Annex 1 A _B157- Mathugama- Aluthgama Road- Summary of Bridge Openings
BRIDGE
Chainage
BridgeNo
PROPO
SEDWIDTH(m)
PdrposedMinimumHeight
AVAILABLEHEIGHT(m)
Measu
redwaterdepth
Opens
pace(uptodeckbott
AvailableWIDTH(m)
Remar
ks
31/3 No Change-5.2m ** 3.00 0.60 2.40 5.20
30+750 31/4Increase height to 1.8m -
Spam 3.15m no change**
1.10 0.20 0.90 3.15
Height to be increased to
1.8m
34/2 No Change - 9m 2.75 1.70 0.30 1.40 9.00
34/3 No Change - 3.4m ** 1.80 0.80 1.00 3.40
34/4 No Change - 3m ** 1.80 0.80 1.00 3.00
35/4 No Change 4.8 ** 2.30 0.70 1.60 4.90
35/5No Change-4.3m
2.002.20 1.10 1.10 4.20
Additional opening allocated
to culverts
Welipenna
Ganga39/5
No Change 18.3**
10.30 1.90 8.40 18.00
40/1 No Change 3m ** 1.85 0.30 1.55 3.00
NewAdd 12m NEW
3.00
Kohiawala
Galamatte RB42+000 New
Add 40m NEW
2.15 Revised further based on new
verticle alignment
Galamatta 42+550 43/4 No Change 45.8m 4.00 4.80 1.90 2.90 46.00
42+814 43/5 Replace 20m 2.00 2.50 0.90 1.60 3.00
42+826 43/6 Replace 20m 2.00 2.00 0.80 1.20
42+978 43/7 Replace 20m 2.00 0.80 0.30 0.50 1.30
43+069 44/1 Replace 6.1m 2.00 1.60 0.40 1.20 1.60
43+678 44/3 Replace 15m 2.00 2.40 1.50 0.90 7.00
43+758 44/4 Replace 6m 2.00 1.20 0.30 0.90 1.60
43+795 44/5 Replace 6m 2.00 0.00 dia.0.645+650 46/2 Replace 6m 2.00 1.00 0.20 0.80 dia.0.945+730 46/3 Replace 6m 2.00 1.50 1.50 0.00 6.00
47+048 48/1 Replace 4m 2.00 0.95 0.25 0.70 2.20
47+400 48/2 Replace 4m 2.00 1.10 0.20 0.90 dia.0.947+865 48/3 Replace 4m 2.00 2.00 1.00 1.00 dia.0.9
49+068 50/1 No Change 8.9m 2.15 1.60 0.70 0.90 9.00
49+308 50/2Replace 13m
2.15 0.90 0.30 0.60 0.60Additional opening added to
50/2
52+111 53/2 No change 3m ** 1.30 0.30 1.00 3.00
Galamatta LB
Feasibility Study and Detailed Design Review NHSP - Southern Expressway Link Roads
Hydrology Repo
Annex 1 A - Page
8/2/2019 Annex 1 a- B157 Hydrorology Calculations
2/8
Hydrauic Computations for bridges in B157- Mathugama- Aluthgama Road
BRIDGE
Number
CATCHMENTAREA
-
sqkm
CATCHMENTAREA(ha)(A
)
LENGTHOFEFFECTIVE
WATERCOURSE-ACADUNITS
LENGTHOFEFFECTIVE
WATERCOURSE(m)L
SLOPE(%)
FLOW
VELOCITY(ft/sec)
TIMEOFCONCENTRATION
Tc=l/60v+15(min)[Ponrajah
's
Formula]
RETURNPERIOD(yr.)
RAINFALLINTENSITY(mm/h
r)
RUNOFFCOEFFICIENT
DISCHARGEQ=CIA/360
(cumecs)
ExistingBridgeWid
th
(m)
Nearbyculvertwidth
(m)
Proposedaddiotion
al
structurewidth(m)
BW(m)-CLEARSPAN
31/3 2.20 220.00 2.70 1695 0.1000 1.5 76.79 100.00 108.95 0.30 19.97 5.20 3.15 0.00 8.35
31/4
34/2 1516.00 2.70 4145 0.0100 1.5 166.09 100.00 62.62 0.30 79.11 9.00 6.40 4.00 19.40
34/3
34/4
35/4 2.39
35/5 9.70 970.00 1.41 4703 0.1000 1.5 186.44 100.00 57.64 0.30 46.59 4.30 4.80 2.00 11.10
35/6 2.00
Welipenna
Gamga39/4 59.60 5960.00 1.60 12265 0.0500 1.5 462.11 100.00 30.08 0.30 149.41 18.30 1.60 10.00 29.90
40/1 2.74
Kohiawala
Galamatte
RB
New 27.00
Galamatta 43/4 147.55 45.80 0.00 0.00 45.80
Galamatta LB 43/5 2.56 20.00
43/6 0.88 20.00
43/7 20.00
44/1 6.00
44/2 Individual Culvert
44/3 18.62 1862.00 0.83 8374 0.0100 1.5 320.26 100.00 39.12 0.30 60.69 0.00 6.00 18.00 24.00
44/4 6.00
44/5 5.00 6.00
44/6 Individual Culvert
45/1 Individual Culvert
45/2 Individual Culvert
45/3 Individual Culvert
45/4 Individual Culvert
45/5 Individual Culvert
8/2/2019 Annex 1 a- B157 Hydrorology Calculations
3/8
Cross Section at U/S Paddy Field
Segment Length Ground Level 100yr Flood Level
Water Height Water Area
0.00 1.4 3.30
18.00 0.5 3.30 1.90 42.30
8.70 0.56 3.30 2.80 24.10
12.70 0.5 3.30 2.74 35.1810.00 0.6 3.30 2.80 27.50
10.00 0.57 3.30 2.70 27.15
13.80 0.55 3.30 2.73 37.81
9.00 0.52 3.30 2.75 24.89
6.80 0.39 3.30 2.78 19.35
6.00 0.39 3.30 2.91 17.46
9.00 0.79 3.30 2.91 24.39
11.50 1.2 3.30 2.51 26.51
18.00 3.3 3.30 2.10 18.90
7.40 4.5 3.30 0.00
-1.20
140.90
Total Area===> 325.53
Velocity===>> 0.30
(Discharge)Q 97.66
Latest Road Design Level
Level m MSL Chainage m
2.315 42000.000,
2.317 42003.000,2.328 42008.078,
2.396 42020.000,
2.431 42023.933,
2.565 42035.227,
2.6 42037.653,
2.637 42040.000,
2.734 42045.653,
2.817 42050.000,
3.037 42060.000,
3.124 42063.508,
3.277 42070.000,
3.464 42080.000,
3.592 42090.000,
3.628 42094.105,
3.652 42097.994,
3.661 42100.000,
3.668 42102.105,
3.673 42104.530,
3.675 42106.812,
3.624 42120.000,
3.493 42131.680,
3.481 42132.480,
3.368 42140.000,
3.172 42153.000,
3.105
8/2/2019 Annex 1 a- B157 Hydrorology Calculations
4/8
ADDITIONAL OPENING FOR 42+000
Cross Section at U/S Paddy FieldSegment
Length
Ground
Level
Embankment
Level Water Height
Water
Area
0.00 1.4 3.10 1.70 38.79
18.00 0.5 3.10 2.60 22.40
8.70 0.56 3.10 2.54 32.70
12.70 0.5 3.10 2.60 25.5510.00 0.6 3.10 2.50 25.20
10.00 0.57 3.10 2.53 35.12
13.80 0.55 3.10 2.55 23.13
9.00 0.52 3.10 2.58 18.02
6.80 0.39 3.10 2.71 16.29
6.00 0.39 3.10 2.71 22.63
9.00 0.79 3.10 2.31 24.26
11.50 1.2 3.10 1.90 15.39
18.00 3.3 3.10 -0.20
7.40 4.5 3.10 -1.40
TOTAL 140.90
Total Area===>>>> 299.491
Velocity===>> 0.3
Q 89.847
This calculates the 100 year Q under embankment level- rest is overflow and do not come to
CALCULATION FOR ADDITIONAL OPENING B157 for KOHILAWALA
Calculation of the Opening Size for Flow Path at "Kohilawala"
Cross Section Area of flow path Kohilawala (A1) 299.5 m2
Assumed velocity(V1) 0.3 m/s
Discharge (Q1= A1xV1) 89.8 m3/s
Assumed velocity at the road section after embanking (V2) 1.08 m/s
Required area at the road section(A2= Q1/V2) 83.2 m2
20 Year Flood Level 2.55
Asumed water height 2.15 ( No Free Bo
Required opening width 38.7
Feasibility Study and Detailed Design Review NHSP - Southern Expressway Link Roads
Hydrology Report
Annex 1 A - Page 3
8/2/2019 Annex 1 a- B157 Hydrorology Calculations
5/8
the proposed opening
rd Alowed)
Feasibility Study and Detailed Design Review NHSP - Southern Expressway Link Roads
Hydrology Report
Annex 1 A - Page 3
8/2/2019 Annex 1 a- B157 Hydrorology Calculations
6/8
XSS of Road for Culvert 43/5 & New Culverts ( Galamatte Bridge 43/4- RB Flood Plain) Calculation of Culvert Opening Sizes
Chainage
From
Galamatte
Flod Plain
42+550km Existing Level
100year
Flood
Level m
MSL
20year
Flood
Level m
MSL
Proposed
Embankm
ent Level
Diff /Fill
Height for
20 Year
Flood Area Q (Welipenna Southern Expressway Bridge) 394 Mike11 study
0 3.123 3.3 2.55 2.55 -0.573 Cross Section Area of flow path through culvert 522.02 m2
20 2.286 3.3 2.55 2.55 0.264 10.2 Assumed velocity(V1) 0.3 m/s
40 1.794 3.3 2.55 2.55 0.756 15.93 Discharge (Q1= A1xV1) 156.606 m3/s60 1.713 3.3 2.55 2.55 0.837 7.9 Assumed velocity at the road section (V2) 1.08 m/s
70 1.807 3.3 2.55 2.55 0.743 15.08 Required area at the road section(A2= Q1/V2) 145.0056 m2
90 1.785 3.3 2.55 2.55 0.765 14.71
110 1.844 3.3 2.55 2.55 0.706 14.08 20 Year Flood Level 2.55
130 1.848 3.3 2.55 2.55 0.702 13.93
150 1.859 3.3 2.55 2.55 0.691 15.15 Asumed water height 2.15170 1.726 3.3 2.55 2.55 0.824 19.31 Required opening width 67.44444
190 1.443 3.3 2.55 2.55 1.107 23.21
210 1.336 3.3 2.55 2.55 1.214 25.34
230 1.230 3.3 2.55 2.55 1.320 24.98
250 1.372 3.3 2.55 2.55 1.178 21.92
270 1.536 3.3 2.55 2.55 1.014 18.14
290 1.750 3.3 2.55 2.55 0.800 15.23
310 1.827 3.3 2.55 2.55 0.723 15.36
330 1.737 3.3 2.55 2.55 0.813 19.19
350 1.444 3.3 2.55 2.55 1.106 22.18370 1.438 3.3 2.55 2.55 1.112 20.96
390 1.566 3.3 2.55 2.55 0.984 18.81
410 1.653 3.3 2.55 2.55 0.897 17.64
430 1.683 3.3 2.55 2.55 0.867 19.05
450 1.512 3.3 2.55 2.55 1.038 19.37
470 1.651 3.3 2.55 2.55 0.899 15.43
490 1.906 3.3 2.55 2.55 0.644 10.68
510 2.126 3.3 2.55 2.55 0.424 8.51
530 2.123 3.3 2.55 2.55 0.427 9.63
550 2.014 3.3 2.55 2.55 0.536 11.04
570 1.982 3.3 2.55 2.55 0.568 11.26
590 1.992 3.3 2.55 2.55 0.558 11.58
610 1.950 3.3 2.55 2.55 0.600 12.57
630 1.893 3.3 2.55 2.55 0.657 12.32
650 1.975 3.3 2.55 2.55 0.575 8.4670 2.285 3.3 2.55 2.55 0.265 2.93
690 2.522 3.3 2.55 2.55 0.028
710 2.961 3.3 2.55 2.55 -0.411
TOTAL=>> 522.02
Feasibility Study and Detailed Design Review NHSP - Southern Expressway Link Roads
Hyd
Anne
8/2/2019 Annex 1 a- B157 Hydrorology Calculations
7/8
SUMMARY OF OPENING DETAILS FROM 42+000-43+069
( Galamatte Bridge Flood Plain - Welipenna River)
Culvert Chainage SLLRDC LS CHAINAGE
LB Kohilawala 42+000 42 2700
Galamatte 43/4 Galamatte 42+550 42.55 2150
43/5 42+814.609 42.814 1886
43/6 42+826.168 42.826 1874
43/7 42+978.780 42.978 1722
44/1 43+069.199 43.069 163144/2 43+301.628 43.301 1399
44/3 43+678.124 43.678 1022
44/4 43+758.856 43.758 942
44/5 43+795.695 43.795 905
44/6 43+860.556 43.86 840
45/1 44+035.703 44.035 665
45/2 44+145.834 44.145 555
Culverts on Galamatta RB Flood Plain
Galamatte LB Flood Plain
SUMMARY OF OPENINGS
Gaamatte LB- Kohilawala 40 m
Galamatte Bridge 45.8 mGalamatte RB 67 m
TOTAL 152.8 m
Southern Expressway -Welipenna 150 m
RB
Feasibility Study and Detailed Design Review NHSP - Southern Expressway Link Roads
Hydrology Report
Annex 1 A - Page 5
8/2/2019 Annex 1 a- B157 Hydrorology Calculations
8/8Feasibility Study and Detailed Design Review NHSP - Southern Expressway Link Roads
Hydrology Report
Annex 1 A - Page 6