Annexure B- Draft Functional
Specification Document
April 2020
Annexure B- Draft Functional Requirement Specifications
Contents About the Document .............................................................................................. 4
1. Pre-Establishment Services ................................................................................. 5
Pre-Establishment Combined Application Form (CAF) for Pre-Establishment Services ............... 7
1.1 Approval for Setting up of School from School Department............................................ 10
1.2 Temporary Service Connection- High Tension (HT) from Tamil Nadu Generation and
Distribution Corporation (TANGEDCo) .............................................................................. 15
1.3 Temporary Service Connection- Low Tension (HT) from Tamil Nadu Generation and
Distribution Corporation (TANGEDCo) .............................................................................. 23
1.4 and 1.5 Obtaining Sewer Connections for commercial establishments and Water Connection
................................................................................................................................... 35
a. CMWSSB- Sewer Connection for Commercial Establishment (for G+2 and below): Single
Assessment .................................................................................................................. 35
b. CMWSSB- Water & Sewer Connection for Commercial Establishment (for G+2 and below):
Multiple Assessment ...................................................................................................... 39
c. CMWSSB- Water & Sewer Connection for Commercial Establishments (G+3 & above) ......... 46
d. CMWSSB- Water Connection for Industries.................................................................... 55
1.6 Obtaining Sewer Connections for Commercial Establishments from Commissionerate of
Municipal Administration (CMA) ....................................................................................... 59
1.7 New Water Supply Connection from Commissionerate of Municipal Administration (CMA) .. 62
1.8 Obtaining Sewer Connections for Commercial Establishments from Directorate of Town
Panchayats (DTP) .......................................................................................................... 65
1.9 New Water Supply Connection from Directorate of Town Panchayat (DTP)....................... 67
1.10 Road cutting permission from Commissionerate of Municipal Administration (CMA) ......... 69
1.11 New Layout Approval (Comprehensive Construction Permit Portal) from Directorate of Town
and Country Planning (DTCP) .......................................................................................... 72
1.12 -1.19 New Construction Permit Approval (Comprehensive Construction Permit Portal) .... 76
2. Pre-Operation Services ..................................................................................... 87
Pre-Operation Combined Application Form (CAF) for Pre-Operation Services ......................... 89
2.1 Certificate of Recognition for Schools from Department of School Education .................... 93
2.2 NoC to schools for affiliation to CBSE from Department of School Education ................... 100
2.3 New Service Connection- High Tension (HT) from Tamil Nadu Generation and Distribution
Corporation (TANGEDCo) ............................................................................................... 109
2.4 Permission to Erect a Lift from Tamil Nadu Electrical Inspectorate (TNEI) ....................... 117
2.5 Registration and Certification of Steam Pipeline by Directorate of Boilers ....................... 122
2.6 Grant of Recognition as Manufacturer of Boilers by Directorate of Boilers ....................... 129
2.7 Provisional Registration of Boilers by Directorate of Boilers ........................................... 134
2.8 Final Registration of Boilers by Directorate of Boilers ................................................... 141
2.9 Grant of License under Insecticide Act, 1968 for manufacture, storage and sale of
insecticides and pesticides and its renewal from Agriculture Department ............................. 146
2.10 Sanitary Certificate for schools from Commissionerate of Municipal Administration (CMA)
.................................................................................................................................. 155
3. Post-Operation Services ................................................................................. 160
Pre-Operation Combined Application Form (CAF) for Post Operation Services ....................... 163
Annexure B- Draft Functional Requirement Specifications
3.1 New Assessment of Property from Greater Chennai Corporation (GCC) .......................... 167
3.2 Load Addition/Reduction from Tamil Nadu Generation and Distribution Corporation
(TANGEDCo) ................................................................................................................ 177
3.3 License for Working a New Lift from Tamil Nadu Electrical Inspectorate (TNEI) ............... 198
3.4 Renewal of License for Working a New Lift from Tamil Nadu Electrical Inspectorate (TNEI)
.................................................................................................................................. 207
3.5 Permission for making addition /alteration to the existing lift from Tamil Nadu Electrical
Inspectorate (TNEI) ...................................................................................................... 215
3.6 Registration of Generator from Tamil Nadu Electrical Inspectorate (TNEI) ...................... 222
3.7 Transfer of Ownership of Boiler by Directorate of Boilers .............................................. 227
3.8 Renewal of Recognition as Manufacturer of Boiler by Directorate of Boilers ..................... 244
3.9 Renewal of Recognition as Erector/Repairer of Boiler by Directorate of Boilers ................ 251
3.10 Renewal of Boiler Registration by Directorate of Boilers .............................................. 258
3.11 Licence issued for the possession and use of Denatured Spirit / Methylated Spirit / Methyl
Alcohol either as such and/ or for use in the manufacture of specified commodities other than
varnish by Prohibition & Excise Department ..................................................................... 264
3.12 and 3.13 Licence for Retail sale of bottled Indian Made Foreign Spirit, in shops and bars by
TASMAC for the Whole State of the Tamil Nadu and Licence for possession of liquor by a non-
proprietary club for supply to Members under TN Liquor (License and permit) Rules, 1981 by
Prohibition & Excise Department ..................................................................................... 274
3.14 Licence for possession of liquor by the Star Hotels by Prohibition & Excise Department .. 280
3.15 Permit to import foreign liquors by FL2, FL3, FL3A and FL3AA Licensees by Prohibition &
Excise Department........................................................................................................ 289
3.16 Permit to export beer to other states and countries by Prohibition & Excise Department . 296
3.17 Renewal of licenses-FL by Prohibition & Excise Department ........................................ 302
3.18 Renewal of Other Licenses by Prohibition & Excise Department ................................... 314
3.19 Apply for NEEDS and UYEGP (<10 lakhs) from Commissionerate of Industries and
Commerce ................................................................................................................... 321
a. New Entrepreneur cum Enterprise Development Scheme (NEEDS) .................................. 321
b. Unemployed Youth Employment Generation Programme (UYEGP) Scheme ....................... 326
3.20 Incentive for Promotion of Energy Audit and Conservation of Energy (PEACE) from
Commissionerate of Industries and Commerce ................................................................. 331
3.21 Subsidy / Incentives for Micro, Small and Medium Enterprises from Tamil Nadu Industrial
Investment Corporation (TIIC) ....................................................................................... 334
a. Capital Subsidy ......................................................................................................... 334
b. Mega Subsidy ........................................................................................................... 342
3.22 Generator Subsidy from Tamil Nadu Industrial Investment Corporation (TIIC) .............. 350
3.23 New assessment of property from Commissionerate of Municipal Administration (CMA) .. 354
3.24 Name transfer of property from Commissionerate of Municipal Administration (CMA) ..... 358
3.25 New assessment of property from Directorate of Town Panchayats (DTP) ..................... 360
3.26 Name transfer of property from Directorate of Town Panchayats (DTP) ........................ 364
Annexure B- Draft Functional Requirement Specifications
About the Document
This document contains the draft version of the detailed Functional Specifications for the following
features of the new Single Window Portal:
• Pre-establishment Combined Application Form (CAF)
• Pre-Operation CAF
• Functional Requirement Specification (FRS) for 55 Services
The functional specifications given in this document is subject to approval from the concerned
Departments.
Annexure B- Draft Functional Requirement Specifications
1. Pre-Establishment Services
Annexure B- Draft Functional Requirement Specifications
S.
No. Clearances/ Services Competent Authority
1. Approval for setting up a School Department of School Education
2.
Temporary Service Connection- High
Tension (HT)
Tamil Nadu Generation and Distribution
Corporation Limited (TANGEDCo)
3.
Temporary Service Connection- Low
Tension (LT) TANGEDCO
4.
Obtaining Sewer Connections for
commercial establishments
Chennai Metropolitan Water Supply and
Sewerage Board (CMWSSB)
5. Water Connection CMWSSB
6.
Obtaining Sewer Connections for
Commercial Establishments
Commissionerate of Municipal Administration
(CMA)
7. New Water Supply Connection CMA
8.
Obtaining Sewer Connections for
Commercial Establishments Directorate of Town Panchayats (DTP)
9. New Water Supply Connection DTP
10. Road cutting permission CMA
11.
New Layout Approval (Comprehensive
Construction Permit Portal)
Directorate of Town and Country Planning
(DTCP)
12. Planning Permission for building
Chennai Metropolitan Development Authority
(CMDA)
13. Planning permission request CMA
14. Building permit CMA
15. Planning Permission for building DTCP
16. Change of Land use DTCP
17. Planning permission request DTP
18. Building license request DTP
19. Building license request Greater Chennai Corporation (GCC)
Annexure B- Draft Functional Requirement Specifications
Pre-Establishment Combined Application Form (CAF) for Pre-
Establishment Services Sl.No. CAF for Pre- Establishment Particulars
Project Information
1.0 Details of Industrial Unit (Proposed to be set-up)
1.1 Name of the Industrial Unit
1.2 Address of the Industrial Unit
1.2.1 Survey Field (SF) Number/ Re-Survey (RS) Number
1.2.2 Revenue Village Name
1.2.3 Local Body Type
1.2.4 Local Body Name
1.2.5 Ward Number
1.2.6 Door Number/ Plot Number
1.2.7 Street/ Road
1.2.8 Area/ Locality
1.2.9 Village / Town/ City
1.2.10 Taluk Name
1.2.11 District
1.2.12 State
1.2.13 Country
1.2.14 Pin code
1.3 Contact details of the Industrial Unit
1.3.1 Telephone Number with STD code
1.3.2 Fax Number with STD code
1.3.3 Mobile Number:
1.3.4 e-mail Address:
1.3.5 Website Address:
1.4 Nature of Organization
Proprietary
Partnership
Private Limited
Public Limited
Co-Operative
Others
1.5 Registration Number issued by Registrar of Companies (ROC)
1.6 Other Registration Details (please fill the relevant registration details)
1.6.1 Foreign Investment Promotion Board (FIPB) / Reserve Bank of India
(RBI) Approval Number [ Issued Date / Expiry Date]
1.6.2 Industrial Entrepreneurs Memorandum Number [Issued Date / Expiry
Date]
1.7 Proposed date of commencement of construction:
1.8 Proposed date of commencement of commercial production:
2.0 Details of Project Promoter(s)
2.1 Name of the Promoter (s)
2.2 Designation of the Promoter (s) (if applicable)
2.3 Address of the Promoter (s)
2.3.1 Door Number/ Plot Number
2.3.2 Street/ Road
2.3.3 Area/ Locality
2.3.4 Village / Town/ City
2.3.5 District
2.3.6 State
2.3.7 Country
2.3.8 Pin code
2.4 Contact details of the Project Promoter(s)
Annexure B- Draft Functional Requirement Specifications
Sl.No. CAF for Pre- Establishment Particulars
2.4.1 Telephone Number with ISD and STD code
2.4.2 Fax Number with STD code
2.4.3 Mobile Number:
2.4.4 e-mail Address:
3.0 Details of Project Investment and Finance
3.1 Details of Estimated Project Cost (INR Crores)
3.1.1 Land
3.1.2 Building
3.1.3 Plant and Machinery - Imported (Landed Cost)
3.1.4 Plant and Machinery - Indigenous
3.1.5 Miscellaneous Assets
3.1.6 Contingencies, etc.,
3.1.7 Others (Please Specify)
3.1.8 TOTAL
3.2 Means of Finance (INR Crores)
3.2.1 Equity from Promoters - Domestic
3.2.2 Equity from Promoters - Foreign
3.2.3 Loan from Financial Institutions
3.2.4 Others (Please Specify)
3.2.5 Estimated Project Cost Total
4.0 Details of Employment
4.1 Skilled Labour
4.2 Unskilled Labour
4.3 Supervisory
4.4 Total Number of Employees
4.5 Number of Contract Employees
4.6 Maximum number of workers proposed to be employed in the factory on
any one day
5.0 Details of Manufacturing
5.1 Brief description of process technology used along with a flow chart (to
be enclosed)
Flow chart (Please enclose a flow chart in a separate sheet)
5.2 Do you have any foreign technical collaboration?
5.3 Whether the factory will be engaged in Dangerous Operations as
indicated under rule 95 of Tamil Nadu Factory Rules 1950?
5.4 Line of manufacture
5.4.1 Description of Item
5.4.2 Installed Capacity
5.5 Raw Material Consumption
5.5.1 Description of Item
6.0 Details of Energy Consumption and Power requirement
6.1 Source of Energy
6.1.1 Captive Generation ( in kVA )
6.1.2 Tamil Nadu Generation and Distribution Corporation Limited
(TANGEDCO) Supply ( in kVA )
6.2 Power Requirements from TANGEDCO
6.2.1 Temporary (during construction, in kVA )
6.2.2 Permanent (production phase, in kVA)
6.2.3 Voltage rating at which HT supply is required:
6.3 If captive power, fuel used for generation
6.3.1 Fuel Type
Coal
Oil / Diesel
Wood
Wind
Annexure B- Draft Functional Requirement Specifications
Sl.No. CAF for Pre- Establishment Particulars
Solar
Others (Please Specify)
7 Details of Water Requirement
7.1 Industrial Use (Kilo Litres per Day)
7.2 Domestic (Kilo Litres per Day)
8 Other details
8.1 Permanent Account Number (PAN) of the Enterprise
Annexure B- Draft Functional Requirement Specifications
1.1 Approval for Setting up of School from School Department
Online Application Form
Sl No
Field Mandatory
(Y/N)
Field Type (character/Num
eric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
Establishment
CAF (Yes/No)
1 Location Details
1.1 Door No. Y Alpha Numeric Y
1.2 Street Name Y Alpha Numeric Y
1.3 District Y Alpha Numeric Y
1.4 Taluk Y Alpha Numeric Y
1.5 Pincode Y Numeric Only 6 numbers Y
1.6 Survey No. N Alpha Numeric
1.7 Plot Area (Sq.m) Y Numeric
2 Educational Agency proposed to open the School
2.1 Name of Agency Y Alpha Numeric
2.2 Is the Agency a registered body? Y Dropdown Select Y/N
2.2 Name of Authorised Person Y Alpha Numeric
2.3 Mobile Number Y Numeric
2.4 Email-ID Y Alpha Numeric
2.5 Endowment Created? Y Dropdown Select Y/N
3 Standards for which recognition is sought for Y Choose multiple options
Choose from the following Options • Nursery • LKG
• UKG • I • II • III • IV
• V • VI
• VII • VIII • IX • X • XI • XII
Annexure B- Draft Functional Requirement Specifications
Sl No
Field Mandatory
(Y/N)
Field Type (character/Num
eric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
Establishment
CAF (Yes/No)
4 Standard wise Strength Option to add more standards
4.1 Standard Y Alpha Numeric
4.2 Class Strength- Girls Y Numeric
4.3 Class Strength- Boys Y Numeric
5 Details of the Children within 8 kms radius
5.1 6 years to 11 years- Girls Y Numeric
5.2 6 years to 11 years- Boys Y Numeric
5.3 12 years to 14 years- Girls Y Numeric
5.4 12 years to 14 years- Boys Y Numeric
5.5 15 years to 17 years- Girls Y Numeric
5.6 15 years to 17 years- Boys Y Numeric
6 Schools within 5 kms Option to add details of more schools
6.1 Type of School Y Dropdown Select from the following • Play School
• Pre-Primary
• Primary • Middle • High • Higher Secondary
6.2 School Name Y Alpha Numeric
6.3 Strength- Nursery
6.4 Strength- LKG Y Numeric Based on the response to S.No. 6.1, standards get enabled as per the following basis
• Play School
(kindergarten) • Pre-Primary (till
UKG) , Primary (till V), and Middle School (till VIII)
• High School (Till X)
6.5 Strength- UKG
6.6 Strength- I
6.7 Strength- II
6.8 Strength- III
6.9 Strength- IV
6.10 Strength- V
6.11 Strength- VI
6.12 Strength- VII
6.13 Strength- VIII
6.14 Strength- IX
Annexure B- Draft Functional Requirement Specifications
Sl No
Field Mandatory
(Y/N)
Field Type (character/Num
eric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
Establishment
CAF (Yes/No)
6.15 Strength- X • Higher Secondary School (Till XII)
6.16 Strength- XI
6.17 Strength- XII
7 Any Natural Barrier between proposed school and villages nearby?
Y Dropdown Select Y/N
8 Number of Feeder Schools Y Numeric
Checklist of Supporting Documents S.
No. Document Mandatory (Y/N)
1 Copy of Registered trust deed/ Bye-laws of the society/Company register certificate (If response to S.No. 2.2 is “Y”) Y
2 Copy of Registered land document in the name of the school or Registered lease deed / rental agreement for 30 years Y
3 Copy of approved plan from the competent authority of the DTCP/CMDA/Local Bodies (including playground) Y
4 License permitting the use of the School building as Public Building under the Tamil Nadu Buildings (Licensing) Act, 1965
(Tamil Nadu Act XIII of 1965) from Revenue Department
Y
5 Financial Statements of the Educational Agency N
6 Proof of Cash reserve in the Bank- Equivalent of one month salary of the proposed teachers Y
Annexure B- Draft Functional Requirement Specifications
Work Flow
Procedure for Obtaining Approval for Setting up of Schools
Level 1
Applicant
Level 3
Level 2
START
Fill online form
Upload the required supporting
documents and pay fees
SMS/Emil Alert to
Applicant & Level 1
officer
Submit the application
End
Receive digitally signed
Approval certificate
Receive reasons
SMS/Email
Alert to Applicant
Respond to Queries
Allot inspection date
Scrutinize the Application,
Documents and ownership
Visit and verify the details in the School
Auto allocate to concerned Level 1
officer
Prepare inspection report
Upload inspection
report
Forward the application to
Level 2
SMS/Email Alert to
Applicant
Review the file and inspection report
Is it a approval case? Approve
Record reason and Reject
Yes
SMS/Email Alert to Level 2 officer
SMS/Email Alert to
respective officer
No SMS/Email Alert to
Applicant
SMS/Email Alert to
Applicant
Forward the application to Level
3
SMS/Email Alert to Level 3 officer
Review the file and inspection report
Any clarifications required?
Raise Queries
Yes
No
SMS/Email Alert to
Applicant
Digital signed Approval certificate
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Fee Details The application fees for getting approval for setting up schools is Rs. 5000.
Annexure B- Draft Functional Requirement Specifications
Approval based Hierarchy Based on the response in S.No.3 regarding the standards in the School
Sl No School Type* Level 1 Level 2 Level 3
1 Play School (Unaided) Block Education Officer (BEO)/ District Education Officer (DEO)
Chief Education Officer (CEO) Joint Director of Education (JDE)
2
Pre-Primary/Primary/Middle
/High/Higher Secondary (Unaided)
BEO/DEO JDE (Private Schools) Director (Private Schools)
3 Pre-Primary/ Primary/ Middle
Schools (Aided) BEO/DEO JDE (Elementary Education) Director (Elementary Education)
4 High School (Aided) BEO/DEO JDE (Secondary Education) Director (School Education)
5 Higher Secondary School (Aided) BEO/DEO HDE (Higher Secondary
Education) Director (School Education)
*Play School (kindergarten), Pre-Primary (till UKG), Primary (till V), Middle School (till VIII), High School (Till X) and Higher Secondary School (Till XII)
Workflow for Hierarchy based Approval Sl No Hierarchy Level Remarks (if any) Timelines
1 Level 1 Raise queries Within 7 working days from date of receipt of application
2 Level 2 Review and forward application to Approval
Authority -
3 Approval Authority (Level 3) Approves/Rejects Within 30 working days from date of receipt of
application
Annexure B- Draft Functional Requirement Specifications
1.2 Temporary Service Connection- High Tension (HT) from Tamil Nadu Generation and Distribution
Corporation (TANGEDCo)
Online Application Form
Sl No
Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric /
Dropdown)
Remarks, if any for IT vendor Auto Populated from Pre-establishment
CAF (Yes/No)
1 Application Details
1.1 Application Category Y Character Auto-fill to “Temporary Connection”
1.2 District Name Y Alpha Numeric Y
1.3 Select your circle Y Dropdown Select from the list of circles pertaining to the District selected in S.No. 1.2
1.4 Application Type Y Dropdown Select Owner/Other than Owner/SIPCOT lease
1.5 Service Category Y Dropdown
Select from
Commercial
Public Lighting
Industrial
Agricultural
Railways- Traction
Railways- Non-Traction
Miscellaneous Sales
Bulk Supplies or Licenses
Water Works
IT Industries
Register factories (w/o
manufacturing)
Govt and aided education
institutions and Hostels
Government Hospital
Local Body
Veterinary Hospitals
Leprosy Centre
Primary Health Centre
Orphanages
Annexure B- Draft Functional Requirement Specifications
Sl No
Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric /
Dropdown)
Remarks, if any for IT vendor Auto Populated from Pre-establishment
CAF (Yes/No)
Public Libraries
Laboratories
Research Institutions
Studios
Cinema Theatres
Housing Complexes
Private Hospital
Hotels
IT enabled services
Private educational Institutions and Hostels
Private Communication Services
1.6 Applicant/Organization Name
a. Salutation Y Dropdown Select Mr.or M/s or Miss or Mrs.
b. Name of Applicant/Organization Name
Y Alpha Numeric
1.7 Authorized Signatory Name
a. Salutation Y Dropdown Select Mr.or M/s or Miss or Mrs.
b. Name of Authorized Signatory Name
Y Alpha Numeric
2 Description of the Premises
2.1 Premises Address Y Alpha Numeric
2.2 District Name Y Alpha Numeric Y
2.3 Taluk Name Y Alpha Numeric Y
2.4 Village Name Y Alpha Numeric Y
2.5 Pin Code Y Numeric Y
2.6 Land Line No. Y
STD Numeric Maximum 5 numbers
Land Line No. Maximum 8 numbers
2.7 Fax. No. Y
STD Numeric Auto-fill as per response to S.No. 2.6
Annexure B- Draft Functional Requirement Specifications
Sl No
Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric /
Dropdown)
Remarks, if any for IT vendor Auto Populated from Pre-establishment
CAF (Yes/No)
Fax No. Maximum 8 numbers
2.8 Is the Billing address different from premises address?
Y
Select Yes or No
If No, Auto-fill the fields under Billing/Communication
Address
3 Billing/ Communication Address
3.1 Premises Address N Alpha Numeric
3.2 District Name Y Dropdown Select from the list of Districts of Tamil
Nadu
3.3 Taluk Name Y Dropdown Select from the list of taluks pertaining to
the response in S. No. 3.2
3.4 Village Name Y Dropdown Select from the list of villages pertaining
to the response in S. No. 3.3
3.5 Pin Code Y Numeric Not less or more than 6 numbers
3.6 Land Line No. Y
STD Numeric Maximum5 numbers
Land Line No. Maximum 8 numbers
3.7 Fax.No. Y
STD Numeric Auto-fill as per response to S.No. 3.6
Fax No. Only 8 numbers
3.8 Mobile No. Y Numeric Y
3.9 Email Y Alpha Numeric Y
3.10 Date of Registration of the Company
Y Date Format (DD/MM/YY)
Future Date will not be permitted
3.11 Nearest Land Mark N Click, if applicable
4 Service Details
4.1 Supply Voltage Y Dropdown Select 11KV/22KV/33KV/66KV/ 110KV/230KV
4.2 Tariff Y Dropdown Select HT IA/ HT IB/ HT IIA/ HT IIB/ HT
III/ HT IV/ HTV/ HT VI/ LT IC-Domestic
Annexure B- Draft Functional Requirement Specifications
Sl No
Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric /
Dropdown)
Remarks, if any for IT vendor Auto Populated from Pre-establishment
CAF (Yes/No)
Supply/ LT- Commercial Supply/ LT VI- Temp. Supply
4.3 Location Type Y Select Rural/Urban
4.4 Whether the metering point in within 30 meters from the
main gate
Y
Select Yes/No
4.5 Details of existing service connections of the applicant, if any
N Alpha Numeric
5 Load Details
5.1 Estimated requirement now
applied
Notified Connected Load
KW Y Numeric
HP Y Numeric
KVA Y Numeric
Total M.D. in KVA Y Numeric
5.2 Notified connected load in H.P Y Alpha Numeric
5.3 No. of Shifts Y Numeric
5.4 Probable date of load maturing
Y Date Format
(DD/MM/YYYY)
5.5 Remarks if any regarding essentially of supply
N Alpha Numeric
Annexure B- Draft Functional Requirement Specifications
Checklist of Supporting Documents S. No. Document Mandatory
If applicant is the owner of premise:
1 Copy of proof of ownership such as sale deed/ partition deed/ gift settlement executed in favour of the applicant/ certified copy of court judgement/ Recent property tax receipt for the premises in name of applicant by authorised signatory
Y
2 Copy of Partnership deed in case the applicant is a partnership firm or Memorandum/ Articles of Association in case of companies registered under Companies Act and Letter/ Resolution authorising the signatory
Y
3 Copy of Memorandum/Articles of Association in case of company registered under Companies Act N
If applicant is not the owner of premise:
1
Consent letter from the owner of the premises OR Valid proof of occupancy along with the following: • Indemnity bond in Form 6 (as per template in Annexure)
• Letter of acceptance to pay enhanced security deposit
Y
2 Copy of Partnership deed in case the applicant is a partnership firm or Memorandum/ Articles of Association in case of companies registered under Companies Act and Letter/ Resolution authorising the signatory
Y
3 Copy of Memorandum/Articles of Association in case of company registered under Companies Act N
Annexure B- Draft Functional Requirement Specifications
Work Flow Procedure for Obtaining HT -Temporary Service Connection
Assis
tant
Engin
eer
(AE)
Applicant
Sanctionin
g A
uth
ori
tyC
hie
f En
gin
eer
(CE)
Ass
ista
nt
Exe
cuti
ve
Engi
nee
r (A
EE)
Exec
uti
ve E
ngi
neer
(E
E)Su
peri
nte
nd E
ngi
nee
r (S
E)
START
Fill online form
Upload the required supporting documents
SMS/Email Alert to
Applicant & DFO
Submit the application
Scrutinize Application and
Documents
Any clarifications required?
Raise QueriesYes
No
Provide clarification to
Queries
SMS/Email
Alert to Applicant
SMS/Email
Alert to AE
Make Changes to the demand
EndReceive the
service number
Allot inspection
date
Conduct Inspection for
feasibility study
Fill Inspection Checklist
SMS/Email Alert to
Applicant
Raise demand for registration
charges and EMD charges
Scrutinizes demand and make changes,
if required.
Yes
Raise Demand accordingly
Pay required
estimated Charges
Carry out execution
work
Raise service connection
charges
SMS/Email Alert to
Applicant
SMS/Email
Alert to Applicant
SMS/Email Alert to AE
Pay connection Charges
Assign Service Number
Any changes?
SMS/Email
Alert to Applicant
SMS/Email
Alert to AE
SMS/EMail
Alert to Applicant
Pay Registration
and EMD Charges
If payment
made within 15
days
Estimate demand
Yes
No
SMS/Email
Alert to AE
Estimate preparation and santion
No
If payment
made within
15 days
Yes
Scrutinizes demand and make changes,
if required.
Forward with Remarks
Scrutinizes demand and make changes,
if required.
Forward with Remarks
Scrutinizes demand and make changes,
if required.
Forward with Remarks
Scrutinizes demand and make changes,
if required.
Forward with Remarks
Forward application
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Annexure B- Draft Functional Requirement Specifications
Fee Details The charges for the High Tension Temporary Service are provided in Annexure A from Pages 53 to
66 in http://www.tnerc.gov.in/orders/Tariff%20Order%202009/2019/MiscCharges-4-10-2019.pdf.
Approval based Hierarchy Sl No
Hierarchy Level
Designation Remarks (if any) Timelines
1 Level 1
Assistant Engineer
(AE)/Junior Engineer (JE)
Raise Queries
Within 7 days of receiving application
and applicant to respond within 7 days from receiving the query
2 Level 2 Assistant Engineer (AE)
1. Conduct inspection and finish
feasibility study 2. Raise demand for registration charges
3. Estimate demand
Within 15 days of application verification. Applicant to pay within 15 days of receiving demand
3 Level 2 Sanctioning Authority
Approve and raise demand
Demand for Estimate charges to be raised within 15 days of receipt of EMD
charges. Estimate charges to be paid by applicant within 15 days of demand receipt.
4 Level 3 AE Assign Service Number
High Tension: (a) Involving Extension &
Improvement - 44 days (b) Involving enhancement of Power Transformers / Addition of Power Transformers - 88 days (c) Involving commissioning of new substation - 132 days
Extra High Tension:
(a) Involving Extension & Improvement - 110 days (b) Involving enhancement of Power Transformers / Addition of Power Transformers - 132 days (c) Involving commissioning of new
substation - 198 days
*Sanctioning Authority
Sl
No Designation
KVA
(1)
Cost (Rs. In lakh)
(2)
1 Chairman - >50
2 Chief Engineer Upto 1000 Upto 50
3 Superintend Engineer Upto 500 Upto 15
4 Executive Engineer - Upto 7.5
5 Assistant Executive Engineer - Upto 2
The authority is designated if the values in either (1) or (2) are met.
Annexure B- Draft Functional Requirement Specifications
Annexure: FORM-6
(To be obtained in a stamped paper)
Indemnity Bond from the occupier when there is no consent letter from owner
Indemnity Bond to be furnished by an intending consumer who is not the owner of the premises
and applies without the consent of the owner
DEED OF INDEMNITY
THIS DEED OF INDEMNITY EXECUTED ON THIS, THE …………….. DAY OF ……………. TWO THOUSAND
…………………….. by Thiru / Tmty. ……………………… S/o. D/o. W/o. …………………………………….. residing at
……………. Having office / workshop at ………………………………………………………. hereinafter called the
indemnifier (which terms shall mean and include executors, administrators, heirs, successors and
assigns) to and in favour of the (name of Licensee and address), a body corporate, hereinafter called
the Licensee (which terms shall mean and include its successors in office and assigns).
WHEREAS the consumer has taken on lease the premises in Door No. ……. For the purpose of
………………. From Thiru / Tmty. ………………………………………………. S/o. D/o. W/o. …………………….. residing
at ………………………………………………. who is the owner of the above said premises.
AND WHEREAS the consumer has approached the said owner of the premises to give his / her
consent in writing to avail of a service connection in his/her name for the purpose of his / her
business.
AND WHEREAS the said owner is not available / has refused to give his/her consent in writing for
the purpose.
AND WHEREAS the indemnifier has requested the Licensee to give a service connection in his/her
name subject to execution of an indemnity bond by him / her indemnifying the Licensee against any
damage or loss caused to the Licensee in respect of the service connection in his/her name.
AND WHEREAS in consideration of the acceptance of the above for a service connection in his/her
name, the indemnifier hereby agrees to indemnify the Licensee against all proceedings, claims,
demands, costs, damages, expenses which the License may incur by reason of a fresh service
connection given to the indemnifier without the consent of the owner of the premises. The
indemnifier further undertakes to make good any sum that may be found to be and become payable
to the Licensee with regard to all liabilities and claims personally as well as by means of both movable
and immovable properties. The indemnifier agrees that the enhanced Security Deposit paid by him
shall be adjusted against the arrears of current consumption charges but also against any claim that
may arise in the event of termination of the agreement prior to the expiry of the contracted period.
The indemnifier further undertakes that the Licensee shall be at liberty to disconnect the service
connection given to him/her, and also for loading the dues remaining unpaid by him/her to other
service connection(s) that may stand in his/her name.
NOW THE CONDITION OF THE above written bond is such that if the indemnifier shall duly and
faithfully observe and perform the above said conditions, then the above written bond shall be
void, otherwise the same shall remain in full force.
Annexure B- Draft Functional Requirement Specifications
1.3 Temporary Service Connection- Low Tension (HT) from Tamil Nadu Generation and Distribution
Corporation (TANGEDCo)
Online Application Form
Sl No Field Mandatory (Y/N)
Field Type (character/N
umeric/ Alpha
Numeric /
Dropdown)
Remarks, if any for IT vendor
Auto Populated from
Pre-Establishment CAF
(Yes/No)
1 General Information
1.1 District Y Dropdown Y
1.2 Select your circle N Dropdown Select from the list of circles pertaining to the District selected
in S.No. 1.1
1.3 Select your section N Dropdown Select from the list of sections pertaining to the Circle selected in S.No. 1.2
1.4 Service Category Y Dropdown
Select (Foreign
Diplomats/Central Department/ Local Body Corporation/ State Government/ Public Sector or Govt. Undertaking/Others
1.5 Type of Ownership of property where supply is required Y Dropdown
Select from Owner/Joint
Property (Partner)/ Tenant with Consent/Tenant without Consent
1.6 Is both communication address and Billing address are same?
Y Dropdown Select Yes/No
1.7 Attach your Photo Y Applicant can upload the file of max. size 30 KB and of png/ jpeg
format
1.8 Applicant Name Y Alpha Numeric
1.9 Name of the Applicant's Father/ Mother/Husband
a. Relationship Y Dropdown Select from (Father/Mother/Husband)
b. Name Y Alpha Numeric
2 Description of the Premises
Annexure B- Draft Functional Requirement Specifications
Sl No Field Mandatory (Y/N)
Field Type (character/N
umeric/ Alpha
Numeric / Dropdown)
Remarks, if any for IT vendor
Auto Populated from
Pre-Establishment CAF (Yes/No)
2.1 Door.No/Name of the House Y Alpha Numeric Y
2.2 Name of the Street Y Alpha Numeric Y
2.3 Name of the Town/Village Y Alpha Numeric Y
2.4 Name of the Taluk Y Alpha Numeric Y
3 Description of the Communication Services
3.1 Door No./Name of the House Y Alpha Numeric
3.2 Name of the Street Y Alpha Numeric
3.3 Name of the Town/Village Y Alpha Numeric
3.4 Name of the Taluk Y Alpha Numeric
3.5 Mobile Number Y Numeric The applicant can only type 10 numbers
3.6 Email Address Y Alpha Numeric
3.7 Any Existing Service Connections? Y Dropdown Select Yes/No
3.8 If Yes, Details of existing service connection of the applicant
N Alpha Numeric
This field enables only if the
response to 3.7 is “Yes”. Enter Consumer number with region code
3.9 GST Number present? Y Dropdown Select Yes/No
3.10 GST Number Y Alpha Numeric
3.11 Phase Y Dropdown Select 1-phase/3-phase
3.12 Tariff Y Dropdown Select Temporary Supply
3.13 Select your Sub-tariff N Dropdown
Select from the following 1. Supply for temporary
activities other than construction of buildings
2. Supply for Lavish Illustration- Outside the building and in open areas for parties/ functions/occasions
Annexure B- Draft Functional Requirement Specifications
Sl No Field Mandatory (Y/N)
Field Type (character/N
umeric/ Alpha
Numeric / Dropdown)
Remarks, if any for IT vendor
Auto Populated from
Pre-Establishment CAF (Yes/No)
3. Supply for construction of
New Building 4. Additional Construction
exceeding 2000 sq.ft 5. Supply for Lavish Illumination- outer surface /outside the buildings 6. Supply for Lavish
Illumination- Permanent 7. Supply for Lavish Illustration- Hoardings and Advertisement Boards 8. Supply for Lavish Illustration- Public meetings in pandhals/ Shamiana/ Pathways/ Streets/
Roads
If the response to 3.13 is a.“Supply for Temporary Activities other than Construction of Building” b. “Supply for Lavish Illumination- Outside the building and
in open areas for parties/functions/occasions” c. “Supply for Lavish Illumination- Public meetings in Pandhals/ Shamiana/ pathways/streets/roads d. “Supply for Lavish Illumination- Outer Surface/outside the buildings/shops by display lights, decorative lights/ flood light, etc
3.14 Enter the Period Of Ty. Supply Request [In Days] Y Numeric
3.15 Select the permanent Tariff After Construction
If the response to 3.13 is, “Supply for Lavish Illumination- Hoardings and Advertisement Boards”
Y Character Auto-fill to “Commercial”
If the response to 3.13 is “Additional Construction exceeding 2000 sq.ft” or “Supply for Construction of New Building”
Y Dropdown Select 1. Industrial- Non-metro, 2. Industrial- Metro,
Annexure B- Draft Functional Requirement Specifications
Sl No Field Mandatory (Y/N)
Field Type (character/N
umeric/ Alpha
Numeric / Dropdown)
Remarks, if any for IT vendor
Auto Populated from
Pre-Establishment CAF (Yes/No)
3. Power loom,
4. Cottage Industries, 5. Commercial
3.16 Whether Under taking obtained from the Consumer? Y Dropdown Select Yes/No
3.17 Do you require welding? Y Dropdown Select Yes/No
3.18 Is your area under Chennai Metro? N Dropdown Select Yes/No
3.19 Select the type of building Y Dropdown
If the response to 3.18 is Yes, Select Building having stilt +4 floors or ground +3 floors (total 4 floors) and above/Others
Declaration
1. I Thiru/Tmty “Auto-fill as response to S.No 1.8”, “Auto-fill as response to S.No 1.9” hereby request you to supply electrical energy for the purpose of “Temporary Service” to the premises hereinafter described. (Note this undertaking does not preclude a separate written contract being entered into, if so desired by the Licensee or the consumer.)
2. I agree to pay for said energy, service connection charges, the deposit of such security, meter rent, as may be demanded in accordance with the scale of rates prescribed under Tamil Nadu Electricity Distribution Code, Supply Code, notifications and orders issued in this regard by Tamil Nadu Electricity Regulatory Commission.
3. I wish to be charged under tariff under schedule of the TNERC tariff order "Change as per the response of S.No. 3.15”.
4. I agree to take supply for “________" years and utilize the energy in the premises described hereunder or outside the premises for my bonafide use
5. In case I sell or otherwise dispose of the property / vacate the premises while the supply is continued, I agree to give one Calendar month notice in
writing and pay all the arrears to the Licensee. Failing such notice, I hold myself responsible for energy consumed in the premises till such notice is given to the Licensee.
4 Load Requirements
Annexure B- Draft Functional Requirement Specifications
Sl No Field Mandatory (Y/N)
Field Type (character/N
umeric/ Alpha
Numeric / Dropdown)
Remarks, if any for IT vendor
Auto Populated from
Pre-Establishment CAF (Yes/No)
Y Numeric
The table to be enabled with the auto calculation of “Total Wattage” and “total load applied
“
Sl.No Description Number of Point's Wattage of Point's Total wattage
A)Lighting
1. Lights
2. Fans
3. Convenient wall plugs
B)Domestic Electrical Apparatus
1. Cookers
2. Water heaters
3. Refrigerator
4. Air conditioner
5. Other Purposes
6. Convenient wall plugs
C)Power Loads
1. Domestic
2. Industrial
3. Welding
4. Other purposes
5. Convenient Wall plugs
Load applied(KW):
Annexure B- Draft Functional Requirement Specifications
Checklist of Supporting Documents S. No. Document Mandatory
1 Copy of proof of ownership such as sale deed/ partition deed/ gift settlement executed in favour of the applicant/ certified copy of court judgement/ Recent property tax receipt for the premises in name of applicant/ computer patta/
allotment letter/ ownership certificate issued by revenue department officials
Y
2 In case of joint property Copies of proof of ownership such as legal heir certificate along with parent documents specified in (1) above and consent letters from co-owners. If consent letter is not produced, an indemnity bond with enhanced security deposit.
Y
3 If the applicant is not the owner, consent letter from owner in Form 5 or valid proof of occupancy and indemnity bond in Form 6. The template of the forms are given in the Annexure
Y
4 For all special/multi-storeyed buildings in Chennai Metropolitan area, copy of Planning Permission for Spl. Multi stories Buildings
Y
5 for all special/multi-storeyed buildings in Chennai Metropolitan area, copy of Completion Certificate or Undertaking
to Furnish Completion Certificate Y
Annexure B- Draft Functional Requirement Specifications
Work Flow
Procedure for Obtaining LT- Temporary Service Connection
Assis
tant
Engin
eer
(AE)
Applicant
Sanctionin
g A
uth
ori
ty
START
Fill online form
Upload the required supporting documents
SMS/Email Alert to
Applicant & DFO
Submit the application
Scrutinize Application and
Documents
Any clarifications required?
Raise QueriesYes
Raise demand for EMD Charges
No
Provide clarification to
Queries
SMS/Email
Alert to Applicant
SMS/Email
Alert to AE
Make Changes to the demand
EndReceive the
service number
Pay EMD Charges
Allot inspection
date
Conduct Inspection
Fill Inspection Checklist
SMS/Email
Alert to Applicant
Raise demand for estimate charges
Forward to Sanctioning Authority
Scrutinizes demand
SMS/Email
Alert to Applicant
SMS/Email
Alert to AE
Yes
NoRaise Demand
accordingly
Pay required estimated Charges
Carry out extension
work
Raise service connection
charges
SMS/EMail
Alert to Applicant
SMS/Email
Alert to Applicant
SMS/Email
Alert to AE
Pay connection Charges
Assign Service Number
Any changes?
SMS/Email
Alert to Applicant
SMS/Email
Alert to AE
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Annexure B- Draft Functional Requirement Specifications
Fee Details
Annexure B- Draft Functional Requirement Specifications
For the tariffs, please find in the link-
http://www.tangedco.gov.in/linkpdf/ONE_PAGE_STATEMENT.pdf
Annexure B- Draft Functional Requirement Specifications
Approval based Hierarchy Sl No
Hierarchy Level Designation Remarks (if any) Timelines
1 Level 1 Assistant Engineer (AE) Raise Queries and raise EMD charges Within 7 days
2 Level 2 Assistant Engineer (AE) Conduct inspection and raise demand
estimate charges -
3 Level 2 Sanctioning Authority* Approve demand -
4 Level 3 AE Assign Temp Service Number Within 30 days
*Sanctioning Authority
Sl No Hierarchy Level Designation
1 Up to 25 KW and cost not exceeding Rs. 5000 AE/ Junior Engineer (JE)
2 Up to 50 KW Assistant Executive Engineer (AEE)
3 Greater than 50 KW and up to 97 KW/ 130 HP Executive Engineer
Annexure B- Draft Functional Requirement Specifications
ANNEXURE
FORM-5
Owner Consent Letter for getting New Supply
To
The Designated Engineer
(Address of the Licensee)
OWNER’S CONSENT LETTER
I …………………………………………………………………………. have ………………………….. being the legal owner ….. of
the premises No. ……………………………………………….. hereby agree as follows:-
I consent to the installation by you at the above mentioned premises tenanted by Thiru / Thirumathy
………………………………… …………………………… ……………………………. of electric service cables, meters, wiring,
fittings and other equipment for the supply of electricity (hereinafter called “The Installation”) under
the terms of an agreement between you and the tenant of the above said premises.
In the event of the above said tenant vacating the aforesaid premises, I shall give you due notice
fifteen days advance to enable you to arrange for the termination of your contract with the aforesaid
tenant failing which I shall be responsible for any loss that may accrue on that account.
Signed by the said …………………………………………
In the presence of …………………………………………
Witness Name ………………………………………………
Address ………………………………………………………..
Annexure B- Draft Functional Requirement Specifications
FORM-6
(To be obtained in a stamped paper)
Indemnity Bond from the occupier when there is no consent letter from owner
Indemnity Bond to be furnished by an intending consumer who is not the owner of the premises
and applies without the consent of the owner
DEED OF INDEMNITY
THIS DEED OF INDEMNITY EXECUTED ON THIS, THE …………….. DAY OF ……………. TWO THOUSAND
…………………….. by Thiru / Tmty. ……………………… S/o. D/o. W/o. …………………………………….. residing at
……………. Having office / workshop at ………………………………………………………. hereinafter called the
indemnifier (which terms shall mean and include executors, administrators, heirs, successors and
assigns) to and in favour of the (name of Licensee and address), a body corporate, hereinafter called
the Licensee (which terms shall mean and include its successors in office and assigns).
WHEREAS the consumer has taken on lease the premises in Door No. ……. For the purpose of
………………. From Thiru / Tmty. ………………………………………………. S/o. D/o. W/o. …………………….. residing
at ………………………………………………. who is the owner of the above said premises.
AND WHEREAS the consumer has approached the said owner of the premises to give his / her
consent in writing to avail of a service connection in his/her name for the purpose of his / her
business.
AND WHEREAS the said owner is not available / has refused to give his/her consent in writing for
the purpose.
AND WHEREAS the indemnifier has requested the Licensee to give a service connection in his/her
name subject to execution of an indemnity bond by him / her indemnifying the Licensee against any
damage or loss caused to the Licensee in respect of the service connection in his/her name.
AND WHEREAS in consideration of the acceptance of the above for a service connection in his/her
name, the indemnifier hereby agrees to indemnify the Licensee against all proceedings, claims,
demands, costs, damages, expenses which the License may incur by reason of a fresh service
connection given to the indemnifier without the consent of the owner of the premises. The
indemnifier further undertakes to make good any sum that may be found to be and become payable
to the Licensee with regard to all liabilities and claims personally as well as by means of both movable
and immovable properties. The indemnifier agrees that the enhanced Security Deposit paid by him
shall be adjusted against the arrears of current consumption charges but also against any claim that
may arise in the event of termination of the agreement prior to the expiry of the contracted period.
The indemnifier further undertakes that the Licensee shall be at liberty to disconnect the service
connection given to him/her, and also for loading the dues remaining unpaid by him/her to other
service connection(s) that may stand in his/her name.
NOW THE CONDITION OF THE above written bond is such that if the indemnifier shall duly and
faithfully observe and perform the above said conditions, then the above written bond shall be
void, otherwise the same shall remain in full force.
Annexure B- Draft Functional Requirement Specifications
35
1.4 and 1.5 Obtaining Sewer Connections for commercial establishments and Water Connection
a. CMWSSB- Sewer Connection for Commercial Establishment (for G+2 and below): Single Assessment
Online Application Form
Sl No Field Mandatory
(Y/N)
Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
establishment CAF (Yes/No)
1 Log-In Y
1.1 Mobile Number Y Numeric OTP to be generated in the applicant’s number for logging in
2 Connection Type Y Checklist Options in checklist: New Sewer
Connection, Renewal, Shifting of Sewer
3 Whether Building is assessed or not?
Y Checklist Options in Checklist: Yes/ No. On Clicking Yes, additional tab to be opens: “Please enter Bill Number as per Property Tax Assessment” (with a
search option to search bill details). On Clicking No, 2 additional tabs
opens: a. Corporation Zone/ Metro Water
Area (Dropdown- List of Corporation Zones)
b. Depot No./ Division No. (Dropdown- List of Depot/ Division with numbers)
4 Name Y Character Y
5 Mobile Y Numeric Y
6 ID Proof Y
6.1 ID Y Dropdown List in dropdown: Aadhar, Ration,
Voter ID, Passport, Bank Passbook,
Electricity Bill, Others On Clicking Others, an additional tab opens “If others, please specify”
6.2 ID Number Y Numeric
7 Location Y Character
8 Street Name Y Character
Annexure B- Draft Functional Requirement Specifications
36
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric) Remarks, if any for IT vendor
Auto Populated from Pre-
establishment CAF
(Yes/No)
9 Door No. Y Numeric
10 Pin Code Y Numeric
11 Category of Building N Character Default: G+2 Floors & Below
12 Whether rainwater harvesting required
Y Checklist Option in Checklist: Yes/ NO
Checklist of Supporting Documents S. No. Document Mandatory
1 No documents required at the time of application
Annexure B- Draft Functional Requirement Specifications
37
Work Flow
PROCEDURE FOR OBTAINING NEW WATER/ SEWER CONNECTION FOR COMMERCIAL ESTABLISHMENT FROM CMWSSB
Assis
tant
Engin
eer
Applicant
START
Fill online form on SWP
Upload the required supporting documents
Email/ SMS Alert to
Applicant & Department
Official
Submit the application
Scrutinize the Application & Supporting Documents
Any clarifications
required?
Raise QueriesYes
Provide clarification to
Queries
Email/ SMS Alert to
Applicant
Payment of Fees
Physical inspection of site and building category for new sewer
connection
No
Raise queries for additional payment
Complete Payment of
Requisite Amount
Email/ SMS Alert to
Applicant
Yes
Is Site Ok?
Reject application
Complete works and enter connection date
Email/ SMS Alert to
Applicant
End
Legend
Online – Department system
Online – Single Window Portal (SWP)
Offline
Email/ SMS Alert to
Applicant
Annexure B- Draft Functional Requirement Specifications
38
Fee Details S. No. Fee Type Rate (in INR)
1 Connection Charge for water & sewer:
a) Category A (for every 100 sq m) 7500
b) Category B (for every 50 sq m) 7500
c) Category C (for every 25 sq m) 7500
• Category A: Offices, Hospitals without inpatient facilities, Educational Institutions without Boarding and Lodging, Temples, Churches, Mosques, guest
houses, shopping / commercial complexes, Cinema Theatres, Factories with or without toilets, consulting room of all kinds and similar type of buildings,
every 100 sq.m of built up area or part thereof, is calculated as one dwelling unit.
• Category B: Hotels, Restaurant, Educational Institutions with Hostels, Lodging Houses, Marriage Hall, Hospitals with Lab & Diagnostic facilities only
and without inpatient facility and any other buildings of similar natures, every 50 sq.m of built up area or part thereof is calculated as one dwelling
unit
• Category C: Hospital with inpatient facilities, every 25 sq.m. of built up area or part thereof is calculated as one dwelling unit.
Workflow for Hierarchy based Approval Sl No Hierarchy Level Designation Remarks (if any) Timelines
1 Level 1 Assistant Engineer
Scrutinizes the Application and conducts physical inspection of site
No timeline
Raises queries for additional payment No timeline
Raises demand for water/ sewer charges 21 ays
Annexure B- Draft Functional Requirement Specifications
39
b. CMWSSB- Water & Sewer Connection for Commercial Establishment (for G+2 and below): Multiple
Assessment
Online Application Form
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
establishment CAF (Yes/No)
1 Initial log in Y
1.1 Connection
Type
Y Checklist Options in Checklist: Water, Sewer, Both
1.2 Whether the Building is assessed or not
Y Checklist Options in Checklist: Yes/ No
1.3 Bill No. as per property tax assessment
Y Numeric
1 Application
Form
1.1 Connection Type
Y Character Auto-populated: Water/ Sewer. Based on selection while logging in.
1.2 Whether sewer
connection available?
Y Checklist Options in Checklist: Yes, No
1.3 Corporation Zone/ Metro Water Area
Y Numeric Auto-populated from Bill Y
1.4 Depot
No./Division No.
Y Numeric Auto-populated from Bill Y
1.5 Whether the connection is
for
Y Checklist Options in checklist: Building Constructed on Vacant Land, Demolition of existing building and reconstruction, sub-division
of property
Y
Annexure B- Draft Functional Requirement Specifications
40
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
establishment CAF (Yes/No)
2 Name and address of the owner
2.1 Name Y Character Auto-populated from Bill
2.2 Mobile Y Numeric
2.3 Landline N Numeric
2.4 E-mail N Character
3 Name and address of the owner (if the
applicant is not the owner)
3.1 Legal Status of the Applicant
Y Checklist Options in Checklist: Owner, Lessee, Power of Attorney
3.2 Name Y Character
3.3 Mobile Y Numeric
3.4 Landline Y Numeric
3.5 E-mail Y Character
3.6 Door No. Y Character Auto-populated from bill
3.7 Street Name Y Character Auto-populated from bill
3.8 Location Y Character Auto-populated from Bill
3.9 Pincode Y Numeric Auto-populated from bill
3.10 Chennai Metro
Consumer
No. by Corporation
Y Numeric Auto-populated from Bill
3.11 Corporation Annual Value
Fixed
Y Numeric Auto-populated from Bill
3.12 Aadhaar Number
Y Numeric
Annexure B- Draft Functional Requirement Specifications
41
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
establishment CAF (Yes/No)
3.13 Whether Sump provided
Y Checklist Options in checklist: Yes/No
4 Non-Residential
Details
4.1 Add Record Y Clicking on this tab, an additional window opens. The details provided in this window get reflected in a table below for
calculation of auto-calculation of tariff.
4.1.1 CMC Number Y Numeric
4.1.2 Floors Y Dropdown Options in dropdown: Basement, Ground Floor, Stilt, Mezzanine, First Floor, Head Room, Lift Room, Second Floor
4.1.3 Enter the Area in sq. m (including common area)
Y
4.1.3.1 Category A (100 sq.m)
N Numeric Category A: Offices, Hospitals without inpatient facilities, Educational Institutions without Boarding and Lodging, Temples, Churches, Mosques, guest houses, shopping / commercial complexes, Cinema Theatres, Factories with or without toilets, consulting room of all kinds and similar type of buildings.
4.1.3.2 Category B (50 sq.m)
N Numeric Category B: Hotels, Restaurant, Educational Institutions with Hostels, Lodging Houses, Marriage Hall, Hospitals with Lab & Diagnostic facilities only and without inpatient facility and any other buildings of similar natures.
4.1.3.3 Category C
(25 sq.m)
N Numeric Category C: Hospital with inpatient facilities.
After saving these details in the window, the values provided get reflected in a table below in the previous window
4.2 Non-residential
details
Y Table To be auto-populated based on information provided above. The table will be as follows: (provision to add multiple rows)
Annexure B- Draft Functional Requirement Specifications
42
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
establishment CAF (Yes/No)
S.No Floor Area in Sq. Ft.
Area in Sq. m.
Total Area
in sq. m
Total area
Edit/ Delete
A B C A B C
1. Option to edit/
delete
5 Amount Payable
Y Table A table to be provided as follows:
S.No. Amount Description Amount
1 Connection charges (as
calculated above) for water
To be auto-
calculated
2 Connection charges (as calculated above) for sewer
To be auto-calculated
3 Advance tax wherever
applicable
To be auto-
calculated
4 Meter testing charges To be auto-calculated
5 Infrastructure Development
Charges (IDC) payable to CMWSSB
To be auto-
calculated
6 Infrastructure Development Charges (IDC) already paid
to CMWSSB through CMDA
Amount to be entered by
applicant
7 Deposit remitted if any for water service connection
Amount to be entered by applicant
8 Deposit remitted if any for sewer service connection
Amount to be entered by
applicant
Annexure B- Draft Functional Requirement Specifications
43
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
establishment CAF (Yes/No)
Total amount payable Auto-calculated
Total Amount Adjusted Auto-calculated
Balance Amount Payable Auto-calculated
Checklist of Supporting Documents S. No. Document Mandatory
1 No documents required at the time of application
Annexure B- Draft Functional Requirement Specifications
44
Work Flow
PROCEDURE FOR OBTAINING NEW WATER/ SEWER CONNECTION FOR COMMERCIAL ESTABLISHMENT FROM CMWSSB
Assis
tant
Engin
eer
Applicant
START
Fill online form on SWP
Upload the required supporting documents
Email/ SMS Alert to
Applicant & Department
Official
Submit the application
Scrutinize the Application & Supporting Documents
Any clarifications
required?
Raise QueriesYes
Provide clarification to
Queries
Email/ SMS Alert to
Applicant
Payment of Fees
Physical inspection of site and building category for new water/
sewer connection
No
Raise queries for additional payment
Complete Payment of
Requisite Amount
Email/ SMS Alert to
Applicant
Yes
Is Site Ok?
Reject application
Complete works and enter connection date
Email/ SMS Alert to
Applicant
End
Legend
Online – Department system
Online – Single Window Portal (SWP)
Offline
Email/ SMS Alert to
Applicant
Annexure B- Draft Functional Requirement Specifications
45
Fee Details S. No. Fee Type Rate (in INR)
1 Connection Charge for water & sewer:
22 Category A (for every 100 sq m) 7500
23 Category B (for every 50 sq m) 7500
24 Category C (for every 25 sq m) 7500
Workflow for Hierarchy based Approval Sl No Hierarchy Level Designation Remarks (if any) Timelines
1 Level 1 Assistant Engineer
Scrutinizes the Application and conducts physical inspection of site
No timeline
Raises queries for additional payment No timeline
Raises demand for water/ sewer charges 21 ays
Annexure B- Draft Functional Requirement Specifications
46
c. CMWSSB- Water & Sewer Connection for Commercial Establishments (G+3 & above)
Online Application Form
Sl
No Field
Mandato
ry (Y/N)
Field Type (character/Nume
ric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
establishment CAF
(Yes/No)
1 Name and
Address of the
Applicant
Y
1.1 Name of the Applicant
Y Character
1.2 Address of
the Applicant
Y Character
1.3 Legal status of the Applicant
Y Dropdown Options in dropdown: Owner, Lessee, Power of Attorney, Other. On clicking on “Other”, a new tab open: Mention, if others
1.4 Name of the owner
Y Character Y
1.5 Address of the owner
Y Character Y
1.6 Contact Details:
Y Y
1.6.1
Phone N Numeric Y
1.6.
2
Mobile Y Numeric Y
1.6.3
Email Y Character Y
2.1 Address of
the premises for which water/ sewer
Y Y
Annexure B- Draft Functional Requirement Specifications
47
Sl
No Field
Mandato
ry (Y/N)
Field Type (character/Nume
ric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
establishment CAF
(Yes/No)
connection is sought
2.2 Whether the connection
is for new building?
Y Dropdown Options in dropdown: Yes/ No Y
2.3 Whether the
connection is for modified building?
Y Dropdown Options in dropdown: Yes/ No
2.4 Whether
Alteration to existing water/ sewer
connection?
Y Dropdown Options in dropdown: Yes/ No Y
3.1 Whether
rainwater harvesting structure provided?
Y Dropdown Options in dropdown: Yes/ No
3.2 Whether
Diaphragm Chamber structure provided?
Y Dropdown Options in dropdown: Yes/ No
4.1 Metro Water Area/
Corporation Zone
Y Numeric
4.2 Depot No./ Division No.
Y Numeric
Annexure B- Draft Functional Requirement Specifications
48
Sl
No Field
Mandato
ry (Y/N)
Field Type (character/Nume
ric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
establishment CAF
(Yes/No)
4.3 CMC No. by Corporation
Y
4.3.1
Zone Y Character
4.3.2
Ward No. Y Numeric
4.3.3
Bill No. Y Numeric
4.3.4
Sub No. Y Numeric
4.3.5
Annual value fixed as per CMC No./ Local Authority
Y Numeric In INR
5 Calculation
of equivalent dwelling units and connection charges
Y Table Following table to be provided:
Sl. No.
Utility of the building
Area per dwelling unit (in sq. m.)
Built-up area (sq.
m.)
Equivalent dwelling units (in
nos.)
Rate per dwelling unit (in INR)
Amount (in INR)
Water
Sewer
Water
Sewer
1 Residential Independent houses
Upto 500 sq ft
(46.47 sq.m)
Upto 46.47
1 100 100
Upto G+1 Above 46.47 Upto 100
1 5000
5000
Utpo G+1 Above 100 upto 200
7500
7500
Annexure B- Draft Functional Requirement Specifications
49
Sl
No Field
Mandato
ry (Y/N)
Field Type (character/Nume
ric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
establishment CAF
(Yes/No)
2 All other residential buildings/ flats (Buildings have G+2 and
above and flats)
All other Buildings/
Flats
Upto 200 7500
7500
3 Non- Residential
Category-A
100 7500
7500
Category-B
50 7500
7500
Category-C
25 7500
7500
4 Mixed Use of buildings (partly residential and partly commercial etc.)
Residential Upto 200 750
0
7500
Commercial
As per Sl. No. 3 above
7500
7500
5 Reconnection/ Shifting/ Renewal
Reconnection of service
connections disconnected for
non-payment of tax and
charges/ Shifting/ Renewal of
Irrespective of built up
area and category for single connectio
n
1 7500
7500
Annexure B- Draft Functional Requirement Specifications
50
Sl
No Field
Mandato
ry (Y/N)
Field Type (character/Nume
ric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
establishment CAF
(Yes/No)
existing
connection
Total in
INR
6 Amount Payable
Y To be Auto-filled
6.1 Connection
Charges (as calculated above) for water
Y To be Auto-filled
6.2 Connection Charges (as
calculated above) for sewer
Y To be Auto-filled
6.3 Advance tax wherever as
para 3 of guidelines)
Y To be Auto-filled
6.4 Meter testing charges (as per para 4
of guidelines)
Y To be Auto-filled
6.5 Deposit Amount for water
Y To be Auto-filled
Annexure B- Draft Functional Requirement Specifications
51
Sl
No Field
Mandato
ry (Y/N)
Field Type (character/Nume
ric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
establishment CAF
(Yes/No)
6.6 Deposit Amount for
Sewer
Y To be Auto-filled
6.7 Caution
Deposit for Temporary Water/ Sewer
Connection
Y To be auto-filled
6.8 Penalty (Reconnection/ Unauthorise
d Connection)
Y To be auto-filled
6.9 Total
Amount
Y To be auto-filled. Summation of (6.1) to (6.8)
Annexure B- Draft Functional Requirement Specifications
52
Checklist of Supporting Documents S. No. Document Mandatory
1 True Copy of plans sanctioned by CMDA/ Corporation of Chennai/ Local Authority Y
2 Copy of Notice issued for assessment for property with floor wise assessment details Y
3 Copies of acknowledgment letters seeking assessment of property tax, water and sewerage tax (if not assessed) Y
4 Drawing showing internal plumbing work and connection to public water/ sewerage main with length, nature of Road
portion such as mud/platform, Tar Bitumen/ WBM etc. signed by owner/applicant Y
5 Registration number of sewer application with copy of the challan for having paid the connection charges if already
sewerage facilities availed Y
6 Proof having paid taxes/ charges upto date Y
7 For address proof, copy of Ration card/ Aadhar Card/ Passport should be enclosed by the applicant seeking sewer/
water connection for the residential independent house upto 500 sq ft N
8
Acknowledged copies of letter seeking assessment for tax from Corporation of Chennai/ Local Authority and CMWSSB
should be enclosed by the applicant seeking sewer/ water connection for the residential independent house upto 500
sq. ft.
N
9 Proof of having paid Infrastructure Development charges to CMWSSB Y
10 Area of floor wise details for each dwellings/ flats/ apartments (self-attested) N
11 In case of applicants having residential independent house upto 500 sq. ft. area, an undertaking letter incorporating
the conditions to be enclosed on a non-judicial stamp of INR 20 N
12 Copies of Infrastructure Development Charges Calculation Sheet signed by the owner Y
Annexure B- Draft Functional Requirement Specifications
53
Work Flow
PROCEDURE FOR OBTAINING NEW WATER CONNECTION FOR COMMERCIAL ESTABLISHMENT (G+3 And Above) FROM CMWSSB
Are
a E
ngin
eer
Applicant
Deputy En
gine
er (Dis
trict
leve
l)
START
Fill online form on SWP
Upload the required supporting documents
Email/ SMS Alert to
Applicant & Department
Official
Submit the application
Scrutinize the Application
Payment of Fees
Legend
Online – Department system
Online – Single Window Portal (SWP)
Offline
Email/ SMS Alert to
ApplicantAny clarifications
required?
Raise QueriesYes
Provide clarification to
Queries
End
Reviews and forwards the application to Deputy Engineer/ Area Engineer at the district level
No
Conducts physical inspection of the site
Raise queries for additional deviations
and payment to Applicant
No
Additional queries?
Complete payment of
Additonal Amount
Prepares a report based on site inspection
Reviews the report Approve the connection
Should the application be
approved?
Reject application
Email/ SMS Alert to
Applicant
Email/ SMS Alert to
Applicant
Annexure B- Draft Functional Requirement Specifications
54
Fee Details
a. The connection charges are computed based on “Equivalent dwelling units” basis the categories reckoned as detailed below:
• Category A: For Offices, Hospitals without inpatient facilities, Educational institutions without boarding and lodging, temples, churches, mosques,
guest houses, shopping/ commercial complexes, cinema theatres, factories, consulting room of all kinds and similar type of buildings, every 100
sq. m. of built up area or part thereof, is calculated as one dwelling unit.
• Category B: For Hotels, Restaurants, Educational Institutions with Hostels, lodging houses, marriage halls, hospitals with lab & diagnostic facilities
and other buildings of similar nature, every 50 sq. m. of built up area or part thereof, is calculated as one dwelling unit
• Category C: For hospital with inpatient facilities, every 25 sq. m. of built up area or part thereof is calculated as one dwelling unit
b. Applicant has to pay INR 3,000 per equivalent dwelling unit as advance tax if the building is not assessed for water and sewerage tax
Workflow for Hierarchy based Approval Sl No Hierarchy Level Designation Remarks (if any) Timelines
1 Level 1 Area Engineer Final approving authority- also scrutinize applications and reviews Inspection Reports prepared by Deputy Engineer (District level)
No timeline
2 Level 2 Deputy Engineer (District Level) Conducts field inspection and prepares Inspection Report- also raises queries to the Applicant in case of
deviations based on field inspection
No timeline
(Timelines to be received from the Department)
Sample Certificate (To be received from the Department)
Annexure B- Draft Functional Requirement Specifications
55
d. CMWSSB- Water Connection for Industries
Online Application Form
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric) Remarks, if any for IT vendor
Auto Populated from Pre-
establishment CAF
(Yes/No)
1 Legal Name of Company Y Character Y
2 Address for Correspondence
2.1 Door No. Y Character Y
2.2 Plot No. Y Character Y
2.3 Street Name Y Character Y
2.4 Location Y Character Y
2.5 Pin Code Y Numeric Y
3 Name of Contact Person Y Character with a dropdown for Salutation
Y
4 Mobile Number Y Numeric Y
5 Landline Number Y Numeric Y
6 Email id Y Character Y
7 Site Address
7.1 Door No. Y Character Y
7.2 Plot No. Y Character Y
7.3 Street Name Y Character Y
7.4 Location Y Character Y
7.5 Pin Code Y Numeric Y
8 Water Classification Y Dropdown Options in dropdown: Industries (treated water), Secondary treated sewage, Tertiary Treatment Reverse Osmosis (TTRO) water
9 Requirement of water in Kilo litres/ Day (KLD)
Y Numeric
10 Cost Rs. Y Numeric To be auto-filled based on requirement of water and tariff rates
11 GST Amount (GST @18%)
Y Numeric Auto-filled based on (10)
12 Total processing amount Y Numeric Auto-generated: Summation of (10) and (11)
Annexure B- Draft Functional Requirement Specifications
56
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric) Remarks, if any for IT vendor
Auto Populated from Pre-
establishment CAF
(Yes/No)
13 Are water sewer lines available near the property?
Y Dropdown Options in dropdown: Yes/ NO
Checklist of Supporting Documents S. No. Document Mandatory
1 No documents required at the time of application
Annexure B- Draft Functional Requirement Specifications
57
Work Flow
PROCEDURE FOR OBTAINING NEW WATER CONNECTION FOR INDUSTRIES FROM CMWSSB
Executive E
ngin
eer
Applicant
Man
agem
en
t C
om
mit
tee
START
Fill online form on SWP
Upload the required supporting documents
Email/ SMS Alert to
Applicant & Department
Official
Submit the application
Scrutinize the Application
Payment of Fees
Legend
Online – Department system
Online – Single Window Portal (SWP)
Offline
Schedules an inspection of the site
Email/ SMS Alert to
Applicant
Conducts physical inspection of the site
Any clarifications
required?
Raise QueriesYes
Provide clarification to
Queries
Prepares an Estimate, verifies and uploads Site Plan, Sump drawing
specifying height of sump and ownership proof received from the
Applicant during Inspection
Prepares Feasibility Report and places it before Management
Committee for decision
Reviews the Feasibility Report
Should the applicant be
approved?
Rejects application
Approves application
Initiates tendering
Issues Work Order
Pays Estimate Amount
End
Annexure B- Draft Functional Requirement Specifications
58
Fee Details S. No. Fee Type Rate (in INR)
1 Application Fee (excluding GST@18%):
22 < 1000 KLD 1,00,000
23 1000-1500 KLD 1,50,000
24 >1500 KLD 2,50,000
Workflow for Hierarchy based Approval Sl No Hierarchy Level Designation Remarks (if any) Timelines
1 Level 1 Executive Engineer
Scrutinizes the Application, prepares Feasibility Report and issues work orders
No timeline
Issue of Work Order 7 days
2 Level 2 Management Committee Final Approving authority based on review of feasibility report
No timeline
Annexure B- Draft Functional Requirement Specifications
59
1.6 Obtaining Sewer Connections for Commercial Establishments from Commissionerate of Municipal
Administration (CMA)
Online Application Form
# Field
Mandatory
(Y/N) Field Type Remarks, if any for IT vendor
Auto Populated from pre-establishment CAF
(Yes/No)
1.1 Name of ULB Y Dropdown Y
1.2 Assessment No. Y
1.3 Mobile Number Y Numeric Y
1.4 Applicant Name Y Alphanumeric
1.5 Pincode Y Numeric Auto-populated based on the Assessment No.
1.6 Area Y Dropdown
1.7 Locality Y Dropdown
1.8 Street Y Dropdown
1.9 Door No.
1.10 Email Y Alphanumeric Y
2 Service Location
2.1 Area Y Dropdown
2.2 Locality Y Dropdown
2.3 Street Y Dropdown
2.4 Zone Dropdown
2.5 Ward Y Dropdown
3 Sewer Connection Details
3.1 Connection type
i. Residential
ii. Commercial iii. Industrial
N Dropdown
Annexure B- Draft Functional Requirement Specifications
60
Checklist of Supporting Documents Sl. No. Document Mandatory (Y/N)
1. Application Form Y
2. Property Tax Receipt Y
3. Deposit Receipt Y
Fee Details No application fee charged
Estimate charges to be paid as raised by department
Annexure B- Draft Functional Requirement Specifications
61
Work Flow Applicant
(SW
P)
Junio
r Assis
tant
(Engin
eeri
ng)
Fitte
r/ P
lum
ber
Junio
r Engin
eer
/ Assis
tant
Engin
eer
Munic
ipal Engin
eer
Munic
ipal
Com
mis
sio
ner
Fill application form
along with
necessary
documents
Schedule inspection
Conduct site
inspection
Prepare inspection
report
Receive
inspection date
Respond to query
with additional
details/ document
SMS alert to applicant
Receives application
and scrutinize
application
Send query to
applicant
Yes
No
SMS alert to applicant
SMS alert to officer
Any queries?
START
Forwards to Fitter/
Plumber
Prepare Rejection
letter with reason
for rejection
Forward Rejection
letter to applicant
Receive rejection
letter
Rejection
LetterSMS alert to applicant
END
Prepare estimate for
pipeline work
Receive demand
letter
Pay requisite fee
Carry out pipeline
work through
contractor
Receive final
connection number
Generate connection
number upon
completion of work
Final
receipt
Scrutinize
application along
with inspection
report
Give internal
approval
Satisfactory?
Yes
Request change in
estimateNo
Scritinize application
along with estimate
Approved?
Issue work order
No
Prepare demand
letter and send to
applicant
Yes
Legend
Online – Single
Window Portal
(SWP)
Online-
Department
system
Offline
Verify payment
Annexure B- Draft Functional Requirement Specifications
62
1.7 New Water Supply Connection from Commissionerate of Municipal Administration (CMA)
Online Application Form
# Field
Mandatory
(Y/N) Field Type Remarks, if any for IT vendor
Auto Populated from Pre-Establishment CAF
(Yes/No)
1.1 Name of ULB Y Dropdown Y
1.2 Assessment No. Y
1.3 Mobile Number Y Numeric Y
1.4 Applicant Name Y Alphanumeric
1.5 Pincode Y Numeric Auto-populated based on the Assessment No.
1.6 Area Y Dropdown
1.7 Locality Y Dropdown
1.8 Street Y Dropdown
1.9 Door No.
1.10 Email Y Alphanumeric Y
2 Service Location
2.1 Area Y Dropdown
2.2 Locality Y Dropdown
2.3 Street Y Dropdown
2.4 Zone Dropdown
2.5 Ward Y Dropdown
3 Water Supply Connection Details
3.1 Usage Y Dropdown Auto-populated based on the Assessment No.
3.2 Connection type iv. Meter v. Slab
N Dropdown
Annexure B- Draft Functional Requirement Specifications
63
Checklist of Supporting Documents Sl. No. Document Mandatory (Yes/No)
1. Application Form Yes
2. Property Tax Receipt Yes
3. Deposit Receipt Yes
Fee Details No application fee charged
Estimate charges to be paid as raised by department
Annexure B- Draft Functional Requirement Specifications
64
Work Flow Applicant
(SW
P)
Junio
r Assis
tant
(Engin
eeri
ng)
Fitte
r/ P
lum
ber
Junio
r Engin
eer
/ Assis
tant
Engin
eer
Munic
ipal Engin
eer
Munic
ipal
Com
mis
sio
ner
Fill application form
along with
necessary
documents
Schedule inspection
Conduct site
inspection
Prepare inspection
report
Receive
inspection date
Respond to query
with additional
details/ document
SMS alert to applicant
Receives application
and scrutinize
application
Send query to
applicant
Yes
No
SMS alert to applicant
SMS alert to officer
Any queries?
START
Forwards to Fitter/
Plumber
Prepare Rejection
letter with reason
for rejection
Forward Rejection
letter to applicant
Receive rejection
letter
Rejection
LetterSMS alert to applicant
END
Prepare estimate for
pipeline work
Receive demand
letter
Pay requisite fee
Carry out pipeline
work through
contractor
Receive final
connection number
Generate connection
number upon
completion of work
Final
receipt
Scrutinize
application along
with inspection
report
Give internal
approval
Satisfactory?
Yes
Request change in
estimateNo
Scritinize application
along with estimate
Approved?
Issue work order
No
Prepare demand
letter and send to
applicant
Yes
Legend
Online – Single
Window Portal
(SWP)
Online-
Department
system
Offline
Verify payment
SMS alert to applicant
Annexure B- Draft Functional Requirement Specifications
65
1.8 Obtaining Sewer Connections for Commercial Establishments from Directorate of Town Panchayats
(DTP)
Online Application Form #
Field
Mandatory
(Y/N) Field Type
Remarks, if any for IT
vendor
Auto Populated from Pre-Establishment CAF
(Yes/No)
1.1 District Y Dropdown Y
1.2 Town Panchayat Y Dropdown Dropdown as per District
selected
Y
1.3 Mobile Number Y Numeric Y
1.4 Email ID Y Alphanumeric Y
1.5 Property Tax No Y Alphanumeric
1.6 Tax Name Y Alphanumeric Auto-populated based on Property Tax No.
1.7 Name Y Alphanumeric Y
1.8 Door No. Y Numeric Auto-populated based on
Property Tax No.
1.9 Ward No. Y Alphanumeric
1.10 Street Name Y Alphanumeric
Checklist of Supporting Documents Sl. No. Document Mandatory (Yes/No)
1. Property Tax Receipt Y
Annexure B- Draft Functional Requirement Specifications
66
Work Flow Applicant
(SW
P)
Executive O
ffic
er
Junio
r Assis
tant
Inspecting A
uth
ority
Fill application form
along with
necessary
documents
Schedule inspection
Conduct site
inspection
Prepare inspection
report
Receive
inspection date
Respond to query
with additional
details/ document
SMS alert to applicant
Receives application
and scrutinize
application
Send query to
applicant
Yes
No
SMS alert to applicant
SMS alert to officer
Any queries?
START
Legend
Online – Single
Window Portal
(SWP)
Online-
Department
system
Offline
Forwards to Junior
Assistant
Prepare Rejection
letter with reason
for rejection
Forward Rejection
letter to applicant
Receive rejection
letter
Rejection
LetterSMS alert to applicant
END
Forwards application
to Inspecting
Authority
Provide inputs for
inspection report
Connection feasible?
Yes
No
Prepare demand
letter for pipeline
work
Approve demand
letter
Receive demand
letter
Pay requisite fee
Pay application fee
Carry out pipeline
work through
contractor
Receive final
connection number
Generate connection
number upon
completion of work
Final
receipt
Annexure B- Draft Functional Requirement Specifications
67
1.9 New Water Supply Connection from Directorate of Town Panchayat (DTP)
Online Application Form
# Field Mandatory
(Y/N) Field Type
Remarks, if any for IT
vendor
Auto Populated from Pre-establishment CAF
(Yes/No)
1.1 District Y Dropdown Y
1.2 Town Panchayat Y Dropdown Dropdown as per District selected
Y
1.3 Mobile Number Y Numeric Y
1.4 Email ID Y Alphanumeric Y
1.5 Property Tax No Y Alphanumeric
1.6 Tax Name Y Alphanumeric Auto-populated based on Property Tax No.
1.7 Name Y Alphanumeric Y
1.8 Door No. Y Numeric Auto-populated based on Property Tax No.
1.9 Ward No. Y Alphanumeric
1.10 Street Name Y Alphanumeric
1.11 Connection Type
i. Domestic ii. Non Domestic
iii. Industries
Y Dropdown
Checklist of Supporting Documents Sl. No. Document Mandatory (Yes/No)
1. Property Tax Receipt Y
Annexure B- Draft Functional Requirement Specifications
68
Work Flow Applicant
(SW
P)
Executive O
ffic
er
Junio
r Assis
tant
Inspecting A
uth
ority
Fill application form
along with
necessary
documents
Schedule inspection
Conduct site
inspection
Prepare inspection
report
Receive
inspection date
Respond to query
with additional
details/ document
SMS alert to applicant
Receives application
and scrutinize
application
Send query to
applicant
Yes
No
SMS alert to applicant
SMS alert to officer
Any queries?
START
Legend
Online – Single
Window Portal
(SWP)
Online-
Department
system
Offline
Forwards to Junior
Assistant
Prepare Rejection
letter with reason
for rejection
Forward Rejection
letter to applicant
Receive rejection
letter
Rejection
LetterSMS alert to applicant
END
Forwards application
to Inspecting
Authority
Provide inputs for
inspection report
Water supply feasible/ available?
Yes
No
Prepare demand
letter for pipeline
work
Approve demand
letter
Receive demand
letter
Pay requisite fee
Pay application fee
Carry out pipeline
work through
contractor
Receive final
connection number
Generate connection
number upon
completion of work
Final
receipt
Annexure B- Draft Functional Requirement Specifications
69
1.10 Road cutting permission from Commissionerate of Municipal Administration (CMA)
Online Application Form
# Field
Mandatory
(Y/N) Field Type Remarks, if any for IT vendor Auto Populated from Pre-
Establishment CAF? (Yes/No)
1.1 Name of ULB Y Dropdown
1.2 Applicant Name Y Alphanumeric
1.6 Mobile Number Y Numeric Y
2 Service Location Details
2.1 Pincode Y Numeric Y
2.2 Area Y Dropdown Y
2.3 Locality Y Dropdown Y
2.4 Street Y Dropdown Y
2.5 Email ID Y Alphanumeric Y
2 Applicant details
2.1 Is Service Location Same as Applicant Location?
(Yes/No)
Y Dropdown If Yes, auto-populate service location details
2.2 Area Y Dropdown Y
2.3 Locality Y Dropdown Y
2.4 Street Y Dropdown Y
2.5 Zone Y Dropdown
2.6 Ward Y Dropdown
3 Status of Tree Y Table Provision to be given to add and delete rows
Annexure B- Draft Functional Requirement Specifications
70
# Field
Mandatory
(Y/N) Field Type Remarks, if any for IT vendor Auto Populated from Pre-
Establishment CAF? (Yes/No)
Sl
No.
Road
Type
Road Length
i. 0-100 mts ii. 100-200 mts iii. 200-500 mts iv. 500-1000 mts
Purpose
i. Telephone Cable ii. Cables iii. Pipeline iv. Electricity Connection
Amount Remarks
Checklist of Supporting Documents Sl.
No. Document
Mandatory
(Yes/No)
1. Map showing the exact location of road cutting (Layout site plan) Y
2. Ward map showing the road cutting requested streets and length &
width of cutting
Y
3. Copy of receipt, showing the up to date payment of Track rent (if any
Telephone/optical cable laid already in this local body)
N
4. Copy of property tax remittance (Applicable to the assessee) Y
Fee Details No application fee charged
Estimate charges to be paid as raised by department
Annexure B- Draft Functional Requirement Specifications
71
Work Flow Applicant
(SW
P)
Junio
r Assis
tant
(Engin
eeri
ng)
Junio
r Engin
eer
/ Assis
tant
Engin
eer
Munic
ipal Engin
eer
Munic
ipal
Com
mis
sio
ner
Fill application form
along with
necessary
documents
Schedule inspection
Conduct site
inspection
Prepare inspection
report
Receive
inspection date
Respond to query
with additional
details/ document
SMS alert to applicant
Receives application
and scrutinize
application
Send query to
applicant
Yes
No
SMS alert to applicant
SMS alert to officer
Any queries?
START
Forwards to Fitter/
Plumber
Prepare Rejection
letter with reason
for rejection
Forward Rejection
letter to applicant
Receive rejection
letter
Rejection
LetterSMS alert to applicant
END
Prepare estimate for
road cutting work
Receive demand
letter
Pay requisite fee
Carry out
roadcutting through
contractor
Receive final receipt
Generate receipt
upon completion of
work
Final
receipt
Give internal
approval
Satisfactory?
Yes
Request change in
estimateNo
Scritinize application
along with estimate
Approved?
Issue work order
No
Prepare demand
letter and send to
applicant
Yes
Legend
Online – Single
Window Portal
(SWP)
Online-
Department
system
Offline
Verify payment
SMS alert to applicant
Annexure B- Draft Functional Requirement Specifications
72
1.11 New Layout Approval (Comprehensive Construction Permit Portal) from Directorate of Town and
Country Planning (DTCP)
Online Application Form to be filled by applicant on Single Window Portal
# Field
Mandatory
(Y/N) Field Type
Remarks, if any for
IT vendor Auto Populated from Pre-
Establishment CAF? (Yes/No)
1.1 Name of Applicant Y Alphanumeric
1.2 Postal Address for correspondence Y Alphanumeric
1.3 Mobile Number Y Numeric Y
1.4 Email ID Y Alphanumeric Y
1.5 Applicant’s right over the land to make the proposed development
(Owner/Rented/Leased)
Y Dropdown
1.6 Project Name Y Alphanumeric Y
2 Development site address Y
2.1 Door Number/ Plot Number Y Alphanumeric Y
2.2 Street/ Road Y Alphanumeric Y
2.3 Area/ Locality Y Dropdown Y
2.4 Village / Town/ City Y Dropdown Y
2.5 Taluk Name Y Dropdown Y
2.6 District Y Dropdown Y
2.7 Pincode Y Numeric Y
Annexure B- Draft Functional Requirement Specifications
73
Online Application Form to be filled by architect
# Field Mandatory
(Y/N) Field Type
Remarks, if any for IT
vendor
Auto Populated from form submitted by
Applicant? (Yes/No)
1.1 Name of Applicant Y Alphanumeric Y
1.2 Postal Address for correspondence Y Alphanumeric Y
1.3 Mobile Number Y Numeric Y
1.4 Email ID Y Alphanumeric Y
1.5 Applicant’s right over the land to
make the proposed development (Owner/Rented/Leased)
Y Dropdown Y
1.6 Project Name Y Alphanumeric Y
2 Development site address Y
2.1 Door Number/ Plot Number Y Alphanumeric Y
2.2 Street/ Road Y Alphanumeric Y
2.3 Area/ Locality Y Dropdown Y
2.4 Village / Town/ City Y Dropdown Y
2.5 Taluk Name Y Dropdown Y
2.6 District Y Dropdown Y
2.7 Pincode Y Numeric Y
3.1 Present use of land? (Residential/ Commercial/ Industrial/ Not classified)
Y Dropdown
3.2 Proposed use of land? (Residential/ Commercial/ Industrial)
Y Dropdown
4.1 Whether site proposed is part of approved layout? (Yes/No)
Y Dropdown
4.2 If yes, provide layout approval number
N Alphanumeric To be displayed only if 4.1 is selected as ‘Yes’
4.3 Layout approval date N
5 Existing land details
Existing use of the adjoining lands in
5.1 North side Y Alphanumeric
5.2 East side Y Alphanumeric
Annexure B- Draft Functional Requirement Specifications
74
# Field Mandatory
(Y/N) Field Type
Remarks, if any for IT
vendor
Auto Populated from form submitted by
Applicant? (Yes/No)
5.3 South side Y Alphanumeric
5.4 West side Y Alphanumeric
6.1 Width of the abutting road Y Numeric
6.2 Status of the abutting road (Private / public)
Y Dropdown
Checklist of Supporting Documents Sl. No Documents for Construction Permit approval Mandatory (Y/ N)
1 Sale Deed/ Lease Deed/ Gift Deed/Partition Deed / Power of Attorney Deed Y
2 Parent documents since 1975 in case of Subdivision of land (if applicable) N
3 Legal Heir and Death Certificate (if applicable) N
4 Up to Date Encumbrance Certificate (EC) – for past 13 years Y
5 Patta/PLR (for all private land) N
6 Chitta (for all private land) N
7 Adangal (If applicable) N
8 Copy of Property Tax or vacant land tax receipt (Latest) Y
Fee Details
Scrutiny fees:
• Rs. 0.75 per sq.m of land area.
Demand charges as raised by department
Annexure B- Draft Functional Requirement Specifications
75
Work Flow Applicant
(SW
P)
Regis
tere
d P
rofe
ssio
nal
(RP)
Assis
tant
Directo
r /D
eputy
Directo
rPla
nnin
g A
ssis
tant/
Superv
isor
Receive application
for Layout Approval
Forward application
to PA/ PS
Receive inspection
date
Prepare inspection
report
Respond to query
with additional
details/ document
Send query to RP
Yes
SMS & email alert to applicant
Any queries?
Conduct inspection
Generate demand
Pay demand charges
Approve and
generate Planning
Permission
Forward application
to AD/DD
Prepare rejection
letter with reason
for rejection
Yes
Receive Layout
Approval
No
Receive Rejection
Letter
No
Rejection
Letter
Layout
ApprovalSMS &
email alert to applicant
SMS & email alert to applicant
SMS & email alert to applicant
SMS & email alert to applicant
Schedule inspection
Satisfactory?
Fill basic details and
select Registered
Professional
Fill application form
and along with
drawing
START
Legend
Online – Single
Window Portal
(SWP)
Online-
Department
system
Offline
Run through Pre-
DCR
Determine required
NOCs and fee
Apply for relevant
NOCs and submit
application
Pay requisite fee
SMS & email alert to applicant
Annexure B- Draft Functional Requirement Specifications
76
1.12 -1.19 New Construction Permit Approval (Comprehensive Construction Permit Portal)
Online Application Form to be filled by applicant on Single Window Portal
# Field
Mandatory
(Y/N) Field Type
Remarks, if any for
IT vendor Auto Populated from Pre-
Establishment CAF? (Yes/No)
1.1 Name of Applicant Y Alphanumeric Y
1.2 Postal Address for correspondence Y Alphanumeric Y
1.3 Mobile Number Y Numeric Y
1.4 Applicant’s right over the land to make the proposed development (Owner/Rented/Leased)
Y Dropdown
1.5 Project Name Y Alphanumeric Y
2 Development site address Y
2.1 Door Number/ Plot Number Y Alphanumeric Y
2.2 Street/ Road Y Alphanumeric Y
2.3 Area/ Locality Y Dropdown Y
2.4 Village / Town/ City Y Dropdown Y
2.5 Taluk Name Y Dropdown Y
2.6 District Y Dropdown Y
2.7 Pincode Y Numeric Y
Annexure B- Draft Functional Requirement Specifications
77
Online Application Form to be filled by architect
# Field Mandatory
(Y/N) Field Type
Remarks, if any for
IT vendor
Auto Populated from form submitted by applicant?
(Yes/No)
1.1 Name of Applicant Y Alphanumeric Y
1.2 Postal Address for correspondence Y Alphanumeric Y
1.3 Mobile Number Y Numeric Y
1.4 Applicant’s right over the land to make the proposed development
(Owner/Rented/Leased)
Y Dropdown Y
1.5 Project Name Y Alphanumeric Y
2 Development site address Y
2.1 Door Number/ Plot Number Y Alphanumeric Y
2.2 Street/ Road Y Alphanumeric Y
2.3 Area/ Locality Y Dropdown Y
2.4 Village / Town/ City Y Dropdown Y
2.5 Taluk Name Y Dropdown Y
2.6 District Y Dropdown Y
2.7 Pincode Y Numeric Y
3.1 Present use of land? (Residential/ Commercial/ Industrial/ Not classified)
Y Dropdown
3.2 Proposed use of land? (Residential/ Commercial/ Industrial)
Y Dropdown
4.1 Whether site proposed is part of approved layout?
(Yes/No)
Y Dropdown
4.2 If yes, provide layout approval
number
N Alphanumeric To be displayed only if
4.1 is selected as ‘Yes’
4.3 Layout approval date N
5 Existing building details
5.1 Floor area N Numeric
5.2 No. of dwelling units N Numeric
6 Proposed building details
6.1 Floor area Y Numeric
Annexure B- Draft Functional Requirement Specifications
78
# Field Mandatory
(Y/N) Field Type
Remarks, if any for
IT vendor
Auto Populated from form submitted by applicant?
(Yes/No)
6.2 No. of dwelling units Y Numeric
7 Industrial usage details
7.1 Existing HP N Numeric
7.2 Proposed HP N Numeric
7.3 Number of workers existing N Numeric
7.4 Number of workers proposed N Numeric
7.5 Whether detailed project report
attached? (Yes/No)
N Dropdown
8 Registered structural engineer details
8.1 Name Y Alphanumeric
8.2 Registration number Y Alphanumeric
9 Registered construction engineer details
9.1 Name Y Alphanumeric
9.2 Registration number Y Alphanumeric
10 Registered Geo-Technical
engineer details (for high-rise
buildings)
10.1 Name N Alphanumeric
10.2 Registration number N Alphanumeric
11 Registered quality auditor details (for high-rise buildings)
11.1 Name N Alphanumeric
11.2 Registration number N Alphanumeric
Annexure B- Draft Functional Requirement Specifications
79
Checklist of Supporting Documents Sl.
No
Documents for Construction Permit approval Mandatory
(Y/ N)
1 Sale Deed/ Lease Deed/ Gift Deed/Partition Deed / Power of Attorney Deed Y
2 Parent documents since 1975 in case of Subdivision of land (if applicable) N
3 Legal Heir and Death Certificate (if applicable) N
4 Up to Date Encumbrance Certificate (EC) – for past 13 years Y
5 Patta/PLR (for all private land) N
6 Chitta (for all private land) N
7 Adangal( If applicable) N
8 Project Report Detailing the raw materials used, process of manufacturing, No of employees and HP requirement in case
of Industries
N
9 Structural Stability certificate issued by the authorized licensed Engineer Y
10 Copy of Property Tax or vacant land tax receipt (Latest) Y
Fee Details
1. Scrutiny fees:
• Rs. 2.00 per sq.m of floor.
• In case of 1st iteration (DCR fail) Rs 1.00 per sq. m of floor area for revised plan
• In case of 2st iteration (DCR fail) Rs 0.40 per sq. m of floor area for revised plan
• In case of 3st iteration (DCR fail) Rs 0.20 per sq. m of floor area for revised plan
• No fees from 4th iteration onwards
2. Demand charges as raised by department
Annexure B- Draft Functional Requirement Specifications
80
Work Flow Applicant
(SW
P)
Regis
tere
d P
rofe
ssio
nal
(RP)
Constr
uction P
erm
it P
ort
al
Fill basic details and
select Registered
Professional
Fill application form
and uploads drawing
SMS alert to officer
START
Run through Pre-
DCR
Determine required
NOCs, department
responsible, and fee
Apply for necessary
NOCs from relevant
agencies
Forward to DTCP for
Planning Permission
Forward to CMDA for
Planning Permission
Forward to local body Planning
Permission
1 2 GCC CMA DTP
3 4 5
Drawing
scrutinized by
Auto-DCR engine
Generate DCR
report and Scrutiny
fees
Yes
Pay scrutiny fees
Generate DCR
report along with
defects
Make corrections to
the drawing and re-
upload
No
Receive scrutiny
payment
Pass?
SMS & email alert to applicant
Annexure B- Draft Functional Requirement Specifications
81
Applicant
(SW
P)
Regis
tere
d P
rofe
ssio
nal
(RP)
Assis
tant
Directo
r /D
eputy
Directo
rPla
nnin
g A
ssis
tant/
Superv
isor
1
Receive application
for planning
permission
Forward application
to PA/ PS
Receive inspection
date
Prepare inspection
report
Respond to query
with additional
details/ document
Send query to RP
Yes
SMS & email alert to applicant
Any queries?
Conduct inspection
along with
inspecting authority
Generate demand
Pay demand charges
Approve and
generate Planning
Permission
Forward application
to AD/DD
Prepare rejection
letter with reason
for rejection
Yes
Receive Planning
Permission
No
Forward to local body Building
Permit
CMA DTP RD
6 7 8
Receive Rejection
Letter
No
Rejection
Letter
Planning
PermissionSMS &
email alert to applicant
SMS & email alert to applicant
SMS & email alert to applicant
SMS & email alert to applicant
Approving Authority
System randomly
allocates
inspector
Review inspection
report and add
comments, if any
Inspecting Authority
Satisfactory?
Annexure B- Draft Functional Requirement Specifications
82
Applicant
(SW
P)
Regis
tere
d P
rofe
ssio
nal
(RP)
Deputy
Pla
nner/
Senio
r Pla
nner
Assis
tant
Pla
nner/
Junio
r Pla
nner
2
Receive application
for planning
permission
Forward application
to AP/ JP
Receive inspection
date
Prepare inspection
report
Respond to query
with additional
details/ document
Send query to RP
Yes
SMS & email alert to applicant
Any queries?
Conduct inspection
along with
inspecting authority
Generate demand
Pay demand charges
Approve and
generate Planning
Permission
Forward application
to DP/SP
Prepare rejection
letter with reason
for rejection
Yes
Receive Planning
Permission
No
Forward to local body Building Permit
CMA DTP RD
6 7 8
Receive Rejection
Letter
No
Rejection
Letter
Planning
PermissionSMS &
email alert to applicant
SMS & email alert to applicant
SMS & email alert to applicant
SMS & email alert to applicant
Approving Authority
System randomly
allocates
inspector
Review inspection
report and add
comments, if any
Inspecting Authority
GCC
9
Satisfactory?
Annexure B- Draft Functional Requirement Specifications
83
Applicant
(SW
P)
Regis
tere
d P
rofe
ssio
nal
(RP)
Executive E
ngin
eer
Assis
tant
Execu
tive E
ngin
eer
3
Receive application
for planning
permission/ building
permit
Receive inspection
date
Respond to query
with additional
details/ document
Send query to RP
Yes
SMS & email alert to applicant
Any queries?
Conduct inspection
Generate demand
Pay demand charges
Approve and
generate Building
Permit
Prepare rejection
letter with reason
for rejection
Receive Building
Permit
Receive Rejection
Letter
Rejection
LetterBuilding
Permit
SMS & email alert to applicant
SMS & email alert to applicant
SMS & email alert to applicant
Drawing
scrutinized by
Auto-DCR engine
No
Generate DCR
report along with
defects
Make corrections to
the drawing and re-
upload
Schedule inspectionYes
Prepare inspection
report and forward
to EE
Review inspection
report add
comments if any
No
Forward application
to EE
Yes
No
END
9
Pass?
Satisfactory?
Annexure B- Draft Functional Requirement Specifications
84
Applicant
(SW
P)
Regis
tere
d P
rofe
ssio
nal
(RP)
Tow
n P
lannin
g O
ffic
er
Junio
r Assis
tant
4
Receive application
for planning
permission/ building
permit
Receive inspection
date
Respond to query
with additional
details/ document
Send query to RP
Yes
SMS & email alert to applicant
Any queries?
Conduct inspection
Generate demand
Pay demand charges
Approve and
generate Building
Permit
Prepare rejection
letter with reason
for rejection
Receive Building
Permit
Receive Rejection
Letter
Rejection
LetterBuilding
Permit
SMS & email alert to applicant
SMS & email alert to applicant
SMS & email alert to applicant
Drawing
scrutinized by
Auto-DCR engine
No
Generate DCR
report along with
defects
Make corrections to
the drawing and re-
upload
Schedule inspectionYes
Prepare inspection
report and forward
to TPO
Review inspection
report add
comments if any
No
Forward application
to TPO
Yes
No
END
6
Pass?
Satisfactory?
Annexure B- Draft Functional Requirement Specifications
85
Applicant
(SW
P)
Regis
tere
d P
rofe
ssio
nal
(RP)
Executive O
ffic
er
Junio
r Assis
tant/
Bill Collecto
r
5
Receive application
for planning
permission/ building
permit
Receive inspection
date
Respond to query
with additional
details/ document
Send query to RP
Yes
SMS & email alert to applicant
Any queries?
Conduct inspection
Generate demand
Pay demand charges
Approve and
generate Building
Permit
Prepare rejection
letter with reason
for rejection
Receive Building
Permit
Receive Rejection
Letter
Rejection
LetterBuilding
Permit
SMS & email alert to applicant
SMS & email alert to applicant
SMS & email alert to applicant
Drawing
scrutinized by
Auto-DCR engine
No
Generate DCR
report along with
defects
Make corrections to
the drawing and re-
upload
Schedule inspectionYes
Prepare inspection
report and forward
to EO
Review inspection
report add
comments if any
No
Forward application
to EO
Yes
No
END
7
Pass?
Satisfactory?
Annexure B- Draft Functional Requirement Specifications
86
Applicant
(SW
P)
Regis
tere
d P
rofe
ssio
nal
(RP)
Blo
ck D
evelo
pm
ent
Off
icer
(BD
O)
8
Receive application
for planning
permission/ building
permit
Receive inspection
date
Respond to query
with additional
details/ document
Send query to RP
Yes
SMS & email alert to applicant
Any queries?
Conduct inspection
Generate demand
Pay demand charges
Generate Building
Permit
Prepare rejection
letter with reason
for rejection
Receive Building
Permit
Receive Rejection
Letter
Rejection
LetterBuilding
Permit
SMS & email alert to applicant
SMS & email alert to applicant
SMS & email alert to applicant
Drawing
scrutinized by
Auto-DCR engine
No
Generate DCR
report along with
defects
Make corrections to
the drawing and re-
upload
Schedule inspectionYes
Prepare inspection
report
Yes
No
END
Pass?
Approved by Council?
Place application in
Council Meeting
Review application
and approve/reject
Inspecting Authority Legend
Online – Single
Window Portal
(SWP)
Online-
Department
system
Offline
Annexure B- Draft Functional Requirement Specifications
87
2. Pre-Operation Services
Annexure B- Draft Functional Requirement Specifications
88
S.
No. Clearances/ Services Competent Authority
1. Certificate of recognition for Schools Department of School Education
2. NoC to schools for affiliation to CBSE Department of School Education
3. Permission to erect a lift Tamil Nadu Electrical Inspectorate (TNEI)
4. New Service Connection- HT TANGEDCo
5.
Registration and Certification of Steam
Pipeline Directorate of Boilers (DoB)
6.
Grant of Recognition as Manufacturer of
Boilers and Boiler Components DoB
7. Provisional Registration of Boilers DoB
8. Final Registration of Boilers DoB
9.
Grant of License under Insecticide Act,
1968 for manufacture, storage and sale of
insecticides and pesticides and its
renewal
Agriculture Department
10. Sanitary Certificate for Schools CMA
Annexure B- Draft Functional Requirement Specifications
89
Pre-Operation Combined Application Form (CAF) for Pre-Operation
Services Sl.
No. Fields Remarks
Project Information
1.0 Details of Industrial Unit (Proposed to
be set-up)
1.1 Name of the Industrial Unit Auto populated from CAF Pre-Establishment
S.No.1.1
1.2 Address of the Industrial Unit
1.2.1 Survey Field (SF) Number/ Re-Survey
(RS) Number
Auto populated from CAF Pre-Establishment
S.No.1.2.1
1.2.2 Revenue Village Name Auto populated from CAF Pre-Establishment
S.No.1.2.2
1.2.3 Local Body Type Auto populated from CAF Pre-Establishment
S.No.1.2.3
1.2.4 Local Body Name Auto populated from CAF Pre-Establishment
S.No.1.2.4
1.2.5 Ward Number Auto populated from CAF Pre-Establishment
S.No.1.2.5
1.2.6 Door Number/ Plot Number Auto populated from CAF Pre-Establishment
S.No.1.2.6
1.2.7 Street/ Road Auto populated from CAF Pre-Establishment
S.No.1.2.7
1.2.8 Area/ Locality Auto populated from CAF Pre-Establishment
S.No.1.2.8
1.2.9 Village / Town/ City Auto populated from CAF Pre-Establishment
S.No.1.2.9
1.2.10 Taluk Name Auto populated from CAF Pre-Establishment
S.No.1.2.10
1.2.11 District Auto populated from CAF Pre-Establishment
S.No.1.2.11
1.2.12 State Auto populated from CAF Pre-Establishment
S.No.1.2.12
1.2.13 Country Auto populated from CAF Pre-Establishment
S.No.1.2.13
1.2.14 Pin code Auto populated from CAF Pre-Establishment
S.No.1.2.14
1.3 Contact details of the Industrial Unit
1.3.1 Telephone Number with STD code Auto populated from CAF Pre-Establishment
S.No.1.3.1
1.3.2 Fax Number with STD code Auto populated from CAF Pre-Establishment
S.No.1.3.2
1.3.3 Mobile Number: Auto populated from CAF Pre-Establishment
S.No.1.3.3
1.3.4 e-mail Address: Auto populated from CAF Pre-Establishment
S.No.1.3.4
1.3.5 Website Address: Auto populated from CAF Pre-Establishment
S.No.1.3.5
1.4 Nature of Organization Auto populated from CAF Pre-Establishment
S.No.1.4 Proprietary Partnership Private Limited Public Limited Co-Operative
Annexure B- Draft Functional Requirement Specifications
90
Sl.
No. Fields Remarks
Others
1.5 Registration Number issued by
Registrar of Companies (ROC)
Auto populated from CAF Pre-Establishment
S.No.1.5
1.6 Other Registration Details (please fill
the relevant registration details)
1.6.1 Foreign Investment Promotion Board
(FIPB) / Reserve Bank of India (RBI)
Approval Number [ Issued Date /
Expiry Date]
Auto populated from CAF Pre-Establishment
S.No.1.6.1
1.6.2 Industrial Entrepreneurs Memorandum
Number [Issued Date / Expiry Date]
Auto populated from CAF Pre-Establishment
S.No.1.6.2
1.7 Proposed date of commencement of
commercial production:
Auto populated from CAF Pre-Establishment
S.No.1.8
2.0 Details of Project Promoter(s)
2.1 Name of the Promoter (s) Auto populated from CAF Pre-Establishment
S.No.2.1
2.2 Designation of the Promoter (s) (if
applicable)
Auto populated from CAF Pre-Establishment
S.No.2.2
2.3 Address of the Promoter (s)
2.3.1 Door Number/ Plot Number Auto populated from CAF Pre-Establishment
S.No.2.3.1
2.3.2 Street/ Road Auto populated from CAF Pre-Establishment
S.No.2.3.2
2.3.3 Area/ Locality Auto populated from CAF Pre-Establishment
S.No.2.3.3
2.3.4 Village / Town/ City Auto populated from CAF Pre-Establishment
S.No.2.3.4
2.3.5 District Auto populated from CAF Pre-Establishment
S.No.2.3.5
2.3.6 State Auto populated from CAF Pre-Establishment
S.No.2.3.6
2.3.7 Country Auto populated from CAF Pre-Establishment
S.No.2.3.7
2.3.8 Pin code Auto populated from CAF Pre-Establishment
S.No.2.3.8
2.4 Contact details of the Project
Promoter(s)
2.4.1 Telephone Number with ISD and STD
code
Auto populated from CAF Pre-Establishment
S.No.2.4.1
2.4.2 Fax Number with STD code Auto populated from CAF Pre-Establishment
S.No.2.4.2
2.4.3 Mobile Number: Auto populated from CAF Pre-Establishment
S.No.2.4.3
2.4.4 e-mail Address: Auto populated from CAF Pre-Establishment
S.No.2.4.4
3.0 Details of Project Investment and
Finance
3.1 Details of Estimated Project Cost (INR
Crores)
3.1.1 Land Auto populated from CAF Pre-Establishment
S.No.3.1.1
3.1.2 Building Auto populated from CAF Pre-Establishment
S.No.3.1.2
3.1.3 Plant and Machinery - Imported
(Landed Cost)
Auto populated from CAF Pre-Establishment
S.No.3.1.3
Annexure B- Draft Functional Requirement Specifications
91
Sl.
No. Fields Remarks
3.1.4 Plant and Machinery - Indigenous Auto populated from CAF Pre-Establishment
S.No.3.1.4
3.1.5 Miscellaneous Assets Auto populated from CAF Pre-Establishment
S.No.3.1.5
3.1.6 Contingencies, etc., Auto populated from CAF Pre-Establishment
S.No.3.1.6
3.1.7 Others (Please Specify) Auto populated from CAF Pre-Establishment
S.No.3.1.7
3.1.8 TOTAL
3.2 Means of Finance (INR Crores)
3.2.1 Equity from Promoters - Domestic Auto populated from CAF Pre-Establishment
S.No.3.2.1
3.2.2 Equity from Promoters - Foreign Auto populated from CAF Pre-Establishment
S.No.3.2.2
3.2.3 Loan from Financial Institutions Auto populated from CAF Pre-Establishment
S.No.3.2.3
3.2.4 Others (Please Specify) Auto populated from CAF Pre-Establishment
S.No.3.2.4
3.2.5 Estimated Project Cost Total
4.0 Details of Employment
4.1 Skilled Labour Auto populated from CAF Pre-Establishment
S.No.4.1
4.2 Unskilled Labour Auto populated from CAF Pre-Establishment
S.No.4.2
4.3 Supervisory Auto populated from CAF Pre-Establishment
S.No.4.3
4.4 Total Number of Employees Auto populated from CAF Pre-Establishment
S.No.4.4
4.5 Number of Contract Employees Auto populated from CAF Pre-Establishment
S.No.4.5
4.6 Maximum number of workers proposed
to be employed in the factory on any
one day
Auto populated from CAF Pre-Establishment
S.No.4.6
5.0 Details of Manufacturing
5.1 Brief description of process technology
used along with a flow chart (to be
enclosed)
Auto populated from CAF Pre-Establishment
S.No.5.1
Flow chart (Please enclose a flow chart
in a separate sheet)
5.2 Do you have any foreign technical
collaboration?
Auto populated from CAF Pre-Establishment
S.No.5.2
5.3 Whether the factory will be engaged in
Dangerous Operations as indicated
under rule 95 of Tamil Nadu Factory
Rules 1950?
Auto populated from CAF Pre-Establishment
S.No.5.3
5.4 Line of manufacture
5.4.1 Description of Item Auto populated from CAF Pre-Establishment
S.No.5.4.1
5.4.2 Installed Capacity Auto populated from CAF Pre-Establishment
S.No.5.4.2
5.5 Raw Material Consumption
5.5.1 Description of Item Auto populated from CAF Pre-Establishment
S.No.5.5.1
Annexure B- Draft Functional Requirement Specifications
92
Sl.
No. Fields Remarks
6.0 Details of Energy Consumption and
Power requirement
6.1 Source of Energy
6.1.1 Captive Generation ( in kVA ) Auto populated from CAF Pre-Establishment
S.No.6.1.1
6.1.2 Tamil Nadu Generation and
Distribution Corporation Limited
(TANGEDCO) Supply ( in kVA )
Auto populated from CAF Pre-Establishment
S.No.6.1.2
6.2 Power Requirements from TANGEDCO
6.2.1 Permanent (production phase, in kVA ) Auto populated from CAF Pre-Establishment
S.No.6.2.2
6.2.2 Voltage rating at which HT supply is
required:
Auto populated from CAF Pre-Establishment
S.No.6.2.3
6.3 If captive power, fuel used for
generation
6.3.1 Fuel Type Auto populated from CAF Pre-Establishment
S.No.6.3.1 Coal Oil / Diesel Wood Wind Solar Others (Please Specify)
7 Details of Water Requirement
7.1 Industrial Use (Kilo Litres per Day) Auto populated from CAF Pre-Establishment
S.No.7.1
7.2 Domestic (Kilo Litres per Day) Auto populated from CAF Pre-Establishment
S.No.7.2
8 Other Details
8.1 PAN Auto populated from CAF Pre-Establishment
S.No.8.1
Annexure B- Draft Functional Requirement Specifications
93
2.1 Certificate of Recognition for Schools from Department of School Education
Online Application Form
Sl No
Field Mandatory
(Y/N)
Field Type (character/Num
eric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
Operation CAF
(Yes/No)
1 School Details
1.1 School Name N Alpha Numeric
1.2 Door No. Y Alpha Numeric Y
1.3 Street Name Y Alpha Numeric Y
1.4 District Y Alpha Numeric Y
1.5 Taluk Y Alpha Numeric Y
1.6 Pincode Y Numeric Only 6 numbers Y
1.7 Survey No. N Alpha Numeric
1.8 Select Management Category
Government Y Dropdown
Fully Aided
Unaided
Partially Aided
Central Govt.
1.9 Select Management Y
If Government,
School Education Department Dropdown
Corporation School
Municipal Corporation
Adi Dravidar Welfare School
Forest Department School
Differently Abled Welfare Development School
Kalla BC/MBC Department School
Rubber Board School
Tribal Welfare School
Aranilayam HR&C Department School
If Fully Aided,
Fully Aided School Dropdown
Anglo India (Fully Aided School)
Oriental (Fully Aided) Sanskrit School
Oriental (Fully Aided) Arabic School
Differently Abled Welfare Department Aided School
Annexure B- Draft Functional Requirement Specifications
94
Sl No
Field Mandatory
(Y/N)
Field Type (character/Num
eric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
Operation CAF
(Yes/No)
If Unaided,
Unaided (Private) School – State Common Board School Dropdown
Matriculation School
Nursery & Primary School
Special School for Differently Abled
Oriental (unaided) Sanskrit School
Oriental (unaided) Arabic School
Unaided (Private) School- Other than State Board
Unrecognized
If Partially Aided,
Partially Aided School Dropdown
Anglo Indian (Partly Aided School)
Oriental (Partly aided) Sanskrit School
Oriental (Partly aided) Arabic School
If Central Govt,
Army Public School Dropdown
Kendriya Vidyalaya
Sainik School
Railway School
Boarstal School (Social Defense Dept)
Kasturba Gandhi Balika Vidhyalaya (KGBV)
Atomic Energy Central School
Defence Department
2 Approval for Setting up of School
2.1 Reference Number of Approval of setting school Y Alpha Numeric
2.2 Date Y Date Format
3 Probable Date of opening of the School Y Date Format
4 Educational Agency proposed to open the School
4.1 Name of Educational Agency Y Alpha Numeric
4.2 Name of Authorised Person Y Alpha Numeric
4.3 Mobile Number Y Numeric
4.4 Email-ID Y Alpha Numeric
5 Standards for which recognition is sought for Y Alpha Numeric Choose from the following Options • Nursery
Annexure B- Draft Functional Requirement Specifications
95
Sl No
Field Mandatory
(Y/N)
Field Type (character/Num
eric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
Operation CAF
(Yes/No)
• LKG • UKG • I • II
• III • IV
• V • VI • VII • VIII • IX
• X • XI • XII
6 Standard wise Strength Option to add more standards
6.1 Standard Y Alpha Numeric
6.2 Class strength Y Numeric
7 Staff Details Option to add more staffing details
7.1 Name Y Alpha Numeric
7.2 Qualification Y Alpha Numeric
7.3 Designation Y Alpha Numeric
8 Building Plan Details
8.1 Building and Premises ownership Y Dropdown Select Owned/ Lease/ rented/ Rent-free
8.2 Room Details Y Option to add more
classroom/other room details
Room Particulars Alpha Numeric
Carpet Area Numeric
8.3 Total area Y Numeric
8.4 Toilet Details Y Option to add more toilet details
Toilet No. Numeric
Carpet Area Numeric
Annexure B- Draft Functional Requirement Specifications
96
Sl No
Field Mandatory
(Y/N)
Field Type (character/Num
eric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
Operation CAF
(Yes/No)
8.5 Other particulars Y
No. of Drinking Water Outlets Numeric
No. of Hand Wash Facilities Numeric
9 Details of items in School
9.1 Details of Furniture, Appliances, Apparatus Y Option to add more details
Type of item Character
Name Alpha Numeric
Number Numeric
9.2 Is Library Provided? Y Dropdown Select Y/N
9.3 Number of books Y Numeric Field to enable if response to 2.2 is “Y”
9.4 Indoor Games or Articles Provided? Y Dropdown Select Y/N
9.5 List of Play materials, games Y Alpha Numeric Field to enable if response to 2.4 is “Y”
9.6 List of Games Y Alpha Numeric
9.7 List of Articles Y Alpha Numeric
9.8 Computer room provided? Y Dropdown Select Y/N
9.9 No. of computers with component Y Numeric Field to enable if response to 2.9 is “Y”
9.10 No. of UPSs Y Numeric
9.11 Science Labs? Y Dropdown Select Y/N
9.12 No. of Labs Y Numeric Field to enable if response to 2.11 is “Y”
10 Compulsory Medical Inspection of Pupils? Y Dropdown Select Y/N
11 Playground Details
11.1 Area (Sq.m) Y
11.2 Ownership Details Y Dropdown Select Owned/ Leased
12 Number of fire extinguishers Y Numeric
Annexure B- Draft Functional Requirement Specifications
97
Checklist of Supporting Documents S.
No. Document Mandatory (Y/N)
1 Copy of Title Deed/Rent Agreement/Lease Deed Y
2 Copy of Building Structural Stability Certificate from PWD authorities/panel engineers Y
3 License permitting the use of the School building as Public Building under the Tamil Nadu Buildings
(Licensing) Act, 1965 (Tamil Nadu Act XIII of 1965) from Revenue Department
Y
4 Sanitation Certificate for schools from Health Officers Y
5 NOC from Fire Safety Department (from TN FRS) Y
6 Copy of the Approved Building Plan from DTCP/CMDA/Local Bodies Y
Annexure B- Draft Functional Requirement Specifications
98
Workflow
Procedure for Obtaining Certificate of Recognition
Level 1
Applicant
Level 3
Level 2
START
Fill online form
Upload the required supporting documents
SMS/Email
Alert to Applicant & Level 1
officer
Submit the application
End
Receive digitally signed
Certificate
Receive reasons
SMS/Email
Alert to Applicant
Respond to Queries
Allot inspection date
Scrutinize the Application,
Documents and ownership
Visit and verify the details in the School
Auto allocate to concerned Level 1
officer
Prepare inspection report
Upload inspection
report
Forward the application to
Level 2
SMS/Email Alert to
Applicant
Review the file and inspection report
Is it a approval case? Approve
Record reason and Reject
Yes
SMS/Email Alert to Level
2 officer
SMS/Email Alert to
respective officer
No SMS/Email Alert to
Applicant
SMS/Email Alert to
Applicant
Forward the application to Level
3
SMS/Email Alert to Level 3 officer
Review the file and inspection report
Any clarifications required?
Raise Queries
Yes
No
SMS/Email Alert to
Applicant
Digital signed Certificate
Pay fees
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Annexure B- Draft Functional Requirement Specifications
99
Fee Details Based on the response in S.No.5 of application form regarding the standards in the School
Sl No School Type Recognition Fees (Rupees)
1 Play School (kindergarten) 5000
2 Pre-Primary (till UKG) , Primary (till V), and Middle School (till VIII)
25000
3 High School (Till X) 50000
4 Higher Secondary School (Till XII) 100000
Approval based Hierarchy Based on the response in S.No.5 of application form regarding the standards in the School
Sl No
School Type Level 1
Level 2 Level 3
1 Play School (Unaided)
Block Education
Officer (BEO)/ District Education Officer (DEO)
Chief Education Officer (CEO)
Joint Director of Education (JDE)
2
Pre-
Primary/Primary/Middle /High/Higher Secondary (Unaided)
BEO/DEO JDE (Private Schools)
Director (Private Schools)
3 Pre-Primary/ Primary/
Middle Schools (Aided) BEO/DEO
JDE (Elementary
Education)
Director (Elementary
Education)
4 High School (Aided) BEO/DEO JDE (Secondary Education)
Director (School Education)
5 Higher Secondary
School (Aided) BEO/DEO
HDE (Higher
Secondary Education)
Director (School
Education)
Workflow for Hierarchy based Approval Sl
No Hierarchy Level Remarks (if any) Timelines
1 Level 1 Raise queries Within 7 working days from date of
receipt of application
2 Level 2 Review and forward application
to Approval Authority -
3
Approval
Authority (Level
3)
Approves/Rejects Within 60 working days from date
of receipt of application
Annexure B- Draft Functional Requirement Specifications
100
2.2 NoC to schools for affiliation to CBSE from Department of School Education
Online Application Form
Sl No
Field Mandatory
(Y/N)
Field Type (character/Num
eric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
Operation CAF
(Yes/No)
1 School Details
1.1 School Name N Alpha Numeric
1.2 Door No. Y Alpha Numeric Y
1.3 Street Name Y Alpha Numeric Y
1.4 District Y Alpha Numeric Y
1.5 Taluk Y Alpha Numeric Y
1.6 Pincode Y Numeric Only 6 numbers Y
1.7 Survey No. N Alpha Numeric
1.9 Select Management Category
Government Y Dropdown
Fully Aided
Unaided
Partially Aided
Central Govt.
2 Approval for setting up School
2.1 Reference Number of Approval of setting school Y Alpha Numeric
2.2 Date Y Date Format
3 Probable Date of opening of the School Y Choose Multiple Options
Choose from the following Options
• Nursery • LKG • UKG • I • II • III
• IV
• V • VI • VII • VIII • IX • X • XI
Annexure B- Draft Functional Requirement Specifications
101
Sl No
Field Mandatory
(Y/N)
Field Type (character/Num
eric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
Operation CAF
(Yes/No)
• XII
4 Educational Agency proposed to open the School
4.1 Name of Educational Agency Y Alpha Numeric
4.2 Name of Authorised Person Y Alpha Numeric
4.3 Mobile Number Y Numeric
4.4 Email-ID Y Alpha Numeric
5 Standards for which recognition is sought for Y Alpha Numeric
6 Standard wise Strength Option to add more standards
6.1 Standard Y Alpha Numeric
6.2 Class strength Y Numeric
7 Staff Details Option to add more staffing details
7.1 Name Y Alpha Numeric
7.2 Qualification Y Alpha Numeric
7.3 Designation Y Alpha Numeric
8 Building Plan Details
8.1 Building and Premises ownership Y Dropdown Select Owned/ Lease/ rented/ Rent-free
8.2 Room Details Y Option to add more
classroom/other room details
Room Particulars Alpha Numeric
Carpet Area Numeric
8.3 Total area Y Numeric
8.4 Toilet Details Y Option to add more toilet details
Toilet No. Numeric
Carpet Area Numeric
8.5 Other particulars Y
No. of Drinking Water outlets Numeric
No. of Hand Wash facilities Numeric
9 Details of items in School
9.1 Details of Furniture, Appliances, Apparatus Y Option to add more
details
Annexure B- Draft Functional Requirement Specifications
102
Sl No
Field Mandatory
(Y/N)
Field Type (character/Num
eric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
Operation CAF
(Yes/No)
Type of item Character
Name Alpha Numeric
Number Numeric
9.2 Is Library Provided? Y Dropdown Select Y/N
9.3 Number of books Y Numeric Field to enable if response to 2.2 is “Y”
9.4 Indoor Games or Articles Provided? Y Dropdown Select Y/N
9.5 List of Play materials, games Y Alpha Numeric Field to enable if response to 2.4 is “Y”
9.6 List of Games Y Alpha Numeric
9.7 List of Articles Y Alpha Numeric
9.8 Computer room provided? Y Dropdown Select Y/N
9.9 No. of computers with component Y Numeric Field to enable if response to 2.9 is “Y”
9.10 No. of UPSs Y Numeric
9.11 Science Labs? Y Dropdown Select Y/N
9.12 No. of Labs Y Numeric Field to enable if response to 2.11 is “Y”
10 Compulsory Medical Inspection of Pupils? Y Dropdown Select Y/N
11 Playground Details
11.1 Area (Sq.m) Y
11.2 Ownership details Y Dropdown Select Owned/ Leased
12 Number of fire extinguishers Y Numeric
Annexure B- Draft Functional Requirement Specifications
103
Checklist of Supporting Documents S.
No. Document Mandatory (Y/N)
1 Copy of Title Deed/Rent Agreement/Lease Deed Y
2 Copy of Building Structural Stability Certificate from PWD authorities/panel engineers Y
3 License permitting the use of the School building as Public Building under the Tamil Nadu Buildings
(Licensing) Act, 1965 (Tamil Nadu Act XIII of 1965) from Revenue Department
Y
4 Sanitation Certificate for Schools from Health Officers Y
5 NOC from Fire Safety Department (from TN FRS) Y
6 Copy of the Approved Building Plan from DTCP/CMDA/Local bodies Y
Annexure B- Draft Functional Requirement Specifications
104
Workflow
Procedure for Obtaining NoC for affiliation to CBSE
Level 1
Applicant
Level 3
Level 2
START
Fill online form
Upload the required supporting documents
SMS/Email
Alert to Applicant & Level 1
officer
Submit the application
EndReceive digitally
signed NoC
Receive reasons
SMS/Email
Alert to Applicant
Respond to Queries
Allot inspection date
Scrutinize the Application,
Documents and ownership
Visit and verify the details in the School
Auto allocate to concerned Level 1
officer
Prepare inspection report
Upload inspection
report
Forward the application to
Level 2
SMS/Email Alert to
Applicant
Review the file and inspection report
Is it a approval case? Approve
Record reason and Reject
Yes
SMS/Email Alert to Level
2 officer
SMS/Email Alert to
respective officer
No SMS/Email Alert to
Applicant
SMS/Email Alert to
Applicant
Forward the application to Level
3
SMS/Email Alert to Level 3 officer
Review the file and inspection report
Any clarifications required?
Raise Queries
Yes
No
SMS/Email Alert to
Applicant
Digital signed NoC
Pay fees
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Annexure B- Draft Functional Requirement Specifications
105
Fee Details Based on the response in S.No.5 regarding the standards in the School
Sl No School Type Fees (Rupees)
1 Play School (kindergarten) 5000
2 Pre-Primary (till UKG) , Primary (till V), and
Middle School (till VIII) 25000
3 High School (Till X) 50000
4 Higher Secondary School (Till XII) 100000
Approval based Hierarchy Based on the response in S.No.5 regarding the standards in the School
Sl No
School Type Level 1
Level 2 Level 3
1 Play School (Unaided)
Block Education Officer (BEO)/ District Education Officer (DEO)
Chief Education Officer (CEO)
Joint Director of Education (JDE)
2
Pre-Primary/Primary/Middle /High/Higher Secondary (Unaided)
BEO/DEO JDE (Private Schools)
Director (Private Schools)
3 Pre-Primary/ Primary/ Middle Schools (Aided)
BEO/DEO JDE (Elementary Education)
Director (Elementary Education)
4 High School (Aided) BEO/DEO JDE (Secondary Education)
Director (School Education)
5 Higher Secondary
School (Aided) BEO/DEO
HDE (Higher
Secondary
Education)
Director (School
Education)
Workflow for Hierarchy based Approval Sl
No Hierarchy Level Remarks (if any) Timelines
1 Level 1 Raise queries Within 7 working days from date of
receipt of application
2 Level 2 Review and forward application
to Approval Authority -
3
Approval
Authority (Level
3)
Approves/Rejects Within 60 working days from date
of receipt of application
Annexure B- Draft Functional Requirement Specifications
106
Checklist filled by Inspecting Officer after Inspection
Annexure B- Draft Functional Requirement Specifications
107
Annexure B- Draft Functional Requirement Specifications
108
Annexure B- Draft Functional Requirement Specifications
109
2.3 New Service Connection- High Tension (HT) from Tamil Nadu Generation and Distribution Corporation
(TANGEDCo)
Online Application Form
Sl No
Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric / Dropdown)
Remarks, if any for IT vendor
Auto Populated from Pre-
Operation CAF (Yes/No)
1 Application Details
1.1 Application Category Y Character Auto-fill to “New HT Service Connection”
1.2 District Name Y Alpha Numeric Y
1.3 Select your circle Y Dropdown Select from the list of circles pertaining to the District selected in S.No. 1.2
1.4 Application Type Y Dropdown Select Owner/Other than Owner/SIPCOT lease
1.5 Service Category Y Dropdown
Select from
Commercial
Public Lighting
Industrial
Agricultural
Railways- Traction
Railways- Non-Traction
Miscellaneous Sales
Bulk Supplies or Licenses
Water Works
IT Industries
Register factories (w/o manufacturing)
Govt and aided education
institutions and Hostels
Government Hospital
Local Body
Veterinary Hospitals
Leprosy Centre
Primary Health Centre
Orphanages
Annexure B- Draft Functional Requirement Specifications
110
Sl No
Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric /
Dropdown)
Remarks, if any for IT vendor
Auto Populated from Pre-
Operation CAF
(Yes/No)
Public Libraries
Laboratories
Research Institutions
Studios
Cinema Theatres
Housing Complexes
Private Hospital
Hotels
IT enabled services
Private educational Institutions and Hostels
Private Communication Services
1.6 Applicant/Organization Name
a. Salutation Y Dropdown Select Mr.or M/s or Miss or Mrs.
b. Name of Applicant/Organization Name
Y Alpha Numeric
1.7 Authorized Signatory Name
a. Salutation Y Dropdown Select Mr.or M/s or Miss or Mrs.
b. Name of Authorized Signatory Name
Y Alpha Numeric
2 Description of the Premises
2.1 Premises Address Y Alpha Numeric
2.2 District Name Y Alpha Numeric Y
2.3 Taluk Name Y Alpha Numeric Y
2.4 Village Name Y Alpha Numeric Y
2.5 Pin Code Y Numeric Y
2.6 Land Line No. Y
STD Numeric Maximum 5 numbers
Land Line No. Maximum 8 numbers
2.7 Fax. No. Y
STD Numeric Auto-fill as per response to S.No. 2.6
Annexure B- Draft Functional Requirement Specifications
111
Sl No
Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric /
Dropdown)
Remarks, if any for IT vendor
Auto Populated from Pre-
Operation CAF
(Yes/No)
Fax No. Maximum 8 numbers
2.8 Is the Billing address different from premises address?
Y
Select Yes or No
If No, Auto-fill the fields under Billing/Communication Address
3 Billing/ Communication
Address
3.1 Premises Address N Alpha Numeric
3.2 District Name Y Dropdown Select from the list of Districts of Tamil Nadu
3.3 Taluk Name Y Dropdown Select from the list of taluks pertaining to
the response in S. No. 3.2
3.4 Village Name Y Dropdown Select from the list of villages pertaining to
the response in S. No. 3.3
3.5 Pin Code Y Numeric Not less or more than 6 numbers
3.6 Land Line No. Y
STD Numeric Maximum 5 numbers
Land Line No. Maximum 8 numbers
3.7 Fax.No. Y
STD Numeric Auto-fill as per response to S.No. 3.6
Fax No. Only 8 numbers
3.8 Mobile No. Y Numeric Y
3.9 Email Y Alpha Numeric Y
3.10 Date of Registration of the Company
Y Date Format (DD/MM/YY)
Future Date will not be permitted
3.11 Nearest Land Mark N Click, if applicable
4 Service Details
4.1 Supply Voltage Y Dropdown Select 11KV/22KV/33KV/66KV/ 110KV/230KV
4.2 Tariff Y
Dropdown Select HT IA/ HT IB/ HT IIA/ HT IIB/ HT III/ HT IV/ HTV/ HT VI/ LT IC-Domestic Supply/ LT- Commercial Supply/ LT VI- Temp. Supply
4.3 Location Type Y Select Rural/Urban
Annexure B- Draft Functional Requirement Specifications
112
Sl No
Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric /
Dropdown)
Remarks, if any for IT vendor
Auto Populated from Pre-
Operation CAF
(Yes/No)
4.4 Whether the metering point in within 30 meters from the main gate
Y
Select Yes/No
4.5 Details of existing service connections of the applicant, if any
N Alpha Numeric
5 Load Details
5.1 Estimated requirement now applied
Notified Connected Load
KW Y Numeric
HP Y Numeric
KVA Y Numeric
Total M.D. in KVA Y Numeric
5.2 Notified connected load in H.P Y Alpha Numeric
5.3 No. of Shifts Y Numeric
5.4 Probable date of load maturing Y Date Format
(DD/MM/YYYY)
5.5 Remarks if any regarding essentially of supply
N Alpha Numeric
Annexure B- Draft Functional Requirement Specifications
113
Checklist of Supporting Documents S. No. Document Mandatory
If applicant is the owner of premise:
1 Copy of proof of ownership such as sale deed/ partition deed/ gift settlement executed in favour of the applicant/ certified copy of court judgement/ Recent property tax receipt for the premises in name of applicant by authorised signatory
Y
2 Copy of Partnership deed in case the applicant is a partnership firm or Memorandum/ Articles of Association in case of companies registered under Companies Act and Letter/ Resolution authorising the signatory
Y
3 Copy of Memorandum/Articles of Association in case of company registered under Companies Act N
If applicant is not the owner of premise:
1
Consent letter from the owner of the premises OR Valid proof of occupancy along with the following: • Indemnity bond in Form 6 (as per template in Annexure)
• Letter of acceptance to pay enhanced security deposit
Y
2 Copy of Partnership deed in case the applicant is a partnership firm or Memorandum/ Articles of Association in case of companies registered under Companies Act and Letter/ Resolution authorising the signatory
Y
3 Copy of Memorandum/Articles of Association in case of company registered under Companies Act N
Annexure B- Draft Functional Requirement Specifications
114
Work Flow Procedure for Obtaining HT -New Service Connection
Assis
tant
Engin
eer
(AE)
Applicant
Sanctionin
g A
uth
ori
tyC
hie
f En
gin
eer
(CE)
Ass
ista
nt
Exe
cuti
ve
Engi
nee
r (A
EE)
Exec
uti
ve E
ngi
neer
(E
E)Su
peri
nte
nd E
ngi
nee
r (S
E)
START
Fill online form
Upload the required supporting documents
SMS/Email Alert to
Applicant & DFO
Submit the application
Scrutinize Application and
Documents
Any clarifications required?
Raise QueriesYes
No
Provide clarification to
Queries
SMS/Email
Alert to Applicant
SMS/Email
Alert to AE
Make Changes to the demand
EndReceive the
service number
Allot inspection
date
Conduct Inspection for
feasibility study
Fill Inspection Checklist
SMS/Email Alert to
Applicant
Raise demand for registration
charges and EMD charges
Scrutinizes demand and make changes,
if required.
Yes
Raise Demand accordingly
Pay required
estimated Charges
Carry out execution
work
Raise service connection
charges
SMS/Email Alert to
Applicant
SMS/Email
Alert to Applicant
SMS/Email Alert to AE
Pay connection Charges
Assign Service Number
Any changes?
SMS/Email
Alert to Applicant
SMS/Email
Alert to AE
SMS/EMail
Alert to Applicant
Pay Registration
and EMD Charges
If payment
made within 15
days
Estimate demand
Yes
No
SMS/Email
Alert to AE
Estimate preparation and santion
No
If payment
made within
15 days
Yes
Scrutinizes demand and make changes,
if required.
Forward with Remarks
Scrutinizes demand and make changes,
if required.
Forward with Remarks
Scrutinizes demand and make changes,
if required.
Forward with Remarks
Scrutinizes demand and make changes,
if required.
Forward with Remarks
Forward application
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Annexure B- Draft Functional Requirement Specifications
115
Fee Details The charges for the High Tension New Service are provided in Annexure A from Pages 53 to 66 in
http://www.tnerc.gov.in/orders/Tariff%20Order%202009/2019/MiscCharges-4-10-2019.pdf.
Approval based Hierarchy Sl No
Hierarchy Level
Designation Remarks (if any) Timelines
1 Level 1
Assistant Engineer
(AE)/Junior Engineer (JE)
Raise Queries
Within 7 days of receiving application
and applicant to respond within 7 days from receiving the query
2 Level 2 Assistant Engineer (AE)
1. Conduct inspection and finish
feasibility study 2. Raise demand for registration charges
3. Estimate demand
Within 15 days of application verification. Applicant to pay within 15 days of receiving demand
3 Level 2 Sanctioning Authority
Approve and raise demand
Demand for Estimate charges to be raised within 15 days of receipt of EMD
charges. Estimate charges to be paid by applicant within 15 days of demand receipt.
4 Level 3 AE Assign Service Number
High Tension: (a) Involving Extension &
Improvement - 44 days (b) Involving enhancement of Power Transformers / Addition of Power Transformers - 88 days (c) Involving commissioning of new substation - 132 days
Extra High Tension:
(a) Involving Extension & Improvement - 110 days (b) Involving enhancement of Power Transformers / Addition of Power Transformers - 132 days (c) Involving commissioning of new
substation - 198 days *Sanctioning Authority
Sl
No Designation
KVA
(1)
Cost (Rs. In lakh)
(2)
1 Chairman - >50
2 Chief Engineer Upto 1000 Upto 50
3 Superintend Engineer Upto 500 Upto 15
4 Executive Engineer - Upto 7.5
5 Assistant Executive Engineer - Upto 2
The authority is designated if the values in either (1) or (2) are met.
Annexure B- Draft Functional Requirement Specifications
116
Annexure: FORM-6
(To be obtained in a stamped paper)
Indemnity Bond from the occupier when there is no consent letter from owner
Indemnity Bond to be furnished by an intending consumer who is not the owner of the premises
and applies without the consent of the owner
DEED OF INDEMNITY
THIS DEED OF INDEMNITY EXECUTED ON THIS, THE …………….. DAY OF ……………. TWO THOUSAND
…………………….. by Thiru / Tmty. ……………………… S/o. D/o. W/o. …………………………………….. residing at
……………. Having office / workshop at ………………………………………………………. hereinafter called the
indemnifier (which terms shall mean and include executors, administrators, heirs, successors and
assigns) to and in favour of the (name of Licensee and address), a body corporate, hereinafter called
the Licensee (which terms shall mean and include its successors in office and assigns).
WHEREAS the consumer has taken on lease the premises in Door No. ……. For the purpose of
………………. From Thiru / Tmty. ………………………………………………. S/o. D/o. W/o. …………………….. residing
at ………………………………………………. who is the owner of the above said premises.
AND WHEREAS the consumer has approached the said owner of the premises to give his / her
consent in writing to avail of a service connection in his/her name for the purpose of his / her
business.
AND WHEREAS the said owner is not available / has refused to give his/her consent in writing for
the purpose.
AND WHEREAS the indemnifier has requested the Licensee to give a service connection in his/her
name subject to execution of an indemnity bond by him / her indemnifying the Licensee against any
damage or loss caused to the Licensee in respect of the service connection in his/her name.
AND WHEREAS in consideration of the acceptance of the above for a service connection in his/her
name, the indemnifier hereby agrees to indemnify the Licensee against all proceedings, claims,
demands, costs, damages, expenses which the License may incur by reason of a fresh service
connection given to the indemnifier without the consent of the owner of the premises. The
indemnifier further undertakes to make good any sum that may be found to be and become payable
to the Licensee with regard to all liabilities and claims personally as well as by means of both movable
and immovable properties. The indemnifier agrees that the enhanced Security Deposit paid by him
shall be adjusted against the arrears of current consumption charges but also against any claim that
may arise in the event of termination of the agreement prior to the expiry of the contracted period.
The indemnifier further undertakes that the Licensee shall be at liberty to disconnect the service
connection given to him/her, and also for loading the dues remaining unpaid by him/her to other
service connection(s) that may stand in his/her name.
NOW THE CONDITION OF THE above written bond is such that if the indemnifier shall duly and
faithfully observe and perform the above said conditions, then the above written bond shall be
void, otherwise the same shall remain in full force.
Annexure B- Draft Functional Requirement Specifications
117
2.4 Permission to Erect a Lift from Tamil Nadu Electrical Inspectorate (TNEI)
Online Application Form
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric) Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
1 Application Type Y Dropdown Auto fill to “Permission to Erect a lift”
2 Applicant Details
2.1 Type of Applicant Y Dropdown Select Agent/ Consumer
2.2 Name of the Applicant Y Alpha Numeric
2.3 Contact Number Y Numeric 10 numbers
2.4 Email-ID Y Alpha Numeric
2.5 Address of the Applicant Y Alpha Numeric
2.6 District Y Dropdown Select from the list of districts of Tamil Nadu
2.7 Pincode Y Numeric 6 numbers
2.8 Name of the Agent N Alpha Numeric
2.9 Address of the Agent N Alpha Numeric
3 Property Details
3.1 Address of the premises where the lift
is to be installed Y Alpha Numeric
3.2 District Y Dropdown Select from the list of districts of Tamil Nadu
3.3 Taluk Y Dropdown Select from the list of Taluks pertaining to the District selected in S.No. 2.2
3.4 Pincode Y Numeric 6 numbers
3.5 Divisional Office Y Auto-fill The divisional office address to be displayed as per the responses of S.No. 2.2 and 2.3
4 Application Details
4.1 Building Plan Approval Number Issues by the Local Body
Y Alpha Numeric
4.2 Local Body Y Alpha Numeric
4.3 Date of approval of building permit Y Date Format
(DD/MM/YYYY)
4.4 License Previously obtained? Y Dropdown Select Y/N
Annexure B- Draft Functional Requirement Specifications
118
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric) Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
4.5 License Details If Response to S.No. 4.4 is “Y”, enable the following fields. Option to “add” details of multiple licenses obtained
License Number of the license obtained Y Alpha Numeric
Issued date of license Y Date Format
(DD/MM/YYYY)
Approved by Y Alpha Numeric Detail of the approving authority to be entered
Installation Address Y Alpha Numeric
4.3 Inspecting Authority Y Auto-fill The address of the divisional office to
be
5 Lift Details
5.1 Type of Lift Y Dropdown Select Car-Lift/ Goods/ Passenger/ Others
5.2 Others Y Alpha Numeric This field to be enabled if the
response to S.No. 5.1 is “Others”
5.3 Make of Lift Y Dropdown
Select from the list of model of lifts
• Asian Lifts • Ever Green Elevators • Aarvin Elevator Company • Accord Elevators India Pvt. Ltd.
• Apollo Lifts • City Elevator • CMC Elevators • Cooper Elevators India Pvt. Lid • Devon Elevators • Dream Elevators • Evergrow
• Fiam Lifts (India)
• GJ Lifts • Golden Elevators Co • Grace Elevators • GS Lifts • Halcon Elevators Pvt. Ltd
• Hephzi Elevators International Company Pvt. Ld.
Annexure B- Draft Functional Requirement Specifications
119
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric) Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
• Honda Lifts • JM Elevators • Johnson Lifts Pvt. Ltd • Kamai Elevators Pvt. Ltd
• Kone Elevator India Pvt. Ltd • Liftech Elevators
• Limra Elevators • M/s. Mobil Elevators Company • M/s.Sai Shradda Lifts • M/s. Sharp Lift • Magnetech Elevators
• Mitsubishi Elevator ETA India (P) Ltd.
• Modern Elevators • Nexus Elevators • Omega Elevators • PGP Lifts • Premier Engineering Systems
• Professional Elevators Pvt. Ltd. • Prompt (Madras) Elevators Co. • Selens Elevators Pvt. Ltd • Sharp Tech Elevators • Silicon Elevators Co • Smart Life Elevators
• SMS Elevator Company • Sona Lifts • Splash lifts • Swift EWngineering • Tamil Elevators
• Thyssenkrupp Elevator (India) • Universal Elevators
• Vista Engineering • Voltos Lifts
5.4 Model of Lift Y Alpha Numeric
5.5 Maximum Speed In m/s Y Numeric
Annexure B- Draft Functional Requirement Specifications
120
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric) Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
5.6 Maximum number of passengers that lift can take
Y Numeric
5.7 Maximum weight of the passengers in
lift (Kg) Y Numeric
5.8 The total weight of the Lift car carrying the maximum load (weight of car plus
maximum allowable load) (Kgs)
Y Numeric
5.9 Weight of the counter weight (Kg) Y Numeric
5.10 Supporting Cables
Number Y Numeric
Supporting cable description Y Alpha Numeric
Supporting cable Weight (kgs) Y Numeric
Supporting cable size (in sq. mm) Y Numeric
5.11
The depth of the pit from lowest part
of the car when at the lowest floor (in mms.)
Y Numeric
5.12 Number of landings Y Numeric
Checklist of Supporting Documents S.
No. Document Mandatory (Y/N)
1
Mechanical Drawings duly signed by the Applicant and Authorized Person of Lift Company, showing • Layout of the lift erection • Plan
• Section Elevation • Arrangement of Doors • Lift well Enclosure • Size and position of the machine relating to the lift well • Position of hoisting machine
• Number of floors to be served and total travel
Y
2 Electrical drawing of Lift duly signed by the Applicant and licensed Electrical Contractor, showing Wiring
Scheme for the complete lift installation including earthing scheme Y
3 Copy of the Building Plan permit Y
Annexure B- Draft Functional Requirement Specifications
121
Work Flow
Procedure for Obtaining Permission to erect a Lift
Applicant
Div
isio
nal S
ection
Off
icer
Assis
tant/
Junio
r Ele
ctr
ical
Inspecto
r (A
EI/
JEI)
- D
ivis
ional
START
Fill online form
Upload the required supporting documents
Pay Fees
Provide clarification to Queries
Send Physical copy of
application, documents
Submit and Generate receipt
EndReceive
Certificate
Receive reasons
SMS/Email
Alert to Officer
Forward the file to AEI/JEI
Verify the application,
documents and payment of fees
Any clarifications required?
Raise Query
Yes
Enter the date of receiving the documents
Digitally signed Permission certificate
Is it a approval case?
Approve
Record reason and Reject
No
Yes
No
SMS/Email Alert to Officer
SMS/Email
Alert to Applicant
SMS/Email
Alert to Applicant
SMS/Email
Alert to Applicant
Enter the courier/speed post details
Note: The department at present does not have the infrastructure to review the drawings online hence the documents are
submitted offline. Development/Installation of the required infrastructure in is the pipeline and when done, the offline submission
will be removed.
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Fee Details Rs. 2500/- (Rupees Two Thousand Five Hundred only) in case of lift having 5 landings;
Rs. 5000/- (Rupees Five Thousand only) in case of lift having more than 5 landings;
Workflow for Hierarchy based Approval Sl
No
Hierarchy
Level Designation Remarks (if any) Timelines
1 Level 1
Assistant/Junior
Electrical Inspector
Raise queries
Within 7 working days
from date of receipt of
documents
2 Approval
Authority Approves/Rejects
Within 30 working days
from date of receipt of
documents
Annexure B- Draft Functional Requirement Specifications
122
2.5 Registration and Certification of Steam Pipeline by Directorate of Boilers
Online Application Form Note: The Form shown below should be auto-populated for an applicant who has applied for Provisional registration of Boilers through Single window
portal. In the case of an applicant who has not applied for provisional registration through SWP earlier, select fields in form below should be auto-populated
from the CAF.
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT
vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
1 Company Details
1.1 Full Name of the Company Y Alpha Numeric and Special
Characters Y
1.2 Owner name Y Alpha Numeric and Special
Characters Y
2 Company Address
2.1 State Y Dropdown Y
2.2 District Y Dropdown Y
2.3 Taluk Y Dropdown Y
2.4 Revenue Village Y Dropdown Y
2.5 Street No./Name Y Alpha Numeric and Special
Characters
Y
2.6 Block No./Name Y Alpha Numeric and Special
Characters
Y
2.7 Pin Code Y Numeric Pin code start with 6 and
6 digit alone Y
3 Contact Details
3.1 Phone / Landline Number. With STD Code
N Numeric (upto 12 digits) Y
3.2 Mobile Number Y Numeric 10 digits only allowed Y
3.3 Email id Y Alpha Numeric and Special
Characters
Y
4 Boiler Details
4.1 Boiler Makers No. Y Alpha Numeric and Special
Characters
4.2 Name of Boiler Maker Y Alpha Numeric and Special
Characters
4.3 Place of Make Y Alpha Numeric and Special
Characters
4.4 Year of Make Y Numeric (upto 4 places)
Annexure B- Draft Functional Requirement Specifications
123
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
4.5 Rating (Total Heating surface Area in Sq.m.)
Y Alpha Numeric and Special
Characters
4.6 Working pressure (in Kg/cm2) Y Alpha Numeric and Special
Characters
4.7 Evaporation Capacity(Kg/hr) Y Alpha Numeric and Special
Characters
4.8
Type of Boiler
i. Horizontal Multi tubular ii. Horizontal Multi tubular
with water wall furnace iii. Water Tube Boilers iv. Others
Y Dropdown
4.9 Description of Boiler Y Alpha Numeric and Special
Characters
4.10 Steam pipe line length (in meter)
Y Alpha Numeric and Special
Characters
4.11 Nominal Bore upto 100mm (diameter in mm)
Y Numeric
Entry of either one is
mandatory
4.12 Nominal Bore exceeding 100mm (diameter in mm)
Y Numeric
4.13 Is Stream pipeline Having Header?
Y Yes/No Radio Button
Annexure B- Draft Functional Requirement Specifications
124
Checklist of Supporting Documents S.
No. Document
Mandatory
1 Drawings of Pipelines Y
2 Certificate Copy of Raw Material of Steam Pipelines issued by Directorate of Boilers or State Directorate of Boilers (if
procured from other State) or by Authorized Manufacturers of Pipelines Y
Annexure B- Draft Functional Requirement Specifications
125
Work Flow
Procedure for Registration and Certification of Steam Pipeline, Directorate of Boilers
Directo
r of
Boilers
Applicant
Circle
Assis
tant
Directo
r/ D
eputy
Directo
r
START
Fill online form
Upload the required supporting documents
SMS/E mail Alert to
Applicant and Director
Submit the application
Scrutinize the Application and
Documents
Any clarifications
required?
Raise QueriesYes
Approval Letter is uploaded
Provide clarification to
Queries
No
Pay Registration & Certification Fees
Online
Send hard copies of supporting
documents along with the printed copy of
the submitted online application
Enter the Speed Post details in the portal
SMS/E mail Alert to
Applicant
SMS/E mail Alert to Applicant and AD/DD
Erector submits the
Commencement Initiation online
Erector uploads the Completion
Report
Uploads the readiness letter
Reviews the Commencement
Initiation
Reviews the Completion
Report
Reviews the Readiness Letter
Allot inspection date
Conducts Field Inspection to run the Hydraulic Test
and verify the submitted documents
Issues the Pass order in form of
Letter
No
Yes
Prepare inspection report
and upload it
If Hydraulic Test
is Passed?
Suggest Recommendations
SMS/E mail Alert to
Applicant
SMS/E mail Alert to Director
Downloads Approval Letter
SMS/E mail Alert to AD/
DD
SMS/E mail Alert to AD/
DD
SMS/E mail Alert to AD/
DD
SMS/E mail Alert to
Applicant
SMS/E mail Alert to
Applicant
Downloads Approval Letter and supporting documents
SMS/E mail Alert to
Applicant
Approves the
Inspection Date
Finalizes Inspection Date
Downloads Pass Order
End
Reviews Recommendations
SMS/E mail Alert to
Applicant
SMS/E mail Alert to
Applicant
SMS/E mail Alert
to AD/DD
SMS/E mail Alert to AD/
DD
SMS/E mail Alert to Applicant and Director
Annexure B- Draft Functional Requirement Specifications
126
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Annexure B- Draft Functional Requirement Specifications
127
Inspection Checklist
S. No. Field Verification Document Checklist
1 Drawings of Pipelines
2 Certificate Copy of Raw Material of Steam Pipelines issued by Directorate of Boilers or State Directorate of Boilers (if procured from other
State) or by Authorized Manufacturers of Pipelines
Annexure B- Draft Functional Requirement Specifications
128
Fee Details S. No
Fee Type Amount (INR)
1 The fees for examination of plans and the particulars of materials, design and construction of steam pipes before the commencement of manufacture of the steam pipes shall be for 30 metres of piping or part thereof subject to a minimum of Rs. 5,000
200
2 For the pipes of nominal bore not exceeding 100 mm inclusive of all fittings excepting fittings like de-superheaters,
steam-receivers, feed heaters and separately fired super heaters for 30 metres of pipe or part thereof
500
3 For pipes of nominal bore exceeding 100 mm inclusive of all fittings excepting fittings like de-superheaters, steam receivers, feed heaters and separately fired super heaters for 30 metres or part thereof
1,200
Workflow for Hierarchy based Approval Sl No Hierarchy Level Designation Remarks (if any) Timelines
1 Level 1 Director of Boilers
On receipt of the application and the hard copies of required documents, scrutinizes the documents
and issues the Approval Letter if there are no queries
2 Level 2 Circle Assistant Director of Boilers/ Deputy Director of Boilers
Review the application, documents, Commencement & Completion report from Erector. On receiving the date of readiness for inspection from applicant, inspect the steam
pipelines with the hydraulic test and uploads the inspection report
Within 30 days from date of receipt of application
3 Approval Authority Circle Assistant Director of Boilers/ Deputy Director of Boilers
On completion of the test issues the Pass Order
Annexure B- Draft Functional Requirement Specifications
129
2.6 Grant of Recognition as Manufacturer of Boilers by Directorate of Boilers
Online Application Form
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Operation CAF
(Yes/No)
1 Company Details
1.1 Name of the Company Y Alpha Numeric and Special
Characters Y
1.2
State of Ownership
i. Single ii. Partnership iii. Ltd. Company
Y Dropdown Y
2 Company Address
2.1 State Y Dropdown Y
2.2 District Y Dropdown Y
2.3 Taluk Y Dropdown Y
2.4 Revenue Village Y Dropdown Y
2.5 Street No./Name Y Alpha Numeric and Special
Characters
Y
2.6 Building/Door/Flat Y Alpha Numeric and Special
Characters
Y
2.7 Block No./Name Y Alpha Numeric and Special
Characters
Y
2.8 Pin Code Y Numeric Pin code start with 6 and
6 digit alone Y
3 Boiler Details
3.1 Type of Boiler Y Multiple Selection
a. Shell Type Boiler Y Check Box
a.1. Shell Type Boilers, Capacity up to (TPH)
Y Numeric
b. Water Tube Boilers Y Check Box
b.1. Water Tube Boilers,
Capacity up to (TPH) Y Numeric
4 Company Registration Details
4.1 Registration Number Y Alpha Numeric and Special
Characters Yes
4.2 Registered Date Y Dropdown Calendar
Annexure B- Draft Functional Requirement Specifications
130
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Operation CAF
(Yes/No)
4.3
Type of Land i. Rent ii. Lease iii. Owned
Y Dropdown
4.4 Place of Registration Y Alpha Numeric and Special
Characters
4.5 Registration Authority Y Alpha Numeric and Special
Characters
5 Manpower and Equipment
Details
5.1 Tools and Plants Required for Manufacturing
Y Alpha Numeric and Special
Characters
There should be provision to add multiple rows to give details of
plant and tools.
5.2 Manpower Strength Y Numeric
6 Contact Details
6.1 Phone / Landline Number. With STD Code
N Numeric (upto 12 digits) Yes
6.2 Mobile Number Y Numeric 10 digits only allowed Yes
6.3 Email id Y Alpha Numeric and Special
Characters
Yes
Annexure B- Draft Functional Requirement Specifications
131
Checklist of Supporting Documents S.
No. Document
Mandatory
1 Data booklet of the Boiler in original (Form II, III & IV and other Form as applicable) Y
2 Layout of steam and other related pipelines in isometric view in triplicate along with material test certificate in original Y
3 Name of the approved erector who is going to erect the Boiler Y
4 List of Manpower (Builders, Suppliers, Engineers, Managers) & Organization Chart Y
5 List of Equipment and Machinery (Name and Capacity) Y
6 Certificate of Incorporation issued by Ministry of Corporate Affairs, Government of India Y
Annexure B- Draft Functional Requirement Specifications
132
Work Flow
Procedure for Grant of Recognition as Manufacturer of Boilers and Boiler Components , Directorate of Boilers
Directo
r of
Boilers
Applicant
START
Fill online form
Upload the required supporting documents
SMS/E mail Alert to
Applicant and Director
Submit the application
Scrutinizes the Payment and Application
Any clarifications
required?
Raise QueriesYes
Approval Recognition
Letter is uploaded
Provide clarification to
Queries
No
Pay Grant Fees Online
SMS/E mail Alert to
Applicant
SMS/E mail Alert to Applicant
SMS/E mail Alert to Director
Allot inspection date
Finalizes Inspection Date
SMS/E mail Alert
to Applicant
Approves the Inspection Date
SMS/E mail Alert to Director
Conducts the Field Inspection to recheck the
information provided online
Downloads Approval
Recognition Letter
End
SMS/E mail Alert to Director
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Annexure B- Draft Functional Requirement Specifications
133
Inspection checklist
S. No. Field Verification Document Checklist
1 Data booklet of the Boiler in original (Form II, III & IV and other Form as applicable)
2 Layout of steam and other related pipelines in isometric view in triplicate along with material test certificate in original
3 Name of the approved erector who is going to erect the Boiler
4 List of Manpower (Builders, Suppliers, Engineers, Managers) & Organization Chart
5 List of Equipments and Machinery (Name and Capacity)
6 Certificate of Incorporation issued by Ministry of Corporate Affairs, Government of India
Fee Details S. No
Fee Type Amount (INR)
1 Manufacturers of water tube boilers 5,000
2 Manufacturers of Shell Type boilers 2,500
Workflow for Hierarchy based Approval Sl No Hierarchy Level Designation Remarks (if any) Timelines
1 Level 1 Director of Boilers On receipt of the application and documents, payment is verified and fixes a date for inspection
2 Approval Authority Director of Boilers
On completion of the inspection, Director may raise queries, if any, else issues the Approval Letter to the manufacturer specifying the type (Shell Type and/or Water Tube) and maximum capacity in
TPH.
Annexure B- Draft Functional Requirement Specifications
134
2.7 Provisional Registration of Boilers by Directorate of Boilers
Online Application Form
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
1 Company Details
1.1 Full Name of the Company Y Alpha Numeric and Special
Characters Y
1.2 Owner name Y Alpha Numeric and Special
Characters Y
2 Company Address
2.1 State Y Dropdown Y
2.2 District Y Dropdown Y
2.3 Taluk Y Dropdown Y
2.4 Revenue Village Y Dropdown Y
2.5 Street No./Name Y Alpha Numeric and Special
Characters
Y
2.6 Block No./Name Y Alpha Numeric and Special
Characters
Y
2.7 Pin Code Y Numeric Pin code start with 6 and
6 digit alone
Y
3 Contact Details
3.1 Phone / Landline Number. With STD Code
N Numeric (upto 12 digits) Y
3.2 Mobile Number Y Numeric 10 digits only allowed Y
3.3 Email id Y Alpha Numeric and Special
Characters
Y
4 Boiler Details
4.1 Boiler Makers No. Y Alpha Numeric and Special
Characters
4.2 Name of Boiler Maker Y Alpha Numeric and Special
Characters
4.3 Place of Make Y Alpha Numeric and Special
Characters
4.4 Year of Make Y Numeric (upto 4 places)
4.5 Rating (Total Heating surface Area in Sq.m.)
Y Alpha Numeric and Special
Characters
Annexure B- Draft Functional Requirement Specifications
135
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
4.6 Working pressure (in Kg/cm2) Y Alpha Numeric and Special
Characters
4.7 Evaporation Capacity(Kg/hr) Y Alpha Numeric and Special
Characters
4.8
Type of Boiler i. Horizontal Multi tubular
ii. Horizontal Multi tubular
with water wall furnace iii. Water Tube Boilers iv. Others
Y Dropdown
4.9 Description of Boiler Y Alpha Numeric and Special
Characters
4.10 Steam pipe line length (in meter)
Y Alpha Numeric and Special
Characters
4.11 Nominal Bore upto 100mm Y Alpha Numeric and Special
Characters
4.12 Nominal Bore exceeding 100mm Y Alpha Numeric and Special
Characters
4.13 Is Stream pipeline Having Header?
Y Yes/No Radio Button
Annexure B- Draft Functional Requirement Specifications
136
Checklist of Supporting Documents S.
No. Document*
Mandatory
1 Form No. II or Form No. XVII Y
2 Form No. III Y
3 Form No. IIIA Y
4 Form No. IIIB Y
5 Form No. IIIC Y
6 Form No. IV or IV A Y
7 Drawings Y
9 Data Scrutiny for Boilers Y
10 Pipeline Drawings Y
11 Test Certificate for Steam Pipelines Y
*The format of the forms to be shared by the Department
Annexure B- Draft Functional Requirement Specifications
137
Work Flow Procedure for Provisional Registration of Boilers, Directorate of Boilers
Directo
r of
Boilers
Applicant
Circle
Assis
tant
Directo
r/ D
eputy
Directo
r
START
Fill online form
Upload the required supporting documents
SMS/E mail Alert to
Applicant and Director
Submit the application
Scrutinize the Application and
Documents
Any clarifications
required?
Raise QueriesYes
Issues the Erector Clearance
Letter
Provide clarification to
Queries
No
Pay Registration Fees Online
Send hard copies of
supporting documents
along with printed copy
of submitted online
application
Enter the Speed Post details in the portal
SMS/E mail Alert to
Applicant
SMS/E mail Alert to Applicant and AD/DD
Reports the Commencement Initiation online
Erector uploads the Completion
Report
Uploads the readiness letter
Reviews the Commencement
Initiation
Reviews the Completion
Report
Reviews the Readiness Letter
Allot inspection date
Conducts Field Inspection to run the Boilers Test & Hydraulic Test and verify the shared
documents
Issues the Provisional Registration
Number of Boilers
No
Yes
Prepare inspection report
and upload it
If Hydraulic Test
is Passed?
Suggest Recommendations
SMS/E mail Alert to
Applicant
SMS/E mail Alert to Director
Downloads Erector Clearance Letter
SMS/E mail Alert to AD/
DD
SMS/E mail Alert to AD/
DD
SMS/E mail Alert to AD/
DD
SMS/E mail Alert to
Applicant
SMS/E mail Alert to
Applicant
Downloads Erector Clearance Letter
SMS/E mail Alert to
Applicant
Approves the
Inspection Date
Finalizes Inspection Date
Downloads the Provisional
Registration of Boilers
End
Reviews Recommendations
SMS/E mail Alert to
Applicant
SMS/E mail Alert to
Applicant
SMS/E mail Alert
to AD/DD
SMS/E mail Alert to AD/
DD
SMS/E mail Alert to Applicant and Director
in 3 days
in 7 days
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Annexure B- Draft Functional Requirement Specifications
138
Inspection Checklist
S. No. Field Verification Document Checklist
1 Form No. II or Form No. XVII
2 Form No. III
3 Form No. IIIA
4 Form No. IIIB
5 Form No. IIIC
6 Form No. IV or IV A
7 Drawings
9 Data Scrutiny for Boilers
10 Pipeline Drawings
11 Test Certificate for Steam Pipelines
Annexure B- Draft Functional Requirement Specifications
139
Fee Details S. No
Fee Type Amount (INR)
1 Registration Fee for boiler (385):
S. No. Boiler Rating Fees in INR
1 For Small Industrial Boiler as per Chapter XIV 1200
2 For Boiler Rating not exceeding 10 sq. meters 1800
3 For Boiler Rating exceeding 10 sq. meters but not exceeding 30 sq. meters 2400
4 For Boiler Rating exceeding 30 sq. meters but not exceeding 50 sq. meters 2700
5 For Boiler Rating exceeding 50 sq. meters but not exceeding 70 sq. meters 3300
6 For Boiler Rating exceeding 70 sq. meters but not exceeding 90 sq. meters 3900
7 For Boiler Rating exceeding 90 sq. meters but not exceeding 110 sq. meters 4500
8 For Boiler Rating exceeding 110 sq. meters but not exceeding 200 sq. meters 5100
9 For Boiler Rating exceeding 200 sq. meters but not exceeding 400 sq. meters 5700
10 For Boiler Rating exceeding 400 sq. meters but not exceeding 600 sq. meters 6600
11 For Boiler Rating exceeding 600 sq. meters but not exceeding 800 sq. meters 7200
12 For Boiler Rating exceeding 800 sq. meters but not exceeding 1000 sq. meters 8100
13 For Boiler Rating exceeding 1000 sq. meters but not exceeding 1200 sq. meters 9600
14 For Boiler Rating exceeding 1200 sq. meters but not exceeding 1400 sq. meters 10800
15 For Boiler Rating exceeding 1400 sq. meters but not exceeding 1600 sq. meters 12600
16 For Boiler Rating exceeding 1600 sq. meters but not exceeding 1800 sq. meters 13500
17 For Boiler Rating exceeding 1800 sq. meters but not exceeding 2000 sq. meters 15000
18 For Boiler Rating exceeding 2000 sq. meters but not exceeding 2200 sq. meters 16200
19 For Boiler Rating exceeding 2200 sq. meters but not exceeding 2400 sq. meters 18000
20 For Boiler Rating exceeding 2400 sq. meters but not exceeding 2600 sq. meters 18900
21 For Boiler Rating exceeding 2600 sq. meters but not exceeding 2800 sq. meters 20400
22 For Boiler Rating exceeding 2800 sq. meters but not exceeding 3000 sq. meters 21600
-
2 Erection Fee (only for Site Assembled boiler as identified by Form II(2). Not applicable for Shop Assembled boiler as
identified by Form II(1) (as per Reg.395A(3))
-
Annexure B- Draft Functional Requirement Specifications
140
Workflow for Hierarchy based Approval Sl No Hierarchy Level Designation Remarks (if any) Timelines
1 Level 1 Director of Boilers
On receipt of the application and the hard copies of required
documents, reviews the documents and payment and issues the Erector Clearance Letter for Applicant and AD/DD
In 3 days of receiving the application
2 Level 2 Assistant Director of Boilers/ Deputy Director of Boilers
Review the application, documents. On receiving the date of readiness
for inspection from applicant, inspect the boiler and the pipelines and upload the inspection report.
3 Approval Authority Director of Boilers On completion of the hydraulic test issues the Provisional Registration
certificate
Annexure B- Draft Functional Requirement Specifications
141
2.8 Final Registration of Boilers by Directorate of Boilers
Online Application Form Note: The Form shown below should be auto-populated for an applicant who has applied for Provisional registration of Boilers through Single window
portal. In the case of an applicant who has not applied for provisional registration through SWP earlier, select fields in form below should be auto-populated
from the CAF.
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
Whether Registration number is Engraved
Y Yes/No Radio Button
1 Registration Details
1.1 Registration number Engraved on the Boiler
Y Alpha Numeric and Special Characters
1.2 Registered Date Y Dropdown Calendar
2 Details of Provisional order
2.1 Provisional order number Y Alpha Numeric and Special
Characters
2.2 Date of provisional order Y Dropdown Calendar
2.3 Whether it is transferred from
other circle
Y Yes/No Radio Button
2.4 Circle name Y Dropdown
3 Company Details
3.1 Full Name of the Company Y Alpha Numeric and Special
Characters Y
3.2 Owner name Y Alpha Numeric and Special
Characters Y
4 Company Address
4.1 State Y Dropdown Y
4.2 District Y Dropdown Y
4.3 Taluk Y Dropdown Y
4.4 Revenue Village Y Dropdown Y
4.5 Street No./Name Y Alpha Numeric and Special
Characters
Y
4.6 Building/Door/Flat No. Y Alpha Numeric and Special
Characters
Y
4.7 Pin Code Y Numeric Pin code start with 6 and
6 digit alone Y
Annexure B- Draft Functional Requirement Specifications
142
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
5 Contact Details
5.1 Phone / Landline Number. With STD Code
N Numeric (upto 12 digits) Y
5.2 Mobile Number Y Numeric 10 digits only allowed Y
5.3 Email id Y Alpha Numeric and Special
Characters
Y
6 Boiler Details
6.1 Boiler Makers No. Y Alpha Numeric and Special
Characters
6.2 Name of Boiler Maker Y Alpha Numeric and Special
Characters
6.3 Place of Make Y Alpha Numeric and Special
Characters
6.4 Year of Make Y Numeric (upto 4 places)
6.5 Rating (Total Heating surface
Area in Sq.m.) Y
Alpha Numeric and Special
Characters
6.6 Working pressure (in Kg/cm2) Y Alpha Numeric and Special
Characters
6.7 Evaporation Capacity(Kg/hr) Y Alpha Numeric and Special
Characters
6.8
Type of Boiler i. Horizontal Multi tubular
ii. Horizontal Multi tubular with water wall furnace
iii. Water Tube Boilers
Others
Y
Dropdown
6.9 How many safety valves installed
Y Numeric (upto 20 places)
6.10 Estimated date of steam test Y Dropdown Calendar
6.11 Circle Details Y Dropdown
Annexure B- Draft Functional Requirement Specifications
143
Checklist of Supporting Documents S.
No. Document
Mandatory
1 Boiler Attendants Certificate Copy issued to the incharge of processing boiler (in case of small boilers) or Boiler Operation
Engineers Certificate Copy issued to the incharge of processing boilers (in case of big boilers)*
*These certificates are issued by Directorate of Boilers to Incharge of Processing Boilers after qualifying the mandatory
examination
Y
Annexure B- Draft Functional Requirement Specifications
144
Work Flow
Procedure for Final Registration of Boilers, Directorate of Boilers
Circle
Assis
tant
Directo
r/ D
eputy
Directo
rApplicant
Directo
r of
Boilers
START
Fill online form
Upload the required supporting documents
SMS/E mail Alert to
Applicant and AD/DD
Submit the application
Reviews the Application and
Documents
Allot inspection date
Conducts Field Inspection to run the
Boilers Test & Hydraulic Test & verify submitted documents
Finalizes Inspection Date
SMS/E mail Alert to Applicant
Approves the
Inspection Date
SMS/E mail Alert to AD/
DD
Updates the MI Book
Uploads the Steam Test Inspection report
Reviews the Inspection report
Issues Registration Certificate in Form 6 and a Cover Letter
Any clarifications
required?
Yes
Provide clarification to
Queries
No
SMS/E mail Alert to
ApplicantRaise Queries
SMS/E mail Alert to AD/
DD
Downloads the Registration Certificate
End
SMS/E mail Alert to AD/DD
SMS/E mail Alert
to Applicant &
AD/DD
SMS/E mail Alert to
Applicant
SMS/E mail Alert
to Applicant &
Director
in 30 days
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Annexure B- Draft Functional Requirement Specifications
145
Inspection Checklist
S. No. Field Verification Document Checklist
1 Boiler Attendants Certificate Copy issued to the incharge of processing boiler (in case of small boilers) or Boiler Operation Engineers Certificate
Copy issued to the incharge of processing boilers (in case of big boilers)*
*These certificates are issued by Directorate of Boilers to Incharge of Processing Boilers after qualifying the mandatory examination
Fee Details No fee for conducting Steam Test & issuing countersigned Certificate.
Workflow for Hierarchy based Approval Sl No Hierarchy Level Designation Remarks (if any) Timelines
1 Level 1 Assistant Director of Boilers/ Deputy Director of Boilers
On receipt of the application and
required documents, fixes the date for Field Inspection
Within 30 days from date of receipt of application
2 Level 2 Assistant Director of Boilers/ Deputy Director of Boilers
Conducts the field inspection and prepares the Inspection Report, M.I. book and Certificate.
3 Level 3 Director of Boilers Reviews the Inspection report
5 Approval Authority Director of Boilers Issues the Registration certificate for the Boilers
Annexure B- Draft Functional Requirement Specifications
146
2.9 Grant of License under Insecticide Act, 1968 for manufacture, storage and sale of insecticides and
pesticides and its renewal from Agriculture Department
Online Application Form
Sl No Field Mandatory (Y/N)
Field Type (character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
1 Details of Applicant Y
1.1 Name of Applicant Y Character Y
1.2 Address of Applicant:
1.2.1 State Y Dropdown Options in dropdown: States Y
1.2.2 District Y Dropdown Options in dropdown: Districts in Tamil Nadu
Y
1.2.3 Taluk Y Dropdown Options in dropdown: Taluks in Tamil Nadu
Y
1.2.4 Zone Y Dropdown Options in dropdown: Zones in Tamil Nadu
1.2.5 Village/ Town N Character Y
1.2.6 Street/ Industrial Area Name
N Character Y
1.2.7 Building/ Door/ Flat/
Survey No.
Y Character Y
1.2.8 Shop No. N Character
1.2.9 Floor Number N Numeric
1.2.10 Pin Code Y Numeric Y
1.3 Mobile Number Y Numeric Y
1.4 Email Id Y Character Y
2 Whether the application
is for:
Y Dropdown Options in Dropdown: a) Grant of
license to Manufacture insecticide, (b) Grant of license to sell/ stock/ exhibit for sale/ distribution of
insecticides, (c) Grant/ renewal of licence for commercial pest control operations
3 Address of Manufacturing premises (in case of
Y
Annexure B- Draft Functional Requirement Specifications
147
Sl No Field Mandatory (Y/N)
Field Type (character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
license to manufacture)
3.1 State Y Dropdown Options in dropdown: States Y
3.2 District Y Dropdown Options in dropdown: Districts in Tamil Nadu
Y
3.3 Taluk Y Dropdown Options in dropdown: Taluks in
Tamil Nadu
Y
3.4 Zone Y Dropdown Options in dropdown: Zones in Tamil Nadu
3.5 Village/ Town N Character Y
3.6 Street/ Industrial Area
Name
N Character Y
3.7 Building/ Door/ Flat/ Survey No.
Y Character Y
3.8 Shop No. N Character
3.9 Floor Number N Numeric
3.10 Pin Code Y Numeric Y
3.11 Name of insecticides and registration number
(issued by State/ Central Department)
Y Table A table with 4 columns and 2 rows to be added (with option of adding rows
if required). Column headers- Sl. No., Name of insecticide, registration number, add row (clicking on which an additional row is to be added)
3.12 Validity period of
certificate of registration
N
3.12.1 From N Calendar Pop-up calendar with DD-MM-YY
3.12.2 To N Calendar Pop-up calendar with DD-MM-YY
4 Complete address of
the premises where
insecticides will be:
Y
4.1 Stored/ Stocked:
4.1.1 State Y Dropdown Options in dropdown: States
4.1.2 District Y Dropdown Options in dropdown: Districts in Tamil Nadu
4.1.3 Taluk Y Dropdown Options in dropdown: Taluks in Tamil Nadu
Annexure B- Draft Functional Requirement Specifications
148
Sl No Field Mandatory (Y/N)
Field Type (character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
4.1.4 Zone Y Dropdown Options in dropdown: Zones in Tamil Nadu
4.1.5 Village/ Town N Character
4.1.6 Street/ Industrial Area Name
N Character
4.1.7 Building/ Door/ Flat/
Survey No.
Y Character
4.1.8 Shop No. N Character
4.1.9 Floor Number N Numeric
4.1.10 Pin Code Y Numeric
4.2 Sold or exhibited for sale or issued for use in case of commercial pest control operations
Y Character
4.2.1 State Y Dropdown Options in dropdown: States
4.2.2 District Y Dropdown Options in dropdown: Districts in Tamil Nadu
4.2.3 Taluk Y Dropdown Options in dropdown: Taluks in Tamil Nadu
4.2.4 Zone Y Dropdown Options in dropdown: Zones in Tamil Nadu
4.2.5 Village/ Town N Character
4.2.6 Street/ Industrial Area
Name
N Character
4.2.7 Building/ Door/ Flat/ Survey No.
Y Character
4.2.8 Shop No. N Character
4.2.9 Floor Number N Numeric
4.2.10 Pin Code Y Numeric
4.3 Whether any of the premises is situated in
residential area
Y Dropdown Options in dropdown: Yes/No
4.4 Whether food articles are stored in any of the above premises
Y Dropdown Options in dropdown: Yes/ No
Annexure B- Draft Functional Requirement Specifications
149
Sl No Field Mandatory (Y/N)
Field Type (character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
5.1 Qualification of the applicant/ technical personnel under employment of the
applicant
Y Table A table with 5 columns and 2 rows to be provided (with option to add rows if required). Column headers- Sl. No., Name and designation,
Qualification, Experience, Add row (clicking on which additional rows to
be added)
5.2 Whether fulfil minimum qualification as per insecticide rules
Y Dropdown Options in dropdown: Yes/ No
6 Training
6.1 Name of the Training/ Course Conducted
Y Character
6.2 Duration of the Training/ Course
Y Numeric In Months
6.3 Certificate Awarded, if any
Y Dropdown Options in dropdown: Yes/No
8 Is the Application being
made for Commercial Pest Control?
Y Dropdown Options in dropdown: Yes/No.
On clicking Yes, tabs from 8.1 to 8.9 and 9 to be opened. On clicking No, directly move to 10
8.1 Address of the registered office
Y Character
8.2 Address of the zonal office
Y Character
8.3 Address of the branch
office
Y Character
8.4 Address of the premises for which the license is applied for
Y Character
8.5 Whether approval of technical expertise obtained
Y Dropdown Options in dropdown: Yes/ No. On clicking Yes, 3 new tabs open: a. State reference number for
approval
Annexure B- Draft Functional Requirement Specifications
150
Sl No Field Mandatory (Y/N)
Field Type (character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
b. Date of approval (pop-up calendar)
c. Valid till (pop-up calendar)
8.6 Name of restricted insecticides for which approval is sought
Y Character A table with 2 columns and 2 rows (with option to add additional rows): a. Sl. No.
b. Name of Insecticide
8.7 Name of responsible technical person
Y Character
8.8 Whether any quantity of restricted insecticide in possession as on date of application
Y Dropdown Options in dropdown: Yes/No. On selecting Yes, a new tab opens: Quantity
8.9 Details of safety equipment, antidotes and all other essential facilities
Y Character
9 In case of licence to sell/
stock etc. and for
commercial pest control operations, name of the insecticide(s) and its/ their manufacturer/ importer which the applicant intends to deal
in and status of the principal certificate(s) in the format given below
Y Table A table with 6 columns and 2 rows
to be provided (with option to add
rows). Column Headers- a. Sl. No. b. Particulars of insecticide c. Name of the Manufacturer/
Importer d. Type of certificate of registration
(to be provided by Client) e. Detailed principal certificate
number/ date of issue/ validity
Add row (clicking on which additional rows to be added)
10 Particulars of licence(s), if issued in the name of applicant by any other state in the area of their jurisdiction
Y Character A table with 5 columns and 2 rows to be provided (with option to add rows). Column headers: a. Sl. No.
Annexure B- Draft Functional Requirement Specifications
151
Sl No Field Mandatory (Y/N)
Field Type (character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
b. Name/ Type of Certificate c. State (dropdown d. Certificate Number e. Applicant Name
f. Certificate Valid till (pop-up calendar)
11 In case of renewal: Y
11.1 State License Number Y Numeric
11.2 Date of Grant Y Calendar Pop-up Calendar with DD-MM-YY
12 Fees to be paid Y Character Auto-calculated
Annexure B- Draft Functional Requirement Specifications
152
Checklist of Supporting Documents S. No. Document Mandatory
Documents for Grant of Manufacturing License:
1 Notarized copy of Central Insecticides Board (CIB) Certificate for all the products Y
2 Memorandum of Articles of Association for incorporation of the firm under Company’s Act (for new alone) Y
3 Bio-Data of the Chemist with degree certificate (attested copy) and the appointment order- in prescribed format
(format to be provided by the Department)
Y
4 Bio-Data of the responsible person of the firm in the prescribed format (format to be provided by the Department) Y
5 Letter of the Authority to sign in the Principal Certificate* Y
6 Affidavit for Payment of Difference of fee if any at later date, in INR 20/- Stamp paper (format to be provided by the
Department)
Y
7 Distributor details in Tamil Nadu in company letterhead and signed by authorized signatory Y
8 Specimen copy each of the label and Tamil leaflets approved by the Central Insecticide Board (Scanned) Y
9 Approved copy of label and leaflets of each products with the signature of the Central Insecticide Board (Scanned) Y
10 Specimen Principle Certificate with sign and date- in form II of Appendix Principal Certificate (sample to be
provided by Department)
Y
13 Details of lab infrastructure (scanned) Y
14 Details of packing facility Y
15 Proposed quantity of pesticides to be manufactured during the licensing period Y
Documents for Grant of License to Sell, Stock, exhibit or distribute Insecticides:
1 Notary attested copy of Manufacturing license for all units in the case of other states Y
2 Latest QPC from concerned State Licensing Authority for all the units Y
Bio-data of the Chemist with degree Certificate (notarized copy) of all units- in the prescribed format (format to be
provided by the Department)
Y
3 Bio-Data of the responsible person of the firm in the prescribed format* Y
4 Letter of the Authority to sign in the Principal Certificate* Y
5 Affidavit for Payment of Difference of fee if any later at later date in INR 20/- Stamp paper* Y
6 Notarized copy of Marketing Agreement/ Memorandum of Articles of Association with the manufacturing unit* Y
7 Distributor details in Tamil Nadu in company letterhead and signed by authorized signatory Y
8 Copy of label and leaflet of each product approved by Central Insecticide Board and also Tamil Literature for all the
products*
Y
9 Principal Certificate with sign and date Y
10 Notarized copy of Central Insecticides Board (CIB) Certificate for all the products Y
11 Copy of Previous Year Sales Permission issued, if any N
12 Details of sale of pesticides in Tamil Nadu for the past 2 years (product-wise details), self-attested N
Annexure B- Draft Functional Requirement Specifications
153
Work Flow
Issuance Of License From Agriculture Department
Assis
tant
from
Pla
nt
Pro
duction S
ection
Applicant
Deputy
Directo
rJo
int
Directo
r of
Agriculture
(D
istr
icts
)A
gric
ult
ure
Off
icer
START
Fill online form on SWP
Upload the required supporting documents
Email & SMS Alert to Applicant & Department
Official
Submit the application
Scrutinize the Application & Supporting Documents
Provide clarification to
Queries
Legend Online – Single Window Portal (SWP)
Payment of Fees
End
Download the License
License
Conduct Field Inspection
Offline
Submit Inspection Report along with recommendations
Notes remarks on the application and forwards the same to Agriculture
Officer
Notes remarks on the application and forwards the same to Joint Director
No
Raise QueriesYes
Email & SMS Alert to
Applicant
Reviews the Inspection Report and recommendations
Should license be issued?
Reject Application
No
Issuance of LicenseYes
Email & SMS Alert
to Applicant
Notes remarks on the application and forwards
the same to Deputy Director
Makes note and forwards the same to Agriculture Officer
Makes note and forwards the same to Deputy Director
Email & SMS Alert
to Applicant
Are there any queries?
Email & SMS Alert to Applicant for Inspection
Annexure B- Draft Functional Requirement Specifications
154
Fee Details S. No. Fee Type Amount (INR)
1 Manufacturing License Fee INR 2000 per product subject to maximum of INR 20000
2 License fee sell, stock or distribute Insecticides INR 500 per product subject to maximum of INR 7500
Workflow for Hierarchy based Approval Sl No Hierarchy Level Designation Remarks (if any) Timelines
1 Level 1 Assistant from Plant Production Section
Scrutinizes application and forwards it to Agriculture Officer for Review
No timeline specified
2 Level 2 Agriculture Officer Makes note of the application and Inspection Report forwards to
Deputy Director No timeline specified
3 Level 3 Deputy Director Final approving authority- also scrutinizes application and reviews inspection report prepared by Joint Director of Agriculture (Districts)
No timeline specified
4 Level 4 Joint Director of Agriculture (Districts)
Conducts physical inspection of the site and prepares an inspection report
No timeline specified
(Timeline to be received from the Department)
Sample Certificate (To be received from Department)
Annexure B- Draft Functional Requirement Specifications
155
2.10 Sanitary Certificate for schools from Commissionerate of Municipal Administration (CMA)
Online Application Form
# Field
Mandatory
(Y/N) Field Type
Remarks, if any for IT
vendor Auto Populated from Pre-Operation CAF (Yes/No)
1.1 Name of ULB Y Dropdown Y
1.2 Name of School Y Alphanumeric Y
1.3 Applicant Name Y Alphanumeric
1.4 Designation Y Alphanumeric
1.5 Mobile Number Y Numeric Y
1.6 Email Y Alphanumeric Y
2 Address of School
2.1 Door No. Y Numeric Y
2.2 Street Y Alphanumeric Y
2.3 Area/ Locality Y Alphanumeric Y
2.4 Taluk Name Y Alphanumeric Y
2.5 District Y Alphanumeric Y
2.6 Pincode Y Numeric Y
Checklist of Supporting Documents Sl. No. Document Mandatory (Yes/No)
1. Structural Stability Certificate Yes
2. Tax Receipt Yes
3. Fire Certificate Yes
4. Form-D from Tahsildar mentioning the usage of the building Yes
5. Rental agreement (if any) No
Fee Details Application Fee: Rs. 1000/-
Annexure B- Draft Functional Requirement Specifications
156
Inspection Checklist
# Field Mandatory
(Y/N) Field Type Remarks, if any for IT vendor
1.1 Date of inspection Y Date selection
1.2 Name of School Y Alphanumeric
2 Staff details
2.1 No. of Male staff Y Numeric
2.2 No. of Female staff Y Numeric
3 Student details
3.1 No. of Boys Y Numeric
3.2 No. of Girls Y Numeric
4 Classroom details
4.1 No. of Classrooms Y Numeric
4.2 Do the classrooms have sufficient ventilation?
(Yes/No)
Y Dropdown
4.3 Do the classrooms have sufficient lighting? (Yes/No)
Dropdown
5 Building Details
5.1 Roof Material Alphanumeric
5.2 Floor material Alphanumeric
5.3 Wall material Alphanumeric
5.4 Are the blackboards in the classroom maintained well? (Yes/No)
Dropdown
5.5 Are any classrooms used as footpath/ veranda?
(Yes/No)
Dropdown
6 Toilet details Y Table
Sl No. Sanitary facilities Number Satisfactory?
1. Washroom for students Yes/No/NA
2. Urinals for students Yes/No/NA
3. Separate toilets for girls Yes/No/NA
4. Washroom for teachers Yes/No/NA
5. Urinals for teachers Yes/No/NA
6. Separate toilets for female staff Yes/No/NA
7 Drinking water details
7.1 Source of drinking water Alphanumeric
Annexure B- Draft Functional Requirement Specifications
157
# Field Mandatory
(Y/N) Field Type Remarks, if any for IT vendor
7.2 Is the source well maintained? (Yes/No)
Dropdown
7.3 Is the supply sufficient? (Yes/No)
Dropdown
7.4 How is the water distributed? Alphanumeric
7.5 Is there lunchroom available? (Yes/No)
Dropdown
7.6 Is kitchen/ storeroom available?
(Yes/No)
Dropdown
7.7 Are they maintained properly? (Yes/No)
Dropdown To be activated on if 7.6, is selected as ‘Yes’
7.8 Is there sufficient playground near the school? (Yes/No)
Dropdown
7.9 Is the building constructed as per building regulations? (Yes/No)
Dropdown
8 Recommendation
8.1 Recommended for approval without restrictions? Radio button Option to select any one as radio button. If 8.1 or 8.2 is selected,
option to enter details to be provided 8.2 If recommended with restrictions, mention
restriction
Alphanumeric
8.3 Not recommended, with reasons Alphanumeric
Annexure B- Draft Functional Requirement Specifications
158
Work Flow Applicant
(SW
P)
Junio
r Assis
tant
(Public H
ealth)
Sanitary
Inspecto
rSanitary
Off
icer
Fill application and
upload necessary
documents
Conduct site
inspection
Prepare inspection
report
Receive
inspection date
Respond to query
with additional
details/ document
SMS alert to applicant
Receives application
and scrutinize
application
Send query to
applicant
Yes
No
SMS alert to applicant
SMS alert to officer
Any queries?
START
Forwards to Sanitary
Inspector
Receive Final
Certificate
Forward application
Sanitary Officer
Receive rejection
letter
Rejection
Letter
Final
CertificateSMS alert to applicant
SMS alert to applicant
END
Schedule Inspection
Prepare Rejection
letter with reason
for rejection
Forward Rejection
letter to applicant
Generate Certificate
No
Yes
Satisfactory?
Pay application fee
Forward Certificate
to applicantScrutinize
application along
with inspection
report
Legend
Online – Single
Window Portal
(SWP)
Online-
Department
system
Offline
Annexure B- Draft Functional Requirement Specifications
159
Sample Final Certificate Municipal Office Address
Certificate No. ---------
Sanitary Certificate
I hereby certify that I have inspected the school building of “(Name of School)” on “(Inspection Date)”. The latrine and urinals arrangements are
satisfactory and the supply of drinking water is sufficient. The sanitation is good and maintained properly. The restrictions in running the school are
mentioned in the Annexure. (To be inserted only if the Sanitary Officer selects to add restrictions)
Digital Signature of Sanitary Officer
Date
-----------
Annexure: Restrictions for running ‘(School Name)’
1. ----- (As entered by Sanitary Officer)
2. ----- (As entered by Sanitary Officer)
3. -----
4. -----
NB: The Annexure shall be inserted only if the Sanitary Officer selects to add restrictions)
Annexure B- Draft Functional Requirement Specifications
160
3. Post-Operation Services
Annexure B- Draft Functional Requirement Specifications
161
S.
No. Clearances/ Services Competent Authority
1. New Assessment of Property GCC
2. Load Addition/Reduction TANGEDCo
3. Licence for working new lift. TNEI
4. Renewal of licence for working of lift. TNEI
5.
Permission for making addition /alteration to the
existing lift. TNEI
6. Registration of Generator TNEI
7. Transfer of Ownership of Boiler DoB
8.
Renewal of Recognition as Manufacturer of Boiler
and Boiler Components DoB
9.
Renewal of Recognition as Erector/Repairer of
Boiler and Boiler Components DoB
10. Renewal of Boiler Registration DoB
11.
Licence issued for the possession and use of
Denatured Spirit / Methylated Spirit / Methyl
Alcohol either as such and/ or for use in the
manufacture of specified commodities other
than varnish
Prohibition and Excise (P&E)
12.
Licence for Retail sale of bottled Indian Made
Foreign Spirit, in shops and bars by the Tamil
Nadu State Marketing Corporation Ltd. for the
Whole State of the Tamil Nadu
P&E
13.
Licence for possession of liquor by a non-
proprietary club for supply to Members under TN
Liquor (License and permit)Rules, 1981
P&E
14.
Licence for possession of liquor by the Star
Hotels P&E
15.
Permit to import foreign liquors by FL2, FL3,
FL3A and FL3AA Licensees P&E
16.
Permit to export beer to other states and
countries. P&E
17. Renewal of licenses-FL P&E
18. Renewal of other licenses P&E
19. Apply for NEEDS and UYEGP (<10 lakhs)
Commissionerate of Industries and
Commerce
20.
Incentive for Promotion of Energy Audit and
Conservation of Energy (PEACE)
Commissionerate of Industries and
Commerce
21.
Subsidy / Incentives for Micro, Small and
Medium Enterprises
Tamil Nadu Industrial Investment
Corporation (TIIC)
Annexure B- Draft Functional Requirement Specifications
162
S.
No. Clearances/ Services Competent Authority
22. Generator Subsidy TIIC
23. New assessment of property CMA
24. Name transfer of property CMA
25. New assessment of property DTP
26. Name Transfer of property DTP
Annexure B- Draft Functional Requirement Specifications
163
Pre-Operation Combined Application Form (CAF) for Post Operation
Services Sl.
No. Fields Remarks
Project Information
1.0 Details of Industrial Unit (Proposed to
be set-up)
1.1 Name of the Industrial Unit Auto populated from CAF Pre-Establishment
S.No.1.1
1.2 Address of the Industrial Unit
1.2.1 Survey Field (SF) Number/ Re-Survey
(RS) Number
Auto populated from CAF Pre-Establishment
S.No.1.2.1
1.2.2 Revenue Village Name Auto populated from CAF Pre-Establishment
S.No.1.2.2
1.2.3 Local Body Type Auto populated from CAF Pre-Establishment
S.No.1.2.3
1.2.4 Local Body Name Auto populated from CAF Pre-Establishment
S.No.1.2.4
1.2.5 Ward Number Auto populated from CAF Pre-Establishment
S.No.1.2.5
1.2.6 Door Number/ Plot Number Auto populated from CAF Pre-Establishment
S.No.1.2.6
1.2.7 Street/ Road Auto populated from CAF Pre-Establishment
S.No.1.2.7
1.2.8 Area/ Locality Auto populated from CAF Pre-Establishment
S.No.1.2.8
1.2.9 Village / Town/ City Auto populated from CAF Pre-Establishment
S.No.1.2.9
1.2.10 Taluk Name Auto populated from CAF Pre-Establishment
S.No.1.2.10
1.2.11 District Auto populated from CAF Pre-Establishment
S.No.1.2.11
1.2.12 State Auto populated from CAF Pre-Establishment
S.No.1.2.12
1.2.13 Country Auto populated from CAF Pre-Establishment
S.No.1.2.13
1.2.14 Pincode Auto populated from CAF Pre-Establishment
S.No.1.2.14
1.3 Contact details of the Industrial Unit
1.3.1 Telephone Number with STD code Auto populated from CAF Pre-Establishment
S.No.1.3.1
1.3.2 Fax Number with STD code Auto populated from CAF Pre-Establishment
S.No.1.3.2
1.3.3 Mobile Number: Auto populated from CAF Pre-Establishment
S.No.1.3.3
1.3.4 e-mail Address: Auto populated from CAF Pre-Establishment
S.No.1.3.4
1.3.5 Website Address: Auto populated from CAF Pre-Establishment
S.No.1.3.5
1.4 Nature of Organization Auto populated from CAF Pre-Establishment
S.No.1.4
Proprietary
Partnership
Private Limited
Public Limited
Co-Operative
Annexure B- Draft Functional Requirement Specifications
164
Sl.
No. Fields Remarks
Others
1.5 Registration Number issued by
Registrar of Companies (ROC)
Auto populated from CAF Pre-Establishment
S.No.1.5
1.6 Other Registration Details (please fill
the relevant registration details)
1.6.1 Foreign Investment Promotion Board
(FIPB) / Reserve Bank of India (RBI)
Approval Number [ Issued Date /
Expiry Date]
Auto populated from CAF Pre-Establishment
S.No.1.6.1
1.6.2 Industrial Entrepreneurs Memorandum
Number [Issued Date / Expiry Date]
Auto populated from CAF Pre-Establishment
S.No.1.6.2
1.7 Proposed date of commencement of
commercial production:
Auto populated from CAF Pre-Establishment
S.No.1.8
2.0 Details of Project Promoter(s)
2.1 Name of the Promoter (s) Auto populated from CAF Pre-Establishment
S.No.2.1
2.2 Designation of the Promoter (s) (if
applicable)
Auto populated from CAF Pre-Establishment
S.No.2.2
2.3 Address of the Promoter (s)
2.3.1 Door Number/ Plot Number Auto populated from CAF Pre-Establishment
S.No.2.3.1
2.3.2 Street/ Road Auto populated from CAF Pre-Establishment
S.No.2.3.2
2.3.3 Area/ Locality Auto populated from CAF Pre-Establishment
S.No.2.3.3
2.3.4 Village / Town/ City Auto populated from CAF Pre-Establishment
S.No.2.3.4
2.3.5 District Auto populated from CAF Pre-Establishment
S.No.2.3.5
2.3.6 State Auto populated from CAF Pre-Establishment
S.No.2.3.6
2.3.7 Country Auto populated from CAF Pre-Establishment
S.No.2.3.7
2.3.8 Pincode Auto populated from CAF Pre-Establishment
S.No.2.3.8
2.4 Contact details of the Project
Promoter(s)
2.4.1 Telephone Number with ISD and STD
code
Auto populated from CAF Pre-Establishment
S.No.2.4.1
2.4.2 Fax Number with STD code Auto populated from CAF Pre-Establishment
S.No.2.4.2
2.4.3 Mobile Number: Auto populated from CAF Pre-Establishment
S.No.2.4.3
2.4.4 e-mail Address: Auto populated from CAF Pre-Establishment
S.No.2.4.4
3.0 Details of Project Investment and
Finance
3.1 Details of Estimated Project Cost (INR
Crores)
3.1.1 Land Auto populated from CAF Pre-Establishment
S.No.3.1.1
3.1.2 Building Auto populated from CAF Pre-Establishment
S.No.3.1.2
3.1.3 Plant and Machinery - Imported
(Landed Cost)
Auto populated from CAF Pre-Establishment
S.No.3.1.3
Annexure B- Draft Functional Requirement Specifications
165
Sl.
No. Fields Remarks
3.1.4 Plant and Machinery - Indigenous Auto populated from CAF Pre-Establishment
S.No.3.1.4
3.1.5 Miscellaneous Assets Auto populated from CAF Pre-Establishment
S.No.3.1.5
3.1.6 Contingencies, etc., Auto populated from CAF Pre-Establishment
S.No.3.1.6
3.1.7 Others (Please Specify) Auto populated from CAF Pre-Establishment
S.No.3.1.7
3.1.8 TOTAL
3.2 Means of Finance (INR Crores)
3.2.1 Equity from Promoters - Domestic Auto populated from CAF Pre-Establishment
S.No.3.2.1
3.2.2 Equity from Promoters - Foreign Auto populated from CAF Pre-Establishment
S.No.3.2.2
3.2.3 Loan from Financial Institutions Auto populated from CAF Pre-Establishment
S.No.3.2.3
3.2.4 Others (Please Specify) Auto populated from CAF Pre-Establishment
S.No.3.2.4
3.2.5 Estimated Project Cost Total
4.0 Details of Employment
4.1 Skilled Labour Auto populated from CAF Pre-Establishment
S.No.4.1
4.2 Unskilled Labour Auto populated from CAF Pre-Establishment
S.No.4.2
4.3 Supervisory Auto populated from CAF Pre-Establishment
S.No.4.3
4.4 Total Number of Employees Auto populated from CAF Pre-Establishment
S.No.4.4
4.5 Number of Contract Employees Auto populated from CAF Pre-Establishment
S.No.4.5
4.6 Maximum number of workers proposed
to be employed in the factory on any
one day
Auto populated from CAF Pre-Establishment
S.No.4.6
5.0 Details of Manufacturing
5.1 Brief description of process technology
used along with a flow chart (to be
enclosed)
Auto populated from CAF Pre-Establishment
S.No.5.1
Flow chart (Please enclose a flow chart
in a separate sheet)
5.2 Do you have any foreign technical
collaboration?
Auto populated from CAF Pre-Establishment
S.No.5.2
5.3 Whether the factory will be engaged in
Dangerous Operations as indicated
under rule 95 of Tamil Nadu Factory
Rules 1950?
Auto populated from CAF Pre-Establishment
S.No.5.3
5.4 Line of manufacture
5.4.1 Description of Item Auto populated from CAF Pre-Establishment
S.No.5.4.1
5.4.2 Installed Capacity Auto populated from CAF Pre-Establishment
S.No.5.4.2
5.5 Raw Material Consumption
5.5.1 Description of Item Auto populated from CAF Pre-Establishment
S.No.5.5.1
Annexure B- Draft Functional Requirement Specifications
166
Sl.
No. Fields Remarks
6.0 Details of Energy Consumption and
Power requirement
6.1 Source of Energy
6.1.1 Captive Generation ( in kVA ) Auto populated from CAF Pre-Establishment
S.No.6.1.1
6.1.2 Tamil Nadu Generation and
Distribution Corporation Limited
(TANGEDCO) Supply ( in kVA )
Auto populated from CAF Pre-Establishment
S.No.6.1.2
6.2 Power Requirements from TANGEDCO
6.2.1 Permanent (production phase, in kVA ) Auto populated from CAF Pre-Establishment
S.No.6.2.2
6.2.2 Voltage rating at which HT supply is
required:
Auto populated from CAF Pre-Establishment
S.No.6.2.3
6.3 If captive power, fuel used for
generation
6.3.1 Fuel Type Auto populated from CAF Pre-Establishment
S.No.6.3.1
Coal
Oil / Diesel
Wood
Wind
Solar
Others (Please Specify)
7 Details of Water Requirement
7.1 Industrial Use (Kilo Litres per Day) Auto populated from CAF Pre-Establishment
S.No.7.1
7.2 Domestic (Kilo Litres per Day) Auto populated from CAF Pre-Establishment
S.No.7.2
8 Other Details
8.1 PAN Auto populated from CAF Pre-Establishment
S.No.8.1
Annexure B- Draft Functional Requirement Specifications
167
3.1 New Assessment of Property from Greater Chennai Corporation (GCC)
Online Application Form
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric / Dropdown)
Remarks, if any for IT vendor Auto Populated
from Pre-operation
CAF (Yes/No)
1 Applicant Details
1.1 Applicant Name Y Alpha Numeric Applicant to fill the Legal Name of the entity Y
1.2 Zone Y Dropdown Select HQ/ HQ- Metro/ HQ-
TACT/N01/N02/N03…../N15
1.3 Ward Y Dropdown Select from the list of wards (N001/N002/N003/N004…../N200)
1.4 Property Group Y Dropdown Select from 1. Banks
2. Board (State Government) 3. Central Government Departments 4. Central Government Undertaking 5. Consulates 6. Corporation (State Government) 7. Corporations (Central Government)
8. Exempted Properties 9. Individual Property 10. Limited Companies (State Government) 11. State Government Department 12. Undertakings (State Government) 13. Others 14. Educational Institution
15. Society (State Government) 16. Institutes (State Government)
1.5 Property Sub-Group Y Dropdown Manufacturing/Service industry
2 Property Address
2.1 Area Y Dropdown Select from the list of areas pertaining to the Ward as selected in S. No.1.4
2.2 Locality Y Dropdown Select from the list of localities pertaining to the area as selected in S.No. 2.1
2.3 Street Ward Y Dropdown Same as the response in S.No. 1.4
2.4 Street Name Y Dropdown Select from the list of Street Name pertaining to the street ward in S.No. 2.3.
Annexure B- Draft Functional Requirement Specifications
168
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric /
Dropdown)
Remarks, if any for IT vendor Auto Populated
from Pre-operation CAF (Yes/No)
2.5 Door No. New Y Numeric
2.6 Door No. Old N Numeric
2.7 Address 1 N
2.8 Pincode Y Numeric Only 6 numbers Y
2.9 If Correspondence Address is Different from Property
Address
Y Click if the addresses are different.
3 Correspondence Address The following fields to get enabled if the correspondence address is different from property address
3.1 Address 1 N Alpha Numeric
3.2 Address 2 N Alpha Numeric
3.3 Pincode N Numeric Only 6 numbers
3.4 Street Name N Alpha Numeric
4 Property Type
4.1 Property Type Y Dropdown Select from the following list 1. Central Government (50%)
2. Super Structure 3. Vacant Land
4. Independent Building 5. Flats in Multi- Storied Buildings 6. Central Government (33%) 7. Central Government (75%) 8. State Government 9. Cell Phone Tower
10. Cinema Theatre 11. Hospital 12. Hotel/Lodging House 13. Kalyana Mandapam
14. Flat 15. Education Institution 16. Hostel
If Super Structure, the following fields will get enabled
4.2 Owner of the Land Y Dropdown Select from
Annexure B- Draft Functional Requirement Specifications
169
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric /
Dropdown)
Remarks, if any for IT vendor Auto Populated
from Pre-operation CAF (Yes/No)
1. Temple Land 2. WAQF Land 3. Central Govt. Land 4. State Govt. Land
5. Church Land 6. Private Land
7. Others
4.3 Land Owner Name N Alpha Numeric
If Vacant Land, the
following fields will get enabled
4.4 Area of Plot in Sq. ft. Y Numeric
4.5 Tax Effective Date Y Date Format
(DD/MM/YYYY)
4.6 Comments N Alpha Numeric
If Independent Building or Educational Institution or Hostel, the
following fields will get enabled
4.7 Area of Plot in Sq. ft. Y Numeric
4.8 Floor Details Option to add details of more floors
Floor Y Dropdown Select Base 1/Base 2/Base 3/ Mezzanine/ Head Room/Lift Room/ Ground/ 1st/2nd…/30th
Built up Area in Sq. ft. Y Numeric
Usage Y Dropdown Select Residential/Non- residential
Occupancy Y Dropdown Select Owner/Tenanted
Type of Construction Y Dropdown Select Semi Permanent/Permanent
Year of Construction Y Numeric
4.9 Date of Completion /Occupation
Y Date Format
4.10 Demand Effective Instalment
N Alpha Numeric Auto-fill based on the response to 4.6
4.11 Comments N Alpha Numeric
If “Flats in Multi Storied Building” or “Flat”, the
Annexure B- Draft Functional Requirement Specifications
170
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric /
Dropdown)
Remarks, if any for IT vendor Auto Populated
from Pre-operation CAF (Yes/No)
following fields will get enabled
4.12 Undivided share of Land in
sq. ft.
Y Numeric
4.13 Floor Details Option to add details of more floors
Floor Y Dropdown Select Base 1/Base 2/Base 3/ Mezzanine/
Head Room/Lift Room/ Ground/ 1st/2nd…/30th
Built up Area in Sq. ft. Y Numeric
Usage Y Dropdown Select Residential/Non- residential
Occupancy Y Dropdown Select Owner/Tenanted
Type of Construction Y Dropdown Select Semi Permanent/Permanent
Year of Construction Y Numeric
4.14 Date of Completion /Occupation
Y Date Format
4.15 Demand Effective Instalment
N Alpha Numeric Auto-fill based on the response to 4.11
4.16 Comments N Alpha Numeric
If “State Government” or
“Central Government”, the following fields will get enabled
4.17 Area of Plot in Sq. ft. Y Numeric
4.18 Floor Details Option to add details of more floors
Floor Y Dropdown Select Base 1/Base 2/Base 3/ Mezzanine/ Head Room/Lift Room/ Ground/ 1st/2nd…/30th
Built up Area in Sq. ft. Y Numeric
Usage Y Dropdown Select Residential/Non- residential
Occupancy Y Dropdown Select Owner/Tenanted
Type of Construction Y Dropdown Select Semi Permanent/Permanent
Year of Construction Y Numeric
4.19 Service Charge Effective Date
Y Date Format
4.20 Demand Effective
Instalment
N Alpha Numeric Auto-fill based on the response to 4.16
4.21 Comments N Alpha Numeric
Annexure B- Draft Functional Requirement Specifications
171
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric /
Dropdown)
Remarks, if any for IT vendor Auto Populated
from Pre-operation CAF (Yes/No)
If, Cell Phone Tower, the following fields will get enabled
4.22 Tax Effective Date Y Date Format
4.23 Demand Effective Instalment
N Alpha Numeric
4.24 Comments N Alpha Numeric
If Cinema Theatre, the following fields will get enabled
4.25 Area of Plot in Sq. ft. Y Numeric
4.26 Category Y Dropdown Select Category A/Category B
4.27 Floor Details Option to add details of more floors
Floor N Dropdown Select Base 1/Base 2/Base 3/ Mezzanine/ Head Room/Lift Room/ Ground/ 1st/2nd…/30th
Built up Area in Sq. ft. Y Numeric
Usage N Dropdown Select Residential/Non- residential
Occupancy N Dropdown Select Owner/Tenanted
Type of Construction N Dropdown Select Semi Permanent/Permanent
Year of Construction N Numeric
4.28 Cinema Theatre Details Option to add details of more details of movie screens
Serial No. Y Numeric Auto-fill
Type Y Dropdown Select Box, Balcony, 1st class, 2nd class, and 3rd class, Class A, Class B and Class C.
No. of Units Y Numeric
No. of Shows Y Numeric
Rate per Unit Y Numeric
Total Y Numeric
4.29 Date of Completion /Occupation
Y Date Format
4.30 Demand Effective Instalment
N Alpha Numeric Auto-fill based on the response to 4.26
4.31 Comments N Alpha Numeric
If Hospital, the following fields will get enabled
Annexure B- Draft Functional Requirement Specifications
172
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric /
Dropdown)
Remarks, if any for IT vendor Auto Populated
from Pre-operation CAF (Yes/No)
4.32 Area of Plot in Sq. ft. Y Numeric
4.33 Category Y Dropdown Select Government/ Private
4.34 Sub- Category Y Dropdown Select Hospital/ Nursing Homes
4.35 Floor Details Option to add details of more floors
Floor N Dropdown Select Base 1/Base 2/Base 3/ Mezzanine/ Head Room/Lift Room/ Ground/ 1st/2nd…/30th
Built up Area in Sq. ft. Y Numeric
Usage N Dropdown Select Residential/Non- residential
Occupancy N Dropdown Select Owner/Tenanted
Type of Construction N Dropdown Select Semi Permanent/Permanent
Year of Construction N Numeric
4.36 Hospital Details Option to add details of more details on hospital wards
Serial No. Y Numeric Auto-fill
Type Y Dropdown Select General Ward/Special Ward/ AC Single/AC Double/AD Deluxe/ Non-AC Single/Non-AC Double/Non- AD Deluxe
No. of Units Y Numeric
Rate per Unit Y Numeric
Total Y Numeric
4.37 Date of Completion /Occupation
Y Date Format
4.38 Demand Effective Instalment
N Alpha Numeric Auto-fill based on the response to 4.34
4.39 Comments N Alpha Numeric
If Hotel/Lodging House, the following fields will get enabled
Area of Plot in Sq. ft. Y Numeric
Category Y Dropdown Select Posh Hotel/A Class Hotel/B Class Hotel
4.40 Floor Details Option to add details of more floors
Floor N Dropdown Select Base 1/Base 2/Base 3/ Mezzanine/
Head Room/Lift Room/ Ground/ 1st/2nd…/30th
Built up Area in Sq. ft. Y Numeric
Usage N Dropdown Select Residential/Non- residential
Annexure B- Draft Functional Requirement Specifications
173
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric /
Dropdown)
Remarks, if any for IT vendor Auto Populated
from Pre-operation CAF (Yes/No)
Occupancy N Dropdown Select Owner/Tenanted
Type of Construction N Dropdown Select Semi Permanent/Permanent
Year of Construction N Numeric
4.41 Hotel/Lodging House Details Option to add details of the rooms
Serial No. Y Numeric Auto-fill
Type Y Dropdown Select Non A/C Single, Non A/C Double, Non
A/C Deluxe, A/C Single, A/C Double, A/C Deluxe, Superior, Deluxe, Ex. Heritage Room, Ex. Suite, Presidential Suite, Corporate or Premium
No. of Units Y Numeric
Rate per Unit Y Numeric
Total Y Numeric
4.42 Date of Completion
/Occupation
Y Date Format
4.43 Demand Effective Instalment
N Alpha Numeric Auto-fill based on the response to 4.39
4.44 Comments N Alpha Numeric
If Kalyana Mandapam, , the following fields will get enabled
4.45 Area of Plot in sq. ft. Y Numeric
4.46 Category Y Dropdown Select with vessels/without vessels
4.47 Floor Details Option to add details of more floors
Floor N Dropdown Select Base 1/Base 2/Base 3/ Mezzanine/ Head Room/Lift Room/ Ground/ 1st/2nd…/30th
Built up Area in Sq. ft. Y Numeric
Usage N Dropdown Select Residential/Non- residential
Occupancy N Dropdown Select Owner/Tenanted
Type of Construction N Dropdown Select Semi Permanent/Permanent
Year of Construction N Numeric
4.48 Rate charged per Marriage Y Numeric
4.49 Date of Completion /Occupation
Y Date Format
4.50 Demand Effective Instalment
N Alpha Numeric Auto-fill based on the response to 4.46
Annexure B- Draft Functional Requirement Specifications
174
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric /
Dropdown)
Remarks, if any for IT vendor Auto Populated
from Pre-operation CAF (Yes/No)
4.51 Comments N Alpha Numeric
Checklist of Supporting Documents S.
No. Document Mandatory (Y/N)
1 Property or vacant land tax paid receipt, if the building is constructed by demolishing the earlier construction or the land
is assessed earlier for vacant land tax Y
2 Copy of Sale deed and Encumbrance Certificate Y
3 Building Plan approved by GCC Y
Annexure B- Draft Functional Requirement Specifications
175
Work Flow
Procedure for obtaining New Assessment of Property
Assis
tant
(Revenue)
Applicant
Assessor
(Revenue)
Sanctionin
g A
uth
ori
ty
START
Fill online form
Upload the required supporting documents
SMS/Email Alert to
Applicant & Assistant
Submit the application
Scrutinize the Application, and
Documents
Any clarifications required?
Yes
Forward application to
Assessor
No
Provide clarification to Queries
Conduct inspection
Prepare inspection report and submit
SMS/Email Alert to
Applicant
EndReceive Notice
Receive reasons
Raise Queries
SMS/Email
Alert to Assistant
Review file
SMS/EMail Alert to
Applicant
Forward to Sanctioning Authority
Review File and inspection report
Approval Case ?
Yes
No
Record reason and Reject
Approve
Inspect 10% of the applications.
Process similar to the earlier one.
Generate Registration Notice
Registration Notice
SMS/Email Alert to
Applicant
Send remarks on rejection
SMS/EMail Alert to
Applicant
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Annexure B- Draft Functional Requirement Specifications
176
Approval - Sanctioning Authority
Sl No Levels Designation Remarks
(if any)
Commercial
Approval/
Rejection to
be provided
by 15 days
of receiving
application
1 <= 1000 sq.ft Additional Revenue Officer (ARO)
2 1001-5000 sq.ft Zonal Officer (ZO)
3 5001-50,000 sq.ft Revenue Officer (RO)
4 > 50,000 sq.ft Regional Deputy Commissioner (RDO)
Residential
1 <= 3000 sq.ft Additional Revenue Officer (ARO)
2 3001- 5000 sq.ft Zonal Officer
3 5001-50,000 sq.ft Revenue Officer (RO)
4 > 50,000 sq.ft Regional Deputy Commissioner (RDO)
Workflow for Hierarchy based Approval Sl
No
Hierarchy
Level Designation Remarks (if any) Timelines
1 Level 1 Assistant Raise queries Within 7 working days from
date of receipt of application
2 Level 2 Assessor Inspection of property -
3 Approval
Authority
Sanctioning
Authority Approves/Rejects
Within 15 working days from
date of receipt of application
Annexure B- Draft Functional Requirement Specifications
177
3.2 Load Addition/Reduction from Tamil Nadu Generation and Distribution Corporation (TANGEDCo)
Online Application Form- HT Load Addition or Reduction Note: a) For applicants who had applied for the service connection earlier through SWP – form to be auto populated based on the new connection
service application form, and b) For applicants who had obtained service connection from dept. portal earlier and applying for load addition or reduction
through SWP – certain details to be auto populated from Pre-Operations CAF.
Sl No
Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric /
Dropdown)
Remarks, if any for IT vendor
Auto Populated from Pre-
Operation CAF
(Yes/No)
1 Application Category Y Dropdown Select Load Addition/Reduction
2 Last four Digit of Service
Number Y Alpha Numeric
3 Application Details
3.1 Service No. Y Alpha Numeric
3.2 Application Category Y Character Auto-fill to “New HT Service
Connection”/”Temporary Connection”
3.3 District Name Y Dropdown Y
3.4 Select your circle Y Dropdown Select from the list of circles pertaining to the
District selected in S.No. 3.3
3.5 Section Y Dropdown Select from the list of sections pertaining to
the circle selected in S.No. 3.4
3.6 Application Type Y Dropdown Select Owner/Other than Owner/SIPCOT
lease
3.7 Service Category Y Dropdown
Select from
Commercial
Public Lighting
Industrial
Agricultural
Railways- Traction
Railways- Non-Traction
Miscellaneous Sales
Bulk Supplies or Licenses
Water Works
IT Industries
Annexure B- Draft Functional Requirement Specifications
178
Sl No
Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric /
Dropdown)
Remarks, if any for IT vendor
Auto Populated from Pre-
Operation CAF
(Yes/No)
Register factories (w/o
manufacturing)
Govt and aided education
institutions and Hostels
Government Hospital
Local Body
Veterinary Hospitals
Leprosy Centre
Primary Health Centre
Orphanages
Public Libraries
Laboratories
Research Institutions
Studios
Cinema Theatres
Housing Complexes
Private Hospital
Hotels
IT enabled services
Private educational Institutions
and Hostels
Private Communication
Services
3.8 Applicant/Organization Name
a. Salutation Y Dropdown Select Mr.or M/s or Miss or Mrs.
b. Name of
Applicant/Organization Name Y Alpha Numeric
3.9 Authorized Signatory Name
a. Salutation Y Dropdown Select Mr.or M/s or Miss or Mrs.
b. Name of Authorized
Signatory Name Y Alpha Numeric
4 Description of the Premises
Annexure B- Draft Functional Requirement Specifications
179
Sl No
Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric /
Dropdown)
Remarks, if any for IT vendor
Auto Populated from Pre-
Operation CAF
(Yes/No)
4.1 Premises Address Y Alpha Numeric
4.2 District Name Y Alpha Numeric Y
4.3 Taluk Name Y Alpha Numeric Y
4.4 Village Name Y Alpha Numeric Y
4.5 Pin Code Y Numeric Y
4.6 Land Line No. Y
STD Numeric Maximum 5 numbers
Land Line No. Maximum 8 numbers
4.7 Fax. No. Y
STD Numeric Auto-fill as per response to S.No. 4.6
Fax No. Maximum 8 numbers
4.8 Is the Billing address different
from premises address? Y
Select Yes or No
4.9 If No, Auto-fill the fields under
Billing/Communication Address
5 Billing/ Communication
Address
5.1 Premises Address N Alpha Numeric
5.2 District Name Y Dropdown Select from the list of Districts of Tamil Nadu
5.3 Taluk Name Y Dropdown Select from the list of taluks pertaining to the
response in S. No. 5.2
5.4 Village Name Y Dropdown Select from the list of villages pertaining to
the response in S. No. 5.3
5.5 Pin Code Y Numeric Not less or more than 6 numbers
5.6 Land Line No. Y
STD Numeric Maximum 5 numbers
Land Line No. Maximum 8 numbers
5.7 Fax.No. Y
STD Numeric Auto-fill as per response to S.No. 5.6
Fax No. Maximum 8 numbers
5.8 Mobile No. Y Numeric Y
Annexure B- Draft Functional Requirement Specifications
180
Sl No
Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric /
Dropdown)
Remarks, if any for IT vendor
Auto Populated from Pre-
Operation CAF
(Yes/No)
5.9 Email Y Alpha Numeric Y
5.10 Date of Registration of the
Company Y
Date Format
(DD/MM/YY) Future Date will not be permitted
5.11 Nearest Land Mark N Click, if applicable
6 Service Details
6.1 Supply Voltage Y Dropdown Select 11KV/22KV/33KV/66KV/
110KV/230KV
6.2 Tariff Y
Dropdown Select HT IA/ HT IB/ HT IIA/ HT IIB/ HT III/
HT IV/ HTV/ HT VI/ LT IC-Domestic Supply/
LT- Commercial Supply/ LT VI- Temp. Supply
6.3 Location Type Y Select Rural/Urban
6.4
Whether the metering point in
within 30 meters from the
main gate
Y
Select Yes/No
6.5
Details of existing service
connections of the applicant, if
any
N Alpha Numeric
7 Load Details
7.1 Load as of now
Notified Connected Load
KW Y Numeric
HP Y Numeric
KVA Y Numeric
Total M.D. in KVA Y Numeric
7.2 Load Addition/ Reduction now
applied
Notified Connected Load
KW Y Numeric
HP Y Numeric
KVA Y Numeric
Total M.D. in KVA Y Numeric
7.3 Total in H.P Y Numeric
Annexure B- Draft Functional Requirement Specifications
181
Sl No
Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric /
Dropdown)
Remarks, if any for IT vendor
Auto Populated from Pre-
Operation CAF
(Yes/No)
7.4 Brief Details of Industry to be
saved N Alpha Numeric
7.5 No. of Shifts Y Numeric
7.6 Probable date of load maturing Y Date Format
(DD/MM/YYYY)
7.7 Remarks if any regarding
essentially of supply N Alpha Numeric
Checklist of Supporting Documents- HT Load Addition or Reduction S. No. Document Mandatory
If applicant is the owner of premise:
1 Copy of proof of ownership such as sale deed/ partition deed/ gift settlement executed in favour of the applicant/ certified copy of court judgement/ Recent property tax receipt for the premises in name of applicant by authorised signatory
Y
2 Copy of Partnership deed in case the applicant is a partnership firm or Memorandum/ Articles of Association in case
of companies registered under Companies Act and Letter/ Resolution authorising the signatory Y
3 Copy of Memorandum/Articles of Association in case of company registered under Companies Act N
If applicant is not the owner of premise:
1
Consent letter from the owner of the premises OR Valid proof of occupancy along with the following: • Indemnity bond in Form 6 (as per template in Annexure)
• Letter of acceptance to pay enhanced security deposit
Y
2 Copy of Partnership deed in case the applicant is a partnership firm or Memorandum/ Articles of Association in case of companies registered under Companies Act and Letter/ Resolution authorising the signatory
Y
3 Copy of Memorandum/Articles of Association in case of company registered under Companies Act N
Annexure B- Draft Functional Requirement Specifications
182
Work Flow- HT Load Addition or Reduction Procedure for Obtaining HT Connection (Load Addition or Reduction)
Assis
tant
Engin
eer
(AE)
Applicant
Sanctionin
g A
uth
ori
tyC
hie
f En
gin
eer
(CE)
Ass
ista
nt
Exe
cuti
ve
Engi
nee
r (A
EE)
Exec
uti
ve E
ngi
neer
(E
E)Su
peri
nte
nd E
ngi
nee
r (S
E)
START
Fill online form
Upload the required supporting documents
SMS/Email Alert to
Applicant & DFO
Submit the application
Scrutinize Application and
Documents
Any clarifications required?
Raise QueriesYes
No
Provide clarification to
Queries
SMS/Email
Alert to Applicant
SMS/Email
Alert to AE
Make Changes to the demand
EndReceive the
service number
Allot inspection
date
Conduct Inspection for
feasibility study
Fill Inspection Checklist
SMS/Email Alert to
Applicant
Raise demand for registration
charges and EMD charges
Scrutinizes demand and make changes,
if required.
Yes
Raise Demand accordingly
Pay required
estimated Charges
Carry out extension
work
Raise service connection
charges
SMS/Email Alert to
Applicant
SMS/Email
Alert to Applicant
SMS/Email Alert to AE
Pay connection Charges
Assign Service Number
Any changes?
SMS/Email
Alert to Applicant
SMS/Email
Alert to AE
SMS/EMail
Alert to Applicant
Pay Registration
and EMD Charges
If payment
made within 15
days
Estimate demand
Yes
No
SMS/Email
Alert to AE
Estimate preparation and santion
No
If payment
made within
15 days
Yes
Scrutinizes demand and make changes,
if required.
Forward with Remarks
Scrutinizes demand and make changes,
if required.
Forward with Remarks
Scrutinizes demand and make changes,
if required.
Forward with Remarks
Scrutinizes demand and make changes,
if required.
Forward with Remarks
Forward application
*For Load Reduction, there is no feasibility study stage
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Annexure B- Draft Functional Requirement Specifications
183
Fee Details- HT Load Addition or Reduction The charges for the Load Addition/reduction are provided in Annexure A from Pages 53 to 66 of
http://www.tnerc.gov.in/orders/Tariff%20Order%202009/2019/MiscCharges-4-10-2019.pdf
Approval based Hierarchy*- HT Load Addition or Reduction Sl
No Hierarchy Level Designation Remarks (if any) Timelines
1 Level 1 Assistant Engineer
(AE)/Junior Engineer (JE) Raise Queries
Within 7 days of receiving application and
applicant to respond within 7 days from receiving
the query
2 Level 2 Assistant Engineer (AE)
1. Conduct inspection and finish feasibility
study
2. Raise demand for registration charges
3. Estimate demand
Within 15 days of application verification.
Applicant to pay within 15 days of receiving
demand
3 Level 2 Sanctioning Authority** Approve and raise demand
Demand for Estimate charges to be raised within
15 days of receipt of EMD charges. Estimate
charges to be paid by applicant within 15 days of
demand receipt.
4 Level 3 AE Assign Service Number
High Tension:
(a) Involving Extension & Improvement - 44
days
(b) Involving enhancement of Power
Transformers / Addition of Power Transformers
- 88 days
(c) Involving commissioning of new substation -
132 days
Extra High Tension:
(a) Involving Extension & Improvement - 110
days
(b) Involving enhancement of Power
Transformers / Addition of Power Transformers
- 132 days
(c) Involving commissioning of new substation -
198 days *Feasibility study stage only for Load addition stage.
Annexure B- Draft Functional Requirement Specifications
184
**Sanctioning Authority
Sl
No Designation
KVA
(1)
Cost (Rs. In lakh) of load Addition
(2)
1 Chairman - >50
2 Chief Engineer Upto 1000 Upto 50
3 Superintend Engineer Upto 500 Upto 15
4 Executive Engineer - Upto 7.5
5 Assistant Executive Engineer - Upto 2
The authority is designated if the values in either (1) or (2) are met.
Annexure B- Draft Functional Requirement Specifications
185
Online Application Form- LT Load Addition or Reduction Note: a) For applicants who had applied for the service connection earlier through SWP – form to be auto populated based on the new
connection service application form, and b) For applicants who had obtained service connection from dept. portal earlier and applying for
load addition or reduction through SWP – certain details to be auto populated from Pre-Operations CAF.
Sl No Field Mandatory (Y/N)
Field Type (character/Numeric
/ Alpha Numeric /
Dropdown)
Remarks, if any for IT vendor
Auto Populated from Pre-
Operatio
n CAF (Yes/No)
1 Application Category Y Dropdown Select Load
Addition/Reduction
2 Last four Digit of Service Number Y Alpha Numeric
3 General Information
3.1 District Y Dropdown Y
3.2 Select your circle N Dropdown
Select from the list of
circles pertaining to the
District selected in S.No.
3.1
3.3 Select your section N Dropdown
Select from the list of
sections pertaining to the
Circle selected in S.No.
3.2
3.4 Service Category Y Dropdown
Select (Foreign
Diplomats/Central
Department/ Local Body
Corporation/ State
Government/ Public
Sector or Govt.
Undertaking/Others
3.5 Type of Ownership of property where supply is required Y Dropdown
Select from Owner/Joint
Property (Partner)/
Tenant with
Consent/Tenant without
Consent
Annexure B- Draft Functional Requirement Specifications
186
Sl No Field Mandatory (Y/N)
Field Type (character/Numeric
/ Alpha Numeric /
Dropdown)
Remarks, if any for IT vendor
Auto Populated from
Pre-Operatio
n CAF (Yes/No)
3.6 Is both communication address and Billing address are
same? Y Dropdown Select Yes/No
3.7 Attach Photo Y
Applicant can upload the
file of max. size 30 KB
and of png/ jpeg format
3.8 Applicant Name Y Alpha Numeric
3.9 Name of the Applicant's Father/ Mother/Husband
a. Relationship Y Dropdown Select from (Father/
Mother/ Husband)
b. Name Y Alpha Numeric
4 Description of the Premises
4.1 Door.No/Name of the House Y Alpha Numeric Y
4.2 Name of the Street Y Alpha Numeric Y
4.3 Name of the Town/Village Y Alpha Numeric Y
4.4 Name of the Taluk Y Alpha Numeric Y
5 Description of the Communication Services
5.1 Door No./Name of the House Y Alpha Numeric
5.2 Name of the Street Y Alpha Numeric
5.3 Name of the Town/Village Y Alpha Numeric
5.4 Name of the Taluk Y Alpha Numeric
5.5 Mobile Number Y Numeric The applicant can only
type 10 numbers
5.6 Email Address Y Alpha Numeric
5.7 Any Existing Service Connections? Y Dropdown Select Yes/No
5.8 If Yes, Details of existing service connection of the
applicant N Alpha Numeric
This field enables only if
the response to 5.7 is
“Yes”. Enter Consumer
number with region code
5.9 GST Number present? Y Dropdown Select Yes/No
Annexure B- Draft Functional Requirement Specifications
187
Sl No Field Mandatory (Y/N)
Field Type (character/Numeric
/ Alpha Numeric /
Dropdown)
Remarks, if any for IT vendor
Auto Populated from
Pre-Operatio
n CAF (Yes/No)
5.10 GST Number Y Alpha Numeric
5.11 Phase Y Dropdown Select 1-phase/3-phase
5.12 Tariff Y Dropdown
Select
1. Industrial- Non-
metro,
2. Industrial- Metro,
3. Power loom,
4. Cottage Industries,
5. Commercial
5.13 Sub-Category Y Dropdown
If Industries – Metro or Industries- Non-metro,
IT Industries
Coffee Grinding (Above 12KW)
Ice Factory (Above 12KW)
Body Building Units (Above 12 KW)
Saw Mill (Above 12KW)
Rice Mills (Above 12KW)
Flour Mills (Above 12KW)
Prawn Farming (Above 12KW)
Poultry Farms (Above 12KW)
Battery Charging Units (Above 12KW)
Other industries
Common Effluent Treatment Plants (Above 12KW)
Dairy Units (Above 12KW)
Cold Storage
Carbide Industries
Steel Industries
Annexure B- Draft Functional Requirement Specifications
188
Sl No Field Mandatory (Y/N)
Field Type (character/Numeric
/ Alpha Numeric /
Dropdown)
Remarks, if any for IT vendor
Auto Populated from
Pre-Operatio
n CAF (Yes/No)
Textile Industries
Ice Cold Beverages
Saggo Factories
Plastic Industries
Chemical Industries
Tanneries
Lime Crushing Industry
If Powerloom,
Warping
Twisting
Winding
Powerloom
Brided Cord Manufacture
If Cottage Industries,
Cottage and Tiny Industries
Micro enterprises
Small gem cutting units
Sericulture
Floriculture
Dairy Units (Below 12 KW)
Coffee Grinding (Below 12 KW)
Ice Factory (Below 12 KW)
Body Building Units (Below 12 KW)
Saw mill (Below 12 KW)
Rice mills (Below 12 KW)
Flour mills (Below 12 KW)
Fish/Prawn Culture
Annexure B- Draft Functional Requirement Specifications
189
Sl No Field Mandatory (Y/N)
Field Type (character/Numeric
/ Alpha Numeric /
Dropdown)
Remarks, if any for IT vendor
Auto Populated from
Pre-Operatio
n CAF (Yes/No)
Poultry/Bird Farming
Battery Charging Units (Below 12 KW)
Horticulture (Below 12 KW)
Waste Land Development
Laundry Works
Common Effluent Treatment Plants (Below 12 KW)
Mushroom Cultivation
Pumping of water for the purpose of agriculture and ailed
activities
Cattle Farming
If Commercial,
Cinema Studios
Shopping Mall/Complexes
Petty Shops/Kiosks/Tea Shops
Restaurants/Small Hotels/Big Hotels
Saloons/Beauty Parlours
Advocate Office/Auditors Office/Consultant Office
Textile Stores
Sweets and Bakery Shops
Creches
Private Hospitals and Clinics
Ration Shop
Two Wheelers Show Room/service centres
Four Wheelers Show Room/service centres
Retirement Homes/Senior Citizen Homes/Old Age Homes
Advocate/Auditor/Doctors Consulting or Office Consultant
rooms beyond 200 sq.ft attached to the residence of such
Professionals
Annexure B- Draft Functional Requirement Specifications
190
Sl No Field Mandatory (Y/N)
Field Type (character/Numeric
/ Alpha Numeric /
Dropdown)
Remarks, if any for IT vendor
Auto Populated from
Pre-Operatio
n CAF (Yes/No)
Handicraft/Artisans Works using connected load exceeding
1 KW
Water Supply Agencies/Agents
Hostel
Jewellery Shops
Grinding Shops
Kalyana Mandapam/Community Hall
Provision Stores/Groceries Shops
Companies Corporate Offices
Textile Showroom/Connected Godown/Tailoring Shops
Photo Copying Shops
Private Banks
Mutton Stall/Fish Stall
Petrol Bunk/Petrol Filling Station
Computer Center/Browsing Center/Telecom Center
Household Articles/Utensils Shops
Wine Shop
Milk Society/Milk Booth/Aavin Milk Parlour
Hardware Shop
Laboratories
Libraries
Service Apartments
Common Lighting, water supply, lift in multi-stories
building/Residential Complexes having non-residential built
up area more than 25%of the total built up area
Photo Studios
Telecom Towers
Prachar Bharathi
NHAI Street Lights
Service Organization like Red Cross Society, etc
Annexure B- Draft Functional Requirement Specifications
191
Sl No Field Mandatory (Y/N)
Field Type (character/Numeric
/ Alpha Numeric /
Dropdown)
Remarks, if any for IT vendor
Auto Populated from
Pre-Operatio
n CAF (Yes/No)
Meditation Centre
Others
Cinema Theatre
Bank/ATM Centres
Government Offices/Shops
Mansion and Lodges
5.14 Wiring Completed on Y Date Format Select the date from the
calendar (DD/MM/YY)
5.15 Do you require welding? Y
5.16 Is your area under Chennai Metro? Y Dropdown
Select Yes/No. This field
will be enabled if the
response to 3.1 is
“Chennai”
5.17 Select the type of building Y Dropdown
Select 1. Stilt+4 floors
or Ground+3 floors and
above, or 2.Others
Declaration
1. I Thiru/Tmty “Auto-fill as response to S.No 3.8”, “Auto-fill as response to S.No 3.9 (b)” hereby request you to supply electrical energy for
the purpose of “Auto-fill as response to S.No.5.13” to the premises hereinafter described. (Note this undertaking does not preclude a separate written contract being entered into, if so desired by the Licensee or the consumer.) 2. I agree to pay for said energy, service connection charges, the deposit of such security, meter rent, as may be demanded in accordance with the scale of rates prescribed under Tamil Nadu Electricity Distribution Code, Supply Code, notifications and orders issued in this regard by Tamil Nadu Electricity Regulatory Commission. 3. I wish to be charged under tariff under schedule of the TNERC tariff order- "LM51 for Commercial, LN 3B for Industries, LA3A2 for
Powerloom, and LA3A1 for Cottage Industries.
4. I agree to take supply for ________ years and utilize the energy in the premises described hereunder or outside the premises for my bonafide use 5. In case I sell or otherwise dispose of the property / vacate the premises while the supply is continued, I agree to give one Calendar month notice in writing and pay all the arrears to the Licensee. Failing such notice, I hold myself responsible for energy consumed in the premises till such notice is given to the Licensee.
6 Load Requirements- Addition/Reduction
Annexure B- Draft Functional Requirement Specifications
192
Sl No Field Mandatory (Y/N)
Field Type (character/Numeric
/ Alpha Numeric /
Dropdown)
Remarks, if any for IT vendor
Auto Populated from
Pre-Operatio
n CAF (Yes/No)
Y Numeric
The table to be enabled
with the auto calculation
of “Total Wattage” and
“total load applied “
Sl.No Description Number of Point's Wattage of Point's Total wattage
A)Lighting
1. Lights
2. Fans
3. Convenient wall plugs
B)Domestic Electrical Apparatus
1. Cookers
2. Water heaters
3. Refrigerator
4. Air conditioner
5. Other Purposes
6. Convenient wall plugs
C)Power Loads
1. Domestic
2. Industrial
3. Welding
4. Other purposes
5. Convenient Wall plugs
Load applied(KW):
Annexure B- Draft Functional Requirement Specifications
193
Checklist of Supporting Documents- LT Load Addition or Reduction S. No. Document Mandatory
1 Copy of proof of ownership such as sale deed/ partition deed/ gift settlement executed in favour of the applicant/ certified copy of court judgement/ Recent property tax receipt for the premises in name of applicant/ computer patta/
allotment letter/ ownership certificate issued by revenue department officials
Y
2 In case of joint property Copies of proof of ownership such as legal heir certificate along with parent documents specified in (1) above and consent letters from co-owners. If consent letter is not produced, an indemnity bond with enhanced security deposit.
Y
3 If the applicant is not the owner, consent letter from owner in Form 5 or valid proof of occupancy and indemnity bond in Form 6. The template of the forms are given in the Annexure
Y
4 For all special/multi-storeyed buildings in Chennai Metropolitan area, copy of Planning Permission for Spl. Multi stories Buildings
Y
5 for all special/multi-storeyed buildings in Chennai Metropolitan area, copy of Completion Certificate or Undertaking
to Furnish Completion Certificate Y
Annexure B- Draft Functional Requirement Specifications
194
Work Flow- LT Load Addition or Reduction Procedure for Obtaining LT Connection
Process Title: LT- Load Addition/Reduction
Assis
tant
Engin
eer
(AE)
Applicant
Sanctionin
g A
uth
ori
ty
START
Fill online form
Upload the required supporting documents
SMS/Email Alert to
Applicant & DFO
Submit the application
Scrutinize Application and
Documents
Any clarifications required?
Raise QueriesYes
Raise demand for EMD Charges
No
Provide clarification to
Queries
SMS/Email
Alert to Applicant
SMS/Email
Alert to AE
Make Changes to the demand
EndReceive the
service number
Pay EMD Charges
Allot inspection
date
Conduct Inspection
Fill Inspection Checklist
SMS/Email
Alert to Applicant
Raise demand for estimate charges
Forward to Sanctioning Authority
Scrutinizes demand
SMS/Email
Alert to Applicant
SMS/Email
Alert to AE
Yes
NoRaise Demand
accordingly
Pay required estimated Charges
Carry out extension
work
Raise service connection
charges
SMS/EMail
Alert to Applicant
SMS/Email
Alert to Applicant
SMS/Email
Alert to AE
Pay connection Charges
Assign Service Number
Any changes?
SMS/Email
Alert to Applicant
SMS/Email
Alert to AE
*No feasibility study stage for load reduction
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Annexure B- Draft Functional Requirement Specifications
195
Fee Details- LT Load Addition or Reduction The charges for the Load Addition/reduction are provided in Annexure A from Pages 53 to 66 of
http://www.tnerc.gov.in/orders/Tariff%20Order%202009/2019/MiscCharges-4-10-2019.pdf
Approval based Hierarchy- LT Load Addition or Reduction Sl
No Hierarchy Level Designation Remarks (if any) Timelines
1 Level 1 Assistant Engineer (AE) Raise Queries and raise EMD charges Within 7 days
2 Level 2 Assistant Engineer (AE) Conduct inspection and raise demand
estimate charges -
3 Level 2 Sanctioning Authority* Approve demand -
4 Level 3 AE Assign Service Number
(a) Involving no Extension or Improvement
work- 7 days - 22 days.
(b) Involving Extension & Improvement without
Distribution Transformers - 44 days.
(c) Involving Extension & Improvement with
Distribution Transformers - 66 days.
*Sanctioning Authority
Sl No Hierarchy Level Designation
1 Up to 25 KW and cost not exceeding Rs. 5000 AE/ Junior Engineer (JE)
2 Up to 50 KW Assistant Executive Engineer (AEE)
3 Greater than 50 KW and up to 97 KW/ 130 HP Executive Engineer
Annexure B- Draft Functional Requirement Specifications
196
ANNEXURE
FORM-5
Owner Consent Letter for getting New Supply
To
The Designated Engineer
(Address of the Licensee)
OWNER’S CONSENT LETTER
I …………………………………………………………………………. have ………………………….. being the legal owner ….. of
the premises No. ……………………………………………….. hereby agree as follows:-
I consent to the installation by you at the above mentioned premises tenanted by Thiru / Thirumathy
………………………………… …………………………… ……………………………. of electric service cables, meters, wiring,
fittings and other equipment for the supply of electricity (hereinafter called “The Installation”) under
the terms of an agreement between you and the tenant of the above said premises.
In the event of the above said tenant vacating the aforesaid premises, I shall give you due notice
fifteen days advance to enable you to arrange for the termination of your contract with the aforesaid
tenant failing which I shall be responsible for any loss that may accrue on that account.
Signed by the said …………………………………………
In the presence of …………………………………………
Witness Name ………………………………………………
Address ………………………………………………………..
Annexure B- Draft Functional Requirement Specifications
197
FORM-6
(To be obtained in a stamped paper)
Indemnity Bond from the occupier when there is no consent letter from owner
Indemnity Bond to be furnished by an intending consumer who is not the owner of the premises
and applies without the consent of the owner
DEED OF INDEMNITY
THIS DEED OF INDEMNITY EXECUTED ON THIS, THE …………….. DAY OF ……………. TWO THOUSAND
…………………….. by Thiru / Tmty. ……………………… S/o. D/o. W/o. …………………………………….. residing at
……………. Having office / workshop at ………………………………………………………. hereinafter called the
indemnifier (which terms shall mean and include executors, administrators, heirs, successors and
assigns) to and in favour of the (name of Licensee and address), a body corporate, hereinafter called
the Licensee (which terms shall mean and include its successors in office and assigns).
WHEREAS the consumer has taken on lease the premises in Door No. ……. For the purpose of
………………. From Thiru / Tmty. ………………………………………………. S/o. D/o. W/o. …………………….. residing
at ………………………………………………. who is the owner of the above said premises.
AND WHEREAS the consumer has approached the said owner of the premises to give his / her
consent in writing to avail of a service connection in his/her name for the purpose of his / her
business.
AND WHEREAS the said owner is not available / has refused to give his/her consent in writing for
the purpose.
AND WHEREAS the indemnifier has requested the Licensee to give a service connection in his/her
name subject to execution of an indemnity bond by him / her indemnifying the Licensee against any
damage or loss caused to the Licensee in respect of the service connection in his/her name.
AND WHEREAS in consideration of the acceptance of the above for a service connection in his/her
name, the indemnifier hereby agrees to indemnify the Licensee against all proceedings, claims,
demands, costs, damages, expenses which the License may incur by reason of a fresh service
connection given to the indemnifier without the consent of the owner of the premises. The
indemnifier further undertakes to make good any sum that may be found to be and become payable
to the Licensee with regard to all liabilities and claims personally as well as by means of both movable
and immovable properties. The indemnifier agrees that the enhanced Security Deposit paid by him
shall be adjusted against the arrears of current consumption charges but also against any claim that
may arise in the event of termination of the agreement prior to the expiry of the contracted period.
The indemnifier further undertakes that the Licensee shall be at liberty to disconnect the service
connection given to him/her, and also for loading the dues remaining unpaid by him/her to other
service connection(s) that may stand in his/her name.
NOW THE CONDITION OF THE above written bond is such that if the indemnifier shall duly and
faithfully observe and perform the above said conditions, then the above written bond shall be void,
otherwise the same shall remain in full force.
Annexure B- Draft Functional Requirement Specifications
198
3.3 License for Working a New Lift from Tamil Nadu Electrical Inspectorate (TNEI)
Online Application Form Note: a) For applicants who had applied for the permission to erect a lift earlier through SWP – form to be auto populated based on the permission to
erect a lift application form, and b) For applicants who had obtained permission from dept. portal earlier and applying for license for working a Lift
through SWP – certain details to be filled from pre-operation CAF.
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
Operation
CAF (Yes/No)
1 Permit to Erect a lift
Permit No. Y Alpha Numeric
Date Y Date Format
(DD/MM/YYYY)
2 Applicant Details
2.1 Type of Applicant Y Dropdown Select from Agent/ Consumer
2.2 Name of the Applicant Y Alpha Numeric
2.3 Contact Number Y Numeric 10 numbers
2.4 Email-ID Y Alpha Numeric
2.5 Address of the Applicant Y Alpha Numeric
2.6 District Y Dropdown Select from the list of districts of Tamil Nadu
2.7 Pincode Y Numeric 6 numbers
2.8 Name of the Agent N Alpha Numeric
2.9 Address of the Agent N Alpha Numeric
3 Property Details
3.1 Address of the premises where the lift is to be installed/made additions or alterations
Y Alpha Numeric
3.2 District Y Dropdown Select from the list of districts of Tamil
Nadu
3.3 Taluk Y Dropdown Select from the list of Taluks pertaining to the District selected in S.No. 3.2
3.4 Pincode Y Numeric 6 numbers
3.5 Divisional Office Y Auto-fill The divisional office address to be displayed as per the responses of S.No. 3.2 and 3.3
Annexure B- Draft Functional Requirement Specifications
199
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric) Remarks, if any for IT vendor
Auto Populated from Pre-
Operation CAF (Yes/No)
4 Application Details
4.1 Building Plan Approval Number Issued by the Local Body
Y Alpha Numeric
4.2 Local Body Y Alpha Numeric
4.3 Date of approval of building permit Y Date Format
(DD/MM/YYYY)
4.4 License Previously obtained? Y Dropdown Select Y/N
4.5 License Details If Response to S.No. 4.4 is “Y”, enable the following fields. Option to “add” details of multiple licenses obtained
License Number of the license obtained Y Alpha Numeric
Issued date of license Y Date Format
(DD/MM/YYYY)
Approved by Y Alpha Numeric Detail of the approving authority to be entered
Installation Address Y Alpha Numeric
4.3 Inspecting Authority Y Auto-fill The address of the divisional office responsible for inspection
5 Lift Details
5.1 Type of lift Y Dropdown Select Car-Lift/ Goods/ Passenger/ Others
5.2 Others Y Alpha Numeric This field to be enabled if the response to
S.No. 5.1 is “Others”
5.3 Make of lift Y Dropdown
Select from the list of model of lifts • Asian Lifts • Ever Green Elevators • Aarvin Elevator Company • Accord Elevators India Pvt. Ltd.
• Apollo Lifts • City Elevator • CMC Elevators • Cooper Elevators India Pvt. Lid • Devon Elevators • Dream Elevators
• Evergrow
Annexure B- Draft Functional Requirement Specifications
200
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric) Remarks, if any for IT vendor
Auto Populated from Pre-
Operation CAF (Yes/No)
• Fiam Lifts (India) • GJ Lifts
• Golden Elevators Co • Grace Elevators
• GS Lifts • Halcon Elevators Pvt. Ltd • Hephzi Elevators International
Company Pvt. Ld. • Honda Lifts
• JM Elevators • Johnson Lifts Pvt. Ltd • Kamai Elevators Pvt. Ltd • Kone Elevator India Pvt. Ltd • Liftech Elevators • Limra Elevators • M/s. Mobil Elevators Company
• M/s.Sai Shradda Lifts • M/s. Sharp Lift • Magnetech Elevators • Mitsubishi Elevator ETA India (P) Ltd. • Modern Elevators • Nexus Elevators
• Omega Elevators • PGP Lifts • Premier Engineering Systems • Professional Elevators Pvt. Ltd. • Prompt (Madras) Elevators Co.
• Selens Elevators Pvt. Ltd • Sharp Tech Elevators
• Silicon Elevators Co • Smart Lift Elevators • SMS Elevator Company • Sona Lifts • Splash lifts • Swift EWngineering
Annexure B- Draft Functional Requirement Specifications
201
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric) Remarks, if any for IT vendor
Auto Populated from Pre-
Operation CAF (Yes/No)
• Tamil Elevators • Thyssenkrupp Elevator (India)
• Universal Elevators • Vista Engineering
• Voltos Lifts
5.4 Model of Lift Y Alpha Numeric
5.5 Maximum Speed In m/s Y Numeric
5.6 Maximum number of passengers that lift can take
Y Numeric
5.7 Maximum weight of the passengers in lift (Kg)
Y Numeric
5.8 The total weight of the Lift car carrying the maximum load (weight of car plus maximum allowable load) (Kgs)
Y Numeric
5.9 Weight of the counter weight (Kg) Y Numeric
5.10 Supporting Cables
Number Y Numeric
Supporting cable description Y Alpha Numeric
Supporting cable Weight (kgs) Y Numeric
Supporting cable size (in sq. mm) Y Numeric
5.11 The depth of the pit from lowest part of the car when at the lowest floor (in
mms.)
Y Numeric
5.12 Number of landings Y Numeric
Declaration: With reference to the letter no. ___________by which permission has been granted to erect a lift at the above mentioned premises, I/We state that
the work of erection of the lift was completed on ___________ by Mr.________________. I/We further request that a license for working the lift may be granted. The work of erection of lift has been carried out in accordance with the provisions in Tamil Nadu Lifts Rules 1997. A work completion report of the manufacturer of Lifts or Company of Electrical and Mechanical Engineers completion report of the license electrical contractor and copy of insurance policy taken by the owner of the lift covering insurance for the persons using the lift are enclosed.
Annexure B- Draft Functional Requirement Specifications
202
Checklist of Supporting Documents S. No. Document Mandatory (Y/N)
1 The work completion report obtained from the Manufacturer of Lifts (Form D of The Tamil Nadu Lifts and
Escalators Rules, 1997) Y
2 Work completion report obtained from the Electrical Contractor (Form E of The Tamil Nadu Lifts and Escalators Rules, 1997)
Y
3 Copy of valid Insurance Policy (Third Party Liability) for the Lift taken by the Owner Y
Annexure B- Draft Functional Requirement Specifications
203
Work Flow
Procedure for Obtaining License for Working a new lift
Applicant
Div
isio
nal S
ection
Off
icer
Assis
tant/
Junio
r Ele
ctr
ical In
specto
r (A
EI/
JEI)
or
Ele
ctr
ical In
specto
r (E
I)
START
Fill online form
Upload the required supporting documents
Pay Fees
Provide clarification to Queries
Send Physical copy of application,
documents
Submit and Generate receipt
End
Receive License/Renewal License
Receive reasons
SMS/Email
Alert to Officer
Forward the file to AEI/JEI
Verify the application,
documents and fee payment
Any clarifications required?
Raise Query Yes
Enter the date of receiving the documents
Digitally signed License/ Renewal License
Is it a approval case?
Approve
Record reason and Reject
No
Yes
SMS/Email
Alert to Officer
SMS/Email
Alert to Applicant
SMS/Email
Alert to Applicant
SMS/Email
Alert to Applicant
Conduct inspection
Allot inspection Date
No
Prepare and send report
Make changes, if
any
SMS/Email
Alert to Applicant
SMS/Email
Alert to AEI/JEI/
EI
Enter the Courier/speed post details
Note: The department at present does not have the infrastructure to review the drawings online
hence the documents are submitted offline. Development/Installation of the required infrastructure
in is the pipeline and when done, the offline submission will be removed.
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Fee Details Rs. 5000/- (Rupees Five Thousand only) in case of lift having 5 landings;
Rs. 10000/- (Rupees Ten Thousand only) in case of lift having more than 5 landings;
Annexure B- Draft Functional Requirement Specifications
204
Workflow for Hierarchy based Approval Sl
No
Hierarchy
Level Designation Remarks (if any) Timelines
1 Level 1
Assistant/Junior
Electrical Inspector or
Electrical Inspectorate
Raise queries
Within 7 working days
from date of receipt of
documents
2 Level 2 Inspection of Lift Within 15 days from date
of receipt of documents
3 Approval
Authority Approves/Rejects
Within 30 working days
from date of receipt of
documents
Annexure B- Draft Functional Requirement Specifications
205
Annexure
Form D
Annexure B- Draft Functional Requirement Specifications
206
Form E
Annexure B- Draft Functional Requirement Specifications
207
3.4 Renewal of License for Working a New Lift from Tamil Nadu Electrical Inspectorate (TNEI)
Online Application Form Note: a) For applicants who had applied for License for working a lift earlier through SWP – form to be auto populated based on the license application
form, and b) For applicants who had obtained permission from dept. portal earlier and applying for license for renewal through SWP – details to be filled
from the pre-operation CAF.
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
Operation CAF (Yes/No)
1 License for Working a lift
License No. Y Alpha Numeric
Date Y Date Format
(DD/MM/YYYY)
2 Applicant Details
2.1 Type of Applicant Y Dropdown Select from Agent/ Consumer
2.2 Name of the Applicant Y Alpha Numeric
2.3 Contact Number Y Numeric 10 numbers
2.4 Email-ID Y Alpha Numeric
2.5 Address of the Applicant Y Alpha Numeric
2.6 District Y Dropdown Select from the list of districts of Tamil
Nadu
2.7 Pincode Y Numeric 6 numbers
2.8 Name of the Agent N Alpha Numeric
2.9 Address of the Agent N Alpha Numeric
3 Property Details
3.1 Address of the premises where the lift is to be installed/made additions or alterations
Y Alpha Numeric
3.2 District Y Dropdown Select from the list of districts of Tamil
Nadu
3.3 Taluk Y Dropdown Select from the list of Taluks pertaining to the District selected in S.No. 2.2
3.4 Pincode Y Numeric 6 numbers
3.5 Divisional Office Y Auto-fill The divisional office address to be displayed as per the responses of S.No. 2.2 and 2.3
Annexure B- Draft Functional Requirement Specifications
208
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
Operation CAF (Yes/No)
4 Application Details
4.1 Building Plan Approval Number Issued
by the Local Body Y Alpha Numeric
4.2 Local Body Y Alpha Numeric
4.3 Date of approval of building permit Y Date Format
(DD/MM/YYYY)
4.4 License Previously obtained? Y Dropdown Select Y/N
4.5 License Details If Response to S.No. 4.4 is “Y”, enable the following fields. Option to “add” details of multiple licenses obtained
License Number of the license obtained Y Alpha Numeric
Issued date of license Y Date Format
(DD/MM/YYYY)
Approved by Y Alpha Numeric Detail of the approving authority to be
entered
Installation Address Y Alpha Numeric
4.3 Inspecting Authority Y Auto-fill The address of the divisional office to be
5 Lift Details
5.1 Type of Lift Y Dropdown Select Car-Lift/ Goods/ Passenger/ Others
5.2 Others Y Alpha Numeric This field to be enabled if the response to S.No. 5.1 is “Others”
5.3 Make of Lift Y Dropdown
Select from the list of model of lifts • Asian Lifts • Ever Green Elevators • Aarvin Elevator Company • Accord Elevators India Pvt. Ltd. • Apollo Lifts
• City Elevator • CMC Elevators • Cooper Elevators India Pvt. Lid • Devon Elevators • Dream Elevators • Evergrow
• Fiam Lifts (India)
Annexure B- Draft Functional Requirement Specifications
209
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
Operation CAF (Yes/No)
• GJ Lifts • Golden Elevators Co • Grace Elevators
• GS Lifts • Halcon Elevators Pvt. Ltd
• Hephzi Elevators International Company Pvt. Ld.
• Honda Lifts • JM Elevators • Johnson Lifts Pvt. Ltd
• Kamai Elevators Pvt. Ltd • Kone Elevator India Pvt. Ltd • Liftech Elevators • Limra Elevators • M/s. Mobil Elevators Company • M/s.Sai Shradda Lifts • M/s. Sharp Lift
• Magnetech Elevators • Mitsubishi Elevator ETA India (P) Ltd. • Modern Elevators • Nexus Elevators • Omega Elevators • PGP Lifts
• Premier Engineering Systems • Professional Elevators Pvt. Ltd. • Prompt (Madras) Elevators Co. • Selens Elevators Pvt. Ltd • Sharp Tech Elevators
• Silicon Elevators Co • Smart Life Elevators
• SMS Elevator Company • Sona Lifts • Splash lifts • Swift EWngineering • Tamil Elevators • Thyssenkrupp Elevator (India)
Annexure B- Draft Functional Requirement Specifications
210
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
Operation CAF (Yes/No)
• Universal Elevators • Vista Engineering • Voltos Lifts
5.4 Model of Lift Y Alpha Numeric
5.5 Maximum Speed In m/s Y Numeric
5.6 Maximum number of passengers that lift can take
Y Numeric
5.7 Maximum weight of the passengers in lift (Kg)
Y Numeric
5.8 The total weight of the Lift car carrying the maximum load (weight of car plus
maximum allowable load) (Kgs)
Y Numeric
5.9 Weight of the counter weight (Kg) Y Numeric
5.10 Supporting Cables
Number Y Numeric
Supporting cable description Y Alpha Numeric
Supporting cable Weight (kgs) Y Numeric
Supporting cable size (in sq. mm) Y Numeric
5.11 The depth of the pit from lowest part of the car when at the lowest floor (in mms.)
Y Numeric
5.12 Number of landings Y Numeric
Declaration: As required under Rule 5(1) of Tamil Nadu Lift Rules, 1997, I/We hereby apply for the renewal of license for working the lift and the required particulars are furnished and request the renewal of license may be granted.
Checklist of Supporting Documents S.
No. Document Mandatory (Y/N)
1 Copy of valid Insurance Policy (Third Party Liability) for the Lift taken by the Owner Y
Annexure B- Draft Functional Requirement Specifications
211
Work Flow
Procedure for Obtaining Renewal of the license for Working a New Lift
Applicant
Div
isio
nal S
ection
Off
icer
Assis
tant/
Junio
r Ele
ctr
ical In
specto
r (A
EI/
JEI)
or
Ele
ctr
ical In
specto
r (E
I)
START
Fill online form
Upload the required supporting documents
Pay Fees
Provide clarification to Queries
Send Physical copy of application,
documents
Submit and Generate receipt
End
Receive License/Renewal License
Receive reasons
SMS/Email
Alert to Officer
Forward the file to AEI/JEI
Verify the application,
documents and fee payment
Any clarifications required?
Raise Query Yes
Enter the date of receiving the documents
Digitally signed License/ Renewal License
Is it a approval case?
Approve
Record reason and Reject
No
Yes
SMS/Email
Alert to Officer
SMS/Email
Alert to Applicant
SMS/Email
Alert to Applicant
SMS/Email
Alert to Applicant
Conduct inspection
Allot inspection Date
No
Prepare and send report
Make changes, if
any
SMS/Email
Alert to Applicant
SMS/Email
Alert to AEI/JEI/
EI
Enter the Courier/speed post details
Note: The department at present does not have the infrastructure to review the drawings online
hence the documents are submitted offline. Development/Installation of the required infrastructure
in is the pipeline and when done, the offline submission will be removed.
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Fee Details Rs. 5000/- (Rupees Five Thousand only) in case of lift having 5 landings;
Rs. 10000/- (Rupees Ten Thousand only) in case of lift having more than 5 landings;
Annexure B- Draft Functional Requirement Specifications
212
Workflow for Hierarchy based Approval Sl
No
Hierarchy
Level Designation Remarks (if any) Timelines
1 Level 1
Assistant/Junior
Electrical Inspector or
Electrical Inspectorate
Raise queries
Within 7 working days
from date of receipt of
documents
2 Level 2 Inspection of Lift Within 15 days from date
of receipt of documents
3 Approval
Authority Approves/Rejects
Within 30 working days
from date of receipt of
documents
Annexure B- Draft Functional Requirement Specifications
213
Annexure
Form D
Annexure B- Draft Functional Requirement Specifications
214
Form E
Annexure B- Draft Functional Requirement Specifications
215
3.5 Permission for making addition /alteration to the existing lift from Tamil Nadu Electrical Inspectorate
(TNEI)
Online Application Form Note: a) For applicants who had applied for the permission to erect a lift earlier through SWP – form to be auto populated based on the permission to
erect a lift application form, and b) For applicants who had obtained permission from dept. portal earlier and applying for additions/alterations to Lift
through SWP – certain details to be auto populated from Pre-Operation CAF.
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto
Populated from Pre-Operation CAF (Yes/No)
1 Application Type Y Dropdown Auto-fill, “Making Addition or Alteration”
2 Applicant Details
2.1 Type of Applicant Y Dropdown Select Agent/ Consumer
2.2 Name of the Applicant Y Alpha Numeric
2.3 Contact Number Y Numeric 10 numbers
2.4 Email-ID Y Alpha Numeric
2.5 Address of the Applicant Y Alpha Numeric
2.6 District Y Dropdown Select from the list of districts of Tamil Nadu
2.7 Pincode Y Numeric 6 numbers
2.8 Name of the Agent N Alpha Numeric
2.9 Address of the Agent N Alpha Numeric
3 Property Details
3.1 Address of the premises where the lift is to be installed/made additions or alterations
Y Alpha Numeric
3.2 District Y Dropdown Select from the list of districts of Tamil Nadu
3.3 Taluk Y Dropdown Select from the list of Taluks pertaining to the District selected in S.No. 2.2
3.4 Pincode Y Numeric 6 numbers
3.5 Divisional Office Y Auto-fill
The divisional office address to be
displayed as per the responses of S.No. 2.2 and 2.3
4 Application Details
Annexure B- Draft Functional Requirement Specifications
216
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric) Remarks, if any for IT vendor
Auto Populated from Pre-
Operation CAF (Yes/No)
4.1 Building Plan Approval Number Issues by the Local Body
Y Alpha Numeric
4.2 Local Body Y Alpha Numeric
4.3 Date of approval of building permit Y Date Format
(DD/MM/YYYY)
4.4 License Previously obtained? Y Dropdown Select Y/N
4.5 License Details If Response to S.No. 4.4 is “Y”, enable the following fields. Option to “add” details of multiple licenses obtained
License Number of the license obtained Y Alpha Numeric
Issued date of license Y Date Format
(DD/MM/YYYY)
Approved by Y Alpha Numeric Detail of the approving authority to be entered
Installation Address Y Alpha Numeric
4.3 Inspecting Authority Y Auto-fill The address of the divisional office to be
5 Lift Details
5.1 Type of Lift Y Dropdown Select Car-Lift/ Goods/ Passenger/ Others
5.2 Others Y Alpha Numeric This field to be enabled if the response to S.No. 5.1 is “Others”
5.3 Make of Lift Y Dropdown
Select from the list of model of lifts
• Asian Lifts • Ever Green Elevators • Aarvin Elevator Company • Accord Elevators India Pvt. Ltd. • Apollo Lifts • City Elevator
• CMC Elevators
• Cooper Elevators India Pvt. Lid • Devon Elevators • Dream Elevators • Evergrow • Fiam Lifts (India) • GJ Lifts
Annexure B- Draft Functional Requirement Specifications
217
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric) Remarks, if any for IT vendor
Auto Populated from Pre-
Operation CAF (Yes/No)
• Golden Elevators Co • Grace Elevators
• GS Lifts • Halcon Elevators Pvt. Ltd
• Hephzi Elevators International Company Pvt. Ld.
• Honda Lifts • JM Elevators • Johnson Lifts Pvt. Ltd
• Kamai Elevators Pvt. Ltd • Kone Elevator India Pvt. Ltd • Liftech Elevators • Limra Elevators • M/s. Mobil Elevators Company • M/s.Sai Shradda Lifts • M/s. Sharp Lift
• Magnetech Elevators • Mitsubishi Elevator ETA India (P) Ltd. • Modern Elevators • Nexus Elevators • Omega Elevators • PGP Lifts
• Premier Engineering Systems • Professional Elevators Pvt. Ltd. • Prompt (Madras) Elevators Co. • Selens Elevators Pvt. Ltd • Sharp Tech Elevators
• Silicon Elevators Co • Smart Life Elevators
• SMS Elevator Company • Sona Lifts • Splash lifts • Swift EWngineering • Tamil Elevators • Thyssenkrupp Elevator (India)
Annexure B- Draft Functional Requirement Specifications
218
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric) Remarks, if any for IT vendor
Auto Populated from Pre-
Operation CAF (Yes/No)
• Universal Elevators • Vista Engineering
• Voltos Lifts
5.4 Model of Lift Y Alpha Numeric
5.5 Maximum Speed In m/s Y Numeric
5.6 Maximum number of passengers that
lift can take Y Numeric
5.7 Maximum weight of the passengers in lift (Kg)
Y Numeric
5.8
The total weight of the Lift car carrying
the maximum load (weight of car plus maximum allowable load) (Kgs)
Y Numeric
5.9 Weight of the counter weight (Kg) Y Numeric
5.10 Supporting Cables
Number Y Numeric
Supporting cable description Y Alpha Numeric
Supporting cable Weight (kgs) Y Numeric
Supporting cable size (in sq. mm) Y Numeric
5.11 The depth of the pit from lowest part of the car when at the lowest floor (in mms.)
Y Numeric
5.12 Number of landings Y Numeric
Checklist of Supporting Documents S.
No. Document Mandatory (Y/N)
1
Mechanical Drawings duly signed by the Applicant and Authorized Person of Lift Company, showing
• Layout of the lift erection • Plan • Section Elevation • Arrangement of Doors • Lift well Enclosure
• Size and position of the machine relating to the lift well • Position of hoisting machine
Y
Annexure B- Draft Functional Requirement Specifications
219
S.
No. Document Mandatory (Y/N)
• Number of floors to be served and total travel
2 Electrical drawing of Lift duly signed by the Applicant and licensed Electrical Contractor, showing Wiring Scheme for the complete lift installation including earthing scheme
Y
3 Copy of the Building Plan permit Y
Annexure B- Draft Functional Requirement Specifications
220
Work Flow
Procedure for Obtaining Permission for additions or alterations to existing life
Applicant
Div
isio
nal S
ection
Off
icer
Assis
tant/
Junio
r Ele
ctr
ical
Inspecto
r (A
EI/
JEI)
- D
ivis
ional
START
Fill online form
Upload the required supporting documents
Pay Fees
Provide clarification to Queries
Send Physical copy of application,
documents
Submit and Generate Receipt
EndReceive
Certificate
Receive reasons
SMS/Email
Alert to Officer
Forward the file to AEI/JEI
Verify the application,
documents and payment of fees
Any clarifications required?
Raise Query Yes
Enter the date of receiving the documents
Digitally signed Permission Certificate
Is it a approval case?
Approve
Record reason and Reject
No
Yes
No
SMS/Email Alert to Officer
SMS/Email
Alert to Applicant
SMS/Email
Alert to Applicant
SMS/Email
Alert to Applicant
Enter the courier/speed post details
Note: The department at present does not have the infrastructure to review the drawings online
hence the documents are submitted offline. Development/Installation of the required infrastructure
in is the pipeline and when done, the offline submission will be removed.
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Fee Details Rs. 2500/- (Rupees Two Thousand Five Hundred only) in case of lift having 5 landings;
Rs. 5000/- (Rupees Five Thousand only) in case of lift having more than 5 landings;
Annexure B- Draft Functional Requirement Specifications
221
Workflow for Hierarchy based Approval Sl
No
Hierarchy
Level Designation Remarks (if any) Timelines
1 Level 1
Assistant/Junior
Electrical Inspector
Raise queries
Within 7 working days
from date of receipt of
documents
2 Approval
Authority Approves/Rejects
Within 30 working days
from date of receipt of
documents
Annexure B- Draft Functional Requirement Specifications
222
3.6 Registration of Generator from Tamil Nadu Electrical Inspectorate (TNEI)
Online Application Form
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric) Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
1 Applicant Details
1.2 Name of the Applicant Y Alpha Numeric Industry Name
1.3 Address of the applicant Y Alpha Numeric
1.4 District Y Dropdown Select from the list of districts of Tamil Nadu
1.5 Pincode Y Numeric 6 numbers
2 Generator Location
2.1 Location where the set is Used Y Alpha Numeric
2.2 District Y Dropdown Select from the list of districts of Tamil Nadu
2.3 Taluk Y Dropdown Select from the list of taluks pertaining to the district as selected in S.No. 2.2
2.4 Pincode Y Numeric
3 Details of Generating Plants Option to “Add” more Generator details
3.1 Type of Installation Y Dropdown Select HT/LT/Power Plant- Co-gen/Power Plant- IPP/ Power Plant- CPP/ Power Plant- SPP/Others
Others N Alpha Numeric This field will enable if the response to
S.No. 3.1 is “Others”
3.2 Type of Plant Y Dropdown
Select from the list of “Type of Plant” • Biomass • Co-Gen • Coal Based Generator • Coal Based PP
• Fossil Fuel Based Co-gen • Gas Based Generator
• Gas Based PP • Solar • Stand Alone Generator • Stand by Generator
• Sugar Mill • Turbo Gen
Annexure B- Draft Functional Requirement Specifications
223
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric) Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
• Waste Heat Recovery Based Co-gen Plant
• Wind • Other
Others N Alpha Numeric This field will enable if the response to S.No. 3.2 is “Others”
3.3 Type of the Fuel Y Dropdown
Select from the list of “Type of Fuel” • Bagasse • Biomass
• Coal • Coal + Diesel • Diesel • Heavy Fuel Oil + Diesel • HFO • HSD/HFO
• Imported Coal • Lignite • LSHS
• LSHS/Diesel • Naptha • Natural Gas • Steam
• Waste Heat Recovery
Others N Alpha Numeric This field will enable if the response to S.No. 3.3 is “Others”
3.4 Generator Rating (KVA) Y Numeric
3.5 Voltage (Volts) Y Numeric
3.6 Manufacturer’s Name Y Alpha Numeric
3.7 Manufacturer’s Sl. No Y Alpha Numeric
3.8 Type of Current Y Dropdown Select AC/DC
3.9 Date of Purchase Y Date Format
(DD/MM/YYYY)
3.10 Date of Installation Y Date Format
(DD/MM/YYYY)
3.11 Date of Commencement of Generation
N Date Format
(DD/MM/YYYY)
Annexure B- Draft Functional Requirement Specifications
224
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric) Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
4 Registration Fee Y Auto-fill Based on the number of generator details added, the fees is calculated
Annexure B- Draft Functional Requirement Specifications
225
Work Flow
Procedure for Registration of Generator
Applicant
Div
isio
nal S
ection
Off
icer
Superi
nte
nd/
Chie
f Accounta
nt/
Ele
ctr
ical
Inspecto
r
START
Fill online form
Pay Fees
Provide clarification to Queries
Send Physical copy of application,
documents
Submit and Generate receipt
EndReceive
Certificate
Receive reasons
SMS/Email
Alert to Officer
Enter the courier/speed post details
Forward the file to AEI/JEI
Verify the application,
documents and payment of fees
Any clarifications required?
Raise Query Yes
Enter the date of receiving the documents
Digitally signed Certificate of Registration
Is it a approval case?
Approve
Record reason and Reject
No
Yes
SMS/Email
Alert to Officer
SMS/Email
Alert to Applicant
SMS/Email
Alert to Applicant
SMS/Email
Alert to Applicant
Conduct inspection
Allot inspection Date
No
Prepare and send report
Make changes, if
any
SMS/Email
Alert to Applicant
SMS/Email Alert to EI/CA/Super.
Note: The department at present does not have the infrastructure to review the drawings online hence the
documents are submitted offline. Development/Installation of the required infrastructure in is the pipeline and
when done, the offline submission will be removed
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Fee Details Rs. 200/Generator
Annexure B- Draft Functional Requirement Specifications
226
Workflow for Hierarchy based Approval Sl No
Hierarchy Level
Designation Remarks (if any) Timelines
1 Level 1 Superintend/ Chief Accountant/Electrical Inspector
Raise queries Within 7 working days from date of receipt of documents
2 Approval Authority
Approves/Rejects
Within 30 working days
from date of receipt of documents
Annexure B- Draft Functional Requirement Specifications
227
3.7 Transfer of Ownership of Boiler by Directorate of Boilers
Online Application Form- Within the State
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
1 Company Details
1.1 Full Name of the Company Y Alpha Numeric and Special
Characters Y
1.2 Owner name Y Alpha Numeric and Special
Characters Y
2 Company Address
2.1 State Y Dropdown Y
2.2 District Y Dropdown Y
2.3 Taluk Y Dropdown Y
2.4 Revenue Village Y Dropdown Y
2.5 Street No./Name Y Alpha Numeric and Special
Characters
Y
2.6 Block No./Name Y Alpha Numeric and Special
Characters
Y
2.7 Pin Code Y Numeric Pin code start with 6 and
6 digit alone
Y
3 Contact Details
3.1 Phone / Landline Number. With STD Code
N Numeric (upto 12 digits) Y
3.2 Mobile Number Y Numeric 10 digits only allowed Y
3.3 Email id Y Alpha Numeric and Special
Characters
Y
4 Boiler Details
4.1 Boiler Makers No. Y Alpha Numeric and Special
Characters
4.2 Name of Boiler Maker Y Alpha Numeric and Special
Characters
4.3 Place of Make Y Alpha Numeric and Special
Characters
4.4 Year of Make Y Numeric (upto 4 places)
4.5 Rating (Total Heating surface Area in Sq.m.)
Y Alpha Numeric and Special
Characters
Annexure B- Draft Functional Requirement Specifications
228
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
4.6 Working pressure (in Kg/cm2) Y Alpha Numeric and Special
Characters
4.7 Evaporation Capacity(Kg/hr) Y Alpha Numeric and Special
Characters
4.8
Type of Boiler v. Horizontal Multi tubular vi. Horizontal Multi tubular
with water wall furnace vii. Water Tube Boilers viii. Others
Y Dropdown
4.9 Description of Boiler Y Alpha Numeric and Special
Characters
4.10 Steam pipe line length (in meter)
Y Alpha Numeric and Special
Characters
4.11 Nominal Bore upto 100mm (diameter in mm)
Y Numeric
Entry of either one is mandatory
4.12 Nominal Bore exceeding 100mm (diameter in mm)
Y Numeric
4.13 Is Stream pipeline Having Header?
Y Yes/No Radio Button
Annexure B- Draft Functional Requirement Specifications
229
Checklist of Supporting Documents- Within the State S.
No. Document
Mandatory
1 No Objection Certificate from original owner Y
2 Drawings of Pipelines and Boilers Y
Annexure B- Draft Functional Requirement Specifications
230
Work Flow- Within the State
Procedure for Transfer of Ownership of Boilers, Directorate of Boilers (Within the State)
Directo
r of
Boilers
Applicant
Circle
Assis
tant
Directo
r/ D
eputy
Directo
r
START
Fill online form
Upload the required supporting documents
SMS/E mail Alert to
Applicant and Director
Submit the application
Send hard copies of
supporting documents
along with printed copy
of submitted online
application
Enter the Speed Post details in the portal
Scrutinize the Application and
Documents
SMS/E mail Alert to
Applicant and Director
Any
clarifications
required?Raise QueriesYes
Issues letter to Circle AD/DD for MI
Book & R Book
Provide clarification to
Queries
No
SMS/email Alert to
Applicant
SMS/email
Alert to Circle AD/
DD
SMS/E mail Alert to Director
Sends the MI book to Director
Reviews the MI Book
Updates Record in MI Book
Approves the drawings, Issues & Uploads Ownership
Change Letter
Erector uploads the
Commencement Report
Erector uploads the Completion
Report
Uploads the readiness letter
Reviews the Commencement
Initiation
Reviews the Completion
Report
Reviews the Readiness Letter
Allot inspection date
Conducts Field Inspection to run the Boilers Test & Hydraulic Test and verify the shared
documents
Issues Provisional Order (Form 5) for the Boiler & Pass Order for the Pipeline in form of
Letter
No
Yes
Prepare inspection report
and upload it
If Tests are
Passed?
Suggest Recommendations
Downloads Ownership Change
Letter
SMS/E mail Alert to AD/
DD
SMS/E mail Alert to AD/
DD
SMS/E mail Alert to AD/
DD
Approves the
Inspection Date
Finalizes Inspection Date
Downloads Provisional Order
& Pass Order
End
Reviews Recommendations
SMS/email Alert to Applicant
SMS/E mail Alert to Applicant
SMS/E mail Alert to AD/DD
SMS/email Alert to AD/
DD
SMS/E mail Alert to Applicant
SMS/E mail Alert to Applicant
SMS/E mail Alert to Applicant
SMS/E mail Alert to Applicant
Downloads Ownership
Change Letter
SMS/E mail Alert to Circle AD/DD
SMS/E mail Alert to
Applicant
Pay Inspection Fees online
Annexure B- Draft Functional Requirement Specifications
231
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Annexure B- Draft Functional Requirement Specifications
232
Inspection Checklist- Within the State
S. No. Field Verification Document Checklist
1 MI Book from Circle AD/DD
2 R Book from Circle AD/DD
3 Drawings of Pipelines and Boilers
Annexure B- Draft Functional Requirement Specifications
233
Fee Details- Within the State
S. No Fee Type Amount (INR)
1 The fees for examination of plans and the particulars of materials, design and construction of steam pipes before the commencement of manufacture of the steam pipes shall be for 30 metres of piping or part thereof subject to a minimum of Rs. 5,000
200
2 For the pipes of nominal bore not exceeding 100 mm inclusive of all fittings excepting fittings like de-superheaters, steam-receivers, feed heaters and separately fired superheaters for 30 metres of pipe or part thereof
500
3 For pipes of nominal bore exceeding 100 mm inclusive of all fittings excepting fittings like de-superheaters, steam receivers, feed heaters and separately fired superheaters for 30 metres or part thereof
1,200
4 Inspection fee for renewal of Certificate
S. No.
Boilers Rating Amount (INR)
1 For Small Industrial Boiler as per Chapter XIV 1000
2 For Boiler Rating not exceeding 10 sq. meters 1600
3 For Boiler Rating exceeding 10 sq. meters but not exceeding 30 sq. meters 2100
4 For Boiler Rating exceeding 30 sq. meters but not exceeding 50 sq. meters 2400
5 For Boiler Rating exceeding 50 sq. meters but not exceeding 70 sq. meters 2700
6 For Boiler Rating exceeding 70 sq. meters but not exceeding 90 sq. meters 3400
7 For Boiler Rating exceeding 90 sq. meters but not exceeding 110 sq. meters 4000
8 For Boiler Rating exceeding 110 sq. meters but not exceeding 200 sq. meters 4500
9 For Boiler Rating exceeding 200 sq. meters but not exceeding 400 sq. meters 5000
10 For Boiler Rating exceeding 400 sq. meters but not exceeding 600 sq. meters 5800
11 For Boiler Rating exceeding 600 sq. meters but not exceeding 800 sq. meters 6300
12 For Boiler Rating exceeding 800 sq. meters but not exceeding 1000 sq. meters 7100
13 For Boiler Rating exceeding 1000 sq. meters but not exceeding 1200 sq. meters 8400
14 For Boiler Rating exceeding 1200 sq. meters but not exceeding 1400 sq. meters 9500
15 For Boiler Rating exceeding 1400 sq. meters but not exceeding 1600 sq. meters 11100
16 For Boiler Rating exceeding 1600 sq. meters but not exceeding 1800 sq. meters 11900
17 For Boiler Rating exceeding 1800 sq. meters but not exceeding 2000 sq. meters 13200
18 For Boiler Rating exceeding 2000 sq. meters but not exceeding 2200 sq. meters 14300
19 For Boiler Rating exceeding 2200 sq. meters but not exceeding 2400 sq. meters 15800
20 For Boiler Rating exceeding 2400 sq. meters but not exceeding 2600 sq. meters 16600
Annexure B- Draft Functional Requirement Specifications
234
S. No Fee Type Amount (INR)
Above 3000 sq. meters, for every 200 sq. meters or part thereof an additional fee of Rs. 500 shall be charged:
• Provided that the Chief Inspector may direct that no fee shall be payable in respect of a fresh application made in pursuance of sub-
section (2) of section 14 of the Act. • Inspection fee for separately fired Super-heater, Re-heater and Feed water heater shall be charged at the same rate. • For Heat Recovery Steam Generators with finned tubes, the fee shall be calculated on heating surface area of bare tubes and on one
fourth of heating surface area of fins. • For renewal of certificate for a period of six months or less on the request of owner, half of applicable fee shall be payable. • Applicable fee shall be payable again for the re-inspection of a defective boiler after completion of repairs. • For inspection on Sundays and Public Holidays under the Negotiable Instrument Act, 1881 (26 of 1881), on the request of owner,
additional fee equivalent to half of applicable fee shall be payable.
Annexure B- Draft Functional Requirement Specifications
235
Workflow for Hierarchy based Approval - Within the State Sl No Hierarchy Level Designation Remarks (if any) Timelines
1 Level 1 Director of Boilers
On receipt of the application and the hard copies of required
documents, scrutinizes the documents and request for MI Book and R Book from Circle AD/DD
2 Level 2 Director of Boilers Reviews and Updates the MI Book, approves the drawings and issues
the Ownership Change Letter
3 Level 3
Circle Assistant Director of
Boilers/ Deputy Director of Boilers
Review the application and documents. On receiving the date of readiness for inspection from
applicant, inspects the boiler and the pipelines and upload the inspection report and mark their recommendations
4 Approval Authority
Circle Assistant Director of
Boilers/ Deputy Director of Boilers
On completion of the test issues the Provisional Order and Pass Order
Annexure B- Draft Functional Requirement Specifications
236
Online Application Form- From Other State
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
1 Company Details
1.1 Full Name of the Company Y Alpha Numeric and Special
Characters
Y
1.2 Owner name Y Alpha Numeric and Special
Characters
Y
2 Company Address
2.1 State Y Dropdown Y
2.2 District Y Dropdown Y
2.3 Taluk Y Dropdown Y
2.4 Revenue Village Y Dropdown Y
2.5 Street No./Name Y Alpha Numeric and Special
Characters
Y
2.6 Block No./Name Y Alpha Numeric and Special
Characters
Y
2.7 Pin Code Y Numeric Pin code start with 6 and
6 digit alone Y
3 Contact Details
3.1 Phone / Landline Number. With
STD Code N Numeric (upto 12 digits)
Y
3.2 Mobile Number Y Numeric 10 digits only allowed Y
3.3 Email id Y Alpha Numeric and Special
Characters
Y
4 Boiler Details
4.1 Boiler Makers No. Y Alpha Numeric and Special
Characters
4.2 Name of Boiler Maker Y Alpha Numeric and Special
Characters
4.3 Place of Make Y Alpha Numeric and Special
Characters
4.4 Year of Make Y Numeric (upto 4 places)
4.5 Rating (Total Heating surface Area in Sq.m.)
Y Alpha Numeric and Special
Characters
4.6 Working pressure (in Kg/cm2) Y Alpha Numeric and Special
Characters
Annexure B- Draft Functional Requirement Specifications
237
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
4.7 Evaporation Capacity(Kg/hr) Y Alpha Numeric and Special
Characters
4.8
Type of Boiler ix. Horizontal Multi tubular
x. Horizontal Multi tubular with water wall furnace
xi. Water Tube Boilers
xii. Others
Y Dropdown
4.9 Description of Boiler Y Alpha Numeric and Special
Characters
4.10 Steam pipe line length (in meter)
Y Alpha Numeric and Special
Characters
4.11 Nominal Bore upto 100mm (diameter in mm)
Y Alpha Numeric and Special
Characters Entry of any one is
mandatory
4.12 Nominal Bore exceeding 100mm (diameter in mm)
Y Alpha Numeric and Special
Characters
4.13 Is Stream pipeline Having Header?
Y Yes/No Radio Button
Annexure B- Draft Functional Requirement Specifications
238
Checklist of Supporting Documents- From Other State S.
No. Document
Mandatory
1 No Objection Certificate from original owner Y
2 Drawings of Pipelines and Boilers Y
Annexure B- Draft Functional Requirement Specifications
239
Work Flow- From Other State
Procedure for Transfer of Ownership of Boilers, Directorate of Boilers (Outside State)
Directo
r of
Boilers
Depart
ment
Applicant
Circle
Assis
tant
Directo
r/ D
eputy
Directo
rD
irec
tor
of B
oile
rs
of T
ran
sfer
Sta
te
START
Fill online form
Upload the required supporting documents
SMS/E mail Alert to
Applicant and Director
Submit the application
Send hard copies of
supporting documents
along with printed copy
of submitted online
application
Enter the Speed Post details in the portal
Scrutinize the Application and
Documents
SMS/E mail Alert to
Applicant and Director
Any
clarifications
required?
Raise Queries
Yes
Issues letter to Director of Boilers
Dept. of other State for MI Book & R
Book
Provide clarification to
Queries
No
SMS/E mail Alert to
Applicant
SMS/E mail Alert to Other
State Director
SMS/E mail Alert to Director
Downloads Ownership Change
Letter
Reports the Commencement Initiation online
Erector uploads the Completion
Report
Uploads the readiness letter
Reviews the Commencement
Initiation
Reviews the Completion
Report
Reviews the Readiness Letter
Allot inspection date
Conducts Field Inspection to run the Boilers Test & Hydraulic Test and verify the shared
documents
Issues Provisional Order (Form 5) for the Boiler & Pass Order for the Pipeline in form of
Letter
No
Yes
Prepare inspection report
and upload it
If Tests are
Passed?
Suggest Recommendations
Downloads Ownership Change
Letter
SMS/E mail Alert to AD/
DD
SMS/E mail Alert to AD/
DD
SMS/E mail Alert to AD/
DD
Approves the
Inspection Date
Finalizes Inspection Date
Downloads Provisional Order
& Pass Order
End
Reviews Recommendations
SMS/E mail Alert to Applicant
SMS/E mail Alert to Applicant
SMS/E mail Alert to AD/DD
SMS/E mail Alert to AD/
DD
SMS/E mail Alert to Applicant
SMS/E mail Alert to Applicant
SMS/E mail Alert to Applicant
SMS/E mail Alert to Applicant
Sends MI Book & R Book
Download Letter
Updates MI Book & R Book
Issues Ownership Change Letter
Pay Inspection Fees online
Annexure B- Draft Functional Requirement Specifications
240
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Annexure B- Draft Functional Requirement Specifications
241
Inspection Checklist- From Other State
S. No. Field Verification Document Checklist
1 MI Book from Circle AD/DD or from Director of Other State
2 R Book from Circle AD/DD or from Director of Other State
3 Drawings of Pipelines and Boilers
Fee Details- From Other State No transfer fees involved, only inspection fees involved.
S. No Fee Type Amount (INR)
1 The fees for examination of plans and the particulars of materials, design and construction of steam pipes
before the commencement of manufacture of the steam pipes shall be for 30 metres of piping or part thereof subject to a minimum of Rs. 5,000
200
2 For the pipes of nominal bore not exceeding 100 mm inclusive of all fittings excepting fittings like de-superheaters, steam-receivers, feed heaters and separately fired superheaters for 30 metres of pipe or part thereof
500
3 For pipes of nominal bore exceeding 100 mm inclusive of all fittings excepting fittings like de-superheaters, steam receivers, feed heaters and separately fired superheaters for 30 metres or part thereof
1,200
4 Inspection fee for renewal of Certificate
S. No.
Boilers Rating Amount (INR)
1 For Small Industrial Boiler as per Chapter XIV 1000
2 For Boiler Rating not exceeding 10 sq. meters 1600
3 For Boiler Rating exceeding 10 sq. meters but not exceeding 30 sq. meters 2100
4 For Boiler Rating exceeding 30 sq. meters but not exceeding 50 sq. meters 2400
5 For Boiler Rating exceeding 50 sq. meters but not exceeding 70 sq. meters 2700
6 For Boiler Rating exceeding 70 sq. meters but not exceeding 90 sq. meters 3400
7 For Boiler Rating exceeding 90 sq. meters but not exceeding 110 sq. meters 4000
8 For Boiler Rating exceeding 110 sq. meters but not exceeding 200 sq. meters 4500
9 For Boiler Rating exceeding 200 sq. meters but not exceeding 400 sq. meters 5000
Annexure B- Draft Functional Requirement Specifications
242
S. No Fee Type Amount (INR)
10 For Boiler Rating exceeding 400 sq. meters but not exceeding 600 sq. meters 5800
11 For Boiler Rating exceeding 600 sq. meters but not exceeding 800 sq. meters 6300
12 For Boiler Rating exceeding 800 sq. meters but not exceeding 1000 sq. meters 7100
13 For Boiler Rating exceeding 1000 sq. meters but not exceeding 1200 sq. meters 8400
14 For Boiler Rating exceeding 1200 sq. meters but not exceeding 1400 sq. meters 9500
15 For Boiler Rating exceeding 1400 sq. meters but not exceeding 1600 sq. meters 11100
16 For Boiler Rating exceeding 1600 sq. meters but not exceeding 1800 sq. meters 11900
17 For Boiler Rating exceeding 1800 sq. meters but not exceeding 2000 sq. meters 13200
18 For Boiler Rating exceeding 2000 sq. meters but not exceeding 2200 sq. meters 14300
19 For Boiler Rating exceeding 2200 sq. meters but not exceeding 2400 sq. meters 15800
20 For Boiler Rating exceeding 2400 sq. meters but not exceeding 2600 sq. meters 16600
Above 3000 sq. meters, for every 200 sq. meters or part thereof an additional fee of Rs. 500 shall be charged:
• Provided that the Chief Inspector may direct that no fee shall be payable in respect of a fresh application made in pursuance of sub-section (2) of section 14 of the Act.
• Inspection fee for separately fired Super-heater, Re-heater and Feed water heater shall be charged at the same rate. • For Heat Recovery Steam Generators with finned tubes, the fee shall be calculated on heating surface area of bare tubes and on one
fourth of heating surface area of fins. • For renewal of certificate for a period of six months or less on the request of owner, half of applicable fee shall be payable. • Applicable fee shall be payable again for the re-inspection of a defective boiler after completion of repairs. • For inspection on Sundays and Public Holidays under the Negotiable Instrument Act, 1881 (26 of 1881), on the request of owner,
additional fee equivalent to half of applicable fee shall be payable.
Annexure B- Draft Functional Requirement Specifications
243
Workflow for Hierarchy based Approval - From Other State Sl No Hierarchy Level Designation Remarks (if any) Timelines
1 Level 1 Director of Boilers
On receipt of the application and the hard copies of required documents, scrutinizes the documents and request for MI Book and R Book from Circle AD/DD
2 Level 2 Director of Boilers of Other State Sends the MI Book and R Book to the Director
3 Level 3 Director of Boilers
Reviews and Updates the MI Book,
approves the drawings and issues the Ownership Change Letter
4 Level 4 Circle Assistant Director of Boilers/ Deputy Director of Boilers
Review the application and documents. On receiving the date of readiness for inspection from applicant, inspects the boiler and the pipelines and upload the inspection report and mark their
recommendations
5 Approval Authority Circle Assistant Director of Boilers/ Deputy Director of Boilers
On completion of the test issues the Provisional Order and Pass Order
Annexure B- Draft Functional Requirement Specifications
244
3.8 Renewal of Recognition as Manufacturer of Boiler by Directorate of Boilers
Online Application Form Note: For applicants who had applied for this clearance earlier through SWP – form to be auto populated basis earlier application form, and b) For
applicants who had obtained certificate from dept. portal / manual procedure earlier and applying for renewal through SWP – certain details to be auto
populated from Pre-Operations CAF.
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operations CAF
(Yes/No)
Registration No. Y Alpha Numeric and Special Characters
On submission it leads to the required form
Manufacturer / Erector i. Manufacturer ii. Erector
Y Radio Button Selection of one of the types
1 Approval of Manufacturer/Erector
Details
1.1 Approval Licence Number Y Alpha Numeric and Special Characters
1.2 Approving Authority Name Y Characters
1.3 Date of Approval Y Dropdown Calendar
1.4 Valid Upto Y Dropdown Calendar
2 Details of Manufacturing / Erection During the
Approved Year
2.1 No. of Components Manufactured / Erected
Y Numeric
3 IBR Approved Welder Details Y Reflect the entries in the table defined below on
submission
3.1 Name of the Welder Y Alpha Numeric and Special Characters
3.2 Certificate Number Y Alpha Numeric and Special
Characters
3.3 Expiry Date of Certificate Y Dropdown Calendar
S. No. Name of the Welder Certification Number Expiry Date of Certificate Delete (Action)
Annexure B- Draft Functional Requirement Specifications
245
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operations CAF
(Yes/No)
4 Company Details
4.1 Name of Company Y Alpha Numeric and Special Characters
Y
4.2 Status of Ownership i.Single ii.Partnership iii.Ltd. Company
Y Dropdown Y
4.3 Owner Name Y Alpha Numeric and Special Characters
Y
5 Company Address
5.1 State Y Dropdown Y
5.2 District Y Dropdown Y
5.3 Taluk Y Dropdown Y
5.4 Revenue Village Y Dropdown Y
5.5 Street Name (only for Chennai
District)
Y Alpha Numeric and Special
Characters
(only for Chennai
District)
Y
5.6 Street No. / Name Y Alpha Numeric and Special Characters
Y
5.7 Building/Door/Flat Y Alpha Numeric and Special Characters
Y
5.8 Block No./Name Y Alpha Numeric and Special Characters
Y
5.9 Pin Code Y Numeric Pin code start with 6 and 6 digit alone
Y
6 Boiler Details
6.1 Type of Boiler Y Multiple Selection
a. Shell Type Boiler Y Check Box
a.1. Shell Type Boilers, Capacity up to (TPH)
Y Numeric
b. Water Tube Boilers Y Check Box
b.1. Water Tube Boilers,
Capacity up to (TPH)
Y Numeric
7 Company Registration Details
7.1 Registration Number Y Alpha Numeric and Special
Characters
Yes
7.2 Registered Date Y Dropdown Calendar
Annexure B- Draft Functional Requirement Specifications
246
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operations CAF
(Yes/No)
7.3 Type of Land i. Rent ii. Lease iii. Owned
Y Dropdown
7.4 Place of Registration Y Alpha Numeric and Special Characters
7.5 Registration Authority Y Alpha Numeric and Special
Characters
8 Manpower and Equipment
Details
8.1 Tools and Plants Required for Manufacturing
Y Alpha Numeric and Special Characters
8.2 Manpower Strength Y Numeric
9 Contact Details
9.1 Phone / Landline Number. With STD Code
N Numeric (upto 12 digits) Y
9.2 Mobile Number Y Numeric 10 digits only allowed Y
9.3 Email id Y Alpha Numeric and Special
Characters
Y
Annexure B- Draft Functional Requirement Specifications
247
Checklist of Supporting Documents S.
No. Document
Mandatory
1 List of Manpower (Builders, Suppliers, Engineers, Managers) & Organization Chart Y
2 List of Equipment and Machinery (Name and Capacity) Y
3 Factory Registration Documents Y
4 Boilers Make number, Boilers Capacity and Type of Boiler Y
Annexure B- Draft Functional Requirement Specifications
248
Work Flow
Process for Renewal of Recognition as Manufacturer of Boiler, Directorate of Boilers
Directo
r of
Boilers
Applicant
START
Fill online form
Upload the required supporting documents
SMS/E mail Alert to
Applicant and Director
Submit the application
Scrutinizes the Payment and Application
Any clarifications
required?
Raise QueriesYes
Renewal Certificate is
Issued
Provide clarification to
Queries
No
Pay Renewal Fees Online
SMS/E mail Alert to
Applicant
SMS/E mail Alert to Applicant
SMS/E mail Alert to Director
Downloads Renewal Certificate
End
SMS/E mail Alert to Director
Yes
Cancels RequestNo
Documents Satisfied?
s
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Annexure B- Draft Functional Requirement Specifications
249
Fee Details S. No
Fee Type Amount (INR)
1 Manufacturers of water tube boilers, and for both Water Tube & Shell Type boilers 4,000
2 Manufacturers of Shell Type boilers 2,000
Annexure B- Draft Functional Requirement Specifications
250
Workflow for Hierarchy based Approval Sl No Hierarchy Level Designation Remarks (if any) Timelines
1 Level 1 Director of Boilers Reviews the application, documents and payment for renewal request by
the applicant
2 Approval Authority Director of Boilers On completion of the verification, issues the Renewal certification
Annexure B- Draft Functional Requirement Specifications
251
3.9 Renewal of Recognition as Erector/Repairer of Boiler by Directorate of Boilers
Online Application Form Note: For applicants who had applied for this clearance earlier through SWP – form to be auto populated basis earlier application form, and b) For
applicants who had obtained certificate from dept. portal / manual procedure earlier and applying for renewal through SWP – certain details to be auto
populated from Pre-Operations CAF.
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT
vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
Registration No. Y Alpha Numeric and Special
Characters
On submission it leads to
the required form
Manufacturer / Erector i. Manufacturer ii. Erector
Y Radio Button Selection of one of the types
1 Approval of Manufacturer/Erector Details
1.1 Approval Licence Number Y Alpha Numeric and Special Characters
1.2 Approving Authority Name Y Characters
1.3 Date of Approval Y Dropdown Calendar
1.4 Valid Upto Y Dropdown Calendar
1.5 Class of Boiler i. Special Class
ii. Class I
iii. Class II
iv. Class III
Y Dropdown
2 Details of Manufacturing / Erection During the Approved Year
2.1 No. of Components Manufactured / Erected
Y Numeric
3 IBR Approved Welder Details Y Reflect the entries in the table defined below on
submission
3.1 Name of the Welder Y Alpha Numeric and Special
Characters
3.2 Certificate Number Y Alpha Numeric and Special Characters
Annexure B- Draft Functional Requirement Specifications
252
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
3.3 Expiry Date of Certificate Y Dropdown Calendar
S. No. Name of the Welder Certification Number Expiry Date of Certificate Delete (Action)
4 Company Details
4.1 Name of Company Y Alpha Numeric and Special
Characters
Yes
4.2 Status of Ownership i.Single
ii.Partnership iii.Ltd. Company
Y Dropdown Yes
4.3 Owner Name Y Alpha Numeric and Special Characters
Yes
5 Company Address
5.1 State Y Dropdown Yes
5.2 District Y Dropdown Yes
5.3 Taluk Y Dropdown Yes
5.4 Revenue Village Y Dropdown Yes
5.5 Street Name (only for Chennai District)
Y Alpha Numeric and Special Characters
(only for Chennai District)
Yes
5.6 Street No. / Name Y Alpha Numeric and Special Characters
Yes
5.7 Building/Door/Flat Y Alpha Numeric and Special Characters
Yes
5.8 Block No./Name Y Alpha Numeric and Special Characters
Yes
5.9 Pin Code Y Numeric Pin code start with 6 and 6 digit alone
Yes
6 Boiler Details
6.1 Type of Boiler Y Multiple Selection
a. Shell Type Boiler Y Check Box
a.1. Shell Type Boilers, Capacity
up to (TPH)
Y Numeric
b. Water Tube Boilers Y Check Box
Annexure B- Draft Functional Requirement Specifications
253
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
b.1. Water Tube Boilers, Capacity up to (TPH)
Y Numeric
7 Company Registration Details
7.1 Registration Number Y Alpha Numeric and Special Characters
Yes
7.2 Registered Date Y Dropdown Calendar
7.3 Type of Land
i. Rent ii. Lease iii. Owned
Y Dropdown
7.4 Place of Registration Y Alpha Numeric and Special Characters
7.5 Registration Authority Y Alpha Numeric and Special Characters
8 Manpower and Equipment Details
8.1 Tools and Plants Required for
Manufacturing
Y Alpha Numeric and Special
Characters
8.2 Manpower Strength Y Numeric
9 Contact Details
9.1 Phone / Landline Number. With STD Code
N Numeric (upto 12 digits) Yes
9.2 Mobile Number Y Numeric 10 digits only allowed Yes
9.3 Email id Y Alpha Numeric and Special Characters
Yes
Annexure B- Draft Functional Requirement Specifications
254
Checklist of Supporting Documents S.
No. Document
Mandatory
1 Original Copy of License Y
2 List of Welders Y
Annexure B- Draft Functional Requirement Specifications
255
Work Flow
Process for Renewal of Recognition as Erector/Repairs of Boilers
Directo
r of
Boilers
Applicant
START
Fill online form
Upload the required supporting documents
SMS/E mail Alert to
Applicant and Director
Submit the application
Scrutinizes the Payment and Application
Any clarifications
required?
Raise QueriesYes
Renewal Certificate is
Issued
Provide clarification to
Queries
No
Pay Renewal Fees Online
SMS/E mail Alert to
Applicant
SMS/E mail Alert to Applicant
SMS/E mail Alert to Director
Downloads Renewal Certificate
End
SMS/E mail Alert to Director
Yes
Cancels RequestNo
Documents Satisfied?
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Annexure B- Draft Functional Requirement Specifications
256
Fee Details S. No
Class of boiler repairer Fees Amount
(INR)
1 Special Class 7,500
2 Class I 5,000
3 Class II 2,500
4 Class III 1,250
Annexure B- Draft Functional Requirement Specifications
257
Workflow for Hierarchy based Approval Sl No Hierarchy Level Designation Remarks (if any) Timelines
1 Level 1 Director of Boilers Reviews the application, documents and payment for renewal request by
the applicant
2 Approval Authority Director of Boilers
On completion of the verification, issues the Renewal certification specifying the Class and limiting pressure of boilers.
Annexure B- Draft Functional Requirement Specifications
258
3.10 Renewal of Boiler Registration by Directorate of Boilers
Online Application Form Note: The Form shown below should be auto-populated for an applicant who has applied for Provisional registration of Boilers through Single window
portal. In the case of an applicant who has not applied for provisional registration through SWP earlier, select fields in form below should be auto-populated
from the CAF.
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT
vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
Boilers Makers No. /
Registration No. Y
Alpha Numeric and Special
Characters
1 Boilers Details
1.1 Registration No of Boiler Y Alpha Numeric and Special Characters
1.2 Boiler Makers No Y Alpha Numeric and Special Characters
1.3 Boiler Rating (Total Heating surface Area in m2)
Y Numeric
1.4 Type of Boilers Y Alpha Numeric and Special Characters
1.5 Place of Manufacturer Y Alpha Numeric and Special Characters
1.6 Year of Manufacturer Y Numeric restricted to 4 places
1.7 Maximum Continuous Evaporation
Y Alpha Numeric and Special Characters
1.8 Name of Owner Y Alpha Numeric and Special
Characters
1.9 Situation of Boiler Y Alpha Numeric and Special Characters
2 Contact Details
2.1 Phone / Landline No. with STD Code
N Numeric
Y
2.2 Mobile Number Y Numeric Y
2.3 Email ID N
Alpha Numeric and Special
Characters
Y
Annexure B- Draft Functional Requirement Specifications
259
Checklist of Supporting Documents S.
No. Document
Mandatory
1 Last Issued Boiler Registration Certificate Copy Y
Annexure B- Draft Functional Requirement Specifications
260
Work Flow
Procedure for Final Registration of Boilers, Directorate of Boilers
Circle
Assis
tant
Directo
r/ D
eputy
Directo
rApplicant
Directo
r of
Boilers
START
Fill online form
Upload the required supporting documents
SMS/E mail Alert to
Applicant and AD/DD
Submit the application
Reviews the Application and
Documents
Allot inspection date
Conducts Field Inspection to run the
Boilers Test & Hydraulic Test & verify submitted documents
Finalizes Inspection Date
SMS/E mail Alert to Applicant
Approves the
Inspection Date
SMS/E mail Alert to AD/
DD
Updates the MI Book
Uploads the Steam Test Inspection report
Reviews the Inspection report
Issues Registration Certificate in Form 6 and a Cover Letter
Any clarifications
required?
Yes
Provide clarification to
Queries
No
SMS/E mail Alert to
ApplicantRaise Queries
SMS/E mail Alert to AD/
DD
Downloads the Registration Certificate
End
SMS/E mail Alert to AD/DD
SMS/E mail Alert
to Applicant &
AD/DD
SMS/E mail Alert to
Applicant
SMS/E mail Alert
to Applicant &
Director
in 30 days
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Annexure B- Draft Functional Requirement Specifications
261
Inspection Checklist
S. No. Field Verification Document Checklist
1 Last Issued Boiler Registration Certificate Copy
Annexure B- Draft Functional Requirement Specifications
262
Fee Details S. No
Fee Type Amount (INR)
1 Inspection fee for renewal of Certificate -
S.
No.
Boilers Rating Amount
(INR)
1 For Small Industrial Boiler as per Chapter XIV 1000
2 For Boiler Rating not exceeding 10 sq. meters 1600
3 For Boiler Rating exceeding 10 sq. meters but not exceeding 30 sq. meters 2100
4 For Boiler Rating exceeding 30 sq. meters but not exceeding 50 sq. meters 2400
5 For Boiler Rating exceeding 50 sq. meters but not exceeding 70 sq. meters 2700
6 For Boiler Rating exceeding 70 sq. meters but not exceeding 90 sq. meters 3400
7 For Boiler Rating exceeding 90 sq. meters but not exceeding 110 sq. meters 4000
8 For Boiler Rating exceeding 110 sq. meters but not exceeding 200 sq. meters 4500
9 For Boiler Rating exceeding 200 sq. meters but not exceeding 400 sq. meters 5000
10 For Boiler Rating exceeding 400 sq. meters but not exceeding 600 sq. meters 5800
11 For Boiler Rating exceeding 600 sq. meters but not exceeding 800 sq. meters 6300
12 For Boiler Rating exceeding 800 sq. meters but not exceeding 1000 sq. meters 7100
13 For Boiler Rating exceeding 1000 sq. meters but not exceeding 1200 sq. meters 8400
14 For Boiler Rating exceeding 1200 sq. meters but not exceeding 1400 sq. meters 9500
15 For Boiler Rating exceeding 1400 sq. meters but not exceeding 1600 sq. meters 11100
16 For Boiler Rating exceeding 1600 sq. meters but not exceeding 1800 sq. meters 11900
17 For Boiler Rating exceeding 1800 sq. meters but not exceeding 2000 sq. meters 13200
18 For Boiler Rating exceeding 2000 sq. meters but not exceeding 2200 sq. meters 14300
19 For Boiler Rating exceeding 2200 sq. meters but not exceeding 2400 sq. meters 15800
20 For Boiler Rating exceeding 2400 sq. meters but not exceeding 2600 sq. meters 16600
Annexure B- Draft Functional Requirement Specifications
263
Workflow for Hierarchy based Approval Sl No Hierarchy Level Designation Remarks (if any) Timelines
1 Level 1 Assistant Director of Boilers/ Deputy Director of Boilers
On receipt of the application and required documents, reviews it and
fixes the date for Field Inspection
2 Level 2 Assistant Director of Boilers/
Deputy Director of Boilers
Conducts the field inspection and prepares the Inspection Repair Report, if required
3 Level 3 Director of Boilers Reviews and Approves the Inspection Repairs Report
4 Level 4 Assistant Director of Boilers/ Deputy Director of Boilers
Once the repairs are done, conducts the Field Inspection again.
5 Approval Authority Assistant Director of Boilers/ Deputy Director of Boilers
Issues the Renewal Certificate for Boilers Registration
Annexure B- Draft Functional Requirement Specifications
264
3.11 Licence issued for the possession and use of Denatured Spirit / Methylated Spirit / Methyl Alcohol
either as such and/ or for use in the manufacture of specified commodities other than varnish by
Prohibition & Excise Department
Online Application Form
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Operation CAF
(Yes/No)
1 Applicant Details
1.1 Name of the Applicant Y Character
2 Club Address
2.1 State Y Dropdown Y
2.2 District Y Dropdown Y
2.3 Taluk Y Dropdown Y
2.4 Revenue Village Y Dropdown Y
2.5 Street No./Name Y Alpha Numeric and Special
Characters Y
2.6 Building/Door/Flat Y Alpha Numeric and Special
Characters Y
2.7 Block No./Name Y Alpha Numeric and Special
Characters Y
2.8 Pin Code Y Numeric Pin code start with 6
and 6 digit alone Y
3 Applicant profile
3.1 Occupation Y Alpha Numeric and Special
Characters
3.2 Monthly Income Y Numeric
4 Address of premises in which the applicant proposes to do business under the licence
4.1 State Y Dropdown
4.2 District Y Dropdown
4.3 Taluk Y Dropdown
4.4 Revenue Village Y Dropdown
4.5 Street No./Name Y Alpha Numeric and Special
Characters
4.6 Building/Door/Flat Y Alpha Numeric and Special
Characters
Annexure B- Draft Functional Requirement Specifications
265
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Operation CAF
(Yes/No)
4.7 Block No./Name Y Alpha Numeric and Special
Characters
4.8 Pin Code Y Numeric Pin code start with 6
and 6 digit alone
5 Local area in which the licence applied for is intended to serve
5.1 State Y Dropdown
5.2 District Y Dropdown
5.3 Taluk Y Dropdown
5.4 Revenue Village Y Dropdown
5.5 Street No./Name Y Alpha Numeric and Special
Characters
5.6 Building/Door/Flat Y Alpha Numeric and Special
Characters
5.7 Block No./Name Y Alpha Numeric and Special
Characters
5.8 Pin Code Y Numeric
6 Quantity Consumed
S. No
Type of Spirit Quantity consumed at a
Time Quantity consumed in a
quarter Quantity consumed in a
year Purpose for which it is
required
# Total
7 Other Details
7.1
If the licence applied for is for
possession and use, whether it is
for use of denatured spirit / Methylated spirit / methyl alcohol as such or for use in the manufacture of commodities other than varnish, the names of commodities and kind of
denatured spirit and Methylated
Y Yes/No Radio button To fill in the below table
if Yes
Annexure B- Draft Functional Requirement Specifications
266
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Operation CAF
(Yes/No)
spirit methyl alcohol as such 2 (1) (c), 2 (1) (h) and 2 (1) (g) to be specified
S. No. Names of Commodities Kind of denatured spirit / methylated spirit / methyl alcohol
1
2
3
4
Add more rows
7.2
If the application is for a licence for manufacture of varnish then:
i. it is for manufacture and use for varnish by the applicant himself
ii. for the manufacture and sale of varnish.
Y Radio Button
8 Other licences held by the applicant, if any, under the T.N.P. Act and Rules
Y Yes/No Radio Button To fill in the below table
if 8 is Yes
S. No. License Name License No. Issued Date Valid till
Add more rows
9 Other business, if any, the applicant is doing
Y Alpha Numeric and Special
Characters Text Box
10
Whether any previous
application for licence under the Tamil Nadu Prohibition Act, 1937 made by the applicant in this or other District in this
State has been rejected
Y Yes/No Radio Button
Y Alpha Numeric and Special
Characters To be filled in if section
10 is Yes
Annexure B- Draft Functional Requirement Specifications
267
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Operation CAF
(Yes/No)
Number of Order
Date of Order
Authority who issued it
11
Any special reasons which the applicant requests to be considered for granting the licence applied for.
Y Alpha Numeric and Special
Characters Text Box
Annexure B- Draft Functional Requirement Specifications
268
Checklist of Supporting Documents S.
No. Document
Mandatory
1. Application for Grant of DL2 licence for possession and use of Denatured Spirit / Methyl Alcohol (Methanol) should be in Form
D.A.1 Y
2. SSI Certificate No. for the manufacture of the proposed commodity issued by the Industries and Commerce Department Y
3. Storage Tank Availability with capacity of Tanks and Safety measures adopted Y
4. No objection Certificate to be obtained for the following Departments:- a. Fire Service b. Public Health c. Tamil Nadu Pollution Control Board d. Police
Y
5. Building Permit Copy along with the Blue Print plan of the premises approved by the competent authority (Local Body) Y
6. Flow Chart and process details of commodities proposed for manufacture Y
7. Form-D Public Building License from the Revenue Department Y
8. Sanitary Certificate and Property Tax Payment Receipt issued by ULB Y
9. Certificate of Structural Soundness issued by an ULB Empanelled Engineer Y
10. Factory License Copy issued by Inspector of Factories Y
Annexure B- Draft Functional Requirement Specifications
269
Work Flow Procedure for Licence issued for the possession and use of Denatured Spirit / Methylated Spirit / Methyl Alcohol either as
such and/ or for use in the manufacture of specified commodities other than varnish
Applicant
Join
t D
irect
or,
Chem
ical
Ass
ista
nt C
PESu
per
inte
nde
nt
CPE
Ass
ista
nt
Co
mm
issi
on
er C
PE
Join
t C
om
mis
sio
ner
CP
ED
istr
ict
Re
ven
ue
Off
icer
Com
mis
sio
ner
CPE
SMS/Email Alert to
JD
Chemical
START
Fill online form
Upload the required supporting documents
Submit the application
Scrutinize the Application and
Documents
Allot inspection date
Finalizes Inspection Date
SMS/Email Alert to Applicant
Any clarifications
required?
Raise Queries
Yes
Provide clarification to
Queries
NoReviews the application and
documents
Approves the
Inspection Date
Conducts Field Inspection
Prepare inspection report
and upload it
Pays Security Deposit
End
SMS/Email Alert to Applicant
Pay License Issuance Fees
Online
Reviews the application and
documents
Reviews the application and
documents
Any clarifications
required?
Yes
Reviews Inspection
Report
Reviews Inspection
Report
Reviews Inspection
Report
Reviews Inspection Report
Allot Technical Inspection date
Finalizes Technical
Inspection Date
Conducts Field Technical Inspection
Uploads Technical Inspection Report
Government Order Issued by
Home Department
Reviews the Application
Reviews the Application
Reviews the Application
Reviews the Application
Reviews the Application
Issues the License Online
No
SMS/Email Alert to Assistant CPE
SMS/Email Alert to
Applicant
SMS/Email Alert to CPE/ Dist. Rev
Collector
SMS/Email Alert to Applicant and Dist. Revenue
Collector
Yes
SMS/Email Alert to Applicant
SMS/Email Alert to Dist.
Rev Collector/ JD
Chemical
SMS/Email Alert to Applicant
SMS/Email Alert to Applicant
SMS/Email Alert to Applicant, CPE & Home
Dept
SMS/Email Alert to Applicant, CPE & JD
Chemical
SMS/Email Alert to
Applicant
SMS/Email
Alert to Joint
Commissioner &
Commissioner CPE
SMS/Email Alert to
Applicant
Download License Copy
License Copy
Annexure B- Draft Functional Requirement Specifications
270
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Annexure B- Draft Functional Requirement Specifications
271
Inspection Checklist S. No. Field Verification Document Checklist
1. Application for Grant of DL2 licence for possession and use of Denatured Spirit / Methyl Alcohol (Methanol) should be in Form D.A.1
2. SSI Certificate No. for the manufacture of the proposed commodity issued by the Industries and Commerce Department
3. Storage Tank Availability with capacity of Tanks and Safety measures adopted
4. No objection Certificate to be obtained for the following Departments:- a. Fire Service b. Public Health c. Tamil Nadu Pollution Control Board d. Police
5. Building Permit Copy along with the Blue Print plan of the premises approved by the competent authority (Local Body)
6. Flow Chart and process details of commodities proposed for manufacture
7. Form-D Public Building License from the Revenue Department
8. Sanitary Certificate and Property Tax Payment Receipt issued by ULB
9. Certificate of Structural Soundness issued by an ULB Empanelled Engineer
10. Factory License Copy issued by Inspector of Factories
Annexure B- Draft Functional Requirement Specifications
272
Fee Details The details of Quantity and the rate of licence fee prescribed are defined below:-
S. No. Quantity License Fee (INR)
1 Not exceeding 500 litres 200
2 Above 500 but not exceeding 10,000 litres 2,000
3 Above 10,000 but not exceeding 1,00,000 litres 10,000
4 Above 1,00,000 litres 25,000
Security Deposit: A sum calculated at the rate of thirty three paise per bulk litre of the annual quota proposed to be allowed under the licence for
denatured spirit and / or methyl alcohol with a maximum ceiling of Rs.6/- lakhs.
Annexure B- Draft Functional Requirement Specifications
273
Workflow for Hierarchy based Approval Sl No Hierarchy Level Designation Remarks (if any) Timelines
1 Level 1 Assistant Commissioner Prohibition & Excise Department
On receipt of the application and the documents, Assistant and Superintendent scrutinize the application and the documents and share it with Assistant Commissioner. AC verifies the application and sends it
to District Revenue Officer for a Field Inspection
10 days
2 Level 2 District Revenue Officer
Review the application and documents. Fixes a date for the inspection, verifies the documents during the inspection and prepares an Inspection Report and
shares it with CPE
15 days
3 Level 3 Assistant Commissioner Prohibition & Excise Department
Assistant and Superintendent scrutinize the Inspection report and share it with the AC. AC reviews the Inspection Report and share it with the Joint Director, Chemical
10 days
4 Level 4 Joint Director, Chemical
Reviews the application and fixes a date for Technical
Inspection and shares the Technical Inspection Report with Home Department to issue the Government Order
15 days
5 Level 5 Joint Commissioner Prohibition & Excise Department
Reviews the application and reports and requests the applicant to pay the security deposit
20 days
6 Approval Authority Commissioner Prohibition & Excise Department
Reviews the application and Issues the License 20 days
Annexure B- Draft Functional Requirement Specifications
274
3.12 and 3.13 Licence for Retail sale of bottled Indian Made Foreign Spirit, in shops and bars by TASMAC
for the Whole State of the Tamil Nadu and Licence for possession of liquor by a non-proprietary club for
supply to Members under TN Liquor (License and permit) Rules, 1981 by Prohibition & Excise Department
Online Application Form Note: As per the discussion with the department, this process is also used to Issue Licence for Retail sale of bottled Indian Made Foreign Spirit, in shops
and bars by the Tamil Nadu State Marketing Corporation Ltd. for the Whole State of the Tamil Nadu.
Sl No Field Mandatory (Y/N)
Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT
vendor
Auto Populated from
Pre-Operation CAF (Yes/No)
1 Club Details
1.1 Name of the Club Y Alpha Numeric and Special
Characters
1.2 If it is a non-proprietary club? Y Yes/No
2 Club Address
2.1 State Y Dropdown Y
2.2 District Y Dropdown Y
2.3 Taluk Y Dropdown Y
2.4 Revenue Village Y Dropdown Y
2.5 Street No./Name Y Alpha Numeric and Special
Characters Y
2.6 Building/Door/Flat Y Alpha Numeric and Special
Characters Y
2.7 Block No./Name Y Alpha Numeric and Special
Characters Y
2.8 Pin Code Y Numeric Pin code start with 6 and
6 digit alone Y
3 Member Details
3.1 Number of permanent members attached to the club
Y Numeric
3.2 Average number of associate or visitor members of the club for a year
Y Numeric
4
Number of Permanent Members who have expressed their desire
or willingness to take liquor from the club
Y Numeric
Annexure B- Draft Functional Requirement Specifications
275
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
5 Quantity of liquor required to be possessed at a time (in unit)
Y Numeric
6 Declaration Y -
Checklist of Supporting Documents S.
No. Document
Mandatory
1. Report about the ownership of the site and the club building Y
2. Report about the registration of the firm with the Registrar of the companies and the Commercial Taxes Department (Latest Certificate)
Y
3. Copy of Payment of taxes due to the Corporation/Local bodies (for running Boarding and Lodging/Latest Certificate) Y
4. Authenticity of the documents (i.e. partnership deed, sale deed, lease deed etc. attested copies to be sent) Y
5. Proof Actual Measurements of the proposal permit room/store room with clear boundaries made in the plan itself Y
6. Proof of Provision of Fire Extinguisher (both in the bar and store room) Y
7. Report from the Police Department to the effect that no adverse or criminal case is pending against the club and No
Objection Certificate
Y
8. List of names and address and occupation of the members of the club duty verified by the Assistant Commissioner (Excise) Y
9. Particulars required under rule 19 (B) of the Tamil Nadu Liquor License and Permit Rules, 1981 Y
10. Copy of bye-laws of the club Y
11. Copy of Name and Address of the President and Secretary of the Club Y
12. Certificate of Structural Soundness issued by an ULB Empanelled Engineer Y
13. Document evidence to prove that the applicant club is functioning without interruption for more than 3 years Y
14. Building Permit Copy along with the Blue Print plan of the premises approved by the competent authority (i.e. Local Body) Y
15. Local body license for the year 2015-16 Y
16. Individual statement from each member of the club expressing his willingness to consume liquor along with photograph Y
17. A report from the District Registrar of the Clubs about the functioning and genuineness of the club Y
18. License under the Tamil Nadu Public Building License rules 1965 Y
Annexure B- Draft Functional Requirement Specifications
276
Work Flow Procedure for Licence for possession of liquor by a non-proprietary club for supply to Members under TN Liquor (License
and permit)Rules, 1981, Prohibition and Excise Department
Assis
tant
CPE
Applicant
Dis
tric
t Assis
tant Collecto
rD
istr
ict
Co
llect
or
Superi
nte
nden
t C
PE
Assis
tant
Com
mis
sio
ner
CPE
Join
t C
om
mis
sio
ner
CPE
Com
mis
sio
ner
CPE
START
Fill online form
Upload the required supporting documents
SMS/Email Alert to
Applicant and Assistant CPE
Submit the application
Scrutinize the Application and
Documents
Downloads Issued Letter
Allot inspection date
Finalizes Inspection Date
SMS/Email Alert to Applicant
Any
clarifications
required?
Raise Queries
Yes
Provide clarification to
Queries
No
SMS/Email Alert to
Assistant CPE
Issues Letter to District Assistant
Collector for Inspection SMS/Email Alert to
Applicant and Dist. Assist. Collector
Approves the
Inspection Date
SMS/Email Alert to Dist.
Collector
Conducts Field Inspection and
verifies the required
documents
Prepare inspection report
and upload it
SMS/Email Alert to Applicant and Assistant CPE
Reviews Inspection
Report
License Request Accepted /Rejected?
Yes
No
Amount Refunded
Pays Security Deposit
End
SMS/Email Alert to Applicant
Pay License Issuance Fees
Online
Reviews and Approves the
Inspection Report
Reviews Inspection
Report
Reviews Inspection
Report
Reviews Inspection
Report
Reviews Inspection
Report
Issues License
License Copy
Download License Copy
SMS/Email
Alert to Applicant
SMS/Email Alert to CPE
Annexure B- Draft Functional Requirement Specifications
277
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Annexure B- Draft Functional Requirement Specifications
278
Inspection Checklist S. No. Field Verification Document Checklist
1. Report about the ownership of the site and the club building
2. Report about the registration of the firm with the Registrar of the companies and the Commercial Taxes Department (Latest Certificate)
3. Copy of Payment of taxes due to the Corporation/Local bodies (for running Boarding and Lodging/Latest Certificate)
4. Authenticity of the documents (i.e. partnership deed, sale deed, lease deed etc. attested copies to be sent)
5. Proof Actual Measurements of the proposal permit room/store room with clear boundaries made in the plan itself
6. Proof of Provision of Fire Extinguisher (both in the bar and store room)
7. Report from the Police Department to the effect that no adverse or criminal case is pending against the club and No Objection Certificate
8. List of names and address and occupation of the members of the club duty verified by the Assistant Commissioner (Excise)
9. Particulars required under rule 19 (B) of the Tamil Nadu Liquor License and Permit Rules, 1981
10. Copy of bye-laws of the club
11. Copy of Name and Address of the President and Secretary of the Club
12. Certificate of Structural Soundness issued by an ULB Empanelled Engineer
13. Document evidence to prove that the applicant club is functioning without interruption for more than 3 years
14. Building Permit Copy along with the Blue Print plan of the premises approved by the competent authority (Local Body)
15. Local body license for the year 2015-16
16. Individual statement from each member of the club expressing his willingness to consume liquor along with photograph
17. A report from the District Registrar of the Clubs about the functioning and genuineness of the club
18. License under the Tamil Nadu Public Building License rules 1965
Fee Details S. No. Fee Type Within Chennai (INR) Outside Chennai (INR)
1 Privilege Fees 12,00,000 8,00,000
2 License Fees 25,000 25,000
3 Application Fees 7,500 7,500
This fees is valid for a financial year only. This license is renewed every financial year.
Annexure B- Draft Functional Requirement Specifications
279
Workflow for Hierarchy based Approval Sl No Hierarchy Level Designation Remarks (if any) Timelines
1 Level 1 Assistant Prohibition & Excise Department
On receipt of the application and the documents, scrutinizes the
documents and issues letter to the District Assistant Collector to conduct the field inspection
15 days
2 Level 2 District Assistant Collector
Review the application, documents. Fixes a date for the inspection, verifies the documents during the
inspection and prepares an Inspection Report
20 days
3 Level 3 District Collector Verifies the Inspection Report and shares it with the CPE Department
15 days
4 Level 4 Assistant CPE Reviews the inspection report and documents
5 days
5 Level 5 Superintendent CPE Reviews the inspection report and documents 5 days
6 Level 6 Assistant Commissioner CPE Reviews the inspection report and documents 5 days
7 Level 7 Joint Commissioner CPE Reviews the inspection report and
documents 5 days
8 Approval Authority Commissioner Prohibition & Excise Department
Reviews the Inspection Report and Issues the License. License can be downloaded once the applicant pays the security deposit required for
Issuance of License.
20 days
Annexure B- Draft Functional Requirement Specifications
280
3.14 Licence for possession of liquor by the Star Hotels by Prohibition & Excise Department
Online Application Form
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
1 Basic Details
1.1 Name of the Hotel Y Alpha Numeric and Special
Characters
1.2 Name of the Applicant Y Characters
2 Star Hotel Address
2.1 State Y Dropdown Y
2.2 District Y Dropdown Y
2.3 Taluk Y Dropdown Y
2.4 Revenue Village Y Dropdown Y
2.5 Street No./Name Y Alpha Numeric and Special
Characters Y
2.6 Building/Door/Flat Y Alpha Numeric and Special
Characters Y
2.7 Block No./Name Y Alpha Numeric and Special
Characters Y
2.8 Pin Code Y Numeric Pin code start with 6 and
6 digit alone Y
3 Applicant Permanent Address
3.1 State Y Dropdown Y
3.2 District Y Dropdown Y
3.3 Taluk Y Dropdown Y
3.4 Revenue Village Y Dropdown Y
3.5 Street No./Name Y Alpha Numeric and Special
Characters Y
3.6 Building/Door/Flat Y Alpha Numeric and Special
Characters Y
3.7 Block No./Name Y Alpha Numeric and Special
Characters Y
3.8 Pin Code Y Numeric Pin code start with 6 and
6 digit alone Y
4 Description of the Room Assigned to
Annexure B- Draft Functional Requirement Specifications
281
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
4.1 Storage of Liquor Y Numeric
i. North Y Alpha Numeric and Special
Characters
ii. East Y Alpha Numeric and Special
Characters
iii. West Y Alpha Numeric and Special
Characters
iv. South Y Alpha Numeric and Special
Characters
4.2 Serving of the liquor (Permit room)
Y Numeric
i. North Y Alpha Numeric and Special
Characters
ii. East Y Alpha Numeric and Special
Characters
iii. West Y Alpha Numeric and Special
Characters
iv. South Y Alpha Numeric and Special
Characters
5 Details of Applicants
5.1 Occupation of the Applicant Y Characters
5.2 Monthly income of the Applicant (INR)
Y Numeric
6
Whether the applicant hotels
have any liquor license previously under the Tamil Nadu Excise Act, 1971 (Tamil Nadu Act 34 of 1971)
Y Yes/No Radio Button
7
Whether any previous application for any license
under the Tamil Nadu Act X of 1937 or the rules made there under by the applicant
Y Yes/No Radio Button
7.1 Name of the Authority Y* Alpha Numeric and Special
Characters *To be mandatorily filled
in if 7 is Yes
7.2 Date of the order Y* Calendar Dropdown *To be mandatorily filled
in if 7 is Yes
Annexure B- Draft Functional Requirement Specifications
282
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
8
Average number of foreign tourists and Foreign residents in India and citizens of India holding health permits residing or
boarding in the hotel per day separately
8.1 Date Y Calendar Dropdown
8.2 Average number of foreign guests
Y Numeric
S. No. Year Month Date Average number of foreign guests
Add more rows
9
Any special reasons which the
applicant desire to be considered
Y Alpha Numeric and Special
Characters
10 Declaration Y -
Annexure B- Draft Functional Requirement Specifications
283
Checklist of Supporting Documents S.
No. Document
Mandatory
1. Report about the ownership site and hotel building Y
2. Report about the management of the hotel business and the proposed bar (sole ownership/partnership to be explained) Y
3. Report about the registration of the firm with the Registrar of Companies and the commercial taxes Department (C.T.
Certificate should be sent for the current year)
Y
4. Copy of Payment of Taxes due to the Corporation/Local Bodies for running boarding and Lodging Certificate for the current year
Y
5. Authenticity of the documents (i.e. partnership deed, sale deed, lease deed etc. attested copies to be sent.) Y
6. Copy of Actual measurements of the proposed permit room/store with clear boundaries made in the plan itself Y
7. Proof of Provision of Fire Extinguisher (both the bar and the store room) Y
8. License from Local Body authority to run the business for running Boarding and Lodging – license for the current year Y
9. Particulars required under the rule 19 of T.N.L. (L&P) Rules, 1981 Y
10. No. of occupants of the hotel in the last 6 months and average per day Y
11. Restaurant sale value for the last one year Y
12. Details of the nearby IMFL shops Y
13. Objection Certificates or Proofs if any for the bar license Y
14. Combined plan of the hotel showing the bar premises Y
15. Authenticated photos of kitchen, 2 rooms with toilet, Restaurant, Conference Hall, Reception, Car Park, Recreation, Room and outer
Y
16. The format prescribed in D.O. Lr P&E V (1) 10003/99 dt 9.9.99 Y
17. No Objection Certificate obtained from the Police Department Y
18. The license under Tamil Nadu Public Building License Rules Y
Annexure B- Draft Functional Requirement Specifications
284
Work Flow Procedure for Licence for possession of liquor by the Star Hotels
Assis
tant
CPE
Applicant
Dis
tric
t Assis
tant Collecto
rD
istr
ict
Co
llect
or
Superi
nte
nden
t C
PE
Assis
tant
Com
mis
sio
ner
CPE
Join
t C
om
mis
sio
ner
CPE
Com
mis
sio
ner
CPE
START
Fill online form
Upload the required supporting documents
SMS/Email Alert to
Applicant and Assistant CPE
Submit the application
Scrutinize the Application and
Documents
Downloads Issued Letter
Allot inspection date
Finalizes Inspection Date
SMS/Email Alert to Applicant
Any
clarifications
required?
Raise Queries
Yes
Provide clarification to
Queries
No
SMS/Email Alert to
Assistant CPE
Issues Letter to District Assistant
Collector for Inspection SMS/Email Alert to
Applicant and Dist. Assist. Collector
Approves the
Inspection Date
SMS/Email Alert to Dist.
Collector
Conducts Field Inspection and
verifies the required
documents
Prepare inspection report
and upload it
SMS/Email Alert to Applicant and Assistant CPE
Reviews Inspection
Report
License Request Accepted /Rejected?
Yes
No
Amount Refunded
Pays Security Deposit
End
SMS/Email Alert to Applicant
Pay License Issuance Fees
Online
Reviews and Approves the
Inspection Report
Reviews Inspection
Report
Reviews Inspection
Report
Reviews Inspection
Report
Reviews Inspection
Report
Issues License
License Copy
Download License Copy
SMS/Email Alert to CPE
SMS/Email
Alert to Applicant
Annexure B- Draft Functional Requirement Specifications
285
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Annexure B- Draft Functional Requirement Specifications
286
Inspection Checklist S. No. Document
1. Report about the ownership site and hotel building
2. Report about the management of the hotel business and the proposed bar (sole ownership/partnership to be explained)
3. Report about the registration of the firm with the Registrar of Companies and the commercial taxes Department (C.T. Certificate should be sent for the current year)
4. Payment of Taxes due to the Corporation/Local Bodies for running boarding and Lodging Certificate for the current year
5. Authenticity of the documents (i.e. partnership deed, sale deed, lease deed etc. attested copies to be sent.)
6. Actual measurements of the proposed permit room/store with clear boundaries made in the plan itself
7. Provision of Fire Extinguisher (both the bar and the store room)
8. License from Local Body authority to run the business for running Boarding and Lodging – license for the current year
9. Chances of misuse of the privilege, if granted
10. Possession limit to be fixed at the time of grant of license
11. Particulars required under the rule 19 of T.N.L. (L&P) Rules, 1981
12. No. of occupants of the hotel in the last 6 months and average per day
13. Restaurant sale value for the last one year
14. Details of the nearby IMFL shops
15. Objections if any for the bar license
16. Combined plan of the hotel showing the bar premises
17. Authenticated photos of kitchen, 2 rooms with toilet, Restaurant, Conference Hall, Reception, Car Park, Recreation, Room and outer
18. The format prescribed in D.O. Lr P&E V (1) 10003/99 dt 9.9.99
19. No Objection Certificate obtained from the Police Department
20. The license under Tamil Nadu Public Building License Rules
Annexure B- Draft Functional Requirement Specifications
287
Fee Details The below rates are applicable to serve liquor from 11am to 12pm only.
S.
No. Fee Type 1 Star & Non-Star 2 Star 3 Star 4 Star 5 Star & above
1 Privilege Fees 5,00,000 6,00,000 8,00,000 12,00,000 20,00,000
2 License Fees 25,000 25,000 25,000 25,000 25,000
3 Application Fees 7,500 7,500 7,500 7,500 7,500
All values in INR
• This fees is valid for a financial year only.
• These license is renewed every financial year and application for renewal is to be filed in by end of February every year.
• A late fees of INR 6,250 is applicable if renewal application is submitted between 1st March to 31st March of a Financial Year.
• In case the hotel does not file the renewal application, the license stands null and void.
Annexure B- Draft Functional Requirement Specifications
288
Workflow for Hierarchy based Approval S. No. Hierarchy Level Designation Remarks (if any) Timelines
1 Level 1 Assistant Prohibition & Excise Department
On receipt of the application and the documents, scrutinizes the documents and issues letter to the District Assistant Collector to
conduct the field inspection
15 days
2 Level 2 District Assistant Collector
Review the application, documents. Fixes a date for the inspection, verifies the documents during the
inspection and prepares an Inspection Report
20 days
3 Level 3 District Collector Verifies the Inspection Report and shares it with the CPE Department
15 days
4 Level 4 Assistant CPE Scrutinizes the inspection report
and documents 5 days
5 Level 5 Superintendent CPE Scrutinizes the inspection report and documents 5 days
6 Level 6 Assistant Commissioner CPE Scrutinizes the inspection report
and documents 5 days
7 Level 7 Joint Commissioner CPE Scrutinizes the inspection report and documents 5 days
8 Approval Authority Commissioner Prohibition &
Excise Department
Reviews the Inspection Report and Issues the License. License can only be downloaded once the applicant pays the security deposit on Issuance of License.
20 days
Annexure B- Draft Functional Requirement Specifications
289
3.15 Permit to import foreign liquors by FL2, FL3, FL3A and FL3AA Licensees by Prohibition & Excise
Department
Online Application Form
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
A Supplier Details
1 Name & Address Details
1.1 Name Y Alpha Numeric and Special
Characters
1.2 Door No. & Street Y Alpha Numeric and Special
Characters
1.3 Location Y Dropdown
1.4 District Name / City Y Dropdown
1.5 Pin Code Y Numeric Pin code start with 6 and
6 digit alone
1.6 State Y Dropdown
1.7 Contact Person Y Characters
1.8 Contact Mobile No. Y Numeric
1.9 Contact Email ID Y Alpha Numeric and Special
Characters
2 Import Export IEC Provision to upload
copy
2.1 License No. Y Alpha Numeric and Special
Characters
2.2 Issue Date Y Dropdown Calendar
3 Original (Supplier) FSSAI License
Provision to upload
copy
3.1 License No. Y Alpha Numeric and Special
Characters
3.2 Issue Date Y Dropdown Calendar
4 Latest (Supplier) FSSAI
License (Renewal)
Provision to upload
copy
4.1 License No. Y Alpha Numeric and Special
Characters
4.2 Issue Date Y Dropdown Calendar
B Bonded Warehouse
1 Name & Address details
Annexure B- Draft Functional Requirement Specifications
290
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
1.1 Customs Bond Y Alpha Numeric and Special
Characters
1.2 Name Y Alpha Numeric and Special
Characters
1.3 Door No. & Street Y Alpha Numeric and Special
Characters
1.4 Location Y Dropdown
1.5 District Name / City Y Dropdown
1.6 Pin Code Y Numeric Pin code start with 6 and
6 digit alone
1.7 State Y Dropdown
1.8 Contact Person Y Characters
1.9 Contact Mobile No. Y Numeric
1.10 Contact Email ID Y Alpha Numeric and Special
Characters
2 Original Bonded Warehouse License
Provision to upload
copy
2.1 License No. Y Alpha Numeric and Special
Characters
2.2 Issue Date Y Dropdown Calendar
3 Latest Bonded Warehouse License (Renewal)
Provision to upload
copy
3.1 License No. Y Alpha Numeric and Special
Characters
3.2 Issue Date Y Dropdown Calendar
4 Original Bonded Warehouse FSSAI License
Provision to upload
copy
4.1 License No. Y Alpha Numeric and Special
Characters
4.2 Issue Date Y Dropdown Calendar
5 Latest Bonded Warehouse
FSSAI License (Renewal)
Provision to upload
copy
5.1 License No. Y Alpha Numeric and Special
Characters
5.2 Issue Date Y Dropdown Calendar
6 Space License Certificate Provision to upload
copy
Annexure B- Draft Functional Requirement Specifications
291
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
6.1 License No. Y Alpha Numeric and Special
Characters
6.2 Issue Date Y Dropdown Calendar
7 Route of Transport
7.1 Loading i. Rail ii Road
Y Dropdown
7.2 State Y Dropdown
7.3 Location Y Dropdown
7.4 Actions - Button to delete the above
entry, if needed
7.5 Unload
7.51 State Y Dropdown
7.52 Location Y Dropdown
8 Permit Period
8.1 Days Y Numeric
C Products
1 Products
1.1
Category i. Beer ii. IFL iii. Wine
Y Dropdown
1.2 Brands Y Dropdown of Pre-defined list
1.3 Quantity (in bottles) Y Numeric
2 Performa Invoice
2.1 Upload Invoice received from Supplier
Y - Provision to upload copy
Annexure B- Draft Functional Requirement Specifications
292
Checklist of Supporting Documents S.
No. Document
Mandatory
1. Original FL2/FL3 License Y
2. Latest FL2/FL3 License (Renewal) Y
3. Original FL2/FL3 FSSAI License Y
4. Latest FL2/FL3 FSSAI License (Renewal) Y
Annexure B- Draft Functional Requirement Specifications
293
Work Flow
Procedure for Permit to import foreign liquors by FL2, FL3, FL3A and FL3AA Licensees
TASM
AC L
td.
Applicant
Ass
ista
nt
CP
ESu
pe
rin
ten
de
nt
CP
E
Ass
ista
nt
Co
mm
issi
on
er
CPE
Join
t C
om
mis
sio
ner
C
PE
Co
mm
issi
on
er
CP
E
START
Fill online form
Upload the required supporting documents
SMS/Email Alert to
Applicant and Sec. Officer
Submit the application
Scrutinize the
Application and
Documents
Any
clarifications
required?
Raise Queries
Yes
Provide clarification to
Queries
No
SMS/Email Alert to Sec.
Officer
Scrutinizes the Application
Payment is done online
SMS/Email Alert
to ApplicantVerifies the payment
Section Officer Accounts Officer
Scrutinizes the Application and
Documents
Admin Officer
Scrutinizes the Application and
Documents
MD TASMAC
Scrutinizes the Application
Scrutinizes the Application
Scrutinizes the Application
Scrutinizes the Application
Issues the Permit
Permit Copy
End
SMS/Email Alert
to Applicant &
Superintendent
CPE
SMS/Email Alert to Applicant, Assistant,
Superintendent, AC, JC & TASMAC Sec. Officer
SMS/Email Alert to
TASMAC & CPE
Download the Permit
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Annexure B- Draft Functional Requirement Specifications
294
Fee Details S.
No. Fee Type Range of Basic Price (Per case of 750.ml pack size) Amount (INR)
1. Ordinary Upto INR 478 223.22
2. Medium INR 479 to INR 547 270.91
3. Premium INR 548 to INR 1643 327.76
4. Super Premium INR 1644 to INR 3923 370.26
5. Premium Deluxe INR 3924 & above 417.68
Annexure B- Draft Functional Requirement Specifications
295
Workflow for Hierarchy based Approval Sl No Hierarchy Level Designation Remarks (if any) Timelines
1 Level 1 TASMAC Ltd.
On receipt of the application and the documents, TASMAC section
officer scrutinizes the application and sends it to Accounts Officer to verify the online payment by the applicant. Admin Officer then scrutinizes the application and shares it with the MD TASMAC for
final scrutiny who then forward it to
the CPE Dept.
6 days
2 Level 2 Assistant CPE Scrutinizes the application and documents
1 day
3 Level 3 Superintendent CPE Scrutinizes the application and documents 1 day
4 Level 4 Assistant Commissioner CPE Scrutinizes the application and documents 2 days
5 Level 5 Joint Commissioner CPE Scrutinizes the application and documents 2 days
6 Approval Authority Commissioner Prohibition & Excise Department
Reviews the application and Issues the Permit
3 days
Annexure B- Draft Functional Requirement Specifications
296
3.16 Permit to export beer to other states and countries by Prohibition & Excise Department
Online Application Form
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
A Importer
1 Name & Address Details
1.1 Name Y Alpha Numeric and Special Characters
1.2 Door No. & Street Y Alpha Numeric and Special Characters
1.3 Location Y Dropdown
1.4 District Name / City Y Dropdown
1.5 Pin Code Y Numeric Pin code start with 6 and 6 digit alone
1.6 State Y Dropdown
1.7 Contact Person Y Characters
1.8 Contact Mobile No. Y Numeric
1.9 Contact Email ID Y Alpha Numeric and Special Characters
B Consignment Destination (Importer Depot/Shop)
2 Importer Depot/Shop Name & Address
2.1 Name Y Alpha Numeric and Special Characters
Fill in Shop Name, rest of the details get auto
populated
2.2 Door No. & Street Y Alpha Numeric and Special Characters
2.3 Location Y Dropdown
2.4 District Name / City Y Dropdown
2.5 Pin Code Y Numeric Pin code start with 6 and
6 digit alone
2.6 State Y Dropdown
2.7 Contact Person Y Characters
2.8 Contact Mobile No. Y Numeric
2.9 Contact Email ID Y Alpha Numeric and Special Characters
Annexure B- Draft Functional Requirement Specifications
297
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
3 Import Export Code
Auto-Populated on information in 2.1
3.1 License No. Y Alpha Numeric and Special
Characters
3.2 Issue Date Y Dropdown Calendar
4 Importer License (Original)
Auto-Populated on information in 2.1
4.1 License No. Y Alpha Numeric and Special
Characters
4.2 Issue Date Y Dropdown Calendar
4.3 Valid till Y Dropdown Calendar
5 Importer License (Renewal - Latest)
Auto-Populated on information in 2.1
5.1 License No. Y Alpha Numeric and Special Characters
5.2 Issue Date Y Dropdown Calendar
5.3 Valid till Y Dropdown Calendar
C Import Permit & Period
6 Import Permit
6.1 Permit No. Y Alpha Numeric and Special Characters
6.2 Issue Date Y Dropdown Calendar
6.3 Valid till Y Dropdown Calendar
6.4 Upload Permit Copy Y
7 Route by which the consignment is to be
transported
Y Text
8 Permit Period Y Days
9 Excise Duty rates
9.1 Name Y Characters
9.2 Fixed/Brand based rate Y Numeric Option to add a row in case amount varies for
other States
9.3 Rate per case - - Auto-calculated
9.4 Actions - -
Button to delete a new entry if entered for
9.2, if required
Annexure B- Draft Functional Requirement Specifications
298
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-Operation CAF
(Yes/No)
D Products Y
10 Proforma Invoice Y Upload Image
11 Products to be exported
11.1 Brand Name Y Dropdown
11.2 Pack size Y ml
11.3 Specification Y %V/V
11.4 Batch Nos. Y Numeric
11.5 Quantity I. in Bottles II. in Case
Y Numeric
11.6 Price per Case Y Numeric
11.7 Value Action -
-
two buttons – Add & Delete to be displayed to edit the entry from
11.1 to 11.6
12 Analysis Report Y Upload Report
13 Worksheet on Special Fees & TASMAC Services Charge
Auto-calculated after submission of above
details
13.1 Value of Products being exported
-
13.2 Export Fee -
13.3 Invoice Net Amount -
13.4 Excise Duty -
13.5 TASMAC Fee -
13.6 Bank Guarantee amount -
14 Bank Guarantee
14.1 Add Bank Guarantee Y Dropdown
Select a bank name from list
Annexure B- Draft Functional Requirement Specifications
299
Checklist of Supporting Documents S.
No. Document
Mandatory
1. Manufacturer License (Original) Y
2. Manufacturer License (Renewal - Latest) Y
3. Export License (Original) Y
4. Export License (Renewal - Latest) Y
5. FSSAI License (Original) Y
6. FSSAI License (Renewal – Latest) Y
Annexure B- Draft Functional Requirement Specifications
300
Work Flow
Procedure for Permit to export beer to other states and countries
TASM
AC L
td.
Applicant
Ass
ista
nt
CP
ESu
per
inte
nd
ent
CP
E
Ass
ista
nt
Co
mm
issi
on
er
CPE
Join
t C
om
mis
sio
ner
C
PE
Co
mm
issi
on
er
CP
EEx
cise
Su
per
viso
ry
Off
icer
, CPE
START
Fill online form
Upload the required supporting documents
SMS/Email Alert to
Applicant and ESO, CPE
Submit the application
Scrutinize the
Application and
Documents
Any
clarifications
required?
Raise Queries
Yes
Provide clarification to
Queries
No
SMS/Email Alert to Sec.
Officer
Scrutinizes the Application
Payment is done online
SMS/Email Alert
to ApplicantVerifies the payment
Section Officer Accounts Officer
Scrutinizes the Application and
Documents
Admin Officer
Scrutinizes the Application and
Documents
MD TASMAC
Scrutinizes the Application
Scrutinizes the Application
Scrutinizes the Application
Scrutinizes the Application
Issues the Permit
End
SMS/Email Alert
to Applicant &
Superintendent
CPE
SMS/Email Alert to Applicant, Assistant,
Superintendent, AC, JC & TASMAC Sec. Officer
SMS/Email Alert to
TASMAC & CPE
Scrutinize the
Application and
Documents
Releases the Bank Guarantee
SMS/Email Alert to
Applicant & Sec. Officer
Permit Copy
Download the Permit
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Annexure B- Draft Functional Requirement Specifications
301
Fee Details EXCISE DUTY:-
• INR 10.00 Per Bulk Litre (Bottle /Can)
• INR 13.10 Per Bulk Litre for Draught Beer EXPORT FEE:-
• INR 2.00 Per Bulk Litre EXPORT PERMIT FEE:-
• INR 10.00 Per Permit
Workflow for Hierarchy based Approval Sl No Hierarchy Level Designation Remarks (if any) Timelines
1 Level 1 Excise Supervisory Officer, CPE Reviews the application and forwards it to the TASMAC Section Office
3 days
2 Level 2 TASMAC Ltd.
On receipt of the application and the documents, TASMAC section officer scrutinizes the application and sends it to Accounts Officer to verify the online payment by the
applicant. Admin Officer then scrutinizes the application and shares it with the MD TASMAC for final scrutiny who then forward it to the CPE Dept.
5 days
3 Level 3 Assistant CPE Scrutinizes the application and documents
1 day
4 Level 4 Superintendent CPE Scrutinizes the application and
documents
1 day
5 Level 5 Assistant Commissioner CPE Scrutinizes the application and
documents
1 day
6 Level 6 Joint Commissioner CPE Scrutinizes the application and documents
2 days
7 Approval Authority Commissioner Prohibition & Excise Department
Reviews the application and Issues the Permit
2 days
Annexure B- Draft Functional Requirement Specifications
302
3.17 Renewal of licenses-FL by Prohibition & Excise Department
Online Application Form (FL2, 3, 3A (TN Tourism), 3AA (TN tourism Tendered)) Note: The Form shown below should be auto-populated for an applicant who has applied for Renewal of FL Licenses through Single window portal. In the
case of an applicant who has not applied for renewal license through SWP earlier, select fields in form below should be auto-populated from the CAF.
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated
from Pre-operations CAF
(Yes/No)
Login Form
1 Hotel / Club Details
1.1 Whether Hotel/Club i. Hotel ii. Club
Y Dropdown
1.2 Name Y Alpha Numeric and Special
Characters
1.3 Non-Proprietary Y Yes/No Only for club
1.4 Address Y Alpha Numeric and Special Characters
Y
1.5 District Y Dropdown Y
1.6 GSTIN N Alpha Numeric and Special Characters
1.7 TIN N Alpha Numeric and Special Characters
1.8 Quantity of liquor authorized to be processed at a time (in units)
Y Numeric
1.9 Whether permitted to possess and
sell Draught Beer i. Yes ii. No
Y dropdown
FL2, FL3 (4 & 5 star) only
2 Original License Copy
2.1 License No. Y Alpha Numeric and Special
Characters
2.2 Issue Date Y Dropdown calendar
2.3 Valid till Y Dropdown calendar
2.4 Upload Copy Y Upload button
3 Contact Details (Person Authorized to login)
3.1 Contact Person Y Characters
Annexure B- Draft Functional Requirement Specifications
303
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
operations CAF
(Yes/No)
3.2 Designation Y Characters
3.3 Mobile Number Y Numeric Y
3.4 Email ID Y Alpha Numeric and Special Characters
Y
3.5 Password Y Alpha Numeric and Special Characters
8 characters (no conditions addl.)
3.6 Confirm Password Y Alpha Numeric and Special
Characters
Application for Renewal of License – F
1 Name & Address
1.1 Name & Address of Applicant - - Auto-populated from login form details
1.2 Original License - - Auto-populated from
login form details
2 Renewal License/Proceedings (License)
2.1 Fee Details - - Auto-Calculated
2.2 Payment/ Fee Remittance Details - - Pay Now button
3 Other Details
3.1 Quantity of liquor authorized to be processed at a time (in units)
Y Numeric Auto-populated from login form details
3.2 Star Gradation of the hotel at the time of grant of license i. 1 Star or Non-Star ii. 2 Star iii. 3 Star iv. 4 Star
v. 5 Star & above
Y Dropdown
Only for FL3/3A
3.3 GSTIN Y Alpha Numeric and Special Characters
3.4 TIN Y Alpha Numeric and Special
Characters
3.5 Whether previous application for license under the TN Prohibition Act X of 1937 or the Rules thereunder or
Y Dropdown
Annexure B- Draft Functional Requirement Specifications
304
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
operations CAF
(Yes/No)
other Rules in force now made by the applicant in this State has been rejected i. Yes
ii. No
3.6 Order No. Y Numeric
3.7 Order Date Y Dropdown Calendar
3.8 The authority which issued such
order
Y Alpha Numeric and Special
Characters
4 Approved Blue Print of the License Premises
Provision to upload the Blue Prints of
the premises
Description of the Room assigned
4.1 1) For storage of Liquor
4.1.1 North Y Characters
4.1.2 East Y Characters
4.1.3 West Y Characters
4.1.4 South Y Characters
4.2 1) For serving of Liquor (Private Room)
4.2.1 North Y Characters
4.2.2 East Y Characters
4.2.3 West Y Characters
4.2.4 South
5 Ownership details of the hotel
5.1 Premises Ownership i. Owned ii. Rented
iii. Leased
Y Dropdown
5.2 Upload Copy Y - Provision to upload
a copy
6 Property tax Receipt (Latest)
6.1 Receipt No. Y Numeric
6.2 Receipt Date Y Dropdown Calendar
Annexure B- Draft Functional Requirement Specifications
305
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
operations CAF
(Yes/No)
7 Encumbrance Certificate Y Upload Provision to upload a copy
8 Boarding & Lodging License /
Certificate (latest) issued by Competent Authority
8.1 Reference No. Y Alpha Numeric and Special
Characters
8.2 Issue Date Y Dropdown Calendar
8.3 Valid till Y Dropdown Calendar
8.4 Issued by Y Characters
9 Restaurant license/ Certificate
(latest) issued by Competent Authority
9.1 Reference No. Y Alpha Numeric and Special Characters
9.2 Issue Date Y Dropdown Calendar
9.3 Valid till Y Dropdown Calendar
9.4 Issued by Y Characters
10 Structural Stability Certificate
issued by Competent Authority
10.1 Reference No. Y Alpha Numeric and Special Characters
10.2 Issue Date Y Dropdown Calendar
10.3 Valid till Y Dropdown Calendar
10.4 Issued by Y Characters
11 Copy of the Valid authorization given to the Competent Authority
issuing Structural Stability Certificate
Y Upload Provision to upload a copy
12 Tamil Nadu Public Building License issued by Competent Authority
Provision to upload a copy
12.1 Reference No. Y Alpha Numeric and Special Characters
12.2 Issue Date Y Dropdown Calendar
12.3 Valid till Y Dropdown Calendar
Annexure B- Draft Functional Requirement Specifications
306
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
operations CAF
(Yes/No)
12.4 Issued by Y Characters
13 Original FSSAI License • Only applicable for FL3 & FL3A
• Provision to upload a copy
13.1 Reference No. Y Alpha Numeric and Special
Characters
13.2 Issue Date Y Dropdown Calendar
13.3 Valid till Y Dropdown Calendar
13.4 Issued by Y Characters
14 Latest FSSAI License • Only applicable for
FL3 & FL3A • Provision to
upload a copy
14.1 Reference No. Y Alpha Numeric and Special Characters
14.2 Issue Date Y Dropdown Calendar
14.3 Valid till Y Dropdown Calendar
14.4 Issued by Y Characters
15 Location of Hotel Premises • Only applicable for FL3 & FL3A
15.1 Whether The hotel Premises is situated within i. Corporation/Municipality/ Town
Panchayat/Census Town/ Village Panchayat forming part of a statutory development authority ii. Any other rural local bodies
Y Dropdown
16 Purchase & sales of Liquor from
previous Year
Y Upload • Only applicable for
FL3 & FL3A
• Provision to upload a scanned copy
17 Room occupancy details Per month with number of
guests stayed
Y upload • Only applicable for FL3 & FL3A
Annexure B- Draft Functional Requirement Specifications
307
Sl No Field Mandatory
(Y/N)
Field Type (character/Numeric/
Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-
operations CAF
(Yes/No)
• Provision to upload a scanned copy
18 Average no. of foreign tourists Y upload • Only applicable for FL3 & FL3A
• Provision to
upload a scanned copy
19 Remarks Y Alpha Numeric and Special
Characters
20 Declaration Y -
Annexure B- Draft Functional Requirement Specifications
308
Checklist of Supporting Documents S.
No. Document
Mandatory
1. Original FL2/FL3 License Y
2. Latest FL2/FL3 License (Renewal) Y
3. Original FL2/FL3 FSSAI License Y
4. Latest FL2/FL3 FSSAI License (Renewal) Y
Annexure B- Draft Functional Requirement Specifications
309
Work Flow Procedure for Renewal of licenses-FL
Regio
nal Assi
sta
nt
Com
mis
sioner
Applicant
Superi
nte
ndent
CPE
Assis
tant
Com
mis
sio
ner
CPE
Join
t Com
mis
sio
ner
CPE
Com
mis
sio
ner
CPE
Dis
tric
t C
olle
cto
rD
ist.
Ass
ista
nt
Col
lect
or
Assis
tant
CPE
START
Fill online form
Upload the required supporting documents
SMS/Email Alert to
Applicant and Regional AC
Submit the application
Scrutinize the Application and
Documents
Any clarifications
required?
Raise QueriesYes
Provide clarification to
Queries
No
SMS/Email Alert to Regional AC
Approves the
Inspection Date
SMS/Email Alert to
Regional AC
Pay Scrutiny Fees Online
Allot inspection date
Finalizes Inspection Date
SMS/Email Alert to Applicant
Conducts Field Inspection and verifies the required
documents
Prepare inspection report
and upload it
SMS/Email Alert to Applicant
SMS/Email Alert to
Applicant
Scrutinizes the Inspection Report
Scrutinizes the Inspection Report
Approves the request for Renewal of
License
Reviews the Application
Scrutinizes the Application
Scrutinize the Application and
Documents
Scrutinize the Application and
Documents
Scrutinize the Application and
Documents
Scrutinize the Application and
Documents
Downloads License
End
Issues the Renewal License
SMS/Email
Alert to Applicant & Dist. AC
SMS/Email
Alert to Applicant
& Regional
AC
SMS/Email Alert to Applicant & Assistant
CPE
SMS/Email Alert to Applicant
SMS/Email
Alert to CPE
Annexure B- Draft Functional Requirement Specifications
310
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Annexure B- Draft Functional Requirement Specifications
311
Inspection Checklist
S. No. Document
1. Original FL2/FL3 License
2. Latest FL2/FL3 License (Renewal)
3. Original FL2/FL3 FSSAI License
4. Latest FL2/FL3 FSSAI License (Renewal)
Annexure B- Draft Functional Requirement Specifications
312
Fee Details
S.
No. Fee Type Amount (INR)
1
2
To be shared by the department.
Annexure B- Draft Functional Requirement Specifications
313
Workflow for Hierarchy based Approval Sl No Hierarchy Level Designation Remarks (if any) Timelines
1. Level 1 Regional Assistant Commissioner
Reviews the Applications and schedules the inspection date with
the applicant. Inspection report is uploaded by regional AC and forwarded to District Collector Office
2. Level 2 District Assistant Collector Scrutinizes the inspection report
3. Level 3 District Collector Scrutinizes the inspection report and approves the request for License Renewal
4. Level 4 Regional Assistant Commissioner Reviews the application completely and sends for further scrutiny to CPE
5. Level 5 Assistant CPE Scrutinizes the application and
documents
6. Level 6 Superintendent CPE Scrutinizes the application and documents
7. Level 7 Assistant Commissioner CPE Scrutinizes the application and
documents
8. Level 8 Joint Commissioner CPE Scrutinizes the application and documents
9. Approval Authority Commissioner Prohibition & Excise Department
Commissioner scrutinizes the application and issues the Renewal License to the applicant
Annexure B- Draft Functional Requirement Specifications
314
3.18 Renewal of Other Licenses by Prohibition & Excise Department
Online Application Form Note: The Form shown below should be auto-populated for an applicant who has applied for Renewal of FL Licenses through Single window portal. In the
case of an applicant who has not applied for renewal license through SWP earlier, select fields in form below should be auto-populated from the CAF.
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-operations
CAF (Yes/No)
1 Applicant Details
1.1 Name of the Applicant Y Character
1.2 License No. Y Alpha Numeric and Special
Characters
2 Club Address
2.1 State Y Dropdown Y
2.2 District Y Dropdown Y
2.3 Taluk Y Dropdown Y
2.4 Revenue Village Y Dropdown Y
2.5 Street No./Name Y Alpha Numeric and Special
Characters Y
2.6 Building/Door/Flat Y Alpha Numeric and Special
Characters Y
2.7 Block No./Name Y Alpha Numeric and Special
Characters Y
2.8 Pin Code Y Numeric Pin code start with 6
and 6 digit alone Y
3 Applicant profile
3.1 Occupation Y Alpha Numeric and Special
Characters
3.2 Monthly Income Y Numeric
4 Address of premises in which the applicant proposes to do
business under the licence
4.1 State Y Dropdown
4.2 District Y Dropdown
4.3 Taluk Y Dropdown
4.4 Revenue Village Y Dropdown
4.5 Street No./Name Y Alpha Numeric and Special
Characters
Annexure B- Draft Functional Requirement Specifications
315
Sl No Field Mandatory (Y/N) Field Type
(character/Numeric/ Alpha Numeric)
Remarks, if any for IT vendor
Auto Populated from Pre-operations
CAF (Yes/No)
4.6 Building/Door/Flat Y Alpha Numeric and Special
Characters
4.7 Block No./Name Y Alpha Numeric and Special
Characters
4.8 Pin Code Y Numeric Pin code start with 6
and 6 digit alone
5 Local area in which the licence
applied for is intended to serve
5.1 State Y Dropdown
5.2 District Y Dropdown
5.3 Taluk Y Dropdown
5.4 Revenue Village Y Dropdown
5.5 Street No./Name Y Alpha Numeric and Special
Characters
5.6 Building/Door/Flat Y Alpha Numeric and Special
Characters
5.7 Block No./Name Y Alpha Numeric and Special
Characters
5.8 Pin Code Y Numeric
Annexure B- Draft Functional Requirement Specifications
316
Checklist of Supporting Documents S.
No. Document
Mandatory
1. SSI Certificate No. for the manufacture of the proposed commodity issued by the Industries and Commerce Department Y
2. Original License Copy Y
3. Copy of Storage Tank Availability with capacity of Tanks and Safety measures adopted Y
4. No objection Certificate issued by the following Departments:- a. Fire Service b. Public Health c. Tamil Nadu Pollution Control Board d. Police
Y
5. Building Permit Copy along with the Blue Print plan of the premises approved by the competent authority (Local Body) Y
6. Flow Chart and process details of commodities proposed for manufacture Y
7. Form-D Public Building License from the Revenue Department Y
8. Sanitary Certificate and Property Tax Payment Receipt issued by ULB Y
9. Certificate of Structural Soundness issued by an ULB Empanelled Engineer Y
10. Factory License Copy issued by Inspector of Factories Y
Annexure B- Draft Functional Requirement Specifications
317
Work Flow
Procedure for Renewal of other Licenses
Applicant
Dis
tric
t R
even
ue
Off
icer
START
Fill online form
Upload the required supporting documents
Submit the application
Allot inspection date
Finalizes Inspection Date
SMS/Email Alert to Applicant
Provide clarification to
Queries
Approves the
Inspection Date
Conducts Field Inspection
Prepare inspection report
and upload it
Renewal License
Issue Renewal Certificate
End
SMS/Email Alert to Applicant
Pay Renewal Fees Online
Reviews the application and
documents
Any clarifications required?
Yes
No
SMS/Email Alert to Assistant CPE
SMS/Email Alert to CPE/ Dist. Rev
Collector
SMS/Email Alert to Applicant
SMS/Email Alert to Dist. Rev Collector
SMS/Email
Alert to DRO
Download Renewal
Certificate
Legend
Offline
Online – Department system
Online – Single Window Portal (SWP)
Annexure B- Draft Functional Requirement Specifications
318
Inspection Checklist S. No. Field Verification Document Checklist
1. SSI Certificate No. for the manufacture of the proposed commodity issued by the Industries and Commerce Department
2. Original License Copy
3. Copy of Storage Tank Availability with capacity of Tanks and Safety measures adopted
4. No objection Certificate issued by the following Departments:- a. Fire Service b. Public Health c. Tamil Nadu Pollution Control Board d. Police
5. Building Permit Copy along with the Blue Print plan of the premises approved by the competent authority (Local Body)
6. Flow Chart and process details of commodities proposed for manufacture
7. Form-D Public Building License from the Revenue Department
8. Sanitary Certificate and Property Tax Payment Receipt issued by ULB
9. Certificate of Structural Soundness issued by an ULB Empanelled Engineer
10. Factory License Copy issued by Inspector of Factories
Annexure B- Draft Functional Requirement Specifications
319
Fee Details
S. No.
Fee Type Amount (INR)
1
2
To be shared by the department.
Annexure B- Draft Functional Requirement Specifications
320
Workflow for Hierarchy based Approval Sl No Hierarchy Level Designation Remarks (if any) Timelines
1 Level 1 District Revenue Officer Review the application and documents. Fixes a date for the inspection, verifies the documents during the inspection and prepares an Inspection Report.
2 Approval Authority District Revenue Officer Issues the Renewal License
Supporting Documents To be provided by the Department
Annexure B- Draft Functional Requirement Specifications
321
3.19 Apply for NEEDS and UYEGP (<10 lakhs) from Commissionerate of Industries and Commerce
a. New Entrepreneur cum Enterprise Development Scheme (NEEDS)
Online Application Form
Sl No Field Mandatory
(Y/N) Field Type
Remarks, if any for IT vendor
Auto-
populated from Pre-operations CAF (Y/N)
1 Details of Applicant
1.1. Name of the Applicant Yes Alphanumeric
1.2 Sex (Male/Female/Transgender)
Yes Dropdown
1.3 Community
(SC/ST/BC/MBC/General)
Yes Dropdown
1.4 Religion i. Buddhism ii. Christianity iii. Hinduism iv. Islam
v. Jainism vi. Sikhism vii. Zoroastrianism
Yes
Dropdown
1.5 Marital Status (Married/Unmarried)
Yes Dropdown
1.6 Differently abled person (Yes/No)
Yes Dropdown
1.7 Ex-Serviceman (Yes/No)
Yes Dropdown
1.8 Date of Birth Yes Date selection
1.9 Father’s Name Yes Alphanumeric
2 Communication Details
2.1 Permanent Address
2.11 Door No. Yes Alphanumeric Y
2.12 Street Name Yes Alphanumeric Y
2.13 Ward No. No Numeric Y
2.14 Village/Area No Alphanumeric Y
2.15 District Yes Dropdown Y
2.16 Taluk Yes Dropdown Y
Annexure B- Draft Functional Requirement Specifications
322
Sl No Field Mandatory
(Y/N) Field Type
Remarks, if any for IT
vendor
Auto-populated from Pre-operations CAF (Y/N)
2.17 Pincode Yes
2.2 Communication Address
Option to replicate Permanent Address as Communication Address if both are same to be
given
2.21 Door No. Yes Alphanumeric Y
2.22 Street Name Yes Alphanumeric Y
2.23 Ward No. No Numeric Y
2.24 Village/Area No Alphanumeric Y
2.25 District Yes Dropdown Y
2.26 Taluk Yes Dropdown Y
2.27 Pincode Yes Numeric Y
3 Aadhar/ Mobile/ Email Details
3.1 Aadhaar No. Yes Numeric
3.2 Mobile No. Yes Numeric Y
3.3 Alternate Mobile No. No Numeric
3.4 Email ID Yes Alphanumeric Y
4 Residing continuously for the last three years in Tamil Nadu in the given above address from where loan is applied? (Yes/No)
Yes
Dropdown
5 Qualification Yes
Educational Qualification Course Details Institution Year of Passing
Certificate obtained from
ITI/ Vocational Training
from recognized Institutions.
Diploma
Graduate/Post Graduate
Degree
Annexure B- Draft Functional Requirement Specifications
323
Sl No Field Mandatory
(Y/N) Field Type
Remarks, if any for IT
vendor
Auto-populated from Pre-operations CAF (Y/N)
6 Whether Entrepreneurship Development Programme (EDP) by Entrepreneurship Development Institute or MSME Development Institute Training undergone? (Yes/No)
Yes
Dropdown
7 Whether the applicant is presently employed? (Yes/No)
Yes Dropdown
8 Whether Registered with Employment Exchange? (Yes/No)
Yes Dropdown
9 Father's Occupation Yes Alphanumeric
10 Previous experience in the line of activity of project (Yes/No)
Yes Dropdown
Application Form for NEEDS Subsidy Claim Period Rate of
Interest (in
%)
Interest
accrued (in
Rs.)
Interest
Paid (in Rs.)
Principal Dues
accrued (in Rs.)
Principal Dues
Paid (in Rs.)
Amount of Interest
subsidy eligible at
25% (in Rs.) From To
NB: To be submitted after receipt of final sanction from bank
Annexure B- Draft Functional Requirement Specifications
324
Checklist of Supporting Documents S. No. Document Mandatory (Y/N)
NEEDS Scheme
1 Proof of age: Transfer certificate/ Record Sheet issued by School/College Y
2 Proof of Adsress- Copy of Ration Card or Residence certificate obtained from the Thasildhar Y
3 Copy of Degree / Diploma / ITI certificate Y
4 Copy of Community Certificate (Not Applicable for General Male/Female/General) N
5 Ex-Service man /Differently abled /Transgenders with valid certificate (If Applicable) N
6 Copy of Rental / Lease Agreement / Sale deed or any Ownership document Y
7 Quotations for machinery / Equipment Y
8 Copy of partnership deed in case of partnership concern N
9 Project Report Y
10 Building Plan Y
11 Estimate of building obtained from a chartered civil engineer Y
12 Encumbrance Certificate Y
Subsidy Claim
1 Final sanction from bank Y
2 Tri-party agreement Y
3 EDP training certificate issued by Entrepreneurship Development Institute Y
Annexure B- Draft Functional Requirement Specifications
325
Work Flow
Fee Details No fee charged.
Annexure B- Draft Functional Requirement Specifications
326
b. Unemployed Youth Employment Generation Programme (UYEGP) Scheme
Online Application Form
Sl No Field Mandatory (Y/N) Field Type Remarks, if any for IT vendor
Auto-populated from Pre-operations CAF (Y/N)
1 Details of Applicant
1.1. Name of the Applicant Yes Alphanumeric
1.2 Sex (Male/Female/Transgender)
Yes Dropdown
1.3 Community
(SC/ST/BC/MBC/General)
Yes Dropdown
1.4 Religion viii. Buddhism ix. Christianity x. Hinduism
xi. Islam xii. Jainism xiii. Sikhism xiv. Zoroastrianism
Yes
Dropdown
1.5 Marital Status
(Married/Unmarried)
Yes Dropdown
1.6 Differently abled person (Yes/No)
Yes Dropdown
1.7 Ex-Serviceman (Yes/No)
Yes Dropdown
1.8 Date of Birth Yes Date selection
1.9 Father’s Name Yes Alphanumeric
2 Communication Details
2.1 Permanent Address
2.11 Door No. Yes Alphanumeric Y
2.12 Street Name Yes Alphanumeric Y
2.13 Ward No. No Numeric Y
2.14 Village/Area No Alphanumeric Y
2.15 District Yes Dropdown Y
2.16 Taluk Yes Dropdown Y
2.17 Pincode Yes
2.2 Communication Address
Option to replicate Permanent
Annexure B- Draft Functional Requirement Specifications
327
Sl No Field Mandatory (Y/N) Field Type Remarks, if any for IT vendor
Auto-populated from Pre-operations CAF (Y/N)
Address as Communication Address if both are same to be given
2.21 Door No. Yes Alphanumeric Y
2.22 Street Name Yes Alphanumeric Y
2.23 Ward No. No Numeric Y
2.24 Village/Area No Alphanumeric Y
2.25 District Yes Dropdown Y
2.26 Taluk Yes Dropdown Y
2.27 Pincode Yes Numeric Y
3 Aadhar/ Mobile/ Email Details
3.1 Aadhaar No. Yes Numeric Y
3.2 Mobile No. Yes Numeric Y
3.3 Alternate Mobile No. No Numeric
3.4 Email ID Yes Alphanumeric Y
4 Residing continuously for the last three years
in the area from where loan is applied? (Yes/No)
Yes
Dropdown
5 Qualification
8th standard passed?
(Yes/No)
Yes Dropdown
6 Whether Training undergone? (Yes/No)
Yes Dropdown
7 Whether availed loan under subsidy linked
Govt.scheme? (Yes/No)
Yes
Dropdown
8 Whether the applicant is presently
employed? (Yes/No)
Yes
Dropdown
9 Whether Registered with Employment Exchange? (Yes/No)
Yes Dropdown
10 Present annual income of the family duly supported by the Affidavit
Yes Numeric
11 Project Details
Annexure B- Draft Functional Requirement Specifications
328
Sl No Field Mandatory (Y/N) Field Type Remarks, if any for IT vendor
Auto-populated from Pre-operations CAF (Y/N)
11.1 Line of Activity Yes Text field Y
11.2 Previous experience in the line of activity, if any
No Text field
11.3 Category of the Venture (Manufacturing/ Service/ Business)
Yes Dropdown
12 Address details of activity Yes
12.1 Door No. (if unit is finalized) No Alphanumeric Y
12.2 Street Name (if unit is finalized) No Alphanumeric Y
12.3 Village/ Town/ City Yes Alphanumeric Y
12.4 District Yes Dropdown Y
12.5 Taluk Yes Dropdown Y
12.6 Block/ Corporation/ Municipality/ Town Panchayat
Yes Dropdown Y
12.7 Pincode Yes Numeric Y
12.8 Legislative Assembly Constituency Yes Dropdown
13 Project Outlay Yes Numeric
13.1 Machinery & Equipment Cost Yes Numeric The respective fields may be
auto-populated from CAF with option to edit
Y
13.2 Working Capital Yes Numeric
13.3 Other fixed assets Yes Numeric Y
13.4 Total Project Cost Yes Numeric To be auto-calculated
(13.1+13.2+13.3)
14 Whether availed any loan for starting the enterprise from any banking/ financial institution of State/Central Govt. (Yes/No)
Yes
Dropdown
Application Form for Subsidy Claim Period Rate of
Interest (in
%)
Interest
accrued (in
Rs.)
Interest
paid (in Rs.)
Principal Dues
accrued (in Rs.)
Principal Dues
Paid (in Rs.)
Amount of Interest
subsidy eligible at
25% (in Rs.) From To
NB: To be submitted after receipt of sanction from bank
Annexure B- Draft Functional Requirement Specifications
329
Checklist of Supporting Documents S. No. Document Mandatory (Y/N)
UYEGP Scheme
1 Transfer certificate/ Record Sheet issued by School/College Y
2 Ration Card or if Ration card is not available Nativity certificate from the Thasildhar / Aadhar card xerox /
Election voters identity card
Y
3 Valid Quotations with GST number Y
4 Affidavit stating annual income of family N
Subsidy Claim
1 Sanction letter from bank Y
2 Tri-party agreement Y
3 EDP training certificate issued by Entrepreneurship Development Institute Y
Annexure B- Draft Functional Requirement Specifications
330
Work Flow
Fee details No fee charged.
Procedure of applying for UYEGP scheme from Commissionerate of Industries and Commerce
Applicant
GM
DIC
Bank M
anager
Fill application
form and upload
supporting
documents
Provide additional
information/
clarification
Complete training
at EDP and obtain
certificate
Upload necessary
documents along
with subsidy claim
form
Receive sanction
letter
Scrutinize the
application and
documents
Field verification
Send queries to
applicantReject application
Letter to Bank
Manager*
Verify bank detailsSchedule for EDP
training
Release susbsidy
claim in
installments
Scrutinize
application and
feasibility of
project
Issue Sanction
letter
Adjust subsidy to
term loan account
Eligible for subsidy?
START
END
Task Force Committee
No
Yes
Upload Provisional
Sanction letter
and bank details
Tri-party agreement
EDP training certificate
Sanction Letter
END
Feasible?Is clarification
required?
Submit application
as proposal to TFC
Reject application
with reason for
rejection
Receive Rejection
Letter
Yes
No
Rejection Letter
SMS and email alert to applicant
SMS and email alert to applicant
SMS and email alert to applicant
SMS and email alert to
officer
SMS and email alert to officer
SMS and email alert to applicant
Legend
Offline
Online –
Department System
Online – Single
Window Portal (SWP)
Sanction letter
Schedule
inspection
Receive inspection
date
Prepare Inspection
Report
Yes
No
SMS and email alert to applicant
SMS and email alert to applicant
*The letter is handed to the applicant and he/she submit the same at the Bank for provisional sanction
Annexure B- Draft Functional Requirement Specifications
331
3.20 Incentive for Promotion of Energy Audit and Conservation of Energy (PEACE) from Commissionerate
of Industries and Commerce
Online Application Form
Sl No Field Mandatory (Y/N) Field Type Remarks, if any for IT
vendor
Auto-populated from Pre-
operations CAF (Y/N)
1 Details of Unit
1.1 Name of the MSME/Unit Yes Alphanumeric Y
1.2 Address of the MSME/Unit Yes Alphanumeric
1.3 Pincode Yes Numeric Y
1.4 Name of Village/Town Yes Alphanumeric Y
1.5 Name of District Yes Dropdown Y
1.6 Category of the Unit : (Micro/Small/Medium)
Yes Dropdown
1.7 Type of Organization
(Proprietary/ Partnership / Private Limited/ Cooperation/ Public Limited)
Yes Dropdown Y
1.8 Name of Proprietor / Managing Partner /
Managing Director / Authorized Signatory
Yes Alphanumeric Y
1.9 Udyog Aadhaar Memorandum Number Yes Alphanumeric Y
1.10 Date issued Yes Date selection Y
1.11 Date of commencement of production Yes Date selection
1.12 Demand / Connected load Consumer No. from
TANGEDCO
Yes Alphanumeric
1.13 Load (in KW) Yes Numeric
2 Investment
2.1 Land Yes Numeric Auto-populated from CAF with an option to edit
Y
2.2 Building Yes Numeric Y
2.3 Plant & Machinery Yes Numeric Y
2.4 Others Yes Numeric Y
2.5 Total Yes Numeric To be auto-calculated based on other entries
3 Energy audit details
3.1 If availed loan for the Energy audit (Yes/No)
Yes Dropdown
Annexure B- Draft Functional Requirement Specifications
332
Sl No Field Mandatory (Y/N) Field Type Remarks, if any for IT
vendor
Auto-populated from Pre-
operations CAF (Y/N)
3.2 Name of Energy Auditor / Organization conducted Energy Audit:
Yes Alphanumeric
3.3 Address of Energy Auditor / Organization conducted Energy Audit
Yes Alphanumeric
3.4 Pincode Yes Numeric
3.5 Details of Accreditation of Energy Auditor by Bureau of Energy Efficiency (BEE)
Yes Alphanumeric
3.6 Amount of expenditure incurred for Energy Audit
Yes Numeric
3.7 Date of completion of Energy Audit
Yes Date selection
3.8 Probable time frame for the implementation of Energy Audit
Yes Alphanumeric
4 Subsidy amount claimed Yes Numeric
Checklist of Supporting Documents S. No. Document Mandatory (Y/N)
1 Copy of Udyog Aadhaar Memorandum Y
2 Copy of Certificate of registration under Indian Partnership Act / LLP /Societies Registration Act/ Certificate of incorporation [Memorandum of association & Article of Association] under Company Act
Y
3 Proof for connected load i.e. EB Meter card/ online Statement Y
4 If alternate source of energy [other than electricity] used, proof for the usage N
5 Document's for engagement of Energy Auditor/ letter of acceptance from energy auditor Y
6 If the Energy auditor is employed in a firm/co., or partner or Director of a firm/Co., then Proof for the same N
7 Copy of accreditation of Energy Auditor by Bureau of Energy Efficiency [BEE] Y
8 Self-certified statement on expenditure incurred for Energy Audit with copy of the bills/ vouchers and receipt etc
Y
9 Copy of the detailed Energy Audit report Y
Annexure B- Draft Functional Requirement Specifications
333
Work Flow
Fee details No fee charged
Annexure B- Draft Functional Requirement Specifications
334
3.21 Subsidy / Incentives for Micro, Small and Medium Enterprises from Tamil Nadu Industrial Investment
Corporation (TIIC)
a. Capital Subsidy
Online Application Form
Sl No Field
Mandatory (Yes/No)
Field Type Remarks, if any for IT vendor
Auto-populated from Pre-
operations CAF
(Y/N)
1 Details of Enterprise
1.1. Name of the Enterprise Yes Alphanumeric Y
1.2. Name of the Proprietor /Managing Partner
/Managing Director
Yes Character
Y
2 Address of the Unit Yes
2.1. Office Address Yes Alphanumeric Field with provision to add
multiple lines
2.2. Enterprise Address Yes Alphanumeric
3 Location of the Enterprise Yes
3.1. Name of District Yes Dropdown Y
3.2. Name of Taluk Yes Dropdown Y
3.3. Name of Block Yes Dropdown Y
3.4. Name of Village/Town/City Yes Dropdown Y
3.5. Located in Industrial Estate? Yes Yes/No dropdown
3.6. Whether Govt./SIDCO/SIPCOT Co-Op/Others Yes Dropdown
3.7. Name of the Industrial Estate Yes Character
4 Contact Details
4.1. Office Number (Landline) Yes Numeric
4.2. Factory Number (Landline) No Numeric Y
4.3. Mobile Number Yes Numeric
5 Status of the Enterprise
5.1. Constitution Yes Dropdown Y
Proprietary
Dropdown options
Partnership
Private Limited
Limited
Co-operation
Others If ‘Others’ is chosen, free text
Annexure B- Draft Functional Requirement Specifications
335
Sl No Field
Mandatory (Yes/No)
Field Type Remarks, if any
for IT vendor
Auto-populated from Pre-
operations CAF (Y/N)
5.2. Type of Industry Yes Dropdown
Micro
Dropdown options
To be auto-
populated based on investment amount
Small
Medium
5.3. Whether New/Expansion/Diversification Yes Dropdown
New
Dropdown options
Expansion
Diversification
5.4. Social Status of Entrepreneur Yes Dropdown
Woman
Dropdown options
SC/ST
Physically disabled
Transgender
Others If ‘Others’ is
chosen, free text
5.5. If Women/ SC, ST /Physically disabled /
Transgender please indicate % Share of the Partner(s) / Director(s) in the equity:
No
Sl No To be automated
Name of Partner(s)/ Director(s) Character Option to add
more than one partner/ director to be provided. Details to be added as extra
rows of table
Sex Dropdown
Community Dropdown
Physically disabled Dropdown
Share Numeric
Value Numeric
Percentage of share Numeric
6 Details of Udyog Aadhaar Memorandum (UAM)
6.1 UAM Number Yes As per UAM No. format
6.2 Date of issue Yes Date selection
6.3 Activity as specified UAM Yes Character
7 Project Details
7.1. Line of Activity Yes
Annexure B- Draft Functional Requirement Specifications
336
Sl No Field
Mandatory (Yes/No)
Field Type Remarks, if any
for IT vendor
Auto-populated from Pre-
operations CAF (Y/N)
Status Items
Manufactured
Installed
capacity
Turnover
In units Value in Rs.
New/ Existing (Dropdown)
Expansion/ Diversification
(Dropdown)
% increase of capacity proposed
under Expansion/ Diversification
Project (display based on previous
selection)
7.2. Fixed Capital Investments Yes Partial
Nature of
Assets
Existing unit Expansion
/Diversification
project
Total % increase under
Expansion/
Diversification Project
Land
Building
Plant and
Machinery
Others
Total
7.3. Means of Finance (in Rs.) Yes
i Equity from Promoters/Partners/Shareholders Numeric
ii Term Loan Numeric
iii Hire Purchase Numeric
iv Leasing Numeric
Annexure B- Draft Functional Requirement Specifications
337
Sl No Field
Mandatory (Yes/No)
Field Type Remarks, if any
for IT vendor
Auto-populated from Pre-
operations CAF (Y/N)
v Public Issue Numeric
vi Preferential Issue Numeric
vii Others Numeric
Total
To be auto-calculated
7.4. Details of Term Loan sanctioned and availed Yes
a. Name of Bank/ Financial Institution Character
b. Type of Loan Character
c. Loan Sanction Number As per format
d. Loan Sanction Date Date selection
e. Term Loan Sanctioned (in Rs.) Numeric
f. Term Loan released (in Rs.) Numeric
g. Rate of Interest (in %) Numeric
8 Details of Power Supply
8.1. Service Connection Number Yes As per format
8.2. Service Connection Date Yes Date selection
8.3. Load Details Yes
Sanctioned Load Connected Load
Power Load (in HP)
Lighting Load (in HP)
Total (in HP)
9 Employment likely to be created Yes
Men Women Total
Managerial
Supervisory/Technical
Workers
Annexure B- Draft Functional Requirement Specifications
338
Sl No Field
Mandatory (Yes/No)
Field Type Remarks, if any
for IT vendor
Auto-populated from Pre-
operations CAF (Y/N)
Skilled
Semi-skilled
Unskilled
Total
10 Details of Registration with Commercial Tax Department
Yes
10.1 TIN Number As per format
10.2 Date of Registration Date selection
10.3 GST Registration Number As per format
10.4 Date of Registration Date selection
11 Date of commencement of commercial production
Yes Date selection
12 Date of first sale invoice raised or date of first delivery Challan
No Date selection
12.1 In case of enterprises manufacturing on job work basis, Give Invoice/ delivery Challan Number
No
As per format
Applicant should be able to fill only any one of 12 and
12.1.
12.2 Invoice/ delivery Challan Date Yes Date selection
13 Details of subsidy claimed in Rs.
a. Plant and Machinery value No Numeric
b. Capital Subsidy / Special Capital subsidy @ 15% of Plant and Machinery (Maximum Rs. 30 lakhs)
No Numeric
c. Employment Intensive Subsidy @ 5% of Plant and
Machinery value (Maximum Rs. 5 lakhs)
No Numeric
d. Additional Capital Subsidy for Select Category of Entrepreneurs 5% (Maximum Rs. 2 lakhs)
No Numeric
e. Additional Capital Subsidy @ 25% on the value of Plant and Machinery installed to promote cleaner
and environment friendly technologies (Maximum Rs. 3 lakhs)
No
Numeric
Total subsidy claimed (This should not exceed Rs. 40 Lakhs)
No Numeric
To be auto-calculated
Annexure B- Draft Functional Requirement Specifications
339
Checklist of Supporting Documents S. No. Document Mandatory (Y/N)
1 Copy of Udyog Aadhaar Memorandum (UAM) Y
2 Copy of Partnership Deed, If Partnership Concern; in case Limited Company copy of Memorandum and Articles
of Association duly signed by the Managing Director.
N
3 If the Enterprise is functioning in its own land, copy of land purchase deed duly signed by the applicant. N
4 If the Enterprise is functioning in a leased land/ building, copy of lease agreement deed executed in stamp
paper minimum of Rs.10/- , for a minimum period of 5 years from the date of commencement of commercial
production.
N
5 Copy of Loan Sanction letter from the Bank / Financial Institution in respect of Bank / Institutional financed
Enterprises.
N
6 Copy of sanction order from TANGEDCO for power supply with copy of Meter card. Y
7 Copy of the invoices of Plant and Machinery. Y
8 Cash bills or stamped receipt duly self-attested (in case machinery is bought on loan, Bank Manager attestation
is required). In case of non-availability of receipts, the bank scroll which shows the payment, with the details of
the machinery supplier, should be furnished, in original, with the attestation of the Bank Manager.
N
9 Certificate of Chartered Accountant for fixed assets created as on date of commencement of commercial
production in the prescribed form
Y
10 Certificate of commencement of commercial production duly signed by Chartered Accountant. Y
For self-fabricated Plant and Machinery items
11 • Chartered Engineer’s Certificate for the value of the plant and machinery.
• Chartered Accountant Certificate for the expenses incurred for the purchase of Plant and machinery to be
furnished.
• Copy of the invoices for components bought
• Cash bills or stamped receipt duly attested (Self attested; in case machinery is bought on loan, Bank
Manager attestation is required)
• Job work bills duly self-attested (in case job is carried out on loan, Bank Manager attestation is required)
N
12 Copy of the first sale invoice raised after commencement of Commercial Production or copy of first delivery challan, in case of enterprises manufacturing on job work basis.
N
Additional Capital Subsidy for Employment Intensive Subsidy:
Annexure B- Draft Functional Requirement Specifications
340
S. No. Document Mandatory (Y/N)
13 Self-declaration for having employed more than 25 workers N
14 Copy of returns to Labour Department / Inspector of Factories Department etc.
N
Additional Capital Subsidy for Select Category of Entrepreneurs:
15 Social/clinical status Certificate from authorities concerned in respect of select category of entrepreneurs like
SC/ST / Physically Handicapped and Transgender:
SC/ST – Community Certificate from Tahsildar
Physically Handicapped – Certificate from District Differently Abled Welfare Office
Transgender - Detail to be captured from UAM
N
Additional Capital Subsidy for Promotion of Cleaner and Environment Friendly Technologies:
16 Letter from Tamil Nadu Pollution Control Board regarding promotion of Cleaner and Environment friendly
technologies in the unit.
N
Additional documents in respect of existing enterprises taking up expansion / diversification. Certificate from Chartered Accountant on
the following:
17 Date of commencement of commercial production after expansion / diversification N
18 Value of fixed assets before Expansion/diversification and after Expansion / diversification % increase of fixed assets due to Expansion / diversification.
N
19 Production capacity and Turnover (both in terms of units and value in Rs.) before expansion/ diversification (for
minimum 3 years), after expansion / diversification (for minimum 3 months) and % increase of production
capacity and Turnover due to expansion / diversification
N
Annexure B- Draft Functional Requirement Specifications
341
Work Flow
Applicant
(SW
P)
Bra
nch M
anager
Loan A
dm
inis
trative O
ffic
er
(LA
O)
Regio
nal Appra
isal H
ead (
RAH
)Regio
nal Appra
isal
Off
icer
(RAO
)
Fill application form
along with
necessary
documents
Schedule inspection
Conduct site
inspection
Prepare inspection
report
Receive
inspection date
Respond to query
with additional
details/ document
SMS & email alert to
applicant
Receives application
and scrutinize
application
Send query to
applicant
Yes
No
SMS & email alert to applicant
SMS alert to officer
Any queries?
START
Legend
Online – Single
Window Portal
(SWP)
Online-
Department
system
Offline
Forwards to LAO
Forward application
to Branch Manager
Receive rejection
letter
Rejection
LetterSMS & email alert to applicant
SMS & email alert to applicant
END
To be forwarded to
RAH?
Receives application
and scrutinize
application
Forwards to RAO
with comments
Prepare sanction/
rejection note as per
comments
Forward note to RAH
Receive sanction/
rejection note
Submit application
to Branch Sanction
Committee
Branch Sanction Committee
Review application
and assess eligibility
Prepare final
sanction letter
Prepare rejection
letter with reason
for rejection
Receive Sanction
Letter
Sanction
Letter
Disburse funds once
funds are allocated
Receive subsidy
amount
Submit application
to Branch Sanction
Committee
Yes
No
No
Yes
Eligible?
Pay requisite fee
Update bank details
Fee Details Rs. 5000 + GST per application
Annexure B- Draft Functional Requirement Specifications
342
b. Mega Subsidy
Online Application Form
Sl No Field Mandatory (Yes/
No) Field Type
Remarks, if any
for IT vendor
Auto-populated from Pre-
operations CAF (Y/N)
1 Details of Enterprise
1.1. Name of the Enterprise Yes Alphanumeric Y
1.2. Type of Unit (New unit/ First time set up in Tamilnadu having manufacturing units in other States/ Existing units / Existing unit in a new site or adjacent vacant site)
Yes
Dropdown
2 Address of the Unit
2.1. Office Address Yes Alphanumeric Field with provision to add multiple lines
2.2. Enterprise Address Yes Alphanumeric
3 Location of the Enterprise
3.1 Name of District Yes Dropdown Y
3.2 Name of Taluk Yes Dropdown Y
3.3 Name of Block Yes Dropdown Y
3.4 Name of Village/Town/City Yes Dropdown Y
3.5 Located in Industrial Estate? Yes Yes/No dropdown
3.6 Whether Govt./SIDCO/SIPCOT Co-Op/Others Yes Dropdown
3.7 Name of the Industrial Estate No Character
4 Contact Details
4.1 Office Number (Landline) Yes Numeric
4.2 Factory Number (Landline) No Numeric Y
4.3 Mobile Number Yes Numeric
5 Status of the Enterprise
5.1. Constitution Yes Dropdown Y
Proprietary
Dropdown options
Partnership
Private Limited
Limited
Co-operation
Others If ‘Others’ is chosen, free text
Annexure B- Draft Functional Requirement Specifications
343
Sl No Field Mandatory (Yes/
No) Field Type
Remarks, if any
for IT vendor
Auto-populated from Pre-
operations CAF (Y/N)
5.2. Type of Industry Yes Dropdown
Micro
Dropdown options
To be auto-
populated based on investment amount
Small
Medium
5.3. Products manufactured
Existing Yes Alphanumeric
Proposed Yes
Installed Capacity
Existing (Prior to Expansion) Yes Numeric
Additional Capacity as part of the expansion No Numeric
6 Details of Registrations
6.1 UAM Number Yes As per format Y
6.2 Date of issue Yes Date selection Y
6.3 ROC / Firm Registration
Certificate
Yes As per format Y
6.4 PAN Yes As per format Y
6.5 TIN Yes As per format
6.6 CIN Yes As per format
6.7 GSTIN Yes As per format
7 Details of the Directors / Partners / Proprietor
Table
Provision to add multiple rows to be given
Sl No. Name Age % of share Whether professional director
8 Financial Assistance Details
8.1 Project implemented with (Bank Loan / Financial Institution loan / Own Finance)
Yes Dropdown
8.2 If implemented with Bank / FI give following
details:
No
Table
To be activated if
Bank loan or Financial institution selected in 8.1
Annexure B- Draft Functional Requirement Specifications
344
Sl No Field Mandatory (Yes/
No) Field Type
Remarks, if any
for IT vendor
Auto-populated from Pre-
operations CAF (Y/N)
Name of
Bank / FI
Address Date of
sanction
Amount
sanctioned (in lakhs)
Amount disbursed (in lakhs)
9 Investment in eligible fixed assets
9.1 Period from Yes Date selection
9.2 Period to Yes Date selection
9.3 Nature of Assets Amount
Land
Building
Plant and Machinery
Imported Machinery
Indigenous Machinery
Effluent Treatment Plant
Transport & Erection
Electricals
Technical Know how
Other Assets
Preliminary & Pre-Operative Expenses
Working Capital Margin
Total
Annexure B- Draft Functional Requirement Specifications
345
Sl No Field Mandatory (Yes/
No) Field Type
Remarks, if any
for IT vendor
Auto-populated from Pre-
operations CAF (Y/N)
10 Means of Finance (in Rs.) Yes Partial
10.1 Share Capital Numeric
10.2 Internal generation Numeric
10.3 Term Loan Numeric
10.4 State capital subsidy Numeric
10.5 Debentures Numeric
10.6 Unsecured loan Numeric
10.7 Deferred payment guarantee Numeric
10.8 Hire Purchase Numeric
10.9 Leasing Numeric
10.10 Others Numeric
10.11 Total Numeric To be auto-calculated
11 Details of Land Yes
11.1 Ownership
(Own Land/ Lease)
Yes Dropdown
11.2 Extent of Land (in acres) Yes Numeric
11.3 Guideline value Yes Numeric
11.4 Document value Yes Numeric
12 Building Details Yes Table
12.1 Sl No. Description Type of roof Area constructed Value
13 Plant and Machinery Details
13.1 Imported Machinery details No Table
13.2 Type of machinery (New/ Second hand)
No Dropdown
13.3
Sl No. Description of Machinery
Name of supplier
Bill / Invoice Number & Date
Value of the Machinery as per Invoice
Import cost
Annexure B- Draft Functional Requirement Specifications
346
Sl No Field Mandatory (Yes/
No) Field Type
Remarks, if any
for IT vendor
Auto-populated from Pre-
operations CAF (Y/N)
13.4 Indigenous Machinery Investment Details (New Machinery only)
No Table
Sl No. Description of Machinery
Name of supplier
Bill / Invoice Number & Date
Value of the Machinery as
per Invoice
14 Employment generation Yes Table Partial
Men Women Total
Managerial
Supervisory/Technical
Non Technical
Workers
Skilled
Semi-skilled
Unskilled
Total
15 Statutory approvals
15.1 Building Plan Approval Number Yes Alphanumeric
15.2 Date of approval Yes Date selection
15.3 Approving authority Yes Alphanumeric
15.4 Planning Permission Number Yes Alphanumeric
15.5 Factory License Number Yes Alphanumeric
15.6 TNPCB clearance Yes Alphanumeric
Annexure B- Draft Functional Requirement Specifications
347
Sl No Field Mandatory (Yes/
No) Field Type
Remarks, if any
for IT vendor
Auto-populated from Pre-
operations CAF (Y/N)
15.7 Other statutory clearance, if any No Alphanumeric Option to mention clearance and clearance number
16 Date of Commencement of Commercial Production
Yes Date selection
17 Date of First Invoice Yes Date selection
18 Details of subsidy application registered if any,
for this project with other institutions / agency of the Central / State Government / any other agencies
No
Alphanumeric
Annexure B- Draft Functional Requirement Specifications
348
Checklist of Supporting Documents S. No. Document Mandatory (Y/N)
1 Udyog Aadhaar Memorandum (UAM) Y
2 Partnership Deed, If Partnership Concern; in case Limited Company copy of Memorandum and Articles of
Association duly signed by the Managing Director.
N
3 If the Enterprise is functioning in its own land, copy of land purchase deed duly signed by the applicant. N
4 If the Enterprise is functioning in a leased land/ building, copy of lease agreement deed executed in stamp
paper minimum of Rs.10/- , for a minimum period of 5 years from the date of commencement of commercial
production .
N
5 Certificate from Company’s Statutory Auditor in case of companies incorporated under ROC/ Chartered
Accountant in case of Proprietary/Partnership firms, for
a) The investment made in Eligible Fixed Assets (EFA) viz., Land, Building and Plant & Machinery
b) The date of commencement of commercial production cum first invoice raised for the new/expansion project
c) Employment of the direct workers.
Y
6 Chartered Engineer’s Certificate for the investment made in Eligible Fixed Assets viz., Land, Building and Plant
and machinery as per the format enclosed.
Y
7 Invoices of the plant and machinery (imported & indigenous) purchased duly attested by the authorized
signatory of the company/concern and evidence for the settlement of the invoices.
Y
8 The documents for new imported machinery such as copy of Letter of Credit, Bill of Entry, Bill of Lading, duty
and details of clearing charges paid etc., shall be furnished.
Y
9 Planning Permission issued Y
10 Building Permit issued Y
11 Factory License Y
12 TNPB Clearance Y
13 Terms & Conditions of the credit facilities if any, extended by Bank/Financial Institution. N
Annexure B- Draft Functional Requirement Specifications
349
Work Flow
Applicant
(SW
P)
Bra
nch M
anager
Loan A
dm
inis
trative O
ffic
er
(LA
O)
Regio
nal Appra
isal H
ead (
RAH
)Regio
nal Appra
isal
Off
icer
(RAO
)
Fill application form
along with
necessary
documents
Schedule inspection
Conduct site
inspection
Prepare inspection
report
Receive
inspection date
Respond to query
with additional
details/ document
SMS & email alert to
applicant
Receives application
and scrutinize
application
Send query to
applicant
Yes
No
SMS & email alert to applicant
SMS alert to officer
Any queries?
START
Legend
Online – Single
Window Portal
(SWP)
Online-
Department
system
Offline
Forwards to LAO
Forward application
to Branch Manager
Receive rejection
letter
Rejection
LetterSMS & email alert to applicant
SMS & email alert to applicant
END
To be forwarded to
RAH?
Receives application
and scrutinize
application
Forwards to RAO
with comments
Prepare sanction/
rejection note as per
comments
Forward note to RAH
Receive sanction/
rejection note
Submit application
to Branch Sanction
Committee
Branch Sanction Committee
Review application
and assess eligibility
Prepare final
sanction letter
Prepare rejection
letter with reason
for rejection
Receive Sanction
Letter
Sanction
Letter
Disburse funds once
funds are allocated
Receive subsidy
amount
Submit application
to Branch Sanction
Committee
Yes
No
No
Yes
Eligible?
Pay requisite fee
Update bank details
Fee Details Rs. 5000 + GST per application
Annexure B- Draft Functional Requirement Specifications
350
3.22 Generator Subsidy from Tamil Nadu Industrial Investment Corporation (TIIC)
Online Application Form
Sl No Field Mandatory (Yes/
No) Field Type
Remarks, if any
for IT vendor
Auto-populated from Pre-
operations CAF (Y/N)
1 Details of Enterprise
1.1. Name of the Enterprise Yes Alphanumeric Y
1.2. Name of the Proprietor /Managing Partner /Managing Director
Yes Character
Y
2 Address of the Unit
2.1. Office Address Yes Alphanumeric Field with
provision to add multiple lines
N
2.2. Enterprise Address Yes Alphanumeric
N
3 Location of the Enterprise
3.1. Name of District Yes Dropdown Y
3.2. Name of Taluk Yes Dropdown Y
3.3. Name of Block Yes Dropdown Y
3.4. Name of Village/Town/City Yes Dropdown Y
3.5. Located in Industrial Estate Yes Yes/No dropdown N
3.6. Whether Govt./SIDCO/SIPCOT Co-Op/Others Yes Dropdown N
3.7. Name of the Industrial Estate Yes Character N
4 Contact Details
4.1. Office Number (Landline) Yes Numeric Y
4.2. Factory Number (Landline) No Numeric
4.3. Mobile Number Yes Numeric Y
5 Status of the Enterprise Yes N
5.1. Constitution Dropdown
Proprietary
Dropdown options
Partnership
Private Limited
Limited
Co-operation
Others If ‘Others’ is chosen, free text
5.2. Type of Industry Yes Dropdown N
Micro Dropdown options
To be auto-populated based
Small
Annexure B- Draft Functional Requirement Specifications
351
Sl No Field Mandatory (Yes/
No) Field Type
Remarks, if any
for IT vendor
Auto-populated from Pre-
operations CAF (Y/N)
Medium on investment amount
6 Product Details
Details of product being manufactured Yes Character N
7 Power connection Details (in kVA)
Total sanctioned power from TANGEDCO Yes Numeric N
Permitted demand by TANGEDCO Yes Numeric N
8 Existing Generator Details
Country made in Yes Character N
Rated capacity Yes Numeric N
Year of purchase Yes Numeric
Validation for 4 digits to be done
N
Present efficiency Numeric N
9 Newly purchased Generator Details
Capacity Yes Numeric N
Date of purchase Yes Date selection N
Name of retailer generator purchased from Yes Character N
Retailer Address Yes Character
Field with provision to add multiple lines
N
Cost of Generator set with alternator Yes Numeric N
Date of installation of Generator Yes Date selection N
Whether it is a replacement? Yes/No dropdown N
10 Source of funds
10.1 Purchased under Yes Dropdown N
Term Loan
Dropdown options
Hire Purchase
Lease
Self-Finance
10.2. If term loan obtained from bank, specify whether the subsidy element has been contemplated in the means of finance
No Yes/No dropdown
To be enabled if the Term loan selected in 9.1.
N
11 Amount of Central/State subsidy availed for the Generator, if any
No Numeric
Non-mandatory N
Annexure B- Draft Functional Requirement Specifications
352
Checklist of Supporting Documents S. No. Document Mandatory (Y/N)
1 Copies of Udyog Aadhaar Memorandum (UAM) Y
2 Memorandum and Articles of Association in case of Corporate Sector / Partnership deed in case of Partnership
concern.
N
3 Copy of Term Loan sanction letter / Chartered Accountant Certificate for own funds. Y
4 Copy of EB Meter card showing maximum sanctioned load / connected load and electricity consumption
readings.
Y
5 Copy of invoice of Generator set Y
6 Stamped payment receipt or bankers payment certificate (if the generator is bought on loan). N
7 Copy of Safety Certificate obtained from the Electrical Inspectorate for installation of Generator. Y
8 Authorised Dealership Certificate for Generator set supplier. Y
9 Banker’s letter indicating Bank Branch code and the Enterprises Term Loan Current A/c. No. for transfer of
subsidy through Electronic Clearance System (ECS)
Y
Annexure B- Draft Functional Requirement Specifications
353
Work Flow Applicant
(SW
P)
Bra
nch M
anager
Loan A
dm
inis
trative O
ffic
er
(LA
O)
Regio
nal Appra
isal H
ead (
RAH
)Regio
nal Appra
isal
Off
icer
(RAO
)
Fill application form
along with
necessary
documents
Schedule inspection
Conduct site
inspection
Prepare inspection
report
Receive
inspection date
Respond to query
with additional
details/ document
SMS & email alert to
applicant
Receives application
and scrutinize
application
Send query to
applicant
Yes
No
SMS & email alert to applicant
SMS alert to officer
Any queries?
START
Legend
Online – Single
Window Portal
(SWP)
Online-
Department
system
Offline
Forwards to LAO
Forward application
to Branch Manager
Receive rejection
letter
Rejection
LetterSMS & email alert to applicant
SMS & email alert to applicant
END
To be forwarded to
RAH?
Receives application
and scrutinize
application
Forwards to RAO
with comments
Prepare sanction/
rejection note as per
comments
Forward note to RAH
Receive sanction/
rejection note
Submit application
to Branch Sanction
Committee
Branch Sanction Committee
Review application
and assess eligibility
Prepare final
sanction letter
Prepare rejection
letter with reason
for rejection
Receive Sanction
Letter
Sanction
Letter
Disburse funds once
funds are allocated
Receive subsidy
amount
Submit application
to Branch Sanction
Committee
Yes
No
No
Yes
Eligible?
Pay requisite fee
Update bank details
Fee Details Rs. 5000 + GST per application
Annexure B- Draft Functional Requirement Specifications
354
3.23 New assessment of property from Commissionerate of Municipal Administration (CMA)
Online Application Form
# Field Mandatory
(Y/N) Field Type Remarks, if any for IT vendor
Auto-populated from Pre-operations CAF
(Y/N)
1.1 Assessment No Y Numeric Assessment No database to be maintained to retrieve data based on Area
1.2 Mobile Number Y Numeric Y
1.3 Applicant Name Y Alphanumeric Y
1.4 Pincode Y Numeric To be auto-populated based on selected Assessment No.
1.5 Area Y Dropdown
1.6 Locality Y Dropdown
1.7 Street Y Dropdown
1.8 Door No. Y Numeric
1.9 Apartment /Landmark /Building name
N Alphanumeric
2 Service Location
2.1 Area Y Dropdown To be auto-populated based on selected Assessment No.
2.2 Locality Y Dropdown
2.3 Street Y Dropdown
2.4 Ward Y Dropdown
2.5 Aadhaar Card No. N Numeric
2.6 Email ID N Alphanumeric Y
3 Property Details
3.1 Property Type N Dropdown By default “Building”
3.2 Reason for creation Y Dropdown By default “New Property”
3.3 Is Building Plan Approved? (Yes/ No)
Y Dropdown
3.4 Approval No Y Alphanumeric
3.5 Approved Building Area (Sq.ft)
Y Numeric
Annexure B- Draft Functional Requirement Specifications
355
# Field Mandatory
(Y/N) Field Type Remarks, if any for IT vendor
Auto-populated from Pre-operations CAF
(Y/N)
3.6 Building Plan Approval
Date
Y Date
selection
3.7 Building Completion/ Occupancy Date
Y Date selection
3.8 Effective tax due date N Date selection
Auto calculated based on occupancy date
3.9 Is it a Government owned building (Yes/No)
Y Dropdown
3.10 Building Location N Dropdown
3.11 Building Age N Dropdown Auto calculated based on occupancy date
4 Floor Details Y Table Provision to be given to add and delete floors
Floor No. Building Area (Sq.ft) Building Usage Building Structure
Annexure B- Draft Functional Requirement Specifications
356
Checklist of Supporting Documents Sl. No. Document Mandatory (Yes/No)
1. Copy of Sale deed/ Gift deed Y
2. Up to Date Encumbrance Certificate (EC) Y
3. Copy of approved Building Permit Y
4. Latest Vacant Land Tax receipt / Property Tax receipt of earlier building (in lieu of Building Permit) N
5. Patta/Chitta Y
Fee Details No fee charged
Annexure B- Draft Functional Requirement Specifications
357
Work Flow
Applicant
(SW
P)
Junio
r Assis
tant
(Revenue)
Bill Collecto
rRevenue I
nspecto
rRevenue O
ffic
er
Fill application form
along with
necessary
documents
Receives application
and verifies tax
details
Conduct site
inspection
Prepare inspection
report
Receive
inspection date
Respond to query
with additional
details/ document
SMS alert to applicant
Receives application
and scrutinize
application
Send query to
applicant
Yes
No
SMS alert to applicant
SMS alert to officer
Any queries?
START
Forwards to Bill
Collector
Receive Assessment
Number
Forward application
Revenue Officer
Receive rejection
letter
Rejection
Letter
Final
Assessment
NumberSMS alert to applicant
SMS alert to applicant
END
Forwards application
to Revenue
Inspector
Schedule Inspection
Prepare Rejection
letter with reason
for rejection
Forward Rejection
letter to applicant
Generate
Assessment Number
No
Yes
Satisfactory?
Legend
Online – Single
Window Portal
(SWP)
Online-
Department
system
Offline
Annexure B- Draft Functional Requirement Specifications
358
3.24 Name transfer of property from Commissionerate of Municipal Administration (CMA)
Online Application Form #
Field
Mandatory
(Y/N) Field Type
Remarks, if any for IT
vendor
Auto-populated from Pre-operations CAF
(Y/N)
1.1 Name of ULB Y Dropdown Y
1.2 Property Assessment No Y Numeric Display property details
based on the Assessment No.
1.3 Mobile Number Y Numeric Y
1.4 Applicant Name Y Alphanumeric Y
1.5 Email ID Y Alphanumeric Y
1.6 Transferee Name Y Alphanumeric
Checklist of Supporting Documents Sl. No. Document Mandatory (Yes/No)
1. Copy of Registration Document pertaining to
change of ownership e.g Sale deed, gift deed etc.
Y
2. Legal document to prove name of transferee N
3. Death certificate in case of name transfer to legal
heir
N
Fee Details No fee charged
Annexure B- Draft Functional Requirement Specifications
359
Work Flow
Applicant
(SW
P)
Junio
r Assis
tant
(Revenue)
Revenue I
nspecto
rRevenue O
ffic
er
Fill application form
along with
necessary
documents
Respond to query
with additional
details/ document
Receives application
and scrutinize
application
Send query to
applicantYes
No
SMS alert to applicant
SMS alert to officer
Any queries?
START
Forwards to
Revenue Inspector
Receive
Confirmation notice
Forward application
to Revenue Officer
Prepare Rejection
letter with reason
for rejection
Forward Rejection
letter to applicant
Receive rejection
letter
Rejection
Letter
Final
Confirmation
noticeSMS alert to applicant
SMS alert to applicant
END
Approve name
transfer of property
No
Yes
Satisfactory?
Legend
Online – Single
Window Portal
(SWP)
Online-
Department
system
Offline
Annexure B- Draft Functional Requirement Specifications
360
3.25 New assessment of property from Directorate of Town Panchayats (DTP)
Online Application Form
# Field Mandatory
(Y/N) Field Type
Remarks, if any for IT
vendor
Auto-populated from Pre-operations CAF
(Y/N)
1.1 District Y Dropdown Y
1.2 Town Panchayat Y Dropdown Dropdown as per District
selected
Y
1.3 Name Y Alphanumeric Y
1.4 Mobile Number Y Numeric Y
1.5 Email ID Y Alphanumeric Y
1.6 Building License No. N Alphanumeric
1.7 Building License Date N Alphanumeric
1.8 Survey No. N Alphanumeric
1.9 Sub Division No. N Alphanumeric
1.1 Block No. Y Numeric Dropdown as per Town
Panchayat selected
1.12 Ward No. Y Dropdown Dropdown as per Block
No. selected
1.13 Street Name Y Dropdown Y
1.14 Building Zone: i. Residential ii. Commercial iii. Industrial
Y Dropdown
1.15 Building Usage
i. Own Residence ii. Rent iii. Industries iv. Commercial
Y Dropdown
1.16 Building Type
i. Rcc ii. Tiled iii. Thatched
Y Dropdown
1.17 Building Age i. Below 5 years ii. 5 to 15 years
iii. 15 to 25 years
Y Dropdown
Annexure B- Draft Functional Requirement Specifications
361
# Field Mandatory
(Y/N) Field Type
Remarks, if any for IT
vendor
Auto-populated from Pre-operations CAF
(Y/N)
iv. Above 25 years
1.18 Total Area Y Numeric
Annexure B- Draft Functional Requirement Specifications
362
Checklist of Supporting Documents Sl. No. Document Mandatory (Yes/No)
1. Copy of latest Registered Document of the property Y
2. Encumbrance Certificate Y
3. Patta Document N
4. Covering Letter Y
5. Building Plan Approved Copy Y
Fee Details No fee charged
Annexure B- Draft Functional Requirement Specifications
363
Work Flow
Applicant (
SW
P)
Executive O
ffic
er
Junio
r Assis
tant
Inspecting A
uth
ority
Fill application form
along with
necessary
documents
Schedule inspection
Conduct site
inspection
Prepare inspection
report
Receive
inspection date
Respond to query
with additional
details/ document
SMS alert to applicant
Receives application
and scrutinize
application
Send query to
applicant
Yes
No
SMS alert to applicant
SMS alert to officer
Any queries?
START
Legend
Online – Single
Window Portal
(SWP)
Online-
Department
system
Offline
Forwards to Junior
Assistant
Receive Assessment
Number
Forward application
to Executive Officer
Prepare Rejection
letter with reason
for rejection
Forward Rejection
letter to applicant
Receive rejection
letter
Rejection
Letter
Final
Assessment
NumberSMS alert to applicant
SMS alert to applicant
END
Forwards application
to Inspecting
Authority
Provide inputs for
inspection report
Generate
Assessment Number
No
YesSatisfactory?
Annexure B- Draft Functional Requirement Specifications
364
3.26 Name transfer of property from Directorate of Town Panchayats (DTP)
Online Application Form #
Field
Mandatory
(Y/N) Field Type
Remarks, if any for IT
vendor
Auto-populated from Pre-operations CAF
(Y/N)
1.1 District Y Dropdown Y
1.2 Town Panchayat Y Dropdown Dropdown as per District
selected
Y
1.3 Property Tax No Y Numeric Display property details based on the Tax No.
1.4 Mobile Number Y Numeric Y
1.5 Email ID Y Alphanumeric Y
1.6 Transfer Name Y Alphanumeric
Checklist of Supporting Documents Sl. No. Document Mandatory (Yes/No)
1. Registration Document for proof of transfer of
ownership (Sale deed/ Gift deed)
Y
2. Legal document to prove name of transferee N
3. Death certificate in case of legal heir transfer N
Fee Details No fee charged
Annexure B- Draft Functional Requirement Specifications
365
Work Flow
Applicant (
SW
P)
Executive O
ffic
er
Junio
r Assis
tant
Fill application form
along with
necessary
documents
Respond to query
with additional
details/ document
Receives application
and scrutinize
application
Send query to
applicant
Yes
No
SMS alert to applicant
SMS alert to officer
Any queries?
START
Legend
Online – Single
Window Portal
(SWP)
Online-
Department
system
Offline
Forwards to Junior
Assistant
Receive
Confirmation notice
Forward application
to Executive Officer
Prepare Rejection
letter with reason
for rejection
Forward Rejection
letter to applicant
Receive rejection
letter
Rejection
Letter
Final
Confirmation
noticeSMS alert to applicant
SMS alert to applicant
END
Approve name
transfer of property
No
YesSatisfactory?