    Andryaas Mamuaya

    Project Manager

    PT PROFAB Indonesia

    PT PROFAB

    Indonesia:http://www.profab.co.id

    PT PAL Indonesia: http://www.pal.co.id

    See My Online CV: http://www.yourwebcv.com/cv.php?user=amamuaya

    Batam, Indonesia Feb 2010 - Present

    Surabaya, Other, Indonesia Jan 1992 - Jan 2010

    Summary

    I consider myself to be a self-motivated, hard working, punctual, and conscientious individual, capable

    of working to high standards and under pressure either as part of a team or on own initiative. As a

    team member, I enjoy an excellent working relationship with colleagues of all ages and personalities. I

    am also able to write creatively and critically, and successfully meet deadline

    Work History

    PT PROFAB INDONESIA

    Project Manager

    The Profab group of companies provides a one stop solution for the oil & gas and related Industries

    from field development to production to refining, Profab can design and manufacture all size and

    material Pressure Vessels, Air Cooled Heat Exchangers, Shell & Tube Heat Exchangers. We

    manufacture Process Modules and Well Head Platforms up to 2000t. Additionally we provide Valve

    refurbishment and design, supply and operate onshore or offshore Drilling Derricks.

    2010- Present: PT PROFABs Project Manager

    2010 : Project Manager in PT PROFAB Indonesia for Chevron- Anchor Pile Project2010 : Project Manager for Skid Module for Siemens - DGF Vessel for EMAS Project

    2010 : Project Manager for Dril ling Template for FMC - PT PAN -Pertamina Project

    2010 : Project Manager for Thickeners Mechanism for Siemens - Hyundai-Hanwa-Arzew

    Refinery

    2010 : Project Manager for Fuel Gas Skid for Boustead- Cristal Project

    2010 : Project Manager for Fuel Gas Skid for Boustead- Petrobas-BIH Project

    PT PAL Indonesia

    Project Manager

    PAL INDONESIA lives up to its reputation as a primary force for national maritime-industry

    development. As part of its effort to support the foundation of a solid maritime industry, we strive to

    deliver knowledge, skills and technology for wider use in the national maritime industry community.

    This effort has become even more relevant as it holds the key for an enhanced national maritime

    industry.

    Participated in GE's

    Nuovo Pignone fo Tota

    Tunu 7 Project

    2002As a Production Engineer participan

    Nuovo Pignone- Italy. PT PAL

    awarded EPC Contract by Total

    Indonesie, Tunu VIII & IX Gas

    Compression Modules

    Stator Frame for Gas

    Turbine Power Plant600MW

    2005

    20 Unit of Stator Frame 600MW

    was made in 2 years for HarbinElectric Corporation during 200

    to 2007. Scope of work compris

    of Material procurement,

    Fabrication, Welding and

    Machinery. Total weight of one

    Frame is 100MT.

    Brace Monopod Platfor

    Kodeco KE32

    View My VisualCV Online: http://www.visualcv.com/ifjw

    Page 1

    http://www.profab.co.id/http://www.pal.co.id/http://www.yourwebcv.com/cv.php?user=amamuayahttp://www.yourwebcv.com/cv.php?user=amamuayahttp://www.visualcv.com/ifjwa84http://www.visualcv.com/ifjwa84http://www.yourwebcv.com/cv.php?user=amamuayahttp://www.yourwebcv.com/cv.php?user=amamuayahttp://www.pal.co.id/http://www.profab.co.id/
  • 8/8/2019 Andryaas Mamuaya VisualCV Resume

    2/7

    2001-2009 : PT PALs Project Manager

    1998-2001 : PT PALs Project Coordinator

    1995-1998 : PT PALs Production Engineer

    1992-1995 : PT PALs Supervisor

    2008-2010 : Project Manager in PT PAL Indonesia for Alstom, ElTebbin, CSA Spain Project

    2007 : Project Manager in PT PAL Indonesia for Metering Skid PGN Project (Perusahaan

    Gas Negara)

    2006-2007 : Project Engineer in PT PAL Indonesia for Engineering, Procurement, Fabrication,

    Precommisioning of KE 32, Topside and Monopod Jacket for KODECO Energy Project

    Detail work

    1. Daily project engineer the project of Offshore EPCI (Engineering, Procurement, Construction &

    Installation) Services for KODECO Energy Oil Co., Indonesia.

    2. Lead the project team to perform engineering, procurement, installation and pre-commissioning of

    the following development projects;

    (a) Tripod Central Poleng Processing Platform (PPP)

    (b) KE32 Wellhead Platform and 7 km of 12 Pipeline (from KE32 to Tee-junction along KE38-PPP)

    (c) Tie-in of the KE-30 pipeline to the preinstalled KE-30 pipeline riser on PPP after PPP installation

    (d) Gas Expansion Phase II Pipeline (70 km of 16 pipelines from PPP to ORF)

    (e) 2 km of 16 Horizontal directional drilling (HDD) pipelines

    3. Provided supervision and management to all Sub Contractors and Vendors responsible for any

    design, procurement, fabrication and installation aspects of the project, to ensure that all parties are

    working to the planning.

    2005-2006 : Project Engineer in PT PAL Indonesia for Engineering, Procurement, Fabrication,

    Precommisioning of Zelda F, Topside and Monopod Jacket for Sumatra SES CNOOC Project

    Detail work

    1. Daily project engineer the project of Offshore EPCI (Engineering, Procurement, Construction &

    Installation) Services for CNOOC, Indonesia.

    2. Lead the project team to perform engineering, procurement, installation and pre-commissioning of

    the following development projects;

    (a) Tripod Central Poleng Processing Platform (PPP)

    (b) Wellhead Platform and 7 km of 12 Pipeline (from WHP to Tee-junction along )

    3. Provided supervision and management to all Sub Contractors and Vendors responsible for any

    design, procurement, fabrication and installation aspects of the project, to ensure that all parties are

    working to the planning.

    2005-2007 : Project Manager for Fabrication & Machining Stator Frame 300MW & 600MW for

    China. Our client Harbin Electric Company- China awarded USD 3.000.000 for Engineering,

    Procurement, Fabrication, and Machining of Stator Frame 300MW (10 units) and Stator Frame

    600MW (10 units). All units will be shipped to China within 1.5 year. Project team involved are 1

    Project Sponsor, 1 Project Manager, 1 Mechanical Engineer, 1 Procurement Officer, 4 Production

    Engineer, 4 Shops manager ( 4 shops for welding and machining), 15 Fitter and 20 Welders.

    Project Manager jobs are: Review Contract, Manage Kick Off Meeting, Project Plan (Manpower

    plan, schedule, engineering, procurement & subcontractor), Project Execution, Project Controlling,

    Reporting Status & Progress to Upper management & Client, Evaluation

    2004-2005 : Project Manager for UOP Recovery Plus Project Module Refinery Plant Pertamina

    Balongan. Our client UOP LLC USA awarded USD 700.000 for Engineering, Procurement,

    Fabrication, and Installation of UOP Recovery Plus Module for Pertamina Balongan. Project team

    involved are 1 Project Sponsor, 1 Project Manager, 1 Mechanical Engineer, 1 Procurement Officer,2 Production Engineer, 4 Shops manager ( 4 shops for welding and machining), 20 Fitter and 16

    Welders. Project Manager jobs are: Review Contract, Manage Kick Off Meeting, Project Plan

    (Manpower plan, schedule, engineering, procurement & subcontractor), Project Execution, Project

    Controlling, Reporting Status & Progress to Upper management & Client, Evaluation

    2003-2004 : PT PALs Project Manager for Pressure Vessels for TUNU 9 Field Defelopment

    Project Our client was PT Astinaputera Ekaperkasa awarded USD 600.000 for Engineering,

    Procurement, Fabrication, and Machining of Pressure Vessels for TUNU 9 Field. Project team

    involved are 1 Project Sponsor, 1 Project Manager, 1 Mechanical Engineer, 1 Procurement Officer,

    2 Production Engineer, 2 Shops manager ( 2 shops for welding and machining), 10 Fitter and 15

    Welders. Project Manager Jobs are: Review Contract, Manage Kick Off Meeting, Project Plan

    2006

    Awarded Contract by Kodeco Energ

    Ltd. for KE-32 Braced Monopod

    Platform

    General Electric StatorFrame

    General Electric award in total

    Units of Stator Frame since 199

    to 2002. Range of 300MW to

    700MW

    Alstom project delivered

    to El Tebbin

    Balance of Plant such as MainCondenser, LP Heater was

    delivered to ElTebbin Egypt

    WHP AHESS

    PLATFORM "A"

    WELLHEAD PLATFORM A

    UJUNG PANGKAHDEVELOPMENT PROJECT

    (AMERADA HESS)

    JACKET 160 TON

    PILES 480 TON

    DECK 450 TON

    TOTAL 1090 TON

    View My VisualCV Online: http://www.visualcv.com/ifjw

    Page 2

    http://www.visualcv.com/ifjwa84http://www.visualcv.com/ifjwa84
  • 8/8/2019 Andryaas Mamuaya VisualCV Resume

    3/7

    (Manpower plan, schedule, engineering, procurement & subcontractor), Project Execution, Project

    Controlling, Reporting Status & Progress to Upper management & Client, Evaluation

    2002 : Project Manager for LPG Storage Vessels for Cemara LPG Plant. Our client PT

    Wahana Insannugraha awarded USD 400.000 for Engineering, Procurement, Fabrication, and

    Installation of LPG Storage Tank and scrubber to Cirebon. Project team involved are 1 Project

    Sponsor, 1 Project Manager, 1 Mechanical Engineer, 1 Procurement Officer, 4 Production Engineer,

    4 Shops manager ( 4 shops for welding and machining), 15 Fitter and 20 Welders. Project Manager

    jobs are: Review Contract, Manage Kick Off Meeting , Project Plan (Manpower plan, schedule,

    engineering, procurement & subcontractor), Project Execution, Project Controlling, Updating &

    Reporting Status & Progress to Upper management & Client, Evaluation

    2002 : PT PALs Project Manager for Duri Steam Flood Area 11 EPC. Our client PT.

    Tripatra awarded USD 400.000 for Engineering, Procurement, Fabrication, and Machining of

    Pressure Vessel for Caltex Pacific Indonesia. Project team involved are 1 Project Sponsor, 1 Project

    Manager, 1 Mechanical Engineer, 1 Procurement Officer, 4 Production Engineer, 4 Shops manager

    ( 4 shops for welding and machining), 15 Fitter and 20 Welders. Project Manager jobs are: Review

    Contract, Manage Kick Off Meeting , Project Plan (Manpower plan, schedule, engineering,

    procurement & subcontractor), Project Execution, Project Controlling, Reporting Status & Progress

    to Upper management & Client, Evaluation

    2001 : PT PALs Project Manager for Stator Frame 7FH2 Project (Mitsubishi Electric

    Company -MELCO ) Our client Mitsubishi Electric Company-JAPAN awarded total USD 950.000

    for Engineering, Procurement, Fabrication, and Machining of Stator Frame 400MW (10 units) All

    units shipped to JAPAN. Project team involved are 1 Project Sponsor, 1 Project Manager, 1

    Mechanical Engineer, 1 Procurement Officer, 4 Production Engineer, 4 Shops manager ( 4 shops

    for welding and machining), 15 Fitter and 20 Welders. Project Manager jobs are: Review Contract,

    Manage Kick Off Meeting , Project Plan (Manpower plan, schedule, engineering, procurement &

    subcontractor), Project Execution, Project Controlling, Reporting Status & Progress to Upper

    management & Client, Evaluation

    2001 : PT PALs Project Manager for Stator Frame 7FH2 Project (General Electric )

    Our client General Electric Power System USA awarded total USD 10.000.000 for Engineering,

    Procurement, Fabrication, and Machining of Stator Frame 400MW (85 units) All units shipped to

    USA. Project team involved are 1 Project Sponsor, 1 Project Manager, 1 Mechanical Engineer, 1

    Procurement Officer, 4 Production Engineer, 4 Shops manager ( 4 shops for welding and

    machining), 15 Fitter and 20 Welders. Project Manager jobs are: Review Contract, Manage Kick

    Off Meeting , Project Plan (Manpower plan, schedule, engineering, procurement & subcontractor),

    Project Execution, Project Controlling, Reporting Status & Progress to Upper management & Client,

    Evaluation

    2000 : PT PALs Production Engineer for Produced Fluid Heat Exchanger, CGS Area 10

    Project (Caltex Project) Our client IKPT awarded USD 900.000 for Engineering, Procurement,

    Fabrication, and Machining of Heat Exchanger for Caltex Pacific Indonesia. Production Engineer job

    are: Detail Scheduling, Monitor and Update Status, Reporting to Project Manager.

    1999 : PT PALs Production Engineer for Air Cooled H/E Project (VICO)

    Our client VICO Indonesia awarded USD 700.000 for Engineering, Procurement,

    Fabrication, and Testing of Air Colled H/E. Production Engineer job are: Detail Scheduling, Monitor

    and Update Status, Reporting to Project Manager.

    1995 1998 : PT PALs Production Engineer for Barge Mounted Power Plant Project (PLN-IHI

    Project). Our client PT PLN awarded USD 13.000.000 for Engineering, Procurement, Fabrication,

    Installation and Testing of BMPP. Production Engineer job are: Detail Scheduling, Monitor andUpdate Status, Reporting to Project Manager.

    1992 1995 : PT PALs Supervisor for PLTU Gresik, PLTU Paiton Project, PLTUG Suralaya

    Project

    Zelda F Monopod WHP

    CNOOC

    As Project Engineer in EPC Proj

    ZELDA F MONOPOD

    WELLHEAD PLATFORMCNOOC SES, Ltd

    MEZZ & MAIN DECK 184 TON

    CELLAR DECK 114 TON

    CAISSON & BOAT LAND 212 TON

    PILES 175 TON

    TOTAL 685 TON

    Condenser Module for

    Alstom

    Alstom Power is one of the long

    term customer and award seve

    BOP Project for Europe and Fa

    East Power Plant.

    Drilling Template -FMC

    for PT PAN

    Four leg Drilling Template

    designed by FMC for PTPartalahan start fabrication by

    early August 2010 and comple

    by end of September 2010

    View My VisualCV Online: http://www.visualcv.com/ifjw

    Page 3

    http://www.visualcv.com/ifjwa84http://www.visualcv.com/ifjwa84
  • 8/8/2019 Andryaas Mamuaya VisualCV Resume

    4/7

    Surabaya, Indonesia Jun 1996 - Jan 2000

    Surabaya, Other, Indonesia Jan 1989 - Jan 1992

    Education

    University of Dr. Soetomo

    Bachelor Degree, English

    http://fs.unitomo.ac.id/

    PT PAL Education Centre

    Shipbuilding Technical High School

    Load Out to Supply Vessel

    Template on board

    Suction Pile for Chevro

    In progress

    View My VisualCV Online: http://www.visualcv.com/ifjw

    Page 4

    http://fs.unitomo.ac.id/http://www.visualcv.com/ifjwa84http://www.visualcv.com/ifjwa84http://fs.unitomo.ac.id/
  • 8/8/2019 Andryaas Mamuaya VisualCV Resume

    5/7

    As Mechanic in

    Mitsubishi -Kobe

    It was invited by Melco-

    Mitsubishi ElectricCompany for Inspection

    of Stator Frame that was

    ordered for 15 Unit of300MW Stator Frame to

    PT PAL

    Installation UOP

    Module at

    Balongan for Blue

    Sky Project

    Pertamina

    The Module was

    fabricated in PT PAL and

    deliver to Balongan for

    installation andcommisioning

    Kodeco KE32

    Topside

    Do you ever see WHP/

    Topside Platformfabricated inside of

    workshop? The building

    must be tall enough andthe goodness was very

    quick and no obstacleslike bad weathers.

    The Twilight of

    Jacket

    This Jacket for Kodeco

    KE32 was alsofabricated inside of

    workshop and load outwas in the twilight to

    catch the high tide of the

    seawater...

    MRS Skid

    More than 150 units

    MRS Skid was fabricatedfor PGN Project funded

    by World Bank

    Balance of Plant

    Alstom BOP for Egypt

    ready to Sail Out.....goodbye my baby

    View My VisualCV Online: http://www.visualcv.com/ifjw

    Page 5

    http://www.visualcv.com/ifjwa84http://www.visualcv.com/ifjwa84
  • 8/8/2019 Andryaas Mamuaya VisualCV Resume

    6/7

    With PT PAL

    colleagues and

    Client

    The background wasContainer Vessel and

    taken in the evening with

    friends and my clientfrom Harbin-China

    Hang out in Cafe

    Sampoerna for

    farewell party

    All my friend since 1989were in school...good

    luck

    My Real Project

    They are my realwork.........

    Lunch@Sampoerna

    Cafe

    UOP team in lunch time

    Technical Standard, Improvement and Project Management

    (Advanced)10+ Years Experience, (Currently in use)

    Project Management & Skill Up Training

    (Advanced)10+ Years Experience, (Currently in use)

    Skills

    Excellent understanding of Material specifications, standardized by ASTM, ASME and BS, DNV,

    MIGAS regulation, piping oil and gas platforms.

    Wide experiences on technical clarifications, material inspections and testingsUnderstanding in application of Six Sigma, TQM, Kaizen, FMEA, Earn Value Analisys, RCA in

    industrial and project management.

    Professional Training

    2005 : ESQ Leadership Training (Certificate)

    2005 : FINON (Financial for Non Finance Manager) (Certificate)

    View My VisualCV Online: http://www.visualcv.com/ifjw

    Page 6

    http://www.visualcv.com/ifjwa84http://www.visualcv.com/ifjwa84
  • 8/8/2019 Andryaas Mamuaya VisualCV Resume

    7/7

    POWER PLANT PROJECT EXPERIENCE

    (Advanced)

    10+ Years Experience, (Last Used 10+ years ago)

    OIL & GAS PROJECT EXPERIENCE

    (Advanced)

    10+ Years Experience, (Last Used 10+ years ago)

    2003 : Project Management Institute Training PMBOK (Certificate)

    2001 : GE Supplier Project Manager Training, Port Blair, India

    2000 : ASME Sec. VIII Div.I (Certificate)

    1999 : Package Assembly & Testing of Gas Turbine and Centrifugal Compressor, Florence, Italy

    1996 : The Pre-Advanced English Course (Conversation Level 6) (Certificate)

    1997 : Peluang dan Tantangan Implementasi ISO 14000 di Industri dalam Era Pasar Bebas

    (Certificate)

    1997 : Indonesian Quality Convention 1997 (Certificate)

    Contribution in Power Plant Project:

    Supply of Balance Of Plant for several Power Plant Components Provider (General Electric Power System,

    Mitsubishi Heavy Industries, Alstom Power Systems, Siemens, etc)EPCI Barge Mounted Power Plant (1 x 30 MW) PT. PLN

    Supply of Balance Of Plant for Gunung Salak Geothermal Power Plant (1x65 MW) ANSALDO, ItalyRehabilitation Works of Power Plant for PLTU Priok unit #3 & #4 (2 x 50 MW) PT. PLN

    EPCI 2 x 20 MW Gas Turbine Power Plant Teluk Lembu, Lampung PT. PLN

    EPCI 1 x 20 MW Gas Turbine Power Plant PIM-2, Aceh PT. PLN

    EPCI 2 x 2.5 MW Geothermal Power Plant Ulumbu, NTT PT. PLN (Under Construction)

    Process Components for several oil & gas exploration & production (Caltex Pacific Indonesia, Vico

    Indonesia, Total Indonesie)Process Components for several oil & gas contractors (IKPT, Sempec, TPEC, Rekayasa Industri)Skid Mounted for Sempec, TPEC and Punj Lloyd

    Modules Packages (< 300 tons) for ARII, Total Indonesie and UOP (USA)Sub-structure monopod for ARII

    Floating Structure for UNOCAL IndonesiaWellhead Platform, Topside, Jacket & Pipeline Installation (Amerada HESS Indonesia, Kodeco Energy,CNOOC)

    Interests

    My interest in opportunities of Oil and Gas, Power Plant Project in Project Management field