Upload
others
View
5
Download
0
Embed Size (px)
Citation preview
An Overview of SMR Laboratory Inspection
Syuhaizat Md Ali Regulatory & Quality Assurance Programme
Malaysian Rubber Board
Content
• Regulatory & Quality Assurance Programme (RQAP)
• Brief on SMR Scheme
• Control of SMR Scheme
• SMR Laboratory Inspection
• Conclusion
MRB ORGANISATION STRUCTURE
CHAIRMAN
DIRECTOR GENERAL
DEPUTY DIRECTOR GENERAL (RESEARCH & INNOVATION)
DEPUTY DIRECTOR GENERAL (POLICY & OPERATION)
MRB EXPERIMENTAL
STATIONS
TECHNOLOGY & ENGINEERING
DIVISION
QUALITY & TECHNICAL SERVICES DIVISION
PRODUCTION DEVELOPMENT
DIVISION
EXTENSION & DEVELOPMENT
DIVISION
ECONOMICS & RUBBER
EXCHANGE DIVISION
LICENSING, ENFORCEMENT
& SUPPORT SERVICES DIVISION
R&D CENTRE OF EXCELLENCE
QUALITY & TECHNICAL SERVICES DIVISION
DIRECTOR
INDUSTRIAL TECHNICAL &
ADVISORY SERVICES
REQULATORY & QUALITY
ASSURANCE PROGRAMME
STANDARDS DEVELOPMENT
AGENCY
METHOD DEVELOPMENT CHEMICAL TEST
TECHNICAL REVISION &
HARMONISATION OF STANDARDS
DEVELOPMENT OF STANDARDS &
SPECIFICATION FOR PRODUCT CERTIFICATION
ACCREDITATION & CERTIFICATION
PROGRAMME
PRODUCTION OF PT MATERIALS
EQUIPMENT DEVELOPMENT
Syuhaizat Md Ali
Mohd Shazali Mohd Dahuri
Yusob Othman Mohd Halizam Ismail
Hairul Ishyam Hussien
Mohd Fikri Munir
Mohamad Firdaus Mohamad Noh
Khairil Safi
Abu Hasan Sabri Zawawi
Azizul Haqim Abd Rahman
Alymuhsin Ismail
Noriza Mat Nor Atiqah Azmi
REGULATORY & QUALITY ASSURANCE PROGRAMME (RQAP)
Contract For Service (CFS)
w.e.f. 9/11/2016
TOTAL STAFFS = 13
Research Officer = 4 Assistance Research Officer = 4
Research Assistance = Contract Staffs = 2
Scope of Work
Product Certification
Authorization & Surveillance Inspection of SMR Testing Laboratory
MRB Mark of Conformity
A TOTAL OF 9 PCB IN MALAYSIA THAT HAVE BEEN ACCREDITED BY STANDARDS MALAYSIA
(AS AT 31 AUGUST 2016)
What make MRB different from other CBs?
We are the specialist/ expert for certification on rubber and rubber products
SMR Scheme
• Launched in 1965
• Revolutionized the rubber industry in Malaysia in many aspects such as processing method, technical specification, quality control, packaging and marketing
• Comprehensive and holistic approaches of total control system
• Gained a good reputation and the confidence of SMR consumers
Total Control of SMR Scheme
Quality Control
Laboratory Inspectorate
SMR Control Laboratory
Instrument Service
Round Robin
Malaysian Rubber Exchange
(MRE)
Unit Inspektorat &
Penguatkuasaan (UIP)
12
SMR Bulletin 7 & 11
Kursus Asas Penguatkuasa Siri 1/2016 13
Information Circular (IC) & Laboratory Advisory Letter (LAL)
•Issued to factories and laboratories
IC
•Issued to laboratories only
LAL
Total of 9 SMR grades as stipulated in the SMR Bulletin No. 11
SMR 10
SMR 20
SMR 10CV
SMR 20CV
SMR 5
SMR GP
SMR L
SMR CV50
SMR CV60
Section SMR Laboratory Inspectorate
Syuhaizat Md Ali
(Head)
Azizul Haqim Abd Rahman
(Lab Inspector)
Alymuhsin Ismail
(Lab Inspector)
Abu Hasan Sabri Zawawi (Research Officer)
SMR LABORATORY INSPECTION
To ensure authorized SMR testing laboratories conform with testing, grading and certification procedures
All authorized SMR Laboratories are subjected to surveillance inspection by LGM
Surveillance inspection - twice a year (unannounced)
continued…1
The frequency of the inspection can change depending upon: Previous report findings Performance in crosscheck and Round
Robin Quality Control feedback
continued…2
Inspection of the laboratory will cover
5 main test
Additional test
Recording
Environment
Calibration
Blending mill
Housekeeping
Continuous Improvement as part of ongoing effort to improve our Laboratory Inspection
• Quality Management System (QMS) – ISO9001
– Documentation
– Report
• Lead Auditor ISO/IEC17025
– competency
• Safety in Laboratory
– Management of Chemicals (cradle to crave)
– Laws & Regulations on Chemicals/ Labs wastes
Our Approaches Toward Inspection
Integrity Competent Accommodative
Conclusion
Laboratory inspection plays an important role in controlling SMR scheme as test results will be used to determine the grade of SMR
Thank You