  ANNE ARUNDEL COUNTY

PRIMARY CONSTRUCTION PROGRAMSTATE HIGHWAY ADMINISTRATION -- Anne Arundel County -- Line 1

Principal Arterial

Urban Freeway/Expressway

Primary

126,450

159,900

CLASSIFICATION:

STATE -

FEDERAL -

STATE SYSTEM :

Annual Average Daily Traffic (vehicles per day)

CURRENT (2015) -

PROJECTED (2035) -

This segment of US 50 experiences severe congestion during peak travel hours. An additional eastbound travel lane on the Severn River/Pearl Harbor Memorial Bridge will improve safety and operations along this important commuter corridor.

EXPLANATION:

STATE GOALS :

Quality of ServiceSystem PreservationX Community VitalitySafety & Security Environmental Stewardship

Maryland Transportation Plan (MTP) Goals/Selection Criteria:

Economic Prosperity

US 50, John Hanson Highway

Project to ease congestion on US 50 from MD 70 to MD 2 northbound (1.7 miles) by restriping lanes on the Severn River/Pearl Harbor Memorial Bridge to accommodate an additional eastbound travel lane.

Planning underway. Engineering to begin during current fiscal year.

Moved from the Development and Evaluation Program to the Construction Program. Funding provided by the Governor's Investment in Highways and Bridges Initiative.

The approaches to the Severn River/Pearl Harbor Memorial Bridge experience severe congestion, particularly the eastbound direction during the evening peak period.

PURPOSE & NEED SUMMARY STATEMENT:

PROJECT:

DESCRIPTION:

ASSOCIATED IMPROVEMENTS:

STATUS:

SIGNIFICANT CHANGE FROM FY 2015 - 20 CTP:

SMART GROWTH STATUS: Project Not Location Specific

Project Inside PFA GrandfatheredProject Outside PFAX

Exception GrantedPFA Status Yet To Be DeterminedException Will Be RequiredX

Not Subject to PFA Law

FEDERALXPOTENTIAL FUNDING SOURCE:

PHASE

PlanningEngineeringRight-of-wayConstructionTotalFederal-Aid

TOTALESTIMATED

COST($000)

EXPENDTHRU

CURRENTYEAR YEAR

SIXYEARTOTAL

BALANCETO

COMPLETEFOR PLANNING PURPOSES ONLY

2,5632,936

021,06726,566

0

833000

8330

1,0001,000

00

2,0000

7301,100

00

1,8300

0836

014,53615,372

0

000

6,5316,531

0

000000

000000

1,7302,936

021,06725,733

0

000000

BUDGET

SPECIALX GENERAL OTHER

2015 2016 2017 ....2018.... ....2019.... ....2020.... ....2021....

PROJECT CASH FLOW

PAGE ____________SHA-AA-1STIP REFERENCE #AA2211 12/01/2015

SECONDARY CONSTRUCTION PROGRAMSTATE HIGHWAY ADMINISTRATION -- Anne Arundel County -- Line 2

Urban Minor Arterial

Urban Minor Arterial

Secondary

24,800

65,700

CLASSIFICATION:

STATE -

FEDERAL -

STATE SYSTEM :

Annual Average Daily Traffic (vehicles per day)

CURRENT (2015) -

PROJECTED (2035) -

This project will relieve traffic congestion at these failing intersections as a result of the projected volumes from BRAC.EXPLANATION:

STATE GOALS :

Quality of ServiceSystem PreservationX Community VitalityXSafety & SecurityX Environmental Stewardship

Maryland Transportation Plan (MTP) Goals/Selection Criteria:

Economic ProsperityX

MD 175, Annapolis Road

Construct intersection capacity improvements at Mapes Road/Charter Oaks Boulevard and Reece Road (0.6 miles). (BRAC intersection improvement) This project includes construction of a new security fence and tree buffer along Fort Meade's property. Bicycle and pedestrian facilities will be provided.

MD 175, National Business Parkway to McCarron Court (Line 3)MD 175, Disney Road to Reece Road (Line 4)MD 175, MD 295 to MD 170 (Line 7)BRAC Intersection Improvements at Fort Meade (Statewide Line 6)

Construction underway.

The cost decrease of $9.3 million is due to reduced utility needs.

This project will improve safety and operations along MD 175 and ease growing congestion resulting from BRAC expansion at Fort Meade.PURPOSE & NEED SUMMARY STATEMENT:

PROJECT:

DESCRIPTION:

ASSOCIATED IMPROVEMENTS:

STATUS:

SIGNIFICANT CHANGE FROM FY 2015 - 20 CTP:

SMART GROWTH STATUS: Project Not Location Specific

Project Inside PFAX GrandfatheredProject Outside PFA

Exception GrantedPFA Status Yet To Be DeterminedException Will Be Required

Not Subject to PFA Law

FEDERALXPOTENTIAL FUNDING SOURCE:

PHASE

PlanningEngineeringRight-of-wayConstructionTotalFederal-Aid

TOTALESTIMATED

COST($000)

EXPENDTHRU

CURRENTYEAR YEAR

SIXYEARTOTAL

BALANCETO

COMPLETEFOR PLANNING PURPOSES ONLY

00

4,40114,51618,91715,627

00

2,0533,3275,3804,392

00

1,1873,6214,8083,975

00

1,1613,9625,1234,243

000

3,6063,6063,017

000000

000000

000000

00

2,34811,18913,53711,235

000000

BUDGET

SPECIALX GENERAL OTHER

2015 2016 2017 ....2018.... ....2019.... ....2020.... ....2021....

PROJECT CASH FLOW

PAGE ____________SHA-AA-2STIP REFERENCE #AA5806 12/01/2015

SECONDARY CONSTRUCTION PROGRAMSTATE HIGHWAY ADMINISTRATION -- Anne Arundel County -- Line 3

Urban Minor Arterial

Urban Minor Arterial

Secondary

24,800 - 38,000

54,300 - 65,700

CLASSIFICATION:

STATE -

FEDERAL -

STATE SYSTEM :

Annual Average Daily Traffic (vehicles per day)

CURRENT (2015) -

PROJECTED (2035) -

This project will address safety concerns at the MD 295 interchange and relieve traffic congestion related to BRAC expansion at Fort Meade.EXPLANATION:

STATE GOALS :

Quality of ServiceXSystem Preservation Community VitalitySafety & SecurityX Environmental Stewardship

Maryland Transportation Plan (MTP) Goals/Selection Criteria:

Economic ProsperityX

MD 175, Annapolis Road

Widen MD 175 from National Business Parkway to McCarron Court from two lanes to six lanes and reconfigure ramps at the MD 295 interchange to create signalized left turns at MD 175.

MD 175, at Mapes and Reece (Line 2)MD 175, Disney Road to Reece Road (Line 4)MD 175, MD 295 to MD 170 (Line 7) BRAC Intersection Improvements at Fort Meade (Statewide Line 6)

Engineering and Right-of-Way underway.

Added $81.2 million to Construction. Funding provided by the Governor's Investment in Highways and Bridges Initiative. This is a breakout project of MD 175 from MD 295 to MD 170 (Line 7).

This project will improve safety and operations along MD 175 and ease growing congestion related to BRAC expansion at Fort Meade.PURPOSE & NEED SUMMARY STATEMENT:

PROJECT:

DESCRIPTION:

ASSOCIATED IMPROVEMENTS:

STATUS:

SIGNIFICANT CHANGE FROM FY 2015 - 20 CTP:

SMART GROWTH STATUS: Project Not Location Specific

Project Inside PFAX GrandfatheredProject Outside PFA

Exception GrantedPFA Status Yet To Be DeterminedException Will Be Required

Not Subject to PFA Law

FEDERALXPOTENTIAL FUNDING SOURCE:

PHASE

PlanningEngineeringRight-of-wayConstructionTotalFederal-Aid

TOTALESTIMATED

COST($000)

EXPENDTHRU

CURRENTYEAR YEAR

SIXYEARTOTAL

BALANCETO

COMPLETEFOR PLANNING PURPOSES ONLY

03,600

26,57881,211

111,3892,842

01,294

7870

2,081997

0846

5,3060

6,152677

0980

6,0000

6,980784

0480

6,2720

6,752384

00

8,2136,949

15,1620

000

15,67815,678

0

000

19,46619,466

0

02,306

25,79142,09370,1901,845

000

39,11839,118

0

BUDGET

SPECIALX GENERAL OTHER

2015 2016 2017 ....2018.... ....2019.... ....2020.... ....2021....

PROJECT CASH FLOW

PAGE ____________SHA-AA-3STIP REFERENCE #AA4363 12/01/2015

SECONDARY CONSTRUCTION PROGRAMSTATE HIGHWAY ADMINISTRATION -- Anne Arundel County -- Line 4

Urban Minor Arterial

Urban Minor Arterial

Secondary

24,800

65,700

CLASSIFICATION:

STATE -

FEDERAL -

STATE SYSTEM :

Annual Average Daily Traffic (vehicles per day)

CURRENT (2015) -

PROJECTED (2035) -

This project will relieve current and future congestion along the MD 175 corridor and will improve access to Fort Meade.EXPLANATION:

STATE GOALS :

Quality of ServiceXSystem Preservation Community VitalityXSafety & SecurityX Environmental StewardshipX

Maryland Transportation Plan (MTP) Goals/Selection Criteria:

Economic ProsperityX

MD 175, Annapolis Road

Widen MD 175 from Disney Road to Reece Road, from the existing two lane roadway to a six lane roadway (1.1 miles). Bicycle and pedestrian facilities will be provided.

MD 175, at Mapes and Reece Roads (Line 2)MD 175, National Business Parkway to McCarron Court (Line 3)MD 175, MD 295 to MD 170 (Line 7)BRAC Intersection Improvements at Fort Meade (Statewide Line 6)

Engineering underway. Construction to begin during budget fiscal year. The project received $10.0 million in TIGER grants for construction.

The cost decrease of $1.0 million is due to reduced inflation.

This project will address current and future congestion along MD 175 and will improve access to Fort Meade.PURPOSE & NEED SUMMARY STATEMENT:

PROJECT:

DESCRIPTION:

ASSOCIATED IMPROVEMENTS:

STATUS:

SIGNIFICANT CHANGE FROM FY 2015 - 20 CTP:

SMART GROWTH STATUS: Project Not Location Specific

Project Inside PFAX GrandfatheredProject Outside PFA

Exception GrantedPFA Status Yet To Be DeterminedException Will Be Required

Not Subject to PFA Law

FEDERALXPOTENTIAL FUNDING SOURCE:

PHASE

PlanningEngineeringRight-of-wayConstructionTotalFederal-Aid

TOTALESTIMATED

COST($000)

EXPENDTHRU

CURRENTYEAR YEAR

SIXYEARTOTAL

BALANCETO

COMPLETEFOR PLANNING PURPOSES ONLY

02,000

043,68045,68035,641

0882

00

882693

0750

00

750589

0368

014,79815,16611,831

000

12,63012,6309,851

000

11,94611,9469,318

000

4,3064,3063,359

000000

01,118

043,68044,79834,948

000000

BUDGET

SPECIALX GENERAL OTHER

2015 2016 2017 ....2018.... ....2019.... ....2020.... ....2021....

PROJECT CASH FLOW

PAGE ____________SHA-AA-4STIP REFERENCE #AA4364 12/01/2015

PRIMARY DEVELOPMENT AND EVALUATION PROGRAMSTATE HIGHWAY ADMINISTRATION -- Anne Arundel County -- Line 5

Principal Arterial

Other Principal Arterial

Primary

64,750 - 84,700

82,950 - 138,450

CLASSIFICATION:

STATE -

FEDERAL -

STATE SYSTEM :

Annual Average Daily Traffic (vehicles per day)

CURRENT (2015) -

PROJECTED (2035) -

MD 3, Robert Crain Highway

Study to upgrade MD 3 from US 50 to MD 32 to address safety and capacity concerns (8.9 miles). Bicycle and pedestrian access will be provided where appropriate.

US 301, South Corridor Transportation Study (Prince George's County - Line 24)US 301, North of Mount Oak Road to US 50 (Prince George's County - Line 25)MD 450, Stonybrook Drive to west of MD 3 (Prince George's County - Line 32)

Planning complete.

None.

This project will improve safety and operations and relieve congestion in this heavily traveled corridor.JUSTIFICATION:

PROJECT:

DESCRIPTION:

ASSOCIATED IMPROVEMENTS:

STATUS:

SIGNIFICANT CHANGE FROM FY 2015 - 20 CTP:

SMART GROWTH STATUS: Project Not Location Specific

Project Inside PFAX GrandfatheredProject Outside PFA

Exception GrantedPFA Status Yet To Be DeterminedException Will Be Required

Not Subject to PFA Law

FEDERALXPOTENTIAL FUNDING SOURCE:

PHASE

PlanningEngineeringRight-of-wayConstructionTotalFederal-Aid

TOTALESTIMATED

COST($000)

EXPENDTHRU

CURRENTYEAR YEAR

SIXYEARTOTAL

BALANCETO

COMPLETEFOR PLANNING PURPOSES ONLY

3,8730

4,6730

8,5462,868

3,8730

4,6730

8,5462,868

000000

000000

000000

000000

000000

000000

000000

000000

BUDGET

SPECIALX GENERAL OTHER

2015 2016 2017 ....2018.... ....2019.... ....2020.... ....2021....

PROJECT CASH FLOW

PAGE ____________SHA-AA-5The estimated cost is for the entire project in Anne Arundel and Prince George's counties.STIP REFERENCE #AT1981 12/01/2015

PRIMARY DEVELOPMENT AND EVALUATION PROGRAMSTATE HIGHWAY ADMINISTRATION -- Anne Arundel County -- Line 6

Principal Arterial

Freeway/Expressway

Primary

98,900

134,700

CLASSIFICATION:

STATE -

FEDERAL -

STATE SYSTEM :

Annual Average Daily Traffic (vehicles per day)

CURRENT (2015) -

PROJECTED (2035) -

MD 295, Baltimore Washington Parkway

Study to widen MD 295 from 4 to 6 lanes from MD 100 to I-195 including an interchange at Hanover Road and improvements to Hanover Road from the CSX railroad tracks in Howard County to MD 170 (3.27 miles).

Planning complete.

None.

This project will help ease congestion and improve access to one of the State's economic engines, the Baltimore-Washington International Thurgood Marshall Airport.JUSTIFICATION:

PROJECT:

DESCRIPTION:

ASSOCIATED IMPROVEMENTS:

STATUS:

SIGNIFICANT CHANGE FROM FY 2015 - 20 CTP:

SMART GROWTH STATUS: Project Not Location Specific

Project Inside PFAX GrandfatheredProject Outside PFA

Exception GrantedPFA Status Yet To Be DeterminedException Will Be Required

Not Subject to PFA Law

FEDERALXPOTENTIAL FUNDING SOURCE:

PHASE

PlanningEngineeringRight-of-wayConstructionTotalFederal-Aid

TOTALESTIMATED

COST($000)

EXPENDTHRU

CURRENTYEAR YEAR

SIXYEARTOTAL

BALANCETO

COMPLETEFOR PLANNING PURPOSES ONLY

2,554000

2,5541,814

2,554000

2,5541,814

000000

000000

000000

000000

000000

000000

000000

000000

BUDGET

SPECIALX GENERAL OTHER

2015 2016 2017 ....2018.... ....2019.... ....2020.... ....2021....

PROJECT CASH FLOW

PAGE ____________SHA-AA-6STIP REFERENCE #AA3721 12/01/2015

SECONDARY DEVELOPMENT AND EVALUATION PROGRAMSTATE HIGHWAY ADMINISTRATION -- Anne Arundel County -- Line 7

Urban Minor Arterial

Urban Minor Arterial

Secondary

24,800 - 38,000

54,300 - 65,700

CLASSIFICATION:

STATE -

FEDERAL -

STATE SYSTEM :

Annual Average Daily Traffic (vehicles per day)

CURRENT (2015) -

PROJECTED (2035) -

MD 175, Annapolis Road

This study will identify traffic flow improvements on MD 175 from MD 295 to MD 170 including the MD 175/MD 295 interchange (5.2 miles). Bicycle and pedestrian facilities will be provided where appropriate. (BRAC Related)

MD 175, at Mapes and Reece Roads (Line 2)MD 175, National Business Parkway to McCarron Court (Line 3)MD 175, Disney Road to Reece Roads (Line 4)MD 198, MD 295 to MD 32 (Line 8)BRAC Intersection Improvements at Fort Meade (Statewide Line 6)

Partial Engineering underway.

The cost decrease of $34.1 million is due to moving the segment from National Business Parkway to McCarron Court to the Construction Program (Line 3).

This project will address current and future congestion along MD 175 and will improve access to Fort Meade.JUSTIFICATION:

PROJECT:

DESCRIPTION:

ASSOCIATED IMPROVEMENTS:

STATUS:

SIGNIFICANT CHANGE FROM FY 2015 - 20 CTP:

SMART GROWTH STATUS: Project Not Location Specific

Project Inside PFAX GrandfatheredProject Outside PFA

Exception GrantedPFA Status Yet To Be DeterminedException Will Be Required

Not Subject to PFA Law

FEDERALXPOTENTIAL FUNDING SOURCE:

PHASE

PlanningEngineeringRight-of-wayConstructionTotalFederal-Aid

TOTALESTIMATED

COST($000)

EXPENDTHRU

CURRENTYEAR YEAR

SIXYEARTOTAL

BALANCETO

COMPLETEFOR PLANNING PURPOSES ONLY

2,6295,034

00

7,6636,984

2,6293,962

00

6,5915,912

0300

00

300300

0232

00

232232

0540

00

540540

000000

000000

000000

01,072

00

1,0721,072

000000

BUDGET

SPECIALX GENERAL OTHER

2015 2016 2017 ....2018.... ....2019.... ....2020.... ....2021....

PROJECT CASH FLOW

PAGE ____________SHA-AA-7STIP REFERENCE #AA4361 12/01/2015

SECONDARY DEVELOPMENT AND EVALUATION PROGRAMSTATE HIGHWAY ADMINISTRATION -- Anne Arundel County -- Line 8

Other Principal Arterial

Other Principal Arterial

Secondary

26,650

43,000

CLASSIFICATION:

STATE -

FEDERAL -

STATE SYSTEM :

Annual Average Daily Traffic (vehicles per day)

CURRENT (2015) -

PROJECTED (2035) -

MD 198, Laurel Fort Meade Road

Study to address capacity needs on MD 198 from MD 295 to MD 32 (2.7 miles). Bicycle and pedestrian access will be provided where appropriate. (BRAC Related)

MD 175, at Mapes and Reece Roads (Line 2)MD 175, National Business Parkway to McCarron Court (Line 3)MD 175, Disney Road to Reece Roads (Line 4)MD 175, MD 295 to MD 170 (Line 7)BRAC Intersection Improvements at Fort Meade (Statewide Line 6)

County contributed $3.5 million for the planning phase. Engineering underway for segment from Corridor Market Place to MD 295 (Phase 1) and the partial interchange at MD 198 and MD 295. None.

MD 198 is a key link to Fort Meade from points south and west. The area in and around Fort Meade will experience substantial growth as a result of BRAC expansion.JUSTIFICATION:

PROJECT:

DESCRIPTION:

ASSOCIATED IMPROVEMENTS:

STATUS:

SIGNIFICANT CHANGE FROM FY 2015 - 20 CTP:

SMART GROWTH STATUS: Project Not Location Specific

Project Inside PFAX GrandfatheredProject Outside PFA

Exception GrantedPFA Status Yet To Be DeterminedException Will Be Required

Not Subject to PFA Law

FEDERALXPOTENTIAL FUNDING SOURCE:

PHASE

PlanningEngineeringRight-of-wayConstructionTotalFederal-Aid

TOTALESTIMATED

COST($000)

EXPENDTHRU

CURRENTYEAR YEAR

SIXYEARTOTAL

BALANCETO

COMPLETEFOR PLANNING PURPOSES ONLY

3,5002,000

00

5,5000

3,500107

00

3,6070

0650

00

6500

0850

00

8500

0393

00

3930

000000

000000

000000

01,893

00

1,8930

000000

BUDGET

SPECIALX GENERAL OTHERX

2015 2016 2017 ....2018.... ....2019.... ....2020.... ....2021....

PROJECT CASH FLOW

PAGE ____________SHA-AA-8STIP REFERENCE #AA5101 12/01/2015

SAFETY, CONGESTION RELIEF, HIGHWAY AND BRIDGE PRESERVATION PROGRAM

ITEM NO. DESCRIPTION AND IMPROVEMENT TYPE

CONSTRUCTIONTOTALESTIMATED

COST($000's)

STATE HIGHWAY ADMINISTRATION -- ANNE ARUNDEL COUNTY LINE 9

ROUTE NO.

December 1, 2015

STARTStatus as of

Fiscal Year 2016 Completions

Resurface/Rehabilitate

10,4821 CompletedVarious locations in Southern Anne Arundel County; mill/grind, patch and resurface pavement

9,3452 CompletedVarious locations in Northern Anne Arundel County; mill/grind, patch and resurface pavement

Bridge Replacement/Rehabilitation

1,5393 Completed11 Existing bridges on MD 295 and MD 100; clean/paint bridges

2,4974 CompletedFort Smallwood Road; bridge 02045 over Stoney Creek; clean/paint bridgesMD 173

4,7795 CompletedBaltimore Beltway; bridge over Patapsco River and Hammonds Ferry Road; clean/paint bridgesI 695

Safety/Spot Improvement

2,0516 CompletedSolomon's Island Road; Jewel Road/MD 423; safetyMD 2

1,1007 CompletedArundel Expressway; MD 177 to MD 695; guardrailMD 10

Urban Reconstruction

1,4298 CompletedWest Street; 500 ft east of Chinquapin Round Road to 500 ft west of Admiral Drive; engineering study

MD 450

Traffic Management

3999 CompletedMD 450 and Severn River/Naval Academy Bridge; lighting

PAGE _________SHA-AA-9

SAFETY, CONGESTION RELIEF, HIGHWAY AND BRIDGE PRESERVATION PROGRAM

ITEM NO. DESCRIPTION AND IMPROVEMENT TYPE

CONSTRUCTIONTOTALESTIMATED

COST($000's)

STATE HIGHWAY ADMINISTRATION -- ANNE ARUNDEL COUNTY LINE 9 (cont'd)

ROUTE NO.

December 1, 2015

STARTStatus as of

Fiscal Years 2017 and 2018

Resurface/Rehabilitate

1,33710 FY 2016At various locations in Anne Arundel County; patching

13,18811 FY 2016At various locations in south Anne Arundel county; mill and resurface

12,61612 FY 2016At various locations in north Anne Arundel county; mill and resurface

70713 FY 2016At various locations in Anne Arundel county; joint sealing

12,96714 Under constructionAt various locations in southern Anne Arundel County; resurface

12,28715 Under constructionAt various locations in Northern Anne Arundel county; resurface

38616 CompletedAt Various locations in Anne Arundel County; joint sealing

80017 FY 2017MD 4 - Service Road; Wrighton Road to Talbot Road; safety and resurfaceMD 980 B

Safety/Spot Improvement

2,28818 FY 2017At various locations in Anne Arundel County; drainage improvementFunding provided by the Governor’s Investment in Highways and Bridges Initiative

2,49619 Under constructionSolomon's Island Road; at Owensville Sudley Road; geometric improvementsMD 2

2,88820 Under constructionSolomon's Island Road; at MD 256; geometric improvementsMD 2

3,34021 Under constructionSolomon's Island Road; at MD 255; geometric improvements(Transportation Infrastructure Investment Act of 2013)

MD 2

PAGE _________SHA-AA-10

SAFETY, CONGESTION RELIEF, HIGHWAY AND BRIDGE PRESERVATION PROGRAM

ITEM NO. DESCRIPTION AND IMPROVEMENT TYPE

CONSTRUCTIONTOTALESTIMATED

COST($000's)

STATE HIGHWAY ADMINISTRATION -- ANNE ARUNDEL COUNTY LINE 9 (cont'd)

ROUTE NO.

December 1, 2015

STARTStatus as of

Fiscal Years 2017 and 2018 (cont'd)

Safety/Spot Improvement (cont'd)

2,67122 Under constructionSolomon's Island Road; at Harwood Drive; geometric improvements(Transportation Infrastructure Investment Act of 2013)

MD 2

2,05923 Under constructionSappington Station Road and MD 175; drainage improvementMD 32

1,56724 FY 2016John Hanson Highway; MD 665 to Severn River; drainage improvementsFunding provided by the Governor’s Investment in Highways and Bridges Initiative

US 50

2625 FY 2016Mayo Road; MD 214 to MD 2 northbound; ADA improvementsMD 253 NB

1,80026 FY 2017Bay Front Road; MD 794; geometric improvementsMD 258

1,03827 CompletedDavidsonville Road; MD 3 to MD 450; sidewalks(Transportation Infrastructure Investment Act of 2013)

MD 424

Urban Reconstruction

48628 CompletedBladen Street; College Creek Park to College Avenue (Bloomsbury Square); streetscape(Note: The cost shown represents SHA share of project cost)

2,50029 Design UnderwayBaltimore Annapolis Boulevard; MD 2 to MD 10; urban reconstruction (Funded for preliminary engineering)

MD 648

Noise Barriers

4,26530 Under constructionAt Oakdale - Type 1A noise barrier; noise abatementI 97

Traffic Management

7131 Under constructionWashington Boulevard; At US 1 and I-97 - generator back-up systems; signal systemizationI 97

PAGE _________SHA-AA-11

SAFETY, CONGESTION RELIEF, HIGHWAY AND BRIDGE PRESERVATION PROGRAM

ITEM NO. DESCRIPTION AND IMPROVEMENT TYPE

CONSTRUCTIONTOTALESTIMATED

COST($000's)

STATE HIGHWAY ADMINISTRATION -- ANNE ARUNDEL COUNTY LINE 9 (cont'd)

ROUTE NO.

December 1, 2015

STARTStatus as of

Fiscal Years 2017 and 2018 (cont'd)

Traffic Management (cont'd)

7,63232 Under constructionJohn Hanson Highway; MD 424 to Severn River Bridge; lightingI 595

2,10533 Under constructionBaltimore Beltway; at I 895 and MD 2; lightingI 695

Environmental Preservation

3,17334 FY 2016Phase 1 IRVM: US50 (AA/PG Co. line to I-97) & I-97 (US50 to MD3); landscape

Commuter Action Improvements

1,86235 CompletedDavidsonville Road; US 50 south of interchange; ridesharing lot expansionMD 424

Intersection Capacity Improvements

5,22936 Under constructionGovernor Ritchie Highway; at Earleigh Heights Road/Magothy Bridge Road; geometric improvements (Transportation Infrastructure Investment Act of 2013)

MD 2

037 FY 2016Mountain Road; at Woods Road; geometric improvements (Anne Arundel County is funding this project)

MD 177

Bicycle Retrofit

1,52238 Under constructionCamp Meade Road; MD 648 to Andover Road; bicycle retrofitMD 170

TMDL Compliance

61139 Under constructionWest of East-West Boulevard; drainage improvementI 97 SB

PAGE _________SHA-AA-12

SAFETY, CONGESTION RELIEF, HIGHWAY AND BRIDGE PRESERVATION PROGRAM

ITEM NO. DESCRIPTION AND IMPROVEMENT TYPE

CONSTRUCTIONTOTALESTIMATED

COST($000's)

STATE HIGHWAY ADMINISTRATION -- ANNE ARUNDEL COUNTY LINE 9 (cont'd)

ROUTE NO.

December 1, 2015

STARTStatus as of

Fiscal Years 2017 and 2018 (cont'd)

TMDL Compliance (cont'd)

1,62140 FY 2016Aris T Allen Boulevard; Broad Creek Stream Restoration; wetlands replacement(Transportation Infrastructure Investment Act of 2013)

MD 665

Enhancements (cont'd)

Rehabilitation/Operation of Historic Transportation Structures (cont'd)

30041 UnderwayHistoric Generals Highway Corridor Study; archaeology surveys, historic research and public outreach along Generals Highway

Environmental Mitigation

74842 FY 2016Rutland Road Fish Passage

1,00043 FY 2016Cowhide Branch stream restoration and Fish Passage; mitigation of water pollution due to highway runoff

Congressional Earmarks

044 South Shore Trail; construct trail from MD 3 to I-97 at Waterbury Road; construct trail (Earmark $1.6 million; PE, CO)

PAGE _________SHA-AA-13