Annual Conference 2008Future Challenges for the Waste Management Industry

Waste Framework Directive -Impact on the European Waste Management Industry

Egbert Tölle, BDE, FEAD Vice President, Board member REMONDIS

REMONDIS – Your Partner For Water And Environmental Services

REMONDIS AG & Co. KG, 09/2008 FEAD Annual Conference 2008 3>

Revenue and Employees

Water and Circular Flow Economy

Revenue (2006) 2,332 Mio. €Revenue (2007) 4,000 Mio. €

Employees (2006) 15,136Employees (2007) 17,000

Logistics

Revenue (2006) 1,909 Mio. €Revenue (2007) 3,000 Mio. €

Employees (2006) 12,181Employees (2007) 14,000

Bio-Industries

Revenue (2006) 494 Mio. €Revenue (2007) 600 Mio. €

Employees (2006) 3,311Employees (2007) 3,500

Corporate Group

Revenue (2006) 4,735 Mio. €Revenue (2007) 7,600 Mio. €

Employees (2006) 30,628Employees (2007) 34,500

All figures (in this presentation) are consolidated, projection for 2007

REMONDIS AG & Co. KG, 09/2008 FEAD Annual Conference 2008 4>

We are one of the leading Water And Environmental Services Companies. The main facts summarised

REMONDIS offers a far reaching network with over 500 sites worldwide REMONDIS is present in 21 European countries as well as China, Japan, Taiwan and Australia REMONDIS services municipalities with over a total of 20 million inhabitants REMONDIS runs more than 6,000 commercial vehicles REMONDIS collects, processes and markets more than 25 million tonnes of recyclable materials

each year REMONDIS operates over 500 own facilities for Sorting, Treatment and Processing

REMONDIS AG & Co. KG, 09/2008 FEAD Annual Conference 2008 5>

Waste Framework Directive – Opportunities and risks

Opportunities for the European recycling and waste management industry:

- 5-step waste hierarchy

- principle of producer responsibility

- legal certainty through distinction between recovery and disposal

- acceptance of waste incineration plants as energy recovery facilities at a guaranteed efficiency of 60 % for existing plants (65% new plants)

- binding recycling targets for paper, glass, metal, plastic, construction and demolition waste until 2020

- increase of bio-waste recovery through a separate bio-waste directive

REMONDIS AG & Co. KG, 09/2008 FEAD Annual Conference 2008 6>

Waste Framework Directive – Opportunities and risks

Risks for the European recycling and waste management industry:

- extension of the principles of self-sufficiency and proximity to mixed municipal waste collected from private households destined for recovery

-Infringement of the principle of free circulation of goods for waste destined for recovery; in contradiction with the principle of the European Internal Market

- no clear distinction between waste and by-products

- no harmonized standards for the end of waste status

- Possibility to ban imports for waste destined for incineration

REMONDIS AG & Co. KG, 09/2008 FEAD Annual Conference 2008 7>

Example: Article 4 – waste hierarchy

The 5-step hierarchy: 1. Prevention 2. Preparing for Re-Use3. Recycling4. Other recovery, e.g. energy recovery; and5. Disposal

Exceptions:Possible departure from waste hierarchy where this is justified by life-cycle thinking on the overall impacts of the generation and management of such waste

REMONDIS AG & Co. KG, 09/2008 FEAD Annual Conference 2008 8>

Example: Bio-waste directive

Separate directive on bio-waste

The commission is asked to carry out an assessment on the management of bio-waste with a view to submit a proposal if appropriate. The assessment shall examine the opportunity of setting minimum requirements for bio-waste management and quality criteria for compost and digestate from bio-waste

Impact: Most positive. Accompanying measure to the landfill directive. Efficient contribution to climate protection through a decrease in methane gas emissions.

REMONDIS AG & Co. KG, 09/2008 FEAD Annual Conference 2008 9>

Example: Article 5 – by-productsCommon position on by-products:

1. Definition with 4 criteria, - further use of the substance or object is certain- the substance or object can be used directly without any further processing other than

normal industrial practice- the substance or object is produced as an integral part of a production process; and- further use is lawful, i.e. the substance or object fulfils all relevant product,

environmental and health protection requirements for the specific use and will not lead to overall adverse environmental or human health impacts 2. use of comitology with scrutiny to adopt measures to determine the criteria to be met for specific substances/objects to be regarded as a by-product

Extended compromise:Object/substance=by-product only when conditions are met. Since by-products fall into category of products, exports of by-products should meet the requirements of the relevant Community legislation.

REMONDIS AG & Co. KG, 09/2008 FEAD Annual Conference 2008 10>

Example: Recycling targets (article 9 & 11)

Agreed targets: 1. by 2020: re-use and recycling target: 50% for household and similar waste, 2. by 2020: re-use and recycling target: 70% for non-hazardous construction and demolition waste

Impact:Most positive. Defined and binding recycling targets, which have to be implemented by the member states, require the reinforcement of circular flow activities and investments in favour of climate protection.

REMONDIS AG & Co. KG, 09/2008 FEAD Annual Conference 2008 11>

Example: Classification of energy recovery / disposal

Classification of energy recovery / disposal

Waste incineration plants can be approved as energy recovery facilities if their energy efficiency is as high as 65 % for new plants and 60 % for existing plants.

Impact: support of high energy efficient waste incineration; electricity and heat generation through waste incineration helps to preserve primary resources.

Potential risk associated with implementation: „possibility of deviation“ from the application of the energy efficiency clause based on local climatic conditions. Market distortion through unequal thresholds.

REMONDIS AG & Co. KG, 09/2008 FEAD Annual Conference 2008 12>

Example: Self-sufficiency and proximity principle, (article 16)

Common position: - establishment of an integrated and adequate network of waste disposal installations

and of installations for the recovery of mixed municipal waste collected from private households and similar waste from other producers

- member states may limit incoming and outgoing shipments of waste for energy recovery (thermal treatment)

FEAD position:

The extension of the self-sufficiency and proximity principle to waste destined for recovery

= is an infringement of the internal market through national protectionism = counteracts the environmental objective of a „European Recycling Society“= limits the effective use of resources= limitation of the free movement of goods

REMONDIS AG & Co. KG, 09/2008 FEAD Annual Conference 2008 13>

Example: Self-sufficiency and proximity principle, (article 16)

Waste quantities vs. plant capacities in Germany

..

0

5

10

15

20

25

30

35

40

45

50

Kapazitäten 2012 Abfallaufkommen 2012

Überhang 8,7 Mio. t

in Mio. t

0

5

10

15

20

25

30

35

40

45

50

Kapazitäten 2005 Abfallaufkommen 2005

in Mio. t

Lücke 8,5 Mio. t

Stichtag TASi 01.06.2005 Prognose 2012*

zusätzliche MVA-

Forcierung Bioabfallkompostierung

MVA- KapazitätenMVA- KapazitätenMVA- KapazitätenMVA- Kapazitäten MBA- KapazitätenMBA- KapazitätenMBA- KapazitätenMBA- Kapazitäten

0

5

10

15

20

25

30

35

40

45

50

Capacities 2012 Waste arisings 2012

backlog 8,7 Mio. t

in million tons

0

5

10

15

20

25

30

35

40

45

50

Kapazitäten 2005 Abfallaufkommen 2005

in Mio. t

Lücke 8,5 Mio. t

0

5

10

15

20

25

30

35

40

45

50

Capacities 2005 Waste arisings 2005

in million tons

Gap 8,5 Mio. t

Due date: TASi, 1 June 2005 Forecast 2012*

zusätzliche MVA-additional WI-capacities- additional BM-capacities--

Promotion of bio-waste composting Bulky refuse and industrial waste recovery

MVA- KapazitätenMVA- KapazitätenMVA- KapazitätenMVA- KapazitätenMVA- KapazitätenWaste incineration capacities--- MBA- KapazitätenMBA- KapazitätenMBA- KapazitätenMBA- KapazitätenMBA- KapazitätenMBA- KapazitätenMBA- KapazitätenBio-mechanical treatment capacities-

• Planned capacities in the Netherlands not taken into account. • Impact on German market to be expected.

Refuse derived fuel capacities

Additional Refuse derived fuel capacities

REMONDIS AG & Co. KG, 09/2008 FEAD Annual Conference 2008 14>

Requirements

Maintenance of free circulation of goods also for mixed municipal waste for recovery

Unequivocal distinction between waste and by-product during implementation in the member states

Harmonized EU standards for the end of waste status

Thank you very much for your attention.