26
Project Completion Report Annex Annex 3-8: Presentation Materials for Final Seminar 3.8.6 Hama DFEA Nippon Koei Co., Ltd. The Capacity Development of Environmental Monitoring at Directorates

Annex 3-8 Presentation Materials for Final Seminar 3.8.6 ...Project Completion Report Annex Annex 3-8: Presentation Materials for Final Seminar 3.8.6 Hama DFEA Nippon Koei Co., Ltd.1

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

  • Project Completion Report Annex

    Annex 3-8: Presentation Materials for Final Seminar

    3.8.6 Hama DFEA

    Nippon Koei Co., Ltd. The Capacity Development of Environmental Monitoring at Directorates

  • 1

    A special presentation about the activities of the project for developing capacities in

    environmental monitoring in the environment directorates"Directorate of Environmental

    Affairs in Hama Governorate "

    Environmental monitoring plan of Directorate of Environmental Affairs in Hama in 2007

    Environmental monitoring objectives

    1. Monitoring industrial wastewater.2. Monitoring water of Orontes river. 3. Monitoring Sewage water.4. Monitoring pollution sources sites especially when complaints are

    received in respect of them.

    1

    The parameters that must analyze and monitor

    ooooBOD9

    ooooCOD8

    -oooSS7

    ooooPO4 -36

    ooooNH3 -N5

    ooooNO 3 -4

    ooooCL -3

    oo--Turbidity2

    oo--Color1

    2-Lab measurements

    ooooTemperature4-

    -o--DO3

    oooEC /TDS2

    ooooPH1

    1-Field measurementsground waterseas and costal areasrivers and lakesdomestic waste waterindustrial waste waterparameternumber

    Monitoring stations

    Wًhen there is a complaintcomplaints

    As needed- like in case of well pollution

    wells

    Orontes river 1 stationRivers and Lakes

    Hama wastewater treatment plant1 stationDomestic wastewater

    1. Sami Factory2. Al-Ras Diary3. Sallora factory4. Robana factory5. Al-Hani factory6. Nada factory for soft drink7. Kernazi Oil Factory8. Kheder Abdulrazzak oil factory9. Al-Zouhour oil factory10. Al- Nawa'eer oil Factory11. Al- Safa oil factor12. Al- Nour oil factory13. Al- Omara oil Factory14. Al- Ahlieh oil factory15. Al- Fadel Oil Factory16. Hama Oil Company17. Sheizar factory for soft drink18. Wool factory19. Ceramic Factory 20. Iron Factory21. Onion Factory22. Al-Majd company for soft drink23. Cement Factory24. Azzara power plant25. Mohardeh power planet

    25 stationsIndustrial wastewater

    remark locations No. of stationswater body

    -Monitoring duration and frequency Duration of this EMP is from the 1st of February to the 31st of December 2007.

    The frequency of the monitoring plan is summarized in the table below.

    complaints

    wells

    11Once / monthOrontes river Rivers and Lakes

    11Once / monthHama wastewater treatment plantDomestic wastewater

    111111111156464455556556645565

    Once / monthOnce / monthOnce / monthOnce / monthOnce / monthOnce / 2 monthsOnce / 2 monthsOnce / 3 monthsOnce / 2 monthsOnce / 3 monthsOnce / 3 monthsOnce / 2 monthsOnce / 2 monthsOnce / 2 monthsOnce / 2 monthsOnce / 2 monthsOnce / 2 monthsOnce / 2 monthsOnce / 2 monthsOnce / 2 monthsFrom Aug. to Nov Once / 2 monthsOnce / 2 monthsOnce / 2 monthsOnce / 2 months

    1. Sami Factory2. Al-Ras Diary3. Sallora factory4. Robana factory5. Al-Hani factory6. Nada factory for soft drink7. Kernazi Oil Factory8. Kheder Abdulrazzak oil factory9. Al-Zouhour oil factory10. Al- Nawa'eer oil Factory11. Al- Safa oil factor12. Al- Nour oil factory13. Al- Omara oil Factory14. Al- Ahlieh oil factory15. Al- Fadel Oil Factory16. Hama Oil Company17. Sheizar factory for soft drink18. Wool factory19. Ceramic Factory 20. Iron Factory21. Onion Factory22. Al-Majd company for soft drink23. Cement Factory24. Azzara power plant25. Mohardeh power planet

    Industrial wastewater

    times (February – December)frequencystationswater body

  • 2

    Analysis method

    Pressure sensor methodBOD514

    Reactor digesting method 0-1500 mg/LCOD13

    Photometric method 0-750 mg/LSS11

    Amino acid method 0-30 mg/LPO4 -310

    Salicilate method 0-50 mg/LNH3 -N9

    Cadmium reduction method 0-10 mg/LNO 3 -8

    Silver nitrate method 10-10000 mg/LCL -7

    Niphilometric method 0.01-1000 NTUTurbidity6

    Platinum -cobalt APHA 0-500 unitColor5

    Electrode methodTemperature4

    Membrane electrode method DO3

    Electrode method EC /TDS2

    Electrode method PH1

    remarksanalysis methodparametersOrontes River

    Hama wastewater treatment plantSampling from Hama wastewater treatment plant

  • 3

    Maximum and minimum data that that have been obtained for Al Hani factory and Wool factory

    164059.10

    1.26501349433806161834.79.2minimum data

    38106816.7

    1.610002100540936186936.28.4Maximum data

    Wool factory

    26170230

  • 4

    Future plan for environmental monitoring in the Directorate of Environmental Affairs in Hama

    In coordination with GCEA and with Governor we seek to maintain in our future to:

    Prepare a mobile laboratory for measuring air pollutants.Prepare additional laboratory equipment (water laboratory -soil laboratory). Train the staff of the lab more. Measure other indicators of water quality.Prepare modes of transport to facilitate the work of staff of the laboratory. Prepare larger staff to work in the lab.

    By providing the mentioned things, we will be able to achieve wider and better environmental monitoring.

    Thanks for your attention

  • Project Completion Report Annex

    Annex 3-8: Presentation Materials for Final Seminar

    3.8.7 Lattakia DFEA

    Nippon Koei Co., Ltd. The Capacity Development of Environmental Monitoring at Directorates

  • The project on Capacity Building of Environment

    Monitoring at Lattakia DFEA

    Purpose of Environmental monitoring• Analysis of industrial waste water effluent

    • Continuous river and lake water quality monitoring and in particular during the olive harvesting season

    • Monitoring the contaminated well water to check the degree of contamination

    • Following up the complaints• Monitoring of seawater, sedimentary, and

    fish• Monitoring urban waste water to check

    new sources of extreme contamination

    • Possibility of utilisation of water resources• Analysis of heavy metals in water, soil, and sedimentary• Analysis of hydrocarbons, halogen, and non halogens

    and pesticides• Analysis of nutrients such as nitrate, nitrite, phosphate,

    ammonia• Measurement of COD, and BOD• Total coliform count• Measurements related to physical and distinctive water

    quality• All this leads to the identification of the pollution source

    in order to apply countermeasures

    Industrial wasteJoud Soft drinksOgarit soft drinks

    Joud steel castAluminum and engines factory

    Al Rabie for perume oilsShamsy dairy

    Joud Wood factoryAl Mutawasset tissue paper

    Demestic Waste WaterAl Azhary outletSouth Corniche Outlet

    Port outlet

    Monitoring stations

    Rivers and lakesAl kabir eshimaly river, bridge ref pointLattakia Tartous highway, near by river mouthAl Sanauber riverAl sharashir River (near by the mouth)Al sin River after meeting abu Bara riverAl Kash riverSaferkubbe LakeBalloran Lake16 tishreen lakeAِl sin lakeErrumaila lake

    Seawater, sedimentary, and fish

    Frequency and durationIndustrial Waste4 times a year

    Domestic waste4 times a yearRivers and lakes6 times a year

    Seawater, sedimentary, and fishTwice a year

    1

  • Laboratory tools and equipment• AAS with accessories, flame device, grafitt furnace, hidride generator, air

    generator, cooling system• GS with accessories, Nitrogen generator, Hydrogen generator, air generator,

    PC, pillars• Spectrophotometer with PC• Incinerator, centrifuge, evaporator• Analytical balance (2 pcs)• COD reactor, and BOD incubator• Color meter DR890• Turbidity meter• pH Meter (2 pcs)• DO Meter• TDS meter• Glassware• Microscope, incubator, autoclave• Millipore water purification device• Distiller• Refrigerator (3 pc)

    Atomic Absorption Spectrophotometer

    GS deviceJICA Lab equipment

    COD reactor, and BOD incubator

    Current situation of Monitoring activities

    • Lattakia DFEA is conducting inspection tours according to the its designated roles and the directives of Lattakia governor, and GCEA to monitor the industrial effluent water and investigate the pollution levels and advise the suitable countermeasures to preserve a healthy environment and environment conservation.

    • DFEA is warning violators and grants them some time to improve the quality of effluent sewage water to become within the Syrian standards

    2

  • Problems and difficulties

    • Lattakia DFEA is suffering lack of vehicles to conduct environment monitoring activates

    • The random distribution of industries and the remoteness of their locations causing difficulties in regular monitoring.

    Activities and proposals for QA, QC and sustainability

    1. Participating to the national programme for Quality assurance of laboratory work in the domain of water quality analysis, and heavy metal analysis (AAS)

    2. Continuous self training through laboratory analysis and regular monitoring, and implementing DFEA plan

    3. Joint sampling with Water and Sewage Establishment, and Directorate of Irrigation to achieve good results

    Sampling and field analysis

    Thank you for your attention

    3

  • Project Completion Report Annex

    Annex 3-8: Presentation Materials for Final Seminar

    3.8.8 Deir ez Zor DFEA

    Nippon Koei Co., Ltd. The Capacity Development of Environmental Monitoring at Directorates

  • 1

    Dier Ezzor DFEA

    • Deir Ezzor DFEA – 4 storey building– 32 Rooms including

    laboratory rooms, and laboratory staff rooms

    Laboratory

    • Two halls allocated for lab, and equipped with necessary equipment for water quality analysis in cooperation with Ministry of Local Administration, GCEA, and JICA

    Objective of Monitoring plan

    • A monitoring plan was developed to cover the main pollution sources (large factories, city domestic sewage, agricultural sewage, Euphrates river monitoring)

    • The objective of the monitoring plan is to monitor Euphrates river water quality since it is the only source of water for domestic, and irrigation purposes. For this objective, 7 monitoring station were established

    Sampling Activities

    • Staff equipped with proper sampling apparatus go to collect samples and bring them back to the laboratory for analysis

    Sampling Activities

    • One of pollutants– Industrial Effluent

    sewage outlet

    Euphrates River monitoring

    • Samples collected at points located before the river enters into Deir Ezzor, at the middle, and at the end of the city

  • 2

    Monitoring of Waste water

    • Open Sewage water channel

    Laboratory analysis

    • After sampling, laboratory staff commence laboratory work

    Data

    • The results of measurement varrydepending on the season, since the quality of Euphrates river water coming from Turkey, domestic, and agricultural sewage varies from season to season

    • The parameter analysis show that the values are exceeding the allowed according to the Syrian standards

    MeasuresAccording to the inspection results, official letter were sent to

    the concerned entities to work on reducing the pollution load on Euphrates river. Many countermeasures were taken

    1. preparation of a study to treat sugar factory waste water2. A study to design Deir Ezzor waste water plant which will

    be commenced in 20083. A study for Jenineh village sewage treatment plant4. To advise the paper factory to rehabilitate its own sewage

    treatment plant

    Environmental awareness plan• Deir Ezzor DFEA is

    spreading environmental awareness amongst the public by holding meetings, inviting institutes, and faculties for observation tours.

    • DFEA staff is very cooperative in explaining all issues related to environment

    Follow up of 2007 plan

    • All activities are running smoothly and according to the plan except for July 2007, as the staff were busy in in relocating to the new building, and re-establishing the laboratories.

  • 3

    Cooperation with other DFEAs

    • There is a coordination plan with Rakka DFEA to jointly monitor Euphrates river in order to prepare a joint report on the environmental status of the river round the year and assess the pollution amount added within the span between the two cities

    Future Plan

    • The observation locations will be increased to count in the big cities within the governoerate

    Thank you for your attention

  • Project Completion Report Annex

    Annex 3-8: Presentation Materials for Final Seminar

    3.8.9 Idleb DFEA

    Nippon Koei Co., Ltd. The Capacity Development of Environmental Monitoring at Directorates

  • 1

    GCEA

    Idleb DFEA

    Idleb DFEA Lab

    ● The national strategy and Environmental work plan in Syria considered the water pollution and shortage as one of the Environmental problems priorities.

    ● Water pollution is a real problem, its danger is increasing day by day, and the person share of drinking water is decreasing annually.

    ● Idleb Governorate is a part of the interior area where drinking water resources decrease gradually for climatic, developmental and population increasing problems.

    introduction

    GCEA Idleb DFEA

    The project of Capacity Development of Environmental Monitoring in Syrian Governorates came on time, the most benefits was establishing labs in all Syrian DFEAs to be the best scientific means because to evaluate Water and Air Quality precisely .

    And the Data these labs present is considered as the essential basis which all plans and constructive activities will start from to prevent Environmental pollution

    GCEA Idleb DFEA

    The main pollution sources which their liquid wastes are considered as an Environmental problem are:Domestic wastewater resulted from cities and other residential areas in the governorate

    GCEA Idleb DFEA

    Liquid wastes resulted from olive oil pressing factories Alghab sugar factory which discharges industrial wastewater to the Orantes River

  • 2

    other factories: vegetable oil, agro food products, diary, and pickles factories...

    We should not forget the wasting water issue

    Characteristics of Idleb Governorate

    1- Idleb is not an industrial governorate, most of its industries are small workshops, and the daily quantity of water consumed does not exceed some cubic meters, (agro food products like pickles and diary factories...)

    2- big number of olive oil factories ( more than 160 pressing factories) discharging high polluted, not treated wastewater to the sewer, rivers, valleys, and near springs and wells during two months every year ( about ten times the pollution of domestic wastewater) because of its high biological load

    GCEA Idleb DFEA

    3- no treatment for domestic wastewater of small or big residential areas, this water is reaching rivers, springs, and near wells, it is used also in irrigation

    4- Orontes River, its tributaries, and its Winter ravines are polluted when entering the Governorate, this pollution increases when running through the Governorate lands because there are no practical countermeasures to prevent discharging pollutants into it, and because of liquid and solid wastes (from olive oil presses, Sugar factory, domestic wastewater) which discharge to the river, the pollution increases in Summer because of law flow rate, which may pollutes wells near the river

    GCEA Idleb DFEA

    Characteristics of Idleb Governorate

    EMP objectives

    Monitoring industrial wastewater to support Environmental inspection when the lab becomes officially accredited

    Monitoring Domestic wastewater for the main cities of the Governorate to find out any changes (new pollution source), and TSPs in the future

    GCEA Idleb DFEA

    Monitoring ground water quality near possible pollution sources or according to request of decision Makers or complaints

    Monitoring natural water resources (rivers, dams, reservoirs) in some important locations

    Acquiring sufficient practical and scientific experience in the field of samples analysis, results interpretation, and Environmental Monitoring

    EMP objectives

  • 3

    Rivers-agricultural

    lands1-3 m3/day405001501683Domestic wastewater

    5 mills

    5-8 factories

    5 factories

    One factory 1m3/sec = 3600 m3/h

    175 presses work only

    40 days/year 25 m3/day

    Number

    Domestic wastewater8002000>160024540Diary factories

    Domestic wastewater8005101600500-13000

    Vegetable oil factories

    Domestic wastewater800123316002573Wheat mills

    Orontes River40150-720150441-965

    Alghab sugar factory

    Rivers-sewage-valleys-

    agricultural lands

    4040000> 15080000 > Olive oil pressing factories

    The future of

    water

    maximum limit

    (Standard)

    BODmg/l

    maximum limit

    (Standard)

    CODmg/l

    Name of establishment

    As high concentration of : BODو COD

    GCEA Idleb DFEA

    5 factories

    -

    10 factories1-3 m3/day

    5-8 factories2-5 m3/day

    All cities and villages in

    the Governorate

    Number

    ---4.5Standard: 6.5-9.5Olive oil press

    factories

    Domestic wastewater

    1107 Standard: 600

    4520Standard: 2000

    5.6Standard: 6.5-9.5Pickles factories

    Domestic wastewater-

    2497Standard: 2000

    6.6-9.0Standard: 6.5-9.5

    Vegetable oil factories

    Domestic wastewater

    700-1500Standard: 600

    1273-22330 Standard:

    2000

    4.7-6Standard: 6.5-9.5Diary factories

    Rivers, agricultural

    lands

    570 mg/lStandard: -

    4500 Standard:

    1600

    7-8.5Standard: 6-9

    Domestic wastewater

    The future of

    waterCL-Mg/l

    TDS Mg/l

    PHName of establishment

    As high concentration of : CL-,TDS,PH

    GCEA Idleb DFEA

    10 factories1-3 m3/day

    5-8 factories2-5 m3/day

    All cities and villages in the Governorate

    175 presses40 days/year 25 m3/day

    Number

    Domestic wastewater

    59 Standard: 20

    90Standard: 100

    6.9 Standard:-Pickles factories

    Domestic wastewater

    638 Standard: 20

    93 Standard: 10061 Standard:-Diary factories

    Rivers, agricultural

    lands

    43 Standard: 15

    70 Standard: 58.5Standard: 50

    Domestic wastewater

    Rivers, sewage, valleys,

    agricultural lands

    1030 Standard: 1540 Standard: 5-

    Olive oil press factories

    The future of waterPO4NH3-NNO3-N

    Name of establishment

    As high concentration of NH3-N ,NO3-N,PO4

    GCEA Idleb DFEA

    Grinders: big quantity of water, around 80 m3/day, BOD is high, solid suspenses

    Slaughters: big quantity of water, organic pollutants (BOD is high)

    Handicraft areas (industrial city in Idleb): oil and grease, solid suspenses

    Agro food products: big quantity of waterconsumption, olive wastewater

    GCEA Idleb DFEA

    Factories are forced to establish treatment station plantsIndustrial wastewater

    A study of a TSP on Jisr Alshughour axis was set and is about to be declared in the Ministry and implemented within 2007 plan

    The studies of other axes of sewage water (which is discharging to Orontes River) are ready, they are either under preparing the contracts or studying TSPs TSP of Sugar factory is being announced

    Pollution of Orontes River - many domestic wastewater outlets discharging to Orontes River, especially in Jisr Alshughour area- Olive oil wastewater- Sugar factory wastewater

    - Domestic wastewater: discharging without treatment out of residential areas and causing pollution to:1- Drinking water resources (rivers, springs, wells, and dams) directly and indirectly2- Agricultural lands which irrigated by this wastewater illegally 3- general hygiene

    1- olive oil pressing wastes: a) liquid wastes: discharging to sewage network, rivers, valleys, and agricultural lands, polluting underground water and drinking water resources

    Environmental problems

    Support establishing sewage networks, rehabilitating old networks, implementing TSP for sewage water to avoid the risk of pollution with sewage water and use this treated water for irrigation, the matter which reduce ground water depletion.

    Fertilizing irrigation was adopted

    Countermeasures

    GCEA Idleb DFEA

    Legislated authorities

    Executive authorities

    Companies

    Citizens

    Environmental Protection Activities

    GCEA Idleb DFEA

  • 4

    Total number of samples in EMP 2007 was 47 samples+10 undefined possible samples

    All industrial establishments of liquid wastes work seasonally Most establishments work seasonally for several reasons, no continuous discharge (manholes often), we visit the establishment several times to take one sampleSome establishments don’t have outlet to collect samples from, because they discharge directly to the sewer Establishments are spreading all over the Governorate (7000 km2), most of sampling stations are more than 60 km far from DFEAMobile lab is not designed in a way to protect equipments from shocks, the service car is not enough for all lab staff, shortage in gasolineWeather conditions (Summer, Winter), roughness of the location of some sampling stationsLab staff has no interest in working full time in the lab because it is a hard work and they don’t get any incentives

    Work difficulties

    GCEA Idleb DFEA

    suggestionsCompletion of providing labs with technical equipments needed, and developing lab equipments continuously Working on accrediting the labs formallyAssign needed budget for the labs and try to achieve self fundTaking care of lab staff (full time work, continuous qualifying, incentives)

    GCEA Idleb DFEA

    Thank you for listening

  • Project Completion Report Annex

    Annex 3-8: Presentation Materials for Final Seminar

    3.8.10 Hasakeh DFEA

    Nippon Koei Co., Ltd. The Capacity Development of Environmental Monitoring at Directorates

  • 1

    Syrian Arab RepublicMinistry of Local Administration and EnvironmentGCEAHasake DFEAــــــــــــــــــــــــــــــــــــــــــ

    The Project on Capacity Building of Environment Monitoring in Hasake DFEA

    Jul. 2005 – Dec. 2007

    The project on Capacity building of environment monitoring was started at Hasake DFEA on July 2007. first the staff attended a lecture training in Damascus, then received the lab. Equipment, and practical training in the field of sampling, field analysis, and lab analysis under the supervision of JICA experts. At the beginning we committed many mistakes, but with constant guidance of JICA experts we were able to overcome our short comes.

    We ware able to develop our environmental monitoring plan for 2006 including a stationary monitoring stations at al Khabour river, Al-JagJagriver, and Basel al Asad lake, in addition to emergency measures.The plan aimed at increasing the practical experience of the staff, and we received training from JICA experts from time to time. During this training, we have become aware to the necessity of Quality Assurance, and Quality Control, which gave us confidence in our results.

    At the end of 2006 we produced our first annual report on the environment monitoring plan with the assistance of JICA experts.

    The 2007 plan was established utilising the feedbacks we received on the 2006 plan, this plan is about to be fully implemented nowadays

    the 2007 plan was prepared in participation with Directorate of irrigation, General establishment of Water and Sewage, joint sampling was introducedour confidence grew as after wefound that our result are more accurate.For instance, when we measured NH3-N parameter we found that the values of NH3-N was 0.08 mg/l, but Water establishment result came out 0.215 mg/l, after we cross checked our results according to QC standards, we confirmed our result , and investigating the problem it has been found that Water Establishment reagents were not storedproperly, and that they can reach our result by replacing the corrupted reagent set.

    As for the data we have acquired, it was archived and analysed according to what we’ve been trained on. We kept paper data, and stored soft copy on lab PCFollowing is a sample data of 2006 inspection of Basel Al Asad lake- Hasake Southern lake

  • 2

    0

    5

    10

    15

    20

    25

    30

    35

    40

    21/02

    /2006

    28/02

    /2006

    07/03

    /2006

    14/03

    /2006

    21/03

    /2006

    28/03

    /2006

    04/04

    /2006

    11/04

    /2006

    18/04

    /2006

    25/04

    /2006

    02/05

    /2006

    09/05

    /2006

    16/05

    /2006

    23/05

    /2006

    30/05

    /2006

    06/06

    /2006

    13/06

    /2006

    We have benefited a lot from the results, and specially the emergency countermeasures related to factories effluent and potable water standards, as we merged this activity to the environment monitoring activity.

    Comparing the results to the Syrian standards we have found that there are many violations for many standards. For instance;

    Part of Suwais channel in Kameshly was totally blocked causing the sewage water back flow to the houses, and forced residents to use their abandoned well for dumping sewage, which affected the wells that are still used, when we received a complaint, we investigated the cause, and found that the cause of pollution is sewage, consequently we informed the concerned authorities which reacted by providing a drinking new water network

    Analysis of Environment situation on the basis of environment monitoring activities:

    The results shows that our rivers are highly contaminated by urban, and industrial sewage water, and consequently polluting lakes. A countermeasure should be taken by establishing treatment plants for sewage, and solid waste, as solid waste Leachate drains into ground water as in Nafker village, where potable water wells were affected by the landfill near by.

    This is where the role of environment monitoring plan emerges to support reports with data

    (at the same time we find that Tigris river water quality is high, but let unutilised)

    Environmental Awareness plan using monitoring data:

    According to the 2008 plan, We are planning to start awareness campaign utilising monitoring data by disclosing the results to public through seminars, lectures, and newsletters, in addition to make this data available at the DFEA library for the public

    We are planning to include the society into our plan in order to receive useful feed back, as the social pressure will work as incentive for factories to apply environment regulations.

  • 3

    Qualit assurance and Quality control activities:

    We have gave this issue a great deal of care for many reasons:

    To check the equipment

    To check the accuracy of results

    This process gives self confidence when we find our results accurate, for instance, when we measure the COD of the standard solution of 500mg/l in the presence of JICA expert Dr. Matsue we find the result 506 mg/l which is quite good

    We have also applied this technique to check the reagents which were out of date, in order to prolong the use of these reagents to the maximum possible duration

    We will continue this procedure on regular basis from now on until we receive QC certificate.

    في مديرية شؤون البيئة بالحسكة 2008خطة المراقبة البيئية للنصف األول لعام

    : األسبوع األول . 1: األسبوع الثاني . 2: األسبوع الثالث . 3: األسبوع الرابع . 4: األسبوع الخامس . 5

    + : الموعد المفترض ألخذ العينة . : موقع االعتيان من نهر الخابور قبل التقائه بنهر الجغجغ في مدينة الحسكة . 1الخابور : موقع االعتيان من نهر الخابور بعد التقائه بنهر الجغجغ في مدينة الحسكة . 2الخابور : موقع االعتيان من نهر الجغجغ قبل التقائه بنهر الخابور في مدينة الحسكة . 1الجغجغ : موقع االعتيان من نهر الجغجغ في مدينة القامشلي . 2الجغجغ

    البحيرة : موقع االعتيان من بحيرة الشهيد باسل األسد جنوب الحسكة

    حزيران أيار نيسان آذار شباط آانون الثاني الشهر

    المحطة

    1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5 1 2 3 4 5

    1الخابور

    + + + + + +

    2الخابور

    + + + + + +

    1الجغجغ

    + + + + + +

    2الجغجغ

    +

    البحيرة

    + +

    الطوارئ

    Thank you for your attention

  • 2005-06-10

    Noالرقم. Item (البند) Date 2007/11/20 التاريخ Remarks (مالحظات)

    وثائق وأجهزة لتسجيل البيانات

    1Itinerary for the trip (route, stations to be covered, start and return time)

    √ المراد تغطيتها ووقت البدء والعودة)خط الرحلة (الطرقات والمحطات

    2 Area map (including sampling site station map) √(متضمنة مواقع خريطة للمنطقة

    ومحطات االعتيان)3 Data result sheets √ صحيفة نتائج البيانات4 Filed notebook √ دفتر مالحظات حقلية

    5 SOP and equipment manuals √ استخدام األجهزةإجراء التشغيل القياسي ودليل 6 Digital camera with date √ آاميرا رقمية

    1 Sampler (long-handled sampler and bucket) √ أداة االعتيان (دلو بمقبض طويل)

    2 Rope √ حبل3 Icebox (with ice packs) √ حافظة الثلج مع قطع الثلج4 Sample bottles √ قوارير العينات5 Labels for sample containers √ لصاقات لحاويات العينات

    6 Pen, pencils, marker (waterproof) √ (ضد الماء)قلم حبر وقلم رصاص وقلم عالم

    7Wash bottle within distilled water (for rinsing electrode and equipment)

    √ (لشطف االلكترود والجهاز)قارورة غسيل ضمن الماء المقطر

    8 Knife/scissors √ سكين/مقص9 Gloves/gum boots √ قفازات / جزمة مطاطية

    10 Tap water for washing hands/towel √ مياه الصنبور لغسل اليدين /منشفة

    11 Drinking water √ مياه للشرب

    12 Portable electric light (especially for sampling during night) بيل (خاصة لالعتيان خالل الليل)

    1 pH meter and calibration standards √ مقياس الـ pH ومقاييس المعايرة

    2 EC and TDS meter √ TDS و EC مقياس الـ3 DO meter √ DO مقياس الـ

    4 Check batters in meters, replace if necessary √تحقق من البطاريات في المقاييس

    واستبدلها عند الضرورة

    5 Check conditions of meters- no dirt etc. √تحقق من حالة المقاييس-عدم وجود

    أوساخ.الخ6 Thermometer √ ميزان الحرارة

    7 Simple equipment for measuring velocity and flowأجهزة بسيطة لقياس السرعة

    والجريان

    8 Other field measurement kit, as required أدوات قياس أخرى حسب الطلب

    1 Emergency phone numbers: رقم هاتف الطوارىء234

    Checklist for Sampling (قائمة الكشف لالعتيان)

    Sampling أجهزة االعتيان

    Documents and equipment for recording data

    Field Measurement Equipment أجهزة قياس في الحقل

    Note: 1) Depending on the local conditions, water body, type of pollution source, etc., all items may not be necessary, or other items, not listed, may be required. 2) It is always safer to carry a few additional numbers

    مالحظة: 1) اعتمادًا على الظروف المحلية وجسم الماء ونوع مصادر التلوث. الخ، قد ال تكون جميع البنود مطلوبة وقد يطلب بنود أخرى غير مذآورة في القائمة 2) من األفضل حمل مواد إضافية أآثر من المطلوب

    Others أخرى

    (The following is a list of items, which should be checked before going to the field. (use tick i.e.√

  • 2005-06-10

    Field Measurement and Observation Record سجل القياسات والمالحظات الميدانية

    20

    5

    1

    عينة من نهر دجلة في المثلث الحدودي بمنطقة المالكية بالقرب من قرية خراب رش

    لوحظ غزارة واضحة للنهر ونشاط لبعض المقالع في المنطقة على ضفة النهر السورية

    نواف عثمان

    أيسر بنيامين

    2007/11/20 13:45 نهر

    طوارئ

    Longitude:خط الطول

    2 L

    SS COD BOD NO3 Turbidity

    Signature:التوقيع

    Type of waterbody:نوع جسم الماءSampling station code:رمز محطة االعتيانLatitude:خط العرض

    Moderateمعتدلة

    PO4 Cl-

    Rain (heavy) ماطر بغزارة خالل االسبوع الماضي

    Rain (heavy)ماطر بغزارة

    Signature:التوقيع

    Sample received by:تم استالم العينة من قبل

    Name:االسم

    Time:الوقت

    Date:التاريخName of sampling station:اسم محطة االعتيان

    Estimated velocity (m/s)::السرعة المقدرة

    Rubbish:نفايات

    Noneال يوجد

    Comments:مالحظات

    Odor:الرائحة

    Weather now:الطقس اآلن

    Clear/sunnyصحو/مشمس

    Observer:المراقب

    Name:اسم

    ColorParameterالمعيار

    Sample Volume (L)حجم العينة

    Depth (m):العمق

    Past 24 hours:الـ 24 ساعة الماضية

    Clear/sunnyصحو/مشمس

    Overcastغائم

    Rain (steady)ماطر باعتدالRain (steady)ماطر باعتدال

    NH3

    Overcastغائم

    Absentغائبة

    Littleقليلة

    Width (m):العرض

    Manyآثير

    Littleقليل

    Moderateمعتدل

    =100 m

    Brief description of site:وصف مختصر للموقع

    Strongقوية

    Oil slick:االنزالق بالزيوت Noneال يوجد

    Littleقليل

    Moderateمعتدل

    Manyآثير

  • Water Quality Results نتائج نوعية المياه

    Parameterالمعيار

    Unitالوحدة

    Sample (No.1) Result

    نتيجة العينة رقم 1

    Replicate Sample (No.2) Result

    نتيجة العينة المكررة رقم2

    Replicate Sample (No.3)

    Result نتيجة العينة المكررة

    رقم 3

    Final Result of the Sample

    النتيجة النهائية للعينة

    Name and Signature:of

    Analystاسم المحلل

    Remarks

    Ph pH unitsوحدات 7.3 7.3 7.3 م.نواف

    Air temp.حرارة الهواء

    0C 18.0 18.0 18.0 م.نواف

    Water temp.حرارة الماء

    0C 15.9 15.2 15.6 م.نواف

    EC μS/cm 507 491 499 م.نواف

    TDS mg/l 246 241 244 م.نواف

    DO mg/l 692.00 6.64 6.78 م.نواف

    Color Unit 55 55 55 م.نواف

    SS mg/l 10 15 13 م.نواف

    CODCr mg/l 5 4 5 م.نواف

    BOD5 mg/l 2 2 2 م.نواف

    NO3--N mg/l 1.7 1.0 1.4 م.نواف

    PO43- mg/l 0.80 1.00 0.90 م.نواف

    Cl- mg/l 50 48 49 م.نواف

    NH3-N mg/l

  • 2005-05-24

    Suggested Preservation Methods and Storage Times

    No. Parameter Recommended ContainerPreservation

    MethodMax. Permissible

    Storage Time Comments

    1 pH Plastic* None, analyze immediately 6 hours Should be measured on site

    2 Water temp. - Not applicable Not applicable Must be measured on site.

    3 EC Plastic Refrigeration 24 hours Should be measured on site

    4 TDS Plastic Refrigeration 24 hours Should be measured on site

    5 DO - None, analyze immediately Analyze immediate Must be measured on site.

    6 Color Plastic Refrigeration 48 hours

    7 SS Plastic Refrigeration 24 hours

    8 CODCr Plastic Refrigeration 24 hours Analyze as soon as possible

    9 BOD5 Plastic Refrigeration 24 hours Analyze as soon as possible

    10 NO3--N Plastic Refrigeration 24 hours

    Analyze as soon as possible. For longer storage periods, adjust sample pH to 2 or less with sulfuric acid, ACS (about 2ml per liter); sample refrigeration; Before testing the stored sample, warm to room temp. and neutralize with 5.0 N Sodium Hydroxide Standard Solution.

    11 PO43- Glass** Refrigeration 24 hours

    12 Cl- Plastic Refrigeration 7 days

    13 NH3-N Plastic Refrigeration 24 hours Analyze as soon as possible

    14 Turbidity Plastic None required 24 hours Preferably tested in the field

    Annex3Annex3-8 : Presentation materials for final seminar3.8.6 Hama DFEA3.8.7 Lattakia DFEA3.8.8 Deir ez Zor DFEA3.8.9 Idleb DFEA3.8.10 Hasakeh DFEA