PCI Outage-Management & GADS Modules
August 11, 2011
Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com Page 2
PCI GSMS Bid-to-Bill Solution for SPP Market
PCI GenManager Bid Formulator Bid Evaluator LMP Manager ISO Communication Wind Module Pre-Settlement Shadow Settlement Settlement Allocation P&L Analyzer
PCI GenPortal & GenBase Datamart Deal Capture Gas Management Outage Management &
GADS
PCI GenTrader Unit Commitment
Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com
Who currently Uses PCI Software Solutions?
PCI GSMS Suite is currently used to Manage around 50% of the US Generation Capacity.
ERCOT (80%), MISO (70%), CAISO (90 %), PJM (30%), SPP (85%)
Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com
Who currently Uses PCI Software Solutions?
PCI GSMS Suite is currently used to Manage around 50% of the US Generation Capacity.
ERCOT (80%), MISO (70%), CAISO (90 %), PJM (30%), SPP (85%)
CustomerPCIGT
PCIGP
PCIGM
American Electric Power X X
City Public Service – San Antonio
X X ERCOT
NV Energy X CAISO
Consumers Energy X X MISO
CDWR X CAISO
Alliant Energy X MISO
Ameren Energy (UE & AEM) X X MISO
Dominion X X PJM
Kansas City Power & Light X X SPP
Empire District X SPP
Florida Power & Light X X
Madison Gas & Electric X MISO
Calpine Energy X X ERCOT
Topaz Power X X ERCOT
Lower Colorado River Authority X X ERCOT
City of Ames MISO
Southern California Edison X X CAISO
Oklahoma Gas & Electric X X SPP
CustomerPCIGT
PCIGP
PCIGM
Duke Energy X X
Direct Energy X
Xcel Energy X X MISOSPP
Optim Energy X X ERCOT
Sempra Energy X X CAISO
Pacific Gas & Electric X CAISO
NRG (Texas) X X
Bryan Texas Utilities X
GDF Suez North America X X ERCOT
MidAmerican Energy X X MISO
Progress Energy X X PA
Westar Energy X X SPP
Orlando Utilities Commission X
NIPSCO X X MISO
FirstEnergy X X PJM
San Diego Gas & Electric X X CAISO
GenOn X X
Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.comPage 5
1/1/2007
Objectives for PCI Outage-Management Module
Automate workflow to:– Capture all Plant Outage
information required by ISO– Submit outage & deratings to
the new SPP Outage Scheduler system
– Manage all Communications and approval process with ISO schedulers
– Manage Communications and approval process with Plant Managers
Submit outage data to NERC GADS and produce plant performance reports
Use outage & derating data to formulate DA & RT offers and forecast DA awards for generators
Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.comPage 6
1/1/2007
SPP Outage Management
SPP is replacing their “OPS1” Outage Scheduler Solution SPP Go-Live is 9/13 using SPP Web page. API becomes available on 9/20.
Option to keep existing business process or migrate to direct submit by Generators.
SPP Outage Scheduler will be integrated into Current Market now and pushed over to future market.
PCI Outage Management can implement with SPP API so clients can manage outages from PCI instead of from SPP Web page.
PCI Outage Management functionality can be delivered for use with new SPP Outage Scheduler.
Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.comPage 7
1/1/2007
Major changes from OPS1
Important Differences between OPS1 and CROW No longer limited to submission at a Balancing Authority
level, may submit at the GOC level. SPP’s CROW will use complete names. PCI automatically
translates from your in house names to the SPP names. Generation derates will be handled differently from what is
currently in OPS1. Generation derates reflect the unit’s Net Available Capacity.– Ex: 100 MW unit is derated to 75 MW. Unit is available to
produce 75 MW. (In OPS2 you would enter a 25 MW curtailment.)
Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com
Capabilities of PCIOutage-Management Module
Enter, edit, and submit outage requests:– Planned (>= 48 hours Lead Time)– Urgent (>= 24 hours to 7 days Lead Time)– Emergency (<= 24 hours Lead Time)– Forced (<= 1 hours Lead Time)
Manage 3-way communication between plant managers, portfolio managers, and ISO operators: – Submit requests internally for
approval and manage approval process
– Submit outage requests to ISO Outage Schedule for ISO approval
– Track ISO approvals – Manage pending requests– Track submissions and alarms
Page 8
Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com
Main Outage-ManagementScreen
Provide Web-Based GUI to enter & update outages
Provide XML data links to communicate with ISO
Provide filters & validation rules to speed up and automate outage-management workflow
Page 91/1/2007
Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com Page 10
Sections divide up read-only, required, and optional fields
Access to historic reviews
Create recurring outages on new
Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com
Sample Workflow Process
Single, coordinated stream of data.
Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com
Provide Gantt Chart to Easily Track Ouatges
View outages using a Gant chart.
Filter units and types of outage.
Select / Edit outage details.
Page 121/1/2007
Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com
Using PCI Outage-Management Moduleto Automate NERC GADS Reporting
Capture all outage & derating data required to support NERC GADS reporting:– Assign unique GADS Id
for each outage– Provide combo box to
allow user to select GADS cause code
– Allow user to specify unit code and utility code required for NERC reporting
– Assign a 2-character event type to describe outage
– Specify an equipment type associated with outage event
Page 13
Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com
Using PCI Outage-Management Moduleto Create GADS Performance Reports
Capture EMS Breaker Status.
Can automatically Generate Outage Tickets based on the breaker status
Compute GADS Performance Statistics
Generate GADS Performance Reports by Plant/Unit
Generate NERC-compliant files
Option to ETL GADS Data to PCI Data Warehouse for BI Reporting
Page 14
Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com
Business Intelligence / Data Warehouse Analytics
Page 15
Example 1 – GADS Reporting – Event Reporting and Analysis
Example 2– “In the Money” Analysis– Compare GADS Performance Records to
Performance History in the ISO
Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com
Sample PCI Report to Summarize Turbine Service Hours
Page 16
Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com
Fully Integrated with PCI GSMS Modules
• PCI Outage Manager is fully integrated with other PCI Modules
• Outages can be entered in the PCI Outage-Management Module. After outage is approved: PCI Bid Formulator can
automatically adjust offer parameters to reflect the current outage status
PCI Bid Evaluator can be run to Forecast DA Awards
PCI GenTrader can use outage information for unit-commitment and production costing runs
Page 17
Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com
Summary of PCI ExtendedOutage-Management Module
Manage outage lifecycle:– Submit new outage requests– Update existing requests– Download status of existing
outages
Fully integrated with:– ISO Outage Scheduler– Other PCI GSMS modules
(GenTrader, Bid Evaluator, Bid Formulator)
Automate NERC GADS Reports
Page 18
Power Costs, Inc. Confidential and Proprietary 2010 www.PowerCosts.com
For More Information
Bid-To-Bill Automation– Forecast LMPs– Automate XML Communications with
ISO– Create Unit & Demand Bids– Evaluate Bidding Strategies– Perform Shadow Settlement– Manage Outages & Deratings
Transaction Management – Deal Capture– Create MISO Financial Contracts– Settlement of Bilateral Transactions
Operations & Trading– Optimal unit commitment and
economic dispatch– Fuel scheduling– Ancillary services optimization
Post Analysis– P&L Analyzer
Gas Management– Forecast Gas Burn– Optimize Pipeline Uses– Nominate Gas & Pipeline Volumes