58
Annex

Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

  • Upload
    others

  • View
    15

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

Annex

Page 2: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

ANNEX I.

Terms of Reference

Page 3: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX I - 1

ANNEX I. Terms of Reference

Page 4: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX I - 2

Page 5: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX I - 3

Page 6: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX I - 4

Page 7: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX I - 5

Page 8: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX I - 6

Page 9: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX I - 7

Page 10: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX I - 8

Page 11: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX I - 9

Page 12: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX I - 10

Page 13: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX I - 11

Page 14: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX I - 12

Page 15: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX I - 13

Page 16: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX I - 14

Page 17: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX I - 15

Page 18: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX I - 16

Page 19: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

ANNEX II.

Sources of Data Information

Page 20: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX II - 1

ANNEX II. Sources of Data Information

Ceylon Electricity Board Department of Wildlife Conservation Divisional Secretary, Hanguranketa Field Surveys conducted by the EIA Consultants Grama Niladri of Hipenkandura Hakurutale, Ambewela and Welikada Irrigation Department Mahaweli Authority of Sri Lanka Meteorology Department Questionnaire administered by the EIA Consultants Road Development Authority Victoria Power Station

Page 21: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

ANNEX III.

References

Page 22: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX III - 1

ANNEX III. References Department of Wildlife Conservation, (1999) Management Plan, Victoria-Randenigala-Rantambe (VRR) Sanctuary, Vol. 2, Proposed Management Plan, FAO.

Environment & Generation Planning Branch, Transmission Division Ceylon Electricity Board, (June 2003), Long Term Generation Expansion Plan 2003-2017

Fauna and Flora Protection Act

Feasibility Study for Expansion of Victoria Hydropower station in Sri Lanka- Interim Report, (2008 September) Japan International cooperation Agency, Ceylon Electricity Board

Global Environmental Facility Project (1997 December) Victoria-Randenigala-Rantambe Sanctuary - Volume 1 - Main report,

Government of the Democratic Socialist republic of Sri Lanka, Ministry of Agricultural Development & Agrarian Services, Mahaweli Authority of Sri Lanka, 2007 June, Mahaweli Development Programme

Land Management, Tenure and Institutions Involved in Land Issues in the Upper Mahaweli Catchment

M.U.A Tennakoon,S.B Ekanayake and Senarath Bulankulame, Setteler Stress : A case Study Of Wekande In System ‘C’ of the Mahaweli Development Area

Mahaweli Ganga Irrigation and Hydro-Power Survey (Stage 1), Food and Agriculture Organization of the United Nations and Irrigation Department of Ceylon, Colombo Sri Lanka, 1966

Mapa, R. B., Dassanayake, A.R. and Nayakekorale (2005) Soils of the Intermediate Zone of Sri Lanka, Special Publication No. 4, Peradeniya:Soil Science Society of Sri Lanka

Population Data of Impact Area of the Victoria 1st stage

Report from Hanguranketha AGA Office,Resource, Profile of Hanguranketha GN Division

Resources Inventories for Protected Areas Victoria, , Randenigala, Rantambe Sanctuary, Vol. 1:183-278, Colombo:JEEP Publication.

Senerath Bulankulame, A Situational Report on Victoria Settelements (A background Strategy Paper on development aspects)

Sumanaratne, H D and S Somasiri, “Runoff Generation and Soil Erosion under Three Different Land Use in the Dry Zone of Sri Lanka,” Tropical Agriculturist 146, 1990, pp 1-9.

VRR Sanctuary Offence Report, Department of Wildlife Conservation

Web site on Noise by U.S. Department of Tranportation. Federal Highway Authority, United State. www.fhwa.dot.gov/environment/ab_noise.htm

Wickramagamage, P. (1990) Soil erosion in the Upper Mahaweli Catchment: A literature review, A Report submitted to GTZ, Kandy

Page 23: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

ANNEX IV.

List of Consultants with Their Work Allocation

Page 24: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX IV - 1

ANNEX IV. List of Consultants with Their Work Allocation Institution: The Center for Environmental Studies University of Peradeniya, Sri Lanka

EIAR Responsibility Consultant

TL/EIA Specialist Prof Shantha K. Hennayake, Director, Center for Environmental Studies, University of Peradeniya

Ecologist Mr. Kithsiri Ranawana, Dept. Zoolgy, University of Peradeniya

Tunneling Engineer Dr. G.S. Gurusinghe, Dept. of Civil Engineering, University of Peradeniya

Environmental Engineer Dr. Uditha Rathnayake, Deputy Director, Center for Environmental Studies, University of Peradeniya

Environmental Engineer Dr. Gemunu Herath, Dept. of Civil Engineering, University of Peradeniya

Social Scientist Mr. MAS Jayakumara, Department of Geography, University of Peradeniya

GIS/Landuse Specialist Prof. Wickremagamage, Department of Geography, University of Peradeniya

Electrical Engineer Dr. Sunil Abeyrathne, Department of Electrical and Electronics Engineering, University of Peradeniya

Environmental Economist Mr. Sunil Thrikawala, Post-Graduate Institute of Agriculture, University of Peradeniya

Development Specialist Dr. Nalani Hennayake, Department of Geography, University of Peradeniya

Research Assistants

GIS mapping Inesha Vithange

GIS mapping Sanjeewani Chandratilake

Project Assistant Rajeetha Liyange

Field Assistant SIA Devika Premadasa

Field Assistant SIA Ariyasinghe Jayawardena

Field Assistant SIA Pabha Herath

Field Assistant SIA Anuradha Pilapitiya

Field Assistant SIA Kanchana Gunawardena

Field Assistant SIA Wathsala Wellage

Data Analyst Sidath Perera

Field Assistant/ Ecology Aloka Pushpakumara, Sanjeewa

Page 25: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

ANNEX V.

Comments Made by the Public, NGOs and Other Agencies

during the Formal and Informal Scoping Meetings

Held by the EIA Team

Page 26: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX V - 1

ANNEX V. Comments Made by the Public, NGOs and Other Agencies

during the Formal and Informal Scoping Meetings Held by the EIA Team

SCOPING MEETINGS 1. Date and Places ...........................................................................................................................1 2. Agenda of the Meetings ..............................................................................................................1 3. Summary of the Issues/ Questions Received -............................................................................2 4. List of Key Institutions Visited and People Interviewed ............................................................2 5. People Attendant .........................................................................................................................3

1. Date and Places

Dates - 1. 2008.09.08 2. 2008.09.08 3. 2008.09.10 4. 2008.09.11

Places - 1. Hingurukaduwa Temple 2. Kottegoda Temple, Adikarigama 3. Sanasa Development Bank, Udawattha 4. Hilpenkandura Communityhall

2. Agenda of the Meetings

1st Meeting 9.30am Start the Meeting and welcome Speech 9.45am Explain the Objective of the Meeting 10.00am Examine the Community ideas and Tea Break 11.15am Take the Social and Economic Information in the Area from the GN Officers 11.45am Vote of Thanks

2nd Meeting 1.00pm Start the Meeting and welcome Speech 1.15pm Explain the Objective of the Meeting 1.30pm Examine the Community ideas and Tea Break 2.45pm Take the Social and Economic Information in the Area from the GN Officers 3.15pm Vote of Thanks

3rd Meeting 9.30am Start the Meeting and welcome Speech 9.45am Explain the Objective of the Meeting 10.00am Examine the Community ideas and Tea Break 11.15am Take the Social and Economic Information in the Area from the GN Officers 11.45am Vote of Thanks

Page 27: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX V - 2

4th Meeting 9.30am Start the Meeting and welcome Speech 9.45am Explain the Objective of the Meeting 10.00am Examine the Community ideas and Tea Break 11.15am Take the Social and Economic Information in the Area from the GN Officers 11.45am Vote of Thanks

3. Summary of the Issues/ Questions Received -

Water Problems- - Decrease the Water Level in the Wells - Changing the Rainfall Systems - Difficult to access the Drinking Water Sources - Drying water Sources - Siltation - Impact to the Ground Water Sources

Agricultural Problems - Loss of the Cultivated Lands - Difficult to take Water Sources for Cultivation lands - Difficult to cultivate the Vegetables - Impacts from the Wild Animals

Other Social Problems - Impacts to the Houses (Vibrations) - Problems of the Compensation - Loss of the Employment Opportunities - Resettlements - Increasing the Land Slide Problems - Increasing the Human- Elephant Conflict

4. List of Key Institutions Visited and People Interviewed

Dam Office, Adikarigama - Mr .N.W Jayawardana Hanguranketha AGA Office - Mrs. M.P.W Shiromanee (Additional Divisional Secretary) Department of Wild Life Conservation, Minipe - Mr. Chamath, Mr.B.Piyal Mahaweli Authority of Sri Lanka, Digana - Mrs. Indu Kumarihami (RPM, Victoria Project)

Page 28: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX V - 3

5. People Attendant

Meeting No. - 01 Date - 2008.09.08 Place - Hingurukaduwa Temple

Page 29: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX V - 4

Meeting No. - 01 Date - 2008.09.08 Place - Hingurukaduwa Temple Covered GN Divisions - Hingurukaduwa, Ambewela

Page 30: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX V - 5

Meeting No. - 01 Date - 2008.09.08 Place - Hingurukaduwa Temple Covered GN Divisions - Hingurukaduwa, Ambewela

Page 31: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX V - 6

Meeting No. - 02 Date - 2008.09.08 Place - Kottegoda Temple Covered GN Divisions - Bogahalanda, Gangaudagama, Adikarigama, Welikada, Idamalanda

Page 32: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX V - 7

Meeting No. - 02 Date - 2008.09.08 Place - Kottegoda Temple Covered GN Divisions - Bogahalanda, Gangaudagama, Adikarigama, Welikada, Idamalanda

Page 33: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX V - 8

Meeting No. - 02 Date - 2008.09.08 Place - Kottegoda Temple Covered GN Divisions - Bogahalanda, Gangaudagama, Adikarigama, Welikada, Idamalanda

Page 34: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX V - 9

Meeting No. - 02 Date - 2008.09.08 Place - Kottegoda Temple Covered GN Divisions - Bogahalanda, Gangaudagama, Adikarigama, Welikada, Idamalanda

Page 35: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX V - 10

Meeting No. - 02 Date - 2008.09.08 Place - Kottegoda Temple Covered GN Divisions - Bogahalanda, Gangaudagama, Adikarigama, Welikada, Idamalanda

Page 36: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX V - 11

Meeting No. - 03 Date - 2008.09.10 Place - Udawaththa Temple Covered GN Divisions - Malulla, Udawaththa East and West, Galauda North and South

Page 37: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX V - 12

Meeting No. - 03 Date - 2008.09.10 Place - Udawaththa Temple Covered GN Divisions - Malulla, Udawaththa East and West, Galauda North and South

Page 38: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX V - 13

Meeting No. - 03 Date - 2008.09.10 Place - Udawaththa Temple Covered GN Divisions - Malulla, Udawaththa East and West, Galauda North and South

Page 39: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX V - 14

Meeting No. - 03 Date - 2008.09.10 Place - Udawaththa Temple Covered GN Divisions - Malulla, Udawaththa East and West, Galauda North and South

Page 40: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX V - 15

Meeting No. - 03 Date - 2008.09.10 Place - Udawaththa Temple Covered GN Divisions - Malulla, Udawaththa East and West, Galauda North and South

Page 41: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX V - 16

Meeting No. - 04 Date - 2008.09.11 Place - Hilpenkandura Community Centre Covered GN Divisions - Hipenkandura, Endiribedda

Page 42: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX V - 17

Meeting No. - 04 Date - 2008.09.11 Place - Hilpenkandura Community Centre Covered GN Divisions - Hipenkandura, Endiribedda

Page 43: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

ANNEX VI.

Complete Set of Relevant Maps, Tables, Charts,

Layout Plans and Other Details

Page 44: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board

ANNEX VI. Complete Set of Relevant Maps, Tables, Charts, Layout Plans and Other Details

1. Scoping Matrix ..........................................................................................................................1 2. Design Drawing .........................................................................................................................2 3. Simulation of Water Level between Powerhouse and Randenigala Reservoir ........................ 11

3.1 Current Fluctuation of Water Level at Randenigala Reservoir...................................... 11 3.2 Estimated Water Level between Power Plant and Randenigala Reservoir .................... 11

4. Fauna and Flora List ................................................................................................................15 4.1 Appendix I. List of Plant Species Found in Spray Zone of Victoria Powerhouse.........15 4.2 Appendix II. List of Plant Species Recorded in Home Gardens ...................................16 4.3 Appendix III. List of Plant Species Recorded in Chenalands........................................18 4.4 Appendix IV. List of Plant Species Recorded in Grasslands .........................................18 4.5 Appendix V. List of Plant Species Recorded in Scrublands ..........................................19 4.6 Appendix VI. List of Plant Species Recorded in Secondary Forests.............................21 4.7 Appendix VII. List of Plant Species Recorded in Stream Bank Vegetation ..................22 4.8 Appendix VIII. List of Fauna Recorded during Sampling in the Study Area................ 23

5. Ecological Survey of Proposed Tunnel Waste Dumping Sites ................................................27 5.1 Dumping Site 01: Near Victoria Powerhouse................................................................27 5.2 Dumping Site 02: near Hakuruthale Police Point..........................................................28 5.3 Dumping Site 03: Kohobagana......................................................................................30 5.4 Dumping Site 04: Serge Chamber .................................................................................33 5.5 Dumping Site 05: Additional Intake ..............................................................................35 5.6 Dumping Site 06: Quarry Site ....................................................................................... 37 5.7 Dumping Site 07: Shooting Gallery ..............................................................................38 5.8 Dumping Site 08: Adikarigama .....................................................................................40 5.9 Proposed Sand Mining Site at Maha Oya, Adikarigama ...............................................42 5.10 Appendix 1. Methodology of Biological Survey...........................................................47

6. DWLC Management Plan for VRR Sanctuary ........................................................................48 7. Cost Benefit Analysis...............................................................................................................67

7.1 Appendix 1: Reduction of Energy during Constructions...............................................67 7.2 Appendix 2: Road Repairing Costs (RDA estimates)....................................................68

8. Answers for Annex I of TOR/EIA ...........................................................................................69 8.1 .......................................................................................................................................69 8.2 .......................................................................................................................................69 8.3 .......................................................................................................................................73 8.4 .......................................................................................................................................73

9. Optimal Layout of Downstream Option for Comparative Study of Alternative Options ........75 9.1 General ..........................................................................................................................75 9.2 Scale of Expansion ........................................................................................................76 9.3 Annual Energy...............................................................................................................79 9.4 Construction Cost .......................................................................................................... 79 9.5 Benefit and Cost Analysis..............................................................................................80

10. Cracks in the Houses in Hakurutale......................................................................................... 83 11. Photographs of Some Scoping Meetings in the Impact Area...................................................84

Page 45: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX VI - 1

1. Scoping Matrix

Restorat Ranking

Surv

eyin

g/fe

asib

ility

stud

y/E

IA

Publ

ic M

eetin

gs

Res

tora

tion

of d

amag

ed si

tes

Con

serv

atio

n

Dril

ling

Bla

stin

g

Tran

spor

t of e

xplo

sive

s

Stor

age

of e

xplo

sive

s

Dis

posa

l of e

xplo

sive

s

Was

te tr

ansp

ort

Was

te d

umpi

ng

Tunn

el li

ning

Tunn

el d

rain

age

Ven

tilat

ion

Wat

er su

pply

Pow

er su

pply

Land

pre

para

tion

Con

stru

ctio

n of

bui

ldin

gs

Con

stru

ctio

n of

tem

p. fa

cilit

ies

Prov

isio

n of

San

itary

faci

litie

s

Mat

eria

l tra

nspo

rt an

d st

orag

e

Equi

pmen

t mai

nten

ance

Mai

ntai

ning

labo

ur c

amps

/wor

ksho

ps

Land

pre

para

tion

Roa

d su

rfac

ing

and

drai

nage

Land

pre

para

tion

Con

stru

ctio

n

Ope

ratio

n of

the

plan

t

Mai

ntan

ing

the

plan

t

Potential Impact

Soil 3 3 6 12 10 12 4 6 8 9Soil erosion from waste dumpsand road construction

Slope stability 2 2 2 6 6 5 5 Landslides/slips

Surface drainage 8 10 8 10 8 2 3 8 7 8Temporary Alteration toSurface drainage patterns

Ground water table 20 20 2Temporary lowering of groundwater

Surface waterquality 4 16 6 16 16 12 4 4 14 10 5

Pollution of surface water fromtunnel discharge

Ground waterquality 12 8 4 5 6 10 Ground Water PollutionIncreased Noise andvibration 10 10 8 8 7 8

Incresed noise blastingsites/workshops/

Air quality 2 6 8 8 8 6 6 4 6 8 10 8 8 8Air pollution at plants/blastingsites

Existing tunnel 16 20 3 cracking

Dam 1 1 cracking

Power house 1 1 cracking

Transport network 4 4 2 2 2 12 11deterioration due to increase ofheavy traffic

Dwellings 4 4 cacking

Forest Cover 16 10 9 8reduction of forest cover atdumping sites

Species Diversityflora 12 16 8 10 8 9 7

reduction of forest cover atdumping sites

Species Diversityfauna 12 16 8 10 8 9 7

migration of some species dueto noise and activities

Elephants 10 5 16Drowning of elephants in thetailrace

Employmentopportunities 2 1 1 2 2Employmentopportunities/local 1 6 8 10 10 12 6 12 12 9 12 12 9

Increase in regionalemployment opportunities

EncroachmentIncrease in local economicopportunities

Communitycohesion 10

Conflicts due to unequalbenefits

Atttitude towardsthe project 12 12 10

Building a positive impressionon the project

Uncertainity on thefuture of AP 10 10 Increase temporarily

Migration temporary in-migration

Local culture 12 10 disturbances from the labourers

Religious places increased contributons

Health 16 16 6increase in work relatedaccidents

Dometic watersupply 20 20 2

Temporary reduction due tolowering of ground water

Cultivation 20 2Temporary reduction due tolowering of ground water

National Economy 25 1reduce carbon fuel/foreignexchage savings

Local economy 16 16 16 16 4injection of capital to the localeconomy

Phys

ical

Exis

ting

Stru

ctur

esB

iotic

Soci

al

Pow

er H

ouse

pearation

Project ActivitiesEnvironmental Parameter

Planning Stage Construction

Tunn

el

Cam

p si

tes a

nd w

orks

hop

Bui

ldin

g A

cces

s Roa

ds

Pow

er H

ouse

rela

ted

Page 46: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropow

er Station Expansion Project

Ceylon E

lectricity Board

AN

NEX

VI - 2

2. D

esign Draw

ing

Page 47: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropow

er Station Expansion Project

Ceylon E

lectricity Board

AN

NEX

VI - 3

Page 48: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropow

er Station Expansion Project

Ceylon E

lectricity Board

AN

NEX

VI - 4

Page 49: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropow

er Station Expansion Project

Ceylon E

lectricity Board

AN

NEX

VI - 5

Page 50: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropow

er Station Expansion Project

Ceylon E

lectricity Board

AN

NEX

VI - 6

Page 51: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropow

er Station Expansion Project

Ceylon E

lectricity Board

AN

NEX

VI - 7

Page 52: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropow

er Station Expansion Project

Ceylon E

lectricity Board

AN

NEX

VI - 8

Page 53: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropow

er Station Expansion Project

Ceylon E

lectricity Board

AN

NEX

VI - 9

Page 54: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropow

er Station Expansion Project

Ceylon E

lectricity Board

AN

NEX

VI - 10

Page 55: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX VI - 11

3. Simulation of Water Level between Powerhouse and Randenigala Reservoir

3.1 Current Fluctuation of Water Level at Randenigala Reservoir

Fluctuation of Randenigala Reservoir water level measured at the first day of each month is shown in Figure 3-1. Maximum water level appears in March and minimum water level appears in September. This tendency is shown in past 8 years. Then, Low Water Level (L.W.L.) is set at 209 m, Mean Water Level (M.W.L.) is set at 218.3 m and High Water Level (H.W.L.) is set at 232 m.

Reservoir WL of Randenigala Reservoir

200

205

210

215

220

225

230

235

Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov DecMonth

mA

SL

2000 2001 2002 20032004 2005 2006 2007Average RWL LWL

Figure 3-1 Water Level in Randenigala Reservoir

3.2 Estimated Water Level between Power Plant and Randenigala Reservoir

229.3230.7231.3

225

230

235

240

245

250

-120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120(m)

EL (m) River Bed

Q 35m3/s

Q 140 m3/s

Q 280m3/s

Figure 3-2 Water Level at Sec.0 (Ch.0) Case1 (LWL)

Page 56: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX VI - 12

230.7231.3

229.3

220

225

230

235

240

245

-120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120(m)

EL (m)

Figure 3-3 Water Level at Sec.1 (Ch.67.7) Case1 (LWL)

228.3229.2

227.5

220

225

230

235

240

245

-120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120(m)

EL (m)

Figure 3-4 Water Level at Sec.2 (Ch.271.0) Case1 (LWL)

228.1228.9

227.2

220

225

230

235

240

245

-120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120(m)

EL (m)

Figure 3-5 Water Level at Sec.3 (Ch.338.6) Case1 (LWL)

Page 57: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX VI - 13

227.7228.3

227.1

220

225

230

235

240

245

-120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120(m)

EL (m)

Figure 3-6 Water Level at Sec.4 (Ch.407.1) Case1 (LWL)

224.2224.8

223.4

220

225

230

235

240

245

-120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120(m)

EL (m)

Figure 3-7 Water Level at Sec.5 (Ch.664.1) Case1 (LWL)

220.4221.0

219.9

215

220

225

230

235

240

-120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120(m)

EL (m)

Figure 3-8 Water level at Sec.6 (Ch.907.8) Case1 (LWL)

Page 58: Annex - JICAEIA Report for the Victoria Hydropower Station Expansion Project Ceylon Electricity Board ANNEX III - 1 ANNEX III. References Department of Wildlife Conservation, (1999)

EIA Report for the Victoria Hydropower Station Expansion Project

Ceylon Electricity Board ANNEX VI - 14

218.5219.1

217.9

215

220

225

230

235

240

-120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120(m)

EL (m)

Figure 3-9 Water Level at Sec.7 (Ch. 1039.8) Case1 (LWL)

213.3214.7

211.8

210

215

220

225

230

235

-120 -100 -80 -60 -40 -20 0 20 40 60 80 100 120(m)

EL (m)

Figure 3-10 Water level at Sec.8 (Ch.1182.1) Case1 (LWL)