PRESENTATION OUTLINE

• STRATEGIC OVERVIEW

• MACROPERSPECTIVE

• PERFORMANCE OVERVIEW

• PERFORMANCE REVIEW OF PRIORITY PROGRAMMES

• REPORT BY THE AUDITOR-GENERAL

• BUDGET VS EXPENDITURE

• EXPLANATION OF EXPENDITURE VARIANCE

2

Page 3: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

3

STRATEGIC OVERVIEW

3

Page 4: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

4

VISION

We are a thriving arts, culture and heritage sector contributing to sustainable economic development, and leveraging on partnerships for a socially cohesive nation

4

Page 5: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

5

STRATEGIC GOALS

• Development, protection, preservation and

promotion of arts, culture and heritage

• Job creation

• Access to information

• Entrenched linguistic diversity

• Human Capital Development

• Governance and accountability5

Page 6: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

6

PROGRAMME DRIVERS

• The programmes of the DAC are informed by a

range of macro policy positions including:

– The Freedom Charter

– 2014 Election Manifesto

– The National Development Plan (NDP)

– The White Paper on Arts, Culture and Heritage, and related

legislation

– The Medium Term Strategic Framework (MTSF), and

Outcome 14 in particular

6

Page 7: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

7

MACRO PERSPECTIVE

7

Page 8: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

8

• The 2013 Creative Industries Mapping study is the first national statistical benchmark of the South Africa creative economy.

• The research was informed by the UNESCO Framework for Cultural Statistics to ensure that the information generated by the study would be comparable with the statistics generated elsewhere in the world.

• The aim of the research was to determine the size and economic contribution of the creative industries in South Africa and identifying critical pressures and key trend

MAPPING STUDY

8

Page 9: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

9

Market Profile

•Over 70% of respondents in the study reported their primary source of income is own revenue generated from the sale of products and services

•Over a third reported that they had received government grants - an indication of the ongoing importance of government financing of the sector.

•The majority of organisations (66%) reported that their markets are locally based households and individuals

•Only 18% of organisations reported that they exported their products.

MAPPING STUDY

9

Page 10: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

10

Contribution to GDP•The creative economy contributed R90,5 billion directly to the country’s GDP in 2013/2014.•Relative to the total RSA GDP, the creative industries sector contributes 2.9% of GDP. This is similar to benchmark countries Chile and Australia but far below Brazil, for example.

Employment•The creative economy accounted for a total number of 562,726 jobs in 2013/2014.•The design and creative services and cultural and natural heritage cluster have the largest employment impact, contributing a combined 54% to total employment.

MAPPING STUDY

10

Page 11: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

11

Employment•Relative to employment in the whole of the South African economy, the creative economy contributes 3,6% of total employment.

Supporting Women and Young People•Over 50% of enterprises in the sector are black-owned – of which fewer than 60% are owned by men and over 30% are owned by young people. •There is an almost equal split in employment between women and men and the majority of employees are black South Africans. •Furthermore, the sector provides significant opportunities for young people; the majority of employees are below the age of 35

MAPPING STUDY

11

Page 12: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

12

2014/15 PERFORMANCE OVERVIEW

12

Page 13: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

13

DEPARTMENTAL PERFORMANCE OVERVIEW

13

Page 14: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

14

PERFORMANCE OVER PAST 5 FINANCIAL YEARS

14

Page 15: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

15

PRIORITY PROGRAMMES1. Outcome 14 Coordination

2. White Paper Finalisation

3. Mzansi Golden Economy

4. Heritage Promotion and Preservation

5. DAC Schools Programme and improving human capacity

6. Libraries Conditional Grants

7. Cultural Diplomacy Program

8. Language development

9. DAC Entities Governance

10. National Days

11. Archives Programme

15

Page 16: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

16

1. Outcome 14 Co-ordination

16

Page 17: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

17

OUTCOME 14• The National Development Plan has as its Vision for 2013, that South African will be more

conscious of the things they have in common than what they have as their differences.

• Working towards this vision, the NDP has set out five (5) long-term nation building goals for

South Africa. They are summarised as follows:

Knowledge of the Constitution and fostering Constitutional Values

Equalizing opportunities, promoting inclusion and redress

Promoting social cohesion across society through increased interaction across race

and class

Promoting active citizenry and broad-based leadership

Achieving a social compact that will lay the basis for equity, inclusion and prosperity

for all.

• The MTSF has 14 Outcomes, to which as the Department of Arts and Culture, we lead and

coordinate Outcome 14: Nation Building and Social Cohesion

17

Page 18: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

18

KEY DELIVERY PARTNERS The Implementation Forum comprises the following delivery partners :

Department of Basic Education

Sports and Recreation South Africa

Department of Cooperative Governance

SALGA

Department od Social Development

Department of Women

Department of Home Affairs

Department of Monitoring and Evaluation

Department of Labour

Department of Communications (Brand SA, GCIS)

Department of Traditional Affairs

Department of Justice and Constitutional Development

NGOs and NPOs

Media, Trade Unions and Civil Society Organizations

18

Page 19: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

19

PROGRESS TO DATE: ACHIEVEMENTS

The Implementation Forum chaired by DAC has been constituted.

4 Progress reports were compiled and submitted to DPME in 2014/15,

however there are challenges with regard to the quality and regularity of

submissions

Bilateral meetings with various departments to unblock bottle necks have

been conducted (with COGTA, DOC, Women, DBE, DTA)

19

Page 20: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

20

CHALLENGES

• In spite of significant support of the Outcome by Cabinet, the following challenges continue to be experienced: The depth and quality of technical assistance to ensure excellent

reporting Absence of data from other spheres of government Joint responsibility by departments in respect of certain

performance indicators Adherence to set reporting deadlines by delivery partners Non committal approach by various departments

20

Page 21: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

21

NATION BUILDING AND SOCIAL COHESION PROGRAMME

21

• In terms of the 12 resolutions taken at the 2012 Summit, the DAC has fulfilled its responsibilities by:– Ensuring that conversations about social cohesion take place at

community level through the hosting 30 Community Conversations

– A draft nation social cohesion toolkit was development in 2014/15

– Hosting a report back summit in March 2015

• Further, prominent members of society were appointed as Social Cohesion Advocates and provided with platforms to engage with the public about social cohesion matters

Page 22: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

22

2. Revising the White Paper

22

Page 23: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

23

2. REVISING THE WHITE PAPER

23

Phase 1: Initiated in October 2014 entailed a preliminary review of the White Paper of 1996 and Revised Draft White Paper and stakeholder consultations which were held as follows: 18 March – Johannesburg 26 March – Cape Town 31 March – Port Elizabeth 2 April – Durban

There have been some delays in the process, however in the current quarter of 2015/16: Further consultative workshops to be announced Phase 1 be concluded and a draft Review Report which will form

the basis of the Revised White Paper will be compiled

Page 24: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

24

3. Mzansi Golden Economy

24

Page 25: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

25

THE MGE PROGRAMME

25

• In 2014/15 all 10 of the MGE work streams, including

the Liberation Heritage Route, were implemented with

significant successes in many areas as follows:

– Audience Development

• Cultural Events: 87 cultural events were supported, including

22 national and regional festivals were supported

• Touring Ventures: 41 touring ventures and 2 cultural Seasons

were supported

• Public Art: 22 public art projects were implemented

• 240 Artists were placed in schools in 8 provinces

Page 26: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

26

THE MGE PROGRAMME

26

• Through the open call process:– over 1,000 applications were received, of which 998 were submitted

to the Open Call panel for review– 186 projects were awarded funding for 2014/2015 across 3

categories

Page 27: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

27

THE MGE PROGRAMME

27

• Research conducted on the impact of identified cultural events found that:– Local audiences in most cases represent up to 50% and more

audiences

– On average 95% indicated that they would return for the festival in the following year.

– Contribution to the local economy:• The National Arts Festival contributed R138,4 million to Grahamstown

• Cape Town International Jazz Festival contributed R129,2 million to Cape Town

• MACUFE contributed R64,3 million to Bloemfontein

• the Marula Festival contributed R20,8 million to the local economy of Phalaborwa

• Mpumalanga Comes Alive contributed R11 million to Mbombela

Page 28: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

28

THE MGE PROGRAMME

28

– Building Demand

• Art Bank: a detailed study on the operational model of the Art Bank

was concluded and the National Museum in Bloemfontein was

identified as the host institution for the pilot phase

• 2 cultural precincts in the Western Cape and Kwa-Zulu-Natal were

supported

• A functional pilot Mzansi Golden Market (MGM) portal was

developed

– Building Capacity

• The NACISA concept was reworked in line with new priorities for the

programme, including master classes and incubators

Page 29: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

29

29

• The MGE programme recognises the importance of relevant and up-to-date information on the sector to inform projects and programmes. In support of this objective:

• A 3 year tender for the Cultural Observatory was awarded to Nelson Mandela Metropolitan University .

• A national mapping study was concluded.

THE MGE PROGRAMME

Page 30: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

30

4. Heritage Promotion and Preservation

30

Page 31: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

31

LIBERATION HERITAGE ROUTE/LEGACY PROJECTS

• The Legacy Project that started in 1998 are part of the Liberation Heritage Route Project which is championed by the Inter-Ministerial Committee under the leadership of the Minister of Arts and Culture. These projects are meant to memorialise events, epochs and people who shaped the history of our country. They are at various stages of development. They are as follows:

• The Sarah Bartmann Centre of Remembrance:

o The Breaking of the Ground ceremony for the construction of the Sarah Bartmann Centre of Remembrance took place on 02 May 2014 in Hankey, Eastern Cape.

o At the end of the 2014/15 financial year progress on site was at 14% due to inclement weather and labour strikes.

o R24 497 714.48 was spent in the 2014/2015 financial year.

• The National Heritage Monument:

o The Steering Committee established to lead the implementation of the National Heritage Monument.

o Draft MOU with the City of Tshwane regarding the lease of the land is under negotiation.

o 56 Sculptures were completed.

31

Page 32: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

32

LIBERATION HERITAGE ROUTE/LEGACY PROJECTS

• The National Heroes Acre:

o Decision was made to locate the National Heroes Acre at the Groenkloof Nature Reserve.

o Presentation on the National Heroes Acre and the National Heritage Monument was done to and approved by the SPCHD Cluster in July 2015.

o It now awaits presentation to Cabinet.

• JL Dube phase 2:

o All prioritised elements started, i.e. amphitheatre, access driveway and parking.

o Construction of the amphitheatre, access driveway and parking at 85% completion as at 30 March 2015.

o The construction as at 29 September - 92% completion.

o The revised completion date is 30 March 2016 due to the delay in procuring the tensile roof material from outside South Africa.

32

Page 33: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

33

LIBERATION HERITAGE ROUTE/LEGACY PROJECTS

• Ncome Phase 2 was officially opened by the President of the Republic of South Africa on 16 December 2014 during the commemoration of the Day of Reconciliation

• Ingquza Hill Museum construction of the Admin Block, Exhibition Halls, Rondavels, walkways, Gate house, toilets, perimeter fence is at 55% completion.

• The statue of Bhambatha was installed at Greytown on the 2nd of April 2014.

• The official unveiling of the statue was scheduled for the 22nd September 2015 and has been postponed

33

Page 34: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

34

THE REPATRIATION PROGRAMME• The Department coordinated three repatriation projects in the financial year

2014/15; namely:

– Nat Nakasa;

– Moses Kotane; and

– JB Marks

• Nat Nakasa:

– Nat Nakasa died in New York in 1965 after falling from a building in an apparent suicide.

– The Minister of Arts and Culture led a delegation consisting of Nakasa family members, officials of the Department of Arts and Culture, Kwa-Zulu Natal Provincial and Local Government and Non-Governmental Organisations to accompany his exhumed remains from New York.

– The Reburial of Nat Nakasa took place at Heroes Acre Cemetery - in Chesterville, Kwa-Zulu Natal on 13 September 2015.

34

Page 35: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

35

THE REPATRIATION PROGRAMME• Moses Kotane and JB Marks

– The Repatriation Process of both Moses Kotane and JB Marks was undertaken in 4 phases, namely: Exhumation, Reception Ceremony, Memorial Service and reburials. The process was coordinated by the Presidency in collaboration with the Department of Arts and Culture.

– Exhumation: The remains of Moses Kotane and JB Marks were exhumed on 13 February 2015. The exhumation delegation included the families of Kotane and JB Marks, the Kotane family Traditional Doctor to undertake required rituals, the Technical Team consisting of the Department of Arts and Culture, the South African Heritage Resources Authority, and the representatives of the North West Provincial and Local Government.

– Repatriation: The Minister of Arts and Culture, Mr Nathi Mthethwa, led the Repatriation Delegation to Moscow 24 February – 1 March 2015 .

– Reception Ceremony: The Reception Ceremony took place at the Waterkloof Base on 1 March 2015

– A Memorial Service was held at the City Hall in Johannesburg on 6 March 2015

– Reburial of Moses Kotane took place on 14 March 2015 in Pella.

– Reburial of JB Marks took place on 22 March 2015 in Ventersdorp.

35

Page 36: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

36

THE REPATRIATION PROGRAMME• Challenges

– The Department has no national policy on repatriation. The repatriations have been undertaken on an ad hoc basis. Hence the Department has initiated the process of developing a national policy that will provide standardized guidelines on the repatriation of human remains.

– The budget involved in repatriations is significant and as such there are serious budget constraints.

36

Page 37: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

37

GEOGRAPHICAL NAMES PROGRAMME • The South African Geographical Names Council is established through

the South African Geographical Names Council Act (Act No 118 of 1998)

• In the 2014/15 financial year no new names were gazetted due to the late appointment of the SAGNC.

• Challenges

• Resistance to change which escalate to court cases challenging Minister’s decision.

• On 8 May 2014 the Pretoria High Court rule in favour of the Minister on Nelspruit to Mbombela name change and there is another outstanding matter on Louis Trichardt to Makhado name change.

• The Pretoria name change has been in the main stream in the media for the past ten years and was referred back to City of Tshwane Metro for public participation.  

• A lack of definition or clarity on public participation and consultation in relation to standardisation of geographical names.

37

Page 38: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

38

NATIONAL SYMBOLS PROGRAMME

• The Bureau of Heraldry is responsible for designing, registering and promoting national symbols to advance nation building and social cohesion.

• The Bureau designed and registered 54 heraldic representations in this financial year.

• The National Orders Award Ceremony which was held in April 2014, was co-ordinated with the Presidency and the Department of Public Works. This event was a great success.

38

Page 39: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

39

5. The DAC Schools Program and

Improving Human Capacity

40

Page 40: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

40

THE SCHOOLS PROGRAMME

40

• A total number of 14 415 flags were installed in schools. This was part of The Flag in Every School Project, which aims to advance Nation Building, Social Cohesion and the popularization of National Symbols.

• A total of 6359 schools received a set of six posters with – The National Anthem (translated in eleven official languages), the Preamble to the SA Constitution and National Symbols and National Orders. Furthermore, each of the schools received 30 National Identity Passport of Patriotism booklets.

• Over and above the Artists in Schools Programme: 4 arts education programmes were

implemented jointly with DBE:

– South African Schools Chorale Eisteddfod (SASCE)

– The Spelling Bee

– Inner City High Schools Drama Festival

– CAPS support (capacity building workshops for the creative arts teachers and subject advisors

– Distribution of 5 000 arts, culture and heritage careers booklets

Page 41: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

41

LANGUAGE BURSARIES

41

• The DAC completed the last year of a 3 year cycle of the Language Bursary project.

• Over the 3 year period, over 900 bursary opportunities were provided at tertiary educational institutions across the country with 284 offered in 2014/15 at the following institutions:– University of Limpopo (39)– Walter Sisulu University (50)– University of Zululand (41)– University of South Africa (118)– University of Johannesburg (36)

Page 42: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

42

HERITAGE BURSARIES• In 2014 the Department of Arts and Culture embarked on a bursary programme to increase the number

of practitioners in the heritage sector.

• In 2014/15 financial year 73 students were sponsored, of whom 54 were women and 29 were men

• 4 students registered for diplomas, 50 for BA degrees, 2 for certificates, 10 for Honours degrees, 5 for Masters degrees and 2 for PhD degrees

• Students registered at the following universities:

• University of Johannesburg

• University of KwaZulu-Natal

• The University of the Witwatersrand

• University of Cape Town

• University of the Western Cape

• UNISA

• University of the North West

• University of Limpopo

42

Page 43: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

43

Training and Incubation Programmes

43

• 527 training programmes were implemented for DAC and 30 interns were placed in various units of the Department

• Training programmes in particular scarce skill areas were hosted for the sector, including:– Film and script writing– Visual arts residencies– Design – Music video production

• A call for incubator proposals was initiated in preparation for the launch of the programme in 2015/16

Page 44: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

44

6. Library Program

44

Page 45: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

45

COMMUNITY LIBRARIES

• 17 new libraries were completed: – 14 built: (Eastern Cape: Sterkspruit, Lady Frere, Tsolo; Gauteng: Wedela,

Rietvallei, Leondale, Evaton North, Olievenhoutbosch; KwaZulu-Natal: Ndumo and Nkungumathe; Mpumalanga: eMjindini; North West: Lomanyaneng and Tlokweng; Western Cape: Prince Alfred Hamlet)

– 3 modular structures: Gauteng - Rooiport and Stinkwater and in Limpopo - Makahlule.

• 20 Libraries upgraded: – (2 in Eastern Cape: Mthatha and Port Alfred; 2 in Free State: Tswelopele

and Bloemfontein Phase ii; 1 in Gauteng: Silverton; 2 in KwaZulu-Natal: Escourt and Nondweni; 5 in Northern Cape: Kareeberg, Richtersveld, Beaconsfield, Judy Scott and Sonny Leon libraries); 8 in Limpopo (Vaalwater, Lebowakgomo, Letsitele, Kgapane, Phalaborwa, Westernburg, Grobblersdal and Leboneng)

• Library Material Purchased: 592 904

45

Page 46: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

46

COMMUNITY LIBRARIES

• The following was possible through the conditional grant funding:

– 1676 library staff were employed,

– provision of free internet access,

– A service for the visually impaired was established at 27 libraries.

• The resources of public libraries are harnessed in supplementing educational resources, supporting early childhood development and providing desperately needed skills to the youth to increase their employment opportunities.

• The Department, in partnership with the Department of Basic Education, has started to build libraries in close proximity to schools. Nine dual purpose libraries were established in Gauteng, Limpopo and the Free State.

46

Page 47: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

47

7. Cultural Diplomacy Program

47

Page 48: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

48

THE INTERNATIONAL RELATIONS PROGRAMME

48

• 2 Seasons were hosted in 2014/15; the SA Year in China and the first year of the

UK/SA Season

• The Charter on the African Cultural Renaissance was ratified in May 2014 and

launched in October 2014 with an implementation strategy that incorporate the

aspirations of the AU Agenda 2063; SA is the 8th country in Africa to ratify the

Charter.

• DAC hosted the Inaugural NEPAD Regional Conference on Arts Education for

SADC which took place in March 2014, in Newtown

• 15 bilateral cultural agreement were implemented and serviced including those

with Argentina, Sweden, the UK, China, France, Burundi, Algeria and Saudi Arabia

• Final consultation on the 1st Quadrennial Country Report on the 2005 UNESCO

Convention on Cultural Diversity was held and the report was completed. It will

now be submitted to Cabinet for approval.

• DAC participated in 8 multilateral fora including BRICS, AU, SADC and NEPAD.

Page 49: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

49

8. Language

49

Page 50: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

50

LANGUAGE POLICY

50

• The South African Language Practitioner’s Council Act, 2014 (Act No. 8 of 2014) aims to regulate the language profession, training language practitioners and provides control of the accreditation and registration of language practitioners was promulgated

• The DAC approved its language policy before the 2nd of November 2014 deadline in compliance with the Use of Official Languages Act, 2012 (Act No. 12 of 2012).

Page 51: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

51

TERMINOLOGY DEVELOPMENT

51

• In consultation with expert panels, annually terminologies are developed in fields including life orientation, mathematics, arts and culture, Human, Social, Economic & Management Sciences.

• In support of the 2014 elections, specific terminologies were developed in partnership with the Independent Electoral Commission (IEC). The terminology was published in a booklet and is accessible electronically through the departmental website

Page 52: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

52

TRANSLATION & EDITING

52

• To ensure that government is able to communicate with

members of the public and the international community, the

DAC provides a comprehensive translation and editing

service

  2012/13 2013/14 2014/15No. of documents translated into Official Languages

728 903 697

No. of documents translated into foreign languages

485 249 207

Page 53: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

53

HUMAN LANGUAGE TECHNOLOGY

53

• Language resource development: HLT development is heavily dependent on the availability of high-quality digital resources in a particular language. Phase II of the project was initiated in 2014/15

• Autshumato: The project has produced a range of translation aides, including open source translation software and machine-translation systems for English to Afrikaans, isiZulu, Sepedi, Xitsonga. In the previous financial year, workshops were hosted for government departments in the use of the software, including Parliament, Departments of Water Affairs and Justice, the City of Tshwane and the Limpopo Legislature.

Page 54: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

54

HUMAN LANGUAGE TECHNOLOGY

54

• Text-to-speech systems for the SA Library for the Blind: Past financial support for the development of speech technologies has made it possible to embark on a project to develop technologies for the SA Library for the Blind in four languages; English, isiXhosa, isiZulu and Afrikaans which are the predominant languages spoken by library’s members.

• Audiobook development: Development of a prototype of an audiobook for print-disabled people complying with international standards

Page 55: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

55

9. DAC Entities Governance(A separate presentation has

been developed)

55

Page 56: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

56

10. National Days

56

Page 57: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

57

NATIONAL DAYS PROGRAMME• The Department of Arts and Culture was coordinating all of the national days

as per June 2012 Cabinet decision.

• All the National days in 2014 happened under the main theme of celebrating 20 Years of Freedom and Democracy (20YoF). Themes for all national days were informed by communication document and massages as prepared by GCIS.

• The themes and national days were used to set the tone for each month that had a commemorative day.

• National days were also used as a vehicle to foster social cohesion, nation building, national identity, socio-economic development, and to put an end to attacks on foreign nationals, racism, discrimination and homophobia.

• Furthermore, national days were used as a platform to create awareness through educational programmes, dialogues and public engagements on the importance of a participatory inclusive society in making the future plans of South Africa.

• An effort was made to spread the celebrations and commemorations accordingly in all provinces to maximise participation and ownership

57

Page 58: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

58

NATIONAL DAYS PROGRAMME

58

• National days are an everlasting reminder for us, now and for future generations, of the key events that took place in our country.

• They are designed to evoke national pride; to commemorate the pain of the past and celebrate the victorious future of our country.

• During the report year, 6 National Days and 1 commemorative day were hosted by the Department of Arts and Culture. They were:

Event Date and venue

Freedom Day 27 April 2014 –Pretoria, Gauteng Province

Youth Day 16 June 2014 – Kimberley, Northern Cape Province

Mandela Day 18 July 2014 – Qunu, Eastern Cape Province

Page 59: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

59

NATIONAL DAYS PROGRAMME

59

Event Date and venue

Women’s day 9 August 2014 – Umlazi, KwaZulu-Natal Province

Heritage Day 24 September 2014 – Orkney, North West Province

Day of Reconciliation 16 December 2014 –Vryheid, KwaZulu-Natal Province

Human Rights Day 21 March 2015 – Uitenhage, Eastern Cape Province

Page 60: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

60

GENERAL CHALLENGES• The failure to attract diverse population groups.• Lack of synergy among the three spheres of government.• Competitive and parallel commemorative environments.• Perceived wastage of resources and extravagance as there

would appear to be little lasting legacy and impact.• Low levels of financial support from Provinces with regard to

logistical implementation.• Subcontracting of local service providers with no capacity leads

to non delivery on certain key logistics• Late withdrawal on financial and procurement commitments

lead to non compliance on procurement processes

60

Page 61: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

61

11. Archives Programme

61

Page 62: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

62

THE NATIONAL ARCHIVES PROGRAMME

Annual National Oral History Conference

•The 11th Annual National Oral History Conference was successfully hosted in Johannesburg from 13-17 October 2014. The conference theme was "Reconsidering the post-apartheid moment: Oral History and the Politics of Transformation”

•The learners programme included report back on oral history projects conducted by learners from Inkangala District. This also included clan names recital by some of the learners.

UNESCO World day for audio-visual Heritage•The National Film, Video and Sound Archives (NFVSA) celebrated the World Day for Audiovisual Heritage on 28 October 2014 (as 27 October was on a Sunday)•Deputy Minister of Arts and Culture Ms. Rejoice Mabudafhasi officiated in renaming the two buildings utilised by the NFVSA to the following:

– Administration Building (Craigilea Building) was renamed to the Dolly Rathebe Administration Building

– Holdings Building (Milkboard Building) was renamed to the Ken Gampu Film Preservation Centre

62

Page 63: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

63

THE NATIONAL ARCHIVES PROGRAMME

Capital Works Projects

•The Heating, Ventilation, Air-Conditioning and Related Installations Capital Works Project is continuing and is set for completion in September 2015.

•Out of this project 2 EPWP beneficiaries have been appointed in permanent positions and 5 beneficiaries on contract basis within the National Archives.

•By the end of the reporting period all work outside the strongrooms have been completed, except for the Reading Room which was completed on 8 April 2015.

• The refurbishment of the Old National Library Complex started on 17 October 2014 and is set for completion in July 2016.

•The 2 projects together will create about 25 000 linear meters of additional space for records and would alleviate the space problems currently experienced by client offices.

63

Page 64: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

64

THE NATIONAL ARCHIVES PROGRAMMERivonia Trial Dictabelt Project

•After the Agreement between DAC and the French L’INSTITUT NATIONAL DE L’AUDIOVISUEL (INA) was signed on 20 December 2013, the first batch of Dictabelts was couriered to Paris, France on 12 October 2014 by 2 archives officials . The collection has been inaccessible for the past 50 plus years due to the obsolete technology [dictabelt] that was used to record the proceedings of this landmark case in the history of SA.

•INA has now already digitised a number of these dictabelts and staff at the NVFSA are currently busy transcribing them.

•After completion of this phase of the project the next phase of training South African Archivists to digitise the dictabelts, will start.

Revamping of the NAAIRS and the new NARSSA Website Projects

•The status of the Revamping of the NAAIRS Project is at 93%. Staff is currently loading content to the new NARSSA website. Due to the interdependency between these projects they will be implemented concurrently. It is planned that staff will start with the testing of the interface between new website and the new Electronic Archival Management System in the middle of October 2015.

64

Page 65: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

65

NATIONAL ARCHIVES PROGRAMME

• 56 File plans were evaluated

• 18 Disposal Authorities were issued

• 10 Outreach projects were implemented by the National Archives

• National Archives: 7 exhibitions (Exhibition on Archival functions, collections and services in Ncome on 16 December 2014; The Rivonia Trial Exhibition exhibited during the Oral History Annual Conference in October 2014; 2 Exhibitions presented as part of National Days i.e. Women's Day Celebrations in Durban (9 August 2014) and Heritage Day (24 September 2014) in Orkney

• Mnet Career Expo 11-14 Aug, JHB• Moshito Music Conference and Exhibitions,4- 6 September, JHB• KZN Music Indaba 28 – 30 Aug, Durban

65

Page 66: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

66

OTHER INFORMATION

66

Page 67: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

67

JOB CREATION STATISTICS

67

• In the year under review:– Over 17,000 jobs were created through 4 MGE work streams– Over 7,900 jobs were created through the 6 Performing Arts

Institutions– 900 jobs were created through sector partnerships– The Legacy Projects created 881 jobs– The National Days created 3,960 jobs– The cultural precinct projects created 290 jobs– The installation of flags created 90 jobs

• There were some challenges with the verification of this information in the audit process

Page 68: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

68

INFRASTRUCTUREChallenge Intervention ProgressInfrastructure projects were managed all over the department.

Roles and Responsibilities amongst the Programmes were not clarified.

Centralisation of the management of infrastructure projects

The structure to establish the Chief Directorate for Infrastructure Development was developed.

This structure will be incorporated to the DAC organogram which is currently under review.

2 officials were managing infrastructure and office accommodation projects worth more than R500m and R90m respectively.

Poor project management.

Limited monitoring & verification of work done.

Increase technical capacity Appointment of technical Project Managers is underway.

68

Page 69: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

69

INFRASTRUCTUREChallenge Intervention Progress

Escalated estimates and increased scope of work by Implementing Agents e.g. DPW

Lack of determination re value for money.

Establishment of the OMNIBUS for the professional service providers, i.e. Architects, Engineers, Quantity Surveyors .

Terms of Reference were developed.

Delays due to unclear processes, e.g. funding criteria, definition of the infrastructure projects, requirements for funding etc.

Development of the infrastructure policy.

Revision of the existing policy to strengthen the identified gaps is underway. 1st draft will be available by 30 Nov 2015 and will be presented to the stakeholders for consultation.

Approved infrastructure plan for MTEF period to avoid delays on implementation, under spending and ad hoc funding.

Development of the User Immovable Asset Management Plan (UAMP)

Revision of the existing UAMP is underway. 2nd draft will be available by 30 November 2015

69

Page 70: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

70

CHILDREN, YOUTH, WOMEN, PEOPLE WITH DISABILITIES AND SENIOR CITIZENS The objective to mainstream Target Groups across all departmental

programmes, also to create targeted initiatives where the aim is to profile women, young people, Senior Citizens and People/Artists with Disabilities

In 2014/15 5 the following projects were initiated:

The programmes included Women in the Arts Programme, Legends Unite Against Gender Based Violence, Intergenerational Clan Names which contributes to Oral History, Community Art therapy Training, Disability Arts (Zwakala Awards and Africa Sinakho Arts) and Mandela the African Opera

The following Youth Development programmes were implemented across all 9 provinces: Youth Month programme 2 Youth Enrichment Programmes, Youth in Arts Mass Participation programme, The School Holiday Programme

70

Page 71: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

71

HUMAN RESOURCE MANAGEMENT

71

• In the year under review, the following achievements were recorded:– Managed to fill most of the critical vacancies (as at 31 March 2015

the vacancy rate was 7.17% against a target of 10%).– Exceeded both targets for representivity that were set:

• There were some challenges with regard to:– the full implementation of the Performance Management and

Development System (92.2% of assessments were finalised as opposed to 100%).

– One grievance could not be finalised within the prescribed time-frame due to its complexity.

Target Actual

Females at Senior Management level 50% 54%

Persons with disabilities 2% 2.4%

Page 72: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

72

REPORT BY THE AUDITOR-GENERAL

72

Page 73: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

73

DAC AUDIT OUTCOMES

2010/11 2011/12 2012/13 2013/14 2014/15

Clean

Unqualified X X XX

Qualified X

Adverse

Disclaimer

73

Page 74: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

74

2014/15 AUDIT OUTCOME

Opinion

• Unqualified Audit Report

Attention was drawn on the following:

• Misstatement in the financial statements;• Findings on non-compliance with regulations;• Inadequate systems to prevent irregular expenditure;• Procurement and contract management system were inadequate;

and• Findings on predetermined objectives.

74

Page 75: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

75

UNAUTHORIZED EXPENDITURE

Financial Year R’000

2011/12 41,769

•The department incurred unauthorised expenditure of R41,769,000 due to funds expended for purposes which were not in accordance with the original intended purpose.

•Relates to shifting of Earmarked funds from 2010 FIFA World Cup budget during 2008/9 financial year.

•The SIU pronounced upon this Unauthorised Expenditure in its final Report.

2012/13. Correction of classification of expenditure from unauthorised to irregular expenditure was done.

Total

-

-

75

Page 76: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

76

IRREGULAR EXPENDITURE

76

Page 77: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

77

Financial Year R’000

2012/13 72,316

No tax clearance certificates obtained from service providers. 394

No quotations were obtained. 3,393

Goods and services above R500 000 were not procured through a competitive bidding process and reasons provided were not justifiable.

28,574

Contract employee’s services were not terminated at the end of the contract and was remunerated for the period that exceeded the contract period.

128

Funds earmarked for capital projects were utilised to pay for goods and services on a lease of space.

16,756

Funds earmarked for FIFA 2010 World Cup were not utilised for the intended purposes, it was used to pay for other DAC projects.

41,769

Funds earmarked for Investing in culture were not utilised for the intended purposes, it was used to pay for Cape Town International Jazz Festival.

4,500

Less: Irregular expenditure condoned (70,756)

Total 97,074

IRREGULAR EXPENDITURE (CONT…)

77

Page 78: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

78

Financial Year

IRREGULAR EXPENDITURE (CONT…)R’000

2013/14 Opening Balance 97,074

Competitive bidding processes were not followed 53,757

No quotations were obtained 7,418

Contract was extended without justification 3,442

Payments have been deliberately split into orders to avoid bidding process 1,078

Official approved expenditure above the delegated amount 1,594

Supply chain management was not followed 2,768

Suppliers used were not on the database 4,287

Sub-total 74,344

Total 171,418

78

Page 79: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

79

R’000

2014/15 Opening Balance 171,418

Irregular expenditure relating to prior year 39,998

Appointment of consultants without following the competitive bidding process 14,085

Competitive bidding process not followed in the appointment of service providers and reasons provided were not justifiable

23,508

Contract extension without justification/without Accounting Officer's approval 3,078 Awarded bids not done through a delegated committee/Accounting Officer 21,367

SCM procurement process not followed 8,095 Bid is advertised for less than the 21 days requirement and reasons provided are not justifiable

1,000

The request for quotations did not specify the preference point system (80/20 or 90/10) to be used as prescribed in terms of the PPPFA. 3,336

IRREGULAR EXPENDITURE (CONT…)

79

Page 80: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

80

R’000

2014/15 Opening Balance 171,418

Prescribed minimum number of quotations not obtained and reasons provided not justifiable 2,082

Sponsorship and Act of grace not approved by the relevant authority 161

Deviation from prescribed procurement processes and no reasons provided and approved by the delegated person or committee.

3,930

TOTAL 2014/15

IRREGULAR EXPENDITURE 2014/15 (CONT…)

IRREGULAR EXPENDITURE DISCLOSURE NOTE 2013/14 ADDITION 2014/15

BALANCES 171,418 120,640 292,058

80

Page 81: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

81

• The department has initiated investigations of possible irregular

expenditure related to the construction of three cultural precincts. These

are Gugulethu, Enyokeni and Nwamita cultural precincts.

INVESTIGATIONS OF POTENTIAL IRREGULAR EXPENDITURE ON CULTURAL PRECINCTS

81

Page 82: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

82

Financial Year R’000

2011/12 – Opening balance : 743

Incorrect VAT payments made during 2008/9 financial year. SIU Report received in May 2012.Interest paid for breach of contract relating to a Service Provider not deemed to have performed adequately in a previous financial year. Court ruling was in favour of the service provider.Cancellation fee paid for workshop venue not utilised

Closing balance

1,294

5_________

2,042

2012/13

Breach of contract with a service provider and failure to defend a court case resulting in paying interest on overdue account.A service was requested on two service providers at the same time to provide catering services which was due to lack of communication.Event was cancelled after the DAC received correspondence from the Presidency that one of the main speakers had commitments and could not make it for the event.Closing balance

457

3

215

_________2,717

FRUITLESS AND WASTEFUL EXPENDITURE

82

Page 83: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

83

Financial Year R’000

2013/14 – Opening balance 2,762

Department paid remuneration for services that were never rendered.Department paid for third party (Government Employee Pension Fund) including interest on behalf of a former employee that never rendered a service.Incorrect notch was advertised, employee was hired and paid according to a wrong notch.Fines and penalties for settlement of debtsBreach of contract – no value for money for services that was paid for.Deposit paid to a supplier for goods that were never delivered.VAT charged by supplier not VAT registered

814

112

2

1,4043,000

126105

Closing balance 8,325

FRUITLESS AND WASTEFUL EXPENDITURE (CONT…)

83

Page 84: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

84

Financial Year R’000

2014/15 – Opening balance 8,325

Less Prior Period error -500

Interest paid on DPW account 83

Interest paid for the late payment on overdue pension fund 11

Cancellation fee 200

Interest paid on additional liability pension owing to GEPF 20

Interest paid on arrears account 13

Interest paid on arrear pension fund 3

Less amount resolved (3,541)Closing balance 4,614

FRUITLESS AND WASTEFUL EXPENDITURE (CONT…)

84

Page 85: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

85

BUDGET VS EXPENDITURE

85

Page 86: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

86

APPROPRIATION PER PROGRAMME

Final Appropriation

Actual Expenditure Variance %

Spent

R’000 R’000 R’000

Administration 266,251 253,193 13,058 95.1%

Institutional Governance 84,802 81,638 3,164 96.3%

Arts and Culture Promotion and Development 998,311 995,030 3,281 99.7%

Heritage Promotion and Preservation 2,175,384 2,122,269 53,115 97.6%

Grand Total 3,524,748 3,452,130 72,618 97.9%

86

Page 87: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

87

APPROPRIATION PER PROGRAMME

87

Page 88: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

88

APPROPRIATION PER ECONOMIC CLASSIFICATIONFinal

AppropriationActual

Expenditure Variance %Spent

  R’000 R’000 R’000  

Compensation of employees 207,051 206,286 765 99.6%Goods and Services 407,783 326,356 81,780 79.9%Provinces & Municipalities (including Conditional Grant) 1,019,713 1,019,713 - 100%

Dept. Agencies & Accounts (Current) 1,171,785 1,220,381 -48,596 104.1%Dept. Agencies & Accounts (Capital) 398,371 299,736 98,635 75.2%Non Profit Institutions 208,594 193,058 15,536 92.6%Foreign Government & International Organisations 3,189 3,127 62 98.1%Higher Education Institutions 580 570 10 98.3%Households 26,770 24,518 2,252 91.6%Public corporations and private enterprises 69,310 147,278 -77,968 212.5Heritage Assets 1,826 1,826 - 100%Machinery & equipment 5,030 5,030 - 100%Software & other Intangible assets 3,990 3,637 353 91.2%Payments for Financial Assets (Theft & Losses) 485 485 - 100%Interest and rent on land 271 129 142 48Grand Total 3,524,748 3,452,130 72,618 97.9%

88

Page 89: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

89

EXPLANATION OF EXPENDITURE VARIANCE PER ECONOMIC

CLASSIFICATION

89

Page 90: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

90

• The R765, 000 underspending was due to posts that became vacant in the year under review. The detail of spending per Programme is as follows:

EXPLANATION OF EXPENDITURE VARIANCE PER ECONOMIC CLASSIFICATION - COMPENSATION OF EMPLOYEES

Final Appropriation

Actual Expenditure

Variance Expenditure as a % of final

appropriation

R’000 R’000 R’000

Administration 89,501 89,501 - 100%

Institutional Governance 26,755 26,687 68 99.7%

Arts and Culture Promotion and Development

41,985 41,404 581 98.6%

Heritage Promotion and Preservation

48,810 48,694 116 99.8%

Total 207,051 206,286 765 99.6%

90

Page 91: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

91

• A total material variance of R82 million was due to the under-

expenditure of (i) R16 mil was due to delays in finalisation of the lease

for the building identified by the Department of Public Works; (ii) R61 mil

correction of office accommodation account for the institutions, which

was re-classified from goods and services to transfer payments and (iii)

R5 mil for other goods and services.

• The detail of spending per Programme are provided in the table below:

EXPLANATION OF EXPENDITURE VARIANCE PER ECONOMIC CLASSIFICATION - GOODS AND SERVICES

91

Page 92: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

92

EXPENDITURE PER PROGRAMMEGOODS AND SERVICES

Final Appropriation

Actual Expenditure Variance %

Spent R’000 R’000 R’000

Administration 164,015 87,505 76,510 53.3%

Institutional Governance 33,378 33,378 - 100%

Arts and Culture Promotion and Development 102,594 102,594 - 100%

Heritage Promotion and Preservation 108,149 103,232 4,917 95.5%

Grand Total 408,136 326,709 81,437 79.9%

92

Page 93: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

93

EXPLANATION OF EXPENDITURE VARIANCE PER ECONOMIC CLASSIFICATIONPROVINCES AND MUNICIPALITIES (CONDITIONAL GRANT)

• An amount of R1 billion (100%) has been transferred to Provinces and Municipalities. The detail of variance per Province is as follows:

93

Name of Province

Division of Revenue Act Adjustments Total

available Actual transfer

by NationalAmount spent by department

% Transferred by National

  R’000 R’000 R’000 R’000 R’000Eastern Cape 109,418 72,492 72,492 72,492 100%Free State 119,013 62,918 64,401 64,401 100%Gauteng 125,608 63,470 66,470 66,470 100%KwaZulu-Natal 122,754 63,145 63,145 63,145 100%Limpopo 81,010 56,528 47,561 47,561 100%Mpumalanga 114,781 72,521 72,521 72,521 100%Northern Cape 118,396 75,596 75,596 75,596 100%North West 98,883 64,058 64,058 64,058 100%Western Cape 126,347 67,058 68,542 68,542 100%Total 1,016,210 1,016,210 1,016,210 1,016,210 100%Provinces & Municipalities (MGE Flagship events)

3,503 3,503 3,503 3,503 100%

Page 94: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

94

EXPLANATION OF EXPENDITURE VARIANCE PER PROVINCEPROVINCES AND MUNICIPALITIES (CONDITIONAL GRANT)

Province Division of

Revenue Act, 2014

(Act No. 10 of 2014)

Provincial Roll-overs

Total Available

Received by

Province: Year to

date

Provincial actual

Payments

% Actual payments of total available

Reason for Variance

R’000 R’000 R’000 R’000 R’000

Eastern Cape

109,418 1,898 111,,316 109,418 84,443 75.9% The under spending of R27 million was due to the Commitments to the value of R17 mil have been made to infrastructure projects and is due to a service provider for the 13 modular libraries appointed late in quarter 4 which has delayed implementation within the financial year.

Free State 119,013 5,708 124,721 119,013 119,155 95.5% Under spending of R6 million was due to infrastructure projects not completed; i.e. (i) Wepener amounting to R3 mil and is at 62% towards completion. (ii) Oranjeville amounts to R2 mil and is at 69% towards completion.

94

Page 95: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

95

EXPLANATION OF EXPENDITURE VARIANCE PER PROVINCEPROVINCES AND MUNICIPALITIES (CONDITIONAL GRANT)

Province Division of

Revenue Act, 2014

(Act No. 10 of 2014)

Provincial Roll-overs

Total Available

Received by

Province: Year to

date

Provincial actual

Payments

% Actual payments of total available

Reason for Variance

R’000 R’000 R’000 R’000 R’000

Gauteng 125,608 - 125,608 125,608 116,021 92.4% The under-expenditure of R9,5 million was due to the incomplete infrastructure projects. 3 of 8 projects was not completed and commitments were made to that effect.

KwaZulu-Natal

122,754 - 122,754 122,754 108,555 88.4% The variance of R14 million was due to delays in awarding infrastructure bids for new projects and payments of IDT by the department, the disputes between IDT and contractor has delayed the project.

95

Page 96: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

96

EXPLANATION OF EXPENDITURE VARIANCE PER PROVINCEPROVINCES AND MUNICIPALITIES (CONDITIONAL GRANT)

Province Division of

Revenue Act, 2014 (Act

No. 10 of

2014)

Provincial Roll-overs

Total Available

Received by

Province: Year to

date

Provincial actual

Payments

% Actual payments of total available

Reason for Variance

R’000 R’000 R’000 R’000 R’000

Limpopo 81,010 14,014 95,024 81,010 57,585 60.6% The under-expenditure of R37 million was due to (i) R8,4 mil has been committed on 5 infrastructure projects. Contractors are on site for all the 5 projects. (ii) R8 mil was not spent on Modular Libraries. The Procurement processes were done and only 1 out of 7 Modular structures was delivered. (iii) R3,4 million was not spent on compensation of staff due to delays in the appointment process. 15 conditional grant staff members were appointed with effect from 1 April 2015.

96

Page 97: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

97

EXPLANATION OF EXPENDITURE VARIANCE PER PROVINCEPROVINCES AND MUNICIPALITIES (CONDITIONAL GRANT)

Province Division of

Revenue Act, 2014 (Act

No. 10 of

2014)

Provincial Roll-overs

Total Available

Received by

Province: Year to

date

Provincial actual

Payments

% Actual payments of total available

Reason for Variance

R’000 R’000 R’000 R’000 R’000

Mpumalanga 114,781 1,116 115,897 114,781 103,493 89.3% The under-expenditure of R12 million was due to (i) Non appointment of staff. The recruitment process was done and candidates interviewed. Decision yet to be taken on appointment of additional conditional grant staff and R3 million was not spent. (ii) R9 million was not utilised on new infrastructure projects: •Glenmore was delayed due to dispute over adjusted rates between the contractor, projects QS and DPW.

97

Page 98: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

98

EXPLANATION OF EXPENDITURE VARIANCE PER PROVINCEPROVINCES AND MUNICIPALITIES (CONDITIONAL GRANT)

Province Division of

Revenue Act, 2014 (Act

No. 10 of

2014)

Provincial Roll-overs

Total Available

Received by

Province: Year to

date

Provincial actual

Payments

% Actual payments of total available

Reason for Variance

R’000 R’000 R’000 R’000 R’000

Mpumalanga 114,781 1,116 115,897 114,781 103,493 89.3% • Emthonjeni progress has slowed down due to challenges between the main contractor and sub-contractors.

• Mgobodzi project is behind the schedule due to delays in sourcing material.

• Contractors for Daggakraal, Acornhoek, Thusiville and Kanyamazane are on site.

98

Page 99: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

99

EXPLANATION OF EXPENDITURE VARIANCE PER PROVINCEPROVINCES AND MUNICIPALITIES (CONDITIONAL GRANT)

Province Divisio

n of Revenue Act, 2014 (Act

No. 10 of

2014)

Provincial Roll-overs

Total Available

Received by

Province: Year to

date

Provincial actual

Payments

% Actual payments of total available

Reason for Variance

R’000 R’000 R’000 R’000 R’000

Northern Cape

118,396 5,163 123,559 118,396 105,010 85.0% An amount of R19 million was not spent due to:•Establishment of New Modular Libraries project was reprioritised – brick and mortar structures planned for cost efficiencies in same sites.•New Infrastructure projects, contractors have been appointed for Danielskuil, Olifantshoek, Cassel, Noupoort, Norvalspont, Louisevale, Warrenton, Logaganeng, Ritchie and Homevale. The under-expenditure was due to late appointment of contractors. The projects are now in progress. 99

Page 100: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

100

EXPLANATION OF EXPENDITURE VARIANCE PER PROVINCEPROVINCES AND MUNICIPALITIES (CONDITIONAL GRANT)

Province Divisio

n of Revenue Act, 2014 (Act

No. 10 of

2014)

Provincial Roll-overs

Total Available

Received by

Province: Year to

date

Provincial actual

Payments

% Actual payments of total available

Reason for Variance

R’000 R’000 R’000 R’000 R’000

Northern Cape

118,396 5,163 123,559 118,396 105,010 85.0% An amount of R19 million was not spent due to:•Establishment of New Modular Libraries project was reprioritised – brick and mortar structures planned for cost efficiencies in same sites.•New Infrastructure projects, contractors have been appointed for Danielskuil, Olifantshoek, Cassel, Noupoort, Norvalspont, Louisevale, Warrenton, Logaganeng, Ritchie and Homevale. The under-expenditure was due to late appointment of contractors. The projects are now in progress. 100

Page 101: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

101

EXPLANATION OF EXPENDITURE VARIANCE PER PROVINCEPROVINCES AND MUNICIPALITIES (CONDITIONAL GRANT)

Province Division of

Revenue Act, 2014 (Act

No. 10 of

2014)

Provincial Roll-overs

Total Available

Received by

Province: Year to

date

Provincial actual

Payments

% Actual payments of total available

Reason for Variance

R’000 R’000 R’000 R’000 R’000

North West 98,883 6,556 105,439 98,883 85,035 80.6% An amount of R20 million was not spent due to:•New Infrastructure Projects: Tlakgameng, Khunwana and Papie Ntjana Community Library. The projects were only handed over to DPW in June 2015 as per EXCO Resolutions. Tlakgament and Papie Ntjana were advertised and closed on 23 September 2014 and Khunwana closed on 17 October 2014. Contractors were only appointed late December 2014 and site hand over was done in January 2015. R11 million was not spent.

101

Page 102: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

102

EXPLANATION OF EXPENDITURE VARIANCE PER PROVINCEPROVINCES AND MUNICIPALITIES (CONDITIONAL GRANT)

Province Division

of Revenue Act, 2014

(Act No. 10 of 2014)

Provincial Roll-overs

Total Available

Received by

Province: Year to

date

Provincial actual

Payments

% Actual payments of total available

Reason for Variance

R’000 R’000 R’000 R’000 R’000

North West 98,883 6,556 105,439 98,883 85,035 80.6% • Upgrading of 3 libraries: Quantity Surveyor was only appointed in September 2014 for scoping and developing of Bill of Quantities:

• Vryburg Library: Implementation of the project was delayed by drawings and bills which were only completed in November 2014.

• Mafikeng Library: It is regarded as a heritage site because the building is older than 60 years and approval to upgrade the library had to be obtained from Heritage and Advisory Services. Bills for Mafikeng were only completed early January 2015. Advert for both libraries placed in Feb 2015 and closed 1st April 2015. R9 mil was not spent.

102

Page 103: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

103

EXPLANATION OF EXPENDITURE VARIANCE PER PROVINCEPROVINCES AND MUNICIPALITIES (CONDITIONAL GRANT)

Province Division

of Revenue Act, 2014

(Act No. 10 of 2014)

Provincial Roll-overs

Total Available

Received by

Province: Year to

date

Provincial actual

Payments

% Actual payments of total available

Reason for Variance

R’000 R’000 R’000 R’000 R’000

North West 98,883 6,556 105,439 98,883 85,035 80.6% • Upgrading of 3 libraries: Quantity Surveyor was only appointed in September 2014 for scoping and developing of Bill of Quantities:

• Vryburg Library: Implementation of the project was delayed by drawings and bills which were only completed in November 2014.

• Mafikeng Library: It is regarded as a heritage site because the building is older than 60 years and approval to upgrade the library had to be obtained from Heritage and Advisory Services. Bills for Mafikeng were only completed early January 2015. Advert for both libraries placed in Feb 2015 and closed 1st April 2015. R9 mil was not spent.

103

Page 104: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

104

EXPLANATION OF EXPENDITURE VARIANCE PER PROVINCEPROVINCES AND MUNICIPALITIES (CONDITIONAL GRANT)

Province Division

of Revenue Act, 2014 (Act No.

10 of 2014)

Provincial Roll-overs

Total Available

Received by

Province: Year to

date

Provincial actual

Payments

% Actual payments of total available

Reason for Variance

R’000 R’000 R’000 R’000 R’000North West 98,883 6,556 105,439 98,883 85,035 80.6% • Lebotlwana was withdrawn by Moretele

Municipality due relocation of schools around the library.

• R3 million for Book detection systems could not be spent: Tender advertised and closed but not awarded because DBAC identified discrepancies and recommended that the tender be re-advertised.

Western Cape

126,347 - 126,347 126,347 126,347 100% • No deviation. The allocation has been fully spent.

TOTAL 1,016,210 34,455 1,050,665 1,016,210 905,644 86.2% The total under-expenditure amount to R145 million.

104

Page 105: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

105

• The subsidies paid over to the various Performing Arts Institutions, PanSALB, Libraries and Heritage Institutions were as follows:

Name of Institution Final Appropriation Actual transferPerforming Arts Institutions (Cur/Cap)

R’000 R’000

Artscape 50,755 50,755

Market Theatre Foundation 27,810 27,810

National Arts Council 97,365 97,365

National Film and Video Foundation 147,588 147,588

Performing Arts Centre of the Free State

37,690 37,690

Playhouse Company 43,085 43,085

State Theatre 45,028 45,028

Windybrow Theatre 10,703 10,703

National Language Services 4,254 4,254

Capital Transfer -Playhouses 69,800 64,452

Mzansi Golden Economy Projects 10,923 8,233

Total 545,001 536,963

DEPARTMENTAL AGENCIES & ACCOUNTS

105

Page 106: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

106

Name of Institution Final Appropriation Actual transferConstitutional Institution R’000 R’000

Pan SA Language Board 83,497 83,497

EXPENDITURE PER INSTITUTIONDEPARTMENTAL AGENCIES & ACCOUNTS

Libraries (Cur/Cap)

National Library of South Africa 72,387 72,387

South African Library for the Blind 16,612 16,612

Community Libraries 11,690 11,690

Total 100,689 100,689

106

Page 107: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

107

Name of Institution Final Appropriation Actual transferHeritage Institutions (Cur/Cap) R’000 R’000

Northern Flagship Museum 66,350 66,350

Iziko Museums of Cape Town 65,331 65,331

War Museum of the Boer Republics 8,613 8,613

KwaZulu-Natal /Natal Museum 17,376 17,376

National Museum 41,085 41,085

Die Afrikaanse Taalmuseum 5,308 5,308

The National English Literature Museum 8,657 8,657

Voortrekker Museum 11,935 11,935

Robben Island Museum 79,324 66,805

William Humphreys Arts Gallery 5,960 5,960

Nelson Mandela Museum 20,124 20,124

EXPENDITURE PER INSTITUTIONDEPARTMENTAL AGENCIES & ACCOUNTS

107

Page 108: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

108

Name of Institution Final Appropriation Actual transfer

Heritage Institutions(Cur/Cap): R’000 R’000

Freedom Park 70,470 70,470

Luthuli Museum 8,890 8,890

South African Heritage Resources Agency

46,417 46,417

National Heritage Council 55,917 55,917

Capital Transfer – Heritage Institutions 174,000 149,285

Total 685,757 648,523

EXPENDITURE PER INSTITUTIONDEPARTMENTAL AGENCIES & ACCOUNTS

108

Page 109: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

109

Final Appropriation Actual transferCapital Works: R’000 R’000

Capital Works of Playhouses 2,096 -

Capital Works of Heritage Institutions 73,224 35,097

Capital Works of Libraries 79,251 50,902

Total 154,571 85,999

Non Profit Institutions:

Subsidies

Business Arts South Africa 7,312 7,312

Engelenburg House Art Collection 289 289

Blind SA 8,140 8,140

Total 15,741 15,741

EXPENDITURE PER ECONOMIC CLASSIFICATION

109

1

Page 110: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

110

Final Appropriation Actual transferNon Profit Institutions: R’000 R’000

Transfers

Arts social development and youth 12,427 9,393

Gcwala Ngamasiko Cultural Festival 1,000 1,000

Kauru Visual Arts Exhibition 2,000 2,000

Cultural and Creative Industries 18,919 18,919

Mzansi Golden Economy Projects 119,468 119,468

National Language Services 1.208 1.208

Heritage Projects 4,700 1,150

Library and Information Association of South Africa

4,500 4,469

Capital Works Heritage Projects 28,631 19,710

Total 192,853 177,317

EXPENDITURE PER ECONOMIC CLASSIFICATION

110

Page 111: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

111

Final Appropriation Actual transfer

Households: R’000 R’000

Employee Social Benefits 3,660 3,660

Language development projects 7,789 7,789

Cultural and Creative Industries 1,081 1,081

Mzansi Golden Economy Projects 2,755 2,755

Heritage Promotion 5,916 3,664

Arts social development and youth 5,569 5,569

Total 26,770 24,518

EXPENDITURE PER ECONOMIC CLASSIFICATION

111

Page 112: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

112

EXPLANATION OF EXPENDITURE PER ECONOMIC CLASSIFICATION

High Education Institutions

•A variance of R10,000 was not spent by 31 March 2015, and the transfer

was for Mzansi Golden Economy projects

Machinery and Equipment

•The budget was fully spent by 31 March 2015 under this economic

classification

112

Page 113: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

113

EXPLANATION OF EXPENDITURE PER ECONOMIC CLASSIFICATION

Software & Other Intangible Assets

•A variance of R353,000 was realised under this economic classification.

Foreign Government & International Organisations

•A variance of R62,000 was due to the exchange rate which resulted in

payment to Sub Fees of Commonwealth Foundation being lower than

anticipated.

113

Page 114: ANNUAL REPORT 2014/15 DIRECTOR-GENERAL: ARTS AND CULTURE DATE: 13/10/2015

114

THANK YOU

114