TERRAMIN AUSTRALIA LIMITEDTERRAMIN AUSTRALIA LIMITED
Angas Zinc Mine18 months onBob Singer – SA Explorers’ Conference 27 November 2009
Important informationImportant information
The information in this presentation is designed as an aid to a spoken explanation. It is not to be considered without that explanation. It is not intended to guide any investment decisions in Terramin Australia Ltd.intended to guide any investment decisions in Terramin Australia Ltd.
The information is intended as a guide to the potential of Terramin’s projects but is not predictive. Consideration of the technical and financial factors requires skilled analysis and understanding of the contextfactors requires skilled analysis and understanding of the context.
The information in this report that relates to Exploration Results and Mineral Resources is based on information compiled by Mr. Robert Singer. Mr Singer is a Member of The Australasian Institute of Mining and Metallurgy. Mr Singer is Chief Geologist and a full time employee of Terramin A t li Li it d H h ffi i t i hi h i l t t th t l f i li ti d t f d it d id ti d t thAustralia Limited. He has sufficient experience which is relevant to the style of mineralisation and type of deposit under consideration and to the activity which he is undertaking to qualify as a Competent Person as defined in the 2004 Edition of the ‘Australasian Code for Reporting Exploration Results, Mineral Resources or Ore Reserves’. Mr. Singer consents to the inclusion in the report of the matters based on his information in the form and context in which it appears.
TERRAMIN AUSTRALIA LIMITED 27 November 2009 SLIDE No. 2
Outline of talkOutline of talk
Introduction Update on Angas Mine Update on Angas Mine What have we learnt? Stepping out Stepping out
TERRAMIN AUSTRALIA LIMITED 27 November 2009 SLIDE No. 3
Company fast factsCompany fast facts
Cash at Bank AUD25 millionDebt facility (Investec Bank) – fully drawn AUD23 millionPublic company - ASX listed
No of Shareholders 4,290Shares on issue 158 millionCommercial convertible notes AUD5.0 M
Strategic holdings:Institutions (Australian & international) 40 M sharesStrategic partners and board 40 M sharesStrategic partner convertible notes* USD30.5 M*These notes are convertible or redeemable at market by Terramin any time in 5 year term
Market Capitalisation (at share price of $0.80) ~AUD127M
`
TERRAMIN AUSTRALIA LIMITED 27 November 2009 SLIDE No. 4
Angas MineAngas Mine
60 km from Adelaide Australia’s first mining
b lt ( 1845)belt (c1845) Company tenements
total 1,160km2, Angas: new discovery 1991 Mining Lease grant August 2006 MARP approved March 2007 Construction from June 2007 Milling from August 2008Milling from August 2008
Fast (but not always smooth) path to production
TERRAMIN AUSTRALIA LIMITED 27 November 2009 SLIDE No. 5
Angas – low operating cost attributesAngas low operating cost attributes
shallow virgin ore body grid power- low fixed price
coarse grind
precious metals credit
no fly-in fly-out
local equipment support services
TERRAMIN AUSTRALIA LIMITED 27 November 2009 SLIDE No. 7
Angas Mine – Progress to dateAngas Mine – Progress to date
Decline at -180m Decline at 180m Development on
six levels Eight stopes
completed Good
reconciliation
TERRAMIN AUSTRALIA LIMITED 27 November 2009 SLIDE No. 8
Ramp up to full productionRamp up to full production
10000
20000
30000
90000
100000100000 16000
0
10000
Q3 2008 Q4
6000070000
80000
90000
Qua
rter
70000
80000
90000
12000
14000
2000030000
40000
50000
Tonn
es p
er Q
40000
50000
60000
Tonn
es
6000
8000
10000
T
0
10000
20000
Q3 2008 Q4 2008 Q1 2009 Q2 2009 Q3 200910000
20000
30000
2000
4000
6000
0
10000
Q3 2008 Q4 2008 Q1 2009 Q2 2009 Q3 2009 Q4 20090
Tonnes Pb conc Zn conc
TERRAMIN AUSTRALIA LIMITED 27 November 2009 SLIDE No. 9
Tonnes Pb conc Zn conc
Building on a year of progressBuilding on a year of progress
Angas mine completes first 16 months of Angas mine completes first 16 months of production production on forecast
d bt t t d debt restructured optimisation initiatives implemented EBITDA forecast $54m over next two yearsy
The next step? –Mill expansion to increase throughput and accelerate cash flow
TERRAMIN AUSTRALIA LIMITED 27 November 2009 SLIDE No. 10
Fleurieu Project
Refocus on exploration Mapping and structural modelling at Angas Additions to database
700 drill holes (North, Aberfoyle) 4,000 surface samples (triple previous) Further BHP and CRA data to upload.
Developing new exploration model
TERRAMIN AUSTRALIA LIMITED 27 November 2009 SLIDE No. 11
Fleurieu Project
Three prong strategyA N Mi Angas Near Mine Incorporate structural model
W lk di t i t d ill t t Walk up district drill targets Old mines
S ti f li h i Supporting surface sampling or geophysics
Regional and DistrictF ll i ti t Follow up existing prospects
Geophysics and geochemistryGenerate new targets
TERRAMIN AUSTRALIA LIMITED 27 November 2009 SLIDE No. 12
Generate new targets
Angas mapping
Anastomosing system Anastomosing system HW and Garwood not separate shears but part of this system
Mineralisation in north east striking shear Mineralisation in north east striking shear Re-oriented into reverse shears (340)
Gi t l ti l h l Gives current lenticular morphology Thickening of ore controlled by anastomosing links
G t h t b li it d b h Garnet host may be limited by shears
TERRAMIN AUSTRALIA LIMITED 27 November 2009 SLIDE No. 13
Angas Mapping140 L l- 140 Level
GarwoodRankine
Hanging Wall
NNNN
TERRAMIN AUSTRALIA LIMITED 27 November 2009 SLIDE No. 14
Angas Mapping140 L l R ki N th- 140 Level Rankine North
TERRAMIN AUSTRALIA LIMITED 27 November 2009 SLIDE No. 16
Fleurieu Project
PREAMIMMA MINE
BREMER MINE
KANMANTOO MINE
TERRAMIN AUSTRALIA LIMITED 27 November 2009 SLIDE No. 19
ANGAS ZINC MINE
Fleurieu Project
MonartoMonartoMonartoMonarto
DistrictDistrict
PreamimmaPreamimma
DistrictDistrict
Warla DistrictWarla District
Brinkley DistrictBrinkley DistrictHarriet HillHarriet Hill
StrathalbynStrathalbyn
DistrictDistrict
DistrictDistrict
TERRAMIN AUSTRALIA LIMITED 27 November 2009 SLIDE No. 20
Monarto - Preamimma District
MonartoMonarto
PreamimmaPreamimma
DistrictDistrict
DistrictDistrict
TERRAMIN AUSTRALIA LIMITED 27 November 2009 SLIDE No. 21
Preamimma exploration
SoilsSoilsSoilsSoils131ppb Au 131ppb Au 1,717ppm As 1,717ppm As
Rock Chips up toRock Chips up to2.7g/t Au 2.7g/t Au
ChargeableChargeableIP featureIP feature
N
Underground sample Underground sample A 9 0 /tA 9 0 /t
Historic WorkingsHistoric Workings
TERRAMIN AUSTRALIA LIMITED 27 November 2009 SLIDE No. 22
Au 9.0 g/tAu 9.0 g/t