Annexures to Water Flushing, Air Blowing Procedures

Embed Size (px)

DESCRIPTION

Water flushing, air blowings.

Citation preview

  • sgskp72TypewriterAnnex - 1 (typical air blowing loops.).
  • sgskp72TypewriterAnnex - 2 (Air blowing/ water flushing test records formats.).
  • sgskp72TypewriterAnnex - 3 (typical water flushing loops.).
  • PLPL COMMISSIONING ORGANOGRAM - SHELL MARINA LOBP-GMP PROJECT

    Commissioning Manager

    Manoj K. Vijay

    Commissioning Engineer ( Piping )

    Mukesh

    Commissioning Engineer (Process)

    ( M.K.Bandopadhyay)

    Commissioning Engineer (Mechanical Packages /

    Equipment)

    P.Shijumon)

    Commissioning Engineer (E & I)

    A.Ghosh

    PTW Coordinator

    Jeeva

    Permit Coordinator

    Bheema Rao

    FPD Coordinator

    Rajesh Valluri.

    Systemization,Test pack & Loop Folder

    Philip Soriano Iris

    Project Manager

    Ashok Singh

    Project Director

    Pranab Basu

    Reporting Liaison

    Commissioning Advisor

    M. K. Bandopadhyay

    HSSE MANAGER

    Prashant Diwedi

    Construction Manager

    Ajai (LOBP) Maran (GMP)

    Engineering Coordinator

    Anuj

    HFE Coordinator

    TBA

    Planner / Scheduler / Controller /Coordinator

    Shinoj PP

    Punch list coordinator / Field Commissioning & Facility (Temp)

    Lead

    Dileep Nair

    Document Controller

    Fatimah / Myrna

    PLL Field Commissioning team & Commissioning subcontractors / package vendors (Supported by Shell operators)

    Project Controls

    Sabya Sachi Sahoo / Omar

    QA/QC Manager

    Srinivasa Rao

    I & C Commissioning engineer

    TBA

    sgskp72TypewriterAnnex - 4 (Organogram.).