    Annex 1 A _B157- Mathugama- Aluthgama Road- Summary of Bridge Openings

    BRIDGE

    Chainage

    BridgeNo

    PROPO

    SEDWIDTH(m)

    PdrposedMinimumHeight

    AVAILABLEHEIGHT(m)

    Measu

    redwaterdepth

    Opens

    pace(uptodeckbott

    AvailableWIDTH(m)

    Remar

    ks

    31/3 No Change-5.2m ** 3.00 0.60 2.40 5.20

    30+750 31/4Increase height to 1.8m -

    Spam 3.15m no change**

    1.10 0.20 0.90 3.15

    Height to be increased to

    1.8m

    34/2 No Change - 9m 2.75 1.70 0.30 1.40 9.00

    34/3 No Change - 3.4m ** 1.80 0.80 1.00 3.40

    34/4 No Change - 3m ** 1.80 0.80 1.00 3.00

    35/4 No Change 4.8 ** 2.30 0.70 1.60 4.90

    35/5No Change-4.3m

    2.002.20 1.10 1.10 4.20

    Additional opening allocated

    to culverts

    Welipenna

    Ganga39/5

    No Change 18.3**

    10.30 1.90 8.40 18.00

    40/1 No Change 3m ** 1.85 0.30 1.55 3.00

    NewAdd 12m NEW

    3.00

    Kohiawala

    Galamatte RB42+000 New

    Add 40m NEW

    2.15 Revised further based on new

    verticle alignment

    Galamatta 42+550 43/4 No Change 45.8m 4.00 4.80 1.90 2.90 46.00

    42+814 43/5 Replace 20m 2.00 2.50 0.90 1.60 3.00

    42+826 43/6 Replace 20m 2.00 2.00 0.80 1.20

    42+978 43/7 Replace 20m 2.00 0.80 0.30 0.50 1.30

    43+069 44/1 Replace 6.1m 2.00 1.60 0.40 1.20 1.60

    43+678 44/3 Replace 15m 2.00 2.40 1.50 0.90 7.00

    43+758 44/4 Replace 6m 2.00 1.20 0.30 0.90 1.60

    43+795 44/5 Replace 6m 2.00 0.00 dia.0.645+650 46/2 Replace 6m 2.00 1.00 0.20 0.80 dia.0.945+730 46/3 Replace 6m 2.00 1.50 1.50 0.00 6.00

    47+048 48/1 Replace 4m 2.00 0.95 0.25 0.70 2.20

    47+400 48/2 Replace 4m 2.00 1.10 0.20 0.90 dia.0.947+865 48/3 Replace 4m 2.00 2.00 1.00 1.00 dia.0.9

    49+068 50/1 No Change 8.9m 2.15 1.60 0.70 0.90 9.00

    49+308 50/2Replace 13m

    2.15 0.90 0.30 0.60 0.60Additional opening added to

    50/2

    52+111 53/2 No change 3m ** 1.30 0.30 1.00 3.00

    Galamatta LB

    Feasibility Study and Detailed Design Review NHSP - Southern Expressway Link Roads

    Hydrology Repo

    Annex 1 A - Page

  • 8/2/2019 Annex 1 a- B157 Hydrorology Calculations

    2/8

    Hydrauic Computations for bridges in B157- Mathugama- Aluthgama Road

    BRIDGE

    Number

    CATCHMENTAREA

    -

    sqkm

    CATCHMENTAREA(ha)(A

    )

    LENGTHOFEFFECTIVE

    WATERCOURSE-ACADUNITS

    LENGTHOFEFFECTIVE

    WATERCOURSE(m)L

    SLOPE(%)

    FLOW

    VELOCITY(ft/sec)

    TIMEOFCONCENTRATION

    Tc=l/60v+15(min)[Ponrajah

    's

    Formula]

    RETURNPERIOD(yr.)

    RAINFALLINTENSITY(mm/h

    r)

    RUNOFFCOEFFICIENT

    DISCHARGEQ=CIA/360

    (cumecs)

    ExistingBridgeWid

    th

    (m)

    Nearbyculvertwidth

    (m)

    Proposedaddiotion

    al

    structurewidth(m)

    BW(m)-CLEARSPAN

    31/3 2.20 220.00 2.70 1695 0.1000 1.5 76.79 100.00 108.95 0.30 19.97 5.20 3.15 0.00 8.35

    31/4

    34/2 1516.00 2.70 4145 0.0100 1.5 166.09 100.00 62.62 0.30 79.11 9.00 6.40 4.00 19.40

    34/3

    34/4

    35/4 2.39

    35/5 9.70 970.00 1.41 4703 0.1000 1.5 186.44 100.00 57.64 0.30 46.59 4.30 4.80 2.00 11.10

    35/6 2.00

    Welipenna

    Gamga39/4 59.60 5960.00 1.60 12265 0.0500 1.5 462.11 100.00 30.08 0.30 149.41 18.30 1.60 10.00 29.90

    40/1 2.74

    Kohiawala

    Galamatte

    RB

    New 27.00

    Galamatta 43/4 147.55 45.80 0.00 0.00 45.80

    Galamatta LB 43/5 2.56 20.00

    43/6 0.88 20.00

    43/7 20.00

    44/1 6.00

    44/2 Individual Culvert

    44/3 18.62 1862.00 0.83 8374 0.0100 1.5 320.26 100.00 39.12 0.30 60.69 0.00 6.00 18.00 24.00

    44/4 6.00

    44/5 5.00 6.00

    44/6 Individual Culvert

    45/1 Individual Culvert

    45/2 Individual Culvert

    45/3 Individual Culvert

    45/4 Individual Culvert

    45/5 Individual Culvert

  • 8/2/2019 Annex 1 a- B157 Hydrorology Calculations

    3/8

    Cross Section at U/S Paddy Field

    Segment Length Ground Level 100yr Flood Level

    Water Height Water Area

    0.00 1.4 3.30

    18.00 0.5 3.30 1.90 42.30

    8.70 0.56 3.30 2.80 24.10

    12.70 0.5 3.30 2.74 35.1810.00 0.6 3.30 2.80 27.50

    10.00 0.57 3.30 2.70 27.15

    13.80 0.55 3.30 2.73 37.81

    9.00 0.52 3.30 2.75 24.89

    6.80 0.39 3.30 2.78 19.35

    6.00 0.39 3.30 2.91 17.46

    9.00 0.79 3.30 2.91 24.39

    11.50 1.2 3.30 2.51 26.51

    18.00 3.3 3.30 2.10 18.90

    7.40 4.5 3.30 0.00

    -1.20

    140.90

    Total Area===> 325.53

    Velocity===>> 0.30

    (Discharge)Q 97.66

    Latest Road Design Level

    Level m MSL Chainage m

    2.315 42000.000,

    2.317 42003.000,2.328 42008.078,

    2.396 42020.000,

    2.431 42023.933,

    2.565 42035.227,

    2.6 42037.653,

    2.637 42040.000,

    2.734 42045.653,

    2.817 42050.000,

    3.037 42060.000,

    3.124 42063.508,

    3.277 42070.000,

    3.464 42080.000,

    3.592 42090.000,

    3.628 42094.105,

    3.652 42097.994,

    3.661 42100.000,

    3.668 42102.105,

    3.673 42104.530,

    3.675 42106.812,

    3.624 42120.000,

    3.493 42131.680,

    3.481 42132.480,

    3.368 42140.000,

    3.172 42153.000,

    3.105

  • 8/2/2019 Annex 1 a- B157 Hydrorology Calculations

    4/8

    ADDITIONAL OPENING FOR 42+000

    Cross Section at U/S Paddy FieldSegment

    Length

    Ground

    Level

    Embankment

    Level Water Height

    Water

    Area

    0.00 1.4 3.10 1.70 38.79

    18.00 0.5 3.10 2.60 22.40

    8.70 0.56 3.10 2.54 32.70

    12.70 0.5 3.10 2.60 25.5510.00 0.6 3.10 2.50 25.20

    10.00 0.57 3.10 2.53 35.12

    13.80 0.55 3.10 2.55 23.13

    9.00 0.52 3.10 2.58 18.02

    6.80 0.39 3.10 2.71 16.29

    6.00 0.39 3.10 2.71 22.63

    9.00 0.79 3.10 2.31 24.26

    11.50 1.2 3.10 1.90 15.39

    18.00 3.3 3.10 -0.20

    7.40 4.5 3.10 -1.40

    TOTAL 140.90

    Total Area===>>>> 299.491

    Velocity===>> 0.3

    Q 89.847

    This calculates the 100 year Q under embankment level- rest is overflow and do not come to

    CALCULATION FOR ADDITIONAL OPENING B157 for KOHILAWALA

    Calculation of the Opening Size for Flow Path at "Kohilawala"

    Cross Section Area of flow path Kohilawala (A1) 299.5 m2

    Assumed velocity(V1) 0.3 m/s

    Discharge (Q1= A1xV1) 89.8 m3/s

    Assumed velocity at the road section after embanking (V2) 1.08 m/s

    Required area at the road section(A2= Q1/V2) 83.2 m2

    20 Year Flood Level 2.55

    Asumed water height 2.15 ( No Free Bo

    Required opening width 38.7

    Feasibility Study and Detailed Design Review NHSP - Southern Expressway Link Roads

    Hydrology Report

    Annex 1 A - Page 3

  • 8/2/2019 Annex 1 a- B157 Hydrorology Calculations

    5/8

    the proposed opening

    rd Alowed)

    Feasibility Study and Detailed Design Review NHSP - Southern Expressway Link Roads

    Hydrology Report

    Annex 1 A - Page 3

  • 8/2/2019 Annex 1 a- B157 Hydrorology Calculations

    6/8

    XSS of Road for Culvert 43/5 & New Culverts ( Galamatte Bridge 43/4- RB Flood Plain) Calculation of Culvert Opening Sizes

    Chainage

    From

    Galamatte

    Flod Plain

    42+550km Existing Level

    100year

    Flood

    Level m

    MSL

    20year

    Flood

    Level m

    MSL

    Proposed

    Embankm

    ent Level

    Diff /Fill

    Height for

    20 Year

    Flood Area Q (Welipenna Southern Expressway Bridge) 394 Mike11 study

    0 3.123 3.3 2.55 2.55 -0.573 Cross Section Area of flow path through culvert 522.02 m2

    20 2.286 3.3 2.55 2.55 0.264 10.2 Assumed velocity(V1) 0.3 m/s

    40 1.794 3.3 2.55 2.55 0.756 15.93 Discharge (Q1= A1xV1) 156.606 m3/s60 1.713 3.3 2.55 2.55 0.837 7.9 Assumed velocity at the road section (V2) 1.08 m/s

    70 1.807 3.3 2.55 2.55 0.743 15.08 Required area at the road section(A2= Q1/V2) 145.0056 m2

    90 1.785 3.3 2.55 2.55 0.765 14.71

    110 1.844 3.3 2.55 2.55 0.706 14.08 20 Year Flood Level 2.55

    130 1.848 3.3 2.55 2.55 0.702 13.93

    150 1.859 3.3 2.55 2.55 0.691 15.15 Asumed water height 2.15170 1.726 3.3 2.55 2.55 0.824 19.31 Required opening width 67.44444

    190 1.443 3.3 2.55 2.55 1.107 23.21

    210 1.336 3.3 2.55 2.55 1.214 25.34

    230 1.230 3.3 2.55 2.55 1.320 24.98

    250 1.372 3.3 2.55 2.55 1.178 21.92

    270 1.536 3.3 2.55 2.55 1.014 18.14

    290 1.750 3.3 2.55 2.55 0.800 15.23

    310 1.827 3.3 2.55 2.55 0.723 15.36

    330 1.737 3.3 2.55 2.55 0.813 19.19

    350 1.444 3.3 2.55 2.55 1.106 22.18370 1.438 3.3 2.55 2.55 1.112 20.96

    390 1.566 3.3 2.55 2.55 0.984 18.81

    410 1.653 3.3 2.55 2.55 0.897 17.64

    430 1.683 3.3 2.55 2.55 0.867 19.05

    450 1.512 3.3 2.55 2.55 1.038 19.37

    470 1.651 3.3 2.55 2.55 0.899 15.43

    490 1.906 3.3 2.55 2.55 0.644 10.68

    510 2.126 3.3 2.55 2.55 0.424 8.51

    530 2.123 3.3 2.55 2.55 0.427 9.63

    550 2.014 3.3 2.55 2.55 0.536 11.04

    570 1.982 3.3 2.55 2.55 0.568 11.26

    590 1.992 3.3 2.55 2.55 0.558 11.58

    610 1.950 3.3 2.55 2.55 0.600 12.57

    630 1.893 3.3 2.55 2.55 0.657 12.32

    650 1.975 3.3 2.55 2.55 0.575 8.4670 2.285 3.3 2.55 2.55 0.265 2.93

    690 2.522 3.3 2.55 2.55 0.028

    710 2.961 3.3 2.55 2.55 -0.411

    TOTAL=>> 522.02

    Feasibility Study and Detailed Design Review NHSP - Southern Expressway Link Roads

    Hyd

    Anne

  • 8/2/2019 Annex 1 a- B157 Hydrorology Calculations

    7/8

    SUMMARY OF OPENING DETAILS FROM 42+000-43+069

    ( Galamatte Bridge Flood Plain - Welipenna River)

    Culvert Chainage SLLRDC LS CHAINAGE

    LB Kohilawala 42+000 42 2700

    Galamatte 43/4 Galamatte 42+550 42.55 2150

    43/5 42+814.609 42.814 1886

    43/6 42+826.168 42.826 1874

    43/7 42+978.780 42.978 1722

    44/1 43+069.199 43.069 163144/2 43+301.628 43.301 1399

    44/3 43+678.124 43.678 1022

    44/4 43+758.856 43.758 942

    44/5 43+795.695 43.795 905

    44/6 43+860.556 43.86 840

    45/1 44+035.703 44.035 665

    45/2 44+145.834 44.145 555

    Culverts on Galamatta RB Flood Plain

    Galamatte LB Flood Plain

    SUMMARY OF OPENINGS

    Gaamatte LB- Kohilawala 40 m

    Galamatte Bridge 45.8 mGalamatte RB 67 m

    TOTAL 152.8 m

    Southern Expressway -Welipenna 150 m

    RB

    Feasibility Study and Detailed Design Review NHSP - Southern Expressway Link Roads

    Hydrology Report

    Annex 1 A - Page 5

  • 8/2/2019 Annex 1 a- B157 Hydrorology Calculations

    8/8Feasibility Study and Detailed Design Review NHSP - Southern Expressway Link Roads

    Hydrology Report

    Annex 1 A - Page 6