24
22 MARCH 2018 ANALYST MEETING 2017 PERFORMANCE REVIEW AND 1H2018 OUTLOOK

ANALYST MEETING - synteccon.com€¦ · ANALYST MEETING 2017 PERFORMANCE REVIEW AND 1H2018 OUTLOOK . Agenda 2017 Performance Summary 2017 Backlog 2018 Outlook Appendix 2 . 3 ... 1Q15

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ANALYST MEETING - synteccon.com€¦ · ANALYST MEETING 2017 PERFORMANCE REVIEW AND 1H2018 OUTLOOK . Agenda 2017 Performance Summary 2017 Backlog 2018 Outlook Appendix 2 . 3 ... 1Q15

2 2 M A R C H 2 0 1 8

ANALYST MEETING

2 0 1 7 P E R F O R M A N C E R E V I E W A N D 1 H 2 0 1 8 O U T L O O K

Page 2: ANALYST MEETING - synteccon.com€¦ · ANALYST MEETING 2017 PERFORMANCE REVIEW AND 1H2018 OUTLOOK . Agenda 2017 Performance Summary 2017 Backlog 2018 Outlook Appendix 2 . 3 ... 1Q15

Agenda

2017 Performance Summary

2017 Backlog

2018 Outlook

Appendix

2

Page 3: ANALYST MEETING - synteccon.com€¦ · ANALYST MEETING 2017 PERFORMANCE REVIEW AND 1H2018 OUTLOOK . Agenda 2017 Performance Summary 2017 Backlog 2018 Outlook Appendix 2 . 3 ... 1Q15

3

Agenda

2017 Performance Summary

Page 4: ANALYST MEETING - synteccon.com€¦ · ANALYST MEETING 2017 PERFORMANCE REVIEW AND 1H2018 OUTLOOK . Agenda 2017 Performance Summary 2017 Backlog 2018 Outlook Appendix 2 . 3 ... 1Q15

1,825 1,599 1,688 1,939 1,675 1,752 1,956 2,121 1,986 2,190 2,293 2,206 7,505 8,675

45 121 46 111 151 132 143 98 123 120 121 117

523

481

-

2,000

4,000

6,000

8,000

10,000

OtherConstruction

Revenue (MB.)

4

Total Revenues (MB.) • Consolidated 2016 vs. 2017 up 14.05% (8,028 vs. 9,156) • Company 2016 vs. 2017 up 14.15% (7,783 vs. 8,885)

1Q15 2Q15 3Q15 4Q15 1Q16 2Q16 3Q16 4Q16 1Q17 2Q17 3Q17 4Q17 2016 2017

Total

1,870

1,720

1,734

2,050

1,826

1,884

2,099

2,219

2,109

2,310

2,414

2,323

8,028

9,156

Page 5: ANALYST MEETING - synteccon.com€¦ · ANALYST MEETING 2017 PERFORMANCE REVIEW AND 1H2018 OUTLOOK . Agenda 2017 Performance Summary 2017 Backlog 2018 Outlook Appendix 2 . 3 ... 1Q15

Gross Profit (MB.) • Consolidated 2016 vs. 2017 up 32.85% (1,455 vs. 1,933) • Company 2016 vs. 2017 up 34.23% (1,367 vs. 1,835)

Gross Profit and Gross Profit Margin

230 206 252 226 313 333

449 359

456 484 482

1,455

1,933

230

330 433 462

1,367

1,835

0

500

1000

1500

2000

2500

1Q15 2Q15 3Q15 4Q15 1Q16 2Q16 3Q16 4Q16 1Q17 2Q17 3Q17 2016 2017

Gross Profit

12.6 12.9

14.9

11.7

18.7 19.0

23.0

16.9

23.0 22.1 21.0

19.4

22.3

12.6 11.9

15.6

21.7 21.0

20.0 18.2

21.1

0.0

5.0

10.0

15.0

20.0

25.0

1Q15 2Q15 3Q15 4Q15 1Q16 2Q16 3Q16 4Q16 1Q17 2Q17 3Q17 2016 2017

Gross Profit Margin

Gross Profit Margin (%) • Consolidated 2016 vs. 2017 up 2.9% (19.4 vs. 22.3) • Company 2016 vs. 2017 up 2.9% (18.2 vs. 21.1)

5

Page 6: ANALYST MEETING - synteccon.com€¦ · ANALYST MEETING 2017 PERFORMANCE REVIEW AND 1H2018 OUTLOOK . Agenda 2017 Performance Summary 2017 Backlog 2018 Outlook Appendix 2 . 3 ... 1Q15

Net Profit and Net Profit Margin

94 105

234 224 249 195

274

133

246 261 244

852

985

106 112

240 224

250 206

281

160

263 278 262

896

1,050

0

200

400

600

800

1000

1200

1Q15 2Q15 3Q15 4Q15 1Q16 2Q16 3Q16 4Q16 1Q17 2Q17 3Q17 2016 2017

Net Profit

5.2

6.5

13.9

11.6

14.9

11.1

14

6.3

12.4 11.9

10.6 11.4 11.4

7

14.2

11.7

14.3

7.6

13.2 12.6

11.4 11.9 12.1

0

2

4

6

8

10

12

14

16

1Q15 2Q15 3Q15 4Q15 1Q16 2Q16 3Q16 4Q16 1Q17 2Q17 3Q17 2016 2017

Net Profit Margin

Net Profit (MB.) • Consolidated 2016 vs. 2017 up 15.61% (852 vs. 985) • Company 2016 vs. 2017 up 17.18% (896 vs. 1,050)

Net Profit Margin (%) • Consolidated 2016 vs. 2017 unaltered (11.4 vs.11.4) • Company 2016 vs. 2017up 0.2%(11.9 vs. 12.1)

6

Page 7: ANALYST MEETING - synteccon.com€¦ · ANALYST MEETING 2017 PERFORMANCE REVIEW AND 1H2018 OUTLOOK . Agenda 2017 Performance Summary 2017 Backlog 2018 Outlook Appendix 2 . 3 ... 1Q15

EBIT / I and Debt to Equity

1.14

1.07 1.09 1.04 1.04

0.96

0.89 0.86

0.83

1.03 1.00 0.98

0.82 0.81 0.77

0.98

0.78

1 0.99

0.93 0.87

0.77 0.8

0.7 0.68 0.68

0.52 0.5 0.48

0.68

0.49

0

0.2

0.4

0.6

0.8

1

1.2

1Q14 2Q14 3Q14 4Q14 1Q15 2Q15 3Q15 4Q15 1Q16 2Q16 3Q16 4Q16 1Q17 2Q17 3Q17 2016 2017

Debt to Equity • Consolidated 2016 vs. 2017 down 0.20% (0.98 vs. 0.78) • Company 2016 vs.2017 down 0.19% (0.68 vs. 0.49)

7

Page 8: ANALYST MEETING - synteccon.com€¦ · ANALYST MEETING 2017 PERFORMANCE REVIEW AND 1H2018 OUTLOOK . Agenda 2017 Performance Summary 2017 Backlog 2018 Outlook Appendix 2 . 3 ... 1Q15

Agenda

2017 Backlog

8

Page 9: ANALYST MEETING - synteccon.com€¦ · ANALYST MEETING 2017 PERFORMANCE REVIEW AND 1H2018 OUTLOOK . Agenda 2017 Performance Summary 2017 Backlog 2018 Outlook Appendix 2 . 3 ... 1Q15

9

Backlog on hand (MB.)

As of 31 Dec 2017 there are 27 projects on hand, valued 25,554 MB., Total Area 1,871,328 Sq.m. Backlog 11,561 MB. These projects will generate revenue till 2019.

6,504 6,228

5,430

5,755 6,657

8,352

10,013

10,584 10,454

12,026 11,561

27 28 31 29 29

24

29 32 36 43 27

0

2000

4000

6000

8000

10000

12000

14000

2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017

Project

Backlog (MB) Project on Hand as of 31 December 2017

Type of Project Exc. Vat (MB.)

21 Residential Projects 19,415

3 Commercial Projects 3,348

3 Leisure Projects 2,028

Total 25,554

Page 10: ANALYST MEETING - synteccon.com€¦ · ANALYST MEETING 2017 PERFORMANCE REVIEW AND 1H2018 OUTLOOK . Agenda 2017 Performance Summary 2017 Backlog 2018 Outlook Appendix 2 . 3 ... 1Q15

10

Progress of Current Projects as of 31 Dec 2017 Listed Company and Related

No. Project Title Project Value

(Exclude VAT 7%) (MB.)

Area (sqm.) % Detail of Project

1 SUPALAI ELITE PHAYATHAI 241 26,800 89.60 31 storey of condominium

2 SUPALAI LITE RATCHADA-NARATHIVAS-SATHORN 328 47,882 61.05 27 storey with rooftops of condominium

3 SUPALAI ELITE SURAWONG 274 28,440 33.85 31 storey with rooftops of condominium

4 SUPALAI VERANDA RAMA 9 647 91,331 16.75 31 storey of condominium

5 SUPALAI ELITE SI-PHRAYA 314 37,070 0.00 1 building of 36 storey of condominium,1 building of 8 storey of clubhouse and car park

6 SUPALAI RIVA GRANDE 1,157.50 132,677 0.00 2 buildings of 36 storey of condominium,1 building of 37 storey of condominium and RMU building

7 LIFE ASOKE 1,798 100,692 91.98 35 storey of condominium

8 LIFE SUKHUMVIT 62 494 25,906 0.00 24 storey of condominium with 1 basement level

9 CHAPTER ONE SHINE BANGPO 427 33,922 9.53 38 storey of condominium,5 storey of car park building

10 THE RESERVE THONGLOR 499 17,978 0.29 26 storey of condominium, 8 storey of car park building

Page 11: ANALYST MEETING - synteccon.com€¦ · ANALYST MEETING 2017 PERFORMANCE REVIEW AND 1H2018 OUTLOOK . Agenda 2017 Performance Summary 2017 Backlog 2018 Outlook Appendix 2 . 3 ... 1Q15

11

Progress of Current Projects as of 31 Dec 2017 Listed Company and Related

No. Project Title Project Value

(Exclude VAT 7%) (MB.)

Area (sqm.) % Detail of Project

11 NOBLE REVOLVE RATCHADA 1,345 71,732 85.20 2 buildings of 38, 42 storey of condominium

12 NOBLE RECOLE 687 26,934 31.63 30 storey of condominium with 5 level basement

13 NOBLE BE 33 683 24,530 16.92 31 storey of condominium with 5 level basement

14 NOBLE BE 19 1,374 51,623 6.97 48 storey of condominium with 1 level basement, 27 storey of condominium with 6 level basement

15 THE ESSE ASOKE 969 53,235 35.03 54 storey of condominium with 2 level basement

16 THE POLITAN RIVE (PHASE 2) 474 36,612 80.46 4 buildings of 8 storey of condominium and 6 storey of car park building

17 THE POLITAN AQUA 1,906 152,426 11.93 61 storey of condominium

18 TERMINAL 21 PATTAYA 1,383 155,140 63.65 1-6 storey shopping mall, 7-25 storey of condominium with 1 basement

19 MI 3 306 19,020 72.73 24 storey of hotel

20 CP TOWER NORTH PARK 784 44,000 0.00 19 storey of office building with 1 basement level

Page 12: ANALYST MEETING - synteccon.com€¦ · ANALYST MEETING 2017 PERFORMANCE REVIEW AND 1H2018 OUTLOOK . Agenda 2017 Performance Summary 2017 Backlog 2018 Outlook Appendix 2 . 3 ... 1Q15

12

Progress of Current Projects as of 31 Dec 2017 Non Listed Company

No. Project Title Project Value

(Exclude VAT 7%) (MB.)

Area (sqm.) % Detail of Project

21 THE PRESIDENT PHETKASEM-BANGKHAE 378 38,198 53.47 27 storey of condominium

22 LAVIQ SUKHUMVIT 57 506 28,549 10.36 33 storey of condominium

23 HOTEL NIKKO BANGKOK 560 49,336 91.21 20 storey of condominium with 4 level basement

24 INFINITY ONE CONDO 400 27,000 55.75 34 storey of condominium

25 KRAAM SUKHUMVIT 26 589 27,900 23.78 29 storey of condominium with 2 level basement

26 I’M CHAINA TOWN 668 30,743 12.88 1 building of 8 storey of hotel with 6 level basement, 1 building of 8 storey of hotel

27 TRR BUILDING 592 36,832 0.00 27 storey of office building with 1 basement level

Page 13: ANALYST MEETING - synteccon.com€¦ · ANALYST MEETING 2017 PERFORMANCE REVIEW AND 1H2018 OUTLOOK . Agenda 2017 Performance Summary 2017 Backlog 2018 Outlook Appendix 2 . 3 ... 1Q15

MEP Work Value 13

No. Project Contract Value

Excl. Vat (MB.)

1 Noble Revolve Ratchada (Phase 1) 159.42 2 Noble Revolve Ratchada (Phase 2) 155.57 3 Noble Recole 108.50 4 Noble BE 19 251.31 5 Swan Lake Khao Yai 11.42 6 Kraam Sukhumvit 26 121.09 7 Noble BE 33 132.16 8 I’m Chaina Town Hotel 179.76 9 The Reserve Thonglor 95.74

10 CP Tower North Park 199.50 11 Life Sukhumvit 62 86.45

Total 1,500.92

Page 14: ANALYST MEETING - synteccon.com€¦ · ANALYST MEETING 2017 PERFORMANCE REVIEW AND 1H2018 OUTLOOK . Agenda 2017 Performance Summary 2017 Backlog 2018 Outlook Appendix 2 . 3 ... 1Q15

14 List of Current Projects as of 31 Dec 2017

1.SUPALAI ELITE PHAYATHAI

2. SUPALAI LITE RATCHADA-NARATHIVAS-SATHORN

3. SUPALAI ELITE SURAWONG 4.SUPALAI

VERANDA RAMA 9

5.SUPALAI ELITE SI-PHRAYA

6.SUPALAI RIVA GRANDE 7. LIFE ASOKE

8. LIFE SUKHUMVIT 62

9. CHAPTER ONE SHINE BANGPO 10. THE RESERVE

THONGLOR 11. NOBLE REVOLVE RATCHADA

12. NOBLE RECOLE

13. NOBLE BE 33 14. NOBLE BE 19

15. THE ESSE ASOKE 16.THE POLITAN RIVE 2 17.THE POLITAN AQUA 18.TERMINAL 21 PATTAYA 19.MI 3

20. CP TOWER NORTH PARK

21.THE PRESIDENT PHETKASEM-BANGKHAE 22. LAVIQ SUKHUMVIT 57

23.NIKKO HOTEL BANGKOK

24. INFINITY ONE CONDO 25.KRAAM SUKHUMVIT 26 26. I’M CHAINA TOWN

27.TRR BUILDING

Page 15: ANALYST MEETING - synteccon.com€¦ · ANALYST MEETING 2017 PERFORMANCE REVIEW AND 1H2018 OUTLOOK . Agenda 2017 Performance Summary 2017 Backlog 2018 Outlook Appendix 2 . 3 ... 1Q15

The construction project signed in 2017

15

No. Project Owner VALUE (MB.)

1Q2017 1 NOBLE BE 33 CONTINENTAL CITY CO., LTD. 731

2 THE PRESIDENT PHETKASEM-BANGKHAE CHAIPATTANA LAND CO., LTD. 405

3 I’M CHINA TOWN GRAND UNILAND CO., LTD. 715

SIGNED CONTRACT VALUE 1Q2017 1,851

2Q2017 4 THE POLITAN AQUA BANGKOK RIVA DEVELOPMENT CO., LTD. 2,040

5 SUPALAI VERANDA RAMA 9 SUPALAI PCL. 692

6 LAVIQ SUKHUMVIT 57 REAL ASSET DEVELOPMENT CO., LTD. 542

7 THE RESERVE THONGLOR PRUKSA REAL ESTATE PCL. 534

8 NOBLE BE 19 CONTINENTAL CITY CO., LTD. 1,470

SIGNED CONTRACT VALUE 2Q2017 5,278

3Q2017 9 CHAPTER ONE SHINE BANGPO PRUKSA REAL ESTATE PCL. 457

SIGNED CONTRACT VALUE 3Q2017 457

4Q2017 10 TRR BUILDING TRR PROPERTY CO., LTD. 592

11 SUPALAI RIVA GRANDE SUPALAI PCL. 1,157.50

SIGNED CONTRACT VALUE 4Q2017 1,749.50

SIGNED CONTRACT TOTAL VALUE 9,335.50

Page 16: ANALYST MEETING - synteccon.com€¦ · ANALYST MEETING 2017 PERFORMANCE REVIEW AND 1H2018 OUTLOOK . Agenda 2017 Performance Summary 2017 Backlog 2018 Outlook Appendix 2 . 3 ... 1Q15

New Project of 1Q2018 16

CP TOWER NORTH PARK

1 building of 19 storey of office building with 1 basement level,

Total Area 44,000 Sqm.

LIFE SUKHUMVIT 62

1 building of 24 storey of condominium with 1 basement level,

Total Area 25,906 Sqm.

No. Project Owner VALUE (MB.)

1Q2018 1 CP TOWER NORTHPARK CP LAND PCL. 784

2 LIFE SUKHUMVIT 62 AP ME5 CO., LTD. 494

3 CENTRIC RATCHAYOTHIN SC ASSET COPORATION PCL. 340

SIGNED CONTRACT VALUE 1,618

CENTRIC RATCHAYOTHIN

1 building of 21 storey of condominium,

Total Area 17,365 Sqm.

Page 17: ANALYST MEETING - synteccon.com€¦ · ANALYST MEETING 2017 PERFORMANCE REVIEW AND 1H2018 OUTLOOK . Agenda 2017 Performance Summary 2017 Backlog 2018 Outlook Appendix 2 . 3 ... 1Q15

17

Project The Dutchess (Leasehold)

Citadines Grand Central

Sri Racha

Somerset Central

Sri Racha

The Zone Prachinburi

Eight Thonglor Retail

Eight Thonglor Hotel

Investment (million baht) 440 327 622 511 728 1,767

Total Room 166 137 177 306 43 148*

Total Area (Sqm.) 20,793 9,492 19,422 20,578 7,834 15,791

2017 Revenue (MB.) 119.38 57.01 - - 201.66

2017 EBITDA (MB.) 24.4 33.34 - - 87.86

2017 Net Profit (MB.) -4.40 1.19 - - -60.69

Status Opened Opened 3Q2018 4Q2019 Opened Opened

% SYNTEC 100% 68% 60%

*Eight Thonglor Hotel some room operate renovated until 2Q2018

Service Apartment

Page 18: ANALYST MEETING - synteccon.com€¦ · ANALYST MEETING 2017 PERFORMANCE REVIEW AND 1H2018 OUTLOOK . Agenda 2017 Performance Summary 2017 Backlog 2018 Outlook Appendix 2 . 3 ... 1Q15

Agenda

2018 Outlook

18

Page 19: ANALYST MEETING - synteccon.com€¦ · ANALYST MEETING 2017 PERFORMANCE REVIEW AND 1H2018 OUTLOOK . Agenda 2017 Performance Summary 2017 Backlog 2018 Outlook Appendix 2 . 3 ... 1Q15

Outlook – Under Tender as of 15 Mar 2018 No. Project Detail Owner Value

(MB.)

1 SUPALAI ORIENTAL SUKHUMVIT 39

2 Buildings of 25 storey of condominiums, 2 Buildings of 35 storey of condominiums and 10 storey of condominium

SUPALAI PCL. 1,250

2 SUPALAI PARK TALAT PHLU STATION

34 storey of condominium SUPALAI PCL. 400

3 NOBLE CHAENGWATTANA 31 storey of condominium with 2 basement level

CONTINENTAL CITY CO., LTD.

1,100

4 NOBLE AROUND SUKHUMVIT 33

25 storey of condominium with 3 basement level

CONTINENTAL CITY CO., LTD.

600

5 METRIS PATTANAKARN 29 storey of condominium MAJOR DEVELOPMENT ESTATE CO., LTD.

500

6 THE ESSE SUKHUMVIT 36 45 storey of condominium S36 PROPERTY CO., LTD. 1,200

7 THE VERTIER 30 storey of condominium with 1 basement level

V SUKHUMVIT PRIME DEVELOPMENT CO., LTD.

350

8 SUKHOTHAI HOUSE 3 storey of residential building with 2 basement level

KHUN YINGLUCK WACHARAPHOL

300

9 PHAYATHAI COMPLEX 51 storey of mix used building with 2 basement level

HHT CONSTRUCTION CO., LTD.

1,200

10 BETRAGRO TOWER II 21 storey of office building with 1 basement level

B&T REALTY CO., LTD. 1,100

11 SAMITIVEJ CHONBURI HOSPITAL

10 storey of hospital building with 1 basement level,1 storey high expanded building A

SAMITIVEJ CHONBURI HOSPITAL CO., LTD.

300

19

Page 20: ANALYST MEETING - synteccon.com€¦ · ANALYST MEETING 2017 PERFORMANCE REVIEW AND 1H2018 OUTLOOK . Agenda 2017 Performance Summary 2017 Backlog 2018 Outlook Appendix 2 . 3 ... 1Q15

Outlook – Under Tender as of 16 Mar 2018 No. Project Detail Owner Value

(MB.)

12 VIMUT INTERNATIONAL HOSPITAL

Sub-structure B1-B4 of 18 storey building and 4 floor basement

VIMUT INTERNATIONAL HOSPITAL CO., LTD.

120

13 SAKON NAKHON SUGAR FACTORY

Sugar Factory THAI ROONG RUANG INDUSTRY CO., LTD.

200

14 ASA AYUTTHAYA-ROJANA 8 storey of residential building ULTITUDE DEVELOPMENT CO., LTD.

200

15 ORB (INTERNATIONAL SCHOOL)

3 buildings of 2 storey of school building, 3 storey of director 'building and 2 buildings of gymnasium

HHT CONSTRUCTION CO., LTD.

650

16 OFFICE BUILDING’ SITTIPOL 1919 CO., LTD.

21 storey of office building with 2 basement level

SITTIPOL 1919 CO., LTD. 250

17 BULPHERE PATTAYA 8 storey of condominium with 1 basement level

HABITAT GROUP CO., LTD. 150

18 PHAHOLYOTHIN34 CONDOMINIUM

2 buildings of 8,4 storey of condominiums,3 storey of clubhouse

CPN RESIDENCE CO., LTD. 300

19 VANISSA BUILDING, BANGKOK

2 buildings of 12,23 storey of office building with 6 basement level

PIYANARONGVIT CO., LTD. 700

20 UOB(THAI)PCL HEAD OFFICE 30 storey of office building with 6 basement level

UNITED OVERSEAS BANK (THAI) PCL.

1,100

21 ACE CHAENGWATTANA 2 buildings of 6 storey of hotel ROMKLAO PLACE CO., LTD. 120

TOTAL 21 PROJECTS 12,090

20

Page 21: ANALYST MEETING - synteccon.com€¦ · ANALYST MEETING 2017 PERFORMANCE REVIEW AND 1H2018 OUTLOOK . Agenda 2017 Performance Summary 2017 Backlog 2018 Outlook Appendix 2 . 3 ... 1Q15

Agenda

Appendix

21

Page 22: ANALYST MEETING - synteccon.com€¦ · ANALYST MEETING 2017 PERFORMANCE REVIEW AND 1H2018 OUTLOOK . Agenda 2017 Performance Summary 2017 Backlog 2018 Outlook Appendix 2 . 3 ... 1Q15

Appendix – Manpower 22

4,862 4,856

6,176 6,888 7,051

7,504

8,675

655 680 688 710 760 826 849

189 186 214 209 207 217 245

844 866 902 919 967 1,043 1,094

4,054 4,435 4,694

4,152 4,181 4,696

4,146

-

1,000

2,000

3,000

4,000

5,000

6,000

7,000

8,000

9,000

10,00020

11

2012

2013

2014

2015

2016

2017

Rev.from Construction Staff Site+Plant Staff HO Total Worker

Page 23: ANALYST MEETING - synteccon.com€¦ · ANALYST MEETING 2017 PERFORMANCE REVIEW AND 1H2018 OUTLOOK . Agenda 2017 Performance Summary 2017 Backlog 2018 Outlook Appendix 2 . 3 ... 1Q15

• Awards • One of 100 achieves ESG100 2 years in a row since 2016 (The Award were given to listed companies notable in conducting business in Environmental, Social, and Governance (ESG) • The score of quality evaluation of Annual General Meeting “AGM” in 2017 by Thai Investors Association was 100 which was regarded as excellent level • Thai Institute of Directors resolved to the Company is a member :The Collection Action Against Corruption” On 9 March 2017 • The result of reliability rating by Tris Rating Co., Ltd showed that the Company got “BBB” and it’s likely to have stable rank. • The Company was selected to be 1 in 65 of the listed companies in Thailand Sustainability Investment 2017 listing of (Sustainable Stock) which reflects company outstanding performance in environment social and governance : ESG • The Company was result of Corporate Governance Evaluation of Thai Listed Companies 2017 revealed that the company was rated in “Excellent Level” by scoring over 90 points from Thai Institute of Directors.

• Overall Performance & Corporate

36

Page 24: ANALYST MEETING - synteccon.com€¦ · ANALYST MEETING 2017 PERFORMANCE REVIEW AND 1H2018 OUTLOOK . Agenda 2017 Performance Summary 2017 Backlog 2018 Outlook Appendix 2 . 3 ... 1Q15

Q & A

Thank you for join us If you want more information Please contact : Investor Relations Division Miss Rattapawee Lapnan Tel : 0-2711-7423 0-2381-6333 Ext. 5941 E-mail : [email protected]

24