An ASSRC (Acc. Sys. Safety Review Com.) meeting was held on Sept. 24, 2013 I have gone around and talked … everybody (with due date Dec. 15) has made or can make a statement now except the window calculation : Perform beam particle analysis for full beam intensity, and luminosity. (Kin Yip, Due 12/15/13) Calculate stress yield due to temperature rise on window at full beam intensity and beam spot size. (J. Tuozzolo, actually C. Pai, Due 1/30/14 12/15/13) Estimate the time to remove beam from the machine when a NMC trips to determine if the time delay is adequate for machine protection. (A. Drees, Due 12/15/13) we’ve been using it … Estimate operational down time and effect to RHIC vacuum, if a vacuum loss occurs in the Roman Pot.(M. Mapes, Due 12/15/13) a week Determine effect upon Be beam pipe in STAR with a catastrophic vacuum loss in the Roman Pot. (W. Meng, Due 12/15/13) no impact Review NMC vs BLM operation or the use of both. Investigate electronic noise issues with NMCs to prevent inadvertent beam aborts. (D. Gassner,

An ASSRC (Acc. Sys. Safety Review Com.) meeting was held on Sept. 24, 2013

  • Upload
    afram

  • View
    32

  • Download
    1

Embed Size (px)

DESCRIPTION

An ASSRC (Acc. Sys. Safety Review Com.) meeting was held on Sept. 24, 2013  I have gone around and talked … everybody (with due date  Dec. 15) has made or can make a statement now except the window calculation : - PowerPoint PPT Presentation

Citation preview

Page 1: An ASSRC (Acc. Sys. Safety Review Com.) meeting was held on Sept. 24, 2013

An ASSRC (Acc. Sys. Safety Review Com.) meeting was held on Sept. 24, 2013

I have gone around and talked … everybody (with due date Dec. 15) has made or can make a statement now except the window calculation :

Perform beam particle analysis for full beam intensity, and luminosity. (Kin Yip, Due 12/15/13)

Calculate stress yield due to temperature rise on window at full beam intensity and beam spot size. (J. Tuozzolo, actually C. Pai, Due 1/30/14 12/15/13)

 Estimate the time to remove beam from the machine when a NMC trips to determine if the time delay is adequate for machine protection. (A. Drees, Due 12/15/13) we’ve been using it … Estimate operational down time and effect to RHIC vacuum, if a vacuum loss occurs in the Roman Pot.(M. Mapes, Due 12/15/13) a week Determine effect upon Be beam pipe in STAR with a catastrophic vacuum loss in the Roman Pot. (W. Meng, Due 12/15/13) no impact Review NMC vs BLM operation or the use of both. Investigate electronic noise issues with NMCs to prevent inadvertent beam aborts. (D. Gassner, Due prior to Run 15).

Review/ update Operation Procedure OPM (TPL 09-09) for PP2PP operations. (P. Ingrassia, due prior to Run 15).