21
Annual Port Review June 24, 2015

Annual Port Review · FY 2015 Performance thru April Fiscal Year YTD (through April) FY 2014 FY 2015 Percentage Change Containerized Cargo TEUs 593,505 637,810 +7.5% Cruise

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Annual Port Review · FY 2015 Performance thru April Fiscal Year YTD (through April) FY 2014 FY 2015 Percentage Change Containerized Cargo TEUs 593,505 637,810 +7.5% Cruise

Annual Port ReviewJune 24, 2015

Page 2: Annual Port Review · FY 2015 Performance thru April Fiscal Year YTD (through April) FY 2014 FY 2015 Percentage Change Containerized Cargo TEUs 593,505 637,810 +7.5% Cruise

Port Everglades by the Numbers

For 2014: #1 Seaport in Florida by revenue - $153 million #1 Container port in Florida (#12 in U.S.) by volume 1,013,344 TEUs #1 Seaport for exports in Florida - $13.6 billion #1 Refrigerated cargo port in Florida (#7 in U.S.) -125,272 TEU’s #1 U.S. gateway for trade with Latin America (15.3 percent of all Latin American & Caribbean trade in the U.S.) #2 Petroleum port in Florida –112.4 million barrels #2 Cruise port for multi-day passengers in the World – 4 million #3 Foreign-Trade Zone (warehouse/distribution exports) in the U.S.

(CY2013)

2

Page 3: Annual Port Review · FY 2015 Performance thru April Fiscal Year YTD (through April) FY 2014 FY 2015 Percentage Change Containerized Cargo TEUs 593,505 637,810 +7.5% Cruise

Key Comparative PerformanceStatistics FY 2014 and FY 2013

MeasurePort

Everglades Miami Jacksonville Canaveral

Savannah(GA PortsAuthority)

Charleston(SC Ports Authority)

Total TEUs FY 2014 1,013,344 877,554 936,972 278 3,136,016 1,739,765

FY 2013 927,572 901,454 926,810 580 2,949,449 1,573,443

% Change 9.2% ‐2.7% 1.1% ‐52.1% 6.3% 10.6%

Cruise Passengers(Multi‐day/Daily)

FY 2014 4,001,354 4,939,000 181,580 4,167,258 0 196,935

FY 2013 3,600,636 4,079,000 185,434 3,986,994 0 185,336

% Change 11.1% 21.1% ‐2.1% 4.5% 0% 6.3%

3

Page 4: Annual Port Review · FY 2015 Performance thru April Fiscal Year YTD (through April) FY 2014 FY 2015 Percentage Change Containerized Cargo TEUs 593,505 637,810 +7.5% Cruise

FY 2015 Performance thru April

Fiscal YearYTD

(through April)FY 2014 FY 2015 Percentage

Change

Containerized CargoTEUs 593,505 637,810 +7.5%

CruisePassengers 2,995,149 3,069,854 +2.5%

PetroleumBarrels 65,911,603 68,838,590 +4.4%

4

Page 5: Annual Port Review · FY 2015 Performance thru April Fiscal Year YTD (through April) FY 2014 FY 2015 Percentage Change Containerized Cargo TEUs 593,505 637,810 +7.5% Cruise

Port Everglades Recommended Budget for FY2016

5

Page 6: Annual Port Review · FY 2015 Performance thru April Fiscal Year YTD (through April) FY 2014 FY 2015 Percentage Change Containerized Cargo TEUs 593,505 637,810 +7.5% Cruise

Summary of Recommended Operating Revenues for FY 2016 - $159,079,200

Cruise $57,651,900

Petroleum $32,268,300

Other $2,701,700

Parking $8,382,800 Real Estate

$16,463,300

Bulk/Break Bulk Cargo $6,709,700

Containerized Cargo

$34,901,500

6

Page 7: Annual Port Review · FY 2015 Performance thru April Fiscal Year YTD (through April) FY 2014 FY 2015 Percentage Change Containerized Cargo TEUs 593,505 637,810 +7.5% Cruise

Revenue Budget Comparison

Division FY15 Revenue Projection

FY16 Recommended

Budget*% Change

Petroleum $31,399,200 $32,268,300 2.8%

Containerized Cargo 33,617,300 34,901,500 3.8%

Cruise56,822,100 57,651,900

1.4%

Bulk/Breakbulk 6,416,200 6,709,700 4.6%

Real Estate 15,319,900 16,463,300 7.5%

Parking 9,342,200 8,382,800 (10.3%)

Other 2,439,900 2,701,700 10.7%

Total $155,356,800 $159,079,200 2.4%

7

*Includes average tariff increase of 2.8%

Page 8: Annual Port Review · FY 2015 Performance thru April Fiscal Year YTD (through April) FY 2014 FY 2015 Percentage Change Containerized Cargo TEUs 593,505 637,810 +7.5% Cruise

Summary of Recommended Operating Expenses for FY2016 - $87,524,800

Other$5,769,600 Insurance

$5,154,100

Fire Rescue$9,161,300

Law Enforcement &

Security$23,000,800

Personnel$19,542,800 Crane

Operations$10,351,600

Contractual Services

$6,751,100

Utilities$4,495,600

Maintenance & Repairs

$3,297,900

8

Page 9: Annual Port Review · FY 2015 Performance thru April Fiscal Year YTD (through April) FY 2014 FY 2015 Percentage Change Containerized Cargo TEUs 593,505 637,810 +7.5% Cruise

Expense Budget Comparison

Expense Category FY15 Adopted Budget FY16 Recommended Budget % Change

Fire/EMS* $8,434,900 $9,161,300 8.6%

Security* 21,011,400 23,000,800 9.5%

Insurance 5,379,900 5,154,100 (4.2%)

Personnel 18,763,100 19,542,800 4.2%

Crane Operations 9,837,000 10,351,600 5.2%

Contractual Services 6,525,700 6,751,100 3.5%

Utilities 4,494,200 4,495,600 0.0%

Maint. & Repairs 3,368,600 3,297,900 (2.1%)

Other 5,583,800 5,769,600 3.3%

Total $83,398,600 $87,524,800 4.9%

*Based on preliminary budget and subject to negotiations with BSO

9

Page 10: Annual Port Review · FY 2015 Performance thru April Fiscal Year YTD (through April) FY 2014 FY 2015 Percentage Change Containerized Cargo TEUs 593,505 637,810 +7.5% Cruise

FY2016 – FY2020 Recommended CIP

10

Page 11: Annual Port Review · FY 2015 Performance thru April Fiscal Year YTD (through April) FY 2014 FY 2015 Percentage Change Containerized Cargo TEUs 593,505 637,810 +7.5% Cruise

Summary of Recommended FY2016 – FY2020 CIP - $792,552,670

Bulkheads142,800,000

Cruise88,550,000

Cargo 292,759,820

Other61,442,850

Deepening & Widening

192,000,000

Reserves15,000,000

11

Page 12: Annual Port Review · FY 2015 Performance thru April Fiscal Year YTD (through April) FY 2014 FY 2015 Percentage Change Containerized Cargo TEUs 593,505 637,810 +7.5% Cruise

2014 Master/Vision Plan Project Needs Improve cruise facilities to expand operations Longer cruise berths and wider slips Improve the petroleum-receiving system and operations Cargo berth and yard capacity Ability to berth fully laden post-Panamax ships of 8,000

to 8,500 20-foot equivalent container units (TEUs) Modern cranes to load and unload post-Panamax ships Foreign Trade Zone relocation Bulkhead replacements

12

Page 13: Annual Port Review · FY 2015 Performance thru April Fiscal Year YTD (through April) FY 2014 FY 2015 Percentage Change Containerized Cargo TEUs 593,505 637,810 +7.5% Cruise

2014 Master/Vision Plan Projects in FY2016 -FY2020 CIPNeobulkStorage Yard

Southport Phase 9A Container Yard

Foreign Trade Zone Relocation

McIntosh Road Gate Lane Addition

Southport TurningNotch Extension

Southport Phase 9B Container Yard

New Crane Rails(Berths 30, 31, 32)

Berths 1, 2, 3New Bulkheads

USACE Deepening & Widening Design & Construction

Slip 2 Westward Lengthening

Slip 1 New Bulkheads & Reconfiguration(Petroleum berths)

CT#25 Improvements/Expansions

Super Post‐Panamax Cranes (2)

West Lake Mitigation

13

Page 14: Annual Port Review · FY 2015 Performance thru April Fiscal Year YTD (through April) FY 2014 FY 2015 Percentage Change Containerized Cargo TEUs 593,505 637,810 +7.5% Cruise

Completed CIP Projects Eller Drive Overpass

Project complete and operational in December 2014Intermodal Container Transfer Facility (ICTF)

Project complete and operational on July 16, 2014

14

Page 15: Annual Port Review · FY 2015 Performance thru April Fiscal Year YTD (through April) FY 2014 FY 2015 Percentage Change Containerized Cargo TEUs 593,505 637,810 +7.5% Cruise

Deeper (48 feet+1+1) and Wider ChannelsU.S. Army Corps of Engineers/Port Everglades

Total Project Cost $374.1M

Anticipated Federal funding $189.9M

Port Funding $184.2M

Total eligible for State funding based on current 75% criteria

$138.2M

Appropriated State funds $3.6M

Currently programmed State funds

$15.0M

Remaining amount eligible for additional State funding

$119.6M

15

Page 16: Annual Port Review · FY 2015 Performance thru April Fiscal Year YTD (through April) FY 2014 FY 2015 Percentage Change Containerized Cargo TEUs 593,505 637,810 +7.5% Cruise

Deeper (48 feet+1+1) and Wider Channels U.S. Army Corps of Engineers/Port Everglades (cont’d)

Channel Deepening and Widening Approved by Civil Works Review Board on

February 27, 2015 Chief’s report expected June 2015 Of the estimated $5.6 million cost of pre-

construction engineering and design, the Port has received $3.6 million from the State

Port can seek Federal reimbursement once project is authorized by Congress

16

Page 17: Annual Port Review · FY 2015 Performance thru April Fiscal Year YTD (through April) FY 2014 FY 2015 Percentage Change Containerized Cargo TEUs 593,505 637,810 +7.5% Cruise

Southport Turning Notch Extension

Total Estimated Project Cost $269.4M

Port funding (minimum) $67.3M

Total eligible for State funding based on current 75% criteria

$202.1M

Appropriated State funds $62.5M

Currently programmed State funds $11.5M

Remaining amount eligible for additional State funding $128.1M

17

Page 18: Annual Port Review · FY 2015 Performance thru April Fiscal Year YTD (through April) FY 2014 FY 2015 Percentage Change Containerized Cargo TEUs 593,505 637,810 +7.5% Cruise

Southport Turning Notch Extension (cont’d)

Southport Turning Notch ExtensionUpland Mangrove Enhancement Underway - Construction completion Summer 2015

Westlake Park Mitigation Design and permitting underway

Turning Notch Construction Design and permitting underway Construction begins end of CY 2016 Construction completion December 2019

18

Page 19: Annual Port Review · FY 2015 Performance thru April Fiscal Year YTD (through April) FY 2014 FY 2015 Percentage Change Containerized Cargo TEUs 593,505 637,810 +7.5% Cruise

Capital Project TotalsProject

Previously Funded

FY 16CIP

FY17-FY20 CIP Total

ACOE Deepening and Widening (Design/Construction/Mitigation) $ 15.0 $ 9.5 $182.5 $207.0

Cruise Terminal 25 (Programming/Design/Construction) 1.4 12.5 12.5 26.4

Southport Electrical Sub-Station (Construction) - 15.0 - 15.0

FTZ Relocation (P3) - 27.0 27.0 54.0

McIntosh Road Checkpoint Modifications (Design/Construction) 0.1 1.4 - 1.5

Multimodal Facility Phase 1 (Design/Construction) - - 40.8 40.8

Neo-Bulk Storage Area (Design/Construction) 0.7 3.5 3.5 7.7

Post Panamax Cranes - SP8 and SP9 (Design/Construction) 15.0 7.5 7.5 30.0

Replacement Bulkheads (Berths 1,2,3,16,17,18,21,22) - 1.2 77.2 78.4

Slip 1 New Bulkhead at Berths 9 and 10 (Design/Construction) 22.0 30.9 30.9 83.8

Slip 2 Westward Lengthening (Design/Construction) 23.0 - - 23.0

Southport Phase 9A Container Yard (Design/Construction) - - 9.7 9.7

Southport Phase 9B Container Yard (Design/Construction) 8.8 - - 8.8

Southport Container Yard Densification (Design/Construction) - - 33.7 33.7

Southport Turning Notch Extension (Design/Construction/Mitigation) 103.7 57.9 107.8 269.4

Total $189.7 $166.4 $533.10 $889.2

19

Page 20: Annual Port Review · FY 2015 Performance thru April Fiscal Year YTD (through April) FY 2014 FY 2015 Percentage Change Containerized Cargo TEUs 593,505 637,810 +7.5% Cruise

Average Tariff Adjustments

FY 2014 FY 2015 FY 2016(Proposed)

3.0% 3.0% 2.8%

20

Page 21: Annual Port Review · FY 2015 Performance thru April Fiscal Year YTD (through April) FY 2014 FY 2015 Percentage Change Containerized Cargo TEUs 593,505 637,810 +7.5% Cruise

Things On Your Radar