91
ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT 03-25-b Excavation in foundation of building. bridges etc complete : In ordinary soil m3 28.26 03-67-c Structural backfill using common material available at site m3 17.97 06-05-i Plain Cement Concrete incl. Placing, compacting, finishing & curing (Ratio 1:4:8) m3 7.44 06-05-f Plain Cement Concrete including placing, compacting, finishing & curing (Ratio 1:2:4) For Pilnth Protection m3 6.18 06-07-a-03 RCC in roof slab, beam, column & other structural members, insitu or precast. (1:2:4) m3 0.16 06-08-c Supply & fabricate M.S. reinforcement for cement concrete (Hot rolled deformed bars Grade 40) tonne 0.03 07-04-a-04 1st class brick work in foundation and plinth in Cement, sand mortar 1:5 m3 25.19 07-05-a-04 1st class brick work in ground floor Cement, sand mortar 1:5 m3 15.15 07-30 Supplying and filling sand under floor or plugging in wells m3 30.68 11-09-c Cement plaster 1:4 upto 20' height: 3/4" thick m2 86.08 11-18-b Cement pointing struck joints, on walls, upto 20' height :Ratio 1:3 m2 77.52 11-29 Extra cost of labour & material for red oxide pigment in cement pointing to match bricks m2 77.52 06-26-b-02 Damp proof course of cem. conc. 1:2:4 including bitumen coat, 1 layer polythene & 2 coats bitumen (2" thick m2 9.62 (13-25-a)+(13-25- b) Preparing surface & painting with snowcem / weathershield paint :1st, 2nd & subsequent coats m2 77.52 13-22-a Preparing surface and painting with emulsion paint : First coat m2 125.14 13-22-b Preparing surface and painting with emulsion paint : 2nd & each subsequent coat. m2 125.14 12-61 MS flat 1/2"x1/8" grill in windows of approved design including painting 3 coats, complete m2 2.97 25-39-b-05 Providing and Fixing steel windows 18 gauge with openable glazed panels With 22 SWG wire gauze : Glass pane 5mm m2 2.97 25-45-a Supplying and Fixing 18 SWG MS Sheet Door with angleiron frame (1.5"x1.5"x1/8"), bolt, hinges, paint etc complete m2 2.76 10-15-d Provide & lay topping of concrete 1:2:4, including surface finishing & dividing in panels : 2" thick m2 39.03 09-46 Providing and Laying Prestressed Roof of Slab/Girder, 2" thick PCC 1:2:4 with chicken mesh, polythene, mud, tar m2 46.46 Site#1: RVA Office Khurasan, Peshawar Total Cost - Site#1 Page 1 of 90

ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

1Construction of one room (20'x15' )size

having verandah

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

03-25-bExcavation in foundation of building. bridges

etc complete : In ordinary soilm3 28.26

03-67-cStructural backfill using common material

available at sitem3 17.97

06-05-iPlain Cement Concrete incl. Placing,

compacting, finishing & curing (Ratio 1:4:8)m3 7.44

06-05-f

Plain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4)

For Pilnth Protection

m3 6.18

06-07-a-03RCC in roof slab, beam, column & other

structural members, insitu or precast. (1:2:4)m3 0.16

06-08-c

Supply & fabricate M.S. reinforcement for

cement concrete (Hot rolled deformed bars

Grade 40)

tonne 0.03

07-04-a-041st class brick work in foundation and plinth

in Cement, sand mortar 1:5m3 25.19

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 15.15

07-30Supplying and filling sand under floor or

plugging in wellsm3 30.68

11-09-c Cement plaster 1:4 upto 20' height:

3/4" thickm2 86.08

11-18-bCement pointing struck joints, on walls, upto

20' height :Ratio 1:3m2 77.52

11-29Extra cost of labour & material for red oxide

pigment in cement pointing to match bricksm2 77.52

06-26-b-02

Damp proof course of cem. conc. 1:2:4

including bitumen coat, 1 layer polythene & 2

coats bitumen (2" thick

m2 9.62

(13-25-a)+(13-25-

b)

Preparing surface & painting with snowcem /

weathershield paint :1st, 2nd & subsequent

coats

m2 77.52

13-22-aPreparing surface and painting with emulsion

paint : First coatm2 125.14

13-22-bPreparing surface and painting with emulsion

paint : 2nd & each subsequent coat.m2 125.14

12-61

MS flat 1/2"x1/8" grill in windows of

approved design including painting 3 coats,

complete

m2 2.97

25-39-b-05

Providing and Fixing steel windows 18 gauge

with openable glazed panels With 22 SWG

wire gauze : Glass pane 5mm

m2 2.97

25-45-a

Supplying and Fixing 18 SWG MS Sheet

Door with angleiron frame (1.5"x1.5"x1/8"),

bolt, hinges, paint etc complete

m2 2.76

10-15-dProvide & lay topping of concrete 1:2:4, including

surface finishing & dividing in panels : 2" thickm2 39.03

09-46

Providing and Laying Prestressed Roof of

Slab/Girder, 2" thick PCC 1:2:4 with chicken mesh,

polythene, mud, tar

m2 46.46

Site#1: RVA Office Khurasan, Peshawar

Total Cost - Site#1 Page 1 of 90

Page 2: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

15-02-a-08

Supply and Fixing PVC pipe for draining rain

water (from roof) complete On surface

including clamps etc: 4" i/d

m 8.53

2 SOLAR ELECTRIFICATION

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

15-02-b-03S&E PVC pipe for wiring purpose complete

Recessed in walls incl.chase elc; 1" i/dRft 50.00

15-09-a

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

4"X 4"

Each 1.00

15-09-c

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

9"X 4"

Each 1.00

15-22-b S&E button holder /angle holder Brass Each 12.00

15-50

Wiring of light/ Fan/ Call bell point in

3/0.029" PVC insulated bare cable in PVC

pipe recesssed

Each 12.00

15-68-c

S&E best quality AC/DC ceiling fan complete

with GI. rod, canopy, blades & regulator: 56"

sweep

Each 4.00

15-25Supply and Erection girder clamp hook, 5/8"

dia.for hanging ceiling fansEach 4.00

15-71-cSupply and Erection single phase imported

auto circuit breaker 20 Amp.Each 10.00

26-01-d-01

Supply and Erection of Solar PV Module

(Solar Panel) Mono-crystalline A-Grade (per

Watt) (As per Approved

Specifications)(260x2=520Watt)

watt 520.00

26-01-n-03Supply and Erection of Stainless Steel Nuts

and Boltswatt 520.00

26-01-m-01

Supply and Erection of hot dipped (80

microns Average) galvanized steel of

minimum thickness of 12 SWG / 2.64 mm

Channel / Pipe or 8 SWG / 4.06 mm Angle

Per Watt 520.00

NSISupply and Fixing LED light Bulb Fixture

(12 watts)Each 6.00

NSI Lead Acid Battery 12 Volt 150AH Each 1.00

NSI Solar Charge Controller Each 1.00

3 Two new toilets

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

03-25-bExcavation in foundation of building. bridges

etc complete : In ordinary soilm3 16.32

03-67-cStructural backfill using Common Material

available at site.m3 2.83

06-05-iPlain Cement Concrete incl. Placing,

compacting, finishing & curing (Ratio 1:4:8)m3 2.69

07-04-a-041st class brick work in foundation and plinth

in Cement, sand mortar 1:5m3 5.17

06-05-fPlain Cement Concrete including placing,

compacting finishing & curing (Ratio 1:2:4)m3 0.28

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#1 Page 2 of 90

Page 3: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

06-26-a-02

Damp proof course of cem. conc. 1:2:4

including bitumen coat, 1 layer polythene & 1

coat bitumen (2" thick)

m2 3.47

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 7.10

11-09-c Cement plaster 1:4 upto 20' height:

3/4" thickm2 33.01

11-23-a-01 White washing: New surface : One coat m2 33.01

11-23-a-02 White washing: New surface : One coat m2 33.01

07-30Supplying and filling sand under floor or

plugging in wellsm3 3.93

11-18-bCement pointing struck joints, on walls, upto

20' height :Ratio 1:3m2 21.54

11-29Extra cost of labour & material for red oxide

pigment in cement pointing to match bricksm2 21.54

10-39-a

Glazed tile 1/4" thick dado jointed in white

cement complete : Coloured Plain tilesm2 11.52

10-50-aProviding and Fixing Ceramic Floor Tiles of

approved quality of Size : 12" x 12"m2 10.16

25-39-a-04

Providing and fixing steel windows/ventilator

with openable glazed pannels, using beam

section for frame 1-1/2" x 1" x 5/8" x 1/8", z-

section for leaves 3/4" x 1" x 3/4" x 1/8", T-

section sashes 1"x1"x1/8", glass panes,

wooden screed for glazing embded over a thin

layer of putty duly screwed with leaves, brass

fittings holdfast, duly painted, complete in all

respects, including all cost of material and

labour etc. as per approved design and as

directed by the engineer - in -charge: Glass

pane 4mm thick

sft 5.00

12-70-a

Supply and Fixing MS Sheet 16 guage(10'' x

2'') box type chowkats including fixing in

position with all charges for Hold fast, Hinges

and .Painting etc

m 9.45

25-45-a

Supplying and Fixing 18 SWG MS Sheet

Door with angleiron frame (1.5"x1.5"x1/8"),

bolt, hinges, paint etc complete

m2 3.02

09-46

Providing and Laying Prestressed Roof of

Slab/Girder, 2" thick PCC 1:2:4 with chicken

mesh, polythene, mud, tar

m2 9.05

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

PLUMBING WORKS

14-03-b

Providing and Fixing glazed earthen ware WC

squatting type with built-in foot rests complete

in all respects : Coloured

each 2.00

14-10-a

Providing and Fixing glazed earthen ware

lowdown flushing cistern 3 gallons (13.63

Liters) capacity including bracket set, copper

connection, etc. complete in all respects:

White

each 2.00

Sub-Total Amount (Rs)

Total Cost - Site#1 Page 3 of 90

Page 4: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

14-13Providing and fixing choricum plated soap

dish complete.Each 1.00

14-15Providing and Fixing CP (chromium plated)

toilet paper holder completeEach 2.00

14-55-eProviding and Fixing GI pipe & including

specials complete 3/4" dia (light)rft 100.00

14-55-fProviding and Fixing GI pipe & including

specials complete 1/2" dia (light)rft 40.00

14-69-b-01

Supplying and Fixing Polyethylene Water

Tank made from food grade FDA Certified

raw material, 3 layers UV stablized, inert with

water, anti-fungus and anti-bacterial and have

a service life of more than 10 years : 200

gallons

(Horizontal)

Each 1.00

14-05-a-07

Providing and Fixing glazed earthen ware

wash hand basin (WHB) complete size 56x40

cm (22"x16"), including bracket set, waste

coupling, complete in all respects: White

without pedestal (Normal Quality)

Each 1.00

14-27-a

Providing and fixing chorimum plated (CP)

mixing valve for wash hand basin (WHB),

sink or shower of approved (Best) quality

Each 1.00

14-24-b

Providing and fixing chromium plated (CP)

bib-cock heavy duty of approved quality : 1.5

cm 1/2"

each 2.00

14-48-bProviding and Fixing brass ball float valve of

approved quality: 3/4" diaEach 2.00

14-33

Providing and Fixing 4" gully trap of approved

quality including cement concrete cost of PVC

grating 6" x6" (150 x 150 mm) and masonry

chamber 12"x12" (300 x 300 mm).

Each 2.00

23-10 Septic Tank (int.Size: 7'x2'x5') complete Each 1.00

14-144-bSupplying and Fixing UPVC soil waste and

vent pipe class B : 4" diaRft 70.00

14-144-cSupplying and Fixing UPVC soil waste and

vent pipe class B : 3" diaRft 20.00

06-07-d-05

Providing manhole size 24" x 18" (inside

dimensions) as per approved design and

specifications complete for 4" to 12" dia pipes

upto 4 ft. (1.2 m) depth with 16" dia.Concrete

Cover fixed in 4" thick RCC 1:2:4 slab (with 5

lbs per Cu.ft. or 80 kg/Cu.m of steel), burnt

brick masonry walls 9" (225 mm) thick set in

1:3 cement sand mortar, 6" thick 1:3:6 cement

concrete in foundation, 4" av. thickness 1:2:4

cement concrete in benching and 1/2" (13mm)

thick cement sand plaster in 1:3 to all inside

wall surfaces, channels and benching

including making requisite number of main

and branch channels but excluding the cost of

excavation, back filling and disposal of

excavated stuff.

Each 2.00

Total Cost - Site#1 Page 4 of 90

Page 5: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

14-37-c

Supply and Fixing cast iron (CI) manhole

cover with frame etc (Heavey Type) of

approved quality complete: 24" (610 mm) dia

Each 2.00

23-11 Soakage Pit (6'dia x 15' deep) complete Each 1.00

14-31-b

Providing and Fixing cast iron (CI) floor trap

approved quality including CI grating &

concrete chamber all round : 4"x3" (100 mm x

75 mm)

Each 2.00

14-37-a

Supply and Fixing cast iron (CI) manhole

cover with frame etc (Heavy Type) of

approved quality complete: 12" (300 mm) dia

Each 2.00

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

4Solar bore upto 150 ft depth with a

discharge of 1 inch

24-41Conducting Elec: Resistivity survey of the area

and furnishing its reports.No 1.00

24-42Logging of bore hole with electrical

equipment and furnishing reports.Job 1.00

24-05

Collection and submission at approved water

testing laboratory of two water samples in

bottles from each bore hole for testing

Per set 1.00

24-02-a-05

Drilling of Bore holes for tube well in all types

of soil and soft rock except hard rock from

ground level upto 328 ft depth (0m to 100m),

including sinking, collection of 100 % corings

and withdrawing of pipe, complete as per

specifications.: Dia of Bore 8" (200 mm) i/d

RFT 150.00

24-18-a-04

Providing, laying, cutting, jointing, testing and

disinfecting UPVC pressure pipeline in

trenches (conforming to BS 3505

manufactured ) jointed with socket, elbow, tee,

bend and plug bend etc.manufactured by the

respective manufacturer complete as per

specifications. UPVC Pressure Pipes Class B

(6 Bar) 6" Nominal Pipe Size (NPS)

RFT 100.00

24-09-a-01

Providing and installing PVC Strainer BSS

Class "B" of approved make \ quality in

tubewell bore hole, including socket, special

sockets, studs etc. complete as per

specification:- 6" Nominal Pipe

Size (NPS) (150mm)

Rft 50.00

26-01-d-01

Supply and Erection of Solar PV Module

(Solar Panel) Mono-crystalline A-Grade (per

Watt) (As per Approved

Specifications)(260x5=1300Watt)

watt 1,300.00

26-01-n-03Supply and Erection of Stainless Steel Nuts

and Boltswatt 1,300.00

Total Amount (Rs)

Sub-Total Amount (Rs)

Total Cost - Site#1 Page 5 of 90

Page 6: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

26-01-m-01

Supply and Erection of hot dipped (80

microns

Average) galvanized steel of minimum

thickness of 12 SWG / 2.64 mm Channel /

Pipe or 8 SWG / 4.06 mm Angle

Per Watt 1,300.00

24-08-a

Providing and installing M.S. Bail plug of

approved make / quality in tubewell bore hole

complete as per specification:- 6" (150 mm)

i/d 2 ft (450 mm) long.

EACH 1.00

24-18-d-02

Providing, laying, cutting, jointing, testing and

disinfecting UPVC pressure pipeline in

trenches(conforming to BS 3505

manufactured ) jointed with socket, elbow, tee,

bend and plug bend etc.manufactured by the

respective manufacturer complete as per

specifications.

uPVC Pressure Pipes Class E (15 Bar)

1"Nominal Pipe Size (NPS) including

delievery upto water tank.

Rft 180.00

24-14

Shrouding with graded pack gravel 3/8" (10

mm) to 1/8" (3 mm) around tubewell in bore

hole complete as per specification:-

Rft 150.00

C

Providing and fixing Solar Water Pump

Including Converter 22 Watts Mercible Water

Pump Of 1 Inch Discharge, cable & Two

Chain Complete in All Respects

Each 1.00

5

Construction of new boundary wall on

backside and a portion of front

boundary wall

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

03-25-bExcavation in foundation of building. bridges

etc complete : In ordinary soilm3 24.47

06-05-iPlain Cement Concrete incl. Placing,

compacting, finishing & curing (Ratio 1:4:8)m3 2.69

06-26-a-02

Damp proof course of cem. conc. 1:2:4

including bitumen coat, 1 layer polythene & 1

coat bitumen (2" thick)

m2 6.69

07-04-a-04

1st class brick work in foundation and plinth

in

Cement, sand mortar 1:5

m3 11.57

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 24.08

11-18-bCement pointing struck joints, on walls, upto

20' height :Ratio 1:3m2 124.87

11-29Extra cost of labour & material for red oxide

pigment in cement pointing to match bricksm2 124.87

Sub-Total Amount (Rs)

NSI

Total Amount (Rs)

Sub-Total Amount (Rs)

Total Cost - Site#1 Page 6 of 90

Page 7: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

06-37Supply & fix broken glasses on court yard

walls, including 1:3:6 cement concrete copingm 29.26

6 Repair of main gate

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

27-77Removing old paint from woodwork/steel with

paint removem2 13.94

27-04Repairing & re-fixing of steel main gate i/c

hold fast, welding complete in all respectsm2 6.97

27-123

Painting on old G.I. sheet with synthetic

enamel paint of approved quality of required

colour to give an even shade:

m2 13.94

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#1 Page 7 of 90

Page 8: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

1 WAITING SHED REPAIR (CGI)

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

25-58-a

Providing and fixing of existing CGI Sheet,

tubular pipe frame (heavy) quality and circular

columns excluding cost of foundation.

m2 1.86

2Providing and laying shingle for lawn to

provide slope (to drain off rain water)

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

16-04-aGranular Sub Base Course using Pit Run

Gravelm3 12.74

3SOLAR ELECTRIFICATION - 2

ROOMS

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

15-02-b-03S&E PVC pipe for wiring purpose complete

Recessed in walls incl.chase elc; 1" i/dRft 30.00

15-09-a

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

4"X 4"

Each 2.00

15-09-c

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

9"X 4"

Each 1.00

15-22-b S&E button holder /angle holder Brass Each 6.00

15-50

Wiring of light/ Fan/ Call bell point in

3/0.029" PVC insulated bare cable in PVC

pipe recesssed

Each 7.00

15-68-c

S&E best quality AC/DC ceiling fan complete

with GI. rod, canopy, blades & regulator: 56"

sweep

Each 2.00

15-25Supply and Erection girder clamp hook, 5/8"

dia.for hanging ceiling fansEach 2.00

15-71-cSupply and Erection single phase imported

auto circuit breaker 20 Amp.Each 4.00

26-01-d-01

Supply and Erection of Solar PV Module

(Solar Panel) Mono-crystalline A-Grade (per

Watt) (As per Approved

Specifications)(260x2=520Watt)

watt 520.00

26-01-n-03Supply and Erection of Stainless Steel Nuts

and Boltswatt 520.00

26-01-m-01

Supply and Erection of hot dipped (80

microns Average) galvanized steel of

minimum thickness of 12 SWG / 2.64 mm

Channel / Pipe or 8 SWG / 4.06 mm Angle

Per Watt 520.00

NSISupply and Fixing LED light Bulb Fixture

(12 watts)Each 2.00

NSI Lead Acid Battery 12 Volt 150AH Each 2.00

NSI Solar Charge Controller Each 2.00

Site#2: BHU Akora, PeshawarMALE SECTION

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#2 Page 8 of 90

Page 9: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

4 ROOF TREATMENT (DOMES)

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

09-13

2 coats of bitumen laid hot using 34 lbs. for

%sft over roof & blinded with sand at 1 cft per

% sft

m2 3.44

14-97 Supply of Polythene sheet of approved quality KG 0.84

11-07-c Cement plaster 1:2, upto 20' height 3/4" thick m2 42.66

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 0.17

5BRICK MASONRY

(RELOCATION OF DOOR)

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-13Dismantling brick work in lime or cement

mortarm3 0.59

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 0.59

11-09-c Cement plaster 1:4 upto 20' height:

3/4" thickm2 6.51

12-48-a Fixing Door including chowkats each 1.00

6

NEW DRAIN & PCC FLOORING 2"

INCH THICK FOR NOT ALLOWING

WATER FROM TOILET TO ROOMS

.HENCE CUTTING DOORS FROM

DOWNSIDE 2'INCHES .

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

27-113 Repair of doors/windows complete m2 46.46

03-25-cExcavation in foundation of building, bridges

etc complete : in hard soil or soft murumcft 97.50

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 1.52

PCC Flooring infront of toilets & one room

with providing slope towards new drain.

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 3.54

06-47-d

Erection and removal of Form work with

M.S.Pipe Scaffolding & Plywood Sheet for

RCC or Plain Concrete (Vertical)

m2 9.67

7SOLAR ELECTRIFICATION - 4

ROOMS

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

Total Amount (Rs)

FEMALE SECTION

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#2 Page 9 of 90

Page 10: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

15-02-b-03S&E PVC pipe for wiring purpose complete

Recessed in walls incl.chase elc; 1" i/dRft 90.00

15-09-a

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

4"X 4"

Each 4.00

15-09-c

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

9"X 4"

Each 2.00

15-22-b S&E button holder /angle holder Brass Each 12.00

15-50

Wiring of light/ Fan/ Call bell point in

3/0.029" PVC insulated bare cable in PVC

pipe recesssed

Each 12.00

15-68-c

S&E best quality AC/DC ceiling fan complete

with GI. rod, canopy, blades & regulator: 56"

sweep

Each 4.00

15-25Supply and Erection girder clamp hook, 5/8"

dia.for hanging ceiling fansEach 4.00

15-71-cSupply and Erection single phase imported

auto circuit breaker 20 Amp.Each 8.00

26-01-d-01

Supply and Erection of Solar PV Module

(Solar Panel) Mono-crystalline A-Grade (per

Watt) (As per Approved

Specifications)(260x3=780Watt)

watt 780.00

26-01-n-03Supply and Erection of Stainless Steel Nuts

and Boltswatt 780.00

26-01-m-01

Supply and Erection of hot dipped (80

microns Average) galvanized steel of

minimum thickness of 12 SWG / 2.64 mm

Channel / Pipe or 8 SWG / 4.06 mm Angle

Per Watt 780.00

NSISupply and Fixing LED light Bulb Fixture

(12 watts)Each 4.00

NSI Lead Acid Battery 12 Volt 150AH Each 3.00

NSI Solar Charge Controller Each 4.00

8 2 EXHAUST FANS

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

15-67

Making hole in wall with necessary masonry

work for exhaust fan any

size complete

Each 2.00

15-69-a

Supply and Erection best quality exhaust fan

complete with shutter

& regulator : 12"sweep

Each 2.00

9

WHITE WASH OF FEMALE STAFF

HOUSE

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-45-a Scraping : White wash or colour wash m2 59.48

11-23-b-01 White washing: old surface : Ist coat m2 268.59

11-23-b-01 White washing: old surface : 2nd coats m2 268.59

10 Generator shed

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#2 Page 10 of 90

Page 11: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

25-58-a

Providing and fixing of Generator shed (in

female section) consisting of CGI Sheet,

tubular pipe frame (heavy) quality and circular

columns excluding cost of foundation.

m2 46.46

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#2 Page 11 of 90

Page 12: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

1Flooring of 3 rooms & verandah PCC

Track

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

06-05-f

Plain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 16.09

2Internal rooms cement plaster upto sill

level (4ft) with nailing

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-48-b Removing from walls: Cement or lime plaster m2 89.62

11-09-c Cement plaster 1:4 upto 20' height:

3/4" thickm2 132.67

28-18

Providing and fixing with steel nails and

washers, the chicken wire mesh of approved

quality, at joint of concrete and masonry work

(4" wide strip) before plastering etc complete

m2 132.67

3

Providing and laying one wall of

verandah to make it community

hall/waiting area including doors and

windows of same size as already of

rooms

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 5.84

11-09-c Cement plaster 1:4 upto 20' height:

3/4" thickm2 42.92

25-39-b-05

Providing and Fixing steel windows 18

gauge with openable glazed panels With

22 SWG wire gauze : Glass pane 5mm

m2 4.60

12-61

MS flat 1/2"x1/8" grill in windows of

approved design including painting 3

coats, complete

m2 4.60

25-45-a

Supplying and Fixing 18 SWG MS Sheet

Door with angleiron frame

(1.5"x1.5"x1/8"), bolt, hinges, paint etc

complete

m2 4.18

06-07-a-03RCC in roof slab, beam, column & other

structural members, insitu or precast. (1:2:4)m3 0.23

06-08-c

Supply & fabricate M.S. reinforcement for

cement concrete (Hot rolled deformed bars

Grade 40)

tonne 0.11

4Windows repair and painting complete

in all respect

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

27-113 Repair of doors/windows complete m2 5.65

Site#3: PDH Turkaman MCH, Peshawar

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#3 Page 12 of 90

Page 13: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

13-02-c-01Painting old surfaces : Doors / windows any

type First coatm2 24.67

13-02-c-02Painting old surfaces : Doors / windows any

type Each subsequent coatm2 24.67

5SOLAR ELECTRIFICATION - 5

ROOMS

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

15-02-b-03S&E PVC pipe for wiring purpose complete

Recessed in walls incl.chase elc; 1" i/dRft 25.00

15-09-a

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

4"X 4"

Each 2.00

15-09-c

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

9"X 4"

Each 5.00

15-22-b S&E button holder /angle holder Brass Each 20.00

15-50

Wiring of light/ Fan/ Call bell point in

3/0.029" PVC insulated bare cable in PVC

pipe recesssed

Each 20.00

15-68-c

S&E best quality AC/DC ceiling fan complete

with GI. rod, canopy, blades & regulator: 56"

sweep

Each 5.00

15-25Supply and Erection girder clamp hook, 5/8"

dia.for hanging ceiling fansEach 5.00

15-71-cSupply and Erection single phase imported

auto circuit breaker 20 Amp.Each 5.00

26-01-d-01

Supply and Erection of Solar PV Module

(Solar Panel) Mono-crystalline A-Grade (per

Watt) (As per Approved

Specifications)(260x5=1300Watt)

watt 1,300.00

26-01-n-03Supply and Erection of Stainless Steel Nuts

and Boltswatt 1,300.00

26-01-m-01

Supply and Erection of hot dipped (80

microns Average) galvanized steel of

minimum thickness of 12 SWG / 2.64 mm

Channel / Pipe or 8 SWG / 4.06 mm Angle

Per Watt 1,300.00

NSISupply and Fixing LED light Bulb Fixture

(12 watts)Each 10.00

NSI Lead Acid Battery 12 Volt 150AH Each 2.00

NSI Solar Charge Controller Each 4.00

6Chowkidar rooms window

repair,wooden battens

12-62

Provide & fix GI wire gauze 22 SWG, 12x12

mesh per sq. in, fixed to steel window

complete

sft 9.00

04-48-b Removing from walls: Cement or lime plaster sft 500.00

11-01-bMud plaster on walls (excluding gobri

leeping) upto 20' height : 1" thicksft 500.00

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#3 Page 13 of 90

Page 14: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

NSIverandah wooden battens turn over and place

again of chowkidar verandahSFT 150.00

NSIProviding and fixing wooden battens for

chowkidar verandah & new roomeach 10.00

7 ROOF TREATMENT

14-97 Supply of Polythene sheet of approved quality KG 136.98

09-11-b

Earth filling over roof including watering,

ramming etc 4" thick earth filling and 1" mud

plaster

m2 44.51

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 3.16

15-02-a-08

Supply and Fixing PVC pipe for draining rain

water (from roof) complete On surface

including clamps etc: 4" i/d

m 14.63

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 3.70

8 White Wash

04-45-a Scraping : White wash or colour wash m2 425.97

11-23-b-01 White washing: Old surface : One coat m2 425.97

11-23-b-02 White washing: Old surface : Two coats m2 425.97

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#3 Page 14 of 90

Page 15: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

1 ROOF TREATMENTS (GF)

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

03-54Uprooting sarkanda growth & disposal within

50mm2 34.29

14-97 Supply of Polythene sheet of approved quality KG 26.60

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 17.41

15-02-a-08

Supply and Fixing PVC pipe for draining rain

water (from roof) complete On surface

including clamps etc: 4" i/d

m 7.31

09-31 Fixing water spouse or parnala. Each 1.00

2 NEW DOORS/WINDOWS

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

12-61

MS flat 1/2"x1/8" grill in windows of

approved design including painting 3 coats,

complete

m2 2.23

25-39-b-05

Providing and Fixing steel windows 18 gauge

with openable glazed panels With 22 SWG

wire gauze : Glass pane 5mm

m2 2.23

25-45-a

Supplying and Fixing 18 SWG MS Sheet

Door with angleiron frame (1.5"x1.5"x1/8"),

bolt, hinges, paint etc complete

m2 2.28

3EXTERNAL DOOR REPAIR NEAR

WATER TANK

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

27-113 Repair of doors/windows complete m2 2.60

4SOLAR ELECTRIFICATION - 6

FANS 6 LIGHTS

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

15-02-b-03S&E PVC pipe for wiring purpose complete

Recessed in walls incl.chase elc; 1" i/dRft 30.00

15-09-a

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

4"X 4"

Each 6.00

15-09-c

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

9"X 4"

Each 2.00

15-22-b S&E button holder /angle holder Brass Each 12.00

15-50

Wiring of light/ Fan/ Call bell point in

3/0.029" PVC insulated bare cable in PVC

pipe recesssed

Each 12.00

Site#4: FPHC Zandai MCH, Peshawar

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#4 Page 15 of 90

Page 16: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

15-68-c

S&E best quality AC/DC ceiling fan complete

with GI. rod, canopy, blades & regulator: 56"

sweep

Each 6.00

15-25Supply and Erection girder clamp hook, 5/8"

dia.for hanging ceiling fansEach 6.00

15-71-cSupply and Erection single phase imported

auto circuit breaker 20 Amp.Each 6.00

26-01-d-01

Supply and Erection of Solar PV Module

(Solar Panel) Mono-crystalline A-Grade (per

Watt) (As per Approved

Specifications)(260x4=1040Watt)

watt 1,040.00

26-01-n-03Supply and Erection of Stainless Steel Nuts

and Boltswatt 1,040.00

26-01-m-01

Supply and Erection of hot dipped (80

microns Average) galvanized steel of

minimum thickness of 12 SWG / 2.64 mm

Channel / Pipe or 8 SWG / 4.06 mm Angle

Per Watt 1,040.00

NSISupply and Fixing LED light Bulb Fixture

(12 watts)Each 6.00

NSI Lead Acid Battery 12 Volt 150AH Each 1.00

NSI Solar Charge Controller Each 1.00

5 REPAIR OF STAIR SLAB

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-48-b

MRS-2017Removing from walls: Cement or lime plaster m2 22.30

27-116

Repairs to plaster of thickness 1/2" to 3/4" in

cement sand mortar 1:4 patches of area 27 Sft

and under, including cutting the patch in

proper shape, raking out joints and preparing

and plastering the surface of the walls

complete, including disposal

of rubbish to the dumping ground within 30

metres lead.

m2 22.30

6 REFIXING OF DOOR AT GF

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

27-113 Refixing of doors/windows complete m2 1.95

7ELECTRIFICATION & MAIN STEEL

AT GATE

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

15-02-b-03

S&E PVC patti fitting/pipe fitting for wiring

purpose complete Recessed in walls incl.chase

elc; 1" i/d

Rft 150.00

15-75-a

Supply and Erection cubical type factory

fabricated floor/wall mounting steel main

board comp. : On surface

Each 1.00

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#4 Page 16 of 90

Page 17: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

8 PLASTERING OF SHED (FF)

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

11-09-c Cement plaster 1:4 upto 20' height:

3/4" thickm2 17.01

9WHITE WASH OF COMPLETE

BUILDING

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-45-a Scraping : White wash or colour wash m2 858.99

11-23-b-01 White washing: Old surface : One coat m2 858.99

11-23-b-02 White washing: Old surface : Two coats m2 858.99

10PROVISION OF PRECAST

SLAB/GIRDER FOR 1 ROOM (FF).

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-22-a Dismantling 1st class tile roofing m2 19.93

01-01-aCarriage of 100 cft / 5 tonne of all materials by

truck or other means 1st 30 meter30M 4.55

01-01-bCarriage of 100 cft / 5 tonne of all materials by

truck or other means 2nd 30 meter30M 4.55

09-46

Providing and Laying Prestressed Roof of

Slab/Girder, 2" thick PCC 1:2:4 with chicken

mesh, polythene, mud, tar

m2 19.93

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#4 Page 17 of 90

Page 18: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

1ROOF TREATMENT OF KITCHEN

& STORE

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

14-97 Supply of Polythene sheet of approved quality KG 51.40

09-11-b

Earth filling over roof including watering,

ramming etc 4" thick earth filling and 1" mud

plaster

m2 210.17

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 3.55

15-02-a-08

Supply and Fixing PVC pipe for draining rain

water (from roof) complete On surface

including clamps etc: 4" i/d

m 19.51

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 0.95

2

INTERNAL ROOMS CEMENT

PLASTER UPTO SILL LEVEL (4

FEET) WITH NAILING.

04-48-b Removing from walls: Cement or lime plaster m2 258.18

11-09-c Cement plaster 1:4 upto 20' height:

3/4" thickm2 265.61

28-18

Providing and fixing with steel nails and

washers, the chicken wire mesh of approved

quality, at joint of concrete and masonry work

(4" wide strip) before plastering etc complete

m2 265.61

3 White Wash

04-45-a Scraping : White wash or colour wash m2 770.59

11-23-b-01 White washing: Old surface : One coat m2 257.91

11-23-b-02 White washing: Old surface : Two coats m2 257.91

11-21-b-01 Distempering Old surface : One coat m2 428.07

11-21-b-02 Distempering Old surface : two coat m2 428.07

13-02-c-01Painting old surfaces : Doors / windows any

type First coatm2 25.42

13-02-c-02Painting old surfaces : Doors / windows any

type Each subsequent coatm2 25.42

4Mud Leaping on Back Side wall

mentioned in (8)

04-48-b Removing from walls: Cement or lime plaster m2 40.43

11-01-bMud plaster on walls (excluding gobri

leeping) upto 20' height : 1" thickm2 40.43

5 20 Number lights including verandah

Site#5: PDH Khurasan MCH, Peshawar

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#5 Page 18 of 90

Page 19: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

NSISupply and Fixing LED light Bulb Fixture

(12 watts)Each 20.00

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#5 Page 19 of 90

Page 20: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

1

Verandah & washroom complete slab

removing and replace it with precast

slab /girders

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-24Dismantling roof of wooden planks & battens

from any height (Verandah)m2 66.91

04-22-a Dismantling 1st class tile roofing (Washroom) m2 4.23

01-01-aCarriage of 100 cft / 5 tonne of all materials by

truck or other means 1st 30 meter30m 16.25

01-01-bCarriage of 100 cft / 5 tonne of all materials by

truck or other means 2nd 30 meter30m 16.25

09-46

Providing and Laying Prestressed Roof of

Slab/Girder, 2" thick PCC 1:2:4 with chicken

mesh, polythene, mud, tar

m2 71.14

2ROOF TREATMENT OF KITCHEN

& STORE

14-97 Supply of Polythene sheet of approved quality KG 4.98

09-11-b

Earth filling over roof including watering,

ramming etc 4" thick earth filling and 1" mud

plaster

m2 20.38

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 0.74

15-02-a-08

Supply and Fixing PVC pipe for draining rain

water (from roof) complete On surface

including clamps etc: 4" i/d

m 7.31

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 0.81

NSISupplying and fixing Steel Girder 8"x4"x3/16

on existing store .ft 15.00

3 WHITE WASH COMPLETE

04-45-a Scraping : White wash or colour wash m2 772.45

11-23-b-01 White washing: Old surface : One coat m2 772.45

11-23-b-02 White washing: Old surface : Two coats m2 772.45

4 ROOF TREATMENT OF DOMES

09-13

2 coats of bitumen laid hot using 34 lbs. for

%sft over roof & blinded with sand at 1 cft per

% sft

m2 15.47

14-97 Supply of Polythene sheet of approved quality KG 3.78

11-07-c Cement plaster 1:2, upto 20' height 3/4" thick m2 42.66

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 0.75

Site#6: FPHC Baghban MCH, Peshawar

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#6 Page 20 of 90

Page 21: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

5SOLAR ELECTRIFICATION - 6

ROOMS

Item. No. Abbreviared Description Unit QtyUnit

Rate

Total

Amount

15-02-b-03S&E PVC pipe for wiring purpose complete

Recessed in walls incl.chase elc; 1" i/dRft 30.00

15-09-a

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

4"X 4"

Each 6.00

15-09-c

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

9"X 4"

Each 2.00

15-22-b S&E button holder /angle holder Brass Each 12.00

15-50

Wiring of light/ Fan/ Call bell point in

3/0.029" PVC insulated bare cable in PVC

pipe recesssed

Each 12.00

15-68-c

S&E best quality AC/DC ceiling fan complete

with GI. rod, canopy, blades & regulator: 56"

sweep

Each 6.00

15-25Supply and Erection girder clamp hook, 5/8"

dia.for hanging ceiling fansEach 6.00

15-71-cSupply and Erection single phase imported

auto circuit breaker 20 Amp.Each 6.00

26-01-d-01

Supply and Erection of Solar PV Module

(Solar Panel) Mono-crystalline A-Grade (per

Watt) (As per Approved

Specifications)(260x4=1040Watt)

watt 1,040.00

26-01-n-03Supply and Erection of Stainless Steel Nuts

and Boltswatt 1,040.00

26-01-m-01

Supply and Erection of hot dipped (80

microns Average) galvanized steel of

minimum thickness of 12 SWG / 2.64 mm

Channel / Pipe or 8 SWG / 4.06 mm Angle

Per Watt 1,040.00

NSISupply and Fixing LED light Bulb Fixture

(12 watts)Each 6.00

NSI Lead Acid Battery 12 Volt 150AH Each 1.00

NSI Solar Charge Controller Each 1.00

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#6 Page 21 of 90

Page 22: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

1

PCC FLOORING IN VERANDAH &

ALSO PCC 4" THICK IN

COURTYARD INFRONT OF MAIN

GATE

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 5.49

2

ROOF TREATMENTS

(TWO ROOMS AND VERANDAH AS

SHOWN IN DRAWINGS)

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

14-97 Supply of Polythene sheet of approved quality KG 50.00

09-11-b

Earth filling over roof including watering,

ramming etc 4" thick earth filling and

1"mudplaster

m2 204.46

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 2.27

15-02-a-08

Supply and Fixing PVC pipe for draining rain

water (from roof) complete On surface

including clamps etc: 4" i/d

m 7.31

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 2.65

3

DOORS REPAIRS AND PAINTING

& WINDOW REPAIR IN MCH

CLINIC

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

27-113 Repair of doors/windows complete m2 3.23

13-02-c-01Painting old surfaces : Doors / windows any

type First coatm2 6.46

13-02-c-02Painting old surfaces : Doors / windows any

type Each subsequent coatm2 6.46

4WHITE WASH OF COMPLETE

BUILDING

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-45-a Scraping : White wash or colour wash m2 331.78

11-23-b-01 White washing: Old surface : One coat m2 331.78

11-23-b-02 White washing: Old surface : Two coats m2 331.78

5SOLAR ELECTRIFICATION - 6

FANS 6 LIGHTS

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

Site#7: PDH Badabair MCH, Peshawar

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#7 Page 22 of 90

Page 23: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

15-02-b-03

S&E PVC Patti/pipe fittings for wiring

purpose complete Recessed in walls incl.chase

elc; 1" i/d

Rft 30.00

15-09-a

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

4"X 4"

Each 6.00

15-09-c

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

9"X 4"

Each 2.00

15-22-b S&E button holder /angle holder Brass Each 12.00

15-50

Wiring of light/ Fan/ Call bell point in

3/0.029" PVC insulated bare cable in PVC

pipe recesssed

Each 12.00

15-68-c

S&E best quality AC/DC ceiling fan complete

with GI. rod, canopy, blades & regulator: 56"

sweep

Each 6.00

15-25Supply and Erection girder clamp hook, 5/8"

dia.for hanging ceiling fansEach 6.00

15-71-cSupply and Erection single phase imported

auto circuit breaker 20 Amp.Each 6.00

26-01-d-01

Supply and Erection of Solar PV Module

(Solar Panel) Mono-crystalline A-Grade (per

Watt) (As per Approved

Specifications)(260x4=1040Watt)

watt 1,040.00

26-01-n-03Supply and Erection of Stainless Steel Nuts

and Boltswatt 1,040.00

26-01-m-01

Supply and Erection of hot dipped (80

microns Average) galvanized steel of

minimum thickness of 12 SWG / 2.64 mm

Channel / Pipe or 8 SWG / 4.06 mm Angle

Per Watt 1,040.00

NSISupply and Fixing LED light Bulb Fixture

(12 watts)Each 6.00

NSI Lead Acid Battery 12 Volt 150AH Each 1.00

NSI Solar Charge Controller Each 1.00

6Wall mud leaping except medical officer

room and MCH Clinic.

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-48-b Removing from walls: Mud plaster m2 331.78

11-01-bMud plaster on walls (excluding gobri

leeping) upto 20' height : 1" thickm2 331.78

7 DRAINS

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

03-25-bExcavation in foundation of building. bridges

etc complete : In ordinary soilm3 1.59

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4)m3 0.79

NSIEXTRA WOODEN PLANKS IN

VERANDAH.

10 Wooden planks

(7'x9")(7x25=175ft)@160/ftRft 175.00

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#7 Page 23 of 90

Page 24: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#7 Page 24 of 90

Page 25: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

1

REFURNISHING HALL INTO

OFFICE SEPARATED BY

PARTITION WALL WITH DOOR,

SHOULD CONTAINS

VENTILATORS & WINDOWS OF

SIZE MORE THAN STANDARD

SIZE, ALSO STAFF DOOR IN

HALL &DISMANTLING

EXISTING WALL OF LENGTH 2'-

1" AT NEW PROPOSED

FURNISHED OFFICE

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-22-a Dismantling 1st class tile roofing m2 72.49

01-01-aCarriage of 100 cft / 5 tonne of all materials

by truck or other means 1st 30 meter30M 16.57

01-01-bCarriage of 100 cft / 5 tonne of all materials

by truck or other means 2nd 30 meter30M 16.57

04-13Dismantling brick work in lime or cement

mortarm3 4.95

01-01-aCarriage of 100 cft / 5 tonne of all materials

by truck or other means 1st 30 meter30M 4.95

01-01-bCarriage of 100 cft / 5 tonne of all materials

by truck or other means 2nd 30 meter30M 4.95

03-25-bExcavation in foundation of building.

bridges etc complete : In ordinary soilm3 32.98

03-67-cStructural backfill using common material

available at sitem3 30.60

06-05-i

Plain Cement Concrete incl. Placing,

compacting, finishing & curing (Ratio

1:4:8)

m3 3.62

06-05-f

Plain Cement Concrete including placing,

compacting, finishing & curing (Ratio

1:2:4) For Pilnth Protection

m3 8.97

06-07-a-03RCC in roof slab, beam, column & other

structural members, insitu or precast. (1:2:4)m3 0.31

06-08-c

Supply & fabricate M.S. reinforcement for

cement concrete (Hot rolled deformed bars

Grade 40)

tonne 0.07

07-04-a-041st class brick work in foundation and

plinth in Cement, sand mortar 1:5m3 15.91

07-05-a-041st class brick work in ground floor

Cement, sand mortar 1:5m3 22.05

11-09-c Cement plaster 1:4 upto 20' height:

3/4" thickm2 188.98

(13-25-a)+(13-

25-b)

Preparing surface & painting with snowcem

/ weathershield paint :1st, 2nd & subsequent

coats

m2 96.44

Site#8: RVA Office Panian, Haripur

Total Cost - Site#8 Page 25 of 90

Page 26: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

06-26-b-02

Damp proof course of cem. conc. 1:2:4

including bitumen coat, 1 layer polythene &

2 coats bitumen (2" thick

m2 8.19

13-22-aPreparing surface and painting with

emulsion paint : First coatm2 172.58

13-22-b

Preparing surface and painting with

emulsion paint : 2nd & each subsequent

coat.

m2 172.58

12-61

MS flat 1/2"x1/8" grill in windows of

approved design including painting 3 coats,

complete

m2 9.01

25-39-b-05

Providing and Fixing steel windows 18

gauge with openable glazed panels With 22

SWG wire gauze : Glass pane 5mm

m2 9.01

12-03-c

1st class teak wood wrought joinery in

doors & windows, panelled or glazed

complete : 1.5" thick

m2 4.55

12-70-a

Supply and Fixing MS Sheet 16 guage

(10'' x 2'')box type chowkats including

fixing in positionwith all charges for Hold

fast, Hinges and Painting etc

m 5.33

25-45-a

Supplying and Fixing 18 SWG MS Sheet

Door with angleiron frame (1.5"x1.5"x1/8"),

bolt, hinges, paint etc complete

m2 2.28

10-15-d

Provide & lay topping of concrete 1:2:4,

including surface finishing & dividing in panels :

2" thick

m2 74.35

09-45

P/F Burnt Brick Tile Roofing over Tee Iron

and Steel Girder, in 1:6 c/s mortar (12' max

span)

m2 78.07

15-02-a-08

Supply and Fixing PVC pipe for draining

rain water (from roof) complete On surface

including clamps etc: 4" i/d

m 7.31

07-30Supplying and filling sand under floor or

plugging in wellsm3 175.54

2SOLAR ELECTRIFICATION OF

NEW PROPOSED HALL

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

15-02-b-03

S&E PVC pipe for wiring purpose complete

Recessed in walls incl.chase elc; 1" i/d Rft 25.00

15-09-a

S&E MS sheet box of 16 SWG. 4 ;deep

with 3/16" thick bakelite sheet top etc

complete; 4"X 4"

Each 2.00

15-09-c

S&E MS sheet box of 16 SWG. 4 ;deep

with 3/16" thick bakelite sheet top etc

complete; 9"X 4"

Each 2.00

15-22-b S&E button holder /angle holder Brass Each 12.00

15-50

Wiring of light/ Fan/ Call bell point in

3/0.029" PVC insulated bare cable in PVC

pipe recesssed

Each 15.00

Total Amount (Rs)

Total Cost - Site#8 Page 26 of 90

Page 27: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

15-68-c

S&E best quality AC/DC ceiling fan

complete with GI. rod, canopy, blades &

regulator: 56" sweep

Each 4.00

15-25Supply and Erection girder clamp hook,

5/8" dia.for hanging ceiling fansEach 4.00

15-71-cSupply and Erection single phase imported

auto circuit breaker 20 Amp.Each 5.00

26-01-d-01

Supply and Erection of Solar PV Module

(Solar Panel) Mono-crystalline A-Grade

(per Watt) (As per Approved

Specifications)(260x2=520Watt)

watt 520.00

26-01-n-03Supply and Erection of Stainless Steel Nuts

and Boltswatt 520.00

26-01-m-01

Supply and Erection of hot dipped (80

microns Average) galvanized steel of

minimum thickness of 12 SWG / 2.64 mm

Channel / Pipe or 8 SWG / 4.06 mm Angle

Per Watt 520.00

NSISupply and Fixing LED light Bulb Fixture

(12 watts)Each 6.00

NSI Lead Acid Battery 12 Volt 150AH Each 1.00

NSI Solar Charge Controller Each 1.00

3 SOLAR WATER PUMP

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

24-41Conducting Elec: Resistivity survey of the

area and furnishing its reports.No 1.00

24-42Logging of bore hole with electrical

equipment and furnishing reports.Job 1.00

24-05

Collection and submission at approved

water testing laboratory of two water

samples in bottles from each bore hole for

testing

Per set 1.00

24-02-a-05

Drilling of Bore holes for tube well in all

types of soil and soft rock except hard rock

from ground level upto 328 ft depth (0m to

100m), including sinking, collection of 100

% corings and withdrawing of pipe,

complete as per specifications.: Dia of Bore

8" (200 mm) i/d

RFT 150.00

24-18-a-04

Providing, laying, cutting, jointing, testing

and disinfecting UPVC pressure pipeline in

trenches (conforming to BS 3505

manufactured ) jointed with socket, elbow,

tee, bend and plug bend etc.manufactured

by the respective manufacturer complete as

per specifications. UPVC Pressure Pipes

Class B (6 Bar) 6" Nominal Pipe Size (NPS)

RFT 100.00

24-09-a-01

Providing and installing PVC Strainer BSS

Class "B" of approved make \ quality in

tubewell bore hole, including socket, special

sockets, studs etc. complete as per

specification:- 6" Nominal Pipe

Size (NPS) (150mm)

Rft 50.00

Total Amount (Rs)

Total Cost - Site#8 Page 27 of 90

Page 28: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

26-01-d-01

Supply and Erection of Solar PV Module

(Solar Panel) Mono-crystalline A-Grade

(per Watt) (As per Approved

Specifications)(260x5=1300Watt)

watt 1,300.00

26-01-n-03Supply and Erection of Stainless Steel Nuts

and Boltswatt 1,300.00

26-01-m-01

Supply and Erection of hot dipped (80

microns

Average) galvanized steel of minimum

thickness of 12 SWG / 2.64 mm Channel /

Pipe or 8 SWG / 4.06 mm Angle

Per Watt 1,300.00

24-08-a

Providing and installing M.S. Bail plug of

approved make / quality in tubewell bore

hole complete as per specification:- 6" (150

mm) i/d 2 ft (450 mm) long.

EACH 1.00

24-18-d-02

Providing, laying, cutting, jointing, testing

and disinfecting UPVC pressure pipeline in

trenches(conforming to BS 3505

manufactured ) jointed with socket, elbow,

tee, bend and plug bend etc.manufactured

by the respective manufacturer complete as

per specifications.

uPVC Pressure Pipes Class E (15 Bar)

1"Nominal Pipe Size (NPS) including

delievery upto water tank.

Rft 150.00

24-14

Shrouding with graded pack gravel 3/8" (10

mm) to 1/8" (3 mm) around tubewell in bore

hole complete as per specification:-

Rft 150.00

C

Providing and fixing Solar Water Pump Including

Converter 22 Watts Mercible Water Pump Of 1

Inch Discharge, cable & Two Chain Complete in

All Respects

Each 1.00

4(i)DISMANTLING THREE EXISTING

TOILETS

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-22-a Dismantling 1st class tile roofing m2 9.51

04-13Dismantling brick work in lime or cement

mortarm3 9.85

01-01-aCarriage of 100 cft / 5 tonne of all materials

by truck or other means 1st 30 meter30M 9.85

01-01-bCarriage of 100 cft / 5 tonne of all materials

by truck or other means 2nd 30 meter30M 9.85

4(ii)CONSTRUCTION OF 2 NEW

TOILETS

NSI

Total Amount (Rs)

Sub-Total Amount (Rs)

Sub-Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#8 Page 28 of 90

Page 29: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

03-25-bExcavation in foundation of building.

bridges etc complete : In ordinary soilm3 16.32

03-67-cStructural backfill using Common Material

available at site.m3 2.83

06-05-i

Plain Cement Concrete incl. Placing,

compacting, finishing & curing (Ratio

1:4:8)

m3 2.69

07-04-a-041st class brick work in foundation and

plinth in Cement, sand mortar 1:5m3 5.17

06-05-fPlain Cement Concrete including placing,

compacting finishing & curing (Ratio 1:2:4)m3 0.28

06-26-a-02

Damp proof course of cem. conc. 1:2:4

including bitumen coat, 1 layer polythene &

1 coat bitumen (2" thick)

m2 3.47

07-05-a-041st class brick work in ground floor

Cement, sand mortar 1:5m3 7.10

11-09-c Cement plaster 1:4 upto 20' height:

3/4" thickm2 33.01

11-23-a-01 White washing: New surface : One coat m2 33.01

11-23-a-02 White washing: New surface : One coat m2 33.01

07-30Supplying and filling sand under floor or

plugging in wellsm3 3.93

11-18-bCement pointing struck joints, on walls,

upto 20' height :Ratio 1:3m2 21.54

11-29

Extra cost of labour & material for red

oxide pigment in cement pointing to match

bricks

m2 21.54

10-39-a

Glazed tile 1/4" thick dado jointed in white

cement complete : Coloured Plain tilesm2 11.52

10-55-lProviding and Fixing of Bathroom tiles

10" x 20" of imported approved qualitym2 8.30

10-50-aProviding and Fixing Ceramic Floor Tiles of

approved quality of Size : 12" x 12"m2 10.16

25-39-a-04

Providing and fixing steel

windows/ventilator with openable glazed

pannels, using beam section for frame 1-

1/2" x 1" x 5/8" x 1/8", z-section for leaves

3/4" x 1" x 3/4" x 1/8", T- section sashes

1"x1"x1/8", glass panes, wooden screed for

glazing embded over a thin layer of putty

duly screwed with leaves, brass fittings

holdfast, duly painted, complete in all

respects, including all cost of material and

labour etc. as per approved design and as

directed by the engineer - in -charge: Glass

pane 4mm thick

sft 5.00

12-70-a

Supply and Fixing MS Sheet 16 guage(10'' x

2'') box type chowkats including fixing in

position with all charges for Hold fast,

Hinges and .Painting etc

m 9.45

25-45-a

Supplying and Fixing 18 SWG MS Sheet

Door with angleiron frame (1.5"x1.5"x1/8"),

bolt, hinges, paint etc complete

m2 3.02

Total Cost - Site#8 Page 29 of 90

Page 30: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

09-46

Providing and Laying Prestressed Roof of

Slab/Girder, 2" thick PCC 1:2:4 with

chicken mesh, polythene, mud, tar

m2 9.05

PLUMBING WORKS

14-01-b

Providing and Fixing glazed earthen ware

WC European type of approved make/size

excluding cost of seat & cover, complete in

all respects:

Coloured

(FOR UNHCR STAFF)

each 1.00

14-03-b

Providing and Fixing glazed earthen ware

WC squatting type with built-in foot rests

complete in all respects : Coloured

(one in simple toilet +one for UNHCR

STAFF)

each 2.00

14-10-a

Providing and Fixing glazed earthen ware

lowdown flushing cistern 3 gallons (13.63

Liters) capacity including bracket set,

copper connection, etc. complete in all

respects: White

each 3.00

14-13Providing and fixing choricum plated soap

dish complete.Each 2.00

14-15Providing and Fixing CP (chromium plated)

toilet paper holder completeEach 2.00

14-55-eProviding and Fixing GI pipe & including

specials complete 3/4" dia (light)rft 100.00

14-55-fProviding and Fixing GI pipe & including

specials complete 1/2" dia (light)rft 60.00

14-69-b-01

Supplying and Fixing Polyethylene Water

Tank made from food grade FDA Certified

raw material, 3 layers UV stablized, inert

with water, anti-fungus and anti-bacterial

and have a service life of more than 10

years : 200 gallons

(Horizontal)

Each 1.00

14-05-a-07

Providing and Fixing glazed earthen ware

wash hand basin (WHB) complete size

56x40 cm (22"x16"), including bracket set,

waste coupling, complete in all respects:

White without pedestal (Normal Quality)

Each 2.00

14-27-a

Providing and fixing chorimum plated (CP)

mixing valve for wash hand basin (WHB),

sink or shower of approved (Best) quality

Each 2.00

14-24-b

Providing and fixing chromium plated (CP)

bib-cock heavy duty of approved quality :

1.5 cm 1/2"

each 2.00

14-48-bProviding and Fixing brass ball float valve

of approved quality: 3/4" diaEach 2.00

14-33

Providing and Fixing 4" gully trap of

approved quality including cement concrete

cost of PVC grating 6" x6" (150 x 150 mm)

and masonry chamber 12"x12" (300 x 300

mm).

Each 3.00

Sub-Total Amount (Rs)

Total Cost - Site#8 Page 30 of 90

Page 31: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

23-10 Septic Tank (int.Size: 7'x2'x5') complete Each 1.00

14-144-bSupplying and Fixing UPVC soil waste and

vent pipe class B : 4" diaRft 70.00

14-144-cSupplying and Fixing UPVC soil waste and

vent pipe class B : 3" diaRft 20.00

06-07-d-05

Providing manhole size 24" x 18" (inside

dimensions) as per approved design and

specifications complete for 4" to 12" dia pipes

upto 4 ft. (1.2 m) depth with 16" dia.Concrete

Cover fixed in 4" thick RCC 1:2:4 slab (with 5

lbs per Cu.ft. or 80 kg/Cu.m of steel), burnt brick

masonry walls 9" (225 mm) thick set in 1:3

cement sand mortar, 6" thick 1:3:6 cement

concrete in foundation, 4" av. thickness 1:2:4

cement concrete in benching and 1/2" (13mm)

thick cement sand plaster in 1:3 to all inside wall

surfaces, channels and benching including

making requisite number of main and branch

channels but excluding the cost of excavation,

back filling and disposal of excavated stuff.

Each 2.00

14-37-c

Supply and Fixing cast iron (CI) manhole

cover with frame etc (Heavey Type) of

approved quality complete: 24" (610 mm)

dia

Each 2.00

23-11 Soakage Pit (6'dia x 15' deep) complete Each 1.00

14-31-b

Providing and Fixing cast iron (CI) floor

trap approved quality including CI grating

& concrete chamber all round : 4"x3" (100

mm x 75 mm)

Each 2.00

14-37-a

Supply and Fixing cast iron (CI) manhole

cover with frame etc (Heavy Type) of

approved quality complete: 12" (300 mm)

dia

Each 2.00

5

CONCRETE PATCHING FROM

GATE (INNER SIDES).

PATHWAYS LEADING TO NEW

FURNISHED PROPOSED OFFICE.

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

06-05-f

Plain Cement Concrete including placing,

compacting, finishing & curing (Ratio

1:2:4)

m3 8.15

6 ROOF TREATMENT

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

14-97Supply of Polythene sheet of approved

qualityKG 15.56

09-11-b

Earth filling over roof including watering,

ramming etc 4" thick earth filling and 1"

mud plaster

m2 63.64

Sub-Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#8 Page 31 of 90

Page 32: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

06-05-f

Plain Cement Concrete including placing,

compacting, finishing & curing (Ratio

1:2:4)

m3 1.20

15-02-a-08

Supply and Fixing PVC pipe for draining

rain water (from roof) complete On surface

including clamps etc: 4" i/d

m 7.31

07-05-a-041st class brick work in ground floor

Cement, sand mortar 1:5m3 1.41

09-31 Fixing water spouse or parnala. Each 1.00

7 NEW GATE FOR RVA OFFICE.

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

25-45-b

Supplying and Fixing 18 SWG MS Sheet

Gate with angle iron frame (2"x2"x3/16")

with side window, lock, painting etc

m2 6.69

8WHITE WASHING OF DOMES &

BUILDING

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-45-a Scraping : White wash or colour wash m2 419.39

11-23-b-01 White washing: Old surface : One coat m2 419.39

11-23-b-02 White washing: Old surface : Two coats m2 419.39

9

NOTED PARKING PLACE

CONCRETE INCLUDING

FILLING.

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

25-58-b

Providing and fixing of parking shed

consisting of CGI Sheet, tubular pipe frame

(heavy) quality and circular columns

excluding cost of foundation.

M2 46.47

06-05-f

Plain Cement Concrete including placing,

compacting, finishing & curing (Ratio

1:2:4)

m3 4.67

10NEW EASTERN BOUNDARY

WALL .

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-13Dismantling brick work in lime or cement

mortarm3 17.99

03-25-bExcavation in foundation of building.

bridges etc complete : In ordinary soilm3 30.83

06-05-i

Plain Cement Concrete incl. Placing,

compacting, finishing & curing (Ratio

1:4:8)

m3 3.39

06-26-b-02

Damp proof course of cem. conc. 1:2:4

including bitumen coat, 1 layer polythene &

2 coats bitumen (2" thick

m2 8.43

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#8 Page 32 of 90

Page 33: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

07-04-a-041st class brick work in foundation and

plinth in Cement, sand mortar 1:5m3 10.92

07-05-a-041st class brick work in ground floor

Cement, sand mortar 1:5m3 17.99

11-18-bCement pointing struck joints, on walls,

upto 20' height :Ratio 1:3m2 78.72

11-29

Extra cost of labour & material for red

oxide pigment in cement pointing to match

bricks

m2 78.72

11EXISTING DOORS/WINDOWS

PAINT.

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

13-02-c-01Painting old surfaces : Doors / windows any

type First coatm2 37.36

13-02-c-02Painting old surfaces : Doors / windows any

type Each subsequent coatm2 37.36

12

OPEN DRAINS NEAR EXISTING

HAND PUMP &UNDERGROUND

DRAINLINE FOR DRAINING

WATER OUT.

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

03-25-bExcavation in foundation of building.

bridges etc complete : In ordinary soilm3 21.29

06-05-fPlain Cement Concrete including placing,

compacting finishing & curing (Ratio 1:2:4)m3 5.65

14-31-b

Providing and Fixing cast iron (CI) floor

trap approved quality including CI grating

& concrete chamber all round : 4"x3" (100

mm x 75 mm)

Each 4.00

03-67-cStructural backfill using common material

available at sitem3 3.57

06-05-i

Plain Cement Concrete incl. Placing,

compacting, finishing & curing (Ratio

1:4:8)

m3 0.76

15-02-a-08

Supply and Fixing PVC pipe for draining

rain water (from roof) complete On surface

including clamps etc: 4" i/d

m 51.81

03-60

Clearance of site by cutting, removing all

shrubs, trees, upto 6 inches (152 mm) girth,

etc. and taking out their entire roots and

filling the hollows with earth complete with

dressing, consolidating and watering the

filling including stacking the serviceable

materials and disposal of useless material as

directed, lead to 10 chains, cost of earth

included.

m2 16.73

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#8 Page 33 of 90

Page 34: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

13

PROPOSING NEW SHED (15'X25')

HAVING PRECAST SLAB/GIRDER

ROOF & PILLARS FOR TRAINING

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

09-46

Providing and Laying Prestressed Roof of

Slab/Girder, 2" thick PCC 1:2:4 with

chicken

mesh, polythene, mud, tar

m2 34.85

BRICK COLUMNS FOR TRAINING

SHED

03-25-bExcavation in foundation of building.

bridges etc complete : In ordinary soilm3 0.77

06-05-i

Plain Cement Concrete incl. Placing,

compacting, finishing & curing (Ratio

1:4:8)

m3 0.13

07-04-a-041st class brick work in foundation and

plinth in Cement, sand mortar 1:5m3 0.25

07-05-a-041st class brick work in ground floor

Cement, sand mortar 1:5m3 1.74

11-09-c Cement plaster 1:4 upto 20' height:

3/4" thickm2 3.36

(13-25-a

)+(13-25-b)

Preparing surface & painting with snowcem

/ weathershield paint : First coat+2ND

COAT ANY SUBSEQUENT COAT

m2 3.36

14APRON SHAPE (CONCRETE

PATCH) OUTSIDE GATE

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

06-05-f

Plain Cement Concrete including placing,

compacting, finishing & curing (Ratio

1:2:4)

m3 2.24

15CONSTRUCTION OF 2 NEW

TOILETS ( SIMPLE)

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

DISMANTLING WESTEN BOUNDARY

WALL OF LENGTH 14'-3" AND ITS

CONSTRUCTION FOR PARDA.

(COVERED IN CONSTRUCTION OF

TOILETS)

04-12 Dismantling brick work in mud mortar m3 0.76

04-13Dismantling brick work in lime or cement

mortarm3 2.32

01-01-aCarriage of 100 cft / 5 tonne of all materials

by truck or other means 1st 30 meter30M 3.93

01-01-bCarriage of 100 cft / 5 tonne of all materials

by truck or other means 2nd 30 meter30M 3.93

CONSTRUCTION OF TWO SIMPLE

TOILETS AS ASHOWN IN DRAWING

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#8 Page 34 of 90

Page 35: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

03-25-bExcavation in foundation of building.

bridges etc complete : In ordinary soilm3 16.32

03-67-cStructural backfill using Common Material

available at site.m3 2.83

06-05-i

Plain Cement Concrete incl. Placing,

compacting, finishing & curing (Ratio

1:4:8)

m3 2.69

07-04-a-041st class brick work in foundation and

plinth in Cement, sand mortar 1:5m3 5.17

06-05-fPlain Cement Concrete including placing,

compacting finishing & curing (Ratio 1:2:4)m3 0.28

06-26-a-02

Damp proof course of cem. conc. 1:2:4

including bitumen coat, 1 layer polythene &

1 coat bitumen (2" thick)

m2 3.47

07-05-a-041st class brick work in ground floor

Cement, sand mortar 1:5m3 7.10

11-09-c Cement plaster 1:4 upto 20' height:

3/4" thickm2 33.01

11-23-a-01 White washing: New surface : One coat m2 33.01

11-23-a-02 White washing: New surface : One coat m2 33.01

07-30Supplying and filling sand under floor or

plugging in wellsm3 3.93

11-18-bCement pointing struck joints, on walls,

upto 20' height :Ratio 1:3m2 21.54

11-29

Extra cost of labour & material for red

oxide pigment in cement pointing to match

bricks

m2 21.54

10-39-a

Glazed tile 1/4" thick dado jointed in white

cement complete : Coloured Plain tilesm2 11.52

10-50-aProviding and Fixing Ceramic Floor Tiles of

approved quality of Size : 12" x 12"m2 10.16

25-39-a-04

Providing and fixing steel

windows/ventilator with openable glazed

pannels, using beam section for frame 1-

1/2" x 1" x 5/8" x 1/8", z-section for leaves

3/4" x 1" x 3/4" x 1/8", T- section sashes

1"x1"x1/8", glass panes, wooden screed for

glazing embded over a thin layer of putty

duly screwed with leaves, brass fittings

holdfast, duly painted, complete in all

respects, including all cost of material and

labour etc. as per approved design and as

directed by the engineer - in -charge: Glass

pane 4mm thick

sft 5.00

12-70-a

Supply and Fixing MS Sheet 16 guage(10'' x

2'') box type chowkats including fixing in

position with all charges for Hold fast,

Hinges and .Painting etc

m 9.45

25-45-a

Supplying and Fixing 18 SWG MS Sheet

Door with angleiron frame (1.5"x1.5"x1/8"),

bolt, hinges, paint etc complete

m2 3.02

09-46

Providing and Laying Prestressed Roof of

Slab/Girder, 2" thick PCC 1:2:4 with

chicken mesh, polythene, mud, tar

m2 9.05

Total Cost - Site#8 Page 35 of 90

Page 36: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

PLUMBING WORKS

14-03-b

Providing and Fixing glazed earthen ware

WC squatting type with built-in foot rests

complete in all respects : Coloured

each 2.00

14-10-a

Providing and Fixing glazed earthen ware

lowdown flushing cistern 3 gallons (13.63

Liters) capacity including bracket set,

copper connection, etc. complete in all

respects: White

each 2.00

14-13Providing and fixing choricum plated soap

dish complete.Each 1.00

14-15Providing and Fixing CP (chromium plated)

toilet paper holder completeEach 2.00

14-55-eProviding and Fixing GI pipe & including

specials complete 3/4" dia (light)rft 100.00

14-55-fProviding and Fixing GI pipe & including

specials complete 1/2" dia (light)rft 40.00

14-69-b-01

Supplying and Fixing Polyethylene Water

Tank made from food grade FDA Certified

raw material, 3 layers UV stablized, inert

with water, anti-fungus and anti-bacterial

and have a service life of more than 10

years : 200 gallons

(Horizontal)

Each 1.00

14-05-a-07

Providing and Fixing glazed earthen ware

wash hand basin (WHB) complete size

56x40 cm (22"x16"), including bracket set,

waste coupling, complete in all respects:

White without pedestal (Normal Quality)

Each 1.00

14-27-a

Providing and fixing chorimum plated (CP)

mixing valve for wash hand basin (WHB),

sink or shower of approved (Best) quality

Each 1.00

14-24-b

Providing and fixing chromium plated (CP)

bib-cock heavy duty of approved quality :

1.5 cm 1/2"

each 2.00

14-48-bProviding and Fixing brass ball float valve

of approved quality: 3/4" diaEach 2.00

14-33

Providing and Fixing 4" gully trap of

approved quality including cement concrete

cost of PVC grating 6" x6" (150 x 150 mm)

and masonry chamber 12"x12" (300 x 300

mm).

Each 2.00

23-10 Septic Tank (int.Size: 7'x2'x5') complete Each 1.00

14-144-bSupplying and Fixing UPVC soil waste and

vent pipe class B : 4" diaRft 70.00

14-144-cSupplying and Fixing UPVC soil waste and

vent pipe class B : 3" diaRft 20.00

Sub-Total Amount (Rs)

Total Cost - Site#8 Page 36 of 90

Page 37: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

06-07-d-05

Providing manhole size 24" x 18" (inside

dimensions) as per approved design and

specifications complete for 4" to 12" dia pipes

upto 4 ft. (1.2 m) depth with 16" dia.Concrete

Cover fixed in 4" thick RCC 1:2:4 slab (with 5

lbs per Cu.ft. or 80 kg/Cu.m of steel), burnt brick

masonry walls 9" (225 mm) thick set in 1:3

cement sand mortar, 6" thick 1:3:6 cement

concrete in foundation, 4" av. thickness 1:2:4

cement concrete in benching and 1/2" (13mm)

thick cement sand plaster in 1:3 to all inside wall

surfaces, channels and benching including

making requisite number of main and branch

channels but excluding the cost of excavation,

back filling and disposal of excavated stuff.

Each 2.00

14-37-c

Supply and Fixing cast iron (CI) manhole

cover with frame etc (Heavey Type) of

approved quality complete: 24" (610 mm)

dia

Each 2.00

23-11 Soakage Pit (6'dia x 15' deep) complete Each 1.00

14-31-b

Providing and Fixing cast iron (CI) floor

trap approved quality including CI grating

& concrete chamber all round : 4"x3" (100

mm x 75 mm)

Each 2.00

14-37-a

Supply and Fixing cast iron (CI) manhole

cover with frame etc (Heavy Type) of

approved quality complete: 12" (300 mm)

dia

Each 2.00

Sub-Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#8 Page 37 of 90

Page 38: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

1 ROOF TREATMENT

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

14-97Supply of Polythene sheet of approved

qualityKG 24.41

06-05-f

Plain Cement Concrete including

placing,

compacting, finishing & curing (Ratio

1:2:4)

m3 5.42

15-02-a-08

Supply and Fixing PVC pipe for draining

rain water (from roof) complete On

surface including clamps etc: 4" i/d

m 7.31

07-05-a-041st class brick work in ground floor

Cement, sand mortar 1:5m3 2.26

2 WATER PUMP 2 HP

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

14-80-a

Supply and fixing of 2.0 HP Monoblock

water pump 1.5"x1.25" 3 stage model DE-

S3 (Deen Pump) single phase for 150 ft

head with all accessories

EACH 1.00

15-05-c

S&E single core PVC insulated copper

conductor 250/440V grade cable;

7/0.029"

m 35.00

3WHITE WASH OF BUILDING

COMPLETE

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-45-a Scraping : White wash or colour wash m2 571.38

11-23-b-01 White washing: Old surface : One coat m2 571.38

11-23-b-02 White washing: Old surface : Two coats m2 571.38

4

CONSTRUCTION OF NEW

BOUNDARY WALL OF 4.5"

HAVING 9"X9" COLUMNS AT

EVERY 10FT SEPARATING

COMMUNITY CENTER FROM

SCHOOL.

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

03-25-bExcavation in foundation of building.

bridges etc complete : In ordinary soilm3 13.93

06-05-i

Plain Cement Concrete incl. Placing,

compacting, finishing & curing (Ratio

1:4:8)

m3 2.30

06-26-b-02

Damp proof course of cem. conc. 1:2:4

including bitumen coat, 1 layer polythene

& 2 coats bitumen (2" thick

m2 8.57

Site#9: Community Centre Panian, Haripur

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#9 Page 38 of 90

Page 39: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

07-04-a-041st class brick work in foundation and

plinth in Cement, sand mortar 1:5m3 8.93

07-05-a-041st class brick work in ground floor

Cement, sand mortar 1:5m3 8.25

11-18-bCement pointing struck joints, on walls,

upto 20' height :Ratio 1:3m2 142.61

11-29

Extra cost of labour & material for red

oxide pigment in cement pointing to

match bricks

m2 142.61

5

REMOVING,CLEANING,

CUTTING OF TREES FOR

PATHWAYS & CLEANING OF

AREAS.

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

03-60

Clearance of site by cutting, removing all

shrubs, trees, upto 6 inches (152 mm)

girth, etc. and taking out their entire roots

and filling the hollows with earth

complete with dressing, consolidating

and watering the filling including

stacking the serviceable materials and

disposal of useless material as directed,

lead to 10 chains, cost of earth included.

m2 192.10

6

ELECTRIFICATION i-e FANS,

LIGHTS 4 FOR CLASSROOMS

AND 2 FOR VERANDAH (AC)

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

15-02-b-03

S&E PVC pipe/patti fitting for wiring

purpose complete Recessed in walls

incl.chase elc; 1" i/d

m 20.00

15-09-a

S&E MS sheet box of 16 SWG. 4 ;deep

with 3/16" thick bakelite sheet top etc

complete; 4"X 4"

Each 3.00

15-09-b

S&E MS sheet box of 16 SWG. 4 ;deep

with 3/16" thick bakelite sheet top etc

complete; 7"X 4"

Each 3.00

15-09-c

S&E MS sheet box of 16 SWG. 4 ;deep

with 3/16" thick bakelite sheet top etc

complete; 9"X 4"

Each 1.00

15-22-b S&E button holder /angle holder Brass Each 10.00

15-24-a

S&E tube light. incl. Rod choke etc.

complete single rod (40 Watts) with 1

chock& starter

Set 4.00

15-41

Earthing of iron clad aluminium swtches

etc with Gl. Wire # 8SWG in Gl. plpe 0

5' dia

job 1.00

15-50

Wiring of light/ Fan/ Call bell point in

3/0.029" PVC insulated bare cable in

PVC pipe recesssed

Each 10.00

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#9 Page 39 of 90

Page 40: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

15-68-c

S&E best quality AC ceiling fan

complete with GI. rod, canopy, blades &

regulator: 56" sweep

Each 4.00

15-25Supply and Erection girder clamp hook,

5/8" dia.for hanging ceiling fansEach 4.00

15-62

Supply and Erection Varanda & outside

room -light fitting round/square type with

gallery ,holder & 40 W bulb

Each 2.00

15-71-cSupply and Erection single phase

imported auto circuit breaker 20 Amp.Each 4.00

7

WALK WAYS FOR TOILETS

FROM ENTRANCE GATE AND

CLASSROOMS

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

06-05-f

Plain Cement Concrete including

placing,

compacting, finishing & curing (Ratio

1:2:4)

m3 3.36

8

REPAIR OF CEMENT PLASTER

OF AFFECTED AREAS AS

DISCUSSED AND NOTED

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-48-bRemoving from walls: Cement or lime

plasterm2 2.97

27-116

Repairs to plaster of thickness 1/2" to

3/4" in cement sand mortar 1:4 patches

of area 27 Sft and under, including

cutting the patch in proper shape, raking

out joints and preparing and plastering

the surface of the walls complete,

including nailing mesh on walls &

disposal

of rubbish to the dumping ground within

30

metres lead.

m2 2.97

9 NEW GATE

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-13Dismantling brick work in lime or

cement mortarm3 1.02

25-45-b

Supplying and Fixing 18 SWG MS Sheet

Gate with angle iron frame (2"x2"x3/16")

with side window, lock, painting etc

m2 4.46

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#9 Page 40 of 90

Page 41: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

10

CONSTRUCTION OF 2 NEW

TOILETS AT COMMUNITY

CENTER

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

03-25-bExcavation in foundation of building.

bridges etc complete : In ordinary soilm3 12.04

03-67-c

Structural backfill using Common

Material

available at site.

m3 2.83

06-05-i

Plain Cement Concrete incl. Placing,

compacting, finishing & curing (Ratio

1:4:8)

m3 3.97

07-04-a-041st class brick work in foundation and

plinth in Cement, sand mortar 1:5m3 4.01

06-05-f

Plain Cement Concrete including

placing, compacting finishing & curing

(Ratio 1:2:4)

m3 0.28

06-26-a-02

Damp proof course of cem. conc. 1:2:4

including bitumen coat, 1 layer polythene

& 1 coat bitumen (2" thick)

m2 2.43

07-05-a-041st class brick work in ground floor

Cement, sand mortar 1:5m3 5.04

11-09-c Cement plaster 1:4 upto 20' height:

3/4" thickm2 23.27

11-23-a-01 White washing: New surface : One coat m2 26.99

11-23-a-02 White washing: New surface : One coat m2 26.99

07-30Supplying and filling sand under floor or

plugging in wellsm3 1.70

11-18-bCement pointing struck joints, on walls,

upto 20' height :Ratio 1:3m2 12.50

11-29

Extra cost of labour & material for red

oxide pigment in cement pointing to

match bricks

m2 12.50

10-39-a

Glazed tile 1/4" thick dado jointed in white

cement complete : Coloured Plain tilesm2 11.52

10-50-a

Providing and Fixing Ceramic Floor

Tiles of

approved quality of Size : 12" x 12"

m2 3.72

25-39-a-04

Providing and fixing steel

windows/ventilator with openable glazed

pannels, using beam section for frame 1-

1/2" x 1" x 5/8" x 1/8", z-section for

leaves 3/4" x 1" x 3/4" x 1/8", T- section

sashes 1"x1"x1/8", glass panes, wooden

screed for glazing embded over a thin

layer of putty duly screwed with leaves,

brass fittings holdfast, duly painted,

complete in all respects, including all

cost of material and labour etc. as per

approved design and as directed by the

engineer - in -charge: Glass pane 4mm

thick

sft 5.00

Total Cost - Site#9 Page 41 of 90

Page 42: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

12-70-a

Supply and Fixing MS Sheet 16

guage(10'' x 2'') box type chowkats

including fixing in position with all

charges for Hold fast, Hinges and

.Painting etc

m 9.45

25-45-a

Supplying and Fixing 18 SWG MS Sheet

Door with angleiron frame

(1.5"x1.5"x1/8"), bolt, hinges, paint etc

complete

m2 3.02

09-46

Providing and Laying Prestressed Roof

of Slab/Girder, 2" thick PCC 1:2:4 with

chicken mesh, polythene, mud, tar

m2 6.04

PLUMBING WORKS

14-03-b

Providing and Fixing glazed earthen

ware WC squatting type with built-in

foot rests complete in all respects :

Coloured

each 2.00

14-10-a

Providing and Fixing glazed earthen

ware lowdown flushing cistern 3 gallons

(13.63 Liters) capacity including bracket

set, copper connection, etc. complete in

all respects: White

each 2.00

14-13Providing and fixing choricum plated

soap dish complete.Each 1.00

14-15Providing and Fixing CP (chromium

plated) toilet paper holder completeEach 2.00

14-55-e

Providing and Fixing GI pipe &

including specials complete 3/4" dia

(light)

rft 100.00

14-55-f

Providing and Fixing GI pipe &

including specials complete 1/2" dia

(light)

rft 40.00

14-69-b-01

Supplying and Fixing Polyethylene

Water Tank made from food grade FDA

Certified raw material, 3 layers UV

stablized, inert with water, anti-fungus

and anti-bacterial and have a service life

of more than 10 years : 200 gallons

(Horizontal)

Each 1.00

14-05-a-07

Providing and Fixing glazed earthen

ware wash hand basin (WHB) complete

size 56x40 cm (22"x16"), including

bracket set, waste coupling, complete in

all respects: White without pedestal

(Normal Quality)

Each 1.00

14-27-a

Providing and fixing chorimum plated

(CP) mixing valve for wash hand basin

(WHB), sink or shower of approved

(Best) quality

Each 1.00

14-24-b

Providing and fixing chromium plated

(CP) bib-cock heavy duty of approved

quality : 1.5 cm 1/2"

each 2.00

Sub-Total Amount (Rs)

Total Cost - Site#9 Page 42 of 90

Page 43: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

14-48-bProviding and Fixing brass ball float

valve of approved quality: 3/4" diaEach 2.00

14-33

Providing and Fixing 4" gully trap of

approved quality including cement

concrete cost of PVC grating 6" x6" (150

x 150 mm) and masonry chamber

12"x12" (300 x 300 mm).

Each 2.00

23-10Septic Tank (int.Size: 7'x2'x5')

completeEach 1.00

14-144-bSupplying and Fixing UPVC soil waste

and vent pipe class B : 4" diaRft 70.00

14-144-cSupplying and Fixing UPVC soil waste

and vent pipe class B : 3" diaRft 20.00

06-07-d-05

Providing manhole size 24" x 18" (inside

dimensions) as per approved design and

specifications complete for 4" to 12" dia pipes

upto 4 ft. (1.2 m) depth with 16" dia.Concrete

Cover fixed in 4" thick RCC 1:2:4 slab (with

5 lbs per Cu.ft. or 80 kg/Cu.m of steel), burnt

brick masonry walls 9" (225 mm) thick set in

1:3 cement sand mortar, 6" thick 1:3:6 cement

concrete in foundation, 4" av. thickness 1:2:4

cement concrete in benching and 1/2" (13mm)

thick cement sand plaster in 1:3 to all inside

wall surfaces, channels and benching

including making requisite number of main

and branch channels but excluding the cost of

excavation, back filling and disposal of

excavated stuff.

Each 2.00

14-37-c

Supply and Fixing cast iron (CI) manhole

cover with frame etc (Heavey Type) of

approved quality complete: 24" (610

mm) dia

Each 2.00

23-11 Soakage Pit (6'dia x 15' deep) complete Each 1.00

14-31-b

Providing and Fixing cast iron (CI) floor

trap approved quality including CI

grating & concrete chamber all round :

4"x3" (100 mm x 75 mm)

Each 2.00

14-37-a

Supply and Fixing cast iron (CI) manhole

cover with frame etc (Heavy Type) of

approved quality complete: 12" (300

mm) dia

Each 2.00

Sub-Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#9 Page 43 of 90

Page 44: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

1 FLOORING OF DOOM 10 MUD

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

10-15-dProvide & lay topping of concrete 1:2:4, including

surface finishing & dividing in panels : 2" thickm2 1.32

2DISMANTLING OF MUD

BOUNDARY WALL

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-12 Dismantling brick work in mud mortar m3 24.49

01-01-aCarriage of 100 cft / 5 tonne of all materials by

truck or other means 1st 30 meter30M 24.49

01-01-bCarriage of 100 cft / 5 tonne of all materials by

truck or other means 2nd 30 meter30M 24.49

3CONSTRUCTION OF NEW

BOUNDARY WALL

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

03-25-bExcavation in foundation of building. bridges

etc complete : In ordinary soilm3 19.59

06-05-iPlain Cement Concrete incl. Placing,

compacting, finishing & curing (Ratio 1:4:8)m3 3.23

06-26-b-02

Damp proof course of cem. conc. 1:2:4

including bitumen coat, 1 layer polythene & 2

coats bitumen (2" thick

m2 12.06

07-04-a-041st class brick work in foundation and plinth

in Cement, sand mortar 1:5m3 12.56

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 22.04

11-18-bCement pointing struck joints, on walls, upto

20' height :Ratio 1:3m2 192.94

11-29Extra cost of labour & material for red oxide

pigment in cement pointing to match bricksm2 192.94

4ROOF TREATMENT OF

DISPENSARY

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

14-97 Supply of Polythene sheet of approved quality KG 2.73

09-11-b

Earth filling over roof including watering,

ramming etc 4" thick earth filling and 1" mud

plaster

m2 11.15

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 0.40

15-02-a-08

Supply and Fixing PVC pipe for draining rain

water (from roof) complete On surface

including clamps etc: 4" i/d

m 3.66

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 0.47

Total Amount (Rs)

Site#10: FPHC Basoomera MCH, Haripur

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#10 Page 44 of 90

Page 45: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

5 ELECTRIFICATION FOR DOMES

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

15-09-a

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

4"X 4"

Each 8.00

15-09-c

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

9"X 4"

Each 4.00

15-22-b S&E button holder /angle holder Brass Each 16.00

15-50

Wiring of light/ Fan/ Call bell point in

3/0.029" PVC insulated bare cable in PVC

pipe recesssed

Each 16.00

15-69-a

Supply and Erection best quality exhaust fan

complete with shutter & regulator : 12"sweep Each 1.00

6

EXAHAST FAN & 4 NUMBER

GLASSES OF WINDOW &

VENTILATOR & water filter

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

15-67

Making hole in wall with necessary masonry

work for exhaust fan any

size complete

each 1.00

NSISupplying and installation of 5mm glass in

existing windowsm2 2.97

NSI Supplying and installation of water filter each 1.00

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#10 Page 45 of 90

Page 46: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

1 ROOF TREATMENT OF EPI ROOM

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

14-97 Supply of Polythene sheet of approved quality KG 4.14

09-11-b

Earth filling over roof including watering,

ramming etc 4" thick earth filling and 1" mud

plaster

m2 16.91

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 0.49

15-02-a-08

Supply and Fixing PVC pipe for draining rain

water (from roof) complete On surface

including clamps etc: 4" i/d

m 3.66

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 0.57

2ROOF TREATMENT OF DOME

(Adjacent to EPI ROOM)

09-13

2 coats of bitumen laid hot using 34 lbs. for

%sft over roof & blinded with sand at 1 cft per

% sft

m2 6.88

14-97 Supply of Polythene sheet of approved quality KG 1.68

11-07-c Cement plaster 1:2, upto 20' height 3/4" thick m2 7.11

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 0.34

3

CUTTING OF EXISTING PCC

DRAIN & TO PROVIDE PROPER

SLOPE TO DRAIN RAIN WATER.

03-25-cExcavation in foundation of building, bridges

etc complete : in hard soil or soft murumm3 2.86

06-05-fPlain Cement Concrete including placing,

compacting finishing & curing (Ratio 1:2:4)m3 2.15

4

RAISING OF BOUNDARY WALL

UPTO 1 FEET & 2 FEET AS

MENTIONED IN DRAWING.

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 3.10

5CGI SHEET /LEAKAGE OF

WAITING SHED

25-58-bSupply and Fixing of CGI sheets complete in

all respectm2 48.61

Site#11: BHU-4 Padana, Haripur

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#11 Page 46 of 90

Page 47: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

Total Amount (Rs)

Total Cost - Site#11 Page 47 of 90

Page 48: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

1 WHITE WASH COMPLETE

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-45-a Scraping : White wash or colour wash m2 857.15

11-23-b-01 White washing: Old surface : One coat m2 857.15

11-23-b-02 White washing: Old surface : Two coats m2 857.15

2 ROOF TREATMENT OF DOMES

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

09-13

2 coats of bitumen laid hot using 34 lbs. for

%sft over roof & blinded with sand at 1 cft per

% sft

m2 8.60

14-97 Supply of Polythene sheet of approved quality KG 2.10

11-07-c Cement plaster 1:2, upto 20' height 3/4" thick m2 49.77

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 0.42

3DOOM ELECTRIFICATION I-E

BOARD & PATTI/PIPE FITTING.

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

15-02-b-03S&E PVC pipe for wiring purpose complete

Recessed in walls incl.chase elc; 1" i/dRft 20.00

15-09-a

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

4"X 4"

Each 8.00

15-09-c

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

9"X 4"

Each 4.00

15-22-b S&E button holder /angle holder Brass Each 16.00

15-50

Wiring of light/ Fan/ Call bell point in

3/0.029" PVC insulated bare cable in PVC

pipe recesssed

Each 16.00

15-71-cSupply and Erection single phase imported

auto circuit breaker 20 Amp.Each 5.00

4 REPAIRING OF 4 DOORS OF

DOMES.

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

27-04Repairing & re-fixing of steel main gate i/c

hold fast, welding complete in all respectsm2 6.69

5EXTENSION OF CGI SHED UPTO

4'WIDE

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

25-58-b

Providing and fixing of parking shed

consisting of CGI Sheet, tubular pipe frame

(heavy) quality and circular columns

excluding cost of foundation.

m2 11.52

Site#12: BHU Deendah MCH, Haripur

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#12 Page 48 of 90

Page 49: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#12 Page 49 of 90

Page 50: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

1 WHITE WASH COMPLETE

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-45-a Scraping : White wash or colour wash m2 732.22

11-23-b-01 White washing: Old surface : One coat m2 732.22

11-23-b-02 White washing: Old surface : Two coats m2 732.22

2 ROOF TREATMENT OF DOMES

09-13

2 coats of bitumen laid hot using 34 lbs. for

%sft over roof & blinded with sand at 1 cft per

% sft

m2 17.19

14-97 Supply of Polythene sheet of approved quality KG 4.20

11-07-c Cement plaster 1:2, upto 20' height 3/4" thick m2 49.77

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 0.75

3 ROOF TREATMENT OF TOILETS

3 Supply of Polythene sheet of approved quality KG 1.16

09-11-b

Earth filling over roof including watering,

ramming etc 4" thick earth filling and 1" mud

plaster

m2 4.76

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 0.37

15-02-a-08

Supply and Fixing PVC pipe for draining rain

water (from roof) complete On surface

including clamps etc: 4" i/d

m 7.31

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 0.44

4 REPAIR OF MAIN GATE

27-77Removing old paint from woodwork/steel with

paint removem2 4.46

27-04Repairing & re-fixing of steel main gate i/c

hold fast, welding complete in all respectsm2 4.46

27-123

Painting on old G.I. sheet with synthetic

enamel paint of approved quality of required

colour to give an even shade:

m2 8.92

Total Amount (Rs)

Site#13: BHU-2 MCH, Haripur

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#13 Page 50 of 90

Page 51: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

1ROOF TREATMENT OF EXISTING

ROOMS & TOILETS

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

14-97 Supply of Polythene sheet of approved quality KG 25.26

09-11-b

Earth filling over roof including watering,

ramming etc 4" thick earth filling and

1"mudplaster

m2 103.30

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 5.74

15-02-a-08

Supply and Fixing PVC pipe for draining rain

water (from roof) complete On surface

including clamps etc: 4" i/d

m 7.31

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 6.73

2

NEW PRECAST SLAB/GIRDER

INCLUDING DISMANTLING OF

OLD ROOM'S VERANDAH ROOF

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-24Dismantling roof of wooden planks & battens

from any heightm2 94.80

01-01-aCarriage of 100 cft / 5 tonne of all materials by

truck or other means 1st 30 meter30 Meter 21.66

01-01-BCarriage of 100 cft / 5 tonne of all materials by

truck or other means 2nd 30 meter31 Meter 21.66

09-46

Providing and Laying Prestressed Roof of

Slab/Girder, 2" thick PCC 1:2:4 with chicken

mesh, polythene, mud, tar

m2 111.38

3NEW DOORS/WINDOWS FOR OLD

ROOMS

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

12-61

MS flat 1/2"x1/8" grill in windows of

approved design including painting 3 coats,

complete

m2 6.69

25-39-b-05

Providing and Fixing steel windows 18 gauge

with openable glazed panels With 22 SWG

wire gauze : Glass pane 5mm

m2 6.69

25-45-a

Supplying and Fixing 18 SWG MS Sheet

Door with angleiron frame (1.5"x1.5"x1/8"),

bolt, hinges, paint etc complete

m2 8.46

4VERANDAH COLUMNS (BRICK

MASONRY)

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

03-25-bExcavation in foundation of building. bridges

etc complete : In ordinary soilm3 3.06

Site#14: BHU Ghulam Banda, Kohat

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#14 Page 51 of 90

Page 52: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

06-05-iPlain Cement Concrete incl. Placing,

compacting, finishing & curing (Ratio 1:4:8)m3 0.34

06-05-fPlain Cement Concrete including placing,

compacting finishing & curing (Ratio 1:2:4)m3 0.51

06-26-b-02

Damp proof course of cem. conc. 1:2:4

including bitumen coat, 1 layer polythene & 2

coats bitumen (2" thick

m2 0.84

07-04-a-041st class brick work in foundation and plinth

in Cement, sand mortar 1:5m3 2.29

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 1.72

11-18-bCement pointing struck joints, on walls, upto

20' height :Ratio 1:3m2 22.58

11-29Extra cost of labour & material for red oxide

pigment in cement pointing to match bricksm2 22.58

5 SOLAR ELECTRIFICATION

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

15-02-b-03S&E PVC pipe for wiring purpose complete

Recessed in walls incl.chase elc; 1" i/dRft 30.00

15-09-a

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

4"X 4"

Each 6.00

15-09-c

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

9"X 4"

Each 2.00

15-22-b S&E button holder /angle holder Brass Each 12.00

15-50

Wiring of light/ Fan/ Call bell point in

3/0.029" PVC insulated bare cable in PVC

pipe recesssed

Each 12.00

15-68-c

S&E best quality AC/DC ceiling fan complete

with GI. rod, canopy, blades & regulator: 56"

sweep

Each 6.00

15-25Supply and Erection girder clamp hook, 5/8"

dia.for hanging ceiling fansEach 6.00

15-71-cSupply and Erection single phase imported

auto circuit breaker 20 Amp.Each 6.00

26-01-d-01

Supply and Erection of Solar PV Module

(Solar Panel) Mono-crystalline A-Grade (per

Watt) (As per Approved

Specifications)(260x4=1040Watt)

watt 1,040.00

26-01-n-03Supply and Erection of Stainless Steel Nuts

and Boltswatt 1,040.00

26-01-m-01

Supply and Erection of hot dipped (80

microns Average) galvanized steel of

minimum thickness of 12 SWG / 2.64 mm

Channel / Pipe or 8 SWG / 4.06 mm Angle

Per Watt 1,040.00

NSISupply and Fixing LED light Bulb Fixture

(12 watts)Each 6.00

NSI Lead Acid Battery 12 Volt 150AH Each 1.00

NSI Solar Charge Controller Each 1.00

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#14 Page 52 of 90

Page 53: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

6

PCC FLOORING IN FRONT OF

ROOMS (OLD & NEW ) ALSO FROM

GATE PORTION

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 6.97

7BOUNDARY WALL REPAIR I-E

PLASTER, BRICK MASONRY

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-48-b

MRS-2017Removing from walls: Cement or lime plaster m2 181.69

27-116

Repairs to plaster of thickness 1/2" to 3/4" in

cement sand mortar 1:4 patches of area 27 Sft

and under, including cutting the patch in

proper shape, raking out joints and preparing

and plastering the surface of the walls

complete, including disposal

of rubbish to the dumping ground within 30

metres lead.

m2 93.40

11-18-bCement pointing struck joints, on walls, upto

20' height :Ratio 1:3m2 88.29

11-29Extra cost of labour & material for red oxide

pigment in cement pointing to match bricksm2 88.29

8

DISMANTLING & ITS NEW

CONSTRUCTION OF WALL AS

MENTION IN DRAWING

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-13Dismantling brick work in lime or cement

mortarm3 7.17

03-25-bExcavation in foundation of building. bridges

etc complete : In ordinary soilm3 34.19

06-05-iPlain Cement Concrete incl. Placing,

compacting, finishing & curing (Ratio 1:4:8)m3 3.22

06-26-b-02

Damp proof course of cem. conc. 1:2:4

including bitumen coat, 1 layer polythene & 2

coats bitumen (2" thick

m2 8.02

07-04-a-041st class brick work in foundation and plinth

in Cement, sand mortar 1:5m3 12.82

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 12.21

11-18-bCement pointing struck joints, on walls, upto

20' height :Ratio 1:3m2 53.44

11-29Extra cost of labour & material for red oxide

pigment in cement pointing to match bricksm2 53.44

9BARBED WIRE ON BOUNDARY

WALL

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#14 Page 53 of 90

Page 54: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

28-17-b

Providing and Fixing barbed wire fencing with

4 horizontal & 2 cross wires : With PCC 1:4:8

base 12"x12"x21"

M 154.93

10WHITE WASH OF COMPLETE

BUILDING

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-45-a Scraping : White wash or colour wash m2 1,041.17

11-23-b-01 White washing: Old surface : One coat m2 1,041.17

11-23-b-02 White washing: Old surface : Two coats m2 1,041.17

11 MAIN GATE

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

27-77Removing old paint from woodwork/steel with

paint removem2 8.68

27-04Repairing & re-fixing of steel main gate i/c

hold fast, welding complete in all respectsm2 6.04

25-58-aSupply and Fixing of CGI sheets on existing

frame complete in all respect.m2 3.07

27-123

Painting on old G.I. sheet with synthetic

enamel paint of approved quality of required

colour to give an even shade:

m2 6.13

12ACCESSIBILITY TO BHU

(CONCRETE ROAD)

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

16-04-aGranular Sub Base Course using Pit Run

Gravelm3 47.42

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 23.81

14-144-aSupplying and Fixing UPVC soil waste and

vent pipe class B : 6" diaRFT 14.63

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#14 Page 54 of 90

Page 55: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

1DISMANTLING OF EXISTING

TOILETS

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-22-a Dismantling 1st class tile roofing m2 6.26

04-12 Dismantling brick work in mud mortar m3 6.99

01-01-aCarriage of 100 cft / 5 tonne of all materials by

truck or other means 1st 30 meter30 Meter 6.99

01-01-BCarriage of 100 cft / 5 tonne of all materials by

truck or other means 2nd 30 meter31 Meter 6.99

2 ROOF TREATMENT OF 8 DOMES

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

09-13

2 coats of bitumen laid hot using 34 lbs. for

%sft over roof & blinded with sand at 1 cft per

% sft

m2 24.07

14-97 Supply of Polythene sheet of approved quality KG 5.89

11-07-c Cement plaster 1:2, upto 20' height 3/4" thick m2 56.88

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 1.17

3 White Wash

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-45-a Scraping : White wash or colour wash m2 499.75

11-23-b-01 White washing: Old surface : One coat m2 499.75

11-23-b-02 White washing: Old surface : Two coats m2 499.75

4SOLAR ELECTRIFICATION FOR 8

DOMES

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

15-02-b-03S&E PVC pipe for wiring purpose complete

Recessed in walls incl.chase elc; 1" i/dRft 30.00

15-09-a

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

4"X 4"

Each 6.00

15-09-c

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

9"X 4"

Each 3.00

15-22-b S&E button holder /angle holder Brass Each 16.00

15-50

Wiring of light/ Fan/ Call bell point in

3/0.029" PVC insulated bare cable in PVC

pipe recesssed

Each 16.00

15-68-c

S&E best quality AC/DC ceiling fan complete

with GI. rod, canopy, blades & regulator: 56"

sweep

Each 8.00

15-25Supply and Erection girder clamp hook, 5/8"

dia.for hanging ceiling fansEach 8.00

15-71-cSupply and Erection single phase imported

auto circuit breaker 20 Amp.Each 16.00

Site#15: BHU Oblan, Kohat

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#15 Page 55 of 90

Page 56: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

26-01-d-01

Supply and Erection of Solar PV Module

(Solar Panel) Mono-crystalline A-Grade (per

Watt) (As per Approved

Specifications)(260x5=780Watt)

watt 1,300.00

26-01-n-03Supply and Erection of Stainless Steel Nuts

and Boltswatt 1,300.00

26-01-m-01

Supply and Erection of hot dipped (80

microns Average) galvanized steel of

minimum thickness of 12 SWG / 2.64 mm

Channel / Pipe or 8 SWG / 4.06 mm Angle

Per Watt 1,300.00

NSISupply and Fixing LED light Bulb Fixture

(12 watts)Each 8.00

NSI Lead Acid Battery 12 Volt 150AH Each 2.00

NSI Solar Charge Controller Each 2.00

5PCC FLOORING AND PLINTH

PROTECTION OF DOMES

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-19-c Dismantling : Plain Cement Concrete 1:2:4 m3 3.53

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 9.66

6DRAINS UNDERGROUND & PIPE

OUTSIDE GATE

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

03-25-bExcavation in foundation of building. bridges

etc complete : In ordinary soilm3 1.60

03-67-cStructural backfill using common material

available at sitem3 1.60

23-01-c

Providing and laying R.C.C. pipe, moulded

with cement concrete 1:1-1/2:3, with spigot,

socket or collar joint, etc. including cost of

reinforcement,conforming to B.S. 5911: Part-

I, 1981 Class "L"including carriage, lowering

in trenches to correct alignment and grade,

jointing, cutting pipe where necessary,

finishing and testing, etc. complete:- 9"

dia:

M 25.30

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 0.08

14-31-b

Providing and Fixing cast iron (CI) floor trap

approved quality including CI grating &

concrete chamber all round : 4"x3" (100 mm x

75 mm)

Each 4.00

14-37-a

Supply and Fixing cast iron (CI) Floor trap

cover with frame etc (Heavy Type) of

approved quality complete: 12" (300 mm) dia

Each 4.00

7 DOORS/WINDOWS

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#15 Page 56 of 90

Page 57: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

13-02-c-01Painting old surfaces : Doors / windows any

type First coatm2 17.96

13-02-c-02Painting old surfaces : Doors / windows any

type Each subsequent coatm2 17.96

8MAIN GATE AND TWO DOMES

DOORS

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

27-77Removing old paint from woodwork/steel with

paint removem2 5.02

27-04Repairing & re-fixing of steel main gate i/c

hold fast, welding complete in all respectsm2 8.02

27-123

Painting on old G.I. sheet with synthetic

enamel paint of approved quality of required

colour to give an even shade:

m2 5.02

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#15 Page 57 of 90

Page 58: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

1ROOF TREATMENT OF EXISTING

ROOMS

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

14-97 Supply of Polythene sheet of approved quality KG 32.95

09-11-b

Earth filling over roof including watering,

ramming etc 4" thick earth filling and 1" mud

plaster

m2 134.76

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 1.63

15-02-a-08

Supply and Fixing PVC pipe for draining rain

water (from roof) complete On surface

including clamps etc: 4" i/d

m 3.66

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 1.91

2SOLAR ELECTRIFICATION OF 3

FANS 3 LIGHTS

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

15-02-b-03S&E PVC pipe for wiring purpose complete

Recessed in walls incl.chase elc; 1" i/dRft 30.00

15-09-a

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

4"X 4"

Each 6.00

15-09-c

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

9"X 4"

Each 2.00

15-22-b S&E button holder /angle holder Brass Each 6.00

15-50

Wiring of light/ Fan/ Call bell point in

3/0.029" PVC insulated bare cable in PVC

pipe recesssed

Each 6.00

15-68-c

S&E best quality AC/DC ceiling fan complete

with GI. rod, canopy, blades & regulator: 56"

sweep

Each 3.00

15-25Supply and Erection girder clamp hook, 5/8"

dia.for hanging ceiling fansEach 3.00

15-71-cSupply and Erection single phase imported

auto circuit breaker 20 Amp.Each 6.00

26-01-d-01

Supply and Erection of Solar PV Module

(Solar Panel) Mono-crystalline A-Grade (per

Watt) (As per Approved

Specifications)(260x2=520Watt)

watt 520.00

26-01-n-03Supply and Erection of Stainless Steel Nuts

and Boltswatt 520.00

26-01-m-01

Supply and Erection of hot dipped (80

microns Average) galvanized steel of

minimum thickness of 12 SWG / 2.64 mm

Channel / Pipe or 8 SWG / 4.06 mm Angle

Per Watt 520.00

NSISupply and Fixing LED light Bulb Fixture

(12 watts)Each 3.00

NSI Lead Acid Battery 12 Volt 150AH Each 1.00

NSI Solar Charge Controller Each 1.00

Site#16: BHU Ghamkol-2, Kohat

Total Amount (Rs)

Total Cost - Site#16 Page 58 of 90

Page 59: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

3WHITE WASH OF COMPLETE

BUILDING.

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-45-a Scraping : White wash or colour wash m2 546.04

11-23-a-03 White washing: New surface : Three coats m2 546.04

4 PCC FLOORING IN FRONT OF

VERANDAH

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 3.05

5 DOORS/WINDOWS PAINTING

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

13-02-c-01Painting old surfaces : Doors / windows any

type First coatm2 19.33

13-02-c-02Painting old surfaces : Doors / windows any

type Each subsequent coatm2 19.33

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#16 Page 59 of 90

Page 60: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

1DISMANTLING OF MUD

BOUNDARY WALL

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-12 Dismantling brick work in mud mortar m3 5.52

01-01-aCarriage of 100 cft / 5 tonne of all materials by

truck or other means 1st 30 meter30M 5.52

01-01-bCarriage of 100 cft / 5 tonne of all materials by

truck or other means 2nd 30 meter30M 5.52

2

CONSTRUCTION OF NEW

BOUNDARY WALL ONE SIDE TILL

MAIN GATE.

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

03-25-bExcavation in foundation of building. bridges

etc complete : In ordinary soilm3 7.36

06-05-iPlain Cement Concrete incl. Placing,

compacting, finishing & curing (Ratio 1:4:8)m3 1.21

06-26-b-02

Damp proof course of cem. conc. 1:2:4

including bitumen coat, 1 layer polythene & 2

coats bitumen (2" thick

m2 4.53

07-04-a-041st class brick work in foundation and plinth

in Cement, sand mortar 1:5m3 4.72

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 9.66

11-18-bCement pointing struck joints, on walls, upto

20' height :Ratio 1:3m2 84.57

11-29Extra cost of labour & material for red oxide

pigment in cement pointing to match bricksm2 84.57

3SOLAR ELECTRIFICATION - 6

ROOMS

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

15-02-b-03S&E PVC pipe for wiring purpose complete

Recessed in walls incl.chase elc; 1" i/dRft 30.00

15-09-a

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

4"X 4"

Each 6.00

15-09-c

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

9"X 4"

Each 2.00

15-22-b S&E button holder /angle holder Brass Each 12.00

15-50

Wiring of light/ Fan/ Call bell point in

3/0.029" PVC insulated bare cable in PVC

pipe recesssed

Each 12.00

15-68-c

S&E best quality AC/DC ceiling fan complete

with GI. rod, canopy, blades & regulator: 56"

sweep

Each 6.00

15-25Supply and Erection girder clamp hook, 5/8"

dia.for hanging ceiling fansEach 6.00

15-71-cSupply and Erection single phase imported

auto circuit breaker 20 Amp.Each 6.00

Site#17: FPHC Zangal Pataiy MCH, Mardan

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#17 Page 60 of 90

Page 61: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

26-01-d-01

Supply and Erection of Solar PV Module

(Solar Panel) Mono-crystalline A-Grade (per

Watt) (As per Approved

Specifications)(260x4=1040Watt)

watt 1,040.00

26-01-n-03Supply and Erection of Stainless Steel Nuts

and Boltswatt 1,040.00

26-01-m-01

Supply and Erection of hot dipped (80

microns Average) galvanized steel of

minimum thickness of 12 SWG / 2.64 mm

Channel / Pipe or 8 SWG / 4.06 mm Angle

Per Watt 1,040.00

NSISupply and Fixing LED light Bulb Fixture

(12 watts)Each 6.00

NSI Lead Acid Battery 12 Volt 150AH Each 1.00

NSI Solar Charge Controller Each 1.00

4INTERNAL SIDE

(DOMES)

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-45-b

Scraping : Ordinary distemper, oil bound

distemper or paint off wall M2 291.87

11-21-b-01 Distempering Old surface : One coat m2 291.87

11-21-b-02 Distempering Old surface : Two coats m2 291.87

5EXTERNAL SIDE

(COMPLETE BUILDING)

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-45-a Scraping : White wash or colour wash m2 99.54

11-23-b-01 White washing: Old surface : One coat m2 99.54

11-23-b-02 White washing: Old surface : Two coats m2 99.54

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#17 Page 61 of 90

Page 62: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

1 UNDERGROUND WATER TANK

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

Already taken with Wash hand facility.

2

RAISING OF BOUNDARY WALL

UPTO 2 FEET AND COLUMNS AT

EVERY 10'

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 2.51

11-18-bCement pointing struck joints, on walls, upto

20' height :Ratio 1:3m2 39.35

11-29Extra cost of labour & material for red oxide

pigment in cement pointing to match bricksm2 39.35

3WHITE WASH OF BOUNDARY

WALL

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-45-a Scraping : White wash or colour wash m2 193.25

11-23-b-01 White washing: old surface : Ist coat #N/A 193.25

11-23-b-01 White washing: old surface : 2nd coats #N/A 193.25

4

ROOF TREATMENT DOOM (THREE

PATCHES FOR PHARMACY ROOM

(ROOF LEAKAGE.)

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

09-13

2 coats of bitumen laid hot using 34 lbs. for

%sft over roof & blinded with sand at 1 cft per

% sft

m2 5.16

14-97 Supply of Polythene sheet of approved quality KG 1.26

11-07-c Cement plaster 1:2, upto 20' height 3/4" thick m2 9.48

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 0.25

5REPLACING WINDOWS GLASSES

IN OPD ROOM AND RECEPTION.

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

NSISupplying and installation of 5mm glass in

existing windowsm2 2.97

Total Amount (Rs)

Site#18: FPHC Barakai MCH, Mardan

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#18 Page 62 of 90

Page 63: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

1DISMANTLING OF EXISTING

ROOMS

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-24Dismantling roof of wooden planks & battens

from any heightm2 113.75

04-12 Dismantling brick work in mud mortar m3 41.63

01-01-aCarriage of 100 cft / 5 tonne of all materials by

truck or other means 1st 30 meter30M 67.62

01-01-bCarriage of 100 cft / 5 tonne of all materials by

truck or other means 2nd 30 meter30M 67.62

2CONSTRUCTION OF THREE

ROOMS

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

06-07-a-03RCC in roof slab, beam, column & other

structural members, insitu or precast. (1:2:4)m3 0.32

06-08-c

Supply & fabricate M.S. reinforcement for

cement concrete (Hot rolled deformed bars

Grade 40)

tonne 0.07

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 30.55

11-09-c Cement plaster 1:4 upto 20' height:

3/4" thickm2 235.71

11-18-bCement pointing struck joints, on walls, upto

20' height :Ratio 1:3m2 70.61

11-29Extra cost of labour & material for red oxide

pigment in cement pointing to match bricksm2 70.61

06-26-b-02

Damp proof course of cem. conc. 1:2:4

including bitumen coat, 1 layer polythene & 2

coats bitumen (2" thick

m2 10.59

(13-25-a)+(13-25-

b)

Preparing surface & painting with snowcem /

weathershield paint :1st, 2nd & subsequent

coats

m2 70.61

13-22-aPreparing surface and painting with emulsion

paint : First coatm2 294.33

13-22-bPreparing surface and painting with emulsion

paint : 2nd & each subsequent coat.m2 294.33

12-61

MS flat 1/2"x1/8" grill in windows of

approved design including painting 3 coats,

complete

m2 4.46

25-39-b-05

Providing and Fixing steel windows 18 gauge

with openable glazed panels With 22 SWG

wire gauze : Glass pane 5mm

m2 4.46

25-45-a

Supplying and Fixing 18 SWG MS Sheet

Door with angleiron frame (1.5"x1.5"x1/8"),

bolt, hinges, paint etc complete

m2 6.83

10-15-dProvide & lay topping of concrete 1:2:4, including

surface finishing & dividing in panels : 2" thickm2 94.24

09-46

Providing and Laying Prestressed Roof of

Slab/Girder, 2" thick PCC 1:2:4 with chicken mesh,

polythene, mud, tar

m2 104.83

Site#19: BHU Taimergarah, Taimergarah

Total Amount (Rs)

Total Cost - Site#19 Page 63 of 90

Page 64: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

15-02-a-08

Supply and Fixing PVC pipe for draining rain

water (from roof) complete On surface

including clamps etc: 4" i/d

m 10.06

3 FOUR NEW MANHOLES

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

06-07-d-05

Providing manhole size 24" x 18" (inside

dimensions) as per approved design and

specifications complete for 4" to 12" dia pipes upto

4 ft. (1.2 m) depth with 16" dia.Concrete Cover

fixed in 4" thick RCC 1:2:4 slab (with 5 lbs per

Cu.ft. or 80 kg/Cu.m of steel), burnt brick masonry

walls 9" (225 mm) thick set in 1:3 cement sand

mortar, 6" thick 1:3:6 cement concrete in

foundation, 4" av. thickness 1:2:4 cement concrete

in benching and 1/2" (13mm) thick cement sand

plaster in 1:3 to all inside wall surfaces, channels

and benching including making requisite number of

main and branch channels but excluding the cost of

excavation, back filling and disposal of excavated

stuff.

Each 4.00

14-37-c

Supply and Fixing cast iron (CI) manhole

cover with frame etc (Heavey Type) of

approved quality complete: 24" (610 mm) dia

Each 4.00

4 Drain

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

03-25-bExcavation in foundation of building. bridges

etc complete : In ordinary soilm3 0.82

06-05-fPlain Cement Concrete including placing,

compacting finishing & curing (Ratio 1:2:4)m3 0.64

06-07-a-03 RCC in roof slab, beam, column & other

structural members, insitu or precast. (1:2:4)m3 2.21

06-08-c

Supply & fabricate M.S. reinforcement for

cement concrete (Hot rolled deformed bars

Grade 40)

Ton 0.20

5SOLAR ELECTRIFICATION NEW

ROOMS

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

15-02-b-03S&E PVC pipe for wiring purpose complete

Recessed in walls incl.chase elc; 1" i/dRft 20.00

15-09-a

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

4"X 4"

Each 2.00

15-09-c

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

9"X 4"

Each 1.00

15-22-b S&E button holder /angle holder Brass Each 10.00

15-50

Wiring of light/ Fan/ Call bell point in

3/0.029" PVC insulated bare cable in PVC

pipe recesssed

Each 10.00

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#19 Page 64 of 90

Page 65: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

15-68-c

S&E best quality AC/DC ceiling fan complete

with GI. rod, canopy, blades & regulator: 56"

sweep

Each 3.00

15-25Supply and Erection girder clamp hook, 5/8"

dia.for hanging ceiling fansEach 3.00

15-71-cSupply and Erection single phase imported

auto circuit breaker 20 Amp.Each 6.00

26-01-d-01

Supply and Erection of Solar PV Module

(Solar Panel) Mono-crystalline A-Grade (per

Watt) (As per Approved

Specifications)(260x2=520Watt)

watt 520.00

26-01-n-03Supply and Erection of Stainless Steel Nuts

and Boltswatt 520.00

26-01-m-01

Supply and Erection of hot dipped (80

microns Average) galvanized steel of

minimum thickness of 12 SWG / 2.64 mm

Channel / Pipe or 8 SWG / 4.06 mm Angle

Per Watt 520.00

NSISupply and Fixing LED light Bulb Fixture

(12 watts)Each 3.00

NSI Lead Acid Battery 12 Volt 150AH Each 1.00

NSI Solar Charge Controller Each 1.00

6New Boundary wall for damaged

portion.

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

06-26-b-02

Damp proof course of cem. conc. 1:2:4

including bitumen coat, 1 layer polythene & 2

coats bitumen (2" thick

m2 3.49

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 7.43

11-18-bCement pointing struck joints, on walls, upto

20' height :Ratio 1:3m2 32.53

11-29Extra cost of labour & material for red oxide

pigment in cement pointing to match bricksm2 32.53

7WHITE WASH OF COMPLETE

BUILDING

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-45-a Scraping : White wash or colour wash m2 409.12

11-23-b-01 White washing: Old surface : One coat m2 409.12

11-23-b-02 White washing: Old surface : Two coats m2 409.12

8 ROOF TREATMENT

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

09-13

2 coats of bitumen laid hot using 34 lbs. for

%sft over roof & blinded with sand at 1 cft per

% sft

m2 5.16

14-97 Supply of Polythene sheet of approved quality KG 1.26

11-07-c Cement plaster 1:2, upto 20' height 3/4" thick m2 35.54

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#19 Page 65 of 90

Page 66: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 0.25

9 PCC TRACK FROM MAIN GATE.

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 7.20

10 MAIN GATE

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

27-77Removing old paint from woodwork/steel with

paint removem2 4.46

27-123

Painting on old G.I. sheet with synthetic

enamel paint of approved quality of required

colour to give an even shade:

m2 4.46

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#19 Page 66 of 90

Page 67: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

1DISMANTLING OF MUD

BOUNDARY WALL

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-12 Dismantling brick work in mud mortar m3 16.65

01-01-aCarriage of 100 cft / 5 tonne of all materials by

truck or other means 1st 30 meter30M 16.65

01-01-bCarriage of 100 cft / 5 tonne of all materials by

truck or other means 2nd 30 meter30M 16.65

2CONSTRUCTION OF NEW

BOUNDARY WALL

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

03-25-bExcavation in foundation of building. bridges

etc complete : In ordinary soilm3 11.10

06-05-iPlain Cement Concrete incl. Placing,

compacting, finishing & curing (Ratio 1:4:8)m3 2.77

06-26-b-02

Damp proof course of cem. conc. 1:2:4

including bitumen coat, 1 layer polythene & 2

coats bitumen (2" thick

m2 6.83

07-04-a-041st class brick work in foundation and plinth

in Cement, sand mortar 1:5m3 7.12

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 12.49

11-18-bCement pointing struck joints, on walls, upto

20' height :Ratio 1:3m2 109.29

11-29Extra cost of labour & material for red oxide

pigment in cement pointing to match bricksm2 109.29

3

PROVIDING CHAIN LINK FENCE

WITH CIRCULAR PIPE HAVING

HEIGHT OF 6 FT.

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

NSI

Providing and fixing chain link fence

including 3" GI Pipe (cutting , fixing, welding)

at 10 feet c/c distance and fence complete in

all respect also includes excavation and pcc

1:2:4 in foundation.

SFT 660.00

4

CLEANING OF OLD PLASTER AND

APPLYING NEW PLASTER TO THE

ROOF OF DOMES.

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-48-b Removing from walls: Cement or lime plaster m2 86.79

11-07-c Cement plaster 1:2, upto 20' height 3/4" thick m2 86.79

5 PCC TRACK FROM MAIN GATE.

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

Total Amount (Rs)

Site#20: BHU Toor Camp Munda, Taimergarah

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#20 Page 67 of 90

Page 68: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 13.85

15-02-a-08

Supply and Fixing PVC pipe for draining rain

water (from roof) complete On surface

including clamps etc: 4" i/d

m 10.97

6SOLAR ELECTRIFICATION 6FANS

6 LIGHTS

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

15-02-b-03S&E PVC pipe for wiring purpose complete

Recessed in walls incl.chase elc; 1" i/dRft 30.00

15-09-a

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

4"X 4"

Each 6.00

15-09-c

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

9"X 4"

Each 2.00

15-22-b S&E button holder /angle holder Brass Each 12.00

15-50

Wiring of light/ Fan/ Call bell point in

3/0.029" PVC insulated bare cable in PVC

pipe recesssed

Each 12.00

15-68-c

S&E best quality AC/DC ceiling fan complete

with GI. rod, canopy, blades & regulator: 56"

sweep

Each 6.00

15-25Supply and Erection girder clamp hook, 5/8"

dia.for hanging ceiling fansEach 6.00

15-71-cSupply and Erection single phase imported

auto circuit breaker 20 Amp.Each 6.00

26-01-d-01

Supply and Erection of Solar PV Module

(Solar Panel) Mono-crystalline A-Grade (per

Watt) (As per Approved

Specifications)(260x4=1040Watt)

watt 1,040.00

26-01-n-03Supply and Erection of Stainless Steel Nuts

and Boltswatt 1,040.00

26-01-m-01

Supply and Erection of hot dipped (80

microns Average) galvanized steel of

minimum thickness of 12 SWG / 2.64 mm

Channel / Pipe or 8 SWG / 4.06 mm Angle

Per Watt 1,040.00

NSISupply and Fixing LED light Bulb Fixture

(12 watts)Each 6.00

NSI Lead Acid Battery 12 Volt 150AH Each 1.00

NSI Solar Charge Controller Each 1.00

7 Drain

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

03-25-bExcavation in foundation of building. bridges

etc complete : In ordinary soilm3 3.53

06-05-fPlain Cement Concrete including placing,

compacting finishing & curing (Ratio 1:2:4)m3 2.20

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#20 Page 68 of 90

Page 69: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

8FILLING FOR THE SAKE OF

LEVELLING GROUND.

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

07-30Supplying and filling sand under floor or

plugging in wellsm3 3.11

9

RECONSTRUCTION OF THE

COLUMNS OF MAIN GATE AND

PAINTING THE EXISTING GATE.

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

03-25-bExcavation in foundation of building. bridges

etc complete : In ordinary soilm3 0.45

06-05-iPlain Cement Concrete incl. Placing,

compacting, finishing & curing (Ratio 1:4:8)m3 0.07

07-04-a-041st class brick work in foundation and plinth

in Cement, sand mortar 1:5m3 1.01

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 0.42

11-09-c Cement plaster 1:4 upto 20' height:

3/4" thickm2 3.72

27-77Removing old paint from woodwork/steel with

paint removem2 6.69

27-123

Painting on old G.I. sheet with synthetic

enamel paint of approved quality of required

colour to give an even shade:

m2 6.69

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#20 Page 69 of 90

Page 70: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

1DISMANTLING OF EXISTING

ROOF

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-22-aDismantling of existing precast slab/girder

roof m2 319.70

09-46

Providing and Laying Prestressed Roof of

Slab/Girder, 2" thick PCC 1:2:4 with chicken mesh,

polythene, mud, tar

m2 319.70

15-02-a-08

Supply and Fixing PVC pipe for draining rain

water (from roof) complete On surface

including clamps etc: 4" i/d

m 14.63

2

REMOVAL AND

RECONSTRUCTION OF COMPLETE

WALL.

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-13Dismantling brick work in lime or cement

mortarm3 8.03

06-26-b-02

Damp proof course of cem. conc. 1:2:4

including bitumen coat, 1 layer polythene & 2

coats bitumen (2" thick

m2 3.76

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 7.07

11-18-bCement pointing struck joints, on walls, upto

20' height :Ratio 1:3m2 35.13

11-29Extra cost of labour & material for red oxide

pigment in cement pointing to match bricksm2 35.13

15-67

Making hole in wall with necessary masonry

work for exhaust fan any

size complete

each 3.00

12-61

MS flat 1/2"x1/8" grill in windows of

approved design including painting 3 coats,

complete

m2 2.23

25-39-b-05

Providing and Fixing steel windows 18 gauge

with openable glazed panels With 22 SWG

wire gauze : Glass pane 5mm

m2 2.23

3 ELECTRIFICATION

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

15-02-b-03S&E PVC pipe for wiring purpose complete

Recessed in walls incl.chase elc; 1" i/dRft 50.00

15-09-c

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

9"X 4"

Each 10.00

15-22-b S&E button holder /angle holder Brass Each 20.00

15-50

Wiring of light/ Fan/ Call bell point in

3/0.029" PVC insulated bare cable in PVC

pipe recesssed

Each 20.00

15-68-c

S&E best quality AC ceiling fan complete

with GI. rod, canopy, blades & regulator: 56"

sweep

Each 2.00

Site#21: BHU Chakdara, Chakdara

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#21 Page 70 of 90

Page 71: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

15-25Supply and Erection girder clamp hook, 5/8"

dia.for hanging ceiling fansEach 2.00

15-71-cSupply and Erection single phase imported

auto circuit breaker 20 Amp.Each 5.00

4

Dismantling of existing floor and laying

of PCC floor of verandah of female

section

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-19-c Dismantling : Plain Cement Concrete 1:2:4 m3 3.19

10-15-dProvide & lay topping of concrete 1:2:4, including

surface finishing & dividing in panels : 2" thickm2 4.98

5SAFETY GRILL FOR BACKSIDE

VERANDAH

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

12-61

MS flat 1/2"x1/8" grill in windows of

approved design including painting 3 coats,

complete

m2 17.98

6REPLACEMENT OF GLASSES IN

EXISTING WINDOWS.

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

NSISupplying and installation of 5mm glass in

existing windowsm2 17.84

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#21 Page 71 of 90

Page 72: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

1

ROOF TREATMENT OF EXISTING

TOILET WILL BECOME FEMAL

TOILET

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

14-97 Supply of Polythene sheet of approved quality KG 1.45

09-11-b

Earth filling over roof including watering,

ramming etc 4" thick earth filling and 1" mud

plaster

m2 5.95

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 0.29

15-02-a-08

Supply and Fixing PVC pipe for draining rain

water (from roof) complete On surface

including clamps etc: 4" i/d

m 3.05

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 0.34

2ROOF TREATMENT OF DOMES (5

Nos)

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

09-13

2 coats of bitumen laid hot using 34 lbs. for

%sft over roof & blinded with sand at 1 cft per

% sft

m2 13.75

14-97 Supply of Polythene sheet of approved quality KG 3.36

11-07-c Cement plaster 1:2, upto 20' height 3/4" thick m2 35.55

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 0.67

3SOLAR ELECTRIFICATION - 6

ROOMS

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

15-02-b-03S&E PVC pipe for wiring purpose complete

Recessed in walls incl.chase elc; 1" i/dRft 30.00

15-09-a

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

4"X 4"

Each 6.00

15-09-c

S&E MS sheet box of 16 SWG. 4 ;deep with

3/16" thick bakelite sheet top etc complete;

9"X 4"

Each 2.00

15-22-b S&E button holder /angle holder Brass Each 12.00

15-50

Wiring of light/ Fan/ Call bell point in

3/0.029" PVC insulated bare cable in PVC

pipe recesssed

Each 12.00

15-68-c

S&E best quality AC/DC ceiling fan complete

with GI. rod, canopy, blades & regulator: 56"

sweep

Each 6.00

15-25Supply and Erection girder clamp hook, 5/8"

dia.for hanging ceiling fansEach 6.00

Site#22: PDH BHU Pusha Pul Dik, DI Khan

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#22 Page 72 of 90

Page 73: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

15-71-cSupply and Erection single phase imported

auto circuit breaker 20 Amp.Each 6.00

26-01-d-01

Supply and Erection of Solar PV Module

(Solar Panel) Mono-crystalline A-Grade (per

Watt) (As per Approved

Specifications)(260x4=1040Watt)

watt 1,040.00

26-01-n-03Supply and Erection of Stainless Steel Nuts

and Boltswatt 1,040.00

26-01-m-01

Supply and Erection of hot dipped (80

microns Average) galvanized steel of

minimum thickness of 12 SWG / 2.64 mm

Channel / Pipe or 8 SWG / 4.06 mm Angle

Per Watt 1,040.00

NSISupply and Fixing LED light Bulb Fixture

(12 watts)Each 6.00

NSI Lead Acid Battery 12 Volt 150AH Each 1.00

NSI Solar Charge Controller Each 1.00

4CONSTRUCTION OF ONE ROOM

WITH VERANDAH

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

03-25-bExcavation in foundation of building. bridges

etc complete : In ordinary soilm3 28.26

03-67-cStructural backfill using common material

available at sitem3 17.97

06-05-iPlain Cement Concrete incl. Placing,

compacting, finishing & curing (Ratio 1:4:8)m3 7.44

06-05-f

Plain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4)

For Pilnth Protection

m3 6.18

06-07-a-03RCC in roof slab, beam, column & other

structural members, insitu or precast. (1:2:4)m3 0.16

06-08-c

Supply & fabricate M.S. reinforcement for

cement concrete (Hot rolled deformed bars

Grade 40)

tonne 0.03

07-04-a-041st class brick work in foundation and plinth

in Cement, sand mortar 1:5m3 25.19

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 15.15

07-30Supplying and filling sand under floor or

plugging in wellsm3 30.68

11-09-c Cement plaster 1:4 upto 20' height:

3/4" thickm2 86.08

11-18-bCement pointing struck joints, on walls, upto

20' height :Ratio 1:3m2 77.52

11-29Extra cost of labour & material for red oxide

pigment in cement pointing to match bricksm2 77.52

06-26-b-02

Damp proof course of cem. conc. 1:2:4

including bitumen coat, 1 layer polythene & 2

coats bitumen (2" thick

m2 9.62

(13-25-a)+(13-25-

b)

Preparing surface & painting with snowcem /

weathershield paint :1st, 2nd & subsequent

coats

m2 77.52

13-22-aPreparing surface and painting with emulsion

paint : First coatm2 125.14

Total Amount (Rs)

Total Cost - Site#22 Page 73 of 90

Page 74: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

13-22-bPreparing surface and painting with emulsion

paint : 2nd & each subsequent coat.m2 125.14

12-61

MS flat 1/2"x1/8" grill in windows of

approved design including painting 3 coats,

complete

m2 2.97

25-39-b-05

Providing and Fixing steel windows 18 gauge

with openable glazed panels With 22 SWG

wire gauze : Glass pane 5mm

m2 2.97

25-45-a

Supplying and Fixing 18 SWG MS Sheet

Door with angleiron frame (1.5"x1.5"x1/8"),

bolt, hinges, paint etc complete

m2 2.76

10-15-dProvide & lay topping of concrete 1:2:4, including

surface finishing & dividing in panels : 2" thickm2 39.03

09-46

Providing and Laying Prestressed Roof of

Slab/Girder, 2" thick PCC 1:2:4 with chicken mesh,

polythene, mud, tar

m2 46.46

15-02-a-08

Supply and Fixing PVC pipe for draining rain

water (from roof) complete On surface

including clamps etc: 4" i/d

m 8.53

5 WAITING SHED 15'X20'

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

25-58-b

Providing and fixing of parking shed

consisting of CGI Sheet, tubular pipe frame

(heavy) quality and circular columns

excluding cost of foundation.

M2 27.88

6NEW GATE AND PATHWAYS

INNER AND OUTSIDE GATES

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

25-45-b

Supplying and Fixing 18 SWG MS Sheet Gate

with angle iron frame (2"x2"x3/16") with side

window, lock, painting etc

m2 5.95

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4)m3 5.69

7 FLOORING OF ALL DOMES

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

10-15-dProvide & lay topping of concrete 1:2:4, including

surface finishing & dividing in panels : 2" thickm2 4.23

REPAIR OF CEMENT PLASTER OF

AFFECTED AREAS AS DISCUSSED AND

NOTED

27-116

Repairs to plaster of thickness 1/2" to 3/4" in

cement sand mortar 1:4 patches of area 27 Sft

and under, including cutting the patch in

proper shape, raking out joints and preparing

and plastering the surface of the walls

complete, including nailing mesh on walls &

disposal

of rubbish to the dumping ground within 30

metres lead.

m2 47.58

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#22 Page 74 of 90

Page 75: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

8 WHITE WASH COMPLETE

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-45-a Scraping : White wash or colour wash m2 456.46

11-23-b-01 White washing: Old surface : One coat m2 456.46

11-23-b-02 White washing: Old surface : Two coats m2 456.46

9 NEW DOORS/WINDOWS

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

12-61

MS flat 1/2"x1/8" grill in windows of

approved design including painting 3 coats,

complete

m2 3.72

25-39-b-05

Providing and Fixing steel windows 18 gauge

with openable glazed panels With 22 SWG

wire gauze : Glass pane 5mm

m2 3.72

25-45-a

Supplying and Fixing 18 SWG MS Sheet

Door with angleiron frame (1.5"x1.5"x1/8"),

bolt, hinges, paint etc complete

m2 8.36

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#22 Page 75 of 90

Page 76: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

1 NEW GATE WITH COLUMNS

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

04-13Dismantling brick work in lime or cement

mortarm3 1.02

25-45-b

Supplying and Fixing 18 SWG MS Sheet

Gate with angle iron frame (2"x2"x3/16")

with side window, lock, painting etc

m2 4.46

03-25-bExcavation in foundation of building. bridges

etc complete : In ordinary soilm3 0.57

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 2.37

07-04-a-041st class brick work in foundation and plinth

in Cement, sand mortar 1:5m3 0.22

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 0.62

11-09-c Cement plaster 1:4 upto 20' height:

3/4" thickm2 6.51

2 NEW DOORS/WINDOWS

12-61

MS flat 1/2"x1/8" grill in windows of

approved design including painting 3 coats,

complete

m2 3.72

25-39-b-05

Providing and Fixing steel windows 18 gauge

with openable glazed panels With 22 SWG

wire gauze : Glass pane 5mm

m2 3.72

25-45-a

Supplying and Fixing 18 SWG MS Sheet

Door with angleiron frame (1.5"x1.5"x1/8"),

bolt, hinges, paint etc complete

m2 8.36

3 DOORS/WINDOWS REPAIR

27-113 Repair of doors/windows complete m2 14.50

13-02-c-01Painting old surfaces : Doors / windows any

type First coatm2 29.00

13-02-c-02Painting old surfaces : Doors / windows any

type Each subsequent coatm2 29.00

4

CONSTRUCTION OF NEW WALL,

NEW BOUNDARY WALL & 2

DOMES WALLS

03-25-bExcavation in foundation of building. bridges

etc complete : In ordinary soilm3 24.30

Site#23: PDH BHU Gambela, Lakki Marwat

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#23 Page 76 of 90

Page 77: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

06-05-iPlain Cement Concrete incl. Placing,

compacting, finishing & curing (Ratio 1:4:8)m3 3.21

06-26-b-02

Damp proof course of cem. conc. 1:2:4

including bitumen coat, 1 layer polythene & 2

coats bitumen (2" thick

m2 9.57

07-04-a-041st class brick work in foundation and plinth

in Cement, sand mortar 1:5m3 10.94

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 20.41

11-18-bCement pointing struck joints, on walls, upto

20' height :Ratio 1:3m2 93.55

11-29Extra cost of labour & material for red oxide

pigment in cement pointing to match bricksm2 93.55

5ROOF TREATMENT OF DOMES &

RELOCATION OF DOME DOOR

09-13

2 coats of bitumen laid hot using 34 lbs. for

%sft over roof & blinded with sand at 1 cft

per % sft

m2 48.14

14-97 Supply of Polythene sheet of approved quality KG 11.77

11-07-c Cement plaster 1:2, upto 20' height 3/4" thick m2 78.21

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 2.35

04-22-a Dismantling 1st class tile roofing m2 17.36

09-46

Providing and Laying Prestressed Roof of

Slab/Girder, 2" thick PCC 1:2:4 with chicken

mesh, polythene, mud, tar

m2 17.36

RELOCATION OF DOOM DOOR

04-13Dismantling brick work in lime or cement

mortarm3 0.35

07-05-a-041st class brick work in ground floor Cement,

sand mortar 1:5m3 0.35

11-09-c Cement plaster 1:4 upto 20' height:

3/4" thickm2 3.90

6 WHITE WASH COMPLETE

04-45-a Scraping : White wash or colour wash m2 904.52

11-23-b-01 White washing: Old surface : One coat m2 904.52

11-23-b-02 White washing: Old surface : Two coats m2 904.52

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#23 Page 77 of 90

Page 78: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

7

REPAIR OF CEMENT PLASTER OF

AFFECTED AREAS AS DISCUSSED

AND NOTED

27-116

Repairs to plaster of thickness 1/2" to 3/4" in

cement sand mortar 1:4 patches of area 27 Sft

and under, including cutting the patch in

proper shape, raking out joints and preparing

and plastering the surface of the walls

complete, including nailing mesh on walls &

disposal

of rubbish to the dumping ground within 30

metres lead.

m2 14.87

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#23 Page 78 of 90

Page 79: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

1 ROOF TREATMENT (DOMES)

S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

09-13

2 coats of bitumen laid hot using 34 lbs. for

%sft over roof & blinded with sand at 1 cft per

% sft

m2 15.47

14-97 Supply of Polythene sheet of approved quality KG 3.78

11-07-c Cement plaster 1:2, upto 20' height 3/4" thick m2 42.66

06-05-fPlain Cement Concrete including placing,

compacting, finishing & curing (Ratio 1:2:4) m3 0.75

2PROPERLY RE-FIX OF CGI SHEET

OF VERANDAH

25-58-a

Providing and fixing of existing CGI Sheet,

tubular pipe frame (heavy) quality and circular

columns excluding cost of foundation.

m2 15.06

3EXTERNAL SIDE DRAIN TO

PROTECT SEEPAGE DURING RAIN

03-25-bExcavation in foundation of building. bridges

etc complete : In ordinary soilm3 67.96

06-05-fPlain Cement Concrete including placing,

compacting finishing & curing (Ratio 1:2:4)m3 11.33

07-04-a-041st class brick work in foundation and plinth

in Cement, sand mortar 1:5m3 31.86

11-09-c Cement plaster 1:4 upto 20' height:

3/4" thickm2 134.91

06-07-a-03 RCC in roof slab, beam, column & other

structural members, insitu or precast. (1:2:4)m3 0.57

06-08-c

Supply & fabricate M.S. reinforcement for

cement concrete (Hot rolled deformed bars

Grade 40)

Ton 0.05

06-47-d

Erection and removal of Form work with

M.S.Pipe Scaffolding & Plywood Sheet for

RCC or Plain Concrete (Vertical)

m2 92.91

4

PROVIDING, LAYING AND

COMPACTING SHINGLE IN FRONT

OF MAIN GATE UPTO LENGTH 115

FT.

16-04-aGranular Sub Base Course using Pit Run

Gravelm3 16.99

Total Amount (Rs)

Site#24: FPHC MCH, Khaki

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Amount (Rs)

Total Cost - Site#24 Page 79 of 90

Page 80: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

S.NO DESCRIPTION AMOUNT (RS)

1 Construction of one room (20'x15' )size having verandah

2 SOLAR ELECTRIFICATION

3 Two new toilets

4 Solar bore upto 150 ft depth with a discharge of 1 inch

5

Construction of new boundary wall on backside and a portion of front

boundary wall.

6 Repair of main gate.

S.NO DESCRIPTION AMOUNT (RS)

MALE SECTION

1 Waiting shed leakage

2

Providing and laying shingle for lawn to provide slope (to drain off rain

water)

3 Solararization for 2 rooms

FEMALE SECTION

1 ROOF TREATMENT (DOMES)

2

BRICK MASONRY

(RELOCATION OF DOOR)

3 NEW DRAIN & PCC FLOORING IN FRONT OF EXISTING TOILETS

4

SOLAR ELECTRIFICATION FOR 4 ROOMS i-e 4 FANS AND 4

LIGHTS

5 2 EXHAUST FANS

6 WHITE WASH OF FEMALE STAFF HOUSE

Site#1: RVA Office Khurasan, Peshawar

Site#2: BHU Akora, Peshawar

TOTAL AMOUNT (RS)

Summary of Total Cost - All 24 Sites Page 80 of 91

Page 81: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

7 Generator shed

S.NO DESCRIPTION AMOUNT (RS)

1 Flooring of 3 rooms & verandah PCC Track

2 Internal rooms cement plaster upto sill level (4ft) with nailing

3

Providing and laying one wall of verandah to make it community

hall/waiting area including doors and windows of same size as already of

rooms.

4 Windows repair and painting complete in all respect

5 Solarization for 05 rooms

6 Chowkidar rooms window repair,wooden battens

7 Roof treatment

8 white washing

S.NO DESCRIPTION AMOUNT (RS)

1 ROOF TREATMENTS (GF)

2 NEW DOORS/WINDOWS

3 EXTERNAL DOOR REPAIR NEAR WATER TANK

4 SOLAR ELECTRIFICATION 6 FANS 6 LIGHTS

5 REPAIR OF STAIR SLAB

6 REFIXING OF DOOR AT GF

7 ELECTRIFICATION

Site#3: PDH Turkaman MCH, Peshawar

Site#4: FPHC Zandai MCH, Peshawar

TOTAL AMOUNT (RS)

TOTAL AMOUNT (RS)

Summary of Total Cost - All 24 Sites Page 81 of 91

Page 82: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

8 PLASTERING OF SHED (FF)

9 WHITE WASH OF COMPLETE BUILDING

10 PROVISION OF PRECAST SLAB/GIRDER FOR 1 ROOM (FF).

S.NO DESCRIPTION AMOUNT (RS)

1 Roof treatment of Main building and toliets/store

2 Internal rooms Cement plaster upto sill level (4 feet) with nailing.

3 white washing of complete building

4 Mud Leaping on Back Side wall mentioned in (8).

5 20 Number lights including verandah

S.NO DESCRIPTION AMOUNT (RS)

1

VERANDAH & WASHROOM COMPLETE SLAB REMOVING AND

REPLACE WITH PRECAST SLAB /GIRDERS

2 ROOF TREATMENT OF KITCHEN & STORE

3 WHITE WASH COMPLETE

4 ROOF TREATMENT OF DOMES

5 SOLAR ELECTRIFICATION FOR 6 ROOMS

S.NO DESCRIPTION AMOUNT (RS)

Site#7: PDH Badabair MCH, Peshawar

Site#6: FPHC Baghban MCH, Peshawar

TOTAL AMOUNT (RS)

Site#5: PDH Khurasan MCH, Peshawar

TOTAL AMOUNT (RS)

TOTAL AMOUNT (RS)

Summary of Total Cost - All 24 Sites Page 82 of 91

Page 83: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

1

PCC FLOORING IN VERANDAH & ALSO PCC 4" THICK IN

COURTYARD INFRONT OF MAIN GATE

2

ROOF TREATMENTS

(TWO ROOMS AND VERANDAH AS SHOWN IN DRAWINGS)

3

DOORS REPAIRS AND PAINTING & WINDOW REPAIR IN MCH

CLINIC

4 WHITE WASH OF COMPLETE BUILDING

5 SOLAR ELECTRIFICATION 6 FANS 6 LIGHTS

6 Wall mud leaping except medical officer room and MCH Clinic.

7 DRAINS

S.NO DESCRIPTION AMOUNT (RS)

1

REFURNISHING HALL INTO OFFICE SEPARATED BY PARTITION

WALL WITH DOOR , SHOULD CONTAINS VENTILATORS &

WINDOWS OF SIZE MORE THAN STANDARD SIZE , ALSO STAFF

2 SOLAR ELECTRIFICATION OF NEW PROPOSED HALL

3 SOLAR WATER PUMP

4 (i)

DISMANTLING THREE EXISTING TOILETS , 2 NEW TOILETS (1

SIMPLE TOILET + 1 FURNISHED TOILET FOR UNHCR STAFF).

4 (ii)

2 NEW TOILETS (1 SIMPLE TOILET + 1 FURNISHED TOILET FOR

UNHCR STAFF).

5

CONCRETE PATCHING FROM GATE (INNER SIDES). PATHWAYS

LEADING TO NEW FURNISHED PROPOSED OFFICE.

6 ROOF TREATMENT OF EXISTING ROOMS

7 NEW GATE FOR RVA OFFICE.

8 WHITE WASHING OF DOMES & BUILDING

9 NOTED PARKING PLACE CONCRETE INCLUDING FILLING.

10 NEW EASTERN BOUNDARY WALL .

11 EXISTING DOORS/WINDOWS PAINT.

Site#8: RVA Office Panian, Haripur

TOTAL AMOUNT (RS)

Summary of Total Cost - All 24 Sites Page 83 of 91

Page 84: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

12

OPEN DRAINS NEAR EXISTING HAND PUMP &UNDERGROUND

DRAINLINE FOR DRAINING WATER OUT.

13

PROPOSING NEW SHED (15'X25') HAVING PRECAST SLAB/GIRDER

ROOF & PILLARS FOR TRAINING

14 APRON SHAPE (CONCRETE PATCH) OUTSIDE GATE

15 TWO NEW TOILETS (SIMPLE)

S.NO DESCRIPTION AMOUNT (RS)

1 ROOF TREATMENT

2 WATER PUMP 2 HP

3 WHITE WASH OF BUILDING COMPLETE

4

CONSTRUCTION OF NEW BOUNDARY WALL OF 4.5" HAVING

9"X9" COLUMNS AT EVERY 10FT SEPARATING COMMUNITY

CENTER FROM SCHOOL.

5

REMOVING,CLEANING, CUTTING OF TREES FOR PATHWAYS &

CLEANING OF AREAS.

6

ELECTRIFICATION i-e FANS, LIGHTS 4 FOR CLASSROOMS AND 2

FOR VERANDAH (AC)

7

WALK WAYS FOR TOILETS FROM ENTRANCE GATE AND

CLASSROOMS

8

REPAIR OF CEMENT PLASTER OF AFFECTED AREAS AS

DISCUSSED AND NOTED

9 NEW GATE

10 2 NEW WASHROOMS

S.NO DESCRIPTION AMOUNT (RS)

1 FLOORING OF DOOM 10 MUD

2 DISMANTLING OF MUD BOUNDARY WALL

TOTAL AMOUNT (RS)

Site#9: Community Centre Panian, Haripur

TOTAL AMOUNT (RS)

Site#10: FPHC Basoomera MCH, Haripur

Summary of Total Cost - All 24 Sites Page 84 of 91

Page 85: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

3 CONSTRUCTION OF NEW BOUNDARY WALL

4 ROOF TREATMENT OF DISPENSARY

5 ELECTRIFICATION FOR DOMES

6

EXAHAST FAN & 4 NUMBER GLASSES OF WINDOW &

VENTILATOR & water filter

S.NO DESCRIPTION AMOUNT (RS)

1 ROOF TREATMENT OF EPI ROOM

2

ROOF TREATMENT OF DOME

(Adjacent to EPI ROOM)

3

CUTTING OF EXISTING PCC DRAIN & TO PROVIDE PROPER

SLOPE TO DRAIN RAIN WATER.

4

RAISING OF BOUNDARY WALL UPTO 1 FEET & 2 FEET AS

MENTIONED IN DRAWING.

5 CGI SHEET /LEAKAGE OF WAITING SHED

S.NO DESCRIPTION AMOUNT (RS)

1 WHITE WASH COMPLETE

2 ROOF TREATMENT OF DOMES

3 DOOM ELECTRIFICATION I-E BOARD & PATTI/PIPE FITTING.

4 REPAIRING OF 4 DOORS OF DOMES.

5 EXTENSION OF CGI SHED UPTO 4'WIDE

Site#12: BHU Deendah MCH, Haripur

TOTAL AMOUNT (RS)

Site#11: BHU-4 Padana, Haripur

TOTAL AMOUNT (RS)

TOTAL AMOUNT (RS)

Site#13: BHU-2 MCH, Haripur

Summary of Total Cost - All 24 Sites Page 85 of 91

Page 86: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

S.NO DESCRIPTION AMOUNT (RS)

1 WHITE WASH COMPLETE

2 ROOF TREATMENT OF DOMES

3 ROOF TREATMENT OF TOILETS

4 REPAIR OF MAIN GATE

S.NO DESCRIPTION AMOUNT (RS)

1 ROOF TREATMENT OF EXISTING ROOMS & TOILETS

2

NEW PRECAST SLAB/GIRDER INCLUDING DISMANTLING OF

OLD ROOM'S VERANDAH ROOF

3 NEW DOORS/WINDOWS FOR OLD ROOMS

4 VERANDAH COLUMNS (BRICK MASONRY)

5 SOLAR ELECTRIFICATION

6

PCC FLOORING IN FRONT OF ROOMS (OLD & NEW ) ALSO FROM

GATE PORTION

7 BOUNDARY WALL REPAIR I-E PLASTERING, POINTING

8

DISMANTLING & ITS NEW CONSTRUCTION OF WALL AS

MENTION IN DRAWING

9 BARBED WIRE ON BOUNDARY WALL

10 WHITE WASH OF COMPLETE BUILDING

11 MAIN GATE

12 ACCESSIBILITY TO BHU (CONCRETE ROAD)

Site#15: BHU Oblan, Kohat

Site#14: BHU Ghulam Banda, Kohat

TOTAL AMOUNT (RS)

TOTAL AMOUNT (RS)

Summary of Total Cost - All 24 Sites Page 86 of 91

Page 87: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

S.NO DESCRIPTION AMOUNT (RS)

1 DISMANTLING OF EXISTING TOILETS

2 ROOF TREATMENT OF 8 DOMES

3 White Wash

4 SOLAR ELECTRIFICATION FOR 8 DOMES

5 PCC FLOORING AND PLINTH PROTECTION OF DOMES

6 DRAINS UNDERGROUND & PIPE OUTSIDE GATE

7 DOORS/WINDOWS

8 MAIN GATE AND TWO DOMES DOORS

S.NO DESCRIPTION AMOUNT (RS)

1 ROOF TREATMENT OF EXISTING ROOMS

2 SOLAR ELECTRIFICATION OF 3 FANS 3 LIGHTS

3 WHITE WASH OF COMPLETE BUILDING.

4 PCC FLOORING IN FRONT OF VERANDAH

5 DOORS/WINDOWS PAINTING

S.NO DESCRIPTION AMOUNT (RS)

1 DISMANTLING OF MUD BOUNDARY WALL

2

CONSTRUCTION OF NEW BOUNDARY WALL ONE SIDE TILL

MAIN GATE.

TOTAL AMOUNT (RS)

Site#17: FPHC Zangal Pataiy MCH, Mardan

Site#16: BHU Ghamkol-2, Kohat

TOTAL AMOUNT (RS)

Summary of Total Cost - All 24 Sites Page 87 of 91

Page 88: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

3 SOLAR ELECTRIFICATION FOR 6 ROOMS

4

INTERNAL SIDE

(DOMES)

5

EXTERNAL SIDE

(COMPLETE BUILDING)

Site#18: FPHC Barakai MCH, Mardan

S.NO DESCRIPTION AMOUNT (RS)

1 UNDERGROUND WATER TANK Already taken with Wash

hand facility.

2

RAISING OF BOUNDARY WALL UPTO 2 FEET AND COLUMNS AT

EVERY 10'

3 WHITE WASH OF BOUNDARY WALL

4

ROOF TREATMENT DOOM (THREE PATCHES FOR PHARMACY

ROOM (ROOF LEAKAGE.)

5 REPLACING WINDOWS GLASSES IN OPD ROOM AND RECEPTION.

S.NO DESCRIPTION AMOUNT (RS)

1 DISMANTLING OF EXISTING ROOMS

2 CONSTRUCTION OF THREE ROOMS

3 FOUR NEW MANHOLES

4 Drain

5 SOLAR ELECTRIFICATION NEW ROOMS

6 New Boundary wall for damaged portion.

7 WHITE WASH OF COMPLETE BUILDING

8 ROOF TREATMENT

Site#19: BHU Taimergarah, Taimergarah

TOTAL AMOUNT (RS)

TOTAL AMOUNT (RS)

Summary of Total Cost - All 24 Sites Page 88 of 91

Page 89: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

9 PCC TRACK FROM MAIN GATE.

10 MAIN GATE

TOTAL AMOUNT (RS)

S.NO DESCRIPTION AMOUNT (RS)

1 DISMANTLING OF MUD BOUNDARY WALL

2 CONSTRUCTION OF NEW BOUNDARY WALL

3

PROVIDING CHAIN LINK FENCE WITH CIRCULAR PIPE HAVING

HEIGHT OF 6 FT.

4

CLEANING OF OLD PLASTER AND APPLYING NEW PLASTER TO

THE ROOF OF DOMES.

5 PCC TRACK FROM MAIN GATE.

6 SOLAR ELECTRIFICATION 6FANS 6 LIGHTS

7 Drain

8 FILLING FOR THE SAKE OF LEVELLING GROUND.

9

RECONSTRUCTION OF THE COLUMNS OF MAIN GATE AND

PAINTING THE EXISTING GATE.

S.NO DESCRIPTION AMOUNT (RS)

1 DISMANTLING OF EXISTING ROOF

2

REMOVAL AND RECONSTRUCTION OF COMPLETE WALL.

3 ELECTRIFICATION

4

Dismantling of existing floor and laying of PCC floor of verandah of

female section

5 SAFETY GRILL FOR BACKSIDE VERANDAH

Site#20: BHU Toor Camp Munda, Taimergarah

Site#21: BHU Chakdara, Chakdara

TOTAL AMOUNT (RS)

Summary of Total Cost - All 24 Sites Page 89 of 91

Page 90: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

6 REPLACEMENT OF GLASSES IN EXISTING WINDOWS.

S.NO DESCRIPTION AMOUNT (RS)

1

ROOF TREATMENT OF EXISTING TOILET WILL BECOME FEMAL

TOILET

2 ROOF TREATMENT OF DOMES (5 Nos)

3 SOLAR ELECTRIFICATION FOR 6 ROOMS

4 CONSTRUCTION OF ONE ROOM WITH VERANDAH

5 WAITING SHED 15'X20'

6 NEW GATE AND PATHWAYS INNER AND OUTSIDE GATES

7 FLOORING OF ALL DOMES

8 WHITE WASH COMPLETE

9 NEW DOORS/WINDOWS

S.NO DESCRIPTION AMOUNT (RS)

1 NEW GATE WITH COLUMNS

2 NEW DOORS/WINDOWS

3 DOORS/WINDOWS REPAIR

4

CONSTRUCTION OF NEW WALL, NEW BOUNDARY WALL & 2

DOMES WALLS

5 ROOF TREATMENT OF DOMES

6 WHITE WASH COMPLETE

Site#23: PDH BHU Gambela, Lakki Marwat

TOTAL AMOUNT (RS)

Site#22: PDH BHU Pusha Pul Dik, DI Khan

TOTAL AMOUNT (RS)

Summary of Total Cost - All 24 Sites Page 90 of 91

Page 91: ANNEX C - Financial Offer Form · ANNEX C - Financial Offer Form SC/RFP/20/028 1 Construction of one room (20'x15' )size having verandah S.No. DESCRIPTION UNIT QUANTITY RATE AMOUNT

ANNEX C - Financial Offer Form SC/RFP/20/028

7

REPAIR OF CEMENT PLASTER OF AFFECTED AREAS AS

DISCUSSED AND NOTED

S.NO DESCRIPTION AMOUNT (RS)

1

ROOF TREATMENT (DOMES)

2

Properly Re-fix of CGI sheet of verandah

3

External side drain to protect seepage during rain

4

Providing, laying and compacting Shingle in front of main Gate upto length

115 ft.

YES NO

YES NO

Delivery/Completion time: ____ Days

Name: ____________________________________________________

Date: _____________________________________________________

Signature: _________________________________________________

Designation: _______________________________________________

TOTAL AMOUNT (RS)

Site#24: FPHC MCH, Khaki

TOTAL AMOUNT (RS)

GRAND TOTAL AMOUNT (RS)

Payment terms: Acceptance of UN payment terms (i.e. 30 days net from receipt of

documents)

Bid Validity: 180 Days

Summary of Total Cost - All 24 Sites Page 91 of 91