2015Annual Report 2015
SERBIA AND MONTENEGRO AIR TRAFFIC SERVICESSMATSA llc BELGRADE
Annual Report 2015
Version: Date:
Status:
Annual Report 20154
CONTENTS 1 Foreword by the CEO 6
2 AboutSerbiaandMontenegroAirTrafficServicesSMATSAllc 8
2.1 OrganisationProfile 82.2 AirNavigationServices(ANS) 82.3 Additionalservices 9
3 Important Business Results Marking 2015 10 3.1 ATMUpgrades 10
3.1.1 TrafficfiguresinSMATSAllcareaofresponsibility 123.2 Equipment,SystemsandInfrastructureImprovement 173.3 AISImprovement 243.4 METServicesImprovement 25
4 BusinessPerformance 264.1 OperationsinaccordancewiththeSESTargets 26
4.1.1 Safety 274.1.2 CapacityandDelays 284.1.3 CostEfficiency 294.1.4 EnvironmentalProtection 30
4.2 Operationinrelationtootherobjectives 314.2.1 Qualityofservices 314.2.2 OtherBusinessPerformanceIndicators 33
5 OrganisationalTechnology-basedManagementSystems 345.1 AirTrafficSafety 345.2 QualityManagement 365.3 InformationTechnologies 375.4 Security 38
6 HumanResources 396.1 FluctuationsandAverageNumberofEmployeesin2015 416.2 EmployeeStructure 42
7 AdditionalServices 437.1 CalibrationoftheGroundBasedRadioNavigationAidsfromtheAir 437.2 ANSPersonnelTrainingCentre 447.3 SMATSAAviationAcademy 45
8 ConsultationswithUsersofServices 46
9 FinancialStatements 499.1 IncomeStatement 499.2 BalanceSheet 539.3 CashFlowStatement 589.4 NotestoFinancialStatements 60
9.4.1 BasisforPreparationofFinancialStatements 609.4.2 SummaryofSignificantAccountingPolicies 619.4.3 FinancialRiskManagement 69
10 Independent Auditor’s Report 72
11 AcronymsandAbbreviations 74
12 Annex1-SMATSAllcOrganisationalStructure 78
Annual Report 2015 5
LISTOFFIGURES Figure 1 - The territory in which SMATSA llc provides air navigation services 9Figure 2 - number oF Flights in the period From 2008 to 2015 12Figure 3 - distribution oF Flights in 2015 13Figure 4 - peak day and peak hour in the period From 2008 to 2015 13Figure 5 - participation oF diFFerent aircraFt types in 2015 14Figure 6 - number oF take-oFFs and landings at airports in the period From 2008 to 2015 14Figure 7 - Distribution oF traFFic at some airports in 2015 14Figure 8 - number oF service units in the period From 2008 to 2015 15Figure 9 - average Flight length and average mtow in Fir beograd in the period From 2008 to 2015 15Figure 10 - unit rate value in 2015 16Figure 11 - average atFm delay per Flight in the area oF SMATSA llc responsibility From 2007 to 2015 28Figure 12 - unit rate given For “serbia - montenegro - kFor” charging area in 2015 29Figure 13 - horizontal Flight eFFiciency For serbia and montenegro in 2015 (source: eurocontrol/pru) 30Figure 14 - employee structure by gender 42Figure 15 - employee structure by qualiFication groups 42Figure 16 - employee structure by age 42
LIST OF TABLEStable 1 - realization oF planned activities in 2015 within the atm 11table 2 - realization oF planned activities in 2015 within equipment systems and inFrastructure improvement compared to planned projects 17table 3 - reasons For the realization oF the most important investments listed in 2015 annual plan . in the part speciFication oF investments 20table 4 - the summary oF realised activities in the area oF ais provision in 2015 24table 5 - realization oF planned activities in 2015 in the Field oF aeronautical meteorology 25table 6 - target and achieved values oF saFety indicators in 2015 27table 7 - analysis oF the FulFillment oF 2015 quality objectives 31table 8 - other business perFormance indicators 33table 9 - realization oF planned activities within the improvement oF the saFety management system in 2015 35table 10 - realization oF planned activities in 2015 in the Field oF quality management 36table 11 - realization oF planned activities in 2015 in the Field oF human resources 40table 12 - planned and actual number oF employees in 2015 41table 13 - Fluctuations oF employees in 2015 by month 41table 14 - realization oF planned activities in 2015 within the calibration oF ground based radio navigation aids 43table 15 - realization oF planned activities in 2015 within the ans personnel training centre 44table 16 - realization oF planned activities in 2015 within the SMATSA aviation academy 45table 17 - realization oF planned activities within the improvement oF the cooperation with relevant organisations in the sphere oF aviation and users oF air navigation services in 2015 46table 18 - satisFaction oF pilot trainees 48table 19 - 2015 income statement, in 000 rsd 49table 20 - 2015 assets, in 000 rsd 53table 21 - 2015 liabilities, in 000 rsd 56table 22 - 2015 cash Flow statement, in 000 rsd 58table 23 - base amortisation rates For certain intangible assets 62table 24 - base depreciation rates For property, plant and equipment 63
Annual Report 20156
01CEO’s Foreword
RadojicaRovčanin,CEO
ForSMATSA llc, 2015wasa year of successandinitialisation of significant projects, while at theinternationallevel,itwasayearofintensivecooperation.
It began with very intensive cooperation withAirNavigationServicesProvidersintheregionindevelopingandimplementationoftheprojects,withintheEUinitiativeon theestablishment of theSingleEuropeanSky,regardlessofthebordersbetweenthestates.
Inearly2015,5providersofairnavigationservices,asfollows:CroatiaControlLtd(CCL),SlovenianAirNavigation Services, Bosnia andHerzegovinaAirNavigationServicesAgency(BHANSA),BulgarianAirTrafficServicesAuthority (BULATSA)andSMATSAllc,agreedtointroduce11optionsoflongrangecross-bordertraffic(LRDs)inordertoproactivelyapproachthecustomers’needsandimprovethequalityofprovidedservices.Thetestingofthesystemwassuccessfullycompletedandall11optionswerepublishedfortheapplication thatwasplanned tobe implementedatthebeginningof2016.Inadditiontothese5ANSPswhichwere directly involved, theAustrianANSP -АUSTROCONTROLalsotookpartinthisphaseoftheprojectasanassociatemember.
Togetherwiththisproject,wehavecontinuedcooperationonthedevelopmentandimplementationoftheconceptoffreerouteplanningonthesouth-eastaxis(SEAFRA-South-EastAxisFreeRouteAirspace).Thisisaproject
In2016wewillcontinuetherealizationofnumerousinitializedprojects,weexpectnumerouschallenges,andSMATSAllcwilltrytoensurethetrustofitsusersthroughitsactivities.
thatbeganinthepreviousyearanditismypleasuretopointoutthaton30thApril,2015,threeprovidersofairnavigationservices(SMATSAllc,CCLandBHANSA),whichareresponsibleforprovidingairnavigationservicesintheairspaceoffourstates-theRepublicofSerbia,theStateofMontenegro,theRepublicofCroatiaandBosniaandHerzegovina,haveofferedtotheairspaceusersthepossibilityofplanningandexecutingflightsnotlimitedbynationalbordersorboundariesoftheareaofresponsibility(AoR),throughtheuseoffreecross-borderrouteplanningonthesouth-eastaxisfromFL325toFL660.
ItisimportanttopointoutthattheparticipantsofthisfirstconceptofEuropeanFRA,whichisconductedovertheterritoriesoffourstates,arealsomembersofFABCE(theRepublicofCroatiaandBosniaandHerzegovina)ononeside,andtheRepublicofSerbiaandtheStateofMontenegroontheotherside,whicharenotpartofFABinitiative,indisputablyprovingthatsuchcooperationispossibleandcanbebeneficialtoallinterestedparties.The ideabehind thisconcept isacommongoal toimprove,ontheonehand,thesafetyandefficiencyofair trafficservicesprovisionand,ontheotherhand,environmentprotectionbyreducingfuelconsumption,CO2andnitrogenoxidesemission.AspecialcuriosityisthattheactivitiesrelatedtoSEAFRAwerecarriedoutinaccordancewithRegulation716/2014,i.e.7yearsbeforetheplanneddateforunlimitedfreeuseofairspaceover9000m,aboveEurope–1stJanuary,2022.
Annual Report 2015 7
Itisofgreatimportancetoemphasisethattheprojectoflongrangecross-bordertraffic(LRDs)willnotaffecttheimplementationoftheFRAintheairspaceofresponsibilityofANSPsparticipatinginbothprojects.
SMATSAllchasestablishedthecooperationwithanumberofprovidersofairnavigationservicesinthecontextofCentralizedservicesaswell,acompletelynewconceptofprojectsdevelopedbyEUROCONTROL.Weareactivelyinvolvedintheseprojects,designedasacompletelynewconceptforprovisionofcertainservices,andtothateffectwehaveofferedtoprovidesomeoftheseservicestotheEuropeancommunityinthefuture,togetherwithourpotentialpartnersfromtheregionandbeyond.Thefirstresultsoftheproceduresareexpectedin2016.
Inthespringof2015,wehostedthe16thThalesUsersGroup(TUG)Conference,whichistraditionallyorganizedeveryotheryearbyoneoftheworld’slargestequipmentmanufacturers,THALESCompany,fortheusersofitsequipment.Duringthisfour-dayconferencewehostedmorethan120representativesofairnavigationservicesprovidersfromaroundtheworldandTHALESCompany,who,inadditiontotheconference,hadtheopportunitytoenjoythenaturalbeautyandsightsofBelgrade.
Itismypleasuretohighlightsomestatisticsdatashowingthatanincreaseintrafficof9%wasrecordedin2015.TheareaofresponsibilityofSMATSAllcwasused,duringtheyear,bytotally597,282flights,whichwereprovidedwithservicesofexceptionalqualitywithoutthedelaysgeneratedbyATC.Duringthepeakday,on29thAugust,arecordof2,969flightswasrealized.
TheapplicationofPerformanceBasedNavigationprocedures(PerformanceBasedNavigation-PBN)hasstartedatairportsinBelgradeandNiš,designedbyapplyingtheareanavigationusingGNSS(GlobalNavigationSatelliteSystem),whiletheapplicationoftheseproceduresatairportsinPodgoricaandTivatisplannedfortheyearof2016.
Withtheaimofbeingamodern,highlyqualifiedandresponsiblecompany,SMATSAllcconstantlyimprovesthelevelofairtrafficservicesprovisiontoenablesafe,regularandefficientperformanceofairtrafficintheareaofresponsibility,evenintheeventofanincreasednumberofserviceusers.Wehavebegunwiththeactivitiesona
multi-yearprojectofcomprehensivemodernizationoftheairtrafficcontrolsystemandatthesametimewehavecontinuedorsuccessfullycompletedalreadyinitiatedmodernizationprojects.Wehavesuccessfullycontinuedtheimplementationofinitializedinfrastructureprojects.In2016weexpectthecompletionofthereconstructionprojectoftheairtrafficcontroltowerinTivat.
SMATSAllchascontinueditshumanitarianactivity.Inthecourseof2015,wedonatedthefundsoftotal30,000,000dinars.WehavedonatedsignificantfundstoSpecialHospital“SaintSava”inBelgrade,CentreforEndocrineSurgeryofClinicalCentreofSerbia,InstituteforOncologyandRadiologyofSerbia.WehavehelpedtheSoupKitchensinKosovoandMetohija,SerbianparticipantsintheSpecialOlympicsandthelargenumberofculturalinstitutions.SMATSAllc,beingasociallyresponsiblecompany,willcontinueinthefuturetohelpthosewhoneedhelpbecauseweknowthatourlittlemeansalottosomeoneelse.
Wecontinuetosuccessfullyprovideservicesofcalibrationofairportandothergroundbasedradio-navigationaidsunderthepreviouslyconcludedcontracts,butalsotoparticipateininternationaltendersfortheprovisionoftheseservices.Wehaveconcludednewcontractsandenrolledanewclassofself-financingcandidatesforairtrafficcontrolofficers.SMATSAAviationAcademyhasenrolled100candidatesinthevarioustypesoftraining.
I proudly emphasize that our investments in thedevelopmentofthesystem,throughhumanresourcesandcontinuousmodernizationandimprovement,aswellasthroughtheconstantraisingofthesafetyawarenesslevelamongallemployeesinSMATSAllc,resultedinSMATSAllctakingthefirstplaceamongprovidersofairnavigationservices,aftertheanalysisprocedureof“SafetyMaturityScore”or“measurementofmaturity”ofthesafetymanagementsystemthatisconductedbyEUROCONTROLeveryyear.
In2016wewillcontinuetherealizationofnumerousinitializedprojects,weexpectnumerouschallenges,andSMATSAllcwilltrytoensurethetrustofitsusersthroughitsactivities.
Извештајопословањуза2015.годину 7
Annual Report 20158
02AboutSerbiaandMontenegro AirTrafficServicesSMATSAllc
2.1OrganisationProfile
SerbiaandMontenegroAirTrafficServicesSMATSAllc (hereinafterSMATSA llc)wasestablished inordertoprovideairtrafficservicesintheareaofitsresponsiblityaswellastoperformotheractivitiesinthefieldofairnavigation.
ThefoundersofSMATSAllcaretheGovernmentsof theRepublic of Serbia and of the State ofMontenegro.
ThecontractsignedbybothGovernmentsin2012,after theAgreementonCooperation in theAirTrafficDomainconcludedbetweentheRepublicofSerbiaandtheStateofMontenegro,confirmedthecontinuityofthecommonproviderofairtrafficcontrolservices-SMATSAllc.
SMATSAllcfullyoperatesincompliancewithnationaland international regulations and internationalagreements.Inaddition,SMATSAllcparticipatesinworkofthemostimportantinternationalaviationorganisationsandrepresentstheRepublicofSerbiaandtheStateofMontenegrointhebestpossibleway.
ThemissionofSMATSAllcistheprovisionofhighqualityairnavigationservices(theservicesinthefieldofATM,CNS,MET,AIS)tocivilandmilitaryaircraft,inordertomaintainandimprovethesafe,orderly,andexpeditiousairtrafficintheairspaceofFIR/UIRBeogradandintheairspaceofothercountries,onthebasisofbilateralstateagreements,aswellastheservicesANSPpersonneltraining,pilotstraining,flightcalibrationservicesofgroundbasednavigationaidsandsystemsfromtheairandaircraftmaintenanceservices.
2.2AirNavigationServices(ANS)
ThemainactivityofSMATSAllcistheprovisionofairnavigationservices(ANS),whichincludes:
1. ATS-AirTrafficServices,2. CNS - Communication, Navigation and
Surveillance,3. AIS-AeronauticalInformationServicesand4. MET-AeronauticalMeteorologicalServices
Serbia,MontenegroandBosniaandHerzegovinaentrustedSMATSAllcwiththeprovisionofairtrafficservices.
SMATSA llcareaof responsibility includes theairspaceabove:
1. TheRepublicofSerbia,2. TheStateofMontenegro,3. PartofinternationalairspaceovertheAdriatic
Sea,and4. PartofBosniaandHerzegovina.
Annual Report 2015 9
Figure 1.TheterritoryinwhichSMATSAllcprovidesairnavigationservices
2.3Additionalservices
Inadditiontoairnavigationservices,SMATSAllcprovidesadditionalservicesthatinclude:
1. ANSPersonnelandPilotTraining,2. FlightCalibrationofGroundBasedRadioNavigationAids,and3. AircraftMaintenance.
Annual Report 201510
03ImportantBusiness ResultsMarking2015
On30thApril,2015,threeprovidersofairnavigationservices(SMATSA,CAAandBHANSA),responsibleforprovidingairnavigationservicesintheairspaceoffourcountries-Serbia,Montenegro,CroatiaandBosniaandHerzegovina,enabledtheplanningandexecutionoftheflightsbyapplyingfreecross-borderrouteplanning(SEAFRA-South-EastAxisFreeRouteAirspace)abovetheflightlevel325.Afterthat,on20thAugust,2015,theamendmenttotheoriginalconceptenteredintoforce,whentheperiod,inwhichthenetworkofATSrouteswassuspended,wasamended.ThisprojectisoneofthekeyimprovementsinthecontextofEUinitiativeontheestablishmentoftheSingleEuropeanSky,regardlessofthebordersbetweenthestates,andaimstoincreasethesafety,efficiency,andairspacecapacity.Activitiesinconnectionwiththisprojectwillbecontinuedin2016,withanaimfortheapplicationintheperiodof24hours.
InMay2015,theProjectofestablishingtheroutesfortheplanningoflongrangedirectcross-bordertraffic(LRD-LongRangeDCTs)beganinBelgrade,wherethefirstofthreemeetingsofthegroupconsistingofrepresentativesofSlovenia,Croatia,BosniaandHerzegovina,Montenegro,SerbiaandBulgariawasheld,whileAustriasubsequentlyjoinedtheinitiative.Theresultoftheworkofthegroupwastheselectionof11LRDoptionsthatextendfromtheSlovenian-AustriantotheBulgarian-Turkishborder,theimplementationofwhichisplannedfor4thFebruary,2016.
PBNproceduresfortheairportNikolaTesla,BeogradandKonstantinVeliki/Nišenteredintoforceduringthisyear,andPBNproceduresforairportsPodgoricaandTivatwillbeputintooperationalusenextyear,afterobtainingtheconsentoftheCAA.
Preparatory activities for introduction of radarvectoringservicebelowthealtitudeof10,000feetinTMAPodgoricaweresuccessfullycompletedduringtheyearandtheamendmentsentered intoforceon30thApril.Afterthesummerseason,from12thNovember,thepositionRDRPlannerwasintroducedintotheoperationalimplementationinTMAPodgorica.
InordertoincreasetheairspacecapacitythroughouttheyearweworkedonchangingandimprovingtheACCBelgradesectorisation.UsingtheEurocontrol’sNESTtool,morethan20differentscenariosofthenewsectorisationhadbeentested,andasolutionincreasing the capacity by 30%, based on theintroductionofthenewDFLwaschosen,withoutmajorchangesinthelateralborders.Implementationofthenewsectorisationisplannedfor4thFebruary,2016.
ActivitiesrelatedtotheprojectofconstructionoftheannextotheATCCbuildingwithatowerincludedtheconsultationswiththecityurbanplanninginstitute,provisionofthefundsfortheprojectdesignsolution,anddraftingofthepreliminaryarchitecturalsolution.At theendof theyear,activitymergedwith theProjectofmodernizationofairtrafficcontrol-SUSAN(SMATSAUpgradeofSystemforAirNavigation).
TheconstructionoftheATCtowerattheairportTivatbeganinSeptember,which,accordingtotheplan,shouldbecompletedbymid-Maynextyear.
On 23rd March, 2015, CCAMS - CentralizedEuropeanSSRCodeAssignmentandManagementSystemwasactivated.
3.1ATMUpgrades
Annual Report 2015 11
BasicProjectIdentification
(BSO)BasicProjectTitle RealizationofPlannedActivities
BSO01.04.01Reorganize the lower part of theairspaceandrationalizetheprovisionofservicesatairports
A preliminary design for the reorganisation of theairspacewasmade for TMCPodgorica and TMCTivat.DuringEASAauditinMontenegro,problemsinVHFcoverageintheareaofresponsibilityoftheTMC and CTR Podgorica were discovered. ThesolutionoftheidentifiedproblemsintheVHFcover-agewillinfluencethedesignedconceptualsolution.Inaddition, theneedwas identifiedfor thechangeofmethodofimplementationoftheexistingclassesofairspaceinMontenegro.Thecollectionofdataonqualityconnectionhasstarted,whichwillbeoneoftheelements for theanalysisof thereorganisationofthelowerairspaceinMontenegro.Inagreementwith the aviation authorities of Montenegro, datacollectionwillbedonebytheendoftheseasonof2016,afterwhichtheworkwillstartonthefinalver-sionoftheproposalforreorganisationofTMCandCTRPodgoricaandTMCandCTRTivatairspace.
ForTMCBeograd,withinthefirststep,thereorgani-sationproposalwasmade,whichforeseestheintro-ductionofPBNprocedures, raising theupper limitof theterminalatFL195with theextensionof theareaof responsibility to thenorthandsouth inor-dertoadapttheairspacestructuretotheoptimizedflightprofiles.Theproposalisconfirmedbyaseriesofsimulations.Simultaneouslywiththereorganisa-tionofairspaceofTMCBeograd, the reduction inthealtitudeofthespaceinresponsibilityofadjacentTMC(Batajnica,KraljevoandPonikve)atFL125waspredicted.Implementationoftheproposaliswaitingforthevalidationfromtheair(CNS-calibration).Forthe realization of the second step the agreementwith the relevant military authorities is necessary,onincreasingthevolumeofairspacethatwouldbeclassifiedwithclassG.
BSO01.04.02Introducetheroutesforplanningofcross-borderdirecttraffic-cross-borderDCTroutes
Theplansfor2015werefullyimplemented.
Theprojectisbeingcarriedoutasplanned.Possiblechanges or earlier termination, depending onthe implementation of local or cross-border FRAconcepts.
BSO01.04.03IntroducePBNnavigationproceduresatairportsinBelgrade,Niš,PodgoricaandTivat
PBNnavigationprocedureswereimplementedattheairportBeogradandNišinthecourseof2015.ForMontenegrinairportsPodgoricaandTivat, the trialPBNprocedureswerepublished,andtheirvalidationfromtheairandmakingthesafetydocumentationisinprogress.Thecompletionof theseactivitiesandacceptanceoftheapplicationofPBNproceduresbytheaviationauthoritiesofMontenegroareexpectedbytheendof2016.
BSO01.04.04ApplytheCCAMS(CentralizedSSR Code Assignment and ManagementSystem)
Theactivitywascompleted inaccordancewith thedefinedplans.
Table 1. Realizationofplannedactivitiesin2015withintheATM
Annual Report 201512
BasicProjectIdentification
(BSO)BasicProjectTitle RealizationofPlannedActivities
BSO01.04.05ApplyH24FreeRouteconceptfrom the upper limit of TMC upwards
Theplansfor2015werefullyimplemented.Thepro-jectisbeingcarriedoutasplanned.
BSO03.03.01
DevelopstrategiccooperationwithATCsofCroatia,Slovenia,BosniaandHerzegovina,MacedoniaandAlbaniainordertoprovidejointcommercialservices
Inthecourseof2015,inaccordancewiththeplan,there were several strategically important bilateralandmultilateralmeetingswithANSPsintheregioninordertoimplementjointprojects(LongRangeDCTs,SEAFRA - SMATSACCL night cross-border FRA,jointeducationofBHANSAcandidatesthroughtheEntryPointNordandpreparationsfornextseason).
BSO06.02.01Conductanalysisofstrengths and weaknesses intheproceduresofjointprocurements
The starting point for the implementation of theactivitiesisanalysisthatwillbedevelopedwithinBSO06.02.02.Analysisofstrengthsandweaknessesintheproceduresof jointprocurementswillbemadeonthebasisofafeasibilitystudyoftheeffectsofthejoiningthepartnershipofANSP,withthepurposeofjointprocurementofunifiedATMsystems.
BSO06.02.02
Engagingtheconsultingfirmfor the design of Feasibility studyforjoiningthepartnershipofANSPwiththegoalofjointprocurementofunifiedATMsystems(COOPANSgrouporadequate)
Theactivitieswerecarriedoutaccordingtotheplan.TheprocessofprocurementoftheFeasibilityStudyfor joining the partnership of ANSP was carriedout, with a goal of joint procurement of unifiedATM systems (COOPANS group or equivalent).ConsultingServicesCompanyHelioswasselectedwiththeaimofdrawingupafeasibilitystudyinthecourseof2016.
3.1.1 Traffic figures in SMATSA llc area of responsibility
Figure 2. Numberofflightsintheperiodfrom2008to2015
Table 1. Realizationofplannedactivitiesin2015withintheATM
2008
100.000
200.000
300.000
400.000
500.000
600.000
700.000
2009 2010 2011 2012 2013 2014 2015
Annual Report 2015 13
Figure 3. Distributionofflightsin2015
Figure 4. Peakdayandpeakhourintheperiodfrom2008to2015
20080
500
1,000
1,500
2,000140
155171 178 176 171
185
216
2,500
3,000
3,500 250
200
150
100
50
02009 2010 2011 2012 2013 2014 2014
Pea
k D
ay -
num
ber o
f flig
hts
Pea
k ho
ur -
num
ber o
f flig
hts
Peak day Peak hour
1,993 2,188 2,261 2,460 2,424 2,4612,619
2,969
13%
87%
Overflights
Take-offs / landings
Annual Report 201514
Figure 5. Participationofdifferentaircrafttypesin2015
Figure 6. Numberoftake-offsandlandingsatairportsintheperiodfrom2008to2015
Figure 7. Distributionoftrafficatsomeairportsin2015
Other types,17%
B738, 21%
A320, 26%
A321, 10%
A319, 9%E190, 2%
B737, 2%A332, 2%
B77W, 2%B733, 2%A333, 2%
B752, 1%
B763, 1%B772, 1%
B734, 1%
Belgrade
Podgorica
Tivat
Other airports (Vršac, Kraljevo, Užice, Niš )
13%
12%
1%
74%
2008
10,000
20,000
30,000
40,000
50,000
60,000
70,000
2009 2010 2011 2012 2013 2014 2015
Num
ber o
f tak
e of
fs /
land
ings
Belgrade Podgorica Tivat Niš
Annual Report 2015 15
Figure8. Numberofserviceunitsintheperiodfrom2008to2015
Figure9. AverageflightlengthandaverageMTOWinFIRBeogradintheperiodfrom2008to2015
km
MTO
W (t
)
78
79
80
81
82
83
84
85
86
87
88
89
225
230
235
240
245
250
255
260
265
270
275
20152014201320122011201020092008
Average flight length (km) Average MTOW (t)
Thou
sand
s
1,000
1,200
1,400
1,600
1,800
2,000
2,200
20152014201320122011201020092008
1,7461,781
1,818 1,829
1,717
1,637
1,750
1,973
Annual Report 201516
Figure 10. Unitratevaluein2015
02 04 06 08 0 100 120
25.18
27.69
29.7130.99
31.32
32.32
34.4735.90
37.02
37.2437.46
38.44
38.49
42.4043.79
45.60
46.16
46.9549.8352.30
55.45
55.49
56.3458.47
63.40
66.40
66.6868.4770.11
70.7971.80
73.45
78.91
90.26
92.56
98.64
0,00 20,00 40,00 60,00 80,00 100,00 120,00
Georgia
Latvia
Ireland
Bulgaria
Turkey
Armenia
Poland
Hungary
Cyprus
Portugal
Romania
Bosnia and Herzegovina
Greece
Serbia / Montenegro / KFOR
Czech Republic
Albania
Croatia
Lithuania
Moldova
Norway
FYROM
Slovakia
Finland
Spain - Canary Islands
Denmark
Sweden
Netherlands
Slovenia
France
Belgium / Luxembourg
Spain
Austria
Italy
Germany
United Kingdom
Switzerland
EUR
Annual Report 2015 17
CNSinfrastructureofSMATSAllcconsistsoftechnicalsystemsanddevices thatmay,atany time,meetcustomer’s requirements,providing theaccurate,preciseandreliable information. Improvementsofsystems,equipmentandinfrastructureinthepreviousperiodenabledtheirconditiontofullymeetinternationalstandardsand requirements in termsofcapacity,functionalityandenvironmentalprotection.
Theactivitiescarriedoutwithintheimplementationoftheactivitiesplanfor2015contributedtoraisingthelevelofserviceprovisioninthefieldofcommunications,navigationandsurveillancetoamuchhigherlevel,thusmeetingtheneedsofserviceusers.
Basicprojectidentification
(BSO)Basicprojecttitle Realizationofplannedactivities
BSO01.01.02
Install a radar system atasuitablelocationtocoverthesoutheasternarea of responsibility of ATCC Belgrade
Inthecourseof2015,anumberofactivitiesweredonewithintheworkinggroupfortheanalysisandselectionofsitesforconstructionofanewradarstation:
• analysis of possible locations to build a newradar station in the southeastern part of the area ofresponsibilityofATCCBeograd(locationBesnaKobilawaschosenasthemostappropriate),
• internal analysis of location Besna Kobila forsettingupthenewradarofSMATSAllc,
• analysisofmutualinfluenceofthesecondaryradarfor the surveillance of air traffic and existing/plannedradiosystemsatthesiteofBesnaKobila-madebytheFacultyofElectricalEngineeringinBelgrade,
• geodeticsurveyingoflocationBesnaKobila,
• measurement and spectrum analysis conductedbythestaffofSMATSAllcandRATEL,
• resolving issues of property relations for theselectedlocationwasinitiated.
Table 2. Realizationofplannedactivitiesin2015withinequipment,systemsandinfrastructureimprove-mentcomparedtoplannedprojects
3.2Equipment,SystemsandInfrastructureImprovement
Annual Report 201518
Basicprojectidentification
(BSO)Basicprojecttitle Realizationofplannedactivities
BSO01.01.03 Installasecondaryradarat Srpska Gora
Withintheproject,thefollowingactivitieswerecarriedoutin2015:
•theinstallationandSiteAcceptanceTest(SAT)werecompleted,•theanalysisofradardatawasperformed,•radarsystemcalibrationfromtheairwascarriedout,•thetrainingofemployeesatthesiteandprobationwerecompleted.
Before putting the system into operational work, FinalAcceptanceCertificatehadbeensignedon18/03/2015,afterwhichthewarrantyperiodof12monthsbegan.Thesystemwasputintooperationon30/04/2015.
BSO01.03.03ImproveVHF/UHFradionetworkbyadding/relocationradiocentres
Theworkontheanalysisinitiatedduring2014iscontinued,with theaim to select a suitable site for the constructionof a new VHF/UHF radio centre, this improving thecoverageof thus improving thecoverage in theSMATSAllc area of responsibility. Potential locationswere visited.Theanalysis includescomparisonof thesites indifferenttechno-economicaspects,andafterthepotentiallocationshadbeenidentified, thecheckof theurbanandtechnicalconditionsandpossibilityforconstructionstarted.
BSO01.03.04ImproveVHF/UHFradiosystem for the needs of ATCC Belgrade
Inthecourseof2015,thesecondphasewascompletedandthethirdphasewascarriedout,oftheprojectfortheinstallationofradiosystemsat locationsKopaonik,Pod-goricaandTransmissionCentreRudnik,thuscompletingallplannedactivitieswithinthisproject.
AnnualReport201518
Table 2. Realizationofplannedactivitiesin2015withinequipment,systemsandinfrastructureimprove-mentcomparedtoplannedprojects
Annual Report 2015 19
Basicprojectidentification
(BSO)Basicprojecttitle Realizationofplannedactivities
BSO01.03.05 ImproveAMHSfunctionalities
During2015,thetechnicalspecificationforAMHSsystemupgrade with new functionalities was prepared, but dueto the problem of insolvency of Company Comsoft asthe only potential bidder, this project (procurement) wasrescheduledfor2016.
BSO01.03.06Implement the connectiontothePENSnetwork
ConnectingtothePENSnetworkwasnotimplementedin2015duetothecomplexityoftheprocurementprocedurewhichmustbecarriedoutinordertomakethisconnec-tionimplemented.TheconnectiontothePENSnetworkisexpectedin2016.
BSO01.08.021
Modernize and automate theaeronauticalmeteorologicalobservations
A1
Procurementandinstallation of laser ceilometersandvisibilitysensors; phase II of the procurement.
InaccordancewiththeAgreementfromMarch2015,concludedwith the bidderVaisala fromFinland, thesecond phase includes delivery and installation oflaserceilometersandvisibilitysensorsforairportsinBatajnica,NišandKraljevoasfollows:
• ADCBatajnica-adevicehasbeeninoperationalusesince17/09/2015,
• ADCNiš-adevice is installedandput into trialoperationinNovember2015,
• ADCKraljevo-adevicewasinstalledinDecember2015.
A3
Procurementandinstallation of a system fordetectingtheelectricaldischargesinthe atmosphere
Allthenecessarydocumentationtostarttheprocurementprocedurewasmade.On30/11/2015, the decisionwasmadetostarttheprocedureofpublicprocurement.
A5 UpgradeofSAWASsystem
After successful completion of the negotiation processwiththeInstituteM.Pupin,thecontractforSAWASsystemupgrade,NAB.00-75/82from20/08/2015wassigned.TwostageswerestipulatedintheContract.Thefirstphaseoftheimplementationisinthetestperiod.
A6 ProcurementoftheMETshelter
Theprocurementwasconductedsuccessfullyandagree-mentwasconcluded,pursuanttowhichthedeliveryoftheequipmentisexpectedatthebeginningof2016.
Inadditiontotheaboveprojects,thetermsofreferenceandinvestmentprogramwerecompletedin2015,thetechnicalspecificationwaspreparedandatenderfortheprocurementandimplementationofFallbackDPSsystemwasannounced.
1 InTable2, theactivitiesonthe implementationof theBSO01.08.02areexplained in thecontextof theMETsystemsurveillance
Table 2. Realizationofplannedactivitiesin2015withinequipment,systemsandinfrastructureimprove-mentcomparedtoplannedprojects
Annual Report 201520
Commenced
Com
pleted
Transferred
to2016
Rationale
PROJE
CTDOCUMEN
TATION
1.
Project-technica
ldocum
entationforthe
constructionoftheAD
CBe
lgradeTow
er
withtheannextoATC
CBe
ogradbuilding
BSO01.05.07
TheConceptualdesignismadeforthepurposesofobtainingthelocation
requirementsfrom
therelevantministry,onthebasisofwhichthedraw
upofthe
necessarytechnicaldocum
entationwillstart.
2.Project-technicaldocumentation
for
thereconstructionofACCBeograd
BSO01.05.01
Inthecourseof2015,anopenpublicprocurementprocedurewasconductedand
theDecisiontoterminatetheprocedurewasmade(changedcircum
stancesthat
haveaffectedtheissuanceoflicense-licenseforthedevelopm
entofprojects
forb
uildingconstructionsintheairportcom
plex).Theprocurem
entprocedurefor
serviceofte
chnicaldocum
entationdevelopm
entforinfrastructuralconnectionof
ACCBeogradandATC
CBeogradbuildingswasalsosuspended.Theprocurement
procedure
wasrepeated
and
the
contractswere
concluded
withC
ompany
MašinoprojektKOPR
INGJSC
,Belgrade,andim
plem
entationisexpectedin2016.
3.DesignofITSystem
BSO06.01.02
In2015,theWorkingGroupwasformedfordraftingthetermsofreferenceforthe
implem
entationofIT
systemdesignforS
MAT
SAllc.C
ontinuationofactivitiesis
expectedinthefutureperiod.
4.Project-technicaldocum
entationfor
buildingslegalization
BSO01.05.02
SMAT
SAllchasfiledrequestsforlegalizationofallfacilitiesituseswithinthele-
galdeadline,andforw
hichtherearenocorrespondingpermitsorw
hicharenot
adequatelyrecordedorregisteredonSMAT
SAllc.InthisprocessSMAT
SAllc
isobligedtoensure,amongotherthings,as-builtdrawingsforfacilitiesthatare
severaldecadesold.Incaseswhereas-builtdrawingscannotbefoundinthear-
chives,itisnecessarytoprocuretheserviceofdevelopmentofprojectsofexist-
ingfacilitiesfortheneedsoftheirlegalization.
CONST
RUCTIONANDREC
ONST
RUCTION
OF
FAC
ILIT
IES
1.
AdaptationofReceivingVHF/
UHFRadioCentreRudnikand
constructionofauxiliaryfacility
BSO01.05.05
ThecontractonpublicprocurementoftheadaptationworksontheReceiving
VHF/UHFRadioC
entreR
udnikandconstructionofitsauxiliaryfacilitywere
concludedin2015.Thefinalreceptionofallperformedworksandre
alizationof
thisinvestmenta
reexpectedin2016.AdaptationofReceivingVHF/UHFRadio
CentreRudnikisnecessaryinordertoensuretheconditionsforinstallationofa
newVHF/UHFradiosystem
plannedforthislocation(asprovidedintheProject
forImprovem
entofV
HF/UHFradiosystem
fortheneedsofATC
CBeograd).
Tabl
e 3.
Reasonsfortherealizationofthemostimportantinvestmentslistedinthe2015AnnualR
eport,inthepartSpecificationofinvestments
Annual Report 2015 21
Commenced
Com
pleted
Transferred
to2016
Rationale
2.ReconstructionofADCTivat
BSO01.05.08
Thecontractonpublicprocuremento
fthereconstructionworksontheAD
CTivat
facilitywasconcludedin2015.Im
plem
entationofthisinvestmentisexpectedin2016.
Thegoalofthisinvestmentistocreatebetterw
orkingconditionsforATC
Osandother
personnelintheAD
CTivatandpreparationofthefacilityfortheincreasingtrafficat
theairportTivat.
3.Reconstructionofsubstations,electric
powerplantsandfacilities
BSO01.05.03
Reconstructionofelectricalinstallations,plantsandfacilitiesshouldbecarried
outonthebasisofprojectsfordesigningtheelectricalinfrastructureforw
hichthe
procurem
entp
rocessiscurrentlyinprogress.Theabovereconstructionshould
includetheworksonfacilitiesofSMAT
SAllc,w
hichdonotm
eettheprescribed
requirements,a
sestablishedonth
ebasisofregularte
stingofelectricalinstal-
lations,aswellasreplacem
entofw
orn-outinstallationsandequipment.There-
constructionofelectricalin
stallationsin
thefacilitiesofADCPonikveandRS
Koševacareprim
arilyplanned.
Installationofnew
,moderntechnologicaldevices,aswellasreconstructionofdi-
lapidatedinfrastructureprovidesth
econditionsforbetterandsaferprovidingof
servicesofelectricitysupplysystem
maintenance.
EQUIPMEN
T
1.Procurementandinstallationofgoods
inthefieldofelectroenergetics
BSO01.05.03
Thisprocurementcontinuesthemulti-yearprocessofreplacingthedevicesforuninter-
ruptiblepow
ersupplyanddevicesforD
Cpow
ersupplyatalllocationsofS
MAT
SAllc.
Buyingthenewequipmentisconditionedbyincreaseindem
andsarisingfrominstalla-
tionofnew
systems,aswellasthelowerreliabilityofexistingdevicesandincreasingly
difficultpurchaseofsparepartsduetocessationofproductionofexistingdevicesthat
aregenerationalandtechnicallyoutdated.
Locationsplannedinth
isprocurementin2016/2017are:RDRKopaonik(UPS
2x60
kVA,BP,2xBM
S),R
DRMurtenica(U
PS2x60kVA,BP,2xBMS),H
eadquarterb
uilding
(1xU
PS100kVA
,BP,2xBMS),T
HBG(2
хUPS
,BP,2xBMS,DC),AD
CPonikve(D
C),
TKSvetiIlija(DC),TH
Kraljevo(DC),VS
Zem
un(DC)COKL
BG(DC),AD
CVršac
(DC),RNSTopola(UPS
andDC),RNSPo
žarevac(UPS
andDC),L
LZTivat(UPS
andDC),TH
Tivat(U
PSandDC),RNSSrem
skaMitrovica(UPS
andDC),RNSVal -
jevo(U
PSandDC),RNSBa
tajnicaRFBT
(UPS
),RNSBa
tajnicaRFPZ
(UPS
)RNS
Jajinci(U
PS),RNSMakiš(U
PS),RNSUgrinovci(U
PS),RNSKrnješevci(U
PS),RNS
Pančevo(UPS
).Thepublicprocurementprocedurestartedin2015,whereassigningandim
plem
enta-
tionoftheContractareexpectedinearly2016.
Tabl
e 3.
Reasonsfortherealizationofthemostimportantinvestmentslistedinthe2015AnnualR
eport,inthepartSpecificationofinvestments
Annual Report 201522
Commenced
Com
pleted
Transferred
to2016
Rationale
2.ProcurementofR
DRsimulator
Thecontractonpublicprocurementofradarsimulatorwasconcludedin2015
andcompleterealizationofthecontractisexpectedin2016.Anewradar
simulatorshouldreplaceASUE/FIRSTplusradarsimulatorw
hoseresourceis
expiringandshouldprovideeffectivetrainingforstudentsofairtrafficcontrol
andairtrafficcontrollers.Expiringofthesoftw
are/hardwareresourcesisan
additionalreasonforthestarto
ftheprocuremento
ftheradarsimulator.A
new
radarsimulatorshouldprovideeffectivetrainingforstudentsofairtrafficcontrol
andairtrafficcontrollersfo
rthefollowingpurposes:B
asicTrainingandRating
Training,C
ontinuationTraining,D
evelopmentTrainingandTestingandValidation
ofOperationalProceduresandProcesses.
3.ExpandingthecapacityofV
CS
simulatorforR
DRsimulator
ThecontractonpublicprocurementforexpansionofthecapacityofVCSsimulator
forradarsimulatorwasconcludedin2015.Totalvalueoftheinvestmentw
asfully
implem
entedin2015.Theinvestmentincludedapurchaseofadditionalhardw
are
toequiptheradarsimulatorworkplaces,inordertoensurefullfunctionalityofthe
system
fortheim
plem
entationoftrainings.
4.
Purchaseofhardw
arefortheneeds
ofinstallationofCIMACTsystem
and
installationofthesystem
BSO01.04.06
Thecontractonpublicprocurementofhardw
arewasconcludedandcom
pleted
duringtheyearof2015,whiletheconclusionofthecontractonprocurem
entand
installationofsoftwareisplannedduring2016,inordertoimplem
entthesystem
itselfo
npurchasedhardware.CIMACTsystem
willensurethefulfilmento
fthe
obligationsofintegrationandcompatibilityontheregionalandEuropeanlevel
withregardtosafetyandprotectionandtheConceptofFlexibleUseofAirspace.
Civil-militarycoordinationbetweenairtrafficcontrolunitsandcom
petentunitsof
theArmyofSerbiaandtheArmyofMontenegroismaintainedatthetacticallevel
inaccordancewiththeworkproceduresandtechnologythathavenotchanged
significantlyinrecentdecades.
Tabl
e 3.
Reasonsfortherealizationofthemostimportantinvestmentslistedinthe2015AnnualR
eport,inthepartSpecificationofinvestments
Annual Report 2015 23
Commenced
Com
pleted
Transferred
to2016
Rationale
5.
ProcurementofD
VOR/DME
equipm
entforairportsinBeogradand
Vršac
BSO01.02.02
ThecontractonpublicprocurementoftheDVOR/DMEequipmentforairportsin
BelgradeandVršacwasconcludedin2015.
Aftersuccessfulcom
pletionofthepublicprocurementprocess,thecontractwith
IndraNaviafrom
NorwaywassignedinAugust2015.Thefactorytrainingforthe
devicem
aintenancewasheldinSeptember,FATwasconductedinNovem
ber
2015,a
ndth
edeliveryofgoodsinDecem
ber2015.T
heinstallationisplanned
inth
esecondquarterof2016,aftercompletionofth
epreparatoryconstruction
works.
TheDVOR/DMEinvestmentatlocationsinBelgradeandVršacwillsignificantly
improvetheinstrumentflightandincreasethesafetyofairtraffic.
6.LocalizerfortheairportTivat
BSO01.02.03
Thecontractonpublicprocurem
entofthelocalizerfortheairportTiva
twasconclu
ded
in2015.
Afters
uccessfulcom
pletionofth
epublicprocurem
entp
rocess,thecontractwithIn
dra
Navia
fromN
orwa
ywa
ssig
nedinM
arch2015.Thefactorytrainingforthedevic
emaintenancewasheldinJuly,andFATwa
sperformedinAugust2015.Theequipment
wasinstalledandSA
Twa
ssuccessfullyperformedinDecem
ber2
015.Theoperational
useisplannedtobeginfrom
7thJanuary2016.
Thedevic
ewa
spurchasedinordertoreplacetheexistingdevic
efrom1993.
Tabl
e 3.
Reasonsfortherealizationofthemostimportantinvestmentslistedinthe2015AnnualR
eport,inthepartSpecificationofinvestments
Annual Report 201524
SMATSAllcaccededtothevariousconsortiainordertoparticipateinthetenderprocessesforCentralizedservices.During2015anumberofmeetingswithinthevariousconsortiawereheld,mainlyrelatedtothepreparationof tenderdocumentation for thesubmissionofbids(CS-1,CS-6-2,CS-6-3,CS-7-1),andforcertaincentralizedservices,dedicatedsessionsinEurocontrolwereheldafterthesubmissionofbids (CS-6-3,CS-1).RepresentativesofCNSparticipatedintheworkofconsortiumforthefollowingcentralizedservices:CS-1,CS-6-2,CS-6-3,andCS-7-1.ForcentralizedservicesCS-6-3,CS-1offersweresubmittedin2015.
3.3AISImprovement
AeronauticalInformationService(AIS)includestheprovisionofaeronauticalinformation/datanecessaryforthesafe,regularandexpeditiousairnavigation.
Aeronauticalinformingproceduresareconsistentwithinternationalstandardsandrecommendedpracticescontained in theSingleEuropeanSky commonrequirements.
Inorder to improveAIS,during2015,additionaltwoemployeesweretrainedtousethesoftwareforcreationofelectronicAIP.Toenhancethecooperationwith theneighbouringprovidersofairnavigationservices,therepresentativesofAIS,togetherwithengineersfromtheITsector,metwiththefunctioningoftheaeronauticalinformationsysteminSloveniacontrol,especiallywiththeprojectofharmonizationwith therequirementsofADQ, i.e.operationandcharacteristicsofthesystemforthedirectelectroniclink.AworkshopforCS5EAIMSsafetyassessmentwasalsoheldattheendoflastyear.
Basicprojectidentification
(BSO)Basicprojecttitle Realizationofplannedactivities
BSO.01.07.01 Improvethequalityofaeronauticaldata
Afterdefiningthesestrategicobjectives,the preparation of the procurementof support services for design of thefeasibility study and development ofdetailedplanofactivitiesintheperiodupto2020hasstarted.
BSO.01.07.03 Introduceasystemforthedirectelectroniclinktodatasources
The activities on the market researchwerecarriedoutduring2015.
BSO.01.07.08
EstablishtheInformationSecurityManagementSystem(ISO17799)andtheSupplyChainSecurityManagementSystem(ISO28000)
There was no activity. Feasibility studyfrom BSO.01.07.01 will provide theanswersfor thewayofdealingwiththisobjective.
Table 4. ThesummaryofrealisedactivitiesintheareaofAISprovisionin2015
Annual Report 2015 25
3.4METServicesImprovement
Table 5. Realizationofplannedactivitiesin2015inthefieldofaeronauticalmeteorology
Basicprojectidentification(BSO) Basicprojecttitle Realizationofplannedactivities
BSO.01.08.01 Centralizingtheforecastingfunctions
The planned activities have been com-pletely implementedand include the fol-lowing:
•aworkinggroupfortheimplementationwasformed;•ananalysisoftheexistingsituationwasperformedandtheplanofthefuturecon-dition was made, including human re-sources;•necessaryprocurementsareplannedin2016and2017.
BSO.01.08.02Modernizeandautomatetheaeronauticalmeteorologicalobservations
Thelargestpartofplannedactivitieswith-in this BSOhas been implemented andincludesthefollowing:
•implementationofvisibilitymeter,powerme-terandPWDsensorswasplannedandcar-riedoutatthe4locations;• Upgrade of the software for the systemSAWASforAUTOMETARforADCUžicewasnotrealizedbecauseitrequestedachangeintheorderofimplementationofvisibilitymeters,ceilometersandPWDsensorsestablishedbytheContract,whichwasnotpossible.
Inordertoimprovethesafety,regularityandefficiencyofAirNavigation,SMATSAllcprovidesaeronauticalmeteorological services inaccordancewith thenationalandinternationalstandardsandregulations.
In the course of 2015, the representatives ofSMATSAllcparticipatedinthe25thmeetingofthe“Meteorologygroup»(METG),held inParisfrom14thto18thSeptemberwithintheICAOEuropeanAirNavigationPlanningGroup(EANPG),aswellasinthe10thinternationalworkshopforprofessionaltraininginmeteorology,organizedbyEUMETCALandtheEuropeanCentreforMedium-RangeWeatherForecasts(ECMWF),heldfrom14thto19thJuneinReading.
METGmeetings are held once a year and thesituation ismonitoredand thedeploymentofallsystemsinthefieldofaeronauticalmeteorologyinEuropeiscoordinatedatthosemeetings,while,intheworkshop,theinteractivedemonstrationswerepresented,aswellasinnovativeideasandtoolsthatwillbeimportantelementsinthefuturedevelopmentofaeronauticalmeteorologicalservices.
Inaddition,therepresentativesofSMATSAllchavealsoparticipatedintheEuropeanConferenceonMeteorologyforAviation(ECMA2015).TheaimoftheconferencewastodrawattentionofthemembersoftheWorldMeteorologicalOrganisation(WMO),RegionalAssociationVI,tothecurrentandfutureweatherchangesinEurope,whichwillcontributetomoreefficientorganisationofairtrafficintheregion,inaccordancewiththeATMMasterPlanapprovedbytheEuropeanCouncil.
Annual Report 201526
04BusinessPerformance
SuccessofSMATSAllcisbasedonthequalityofprovided service and the efficiency of theATCsystem.Inordertoimprovebusinessperformanceinaccordancewiththeobligationsarisingfromthenationalandinternationalstandardsaswellastheneedsoftheusers,SMATSAllcisactivelymonitoringtheimplementationinrelationtothesetobjectivesandtakingthecorrectivemeasures,ifnecessary.
4.1Operationsinaccordancewiththe SES Targets
BearinginmindthattheRepublicofSerbiaandtheStateofMontenegroarethesignatoriesoftheECAAagreement,theCivilAviationDirectorateoftheRSandtheCivilAviationAgencyofMontenegrohavetakenthebasicregulationsrelatedtothePerformanceSchemewithintheSingleEuropeanSkyintodomesticlegislationintheformof:
•TheRegulationonrequirements, issuingandvalidityperiodofthecertificateforprovidingairnavigationservices(Off.GazetteoftheRS,No.32/11,54/12,24/13),withwhichawholeCommissionImplementingRegulation(EU)No.1035/2011and1034/2011from17/10/2011istakenover,amendingtheRegulation(EU)No.691/2010,and
• The Regulat ion laying down commonrequirements,Air TrafficManagement andAirNavigationServicessecuritysurveillance,software safety assurance system andPerformanceScheme(which takesover theCommissionRegulations(EC)No.1035/2011,1034/2011, 482/2008 and 691/2010), (Off.GazetteofMontenegro,No.65/2012).
However, the European Commission has thegoaltofullyintegratetheECAApartnersintothethirdreferenceperiod(startingfrom2020).Inthisregard,adocument,agreedamongtheCAA,CADandSMATSAllc,wassignedin2015,definingtheprocedureandtimeframefortheinitialimplementationofSESPerformanceScheme(NationalRoadmap).ThejointworkinggroupsatthelevelofCAD,CAAandSMATSAllcwereformed.RepresentativesofSMATSAllcactivelydealwithissuesinrelationtothedefinedobjectivesandprovideallthenecessaryexpertise for implementing the Initial NationalPerformancePlan.
InaccordancewiththerequirementsofSES,SMATSAllcmonitorsbusinessperformanceinfourkeyareas:safety,capacity,costefficiencyandenvironmentalprotection.
Annual Report 2015 27
4.1.1 Safety
Titleofsafetyindicator Acceptablelevelofsafety Achievedvalues
NumberofaccidentswithATMinfluenceperyear <0.007accidents 0
Numberofseriousincidentsperyear <5incidents 0
Numberofsignificantincidentsperyear <50incidents 0
Numberofrunwayincursionsperyear <3incidents 0
DPSfailuresperyear <10incidents 1
DurationofSSRradarstationsoutageperyear <600minutes
5.86minutesKoviona0minutesKoševac634.46minutesMurtenica2nodowntimesSrpskaGora(Podgorica)
2PSR/SSRradaronRSMurtenicahadanoutageofatotal634.46minutesduring2015,duetotheeventsfromJune(theappearanceofthealarmonthesecondaryradar,causedbytheadverseweatherconditions-frequentatmosphericdischarges).
Table 6. Targetandachievedvaluesofsafetyindicatorsin2015
InordertomeettherequirementsrelatingtotheassessmentandmonitoringofthesafetylevelinthecontextofthePerformanceScheme,SMATSAllchasdevelopedaprocessformonitoringthesafetyindicatorsinallpartsofthesystem.
AmongtheobjectivesrelatingtothestatusofSafetyManagementSystemofanairnavigationserviceprovider(SMSindicators)inthesecondreferenceperiod indicatorsof theefficiencyof theSafetyManagementSystem,theimplementationlevelofRATmethodologyforclassificationofoccurrences(whichSMATSAanalyzesonthebasisofitsSMS)andimplementationlevelofJustculturehavebeendefined.
InformationcollectionandassessmentinthefieldofSMSindicatorsisdonebytheEuropeanAviationSafetyAgency(EASA).MonitoringtheseindicatorsbySMATSAmeansanannualanalysisofthereceivedEASA evaluation, on the basis of which somecorrectiveactionsaretaken,ifnecessary.
MonitoringofSMSindicatorsisdonevoluntarily,inordertobepreparedfortheimplementationoftheregulationthatisnotyetbindingfortheRepublicofSerbia,butitsimplementationinthelegalsystemoftheRepublicofSerbiaisexpected.Accordingly,on31stDecember,2015,theamendedrulebookofCAD,thatdefinesmonitoringofSMSindicators,enteredintoforce.
Assessment of the eff iciency of the SafetyManagementSystemiscarriedoutonthebasisofsafetyindicatorslaiddownatthenationallevelbytheAviationAuthorities(CADandCAA).Analysisofsafetyindicatorsiscarriedoutannually,andtheresultsfor2015arepresentedinthetablebelow.
Annual Report 201528
DurationofPSRradarstationsoutageperyear <2,400minutes
105.28minutesKoviona670.25minutesMurtenicanooutagesSrpskaGora(Podgorica)3
MeantimebetweenoutagesforLLZILS(CATIII)peryear >4,000hours 8,746hours
MeantimebetweenoutagesforLLZILS(CATI)peryear >1,000hours 8,747hours
Numberoflossesordegradationsofoneormoreoperationalfrequenciesperyear
<60incidents 7
4.1.2 Capacity and Delays
AccordingtothesourceEUROCONTROLNMOC,in2015theaveragedelayperoneIFRflightgeneratedbySMATSAllcamountedto0.02524min,whichmeetstherequestedlevels.
3PrimaryradaratthesiteSrpskaGoraisexcludedfromtheoperationaluseon18/11/2014becauseoftheinstallationofthesecondaryradarwithintheproject“UpgradingtheradarsystematthesiteofSrpskaGora(Podgorica)byinstallingthesecondaryradar”.PrimaryandsecondaryradarsontheRSSrpskaGorawereputintooperationon30April2015.SystemandtotalavailabilityforPSR/SSRSrpskaGoraiscalculatedforthetimeintervalfrom01Mayto31December2015.
Figure 11. AverageATFMdelayperflightintheareaofSMATSAllcresponsibilityfrom2007to2015
0,19
0,3
0,8
Table 6. Targetandachievedvaluesofsafetyindicatorsin2015
2007
0.00243 0.00631 0.00398 0.009540.04968
0.19
0.3
0.8
0.00173 0.01776 0.00564 0.02524
0.90
0.70
0.50
0.30
0.80
0.60
0.40
0.20
0.10
0.002008 2009 2010 2011 2012 2013 2014 2015
Min
utes
Average SMATSA llc ATFM Delay per Flight
SMATSA llc Quality Objectives
EUROCONTROL Target Value
European Commission Allowed Value
Annual Report 2015 29
Figure 12. UnitRategivenfor“Serbia-Montenegro-KFOR”chargingareain2015
*sourceCRCO
4.1.3 Cost Efficiency
InthesecondreferenceperiodattheEUlevel,themainindicatorofcostefficiencyistheaverageUnitRatevalue,whichfor2015amountsto:EUR56.64(reducedto the levelofEUR=2009).Theaim isdefinedbytheDecisionoftheEuropeanCommission
2014/132/EC.TheplannedUnitRatevaluegivenfor“Serbia-Montenegro-KFOR”chargingarea,whereSMATSAllcprovidesairnavigationservices,in2015wasinlinewiththedefinedobjectiveofSES.
AttheNovembermeetingoftheEUROCONTROLEnlargedCommittee in2014, theunit ratevaluegivenforSerbia/Montenegro/KFORchargingareafor2015wasdetermined,andthenadopted(DecisionNo.132from05/12/2014inAnnexNo.1,publishedinthe“OfficialGazetteoftheRS”,No.141/14).Inaccordancewiththisdecision,theunitratevaluegivenfor“Serbia-Montenegro-KFOR”chargingareafor2015,isEUR42.29(NationalUnitRate),i.e.EUR42.40(GlobalUnitRate)includingEUROCONTROLAdministrativeUnitRate.
The specified unit rate value, which belongsexclusivelytoSMATSAin2015,isapproximatelyEUR33.47.
SMATSAllcincomein2015isby5.2%higherthanplannedi.e.by5.6%lowerthanin2014.Despitethehigherrealizationoftrafficandserviceunits,whataffected the lowergenerationof income in2015
comparedto2014arethemonthlyvaluesoftheunitrate,andincomedistributionkeyamongtheentities.Inaddition, itshouldbenotedthattheincomein2014includedthecollectionofthearrearsinamoresignificantamountincomparisonwiththeyearof2015.
Ontheotherhand,thedynamicsofrealizationofinvestmentsin2015causedalowerrealizationinrelationtotheplan,anditresultedinthetransferofinvestmentsinto2016.
AlloftheabovedidnotaffectbusinessefficiencyofSMATSAllcnorthesafetyandqualityofairnavigationservices.
Thefigurebelowprovidesanoverviewofthevaluesoftheunitrategivenfor“Serbia-Montenegro-KFOR”chargingareaandmonthlyadjustedvaluesfor2015.
42.40
41.41
41.03
41.50
41.79 41.8841.72 41.74
41.86 41.86 41.9141.70
Annual Report 201530
4.1.4 Environmental Protection
Ratingoftheenvironmentalprotectionleveliscarriedouton thebasisof theaveragehorizontal flightefficiency,anindicatorrecognizedintheregulationsconcerningthePerformanceSchemeinthecontextoftheSingleEuropeanSkyregulation.Inthesecondreference period (2015-2019), target values ofindicatorsaredefinedasfollows:
1. KEA(KeyperformanceEnvironmentindicatorbasedonActual trajectory)- indicatorof thedeviationof the flightpath in relation to thegreatcirclepath.Theaveragehorizontalflightefficiencyby2019isadeviationfromtheactualpathof2.6%inrelationtothegreatcirclepath,
2. KEP(KeyperformanceEnvironmentindicatorbasedonlastfiledflightplan)-indicatorofthedeviationinthelastfiledflightplanrelativetothegreatcirclepath.Theaveragehorizontalflightefficiencyby2019isadeviationfromthelastfiledflightplanof4.1%inrelationtothegreatcirclepath.
ThevaluesofthehorizontalflightefficiencyindicatorsforSerbiaandMontenegroin2015fullymeetthesetvalues,asshowninthefigurebelow.
Thisconfirmsonceagainthatwithconstantimprovementoftheroutenetwork,airspaceandworktechnologyorganisation,aswellaswithintroductionofnewprocedures,SMATSAllcismakingasignificantcontributiontoenvironmentalprotection.
Figure 13. HorizontalflightefficiencyforSerbiaandMontenegroin2015(source:EUROCONTROL/PRU)
3.0
2.5
2.0
1.5
1.0
0.5
00Jan
Inef
ficie
ncy
(%)
Feb Mar Apr May Jun Jul Aug Sep Okt Nov Dec
Annual Report 2015 31
4.2Operationinrelationtootherobjectives
4.2.1 Quality of services
AttheregularmeetingoftheQualityCommittee,SMATSAllcanalyzesanddeterminestheannualqualityobjectives.
Thefollowingtablerepresentstheanalysisofthefulfilmentof2015qualityobjectives:
Service Objective Planned Achieved Note
АТМ
TheaveragedelayperIFRflightgenerated bySMATSA llc annu-ally
lessthan0.3minutes YES 0.0252minutes
The percentage of aircraft thattakeofffromtheareaofrespon-sibility of SMATSA llc within thetimetoleranceofissuedslot
morethan83% YES 89.91%
Thenumberofseriousincidents,which are found to have beencausedbyATM
lessthan5 YES
After examining the base ofevents in SAF.00 for 2015, itwasdeterminedthattherewasatotalof251reportedevents,6ofwhich required further analysis,5 by the SAF.00 departmentandonebyCADincooperationwith experts from SMATSA llc.Besidesthehelicopteraccident,noothereventwasqualifiedbythe Aviation Authorities as anaccidentorseriousincident.
CNS
Thesystemavailabilityoftechni-caldevicesandsystems thatdi-rectlyaffect theprovisionofser-vices
А(t)=99.9% YES
Despitetheexceptionsfromthedesiredvaluesofsystemavail-abilityspecifiedintheAnnexes,and due to the individual andgroup redundancy of CNS de-vicesandsystems,during2015itcanbeconsideredthattheob-jective of quality in the field ofCNSismet.
МЕТ TerminalAerodromeForecast(TAF)accordingtoICAOAnnex3,Attach-
mentBYES
Average for all airports 95.2%,thus achieving the desiredoperational accuracy given inICAOAnnex3,AttachmentB.
AIS QualityratingQ higherthan0.77 YES 0,778
TRE
Realizationoftheoreticaltrainingnumberofclassesforthecurrentyear, for each enrolled group ofcandidatesintheANSPersonnelTrainingCentre
100% YES
Classes of theoretical traininghave been conducted in accor-dancewiththeappropriateDeci-siononthetrainingconduction.
Realization of practical trainingnumberofclassesforthecurrentyear, for each enrolled group ofcandidatesintheANSPersonnelTrainingCentre
100% YES
ClassesofpracticaltraininghavebeenimplementedinaccordancewiththeappropriateDecisiononthetrainingconduction.
Table 7. Analysisofthefulfilmentof2015qualityobjectives
Annual Report 201532
Service Objective Planned Achieved Note
ATO
The percentage of the realizedclasses of theoretical training inrelationtotheplannednumberofclasses for the current year, foreachenrolledgroupofcandidatesatSMATSAAviationAcademy
100% YES 117%
Meeting the planned deadlinesforcompletionoftheoreticaltrain-ingforthecurrentyearatSMAT-SAAviationAcademy
100% YES Deadlines for completion of allenrolledgroupsaremet.
Thepercentageofcompletedflighthours in relation to the plannednumberofflighthoursforthecur-rentyear, foreachenrolledgroupofcandidatesatSMATSAAviationAcademy
100% YES 116%
Meeting the planned deadlinesfor completion of flight trainingfor the current year at SMATSAAviationAcademy
100% YES
Deadlines for completion of allenrolled groupsaremet for allthe candidates who regularlyattendedtheflighttraining.
CALImplementationoftheannualcal-ibrationplan
100%YES 106%
Successfulcontractrenewal 2 contracts NO 1 contract
MO
Compliancewithworknormsex-pressedinpercentagecomparedto the norms prescribed by themanufactureroftheaircraft
morethan97% YES 97.78%
Renewalofexistingcontractswithusersofaircraftmaintenanceser-vicesandsigningandimplemen-tation of the contract on aircraftmaintenanceservices
Renewalofexistingcontractswithusersofaircraft
maintenanceservicesand signing and implementationofthecontractontheprovisionofaircraft
maintenanceservices
YES
All the previous contracts withtheusersofaircraftmaintenanceservicesareineffectand4newcontracts on the provision ofaircraft maintenance servicesowned by a third party weresignedandimplemented.
Table 7. Analysisofthefulfilmentof2015qualityobjectives
Annual Report 2015 33
4.2.2 Other Business Performance Indicators
ForcertainareasthatarenotcoveredbyqualityobjectivesandbyEuropeananddomesticregulations,theinternalobjectivesareset,thatplayaroleinmeasuringbusinessperformanceincertainbusinessareasbasedonperformanceindicators.
Area Titleofindicator Methodofmonitoring(methodologyorformula) Planned Achieved
CAL
Flightsafetyduringtheexecutionofgroundbasedradionavigationaidscalibrationtasks
Numberofeventsthathavehadanimpactonendangeringtheflightsafety
0 0
ITTimeofoperationofVDIsystemwithoutfailuresanddowntime
Percentageofavailabilitytimefortheperiodofoneyear
95% 65%
IT
TimeofIToperation;datacentrebasedonvirtualizationoftheserver,networkandsystemresourcesfordatastorage
Percentageoftimewithoutfailurefortheperiodofoneyear
99% 99%
IT
PercentageofrealizationofplannedprocurementsintheinvestmentcycleofprocurementofITequipmentandlicenses
Percentageofrealization 100% 90%
IT
TimeofglitchremovalandreportsofinterferencesonITequipmentandsystems
Timeexpressedinminutes 15 30
IT Monitoringofsystemundercontrol
Percentageofsystemundercontrol.MonitoringtheappliedmeasuresintheITsysteminordertoincreasethetimeofavailabilityofthesystem
70% 80%
Table8.Otherbusinessperformanceindicators
Annual Report 201534
05OrganisationalTechnology-basedManagementSystems5.1AirTrafficSafety
Developmentof theSafetyManagementSystemin accordance wi th the requi rements andrecommendationsofthenationalandinternationallegislationandrecognizedoracceptedgoodpracticesisoneofthemainobjectivesofSMATSAllc.
Byconstantlyimprovingthelevelofsafety,SMATSAllcstrivestoprovideallthenecessaryconditionsforthesaferunningofairtrafficinitsareaofresponsibility,andthus,inthebestway,satisfytherequirementsofitsusers.
By following thebasicprinciplesof safety, in itsoperationsSMATSAllcappliestherelevantprocessesandproceduresthatensureabetterunderstanding,acceptanceandimplementationofhighstandardsofairtrafficsafety,inaccordancewiththehigheststandardsandrecommendedpractices.
Evaluationof theperformanceof theestablishedSafetyManagementSystem isperformedby theEUROCONROLeveryyear.Accordingtotheresultsof theanalysis “SafetyMaturityScore” for2015,SMATSAllcwasrankedinfirstplaceinthecategoryof48providersofairnavigationservices.
Establishingthe“RunwaySafetyTeam”forAirportNikolaTeslaBeogradinthemiddleof2015isanotherexampleofgoodcooperationofSMATSAllcwithotherparticipantsintheairtrafficsystemoftheRepublicofSerbiaanddedicationtocontinuousimprovementofsafety.
Inaccordancewiththeplan,inthefieldofsafety,during2015,theactivitieswereimplementedwithinthebasicproject(BSOs),whoseimplementationisenvisagedbySMATSAllcBusinessstrategy(Table9).
AnnualTeport201534
Annual Report 2015 35
Basicprojectidentification
(BSO)Basicprojecttitle Realizationofplannedactivities
BSO.05.01.01DevelopawarenessofSafetyCultureandJustCulture
The activities to improve the Safety Culture wereperformed, in accordance with the conclusions andrecommendations of an independent measurementand a plan described in the internal documents ofSAF.Increasednumberofinitiativesandpointingoutthe latent risks in behaviour and work of executors,as well as the inconsistencies within the prescribeddocuments,indicatethepopularizationofJustCultureamongtheemployees.
BSO.05.01.02 ImplementthepoliciesofJustCulture
PoliciesofJustCulturewereadoptedandapprovedon30thJune2015.
BSO.05.01.03
IntegratetheconceptofSafetyCultureandJustCultureintotheorganisationalactivitiesandprocesses
Improving the Safety Culture and integrating theprinciplesofJustCultureintoorganisationalactivitiesandprocessesofSMATSAllcwereconductedduring2015throughthefollowingactivities:
• Improving the system of events reporting byintroducing the category of voluntary reportingandprovidingproposalsforimprovingtheoverallservice;
• Working on development of organisationalawareness that, inwork, errorsareunavoidablecategory, but that employees must follow theprescribed operating procedures and thatintentionalerrorswillnotbetolerated;
•Providingtechnicalsupporttotheemployeewhowas involved in theaccident/incident in theformoflegalrepresentationinthecourtproceedings;
• Creating CISM document (Critical IncidentStressManagement);
•Prescribingtheprocedureofreturningemployeesintotheoperationalwork,accordingtotheseverityofeventsinwhichtheyparticipated.
BSO.05.02.01ImplementingASMT(AutomaticSafetyMonitoringTool)
ASMTimplementationin2015wasnotrealizedduetoobjectivereasons.Asetofnecessarydocumentsandactivitiesarepreparedforthepurposeofimplementa-tionofthetool.
Table9.Realizationofplannedactivitieswithintheimprovementofthesafetymanagementsystemin2015
Annual Report 201536
5.2 Quality Management
QualityManagementtasksincludestheparticipationinthepreparationandcoordinationofactivitiesduringperiodicauditsofallservicesthatSMATSAllcprovides,bynationalsupervisoryauthoritiesofthestate-ownedfoundersofSMATSAllc,aswellasimplementationofinternalaudits.
Also,aspartofEASAaudit,whichwasconductedin 2015 in Montenegro, representatives of theQualityManagementDepartmentparticipatedinthecomprehensivepreparatoryactivitiesandmeetingsatthelevelofSMATSAllc,aswellaswiththerepresentativesof theCivilAviationAgencyofMontenegro.WithinEASAsupervision,thesubjecttoverificationwastheQMSsystemanditsapplicationintheorganisationalunitsofSMATSAllcinMontenegro.Aftertheaudit,the
representativesofQMSSMATSAllcactivelyparticipatedindefiningtheproposedmeasuresaccordingtothefindingsofEASA,aswellasinsubsequentactivitiesafterthecheckinorganisationalunitsinMontenegro.
During2015,aregularannualauditoftheestablishedQualityManagementSystem(QMS)inSMATSAllcwassuccessfullyconductedbySGSCertificationCompany,aspartofmaintaining ISO9001certificatevalidity.With theentry into forceof thenewversionof ISOStandard9001:2015,athree-yeartransitionalperiodforSMATSAllctoadjusttonewrequirementsoftheQualityManagementSystembegan.Inaddition,theactivitiesontheintroductionofEnvironmentalManagementSystem(EMS)were initialized, according to ISOStandard14001:2015.
Basicprojectiden-tification(BSO) Basicprojecttitle Realizationofplannedactivities
BSO04.02.01Establishthepolicyofenvironmentalprotectionandsustainabledevelop-ment
The Policy of environmental protection andsustainabledevelopmentwasestablishedandenteredintoforceon15thDecember2015.
BSO04.02.02Documentandimplementthepro-ceduresinthefieldofenvironmentalprotection
The procedure for Waste management andassociated plans were adopted. Drafting of alargernumberofnewproceduresisinprogress,accordingto therequirementsofEMSsystem,andupdatingofanumberofexistingproceduresfromotherdomains(QM,NAB,CED,GEN).
BSO04.02.03ComplywiththenationalandEUle-galrequirementsinthefieldofenvi-ronmentalprotection
InordertocomplywiththenationalandEUle-galrequirementsinthefieldofenvironmentalprotection,preparationsfortheimplementationofpublicprocurementproceduresforthereal-izationofservicesofsoil,groundwater,equip-mentandmaterialtestingareinprogress.
BSO04.02.04 Reducegreenhousegasemissions(objectiveENV01)
Navigation procedures using the CDA(ContinuousDescentApproach)techniquehavebeen identified as an aspect of environmentalimpact and will be managed as part of theEnvironmentalManagementSystem.
BSO04.02.05Establishthegeneralandspecificobjectivesinthefieldofenvironmen-talprotection
The scope ofwork of theQualityCommittee ofwork in the field of environmental managementisexpanded.Aproposalforgeneralandspecificobjectivesinthefieldofenvironmentalprotectionwas designed, which will be forwarded to theQualityCommitteeforadoptioninearly2016.
BSO06.01.01IntroducetheLeanconceptintoop-erationofSMATSAllcandexecutethebusinessprocessesanalysis
InordertooptimizeandimprovethemanagementsystematthelevelofSMATSAllc,thetrainingsinmodernmethodsoforganisation,processesand risksmanagementwill be included in theprocurementplanfor2016.
Table 10. Realizationofplannedactivitiesin2015inthefieldofqualitymanagement
Annual Report 2015 37
5.3InformationTechnologies
The function of information technologies inSMATSAllcprovidesthemaintenanceandupgradeof information infrastructure, development ofapplicationsforthecurrentbusinessprocesses,whileprovidingthemaximumreliabilityandqualityofthecompletesystem.
Multipleapplicationsweredevelopedwithin theapplicationservicesdepartmentduring2015:
1. Applicationforrecordingandmonitoringofthepublicprocurementcontracts,
2. AnewWebsitefortheIFISconferencethat,inadditiontobasicinformationabouttheevent,enablesregistrationoftheparticipantswiththepossibilityofpayingtheregistrationfeebycreditcardandgeneratingtheproformainvoiceand
3. Webapplicationfordisplayingtheradarandsatellitemeteodataforthepurposeofinformingairtrafficcontrollers.
Inaddition,thepreparationofawebapplicationthat combines all the features of two-waycommunicationbetweentheCRCOandSMATSAllcforthepurposeofinvoicingandcollectionofroutechargeshasstarted.
Duringtheyear,theworkwasdoneontheinformationportalabout thecompletedoperations, thatwillcarryout theprocessinganddisplayof traffic in3D/4Dtechnology,DCTanalysisandverificationoftheinformationreceivedwiththeCRCOdata.TheportalwillbeobtainedbyconnectingtheSMATSA
FDPSsystemandEurocontrolNMsysteminanexistingdatabaseofcompletedoperations.Theapplicationwillincludegraphicalandanalyticaltoolthatwillbeusedtoanalyzetherealizedtrafficinthetransportnetworksystemintheregion,toanalyzetheenvironmentalparametersandverifytheincomeoftherealizedflight.
Creating theWebapplication formanaging thestorehouseoperationshasalsostarted in2015.Withthehelpofthisapplication,theinputofthefixedassetsbasedontheinputdocumentwillberecordedontheonehand,andontheotherhanditwillrecordalldebtsandcondemnationsoffixedassets.Amultitudeofreportsandrecords,suchascheck-outforms,chargelists,stocklistsandsoonwillbeavailablefortheusers.
Continuousinvestment intoIT infrastructure isaprerequisiteforbusinessprocessesdevelopment,i.e.efficientandeffectiveexchangeofelectronicdata.IntheperiodfromMarchtoDecember,theannualinvestmentcycleofprocurementofcomputer,serverandnetworkequipmentwasconducted,aswellastheexpansionofdatastoragesystem.
InaccordancewiththeBusinessStrategyofSMATSAllc, theWorkingGroupwas formed fordraftingthetermsofreferencefor the implementationofinformationsystemdesignforSMATSAllc(BSO01.06.02).
Annual Report 201538
5.4Security
Inordertoraisetheawarenessabouttheimportanceofsafetyandhealthprotectionandfirepreventionatwork,thetrainingwasconductedforemployeesinSMATSAllcinthelastyear,inaccordancewiththeapplicableregulationsintheseareas.
IntheperiodfromOctoberuntilDecemberlastyear,thetrainingontheimportanceofaviationsecuritywasconductedfor150employeesinSMATSAllc,thatcanaccess,unaccompanied,therestrictedareasoftheairportandcriticalinformationsystems.
During2015,approvalswereobtainedbytheCADandCAA for thedocuments related toaviationsecurity:
1. SCM.MAN.001 - Av ia t ion Secur i t yProgrammefortheterritoryofMontenegro,and
2. SCM.MAN.002 - Av ia t ion Secur i t yProgramme.
TheprogrammesareincompliancewiththeNationalCivilAviationSecurityProgrammeoftheRepublicofSerbiaandtheNationalCivilAviationSafetyProgramofMontenegro.
Duringtheyear,theinstallationofvideosurveillanceinADCNiš,RSKovionaandTransmissioncentreRudnikwasperformed,aswellasthesystemsforaccesscontrolinADCNiš,ADCVršac,TransmissioncentreRudnikandTransmissioncentreBelgrade.
Inaddition,theanti-burglarsystemwasinstalledwiththepossibilityofremotecontrolvia2G/3GmobilenetworkattheGroundBasedRadioNavigationalAids locations.
InNovember,SMATSAllcwaspartoftheECACAviationSecurityAuditsintheRepublicofSerbia,andduringtheaudit,thesecuritymeasuresappliedbySMATSAllcweretestedinaccordancewiththerequirementsofECACDoc30.
Inordertocontributetotheimprovementofaviationsecuritymeasuresandproceduresattheairport,therepresentativesofSMATSAllcregularlyparticipatedinmeetingsoftheAirportAviationSecurityCommitteeduring2015.
AnnualReport201538
Annual Report 2015 39
06HumanResourcesInaccordancewithfollowingthemoderntrendsinthefieldofhumanresourcesdevelopment,theworkonimproving,revisingandimplementingtheproceduresandpoliciesinthisfieldcontinuedin2015.
RepresentativesofSMATSAllcparticipatedintheregularannualmeetingofthe“FEASTUserMeetingGroup13”inordertomonitorthedevelopmentoftheselectioninstrument,exchangeofexperienceswithotherusersofthetest,analysisandinterpretationofcandidates’achievementsandimplementationofthenewsoftwareplatform.
Moreover,in2015,incooperationwiththeCivilAviationDirectorateoftheRepublicofSerbia,acourse“ATCOMedicalRequirements”wasorganizedandimplemented,withanemphasisonthepresentationoftheactivitiesandtasksofairtrafficcontrollersandtheiranalysesfromthestandpointofhumanfactor.
Basicprojectidentification(BSO) Basicprojecttitle Realizationofplannedactivities
BSO.07.01.01
CoordinatetheactivitiesofimprovingthesystematizationofthejobsinaccordancewiththeBusinessStrategy
TheRulebookonAmendments to theRulebookontheOrganisationandsystematizationof the Jobs ofAirTrafficControlOfficers ofSerbiaandMontenegroSMATSAllcBelgrade
BSO.07.01.02 Conductananalysisofthejobsperworkplace/OU
After adopting the Catalogue of OU, tasksanalysis of jobs per workplace/OU startedand was partially performed in 2015. Thecompletion of the analysis and proposalfor amending the job description per theworkplace/OUisexpectedin2016.
BSO.07.01.03
CarryoutadetailedanalysisoftheknowledgeandskillsrequiredforthekeypositionsinbusinessdevelopmentofSMATSA llc
Theanalysisof therequiredknowledgeandskillsforalljobsinSMATSAllcstartedandwaspartiallyperformedin2015.Throughthedrafttext of the document Career management,the proposal for amendments to the criteriarequired for certain positions was done. In2016theprocessofdefiningthekeypositionsinbusinessdevelopmentofSMATSA llcwillbegin.
BSO.07.01.04
Carryoutadetailedanalysisofthepsychophysicaldemandsofthejobsandcontraindicationsforthespecifiedjob
Theanalysisofthepsychophysicaldemandsofthejobsandcontraindicationsforthespecifiedjob started and was partially performed in2015. The procedures for monitoring thepsychophysical demands of the jobs andcontraindications for the specified job will bedesignedin2016.
Table 11. Realizationofplannedactivitiesin2015inthefieldofhumanresources
Annual Report 201540
Basicprojectidentification(BSO) Basicprojecttitle Realizationofplannedactivities
BSO.07.03.01Continuouslydevelopmoreobjectivesystemsofemployeeassessmentmethodology
Theprocedure forCareermanagementwasdefined in 2015 and its implementation isexpected in2016.Aspartof theprocedure,theseformshavebeendeveloped:employeeassessmentduringthetraining,probationary,periodic (annual) assessment of employeesbyadirectsupervisor.
BSO.07.03.04Systematicallyruntheactivitiestoraisethelevelofemployeesatisfaction
InthecontextofCareermanagementproceduretheemployeeSelf-assessmentformisdeveloped,which gives the possibility to the employees toexpress their abilities and affinities in terms ofdevelopingtheircareersinSMATSAllc.
BSO.07.04.01
Establishasystemofcontinuousmonitoringofpsychophysicalconditionofaviationpersonnelfromthepointofthesecurityofairtraffic
TheprocedureHUM.PROC.004wasadopted- Monitoring of Medical Ability of Air TrafficControlOfficersandPilots.
BSO.07.04.02Establishasystemprocessofstressmanagementintheworkplace
TheprocedureforCriticalIncidentStressMan-agementwascreatedandsubmittedforopin-ion.
BSO.07.04.05 ImplementCISM
CISMprogramispartofsystemstressman-agementprocessintheworkplaceandisin-cluded in theproposal for theprocedure forCriticalIncidentStressManagement.
BSO.07.05.01
DevelopaprogramfortrainingoftheAirTrafficControlOfficersincooperationwithuniversitiesforachievingtheVIandVIIlevelofeducation
Theprocessofcooperationwith theFacultyofTransport inBelgrade in thedevelopmentof study programmes forAir Traffic ControlOfficersandPilotsstartedin2015.
BSO.07.05.02Establishasystemofcontinuouseducationandtrainingoftheemployees
A public procurement procedure to improvetheEnglish languageskillsofair trafficcon-trollersoutside theaviation terminologywasconductedin2015.Therealizationofthispro-curementisplannedfor2016.
BSO.07.05.03Establishasystemtomonitorthecontinuouseducationandtraining
Thepreparationofprocedure formonitoringthecontinuouseducationandtrainingof theemployeesstartedin2015,anditsimplemen-tationisplannedfor2016.
Table 11. Realizationofplannedactivitiesin2015inthefieldofhumanresources
Annual Report 2015 41
6.1FluctuationsandAverageNumberofEmployeesin2015
Theaveragenumberof885employeesin2015wasslightlybelowtheplannednumber.
Month Plannednumberofemployees Actualnumberofemployees
January 875 881
February 879 882
March 885 882
April 890 882
May 891 883
June 894 886
July 895 887
August 895 886
September 893 885
October 894 885
November 895 888
December 899 888
Averagein2015 890 885
Table 12. Plannedandactualnumberofemployeesin2015
Table 13. Fluctuationsofemployeesin2015bymonth
Fluctuations I II III IV V VI VII VIII IX X XI XII Укупно
Inflow(+) 9 2 2 0 4 4 2 0 2 1 3 1 30
Outflow(-) 0 1 2 0 3 1 1 1 3 1 0 0 13
Annual Report 201542
6.2EmployeeStructure
Thefollowingfiguresshowtheemployeestructureattheendof2015,accordingtogender,qualificationgroupsandage.
Figure 14. Employeestructurebygender
Figure 15. Employeestructurebyqualificationgroups
Figure 16. Employeestructurebyage
Male
Female70.88%
29.12%
I, II, III
IV, V
VII
VI + Air TrafficControl Officers
33.45%32.55%
32.88%1.13%
to 25 years
26-35
46-55
56-65
36-45
22.35%
1.24%
18.74%
29.46%28.22%
Annual Report 2015 43
07AdditionalServices7.1CalibrationoftheGroundBasedRadioNavigationAidsfromtheAir
Thankstoadequateequipmentandcompetenthumanresources,SMATSA llc isable toprovideservicesofcalibrationofgroundbasedradionavigationaidsfromtheair,checktheflightproceduresandprovidetestingservicesrelatedtothechoiceoflocationforsettingupanewgroundbasedradionavigationaids.Forthispurpose,themodernaircraftHawkerBeechcraftKingAir350isused,withbuilt-incalibrationequipment(AD-AFIS-260),whichSMATSAllcusesforitsownneeds,butalsoprovidesservicestoexternalusers.
ProvisionofservicesiscarriedoutinaccordancewiththerequirementsandrecommendationsthathavebeendefinedinthedocumentsoftheInternationalCivilAviationOrganisation-ICAO-Annex10,Annex14andDoc8071.
Regularandnon-scheduledcalibrationsonthebasisofconcludedcontractswithCroatiaControlLtd,SloveniaControl,HungaroControl,BudapestAirport,LFV-SwedenAirTrafficControlandAgencyfor theProvisionofAirNavigationServicesinBosniaandHerzegovina(BHANSA)werecarriedoutduring2015.
Inordertokeeppacewithmoderntrendsinthisfield,inMarch2015,therepresentativesofSMATSAllcparticipatedin the43rdmeetingof theInternationalCommitteeforAirspaceStandardsandCalibration(ICASC)inToulouse,France,where the legislation, technical requirementsandcurrentstatuswerediscussed.Atthe44thmeetingofICASC,heldinBelgradefrom3rdto5thNovember,amongotherthings,preparationsweremadefortheorganisationofIFIS(InternationalFlightInspectionSymposium),whichwillbeheldinBelgradenextyear.
Explanationofadegreeofrealizationofthegoalssetfor2015withintheprovisionofservicesofcalibrationofgroundbasedradionavigationaidsisshowninthefollowingtable.
Basicprojectidentification(BSO) Basicprojecttitle Realizationofplannedactivities
BSO03.01.01
Engageinkeepingthecurrentnumberofcalibrationofgroundbasedradionavigationaidsfromtheairusers
DegreeofrealizationisreducedbecauseofnotobtaininganinternationaltenderfortheprovisionofcalibrationservicesforaperiodoftwoyearsinMacedonia.Anumberofotherusersoftheservicesremainedunchanged.Duringtheyear,theservicetocustomerinSwedenwasprovidedseveraltimes.
Table 14. Realizationofplannedactivitiesin2015withinthecalibrationofgroundbasedradionavigationaids
Annual Report 201544
7.2 ANS Personnel Training Centre
SMATSAllcANSPersonnelTrainingCentreiscertifiedcentreengagedintrainingandadvancementofairtrafficcontrolofficers,CNSpersonnelandaeronauticalMETpersonnel.TrainingprogrammesandplansareharmonisedwiththerequirementsofESARR,nationalandinternationalregulations,aswellaswithICAOstandards.
SMATSAllcTrainingCentre,besidesthetrainingforitsownneeds,provides training forexternalusers,bothorganisationsandindividuals.Inthisregard,theconceptoftrainingofself-fundingATCOclasseshasbeenintroduced.
Anew2D/3Dsimulatorwaspurchasedin2015,whichfurtherraisedthequalityandefficiencyintheprovisionoftrainingservicesintheTrainingCentre.Thetrainingofcandidateswithintheinitial,developmentandcontinuationtrainingofairtrafficcontrollerswillbeconductedonthesimulator.
Thefollowingtableshowsthemostimportanttrainingsthatwerecompletedin2015inaccordancewiththeTrainingPlaninANSPersonnelTrainingCentre.
TitleofthetrainingNumberofplanned
candidates
Numberoftrainedcandidates
Basic Training 25 25
RatingTrainingADI 15 15
Rating Training APP 3 3
RatingEndorsementTrainingTCL 12 12
RefreshertrainingOJTinstructorsandsimulatorinstructors 9 9
Table 15. Realizationofplannedactivitiesin2015withintheANSPersonnelTrainingCentre
Annual Report 2015 45
7.3SMATSAAviationAcademy
InSMATSAAviationAcademy,in2015,thetrainingwasattendedby135candidatesinvariousstagesoftraining.Fromthebeginningoftheyear,42candidatesenrolled:15inMarchand23inSeptemberinATP(A)Integratedtrainingand4candidatesinFI(A)training.
Duringtheyearthetrainingwasfinishedbythetotalof33candidates,22ofwhomcompletedthemostdemandingtrainingATP(A).
Inordertoachievethedevelopmentgoalsandimprovethequalityofexistingtrainings,during2015contactshavebeenmadewiththeeducationalinstitutionsofhighereducation.ThecooperationwiththeFacultyofTransportandTrafficEngineering,UniversityofBelgrade,asthemostreputableinstitution,wasrealized,andtheanalysisofcompatibilityofthecurriculaisperformedwithit,inordertodefineanewcourse“Pilot-engineer”.
Also,during2015,asubstantialeffortwasmadetoimprovetheconditionsandimplementationoftraining,i.e.toupdateandrevitalizetheinfrastructure.Thecontracton thepublicprocurementofmaintenanceservicesforALSIMsimulatorwas concludedwith simulatormanufacturerALSIMSIMULATEURSSARL,France,whichensuresthehighestpossiblelevelofmaintenanceoftheflightsimulatorFNPTII.
SMATSAAviationAcademyalsoprovidestheservicesofaircraftmaintenance.Inthisregard,thecontractsfortheprovisionofserviceswithcompaniesfromGreece,SerbiaandMacedoniawereconcludedduring2015,andforsomeofthemSMATSAAviationAcademyprovidestheservicesofaircraftstorage.
Table 16. Realizationofplannedactivitiesin2015withintheSMATSAAviationAcademy
Basicprojectidentification(BSO) Basicprojecttitle Realizationofplanned
activities
BSO03.02.01To carry out a necessary analysis in order tomakeadecisiontoseparateSMATSAAviationAcademy as an independent entity fromSMATSAllcsystem
Transferofactivitiesintothenextyear.
Annual Report 201546
08Consultationswith UsersofServices
SMATSA llc achieves its business goals whilerespectingtherequirementsofusersofairnavigationservices,aswellasusersofadditionalservicesitprovides.AmongusersofSMATSAllcservicesareairlinesandoperators(civilandmilitary)withintheprovisionofANSservices,airportsandair trafficcontrolswithintheserviceofcalibrationofgroundbasedradionavigationaids,individualsandgroupsinthecontextofANSpersonnelandpilotstraining,aswellascompanieswithintheaircraftmaintenanceservices.
Inadditiontoconsultationswithindividualserviceusers,SMATSA llccooperateswith internationalassociationsandorganisations in the fieldofairtransport (EUROCONTROL,CRCO, IATA, ICAO,EASA,CANSO,ICASCetc.).Throughparticipationinworkinggroups,conferencesandmeetings,SMATSA
llcconsultswithitsserviceusers,withtheaimofconstantimprovementofitsservices.
Inanefforttobecomearegionalleaderintheprovisionofairnavigation,calibrationandtrainingofaviationpersonnelservices,SMATSAllcisimplementinganumberofactivitiesaimedatimprovingthecooperationwithserviceusersandrelevantorganisationsinthesphereofaviation.
During2015,theactivitieswerecarriedout,withintheimplementationofbasicprojects,inordertoimprovethecooperationwiththeserviceusers.ThedegreeofimplementationoftheactivitiesinrelationtotheplanestablishedbytheAnnualPlanfortheyearof2015ispresentedinTable17.
Basicprojectidentification(BSO) Basicprojecttitle Realizationofplannedactivities
BSO02.01.01
Improvethecooperationthroughestablishmentofdirect,regularconsultationsandcontactswiththeairlineswhicharethebiggestusersofairnavigationservices
In order to improve the cooperation with serviceusers,i.e.airlines,attheendof2015ananalysisofSMATSA“Top100users”wasperformed,publishedbyEUROCONTROL,inordertoestablisharegularcommunicationinthefuture.
BSO02.01.02
Improvethecooperationthroughestablishmentofdirect,regularconsultationsandcontacts(meetingsandparticipationinworkinggroups)withotherusersofairnavigationservices
In order to improve the cooperation with serviceusers, at the end of 2015, preparatory activitieswereconductedfortheimplementationoftheusersofairnavigationservicessurvey.
Table 17. Realizationofplannedactivitieswithintheimprovementofthecooperationwithrelevantorganisa-tionsinthesphereofaviationandusersofairnavigationservicesin2015
Annual Report 2015 47
Thebest indicatorsofservicesqualityprovidedbySMATSAllcaretheresultsofcustomersatisfactionquestionnaire,whichareconductedannually.Theresultsoftestsconductedin2015showedthatSMATSAllcmeetstherequirementsofusersintermsofthelevelandqualityofallprovidedservices:
1.ReportsfromRNDSGandNMEUROCONTROLmeetingindicatethattheairlinesaresatisfiedwiththelevelandqualityofATMservicesprovidedbySMATSAllc.WithoutmentioningSMATSAllcinthereportthatisdedicatedtodelaysandunfulfilleduserexpectations,NMEUROCONTROLhighlightstheimportanceofimplementingtheFRAconcept.
2.In2015therewerenoobjectionsofusersofCNSservicesprovidedbySMATSAllc.
3.Analysis of satisfactionofMETserviceusersthroughaquestionnairereflectsthesatisfactionofthecustomerswithprovidedMETservices.
4.ByanalyzingtheAISservicecustomersatisfactionquestionnaireitwasconcluded,thattheusersratedtheprovisionofaeronauticalinformationservicesasexcellent.Outof11completedquestionnairesreceivedin2015,10questionnaireswerewithanexcellentgrade,andonewithagoodgrade.
5.Onthebasisoforalconsultationwithusersofcalibrationofgroundbasedradionavigationaidsservices,itwasconcludedthatthereisnoneedtoconductawrittencustomersatisfactionsurveyattheendoftheyear.Basedoninterviews,itwasestimatedthattheaveragerateofusersremainedunchangedcomparedtolastyearanditamountedto4.93fromamaximumof5:00.
6.Change in thestatusof theprocedure,whichrequirestheimplementationofsurveyfortheevaluationoftrainingintheANSPersonnelTrainingCentremadeitpossiblefortheuserssatisfactionscorefor2015tobedeterminedonthebasisofthefactthattherewerenoobjectionsofthetrainees.
7.Theresultsofthesurveyconductedin2015onasampleof30candidatesattendingtrainingforpilotsarepresentedinthetable.
8.Analysisofusersatisfactionwiththeserviceofaircraftmaintenanceiscarriedoutbyfillingintheappropriateform.ServiceusersratedtheservicesofMOin2015as«excellent».
Table 17. Realizationofplannedactivitieswithintheimprovementofthecooperationwithrelevantorganisa-tionsinthesphereofaviationandusersofairnavigationservicesin2015
Basicprojectidentification(BSO) Basicprojecttitle Realizationofplannedactivities
BSO02.02.01
ImproveandmaintainthecooperationwiththeMinistriesofSerbiaandMontenegrowhoareresponsiblefortheadoptionofbusinessplans
Thebasicprojectwascancelledbecauseitinvolvesthe activities that represent a constant annualactivity.
BSO02.02.02
ImprovethecooperationwiththeCivilAviationDirectorateoftheRepublicofSerbiaandtheCivilAviationAgencyofMontenegro
Thebasicprojectwascancelledbecauseitinvolvesthe activities that represent a constant annualactivity.
BSO02.02.03
Proactivelyparticipateintheworkinggroups,conferencesandmeetingswithrelevantorganisationsandgroups,wheretheregulations,policiesorstrategiesaremade,thatmayaffecttheoperationofSMATSAllc
During2015SMATSAllcrepresentativesparticipatedin numerous working groups, conferences andmeetings with relevant organisations in order toimproveoperationsinallfields.
BSO02.02.04Establishthe“RunwaySafetyTeam”forADNikolaTeslaBeograd
“RunwaySafetyTeam”forADNikolaTeslaBeogradisestablishedon14/05/2015.
Annual Report 201548
Field dissatisfied neutral satisfied verysatisfied
KnowledgebeforecomingtotheAcademy 10% 43% 33% 13%
KnowledgeaftercompletionoftheAcademy 0% 3% 43% 53%
Theoryinstructors 3% 21% 38% 38%
Teachingaidsandteachingresources 3% 33% 40% 23%
Books 3% 17% 60% 20%
Acquiredflyingskills 0% 3% 33% 63%
Flyinginstructors 0% 6% 17% 77%
Flyingtrainingorganisation 6% 27% 40% 27%
Dailyorganisation 3% 20% 67% 10%
Briefingsanddebriefings 0% 7% 60% 33%
Generalassessmentoftheoveralltraining 0% 3% 70% 27%
Table18.Satisfactionofpilottrainees
Annual Report 2015 49
09FinancialStatements9.1IncomeStatement
ITEM AOPAmountCurrentyear
AmountPreviousyear
REVENUEFROMREGULAROPERATIONS
A.OPERATINGINCOME(1002+1009+1016+1017) 1001 10,001,482 10,103,295
I.SALESOFMERCHANDISE(1003+1004+1005+1006+1007+1008) 1002 0 0
1.Salesofmerchandisetoparentcompaniesandsubsidiaries-domestic 1003
2.Salesofmerchandisetoparentcompaniesandsubsidiaries-foreign 1004
3.Salesofmerchandisetootherassociatedlegalentities-domestic 1005
4.Salesofmerchandisetootherassociatedlegalentities-foreign 1006
5.Salesofmerchandise-domestic 1007
6.Salesofmerchandise-foreign 1008
II.SALESOFGOODSANDSERVICESRENDERED1009 9,586,995 9,792,091
(1010+1011+1012+1013+1014+1015)
1.Salesoffinishedgoodsandservicesrenderedtoparentcompaniesandsubsidiaries-domestic 1010
2.Salesoffinishedgoodsandservicesrenderedtoparentcompaniesandsubsidiaries-foreign 1011
3.Salesoffinishedgoodsandservicesrenderedtootherassociatedlegalentities-domestic 1012
4.Salesoffinishedgoodsandservicesrenderedtootherassociatedlegalentities-foreign 1013
5.Salesoffinishedgoodsandservicesrendered-domestic 1014 397,878 356,762
6.Salesoffinishedgoodsandservicesrendered-foreign 1015 9,189,117 9,435,329
III.REVENUESFROMPREMIUMS,SUBVENTIONS,GRANTSETC. 1016 585 1,352
IV.OTHEROPERATINGINCOME 1017 413,902 309,852
Table19.2015IncomeStatement,in000RSD
Annual Report 201550
ITEM AOPAmountCurrentyear
AmountPreviousyear
EXPENSESFROMREGULAROPERATIONS
B.OPERATINGEXPENSES1018 8,947,731 8,325,929
(1019–1020–1021+1022+1023+1024+1025+1026+1027+1028+1029)≥0
I.PURCHASECOSTOFGOODSSOLD 1019
II.INCOMEFROMACTIVATINGOWNPRODUCTSANDGOODS 1020
IIIINCREASEINVALUEOFINVENTORIESOFWORKINPROGRESSANDFINISHEDGOODSANDUNFINISHEDSERVICES 1021
IVDECREASEINVALUEOFINVENTORIESOFWORKINPROGRESSANDFINISHEDGOODSANDUNFINISHEDSERVICES 1022
V.MATERIALCOSTS 1023 91,602 61,673
VI.COSTSOFFUELANDENERGY 1024 144,983 138,348
VII.COSTOFSALARIES,FRINGEBENEFITSANDOTHERPERSONALEXPENSES 1025 5,560,053 5,183,503
VIII.COSTOFPRODUCTIONSERVICES 1026 1,114,143 1,036,732
IX.DEPRECIATIONCOSTS 1027 1,196,698 1,117,340
X.LONG-TERMPROVISIONCOSTS 1028 108,595 120,012
XI.INTANGIBLECOSTS 1029 731,657 668,321
C.OPERATINGPROFIT(1001–1018)≥0 1030 1,053,751 1,777,366
D.OPERATINGLOSS(1018–1001)≥0 1031
E.FINANCIALINCOME(1033+1038+1039) 1032 110,335 355,050
I.FINANCIALREVENUESFROMASSOCIATEDLEGALENTITIESANDOTHERFINANCIALREVENUES(1034+1035+1036+1037) 1033 0 0
1.Financialrevenuesfromparentanddependentlegalentities 1034
2.Financialrevenuesfromotherrelatedlegalentities 1035
3.Revenuesfromparticipationinprofitofassociatedlegalentitiesandjointventures 1036
4.Otherfinancialrevenues 1037
II.INTERESTRECEIVABLES 1038 22,327 23,694
IIIPOSITIVEEFFECTSONEXCHANGERATEANDEFFECTSOFFOREIGNCURRENCYCLAUSE(TOTHIRDPARTIES) 1039 88,008 331,356
Table19.2015IncomeStatement,in000RSD
Annual Report 2015 51
ITEM AOPAmountCurrentyear
AmountPreviousyear
F.FINANCIALEXPENSES(1041+1046+1047) 1040 186,485 538,926
IFINANCIALEXPENSESINCURREDWITHASSOCIATEDLEGALENTITIESANDOTHERFINANCIALEXPENSES(1042+1043+1044+1045) 1041 0 0
1.Financialexpensesincurredwithparentanddependentlegalentities 1042
2.Financialexpensesincurredwithotherrelatedlegalentities 1043
3.Expensesfromparticipationinlossofassociatedlegalentitiesandjointventures 1044
4.Otherfinancialexpenses 1045
II.INTERESTEXPENSES(TOTHIRDPARTIES) 1046 114,484 142,018
III.NEGATIVEEFFECTSONEXCHANGERATEANDEFFECTSOFFOREIGNCURRENCYCLAUSE(TOTHIRDPARTIES) 1047 72,001 396,908
G.PROFITFROMFINANCING(1032-1040) 1048
H.LOSSFROMFINANCING(1040-1032) 1049 76,150 183,876
I.INCOMEONOTHERPROPERTYVALUERECONCILIATIONSHOWNATFAIRVALUEINTHEINCOMESTATEMENT 1050 150,179 723,462
J.EXPENSESONOTHERPROPERTYVALUERECONCILIATIONSHOWNATFAIRVALUEINTHEINCOMESTATEMENT 1051 165,842 301,955
K.OTHERINCOMES 1052 54,272 36,718
L.OTHEREXPENSES 1053 621,514 243,370
M.PROFITFROMREGULARBUSINESSOPERATIONSBEFORETAX(1030-1031+1048-1049+1050-1051+1052-1053) 1054 394,696 1,808,345
N.LOSSESFROMREGULARBUSINESSOPERATIONSBEFORETAX(1031-1030+1049-1048+1051-1050+1053-1052) 1055
O.NETPROFITFROMBREAKOPERATIONS,EFFECTSOFCHANGESINACCOUNTINGPOLICIESANDCORRECTIONSOFERRORSFROMPREVIOUSPERIODS
1056
P.NETLOSSFROMBREAKOPERATIONS,EFFECTSOFCHANGESINACCOUNTINGPOLICIESANDCORRECTIONSOFERRORSFROMPREVIOUSPERIODS
1057
Q.PROFITBEFORETAX(1054-1055+1056-1057) 1058 394,696 1,808,345
R.LOSSESBEFORETAX(1055-1054+1057-1056) 1059
Table19.2015IncomeStatement,in000RSD
Annual Report 201552
ITEM AOPAmountCurrentyear
AmountPreviousyear
S.TAXONPROFIT
I.TAXEXPENSESOFTHEPERIOD 1060 197,130 347,180
II.DEFERREDTAXEXPENSESOFAPERIOD 1061 37,151
III.DEFERREDTAXREVENUEOFAPERIOD 1062 22,852
T.PERSONALEARNINGSPAIDTOEMPLOYER 1063
U.NETPROFIT1064 220,418 1,424,014
(1058–1059–1060–1061+1062)
V. NET LOSS 1065
(1059–1058+1060+1061–1062)
I.NETPROFITOFMINORITYSHAREHOLDERS 1066
II.NETPROFITOFMAJORITYOWNER 1067
III.EARNINGSPERSHARE
1.Basicearningspershare 1068
2.Reduced(diluted)earningspershare 1069
AnnualReport201552
Table19.2015IncomeStatement,in000RSD
Annual Report 2015 53
9.2BalanceSheet
ITEM AOPAmountCurrentyear
AmountPreviousyear
ASSETS
A.SUBSCRIBEDCAPITALUNPAID 0001
B.FIXEDASSETS(0003+0010+0019+0024+0034) 0002 12,329,351 13,822,829
I.INTANGIBLEASSETS(0004+0005+0006+0007+0008+0009) 0003 27,775 25,275
1.Investmentsindevelopment 0004
2.Concessions,patents,licenses,trademarksandservicemarks,softwareandotherrights 0005 25,484 24,199
3.Goodwill 0006
4.Otherintangibleassets 0007
5.Intangibleassetsinprogress 0008 2,291 1,076
6.Prepaymentsforintangibleassets 0009
II.PROPERTY,PLANTANDEQUIPMENT0010 12,299,727 13,795,705
(0011+0012+0013+0014+0015+0016+0017+0018)
1. Land 0011 548,314 548,314
2. Buildings 0012 5,314,671 5,405,273
3.Plantandequipment 0013 5,996,681 7,262,490
4.Investmentproperty 0014
5.Otherproperty,plantandequipment 0015 4,284 4,509
6.Property,plantandequipmentinprogress 0016 357,356 445,438
7.Investmentsinotherentity’sproperty,plantandequipment 0017 2,240 3,308
8.Prepaymentsforproperty,plantandequipment 0018 76,181 126,373
III.BIOLOGICALASSETS(0020+0021+0022+0023) 0019 1,849 1,849
1.Forestsandplantations 0020 1,849 1,849
2.Livestock 0021
3.Biologicalassetsinprogress 0022
4.Prepaymentsforbiologicalassets 0023
IVLONGTERMFINANCIALINVESTMENTS(0025+0026+0027+0028+0029+0030+0031+0032+0033) 0024 0 0
1.Investmentsinaffiliatedcompanies 0025
2.Investmentsinassociatedcompaniesandjointventures 0026
3.Investmentsinotherthirdpartiescompaniesandothersecurities 0027
Table 20. 2015Assets,in000RSD
Annual Report 201554
ITEM AOPAmountCurrentyear
AmountPreviousyear
4.Longterminvestmentsinparentandaffiliatedcompanies 0028
5.Longterminvestmentsinotherthirdpartiescompanies 0029
6.Longterminvestments,domestic 0030
7.Longterminvestments,foreigncountries 0031
8.Securitiesheldtomaturity 0032
9.Otherlongtermfinancialinvestments 0033
V.LONGTERMRECEIVABLES(0035+0036+0037+0038+0039+0040+0041) 0034 0 0
1.Receivablesfromparentcompanyandaffiliatedcompanies 0035
2.Receivablesfromotherthirdpartiescompanies 0036
3.Receivablesfromcreditsales 0037
4.Receivablesfromfinancialleasingcontracts 0038
5.Receivablesfrompledgedassets 0039
6.Baddebtsanduncollectibleclaims 0040
7.Otherlongtermreceivables 0041
C.DEFERREDTAXASSETS 0042
D.CURRENTASSETS0043 5,105,927 4,681,223
(0044+0051+0059+0060+0061+0062+0068+0069+0070)
I.INVENTORIES(0045+0046+0047+0048+0049+0050) 0044 146,275 162,004
1.Material,spareparts,toolsandsmallinventories 0045 138,060 161,172
2.Workandservicesinprogress 0046
3.Finishedproducts 0047
4. Goods 0048
5.Fixedassetsforsale 0049
6.Prepaymentsforinventoriesandservices 0050 8,215 832
IIRECEIVABLESFROMSALES0051 1,001,567 1,559,225
(0052+0053+0054+0055+0056+0057+0058)
1.Domestictradereceivables-parentcompanyandsubsidiaries 0052
2.Foreigntradereceivables-parentcompanyandsubsidiaries 0053
3.Domestictradereceivables-otheraffiliatedcompanies 0054
4.Foreigntradereceivables-otheraffiliatedcompanies 0055
5.Domestictradereceivables 0056 31,614 383,187
6.Foreigntradereceivables 0057 969,953 1,176,038
7.Otherreceivablesfromsales 0058
IIIRECEIVABLESFROMSPECIFICBUSINESSOPERATIONS 0059
Table 20. 2015Assets,in000RSD
Annual Report 2015 55
ITEM AOPAmountCurrentyear
AmountPreviousyear
IVOTHERRECEIVABLES 0060 203,083 41,235
V.FINANCIALASSETSASSESSEDATFAIRVALUEINTHEINCOMESTATEMENT 0061
VISHORTTERMFINANCIALINVESTMENTS0062 0 0
(0063+0064+0065+0066+0067)
1.Shorttermloansandinvestments-parentcompanyandsubsidiaries 0063
2.Shorttermloansandinvestments-otheraffiliatedcompanies 0064
3.Shorttermcreditsandloans,domestic 0065
4.Shorttermcreditsandloans,foreigncountries 0066
5.Othershorttermfinancialinvestments 0067
VII.CASHANDCASHEQUIVALENTS 0068 3,638,462 2,857,298
VIII.VALUEADDEDTAX 0069 68,887 32,699
IX.PREPAYMENTSANDACCRUEDINCOME 0070 47,653 28,762
E.TOTALASSETS=OPERATINGASSETS(0001+0002+0042+0043) 0071 17,435,278 18,504,052
F.OFF-BALANCESHEETASSET 0072 204,934 136,253
Table 20. 2015Assets,in000RSD
AnnualReport2015 55
Annual Report 201556
ITEM AOPAmountCurrentyear
AmountPreviousyear
A.EQUITY(0402+0411–0412+0413+0414+0415–0416+0417+0420–0421)≥0=(0071–0424–0441–0442) 401 12,226,886 11,993,592
I.INITIALCAPITAL402 1,873,820 1,873,820
(0403+0404+0405+0406+0407+0408+0409+0410)
1.Sharecapital 403
2.Stakesinlimitedliabilitycompanies 404 355 355
3.Stakes 405
4.Stateownedcapital 406 1,862,848 1,862,848
5.Sociallyownedcapital 407
6.Cooperativestakes 408
7.Issuingpremiums 409
8.Otherinitialcapital 410 10,617 10,617
II.SUBSCRIBEDCAPITALUNPAID 411
III.SHARESBUYBACK 412
IV.RESERVES 413 507,044 507,044
V.REVALUATIONRESERVESFROMREVALUATIONOFINTANGIBLESASSETS,PROPERTIES,PLANTANDEQUIPMENT 414 3,179,315 3,384,470
VI.UNREALISEDGAINSFROMSECURITIESANDOTHERCOMPONENTSOFOTHERCOMPREHENSIVERESULT 415 13,132 17,965
VII.UNREALISEDLOSSESFROMSECURITIESANDOTHERCOMPONENTSOFOTHERCOMPREHENSIVERESULT 416
VIII.RETAINEDEARNINGS417 6,653,575 6,210,293
(0418+0419)
1.Retainedearningsfrompreviousyears 418 6,210,293 4,778,395
2.Retainedearningsfromcurrentyear 419 443,282 1,431,898
IX.NON-CONTROLLINGINTEREST 420
X.LOSSES(0422+0423) 421 0 0
1.Lossesfrompreviousyears 422
2.Lossesfromcurrentyear 423
B.LONGTERMPROVISIONSANDLIABILITIES(0425+0432) 424 2,943,325 4,033,860
I.LONGTERMPROVISIONS425 692,151 625,134
(0426+0427+0428+0429+0430+0431)
1.Provisionsforwarrantyperiodcosts 426
2.Provisionsforrecoveryofnaturalresources 427
3.Provisionsforrestructuringcosts 428
4.Provisionsforwagesandotheremployeebenefits 429 660,768 602,893
5.Provisionsforlegalexpenses 430 31,383 22,241
Table 21. 2015Liabilities,in000RSD
Annual Report 2015 57
Table 21. 2015Liabilities,in000RSD
ITEM AOPAmountCurrentyear
AmountPreviousyear
6.Otherlongtermprovisions 431
IILONGTERMLIABILITIES432 2,251,174 3,408,726
(0433+0434+0435+0436+0437+0438+0439+0440)
1.Liabilitiesconvertibleintocapital 433
2.Liabilitiestoparentcompanyandsubsidiaries 434
3.Liabilitiestootheraffiliatedcompanies 435
4.Liabilitiesforissuedsecuritiesformorethanoneyear 436
5.Longtermcreditsandloans,domestic 437
6.Longtermcreditsandloans,foreigncountries 438 2,251,174 3,408,726
7.Longtermliabilitiesfromfinancialleasing 439
8.Otherlongtermliabilities 440
C.DEFERREDTAXLIABILITIES 441 565,197 610,908
D.SHORTTERMLIABILITIES442 1,699,870 1,865,692
(0443+0450+0451+0459+0460+0461+0462)
I.SHORTTERMFINANCIALLIABILITIES443 1,201,618 1,140,354
(0444+0445+0446+0447+0448+0449)
1.Shorttermloansfromparentcompanyandsubsidiaries 444
2.Shorttermloansfromotheraffiliatedcompanies 445
3.Shorttermcreditsandloans,domestic 446
4.Shorttermcreditsandloans,foreigncountries 447
5.Liabilitiesfromfixedassetsandassetsfromdiscontinuedoperationsavailableforsale 448
6.Othershorttermfinancialliabilities 449 1,201,618 1,140,354
II.RECEIVEDADVANCES,DEPOSITSANDBONDS 450 113,980 140,865
III.OPERATINGLIABILITIES(0452+0453+0454+0455+0456+0457+0458) 451 315,185 296,155
1.Suppliers-parentcompanyandsubsidiaries,local 452
2.Suppliers-parentcompanyandsubsidiaries,foreigncountries 453
3.Suppliers-otheraffiliatedcompanies,local 454
4.Suppliers-otheraffiliatedcompanies,foreigncountries 455
5.Suppliers,local 456 116,345 183,909
6.Suppliers,abroad 457 198,725 112,131
7.Otheroperatingliabilities 458 115 115
IV.OTHERSHORTTERMLIABILITIES 459 22,742 119,374
V.LIABILITIESFORVALUEADDEDTAX 460
VI.LIABILITIESFOROTHERTAXES,CONTRIBUTIONSANDFEESPAYABLE 461 30,845 166,321
Annual Report 201558
ITEM AOPAmountCurrentyear
AmountPreviousyear
VII.ACCRUEDEXPENSESANDDEFERREDINCOME 462 15,500 2,623
E.LOSSESEXCEEDINGCAPITAL(0412+0416+0421–0420–0417–0415–0414–0413–0411–0402)≥0=(0441+0424+0442–0071)≥0 463
F.TOTALLIABILITIES(0424+0442+0441+0401–0463)≥0 464 17,435,278 18,504,052
G.OFF-BALANCELIABILITIES 465 204,934 136,253
9.3CashFlowStatement
ITEM AOPAmountCurrentyear
AmountPreviousyear
A.CASHFLOWFROMOPERATINGACTIVITIES3001 10,923,495 10,664,579
ICashinflowsfromoperatingactivities(1-3)
1.Salesandreceivedadvances 3002 10,093,928 10,001,136
2.Interestreceivedfromoperatingactivities 3003 22,327 23,694
3.Otherinflowsfromordinaryoperations 3004 807,240 639,749
II.Cashoutflowsfromoperatingactivities(1-5) 3005 9,317,064 8,098,993
1.Paymentstosuppliersandadvancepayments 3006 2,843,732 2,322,547
2.Salaries,wagesandotherpersonalexpenses 3007 5,769,664 5,284,427
3.Interestspaid 3008 217,111 142,018
4.Incometax 3009 486,557 350,001
5.Paymentsofotherpublicrevenues 3010
III.Netcashinflowfromoperatingactivities(I-II) 3011 1,606,431 2,565,586
IV.Netcashoutflowfromoperatingactivities(II-I) 3012
B.CASHFLOWSFROMINVESTINGACTIVITIES3013 1,094,757 -
I.Cashinflowsfrominvestingactivities(1-5)
1.Saleofsharesandstocks(netinflows) 3014
2.Saleofintangibleassets,properties,plant,equipmentandbiologicalassets 3015 1,094,757
3.Otherfinancialinvestments(netinflows) 3016
4.Interestsreceivedfrominvestingactivities 3017
5.Dividendsreceived 3018
II.Cashoutflowsfrominvestingactivities(1to3) 3019 809,609 783,426
1.Purchaseofsharesandstocks(netoutflows) 3020
Table 21. 2015Liabilities,in000RSD
Table 22. 2015CashFlowStatement,in000RSD
Annual Report 2015 59
Table 22. 2015CashFlowStatement,in000RSD
ITEM AOPAmountCurrentyear
AmountPreviousyear
2.Purchaseofintangibleassets,properties,plant,equipmentandbiologicalassets 3021 809,609 783,426
3.Otherfinancialinvestments(netoutflows) 3022
III.Netcashinflowfrominvestingactivities(I-II) 3023 285,148
IV.Netcashoutflowfrominvestingactivities(II-I) 3024 783,426
C.CASHFLOWSFROMFINANCINGACTIVITIES3025 - -
I.Cashinflowsfromfinancingactivities(1to5)
1.Initialcapitalincrease 3026
2.Longtermloans(netinflows) 3027
3.Shorttermloans(netinflows) 3028
4.Otherlongtermliabilities 3029
5.Othershorttermliabilities 3030
II.Cashoutflowsfromfinancingactivities(1to6) 3031 1,113,317 992,551
1.Repurchaseofownsharesandstocks 3032
2.Longtermloans(outflows) 3033 1,113,317 992,551
3.Shorttermloans(outflows) 3034
4.Otherliabilities(outflows) 3035
5.Financialleasing 3036
6.Dividendspaid 3037
III.Netcashinflowfromfinancingactivities(I-II) 3038
IV.Netcashoutflowfromfinancingactivities(II-I) 3039 1,113,317 992,551
D.TOTALCASHINFLOW(3001+3013+3025) 3040 12,018,252 10,664,579
E.TOTALCASHOUTFLOW(3005+3019+3031) 3041 11,239,990 9,874,970
F.NETCASHINFLOW(3040–3041) 3042 778,262 789,609
G.NETCASHOUTFLOW(3041–3040) 3043
H.CASHBALANCEATBEGINNINGOFACCOUNTINGPERIOD 3044 2,857,298 1,927,235
I.FOREIGNEXCHANGEDIFFERENCEFROMCONVERSIONOFCASH 3045 10,233 202,310
J.FOREIGNEXCHANGELOSSESFROMCONVERSIONOFCASH 3046 7,331 61,856
K.CASHBALANCEATTHEENDOFACCOUNTINGPERIOD3047 3,638,462 2,857,298
(3042–3043+3044+3045–3046)
Annual Report 201560
9.4NotestoFinancialStatements
9.4.1 Basis for Preparation of Financial Statements
Financialstatementsfor2015werepreparedinamannerandinaccordancewiththelegalregulations.
LegalentitiesandentrepreneursintheRepublicofSerbiahavetheobligationtokeepbusinessrecords,recogniseandevaluateassetsandliabilities,revenuesandexpenses,andtoprepare,present,submitanddisclosefinancialstatements, inaccordancewiththeAccountingandAuditingLaw(“OfficialGazetteoftheRS”,No.62/2013),aswellasinaccordancewithotherapplicablebylaws.SMATSAllc,beingalargelegalentity,isrequiredtoapplyInternationalFinancialReportingStandards (IFRS),which, intermsofthementionedlaw,comprise:FrameworkforPreparationandPresentationofFinancialStatements(“Framework“),InternationalAccountingStandards(IAS),InternationalFinancialReportingStandards(IFRS)and therelated Interpretations, issuedbytheInternationalFinancialReportingInterpretationsCommittee(IFRIC),additionalamendmentstothosestandardsandtherelatedInterpretations,approvedby the InternationalAccountingStandardsBoard(“Board“),whichweretranslatedandpublishedbytheministryresponsibleforfinancialaffairs.
ByvirtueoftheDecisionoftheMinistry,dated13thMarch,2014,published in theOfficialGazetteoftheRSNo.35,dated27thMarch2014,(hereinafter“TheDecisiononAdoptionof theTranslations”)the translationsof themain textsof the IASandtheIFRS,theConceptualFrameworkforFinancialReporting(“ConceptualFramework“),adoptedbytheBoard,andoftherelatedIFRICInterpretations,wereapprovedandpublished.Thetranslationsmentionedabove,publishedintheDecisiononAdoptionoftheTranslations,donotincludebasisforclosing,illustrativeexamples,guidelines,comments,opposingopinions,elaboratedexamples,oranyothersupplementaryexplanatorymaterial whichmay be adopted inconnectionwiththestandards,ortheinterpretations,exceptifnotexplicitlybeingstatedthatsuchmaterialisaconstituentpartofthestandard,ortheinterpretation.OnthebasisoftheDecisionontheAdoptionoftheTranslations,theConceptualFramework,IAS,IFRS,IFRICandtherelatedInterpretations,whichweretranslated,havebeenappliedsincethepreparationofthefinancialstatementsasof31stDecember,2014.IFRSsandInterpretationsoftheStandardsamendedorissuedafterthisdatehavenotbeentranslatedandpublished,andthereforetheyarenotappliedinthepreparationofthesefinancialstatements.
However,until thedateof thepreparationof thepresentedfinancialstatements,notallamendmentsoftheIAS/IFRSandIFRICInterpretations,inforcesince1stJanuary,2014,hadbeentranslated.Apartfromthat,certainlegalactsandbylawsprescribeaccountingprocedures,evaluationsanddisclosingmethodswhich, in some cases, do not complywiththerequirementsof theIAS/IFRSandIFRICInterpretations.
Apartfromthis,theattachedfinancialstatementsdeviatefromIASandIFRSinthefollowing:
•The”Off-balancesheetequityandliabilities”areshowninthebalancesheetform.AccordingtoIFRSdefinition,theheretoitemsrepresentneitherequitynorliabilities.
•SMATSAllcpreparedthesefinancialstatementsin the form prescribed by the Ministry ofFinance,which isnot incompliancewith theIAS1 requirements - ’’FinancialStatementsPresentation“.
FinancialStatementshavebeenpreparedunderhistoricalcostprinciple,modifiedbyrevaluationofproperty,plantandequipmentandfinancialassetsandliabilities,whereeffectsofchangesinfairvaluesaredisclosedintheincomestatement.
SMATSAllchaspreparedtheseFinancialStatementsbyapplyingacceptedaccountingpolicies.
SMATSA llc financial statements are shown inthousandsofDinars(RSD)pursuanttotheAccountingandAuditing Law. Dinar represents the officialreportingcurrencyintheRepublicofSerbia.
ThepreparationofFinancialStatementsfor2015ofAirTrafficControlofSerbiaandMontenegroSMATSAllcBelgrade,fortheaccountingperiodendingon31stDecember,2015,wascarriedout,inallmateriallysignificantrespects,inaccordancewiththeAccountingandAuditingLaw(“TheOfficialGazetteoftheRS”,No.62/2013)whichimpliesusingInternationalAccountingStandards(IAS),aswellasInternationalFinancialReportingStandards(IFRS),andinaccordancewiththeregulationsissuedbytheMinistryofFinanceoftheRepublicofSerbia.
TheDecisionmadebytheMinistryofFinanceoftheRepublicofSerbia(number401-00-380/2010from25thOctober,2010)determinedandpublished
AnnualReport201560
Annual Report 2015 61
9.4.2 Summary of Significant Accounting Policies
theFrameworkandtranslationoftheIAS,andtheywereineffecton31stDecember,2014,onwhichtheAccountingandAuditingLawisbasedon.SMATSAllcmanagementestimatestheimpactofchangesinIAS,newlyissuedIFRS,andtheInterpretationsofStandardsonconsolidatedfinancialstatements.AmendmentstoexistingIASs,newlyissuedIFRSsandInterpretationsofStandards,thereplacementofcurrentIASswithnewones,whichwentintoeffecton1stJanuary,2014,aswellasadoptionofnewinterpretationswhichwentineffectduring2014,havenotsignificantlychangedtheSMATSAllcaccountingpolicies,norhadanysignificantmaterialinfluenceonthefinancialstatementsintheperiodoftheirinitialadoption.SincethemajorityofthesechangesarenotapplicabletotheSMATSAllcoperations,SMATSAllcmanagementdoesnotexpressanyexplicitorunreservedstatementontheharmonisationoftheFinancialStatementswithIFRS,appliedintheperioddisclosedinsubmittedFinancialStatements.
AuditofSMATSAllcFinancialStatementsfor2014wascarriedoutby“MooreStephensAuditingandAccounting”Ltd.,thecompanyforauditing,accountingandconsulting,Studentskitrg4/V,Belgrade.AccordingtotheIndependentAuditor’sReport,theFinancialStatementsgive,inallmaterialrespects,trueandfairviewofthefinancialpositionofSMATSAllcas
at31/12/2014,aswellastheresultofitsbusinessoperationsanditscashflowsfortheyearthenended,allinaccordancewiththeaccountingregulationsineffectintheRepublicofSerbiaandaccountingpoliciesdisclosedintheNotestoFinancialStatements.
InaccordancewiththeprovisionsofArticle34oftheLawonAccountingandAuditing,theFinancialStatements for 2014, together with the “MooreStephensAuditingandAccounting”Ltd.IndependentAuditor’sReport,SMATSAllcAssemblyDecisionontheAdoptionoftheFinancialStatementsfor2014,SMATSAllcAssemblyDecisionontheDistributionoftheProfitfromtheRetainedEarningsandtheAnnualReport for 2014,weresubmitted to theSerbianBusinessRegistersAgencyforpublicationonthewebsiteoftheRegisterofFinancialStatements.
The preparation of the Financial Statements inconformitywith IFRS requires theapplicationofcertaincriticalaccountingestimates.ItalsorequirestheManagementtoexerciseitsjudgmentinapplyingtheSMATSAllcaccountingpolicies.
ErrorsfromthepreviousyearsarenotreflectedintheFinancialStatementsfor2015,buttheywererecordedingroups57and67respectively in theFinancialStatementsfor2015.
9.4.2.1 IntangibleAssets
Anintangibleassetisanidentifiablenon-monetaryassetwithoutphysicalsubstance:
•held foruse in theproductionorsupplyofgoodsorservices, for rental toothersor foradministrativepurposes;
•controlledbySMATSAllcasaresultofpasteventsand
•fromwhichthefutureeconomicbenefitsareexpectedtoflowtotheentity.
Intangibleassetsinclude:developmentinvestments,concessions,patents,licencesandsimilarrights;otherintangibleassets;intangibleassetsinpreparationandprepaymentsforintangibleassets.
Theacquisitionofintangibleassetsduringtheyearisrecordedatcostvalue.Thecostvaluecomprisesinvoicevalueplusalldependentpurchasecostsandallcostsofbringingtheassettoitsworkingcondition
for its intendeduse.Thecostpriceof internallygeneratedintangibleassetscomprisesdirectcostsandtheassociatedindirectcosts,pertainingtotheparticularasset.
Borrowingcostsincurreduntilthetimeoftheintangibleassetbeingputintouse,arecapitalised,thatis,areincludedinthecostvalue.
After the initial recognition, an intangible assetiscarriedatitscostvalueoratitscostpricelessthe accumulated amortisation andaccumulatedimpairmentlosses.
An intangibleasset is recognisedand issubjecttoamortisation if itmeets therecognitioncriteriaprescribedbytherevisedIAS38,IntangibleAssets,andhasausefullifethatexceedstheperiodofoneyear.
Anyadditionalcostassociatedtoanalreadyrecognisedintangibleasset,iscreditedtothepresentedamountoftheasset,iftheinflowofthefutureeconomicbenefitsislikelytobelargerthantheinitiallyestimatedrateofreturnoftheasset.
AnnualReport2015 61
Annual Report 201562
SMATSAllcrecognisesthatcarryingvalueofanitemofintangibleassetwillincludethecostsofreplacingthepartofsuchanitemwhenthatcostsareincurrediftherecognitioncriteriaprescribedbytheIAS38–”IntangibleAssets“,(Paragraph21),aremet.
Anyotheradditionalcostisrecognisedastheexpensefortheperiodwhenitwasincurred.
Ifthereareindicatorssuggestingthattherehasbeenareductioninthevalue,thecarryingvalueofintangibleassetsiscalculatedand,ifitisdeterminedthattherehasbeenareduction,thevalueoftheassetisreducedtoitsrecoverableamount.
Gainsorlossesarisingfromwritingoffordisposalarecalculatedasthedifferencebetweentheestimatednetsalesrevenuesandthepresentedamountoftheasset,andarerecognisedasRevenuesorExpensesintheIncomeStatement.
Impairmentof intangibleassets is recognisedbyreducingthevalueofinvestmentswhilerecognisingtheexpensesintheIncomeStatementinaccordancewithIAS36–ImpairmentofAssets.
Ifthereareindicatorssuggestingthattherehasbeenareductioninvalue,carryingvalueofintangibleassetsiscalculatedand,ifitisdeterminedthattherehasbeenareduction,thevalueoftheassetisreducedtoitsrecoverableamount.
Theresidualvalueofanintangibleassetisassumedtobezero,unless:
• there is a commitment of a third party topurchasetheassetattheendofitsremainingusefullife,or
•thereisanactivemarketfortheasset,andtheresidualvaluecanbedeterminedbyreferencetothatmarket,anditisprobablethatsuchamarketwillexistattheendoftheusefullifeoftheasset.
Intangibleassetssubjecttoamortisationareamortisedusingthestraight-linemethodoverthecourseoffiveyears,exceptforassetswhoselifeisdeterminedbyacontract,inwhichcasetheyarewrittenoffwithinthetermsspecifiedinthecontract.Theamortisationofanintangibleassetiscalculatedasofthebeginningofthemonthfollowingthemonththattheintangibleassetwasputintouse.Thebasisoftheamortisationcalculationisthecostvaluelesstheaccumulatedamortisationandtotallossduetoimpairment.
Amortisationratespertainingtointangibleassetscanbealteredandamendedonlyuponanorderinthewrittenformissuedbyacompetentdepartment,withtheapprovalgivenbytheCNSDirectorandwiththeconsentoftheSMATSAllcCEO,aswellasupontheacceptedindependentassessor’sreport.
IntangibleassetsortherightofuseunderalicensingagreementareaccountedforinaccordancewiththeIAS38.Licensingagreementregulatestherightofusewhichisbeinggrantedbythelicensorandthelicensee’sobligations.Thecompensationthatthelicenseepaysis regardedby the licenseeasan intangibleasset
(providedthattherightwhichisthesubjectmatterofthecontractisusedlongerthanoneyear).
Costswhichcanbedirectlyattributedtosoftwarearecapitalisedaspartofasoftwareproduct.Otherdevelopmentcostswhichcannotmeetthecriteriaarerecognisedasexpenseswhentheyarise.
An intangibleasset isno longerpresented in thebalancesheetafteritsdisposaloraftertheassethaspermanentlybeentakenoutofservice,andwhennofutureeconomicbenefitsareexpectedfromitsdisposal.
Item AmortisationRate
Licences 14.28-100
Licensedsoftware 10-100
Projectdocumentation 20
Table 23. Baseamortisationratesforcertainintangibleassets
Annual Report 2015 63
9.4.2.2 Property,PlantandEquipment
Tangibleassetsarerecognisedasproperty,plantandequipmentandaresubjecttodepreciationiftheymeettherecognitioncriteriaprescribedbytheIAS16Property,PlantandEquipment,andhaveusefullivesthatexceedaperiodofoneyear.Anitemofproperty,plantandequipmentthatmeetsthefixedassetrecognitioncriteriaisinitiallymeasuredatcostvalueoratcostprice.Anyadditionalcostassociatedtoalreadyrecognisedproperty,plantandequipmentiscreditedtothepresentedamountoftheassetiftheinflowofthefutureeconomicbenefitsislikelytobelargerthantheinitiallyestimatedrateofreturnoftheasset.Anyotheradditionalcostisrecognisedasexpensefortheperiodwhenitwasincurred.
Additional costsofpossiblysignificant value,whichcomprisemainlylabourcosts,costsofoperatingsuppliesandcostsofminorspareparts,arepresentedascostsofcurrentmaintenance.Replacingofmajorspareparts,whoseshelflivesareshorterthanoneyear,ispresentedasmaintenancecost,becausesuchsparepartdoesnotmeettheassetrecognitioncriteria.
Consideringthefactthattheconstituentpartsofbuildingstructuresmayneedtobereplacedpriortotheexpiryofthelifetimeofabuildingasawhole,Paragraph13oftherevisedIAS16allowstheentitytorecognisetheassetwhichisreplacedasaseparateassetifitmeetstwobasic
conditionsprescribedbytheParagraph7ofthisstandard(а)– it isprobable that the futureeconomicbenefitsassociatedwiththeassetwillflowtotheentity,and(b)–thecostvalue,orthecostpriceoftheassetcanbemeasuredreliably.Therecognitionisdoneatthetimewhenthereplacementcostsareincurred,whilethecarryingvalueofthepartswhicharereplacedisderecognised,nomatterwhetherthereplacedparthasbeendepreciatedornot.Ifitisnotappropriatetodeterminethecarryingvalueofthereplacedpart,Paragraph70oftherevisedIAS16stipulatesthatthereplacementcostscanbeusedastheinformationontheamountofthecostsofthereplacedpartatthetimeofitspurchaseorconstruction.
Ifthepartwhichisreplacedisnotrecordedasaseparateitemofasset,andhasalifewhichisdifferentfromthelifeofanasset,andifthecarryingvalueisdeterminedbyusingthereplacementmethod,thewritten-offvalue(ofaccrueddepreciation)isdeterminedbyapplyingtherateusedfordepreciationoftheassetcomprisingthatpart,andnotbyapplyingtheratearisingfromthelifeofthepartwhichisreplaced.
Property,plantandequipmentaredepreciatedusingthestraight-linemethod,asofthedateoftheassetbeingmadeavailableforuse.
Thebasedepreciation rates forparticulargroupsofproperty,plantandequipmentaregiveninthefollowingtable:
Calculationofdepreciationfortaxpurposesisdoneinaccordancewith theCorporateIncomeTaxLawof theRepublicofSerbia,and theRegulationsontheClassificationofFixedAssetsandtheMethodofDeterminingDepreciation forTaxPurposes,whichresultsindeferredtaxes.
Investments inotherentity`scapitalassets for thepurpose of performing business operations are
recognisedandpresentedinadifferentaccountascapitalassetsprovidedtheirusefullivesarelongerthanoneyear.
Investmentsinotherentity’sfixedassetsareamortisedbasedontheirestimatedutilisationlives.
Property,plantandequipmentarenotaccountedintothebalancesheetaftertheirdisposalorwhentheasset
Table 24. Basedepreciationratesforproperty,plantandequipment
Item 2015DepreciationRate 2014DepreciationRate
Buildings 0.24-50% 0.24-50%
Equipment 5.56-50% 5.56-50%
Vehicles 10-50% 16.67-50%
Computerequipment 14.28-50% 14.28-50%
Furniture 10-50% 10-50%
Otherequipment 4-50% 5.56-50%
Aircraft 2.86-12.50% 2.86-12.50%
Investmentsinotherentity’sequipment 6.66-20% 6.66-20%
Annual Report 201564
ispermanentlywithdrawnfromuseandwhennofurthereconomicbenefitisexpectedfromitsdisposal.
Gainsorlossesarisingfromwritingoffordisposalofproperty,plantandequipment,arecalculatedasthedifferencebetweentheestimatednetsalesrevenuesand thepresentedamountof theassets,andarerecognisedasRevenuesorExpensesintheIncomeStatement.
Whenrevaluedassetsaresold,therevaluationamountincludedintherevaluationreserveistransferredtoretainedearnings.
Property,plantandequipmentwhicharewithdrawnfromactiveuseandwhichareheldfordisposal,arepresentedintheamountsaspresentedonthedateoftheassetbeingwithdrawnfromactiveuse.
Onthedateofissueofeachbalancesheet,SMATSAllcassesseswhetherthereisanyindicationthattheassetmayhavebeenimpaired.Ifanysuchindicationexists,SMATSAllcassessestheamountoftheassetthatcanberecovered.Iftherecoverableamountoftheassetislowerthanitscarryingvalue,thecarryingvalueisreducedtorecoverableamountandpreviouslyestablishedrevaluationreservespertainingtothatassetareconsequentlyreduced.Ifnorevaluationreservespertainingtotheassetwhosevalueisreducedhavebeenestablished,orifsuchreserveshavebeenusedforotherpurposes,impairmentlossisrecognizedastheexpenseoftheperiod.
If,onthebalancesheetdate,thereareanyindicationsthatthepreviouslyrecognisedimpairmentlossdoesnotexistorthatithasbeenreduced,theassessmentoftherecoverableamountofthatassetismade.Theimpairmentlossrecognisedinthepreviousyearsisrecognisedasrevenue,incasewhenthebasicmethodofmeasuringproperty,plantandequipmentisapplied,thatisasincreaseinrevaluationreserveifthealternativemethodofevaluationofproperty,plantandequipmentisapplied,andthecarryingvalueisincreasedtotherecoverableamount.
Theassessmentsofthefairvalueandtheremainingvalueof theasset (aswell as residual value)areperformedbyanauthorisedassessor,inaccordancewiththeIAS16–Property,PlantandEquipment,withtheassessmentresultsbeingrecordedunderrevenuesorexpenses.
Anyadditionalcostassociatedtoanalreadyrecogniseditemofproperty,plantandequipment,iscreditedtothepresentedamountoftheasset,ifitislikelythattheinflowofthefutureeconomicbenefitswillbelargerthantheinitiallyestimatedrateofreturnoftheassetandthat
thecostvalue/costpriceoftheadditionalcostcanbemeasuredreliably.
9.4.2.3 ToolsandAccessories
It ismandatorythat thetoolsandaccessorieswithutilisationlivesshorterthanoneyear,arepresentedascurrentassets(asinventories),regardlessoftheircostvalue.Theseassetsarenotdepreciated,buttheirtotalvalueistransferredtoexpenseswhentheyareputintouse.
Tools and accessories which are written off bycalculationarerecognisedasfixedassetsandaresubjecttodepreciationiftheirusefullivesarelongerthanoneyear.
Itemsoftoolsandaccessorieswhichdonotmeettheseconditionsarepresentedascurrentassets(inventories).
Theindividualvalueoftoolsandaccessoriesofthesametypewhicharecombinedlyusediscalculatedasthesumofthe individualvaluesofall toolsandaccessoriesofthesametype.
9.4.2.4 SpareParts
Installedsparepartsarerecognizedasfixedassetsiftheirusefullivesarelongerthanoneyear.
Suchspareparts,uponbeinginstalled,increasethecarryingamountof theassetsthat theyhavebeeninstalledin.
SparepartswhichdonotsatisfytheconditionsfromParagraph1ofthisArticle,atthetimeoftheinstallation,shallbepresentedasanoperatingcost.
9.4.2.5 Inventories
InventoriesareaccountedforinaccordancewiththeIAS2Inventories.
Inventoriesareassets in the formofmaterialsorsuppliestobeconsumedintheproductionprocess,orinthecourseofprovidingservices.
Inventoriesincluderawmaterialsandconsumables,whichshallbeusedintheproductionprocess,orinthecourseofprovidingservices.
Suppliesofmaterialspurchasedfromsuppliersaremeasuredatthecostvalueornetsalevalue,ifitislower.
Thecostvalueorcostpriceofinventoriescomprisesofallcostsofapurchase,andothercostsincurredbybringingtheinventoriestotheirpresentlocationandcondition.
Thecostsofpurchaseofmaterialsincludepurchaseprice,importdutiesandothertaxes(exceptthetaxes
Annual Report 2015 65
thatcansubsequentlyberefundedtotheentitybythetaxauthorities,suchasVAT,whichcanbedeductedaspriortax),transportcharges,handlingchargesandothercostswhichcanbedirectlyattributedtothepurchaseofmaterial.Reductions,discountsandothersimilaritemsaredeductedwhencalculatingpurchasecosts.
TheassessmentofthenetsalevalueofthesuppliesofmaterialsismadebyaspecialcommitteeestablishedbySMATSAllcCEO.
Thecalculationoftheoutputofsuppliesofmaterials(materialused)ismadebyemployingtheweightedaveragecostmethod.
Theweightedaveragecostiscalculateduponeverynewinputofmaterial.
Incaseofoperatinginhyperinflationaryenvironment,thevalueoftheinventoriesisadjustedbyapplyingapriceindex,inaccordancewiththeIAS29.
9.4.2.6 Short-termReceivablesandInvestments
Short-termreceivablescomprisedomesticandforeigntradereceivablesforthesaleofgoodsandservicesrendered.
Short-terminvestmentscompriseloans,securitiesandothershort-terminvestmentswhosedateofmaturityand/orsaleisoneyearfromthebalancesheetdate.
Short-termaccountsreceivablesaremeasuredattheiroriginalinvoicevalue.
Iftheinvoicevalueisdenominatedinaforeigncurrency,thevalueiscalculatedintothestatementcurrencyattheaverageexchangerateapplicableonthedateofthetransaction.
Changesintheexchangeratefromthetransactiondatetothereceivablescollectiondatearepresentedasexchangerategainsandlossesandcreditedtorevenues,orchargedagainstexpenses.
Receivablesdenominatedinaforeigncurrencyonthebalancedatearecomputedbyapplyingtheapplicablemiddleexchangerate,andexchangeratedifferencesarerecognisedasrevenuesorexpensesoftheperiod.
Indirectwrite-offand/or correctionof valueof theaccountsreceivableattheexpenseoftheoperatingexpendituresoftheperiod,attheaccountofcorrectionofvalue,isdoneforaccountsreceivable,inaccordancewiththestatutorydeadlineapplicableasoftheinvoiceduedate,with theestimateofcollectibilityofeachindividualaccountreceivable.Thedecisiononindirectwrite-offand/orcorrectionofvalueof theaccountsreceivable, at theaccount of correctionof value,upontheproposalmadebythecommitteeforrecord-
keepingofreceivablesandshort-terminvestments,ismadebySMATSAllcSupervisoryBoard.Directwrite-offof receivablesat theexpenseof theoperatingexpenditureoftheperiodisdoneifuncollectibilityiscertainanddocumented–theentityfailedtocollectthereceivablesbylegalmeans,andtheaccountreceivablewaspreviouslyincludedintheentity’srevenues.Thedecisionondirectwrite-offoftheaccountsreceivablesismadebySMATSAllcSupervisoryBoard,upontheproposalmadebythecommitteeforrecord-keepingofreceivablesandshort-terminvestmentsand/oraspertheannualreportproducedbyEUROCONTROL.ThecalculationandcollectionofairtrafficserviceprovisionchargesintheairspaceoftheRepublicofSerbia–FlightInformationRegionBelgrade(FIRBelgrade)aredoneinaccordancewiththecurrentregulationsandthesetamountofairtrafficservicechargeintheterminalcontrolareas.
9.4.2.7CashandCashEquivalents
Cashequivalentsandcashconstitutepartofthecurrent(operating)assetsofalegalentity,whicharemeasuredatnominal,i.e.fairvalue,inaccordancewiththeIAS39-FinancialInstruments:RecognitionandMeasurement,andotherrelevantstandards(theIAS32-FinancialInstruments:PresentationandtheIAS7-StatementofCashFlows).
Cashandcashequivalentscomprise:cashinhand,demand deposits, other short-term highly liquidinvestmentswithanoriginalmaturityperiodofuptothreemonthsorshorter(chequesandbillsreceivedforcollection,currentinvestmentsinsecurities)andbankoverdrafts.Inthebalancesheet,bankoverdraftsareincludedinborrowingliabilities,withincurrentliabilities.
9.4.2.8 Off-BalanceSheetAssetsandLiabilities
Off-Balancesheetassets/liabilitiescomprisetherecordsofthefollowing:receivedguarantees,issuedguarantees,counterguaranteesandrespectiveliabilities.
9.4.2.9 ShareCapital
Sharecapitaloriginatesfromtheincorporationbasedonthefounder’sstakeinSMATSAllc.ThefoundersofSMATSAllcaretheRepublicofSerbia(92%)andtheStateofMontenegro(8%).SharecapitalisinitiallystatedintheamountoftheestimatedstakeinSMATSAllc(itcomprisesboththecapitalpaidinandtheaccountedunpaidcapital).ChangesinthesharecapitalarecarriedoutexclusivelyaccordingtotherulesprescribedbytheLawonBusinessCompanies,andallchangesinthesharecapitalareregisteredwiththeappropriateRegister.SharecapitalstatedindinarsisnotchangedaccordingtochangesofEURexchangerates,althoughitisstatedinEurosintheRegister.
Annual Report 201566
9.4.2.10Reserves
SMATSAllchasthereserveformedfromtheretainedearningsuntil thereservereachesat least20%ofthesharecapitalasgovernedby theContractonConfirmationoftheContinuityofAirNavigationServicesProvisionwithintheAirspaceofSerbiaandMontenegro.
9.4.2.11RevaluationReserves
Revaluationreservescomprisethepositiveeffectsofchangesinthefairvalueofproperty,plant,equipment,intangibleassetsandotherfinancialinstruments.InaccordancewithIAS16andIAS38,whenanasset’scarryingamountisincreasedasaresultofrevaluation,thepositiveeffectofrevaluationiscrediteddirectlytocapital,as therevaluationreserve.Decrease inrevaluationreservesarisesfromnegativerevaluationofanasset, forwhich therevaluationreservewaspreviouslycreated.Negativeeffectsofrevaluationincaseofrealisation(disposalanddecommissioningofassets)ariseiftherevaluationreservewascarriedregardingthatspecificasset.
9.4.2.12RetainedEarnings
Retainedearningsarecarriedasretainedearningsfromprioryearsandretainedearningsofthecurrentyear.Thecumulatedretainedearningsfromprioryearsandtheeffectsfromchangeintheaccountingpolicyandcorrectionofmaterialfundamentalerror,inaccordancewithIAS8andadoptedaccountingpolicies,arecarriedinaccountRetainedearningsfromprioryears.Retainedearningsof thecurrentyeararise fromtransferofaresultfromcurrentyeartotheaccountofretainedearnings.RealisedrevaluationreservesaretransferredtoRetainedearningsofthecurrentyearintheBalanceSheet.
9.4.2.13Provisions
Long-termprovisionscompriseprovisionsinwarrantyperiod,provisions for retainedcautionmoneyanddeposits,provisionsforrestructuringofcompanies,provisionsforemployeebenefits(IAS19–EmployeeBenefits)andotherlong-termprovisionsforcoverageofliabilities(legaloractual),arisenasaresultofpastevents,whicharelikelytocausetheoutflowofresourcesofeconomicbenefitsforthepurposeoftheirsettlementandwhichmaybereliablymeasured(e.g.litigationsinprogress),andprovisionsforguaranteesissuedandotherformsofbond.
Long-termprovisionsforcostsandrisksaremonitoredattheirtypes,andtheirrespectivereductionorterminationarecreditedtotheincome.
Provisionsarenot recognised for futureoperatinglosses.
Provisionsdifferfromotherliabilities,suchasaccountspayabletothesuppliersandcalculatedliabilities,sincetheyareuncertaininrespecttotheiroriginationdateorthesumoffutureexpendituresrequiredfortheirsettlement.
Provisionsaremeasuredintheamountrecognisedastheprovision,whichrepresentsthebestestimationofexpendituresrequiredforsettlementofthepresentliabilityasonthebalancesheetdate.
Provisions are tested as on each balance sheetdateandcorrectedsoastopresentthebestpresentestimate.Ifitisnotlikelythattheoutflowofresourcesofeconomicbenefitisrequiredforsettlementofliabilities,therespectiveprovisionisabolished.
Provisionrepresentstheliability(legalorconstructive),existingasonthebalancesheetdate,butisofuncertainmaturitydateandamount.
Annual Report 2015 67
WithintheaccountProvisionsforemployeebenefits,SMATSAllcrecordslong-termprovisionsforemployeebenefits(retirementindemnitiesandjubileeawards)paidinlinewiththerightsacquiredduringemploymentandpost-employment,inaccordancewiththeIAS19–EmployeeBenefits.AccordingtoIAS19,paymentsforretirementindemnitiesandjubileeawardsarenottobechargedtotheperiodwhenpaymentwaseffectedtoemployees,buttheacquiredrightforsuchpaymentsistobecalculatedduringtheemployment,thatisfromtheemploymentdatethroughouttherespectivepaymentundertheacquiredright.SMATSAllcrecordsprovisionsthereunderinaccordancewiththeestimationperformedbytheaccreditedactuary.
9.4.2.14Liabilities
Liabilitiesareconsideredas:
•long-termliabilities(liabilitiestoassociatedlegalentitiesandlegalentitieswithintercompanyinterest,long-termloans,liabilitiesarisingfromthelong-termsecuritiesandotherlong-termliabilities).Long-termliabilitiesbecomedueandpayableintheperiodlongerthanayearfromthedatewhenincurred,i.e.fromthebalancesheetdate,respectively,andarerecognisedandmeasuredinaccordancewithIAS39-FinancialInstruments:RecognitionandMeasurementandotherrelevantIASs.SMATSAllchascreatedthelong-termliabilityforlong-termcrossborderloans.
Whenrecognisingthelong-termliabilitiesforloans,SMATSAllcwasguidedbytheguidelinesofIAS23-BorrowingCosts.Interestexpensesandotherborrowingcoststhataredirectlyattributabletotheacquisition,constructionordevelopmentofqualifyingassetmustbecapitalised(attributed)tothepurchase(cost)valueofthatasset.
Thecapitalisationperiod is theperiod fromthebeginningoftheinvestmentinthequalifyingasset(beginningofthecapitalisation)tothemomentwhenallactivitiesnecessarytopreparetheassetfortheplanneduseorsale(cessationofthecapitalisation)areessentiallycompleted.Borrowingcostsincurredbeforeandafterthecapitalisationperiod,regardlessofwhethertheyareincurredbytheloanswithorwithoutthespecialpurposefortheacquisitionofthespecificasset,arerecognisedastheexpenseoftheperiod.
According to Paragraph 23 of IAS 23, thecapitalisationoftheborrowingcostsissuspendedduring the extended periods in which activedevelopmentofthequalifyingassetisinterrupted.Theborrowingcostsincurredduringanextendedperiodinwhichtheactivitiesnecessarytoprepare
theassetforitsplanneduseorsalearesuspended,cannotbecapitalised,butareshownasanexpenseofthatperiod(e.g.temporarysuspensionoftheinitiatedfacilityconstruction).
Given that the loan is recorded in the foreigncurrency,suchliabilityiscalculatedonthebalancesheetdateaccordingtothemiddleexchangerateofthatcurrency,andtherespectiveexchangerategainsandlossesarisingthereunderarerecorded;
•short-termfinancialliabilities(liabilitiestowardsassociated legalentitiesand legalentitieswithintercompanyinterests,short-termloansandothershort-termfinancialliabilities);SMATSAllcrecordedtheliabilitytowardstheCivilAviationDirectorateoftheRepublicofSerbiaunderthesignedProtocolTOP04,number184/9,dated20/08/2007;
•short-term liabilities frombusinessoperations(suppliers and other liabilities from businessoperations).SMATSA llc recordedall liabilitiestowardsdomesticandforeignsuppliers;
•othershort-termliabilities(liabilitiesforsalaries,commissionearnings,fringebenefitsforSMATSAllcSupervisoryBoardandAssemblymembers,liabilitiestophysicalpersonsrelatedtocontractualfees)and
•LiabilitiesforValueAddedTax(VAT).
Short-termliabilitiesareliabilitieswhichareduewithinoneyearfromthedateoffinancialstatementspreparation.
Aliabilityrepresentsanycontractualliabilityfor:
•thetransferofcashoranyotherfinancialassettoanothercompany,or
•exchangeoffinancialinstrumentswithanothercompanyunderpotentiallyadverseconditions.
Upon initial recognition,SMATSA llcmeasures itsfinancial liabilityasper itspurchasevalue,whichrepresentsthefairvalueofthecompensationreceivedfor it.Transactioncostsare included in the initialmeasurementofallfinancialliabilities.
Liabilitiesdenominatedinforeigncurrencies,aswellastheliabilitieswiththeindexclause,aremeasuredasonthefinancialstatementspreparationdateaccordingto the foreigncurrencymiddleexchangerate.Thedifferences calculated then are accounted for asexpenseorrevenueoftheperiod.
Reductionintheliabilitiesunderthelaw,extrajudicialsettlementandalikeisperformedthroughadirectwrite-off.
Annual Report 201568
9.4.2.15CurrentandDeferredIncomeTax
Taxexpensesforaperiodcomprisethecurrentandthedeferredtax.Thetaxisrecognisedintheincomestatement,excepttotheextenttowhichitrelatestotheitemsrecogniseddirectlyinthesharecapital.Inthiscase,thetaxisalsorecognisedinthecapital.
Currentincometaxiscalculatedonthebalancesheetdate,basedonthevalidstatutorytax-relatedregulationsoftheRepublicofSerbia,whereSMATSAllcoperatesandgenerates taxable income.Themanagementperiodicallyreviewstheitemsinthetaxreturn,withrespecttothesituationsinwhichtheapplicabletaxregulationissubjecttotheinterpretation,andmakesreservationof funds, if appropriate,basedon theamountsexpectedtobepaidtothetaxauthorities.
Deferredincometaxiscalculatedinthefullamount,usingtheliabilitymethod,forthetemporarydifferencesarisingbetweenthetaxbasisofassetsandliabilitiesand theirbookvalues in the financialstatements.However,ifthedeferredincometax,providedithasnotbeenenteredintotheaccountingrecords,arisesfromtheinitialrecognitionofanassetorliabilityinatransactionotherthanabusinesscombination,that,atthetimeofthetransaction,affectsneithertheaccountingnorthetaxableprofitorloss,thenthedeferredtaxisnotaccountedfor.Deferredincometaxisdeterminedusingtaxrates(andlaws)thathavebeenenactedbythebalancesheetdateandwhichareexpectedtobeimplementedintheperiodinwhichthedeferredtaxassetsaretoberealisedorthedeferredincometaxliabilitiessettled.
Deferredtaxassetisrecognisedtotheamountexpectedtobecoveredby the future taxableprofit,and thetemporarydifferencesareexpectedtobesettledoutofthatprofit.
9.4.2.16RevenuesandExpenses
RevenuescompriserevenuesfromtheordinarycourseofSMATSAllcactivitiesandgains.Revenuesfromtheordinarycourseofactivitiesarerevenuesgainedfromprovidingservicesinairtraffic,revenuesfromprovidingflightcalibrationservices,fromtrainingofpilotsandairtrafficcontrolofficers,fromsubsidies,grants,compensationsandrecoveryofdutiesbasedonthesaleofservices,andotherrevenuescalculatedintheaccountingdocument,irrespectiveoftheirpaymenttime.
Gainsrepresentotheritemsqualifiedasrevenues,andmayarise,thoughnotnecessarily,fromtheordinarycourseofSMATSAllcactivities.Gainsrepresentanincreaseineconomicbenefits,andassucharenotdifferentinnaturefromrevenues.Gainsincludegainsondisposaloflong-termassets,unrealisedgains;e.g.
theonesresultingfromanincreaseinbookvalueoflong-termassets.Gainsarerecognisedonanetbasis,afterbeingreducedfortherespectiveexpenses.
Varioustypesofassetsmaybereceivedorincreasedthroughrevenues,forexamplecash,receivablesandgoodsandservices receivedascompensation fordeliveredproductsandservices.Inaddition,revenuesmayarisefromsettlementofliabilityfromrepaymentofresidualdebt.
SMATSAllcrecognisesrevenueswhentherevenuemaybereliablymeasured,whenitislikelythatSMATSAllcwillhavetheeconomybenefitstherefrominthefutureandwhenseparatecriteriaaremetforeachrespectiveactivity.Therevenueisnotdeemedasreliablymeasureduntilallprospectiveliabilities,whichmayarisefromsale,aresettled.SMATSAllcbasesitsestimatesonresultsfromprioroperations,giventhetypeofcustomer,typeoftransactionandspecificnatureofeverytransaction.
Revenues from contracts with fixed pricing (forservices relative topilots and controllers trainingandflightcalibrationservices)arerecognisedatthecompletionratemethod.Therevenuesfromservicesareproportionallyrecognisedbasedonthecompletionrateoftheserviceonthebalancesheetdate.
Interestincomeisrecognisedonatime-proportionbasis.
Revenuesfromforeigncurrencyclauseincludethepositiveeffectofcontractedrevaluationandforeigncurrencyclause.
SMATSAllcrecordsRevenuesbasedonthecorrectionofimmaterialerrorsfromprioryearsintheaccount692.Onthebalancesheetdate(31/12),businesseventsrecordedintheaccount692arereclassifiedtotheaccount679(iftheydonotrepresentmaterialerrors)ortotheaccountofretainedearnings,iftheyrepresentamaterialerror.
Totaloperatingexpensescomprise:costsofmaterial,wages, salaries and other personal expenses,depreciationandprovisions,producingandintangiblecosts,irrespectiveofthepaymentdate.
Expenditures for advert is ing, promotion andentertainmentmustbereliable,thatisdocumented,inrespectoftheiroccurrenceandpayment.Thereliablydocumentedcostsarerecognisedasentertainmentexpenditures,arisenunder the followinggrounds:restaurantservicesforbusinesspartnersinrespecttoconclusionandrealisationoftheagreementoranyotherformofbusinesscollaboration,givingproducttobusinesspartners,cateringservices for jubileecelebrationsandthelike.
Annual Report 2015 69
SMATSAllcrecordsExpensesbasedonthecorrectionofimmaterialerrorsfromprioryearsintheaccount592.Onthebalancesheetdate(31/12),businesseventsrecordedintheaccount592arereclassifiedtotheaccount579(iftheydonotrepresentmaterialerrors)ortotheaccountofretainedearnings,iftheyrepresentamaterialerror.
Lossesrepresentotheritemsqualifyingasexpenses,andmayarise,thoughnotnecessarily,fromtheordinarycourseofSMATSA llcactivities.Losses representreductionineconomicbenefits,andassucharenotdifferentinnaturefromotherexpenses.
Lossescomprise,forexample,thelossresultingfromcatastrophes,suchasfireandflood,andtheonesresultingfromthesaleoflong-termassets.Furthermore,bydefinitiontheexpensecomprisesunrealisedloss,forexamplethelossoriginatingfromeffectsofincreaseinforeigncurrencyexchangerateinrespecttocreatingdebtinthatrespectivecurrency.Whenlossisrecognisedintheincomestatement,itiscarriedseparately,sincetheacknowledgementthereofisusefulwhenpassingtheeconomy-relateddecisions.Theloss isusuallyrecognisedatthenetbasis,afteritsreductionbytherespectiverevenues.
9.4.2.17InterestandOtherBorrowingCosts
InterestandotherborrowingcostsofSMATSAllcareaccountedforasperthebasicprocedureinaccordancewiththeIAS23BorrowingCosts.
Interestexpensesandotherborrowingcoststhataredirectlyattributabletotheacquisition,constructionordevelopmentofqualifyingassetmustbecapitalised(attributed)tothepurchasevalue(cost)ofthatasset.
Theborrowingcostsincurredduringanextendedperiodinwhichtheactivitiesnecessarytopreparetheassetfor itsplanneduseorsalearesuspended,cannotbecapitalised,butareshownasanexpenseofthatperiod(e.g.temporarysuspensionoftheinitiatedfacilityconstruction).
9.4.2.18SubsequentlyDetectedErrors
Subsequently foundmaterialerrorsarecorrectedthroughtheaccountofretainedearningsfrompreviousyears,thatis,throughtheretainedlossesfrompreviousyears,inthemannerestablishedbytheIAS8AccountingPolicies,ChangesinAccountingEstimatesandErrors.
Amaterial error is an errorwhich individually, orcumulativelywithothererrors,exceeds3%oftotalrevenues.
Subsequentlyfounderrorsthatarenotmaterialarerestatedforcorrectionagainstexpenses,or,infavourofrevenuesintheperiodwhenidentified.
9.4.2.19Functionalandpresentationcurrency
FunctionalandpresentationcurrencyofSMATSAlls,inaccordancewiththeIAS21TheEffectsofChangesinForeignExchangeRates,isdinar.
9.4.3.1 FinancialRiskFactors
SMATSAllcactivitiesareexposedtovariousfinancialrisks:marketrisk(includingforeignexchangeraterisk,fairvalueinterestraterisk,cashflowinterestrisk,pricechangerisk),creditrisk,liquidityriskandcashflowrisk.ThemainfocusofriskmanagementwithinSMATSAllcisontheattempttominimisethepotentialadverseeffectsonthecompany’sfinancialperformanceintheconditionsofunpredictabilityoffinancialmarkets.SMATSAllcusesderivativefinancialinstrumentstohedgecertainriskexposures.
RiskmanagementiscarriedoutbythemanagementofSMATSAllcinlinewiththerecommendationsoftheSupervisoryBoard.ThemanagementofSMATSAllcidentifiesandevaluatesfinancialrisks,anddefinesriskprotectionmethodsincooperationwiththecompany’soperatingunits.
ThemanagementofSMATSAllcpassesitsbusinessdecisionsdulyandaccuratelytherebyprotectingitselffromcreditandmarketrisks.
9.4.3.2 FinancialRiskManagementObjectives
Financialriskscomprise:
•marketrisk(currencyriskandinterestrisk),
•creditrisk,and
•liquidityrisk.
FinancialrisksarereviewedonatimebasisandareprimarilyhedgedbyreductionofSMATSAllcexposuretosuchrisks.SMATSAllcdoesnotuseanyfinancialinstrumentswhatsoeverinordertohedgetheimpactoffinancialrisksonitsoperations,duetothefactthatsuchinstrumentsarenotwidelyused,andthatnoorganisedmarketofsuchinstrumentsexistsintheRepublicofSerbia.
9.4.3FinancialRiskManagement
Annual Report 201570
9.4.3.2.1MarketRisk(CurrencyRiskandInterestRisk)
Initsbusinessactivities,SMATSAllcisexposedtofinancialriskspertainingtoforeigncurrencyexchangerisks arising from various currency fluctuations(SMATSAllcoperatesinternationally)andvariationsofinterestrates.Theriskarisesfromfuturecommercialtransactions,recognisedassetsorliabilitiesandnetinvestmentsinforeignoperations.ForeignexchangeriskariseswhenfuturecommercialtransactionsandrecognisedassetsandliabilitiesaredenominatedincurrencythatisnotSMATSAllcfunctionalcurrency.
Themarketriskexposureisreviewedbythesensitivityanalysis.TherewerenosignificantchangesinSMATSAllcexposuretothemarketriskor inthemannerofSMATSAllcmanagementormeasurementofsucharisk.
SMATSAllcisobligedtohedgeitstotalexposuretoexchangerateriskbypassingdulyandtimelydecisions.
BasicfinancialinstrumentsofSMATSAllcarecashandcashequivalents,receivables,financialinvestmentsoriginatingdirectlyfromSMATSAllcactivitiesandthelong-termandshort-termborrowings,accountspayableandotherliabilitieswhoseprimarypurposeisfinancingofSMATSAllccurrentoperations.AccountspayablewerepartiallysettledinJanuaryandFebruary2015.
ThepolicyofSMATSAllcmanagementinrespecttoriskmanagementistohedgebetween90%and100% of expected cash flow (mainly revenuesfromprovidedservicesandcostsofacquisitionofequipmentandspareparts)ineverymajorcurrencywithinthefollowing12months.Thepercentageofcollectionofroutechargesforservicesprovidedtoforeigncustomerscomprisedapproximately99%.Thepercentageofcollectionofterminalserviceschargesfromforeigncustomerscomprisedapproximately85%,andfromdomesticcustomers,approximately98%.
9.4.3.2.2ForeignExchangeRateRisk
SMATSAllcisexposedtoforeignexchangerateriskprimarilythroughcashandcashequivalents,accountsreceivables,long-termloansandaccountspayableswhicharedenominatedinforeigncurrency.SMATSAllcdoesnotusesomespecialfinancialinstrumentsagainst risksince thiskindof instruments isnotcommonintheRepublicofSerbia.
Economicenvironmentstability,inwhichSMATSAllcisperformingitsactivities,dependsagreatdealonGovernmentmeasuresineconomy,includingaswelltheestablishmentofrelevantlegalframework.
SMATSAllcisinfluencedbyEuro(EUR)andAmericandollar(USD)changerate.Thestructureofthefinancial
assets ismainlycomposedofaccountsreceivables(mostlyforeigncompanies’debts)andcashandcashequivalents(foreigncurrencyaccount).Liabilitiesarecomposedoflong-termloansandpayables.Long-termloansarerecordedinforeigncurrencywhilepayablesfor equipment and spare parts are also recordedin foreigncurrency,andpayables for fixedmonthlyliabilities(electricity,telephone,fueletc.)arerecordedindomesticcurrency.Statedassetsandliabilitiesareexpressedinforeigncurrencyon31/12ofthecurrentyearandaccordingtothattheexchangedifferenceisregistered.Businessresultdependspartlyonfinancialrevenuesandexpenses.Financialrevenuesparticipationpercentage(positivecurrencyexchangedifferences)intotalrevenuesin2015was0.85%(in2014itwas2.95%).
Financialexpensesparticipationpercentage(negativecurrencyexchangedifferences)intotalexpensesin2015was0.72%(in2014itwas4.21%).
9.4.3.2.3InterestRisk
SMATSAllcisexposedtointerestratechangefortheliabilitieswithvariableinterestrate.ThisriskdependsonthefinancialmarketsoSMATSAllcdoesnothaveavailableinstrumentstomitigateitsinfluence.
9.4.3.3 CreditRisk
CreditswhicharegivenwithchangeableinterestratesexposeSMATSAllctocashflowinterestrisk.CreditswhicharegivenwithfixedinterestrateexposeSMATSAllctofairmarketvalueinterestraterisk.Inthecourseof2014and2015,SMATSAllccreditswithfixedandchangeable interestratewereexpressed in foreigncurrency.
Sensitivity analyses showed that the interest ratechangesrelatedtotheloanfromtheEBRDdonotexposeSMATSAllctotheinterestraterisk.Themanagementestimatesthatthepossiblechangesintheinterestratescouldcompriseeithertheincreaseordecreaseof1%.TheconclusionisthatsuchchangewouldnothaveasignificantimpactonSMATSAllcfinancialresult.
9.4.3.3.1DebtRatio
SinceSMATSA llchasobtained the loans in theamounthigherthantheamountofcashandcashequivalents(RSD3,427,544and3,638,462thousandofdinars),thismeansthatSMATSAllchasadebtratiothatcanberepresentedintwoways:
• Bor rowed funds /Tota l funds x 100 =3,910,181/17,435,278x100=22.43%
•Long-termloans/Capital+Long-termliabilitiesx100=3,427,544/15,654,430x100=21.90%
Annual Report 2015 71
Thefirstratioisusedtoshowtheborrowedfundsshareinthetotalcapitalandthecontributionoftheborrowedcapitaltothefinancingoftheassets.Thedebtratio(gearingratio)showsthateveryRSDofSMATSAllcavailablefundscontainsRSD0.2243dinarsofforeignfunds(absolutely),i.e.theindebtednessofthecompanyamountsto22.43%ofthetotalfinancingfunds(relatively).Thismeansthatthecreditorshavetherighttouseavailablecompanyassetsuptotheamountoftheindebtedness.
Thesecondratioisusedtoshowtheborrowedlong-termcapitalshareinthetotallong-termcapital(ownedandborrowed),whichiscloselyrelatedtothedegreeofprofitabilityandthecapitalreleasespeedthroughthecapitalwrite-off(depreciation).Thelong-termloansshareinthetotallong-termfundsamountsto21.90%.Thehighshareoftheliabilitiesinthetotalcapitalandofthelong-termliabilitiesinthecapitalisacceptableandwillnotjeopardizethesafetyandliquiditysincethelevelofavailablecashequivalentsishigh.
SMATSAllchasnotpledgedanyassetsinordertosecuretheloan.
9.4.3.4 LiquidityRisk
Liquidityisdefinedastheabilityofacompanytomeetthefinancialcommitmentsfortheentireamountandontime,whileatthesametimepreservingtherequiredscopeandstructureofcurrentassets toconductcurrentoperations,andcreditworthiness.Maintainingfinancialsolvency(liquidity)istherequirementprimarilyimposedonSMATSAllcbythelender(creditor),i.e.thelegalsystem.
Theliquidityrepresentsthecoverageoftheshort-termliabilitieswiththecurrentassets.
SMATSAllcManagementmaintainedtheliquidityoftheoperationsbytheadequatefinancingoftherealpartofthecurrentassets(inventories)withthelong-termcapitalandensuringthatthenominalassets(receivables+cash)arealwaysfinancedwiththeshort-termliabilities,providedthattheturnoverspeedisalwaysthesame,whichmeans,providedthatthevelocityofmaturitiesofshort-termliabilitiesmatchedthespeedofcollection.
Prudentliquidityriskmanagementimpliesmaintainingthesufficientcashandprovidingtheadequatesourcesof funding throughanadequateamountofcreditliabilitiesandpossibility.
AnnualReport 71
Annual Report 201572
10IndependentAuditor’sReport
Annual Report 2015 73
Annual Report 201574
11AcronymsandAbbreviations
ADR All-PurposeDataStreamReplicator
ADQ AeronauticalDataQuality
AFIS AerodromeFlightInformationServices
AFTN AeronauticalFixedTelecommunicationNetwork
AIP AeronauicalInformationPublication
AIS AeronauticalInformationSevices
ALR AlertingServices
AMHS AeronauticalMessageHandlingSystem
ARTAS ATMsuRveillanceTrackerAndServer
ASM AirspaceManagement
ATC AirTrafficControl
ATFCM AirTrafficFlowandCapacityManagement
ATFM AirTrafficFlowManagement
ATIS AutomaticTerminalInformationService
ATM AirTrafficManagement
ATP AirlinePilotTraining
ATS AirTrafficServices
BHANSA BosniaandHerzegovinaAirNavigationServiceAgency
CANSO CivilAirNavigationServicesOrganisation
CAT Category
CDA ContinuousDecisionApproach
CIMACT CivilMilitaryATMCo-ordinationTool
Annual Report 2015 75
CPL ComercialPilotLicence
CPR Correlatedpositionreport
CS5EAIMS CentralisedServices5:EuropeanATMInformationManagementService
DCT Directroute
DME DistanceMeasuringEquipment
DPS DataProcessingSystem
DVOR DopplerVOR
EANPG EuropeanAirNavigationPlanningGroup
EASA EuropeanAviationSafetyAgency
ECAC EuropeanCivilAviationConference
ECMA EuropeanConferenceonMeteorologyforAviation
ЕCМWF EuropeanCentreforMedium-RangeWeatherForecasts
ESARR EurocontrolSafetyRegulatoryRequirements
EUMETCAL EuropeanMeteorologicalComputerAssistedLearning
ETFMS EnhancedTacticalFlowManagementSystem
EUROCONTROL EuropeanAgencyfortheSafetyofAirNavigation
FAB FunctionalAirspaceBlock
FAMUS FutureATMModernisationandUpgradeSystem
FDPS FlightDataProcesingSystem
FIR FlightInformationRegion
FIS FlightInformationServices
FMTP FlightMessageTransferProtocol
FUA FlexibileUseofAirspace
GRIB GriddedBinary
ICAO InternationalCivilAviationOrganisation
ICASC InternationalCommitteeforAirspaceStandardsandCalibration
IFIS InternationalFlightInspectionSymposium
ILS InstrumentLandingSystem
LLZ Localizer
Annual Report 201576
LOA LetterofAgreement
LRD LongRangeDCTs
LVP LowVisibilityProcedures
MET MeteorologyorMeteorological
MTOW Maximumtakeofweight
NATO NorthAtlanticTreatyOrganisation
OAT OperationalAirTraffic
OLDI On-LineDataInterchange
PANS OPS ProceduresforAirNavigationServices-AircraftOperations
PBN PerformanceBasedNavigation
PBNSID PerformanceBasedNavigationStandardInstrumentDepartures
PBN STAR PerformanceBasedNavigationStandardArrival
PPL PrivatePilotLicence
PSR PrimarySurveillanceRadar
RMCDE RadarMessageConversionandDistributionEquipment
ROMATSA RomanianAirTrafficServices
RRR RadarDataRecording&ReplaySystem
SAA SMATSAAviationAcademy
SEAFRA SouthEastAxisFreeRouteAirspace
SES SingleEuropeanSky
SMATSA SerbiaandMontenegroAirTrafficServicesSMATSAllc
SMS SafetyManagmеntSystem
SSR SecondarySurveillanceRadar
SUSAN SMATSAUpgradeofSystemforAirNavigation
TRS TimeReferenceSignal
TSA TemporarySegregatedArea
VCS VoiceCommunicationSystem
WMO WorldMeteorologicalOrganisation
ACS AerodromeControlService
Annual Report 2015 77
CAA CivilAviationAgencyofMontenegro
CAD CivilAviationDirectorateoftheRepublicofSerbia
RNS Ground radio navigation
PSS Runway
ATC Terminalairtrafficcontrol
ATCC AirTrafficControlCentre
AnnualReport2015 77
AS
SE
MB
LY
SUPERVISORYBOARD
ATMSector
AVIA
TIO
N
TEC
HN
OLO
GIE
S SE
CTO
R
Internalaudit
CEO/DeputyCEO
Secretariat
Departmentforcom
mercial
trans
actio
ns
Com
mercialand
Econom
icAffairs
Sector
FinancialAffairs
Department
Procurem
ent
Department
Appl
icat
ion
Services
Department
Theoretical
Trai
ning
Department
AirTrafficController
TrainingDepartment
Services
Department
AircraftMainte-
nanceDepartment
Prov
idin
g Conditionsfor
theuseofAirport
Department
FlightTraining
Department
ADCBeograd
ADCBatajnica
ADCVršac
ADCKraljevo
ADCNiš
ADCPriština
ADCPonikve
АКЛ
Подгорица
Operations
Department
Groundbased
Nav
igat
ion
Systemsand
METE
quipment
Department
ATCAV
Department
Rad
ar
Equipm
ent
Department
Electricity&HVA
C
Department
Coordination
Survellianceand
Mon
itorin
g Department
Aeronautical
Messages
ExchangeGroup
Telecommuni-
catio
nsDepartment
ATCOperational
Technologyand
ATSDepartment
CNSPlanningand
Development
Devision
ATM&MET
Planing
andDevelopment
Department
CNSSystem
Managam
entand
Implem
etation
Department
Development
Devision
AISDepartment
Facilitiesand
Infrastructure
Plan
ning
and
Maintance
Department
ATCCShift
MET
Department
Controland
Protection
ofAirspace
Section
Allocationof
Airspace
Section
Control,
Protectionand
Allocationof
Airspace
Department
АКЛ
Тиват
Security
Department
Administrative
Department
ContractExecution
Mon
itorin
g Department
PlanningAnalysis
andReporting
Department
Normative
Legal
AffairsandProperty
Rights
Departm
ent
Hum
anResources
Development
Department
Networkand
System
Services
Department
ANS
Pers
onne
l Tr
aini
ng
Cent
reTM
C B
eogr
adTM
CPo
dgorica
Ope
ratio
ns
Division
ATC
Ope
ratio
nal
Trai
ning
Division
ATM
& A
ISDivision
Ope
ratio
nal A
T De
partm
ent
Flig
ht
Calib
ratio
n Division
AT P
lann
ing
and
Developm
entD
ivision
SMAT
SAAviation
Academ
y
Hum
an
Resources
Legaland
Administrative
Affairssector
ITandSecurity
sector
Aeronautical
Personnel
TrainingSector
TerminalandAerodromeFlight
ControlandAdm
inistrative
Affairssector
ATCCBelgrade
OperationalAviation
Technologies
SafetyCom
mittee
QualityCom
mittee
SecurityCom
mittee
SafetyandQuality
Sector
AirTrafficSa
fety
Department
QualityManagem
ent
Department
12Annex1-SMATSAllcOrganisationalStructure
Company Name: Serbia and Montenegro Air Traffic Services
SMATSA llc, Belgrade
Head Office: Nikola Pasic Square 10, 11000 Beograd, Republic of Serbia, P.O.Box 640
Registration Number: 17520407
Tax ID Number:103170161
Telephone:+381 11 3218 123
Fax:+381 11 3240 456
Е-mail: [email protected]
Website: www.smatsa.rs