ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC COMPLIANCE REPORT A. COMPLIANCE WITH NOC & CC&A B. EC COMPLIANCE REPORT OF ONE YEAR

ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC COMPLIANCE REPORT

A. COMPLIANCE WITH NOC & CC&A

B. EC COMPLIANCE REPORT OF ONE YEAR

Page 2: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 3: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 4: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 5: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 6: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 7: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

COMPLIANCE REPORT OF CONSENTS AND AUTHORIZATION

For Water (Prevention and control of pollution) ACT –1974, Air (Prevention And Control of Pollution) Act – 1981

and Authorization under Hazardous waste –Management Rules -2008:

Order Ref. No. : WH-12518, Dated: 22-02-2012, valid up to 08/01/2017.

LIST OF PRODUCTS & PRODUCTION CAPACITY PER MONTH AS PER CONSET TO OPERATE:

Sr.

No.

Name of the Product Quantity (Kg/Month) as per CC&A

1 L-Methyl-Seleno Cystine 10.00

2 L-Seleno Methionine 30.00

3 5-Bromo-Benzo Thiophene 25.00

4 4-Cyclohexanone Mono Ketal 10.00

5 1, 1 – Dimethoxy Cyclohexane 30.00

6 Methyl Acetate 4.625

7 Methanol 7.50

8 Methyl Formate 12.856

Compliance of subjective conditions :

Sr. No. CONDITION COMPLIANCE STATUS

Condition Under Water Act.1974

2.1. The quantity of Industrial effluent to be generated

from the manufacturing process and other ancillary

industrial operation shall not exceed 330 lits/ day.

We do comply with this condition

2.2 The quantity of the domestic waste water (sewage)

shall not exceed 1000 lits/day.

We are and we shall comply with the

condition.

3.1 The effluent from the industrial unit shall conform to

the CETP inlet norms mentioned in column No.2

below. The final discharge from CETP shall adhere to

the prescribed standards for CETP.

We are and we shall comply with the

condition.

3.2 In the event of the effluent from industrial unit not

rounted through CETP, the applicant shall provide

adequate effluent treatment system in order to

achieve the quality of the treated effluent as per GPCB

norms mentioned in column No.3

All efforts shall be made to remove colour &

unpleasant Odour as far as practicable.

We are and we shall comply with the

condition.

3.3 The final treated effluent conforming to the above

standards shall be discharged into CETP Vapi & shall

ultimately be conveyed into tidal zone of river

Damanganga.

We are and we shall comply with the

condition.

3.4 Sewage shall be disposed of through septic tank/soak We are and we shall comply with the

Page 8: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

pit system and shall be discharged into underground

drainage system.

condition.

Compliance of conditions under Hazardous Wastes Rules :

Sr. No. CONDITION COMPLIANCE REPORT

4.1 The process emission through various stacks/vent of

reactors , process vessel shall conform to the

following standards:

We are and we shall comply with the

condition.

4.2 The applicant shall provide portholes, ladder,

platform etc at chimney(s) for monitoring the air

emission and the same shall be open for inspection

to/and for use of the Board’s staff. The chimney (s)

vents attached to various source shall be designed

by numbers such as S-I.S-2 etc. and these shall be

painted/displayed to facilitate identification

We are and we shall comply with the

condition.

4.3 The Industry shall take adequate measures for

control of noise level from its own sources within

the premises so as to maintain ambient air quality

standards in respect of noise less than 75 dB

during day time and 70 dB(A)during night time.

Day time is recorded to be between 6 a.m. to 10

p.m. and night time is recorded between 10 p.m.

and 6.00 a.m

We are and we shall comply with the

condition.

General Conditions:

5.1. Any change in personal, equipment or working

conditions as mentioned in the consents

form/order should immediately be intimated to

this Board.

We are and we shall comply with the condition.

5.2. Applicant shall also comply with the general

conditions given in annexure I.

We are and we shall comply with the condition.

AUTHORISATION FOR THE MANAGEMNENT & HANDLING OF HAZARDOUS WASTES

FROM-2:

6.1 Number of authorization: AWH-31988 Date of

issue: 19/03/2009.

We are and we shall comply with the condition.

6.2 The authorization is granted to operate a facility

for collection, storage within factory premises

transportation and ultimate disposal of hazardous

wastes at TSDF developed by the Vapi Waste &

Effluent Management Co. Ltd- Vapi.

We are and we shall comply with the condition.

6.3 The authorization shall be valid up to 21/12/2013. We are and we shall comply with the condition.

6.4 The authorization is subject to the conditions

stated below and such other conditions as may be

specified in the rules from time to time under the

Environment (Protection) Act-1986.

We are and we shall comply with the condition.

6.5 Terms & conditions of Authorisation (a to g). We are and we shall comply with the condition.

Page 9: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

6.6 In addition to above terms and conditions Industry

shall also comply following directives issued by the

Supreme Court of India dated 14th October 2003.

(a & b)

We are and we shall comply with the condition.

Page 10: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 11: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 12: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 13: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 14: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

ANNEXURE II: TABULAR REPORT FOR COMPLIANCE WITH AWARDED TORs

Page 15: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

M/S. EBURON ORGANICS (I) PVT. LTD.

EIA Consultant Organization: Unistar Environment & Research Labs Pvt. Ltd.

(QCI-NABET Provisionally Accredited Consultant Organization)

Annexure –II : TOR compliance Page: 1

EIA Report for: Proposed Expansion of Synthetic Organic Manufacturing Unit GIDC Estate, Vapi, Dist. Valsad, Gujarat. (Category: 5(f)“B”)

ANNEXURE: II POINT WISE TABULAR COMPLIANCE OF AWARDED TOR

Draft Terms of Reference (TOR) have been discussed and finalized during the 26th Expert Appraisal Committee (Industry-2) meeting heldon 17th –18th August, 2011 for preparation of EIA/EMP. The letter of awarded TORs was issued by Expert Appraisal Committee of MoEF, New Delhi on 4th November 2011 wide letter No. F.NO.J-11011/317/2011 – IA II (I). The EIA study has been conducted by EIA Consultant – M/S. Unistar Environment & Research Labs Pvt. Ltd. The consulting organization for EIA has been accredited under NABET scheme for the Sector of Synthetic Organic Chemicals. Following are the particulars of Awarded TOR Points &point wise compliance status with compliance note:

PARTICULAR OF AWARDED TOR POINTS COMPLIANCE STATUS & NOTE

1. Executive summary of the project Complied The document of Executive Summary has been submitted with the present EIA report.

2. Justification of the project. Complied The justification of the project has been explained in EIA Report under Chapter 1, Section-1.3.1.

3. Promoters and their back ground. Complied The details of promoters of the company has been given in EIA Report under Chapter 1, Section-1.2

4. Regulatory framework. Complied The Regulatory Framework applicable to the project has been explained in EIA Report under Chapter 1, Section-1.4

5. Environmental clearance / consents to operate accorded by the Ministry/GPCB for their existing unit alongwith point-wise compliance report may be submitted.

Complied Environmental Status of Existing Units is Enclosed as Annexure-I

6. Notice/directions issued by the regulatory agencies under the Water Act, 1974 the Air Act 1981 and directions issued under the of E (P) Act, 1986 during the last one year

Complied Not Applicable

Page 16: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

M/S. EBURON ORGANICS (I) PVT. LTD.

EIA Consultant Organization: Unistar Environment & Research Labs Pvt. Ltd.

(QCI-NABET Provisionally Accredited Consultant Organization)

Annexure –II : TOR compliance Page: 2

EIA Report for: Proposed Expansion of Synthetic Organic Manufacturing Unit GIDC Estate, Vapi, Dist. Valsad, Gujarat. (Category: 5(f)“B”)

7. Copy of Gazette Notification issued by the Govt. of Gujarat indicating project is located in the industrial area.

Complied Copy of Gazette Notification enclosed as Annexure-VI.

8. A map indicating location of the project and distance from severely polluted area

Complied The map has been presented in EIA Report under Chapter 1, Figure 1.1 & 1.2 &Chapter 2, Figure 2.1

9. Project location and plant layout. Complied The project location map & layout of premises have been presented in EIA Report under Chapter 1, Figure 1.1 & 1.2 & Chapter 2, Figure 2.2 & Annexure V.

10. Infrastructure facilities including power sources. Complied The infrastructure facilities required for the project have been explained in EIA Report under Chapter 2, Section 2.2

11. Total cost of the project along with total capital cost and recurring cost/annum for environmental pollution control measures.

Complied The total cost & break up including capital & recurring cost for environmental pollution control measures has been presented in EIA Report under Chapter 2, Section 2.4.5

12. Project site location along with site map of 10 km area and site details providing various industries, surface water bodies, forests etc.

Complied The project site location & map of 10 km area with necessary features has been presented in EIA Report under Chapter 3, Figure 3.1

13. Present land use based on satellite imagery for the study area of 10 km radius.

Complied The present land use based on IRS P6 LISS III satellite image has been presented in EIA Report under Chapter 3, Section 3.3.1.3 &Figure 3.3(a) to Figure 3.3(c)

14. Location of National Park/Wild life sanctuary/Reserve Forest within 10 km radius of the project.

Complied No NP/WLS with in 10 km radius of project site. Details are given in EIA Report under Chapter 3, Section 3.2.1 & Table 3.1.

15. Permission from State Forest Department regarding the Impact of the proposed plant on the surrounding

Complied As there is no reserved forest

Page 17: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

M/S. EBURON ORGANICS (I) PVT. LTD.

EIA Consultant Organization: Unistar Environment & Research Labs Pvt. Ltd.

(QCI-NABET Provisionally Accredited Consultant Organization)

Annexure –II : TOR compliance Page: 3

EIA Report for: Proposed Expansion of Synthetic Organic Manufacturing Unit GIDC Estate, Vapi, Dist. Valsad, Gujarat. (Category: 5(f)“B”)

reserve forest. within 10 km radius hence permission from state forest department is not applicable.

16. Details of the total land and break-up of the land use for green belt and other uses.

Complied The breakup of plot area/land of the existing & proposed project has been presented in EIA Report under Chapter 2, Section 2.4.1, and Table-2.3.

17. List of products along with the production capacities. Complied The list of existing & proposed project has been tabulated in EIA Report under Chapter 2, Section 2.3, and Table-2.2.

18. Detailed list of raw material required and source, mode of storage and transportation.

Complied The details of raw materials have been explained in EIA Report under Chapter 2, Section 2.5.2, and Table-2.8.

19. Manufacturing process details along with the chemical reactions and process flow chart.

Complied The detail has been explained in EIA Report under Chapter 2, Section 2.5.3.

20. Action plan for the transportation of raw material and products.

Complied The action plan for transportation of raw materials has been shown in EIA Report under Chapter 2, 2.5.2

21. Site-specific micro-meteorological data using temperature, relative humidity, hourly wind speed and direction and rainfall is necessary.

Complied The site specific micro-meteorological data has been presented in EIA Report under Chapter 3, Section 3.3.2

22. Ambient air quality monitoring at 6 locations within the study area of 5 km., aerial coverage from project site as per NAAQES notified on 16th September, 2009. Location of one AAQMS in downwind direction.

Complied The details of ambient air quality monitoring at 6 locations has been explained in EIA Report under Chapter 3, Section 3.3.3

23. One season site-specific micro-meteorological data using temperature, relative humidity, hourly wind speed and direction and rainfall and AAQ data (except monsoon) for PM10, SO2, NOx including VOCs should be collected. The monitoring stations should take into account the pre-dominant wind direction, population zone and sensitive receptors including reserved

Complied One season data of site specific micrometeorology has been presented in EIA Report under Chapter 3, Section 3.3.2 One season data of ambient air quality monitoring for PM10, SO2,

Page 18: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

M/S. EBURON ORGANICS (I) PVT. LTD.

EIA Consultant Organization: Unistar Environment & Research Labs Pvt. Ltd.

(QCI-NABET Provisionally Accredited Consultant Organization)

Annexure –II : TOR compliance Page: 4

EIA Report for: Proposed Expansion of Synthetic Organic Manufacturing Unit GIDC Estate, Vapi, Dist. Valsad, Gujarat. (Category: 5(f)“B”)

forests. Data for water and noise monitoring should also be included.

NOx including HC and VOCshas been presented in EIA Report under Chapter 3, Section 3.3.3

24. Air pollution control measures proposed for the effective control of gaseous emissions within permissible limits.

Complied Air Pollution Control Measures proposed for the project has been described in EIA Report under Chapter 2, Section 2.7.1 & Chapter 8, Section 8.3.1.

25. Name of all the solvents to be used in the process and details of solvent recovery system.

Complied Name of the solvents to be used in the process and details of solvent recovery system has been described in EIA Report under Chapter 8, of Section 8.3.10.

26. Design details of ETP, incinerator, if any, along with control of Dioxin & Furan, boiler, scrubbers/bag filters etc.

Complied Details ETP& boiler and scrubbers has been described in EIA Report under Chapter 2, Section 2.7

27. Action plan to control ambient air quality as per NAAQES Standards notified by the Ministry on 16th September, 2009.

Complied Action plan to control ambient air quality as per NAAQES Standards notified by the Ministry on 16thSeptember, 2009 has been described in EIA Report under Chapter 5 as Environmental Monitoring Plan and as EMP in Chapter 2, Section 2.7.1 & Chapter 8, Section 8.4.3

28. An action plan to control and monitor secondary fugitive emissions from all the sources.

Complied As Above point 26.

29. Determination of atmospheric inversion level at the project site and assessment of ground level concentration of pollutants from the stack emission based on site-specific meteorological features. Air quality modelling for proposed plant.

Complied The details regarding Modeling for Emission & Ambient Air Quality has been described in EIA Report under Chapter 4, Section 4.3.2

30. Permission for the drawl of 6.05 m3/day GIDC water should be obtained. Water balance chart including quantity of effluent generated recycled and reused and effluent discharge.

Complied The letter from GIDC water Supply Department has been presented in EIA Report under Annexure VII.

31. Action plan for ‘zero’ discharge of effluent as proposed should be included. Explore the recycling of process water.

Complied No effluent will be disposed off. Blow down from Boiler & Cooling system will be used in scrubber

Page 19: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

M/S. EBURON ORGANICS (I) PVT. LTD.

EIA Consultant Organization: Unistar Environment & Research Labs Pvt. Ltd.

(QCI-NABET Provisionally Accredited Consultant Organization)

Annexure –II : TOR compliance Page: 5

EIA Report for: Proposed Expansion of Synthetic Organic Manufacturing Unit GIDC Estate, Vapi, Dist. Valsad, Gujarat. (Category: 5(f)“B”)

for recovery of HCl. Thus the proposed project will be Zero Discharge Unit. The existing unit is also Zero Discharge Unit. Details are presented in EIA Report under Chapter 2, section 2.7.2.

32. Ground water quality monitoring minimum at 6 locations should be carried out

Complied The details of Ground water quality monitoring at 6 locations has been explained in EIA Report under Chapter 3, Section 3.3.4.3 and table-3.8.

33. The details of solid and hazardous wastes generation, storage, utilization and disposal particularly related to the hazardous waste calorific value of hazardous waste and detailed characteristic of the hazardous waste. Action plan for the disposal of fly ash generated from boiler should be included.

Complied The details of hazardous wastes have been described in EIA Report under Chapter 2, Section 2.4.3. There is no Fly ash generation from existing & proposed project. Boiler will be operated using LDO as fuel.

34. Precautions to be taken during storage and transportation of hazardous chemicals should be clearly mentioned and incorporated.

Complied The details of precautions to be taken during storage & transportation have been described in EIA Report under Chapter 2, Section 2.4.5 & 2.7.1 and in Risk Assessment Report (Annexure IV)

35. A copy of the Memorandum of Understanding signed with cement manufacturers indicating clearly that they will utilized all the organic solid waste generated.

Complied There will be no organic solid waste to dispose-off through cement industry.

36. Authorization/Membership for the disposal of liquid effluent in CETP and solid/hazardous waste in TSDF.

Complied The copies of TSDF&CEPT membership have been presented in EIA Report under Annexure IX.

37. Risk assessment for storage for chemicals/solvents. Action plan for handling & safety system.

Complied The Risk Assessment Report has been enclosed in EIA Report under Annexure IV.

38. An action plan to develop green belt in 33 % area Complied The details of greenbelt development have been described in EIA Report under Chapter 2, Section 2.4.7.1 &

Page 20: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

M/S. EBURON ORGANICS (I) PVT. LTD.

EIA Consultant Organization: Unistar Environment & Research Labs Pvt. Ltd.

(QCI-NABET Provisionally Accredited Consultant Organization)

Annexure –II : TOR compliance Page: 6

EIA Report for: Proposed Expansion of Synthetic Organic Manufacturing Unit GIDC Estate, Vapi, Dist. Valsad, Gujarat. (Category: 5(f)“B”)

Chapter 8, Section 8.4.9.1.

39. Action plan for rainwater harvesting measures at plant site should be included to harvest rainwater from the roof tops and storm water drains to recharge the ground water.

Complied The details of rainwater harvesting measures have been described in EIA Report under Chapter 2, Section 2.4.7.2 & Chapter 8, Section 8.4.9.2.

40. Occupational health of the workers needs to be carried out. Action plan may be included

Complied The details of occupational health of worker have been described in EIA Report under Chapter 2, Section 2.4.6 & Chapter 8, Section 8.4.7.

41. Socio-economic development activities should be in place.

Complied The details of socioeconomic development activities have been described in EIA Report under Chapter 8, Section 8.4.6.

42. Note on compliance to the recommendations mentioned in the CREP guidelines.

As the project activities does not cover under CREP hence this is not applicable to unit.

43. Detailed Environment management Plan (EMP) with specific reference to details of air pollution control system, water & wastewater management, monitoring frequency, responsibility and time bound implementation plan for mitigation measure should be provided.

Complied The detailed EMP for proposed project has been prepared covering all necessary measures & action plans. The prepared EMP focusing on all mitigation measures & action plan required for control & prevention of probable impacts of the proposed project has been described in EIA Report under Chapter 8.

44. EMP should include the concept of waste-minimization, recycle / reuse / recover techniques, Energy conservation, and natural resource conservation.

Complied The detailed EMP have been described in EIA Report under Chapter 8.The details of energy conservation, waste minimization &reuse/recyle, resource recovery & reuse/recycling etc. have been described as Cleaner Production Measures in EIA Report under Chapter 8, Section 8.4.8.

45. Total capital cost and recurring cost/annum for environmental pollution control measures.

Complied The details of capital & recurring cost for environmental pollution

Page 21: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

M/S. EBURON ORGANICS (I) PVT. LTD.

EIA Consultant Organization: Unistar Environment & Research Labs Pvt. Ltd.

(QCI-NABET Provisionally Accredited Consultant Organization)

Annexure –II : TOR compliance Page: 7

EIA Report for: Proposed Expansion of Synthetic Organic Manufacturing Unit GIDC Estate, Vapi, Dist. Valsad, Gujarat. (Category: 5(f)“B”)

control measures have been described in EIA Report under Chapter 5, Section 5.2.5.

46. Any litigation pending against the project and/or any direction/order passed by any Court of Law against the project, if so, details thereof.

Complied No litigation is pending against the project and/or no direction/order is passed by any Court of Law against the project.

47. A tabular chart with index for point wise compliance of above TORs.

Complied The present Annexure.

The following general points have been noted & followed for conducting EIA study & preparation & submission of EIA Report:

i. All documents should be properly indexed, page numbered.

ii. Period/date of data collection should be clearly indicated. iii. Authenticated English translation of all material provided in Regional languages. iv. The letter/application for EC should quote the MOEF file No. and also attach a copy of the

letter. v. The copy of the letter received from the Ministry should be also attached as an annexure

to the final EIA-EMP Report. vi. The final EIA-EMP report submitted to the Ministry must incorporate the issues in this

letter. The index of the final EIA-EMP report must indicate the specific chapter and page no. of the EIA-EMP Report.

vii. While preparing the EIA report, the instructions for the proponents and instructions for the consultants issued by MoEF vide O.M. No. J-11013/41/2006-IA.II (I) dated 4th August, 2009, which are available on the website of this Ministry should also be followed.

viii. The consultants involved in the preparation of EIA/EMP report after accreditation with Quality Council of India (QCl)/National Accreditation Board of Education and Training (NABET) would need to include a certificate in this regard in the EIA/EMP reports prepared by them and data provided by other organization/Laboratories including their status of approvals etc. In this regard, circular no. J-11013/77/2004-IA II(I) dated 2nd December, 2009 and 30th June, 2011 available on the Ministry’s website http://www.moef.nic.in may be referred.

ix. Certificate of Accreditation issued by the QCI to the environmental consultant should be included.

Page 22: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

ANNEXURE III: MSDS OF CHEMICALS

1. Phenol 2. Isodecanol 3. 2-ethyl hexanol 4. Phosphorus trichloride 5. Phosphorous pentoxide 6. Phosphoric Acid 7. Trisdecyl alcohol 8. Nonyl phenol 9. Tri phenyl phosphate 10. HCl (l)

Page 23: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

ANNEXURE V: DETAILED LAYOUT OF PLANT & PREMISES

Page 24: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 25: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

ANNEXURE VI: COPY LETTER OF PLOT ALLOTMENT LETTER FROM GIDC – VAPI & NOTIFICATION REGARDING GIDC - VAPI

Page 26: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 27: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 28: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 29: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 30: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 31: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 32: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 33: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 34: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 35: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 36: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 37: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

ANNEXURE VII: COPY LETTER FOR WATER SUPPLY FROM GIDC WATER SUPPLY DEPARTMENT

Page 38: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 39: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

ANNEXURE VII: COPY LETTER FOR TSDF & CETP MEMBERSHIP

Page 40: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 41: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 42: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 43: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 44: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

ANNEXURE IX: Site specific Meteorological data &

Air quality modeling Result (PM10, SOx, NOx & HCl)

Page 45: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

Eburon Organics (I) Pvt. Ltd. GIDC, Vapi 

1  

ANNEXURE‐IX 

Site Specific Micrometeorological Data and  

Air Quality Modelling Results (PM10, SOx, NOx, HCl and VOC) 

 

TEMPERATURE 0C 

Month  Max  Min 

October‐2011  38.5  25.9 

November‐2011  37.7  24.3 

December‐2011  36.5  14.0 

 

RELATIVE HUMIDITY (%) 

Month  Max  Min 

October‐2011  86  16 

November‐2011  85  19 

December‐2011  85  20 

 

SPEED (M/Sec) 

Month  Max  Min 

October‐2011  5.90  0.21 

November‐2011  6.30  0.10 

December‐2011  5.60  0.17 

 

Page 46: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

Eburon Organics (I) Pvt. Ltd. GIDC, Vapi 

2  

 

 

Page 47: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

Eburon Organics (I) Pvt. Ltd. GIDC, Vapi 

3  

 

 

Page 48: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

1 PM10

Discrete Receptor

X        Y       

Concentration (AVERAGE CONC) 

[ug/m^3]

Elevation (ZELEV)

Hill Heights (ZHILL)

Flagpole (ZFLAG)

Averagin Period (AVE)

Source Group (GRP)

Rank Net ID Date (DATE(CON)  

                  ‐5000 ‐5000 0.02031 18 18 0 24‐HR         ALL              1ST  UCART1 12/30/2011  24 hr                  ‐4000 ‐5000 0.02594 18 18 0 24‐HR         ALL              1ST  UCART1 12/31/2011  24 hr                  ‐3000 ‐5000 0.02336 18 18 0 24‐HR         ALL              1ST  UCART1 12/20/2011  24 hr                  ‐2000 ‐5000 0.02744 18 18 0 24‐HR         ALL              1ST  UCART1 11/4/2011  24 hr                   ‐1000 ‐5000 0.02547 18 18 0 24‐HR         ALL              1ST  UCART1 10/17/2011  24 hr                  0 ‐5000 0.00866 18 18 0 24‐HR         ALL              1ST  UCART1 10/18/2011  24 hr                  1000 ‐5000 0.00252 18 18 0 24‐HR         ALL              1ST  UCART1 10/16/2011  24 hr                  2000 ‐5000 0.00504 18 18 0 24‐HR         ALL              1ST  UCART1 11/30/2011  24 hr                  3000 ‐5000 0.00372 18 18 0 24‐HR         ALL              1ST  UCART1 12/7/2011  24 hr                   4000 ‐5000 0.00388 18 18 0 24‐HR         ALL              1ST  UCART1 12/7/2011  24 hr                   5000 ‐5000 0.0037 18 18 0 24‐HR         ALL              1ST  UCART1 11/3/2011  24 hr                   ‐5000 ‐4000 0.0193 18 18 0 24‐HR         ALL              1ST  UCART1 12/28/2011  24 hr                  ‐4000 ‐4000 0.02604 18 18 0 24‐HR         ALL              1ST  UCART1 12/30/2011  24 hr                  ‐3000 ‐4000 0.03629 18 18 0 24‐HR         ALL              1ST  UCART1 12/31/2011  24 hr                  ‐2000 ‐4000 0.02757 18 18 0 24‐HR         ALL              1ST  UCART1 10/12/2011  24 hr                  ‐1000 ‐4000 0.02251 18 18 0 24‐HR         ALL              1ST  UCART1 11/7/2011  24 hr                   0 ‐4000 0.01075 18 18 0 24‐HR         ALL              1ST  UCART1 10/18/2011  24 hr                  1000 ‐4000 0.00651 18 18 0 24‐HR         ALL              1ST  UCART1 11/30/2011  24 hr                  2000 ‐4000 0.00312 18 18 0 24‐HR         ALL              1ST  UCART1 10/16/2011  24 hr                  3000 ‐4000 0.00563 18 18 0 24‐HR         ALL              1ST  UCART1 12/7/2011  24 hr                   4000 ‐4000 0.00351 18 18 0 24‐HR         ALL              1ST  UCART1 11/3/2011  24 hr                   5000 ‐4000 0.00583 18 18 0 24‐HR         ALL              1ST  UCART1 10/4/2011  24 hr                   ‐5000 ‐3000 0.03075 18 18 0 24‐HR         ALL              1ST  UCART1 11/27/2011  24 hr                  ‐4000 ‐3000 0.02436 18 18 0 24‐HR         ALL              1ST  UCART1 12/28/2011  24 hr                  ‐3000 ‐3000 0.03468 18 18 0 24‐HR         ALL              1ST  UCART1 12/28/2011  24 hr                  ‐2000 ‐3000 0.04643 18 18 0 24‐HR         ALL              1ST  UCART1 12/31/2011  24 hr                  ‐1000 ‐3000 0.02536 18 18 0 24‐HR         ALL              1ST  UCART1 10/21/2011  24 hr                  0 ‐3000 0.0137 18 18 0 24‐HR         ALL              1ST  UCART1 10/18/2011  24 hr                  1000 ‐3000 0.01223 18 18 0 24‐HR         ALL              1ST  UCART1 11/30/2011  24 hr                  2000 ‐3000 0.00506 18 18 0 24‐HR         ALL              1ST  UCART1 12/7/2011  24 hr 

PM10 ‐ Dispersing Modeling Result 

Page 49: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

2 PM10

                  3000 ‐3000 0.00426 18 18 0 24‐HR         ALL              1ST  UCART1 10/17/2011  24 hr                  4000 ‐3000 0.00826 18 18 0 24‐HR         ALL              1ST  UCART1 10/4/2011  24 hr                   5000 ‐3000 0.00876 18 18 0 24‐HR         ALL              1ST  UCART1 11/29/2011  24 hr                  ‐5000 ‐2000 0.03645 18 18 0 24‐HR         ALL              1ST  UCART1 12/21/2011  24 hr                  ‐4000 ‐2000 0.05067 18 18 0 24‐HR         ALL              1ST  UCART1 11/27/2011  24 hr                  ‐3000 ‐2000 0.03797 18 18 0 24‐HR         ALL              1ST  UCART1 11/27/2011  24 hr                  ‐2000 ‐2000 0.05062 18 18 0 24‐HR         ALL              1ST  UCART1 12/28/2011  24 hr                  ‐1000 ‐2000 0.04284 18 18 0 24‐HR         ALL              1ST  UCART1 12/28/2011  24 hr                  0 ‐2000 0.01701 18 18 0 24‐HR         ALL              1ST  UCART1 10/18/2011  24 hr                  1000 ‐2000 0.00876 18 18 0 24‐HR         ALL              1ST  UCART1 10/16/2011  24 hr                  2000 ‐2000 0.00779 18 18 0 24‐HR         ALL              1ST  UCART1 10/17/2011  24 hr                  3000 ‐2000 0.00831 18 18 0 24‐HR         ALL              1ST  UCART1 10/4/2011  24 hr                   4000 ‐2000 0.01808 18 18 0 24‐HR         ALL              1ST  UCART1 11/29/2011  24 hr                  5000 ‐2000 0.00766 18 18 0 24‐HR         ALL              1ST  UCART1 11/30/2011  24 hr                  ‐5000 ‐1000 0.02449 18 18 0 24‐HR         ALL              1ST  UCART1 12/23/2011  24 hr                  ‐4000 ‐1000 0.03553 18 18 0 24‐HR         ALL              1ST  UCART1 12/24/2011  24 hr                  ‐3000 ‐1000 0.0497 18 18 0 24‐HR         ALL              1ST  UCART1 12/21/2011  24 hr                  ‐2000 ‐1000 0.08224 18 18 0 24‐HR         ALL              1ST  UCART1 11/27/2011  24 hr                  ‐1000 ‐1000 0.06356 18 18 0 24‐HR         ALL              1ST  UCART1 12/28/2011  24 hr                  0 ‐1000 0.02821 18 18 0 24‐HR         ALL              1ST  UCART1 10/1/2011  24 hr                   1000 ‐1000 0.01917 18 18 0 24‐HR         ALL              1ST  UCART1 10/17/2011  24 hr                  2000 ‐1000 0.02849 18 18 0 24‐HR         ALL              1ST  UCART1 11/29/2011  24 hr                  3000 ‐1000 0.0105 18 18 0 24‐HR         ALL              1ST  UCART1 11/30/2011  24 hr                  4000 ‐1000 0.00637 18 18 0 24‐HR         ALL              1ST  UCART1 10/17/2011  24 hr                  5000 ‐1000 0.00699 18 18 0 24‐HR         ALL              1ST  UCART1 10/4/2011  24 hr                   ‐5000 0 0.02064 18 18 0 24‐HR         ALL              1ST  UCART1 12/27/2011  24 hr                  ‐4000 0 0.02678 18 18 0 24‐HR         ALL              1ST  UCART1 12/27/2011  24 hr                  ‐3000 0 0.03554 18 18 0 24‐HR         ALL              1ST  UCART1 12/27/2011  24 hr                  ‐2000 0 0.04284 18 18 0 24‐HR         ALL              1ST  UCART1 12/27/2011  24 hr                  ‐1000 0 0.03307 18 18 0 24‐HR         ALL              1ST  UCART1 12/21/2011  24 hr

SITE (1)          0 0 1.00E‐05 18 18 0 24‐HR         ALL              1ST  UCART1 12/7/2011  24 hr                   1000 0 0.02035 18 18 0 24‐HR         ALL              1ST  UCART1 10/3/2011  24 hr                   2000 0 0.0182 18 18 0 24‐HR         ALL              1ST  UCART1 10/3/2011  24 hr                   3000 0 0.01444 18 18 0 24‐HR         ALL              1ST  UCART1 10/3/2011  24 hr                   4000 0 0.01126 18 18 0 24‐HR         ALL              1ST  UCART1 10/3/2011  24 hr                   5000 0 0.00905 18 18 0 24‐HR         ALL              1ST  UCART1 10/3/2011  24 hr 

Page 50: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

3 PM10

                  ‐5000 1000 0.02453 18 18 0 24‐HR         ALL              1ST  UCART1 12/2/2011  24 hr                   ‐4000 1000 0.03167 18 18 0 24‐HR         ALL              1ST  UCART1 10/26/2011  24 hr                  ‐3000 1000 0.03884 18 18 0 24‐HR         ALL              1ST  UCART1 10/26/2011  24 hr

CHANDOR (3)       ‐2000 1000 0.02955 18 18 0 24‐HR         ALL              1ST  UCART1 10/26/2011  24 hr                  ‐1000 1000 0.01467 18 18 0 24‐HR         ALL              1ST  UCART1 11/30/2011  24 hr                  0 1000 0.01317 18 18 0 24‐HR         ALL              1ST  UCART1 11/23/2011  24 hr                  1000 1000 0.01206 18 18 0 24‐HR         ALL              1ST  UCART1 11/30/2011  24 hr                  2000 1000 0.03633 18 18 0 24‐HR         ALL              1ST  UCART1 11/26/2011  24 hr                  3000 1000 0.01971 18 18 0 24‐HR         ALL              1ST  UCART1 10/17/2011  24 hr                  4000 1000 0.00878 18 18 0 24‐HR         ALL              1ST  UCART1 10/4/2011  24 hr                   5000 1000 0.01221 18 18 0 24‐HR         ALL              1ST  UCART1 10/4/2011  24 hr                   ‐5000 2000 0.02729 18 18 0 24‐HR         ALL              1ST  UCART1 12/1/2011  24 hr                   ‐4000 2000 0.01956 18 18 0 24‐HR         ALL              1ST  UCART1 12/1/2011  24 hr                   ‐3000 2000 0.01418 18 18 0 24‐HR         ALL              1ST  UCART1 11/30/2011  24 hr                  ‐2000 2000 0.01461 18 18 0 24‐HR         ALL              1ST  UCART1 11/30/2011  24 hr                  ‐1000 2000 0.01781 18 18 0 24‐HR         ALL              1ST  UCART1 10/24/2011  24 hr                  0 2000 0.01164 18 18 0 24‐HR         ALL              1ST  UCART1 11/9/2011  24 hr                   1000 2000 0.05012 18 18 0 24‐HR         ALL              1ST  UCART1 11/24/2011  24 hr                  2000 2000 0.00886 18 18 0 24‐HR         ALL              1ST  UCART1 11/30/2011  24 hr                  3000 2000 0.01388 18 18 0 24‐HR         ALL              1ST  UCART1 11/25/2011  24 hr                  4000 2000 0.02044 18 18 0 24‐HR         ALL              1ST  UCART1 11/26/2011  24 hr                  5000 2000 0.01556 18 18 0 24‐HR         ALL              1ST  UCART1 10/17/2011  24 hr                  ‐5000 3000 0.01185 18 18 0 24‐HR         ALL              1ST  UCART1 11/30/2011  24 hr                  ‐4000 3000 0.01385 18 18 0 24‐HR         ALL              1ST  UCART1 11/30/2011  24 hr                  ‐3000 3000 0.01082 18 18 0 24‐HR         ALL              1ST  UCART1 11/30/2011  24 hr                  ‐2000 3000 0.01633 18 18 0 24‐HR         ALL              1ST  UCART1 11/23/2011  24 hr                  ‐1000 3000 0.00503 18 18 0 24‐HR         ALL              1ST  UCART1 11/29/2011  24 hr                  0 3000 0.00932 18 18 0 24‐HR         ALL              1ST  UCART1 11/9/2011  24 hr                   1000 3000 0.02073 18 18 0 24‐HR         ALL              1ST  UCART1 11/24/2011  24 hr                  2000 3000 0.03194 18 18 0 24‐HR         ALL              1ST  UCART1 11/9/2011  24 hr                   3000 3000 0.00728 18 18 0 24‐HR         ALL              1ST  UCART1 12/3/2011  24 hr                   4000 3000 0.01029 18 18 0 24‐HR         ALL              1ST  UCART1 10/30/2011  24 hr                  5000 3000 0.01122 18 18 0 24‐HR         ALL              1ST  UCART1 11/25/2011  24 hr                  ‐5000 4000 0.01085 18 18 0 24‐HR         ALL              1ST  UCART1 11/30/2011  24 hr                  ‐4000 4000 0.00803 18 18 0 24‐HR         ALL              1ST  UCART1 11/30/2011  24 hr                  ‐3000 4000 0.01357 18 18 0 24‐HR         ALL              1ST  UCART1 11/23/2011  24 hr

Page 51: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

4 PM10

                  ‐2000 4000 0.01045 18 18 0 24‐HR         ALL              1ST  UCART1 10/24/2011  24 hr                  ‐1000 4000 0.00746 18 18 0 24‐HR         ALL              1ST  UCART1 11/23/2011  24 hr                  0 4000 0.00686 18 18 0 24‐HR         ALL              1ST  UCART1 11/9/2011  24 hr                   1000 4000 0.00936 18 18 0 24‐HR         ALL              1ST  UCART1 11/29/2011  24 hr                  2000 4000 0.0298 18 18 0 24‐HR         ALL              1ST  UCART1 11/24/2011  24 hr                  3000 4000 0.01542 18 18 0 24‐HR         ALL              1ST  UCART1 11/24/2011  24 hr                  4000 4000 0.00677 18 18 0 24‐HR         ALL              1ST  UCART1 12/3/2011  24 hr                   5000 4000 0.00689 18 18 0 24‐HR         ALL              1ST  UCART1 10/21/2011  24 hr                  ‐5000 5000 0.00656 18 18 0 24‐HR         ALL              1ST  UCART1 12/1/2011  24 hr                   ‐4000 5000 0.00936 18 18 0 24‐HR         ALL              1ST  UCART1 11/23/2011  24 hr                  ‐3000 5000 0.00732 18 18 0 24‐HR         ALL              1ST  UCART1 10/24/2011  24 hr                  ‐2000 5000 0.00504 18 18 0 24‐HR         ALL              1ST  UCART1 10/25/2011  24 hr                  ‐1000 5000 0.01017 18 18 0 24‐HR         ALL              1ST  UCART1 11/23/2011  24 hr                  0 5000 0.00538 18 18 0 24‐HR         ALL              1ST  UCART1 10/10/2011  24 hr                  1000 5000 0.00818 18 18 0 24‐HR         ALL              1ST  UCART1 11/29/2011  24 hr                  2000 5000 0.01927 18 18 0 24‐HR         ALL              1ST  UCART1 11/24/2011  24 hr                  3000 5000 0.02248 18 18 0 24‐HR         ALL              1ST  UCART1 11/9/2011  24 hr                   4000 5000 0.01035 18 18 0 24‐HR         ALL              1ST  UCART1 11/24/2011  24 hr                  5000 5000 0.00602 18 18 0 24‐HR         ALL              1ST  UCART1 12/3/2011  24 hr 

SITE (1)          0 0 1.00E‐05 18 18 0 24‐HR         ALL              1ST         12/7/2011  24 hr PUNAT (2)         ‐2500 ‐1500 0.0611 18 18 0 24‐HR         ALL              1ST         11/27/2011  24 hrCHANDOR (3)       ‐2000 1000 0.02955 18 18 0 24‐HR         ALL              1ST         10/26/2011  24 hrCHHIRI (4)        2000 3800 0.02992 18 18 0 24‐HR         ALL              1ST         11/24/2011  24 hrKARWAD (5)        4000 1800 0.02089 18 18 0 24‐HR         ALL              1ST         11/26/2011  24 hrDUNGARA (7)      3500 ‐1500 0.01462 18 18 0 24‐HR         ALL              1ST         11/29/2011  24 hr

Page 52: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

1 SO2

Discrete Receptor X        Y       

Concentration (AVERAGE CONC) 

[ug/m^3]

Elevation (ZELEV)

Hill Heights (ZHILL)

Flagpole (ZFLAG)

Averagin Period (AVE)

Source Group (GRP)

Rank Net ID Date (DATE(CON)  

                  ‐5000 ‐5000 0.03942 18 18 0 24‐HR      ALL        1ST  UCART1 12/30/2011  24 hr                  ‐4000 ‐5000 0.05044 18 18 0 24‐HR      ALL        1ST  UCART1 12/31/2011  24 hr                  ‐3000 ‐5000 0.0453 18 18 0 24‐HR      ALL        1ST  UCART1 12/20/2011  24 hr                  ‐2000 ‐5000 0.06249 18 18 0 24‐HR      ALL        1ST  UCART1 11/4/2011  24 hr                   ‐1000 ‐5000 0.04972 18 18 0 24‐HR      ALL        1ST  UCART1 10/17/2011  24 hr                  0 ‐5000 0.01756 18 18 0 24‐HR      ALL        1ST  UCART1 10/18/2011  24 hr                  1000 ‐5000 0.00708 18 18 0 24‐HR      ALL        1ST  UCART1 10/20/2011  24 hr                  2000 ‐5000 0.01002 18 18 0 24‐HR      ALL        1ST  UCART1 11/30/2011  24 hr                  3000 ‐5000 0.00864 18 18 0 24‐HR      ALL        1ST  UCART1 12/7/2011  24 hr                   4000 ‐5000 0.00877 18 18 0 24‐HR      ALL        1ST  UCART1 12/7/2011  24 hr                   5000 ‐5000 0.00914 18 18 0 24‐HR      ALL        1ST  UCART1 11/3/2011  24 hr                   ‐5000 ‐4000 0.03981 18 18 0 24‐HR      ALL        1ST  UCART1 12/28/2011  24 hr                  ‐4000 ‐4000 0.05115 18 18 0 24‐HR      ALL        1ST  UCART1 12/30/2011  24 hr                  ‐3000 ‐4000 0.07095 18 18 0 24‐HR      ALL        1ST  UCART1 12/31/2011  24 hr                  ‐2000 ‐4000 0.06035 18 18 0 24‐HR      ALL        1ST  UCART1 10/12/2011  24 hr                  ‐1000 ‐4000 0.05158 18 18 0 24‐HR      ALL        1ST  UCART1 11/7/2011  24 hr                   0 ‐4000 0.02206 18 18 0 24‐HR      ALL        1ST  UCART1 10/18/2011  24 hr                  1000 ‐4000 0.01303 18 18 0 24‐HR      ALL        1ST  UCART1 11/30/2011  24 hr                  2000 ‐4000 0.00621 18 18 0 24‐HR      ALL        1ST  UCART1 10/17/2011  24 hr                  3000 ‐4000 0.01294 18 18 0 24‐HR      ALL        1ST  UCART1 12/7/2011  24 hr                   4000 ‐4000 0.00983 18 18 0 24‐HR      ALL        1ST  UCART1 11/3/2011  24 hr                   5000 ‐4000 0.01247 18 18 0 24‐HR      ALL        1ST  UCART1 10/4/2011  24 hr                   ‐5000 ‐3000 0.05896 18 18 0 24‐HR      ALL        1ST  UCART1 11/27/2011  24 hr                  ‐4000 ‐3000 0.05308 18 18 0 24‐HR      ALL        1ST  UCART1 12/28/2011  24 hr                  ‐3000 ‐3000 0.06879 18 18 0 24‐HR      ALL        1ST  UCART1 12/28/2011  24 hr                  ‐2000 ‐3000 0.09251 18 18 0 24‐HR      ALL        1ST  UCART1 12/31/2011  24 hr                  ‐1000 ‐3000 0.07074 18 18 0 24‐HR      ALL        1ST  UCART1 10/22/2011  24 hr                  0 ‐3000 0.02879 18 18 0 24‐HR      ALL        1ST  UCART1 10/18/2011  24 hr                  1000 ‐3000 0.0243 18 18 0 24‐HR      ALL        1ST  UCART1 11/30/2011  24 hr                  2000 ‐3000 0.01432 18 18 0 24‐HR      ALL        1ST  UCART1 12/7/2011  24 hr 

                                                                             SO2‐ Dispersing Modeling Result

Page 53: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

2 SO2

                  3000 ‐3000 0.01045 18 18 0 24‐HR      ALL        1ST  UCART1 11/3/2011  24 hr                   4000 ‐3000 0.01776 18 18 0 24‐HR      ALL        1ST  UCART1 10/4/2011  24 hr                   5000 ‐3000 0.01693 18 18 0 24‐HR      ALL        1ST  UCART1 11/29/2011  24 hr                  ‐5000 ‐2000 0.0728 18 18 0 24‐HR      ALL        1ST  UCART1 12/21/2011  24 hr                  ‐4000 ‐2000 0.09818 18 18 0 24‐HR      ALL        1ST  UCART1 11/27/2011  24 hr                  ‐3000 ‐2000 0.07482 18 18 0 24‐HR      ALL        1ST  UCART1 11/28/2011  24 hr                  ‐2000 ‐2000 0.10389 18 18 0 24‐HR      ALL        1ST  UCART1 12/28/2011  24 hr                  ‐1000 ‐2000 0.10781 18 18 0 24‐HR      ALL        1ST  UCART1 10/12/2011  24 hr                  0 ‐2000 0.0391 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  1000 ‐2000 0.01714 18 18 0 24‐HR      ALL        1ST  UCART1 10/16/2011  24 hr                  2000 ‐2000 0.01695 18 18 0 24‐HR      ALL        1ST  UCART1 10/17/2011  24 hr                  3000 ‐2000 0.0195 18 18 0 24‐HR      ALL        1ST  UCART1 10/4/2011  24 hr                   4000 ‐2000 0.03486 18 18 0 24‐HR      ALL        1ST  UCART1 11/29/2011  24 hr                  5000 ‐2000 0.01487 18 18 0 24‐HR      ALL        1ST  UCART1 11/30/2011  24 hr                  ‐5000 ‐1000 0.05322 18 18 0 24‐HR      ALL        1ST  UCART1 12/23/2011  24 hr                  ‐4000 ‐1000 0.07588 18 18 0 24‐HR      ALL        1ST  UCART1 12/24/2011  24 hr                  ‐3000 ‐1000 0.11333 18 18 0 24‐HR      ALL        1ST  UCART1 12/21/2011  24 hr                  ‐2000 ‐1000 0.17022 18 18 0 24‐HR      ALL        1ST  UCART1 11/27/2011  24 hr                  ‐1000 ‐1000 0.15548 18 18 0 24‐HR      ALL        1ST  UCART1 12/28/2011  24 hr                  0 ‐1000 0.08092 18 18 0 24‐HR      ALL        1ST  UCART1 10/20/2011  24 hr                  1000 ‐1000 0.04207 18 18 0 24‐HR      ALL        1ST  UCART1 10/17/2011  24 hr                  2000 ‐1000 0.05718 18 18 0 24‐HR      ALL        1ST  UCART1 11/29/2011  24 hr                  3000 ‐1000 0.02134 18 18 0 24‐HR      ALL        1ST  UCART1 11/30/2011  24 hr                  4000 ‐1000 0.01339 18 18 0 24‐HR      ALL        1ST  UCART1 10/17/2011  24 hr                  5000 ‐1000 0.0156 18 18 0 24‐HR      ALL        1ST  UCART1 10/4/2011  24 hr                   ‐5000 0 0.04157 18 18 0 24‐HR      ALL        1ST  UCART1 12/27/2011  24 hr                  ‐4000 0 0.05477 18 18 0 24‐HR      ALL        1ST  UCART1 12/27/2011  24 hr                  ‐3000 0 0.07481 18 18 0 24‐HR      ALL        1ST  UCART1 12/27/2011  24 hr                  ‐2000 0 0.09794 18 18 0 24‐HR      ALL        1ST  UCART1 12/27/2011  24 hr                  ‐1000 0 0.14941 18 18 0 24‐HR      ALL        1ST  UCART1 10/9/2011  24 hr 

SITE (1)          0 0 0.47038 18 18 0 24‐HR      ALL        1ST  UCART1 10/16/2011  24 hr                  1000 0 0.06976 18 18 0 24‐HR      ALL        1ST  UCART1 10/4/2011  24 hr                   2000 0 0.0425 18 18 0 24‐HR      ALL        1ST  UCART1 10/4/2011  24 hr                   3000 0 0.0304 18 18 0 24‐HR      ALL        1ST  UCART1 10/3/2011  24 hr                   4000 0 0.02322 18 18 0 24‐HR      ALL        1ST  UCART1 10/3/2011  24 hr                   5000 0 0.01845 18 18 0 24‐HR      ALL        1ST  UCART1 10/3/2011  24 hr 

Page 54: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

3 SO2

                  ‐5000 1000 0.05675 18 18 0 24‐HR      ALL        1ST  UCART1 12/2/2011  24 hr                   ‐4000 1000 0.06347 18 18 0 24‐HR      ALL        1ST  UCART1 10/26/2011  24 hr                  ‐3000 1000 0.07953 18 18 0 24‐HR      ALL        1ST  UCART1 10/26/2011  24 hr

CHANDOR (3)       ‐2000 1000 0.07994 18 18 0 24‐HR      ALL        1ST  UCART1 12/1/2011  24 hr                   ‐1000 1000 0.05219 18 18 0 24‐HR      ALL        1ST  UCART1 12/1/2011  24 hr                   0 1000 0.07033 18 18 0 24‐HR      ALL        1ST  UCART1 10/26/2011  24 hr                  1000 1000 0.0424 18 18 0 24‐HR      ALL        1ST  UCART1 11/3/2011  24 hr                   2000 1000 0.07984 18 18 0 24‐HR      ALL        1ST  UCART1 11/26/2011  24 hr                  3000 1000 0.04485 18 18 0 24‐HR      ALL        1ST  UCART1 10/17/2011  24 hr                  4000 1000 0.02022 18 18 0 24‐HR      ALL        1ST  UCART1 10/4/2011  24 hr                   5000 1000 0.02553 18 18 0 24‐HR      ALL        1ST  UCART1 10/4/2011  24 hr                   ‐5000 2000 0.0591 18 18 0 24‐HR      ALL        1ST  UCART1 12/1/2011  24 hr                   ‐4000 2000 0.05432 18 18 0 24‐HR      ALL        1ST  UCART1 12/1/2011  24 hr                   ‐3000 2000 0.03237 18 18 0 24‐HR      ALL        1ST  UCART1 12/1/2011  24 hr                   ‐2000 2000 0.03171 18 18 0 24‐HR      ALL        1ST  UCART1 11/30/2011  24 hr                  ‐1000 2000 0.04087 18 18 0 24‐HR      ALL        1ST  UCART1 10/24/2011  24 hr                  0 2000 0.03553 18 18 0 24‐HR      ALL        1ST  UCART1 10/26/2011  24 hr                  1000 2000 0.11052 18 18 0 24‐HR      ALL        1ST  UCART1 11/24/2011  24 hr                  2000 2000 0.02287 18 18 0 24‐HR      ALL        1ST  UCART1 12/3/2011  24 hr                   3000 2000 0.03065 18 18 0 24‐HR      ALL        1ST  UCART1 11/25/2011  24 hr                  4000 2000 0.04138 18 18 0 24‐HR      ALL        1ST  UCART1 11/26/2011  24 hr                  5000 2000 0.03305 18 18 0 24‐HR      ALL        1ST  UCART1 10/17/2011  24 hr                  ‐5000 3000 0.02339 18 18 0 24‐HR      ALL        1ST  UCART1 11/30/2011  24 hr                  ‐4000 3000 0.02761 18 18 0 24‐HR      ALL        1ST  UCART1 11/30/2011  24 hr                  ‐3000 3000 0.02199 18 18 0 24‐HR      ALL        1ST  UCART1 11/30/2011  24 hr                  ‐2000 3000 0.03223 18 18 0 24‐HR      ALL        1ST  UCART1 11/23/2011  24 hr                  ‐1000 3000 0.02056 18 18 0 24‐HR      ALL        1ST  UCART1 10/23/2011  24 hr                  0 3000 0.02142 18 18 0 24‐HR      ALL        1ST  UCART1 11/9/2011  24 hr                   1000 3000 0.04628 18 18 0 24‐HR      ALL        1ST  UCART1 11/24/2011  24 hr                  2000 3000 0.06547 18 18 0 24‐HR      ALL        1ST  UCART1 11/9/2011  24 hr                   3000 3000 0.01815 18 18 0 24‐HR      ALL        1ST  UCART1 12/3/2011  24 hr                   4000 3000 0.02174 18 18 0 24‐HR      ALL        1ST  UCART1 10/30/2011  24 hr                  5000 3000 0.02232 18 18 0 24‐HR      ALL        1ST  UCART1 11/25/2011  24 hr                  ‐5000 4000 0.02111 18 18 0 24‐HR      ALL        1ST  UCART1 11/30/2011  24 hr                  ‐4000 4000 0.01634 18 18 0 24‐HR      ALL        1ST  UCART1 12/1/2011  24 hr                   ‐3000 4000 0.02622 18 18 0 24‐HR      ALL        1ST  UCART1 11/23/2011  24 hr

Page 55: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

4 SO2

                  ‐2000 4000 0.02205 18 18 0 24‐HR      ALL        1ST  UCART1 10/24/2011  24 hr                  ‐1000 4000 0.01709 18 18 0 24‐HR      ALL        1ST  UCART1 11/6/2011  24 hr                   0 4000 0.01536 18 18 0 24‐HR      ALL        1ST  UCART1 11/9/2011  24 hr                   1000 4000 0.02045 18 18 0 24‐HR      ALL        1ST  UCART1 11/7/2011  24 hr                   2000 4000 0.05932 18 18 0 24‐HR      ALL        1ST  UCART1 11/24/2011  24 hr                  3000 4000 0.03119 18 18 0 24‐HR      ALL        1ST  UCART1 11/9/2011  24 hr                   4000 4000 0.01517 18 18 0 24‐HR      ALL        1ST  UCART1 12/3/2011  24 hr                   5000 4000 0.01403 18 18 0 24‐HR      ALL        1ST  UCART1 10/30/2011  24 hr                  ‐5000 5000 0.01424 18 18 0 24‐HR      ALL        1ST  UCART1 12/1/2011  24 hr                   ‐4000 5000 0.018 18 18 0 24‐HR      ALL        1ST  UCART1 11/23/2011  24 hr                  ‐3000 5000 0.01544 18 18 0 24‐HR      ALL        1ST  UCART1 10/24/2011  24 hr                  ‐2000 5000 0.01548 18 18 0 24‐HR      ALL        1ST  UCART1 10/25/2011  24 hr                  ‐1000 5000 0.01973 18 18 0 24‐HR      ALL        1ST  UCART1 11/23/2011  24 hr                  0 5000 0.012 18 18 0 24‐HR      ALL        1ST  UCART1 10/10/2011  24 hr                  1000 5000 0.01588 18 18 0 24‐HR      ALL        1ST  UCART1 11/29/2011  24 hr                  2000 5000 0.0384 18 18 0 24‐HR      ALL        1ST  UCART1 11/24/2011  24 hr                  3000 5000 0.04399 18 18 0 24‐HR      ALL        1ST  UCART1 11/9/2011  24 hr                   4000 5000 0.02045 18 18 0 24‐HR      ALL        1ST  UCART1 11/24/2011  24 hr                  5000 5000 0.01288 18 18 0 24‐HR      ALL        1ST  UCART1 12/3/2011  24 hr 

SITE (1)          0 0 0.47038 18 18 0 24‐HR      ALL        1ST         10/16/2011  24 hrPUNAT (2)         ‐2500 ‐1500 0.12121 18 18 0 24‐HR      ALL        1ST         11/27/2011  24 hr

CHANDOR (3)       ‐2000 1000 0.07994 18 18 0 24‐HR      ALL        1ST         12/1/2011  24 hr CHHIRI (4)        2000 3800 0.06001 18 18 0 24‐HR      ALL        1ST         11/24/2011  24 hrKARWAD (5)        4000 1800 0.04208 18 18 0 24‐HR      ALL        1ST         11/26/2011  24 hrDUNGARA (7)       3500 ‐1500 0.02904 18 18 0 24‐HR      ALL        1ST         11/29/2011  24 hr

Page 56: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

1 NOx

Discrete Receptor

X        Y       

Concentration (AVERAGE CONC) 

[ug/m^3]

Elevation (ZELEV)

Hill Heights (ZHILL)

Flagpole (ZFLAG)

Averagin Period (AVE)

Source Group (GRP)

Rank Net ID Date (DATE(CON)  

                  ‐5000 ‐5000 0.0346 18 18 0 24‐HR      ALL       1ST  UCART1 12/30/2011  24 hr                  ‐4000 ‐5000 0.0448 18 18 0 24‐HR      ALL       1ST  UCART1 12/31/2011  24 hr                  ‐3000 ‐5000 0.04032 18 18 0 24‐HR      ALL       1ST  UCART1 12/20/2011  24 hr                  ‐2000 ‐5000 0.04439 18 18 0 24‐HR      ALL       1ST  UCART1 11/4/2011  24 hr                   ‐1000 ‐5000 0.04321 18 18 0 24‐HR      ALL       1ST  UCART1 10/17/2011  24 hr                  0 ‐5000 0.01494 18 18 0 24‐HR      ALL       1ST  UCART1 10/18/2011  24 hr                  1000 ‐5000 0.00438 18 18 0 24‐HR      ALL       1ST  UCART1 10/16/2011  24 hr                  2000 ‐5000 0.00865 18 18 0 24‐HR      ALL       1ST  UCART1 11/30/2011  24 hr                  3000 ‐5000 0.00581 18 18 0 24‐HR      ALL       1ST  UCART1 12/7/2011  24 hr                   4000 ‐5000 0.00611 18 18 0 24‐HR      ALL       1ST  UCART1 12/7/2011  24 hr                   5000 ‐5000 0.00626 18 18 0 24‐HR      ALL       1ST  UCART1 11/3/2011  24 hr                   ‐5000 ‐4000 0.03249 18 18 0 24‐HR      ALL       1ST  UCART1 12/28/2011  24 hr                  ‐4000 ‐4000 0.04419 18 18 0 24‐HR      ALL       1ST  UCART1 12/30/2011  24 hr                  ‐3000 ‐4000 0.06247 18 18 0 24‐HR      ALL       1ST  UCART1 12/31/2011  24 hr                  ‐2000 ‐4000 0.0469 18 18 0 24‐HR      ALL       1ST  UCART1 10/12/2011  24 hr                  ‐1000 ‐4000 0.03872 18 18 0 24‐HR      ALL       1ST  UCART1 11/7/2011  24 hr                   0 ‐4000 0.01843 18 18 0 24‐HR      ALL       1ST  UCART1 10/18/2011  24 hr                  1000 ‐4000 0.0111 18 18 0 24‐HR      ALL       1ST  UCART1 11/30/2011  24 hr                  2000 ‐4000 0.00543 18 18 0 24‐HR      ALL       1ST  UCART1 10/16/2011  24 hr                  3000 ‐4000 0.00873 18 18 0 24‐HR      ALL       1ST  UCART1 12/7/2011  24 hr                   4000 ‐4000 0.00584 18 18 0 24‐HR      ALL       1ST  UCART1 11/3/2011  24 hr                   5000 ‐4000 0.01008 18 18 0 24‐HR      ALL       1ST  UCART1 10/4/2011  24 hr                   ‐5000 ‐3000 0.05275 18 18 0 24‐HR      ALL       1ST  UCART1 11/27/2011  24 hr                  ‐4000 ‐3000 0.04058 18 18 0 24‐HR      ALL       1ST  UCART1 12/28/2011  24 hr                  ‐3000 ‐3000 0.05943 18 18 0 24‐HR      ALL       1ST  UCART1 12/28/2011  24 hr                  ‐2000 ‐3000 0.0792 18 18 0 24‐HR      ALL       1ST  UCART1 12/31/2011  24 hr                  ‐1000 ‐3000 0.04387 18 18 0 24‐HR      ALL       1ST  UCART1 10/21/2011  24 hr                  0 ‐3000 0.02328 18 18 0 24‐HR      ALL       1ST  UCART1 10/18/2011  24 hr                  1000 ‐3000 0.02078 18 18 0 24‐HR      ALL       1ST  UCART1 11/30/2011  24 hr                  2000 ‐3000 0.00778 18 18 0 24‐HR      ALL       1ST  UCART1 12/7/2011  24 hr                   3000 ‐3000 0.0074 18 18 0 24‐HR      ALL       1ST  UCART1 10/17/2011  24 hr

NOx‐ Dispersing Modeling Result

Page 57: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

2 NOx

                  4000 ‐3000 0.01424 18 18 0 24‐HR      ALL       1ST  UCART1 10/4/2011  24 hr                   5000 ‐3000 0.01508 18 18 0 24‐HR      ALL       1ST  UCART1 11/29/2011  24 hr                  ‐5000 ‐2000 0.06071 18 18 0 24‐HR      ALL       1ST  UCART1 12/21/2011  24 hr                  ‐4000 ‐2000 0.0863 18 18 0 24‐HR      ALL       1ST  UCART1 11/27/2011  24 hr                  ‐3000 ‐2000 0.06428 18 18 0 24‐HR      ALL       1ST  UCART1 11/27/2011  24 hr                  ‐2000 ‐2000 0.08563 18 18 0 24‐HR      ALL       1ST  UCART1 12/28/2011  24 hr                  ‐1000 ‐2000 0.07149 18 18 0 24‐HR      ALL       1ST  UCART1 12/28/2011  24 hr                  0 ‐2000 0.02813 18 18 0 24‐HR      ALL       1ST  UCART1 10/18/2011  24 hr                  1000 ‐2000 0.01514 18 18 0 24‐HR      ALL       1ST  UCART1 10/16/2011  24 hr                  2000 ‐2000 0.0135 18 18 0 24‐HR      ALL       1ST  UCART1 10/17/2011  24 hr                  3000 ‐2000 0.01419 18 18 0 24‐HR      ALL       1ST  UCART1 10/4/2011  24 hr                   4000 ‐2000 0.0311 18 18 0 24‐HR      ALL       1ST  UCART1 11/29/2011  24 hr                  5000 ‐2000 0.0132 18 18 0 24‐HR      ALL       1ST  UCART1 11/30/2011  24 hr                  ‐5000 ‐1000 0.04196 18 18 0 24‐HR      ALL       1ST  UCART1 12/23/2011  24 hr                  ‐4000 ‐1000 0.0598 18 18 0 24‐HR      ALL       1ST  UCART1 12/24/2011  24 hr                  ‐3000 ‐1000 0.08321 18 18 0 24‐HR      ALL       1ST  UCART1 12/21/2011  24 hr                  ‐2000 ‐1000 0.1364 18 18 0 24‐HR      ALL       1ST  UCART1 11/27/2011  24 hr                  ‐1000 ‐1000 0.10222 18 18 0 24‐HR      ALL       1ST  UCART1 12/28/2011  24 hr                  0 ‐1000 0.04848 18 18 0 24‐HR      ALL       1ST  UCART1 10/1/2011  24 hr                   1000 ‐1000 0.03287 18 18 0 24‐HR      ALL       1ST  UCART1 10/17/2011  24 hr                  2000 ‐1000 0.04744 18 18 0 24‐HR      ALL       1ST  UCART1 11/29/2011  24 hr                  3000 ‐1000 0.01785 18 18 0 24‐HR      ALL       1ST  UCART1 11/30/2011  24 hr                  4000 ‐1000 0.01109 18 18 0 24‐HR      ALL       1ST  UCART1 10/17/2011  24 hr                  5000 ‐1000 0.01132 18 18 0 24‐HR      ALL       1ST  UCART1 10/4/2011  24 hr                   ‐5000 0 0.03544 18 18 0 24‐HR      ALL       1ST  UCART1 12/27/2011  24 hr                  ‐4000 0 0.04571 18 18 0 24‐HR      ALL       1ST  UCART1 12/27/2011  24 hr                  ‐3000 0 0.06003 18 18 0 24‐HR      ALL       1ST  UCART1 12/27/2011  24 hr                  ‐2000 0 0.06969 18 18 0 24‐HR      ALL       1ST  UCART1 12/27/2011  24 hr                  ‐1000 0 0.05482 18 18 0 24‐HR      ALL       1ST  UCART1 12/21/2011  24 hr

SITE (1)          0 0 3.00E‐05 18 18 0 24‐HR      ALL       1ST  UCART1 12/7/2011  24 hr                   1000 0 0.03364 18 18 0 24‐HR      ALL       1ST  UCART1 10/3/2011  24 hr                   2000 0 0.03033 18 18 0 24‐HR      ALL       1ST  UCART1 10/3/2011  24 hr                   3000 0 0.0246 18 18 0 24‐HR      ALL       1ST  UCART1 10/3/2011  24 hr                   4000 0 0.01933 18 18 0 24‐HR      ALL       1ST  UCART1 10/3/2011  24 hr                   5000 0 0.01561 18 18 0 24‐HR      ALL       1ST  UCART1 10/3/2011  24 hr                   ‐5000 1000 0.04076 18 18 0 24‐HR      ALL       1ST  UCART1 10/26/2011  24 hr

Page 58: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

3 NOx

                  ‐4000 1000 0.05429 18 18 0 24‐HR      ALL       1ST  UCART1 10/26/2011  24 hr                  ‐3000 1000 0.06647 18 18 0 24‐HR      ALL       1ST  UCART1 10/26/2011  24 hr

CHANDOR (3)       ‐2000 1000 0.05071 18 18 0 24‐HR      ALL       1ST  UCART1 10/26/2011  24 hr                  ‐1000 1000 0.0232 18 18 0 24‐HR      ALL       1ST  UCART1 11/30/2011  24 hr                  0 1000 0.02135 18 18 0 24‐HR      ALL       1ST  UCART1 11/23/2011  24 hr                  1000 1000 0.01939 18 18 0 24‐HR      ALL       1ST  UCART1 11/30/2011  24 hr                  2000 1000 0.06237 18 18 0 24‐HR      ALL       1ST  UCART1 11/26/2011  24 hr                  3000 1000 0.03344 18 18 0 24‐HR      ALL       1ST  UCART1 10/17/2011  24 hr                  4000 1000 0.01502 18 18 0 24‐HR      ALL       1ST  UCART1 10/4/2011  24 hr                   5000 1000 0.02106 18 18 0 24‐HR      ALL       1ST  UCART1 10/4/2011  24 hr                   ‐5000 2000 0.04315 18 18 0 24‐HR      ALL       1ST  UCART1 12/1/2011  24 hr                   ‐4000 2000 0.03039 18 18 0 24‐HR      ALL       1ST  UCART1 12/1/2011  24 hr                   ‐3000 2000 0.02354 18 18 0 24‐HR      ALL       1ST  UCART1 11/9/2011  24 hr                   ‐2000 2000 0.02441 18 18 0 24‐HR      ALL       1ST  UCART1 11/30/2011  24 hr                  ‐1000 2000 0.02955 18 18 0 24‐HR      ALL       1ST  UCART1 10/24/2011  24 hr                  0 2000 0.01894 18 18 0 24‐HR      ALL       1ST  UCART1 11/9/2011  24 hr                   1000 2000 0.08452 18 18 0 24‐HR      ALL       1ST  UCART1 11/24/2011  24 hr                  2000 2000 0.01489 18 18 0 24‐HR      ALL       1ST  UCART1 11/30/2011  24 hr                  3000 2000 0.02295 18 18 0 24‐HR      ALL       1ST  UCART1 11/25/2011  24 hr                  4000 2000 0.03468 18 18 0 24‐HR      ALL       1ST  UCART1 11/26/2011  24 hr                  5000 2000 0.02692 18 18 0 24‐HR      ALL       1ST  UCART1 10/17/2011  24 hr                  ‐5000 3000 0.01893 18 18 0 24‐HR      ALL       1ST  UCART1 11/30/2011  24 hr                  ‐4000 3000 0.02277 18 18 0 24‐HR      ALL       1ST  UCART1 11/30/2011  24 hr                  ‐3000 3000 0.01841 18 18 0 24‐HR      ALL       1ST  UCART1 11/30/2011  24 hr                  ‐2000 3000 0.02786 18 18 0 24‐HR      ALL       1ST  UCART1 11/23/2011  24 hr                  ‐1000 3000 0.00768 18 18 0 24‐HR      ALL       1ST  UCART1 11/29/2011  24 hr                  0 3000 0.01572 18 18 0 24‐HR      ALL       1ST  UCART1 11/9/2011  24 hr                   1000 3000 0.03486 18 18 0 24‐HR      ALL       1ST  UCART1 11/24/2011  24 hr                  2000 3000 0.05381 18 18 0 24‐HR      ALL       1ST  UCART1 11/9/2011  24 hr                   3000 3000 0.01171 18 18 0 24‐HR      ALL       1ST  UCART1 12/3/2011  24 hr                   4000 3000 0.01709 18 18 0 24‐HR      ALL       1ST  UCART1 10/30/2011  24 hr                  5000 3000 0.01868 18 18 0 24‐HR      ALL       1ST  UCART1 11/25/2011  24 hr                  ‐5000 4000 0.01819 18 18 0 24‐HR      ALL       1ST  UCART1 11/30/2011  24 hr                  ‐4000 4000 0.01379 18 18 0 24‐HR      ALL       1ST  UCART1 11/30/2011  24 hr                  ‐3000 4000 0.02337 18 18 0 24‐HR      ALL       1ST  UCART1 11/23/2011  24 hr                  ‐2000 4000 0.01794 18 18 0 24‐HR      ALL       1ST  UCART1 10/24/2011  24 hr

Page 59: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

4 NOx

                  ‐1000 4000 0.01281 18 18 0 24‐HR      ALL       1ST  UCART1 11/23/2011  24 hr                  0 4000 0.01168 18 18 0 24‐HR      ALL       1ST  UCART1 11/9/2011  24 hr                   1000 4000 0.01602 18 18 0 24‐HR      ALL       1ST  UCART1 11/29/2011  24 hr                  2000 4000 0.05049 18 18 0 24‐HR      ALL       1ST  UCART1 11/24/2011  24 hr                  3000 4000 0.02607 18 18 0 24‐HR      ALL       1ST  UCART1 11/9/2011  24 hr                   4000 4000 0.01088 18 18 0 24‐HR      ALL       1ST  UCART1 12/3/2011  24 hr                   5000 4000 0.01195 18 18 0 24‐HR      ALL       1ST  UCART1 10/21/2011  24 hr                  ‐5000 5000 0.01053 18 18 0 24‐HR      ALL       1ST  UCART1 11/30/2011  24 hr                  ‐4000 5000 0.01619 18 18 0 24‐HR      ALL       1ST  UCART1 11/23/2011  24 hr                  ‐3000 5000 0.01261 18 18 0 24‐HR      ALL       1ST  UCART1 10/24/2011  24 hr                  ‐2000 5000 0.00798 18 18 0 24‐HR      ALL       1ST  UCART1 10/24/2011  24 hr                  ‐1000 5000 0.01759 18 18 0 24‐HR      ALL       1ST  UCART1 11/23/2011  24 hr                  0 5000 0.00887 18 18 0 24‐HR      ALL       1ST  UCART1 11/9/2011  24 hr                   1000 5000 0.01411 18 18 0 24‐HR      ALL       1ST  UCART1 11/29/2011  24 hr                  2000 5000 0.03276 18 18 0 24‐HR      ALL       1ST  UCART1 11/24/2011  24 hr                  3000 5000 0.0378 18 18 0 24‐HR      ALL       1ST  UCART1 11/9/2011  24 hr                   4000 5000 0.01723 18 18 0 24‐HR      ALL       1ST  UCART1 11/24/2011  24 hr                  5000 5000 0.00978 18 18 0 24‐HR      ALL       1ST  UCART1 12/3/2011  24 hr 

SITE (1)          0 0 3.00E‐05 18 18 0 24‐HR      ALL       1ST         12/7/2011  24 hr PUNAT (2)         ‐2500 ‐1500 0.10282 18 18 0 24‐HR      ALL       1ST         11/27/2011  24 hr

CHANDOR (3)       ‐2000 1000 0.05071 18 18 0 24‐HR      ALL       1ST         10/26/2011  24 hrCHHIRI (4)        2000 3800 0.0506 18 18 0 24‐HR      ALL       1ST         11/24/2011  24 hrKARWAD (5)        4000 1800 0.03564 18 18 0 24‐HR      ALL       1ST         11/26/2011  24 hrDUNGARA (7)       3500 ‐1500 0.02499 18 18 0 24‐HR      ALL       1ST         11/29/2011  24 hr

Page 60: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

1 HCl

Discrete Receptor X        Y       

Concentration (AVERAGE CONC) 

[ug/m^3]Elevation (ZELEV)

Hill Heights (ZHILL)

Flagpole (ZFLAG)

Averagin Period (AVE)

Source Group (GRP) Rank Net ID Date (DATE(CON)  

                  ‐5000 ‐5000 0.01475 18 18 0 24‐HR      ALL        1ST  UCART1 12/16/2011  24 hr                  ‐4000 ‐5000 0.0126 18 18 0 24‐HR      ALL        1ST  UCART1 12/19/2011  24 hr                  ‐3000 ‐5000 0.01107 18 18 0 24‐HR      ALL        1ST  UCART1 12/19/2011  24 hr                  ‐2000 ‐5000 0.01809 18 18 0 24‐HR      ALL        1ST  UCART1 11/4/2011  24 hr                   ‐1000 ‐5000 0.02311 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  0 ‐5000 0.00938 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  1000 ‐5000 0.00635 18 18 0 24‐HR      ALL        1ST  UCART1 10/20/2011  24 hr                  2000 ‐5000 0.00437 18 18 0 24‐HR      ALL        1ST  UCART1 10/17/2011  24 hr                  3000 ‐5000 0.00366 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  4000 ‐5000 0.00337 18 18 0 24‐HR      ALL        1ST  UCART1 10/20/2011  24 hr                  5000 ‐5000 0.0046 18 18 0 24‐HR      ALL        1ST  UCART1 12/6/2011  24 hr                   ‐5000 ‐4000 0.01347 18 18 0 24‐HR      ALL        1ST  UCART1 11/21/2011  24 hr                  ‐4000 ‐4000 0.02033 18 18 0 24‐HR      ALL        1ST  UCART1 12/16/2011  24 hr                  ‐3000 ‐4000 0.01869 18 18 0 24‐HR      ALL        1ST  UCART1 12/19/2011  24 hr                  ‐2000 ‐4000 0.01653 18 18 0 24‐HR      ALL        1ST  UCART1 11/4/2011  24 hr                   ‐1000 ‐4000 0.02558 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  0 ‐4000 0.01365 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  1000 ‐4000 0.00935 18 18 0 24‐HR      ALL        1ST  UCART1 10/20/2011  24 hr                  2000 ‐4000 0.00526 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  3000 ‐4000 0.00453 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  4000 ‐4000 0.00623 18 18 0 24‐HR      ALL        1ST  UCART1 12/6/2011  24 hr                   5000 ‐4000 0.00426 18 18 0 24‐HR      ALL        1ST  UCART1 10/6/2011  24 hr                   ‐5000 ‐3000 0.01766 18 18 0 24‐HR      ALL        1ST  UCART1 11/18/2011  24 hr                  ‐4000 ‐3000 0.01954 18 18 0 24‐HR      ALL        1ST  UCART1 11/21/2011  24 hr                  ‐3000 ‐3000 0.03013 18 18 0 24‐HR      ALL        1ST  UCART1 12/16/2011  24 hr                  ‐2000 ‐3000 0.02754 18 18 0 24‐HR      ALL        1ST  UCART1 12/19/2011  24 hr                  ‐1000 ‐3000 0.03594 18 18 0 24‐HR      ALL        1ST  UCART1 10/22/2011  24 hr                  0 ‐3000 0.02154 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  1000 ‐3000 0.01116 18 18 0 24‐HR      ALL        1ST  UCART1 10/20/2011  24 hr                  2000 ‐3000 0.00703 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  3000 ‐3000 0.00903 18 18 0 24‐HR      ALL        1ST  UCART1 12/6/2011  24 hr 

HCl ‐ Dispersing Modeling Result

Page 61: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

2 HCl

                  4000 ‐3000 0.0069 18 18 0 24‐HR      ALL        1ST  UCART1 10/5/2011  24 hr                   5000 ‐3000 0.00748 18 18 0 24‐HR      ALL        1ST  UCART1 11/16/2011  24 hr                  ‐5000 ‐2000 0.02638 18 18 0 24‐HR      ALL        1ST  UCART1 12/4/2011  24 hr                   ‐4000 ‐2000 0.02408 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  ‐3000 ‐2000 0.03339 18 18 0 24‐HR      ALL        1ST  UCART1 11/18/2011  24 hr                  ‐2000 ‐2000 0.05044 18 18 0 24‐HR      ALL        1ST  UCART1 12/16/2011  24 hr                  ‐1000 ‐2000 0.04684 18 18 0 24‐HR      ALL        1ST  UCART1 11/4/2011  24 hr                   0 ‐2000 0.03834 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  1000 ‐2000 0.01288 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  2000 ‐2000 0.01521 18 18 0 24‐HR      ALL        1ST  UCART1 10/20/2011  24 hr                  3000 ‐2000 0.01327 18 18 0 24‐HR      ALL        1ST  UCART1 11/3/2011  24 hr                   4000 ‐2000 0.01066 18 18 0 24‐HR      ALL        1ST  UCART1 11/3/2011  24 hr                   5000 ‐2000 0.00793 18 18 0 24‐HR      ALL        1ST  UCART1 11/3/2011  24 hr                   ‐5000 ‐1000 0.02198 18 18 0 24‐HR      ALL        1ST  UCART1 12/4/2011  24 hr                   ‐4000 ‐1000 0.03496 18 18 0 24‐HR      ALL        1ST  UCART1 12/4/2011  24 hr                   ‐3000 ‐1000 0.05779 18 18 0 24‐HR      ALL        1ST  UCART1 12/4/2011  24 hr                   ‐2000 ‐1000 0.06334 18 18 0 24‐HR      ALL        1ST  UCART1 12/9/2011  24 hr                   ‐1000 ‐1000 0.10798 18 18 0 24‐HR      ALL        1ST  UCART1 12/16/2011  24 hr                  0 ‐1000 0.07956 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  1000 ‐1000 0.03333 18 18 0 24‐HR      ALL        1ST  UCART1 10/20/2011  24 hr                  2000 ‐1000 0.02939 18 18 0 24‐HR      ALL        1ST  UCART1 11/3/2011  24 hr                   3000 ‐1000 0.01638 18 18 0 24‐HR      ALL        1ST  UCART1 11/3/2011  24 hr                   4000 ‐1000 0.00946 18 18 0 24‐HR      ALL        1ST  UCART1 10/20/2011  24 hr                  5000 ‐1000 0.00666 18 18 0 24‐HR      ALL        1ST  UCART1 10/20/2011  24 hr                  ‐5000 0 0.02093 18 18 0 24‐HR      ALL        1ST  UCART1 12/2/2011  24 hr                   ‐4000 0 0.02868 18 18 0 24‐HR      ALL        1ST  UCART1 12/2/2011  24 hr                   ‐3000 0 0.04191 18 18 0 24‐HR      ALL        1ST  UCART1 12/2/2011  24 hr                   ‐2000 0 0.06725 18 18 0 24‐HR      ALL        1ST  UCART1 12/2/2011  24 hr                   ‐1000 0 0.13567 18 18 0 24‐HR      ALL        1ST  UCART1 10/14/2011  24 hr

SITE (1)          0 0 0.47038 18 18 0 24‐HR      ALL        1ST  UCART1 10/16/2011  24 hr                  1000 0 0.05249 18 18 0 24‐HR      ALL        1ST  UCART1 10/4/2011  24 hr                   2000 0 0.01914 18 18 0 24‐HR      ALL        1ST  UCART1 10/4/2011  24 hr                   3000 0 0.01 18 18 0 24‐HR      ALL        1ST  UCART1 10/4/2011  24 hr                   4000 0 0.00621 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  5000 0 0.00458 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  ‐5000 1000 0.0178 18 18 0 24‐HR      ALL        1ST  UCART1 10/14/2011  24 hr

Page 62: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

3 HCl

                  ‐4000 1000 0.0219 18 18 0 24‐HR      ALL        1ST  UCART1 10/29/2011  24 hr                  ‐3000 1000 0.03008 18 18 0 24‐HR      ALL        1ST  UCART1 11/6/2011  24 hr 

CHANDOR (3)       ‐2000 1000 0.06452 18 18 0 24‐HR      ALL        1ST  UCART1 12/1/2011  24 hr                   ‐1000 1000 0.05028 18 18 0 24‐HR      ALL        1ST  UCART1 12/1/2011  24 hr                   0 1000 0.06956 18 18 0 24‐HR      ALL        1ST  UCART1 10/26/2011  24 hr                  1000 1000 0.04045 18 18 0 24‐HR      ALL        1ST  UCART1 11/6/2011  24 hr                   2000 1000 0.02405 18 18 0 24‐HR      ALL        1ST  UCART1 12/5/2011  24 hr                   3000 1000 0.0132 18 18 0 24‐HR      ALL        1ST  UCART1 11/13/2011  24 hr                  4000 1000 0.00902 18 18 0 24‐HR      ALL        1ST  UCART1 11/13/2011  24 hr                  5000 1000 0.00752 18 18 0 24‐HR      ALL        1ST  UCART1 12/3/2011  24 hr                   ‐5000 2000 0.01594 18 18 0 24‐HR      ALL        1ST  UCART1 12/1/2011  24 hr                   ‐4000 2000 0.02392 18 18 0 24‐HR      ALL        1ST  UCART1 12/1/2011  24 hr                   ‐3000 2000 0.02914 18 18 0 24‐HR      ALL        1ST  UCART1 12/1/2011  24 hr                   ‐2000 2000 0.01881 18 18 0 24‐HR      ALL        1ST  UCART1 12/5/2011  24 hr                   ‐1000 2000 0.03641 18 18 0 24‐HR      ALL        1ST  UCART1 11/16/2011  24 hr                  0 2000 0.03479 18 18 0 24‐HR      ALL        1ST  UCART1 10/26/2011  24 hr                  1000 2000 0.04477 18 18 0 24‐HR      ALL        1ST  UCART1 11/7/2011  24 hr                   2000 2000 0.01852 18 18 0 24‐HR      ALL        1ST  UCART1 11/16/2011  24 hr                  3000 2000 0.01044 18 18 0 24‐HR      ALL        1ST  UCART1 11/3/2011  24 hr                   4000 2000 0.00977 18 18 0 24‐HR      ALL        1ST  UCART1 12/5/2011  24 hr                   5000 2000 0.00721 18 18 0 24‐HR      ALL        1ST  UCART1 12/5/2011  24 hr                   ‐5000 3000 0.01427 18 18 0 24‐HR      ALL        1ST  UCART1 12/1/2011  24 hr                   ‐4000 3000 0.01582 18 18 0 24‐HR      ALL        1ST  UCART1 12/1/2011  24 hr                   ‐3000 3000 0.01076 18 18 0 24‐HR      ALL        1ST  UCART1 12/5/2011  24 hr                   ‐2000 3000 0.01773 18 18 0 24‐HR      ALL        1ST  UCART1 11/4/2011  24 hr                   ‐1000 3000 0.01986 18 18 0 24‐HR      ALL        1ST  UCART1 10/23/2011  24 hr                  0 3000 0.02058 18 18 0 24‐HR      ALL        1ST  UCART1 10/26/2011  24 hr                  1000 3000 0.01853 18 18 0 24‐HR      ALL        1ST  UCART1 11/3/2011  24 hr                   2000 3000 0.02721 18 18 0 24‐HR      ALL        1ST  UCART1 10/23/2011  24 hr                  3000 3000 0.011 18 18 0 24‐HR      ALL        1ST  UCART1 11/16/2011  24 hr                  4000 3000 0.00471 18 18 0 24‐HR      ALL        1ST  UCART1 11/3/2011  24 hr                   5000 3000 0.00627 18 18 0 24‐HR      ALL        1ST  UCART1 11/3/2011  24 hr                   ‐5000 4000 0.0092 18 18 0 24‐HR      ALL        1ST  UCART1 12/1/2011  24 hr                   ‐4000 4000 0.00709 18 18 0 24‐HR      ALL        1ST  UCART1 12/5/2011  24 hr                   ‐3000 4000 0.00951 18 18 0 24‐HR      ALL        1ST  UCART1 11/15/2011  24 hr                  ‐2000 4000 0.01535 18 18 0 24‐HR      ALL        1ST  UCART1 11/16/2011  24 hr

Page 63: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

4 HCl

                  ‐1000 4000 0.01467 18 18 0 24‐HR      ALL        1ST  UCART1 10/23/2011  24 hr                  0 4000 0.01363 18 18 0 24‐HR      ALL        1ST  UCART1 10/26/2011  24 hr                  1000 4000 0.01257 18 18 0 24‐HR      ALL        1ST  UCART1 11/3/2011  24 hr                   2000 4000 0.01685 18 18 0 24‐HR      ALL        1ST  UCART1 11/7/2011  24 hr                   3000 4000 0.01489 18 18 0 24‐HR      ALL        1ST  UCART1 11/6/2011  24 hr                   4000 4000 0.00743 18 18 0 24‐HR      ALL        1ST  UCART1 11/16/2011  24 hr                  5000 4000 0.00359 18 18 0 24‐HR      ALL        1ST  UCART1 11/16/2011  24 hr                  ‐5000 5000 0.00507 18 18 0 24‐HR      ALL        1ST  UCART1 12/5/2011  24 hr                   ‐4000 5000 0.00756 18 18 0 24‐HR      ALL        1ST  UCART1 11/15/2011  24 hr                  ‐3000 5000 0.00935 18 18 0 24‐HR      ALL        1ST  UCART1 11/4/2011  24 hr                   ‐2000 5000 0.01118 18 18 0 24‐HR      ALL        1ST  UCART1 11/16/2011  24 hr                  ‐1000 5000 0.01114 18 18 0 24‐HR      ALL        1ST  UCART1 10/23/2011  24 hr                  0 5000 0.0097 18 18 0 24‐HR      ALL        1ST  UCART1 10/26/2011  24 hr                  1000 5000 0.00834 18 18 0 24‐HR      ALL        1ST  UCART1 11/3/2011  24 hr                   2000 5000 0.00898 18 18 0 24‐HR      ALL        1ST  UCART1 11/7/2011  24 hr                   3000 5000 0.01357 18 18 0 24‐HR      ALL        1ST  UCART1 10/23/2011  24 hr                  4000 5000 0.00919 18 18 0 24‐HR      ALL        1ST  UCART1 11/6/2011  24 hr                   5000 5000 0.00542 18 18 0 24‐HR      ALL        1ST  UCART1 11/16/2011  24 hr

SITE (1)          0 0 0.47038 18 18 0 24‐HR      ALL        1ST        10/16/2011  24 hrPUNAT (2)         ‐2500 ‐1500 0.04435 18 18 0 24‐HR      ALL        1ST        11/18/2011  24 hr

CHANDOR (3)       ‐2000 1000 0.06452 18 18 0 24‐HR      ALL        1ST        12/1/2011  24 hr CHHIRI (4)        2000 3800 0.01895 18 18 0 24‐HR      ALL        1ST        11/7/2011  24 hr KARWAD (5)        4000 1800 0.01051 18 18 0 24‐HR      ALL        1ST        12/5/2011  24 hr DUNGARA (7)       3500 ‐1500 0.01343 18 18 0 24‐HR      ALL        1ST        11/3/2011  24 hr 

Page 64: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

1 VOC

Discrete Receptor X        Y       

Concentration (AVERAGE CONC) 

[ug/m^3]Elevation (ZELEV)

Hill Heights (ZHILL)

Flagpole (ZFLAG)

Averagin Period (AVE)

Source Group (GRP) Rank Net ID Date (DATE(CON)  

                  ‐5000 ‐5000 0.00369 18 18 0 24‐HR      ALL        1ST  UCART1 12/16/2011  24 hr                  ‐4000 ‐5000 0.00315 18 18 0 24‐HR      ALL        1ST  UCART1 12/19/2011  24 hr                  ‐3000 ‐5000 0.00277 18 18 0 24‐HR      ALL        1ST  UCART1 12/19/2011  24 hr                  ‐2000 ‐5000 0.00452 18 18 0 24‐HR      ALL        1ST  UCART1 11/4/2011  24 hr                   ‐1000 ‐5000 0.00578 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  0 ‐5000 0.00235 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  1000 ‐5000 0.00159 18 18 0 24‐HR      ALL        1ST  UCART1 10/20/2011  24 hr                  2000 ‐5000 0.00109 18 18 0 24‐HR      ALL        1ST  UCART1 10/17/2011  24 hr                  3000 ‐5000 0.00092 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  4000 ‐5000 0.00084 18 18 0 24‐HR      ALL        1ST  UCART1 10/20/2011  24 hr                  5000 ‐5000 0.00115 18 18 0 24‐HR      ALL        1ST  UCART1 12/6/2011  24 hr                   ‐5000 ‐4000 0.00337 18 18 0 24‐HR      ALL        1ST  UCART1 11/21/2011  24 hr                  ‐4000 ‐4000 0.00508 18 18 0 24‐HR      ALL        1ST  UCART1 12/16/2011  24 hr                  ‐3000 ‐4000 0.00467 18 18 0 24‐HR      ALL        1ST  UCART1 12/19/2011  24 hr                  ‐2000 ‐4000 0.00413 18 18 0 24‐HR      ALL        1ST  UCART1 11/4/2011  24 hr                   ‐1000 ‐4000 0.0064 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  0 ‐4000 0.00341 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  1000 ‐4000 0.00234 18 18 0 24‐HR      ALL        1ST  UCART1 10/20/2011  24 hr                  2000 ‐4000 0.00132 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  3000 ‐4000 0.00113 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  4000 ‐4000 0.00156 18 18 0 24‐HR      ALL        1ST  UCART1 12/6/2011  24 hr                   5000 ‐4000 0.00107 18 18 0 24‐HR      ALL        1ST  UCART1 10/6/2011  24 hr                   ‐5000 ‐3000 0.00442 18 18 0 24‐HR      ALL        1ST  UCART1 11/18/2011  24 hr                  ‐4000 ‐3000 0.00488 18 18 0 24‐HR      ALL        1ST  UCART1 11/21/2011  24 hr                  ‐3000 ‐3000 0.00753 18 18 0 24‐HR      ALL        1ST  UCART1 12/16/2011  24 hr                  ‐2000 ‐3000 0.00688 18 18 0 24‐HR      ALL        1ST  UCART1 12/19/2011  24 hr                  ‐1000 ‐3000 0.00899 18 18 0 24‐HR      ALL        1ST  UCART1 10/22/2011  24 hr                  0 ‐3000 0.00539 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  1000 ‐3000 0.00279 18 18 0 24‐HR      ALL        1ST  UCART1 10/20/2011  24 hr                  2000 ‐3000 0.00176 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  3000 ‐3000 0.00226 18 18 0 24‐HR      ALL        1ST  UCART1 12/6/2011  24 hr 

VOC ‐ Dispersing Modeling Result

Page 65: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

2 VOC

                  4000 ‐3000 0.00172 18 18 0 24‐HR      ALL        1ST  UCART1 10/5/2011  24 hr                   5000 ‐3000 0.00187 18 18 0 24‐HR      ALL        1ST  UCART1 11/16/2011  24 hr                  ‐5000 ‐2000 0.00659 18 18 0 24‐HR      ALL        1ST  UCART1 12/4/2011  24 hr                   ‐4000 ‐2000 0.00602 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  ‐3000 ‐2000 0.00835 18 18 0 24‐HR      ALL        1ST  UCART1 11/18/2011  24 hr                  ‐2000 ‐2000 0.01261 18 18 0 24‐HR      ALL        1ST  UCART1 12/16/2011  24 hr                  ‐1000 ‐2000 0.01171 18 18 0 24‐HR      ALL        1ST  UCART1 11/4/2011  24 hr                   0 ‐2000 0.00958 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  1000 ‐2000 0.00322 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  2000 ‐2000 0.0038 18 18 0 24‐HR      ALL        1ST  UCART1 10/20/2011  24 hr                  3000 ‐2000 0.00332 18 18 0 24‐HR      ALL        1ST  UCART1 11/3/2011  24 hr                   4000 ‐2000 0.00266 18 18 0 24‐HR      ALL        1ST  UCART1 11/3/2011  24 hr                   5000 ‐2000 0.00198 18 18 0 24‐HR      ALL        1ST  UCART1 11/3/2011  24 hr                   ‐5000 ‐1000 0.00549 18 18 0 24‐HR      ALL        1ST  UCART1 12/4/2011  24 hr                   ‐4000 ‐1000 0.00874 18 18 0 24‐HR      ALL        1ST  UCART1 12/4/2011  24 hr                   ‐3000 ‐1000 0.01445 18 18 0 24‐HR      ALL        1ST  UCART1 12/4/2011  24 hr                   ‐2000 ‐1000 0.01584 18 18 0 24‐HR      ALL        1ST  UCART1 12/9/2011  24 hr                   ‐1000 ‐1000 0.027 18 18 0 24‐HR      ALL        1ST  UCART1 12/16/2011  24 hr                  0 ‐1000 0.01989 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  1000 ‐1000 0.00833 18 18 0 24‐HR      ALL        1ST  UCART1 10/20/2011  24 hr                  2000 ‐1000 0.00735 18 18 0 24‐HR      ALL        1ST  UCART1 11/3/2011  24 hr                   3000 ‐1000 0.0041 18 18 0 24‐HR      ALL        1ST  UCART1 11/3/2011  24 hr                   4000 ‐1000 0.00236 18 18 0 24‐HR      ALL        1ST  UCART1 10/20/2011  24 hr                  5000 ‐1000 0.00166 18 18 0 24‐HR      ALL        1ST  UCART1 10/20/2011  24 hr                  ‐5000 0 0.00523 18 18 0 24‐HR      ALL        1ST  UCART1 12/2/2011  24 hr                   ‐4000 0 0.00717 18 18 0 24‐HR      ALL        1ST  UCART1 12/2/2011  24 hr                   ‐3000 0 0.01048 18 18 0 24‐HR      ALL        1ST  UCART1 12/2/2011  24 hr                   ‐2000 0 0.01681 18 18 0 24‐HR      ALL        1ST  UCART1 12/2/2011  24 hr                   ‐1000 0 0.03392 18 18 0 24‐HR      ALL        1ST  UCART1 10/14/2011  24 hr

SITE (1)          0 0 0.11759 18 18 0 24‐HR      ALL        1ST  UCART1 10/16/2011  24 hr                  1000 0 0.01312 18 18 0 24‐HR      ALL        1ST  UCART1 10/4/2011  24 hr                   2000 0 0.00478 18 18 0 24‐HR      ALL        1ST  UCART1 10/4/2011  24 hr                   3000 0 0.0025 18 18 0 24‐HR      ALL        1ST  UCART1 10/4/2011  24 hr                   4000 0 0.00155 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  5000 0 0.00114 18 18 0 24‐HR      ALL        1ST  UCART1 11/12/2011  24 hr                  ‐5000 1000 0.00445 18 18 0 24‐HR      ALL        1ST  UCART1 10/14/2011  24 hr

Page 66: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

3 VOC

                  ‐4000 1000 0.00548 18 18 0 24‐HR      ALL        1ST  UCART1 10/29/2011  24 hr                  ‐3000 1000 0.00752 18 18 0 24‐HR      ALL        1ST  UCART1 11/6/2011  24 hr 

CHANDOR (3)       ‐2000 1000 0.01613 18 18 0 24‐HR      ALL        1ST  UCART1 12/1/2011  24 hr                   ‐1000 1000 0.01257 18 18 0 24‐HR      ALL        1ST  UCART1 12/1/2011  24 hr                   0 1000 0.01739 18 18 0 24‐HR      ALL        1ST  UCART1 10/26/2011  24 hr                  1000 1000 0.01011 18 18 0 24‐HR      ALL        1ST  UCART1 11/6/2011  24 hr                   2000 1000 0.00601 18 18 0 24‐HR      ALL        1ST  UCART1 12/5/2011  24 hr                   3000 1000 0.0033 18 18 0 24‐HR      ALL        1ST  UCART1 11/13/2011  24 hr                  4000 1000 0.00225 18 18 0 24‐HR      ALL        1ST  UCART1 11/13/2011  24 hr                  5000 1000 0.00188 18 18 0 24‐HR      ALL        1ST  UCART1 12/3/2011  24 hr                   ‐5000 2000 0.00399 18 18 0 24‐HR      ALL        1ST  UCART1 12/1/2011  24 hr                   ‐4000 2000 0.00598 18 18 0 24‐HR      ALL        1ST  UCART1 12/1/2011  24 hr                   ‐3000 2000 0.00729 18 18 0 24‐HR      ALL        1ST  UCART1 12/1/2011  24 hr                   ‐2000 2000 0.0047 18 18 0 24‐HR      ALL        1ST  UCART1 12/5/2011  24 hr                   ‐1000 2000 0.0091 18 18 0 24‐HR      ALL        1ST  UCART1 11/16/2011  24 hr                  0 2000 0.0087 18 18 0 24‐HR      ALL        1ST  UCART1 10/26/2011  24 hr                  1000 2000 0.01119 18 18 0 24‐HR      ALL        1ST  UCART1 11/7/2011  24 hr                   2000 2000 0.00463 18 18 0 24‐HR      ALL        1ST  UCART1 11/16/2011  24 hr                  3000 2000 0.00261 18 18 0 24‐HR      ALL        1ST  UCART1 11/3/2011  24 hr                   4000 2000 0.00244 18 18 0 24‐HR      ALL        1ST  UCART1 12/5/2011  24 hr                   5000 2000 0.0018 18 18 0 24‐HR      ALL        1ST  UCART1 12/5/2011  24 hr                   ‐5000 3000 0.00357 18 18 0 24‐HR      ALL        1ST  UCART1 12/1/2011  24 hr                   ‐4000 3000 0.00396 18 18 0 24‐HR      ALL        1ST  UCART1 12/1/2011  24 hr                   ‐3000 3000 0.00269 18 18 0 24‐HR      ALL        1ST  UCART1 12/5/2011  24 hr                   ‐2000 3000 0.00443 18 18 0 24‐HR      ALL        1ST  UCART1 11/4/2011  24 hr                   ‐1000 3000 0.00496 18 18 0 24‐HR      ALL        1ST  UCART1 10/23/2011  24 hr                  0 3000 0.00515 18 18 0 24‐HR      ALL        1ST  UCART1 10/26/2011  24 hr                  1000 3000 0.00463 18 18 0 24‐HR      ALL        1ST  UCART1 11/3/2011  24 hr                   2000 3000 0.0068 18 18 0 24‐HR      ALL        1ST  UCART1 10/23/2011  24 hr                  3000 3000 0.00275 18 18 0 24‐HR      ALL        1ST  UCART1 11/16/2011  24 hr                  4000 3000 0.00118 18 18 0 24‐HR      ALL        1ST  UCART1 11/3/2011  24 hr                   5000 3000 0.00157 18 18 0 24‐HR      ALL        1ST  UCART1 11/3/2011  24 hr                   ‐5000 4000 0.0023 18 18 0 24‐HR      ALL        1ST  UCART1 12/1/2011  24 hr                   ‐4000 4000 0.00177 18 18 0 24‐HR      ALL        1ST  UCART1 12/5/2011  24 hr                   ‐3000 4000 0.00238 18 18 0 24‐HR      ALL        1ST  UCART1 11/15/2011  24 hr                  ‐2000 4000 0.00384 18 18 0 24‐HR      ALL        1ST  UCART1 11/16/2011  24 hr

Page 67: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

4 VOC

                  ‐1000 4000 0.00367 18 18 0 24‐HR      ALL        1ST  UCART1 10/23/2011  24 hr                  0 4000 0.00341 18 18 0 24‐HR      ALL        1ST  UCART1 10/26/2011  24 hr                  1000 4000 0.00314 18 18 0 24‐HR      ALL        1ST  UCART1 11/3/2011  24 hr                   2000 4000 0.00421 18 18 0 24‐HR      ALL        1ST  UCART1 11/7/2011  24 hr                   3000 4000 0.00372 18 18 0 24‐HR      ALL        1ST  UCART1 11/6/2011  24 hr                   4000 4000 0.00186 18 18 0 24‐HR      ALL        1ST  UCART1 11/16/2011  24 hr                  5000 4000 0.0009 18 18 0 24‐HR      ALL        1ST  UCART1 11/16/2011  24 hr                  ‐5000 5000 0.00127 18 18 0 24‐HR      ALL        1ST  UCART1 12/5/2011  24 hr                   ‐4000 5000 0.00189 18 18 0 24‐HR      ALL        1ST  UCART1 11/15/2011  24 hr                  ‐3000 5000 0.00234 18 18 0 24‐HR      ALL        1ST  UCART1 11/4/2011  24 hr                   ‐2000 5000 0.0028 18 18 0 24‐HR      ALL        1ST  UCART1 11/16/2011  24 hr                  ‐1000 5000 0.00278 18 18 0 24‐HR      ALL        1ST  UCART1 10/23/2011  24 hr                  0 5000 0.00242 18 18 0 24‐HR      ALL        1ST  UCART1 10/26/2011  24 hr                  1000 5000 0.00208 18 18 0 24‐HR      ALL        1ST  UCART1 11/3/2011  24 hr                   2000 5000 0.00224 18 18 0 24‐HR      ALL        1ST  UCART1 11/7/2011  24 hr                   3000 5000 0.00339 18 18 0 24‐HR      ALL        1ST  UCART1 10/23/2011  24 hr                  4000 5000 0.0023 18 18 0 24‐HR      ALL        1ST  UCART1 11/6/2011  24 hr                   5000 5000 0.00135 18 18 0 24‐HR      ALL        1ST  UCART1 11/16/2011  24 hr

SITE (1)          0 0 0.11759 18 18 0 24‐HR      ALL        1ST        10/16/2011  24 hrPUNAT (2)         ‐2500 ‐1500 0.01109 18 18 0 24‐HR      ALL        1ST        11/18/2011  24 hr

CHANDOR (3)       ‐2000 1000 0.01613 18 18 0 24‐HR      ALL        1ST        12/1/2011  24 hr CHHIRI (4)        2000 3800 0.00474 18 18 0 24‐HR      ALL        1ST        11/7/2011  24 hr KARWAD (5)        4000 1800 0.00263 18 18 0 24‐HR      ALL        1ST        12/5/2011  24 hr DUNGARA (7)       3500 ‐1500 0.00336 18 18 0 24‐HR      ALL        1ST        11/3/2011  24 hr 

Page 68: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

Annexure X:

Environmental Methods

Page 69: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

Annexure X: Environmental Methods

WATER PARAMETER AND METHOD

Sr. No. Parameters Method

1. Colour APHA Pt.Co2120B

2. Odour APHA 2150 B

3. Taste --

4. Turbidity APHA 2130-B

5. pH APHA 4500-H+B

6. Total Hardness APHA 2340 C

7. Iron APHA 3500B

8. Chloride APHA 4500CI-B

9. Residual Free Chlorine APHA 4500CI-B

10. Total Dissolve Solids APHA 2540 C

11. Calcium APHA 3500Ca

12. Magnesium APHA 3500Mg B

13. Copper APHA 3500-B

14. Manganese APHA 3500 B

15. Sulphate APHA 4500E

16. Nitrate APHA 4500E –B

17. Fluoride APHA 4500FD

18. Phenolic Compounds APHA 5530 C

19. Mercury APHA 3112-B

20. Cadmium APHA 3111-B

21. Selenium IS3025(Part-55)

22. Arsenic IS3025(Part-37)

23. Cyanide APHA 4500C

24. Lead APHA 3500-B

25. Zinc IS 3025 (Part -49)

26. Hexavalent Chromium APHA 3500-B

27. Mineral Oil APHA 2570 A

28. Alkalinity APHA 2310 B

29. Aluminium IS 3025 (Part-55)

30. Boron APHA 4500BC

Page 70: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

AIR PARAMETER AND METHOD

MICROBIOLOGICAL TEST

1 PARTICULATE MATTER (PM10) IS 5182 (Part 23) : 2006

2 SULPHUR DIOXIDE IS 5182 (Part 2) : 2001

3 NITROGEN DIOXIDE CPCB

4 HC CPCB

5 VOC Adopted from OSHA & NIOSH (By

GLC)

6 NOISE LEVEL SLM-100 (Instrument)

1. TBC APHA 9215-C

2. E.Coli IS:15185:2002

3. Total Coliform APHA 9221-B

4. Faecal Coliform APHA 9222-D

5. Staphyloccous aureus IS:5887 (Part II):1976 (Reaff-2005)

Page 71: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied

SOIL PARAMETER AND METHOD

Sr.

No.

Parameters Method

1. Bulk Density

Soil Analysis BY M.I Jackson

Method

2. Salinity

3. Porosity

4. Texture Class

5. Silt

Clay

Sand

6. Ph( 5% Solution)

7. Electrical Conductivity

8. Cation Exchange Capacity

9. Sodium

10. Potassium

11. Nitrogen

12. Magnesium

13. Phosphorous

14. SAR

15. Water Holding Capacity

16. Iron as Fe

17. Copper as Cu

18. Zinc as Zn

19. Manganese as Mn

20. Nickel as Ni

Page 72: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 73: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 74: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied
Page 75: ANNEXURE I: ENVIRONMENTAL STATUS OF EXISTING UNIT & EC ...environmentclearance.nic.in/writereaddata/online/... · Gujarat indicating project is located in the industrial area. Complied