An Urban Land InstituteAdvisory Services Panel
February 10-14, 2013
Columbia, South CarolinaAn Era of a New Renaissance for
Colorado Springs
2
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
• The mission of the Urban Land Institute is to provide leadership in the responsible use of land and in creating and sustaining thriving communities worldwide.
• ULI is a membership organization with nearly 30,000 members, worldwide representing the spectrum of real estate development, land use planning and financial disciplines, working in private enterprise and public service.
• What the Urban Land Institute does:– Conducts Research – Provides a forum for sharing of best practices– Writes, edits and publishes books and magazines– Organizes and conducts meetings– Directs outreach programs– Conduct Advisory Services Panels
About the Urban Land Institute
3
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
• Since 1947
• 15 - 20 panels a year on a variety of land use subjects
• Provides independent, objective candid advice on important land use and real estate issues
• Process
• Review background materials
• Receive a sponsor presentation & tour
• Conduct stakeholder interviews
• Consider data, frame issues and write recommendations
• Make presentation
• Produce a final report
The ULI Advisory Services Program
4
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 Thank You
• Mayor Steve Benjamin• City Council Members
• Sam Davis• Tameika Isaac Devine• Leona K Plaugh• Brian DeQuincey
Newman• Cameron Runyan• Moe Baddourah
• Fred Delk• Heather Foley
• Columbia Development Corporation
• Arnold Companies• City Center Partnership• Columbia Metropolitan
Convention Center• Five Points• Historic Columbia
Foundation• Thompson & Company• University of South
Carolina• The Congagree Vista
5
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 The PanelChair
Alex Rose
Panelists
John KnottDan ConwayStephen EngblomAmy Barrett Calvin GladneyRick DishnicaTom Murphy
ULI Staff
Tom Eitler
6
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
• Connectivity• A Plan• Leadership
7
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13John Knott
8
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 Vision for the Future
Buildings and Cities as Living Organisms
9
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 What you said September 2011 – ULI SC TAP
• Columbia is a City of Neighborhood islands that are stranded from each other
• Columbia is a Capital City and the most International City in the State
• Columbia has great Urban Moments but not a great Urban Fabric
• Too many plans and too little action• Columbia - A 21st Century
Sustainable City that sets example for the State
• One Columbia is the Common Goal
10
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
What we observed September 2011
• Lack of physical connectivity between neighborhoods, cultural and historic assets, accompanied by lack of civic connections among groups and leadership
• Number of willing participants with a depth of knowledge across many issues
• Columbia may be the most over parked city in the State
• Current density of development and limited number of residential units in the Urban Core is inadequate to achieve connectivity, urbanism desired
• Safety for all ages must be overriding priority
11
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
Challenges identified in 2011
• Limited planning powers and outdated Euclidian Zoning Ordinances
• Fragmented ownership of roads and parcels
• Disconnected Urban Moments and public open space
• Lack of strategic focus and coordination for redevelopment
• Inadequate redevelopment incentives and financing strategies
12
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
What you said February 2013 – ULI National Advisory Panel• Different neighborhoods separated by very wide streets• Need Bridges over layers of Government• History trail connecting downtown historic assets like the
Freedom Trail in Boston• Assembly / Gervais biggest problem• Higher priority on mixed use development• Must have great urban schools to grow residential
capacity• What is Columbia’s actual identity – What and Who do
we want to be
13
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
Vision – Who is Columbia
• Ecological City• University City• Capital City• Entrepreneurial City
14
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
Growth Strategies – Build on Assets
• Capital & Cash Flow Mapping Strategic Partners• Entrepreneurial/Incubater Economy• Those Who Work Downtown Live Downtown• Eco-Cultural Tourism Cluster
15
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
Strategic Partners
• SCDOT / City• USC / City Parking & Connectivity• USC / City / Five Points• City / Clemson University• City / USC Research Centers
16
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13Dan Conway
17
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13Six County Area
18
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 Six County Area
• 781,000 people• 301,000 households• 462,000 people employed• Includes over 36,500 college
students
• Projected to grow by:– 10,400 people per year– 6,200 jobs per year
19
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 City of Columbia
• 132,000 people• 46,000 households• Growing by 1,000-1,500 people per year• 30% live within 7 minutes of the State
Capital• Over 150,000 people commute to work in
the City Center• That equals 30% of the total jobs in the
region• But only 17% of the region’s population
live in the City.
20
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 Office
• Regional Office Market includes 33.4 million square feet with 11% vacancy
• Projected to grow annually by 484,000 square feet• Central Business District has 10.9 million square feet• CBD should grow by 266,000 square feet per year• Typical offices should be between 50,000 and 80,000
square feet.• Next ten years downtown should absorb almost 2.7
million square feet.
21
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 Retail
• Regional Retail includes 19.7 million square feet with a 12.7% vacancy rate.
• Market will grow by 365,000 square feet annually
• CBD has 665,000 square feet with a very healthy vacancy of 7.5%
• CBD retail will grow by 200,000 square feet over the next ten years.
22
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 Industrial
• The region has 37.8 million square feet of Industrial
• Industrial will grow annually by 670,000 square feet of which 135,000 will be flex space appropriate for downtown
• The CBD has 2.4 million square feet of industrial with just a 2.5% vacancy rate
• The annual market for flex space in downtown will average 70,000 square feet.
23
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 Hotels
• The region has a very significant hotel market with 11,000 rooms and is expected to grow by 360 annually
• In the downtown area there are 2,445 rooms at 25 hotels
• Over the next ten years the room count will nearly double 2,000 rooms will be needed in downtown
24
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 Hospital/Medical
• The region has 8 hospitals with 2,191 beds of which 4 hospitals with 1,414 beds are in the environs of CBD.
• Over the next ten years the region will add over 1,400 beds and 900 of those beds, in two hospitals will be needed in the environs of the CBD.
25
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 Residential
• The region will experience a demand annually for:– 3,050 single-family homes– 500 townhomes and condominiums– 700 rental apartments
• The CBD will experience an annual demand for – 100 townhomes and condominiums – 300 rental apartments
26
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 Status Quo
Types of UsesSquare Feet/Units
(10 years)Land Demand in Acres
(10 Years)Office 1,750,000 145Retail 150,000 15Flex 450,000 35Hotel 1300 units 25Medical/Hospital 600 beds 25Townhome/Condo 600 units 40Rental Apartments 2,000 units 100
Total 385
27
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 Transformational
Types of UsesSquare Feet/Units
(10 years)Land Demand in Acres
(10 Years)Office 2,700,000 sq. ft. 225Retail 200,000 sq. ft. 20Flex 700,000 sq. ft. 50Hotel 2,000 rooms 40Medical/Hospital 900 beds 35Townhome/Condo 1, 000 units 65Rental Apartments 3,000 units 150
Total 585
28
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13Stephen Engblom and Amy Barrett
29
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 Vision for the Future
30
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
• Historic Plan• One of the 1st Planned community in USA• Ecology, Mobility and Development• Manufacturing, Governing, Learning and Living• Great Natural Assets: River, City Parks and Creeks• 20c Impacts: • Car Infrastructure >> divided the neighborhoods and
separated the river from the city• Demise of Manufacturing >>has eroded the
development pattern• Organs without the Skeleton
31
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 Vision for the Future
Insert Existing Context Map (Districts)
32
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 Vision for the Future
Innovista
Bull Street Campus
Main Street
HistoricGarden
University
Vista
Five Points
33
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
• Innovista– Primary Land Uses – Incubator Office Spaces related to University, University Residential, Residential,
Conference and Business Related Hotels– Challenges/Opportunities – Incremental Critical Mass // Green Street Corridor // AMTRAK Station –
TOD• Vista
– Primary Land Uses – Entertainment and Food and Beverage, Creative Industries and Office, Museum District, Waterfront Hotel
– Challenges/Opportunities – Connection to Main Street and River // Museum District • Main Street
– Primary Land uses - Corporate Commercial, Hotels, retail and dining– Challenges/Opportunities – Provide connectivity to Vista via Lady Street // Capitol Corner
• Historic / Garden District– Primary Land Uses – Historic Museums, Residential and Adaptive re-use– Challenges/Opportunities – Traffic Calming // Repopulating the district // Synergies with Bull Campus
• Bull Street Campus – An innovative new AABB community– Recommended Land Uses - new residential neighborhoods, medical cluster. – Challenges/Opportunities - create a new city park – similar to Finlay - Should not compete with Vista or
Innovista.
• Five Points– Primary Land uses - University related Retail and Entertainment– Challenges/Opportunities – Address Flooding and provide Safe Green Street Rail Bridge and
pedestrian Connection to University
34
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 Vision for the Future
35
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
Ecology and Mobility
• River Authority – Both sides of the river with West Columbia and Cayce• Insert images from Chattanooga• New Neighborhood Park• Shaded Streets Campaign• Green Streets – E-W as Canopy Planting• N-S as Palmetto and Flowering Trees• Complete Streets Program (partner with SCDOT)• Assembly – Esplanade and Farmers Market Restoration• Gervais – Canopy Boulevard • Green Street – University Spine – Managed Street with priority• Plaza Streets – Main, Lincoln and Saluda• Transit Plan – Campus shuttle on Green to • Bike Routes: On Secondary Streets where Bikes are given full lanes along slower
traffic• Transit Routes – Link all districts
36
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
Congaree River
37
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
Case Study: Chattanooga
38
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
Case Study: Chattanooga
39
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
Case Study: Chattanooga
40
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
41
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
Gervais Street
42
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
Main Street
43
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
Assembly Street
44
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 Complete Streets
45
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
Vista District
46
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
Main Street
47
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
48
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
49
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
50
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
E/W Canopy StreetsN/S Palmetto StreetsMixed Use Development (8-10 Stories)
Market Halls at Lady and Senate Streets
Assembly Street Esplanade
51
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
52
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
Well Designed Density Short-term Long-term
City-Wide 1SC DOT Workshop Complete Streets
2. Leadership trips to other cities 100,000 shade trees
3. Greentape onerous processes New Zoning Code
4. Celebrate Waterfront Parks Complete Greenway
5. Complete bike/ped Masterplan Implement bike/ped Masterplan
To Do List: City-Wide
53
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
Well Designed Density People Live,Visitors Enjoy,Nature Thrives,Culture Celebrates,Businesses Invest
Developing the Vision: In Columbia… Community
54
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13Calvin Gladney & Rick Dishnica
55
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 IMPLEMENTATION TOOLKIT
• Why? Create a Vibrant Urban Core • How? Establish a Redevelopment
Commission • Who? Continuous Engagement with
All Stakeholders • When? Timing and Next Steps
56
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 Why? Create a Vibrant Urban Core
• Jobs + Housing + Retail + Public Spaces = Great Urban Core
– Create Jobs– Build Housing– Attract Retail– Provide Amenities
• A Great Urban Core will result from people living, working & playing downtown
57
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 How? Establish a Redevelopment Commission
• Legal Authority: Title 31 of state code• Rationale - $• Benefits
– Land Acquisition – Land Banking– Make Deals– Leverage Private Financing Tools
• Tax Increment Financing and Bonding – Public Infrastructure and Development projects
• Provide long-term loans through Fund - “Columbia Futures Fund”
• New Market, Historic and Job Tax Credits– Maintenance and Management Activities to complement existing
BIDs– Implementing Plans for the Districts
• Partner with Local Development Corporations
58
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 Who? Continuous Engagement with All Stakeholders
• Key Points– Stage has been set by local sponsors who funded ULI Advisory Service
Panel– Keep this energy going! – Create a leadership group that facilitates future engagement – ALL stakeholders involved in a two way conversation-Need to listen
• Who are the Stakeholders You Need to Engage?• Participants at the ULI public meetings (approximately 120 people)• Neighborhood groups and leadership• Sponsors for ULI Advisory Service Panel• Government (City, County, State & Federal)• Colleges and Universities• Business Community• Special Interest Groups – Bicyclists, Preservationists Etc.
59
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 What are Potential Topics for Your Engagement?
• Connectivity of Districts• Zoning Ordinance Update• Comprehensive Plan• Multi-Modal Transportation • Visioning – Who is Columbia & What Does it Want to Be?• Town and Gown • Partnerships with stakeholders• Leveraging the Creative Community• The Riverfront• Parking• Development Process Reform
60
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 What are Tools for Engagement?
• Workshops• Design Charettes• Online and Social Media
Engagement Strategy• Focus Groups• Surveys• Presentations• Mobile and Walking Tours• ULI Reality Check
Engagement should be Comprehensive, Flexible and Innovative
61
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 When? Timing and Next Steps
• Key Points– Think Big – Look for
Transformative Demand Drivers
– Pick off Low Hanging Fruit – Get Out of Town – Establish A Sense of Urgency– Act Strategically Not Tactically
(Limit One-Off Deals)
62
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 Timeline: Immediate
• Publicize ULI Connectivity Study and Recommendations–Publicize and Distribute on Web + Social Media
• Identify and publicize safe bike routes
• Put in certain missing sidewalks
63
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 Timeline: SHORT TERM (Next 12 months)
• Meet with SC DOT on implementing Complete Streets and Bicycle Master Plan
• Create Overlay District for Form Based Zoning for Vista and Innovista as Template for Zoning Update
• Prepare for ULI Reality Check• Select Cities for Benchmarking (Planning and Permitting Process,
Department Organization, Economic Development) and Go on One Trip
• Create Progress Reports on all existing Plans• Appoint Development Ombudsman to facilitate permit processing• Prepare for Creation of Redevelopment Commission • Start Using 1% Tax revenue for transportation priorities• Create City-USC Working Group and begin collaboration on Innovista,
Vista & Five Points Districts
64
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 Timeline: INTERMEDIATE TERM (Next 12 – 24 months)
• Create Redevelopment Commission Including Geographic Boundaries (Garden District, Main Street District and the Vista)
• Revive Assembly Street Farmer’s Market• Implement Zoning Update• Five Points Association, City and University continue collaboration on
public safety and infrastructure (railroad crossing, green street extension and flooding)
• City/USC Working Group Meet to discuss economic development, leveraging assets and cost-sharing on priority items and operational synergies
• Develop Metrics and a Report Card Assessing Performance City-University Collaboration (See M.B Reilly Report Card 3/12/07)
65
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 Timeline: LONGER TERM (24 months and Beyond)
• Important Long Term Challenges, Assets and Strategies • Engagement – Engage Key Stakeholders in Visioning Exercise
(Who is Columbia?)• Bull Campus – Intentional Development Choices• Parking Lots and Structures• Revise Tax Structure – 67% of property currently exempt from
taxes• Three Affected Cities (Columbia, West Columbia and Cayce)
Work with Three Rivers Alliance on River programming, infrastructure, maintenance and funding
• Improve the School System• Fort Jackson Retention• Additional Districts• 100,000 Shade Trees in Columbia
66
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13Tom Murphy
67
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 Five Converging Forces• Globalization
• Climate Change
• Technological Innovation
• Infrastructure Needs
• Demographics
68
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
1-2 December 2009
America’s First Road TripHoratio Nelson Jackson, Sewall Crocker and Bud
69
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
Transforming Pittsburgh
70
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
Transforming Pittsburgh
71
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13Transforming Pittsburgh
South Side Works
72
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
The South Side Workshas expanded an
historic neighborhood and created a regional
destination
73
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
South Side Works is a walkable mixed-use
Live-Work-PlayEnvironment
74
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 The mixed-use site masterplan has reconnected the neighborhood to the river
Public Funding: $103,000,000 (9 Sources)Private Financing: $420,000,000 (To date)Total Development Cost: $523,000,000 (To date)
75
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 Choices: Reaching for the Future
• Status Quo vs. Transformational
• Urgency: the world is not waiting
.
76
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
Leadership
• Well-managed• Investing in the future• Strategic Partnerships• Bridging Layers of
Government• Strategic partnerships
$625M in annual research, economic engine, raw materials
• Action rather than studies
• Competitive Advantages
77
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13 Bold Vision• Intentional vs. Transaction• Principles that form the Core:
– Riverfront– Heritage– Universities/Research– Arts and Culture– The Capital– Entrepreneurial Culture
78
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
Institutional Capacity
• Who is in charge• Aligning responsibility and
Authority• Development Commission
– Land control, Money, Deal making capacity
• Sophisticated Staff
79
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
Dynamic Financial Tools• Pool of Fund for patient loans• Public Private Shared Risk• Menu
» CDBG (allocated through the City)» HOME (HUD)» Brownfield Economic Development Initiative Grants (BEDI):» EDA (Public Works and Economic Development Program » EPA (Brownfield Assessment and Clean-Up grants)» Redevelopment Capital Assistance Program (RACP)» Business In Our sites (BIOS)» Industrial Sites Reuse Program (ISRP)» Infrastructure and Facilities Improvement Program (IFIP)» Infrastructure Development Program (IDP)» Housing Redevelopment Assistance Program (HRA)» URA and City Bonds» Tax Increment Financing (TIF)» Pittsburgh Development Fund (PDF)» Urban Development Fund (UDF)» Pittsburgh Business Growth Fund» Pennsylvania Industrial Development Authority Loans (PIDA)» Street face Program» Community Development Investment Fund (CDIF)» Pittsburgh Housing Construction Fund (PHCF)» Neighborhood Housing Program (NHP)» Housing Recovery Program (HRP)» Multi-Family Revenue Bond Program (MFRBP)» Rental Housing Development & Improvement Program (RHDIP)
80
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
Design Excellence
• It’ll do vs. World Class
81
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
Where Will the New Roads Lead?
82
Advis
ory S
ervic
es P
anel
·Colu
mbia,
Sou
th Ca
rolin
a Feb
ruar
y 20
13
• Vision• Strategic• Partnerships• Opportunities• Prioritization• Engagement• Choices• Urgency• Transformational• Action
83