Annexure - 7 NABET Certificate
RA-196th AC Meeting : May 31, 2019 Page 1
NATIONAL ACCREDITATION BOARD FOR EDUCATION & TRAINING
QUALITY COUNCIL OF INDIA QCI Office, 1st Floor, ITPI Building, Ring Road, I.P. Estate, New Delhi
Scheme for Accreditation of EIA Consultant Organizations
Accreditation Committee Meeting for Re-Accreditation held on
May 31, 2019
The following members were present during the meeting:
1. Prof. B. B Dhar - Chairman
2. Prof. C. P. Kaushik - Member
3. Prof. Umesh Kulshreshtha - Member
4. Sh. A. K. Ghose - Member
5. Dr. P. L. Ahuja Rai - Member
Dr. S. R Wate, Prof. G. J Chakrapani, Dr. J. P. Gupta and Prof. Rajesh Khanna expressed their inability to
attend the meeting.
Mr. A.K. Jha – Senior Director, Dr. Pawan Kumar Singh – Assisstant Director and Ms. Preeti Pawaria Khatri – Accreditation Officer were present in the meeting.
1.0 Cases for Re-Accreditation The following cases were discussed and decisions were taken as noted below.
1.1 Equinox Environments India Pvt. Ltd., Kolhapur
The ACO has been assessed as per Version 3 of the Scheme. Result of the Re-accreditation Assessment
(RA2) is given below:
1.1.1 Category of Approval :
The ACO has scored more than 60% marks hence it continues to be accredited with Cat.A.
1.1.2 Scope of Accreditation:
Sl. No.
NABET Scheme Sectors
Name of Sector Cat.
Project or Activity as per MoEFCC Notification dt. September 14,2006 & subsequent Amendments
1. 1 Mining of minerals including opencast / underground mining
A 1 (a) (i)
2. 2 Off shore and on-shore oil and gas exploration, development & production
A 1 (b)
3. 4 Thermal power plants B 1 (d)
4. 8 Metallurgical industries – secondary B 3 (a)
RA-196th AC Meeting : May 31, 2019 Page 2
5. 12 Asbestos milling and asbestos based products A 4 I
6. 17 Pesticides industry and pesticide specific intermediates (excluding formulations)
A 5 (b)
7. 18
Petro-chemical complexes (industries based on processing of petroleum fractions & natural gas and/or reforming to aromatics)
A 5 (c )
8. 20
Petrochemical based processing (processes other than cracking &reformation and not covered under the complexes)
A 5 I
9. 21
Synthetic organic chemicals industry (dyes & dye intermediates; bulk drugs and intermediates excluding drug formulations; synthetic rubbers; basic organic chemicals, other synthetic organic chemicals and chemical intermediates)
A 5 (f)
10. 22 Distilleries A 5 (g) 11. 25 Sugar Industry B 5 (j)
12. 32 Common hazardous waste treatment, storage and disposal facilities (TSDFs)
A 7 (d)
13. 32A Bio-medical waste treatment facilities B 7 (da)
14. 37 Common municipal solid waste management facility (CMSWMF)
B 7 (i)
15. 39 Townships and Area development projects B 8 (b)
1.1.3 Sectors approved for EIA Coordinators (Ecs)
a. Assessed as per RA norms – for Ecs approved earlier:
S. No.
Name Earlier approval status
(SA/subsequently) Current approval status (after RA) Remarks
Sector Cat. Status Cat.
In-house
1 Sangram Prataprao Ghugare
21 A Renewed A None
22 A Renewed A None
25 B Renewed B None
2 Sulakshna Ayarekar 21 A Renewed A None
22 A Renewed A None
b. Assessed as per IA norms – for new Sectors of approved Ecs and fresh Ecs proposed:
RA-196th AC Meeting : May 31, 2019 Page 3
1.1.4 Functional Areas (FA) approved for Functional Area Experts (FAEs):
a. Assessed as per RA norms – for FAEs approved earlier:
SI. No.
Name Earlier approval status
Approval status after RA
Remarks Fas approved in
SA/subsequently Cat. Status Cat.
In-house
1 Sai Mohite WP B Renewed B None
2 Jaydeep Subhash Patil
WP B Renewed A Upgraded
3 Tejal S Patil AQ B Renewed B None
4 Rohan Jaganath Lad
AP
- - - Left the organization EB
RH
SC
5 Yuvraj Damugade
HW - - - Candidature withdrawn
AP A Renewed A None
AQ A Renewed A None
6 Sandip Mangalekar AP B Renewed B None
Sl. No.
Name Sectors
Cat. Remarks Applied Recommended Approved
In-house
1 Sulakshna Ayarekar
25 Yes Yes B None 12 Yes Yes A None
2 Sangram Prataprao Ghugare
4 Yes Yes B None
8 Yes Yes
B Secondary metallurgy only
3 Rohan Jagannath Lad
1 - - - Left the organization
21
4 Kuldeep Mahadev Gurav
38 - - - Absent
39
Empanelled
5 Bhaskar Thorat
22 Yes Yes A None
21 Yes Yes A None
18 Yes Yes A None
17 Yes Yes A None
20 Yes Yes A None
6 Vinay Kumar Kurakula
32 Yes Yes A None 32A Yes Yes B None
37 Yes Yes B None
7 Vivek Navare 1 Yes Yes A None
8 Ratnakumar Vijaykumar Mudliar
2 Yes Yes A None
21 Yes Yes A None
32 Yes Yes A None
37 - - - To be assessed
39 Yes Yes B None
4 - - - Candidature withdrawn
9 Anilkumar Ramchandrarao Kulkarni
1
Yes
Yes A Opencast mining only
RA-196th AC Meeting : May 31, 2019 Page 4
SI. No.
Name Earlier approval status
Approval status after RA
Remarks Fas approved in
SA/subsequently Cat. Status Cat.
NV B Renewed B None
7 Sulakshna Ayarekar
EB A Renewed A None
8 Neeraj Powar SE B Renewed B None
9 Sangram Prataprao Ghugare
AP A Renewed A None
WP A Renewed A With an observation
SHW A Renewed A None
10 Jay Samant EB A Renewed A None
11 Anuradha Jay Samant
SE A Renewed A None
12 Vaibhav Srvase HG
- - - Left the organization GEO
Empanelled
13 Sunil S Shaha WP A Renewed A None
14 Jotiram Balwant Pishte
HG A Renewed A None
GEO A Renewed A None
15 Vinod Sahasrabuddhe
RH A Renewed A None
16 Balkrishna Lole SC A Renewed A None
17 Jayant M Gadgil
AQ A Renewed A None
AP - - - Candidature withdrawn
WP - - -
b. Assessed as per IA norms – approved experts for new functional areas and fresh FAEs proposed:
Sl. No.
Name Functional Areas
Cat Remarks Applied Recommended Approved
In-house
1 Tejal S Patil BMW - - - Candidature withdrawn
2 Sandip Mangalekar WP
- - - Opted for TM role RH
3 Sangram Prataprao Ghugare
AQ - - - Candidature withdrawn
4 Ajit Vyankatesh Kulkarni
HG - - - To be assessed
GEO - - - To be assessed
5 Kuldeep Mahadev Gurav
SHW - - - Absent
EB
Empanelled
6 Sunil S Shaha SW Yes Yes A None
7 Vinaykumar Kurakula
SHW Yes Yes A None
NV Yes Yes A None
LU Yes Yes A None
8 Bhaskar Thorat
HW Yes Yes A None
WP Yes Yes A None
RH Yes Yes A None
9 Vivek Navare HG Yes Yes B None
RA-196th AC Meeting : May 31, 2019 Page 5
Sl. No.
Name Functional Areas
Cat Remarks Applied Recommended Approved
GEO Yes Yes B None
10 Rahul Ramrao Deshmukh
SE Yes Yes A None
11 Anilkumar Ramchandrarao Kulkarni
HG Yes Yes A None
GEO Yes Yes A None
SC Yes Yes A None
12 Ratnakumar Vijaykumar Mudliar
SC Yes Yes A None
SHW Yes Yes A None
WP Yes Yes A None
1.1.5 Functional Area Associates (FAAs)
a. FAAs approved earlier:
SI. No.
Name Approval status
FAE/Mentor Remarks
Applied Approved
In-house
1 Sangram Patil
AP Yes Yuvraj Damugade With an observation
AQ Yes Yuvraj Damugade With an observation
2 Tejal S Patil
AP Yes Sangram P Ghugare None HW Yes Sangram P Ghugare None
b. FAAs applied afresh:
SI. No.
Name Approval status
FAE/Mentor Remarks
Applied Approved
In-house
1 Rakesh Dilip Bhosale
SC
-
-
The provision of FAAs is for fresh technical graduates/ Post-graduates in the EIA profession and is applicable for candidates having less than 5 years’ experience after having the minimum qualification as required by the Scheme. Hence, the candidate is not eligble as FAA. Recommened as TM.
RH Yes Vinod Sahasrabuddhe
None
2 Poonam Dadaso Powar
SHW Yes Vinaykumar K
None
SC Yes Balakrishna Lole
None
3 Nachiket Suryakant Patil
NV - -
Absent
EB
Note: The following will be communicated to the ACO by NABET 1. Detailed observations and reasons for alerts. 2. Results of balance candidates and details of assessment.
RA-196th AC Meeting : May 31, 2019 Page 6
1.2 T R Associates, Ahmedabad
The ACO has been assessed as per Version 3 of the Scheme. Result of the Re-accreditation Assessment
(RA2) is given below:
1.2.1 Category of Approval :
The ACO has scored more than 60% marks hence it continues to be accredited with Cat.A.
1.2.2 Scope of Accreditation:
Sl. No.
NABET Scheme Sectors
Name of Sector Cat.
Project or Activity as per MoEFCC Notification dt. September 14,2006 & subsequent Amendments
1. 1 Mining of minerals – Opencast mining (Minor minerals only)
B 1(a) (i)
2. 4 Thermal power plants B 1 (d)
3. 9 Cement plants B 3 (b)
4. 13 Chlor-alkali industry A 4 (d)
5. 14 Soda ash Industry A 4 (e)
6. 17 Pesticides industry and pesticide specific intermediates (excluding formulations)
A 5 (b)
7. 21
Synthetic organic chemicals industry (dyes & dye intermediates; bulk drugs and intermediates excluding drug formulations; synthetic rubbers; basic organic chemicals, other synthetic organic chemicals and chemical intermediates)
A 5 (f)
8. 38 Building and construction projects B 8 (a) Note: FAE requirement fulfilling is in process for core FA – EB for sector 1.
1.2.3 Sectors approved for EIA Coordinators (ECs)
a. Assessed as per RA norms – for ECs approved earlier:
S. No.
Name Earlier approval status
(SA/subsequently) Current approval status (after RA) Remarks
Sector Cat. Status Cat.
In-house
1 Malav P Dalwadi
9 B Renewed B None
21 B Renewed A Upgraded
38 B Renewed B None
2 Tribhovanbhai Ramjibhai Patel
9 B Renewed B None
38 B Renewed B None
21 A Renewed A None
27 - - - Candidature withdrawn
28 - - - Candidature withdrawn
RA-196th AC Meeting : May 31, 2019 Page 7
S. No.
Name Earlier approval status
(SA/subsequently) Current approval status (after RA) Remarks
Sector Cat. Status Cat.
3 Hiral K Shah 21 A Renewed A None
b. Assessed as per IA norms – for new Sectors of approved ECs and fresh ECs proposed:
Note: FAE requirement fulfilling is in process for core FA – EB for sector 1.
1.2.4 Functional Areas (FA) approved for Functional Area Experts (FAEs):
a. Assessed as per RA norms – for FAEs approved earlier:
SI. No.
Name Earlier approval status
Approval status after RA
Remarks FAs approved in SA/subsequently
Cat. Status Cat.
In-house
1 Ishverlal Mohanlal Patel
HG A Renewed A None
GEO A Renewed A None
2 Snehaben Sankabhai Patel
SE A Renewed A None
3 Vishwas Tribhovanbhai Patel
LU A Renewed A None
4 Bachubhai Tribhuvandas Patel
SC A Renewed A None
5 Malav P Dalwadi WP A Renewed A None
6 Darshit Kirtikumar Dave
WP B Renewed B None
RH B Renewed B None
7 Hiral K Shah
AP B Renewed A Upgraded
WP A Renewed A None
SHW B Renewed A (SW and HW) Upgraded
AQ B Renewed A Upgraded
9 Tribhovanbhai Ramjibhai Patel
AP A Renewed A None
WP A Renewed A None
RH A Renewed A None
SHW A Renewed A (SW and HW)
Sl. No.
Name Sectors
Cat. Remarks Applied Recommended Approved
In-house
1 Darshit Kirtikumar Dave
21 Yes Yes
A None
2 Ashvin Kumar Joitaram Suthar
4 Yes Yes B None
13 Yes Yes A None
14 Yes Yes A None
17 Yes Yes A None
21 Yes Yes A None
Empanelled
3 Mayank Girishkumar Patel
1 Yes Yes
B Opencast mining – Minor minerals only
RA-196th AC Meeting : May 31, 2019 Page 8
SI. No.
Name Earlier approval status
Approval status after RA
Remarks FAs approved in SA/subsequently
Cat. Status Cat.
Empanelled
10 Rajendra T Gohil NV A Renewed A None
11 Pankaj Narayan Joshi
EB A Renewed A None
b. Assessed as per IA norms – approved experts for new functional areas and fresh FAEs proposed:
Sl. No.
Name Functional Areas
Cat Remarks Applied Recommended Approved
In-house
1 Mayank Girishkumar Patel
HG Yes Yes B None
GEO Yes Yes B None
2 Neha Dhwanil Shethwala
WP
- - - Opted for TM role SHW
RH
3 Ashvin Kumar Joitaram Suthar
WP Yes Yes B None
AP Yes Yes B None
Empanelled
4 Urv Shailesh Bhai Patel
WP Yes Yes B None
AQ Yes Yes B None
1.2.5 Functional Area Associates (FAAs) a. FAAs approved earlier:
SI. No.
Name Approval status
FAE/Mentor Remarks
Applied Approved
In-house
1 Krushna K Mehta
SC Yes Bachubhai Tribhuvandas Patel
None
b. FAAs applied afresh:
SI. No.
Name Approval status
FAE/Mentor Remarks
Applied Approved
In-house
1 Riya M Doshi AQ Yes Hiral K Shah None
NV Yes Rajendra T Gohil None
2 Chintan Sanjaybhai Upadhyay
WP Yes Hiral K Shah
None
LU Yes Vishwas Tribhovanbhai
Patel
None
3 Hasti Haresh Kumar Patel
SHW Yes Tribhovanbhai Ramjibhai Patel
(SW and HW)
HG Yes Ishverlal Mohanlal Patel
None
RA-196th AC Meeting : May 31, 2019 Page 9
SI. No.
Name Approval status
FAE/Mentor Remarks
Applied Approved
4 Rishabh Lalit Kumar Oza
LU Yes Vishwas Tribhovanbhai
Patel
None
HG Yes Ishverlal Mohanlal Patel
Note: The following will be communicated to the ACO by NABET 1. Detailed observations and reasons for alerts. 2. Results of balance candidates and details of assessment.
The meeting ended with a vote of thanks to the Chair.
Issued by:
A.K Jha
Senior Director
QCI- NABET
Abbreviations
ACO : Accredited Consultant Organization
AC :Accreditation Committee ANC :Approval not continued Cat. : Category
IA : Initial Accreditation
EC : EIA Coordinator
FAE : Functional Area Expert
RA : Re-Accreditation
SA : Surveillance Assessment
FAA : Functional Area Associates
NC : Non-conformance
Government of IndiaCentral Ground Water Authority (CGWA)
Ministry of Water Resources, River Development and Ganga RejuvenationApplications for lssue of NOC to Abstract Ground Water (NOCAP)
Application for Permission to Abstract Ground Water for Industrial Use(Application For New NOG)
Application N umber : 21 -41 4860/GJ/lND/201 I1. General lnformation:
Water Quality: 'Fresh Water
Application Type Category/ Type of Application: Chemical
(i) Name of Industry: M/S. SILVANO INDUSTRIES LLP
(ii) Location Details of the lndustrial Unit- (Attach Approved Site Plan with Location Map) ($)
'Address Line 1 : ISURVEY NO - 403 PAIKI 2, 403 PAIKI 3 PAIKI
Address Line 2 :
Address Line 3 :
State:
District:
GUJARAT
MORBI
Sub-District:
Village/Town:
Latitude:
Logitude:
Area Type :
Area Type Gategory :
(iii) :Communication Address
Address Line 1:
Address Line 2:
iMorvi
Nava Sadulka
22.928078
70.833666
Non-Notified
Safe
PANCHOTIYA BROTHERS, 2 PAREKH SHOPPINGCENTER,
OPP. BANK OF BARODA SARDAR ROAD,
lAddress Line 3:'State: GUJARAT
District: |\rf OnAf
Sub-District: Morvi
Pincode: 363641
Phone Number with Area Code:' iMobile Number: 91 9909973390
'Fax Number:
E-Mail: [email protected]
(iv) ,5"11"n, Features of the Industrial Activity:
ilrtlr. Siiu"no lndustries LLP propose to manufacture Ceramic Binders and Wood type Adhesives which will be locatedrat Survey No.:403 paiki2,403 paiki 3 paiki, Village: Nava Sadulka, Haripar- Kerala Road, Taluka: Morbi, District:Morbi, Gujarat -363642.
(v) iLand Use Details of the Existing / Proposed Industrial Unit Premises Ownership of the Land :
Land Use Details Existing (sq meter) Proposed (sq meter) Grand Total(sq meter)
Green Belt Area 5875.00 5875.00
Open Land 3307.00 3307.00
09/03/2019 05:44 PM SiLvaflo Inr!*stries LLP Page 1 of 6
\3 V. \0esignated Partner
Government of IndiaCentral Ground Water Authority (CGWA)
Ministry of Water Resources, River Development and Ganga RejuvenationApplications for lssue of NOC to Abstract Ground Water (NOCAP)
Application fcii Permission to Abstract Ground Water for Industrial Use(Application For New NOC)
Application Number : 2'l -414860/GJ/lND/201 9
2670.00
5954.00
17806.00
There is Machhu River - (4.7 km) in West direction
i (vii) jSource of Availability of Surface Water for ;Attached as Annexurei ]Infrastructure Use (Submit Water Availability /,I Non Availability Gertificate):($)
660.00
Village - Amar Nagar (1.2 km) NW direction
(x) Whether Ground Water Utilization for: 'New Industry
Date of Commencement Industry:
lDate of Expansion :
Details of Water Requirement (Fresh and Recycled Water Usage):(Please Enclose Water Balance Flow Chart of Activities and Requirement of Water at each Stage) ($)
'' -'i"(i) lTotal Water Requirement (a+b+c+d) (m3/day)
Road/ Paved Areaf.*--., iRooftop area of building/ i
sheds
Total
tuil Oilinage in the Area (River/ Nala etc) :
Proposed
2670.00
5954.00
17806.00
Total
130.00
0.00
0.00
130,00
24.40
154.40
AnnualRequirement
(m3/year)
32280.00
1305.00
5415.00
0.00
39000.00
L_.c:rf
tviiii Annual n rr1,(ix) ps / Vill i ius of
Ithe Industrial Unit):
2.
Existing
'Water Requirement Details (Fresh Water) (m3/day)
0.00
0.00
0.00
130.00
0.00'
o.oo l
130.00'
24.40
154.40
lTotal Fresh Water Requirement ;
_ -, (a*_l*P+c)t$ -9/'{lv L" "
(d) IRecycled Water Usage (m3/day): i'
Total Water Requirement :
.;(a+b+c+dXm3/day)(ii) tBreakup of Water Requirement and Usage:
i ActivitY
Industrial Activitvj"
lResidential/iDomestic*"t*-jGreenbeltiDevelopment
i/EnvironmentiMaintenance*t'iOther Use
. ; ...........*,,
,Grand Total
Existing ProposedRequirement' Requirement
TotalRequirement
(m3/dayJ_.
107.60
4.35
18.05
No. ofOperational Days
in a Year
300
300
*"\'
I
** *i*
_(m3/day_) .
0.00i
0.00
.- OJ0l
:
1
l
0.00 j
" . ",*- ***:':0.001
(m3/day)
107.60
4.35
18.05
0.00
130.00
0.00
130.00
5t{,van0 Industries LLp Pase 2 of 6
t3.\r^ hDesign r
0910312019 05:44 PM
Government of IndiaCentral Ground Water Authority (CGWA)
Ministry of Water Resources, River Development and Ganga RejuvenationApplications for lssue of NOG to Abstract Ground Water (NOCAP)
Application for Permission to Abstract Ground Water for Industrial Use(Application For New NOC)
Appfication Number z 21 -414860/GJ/lND/201 I1 liii; 'er"afup of Recycled Water Usage:
Water Available ,24.40... ... .. .. . ...i*"..,..."
i i i). iReuse in IndustrialActivity: : 24.40: 300- -*--*-t"-"''
. : (c) lTotalTreated Water Utilized: '. 24.40
iNet Ground Water Requirement:
3. .(a). Groundwater Abstraction Structure- Existing:
130.00 (m3/day)
Nuntber of Existing Structures:
brlf
(m3/year)
2700.00
7320.00
0.00
0.00
7320.00
Discharge i Operatio I
(m3/Hour) nal Hours;1 (Dayl I i
Days :i (Year) Iii.:.
Depth(Meter)
IDiameter
(mm)
Depthto
WaterLevel
(Metersbelow
GroundLevel)
ModeofLift
Name
HorsePower
ofPump
WhetherFittedwith
WaterMeter
Whether PermissionRegistered
with CGWA / lf soDetails Thereof
WhetherPermissionRegistered
withCGWA / If
soDetailsThereof
No/-
(b). Groundwater Abstraction Structure- Proposed:
Number of Proposed Structures: 1
SNo. i Type of j Depthi Structure I (Meter)
J Name / Year i I
I of i DiameterlConstruction I (mm)
l
t"1 lBorewell/ t120.00 |12019 :254
j Depth iDischargej to I (m3/Hour)Operatio Mode Horse Whether
i nal of i Power . fittedj Hours Lift : of withr 1Oay1 / Name Pump i Water; Days Meter
(Year)
WaterLevel
(Metersbelow
GroundLevel)
50.00 7.50 Yes
4.
22.00 61300 SubmersiblePump
i-iGroundwater Availability (Please Enclose a Comprehensive Report / Note on Groundwater Condition in and
:4fgy"_9119 lfqil_4p"pli_9_9"-1J9" 19__FdrJtries GonsuTj"n_q_"9_1,9"?!_eJ .r-["_l_9!_o_r3/day,i($)
"Yllrplt:*re'Details of Rrainwater Harvesting and Artificial Recharge Measures Proposed / lmplemented. lf Ground Water]Recharge outside ther Industrial Unit Premises, then provide NOC from the Goncern Authority / Agency if Already implemented, details
;Tly-99-ty-1lF.l'.*. (lllxn-ng jly..9!9.r "t!*ery""..!ils-/A.rtif-9i{Rgch.arse
Proposar)'($)
iAttached as Annexure
${[vano Ll-P
B.\,, qDesignated Fartner
09/03/2019 05:44 PM Page 3 of 6
Government of IndiaCentral Ground Water Authority (CGWA)
Ministry of Water Resources, River Development and Ganga ReJuvenationApplications for lssue of NOC to Abstract Ground Water (NOCAP)
Application for Permission to Abstract Ground Water for lndustrial Use(Application For New NOC)
Application Number =
21 -41 4860lcJ/lND/201 I6, Consent to Operate / Estibilish / Approval Letter from Statutory Bodies viz Ministry of Environment & Forests
(MoEF) or State Pollution Control Board(SPCB) or State Level Expert Appraisal Committee(SEAC) or State LevelEnvironment lmpact Assessment Authority(SLEIAA): ($)
Attached ConsenU Approval of Government Agency(Previous: Referral Letter)
Letter Number No.lA-J-1 101 1 142012018JA-ll(l)
S.No Consent /Approval of Attachment Name File Name. GovornmentAgency1 Ministry of Environment and ToR TOR Online letter.pdf
Forests
7. Have You Applied Earlier for Groundwater Clearance from CGWA / State Government Agency:
lf Yes, so Details thereof with Status:
INDUSTRIAL USE- Self Declaration
Ef tt is to certify that no case related to ground water withdrawal/ contamination is pending against the industry/ projecV unit ason date. Any such case filed against the company/ projecU unit in respect of ground water withdrawal/ contamination duringthe pendency of this application shall be immediately brought to the notice of CGWA.It is to Certify that the Data and Information Furnished Above are True to the Best of My Knowledge and Belief and I amAware that if Any Part of the Data / Information Submitted is Found to be False or Misleading at Any Stage the Applicationwill be Rejected Out Rightly.
1. Application Proforma is Subject to Modification from Time to Time.
2. Application should be submitted to Regional Office.
Regional Director,Gentral Ground Water Board West Central Region, Swami Narayan Gollege, Building, Shah AlamTolnaka, AHMADABAD, GUJARAT, 380022
3. Incomplete Application will be Summarily Rejected.
Submitted Application will not be Processed till the Print Out of the Signed Complete Application is Submitted toRegionalOffice.4. Applicant has to Submit Processing Fee of Rs. 1000.00/- (Rupees One Thousand Onty) through NON TAX RECE|PT PORTAL(http.s://bharatkosh.gov.in). A receipt will be generated. Please fill in the Transaction Ref No. and Date from the receipt, in print out ofapplication and attach receipt along with hard copy of application.
Bharatkosh Details:-
Transaction RefNumber:-
Dated:-
c g o 3 | o o o Eq q +O1*o3 -26\q
Noter The Pro_cessing Fee is Non-Refundable. Applicant should ensure and Check Eligibility of Submission of Applicationand Required Documents before Submltting Online Application.
Attached Files:
1). Site Plan with Location Map (Previous: Site Plan) : (Refer: 1 (ii))
S.No Aftachment Name, 1 Plant Layout
2). Certified Revenue Sketch : (Refer: 1 (ii))
No Alta0hm6nt Found! '
Plant layout.pdf
File Name
SiLvaidG Indr:stries 11,P
09/03/2019 05:44 PM
BN' u\Desig itdrpageqof6
Government of IndiaCentral Ground Water Authority (CGWA)
Ministry of Water Resources, River Development and Ganga RejuvenationApplications for lssue of NOC to Abstract Ground Water (NOCAP)
Application for Permission to Abstract Ground Water for Industrial Use(Application For New NOC)
Appl ication Number t 21 -41 4860/cJ/lND/201 93). Documents of Ownership / Lease : (Refer: 1 (v))
No Attachment Found!
4). Source Water Availability/Non-availability Certificate(Previous: Source of Availability of Surface Water) :
(Refer: 1 (vii))
S.No i Attachment Name File Name
t :surface water non availability Surface water non availability certificate.PDF;certificate
5). Water Balance Flow Ghaft (Previous: Enclose Flow Chart of Activity and Requirement of Water): (Refer: 2)
S.No I Attachment Name File Name
1 Water balancl dl"grr. Water balance.pdf
6). Hydrogeological Report(Previous: Groundwater Availability Report) : (Refer: 4)
S.No ' Attachment Name . File Name
I HyOrotogy relort Hydrology report.pdf
7). Rain Water Harvesting/Artificial Recharge proposal(Previous: Details of Rainwater Harvesting / ArtificialRecharge Measures) : (Refer: 5)
S.No Attachment Name : File Name
1 Rain water harvesting Rain water harvesting.pdf
8), Authorization Letter (Previous: Authorization) :
S.No Attachment Name File Name
1 Authorization letter Authorization letter.pdf
10), Ground Water Quality Report(Previous: Non-Polluting Effluent) :
S.No Attachment Name File Name
1 Ground water quality repoft Ground water quality report.pdf
11). Extra Attachment :
S.No Attachment Name File Name
1 Bharatkosh Challan Bharatkosh Challan.odf
12). Scanned Industrial Application :
No Attachment Found!
Srtvano if,dusiries LLF
13 V, P^"nAcrrorDesigrrated Partner
09/03/2019 05:44 PM Page 5 of 6
Gentrar ",::ffi
'fii:iJ'iiJnilfty (ccwA)Ministry of Water Resources, River Development and Ganga Rejuvenation
Applications for lssue of NOG to Abstract Ground Water (NOCAP)
Application for Permission to Abstract Ground Water for Industrial Use(Application For New NOG)
Application Number : 21 -41 4860/cJ/lND/201 IDate : Name & Signature of the applicant
Place : (with official seat)
AssociatedUser: silvano
Submitted By User : silvano
Submission Date : 0910312019
$itv'nno 0ndus'ti'i ms !-["$j
B.\, Pcnr.olosq.Besigmated Pnrtmen
L\, * In case signed by any authorized signatory, the details of the signatory with the authorization shall bef enclosed.
Sitvairo trndustries LLP
E.V, qDes rtner
09/03/2019 05:44 PM Page 6 of 6