A.narayanan Final

Embed Size (px)

Citation preview

  • 8/12/2019 A.narayanan Final

    1/4

    S.A. CONSTRUCTION Cell : 94434 57224 81480 59489

    Civil Engineering Con!l"#n" $ Con"r#%"or& 'i%ene( )!il(ing S!rve*or

    O++ : 19,& T.-. /AIN ROA& A//AET& SA'E/ ,3, 003

    RESI : NORT ETENSION& 1441& ATTANAICAR STREET& A//AET& SA'E/ ,3, 003.

    Er. Sri. Ar!!g#&.C.E.&Civil Engineer

    ETAI'E AN A)STRACT ESTI/ATE

    N#e o6 "e or :Detailed and Abstract Estimate for the proposed Reconstruction of

    R.C.C Terraced roof Residential building in Ground Floor (As per the existing

    R.C.C Roof Buiilding in demolished at .!o" ##$%%& D.!o" '$#)%&

    *atta !o" +,'& Amai -ondalampatt /illage& alem T0 1 Dt.

    N#e o6 "e Ali%#n" : 1. Tir!. A.NARA;ANAN& $o. Thiru. Arumugam

    2. T" . AR-ATI&

    )

    =>

    =>

    ?"*.

    =32>R#"e er Ao!n"

    1. E#r" or e@%#v#"ion in #ll %l#e o6 oil in%l!(ing le#( #n( li6" 6or 6o!n(#"ion e"% %ole"e

    2ain 3alls alround %4% #'.+5 6.7% %.5 56.'5

    Cross 3all #4% 7.5' 6.7% %.5 '.%%

    8ong 9all %4% '.5, 6.7% %.5 .#+

    4,.093 275 3 12,75.00

    2. R.R #onr* in /!( or"#r 6or 6o!n(#"ion

    2ain 3alls alround %4% #'.+5 6.7% %.5 56.'5

    Cross 3all #4% 7.5' 6.7% %.5 '.%%

    8ong 9all %4% '.5, 6.7% %.5 .#+

    4,.093 950 3 4378,.00

    3 R.R #onr* in C./. 1:, i@ 6or B#een"

    2ain 3alls alround %4% #'.+5 6.:7 6.'7 ,.7#

    Cross 3all %4% 7.5' 6.:7 6.'7 #.#5

    8ong 9all %4% '.5, 6.:7 6.'7 #.+

    14.433 1800 3 25974.00

    4R.C.C or 6or lin" )e#& 'in"el %! !n#(e #n( roo6 l#B in C.C 1:2:4 i@ in%l!(ing%en"ering #n( "eel 6#Bri%#"ion or e"%.& %ole"e in .+ $ +.+

    lin" )e# in .+

    2ain 3alls alround%4% #'.+5 6.#5 6.%+ 6.,+ m5

    8ong 3all %4% 7.5' 6.#5 6.%+ 6.## m5

    Cross 3all %4+ '.5, 6.#5 6.%+ 6.#+ m5

    1.42 3

  • 8/12/2019 A.narayanan Final

    2/4

    'in"el C! S!n#(e in .+

    2ain 3alls alround %4% #'.+5 6.#5 6.#5 %.:7 m5

    8ong 3all %4% 7.5' 6.#5 6.#5 6.5' m5

    Cross 3all %4% '.5, 6.#5 6.#5 6.5, m5

    To"#l 2.22 3

    +.+

    2ain 3alls alround %4% #%.,7 6.#5 6.#5 1.1,3

    *artition %4% 7.7 6.#5 6.#5 0.3,3

    To"#l 1.523

    Roo6 Sl#B

    G.F 1X1 '.75 7.76 6.%% +.+: m5

    F.F 1X1 :5.' 6.%% :.# m5

    G.F 1 F.F 1X2 7.% %.6 6.%% %.5: m5

    To"#l 11.70 3

    Ne" To"#l 1,.8, 3 22000 3 3&70&920.00

    5 Soil 6illing 6or B#een" in%l!(ing %o#%"ing e"% %ole"e

    Building %4% 7.'% +.', 6.,% 5+.5+ m5 750 3 2,&513.00

    ,. S!er "r!%"!re in ).< in %. 1:, i@ !ing %o!n"r* Bri% in%l!(ing e"% %ole"e

    2ain 3alls alround %4% #'.+5 6.#5 '.+ :,.'6 m5

    8ong 9all #4% 7.5, 6.#5 5.6+ .,: m5

    Cross 3all #4% '.5, 6.#5 5.6+ %6.5' m5

    To"#l ,9.01 3

    e(!%" oor $

  • 8/12/2019 A.narayanan Final

    3/4

    7S!l*ing #n( 6i@ing o6 oor $ in(o #re el( in oi"ion 6r#e #re Be" !#li"* o6 #l#i*#n

    #l oo( (oor #re %o#n* #n!6#%"!ring 6l! (oor in%l!(ing e"% %ole"e

    .+ $ +.+

    D ; Door %47 6.,% ) #.%5 %%.75m#

    D% ; Door %4# 6.'7 ) #.%5 5.#: m#

    3 ; 3indo9 %47 %.## ) %.5' %6.65 m#

    / ; all %4#:.6: 5.6+

    )#:.7: m#

    -it %4#5.#6 %.##

    )'.% m#

    Toilet %4##.%' %.+#

    )7.+, m#

    To"#l92.17 2 300 m# 27,51.00

    9.

  • 8/12/2019 A.narayanan Final

    4/4

    12 roviion 6or #in"ing 6or (oor #n( in(o #re 2 %o#" i" Be"

    !#li"* o6 en#el #in" over # %o#" o6 rier #n( #""*.'.S 40&000.00

    13 roviion 6or