OFFICE OF DISASTER PREPAREDNESS
AND MANAGEMENTAND MANAGEMENT
STRATEGIC PLAN 2010 - 2015
FINAL DRAFT
CARING – COORDINATION – CULTURE OF RESILIENCE
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
CARING COORDINATION CULTURE OF RESILIENCE
TABLE OF CONTENTS
1.0 Foreword…..………………………………………………………………………………....................................... 2.0 Executive Summary...………………………………………………………………………………………………………
34
Chapter 1 – The Organization..……………………………………………………………………………………………… Chapter 2 – The Strategic Planning Exercise.………………………………………………………………………… Chapter 3 – The Strategic Framework………...……………………………………………………………………….. Chapter 4 – Strategic Analysis………………...…………………………………………………………………………….
6101517 Chapter 4 Strategic Analysis………………...…………………………………………………………………………….
Chapter 5 – Goals and Objectives………..……………………………………………………............................. Chapter 6………………………………………………………………………………………………………………………………
6.1 Organizational Strategy & Action Plan………………………………………………………………….. 6 2 Critical Success Factors
1723272736 6.2 Critical Success Factors………………………………………………………………………………………….
6.3 The Action Plan…………………………………………………………………………………………………….. Chapter 7: Conclusion…………………………………………………………………………………………………………… Appendix I: Action Plan………………………………………………………………………………………………………… A di II M t St t & F ti l A
36444548
Appendix II: Management Structure & Functional Areas………………………………………………………. Appendix III: Legal & Regulatory Framework.……………………………………………............................. Appendix IV: Policy Framework……………………………………………………………………………………………. Appendix V: Glossary of Terms………………………………………………….………….………………………………
54555657
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011 2
1.0 FOREWORD
The ODPM Strategic Plan 2010 – 2015 represents the primary vehicle for alignment of the activities of the organization withthe Disaster Management component of the mission of the Ministry of National Security (MNS) – and the National Vision,Seven Pillars for Sustainable Development.
The plan is structured to guide the organization’s operational decision making relative to cost and general management aswell as, the systematic execution of projects to fulfill the selected Strategic Initiatives for the planning period 2010 – 2015.The Initiatives adopted by the ODPM include:
Strategic Partnerships Strategic Partnerships Operational Excellence Community Resilience Enhancing DRM Capabilities
The carefully selected Strategic Initiatives listed above are intended to advance the organization to improved levels ofexecution of its mandate – formulating an all‐hazard approach to emergency/risk management, encompassing acomprehensive framework that includes mitigation, preparedness, response and recovery. A range of “Key” Enterprise LevelProjects including; Capital – Infrastructure – Continuous Improvement and Technology, projects have been selected to driveth f lfill t f th I iti ti th t ill l d t ti th h t th i ti th t 5 Ythe fulfillment of these Initiatives that will lead to execution throughout the organization over the next 5 Years.
The OPDM 5‐Year Strategic Plan will be cascaded across the organization through a series of 1‐Year Enterprise OperatingPlans designed to be implemented by the organization in each “current” year, thereby giving ODPM the ability to adjust oraccelerate the targets throughout the planning period to drive optimum achievements of the 5 – Year Strategic Goals.
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011 3
CHAPTER 1THE ORGANIZATION
The ODPM was established by Cabinet in January 2005 with a mandate that was more comprehensive than that of
its predecessor the National Emergency Management Agency (NEMA) Consequently the ODPM is the nationalits predecessor, the National Emergency Management Agency (NEMA). Consequently, the ODPM is the national
coordinating agency that manages all phases of the Disaster Management Cycle; prevention, mitigation,
preparedness, response and recovery as well as climate change adaptation programs. The main purpose of the
ODPM is to initiate the national effort aimed at addressing Comprehensive Disaster Management (CDM) The ODPMODPM is to initiate the national effort aimed at addressing Comprehensive Disaster Management (CDM). The ODPM
has a more pro‐active than re‐active role which entails generating and implementing a Comprehensive Disaster Plan
to address Trinidad and Tobago’s capacity to respond to large‐scale disasters. The overall design of ODPM’s mandate
represents a strategic shift which includes Risk Management. As such, the ODPM is principally responsible for:represents a strategic shift which includes Risk Management. As such, the ODPM is principally responsible for:
Managing the coordination of First Responder Agencies during and after national emergencies.
Critical Infrastructure Protection.
Prevention and mitigation initiatives to reduce impact of hazards or potential disasters.
Public education / community outreach activities.
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011 4
CHAPTER 1THE ORGANIZATION
ODPM MANDATEThe ODPM was established by Cabinet in January 2005, and is responsible for leading
the National effort in protecting public health and safety; restoring essential government services; and providing emergency relief to those affected severely by
hazards.
Per Cabinet Minute No. 56 of January 6, 2005;By its very mandate the ODPM is committed to formulating an all‐hazard approach y y g pp
to emergency/risk management. This all‐hazard approach encompasses a comprehensive framework that includes mitigation, preparedness, response and
recovery.
Per the Disaster Measures Act, 1978 Chapter 16:50;The ODPM is to provide for the taking of prompt and expeditious measures for the
alleviation of the effects of disaster and for matters connected therewith.
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011 5
CHAPTER 1THE ORGANIZATION
HIGH LEVELORG CHART
Ministry of National Security
Chief Executive Officer ODPM
Deputy Chief Executive Officer
Corporate ServicesMitigation Manager (Mitigation, Planning and Research Unit)
Operations Manager (Preparedness & Response Unit)
Training & Education Specialist (Public
Information & Education Community Outreach Unit)
Corporate Services Manager
Administrative Support and (Finance
Unit)
Project Management
Specialist (Project Management Unit)
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011 6
CHAPTER 2 –THE STRATEGIC PLANNING EXERCISE2.1 RATIONALE
The mandate of the Ministry of National Security towards maintaining a secure and safe nation for the citizens ofTrinidad and Tobago – National and Personal Security – dictates the necessary alignment of ODPM StrategicPriorities with those of the Ministry. In this regard the ODPM Strategic Plan has incorporated key elements of the 7Pillars for National Development.
Comprehensive Disaster Management (CDM) represents the primary component of this mandate which ODPM isp g ( ) p p y pmost strategically positioned to deliver. As such, ODPM must take the lead in partnering with Government – Privateand Public Sector – Civil Society and NGOs – Citizens of Trinidad and Tobago to fulfill this mandate. ODPM plays acritical role in CDM and must lead National disaster preparedness and coordination initiatives.
The strategic planning process was necessary to engage the ODPM Executive Leadership Team (ELT) and SeniorTechnical Staff in understanding the national mandate and priorities to inform the specific projects highlighted inthe 2010‐2015 Strategic Plan.
The ELT declares its commitment to the Strategic Initiatives in its drive towards the effective implementation of the2010‐2015 ODPM Strategic Plan, and the achievement of its Strategic Goals.
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011 7
CHAPTER 2 –THE STRATEGIC PLANNING EXERCISE2.2 METHODOLOGY
The Strategic Plan 2010 – 2015 defines the organization’s Strategy and will guide the organization in the fulfillment of its
Performance Commitments to both the government and citizens of Trinidad and Tobago – and our focal point partners
(Grenada, Guyana and Suriname). The ODPM Executive Leadership Team (ELT) developed its Strategy relative to the
Goals and Initiatives of the Government of Trinidad and Tobago to ensure alignment through the series of activities
outlined below:
1. GORTT – MNS – ODPM Alignment
2. Organizational Effectiveness Assessment & SWOT Analysis
3. Defining Strategic Goals
4. Establishing Strategic Initiatives – Strategic Objectives – Strategic Priorities to translate Strategy to Execution
5. Development of Key Metrics and Enterprise Balanced Scorecards
6. Project Rationalization and Alignment to Strategic Priorities
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011 8
CHAPTER 2 –THE STRATEGIC PLANNING EXERCISE2.2 METHODOLOGY
VISION, MISSION, VISION, MISSION, VALUES (MVVALUES (MV22))
STRATEGIC PYRAMID©
Alignment of ODPM MV2 to MNS MV2
SWOT Analysis
STRATEGIC GOALSSTRATEGIC GOALS
SWOT Analysis
Develop Strategic Goals and Targets
STRATEGIC INITIATIVESSTRATEGIC INITIATIVES
STRATEGIC OBJECTIVESSTRATEGIC OBJECTIVES
Select / Define Strategic Initiatives
Develop Strategic Objectives
STRATEGIC PRIORITIESSTRATEGIC PRIORITIESEstablish Strategic Priorities
PROJECTSPROJECTS
Select / Rationalize ODPM / TT Enterprise Projects
Complete Action Plan Framework
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
SCORECARD SCORECARD ‐‐METRICSMETRICS
© OPUS STRATEGIC PYRAMID
Identify Performance Metrics
9
DISASTER MANAGEMENT CYCLE
PREVENTION
MITIGATIONRECOVERY MITIGATIONRECOVERY
PREPAREDNESSRESPONSE
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011 10
CHAPTER 2 –THE STRATEGIC PLANNING EXERCISE2.3 ALIGNMENT
The Strategic Alignment of ODPM to the National Vision is essential to the enhancement of Trinidad and Tobago’s disaster
management capacity and readiness. This alignment ultimately informs the activities and operations of the organization.
The ODPM Strategic Plan 2010 – 2015 is informed by the Government of Trinidad and Tobago National Strategy and
framed by its Seven (7) Pillars. ODPM’s Mandate includes national preparedness in the event of incidents; emergencies
and disasters and disaster management. (See Chapter 1 for a comprehensive overview of ODPM’s Mandate.)
The Executive Leadership Team conducted an exercise to align the Vision – Mission of ODPM to the GORTT Seven (7)
Pillars for Sustainable Development.
TERED
ENT
L &
CURIT
Y
ON &
TIO
NS
GIE
S
SIF
IED,
GE
VE
Y
NANCE
OLIC
Y
Y
ON &
TIC
E
EOPLE C
ENT
DEVELOPM
NATIO
NAL
RSONAL S
EC
INFORM
ATIO
OM
MUNIC
ATECHNOLOG
ORE D
IVERS
KNOW
LED
INTENSI V
ECONOM
OOD G
OVER
FOREIG
N P
O
POVERT
ERADIC
ATI O
SOCIA
L J
US
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
P
PE C M GO
11
CHAPTER 2 –THE STRATEGIC PLANNING EXERCISE2.3 ALIGNMENT
RED
T RIT
Y
&
ONS
S ED,
NCE
CY&
CE
PLE C
ENTER
EVELOPM
ENT
NATIO
NAL &
ONAL S
ECUR
FORM
ATIO
N
MM
UNIC
ATIO
CHNOLOGIE
E D
IVERSIF
IKNOW
LEDGE
INTENSIV
E
ECONOM
Y
D G
OVERNA
REIG
N P
OLIC
POVERTY
ADIC
ATIO
N
CIA
L J
USTI C
PEO DE N
PERS
INF
COM TE
MOR K
GOO
FOR
ER
SO
MNS
ODPM
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011 12
CHAPTER 3THE STRATEGIC FRAMEWORK
ODPM VISION ODPM MISSION
To build national Disaster Risk Management andClimate Change Adaptation capabilities with ourpartners and coordinate response and recoveryoperations in order to protect the people
To become the premier regional Disaster RiskManagement Organization.
operations in order to protect the people,environment and economy and ensure a disasterresilient nation.
ODPM Values
Responsive Resourceful Continuous Learning Team Oriented
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
Dedicated Reliable
13
ODPM –ValuesWe will react effectively and favourablythrough
collaboration with key players through the coordination and management of resources in all
operations.
Responsive
ResourcefulReliableWe will use all available resources to act
effectively and develop innovative solutions to challenges.
We will provide accurate information and maintain
dependable plans and systems to ensure consistently high
quality and performance in all
CORE VALUES
our operations.
Continuous LearningDedicated
Constantly acquiring current competencies through
professional development & knowledge transfers within the
organisation.
Be purposeful and committed to the
attainment of our goals and aspirations, taking full
responsibility for our obligations and conduct.
Team Oriented
gobligations and conduct.
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
We commit to working together for the benefit of the team and promote synergy across all
units.
14
CHAPTER 4 – STRATEGIC ANALYSIS4.1 SWOT ANALYSIS ‐ STRENGTHS & WEAKNESSES
DIMENSION STRENGTH WEAKNESS
SHARED VALUES • High Performance • No standard method for knowledge transfer
INTERNAL ENVIRONMENT
SHARED VALUES • High Performance• Resourcefulness• Dedicated Employees• Well established learning culture• Wide knowledge base
• No standard method for knowledge transfer• Lack of social cohesion
STRATEGY • Organization has a desire to develop strategy • No definite strategySTRATEGY Organization has a desire to develop strategy No definite strategy
STRUCTURE • Flat Organizational Structure• Clear reporting lines exist• Narrow span of control
• Inability to track changes in organizational development• Inability to engage in job rotation• Organization design is inadequate
SYSTEMS • Successful organizational systems based on strong • Inadequate performance tracking systemSYST MS g y gestablished relationships
q p g y• Lack of robustness• Lack of process mapping
SKILLS • Wide range of skills exist in each unit • Core DRM skills need to be improved• Transference and retention of skills via staffing is lacking
STYLE • Dynamic environment • Leadership style constantly changesSTYLE Dynamic environment• Foster growth• Detailed oriented and participative
Leadership style constantly changes• Autocratic leadership• Ad hoc operations and communications• Time management issues
SERVICES ANDPRODUCTS
• Information is provided to the public in a timely manner• Facilitation of stakeholder planning processes
• Information is not provided on a timely basis to staff• Insufficient staff training
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
PRODUCTS p g p• Hazard and disaster management information is readily available
• Utilization of modern methods for communication
g• Inadequate national risk and vulnerability assessment• Absence of surveys to gauge effectiveness of information disseminated to the public
15
CHAPTER 4 – STRATEGIC ANALYSIS4.1 SWOT ANALYSIS –OPPORTUNITIES & THREATS
DIMENSION OPPORTUNITIES THREATS
POLITICAL • New government • Lack of understanding about the ODPM
EXTERNAL ENVIRONMENT
POLITICAL • New government• New strategies
• Lack of understanding about the ODPM
ECONOMIC • Availability of external funding for DRM, climate change and training initiatives
• Recession resulting in less government funding• Disasters are reducing national wealth
SOCIO‐CULTURAL • Increased international interest in DRMd l
• Complacent attitude of citizensh ll f d b l bl l• Increased national interest in ODPM
• Emergence in new media• Challenges faced by vulnerable population• National perception of roles and responsibilities of the ODPM
TECHNICAL / STRUCTURAL
• Existence of new technology to support DRM• Local and International standards are developed that can be improved
• Cost of technology is prohibitive• Vulnerable communications• Technology is continuously evolving and is costlybe improved • Technology is continuously evolving and is costly
LEGAL / REGULATORY
• Government has an aggressive legislative agenda• New regulatory requirements
• Forces the organization into unplanned change• Absence of legislation increases vulnerability• Conduct of roles and responsibilities
ENVIRONMENT • DRR is linked to the environment inclusive of sustainable d l d li h h i i
• Poor environmental regulatory practicesF /i i f didevelopment and climate change hence opportunities to
share resources/efforts• Environmental issues are topical resulting in heightened awareness and interest
• Frequency/intensity of disasters• Lack of enforcement
STAKEHOLDERS • Increase in general awareness presents an opportunity to improve image of ODPM
• Misunderstanding of roles and responsibilities of ODPM• Lack of training
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
improve image of ODPM• Greater interest by stakeholder allows for increased willingness for capacity building in DRM
• Lack of training
16
4.2 STAKEHOLDER ANALYSIS
STAKEHOLDER ISSUE IMPACT ASSUMPTIONS SERVICE DELIVERABLES
Ali d S i PlMINISTRY OF NATIONAL SECURITY Strategic Partnership Value Enhancement Complimentary Goals
• Aligned Strategic Plans
• On‐Time Key Reports
Fi t R d
STRATEGIC PARTNERS Strategic Partnership Value Enhancement Complimentary Initiatives
• First Responder Alignment
• Municipal / Regional Corporation Alignment
EMPLOYEES Employee Engagement Workforce Productivity Low Absenteeism
• Teambuilding
• Integrated Performance Management SystemManagement System
CUSTOMERS Comprehensive DisasterPl i Disaster Risk Reduction Stakeholder Engagement
• Enhanced DRM Technical Capabilities
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
Planning g g• Facilitation and Certification
17
4.2 STAKEHOLDER ANALYSISALIGNING ODPM VISION TO PILLARS FOR SUSTAINABLE DEVELOPMENT
Seven Interconnected Pillars for Sustainable Development ODPM
Vision: To become the premier regional Disaster RiskManagement Organization.
Mission: To build national Disaster Risk Management
PILLAR #1 People‐Centred Development – We need Everyone and All Can Contribute
PILLAR #2 Mission: To build national Disaster Risk Managementand Climate Change Adaptation capabilities with ourpartners and coordinate response and recoveryoperations in order to protect the people, environmentand economy and ensure a disaster resilient nation.
Poverty Eradication and Social Justice – Preference for poor and disadvantaged
PILLAR #3National and Personal Security – Human Security for Peace and Prosperityand Prosperity
PILLAR #4Information and Communication Technologies – Connecting T&T and Building New Economy
PILLAR #5Most Closely Aligned to the following Pillars:
PILLAR #5A More Diversified, Knowledge Intensive Economy –Building on the Native Genius of Our People
PILLAR #6Good Governance – People Participation
PILLAR #1 People‐Centred Development
PILLAR #3i l d l S i
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
PILLAR #7Foreign Policy – Securing Our Place in the World
National and Personal Security
18
4.2 STAKEHOLDER ANALYSISAligning ODPM Vision‐Mission to MNSVision‐Mission
MNS – VISION ODPM – VISION
To become the premier regional Disaster RiskManagement Organization.
The Ministry of National Security is Trinidad andTobago’s premier organization for the safety andsecurity. The Ministry is continually evolving to providethe best service by being prepared to handle everchanging threats, both foreign and domestic.
MNS – MISSION
To build national Disaster Risk Management and
ODPM – MISSION
To create an environment that ensures public safety andClimate Change Adaptation capabilities with ourpartners and coordinate response and recoveryoperations in order to protect the people, environmentand economy and ensure a disaster resilient nation.
security through the maintenance of law and order andthe commitment of all available resources to theprotection of life and property.
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011 19
CHAPTER 5GOALS & OBJECTIVES
ODPM selected three (3) areas for strategic focus in designing its 5‐Year Strategic Plan for the period2010 – 2015.
Each of these focus areas were assigned targets representing the Strategic Goals of the organization.ODPM Strategic Goals inform the Strategic Initiatives – Strategic Objectives – Strategic Priorities andProjects that will result in the achievement of ODPM’s Strategy. The Strategic Goals are the ultimate
f th f f ODPM’ St t timeasure of the performance of ODPM’s Strategy execution.
The three (3) Strategic Goals selected include:
• 100% ReadinessGOAL 1
• Legislative AuthorityGOAL 2 • Legislative AuthorityGOAL 2
• 100% National Risk ReductionGOAL 3
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
The details of these Strategic Goals are outlined on the following pages.
20
ODPM STRATEGIC GOALS
MNS
CEO
L i l i A h i 100% N i lStrategic Goals 100% ReadinessLegislative Authority(December 2011)
100% NationalRisk Reduction
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011 21
CHAPTER 5ODPM STRATEGIC GOALS AND OBJECTIVES
GOAL 1 – MANAGEMENT PERFORMANCE
100% READINESS
Communities ExternalCommunities
A i E lAgencies
ODPM P &
External
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
ODPM Processes & Systems
Internal
22
CHAPTER 5ODPM STRATEGIC GOALS AND OBJECTIVES
LEGISLATIVE GOAL 2 ‐ EFFECTIVE AND EFFICIENT
INSTITUTIONS
AUTHORITY (DECEMBER 2011)
Legal CodificationLegal Codification
Policy Review & Policy Review &Development
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
Legislative Review
23
CHAPTER 5ODPM STRATEGIC GOALS AND OBJECTIVES
GOAL 3 ‐ SERVICE DELIVERY EXCELLENCE
100% NATIONAL100% NATIONAL RISK REDUCTION
% reduction in impact cost (loss of life and property)(loss of life and property)
% reduction in number of incidents
% reduction in hazard events
RISKFrequency of Hazards x Vulnerability Index
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
% reduction in vulnerabilityRISK =
Capacity
24
CHAPTER 66.1 ORGANIZATIONAL STRATEGY AND ACTION PLAN
CEO
Strategic Goals 100% ReadinessLegislative Authority(December 2011)
100% NationalRisk Reduction
StrategicPartnerships
OperationalExcellence
CommunityResilience
Enhancing DRMTechnicalCapabilities
Strategic
Initiatives
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011 25
CHAPTER 66.1A ODPM STRATEGIC INITIATIVES
Strategic Initiatives are ventures on which organizations embark to achieve their Strategic Goals. They allow theorganization to break – up the Strategy into discrete components for execution. Strategic Initiatives provide“umbrellas” under which projects and activities can be aligned to drive execution and close gaps in keyp j g g p yperformance measures. Strategic Initiatives have a finite life cycle but may extend across multiple strategicplanning cycles.
ODPM l d h f ll i S i I i i iODPM selected the following Strategic Initiatives:
STRATEGIC PARTNERSHIPS
OPERATIONAL EXCELLENCE
COMMUNITY RESILIENCE
ENHANCING DRM TECHNICAL CAPABILITIES
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
ENHANCING DRM TECHNICAL CAPABILITIES
26
CHAPTER 66.1A ODPM STRATEGIC INITIATIVES
1 STRATEGIC1. STRATEGIC
PARTNERSHIPS
Engage our key local, regional andinternational stakeholders to align ourdisaster management initiatives towards theachievement of ODPM National goals. Weill l th t t i t hi t
Strategic Objectives
Capacity / Reachwill leverage these strategic partnerships todrive resource optimization and value for ourcitizens and regional partners.
Resource Management
Response Capability
Image & Branding
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
Image & Branding
27
CHAPTER 66.1A ODPM STRATEGIC INITIATIVES
2 OPERATIONAL EXCELLENCE2. OPERATIONAL EXCELLENCE
ODPM will continuously improve its role inODPM will continuously improve its role incoordinating the management of local,national, regional and internationalresources to optimize Comprehensive
Strategic Objectives
p pDisaster Management (CDM) – Prevention,Mitigation, Preparedness, Response andRecovery. We will ensure quality and cost
Framework Alignment
Resource Management
Coordination Effectiveness
effectiveness in all ODPM operations in aboundaryless environment enabling highlytrained staff and lean processes designed for
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
Programme Development & Managementrapid execution.
28
CHAPTER 66.1A ODPM STRATEGIC INITIATIVES
3. COMMUNITY RESILIENCE
ODPM will champion a systematicapproach to developing disaster
St t i Obj ti
approach to developing disastermanagement capability in our localcommunities. We will design andimplement programmes that willStrategic Objectives
Readiness
Resource Management
implement programmes that willenhance awareness, build capacity andcapability by partnering with ourcitizens and key stakeholders.
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
Public / Family Awareness & Education
29
CHAPTER 66.1A ODPM STRATEGIC INITIATIVES
4. ENHANCING DRM TECHNICAL
CAPABILITIESCAPABILITIES
ODPM will strengthen DRM/DRRtechnical capabilities by using
Strategic Objectives
Programme Development & Management
innovative approaches to enhancedisaster management competenciesamongst our communities and
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
Certificationpartnerships.
30
6.1B STRATEGIC LINKAGES: INITIATIVES OBJECTIVESStrategic Objectives are specific pathways designed to achieve a given Strategic Initiative. ODPM selected the following:STRATEGIC INITIATIVES STRATEGIC OBJECTIVES
Strategic Partnerships Capacity / Reach (CR)• Partner Strategically ‐ Build External DRM Capacity• Extend Breadth of Geographical Reach
Response Capability (RC)• Manage and Enhance Response to Reduce Hazard Impacts• Ensure Continuity of Government – Businesses – Families
Image & Branding (IB)• Improve Public Perception – Raise Brand Awareness – Improve Brand Recognition
Operational Excellence Framework Alignment (FA)• Alignment to HYOGO CDEMA National StrategyAlignment to HYOGO , CDEMA, National Strategy
Resource Management (RM)• HR / Cost / Assets / Supplies
Coordination Effectiveness (CE)• Define Roles & Responsibilities – Develop Mutual Understanding
Integrated Performance Management (IPM)• Measure – Manage – Plan Performance
Community Resilience Readiness (R)• Private / Government / Regional / Public• Culture of Readiness & Response• Culture of Readiness & Response
Public / Family Awareness & Education (PFAE)• Culture of Disaster Preparedness – Common Disaster Risk Knowledge• Disaster Factors – Reducing Exposure and Vulnerability to Hazards
Enhancing DRM Technical Capabilities Programme Development (PD)
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
Enhancing DRM Technical Capabilities g p ( )• Mitigate and Reduce National and Regional Disaster Risk
Certification (C)• Recognized Authority – Enhanced DRM Competencies
31
CHAPTER 66.1C ODPM STRATEGIC OBJECTIVES
1. Capacity / Reach (CR) To facilitate the development and implementation of multi-disciplinary programmes with our strategic partners to build DRMcapacity and achieve national and regional resilience.
2. Response Capability (RC) Manage and enhance our national and regional response mechanisms to reduce hazard impact and ensure continuity ofgovernment, business and family functions.
3. Image and Branding (IB) We will reinforce the ODPM brand to enhance the public’s perception of the organization, raise awareness of our highquality products and training services, and improve brand recognition across Trinidad and Tobago.
4. Framework Alignment (FA) To ensure that national strategies are consistent with adopted HYOGO and CDM frameworks to achieve DRMoperational excellence.
5. Resource Management (RM) To optimize human and physical assets to ensure effective implementation of CDM initiatives through an efficientsystem for the allocation, deployment and utilization of resources.
6. Coordination Effectiveness (CE) ODPM will promote synergy among strategic partners and stakeholders by clearly defining roles andresponsibilities, developing mutual understanding among partners in the execution of collective duties.
7. Integrated Performance Management (IPM) ODPM will ensure the sustainability of desired outcomes of quality and performance throughmeasurement, monitoring and evaluation of Enterprise level and individual performance across the organization.
8. Readiness (R) To champion an integrated approach towards increasing disaster readiness through the establishment of effective SOPs, appropriatetraining to create a culture of readiness and response.
9. Public / Family Awareness and Education (PFAE) To create a culture of disaster preparedness across all levels of society by developingcommunity programmes to increase common knowledge about disaster risks, factors that lead to disasters and actions that can be taken collectivelyto reduce exposure and vulnerability to hazards.
10. Programme Development (PDM) ODPM will identify and manage programmes that are consistent with the National CDM Strategy to mitigate andreduce national and regional risk.
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
g
11. Qualification and Certification Standards (C) To partner with UTT and other local and international recognized authorities to facilitate thedevelopment and delivery of accredited courses that will enhance national and regional DRM competencies.
32
CHAPTER 66.2 CRITICAL SUCCESS FACTORS / STRATEGIC PRIORITIES
Strategic Priorities are “Sub‐Initiatives” that focus on specific areas for development. They represent the factors that are critical
to ensuring the achievement of goals and objectives. They are intended to frame the scope of operational activities that MUST
be undertaken by the organization to ensure readiness for execution. ODPM adopted 11 Critical Success Factors / Strategic
Priorities based on the results of the Organizational Assessment exercise and the Strategic Goals set by the Core Team. The
surnames of the owners of these Priorities appear next to them.
The Strategic Priorities (for goal achievement) are:
Strategic Priority Owner Abbreviation
1 Legislative Framework CEO LF
2 Partnerships CEO / PRU / MPRU / PIECO P
3 Cost Effectiveness CS CE
4 Planning MPRU / PRU P
5 Community Preparedness PIECO / PRU CP
6 Organizational Development CEO / CS OD6 Organizational Development CEO / CS OD
7 Funding (Grant Writing, Certification Fees, Contributions/Donations) MPRU / CS F
8 Image & Branding CEO / PIECO IB
9 Project Management PM PM
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
j g
10 Integrated Performance Management CS IPM
11 Capital and Infrastructure Projects CEO / PRU / CS CIP
33
6.2 CRITICAL SUCCESS FACTORSODPM KEY PROJECTS 2011 – 2015PROJECT PROJECT
1 Legislative Framework Review 21 “Safer Buildings” (Urban / Rural Planning)
2 Cost Effectiveness 22 NEOC Management
3 Recruitment and Staffing 23 ODPM Relocation
4 C O R E (Communities Organized & Ready for Emergencies) 4 C.O.R.E. (Communities Organized & Ready for Emergencies) Project 24 Disaster Information Mapping
5 International Funding 25 BCM Planning
6 Regional Funding 26 Egress Planning
7 Local Funding 27 Evacuation Planning7 Local Funding 27 Evacuation Planning
8 Strategic Partnerships 28 National Stakeholder Training
9 Strategic Planning 29 National Volunteer Programme
10 Warehousing and Inventory Management 30 Shelter Inspection Exercise
11 National Preparedness Survey 31 ODPM Long-Term Relocation
12 ODPM Image and Branding 32 Hazard Information System
13 Teambuilding 33 Early Warning Systems
14 Integrated Performance Management System 34 Institutional Framework14 Integrated Performance Management System 34 Institutional Framework
15 National Incident Management System
16 Critical Facilities Protection
17 National Response Planning
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
18 National Education Campaign
19 Organizational Training Plans
20 National Risk Assessment34
6.2 CRITICAL SUCCESS FACTORSODPM KEY ENTERPRISE PROJECT SCORECARD
Strategic Priorit Project Name Project Description Metric(s) Targeted Strat O ner Start EndStrategic Priority Project Name Project Description Metric(s) Targeted Init Owner Date Date
LEGISLATIVE FRAMEWORK
Legislative Framework Review
- CDM Framework
Evaluate existing policies / legislation / acts to design appropriate legislative framework for Trinidad and Tobago and regional j i di ti
- legislative authority
% l ti d ft l i l tiSP SR / CEO,
DJ KB Nov 2009 Dec 2011FRAMEWORK - Critical Facilities Protection Policy
jurisdiction
Legislative authority to facilitate ODPM coordination
- % completion draft legislation DJ, KB
COST ff i
Conduct Process Mapping exercise and develop
- % variance from budget
- % critical items out of stock CJ VM COST EFFECTIVENESS Cost Effectiveness Departmental Cost Centres
and controls to reduce operating costs
% critical items out of stock
- % on-time completion of audits
OE CJ, VM, NEW Jun 1 2011 Dec 2011
Org Structure
- % completion of new org structure design
- % of candidates meeting
ORGANIZATIONAL DEVELOPMENT
Recruitment and Staffing
Org Structure
Recruitment and Staffing
Key Role Staffing
% of candidates meeting competency requirements
- # of key positions vacant
- average time to fill key vacancies
- key position turnover
OE / EDRM CJ, NS May 31
2011 Jul 31 2011
key position turnover
COMMUNITY PREPAREDNESS
C.O.R.E. (Communities Organized and Ready for
Develop and implement Community Based Flood (Education) Mitigation and Control Project to establish
- # of communities visited
- # of communities completing readiness assessment
- # of communities achieving readiness Level 1 – Level 2 –L l 3
CR
SR / CEO, CB;
Regional May 2011 Dec 31 2011
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
PREPAREDNESS Ready for Emergencies) Project
jnational and local coordination solutions.
Level 3
- Awareness (Overall Public –Specific Communities: TBD)
- Resilience
Regional Coords (5)
2011
35
6.2 CRITICAL SUCCESS FACTORSODPM KEY ENTERPRISE PROJECT SCORECARD
St t i P i it P j t N P j t D i ti M t i ( ) T t d Strat O Start EndStrategic Priority Project Name Project Description Metric(s) Targeted Init Owner Date Date
FUNDING International Funding
Develop and implement project toraise Disaster
- % of international funding opportunities / grants won OE TBD TBD TBDFUNDING International Funding Management funds
from International sources.
- international funds raisedOE TBD TBD TBD
Develop and
FUNDING Regional Funding
e e op a d implement project toraise Disaster Management funds from Regional sources.
- % of regional funding opportunities won
- regional funds raisedOE TBD TBD TBD
FUNDING Local Funding
Develop and implement project toraise Disaster Management funds from local sources including the private sector and local
- revenue from certification fees
- private sector contributions / donations
OE TBD TBD TBD
sector and local communities. - local funds raised
Define Strategic Partners, Partnership Objectives & Value E h
- % on-time response
- Efficiency measure SR / CEO,
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
PARTNERSHIPS Strategic Partnerships Exchange.
Create formalStrategic Partner Relationships
- Reliability
- Coordination effectiveness (R-Y-G)
SP/ ,
ELT, NS, NEW
June 1 2011 Dec 1 2011
36
6.2 CRITICAL SUCCESS FACTORSODPM KEY ENTERPRISE PROJECT SCORECARD
St t i P i it P j t N P j t D i ti M t i ( ) T t d Strat O Start EndStrategic Priority Project Name Project Description Metric(s) Targeted StratInit Owner Start
DateEndDate
PLANNING Strategic Planning Completion of Strategic Plan 2010-2015
- % completion strategic planning exercise
- % ODPM readiness Level 1 –Level 2 – Level 3
OE SR / CEO Apr 28 2011 May 20 2011
- strategic alignment
PLANNING
COST
Warehousing and Inventory
Manage inventory of preparedness and emergency supplies (incl. perishables).
d tif it bl l ti
- % warehouses achieving readiness
- # stock outs of key items OE / CR CJ, NEW Jun 1 2011 Sep 1 2011COST EFFECTIVENESS Management Identify suitable locations
and setup satellitewarehouses across Trinidad and Tobago.
# stock outs of key items
- inventory turns
- % of demographic surveys completed
COMMUNITY PREPAREDNESS
National Preparedness Survey
Comprehensive baseline assessment of the citizens of Trinidad and Tobago’s knowledge of hazards, knowledge of damage and losses, awareness of preparedness measures,
- % of communities achieving readiness Level 1 – Level 2 –Level 3
- % on-time reporting of partner agencies
% f t t i t
CR / OECB, VR,
Regional Coords (5)
Jun 1 2011 Dec 31 2011
preparedness measures, exposure to ODPM media and awareness of evacuation procedures.
- % of strategic partners achieving readiness Level 1 –Level 2 – Level 3
- Awareness
- Resilience
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
IMAGE & BRANDING
ODPM Image and Branding
Image and Branding Assessment
- brand awareness- brand recognition- brand credibility
SP CB, DN TBD TBD
37
6.2 CRITICAL SUCCESS FACTORSODPM KEY ENTERPRISE PROJECT SCORECARD
St t i P i it P j t N P j t D i ti M t i ( ) T t d Strat O Start EndStrategic Priority Project Name Project Description Metric(s) Targeted StratInit Owner Start
DateEndDate
IMAGE AND BRANDING Teambuilding Develop ODPM Teambuilding
Programme
- % increase in employee satisfaction
- % increase in productivity
- % reduction in absenteeism
EDRM / SP
SR / CEO, NS Apr 1 2011 Sept 30
2011% reduction in absenteeism
- % reduction in employee turnover rate
INTEGRATED PERFORMANCE
Integrated Performance
Develop Integrated Performance Management System linking Organizational – Departmental – Individual
- % increase in productivity
OE SR / CEO, Jun 15 2011 Sep 30 PERFORMANCE MANAGEMENT Management
System
Departmental Individual Performance. Develop Operating Plans. Implement Audit Tools & Processes
- % completion of planning activities & projects
OE NS Jun 15 2011 2011
National Incident Develop National Disaster Response Framework for
- response time
- % risk reduction
PLANNINGNational Incident Management System (NIMS)
pIncident Management and delivery of collaborative emergency response activities.
- % of incidents reported (Level 1 – 2 – 3)
- % of serious incidents not reported (Level 1 – 2 – 3)
OE / SP OPS / CEO, (NEW) / TBD Jun 1 2011 Jun 1 2012
- 100% critical facilities id tifi d t
PLANNING Critical Facilities Protection
Review / Complete CFP Policy
Identify critical sectors and facilities and develop
identified across sectors
- % of critical facilities with adequate protection systems in place
- % sectors with critical facilities protection plans
OE / SP OPS, DJ, NEW, (TP) Sep 2009 TBD
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
protection plans. protection plans
- % completion of CFP Policy
- # security breaches at critical facilities
38
6.2 CRITICAL SUCCESS FACTORSODPM KEY ENTERPRISE PROJECT SCORECARD
Strategic Priority Project Name Project Description Metric(s) Targeted Strat Owner Start EndStrategic Priority Project Name Project Description Metric(s) Targeted Init Owner Date Date
PLANNING National ResponsePlanning
Facilitate the Completion of Emergency Response Plans for First Responder Agencies (Police Fire Services
- % first responders with ODPM certified response plans
- % regional / municipal corporations with response SP / OE SR / CEO,
OPS KB VM Jun 1 2011 Dec 31 2011Planning (Police, Fire Services,
Emergency Health Services, Regional /Municipal Corporations)
p pplans
- % of strategic partners achieving readiness Level 1 –Level 2 – Level 3
/ OPS, KB, VM 2011
Conduct Public Education and - Awareness
COMMUNITY PREPAREDNESS
National Education Campaign
Education and Advertising Campaign on Disaster Preparedness and Emergency Planning to increase public awareness and mitigate disaster risk.
Awareness
- Reduction in number of incidents
- Reduction in number of losses (life, resources)
CR / EDRM CB, DN, VR Sep 2010 Sep 2011
g
ORGANIZATIONAL DEVELOPMENT
Organizational Training Plans
Competency audits & development of training plans
- % employees with required competencies
- % training plans developed and implemented
EDRM NS Jun 15 2011 Dec 31 2011g p p
- DRM technical capabilities
Conduct country-- # of regions assessed (% of 14 regions + Tobago)
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
PLANNING National Risk Assessment wide hazard and vulnerability risk assessments
g g )
- % completion of national assessment
CR SR / CEO, OPS, DJ, SB Feb 2011 Feb 2013
39
6.2 CRITICAL SUCCESS FACTORSODPM KEY ENTERPRISE PROJECT SCORECARD
St t i P i it P j t N P j t D i ti M t i ( ) T t d Strat O Start EndStrategic Priority Project Name Project Description Metric(s) Targeted StratInit Owner Start
DateEndDate
PLANNING Safer Buildings (Urban / Rural Planning)
Collaborating with Town & Country Planning to ensure appropriate land use, planning; adherence
- risk reduction
- incident reduction
- reduction in losses SP SR / CEO, DJ, KB Sep 2011 Sep 2012
to building codes, zoning laws (new construction) - % compliance with
building codes
Management of the National Emergency Operations Center - % of NEOC Processes
PLANNING NEOC Management
Operations Center (NEOC).
Includes development, implementation and testing Standard Operating Procedures (SOPs) for all NEOC
reviewed
- % NEOC SOPs developed
- % on-time exercise of NEOC
NEOC Readiness (R Y G)
OE TBD TBD TBD
( )Disaster Readiness processes.
- NEOC Readiness (R – Y – G)
CAPITAL & INFRASTRUCTURE ODPM Short-Term
Conduct feasibility study –develop ODPM short term
i - TBD OE SR / CEO, Jun 2009 Sept 2011INFRASTRUCTURE PROJECTS Relocation relocation plan – relocate
ODPM.TBD OE KB, NEW Jun 2009 Sept 2011
INTEGRATED Di t I f ti Disaster related mapping U f GIS t h
- response timeDJ SB DM
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
INTEGRATED PERFORMANCE MANAGEMENT
Disaster Information Mapping
Use of GIS to enhance national DRM planning, mitigation and response.
- preparedness- cost
OE DJ, SB, DM, VM TBD TBD
40
6.2 CRITICAL SUCCESS FACTORSODPM KEY ENTERPRISE PROJECT SCORECARD
Strategic Priority Project Name Project Description Metric(s) Targeted StratInit Owner Start
DateEndDate
PLANNING BCM PlanningBusiness Continuity Management (BCM) Planning Initiative for all
- # of Ministries participating in BCM Workshops: 12
SP / EDRM OPS, CJ, DJ 2009 Dec 1 2011g Planning Initiative for all Ministries. - % of Key Ministries with
completed BCM Plans: 0
/ , ,
Coordinate / facilitateplans to harmonize the operations of first responders and their
- % Mass Egress Plans Completed and Implemented: 20% D 17 PLANNING Egress Planning
responders and their support agencies to facilitate emergency preparedness and response during egress operations – test quarterly.
Implemented: 20%
- Plans Tested: POS Mass Egress Plan Tested April 2011 (Tabletop Test)
SP / EDRM OPS, CJ Nov 9 2010 Dec 17 2010
Effectively facilitate the d l t f
PLANNING Evacuation Planning
development of mass evacuation plans for the 14 regional / municipal corporations. Coordinate the activation and exercise of mass evacuation plans.
- Plans Implemented: 0%
- Plans Tested: 0%SP / EDRM OPS, CJ TBD TBD
PARTNERSHIPS National Stakeholder Training
Stakeholder Capacity Development Workshops on a range of DRM topics including: Damage And Loss Assessment (DALA), Damage Assessment And Need Analysis (DANA),
- % of stakeholders completing required Disaster Management Training: 100% EDRM / SP OPS, CJ Jan 1 2010 TBD
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
Training eed a ys s ( ), EOC Management, Incident Command System, Shelters & Shelter Management, Urban SAR, Web EOC.
- Training: 2x per year, per stakeholder
41
6.2 CRITICAL SUCCESS FACTORSODPM KEY ENTERPRISE PROJECT SCORECARD
Strategic Priority Project Name Project Description Metric(s) Targeted StratInit Owner Start
DateEndDate
Establish a mechanism through which volunteers can offer their time, efforts and
COMMUNITY PREPAREDNESS
National Volunteer Programme
skills at varying levels of a disaster. Provide volunteers with disaster related training and emergency skills which will enable them to support stakeholders at each phase of Disaster Risk Reduction and M t hi h
- % Completion of Volunteer Policy: 20%
- Volunteer Policy Implemented
EDRM / CR CB, OPS Aug 1 2010 Sept 1 2011
Management which encompasses prevention, mitigation, preparedness response and recovery.
Inspection to ensure all - Standard: Every 3 Years
COMMUNITY PREPAREDNESS
Shelter InspectionExercise
pestablished shelters meet National Standards: Adequate Space, Building Integrity, Sanitation, Sanitation Facilities, Location, Other Needs
Standard: Every 3 Years
- 5 of 14 Corporations Inspected
- % of Shelters Inspected: TBD
SP / CR OPS, CJ Nov 1 2010 Nov 2010 / June 2011
CAPITAL AND INFRASTRUCTURE ODPM New Facility
i
Determine Design Plan and Building Specifications for New ODPM Facility. Determine cost s– source funding - conduct Feasibility St d
-% completion design plan
-% completion building specifications OE DJ KB 2009
Plan: Oct 2012
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
INFRASTRUCTURE PROJECTS Construction Study.
Collaborate with MNS Projects Dept and other key stakeholders.
-Response time
-Readiness
OE DJ, KB 2009Constructio
n: 2015
42
6.2 CRITICAL SUCCESS FACTORSODPM KEY ENTERPRISE PROJECT SCORECARD
Strategic Priority Project Name Project Description Metric(s) Targeted StratInit Owner Start
DateEndDate
COMMUNITY PREPAREDNESS
Hazard Information Systems
Design and implementation of a hazard information system to track and monitor hazards across Trinidad and Tobago; establish historical data for comprehensive disaster management.
- TBD OE DJ, SB 2009 Sept 1 2012
disaster management.
Implementation of early i t f
COMMUNITY PREPAREDNESS
Early Warning Systems
warning systems for hydrometeorogical incidents across Trinidad and Tobago.
Includes San Juan River Basin and Tsunami Warning Projects.
- TBD OE DJ, OPS, CJ 2009 Sept 1 2012
LEGISLATIVE Institutional
Design and develop an appropriate institutional framework for CDM in Trinidad and Tobago. Guide GORTT i th f th - TBD SP / OE DJ KB 2009 Dec 2011
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
FRAMEWORK Framework GORTT in the further development and implementation of CDM Institutional Framework
TBD SP / OE DJ, KB 2009 Dec 2011
43
CHAPTER 66.3 THE ACTION PLAN
Template for Action Plan found in Appendix 1:
DEVELOPMENT PILLAR (S):DEVELOPMENT PILLAR (S):
STRATEGIC GOAL:
EXPECTED IMPACT (STRATEGIC INITIATIVE):
ODPM TARGET TIMEFRAMEODPM STRATEGIC OBJECTIVE
ODPM STRATEGIC PRIORITY
ODPM KEY PROJECTS ODPM METRICS BASELINE
DATA 2010
TARGET TIMEFRAME
2011 2013 2015 Y1 Y2 Y3 Y4 Y5
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011 44
CHAPTER 7CONCLUSION
The ODPM Strategic Plan 2010 – 2015 represents the primary vehicle for alignment of the activities of the organization with the Disaster
Management component of the mission of the Ministry of National Security. We remain confident that with the support of our Management Team,
Employees and Strategic Partners we will achieve the Strategic Goals stated in this plan to improve disaster preparedness and reduce disaster risk
across Trinidad and Tobago. Given Trinidad and Tobago’s current level of Disaster Readiness, ODPM must rapidly accelerate the roll‐out of projects
selected to drive the fulfillment of our Strategic Initiatives.
ODPM will strive to increase capacity in all stages of Disaster Management Cycle by cascading the ODPM Strategic Plan across the organization.
Consistently hitting performance targets requires an Integrated Performance Management System to translate Strategy to Execution. Next steps in
the full implementation of the ODPM Strategic Plan 2010 – 2015 should include a series of 1‐Year Enterprise Operating Plans and the completion of
an Enterprise Performance Management System.
The completion of an Enterprise Performance Management System will drive performance under each of the 5 Disaster Management dimensions.
The ELT will put measures in place to improve communication and collaboration between GORTT, Private Sector, Civil Society and the Public to
reduce the impact of hazards and reduce vulnerability to threats. We will assert ODPM’s Role in national Disaster Risk Reduction by pursuing
comprehensive legislation to establish the ODPM as Trinidad and Tobago’s Disaster Management Authority.
To achieve these Goals, ODPM must cascade the Strategy across the Middle Management and Frontline levels of the organization by translating
organizational targets to departments, and departmental targets to individuals. This disaggregation of the Strategic Plan will enable ODPM to adjust
or accelerate the targets throughout the planning period to drive optimum achievements of the Strategic Goals. The completion of an Integrated
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
Performance Management System will allow ODPM to measure, manage and evaluate progress the overall achievement of the ODPM Strategy.
45
Planning
ODPM STRATEGIC PLAN 2010 – 2015STRATEGIC COMPASS
100% 100% RISK
KEY
100%READINESS
100% RISKREDUCTION
STRATEGIC GOALS
STRATEGIC INITIATIVES
KEYLEGISLATIVE AUTHORITY (DEC 2011)
STRATEGIC OBJECTIVES
STRATEGIC PRIORITIES
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
TOP 10 PROJECTS
LegislativeFramework
© OPUS STRATEGIC COMPASS
46
CHAPTER 66.1 ORGANIZATIONAL STRATEGY AND ACTION PLAN
STRATEGICGOALS 100% Readiness
Legislative Authority(December 2011)
100% NationalRisk Reduction
StrategicPartnerships
OperationalExcellence
CommunityResilience
Enhancing DRMTechnical
C bili i
STRATEGICINITIATIVES Partnerships Excellence Resilience Capabilities
Capacity /Reach
ResponseCapability
Image &Branding
CoordinationEffectiveness
Public Awareness& Education Certificationp y g
FrameworkAlignment
STRATEGICOBJECTIVES
ResourceManagement
Integrated PerformanceManagement ReadinessProgramme
Development
LegislativeFramework
Planning Image &Branding
OrganizationalDevelopment
CommunityPreparedness Funding
STRATEGICPRIORITIES
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
ProjectManagementPartnerships
Integrated PerformanceManagement
CostEffectiveness
PRIORITIES
47
ODPM READINESS ASSESSMENTFOR JANUARY 2010 - APRIL 2011
ODPM OVERALL READINESS
INITIATIVE / PROJECT READINESS
PREVENTION
Ad ti i d M lti M di C i
ODPM OVERALL READINESS:
Critically Lagging
Behind Target
On Target
LEGEND:
Advertising and Multi-Media Campaign
Community Disaster Risk Reduction Programme
Private Sector Engagement Programme
MITIGATION
E l P bli W i S t (EWS)
DISASTER MANAGEMENT CYCLE
Early Public Warning System (EWS)
Geographic Information System
National Earthquake Consultation
PLANNING / PREPAREDNESS
St t i Pl iStrategic Planning
Egress Planning
FA-HUM Exercise
Evacuation Planning
N ti l St k h ld T i iDISASTER MANAGEMENT
COMPETENCYREADINESS
National Stakeholder Training
BCM Planning Initiative
National Disaster Preparedness Survey
RESPONSE / RECOVERY
E R Pl
COMPETENCY
PREVENTION
MITIGATION
PLANNING / PREPAREDNESS
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
Emergency Response Plans
Shelter Inspection Exercise
NEOC Management
PLANNING / PREPAREDNESS
RESPONSE / RECOVERY
48
APPENDICES
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
APPENDIX I: ACTION PLAN
The following pages outline the ODPM Action Plan in the format below:
DEVELOPMENT PILLAR (S):DEVELOPMENT PILLAR (S):
STRATEGIC GOAL:
EXPECTED IMPACT (STRATEGIC INITIATIVE):
ODPM TARGET TIMEFRAMEODPM STRATEGIC OBJECTIVE
ODPM STRATEGIC PRIORITY
ODPM KEY PROJECTS ODPM METRICS BASELINE
DATA 2010
TARGET TIMEFRAME
2011 2013 2015 Y1 Y2 Y3 Y4 Y5
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011 50
DEVELOPMENT PILLAR (S): PILLAR 1: PEOPLE CENTERED DEVELOPMENT
STRATEGIC GOAL: 100% READINESS
EXPECTED IMPACT (STRATEGIC INITIATIVE) OPERATIONAL EXCELLENCE / ENHANCING DRM TECHNICAL CAPABILITIES / STRATEGIC PARTNERSHIPS(STRATEGIC INITIATIVE): / /
ODPM STRATEGIC OBJECTIVE
ODPM STRATEGIC PRIORITY
ODPM KEY PROJECTS ODPM METRICS
BASELINEDATA 2010
TARGET TIMEFRAME
2011 2013 2015 Y1 Y2 Y3 Y4 Y5
- % variance from budgetTBD 5% 5% 5%
RESOURCE MANAGEMENT
COST EFFECTIVENESS
Cost Effectiveness
- % critical items out of stock- % on-time completion of audits
TBD
TBD
TBD
5%
0%
100%
5%
0%
100%
5%
0%
100%
- % completion of new org structure design 70% 100% 100% 100%
READINESS
RESPONSE CAPABILITY
ORGANIZATIONAL DEVELOPMENT
Recruitment and Staffing
- % of candidates meeting competency requirements- # of key positions vacant- average time to fill key vacancies- key position turnover
TBD
2
TBD
TBD
80%
0
6 WEEKS
TBD
90%
0
6 WEEKS
TBD
90%
0
6 WEEKS
TBD- key position turnover
READINESS PLANNINGNationalResponsePlanning
-% first responders with ODPM certified response plans- % regional / municipal corporations with response plans
TBD
TBD
TBD
50%
50%
TBD
100%
100%
TBD
100%
100%
TBDg p p- % of strategic partners achieving readiness Level 1 – Level 2 – Level 3
TBD TBD TBD TBD
COORDINATIONEFFECTIVENESS
- % strategic partners with defined SLAs-% on-time response
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
EFFECTIVENESS
CAPACITY / REACH
PARTNERSHIPS Strategic Partnerships
p-Efficiency measure-Reliability-Coordination effectiveness (R-Y-G)
TBD
TBD
YELLOW
TBD
TBD
GREEN
TBD
TBD
GREEN
TBD
TBD
GREEN
51
DEVELOPMENT PILLAR (S): PILLAR 1: PEOPLE CENTERED DEVELOPMENT
STRATEGIC GOAL: 100% READINESS
EXPECTED IMPACT (STRATEGIC INITIATIVE): OPERATIONAL EXCELLENCE / COMMUNITY RESILIENCE(STRATEGIC INITIATIVE):
ODPM STRATEGIC OBJECTIVE
ODPM STRATEGIC PRIORITY
ODPM KEY PROJECTS ODPM METRICS
BASELINEDATA 2010
TARGET TIMEFRAME
2011 2013 2015 Y1 Y2 Y3 Y4 Y5
READINESS -% completion strategic l i i 100% 100% 100% 100%
COORDINATION EFFECTIVENESS
PLANNING Strategic Planning
planning exercise- % ODPM readiness Level 1 – Level 2 – Level 3- strategic alignment
100%
TBD
TBD
100%
TBD
TBD
100%
TBD
TBD
100%
TBD
TBD
READINESS PLANNING National Risk Assessment
- # of regions assessed (% of 14 regions + Tobago)
- % completion of national assessment
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
INTEGRATEDPERFORMANCE MANAGEMENT
INTEGRATED PERFORMANCE MANAGEMENT
Integrated PerformanceManagement System
-% increase in productivity- % completion of planning activities & projects
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
READINESS PLANNING “Safer
- risk reduction- incident reduction
d ti i l
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
READINESS PLANNING Buildings” - reduction in losses- % compliance with building codes
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
52
DEVELOPMENT PILLAR (S): PILLAR 1: PEOPLE CENTERED DEVELOPMENT
STRATEGIC GOAL: 100% NATIONAL RISK REDUCTION / 100% READINESS
EXPECTED IMPACTEXPECTED IMPACT (STRATEGIC INITIATIVE): STRATEGIC PARTNERSHIPS / COMMUNITY RESILIENCE / OPERATIONAL EXCELLENCE
ODPM STRATEGIC OBJECTIVE
ODPM STRATEGIC PRIORITY
ODPM KEY PROJECTS ODPM METRICS
BASELINEDATA 2010
TARGET TIMEFRAME
2011 2013 2015 Y1 Y2 Y3 Y4 Y5
RESPONSE CAPABILITYINTEGRATED
PERFORMANCE MANAGEMENT
ODPM GIS- response time- preparedness- cost
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
CERTIFICATION PARTNERSHIPSNational Stakeholder
- % of stakeholders completing required Disaster Management Training: 100%
TBD TBD TBD TBD
Training
- Training: 2x per yearTBD TBD TBD TBD
- # of communities visited
CAPACITY / REACH
READINESS
COMMUNITY PREPAREDNESS
C.O.R.E. (Communities Organized and Ready for
- # of communities completing readiness assessment-# of communities achieving readiness Level 1 – Level 2 –Level 3
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
Emergencies) Project
- Awareness (Overall Public – Specific Communities: TBD)- Resilience
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
53
DEVELOPMENT PILLAR (S): PILLAR 1: PEOPLE CENTERED DEVELOPMENT
STRATEGIC GOAL: 100% NATIONAL RISK REDUCTION / 100% READINESS
EXPECTED IMPACTEXPECTED IMPACT (STRATEGIC INITIATIVE): COMMUNITY RESILIENCE / ENHANCING DRM CAPABILITIES
ODPM STRATEGIC OBJECTIVE
ODPM STRATEGIC PRIORITY
ODPM KEY PROJECTS ODPM METRICS
BASELINEDATA 2010
TARGET TIMEFRAME
2011 2013 2015 Y1 Y2 Y3 Y4 Y5
% of demographic
READINESS
INTEGRATED COMMUNITY PREPAREDNESS
National Preparedness
-% of demographic surveys completed- % of communities achieving readiness Level 1 – Level 2 – Level 3-% on-time reporting of partner agencies
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
PERFORMANCE MANAGEMENT
PREPAREDNESS pSurvey
partner agencies- % of strategic partners achieving readiness Level 1 – Level 2 – Level 3- Awareness- Resilience
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
PUBLIC AWARENESS & EDUCATION
COMMUNITY PREPAREDNESS
National Education Campaign
-Awareness- Reduction in number of incidents- Reduction in number of losses (life, resources)
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
CAPACITY / REACH
PROGRAMMECOMMUNITY
PREPAREDNESS
National Volunteer
-% Completion of Volunteer Policy: 20%
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
PROGRAMME DEVELOPMENT
PREPAREDNESS Programme -Volunteer Policy Implemented
TBD TBD TBD TBD
54
DEVELOPMENT PILLAR (S): PILLAR 3: NATIONAL AND PERSONAL SECURITY
STRATEGIC GOAL: 100% NATIONAL RISK REDUCTION
EXPECTED IMPACT(STRATEGIC INITIATIVE): OPERATIONAL EXCELLENCE
ODPM STRATEGIC OBJECTIVE
ODPM STRATEGIC PRIORITY
ODPM KEY PROJECTS ODPM METRICS BASELINE
DATA 2010
TARGET TIMELINE
2011 2013 2015 Y Y Y Y Y2011 2013 2015 1 2 3 4 5
RESOURCE I t ti l
- % of international funding opportunities TBD TBD TBD TBDRESOURCE
MANAGEMENT FUNDING International Funding
g pp/ grants won- international funds raised
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
RESOURCEMANAGEMENT FUNDING Regional
Funding
- % of regional funding opportunities won
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD- regional funds raised
- revenue from certification fees TBD TBD TBD TBD
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
RESOURCE MANAGEMENT FUNDING Local Funding - private sector
contributions / donations-local funds raised
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
55
DEVELOPMENT PILLAR (S): PILLAR 3: NATIONAL AND PERSONAL SECURITY
STRATEGIC GOAL: 100% NATIONAL RISK REDUCTION
EXPECTED IMPACT STRATEGIC PARTNERSHIPS / OPERATIONAL EXCELLENCE(STRATEGIC INITIATIVE): STRATEGIC PARTNERSHIPS / OPERATIONAL EXCELLENCE
ODPM STRATEGIC OBJECTIVE
ODPM STRATEGIC PRIORITY
ODPM KEY PROJECTS ODPM METRICS BASELINE
DATA 2010
TARGET TIMELINE
2011 2013 2015 Y1
Y2
Y3
Y4
Y5
IMAGE AND BRANDING IMAGE & BRANDING
ODPM Image and Branding
- brand awareness- brand recognition
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBDG g- brand credibility TBD TBD TBD TBD
COORDINATIONCOORDINATION EFFECTIVENESS
FRAMEWORK ALIGNMENT
LEGISLATIVE FRAMEWORK
Legislative Review
- legislative authority
- % completion draft legislation
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
READINESSIMAGE AND BRANDING Teambuilding
- % increase in employee satisfaction
- % increase in productivity
- % reduction in
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
IMAGE AND BRANDINGBRANDING - % reduction in
absenteeism
- % reduction in employee turnover rate
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
56
DEVELOPMENT PILLAR (S): PILLAR 3: NATIONAL AND PERSONAL SECURITY
STRATEGIC GOAL: 100% NATIONAL RISK REDUCTION / 100% READINESS
EXPECTED IMPACT(STRATEGIC INITIATIVE): OPERATIONAL EXCELLENCE(STRATEGIC INITIATIVE):
ODPM STRATEGIC OBJECTIVE
ODPM STRATEGIC PRIORITY
ODPM KEY PROJECTS ODPM METRICS BASELINE
DATA 2010
TARGET TIMELINE
2011 2013 2015 Y1
Y2
Y3
Y4
Y5
READINESS COMMUNITY PREPAREDNESS
Shelter Inspection
- Standard: Every 3 Years- 5 of 14 Corporations Inspected
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBDPREPAREDNESS pExercise Inspected
- % of Shelters Inspected: TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
RESOURCE MANAGEMENT
READINESS
PLANNING
COST EFFECTIVENESS
Warehousing and Inventory Management
- % warehouses achieving readiness- # stock outs of key items
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBDREADINESS C SS- inventory turns
TBD TBD TBD TBD
READINESS- % employees with required competencies
TBD TBD TBD TBD
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
INTEGRATED PERFORMANCE MANAGEMENT
ORGANIZATIONAL DEVELOPMENT
OrganizationalTraining Plans
- % training plans developed and implemented- DRM technical capabilities
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
57
DEVELOPMENT PILLAR (S): PILLAR 3: NATIONAL AND PERSONAL SECURITY
STRATEGIC GOAL:
EXPECTED IMPACT(STRATEGIC INITIATIVE): OPERATIONAL EXCELLENCE
ODPM STRATEGIC OBJECTIVE
ODPM STRATEGIC PRIORITY
ODPM KEY PROJECTS ODPM METRICS BASELINE
DATA 2010
TARGET TIMELINE
2011 2013 2015 Y1
Y2
Y3
Y4
Y5
- % of NEOC Processes reviewed
RESPONSE CAPABILITY PLANNING NEOC Management
Processes reviewed- % NEOC SOPs developed- % on-time exercise of NEOC- NEOC Readiness (R –
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
Y – G)
RESPONSE CAPABILITY PLANNING
NationalIncident Management
- response time- % risk reduction- % of incidents reported (Level 1 – 2 –3)
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBDgSystem (NIMS)
3)- % of serious incidents not reported (Level 1 – 2 – 3)
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
- 100% critical facilities identified across sectors
READINESS
CAPACITY / REACHPLANNING
Critical Facilities Protection
- % of critical facilities with adequate protection systems in place- % sectors with critical facilities
t ti l
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
protection plans- % completion of CFP Policy- # security breaches at critical facilities
TBD TBD TBD TBD
58
DEVELOPMENT PILLAR (S): PILLAR 3: NATIONAL AND PERSONAL SECURITY
STRATEGIC GOAL:
EXPECTED IMPACTEXPECTED IMPACT(STRATEGIC INITIATIVE): ENHANCING DRM TECHNICAL CAPABILITIES
ODPM STRATEGIC OBJECTIVE
ODPM STRATEGIC PRIORITY
ODPM KEY PROJECTS ODPM METRICS BASELINE
DATA 2010
TARGET TIMELINE
2011 2013 2015 Y1
Y2
Y3
Y4
Y51 2 3 4 5
RESPONSE CAPABILITY
CAPACITY / REACH
READINESS
CERTIFICATIONBCM Planning
- # of Ministries participating in BCM Workshops: 12
- % of Key Ministries
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBDCAPACITY / REACH % of Key Ministries with completed BCM Plans: 0
READINESS
- % Mass Egress Plans Completed and Implemented: 20%
TBD TBD TBD TBDRESPONSE CAPABILITY
CERTIFICATIONEgress Planning - Plans Tested: POS
Mass Egress Plan Tested April 2011 (Tabletop Test)
TBD
TBD
TBD
TBD
TBD
TBD
TBD
TBD
READINESSRESPONSE CAPABILITY
READINESS
CERTIFICATION
Evacuation Planning
- Plans Implemented:- Plans Tested:
0%
0%
TBD
TBD
TBD
TBD
TBD
TBD
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
COORDINATION EFFECTIVENESS
CAPITAL & INFRASTRUCTURE
PROJECTS
ODPM Relocation - TBD TBD TBD TBD TBD
59
APPENDIX IIODPM MANAGEMENT STRUCTURE & FUNCTIONAL AREAS
Per the Organizational Structure presented in Chapter 1, at the time of writing of this Strategic Plan ODPM’sFunctional Areas included the following five (5) Departments:
1 Miti ti Pl i d R h U it d t li l i GIS l i iti ti l i1. Mitigation, Planning and Research Unit advocates policy planning, GIS analysis, mitigation planning, implementation of mitigation strategies, data collection, dissemination of information, research and critical facilities protection.
2. Preparedness and Response Unit is responsible for most operations including the coordination of First2. Preparedness and Response Unit is responsible for most operations including the coordination of First Responder agencies, facilitation of training and capacity building and institutional strengthening programmes for staff, stakeholders and First Responder agencies as well as the continuous development and review of National and Regional Response Plans.
3. Public Information and Education Community Outreach has oversight of public education/awareness initiatives, public relations, information dissemination, media relations, community outreach programmes and volunteerism.
4 Administrative Support and Finance Unit is responsible for business services human resources finance and4. Administrative Support and Finance Unit is responsible for business services, human resources, finance and accounting and information communications technology.
5. Project Management Unit assists the ODPM’s strategic unit in project monitoring, tracking and reporting to internal or external agencies.
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
The full ODPM Org Chart appears on the following page.
60
APPENDIX IIODPM MANAGEMENT STRUCTURE & FUNCTIONAL AREAS
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011 61
APPENDIX IIIODPM LEGAL & REGULATORY FRAMEWORK
Current Legal / Regulatory Framework
Assessment Treatment Preparedness Response Recovery
Legislation
StandardsRegulationsRegulationsInspections
CodesLicenses
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011 62
REQUIREMENTS OF LEGAL AND REGULATORY FRAMEWORK
Empower National Coordinating Authority (ODPM) to execute and deliver on its new, expanded mandate
Align subsidiary and associated legal instruments with the imperatives of the evolving CDM Programme
Impose mandatory business and government continuity standards
Empower all stakeholders by:
Clarifying roles and responsibilities
Stipulating capacity requirements (inspectors, licensed operators, etc.) to support delivery of all aspectsof CDMP
Enabling quality assurance re compliance and reporting
Providing access to funding, via budgetary process (cf. PSIP)
Establish emergency protocols
Including inter‐governmental and private sector arrangements
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
Establish information sharing and confidentiality protocols
63
APPENDIX IVPOLICY FRAMEWORK
HYOGO INTERNATIONAL POLICY FRAMEWORKThe HYOGO Framework outlines 5 Priorities for Action:
1Make Disaster Risk Reduction a national and local priority
2Build a culture of safety and resilience
3Identify, assess and monitor disaster risks and strengthen initiatives
44Reduce the underlying risk factors
5
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
5Improve response effectiveness by strengthening disaster preparedness
64
HYOGO FRAMEWORK & IMPACT REDUCTION WORK GROUPS
IdentifyRisks
Treat Risks RespondAssess
RisksRecover
Risks Risks RespondRisks
CoordinationWork Gro p
ResponseWork Group
ReliefWork Group
Work Group
Impact Assess’ntWk.Group Group
Hyogo 2
GroupWk.Group
Hyogo 3
Hyogo 4 H 4
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
Hyogo 5
65
APPENDIX IVPOLICY FRAMEWORK
CDEMA REGIONAL POLICY FRAMEWORK Mobilise and coordinate disaster relief
Mitigate or eliminate the immediate consequences of disasters
Provide immediate and coordinated response through emergency disaster Provide immediate and coordinated response through emergency disasterrelief
Secure, coordinate and provide reliable and comprehensive information ondisasters to interested inter‐governmental and non‐governmentalorganisations
Encourage the adoption of disaster loss reduction and mitigation policies and Encourage the adoption of disaster loss reduction and mitigation policies andpractices; cooperative arrangements and mechanisms to facilitate thedevelopment of a culture of disaster loss reduction
C di t th t bli h t h t d i t f d t
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
Coordinate the establishment, enhancement and maintenance of adequateemergency disaster response capabilities among Participating States.
66
APPENDIX IVPOLICY FRAMEWORK
NATIONAL CDM POLICY FRAMEWORK
Parliament
NSC
Disaster Management Council
Risk & Consequence Management Workstreams & Task Groups
OFFICE OF DISASTER PREPAREDNESS AND MANAGEMENT – DRAFT STRATEGIC PLAN 2010 – 2015 JUNE 1ST 2011
Policy FrameworkLegal & Reg. F/W – laws, regs, codes, standards, licenses
67