An Integrated Industrial Park

An Integrated Industrial Park. Outline Background Vision and Objective Geographical Location and Site Advantages Opportunities Offerings Conditions Overview

Embed Size (px)

Citation preview

Page 1: An Integrated Industrial Park. Outline Background Vision and Objective Geographical Location and Site Advantages Opportunities Offerings Conditions Overview

An Integrated Industrial Park

Page 2: An Integrated Industrial Park. Outline Background Vision and Objective Geographical Location and Site Advantages Opportunities Offerings Conditions Overview

Outline

Background

Vision and Objective

Geographical Location and Site

Advantages

Opportunities

Offerings Conditions

Overview of Petro Rabigh

Page 3: An Integrated Industrial Park. Outline Background Vision and Objective Geographical Location and Site Advantages Opportunities Offerings Conditions Overview

Saudi Aramco

A fully-integrated, global petroleum enterprise.

Sumitomo ChemicalOne of the Sumitomo group company, and also one of Japan's leading chemical manufacturers, offering a diverse range of products in worldwide.

Background

Page 4: An Integrated Industrial Park. Outline Background Vision and Objective Geographical Location and Site Advantages Opportunities Offerings Conditions Overview

Establishing an industrial park to convert petrochemical further into downstream product with an integrated network of feedstock suppliers, infrastructure and

service providers .

Create more “Value” in Saudi Arabia

Job, Skill, Future Business Opportunity

Create more “Value” in Saudi Arabia

Job, Skill, Future Business Opportunity

Vision

Page 5: An Integrated Industrial Park. Outline Background Vision and Objective Geographical Location and Site Advantages Opportunities Offerings Conditions Overview

Objective

Enhanced local economy with a variety of industries and services

Creation Job opportunities for local society

Attraction of Local & foreign investments for High Value Added & Export Oriented industries

A platform for broad downstream industries

Page 6: An Integrated Industrial Park. Outline Background Vision and Objective Geographical Location and Site Advantages Opportunities Offerings Conditions Overview

6

Ethylene1,300 KTA

Propylene900 KTA

Ethane

95 MMSCFD

Ethane CrackerEthane Cracker

LLDPE

LLDPE

PP (Homo)

PP (Block)

MEG

HDPE

PO

LL Density polyethylene 250 KTA

LL Density polyethylene 350 KTA

High Density Polyethylene 300 KTA

Ethylene Glycol600 KTA

Polypropylene - Homo 350 KTA

Polypropylene – ICP 350 KTA

Propylene Oxide 200 KTA

Petrochemicals

VDU VGOHDT

HOFCCHOFCCC4 Alky&Isom

Gasoline (63 MBD)

Fuel Oil (89 MBD)

Refinery

Upgrade

CDU

Naphtha

Kerosene

Fuel Oil

Crude

400,000 BPD

Existing Refinery

Utilities & OffsitesWater 、 Steam, PowerCooling WaterPotable WaterCompressed AirTankageFlare SystemsMarine LoadingMisc. ProjectsPipelinesBuildingsCommunications

Petro Rabigh Process Configuration

Page 7: An Integrated Industrial Park. Outline Background Vision and Objective Geographical Location and Site Advantages Opportunities Offerings Conditions Overview

Geographical Location

Saudi current and planned rail network In the same site with Petro Rabigh

Saudi Arabia is already well connected by extensive road network. RCIP is within 7 Km from the highway.

150 Km to KAI Airport in Jeddah

180 Km to Jeddah Islamic Port, World 28th (in 2004) and Saudi Arabia largest container Port. handle 39 MM ton (exclude crude oil) and exports to 66 countries worldwide and still growing rapidly

20 Km to King Abdullah Economic City as an access to a possible future seaport and other facilities.

Rail transport may be a good option from East to west by 2012…Expansion underway• North-South expected for 2010• Land bridge expected for 2012-2014

170 Km from Yanbu Industrial City

Page 8: An Integrated Industrial Park. Outline Background Vision and Objective Geographical Location and Site Advantages Opportunities Offerings Conditions Overview

8

Geographical Condition

King Abdullah Economic City and its Sea Port

PETRORabigh

Rabigh Town

NW

Page 9: An Integrated Industrial Park. Outline Background Vision and Objective Geographical Location and Site Advantages Opportunities Offerings Conditions Overview

RCIP Site

In the same site with Petro Rabigh

RCIP occupy's 240 ha (2,400,000 m2)

RCIP is Isolated from Petro Rabigh with Property Fence and has its own entrance connected to the highway

RCIP is divided in to 5 Zones to accommodate around 30-40 Medium / Small industries.• Zone I – Industrial Services • Zone II -Plastic Processing• Zone III - Assembling • Zone IV - High-Tech• Zone V - Logistic and Utility

RCIP site is equipped with high standard utilities and infrastructure network, i.e. power , desalinated water , sewage and communication networks.

Petro Rabigh Complex

Rabigh ConversionIndustrial Park

Page 10: An Integrated Industrial Park. Outline Background Vision and Objective Geographical Location and Site Advantages Opportunities Offerings Conditions Overview

Rabigh Plus Tech Park construction is based on the highest International standards including:-

Buildings• Administration Building, 643 SM

• Cafeteria building, 461 SM

• Support service building, 461 SM.

• Maintenance building, 461 SM

• Substation Building, 622 SM.

• Massjed, 162 SM to accommodate 90 persons.

• Guard house, 26 SM

Rabigh Plus Tech Park

Page 11: An Integrated Industrial Park. Outline Background Vision and Objective Geographical Location and Site Advantages Opportunities Offerings Conditions Overview

Roads and Parking areas Total length of roads at park is around 15KM with 5

categories as follows:

• Primary road: 3.6 KM length, with 35 M width

• Secondary road: 2.9 KM length, with 25 M width

• Collector road: 3.9 KM length, with 20 M width

• Patrol road: 4 KM length, with 4 M width.

Side walk: 25 KM length with 2 M width around park Site

Rabigh Plus Tech Park

Page 12: An Integrated Industrial Park. Outline Background Vision and Objective Geographical Location and Site Advantages Opportunities Offerings Conditions Overview

Sanitary networks

Total length of sanitary net work around 9 KM with 3 lifting station, 89 Sewer manholes and 89 inspection chamber box.

Storm Water drainage

Total length of storm water drainage around 8.4 KM including 4 concrete culvert box.

Water networks

Desalinated water net works for RCIP site is around 14.5 KM. The raw water is provided by Petro Rabigh at 300 CM per HR through 12” pipe line with total length 5.6 KM.

Rabigh Plus Tech Park

Page 13: An Integrated Industrial Park. Outline Background Vision and Objective Geographical Location and Site Advantages Opportunities Offerings Conditions Overview

Electrical networks

Total length of electrical cable network is around 39 KM Providing power to site at 13.8 KV. The network will include 4 transformers, 4 switchgears and 48 RMU.

The Power is provided by Petro Rabigh to the park site through 29 KM of Electrical Cable at 34.5 KV.

Communication net works

Total length of primary communication net works is around 35 KM and secondary network is around 13.6 KM with 13 communication manhole, 10 hand hole, 121 pulling hole and 6 cabinet base.

Landscaping

Landscaping area covers 500 SM with water concrete fountain in the center of the Park.

Rabigh Plus Tech Park

Page 14: An Integrated Industrial Park. Outline Background Vision and Objective Geographical Location and Site Advantages Opportunities Offerings Conditions Overview

Refinery Refinery

PetrochemicalProcessing

PetrochemicalProcessing

Integrated Refinery & Petrochemical Center

SupportingBusiness / Industrial

Services

Feedstock supplyLong term agreements

Competitive prices

High value added / Export oriented industries

Housing

Commercial Services

Hotels & Other BusinessServices

Training Facilities

Social Services

Urban Amenities &Environment

Outside Park Facilities / Services

Logistic Services

One stop service center

Technical supportServices (PTC)

Utilities SupplyAt cost

ConceptFully Integrated Industrial park

Industrial Park

Page 15: An Integrated Industrial Park. Outline Background Vision and Objective Geographical Location and Site Advantages Opportunities Offerings Conditions Overview

15

Diversification of Industries

Page 16: An Integrated Industrial Park. Outline Background Vision and Objective Geographical Location and Site Advantages Opportunities Offerings Conditions Overview

Identified Opportunities for Plastic ProcessingI. Non-Woven Fabrics (Hygienic & Medical)

II. Geo synthetic Materials

III. Dry Bulk PE Container Liners

IV. Medical Solution Bottles & Sharp Containers

V. Woven Fabric for Flat Jumbo Bags

VI. Automobile Small Parts

VII. BOPP Film

VIII. HDPE Composite Pipes

OpportunitiesFirst : Selection of Opportunities (Plastic

Processing)

Page 17: An Integrated Industrial Park. Outline Background Vision and Objective Geographical Location and Site Advantages Opportunities Offerings Conditions Overview

1. Children related -Infant care -Toys-Stationery-Baby stroller-Child seat

2. Automobile parts: - Battery container

- Accessories - Replacement parts

3. Tires -Automobile tires

4. Medical & health: -IV solution bag

-Supplements-Barrier film-Disposable medical analytical products

5. Water related: -Water purification plant

-Membrane-Rigid pipe-Chemical additives

6. Construction -Plastic flooring- Domestic -Wall paper

-Water proof sheet

7. Construction -Specialty film- Export (window, construction, agriculture)

8. Household -Household appliancesElectric -Switches, wire and Appliances cables

-LCD (long term goal)

9. Paints -Construction paints-Repair paints for

automotive-Paint for plastic

10. Others -Plastic in general-Recycling system

Suggested Products by Category

OpportunitiesSecond : Selection of Opportunities (Wide

Range)

Page 18: An Integrated Industrial Park. Outline Background Vision and Objective Geographical Location and Site Advantages Opportunities Offerings Conditions Overview

18

Offering Conditions

• Land

Lease Rate (for 30 Years) include industrial park management fee

(6) SR/sq m/year , to be revised every 5 years

Lots are of multiple of 5000 sq m.

• Utilitieso Electricity unit Supplied @ 13.8 KV 10 Halalah / Kwho Desalinated Water 4.5 SR / m3

• Feedstock

from Petro Rabigh at market based competitive prices and through long term supply agreements. Tenants has the option to use feedstock from other than Petro Rabigh