 2 6

Para.5 Cash Settlement Suspense Account (CSSA)

During the period under review there is still `82.73 crore(Dr.) and `15.65 crore

(Cr.), net `67.08 crores(Dr.) [`82.73 crores(Dr.) - `15.65 crore(Cr.)] is lying unadjusted

under the CSSA as on March‟2013. The amount is lying unadjusted since Sept‟1979 when

the CSSA had been discontinued. The matter has been repeatedly taken up with the

Government and Heads of the Works Departments for adjustment. Early action for

adjustment of the debit balance at the end of 2012-13 under CSSA may be taken to prevent

possible pilferage or misappropriation of store.

Page 10: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

x

Para.6 Adjustment of WMC Memos

Work Miscellaneous Clearance Memos had been already sent by the Accountant

General (A&E) Assam to various work divisions in connection with the purchases made

through the DGSD for necessary adjustment under concerned Major Heads of Accounts.

The system of purchasing goods through the DGSD had been dispensed with from 2001-

02. In spite of repeated persuasion and holding of meetings for long outstanding WMC

Memos, no satisfactory result yielded and an amount of `108,11,01,258.84 as detailed

below still remains un-adjusted till F.Y. 2012-13:

Year Amount un-adjusted

1990-91 `2,93,74,261.82

1991-92 `3,83,53,028.00

1992-93 `8,85,58,165.00

1993-94 `20,22,87,565.00

1994-95 `6,14,71,363.00

1995-96 `29,44,87,678.02

1996-97 `15,99,80,329.00

1997-98 `18,55,05,372.00

1998-99 `1,86,63,064.00

1999-00 `24,16,238.00

2000-01 `4,195.00

`108,11,01,258.84

A time bound programme is to be taken by the Government for settlement of the

long pending issue without further delay.

Page 11: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xi

Para.7 Non-submission/delayed submission of Form-50 & 51 and settlement of

remittance transaction:

Work divisions are to submit Form-50 & 51 –Schedule of Monthly Settlement with

Treasuries immediately either along with monthly account or subsequently showing detail

particulars of cheques drawn by the divisions and cheques encashed by treasuries. Also

remittances made into treasuries and remittances acknowledge by treasuries. These Forms

enable to establish irregularity, if any, while transacting Government money. It is observed

that 232 NTA & TA(State) divisions out of 263 did not furnish Form-50 & 51 to the

Principal Accountant General during F.Y. 2012-13. This has resulted in accumulation of

balances under head of accounts „8782-Cash Remittance‟etc. The position of balances as

on 31.03.2013 is as under:-

8782-Cash Remittance etc.-102 PW Remittance(Rupees in Lacs)

I- Remittance into treasuries `154.28(Dr.)

II-PW Cheques `836.65(Cr.)

The balance `154.28 Lacs(Dr) under „8782-I Remittance into Treasuries‟ represents

moneys had been remitted into treasuries by the divisions; but not acknowledged as per

treasury accounts. There should not be any outstanding balance under „I-Remittance into

treasuries‟ at the close of the financial year; but the unacknowledged remittances as on

31.03.2012 was as high as `154.28 Lacs. The reasons could be ascertained if the divisions

furnish Form-50 at the earliest.

The credit balance of `836.65 Lacs represents the amount of cheques drawn by the

divisions but not encashed in the treasuries. Due to non submission of Form-51 by the

divisions not only the concerned broadsheet could be posted and verified; but even checks

against irregular drawal, if any, could be exercised.

The matter regarding submission of Form50 & 51 deserves top priority from the

Government. The matter has been highlighted on various occasions to the State

Government as well as in earlier reviews.

Page 12: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xii

Para.8 Expenditure on maintenance of National Highways and reimbursement

thereof.

Each year National Highway Divisions of the State undertake the work of repair

and maintenance of the National Highways on behalf of the Ministry of Surface Transport,

Government of India. Expenditure incurred on the works is sanctioned by the Ministry of

Surface Transport and initially met from the cash balance of the State Govt. by debiting to

„8658 Suspense Account-101 PAO Suspense- Item adjustable by Regional PAO, Ministry

of Surface Transport, Govt. of India‟. Claim for reimbursement of State expenditure on

National Highways are preferred by the Principal Accountant General(A&E) to the

Regional PAO, Ministry of Surface Transport(NH), Guwahati on the basis of supporting

vouchers and documents received along with the monthly accounts submitted by NH

Divisions.

The Regional PAO scrutinize the claims and reimburses all such claims which are

found admissible to the State Government through the Principal Accountant General(A&E)

by cheque/Bank Draft who in turn deposit the same to the state exchequer. However,

sometimes a part of the claims is kept withheld. During the year 2011-12 an amount of

`43,34,921/- of Silchar NH Division for the month of Feb‟2012 has been withheld due

wanting of Spill over sanction from the Ministry relating to FDR works placed for

reimbursement which is yet to be settled. Outstanding amount receivable from the RPAO,

Guwahati for 2012-13 is `20,87,10,357/-as on date out of `31,13,10,357/-. The matter is

under correspondence. However, vouchers are treated inadmissible in account for

following reasons also:

a) Expenditure is in excess of sanction

b) Expenditure on items not related to National Highway works

c) Expenditure which are hanged for court case are included in accounts without

obtaining prior sanction from the Ministry.

Further, the expenditure incurred on items other than NH but incorporated as NH

expenditure are required to be written back in PAG‟s Book. Inadmissible expenditure are

transferred from „8658-101 PAO suspense‟ to the concerned service head of accounts of

the State Govt. There is an urgent need to exercise proper checks while submitting accounts

of the NH works with reference to guideline above.

Page 13: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xiii

Part-II Audit Wing

ANNUAL REVIEW ON THE WORKING OF

PUBLIC WORKS DEPARTMENT, IRRIGATION

DEPARTMENT, WATER RESOURCES DEPARTMENT, PUBLIC HEALTH

ENGINEERING DEPARTMENT ETC. FOR THE

YEAR 2012-13

1.Maintenance of Tools & Plant Ledger:-Information gathered in respect of 36 divisions, out of

171 divisions, which were required to maintain Tools and Plant Ledger during the year 2012-13

disclosed the following points:-

(a) Tools and Plants Ledger showing the receipts, issue and balances of T & P articles (Category

wise /itemwise) are required to be closed at the end of September each year but except 19

Division the same was not closed by any of the enlisted divisions including

16 Divisions where neither ledger was maintained nor records were made available to audit.

Details shown in Annexure –„A‟.

(b) Physical verification of available balance of T & P articles was in arrears upto

2012-13 in 36 enlisted Divisions including 21 Division where either such verification was not

done at all or records in respect of physical verification was not made available to audit. Enlisted

divisions are shown in Annexure –B.

2. Priced Store Ledger:-

(a) According to codal provisions, “Priced Store Ledger” showing receipts, issue & balances of

store (item wise) of various works Divisions are required to be maintained for both quantities and

values and should be closed at the end of each month by every works division holding stock and

stores .

Out of 36 Divisions, which held the stock of stores in 2012-13 ,details of stock

transactions were gathered from 36 numbers of divisions and it was found that in

3 Divisions Priced Store Ledger were closed upto March 2012 and in 18 divisions either such

Ledger was not maintained or the records were not made available to audit. Details are given in

Annexure –C.

(b) Excess value of Stock over Reserve Stock Limit:-

As per codal provision, reserve stock should be maintained only after limit is fixed by the

State Government .Out of 36 Divisions from which information have been collected, the value of

the stores held by 9 Divisions was ` 906.79 lakh as on 31-3-13 against the sanctioned reserve

stock limit of ` 91.00 lakh and thereby excess stock of ` 815.79 lakh was held by those

Page 14: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xiv

Divisions. Moreover the position relating to retention of stock exceeding the Reserve Stock Limit

could not be determined against 20 Works Divisions as either the Reserve Stock Limit or the

present value of stock could not be made available to audit.The position is shown in Annexure –

„D‟.

(c) Physical verification of stock :-Annual physical verification of stock was in arrear against 14

Divisions .Moreover, against 21 Divisions either physical verification of stock are not done or the

position was not made available to audit. Position shown in Annexure –„E‟.

3. Miscellaneous P.W.Advances:-

Amounts booked under Misc P.W.Advance represents dues recoverable from different

agencies including contractors, outside bodies etc. The clearance of outstanding balance is

necessary to depict a true picture of the accounts.

The balances outstanding under Misc .P.W.Advance against 17 Divisions amounting to `

1353 lakh is shown in Annexure –„F‟. Moreover in 19 Divisions either records are not

maintained to show unadjusted Misc .P.W.Advance or records were not made available to audit

as shown in Annexure –F.

4. Maintenance of contractor ledger:-

As per codal provisions, the contractor ledger should be maintained to show the various

payments made to the contractor i.e advance payment, secured advance, value of store materials

issued to the contractor as well as payment made to the contractor against different work bills and

adjustment made there against, etc, but either this was not maintained or update position not made

available for 11 Divisions, as shown in Annexure –„G‟.

Moreover, position regarding maintenance of Contractors‟ Ledger was not made

available to audit by 1 Division as indicated in Annexure –‘G’.

5. Maintenance of Register of works:-

As required under codal provisions, the Register of works should be maintained to show

sub-head wise sanctioned amount in respect of Scheme/Project work and the expenditure incurred

thereagainst together with monthly/annual progressive total but this was either not maintained or

upto date maintenance was not done in 8 Divisions. Details are furnished in Annexure –„H‟.

Moreover, position regarding maintenance of Register of Works was not made available

to audit in respect of 3 Divisions .

6. Delay in settlement of remittances, transactions and submission of Form-51

Divisional officers are required to effect reconciliation with treasuries in respect of

cheque drawn and amount remitted into treasury.

Page 15: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xv

But this was not done or in arrears in most of the Divisions .Position of reconciliation

with treasury in respect 36 Divisions is furnished in Annexure-1

7. Outstanding W.M.C Memos:-

W.M.C memo received by the Division from the Pr.A.G (A & E ) need to be verified and

adjusted promptly. But many divisions did not take necessary steps to adjust the outstanding

W.M.C memos valued ` 817.38 lakh relating to 16 Divisions. Details are given in Annexure –

„J‟.

8. Outstanding C.S.S.A Claims.

As per codal provision all transactions relating to service rendered or supplies made by

the division should be accounted for in “Cash Settlement Suspense Account”. On closing the

monthly account of the Division, a copy of the part-1 of Form -1 should be sent to the Division

concerned supported by all relevant vouchers. Immediately on receipt of the copy of Form-1 from

the originating Division, the responding Division should make payment by Cheque or Bank Draft

within 10 (ten) days of the receipt of the account so that at the close of the year there should

normally be no balance under this suspense account. Although the operation of C.S.S. A/c was

discontinued w.e.f 1-10-79 vide Govt.of Assams letter no. 133-97/78/53 dtd.12-07-79 ,an amount

of `` 1547.09 lakh (outward claims ` 1163.90 lakh & inward claims ` 383.19 lakh ) was found

unadjusted under C.S.S Account against 25 number of Divisions as on 31-03-13. Moreover,

though required, such records were not maintained by 1 Divisions. Detailed shown in

Annexure „K‟.

9 Settlement of outstanding Inspection Report:-

Under the provision of Rule 148 and 164 of A.P.W.D code (similar provisions

under Rule 94 and 487 of the Assam Financial Rules) the Divisional Officer is required

to take prompt action to send replies to the Audit Inspection Reports within a fortnight to

the Principal Accountant General (Audit) Assam, Guwahati for expeditious settlement of

audit objection of the Inspection Report. Those provisions were not followed by most of

the Divisional Officers, as a result of which there has been inordinate delay in settlement

of 549 outstanding Inspection Reports containing 2653 paras at the end of 31st March

„2013.

However, the process of settlement of Inspection Reports/Paras is in progress

through audit objection committee meetings as well as regular persuasion made from this

end..

Page 16: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xvi

ANNEXURE ‘A‟

STATEMENT SHOWING THE DIVISION WISE POSITION OF ARREAR IN CLOSING OF T&P:

LEDGER FOR THE YEAR 2012-13

(Table No.-1)

Sl

No Name of the Division Period I.R. No.

Year From

which closing is

in Arrear

First reply received/

Not received

1 Executive Engineer, PWD (R),

Abhayapuri Construction Divn.

(NH)

5/10 to

12/13 Eco-1.1/PWD(R)-17/12-13 Not Maintained Received

2 Executive Engineer, PWD (R),

Guwahati City Division -II

1/10 to

12/12 Eco-1.1/PWD(R)-16/12-13 April 10 Not Received

3 Executive Engineer, PWD (R),

Barpeta Rural Road Division

06/10 to

10/12 Eco-1.1/PWD(R)-10/12-13 Not Known Not Received

4 Executive Engineer, PWD (R),

Guwahati City Division -III

01/11 to

07/12 Eco-1.1/PWD(R)-02/12-13 Not Maintained Received

5 Executive Engineer, PWD (R),

North Guwahati State Road

Division

01/11 to

09/12 Eco-1.1/PWD(R)-06/12-13 September 12 Received

6 Executive Engineer, PWD (R),

Nalbari State Road Division

11/09 to

09/12 Eco-1.1/PWD(R)-05/12-13 Not Known Received

7 Executive Engineer, PWD (R),

Guwahati Road Division

06/10 to

09/12 Eco-1.1/PWD(R)-08/12-13 September 08 Received

8 Executive Engineer, PWD (R),

Guwahati City Division -I

01/12 to

12/12 Eco-1.1/PWD(R)-15/12-13 January 94 Received

9 Executive Engineer, PWD (R),

Jorhat NEC Division

11/10 to

02/12 WA-II/PWD(R)-36/12-13 30.09.03 Received

10 Executive Engineer, PWD (R),

Koliabor Rural Road

08/08 to

01/12 WA-II /PWD(R)-44/12-13 03/2012 Received

11 Executive Engineer, PWD (R),

Silchar NEC Division

10/09 to

01/12 WA-II /PWD(R)-45/12-13 01/2012 Received

12 Executive Engineer, PWD (R),

Karimganj NEC Division

05/09 to

01/12 WA-II /PWD(R)-46/12-13 Not Maintained Received

13 Executive Engineer, PWD (R),

Nagaon Rural Road Division

08/10 to

08/12 Eco-1.1/PWD(R)-03/12-13 03/2008 Received

14 Executive Engineer, PWD (R),

Nagaon Statel Road Division

02/10 to

07/12

Eco-1/PWD(R)-1/12-13/124

dt. 19.11.2012 10/2006 Received

15 Executive Engineer, PWD (R),

Morigaon Rural Road Division

08/11 to

08/12

Eco-1.1/PWD(R)-4/12-

13/1246 dt. 21.11.2012 08/2012 Received

16 Executive Engineer, PWD (R),

Hailakandi NEC Division

06/10 to

08/12

Eco-1.1/PWD(R)-07/12-

13/1345 dt. 13.12.2012 Not Known Received

17 Executive Engineer, PWD (R),

Sivasagar State Road Division

09/10 to

09/12

Eco-1.1/PWD(R)-09/12-

13/1424 dt. 28.08.2012 03/2012 Received

18 Executive Engineer, PWD (R),

Jorhat NH Division

04/10 to

10/12

Eco-1.1/PWD(R)-12/12-

13/1558 dt. 21.01.2013 11/2012 Received

19 Executive Engineer, PWD (R),

Sivasagar Rural Road Division

05/10 to

10/12

Eco-1.1/PWD(R)-11/12-

13/1645 dt. 28.01.2013 Not Known Received

20 Executive Engineer, PWD (R),

Jorhat Rural Road Division

05/10 to

11/12

Eco-1.1/PWD(R)-13/12-

13/1672 dt. 31.01.2013 Not Known Received

21 Executive Engineer, PWD (R),

Morigaon State Road Division

09/10 to

11/12

Eco-1.1/PWD(R)-14/12-

13/1730 dt. 31.01.2013 Not Known -

22 Executive Engineer, PWD (R),

Guwahati NH Division

10/11 to

02/13 Eco-1.1/PWD(B)-02/13-14 01/2002 Not Received

23 Executive Engineer, PWD (Bldg),

Guwahati Building Division-II

03/10 to

02/13 Eco-1.1/PWD(B)-05/12-13 Not Known Received

24 Executive Engineer, PWD (Bldg),

Guwahati Building Division-I

03/10 to

12/12 Eco-1.1/PWD(B)-1/12-13 10/2012 Received

25 Executive Engineer, Nagaon

Water Resource Division

04/08 to

08/12 Eco-1.1/WR-1/12-13 10/2005 Received

26 Executive Engineer, Palash Bari

Gumi Water Resource Project

Division

09/08 to

12/12 Eco-1.1/WR-2/12-13 Not Maintained Not Received

Page 17: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xvii

27 Executive Engineer, Tezpur

Water Resource Division

07/10 to

12/12 Eco-1.1/WR-3/12-13 Not Maintained Not Received

28 Executive Engineer, Nalbari

Irrigation Division

08/09 to

07/12 Eco-1.1/Irrig-1/12-13 Not Known Received

29 Executive Engineer, Guwahati

Irrigation Division

06/10to

09/12 Eco-1.1/Irrig-3/12-13 10/2011 Received

30 Executive Engineer, Pahumara

Rupahi Irrigation Division

08/10 to

10/12 Eco-1.1/Irrig-5/12-13 10/2001 Received

31 Executive Engineer, Pathsala

Irrigation Division

07/08 to

11/12 Eco-1.1/Irrig-6/12-13 09/2009 Received

32 Executive Engineer, Nagaon

Irrigation Division

03/10 to

03/12 Eco-1.1/Irrig-2/12-13 Not Maintained Not Received

33 Executive Engineer, Hailakandi

Irrigation Division

01/11 to

10/12 Eco-1.1/Irrig-4/12-13 05/2012 Received

34 Executive Engineer, Biswanath

Chariali Irrigation Division

12/09 to

12/12 Eco-1.1/Irrig-8/12-13 Not Maintained Received

35 Executive Engineer, Morigaon

Irrigation Division

08/10 to

01/13 Eco-1.1/Irrig-9/12-13 Not Maintained Received

36 Executive Engineer, Guwahati

Electrical Division (Irrigation)

10/10 to

01/13 Eco-1.1/Irrig-7/12-13 Up to date Received

Page 18: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xviii

ANNEXURE ‘B‟

TATEMENT SHOWING THE DIVISION WISE POSITION OF PHYSICAL VERIFICATION OF T&P 12-13

Sl

No Name of the Division Period I.R. No.

Position of physical verification

T&P

1 Executive Engineer, PWD (R),

Abhayapuri Construction Divn.

(NH)

5/10 to 12/13 Eco-1.1/PWD(R)-17/12-13 07-03-2007

2 Executive Engineer, PWD (R),

Guwahati City Division -II

1/10 to 12/12 Eco-1.1/PWD(R)-16/12-13 Not Done

3 Executive Engineer, PWD (R),

Barpeta Rural Road Division

06/10 to

10/12

Eco-1.1/PWD(R)-10/12-13 Not Known

4 Executive Engineer, PWD (R),

Guwahati City Division -III

01/11 to

07/12

Eco-1.1/PWD(R)-02/12-13 Not Done

5 Executive Engineer, PWD (R),

North Guwahati State Road

Division

01/11 to

09/12

Eco-1.1/PWD(R)-06/12-13 09/2012

6 Executive Engineer, PWD (R),

Nalbari State Road Division

11/09 to

09/12

Eco-1.1/PWD(R)-05/12-13 Not Done

7 Executive Engineer, PWD (R),

Guwahati Road Division

06/10 to

09/12

Eco-1.1/PWD(R)-08/12-13 Not Known

8 Executive Engineer, PWD (R),

Guwahati City Division -I

01/12 to

12/12

Eco-1.1/PWD(R)-15/12-13 Not Known

9 Executive Engineer, PWD (R),

Jorhat NEC Division

11/10 to

02/12

WA-II/PWD(R)-36/12-13 09/2003

10 Executive Engineer, PWD (R),

Koliabor Rural Road

08/08 to

01/12

WA-II /PWD(R)-44/12-13 01/2012

11 Executive Engineer, PWD (R),

Silchar NEC Division

10/09 to

01/12

WA-II /PWD(R)-45/12-13 Not Done

12 Executive Engineer, PWD (R),

Karimganj NEC Division

05/09 to

01/12

WA-II /PWD(R)-46/12-13 Not Done

13 Executive Engineer, PWD (R),

Nagaon Rural Road Division

08/10 to

08/12

Eco-1.1/PWD(R)-03/12-13 Not Done

14 Executive Engineer, PWD (R),

Nagaon Statel Road Division

02/10 to

07/12

Eco-1/PWD(R)-1/12-13/124

dt. 19.11.2012

04/2001

15 Executive Engineer, PWD (R),

Morigaon Rural Road Division

08/11 to

08/12

Eco-1.1/PWD(R)-4/12-

13/1246 dt. 21.11.2012

07/2011

16 Executive Engineer, PWD (R),

Hailakandi NEC Division

06/10 to

08/12

Eco-1.1/PWD(R)-07/12-

13/1345 dt. 13.12.2012

Not Known

17 Executive Engineer, PWD (R),

Sivasagar State Road Division

09/10 to

09/12

Eco-1.1/PWD(R)-09/12-

13/1424 dt. 28.08.2012

Not Done

18 Executive Engineer, PWD (R),

Jorhat NH Division

04/10 to

10/12

Eco-1.1/PWD(R)-12/12-

13/1558 dt. 21.01.2013

08/2008

19 Executive Engineer, PWD (R),

Sivasagar Rural Road Division

05/10 to

10/12

Eco-1.1/PWD(R)-11/12-

13/1645 dt. 28.01.2013

Not Done

20 Executive Engineer, PWD (R),

Jorhat Rural Road Division

05/10 to

11/12

Eco-1.1/PWD(R)-13/12-

13/1672 dt. 31.01.2013

Not Done

21 Executive Engineer, PWD (R),

Morigaon State Road Division

09/10 to

11/12

Eco-1.1/PWD(R)-14/12-

13/1730 dt. 31.01.2013

Not Known

22 Executive Engineer, PWD (R),

Guwahati NH Division

10/11 to

02/13

Eco-1.1/PWD(B)-02/13-14 Not Done

23 Executive Engineer, PWD (Bldg),

Guwahati Building Division-II

03/10 to

02/13

Eco-1.1/PWD(B)-05/12-13 Not Known

24 Executive Engineer, PWD (Bldg),

Guwahati Building Division-I

03/10 to

12/12

Eco-1.1/PWD(B)-1/12-13 08/2012

25 Executive Engineer, Nagaon

Water Resource Division

04/08 to

08/12

Eco-1.1/WR-1/12-13 10/2000

26 Executive Engineer, Palash Bari

Gumi Water Resource Project

Division

07/10 to

12/12

Eco-1.1/WR-2/12-13 01/2003

27 Executive Engineer, Tezpur Water

Resource Division

07/10 to

12/12

Eco-1.1/WR-3/12-13 Not Done

28 Executive Engineer, Nalbari 08/09 to Eco-1.1/Irrig-1/12-13 05/2010

Page 19: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xix

Irrigation Division 07/12

29 Executive Engineer, Guwahati

Irrigation Division

06/10to 09/12 Eco-1.1/Irrig-3/12-13 02/2002

30 Executive Engineer, Pahumara

Rupahi Irrigation Division

08/10 to

10/12

Eco-1.1/Irrig-5/12-13 02/2010

31 Executive Engineer, Pathsala

Irrigation Division

10/10 to

01/13

Eco-1.1/Irrig-7/12-13 04/1989

32 Executive Engineer, Nagaon

Irrigation Division

03/10 to

03/12

Eco-1.1/Irrig-2/12-13 Not Done

33 Executive Engineer, Hailakandi

Irrigation Division

01/11 to

10/12

Eco-1.1/Irrig-4/12-13 Not Done

34 Executive Engineer, Biswanath

Chariali Irrigation Division

12/09 to

12/12

Eco-1.1/Irrig-8/12-13 Not Done

35 Executive Engineer, Morigaon

Irrigation Division

08/10 to

01/13

Eco-1.1/Irrig-7/12-13 Not Done

36 Executive Engineer, Guwahati

Electrical Division (Irrigation)

10/10 to

01/13

Eco-1.1/Irrig-7/12-13 05/2011

Page 20: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xx

ANNEXURE ‘C‟

STATEMENT SHOWING THE DIVISION WISE POSITION ON CLOSING OF PRICED STORES LEDGER

2012-13

Sl

No Name of the Division Period I.R. No. Position of physical verification T&P

1 Executive Engineer, PWD (R),

Abhayapuri Construction Divn.

(NH)

5/10 to 12/13 Eco-1.1/PWD(R)-17/12-

13

03/2001

2 Executive Engineer, PWD (R),

Guwahati City Division -II

1/10 to 12/12 Eco-1.1/PWD(R)-16/12-

13

Not Maintained.

3 Executive Engineer, PWD (R),

Barpeta Rural Road Division

06/10 to

10/12

Eco-1.1/PWD(R)-10/12-

13

Nil

4 Executive Engineer, PWD (R),

Guwahati City Division -III

01/11 to

07/12

Eco-1.1/PWD(R)-02/12-

13

Not Maintained.

5 Executive Engineer, PWD (R),

North Guwahati State Road

Division

01/11 to

09/12

Eco-1.1/PWD(R)-06/12-

13

Nil

6 Executive Engineer, PWD (R),

Nalbari State Road Division

11/09 to

09/12

Eco-1.1/PWD(R)-05/12-

13

Nil

7 Executive Engineer, PWD (R),

Guwahati Road Division

06/10 to

09/12

Eco-1.1/PWD(R)-08/12-

13

03/1996

8 Executive Engineer, PWD (R),

Guwahati City Division -I

01/12 to

12/12

Eco-1.1/PWD(R)-15/12-

13

1996-97

9 Executive Engineer, PWD (R),

Jorhat NEC Division

11/10 to

02/12

WA-II/PWD(R)-36/12-

13

Not applicable as per I.R.

10 Executive Engineer, PWD (R),

Koliabor Rural Road

08/08 to

01/12

WA-II /PWD(R)-44/12-

13

Not Maintained.

11 Executive Engineer, PWD (R),

Silchar NEC Division

10/09 to

01/12

WA-II /PWD(R)-45/12-

13

Nil

12 Executive Engineer, PWD (R),

Karimganj NEC Division

05/09 to

01/12

WA-II /PWD(R)-46/12-

13

Nil

13 Executive Engineer, PWD (R),

Nagaon Rural Road Division

08/10 to

08/12

Eco-1.1/PWD(R)-03/12-

13

03/2008

14 Executive Engineer, PWD (R),

Nagaon Statel Road Division

02/10 to

07/12

Eco-1/PWD(R)-1/12-

13/124 dt. 19.11.2012

03/2001

15 Executive Engineer, PWD (R),

Morigaon Rural Road Division

08/11 to

08/12

Eco-1.1/PWD(R)-4/12-

13/1246 dt. 21.11.2012

03/2012

16 Executive Engineer, PWD (R),

Hailakandi NEC Division

06/10 to

08/12

Eco-1.1/PWD(R)-07/12-

13/1345 dt. 13.12.2012

03/2010

17 Executive Engineer, PWD (R),

Sivasagar State Road Division

09/10 to

09/12

Eco-1.1/PWD(R)-09/12-

13/1424 dt. 28.08.2012

01/2012

18 Executive Engineer, PWD (R),

Jorhat NH Division

04/10 to

10/12

Eco-1.1/PWD(R)-12/12-

13/1558 dt. 21.01.2013

03/2010

19 Executive Engineer, PWD (R),

Sivasagar Rural Road Division

05/10 to

10/12

Eco-1.1/PWD(R)-11/12-

13/1645 dt. 28.01.2013

Not Maintained.

20 Executive Engineer, PWD (R),

Jorhat Rural Road Division

05/10 to

11/12

Eco-1.1/PWD(R)-13/12-

13/1672 dt. 31.01.2013

08/2007

21 Executive Engineer, PWD (R),

Morigaon State Road Division

09/10 to

11/12

Eco-1.1/PWD(R)-04/12-

13/1730 dt. 31.01.2013

Not Known

22 Executive Engineer, PWD (R),

Guwahati NH Division

10/11 to

02/13

Eco-1.1/PWD(B)-02/13-

14

03/2000

23 Executive Engineer, PWD

(Bldg), Guwahati Building

Division-II

03/10 to

02/13

Eco-1.1/PWD(B)-05/12-

13

1996-97

24 Executive Engineer, PWD

(Bldg), Guwahati Building

Division-I

03/10 to

12/12

Eco-1.1/PWD(B)-1/12-

13

Up to date

25 Executive Engineer, Nagaon

Water Resource Division

04/08 to

08/12

Eco-1.1/WR-1/12-13 08/2012

26 Executive Engineer, Palash

Bari Gumi Water Resource

Project Division

07/10 to

12/12

Eco-1.1/WR-2/12-13 Not Maintained.

Page 21: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xxi

27 Executive Engineer, Tezpur

Water Resource Division

07/10 to

12/12

Eco-1.1/WR-3/12-13 Nil

28 Executive Engineer, Nalbari

Irrigation Division

08/09 to

07/12

Eco-1.1/Irrig-1/12-13 09/2005

29 Executive Engineer, Guwahati

Irrigation Division

06/10to 09/12 Eco-1.1/Irrig-3/12-13 Not Known.

30 Executive Engineer, Pahumara

Rupahi Irrigation Division

08/10 to

10/12

Eco-1.1/Irrig-5/12-13 05/1982

31 Executive Engineer, Pathsala

Irrigation Division

10/10 to

01/13

Eco-1.1/Irrig-7/12-13 Not Known.

32 Executive Engineer, Nagaon

Irrigation Division

03/10 to

03/12

Eco-1.1/Irrig-2/12-13 Not maintained.

33 Executive Engineer, Hailakandi

Irrigation Division

01/11 to

10/12

Eco-1.1/Irrig-4/12-13 03/2012

34 Executive Engineer, Biswanath

Chariali Irrigation Division

12/09 to

12/12

Eco-1.1/Irrig-8/12-13 Not maintained.

35 Executive Engineer, Morigaon

Irrigation Division

08/10 to

01/13

Eco-1.1/Irrig-7/12-13 Not maintained.

36 Executive Engineer, Guwahati

Electrical Division (Irrigation)

10/10 to

01/13

Eco-1.1/Irrig-7/12-13 Not Known.

Page 22: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xxii

ANNEXURE ‘D‟

STATEMENT SHOWING THE DIVISION WHERE THE VALUE OF STOCK EXCEEDED THE RESERVE

STOCK LIMIT 2012-13

Sl

No Name of the Division Period I.R. No.

Sanctioned

R.S.L

(` in lakh)

Present

under stock

(` in lakh)

Excess over R.S.L

(` in lakh)

1 Executive Engineer,

PWD (R), Abhayapuri

Construction Divn.

(NH)

5/10 to

12/13

Eco-1.1/PWD(R)-

17/12-13

6.00 71.16 65.16

2 Executive Engineer,

PWD (R), Guwahati

City Division -II

1/10 to

12/12

Eco-1.1/PWD(R)-

16/12-13

5.00 23.28 18.28

3 Executive Engineer,

PWD (R), Barpeta

Rural Road Division

06/10 to

10/12

Eco-1.1/PWD(R)-

10/12-13

10.00 137.73 127.73

4 Executive Engineer,

PWD (R), Guwahati

City Division -III

01/11 to

07/12

Eco-1.1/PWD(R)-

02/12-13

Nil Nil Nil

5 Executive Engineer,

PWD (R), North

Guwahati State Road

Division

01/11 to

09/12

Eco-1.1/PWD(R)-

06/12-13

Nil Nil Nil

6 Executive Engineer,

PWD (R), Nalbari State

Road Division

11/09 to

09/12

Eco-1.1/PWD(R)-

05/12-13

Nil Nil Nil

7 Executive Engineer,

PWD (R), Guwahati

Road Division

06/10 to

09/12

Eco-1.1/PWD(R)-

08/12-13

50.00 Nil Nil

8 Executive Engineer,

PWD (R), Guwahati

City Division -I

01/12 to

12/12

Eco-1.1/PWD(R)-

15/12-13

Not available Not

available

Not available

9 Executive Engineer,

PWD (R), Jorhat NEC

Division

11/10 to

02/12

WA-II/PWD(R)-

36/12-13

5.00 4.96 -

10 Executive Engineer,

PWD (R), Koliabor

Rural Road

08/08 to

01/12

WA-II /PWD(R)-

44/12-13

3.00 2.37 -

11 Executive Engineer,

PWD (R), Silchar NEC

Division

10/09 to

01/12

WA-II /PWD(R)-

45/12-13

Nil Nil Nil

12 Executive Engineer,

PWD (R), Karimganj

NEC Division

05/09 to

01/12

WA-II /PWD(R)-

46/12-13

Nil Nil Nil

13 Executive Engineer,

PWD (R), Nagaon Rural

Road Division

08/10 to

08/12

Eco-1.1/PWD(R)-

03/12-13

10.00 91.82 81.82

14 Executive Engineer,

PWD (R), Nagaon Statel

Road Division

02/10 to

07/12

Eco-1/PWD(R)-

1/12-13/124 dt.

19.11.2012

18.00 39.88 21.88

15 Executive Engineer,

PWD (R), Morigaon

Rural Road Division

08/11 to

08/12

Eco-1.1/PWD(R)-

4/12-13/1246 dt.

21.11.2012

Nil Nil Nil

16 Executive Engineer,

PWD (R), Hailakandi

NEC Division

06/10 to

08/12

Eco-1.1/PWD(R)-

07/12-13/1345 dt.

13.12.2012

Nil Nil Nil

17 Executive Engineer,

PWD (R), Sivasagar

State Road Division

09/10 to

09/12

Eco-1.1/PWD(R)-

09/12-13/1424 dt.

28.08.2012

Nil Nil Nil

18 Executive Engineer,

PWD (R), Jorhat NH

Division

04/10 to

10/12

Eco-1.1/PWD(R)-

12/12-13/1558 dt.

21.01.2013

7.00 3.06 -

Page 23: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xxiii

19 Executive Engineer,

PWD (R), Sivasagar

Rural Road Division

05/10 to

10/12

Eco-1.1/PWD(R)-

11/12-13/1645 dt.

28.01.2013

10.00 72.37 62.37

20 Executive Engineer,

PWD (R), Jorhat Rural

Road Division

05/10 to

11/12

Eco-1.1/PWD(R)-

13/12-13/1672 dt.

31.01.2013

Nil Nil Nil

21 Executive Engineer,

PWD (R), Morigaon

State Road Division

09/10 to

11/12

Eco-1.1/PWD(R)-

14/12-13/1730 dt.

31.01.2013

22 Executive Engineer,

PWD (R), Guwahati NH

Division

10/11 to

02/13

Eco-1.1/PWD(B)-

02/13-14

15.00 Nil Nil

23 Executive Engineer,

PWD (Bldg), Guwahati

Building Division-II

03/10 to

02/13

Eco-1.1/PWD(B)-

05/12-13

10.00 350.11 340.11

24 Executive Engineer,

PWD (Bldg), Guwahati

Building Division-I

03/10 to

12/12

Eco-1.1/PWD(B)-

1/12-13

50.00 Nil Nil

25 Executive Engineer,

Nagaon Water Resource

Division

04/08 to

08/12

Eco-1.1/WR-1/12-

13

Nil 75.358 Nil

26 Executive Engineer,

Palash Bari Gumi

Water Resource Project

Division

09/08 to

12/12

Eco-1.1/WR-2/12-

13

Nil Nil Nil

27 Executive Engineer,

Tezpur Water Resource

Division

07/10 to

12/12

Eco-1.1/WR-3/12-

13

0.20 (-) 2.71 Nil

28 Executive Engineer,

Nalbari Irrigation

Division

08/09 to

07/12

Eco-1.1/Irrig-1/12-

13

4.50 1.11 -

29 Executive Engineer,

Guwahati Irrigation

Division

06/10to

09/12

Eco-1.1/Irrig-3/12-

13

Nil Nil Nil

30 Executive Engineer,

Pahumara Rupahi

Irrigation Division

08/10 to

10/12

Eco-1.1/Irrig-5/12-

13

10.00 36.28 26.28

31 Executive Engineer,

Pathsala Irrigation

Division

07/08 to

11/12

Eco-1.1/Irrig-6/12-

13

12.00 84.16 72.16

32 Executive Engineer,

Nagaon Irrigation

Division

03/10 to

03/12

Eco-1.1/Irrig-2/12-

13

Nil Nil Nil

33 Executive Engineer,

Hailakandi Irrigation

Division

01/11 to

10/12

Eco-1.1/Irrig-4/12-

13

Nil Nil Nil

34 Executive Engineer,

Biswanath Chariali

Irrigation Division

12/09 to

12/12

Eco-1.1/Irrig-8/12-

13

Nil Nil Nil

35 Executive Engineer,

Morigaon Irrigation

Division

08/10 to

01/13

Eco-1.1/Irrig-7/12-

13

Nil Nil Nil

36 Executive Engineer,

Guwahati Electrical

Division (Irrigation)

10/10 to

01/13

Eco-1.1/Irrig-7/12-

13

10.00 NA NA

TOTAL 235.70 915.58 815.79

Page 24: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xxiv

ANNEXURE ‘E‟

STATEMENT SHOWING THE DIVISION WISE POSITION OF PHYSICAL VERIFICATION OF STOCK

& STORE 2012-13

Sl

No Name of the Division Period I.R. No.

Position of physical

verification

of Stock & Store

1 Executive Engineer, PWD

(R), Abhayapuri

Construction Divn. (NH)

5/10 to 12/13 Eco-1.1/PWD(R)-17/12-13 03/2009

2 Executive Engineer, PWD

(R), Guwahati City

Division -II

1/10 to 12/12 Eco-1.1/PWD(R)-16/12-13 Not Done

3 Executive Engineer, PWD

(R), Barpeta Rural Road

Division

06/10 to 10/12 Eco-1.1/PWD(R)-10/12-13 Not Done

4 Executive Engineer, PWD

(R), Guwahati City

Division -III

01/11 to 07/12 Eco-1.1/PWD(R)-02/12-13 Not Done

5 Executive Engineer, PWD

(R), North Guwahati State

Road Division

01/11 to 09/12 Eco-1.1/PWD(R)-06/12-13 NA

6 Executive Engineer, PWD

(R), Nalbari State Road

Division

11/09 to 09/12 Eco-1.1/PWD(R)-05/12-13 Not Done

7 Executive Engineer, PWD

(R), Guwahati Road

Division

06/10 to 09/12 Eco-1.1/PWD(R)-08/12-13 04/2010

8 Executive Engineer, PWD

(R), Guwahati City

Division -I

01/12 to 12/12 Eco-1.1/PWD(R)-15/12-13 Not Done

9 Executive Engineer, PWD

(R), Jorhat NEC Division

11/10 to 02/12 WA-II/PWD(R)-36/12-13 12/2011

10 Executive Engineer, PWD

(R), Koliabor Rural Road

08/08 to

01/12

WA-II /PWD(R)-44/12-13 01/2012

11 Executive Engineer, PWD

(R), Silchar NEC Division

10/09 to 01/12 WA-II /PWD(R)-45/12-13 Not Done

12 Executive Engineer, PWD

(R), Karimganj NEC

Division

05/09 to 01/12 WA-II /PWD(R)-46/12-13 Nil

13 Executive Engineer, PWD

(R), Nagaon Rural Road

Division

08/10 to 08/12 Eco-1.1/PWD(R)-03/12-13 Not Done

14 Executive Engineer, PWD

(R), Nagaon Statel Road

Division

02/10 to 07/12 Eco-1/PWD(R)-1/12-13/124

dt. 19.11.2012

Not Done

15 Executive Engineer, PWD

(R), Morigaon Rural Road

Division

08/11 to 08/12 Eco-1.1/PWD(R)-4/12-13/

1246 dt. 21.11.2012

12/2011

16 Executive Engineer, PWD

(R), Hailakandi NEC

Division

06/10 to 08/12 Eco-1.1/PWD(R)-07/12-13/

1345 dt. 13.12.2012

Nil

17 Executive Engineer, PWD

(R), Sivasagar State Road

Division

09/10 to 09/12 Eco-1.1/PWD(R)-09/12-13/

1424 dt. 28.08.2012

Not Done

18 Executive Engineer, PWD

(R), Jorhat NH Division

04/10 to 10/12 Eco-1.1/PWD(R)-12/12-13/

1558 dt. 21.01.2013

08/2008

19 Executive Engineer, PWD

(R), Sivasagar Rural Road

Division

05/10 to 10/12 Eco-1.1/PWD(R)-11/12-13/

1645 dt. 28.01.2013

Done

20 Executive Engineer, PWD

(R), Jorhat Rural Road

Division

05/10 to 11/12 Eco-1.1/PWD(R)-13/12-13/

1672 dt. 31.01.2013

Not Done

Page 25: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xxv

21 Executive Engineer, PWD

(R), Morigaon State Road

Division

09/10 to 11/12 Eco-1.1/PWD(R)-14/12-13/

1730 dt. 31.01.2013

22 Executive Engineer, PWD

(R), Guwahati NH Division

10/11 to 02/13 Eco-1.1/PWD(B)-02/13-14 Not Done

23 Executive Engineer, PWD

(Bldg), Guwahati Building

Division-II

03/10 to 02/13 Eco-1.1/PWD(B)-05/12-13 04/2003

24 Executive Engineer, PWD

(Bldg), Guwahati Building

Division-I

03/10 to 12/12 Eco-1.1/PWD(B)-1/12-13 08/2012

25 Executive Engineer,

Nagaon Water Resource

Division

04/08 to 08/12 Eco-1.1/WR-1/12-13 10/2000

26 Executive Engineer, Palash

Bari Gumi Water Resource

Project Division

09/08 to 12/12 Eco-1.1/WR-2/12-13 Nil

27 Executive Engineer, Tezpur

Water Resource Division

07/10 to 12/12 Eco-1.1/WR-3/12-13 Not Done

28 Executive Engineer,

Nalbari Irrigation Division

08/09 to 07/12 Eco-1.1/Irrig-1/12-13 05/2010

29 Executive Engineer,

Guwahati Irrigation

Division

06/10to 09/12 Eco-1.1/Irrig-3/12-13 02/2002

30 Executive Engineer,

Pahumara Rupahi

Irrigation Division

08/10 to 10/12 Eco-1.1/Irrig-5/12-13 02/2010

31 Executive Engineer,

Pathsala Irrigation Division

07/08 to

11/12

Eco-1.1/Irrig-6/12-13 07/1989

32 Executive Engineer,

Nagaon Irrigation Division

03/10 to 03/12 Eco-1.1/Irrig-2/12-13 Not Done.

33 Executive Engineer,

Hailakandi Irrigation

Division

01/11 to 10/12 Eco-1.1/Irrig-4/12-13 Not Done.

34 Executive Engineer,

Biswanath Chariali

Irrigation Division

12/09 to 12/12 Eco-1.1/Irrig-8/12-13 Not Done.

35 Executive Engineer,

Morigaon Irrigation

Division

08/10 to 01/13 Eco-1.1/Irrig-7/12-13 Not Done.

36 Executive Engineer,

Guwahati Electrical

Division (Irrigation)

10/10 to 01/13 Eco-1.1/Irrig-7/12-13 05/2001

Page 26: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xxvi

ANNEXURE ‘F‟

STATEMENT SHOWING THE DIVISION WISE POSITION OF AMOUNT LYING UNADJUSTED UNDER

MISC. P.W. ADVANCE UP TO

2012-13

Sl

No Name of the Division Period I.R. No.

Position of Misc. P.W.

Advance

(` in lakh)

1 Executive Engineer, PWD

(R), Abhayapuri

Construction Divn. (NH)

5/10 to 12/13 Eco-1.1/PWD(R)-17/12-13 13.67

2 Executive Engineer, PWD

(R), Guwahati City Division

-II

1/10 to 12/12 Eco-1.1/PWD(R)-16/12-13 Nil

3 Executive Engineer, PWD

(R), Barpeta Rural Road

Division

06/10 to

10/12

Eco-1.1/PWD(R)-10/12-13 134.60

4 Executive Engineer, PWD

(R), Guwahati City Division

-III

01/11 to

07/12

Eco-1.1/PWD(R)-02/12-13 14.09

5 Executive Engineer, PWD

(R), North Guwahati State

Road Division

01/11 to

09/12

Eco-1.1/PWD(R)-06/12-13 26.66

6 Executive Engineer, PWD

(R), Nalbari State Road

Division

11/09 to

09/12

Eco-1.1/PWD(R)-05/12-13 Nil

7 Executive Engineer, PWD

(R), Guwahati Road

Division

06/10 to

09/12

Eco-1.1/PWD(R)-08/12-13 NA

8 Executive Engineer, PWD

(R), Guwahati City Division

-I

01/12 to

12/12

Eco-1.1/PWD(R)-15/12-13 Nil

9 Executive Engineer, PWD

(R), Jorhat NEC Division

11/10 to

02/12

WA-II/PWD(R)-36/12-13 7.06

10 Executive Engineer, PWD

(R), Koliabor Rural Road

08/08 to

01/12

WA-II /PWD(R)-44/12-13 29.24

11 Executive Engineer, PWD

(R), Silchar NEC Division

10/09 to

01/12

WA-II /PWD(R)-45/12-13 Nil

12 Executive Engineer, PWD

(R), Karimganj NEC

Division

05/09 to

01/12

WA-II /PWD(R)-46/12-13 Nil

13 Executive Engineer, PWD

(R), Nagaon Rural Road

Division

08/10 to

08/12

Eco-1.1/PWD(R)-03/12-13 14.21

14 Executive Engineer, PWD

(R), Nagaon Statel Road

Division

02/10 to

07/12

Eco-1/PWD(R)-1/12-

13/124 dt. 19.11.2012

Nil

15 Executive Engineer, PWD

(R), Morigaon Rural Road

Division

08/11 to

08/12

Eco-1.1/PWD(R)-4/12-

13/1246 dt. 21.11.2012

Nil

16 Executive Engineer, PWD

(R), Hailakandi NEC

Division

06/10 to

08/12

Eco-1.1/PWD(R)-07/12-

13/1345 dt. 13.12.2012

Nil

17 Executive Engineer, PWD

(R), Sivasagar State Road

Division

09/10 to

09/12

Eco-1.1/PWD(R)-09/12-

13/1424 dt. 28.08.2012

Nil

18 Executive Engineer, PWD

(R), Jorhat NH Division

04/10 to

10/12

Eco-1.1/PWD(R)-12/12-

13/1558 dt. 21.01.2013

9.44

19 Executive Engineer, PWD

(R), Sivasagar Rural Road

05/10 to

10/12

Eco-1.1/PWD(R)-11/12-

13/1645 dt. 28.01.2013

Nil

Page 27: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xxvii

Division

20 Executive Engineer, PWD

(R), Jorhat Rural Road

Division

05/10 to

11/12

Eco-1.1/PWD(R)-13/12-

13/1672 dt. 31.01.2013

Nil

21 Executive Engineer, PWD

(R), Morigaon State Road

Division

09/10 to

11/12

Eco-1.1/PWD(R)-14/12-

13/1730 dt. 31.01.2013

22 Executive Engineer, PWD

(R), Guwahati NH Division

10/11 to

02/13

Eco-1.1/PWD(B)-02/13-

14

58.16

23 Executive Engineer, PWD

(Bldg), Guwahati Building

Division-II

03/10 to

02/13

Eco-1.1/PWD(B)-05/12-

13

47.27

24 Executive Engineer, PWD

(Bldg), Guwahati Building

Division-I

03/10 to

12/12

Eco-1.1/PWD(B)-1/12-13 974.25

25 Executive Engineer, Nagaon

Water Resource Division

04/08 to

08/12

Eco-1.1/WR-1/12-13 Nil

26 Executive Engineer, Palash

Bari Gumi Water Resource

Project Division

09/08 to

12/12

Eco-1.1/WR-2/12-13 Nil

27 Executive Engineer, Tezpur

Water Resource Division

07/10 to

12/12

Eco-1.1/WR-3/12-13 8.08

28 Executive Engineer, Nalbari

Irrigation Division

08/09 to

07/12

Eco-1.1/Irrig-1/12-13 6.13

29 Executive Engineer,

Guwahati Irrigation

Division

06/10to 09/12 Eco-1.1/Irrig-3/12-13 5.62

30 Executive Engineer,

Pahumara Rupahi Irrigation

Division

08/10 to

10/12

Eco-1.1/Irrig-5/12-13 Nil

31 Executive Engineer,

Pathsala Irrigation Division

07/08 to

11/12

Eco-1.1/Irrig-6/12-13 3.46

32 Executive Engineer, Nagaon

Irrigation Division

03/10 to

03/12

Eco-1.1/Irrig-2/12-13 Nil

33 Executive Engineer,

Hailakandi Irrigation

Division

01/11 to

10/12

Eco-1.1/Irrig-4/12-13 0.63

34 Executive Engineer,

Biswanath Chariali

Irrigation Division

12/09 to

12/12

Eco-1.1/Irrig-8/12-13 Nil

35 Executive Engineer,

Morigaon Irrigation

Division

08/10 to

01/13

Eco-1.1/Irrig-7/12-13 Nil

36 Executive Engineer,

Guwahati Electrical

Division (Irrigation)

10/10 to

01/13

Eco-1.1/Irrig-7/12-13 0.43

TOTAL 1353.00

Page 28: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xxviii

ANNEXURE ‘G’

STATEMENT SHOWING THE DIVISION WISE POSITION OF CONTRACTOR LEDGER 2012-13

Sl

No Name of the Division Period I.R. No.

Month from which

contractor Ledger Not

Maintained.

1 Executive Engineer, PWD

(R), Abhayapuri

Construction Divn. (NH)

5/10 to 12/13 Eco-1.1/PWD(R)-17/12-

13

Not Maintained

2 Executive Engineer, PWD

(R), Guwahati City

Division -II

1/10 to 12/12 Eco-1.1/PWD(R)-16/12-

13

04/2010

3 Executive Engineer, PWD

(R), Barpeta Rural Road

Division

06/10 to 10/12 Eco-1.1/PWD(R)-10/12-

13

Not Maintained

4 Executive Engineer, PWD

(R), Guwahati City

Division -III

01/11 to 07/12 Eco-1.1/PWD(R)-02/12-

13

Not Maintained

5 Executive Engineer, PWD

(R), North Guwahati State

Road Division

01/11 to 09/12 Eco-1.1/PWD(R)-06/12-

13

09/2012

6 Executive Engineer, PWD

(R), Nalbari State Road

Division

11/09 to 09/12 Eco-1.1/PWD(R)-05/12-

13

10/2012

7 Executive Engineer, PWD

(R), Guwahati Road

Division

06/10 to 09/12 Eco-1.1/PWD(R)-08/12-

13

04/2012

8 Executive Engineer, PWD

(R), Guwahati City

Division -I

01/12 to 12/12 Eco-1.1/PWD(R)-15/12-

13

Not Maintained

9 Executive Engineer, PWD

(R), Jorhat NEC Division

11/10 to 02/12 WA-II/PWD(R)-36/12-13 01/2012

10 Executive Engineer, PWD

(R), Koliabor Rural Road

08/08 to

01/12

WA-II /PWD(R)-44/12-13 Not Maintained

11 Executive Engineer, PWD

(R), Silchar NEC Division

10/09 to 01/12 WA-II /PWD(R)-45/12-13 01/2012

12 Executive Engineer, PWD

(R), Karimganj NEC

Division

05/09 to 01/12 WA-II /PWD(R)-46/12-13 01/2012

13 Executive Engineer, PWD

(R), Nagaon Rural Road

Division

08/10 to 08/12 Eco-1.1/PWD(R)-03/12-

13

03/2008

14 Executive Engineer, PWD

(R), Nagaon Statel Road

Division

02/10 to 07/12 Eco-1/PWD(R)-1/12-

13/124 dt. 19.11.2012

03/2012

15 Executive Engineer, PWD

(R), Morigaon Rural Road

Division

08/11 to 08/12 Eco-1.1/PWD(R)-4/12-

13/1246 dt. 21.11.2012

08/2012

16 Executive Engineer, PWD

(R), Hailakandi NEC

Division

06/10 to 08/12 Eco-1.1/PWD(R)-07/12-

13/1345 dt. 13.12.2012

03/2012

17 Executive Engineer, PWD

(R), Sivasagar State Road

Division

09/10 to 09/12 Eco-1.1/PWD(R)-09/12-

13/1424 dt. 28.08.2012

08/2012

18 Executive Engineer, PWD

(R), Jorhat NH Division

04/10 to 10/12 Eco-1.1/PWD(R)-12/12-

13/1558 dt. 21.01.2013

11/2012

19 Executive Engineer, PWD

(R), Sivasagar Rural Road

Division

05/10 to 10/12 Eco-1.1/PWD(R)-11/12-

13/1645 dt. 28.01.2013

Up to date

20 Executive Engineer, PWD

(R), Jorhat Rural Road

Division

05/10 to 11/12 Eco-1.1/PWD(R)-13/12-

13/1672 dt. 31.01.2013

11/2012

21 Executive Engineer, PWD 09/10 to 11/12 Eco-1.1/PWD(R)-14/12-

Page 29: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xxix

(R), Morigaon State Road

Division

13/1730 dt. 31.01.2013

22 Executive Engineer, PWD

(R), Guwahati NH Division

10/11 to 02/13 Eco-1.1/PWD(B)-02/13-

14

01/2002

23 Executive Engineer, PWD

(Bldg), Guwahati Building

Division-II

03/10 to 02/13 Eco-1.1/PWD(B)-05/12-

13

Not Maintained

24 Executive Engineer, PWD

(Bldg), Guwahati Building

Division-I

03/10 to 12/12 Eco-1.1/PWD(B)-1/12-13 Up to date

25 Executive Engineer,

Nagaon Water Resource

Division

04/08 to 08/12 Eco-1.1/WR-1/12-13 10/2005

26 Executive Engineer, Palash

Bari Gumi Water Resource

Project Division

09/08 to

12/12

Eco-1.1/WR-2/12-13 Not Maintained

27 Executive Engineer,

Tezpur Water Resource

Division

07/10 to 12/12 Eco-1.1/WR-3/12-13 Not Maintained

28 Executive Engineer,

Nalbari Irrigation Division

08/09 to 07/12 Eco-1.1/Irrig-1/12-13 08/2009

29 Executive Engineer,

Guwahati Irrigation

Division

06/10to 09/12 Eco-1.1/Irrig-3/12-13 04/2012

30 Executive Engineer,

Pahumara Rupahi

Irrigation Division

08/10 to 10/12 Eco-1.1/Irrig-5/12-13 09/2001

31 Executive Engineer,

Pathsala Irrigation Division

07/08 to 11/12 Eco-1.1/Irrig-6/12-13 12/2012

32 Executive Engineer,

Nagaon Irrigation Division

03/10 to 03/12 Eco-1.1/Irrig-2/12-13 Not Maintained

33 Executive Engineer,

Hailakandi Irrigation

Division

01/11 to 10/12 Eco-1.1/Irrig-4/12-13 04/2009

34 Executive Engineer,

Biswanath Chariali

Irrigation Division

12/09 to 12/12 Eco-1.1/Irrig-8/12-13 Not Maintained

35 Executive Engineer,

Morigaon Irrigation

Division

08/10 to 01/13 Eco-1.1/Irrig-7/12-13 Not Maintained

36 Executive Engineer,

Guwahati Electrical

Division (Irrigation)

10/10 to 01/13 Eco-1.1/Irrig-7/12-13 01/2013

Page 30: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xxx

ANNEXURE ‘H’

STATEMENT SHOWING THE DIVISION WISE POSITION OF REGISTER OF WORKS 2012-13

Sl

No Name of the Division Period I.R. No.

Month from which register

Ledger Not Maintained.

1 Executive Engineer, PWD

(R), Abhayapuri

Construction Divn. (NH)

5/10 to 12/13 Eco-1.1/PWD(R)-17/12-

13

Not Maintained

2 Executive Engineer, PWD

(R), Guwahati City

Division -II

1/10 to 12/12 Eco-1.1/PWD(R)-16/12-

13

Up to date

3 Executive Engineer, PWD

(R), Barpeta Rural Road

Division

06/10 to 10/12 Eco-1.1/PWD(R)-10/12-

13

Not Known

4 Executive Engineer, PWD

(R), Guwahati City

Division -III

01/11 to 07/12 Eco-1.1/PWD(R)-02/12-

13

07/2012

5 Executive Engineer, PWD

(R), North Guwahati State

Road Division

01/11 to 09/12 Eco-1.1/PWD(R)-06/12-

13

08/2012

6 Executive Engineer, PWD

(R), Nalbari State Road

Division

11/09 to 09/12 Eco-1.1/PWD(R)-05/12-

13

10/2012

7 Executive Engineer, PWD

(R), Guwahati Road

Division

06/10 to 09/12 Eco-1.1/PWD(R)-08/12-

13

04/2012

8 Executive Engineer, PWD

(R), Guwahati City

Division -I

01/12 to 12/12 Eco-1.1/PWD(R)-15/12-

13

Not Maintained

9 Executive Engineer, PWD

(R), Jorhat NEC Division

11/10 to 02/12 WA-II/PWD(R)-36/12-13 01/2012

10 Executive Engineer, PWD

(R), Koliabor Rural Road

08/08 to

01/12

WA-II /PWD(R)-44/12-13 03/1998

11 Executive Engineer, PWD

(R), Silchar NEC Division

10/09 to 01/12 WA-II /PWD(R)-45/12-13 01/2012

12 Executive Engineer, PWD

(R), Karimganj NEC

Division

05/09 to 01/12 WA-II /PWD(R)-46/12-13 01/2012

13 Executive Engineer, PWD

(R), Nagaon Rural Road

Division

08/10 to 08/12 Eco-1.1/PWD(R)-03/12-

13

08/2012

14 Executive Engineer, PWD

(R), Nagaon Statel Road

Division

02/10 to 07/12 Eco-1/PWD(R)-1/12-

13/124 dt. 19.11.2012

03/2012

15 Executive Engineer, PWD

(R), Morigaon Rural Road

Division

08/11 to 08/12 Eco-1.1/PWD(R)-4/12-

13/1246 dt. 21.11.2012

08/2012

16 Executive Engineer, PWD

(R), Hailakandi NEC

Division

06/10 to 08/12 Eco-1.1/PWD(R)-07/12-

13/1345 dt. 13.12.2012

03/2012

17 Executive Engineer, PWD

(R), Sivasagar State Road

Division

09/10 to 09/12 Eco-1.1/PWD(R)-09/12-

13/1424 dt. 28.08.2012

08/2012

18 Executive Engineer, PWD

(R), Jorhat NH Division

04/10 to 10/12 Eco-1.1/PWD(R)-12/12-

13/1558 dt. 21.01.2013

11/2012

19 Executive Engineer, PWD

(R), Sivasagar Rural Road

Division

05/10 to 10/12 Eco-1.1/PWD(R)-11/12-

13/1645 dt. 28.01.2013

10/2012

20 Executive Engineer, PWD

(R), Jorhat Rural Road

Division

05/10 to 11/12 Eco-1.1/PWD(R)-13/12-

13/1672 dt. 31.01.2013

Up to date

21 Executive Engineer, PWD

(R), Morigaon State Road

09/10 to 11/12 Eco-1.1/PWD(R)-14/12-

13/1730 dt. 31.01.2013

Page 31: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xxxi

Division

22 Executive Engineer, PWD

(R), Guwahati NH Division

10/11 to 02/13 Eco-1.1/PWD(B)-02/13-

14

10/2011

23 Executive Engineer, PWD

(Bldg), Guwahati Building

Division-II

03/10 to 02/13 Eco-1.1/PWD(B)-05/12-

13

Not Known

24 Executive Engineer, PWD

(Bldg), Guwahati Building

Division-I

03/10 to 12/12 Eco-1.1/PWD(B)-1/12-13 01/2013

25 Executive Engineer,

Nagaon Water Resource

Division

04/08 to 08/12 Eco-1.1/WR-1/12-13 09/2012

26 Executive Engineer, Palash

Bari Gumi Water Resource

Project Division

09/08 to

12/12

Eco-1.1/WR-2/12-13 12/2012

27 Executive Engineer,

Tezpur Water Resource

Division

07/10 to 12/12 Eco-1.1/WR-3/12-13 Not Maintained

28 Executive Engineer,

Nalbari Irrigation Division

08/09 to 07/12 Eco-1.1/Irrig-1/12-13 1993

29 Executive Engineer,

Guwahati Irrigation

Division

06/10to 09/12 Eco-1.1/Irrig-3/12-13 03/2012

30 Executive Engineer,

Pahumara Rupahi

Irrigation Division

08/10 to 10/12 Eco-1.1/Irrig-5/12-13 03/2012

31 Executive Engineer,

Pathsala Irrigation Division

07/08 to 11/12 Eco-1.1/Irrig-6/12-13 12/2012

32 Executive Engineer,

Nagaon Irrigation Division

03/10 to 03/12 Eco-1.1/Irrig-2/12-13 04/2011

33 Executive Engineer,

Hailakandi Irrigation

Division

01/11 to 10/12 Eco-1.1/Irrig-4/12-13 04/2012

34 Executive Engineer,

Biswanath Chariali

Irrigation Division

12/09 to 12/12 Eco-1.1/Irrig-8/12-13 Not Maintained

35 Executive Engineer,

Morigaon Irrigation

Division

08/10 to 01/13 Eco-1.1/Irrig-7/12-13 04/2011

36 Executive Engineer,

Guwahati Electrical

Division (Irrigation)

10/10 to 01/13 Eco-1.1/Irrig-7/12-13 01/2013

Page 32: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xxxii

ANNEXURE ‘I’

STATEMENT SHOWING THE DIVISION WISE POSITION OF SETTLEMENT WITH TREASURIES AND

DELAY IN SUBMISSION OF FORM-51.

2012-13

Sl

No Name of the Division Period I.R. No.

Reconciliation in

Arrear w.e.f

1 Executive Engineer, PWD

(R), Abhayapuri

Construction Divn. (NH)

5/10 to 12/13 Eco-1.1/PWD(R)-17/12-13 05/2006

2 Executive Engineer, PWD

(R), Guwahati City

Division -II

1/10 to 12/12 Eco-1.1/PWD(R)-16/12-13 12/1989

3 Executive Engineer, PWD

(R), Barpeta Rural Road

Division

06/10 to 10/12 Eco-1.1/PWD(R)-10/12-13 02/1993

4 Executive Engineer, PWD

(R), Guwahati City

Division -III

01/11 to 07/12 Eco-1.1/PWD(R)-02/12-13 1989

5 Executive Engineer, PWD

(R), North Guwahati State

Road Division

01/11 to 09/12 Eco-1.1/PWD(R)-06/12-13 07/1999

6 Executive Engineer, PWD

(R), Nalbari State Road

Division

11/09 to 09/12 Eco-1.1/PWD(R)-05/12-13 2005

7 Executive Engineer, PWD

(R), Guwahati Road

Division

06/10 to 09/12 Eco-1.1/PWD(R)-08/12-13 10/2012

8 Executive Engineer, PWD

(R), Guwahati City

Division -I

01/12 to 12/12 Eco-1.1/PWD(R)-15/12-13 12/1984

9 Executive Engineer, PWD

(R), Jorhat NEC Division

11/10 to 02/12 WA-II/PWD(R)-36/12-13 01/2012

10 Executive Engineer, PWD

(R), Koliabor Rural Road

08/08 to 01/12 WA-II /PWD(R)-44/12-13 03/2009

11 Executive Engineer, PWD

(R), Silchar NEC Division

10/09 to 01/12 WA-II /PWD(R)-45/12-13 10/2010

12 Executive Engineer, PWD

(R), Karimganj NEC

Division

05/09 to 01/12 WA-II /PWD(R)-46/12-13 01/2012

13 Executive Engineer, PWD

(R), Nagaon Rural Road

Division

08/10 to 08/12 Eco-1.1/PWD(R)-03/12-13 03/2011

14 Executive Engineer, PWD

(R), Nagaon Statel Road

Division

02/10 to 07/12 Eco-1/PWD(R)-1/12-13/124 dt.

19.11.2012

12/1996

15 Executive Engineer, PWD

(R), Morigaon Rural Road

Division

08/11 to 08/12 Eco-1.1/PWD(R)-4/12-13/1246

dt. 21.11.2012

11/2007

16 Executive Engineer, PWD

(R), Hailakandi NEC

Division

06/10 to 08/12 Eco-1.1/PWD(R)-07/12-13/1345

dt. 13.12.2012

03/2010

17 Executive Engineer, PWD

(R), Sivasagar State Road

Division

09/10 to 09/12 Eco-1.1/PWD(R)-09/12-13/1424

dt. 28.08.2012

05/2008

18 Executive Engineer, PWD

(R), Jorhat NH Division

04/10 to 10/12 Eco-1.1/PWD(R)-12/12-13/1558

dt. 21.01.2013

04/2006

19 Executive Engineer, PWD

(R), Sivasagar Rural Road

Division

05/10 to 10/12 Eco-1.1/PWD(R)-11/12-13/1645

dt. 28.01.2013

05/2009

20 Executive Engineer, PWD

(R), Jorhat Rural Road

Division

05/10 to 11/12 Eco-1.1/PWD(R)-13/12-13/1672

dt. 31.01.2013

02/2009

Page 33: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xxxiii

21 Executive Engineer, PWD

(R), Morigaon State Road

Division

09/10 to 11/12 Eco-1.1/PWD(R)-14/12-13/1730

dt. 31.01.2013

22 Executive Engineer, PWD

(R), Guwahati NH Division

10/11 to 02/13 Eco-1.1/PWD(B)-02/13-14 01/1985

23 Executive Engineer, PWD

(Bldg), Guwahati Building

Division-II

03/10 to 02/13 Eco-1.1/PWD(B)-05/12-13 10/2010

24 Executive Engineer, PWD

(Bldg), Guwahati Building

Division-I

03/10 to 12/12 Eco-1.1/PWD(B)-1/12-13 07/1967

25 Executive Engineer,

Nagaon Water Resource

Division

04/08 to 08/12 Eco-1.1/WR-1/12-13 03/1995

26 Executive Engineer, Palash

Bari Gumi Water Resource

Project Division

09/08 to 12/12 Eco-1.1/WR-2/12-13 07/1986

27 Executive Engineer, Tezpur

Water Resource Division

07/10 to 12/12 Eco-1.1/WR-3/12-13 04/1991

28 Executive Engineer,

Nalbari Irrigation Division

08/09 to 07/12 Eco-1.1/Irrig-1/12-13 04/1985

29 Executive Engineer,

Guwahati Irrigation

Division

06/10to 09/12 Eco-1.1/Irrig-3/12-13 01/1979

30 Executive Engineer,

Pahumara Rupahi

Irrigation Division

08/10 to 10/12 Eco-1.1/Irrig-5/12-13 11/1986

31 Executive Engineer,

Pathsala Irrigation Division

07/08 to 11/12 Eco-1.1/Irrig-6/12-13 04/2007

32 Executive Engineer,

Nagaon Irrigation Division

03/10 to 03/12 Eco-1.1/Irrig-2/12-13 04/2003

33 Executive Engineer,

Hailakandi Irrigation

Division

01/11 to 10/12 Eco-1.1/Irrig-4/12-13 03/2010

34 Executive Engineer,

Biswanath Chariali

Irrigation Division

12/09 to 12/12 Eco-1.1/Irrig-8/12-13 03/2009

35 Executive Engineer,

Morigaon Irrigation

Division

08/10 to 01/13 Eco-1.1/Irrig-7/12-13 10/1982

36 Executive Engineer,

Guwahati Electrical

Division (Irrigation)

10/10 to 01/13 Eco-1.1/Irrig-7/12-13 03/1987

Page 34: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xxxiv

ANNEXURE ‘J’

STATEMENT SHOWING THE DIVISION WISE POSITION OF OUTSTANDING W.M.C. WITH MONEY

VALUE

2012-13

Sl

No Name of the Division Period I.R. No.

Amounting

outstanding

(` in lakh)

1 Executive Engineer, PWD

(R), Abhayapuri

Construction Divn. (NH)

5/10 to 12/13 Eco-1.1/PWD(R)-17/12-13 76.84

2 Executive Engineer, PWD

(R), Guwahati City

Division -II

1/10 to 12/12 Eco-1.1/PWD(R)-16/12-13 Nil

3 Executive Engineer, PWD

(R), Barpeta Rural Road

Division

06/10 to 10/12 Eco-1.1/PWD(R)-10/12-13 66.85

4 Executive Engineer, PWD

(R), Guwahati City

Division -III

01/11 to 07/12 Eco-1.1/PWD(R)-02/12-13 57.00

5 Executive Engineer, PWD

(R), North Guwahati State

Road Division

01/11 to 09/12 Eco-1.1/PWD(R)-06/12-13 26.66

6 Executive Engineer, PWD

(R), Nalbari State Road

Division

11/09 to 09/12 Eco-1.1/PWD(R)-05/12-13 Nil

7 Executive Engineer, PWD

(R), Guwahati Road

Division

06/10 to 09/12 Eco-1.1/PWD(R)-08/12-13 Nil

8 Executive Engineer, PWD

(R), Guwahati City

Division -I

01/12 to 12/12 Eco-1.1/PWD(R)-15/12-13 133.82

9 Executive Engineer, PWD

(R), Jorhat NEC Division

11/10 to 02/12 WA-II/PWD(R)-36/12-13 Not known

10 Executive Engineer, PWD

(R), Koliabor Rural Road

08/08 to 01/12 WA-II /PWD(R)-44/12-13 43.68

11 Executive Engineer, PWD

(R), Silchar NEC Division

10/09 to 01/12 WA-II /PWD(R)-45/12-13 Nil

12 Executive Engineer, PWD

(R), Karimganj NEC

Division

05/09 to 01/12 WA-II /PWD(R)-46/12-13 Nil

13 Executive Engineer, PWD

(R), Nagaon Rural Road

Division

08/10 to 08/12 Eco-1.1/PWD(R)-03/12-13 3.93

14 Executive Engineer, PWD

(R), Nagaon Statel Road

Division

02/10 to 07/12 Eco-1/PWD(R)-1/12-13/124 dt.

19.11.2012

45.45

15 Executive Engineer, PWD

(R), Morigaon Rural Road

Division

08/11 to 08/12 Eco-1.1/PWD(R)-4/12-13/1246 dt.

21.11.2012

Nil

16 Executive Engineer, PWD

(R), Hailakandi NEC

Division

06/10 to 08/12 Eco-1.1/PWD(R)-07/12-13/1345 dt.

13.12.2012

Nil

17 Executive Engineer, PWD

(R), Sivasagar State Road

Division

09/10 to 09/12 Eco-1.1/PWD(R)-09/12-13/1424 dt.

28.08.2012

48.10

18 Executive Engineer, PWD

(R), Jorhat NH Division

04/10 to 10/12 Eco-1.1/PWD(R)-12/12-13/1558 dt.

21.01.2013

60.01

19 Executive Engineer, PWD

(R), Sivasagar Rural Road

05/10 to 10/12 Eco-1.1/PWD(R)-11/12-13/1645 dt.

28.01.2013

1.79

Page 35: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xxxv

Division

20 Executive Engineer, PWD

(R), Jorhat Rural Road

Division

05/10 to 11/12 Eco-1.1/PWD(R)-13/12-13/1672 dt.

31.01.2013

12.79

21 Executive Engineer, PWD

(R), Morigaon State Road

Division

09/10 to 11/12 Eco-1.1/PWD(R)-14/12-13/1730 dt.

31.01.2013

22 Executive Engineer, PWD

(R), Guwahati NH Division

10/11 to 02/13 Eco-1.1/PWD(B)-02/13-14 179.39

23 Executive Engineer, PWD

(Bldg), Guwahati Building

Division-II

03/10 to 02/13 Eco-1.1/PWD(B)-05/12-13 Nil

24 Executive Engineer, PWD

(Bldg), Guwahati Building

Division-I

03/10 to 12/12 Eco-1.1/PWD(B)-1/12-13 Nil

25 Executive Engineer,

Nagaon Water Resource

Division

04/08 to 08/12 Eco-1.1/WR-1/12-13 Nil

26 Executive Engineer, Palash

Bari Gumi Water Resource

Project Division

09/08 to 12/12 Eco-1.1/WR-2/12-13 Nil

27 Executive Engineer, Tezpur

Water Resource Division

07/10 to 12/12 Eco-1.1/WR-3/12-13 Nil

28 Executive Engineer,

Nalbari Irrigation Division

08/09 to 07/12 Eco-1.1/Irrig-1/12-13 Nil

29 Executive Engineer,

Guwahati Irrigation

Division

06/10to 09/12 Eco-1.1/Irrig-3/12-13 22.09

30 Executive Engineer,

Pahumara Rupahi

Irrigation Division

08/10 to 10/12 Eco-1.1/Irrig-5/12-13 Nil

31 Executive Engineer,

Pathsala Irrigation Division

07/08 to 11/12 Eco-1.1/Irrig-6/12-13 26.21

32 Executive Engineer,

Nagaon Irrigation Division

03/10 to 03/12 Eco-1.1/Irrig-2/12-13 Nil

33 Executive Engineer,

Hailakandi Irrigation

Division

01/11 to 10/12 Eco-1.1/Irrig-4/12-13 12.77

34 Executive Engineer,

Biswanath Chariali

Irrigation Division

12/09 to 12/12 Eco-1.1/Irrig-8/12-13 Nil

35 Executive Engineer,

Morigaon Irrigation

Division

08/10 to 01/13 Eco-1.1/Irrig-7/12-13 Nil

36 Executive Engineer,

Guwahati Electrical

Division (Irrigation)

10/10 to 01/13 Eco-1.1/Irrig-7/12-13 Nil

Page 36: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xxxiii

ANNEXURE ‘K’

STATEMENT SHOWING THE DIVISION WISE POSITION OF AMOUNT LYING UNDER CASH SETTLEMENT SUSPENSE 2012-13

Sl No Name of the Division Period I.R. No. Inward Claim

(` in lakh)

Outward Claim

(` in lakh)

1 Executive Engineer, PWD (R),

Abhayapuri Construction Divn. (NH)

5/10 to 12/13 Eco-1.1/PWD(R)-17/12-13 Nil 56.29

2 Executive Engineer, PWD (R), Guwahati

City Division -II

1/10 to 12/12 Eco-1.1/PWD(R)-16/12-13 Nil Nil

3 Executive Engineer, PWD (R), Barpeta

Rural Road Division

06/10 to 10/12 Eco-1.1/PWD(R)-10/12-13 34.71 17.60

4 Executive Engineer, PWD (R), Guwahati

City Division -III

01/11 to 07/12 Eco-1.1/PWD(R)-02/12-13 2.36 3.87

5 Executive Engineer, PWD (R), North

Guwahati State Road Division

01/11 to 09/12 Eco-1.1/PWD(R)-06/12-13 Nil Nil

6 Executive Engineer, PWD (R), Nalbari

State Road Division

11/09 to 09/12 Eco-1.1/PWD(R)-05/12-13 Nil Nil

7 Executive Engineer, PWD (R), Guwahati

Road Division

06/10 to 09/12 Eco-1.1/PWD(R)-08/12-13 36.22 162.67

8 Executive Engineer, PWD (R), Guwahati

City Division -I

01/12 to 12/12 Eco-1.1/PWD(R)-15/12-13 23.11 5.78

9 Executive Engineer, PWD (R), Jorhat

NEC Division

11/10 to 02/12 WA-II/PWD(R)-36/12-13 2.90 1.79

10 Executive Engineer, PWD (R), Koliabor

Rural Road

08/08 to 01/12 WA-II /PWD(R)-44/12-13 - 6.97

11 Executive Engineer, PWD (R), Silchar

NEC Division

10/09 to 01/12 WA-II /PWD(R)-45/12-13 Nil Nil

12 Executive Engineer, PWD (R), Karimganj

NEC Division

05/09 to 01/12 WA-II /PWD(R)-46/12-13 Nil Nil

13 Executive Engineer, PWD (R), Nagaon

Rural Road Division

08/10 to 08/12 Eco-1.1/PWD(R)-03/12-13 19.77 0.05

14 Executive Engineer, PWD (R), Nagaon

Statel Road Division

02/10 to 07/12 Eco-1/PWD(R)-1/12-13/124

dt. 19.11.2012

13.57 14.63

15 Executive Engineer, PWD (R), Morigaon

Rural Road Division

08/11 to 08/12 Eco-1.1/PWD(R)-4/12-13/1246 dt.

21.11.2012

Nil Nil

16 Executive Engineer, PWD (R), Hailakandi

NEC Division

06/10 to 08/12 Eco-1.1/PWD(R)-07/12-13/1345 dt.

13.12.2012

Nil Nil

17 Executive Engineer, PWD (R), Sivasagar

State Road Division

09/10 to 09/12 Eco-1.1/PWD(R)-09/12-13/1424 dt.

28.08.2012

Nil Nil

18 Executive Engineer, PWD (R), Jorhat NH

Division

04/10 to 10/12 Eco-1.1/PWD(R)-12/12-13/1558 dt.

21.01.2013

1.98 8.66

Page 37: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xxxiv

19 Executive Engineer, PWD (R), Sivasagar

Rural Road Division

05/10 to 10/12 Eco-1.1/PWD(R)-11/12-13/1645 dt.

28.01.2013

23.72 1.91

20 Executive Engineer, PWD (R), Jorhat

Rural Road Division

05/10 to 11/12 Eco-1.1/PWD(R)-13/12-13/1672 dt.

31.01.2013

Nil Nil

21 Executive Engineer, PWD (R), Morigaon

State Road Division

09/10 to 11/12 Eco-1.1/PWD(R)-14/12-13/1730 dt.

31.01.2013

22 Executive Engineer, PWD (R), Guwahati

NH Division

10/11 to 02/13 Eco-1.1/PWD(B)-02/13-14 32.11 30.84

23 Executive Engineer, PWD (Bldg),

Guwahati Building Division-II

03/10 to 02/13 Eco-1.1/PWD(B)-05/12-13 74.68 64.53

24 Executive Engineer, PWD (Bldg),

Guwahati Building Division-I

03/10 to 12/12 Eco-1.1/PWD(B)-1/12-13 34.76 723.67

25 Executive Engineer, Nagaon Water

Resource Division

04/08 to 08/12 Eco-1.1/WR-1/12-13 7.66 1.60

26 Executive Engineer, Palash Bari Gumi

Water Resource Project Division

09/08 to 12/12 Eco-1.1/WR-2/12-13 13.81 -

27 Executive Engineer, Tezpur Water

Resource Division

07/10 to 12/12 Eco-1.1/WR-3/12-13 - 6.52

28 Executive Engineer, Nalbari Irrigation

Division

08/09 to 07/12 Eco-1.1/Irrig-1/12-13 11.59 14.35

29 Executive Engineer, Guwahati Irrigation

Division

06/10to 09/12 Eco-1.1/Irrig-3/12-13 3.67 27.81

30 Executive Engineer, Pahumara Rupahi

Irrigation Division

08/10 to 10/12 Eco-1.1/Irrig-5/12-13 15.72 0.38

31 Executive Engineer, Pathsala Irrigation

Division

07/08 to 11/12 Eco-1.1/Irrig-6/12-13 12.02 6.56

32 Executive Engineer, Nagaon Irrigation

Division

03/10 to 03/12 Eco-1.1/Irrig-2/12-13 13.27 3.39

33 Executive Engineer, Hailakandi

Irrigation Division

01/11 to 10/12 Eco-1.1/Irrig-4/12-13 Nil 4.03

34 Executive Engineer, Biswanath Chariali

Irrigation Division

12/09 to 12/12 Eco-1.1/Irrig-8/12-13 4.03 Nil

35 Executive Engineer, Morigaon Irrigation

Division

08/10 to 01/13 Eco-1.1/Irrig-7/12-13 5.56 Nil

36 Executive Engineer, Guwahati Electrical

Division (Irrigation)

10/10 to 01/13 Eco-1.1/Irrig-7/12-13 Nil Nil

Page 38: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xxxv

ANNEXURE ‘L’

STATEMENT SHOWING THE DIVISION WISE POSITION OF PAYMENT MADE THROUGH HAND RECEIPT DURING THE YEAR 2012-13

Sl No Name of the Division Period I.R. No. Amount

(` in lakh)

1 Executive Engineer, PWD (R),

Abhayapuri Construction Divn. (NH)

5/10 to 12/13 Eco-1.1/PWD(R)-17/12-13

2 Executive Engineer, PWD (R), Guwahati

City Division -II

1/10 to 12/12 Eco-1.1/PWD(R)-16/12-13

3 Executive Engineer, PWD (R), Barpeta

Rural Road Division

06/10 to 10/12 Eco-1.1/PWD(R)-10/12-13

4 Executive Engineer, PWD (R), Guwahati

City Division -III

01/11 to 07/12 Eco-1.1/PWD(R)-02/12-13

5 Executive Engineer, PWD (R), North

Guwahati State Road Division

01/11 to 09/12 Eco-1.1/PWD(R)-06/12-13

6 Executive Engineer, PWD (R), Nalbari

State Road Division

11/09 to 09/12 Eco-1.1/PWD(R)-05/12-13

7 Executive Engineer, PWD (R), Guwahati

Road Division

06/10 to 09/12 Eco-1.1/PWD(R)-08/12-13

8 Executive Engineer, PWD (R), Guwahati

City Division -I

01/12 to 12/12 Eco-1.1/PWD(R)-15/12-13

9 Executive Engineer, PWD (R), Jorhat

NEC Division

11/10 to 02/12 WA-II/PWD(R)-36/12-13

10 Executive Engineer, PWD (R), Koliabor

Rural Road

08/08 to 01/12 WA-II /PWD(R)-44/12-13

11 Executive Engineer, PWD (R), Silchar

NEC Division

10/09 to 01/12 WA-II /PWD(R)-45/12-13

12 Executive Engineer, PWD (R), Karimganj

NEC Division

05/09 to 01/12 WA-II /PWD(R)-46/12-13

13 Executive Engineer, PWD (R), Nagaon

Rural Road Division

08/10 to 08/12 Eco-1.1/PWD(R)-03/12-13

14 Executive Engineer, PWD (R), Nagaon

Statel Road Division

02/10 to 07/12 Eco-1/PWD(R)-1/12-13/124 dt. 19.11.2012

15 Executive Engineer, PWD (R), Morigaon

Rural Road Division

08/11 to 08/12 Eco-1.1/PWD(R)-4/12-13/1246 dt. 21.11.2012

16 Executive Engineer, PWD (R), Hailakandi

NEC Division

06/10 to 08/12 Eco-1.1/PWD(R)-07/12-13/1345 dt.

13.12.2012

17 Executive Engineer, PWD (R), Sivasagar

State Road Division

09/10 to 09/12 Eco-1.1/PWD(R)-09/12-13/1424 dt.

28.08.2012

18 Executive Engineer, PWD (R), Jorhat NH

Division

04/10 to 10/12 Eco-1.1/PWD(R)-12/12-13/1558 dt.

21.01.2013

19 Executive Engineer, PWD (R), Sivasagar

Rural Road Division

05/10 to 10/12 Eco-1.1/PWD(R)-11/12-13/1645 dt.

28.01.2013

Page 39: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xxxvi

20 Executive Engineer, PWD (R), Jorhat

Rural Road Division

05/10 to 11/12 Eco-1.1/PWD(R)-13/12-13/1672 dt.

31.01.2013

21 Executive Engineer, PWD (R), Morigaon

State Road Division

09/10 to 11/12 Eco-1.1/PWD(R)-14/12-13/1730 dt.

31.01.2013

22 Executive Engineer, PWD (R), Guwahati

NH Division

10/11 to 02/13 Eco-1.1/PWD(B)-02/13-14

23 Executive Engineer, PWD (Bldg),

Guwahati Building Division-II

03/10 to 02/13 Eco-1.1/PWD(B)-05/12-13

24 Executive Engineer, PWD (Bldg),

Guwahati Building Division-I

03/10 to 12/12 Eco-1.1/PWD(B)-1/12-13

25 Executive Engineer, Nagaon Water

Resource Division

04/08 to 08/12 Eco-1.1/WR-1/12-13

26 Executive Engineer, Palash Bari Gumi

Water Resource Project Division

09/08 to 12/12 Eco-1.1/WR-2/12-13

27 Executive Engineer, Tezpur Water

Resource Division

07/10 to 12/12 Eco-1.1/WR-3/12-13

28 Executive Engineer, Nalbari Irrigation

Division

08/09 to 07/12 Eco-1.1/Irrig-1/12-13

29 Executive Engineer, Guwahati Irrigation

Division

06/10to 09/12 Eco-1.1/Irrig-3/12-13

30 Executive Engineer, Pahumara Rupahi

Irrigation Division

08/10 to 10/12 Eco-1.1/Irrig-5/12-13

31 Executive Engineer, Pathsala Irrigation

Division

07/08 to 11/12 Eco-1.1/Irrig-6/12-13

32 Executive Engineer, Nagaon Irrigation

Division

03/10 to 03/12 Eco-1.1/Irrig-2/12-13

33 Executive Engineer, Hailakandi

Irrigation Division

01/11 to 10/12 Eco-1.1/Irrig-4/12-13

34 Executive Engineer, Biswanath Chariali

Irrigation Division

12/09 to 12/12 Eco-1.1/Irrig-8/12-13

35 Executive Engineer, Morigaon Irrigation

Division

08/10 to 01/13 Eco-1.1/Irrig-7/12-13

36 Executive Engineer, Guwahati Electrical

Division (Irrigation)

10/10 to 01/13 Eco-1.1/Irrig-7/12-13

Page 40: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xxxvii

ANNEXURE ‘M’

STATEMENT SHOWING THE DIVISION WISE POSITION OF EXCESS EXPENDITURE OVER SANCTIONED ESTIMATES 2012-13

Sl No Name of the Division Period I.R. No. No. of Scheme/ works

A. Amount

(` in lakh)

Excess Expendr.

Incurred

(` in lakh)

1 Executive Engineer, PWD (R),

Abhayapuri Construction Divn.

(NH)

5/10 to 12/13 Eco-1.1/PWD(R)-17/12-13 Nil Nil Nil

2 Executive Engineer, PWD (R),

Guwahati City Division -II

1/10 to 12/12 Eco-1.1/PWD(R)-16/12-13 Nil Nil Nil

3 Executive Engineer, PWD (R),

Barpeta Rural Road Division

06/10 to 10/12 Eco-1.1/PWD(R)-10/12-13 Nil Nil Nil

4 Executive Engineer, PWD (R),

Guwahati City Division -III

01/11 to 07/12 Eco-1.1/PWD(R)-02/12-13 Nil Nil Nil

5 Executive Engineer, PWD (R),

North Guwahati State Road

Division

01/11 to 09/12 Eco-1.1/PWD(R)-06/12-13 Nil Nil Nil

6 Executive Engineer, PWD (R),

Nalbari State Road Division

11/09 to 09/12 Eco-1.1/PWD(R)-05/12-13 Nil Nil Nil

7 Executive Engineer, PWD (R),

Guwahati Road Division

06/10 to 09/12 Eco-1.1/PWD(R)-08/12-13 Nil Nil Nil

8 Executive Engineer, PWD (R),

Guwahati City Division -I

01/12 to 12/12 Eco-1.1/PWD(R)-15/12-13 Nil Nil Nil

9 Executive Engineer, PWD (R),

Jorhat NEC Division

11/10 to 02/12 WA-II/PWD(R)-36/12-13 Nil Nil Nil

10 Executive Engineer, PWD (R),

Koliabor Rural Road

08/08 to 01/12 WA-II /PWD(R)-44/12-13 Nil Nil Nil

11 Executive Engineer, PWD (R),

Silchar NEC Division

10/09 to 01/12 WA-II /PWD(R)-45/12-13 Nil Nil Nil

12 Executive Engineer, PWD (R),

Karimganj NEC Division

05/09 to 01/12 WA-II /PWD(R)-46/12-13 B.A. Kanai Bazar

Road

72.54 27.03

13 Executive Engineer, PWD (R),

Nagaon Rural Road Division

08/10 to 08/12 Eco-1.1/PWD(R)-03/12-13 Nil Nil Nil

14 Executive Engineer, PWD (R),

Nagaon Statel Road Division

02/10 to 07/12 Eco-1/PWD(R)-1/12-13/124 dt.

19.11.2012

Nil Nil Nil

15 Executive Engineer, PWD (R),

Morigaon Rural Road Division

08/11 to 08/12 Eco-1.1/PWD(R)-4/12-13/1246

dt. 21.11.2012

Nil Nil Nil

16 Executive Engineer, PWD (R),

Hailakandi NEC Division

06/10 to 08/12 Eco-1.1/PWD(R)-07/12-13/1345

dt. 13.12.2012

Nil Nil Nil

17 Executive Engineer, PWD (R),

Sivasagar State Road Division

09/10 to 09/12 Eco-1.1/PWD(R)-09/12-13/1424

dt. 28.08.2012

Nil Nil Nil

Page 41: ANNUAL REVIEWagasm.cag.gov.in/forms/new_pdf/WM_AR_12_13.pdfReport on the ANNUAL REVIEW ON THE WORKING OF PUBLIC WORKS DIVISIONS OF ASSAM for the Year 2012-13 PRINCIPAL ACCOUNTANT GENERAL(A&E)ASSAM

xxxviii

18 Executive Engineer, PWD (R),

Jorhat NH Division

04/10 to 10/12 Eco-1.1/PWD(R)-12/12-13/1558

dt. 21.01.2013

Nil Nil Nil

19 Executive Engineer, PWD (R),

Sivasagar Rural Road Division

05/10 to 10/12 Eco-1.1/PWD(R)-11/12-13/1645

dt. 28.01.2013

Nil Nil Nil

20 Executive Engineer, PWD (R),

Jorhat Rural Road Division

05/10 to 11/12 Eco-1.1/PWD(R)-13/12-13/1672

dt. 31.01.2013

Nil Nil Nil

21 Executive Engineer, PWD (R),

Morigaon State Road Division

09/10 to 11/12 Eco-1.1/PWD(R)-14/12-13/1730

dt. 31.01.2013

Nil Nil Nil

22 Executive Engineer, PWD (R),

Guwahati NH Division

10/11 to 02/13 Eco-1.1/PWD(B)-02/13-14 Nil Nil Nil

23 Executive Engineer, PWD

(Bldg), Guwahati Building

Division-II

03/10 to 02/13 Eco-1.1/PWD(B)-05/12-13 Nil Nil Nil

24 Executive Engineer, PWD

(Bldg), Guwahati Building

Division-I

03/10 to 12/12 Eco-1.1/PWD(B)-1/12-13 Nil Nil Nil

25 Executive Engineer, Nagaon

Water Resource Division

04/08 to 08/12 Eco-1.1/WR-1/12-13 Nil Nil Nil

26 Executive Engineer, Palash Bari

Gumi Water Resource Project

Division

09/08 to 12/12 Eco-1.1/WR-2/12-13 Nil Nil Nil

27 Executive Engineer, Tezpur

Water Resource Division

07/10 to 12/12 Eco-1.1/WR-3/12-13 Nil Nil Nil

28 Executive Engineer, Nalbari

Irrigation Division

08/09 to 07/12 Eco-1.1/Irrig-1/12-13 Nil Nil Nil

29 Executive Engineer, Guwahati

Irrigation Division

06/10to 09/12 Eco-1.1/Irrig-3/12-13 Nil Nil Nil

30 Executive Engineer, Pahumara

Rupahi Irrigation Division

08/10 to 10/12 Eco-1.1/Irrig-5/12-13 Nil Nil Nil

31 Executive Engineer, Pathsala

Irrigation Division

07/08 to 11/12 Eco-1.1/Irrig-6/12-13 Nil Nil Nil

32 Executive Engineer, Nagaon

Irrigation Division

03/10 to 03/12 Eco-1.1/Irrig-2/12-13 Nil Nil Nil

33 Executive Engineer, Hailakandi

Irrigation Division

01/11 to 10/12 Eco-1.1/Irrig-4/12-13 Nil Nil Nil

34 Executive Engineer, Biswanath

Chariali Irrigation Division

12/09 to 12/12 Eco-1.1/Irrig-8/12-13 Nil Nil Nil

35 Executive Engineer, Morigaon

Irrigation Division

08/10 to 01/13 Eco-1.1/Irrig-7/12-13 Nil Nil Nil

36 Executive Engineer, Guwahati

Electrical Division (Irrigation)

10/10 to 01/13 Eco-1.1/Irrig-7/12-13 Nil Nil Nil