 Int. J. Production Economics 96 (2005) 47–62 An AHP-based approach to ERP system selection Chun-Chin Wei, Chen-Fu Chien, Mao-Jiun J. Wang* Depart ment of Indus trial Engineer ing and Engine ering Manageme nt, National Tsing Hua Universit y, Hsin Chu, Taiwan 30043, ROC Received 28 March 2003; accepted 5 March 2004 Abstract An Enter prise Resource Pl anni ng (ERP) syst em is a critical inves tment that can si gni c antl y af fect future competitiveness and performance of a company. This study presents a comprehensive framework for selecting a suitable ERP system. The framewo rk can systematicall y construct the objecti ves of ERP selection to suppor t the busine ss goals and strategies of an enterprise, identify the appropriate attributes, and set up a consistent evaluation standard for facilitating a group decision process. A real-world example demonstrates the feasibility of the proposed framework. r 2004 Elsevier B.V. All rights reserved. Keywords:  ERP system; Decision analysis; Analytic hierarchy process (AHP); Information system 1. Introdu ction Sev ere mar ket comp eti tion has dra mat ica lly tra nsf ormed the bus ine ss env ironme nt wit h the result that companies need to reduce total costs, maxi mi ze return on inve st ment , shorte n lea d ti me s, and be more r es po nsive to c us to mer demands. Highly dynamic markets call for effec- tiv e enterp rise inf ormati on systems to enh anc e competitive advantage. Enterprise Resource Plan- ning (ERP) is inc reasin gly important in mod ern business because of its ability to integrate the ow of ma te ri al , nance, an d info rmat ion an d to support orga nizat ional strat egies ( Yusuf et al ., 2004,  Ya o and He , 20 00). A succ es sf ul ERP pr oj ect invo lves mana gi ng bu si ness process change, selecting an ERP software system and a co- ope rat ive ven dor , impleme nti ng thi s sys tem, and examining the practicality of the new system. Owing to the complexity of the business environ- ment, the limitations in availa ble res our ces , and the di vers ity of ERP al ternat ives, ERP syst em selection is tedious and time consuming. However, giv en the con siderable na nci al inv est ment and pot ent ial ris ks and ben et s, the import ance of a per tinent ERP system sel ecti on cannot be over- emphasized (Teltumbde, 2000). Existin g ERP commerc ial packages cannot provid e a onc e-f or- all bus ine ss mod el for every pr ocess of al l indu stry. Thus, no si ng le ERP pac kaged sof twa re can mee t all compan y fun c- tionaliti es or all spe cial bus ine ss requir eme nts (Sar kis and Sun dar raj , 200 0;  Teltu mbde, 2000 ; Hong and Kim, 2002). Therefore, companies must choose a exible ERP system and a co-operative vendor that is responsive to customer needs. All too often there is no systematic evaluation frame- work in place when most companies evaluate ERP AR TIC LE IN PR ESS *Corresponding author. Tel.: +886-3-5742655; fax: +886-3- 5722685. E-mail address:  [email protected] (M.-J.J. Wang). 0925-52 73/$- see fron t matter r 2004 Elsevier B.V. All rights reserved. doi:10.1016/j.ijpe.2004.03.004

An AHP-based Approach to ERP System Selection

Embed Size (px)

DESCRIPTION

AHP

Citation preview

  • mics

    h t

    Ch

    ent,

    03; ac

    a c

    y pre

    the

    attr

    facilitating a group decision process. A real-world example demonstrates the feasibility of the proposed framework.

    2004, Yao and He, 2000). A successful ERPproject involves managing business process

    tionalities or all special business requirements(Sarkis and Sundarraj, 2000; Teltumbde, 2000;

    ARTICLE IN PRESSchange, selecting an ERP software system and a Hong and Kim, 2002). Therefore, companies mustchoose a exible ERP system and a co-operativevendor that is responsive to customer needs. Alltoo often there is no systematic evaluation frame-work in place when most companies evaluate ERP

    *Corresponding author. Tel.: +886-3-5742655; fax: +886-3-

    5722685.

    E-mail address: [email protected] (M.-J.J. Wang).

    0925-5273/$ - see front matter r 2004 Elsevier B.V. All rights reserved.doi:10.1016/j.ijpeKeywords: ERP system; Decision analysis; Analytic hierarchy process (AHP); Information system

    1. Introduction

    Severe market competition has dramaticallytransformed the business environment with theresult that companies need to reduce total costs,maximize return on investment, shorten leadtimes, and be more responsive to customerdemands. Highly dynamic markets call for effec-tive enterprise information systems to enhancecompetitive advantage. Enterprise Resource Plan-ning (ERP) is increasingly important in modernbusiness because of its ability to integrate the owof material, nance, and information and tosupport organizational strategies (Yusuf et al.,

    co-operative vendor, implementing this system,and examining the practicality of the new system.Owing to the complexity of the business environ-ment, the limitations in available resources, andthe diversity of ERP alternatives, ERP systemselection is tedious and time consuming. However,given the considerable nancial investment andpotential risks and benets, the importance of apertinent ERP system selection cannot be over-emphasized (Teltumbde, 2000).Existing ERP commercial packages cannot

    provide a once-for-all business model for everyprocess of all industry. Thus, no single ERPpackaged software can meet all company func-r 2004 Elsevier B.V. All rights reserved.Int. J. Production Econo

    An AHP-based approac

    Chun-Chin Wei, Chen-Fu

    Department of Industrial Engineering and Engineering Managem

    Received 28 March 20

    Abstract

    An Enterprise Resource Planning (ERP) system is

    competitiveness and performance of a company. This stud

    ERP system. The framework can systematically construct

    and strategies of an enterprise, identify the appropriate.2004.03.00496 (2005) 4762

    o ERP system selection

    ien, Mao-Jiun J. Wang*

    National Tsing Hua University, Hsin Chu, Taiwan 30043, ROC

    cepted 5 March 2004

    ritical investment that can signicantly affect future

    sents a comprehensive framework for selecting a suitable

    objectives of ERP selection to support the business goals

    ibutes, and set up a consistent evaluation standard for

  • ARTICLE IN PRESS

    uctionsystems. In addition, ERP vendor hype furthercomplicates the selection process. Decision makersfrequently adopt the common ERP evaluationcriteria as the measures without developing tailor-made objectives and clear requirements that echothe company characteristics, its position in itscompetitive environment, and its corporate strat-egy. The result is an inevitable delay of ERPimplementation and under-performance of thesystem. Hence, an ERP system selection frame-work is extremely critical in assisting executivesto evaluate from the perspective of companystrategies.Since the business environment is characterized

    by high uncertainty, the process of ERP systemassessment involves numerous problems. Kumaret al. (2002) emphasized that installing an ERPsystem is much more than having another infor-mation technology tool; it is a decision on how toshape the organizational business. Motwani et al.(2002) emphasized that ERP adoption involvesinitiating appropriate business process changes aswell as information technology changes to sig-nicantly enhance performance, quality, costs,exibility, and responsiveness. However, manycompanies install their ERP systems hurriedlywithout fully understanding the implicationsfor their business or the need for compatibilitywith overall organizational goals and strategies(Hicks and Stecke, 1995). The result of thishasty approach is failed projects or weaksystems whose logic conicts with organizationalgoals.This study proposes a comprehensive ERP

    system selection framework in which the objectivehierarchy is constructed and the appropriateattributes are specied to provide detailedguidance for ERP system evaluation. The pro-posed methodology also ensures that theevaluation process is aligned with the competitivestrategies and goals of the enterprise. Theanalytic hierarchy process (AHP) method (Saaty,1980) is applied for dealing with the ambiguitiesinvolved in the assessment of ERP alternatives andrelative importance weightings of attributes. Anempirical case in Taiwan is described to demon-strate the practical viability of the proposed

    C.-C. Wei et al. / Int. J. Prod48method.2. Selection method review

    A number of methods have been applied to ERPor other information system (IS) selection includ-ing scoring, ranking, mathematical optimization,and multi-criteria decision analysis. The scoring(Lucas and Moore, 1976) method is intuitive, buttoo simple to truly reect opinions of the decisionmakers. Buss (1983) proposed a ranking approachto compare computer projects. This method alsohas the same limitation with scoring method.Mathematical optimization such as goal program-ming, 01 programming, and nonlinear program-ming have been applied to resource optimizationfor IS selection. Santhanam and Kyparisis (1995,1996) proposed a nonlinear programming modelto optimize resource allocation allowing for theinteraction of factors; their model consideredinterdependencies between projects in the ISselection process. Lee and Kim (2000) claimedthat Santhanam and Kyparisis model dealt withIS selection problems with limited criteria. Theycombined the analytic network process (ANP) anda 01 goal-programming model to select an ISproject. Badri et al. (2001) presented a 01 goalprogramming model to select an IS projectconsidering multiple criteria including benets,hardware, software and other costs, risk factors,preferences of decision makers and users, comple-tion time, and training time constraints. However,the applicability of these methods is often wea-kened by sophisticated mathematic models orlimited attributes to carry out in a real-worldERP system selection decision, especially whensome attributes are not readily quantiable, as wellas not too easy for managers to understand.Moreover, these methodologies focus too muchon quantiable calculations and look down uponthe comprehensive selection framework of ERPsystem and the strategic considerations of acompany.The AHP method, introduced by Saaty (1980),

    directs how to determine the priority of a set ofalternatives and the relative importance of attri-butes in a multiple criteria decision-making pro-blem, and has been widely discussed in variousaspects. For example, Schniederjans and Wilson

    Economics 96 (2005) 4762(1991) utilized the AHP method to determine the

  • to select

    criteria

    fulllme

    gible measures with respect to numerous competing

    ARTICLE IN PRESS

    uctionobjectives inherent in ERP system selection andfacilitates the group decision-making process.

    3. Procedure for selecting a suitable ERP system

    To clearly present the proposed ERP systemselection framework, a stepwise procedure is rstdescribed:

    Step 1. Form a project team and collect allpossible information about ERP vendorsand systems.

    Step 2. Identify the ERP system characteristics.Step 3. Construct a structure of objectives to

    develop the fundamental-objective hierar-chy and means-objective network.

    Step 4. Extract the attributes for evaluating ERPsystems from the structure of objectives.

    Step 5. Filter out unqualied vendors by askingspecic questions, which are formulatedaccording to the system requirements.

    Step 6. Evaluate the ERP systems using the AHPmethod.

    Step 7. Discuss the results and make the nalstudy, a systematic procedure is proposed toconstruct the objective structure taking intoaccount company strategies and thus extract theassociated attributes for evaluating ERP systems.This study uses the analytical framework of AHPto synthesize decision makers tangible and intan-researchstructurextract the proper criteria for evaluating thent of the companys requirements. Littlehas addressed the issue of objectives for evaluating ERP systems. In thisstructurehow to erelating to the companys strategies and

    explainon the elaboration of some commonfor ERP evaluation. However, it did nothow to construct a specic objectiveque andfocusedrk based on the Nominal Group Techni-AHP to select an ERP system. His studyAHP mframewo. Lai et al. (1999) conducted a case studya multimedia authoring system using theethod. Teltumbde (2000) proposed aweightsselectionweights of attributes and applied theseto a goal programming model for ISrelativeC.-C. Wei et al. / Int. J. Proddecision.Fig. 1 shows a owchart for the ERP selectionprocess. The details of each step are presentedbelow.

    3.1. Form a project team and collect information on

    ERP systems

    The rst step is to form a project team thatconsists of decision makers, functional experts andsenior representatives of user departments. Theparticipation and support of top managers sig-nicantly inuences the success of ERP adoption(Ptak, 2000). A wide range of informationconcerning ERP vendors and systems should beobtained from professional magazines, exhibi-tions, yearbooks, the Internet, and other sourcesto ensure that feasible systems are not overlooked.

    3.2. Identify the ERP system characteristics

    Different companies may adopt an ERP systemfor completely different reasons, including techni-cal and business reasons. The initial rationale foradopting an ERP system inuences problemdenition, methods of achieving goals, and othersubsequent activities. To ensure the processprogresses smoothly from the start, the projectteam has to analyze the ERP selection problem byidentifying decision elements, including the stake-holders, number of alternatives, project objectives,project risks, and other concerns. The project teamcan clarify the complex situation, sketch theproblem and develop an initial plan. The phasealso highlights in advance some difculties innding solutions and supports owing to organiza-tional limitations and resource constraints.

    3.3. Construct the structure of objectives

    Structuring the objectives involves organizingthem so that the project team can describe in detailwhat a company wants to achieve, and thenincorporate these objectives appropriately intothe decision model. In the rst place, the projectteam should dene the ERP system scope bycompany policy, business attribute, industry en-

    Economics 96 (2005) 4762 49vironment, and the goals of the project.

  • ARTICLE IN PRESS

    t team

    matio

    cteris

    obje

    ntal- a

    uctionConstitute an ERP projec

    Collect the relevant infor

    Identify the project chara

    Discuss and construct the

    Distinguish the fundame

    C.-C. Wei et al. / Int. J. Prod50Before constructing a detailed objective frame-work, it is necessary to ensure that the strategicobjective scope is appropriate for the projectcharacteristics. The strategic objectives offer asolid basis for decision-making and a stablereference point for ill-structured decision situa-tions. The strategic objectives guide the ultimategoals that the project team should strive toachieve; thus they also serve as the mechanism toharmonize the opinions of different individualswithin the project team.

    Establish fundamental-objective hierarchy

    Acceptable to senior management?

    Extract the attributes for evaluating ERP systems

    Form the AHP model

    Evaluate the ERP systems by t

    Analyze and discuss the result

    Make the final decision

    Yes

    No

    Fig. 1. Comprehensive ERP sysn about ERP systems

    tics

    ctives of project

    nd means-objectives

    Economics 96 (2005) 4762All objectives derived from the strategic objec-tive scope will be structured systematically. It iscritical to distinguish fundamental-objectives frommeans-objectives in the objective developmentprocess. Fundamental-objectives are those thatare important because they reect what thedecision makers really want to accomplish. Mean-while, means-objectives are those which help thefulllment of other objectives (Clemen, 1996).The fundamental-objectives are organized into a

    hierarchy and indicate directions in which the

    Establish means-objective network

    Develop the attribute details, screening and evaluation guidance

    Screen out the unqualified ERP systems

    he AHP method

    s

    Yes

    No

    Acceptable to senior management?

    tem selection framework.

  • ARTICLE IN PRESS

    uctionproject team should strive to perform better. Twomethods can be used to establish the hierarchy ofERP system fundamental-objectives, namely top-down decomposition and bottom-up synthesis. Inthe top-down decomposition procedure, the pro-ject team discusses What do you mean by thatupper-level objective? The answers reveal thelower-level fundamental-objectives, which explainthe meanings of the upper-level objective. Alter-natively, managers can start from a lower-levelobjective by asking, Of what more generalobjective is this aspect? to nd a more generalobjective and move upwards via the bottom-upsynthesis procedure. The upper levels in thehierarchy refer to more general objectives andthe lower levels contain important elaborations ofthe upper objectives. When organizing the hier-archy of fundamental-objectives, the project teammust keep in mind to pay attention to thelimitations of decision elements and the alterna-tion of business environment at any time.Means-objectives are organized into networks

    (Clemen, 1996). The project team can create ameans-objective apart from the fundamental-ob-jectives by asking, How could you achieve this?The answers to this question identify the corre-sponding means-objectives and describe the lin-kages among them. Alternatively, the project teamlinks a means-objective toward the correspondingfundamental-objective by asking the questionWhy is that important? Having formulatedthese means-objectives, the project team canensure specic ways of accomplishing the funda-mental-objectives. Additionally, the team cannarrow the set of ERP candidates by examiningthese means-objectives and also develop detailedattribute specications to assess the ERP systems.

    3.4. Extract the attributes used for evaluation

    After creating the structure of objectives, theproject team can derive the attributes pertinent toevaluating each ERP system. Both quantitativeand qualitative attributes that satisfy the strategiesand goals of the company should be involved.Ideally, the team should develop its own structureof critical objectives and select appropriate mea-

    C.-C. Wei et al. / Int. J. Prodsurable attributes to indicate the degree to whichthe corresponding objective is achieved, based onthe business environment and requirements.Therefore, the selected attributes will be consistentwith the objective framework, guided by thecompany strategy.The project team should iteratively examine and

    modify the set of selected attributes so that theyare complete, decomposable, nonredundant, mea-surable, and minimal (Keeney and Raiffa, 1993).Then, these attributes will be used as the basis ofthe AHP model.

    3.5. Screen the unqualified ERP systems

    Numerous alternatives are collected initially,and hence a ltering mechanism is required toshorten the list of ERP candidates. The detailedcharacteristics desired by the company for theERP system are developed over many meetings.Next, suitable characteristics are transferred tospecic requirements to form a questionnaire orchecklist of system specications. Simultaneously,examining the network of means-objectives canhelp to scrutinize system specications and ensurethat these requirements are consistent with corpo-rate objectives. The listed vendors are requested toprovide information in response to the specicquestions included in the questionnaire. Theproject team then assesses this information toeliminate the obviously unqualied vendors.

    3.6. Evaluate the ERP systems by using the AHP

    method

    The AHP is a multi-attribute evaluation methodthat involves three phases: decomposition, com-parative judgments, and synthesis of priorities(Saaty, 1980). In the decomposition phase, theproject team can explicitly develop the AHPhierarchy model from the fundamental-objectivehierarchy as mentioned above. In the secondphase, each decision maker utilizes paired compar-isons for the attributes and alternatives to extractjudgment matrices with a nine-point scale at eachlevel. In the third phase, the paired comparisonprocess is repeated for each attribute in thealternative prioritization problem based on the

    Economics 96 (2005) 4762 51largest eigen-value method. Finally, the relative

  • departments, with at least 5 years experience in

    natiregurevi

    T

    inte

    syst

    ARTICLE IN PRESS

    uctionthe company and expertise in their particularelds, were also chosen to participate in the projectteam. To encourage employee engagement andsupport, the project team held several promotionalworkshops. These meetings produced numerousvaluable recommendations, to which the projectteam responded during the project implementationimportance of attributes and the global priority ofalternatives can be obtained by aggregating theweights over the hierarchy. Hence, AHP canaccelerate the development of a consensusamongst multiple decision makers in ERP systemselection process.

    4. Practical example

    The proposed framework was applied to ERPsystem selection at an electronics company inHsinchu science park, Taiwan. This companydesigns and manufactures modular microwavecommunication systems and exports them to theUSA, Europe, and Mainland China. On the onehand, the fragmented modules of the existing ERPsystem limited the companys operating efciency,caused much duplication of effort, and confusedthe business processes. On the other hand, thesales cycle of export and the need to maintain goodcustomer service in the highly dynamic businessenvironment put increasingly heavy pressure onthe company. In order to maintain its competi-tiveness, the top management announced thelaunch of a series of projects including theadoption of an ERP system and the re-engineeringof the complex business process to enhance theeffectiveness of its global logistics and providequick responses to customer demands.

    4.1. Identify the ERP system characteristics

    A steering committee of three senior managerswas formed, including the General Manager andsenior MIS and Purchasing managers, with theresponsibility to formulate the project plan,integrate project resources, and select a suitableERP system. Representatives of different user

    C.-C. Wei et al. / Int. J. Prod52to reduce resistance to the project.The process of constructing the objectivestructure of ERP system selection was bothdialectic and analytic, and thus captured themental structure of decision makers. We recom-mended to rst scope out the important strategicobjectives. After discussing with the project team,we gathered the following results:

    (1) To satisfy business strategy: to satisfy theindustrial characteristics and the businessgoals and adapt to dynamic business environ-ment.

    (2) To enhance business process performance: tointegrate business systems and procedures andenhance information transparency.

    (3) To improve operations quality and efciency:to standardize and simplify operations ow,improve quality and reduce lead times.

    (4) To shorten turn-around time to the customer:to efciently analyze customer informationfrom various markets and quickly respond tovarious customer demands.

    (5) To support globalization development: tosupport business operations worldwide.

    Structured interviews and discussions were usedto elicit the structure of objectives from themembers of the project team during several meet-4.2.ingsl legal and tax systems. Initially, 20 ERPems were proposed by various vendors.

    Organize the structure of objectivesowilocavered the invitations to various vendors. Toprnational ERP systems were not consideredng to a budget cap and the need to supporttiondelit was preserved.he project team widely collected the informa-on ERP systems and vendors and activelythemenves, and other major concerns at the rstlar project team meeting. This process wasewed iteratively in later meetings to ensure thatexibility to changes in the business environ-tion

    P implementation, the project scope, organiza-al strengths and weaknesses, potential alter-To obtain a clear understanding of the crucialelements involved in the decision, we suggestedthat the project team should discuss the goals ofER

    Economics 96 (2005) 4762. Fig. 2 displays the fundamental-objective

  • ARTICLE IN PRESS

    inimizst

    inimizpleme

    uctionMco

    Mim

    C.-C. Wei et al. / Int. J. Prodhierarchy. The ultimate goal is to select the mostsuitable ERP system. This is divided into twolower-level objective sets, namely choosing themost appropriate ERP system and choosing thebest ERP vendor.We led the team members to discuss What does

    choosing the most appropriate ERP system

    Selecting the most suitable ERP system

    Choosing the best ERP vendor

    Choosing the most appropriate ERP system

    Having system f

    Having interfaceoperatio

    Having function

    Having reliabili

    Having reputatio

    Supplyiservice

    Providintechnica

    Fig. 2. Fundamental-obing total

    ing ntation time

    Maintenance costs

    Price

    Consultant expenses

    Infrastructure costs

    Economics 96 (2005) 4762 53mean? Choosing the most appropriate ERPsystem, meant selecting an ERP system that canminimize total costs and implementation time, hascomplete functionality, user-friendly interface andoperations, and satises system exibility andreliability. On the other hand, the objectives ofselecting the best ERP vendor were those related

    Security

    Function-fitness

    Module completion

    excellent lexibility

    user-friendly and ns

    complete ality

    high system ty

    good n

    ng ongoing

    g good l capability

    Upgrade ability

    Ease of integration

    Ease of in-house development

    Ease of operation

    Ease of learning

    Stability

    Recovery ability

    Financial condition

    Scale of vendor

    Market share

    R&D capability

    Warranties

    Technical support capability

    Implementation ability

    Training service

    Consultant service

    Service speed

    jective hierarchy.

  • ARTICLE IN PRESS

    uctionto vendor features, including excellent reputation,technical capability, and ongoing service. Fig. 2shows the two objective sets that constitute thethird level of the fundamental-objective hierarchy.For example, we further asked What doesminimizing total costs mean? to drill down inthe objective of total cost minimization and foundthat the answer lay in minimizing system price,maintenance expenses, consultant expenses, andinfrastructure costs. Similarly, the top-down de-composition method found that the other objec-tives in level 3 must also be decomposed toestablish their practical meanings. Level 4 revealsthe details that can be used to compare theperformance of alternatives.To verify the consistency of the fundamental-

    objective hierarchy, we can simultaneously ask theproject team to synthesize the lower-level objec-tives into more general objectives and thus renethe hierarchical structure previously derived fromthe top-down decomposition method. Indeed, thisprocess was iterative and the structure was notunique.The means-objective networks for system and

    vendor factors were formulated simultaneously asshown in Figs. 3 and 4, respectively. The projectteam started from the bottom objectives of thefundamental-objective hierarchy (Fig. 2) by askingthe question, How can this objective beachieved? to help the project team to identifythe means-objectives and establish links amongthem. For example, in Fig. 3, the answers to thequestion, How can a lower price for the ERPsystem be achieved? were minimizing the degreeof customization and reducing the price ofvendors quotation. That is, if the team couldprovide clear requirements and specications tothe vendor, then customization could be controlledand the price thus lowered. Furthermore, in orderto have clear requirements, business process re-engineering ought to be done rst. In additional,as illustrated in Fig. 4, the project team concernedthe situation in which an ERP vendor may be toolarge to give sufcient supports to a mid-rangecustomer or an ERP vendor may be too small tosurvive and provide consistent service. Thus theproject team needed to collect and analyze the

    C.-C. Wei et al. / Int. J. Prod54ERP market data and the vendor provideddata to ensure that the size of the vendor matcheswell with the size of the company. Following asimilar approach, we systematically elaborated thecauseeffect relationships among all the means-objectives into a complete network. Similarly, theproject team incorporated other means-objectivesinto the network in a logical way.Also, we encouraged the team to repeatedly

    examine all means-objective linkages in order toconrm every relationship was reasonable. Theprocess was iterative and diagnostic. For instance,the answer to the question Why are clearrequirements important? was that providing clearrequirements would enable the project team toreduce the degree of customization, produceprecise specications, and conrm all requiredmodules by redening and repositioning thebusiness processes. Furthermore, clear require-ments would also help to identify the systemfunctions and clarify the gap between the ERPsystem and the existing operations procedure. Bythis means, the company would be able to reduceproject cost, assess system suitability, and proposecomplete functional requirements.

    4.3. Extract the attributes for evaluating ERP

    systems

    It may be impractical to make paired compar-isons among the ERP systems with respect to everydetailed dimension in level 4 of the fundamental-objective hierarchy in Fig. 2. The difculty arisesbecause too many attributes lead to numerouspaired comparisons in AHP and cause an inef-cient process. Representatives from different userdepartments in the project team were divided intoresearch groups to gather and evaluate the ERPsystem data based on their specialities and jobresponsibility. For example, the Finance Depart-ment and Purchase Department members joined acost research group to provide nancial data,and the MIS Department members studied thefunctionality, exibility, and reliability of eachERP system as well as the technical ability of eachvendor. The evaluations from the research groupswere discussed in a full assembly of the projectteam. The three major decision makers then

    Economics 96 (2005) 4762combined the suggestions of each research group

  • ARTICLE IN PRESS

    Implementation time

    Security

    Function fitness

    Module completion

    Flexibility

    User friendliness

    Functionality

    Reliability

    Upgrade ability

    Ease of integration

    Ease of in-house development

    Ease of operation

    Ease of learning

    Stability

    Recovery ability

    Total costs

    Maintenance costs

    Price

    Consultant expenses

    Infrastructure costs

    Degree of customization

    Price of vendors quotation

    Degree of employee cooperation

    On schedule

    Infrastructure integration

    Satisfies requirements

    Globalization

    Comparison with existing processes

    Parameters setting

    Permission management

    Provision of a guidebook

    Step-by-step command

    Graphic interface

    Few bugs

    Ease of integration with other systems

    Platform independence

    Common programminglanguage

    Online help

    Online learning

    System maturity

    Minimum of system break down

    Automatic data recovery

    Automatic data backup

    Payment

    Discount

    Number of modules

    Provision of consultants

    Cooperation with the consultant companies

    Clear requirements

    Hardware support

    Other systems support

    Multi-language

    Multi-currency

    Multi-site

    System & database protection

    Price of consultants

    Fig. 3. Means-objective network (system factors).

    C.-C. Wei et al. / Int. J. Production Economics 96 (2005) 4762 55

  • ARTICLE IN PRESS

    Reputation

    Financial condition

    Scale of vendor

    Market share

    ERP market data

    Vendor provided data

    Service

    Technical capability

    R&D capability

    Warranties

    Technical support capability

    Implement- ation ability

    Training service

    Consultant service

    Service speed

    R&D investment

    Number of R&D engineers

    Engineers experience

    R&D technology

    Diverse product line

    Upgrade technology

    Warranty terms

    Warranty details

    Consultant experience

    Number of consultants

    Sufficient training time

    Adequate training lessons

    Clear problem-solving program

    Online service

    Implementation methodology

    Domain knowledge

    Technology cooperation

    Implementation experience

    Financial stability

    Long-term financial viability

    Scale matching

    Fig. 4. Means-objective network (vendor factors).

    C.-C. Wei et al. / Int. J. Production Economics 96 (2005) 476256

  • with their subjective opinions to evaluate thealternatives.The fundamental-objective hierarchy was mod-

    ied to generate an AHP hierarchy. This AHPhierarchy is composed of four levels, as illustratedin Fig. 5. Level 1 reveals the strategic objective forselecting the most suitable ERP system. Level 2consists of two main objectives, namely choosingthe most appropriate ERP system and selecting thebest vendor. Level 3 contains the associatedattributes that are used to measure various ERPsystems and vendor, respectively. The bottom levelconsists of the alternative ERP systems.Using the means-objective network (Figs. 3 and

    4), we assisted the project team to establish theevaluation criteria and specic requirements. Thisprocess can ensure that everyone follows the samecriteria in the evaluation process consistently.Table 1 presents the detailed description of theattributes in the AHP model (Fig. 5) with theassociated means extracted from the means-objective network.

    4.4. Screen the ERP alternatives

    Unfavorable alternatives were eliminated bythorough examination of system specicationsand requirements derived from the means-objectivenetwork. Table 2 lists some of the questions. Afterpreliminary screening, three systems A, B, and C,were selected and requested to provide detailedproposals for further consideration. Meanwhile,intensive interviews and working meetings werescheduled with each vendor. Further, core businessworkows and special requirements of the com-pany were assessed by running demo scenarios andexamining the capacity of each system to fulllthese key demands. Finally, user representativesconducted unit tests related to system feasibility.

    4.5. Evaluate the alternatives using AHP and select

    a suitable ERP system

    Following the AHP methodology, paired com-parisons of the alternatives on each attribute and

    ARTICLE IN PRESS

    ImplTime

    Func

    Tota

    User

    Flex

    Reli

    Repu

    Techcapa

    Serv

    C.-C. Wei et al. / Int. J. Production Economics 96 (2005) 4762 57ERPsystemselection

    Systemfactors

    Vendor factors Fig. 5. AHP hementation

    tionality

    l costs

    friendliness

    ibility

    ability

    tation

    nical bility

    ice

    System A

    System B

    System C ierarchy.

  • ARTICLE IN PRESS

    s

    uctionTable 1

    Attribute details

    Attributes Evaluation item

    C.-C. Wei et al. / Int. J. Prod58the inter-attribute relative importance were madeand converted to a numerical scale of 19. Thesoftware Expert Choice was then used to deter-mine the normalized weights and synthesize the

    System software factors Total costs 1. Price

    2. Maintenance cost

    3. Consultant expen

    4. Infrastructure cos

    Implementation time

    Functionality 1. Module completio

    2. Function tness

    3. Security

    User friendliness 1. Ease of operation

    2. Ease of learning

    Flexibility 1. Upgrade ability

    2. Ease of integratio

    3. Ease of in-house d

    Reliability 1. Stability

    2. Recovery ability

    Vendor factors Reputation 1. Scale of vendor

    2. Financial conditio

    3. Market share

    Technical capability 1. R&D ability

    2. Technical support

    3. Implementation a

    Service 1. Warranties

    2. Consultant service

    3. Training service

    4. Service speedMeans

    Economics 96 (2005) 4762results. Table 3 lists the inter-attribute pairedcomparison matrices of decision maker 1 forsystem software and vendor attributes. Therelative weights of each attribute for all decision

    1. Limited project budget

    s 2. Limited annual maintenance budget

    ses 3. Limited infrastructure budget

    ts

    1. 69 months

    2. Project management ability

    n 1. Availability of necessary modules

    2. Parameter setting

    3. High function-tness

    4. Multi-currency, multi-language, and multi-site

    5. Permission management

    6. Database protection

    1. Graphic interface

    2. Step-by-step command

    3. Provision of a guidebook

    4. Online learning

    5. Online help

    1. Common programming language

    n 2. Platform independence

    evelopment 3. Ease of integration with other IS

    1. Automatic data recovery

    2. Automatic data backup

    1. Scale matching

    n 2. Financial stability

    3. Long-term nancial viability

    4. Provision of reference sites

    1. Good upgrade service

    capability 2. Diverse product line

    bility 3. Good implementation experience

    4. Ease of implementation

    5. Adequate number of engineers

    6. Cooperation with other partners

    7. Domain knowledge

    1. Warranty details

    2. Adequate number of experienced consultants

    3. Complete training lessons

    4. Good problem-solving program

    5. Online service

  • ARTICLE IN PRESS

    the p

    een c

    plex,

    or is

    uctionTable 2

    Examples of screening questions

    Items Questions

    Cost vs. budget 1. What are the total costs of

    2. If a discrepancy exists betw

    Complexity 1. Is the ERP system too com

    2. Does it t our requirements

    C.-C. Wei et al. / Int. J. Prodmakers are listed in Table 4. Table 5 presents theevaluation results of all decision makers, and thelast column of this table indicates the overallpriority of the three ERP systems using thegeometric mean method. As shown in Table 5,system A was the best choice for the company.Throughout the evaluation process, the consis-

    tency index (CI) and consistency ratio (CR) ofeach decision makers paired comparison matrixshould be less than the threshold value 0.1 (Saaty,

    Requirement coverage 1. Do the system and modules mee

    Flexibility 1. Is the technology exible and lon

    Fundamentals 1. What database and hardware ca

    Information technology 1. Does the vendor provide other in

    Manufacturing Execution System (

    Management (CRM), and Electron

    2. Is the system integrated with tho

    Vendor size 1. Does the size of the vendor matc

    2. Is the vendor too big to pay atte

    consistent service?

    Domain knowledge 1. What are the target domain and

    2. Do they correspond with the com

    Implementation methodology 1. What is the implementation met

    2. Is it feasible and simple?

    Maintain service 1. Who supports upgrades and mai

    2. Does the vendor have any local

    Consultant service 1. Does the vendor provide consult

    2. Does the vendor co-operate with

    Financial considerations 1. What was the nancial performa

    2. What are its current nancial fo

    3. Does the vendor have any ventur

    For example, is this vendor deep in

    income substantially dropped in a sroject?

    ost and budget then is it acceptable?

    too simple or just right?

    it overqualied?

    Economics 96 (2005) 4762 591980) to ensure that the decision maker wasconsistent in assigning paired comparisons. Other-wise the decision maker may need to reconsider hisevaluation.According to Table 4, the decision makers were

    fairly consistent in ranking the attributes. Thefunctionality of the ERP system was ranked rstamong system factors, followed by system ex-ibility, implementation time, total cost, user-friendliness, and system reliability. As for vendor

    t all our requirements?

    g lasting?

    n support the system?

    formation systems, such as, Supply Chain Management (SCM),

    MES), Data Warehousing (DW), Customer Relationship

    ic Commerce (EC)?

    se of other partners?

    h that of our company?

    ntion to us? Or is the vendor too small to survive and provide

    market of the provider?

    panys needs of the purchasing company?

    hodology?

    ntenance? The software supplier or the reseller?

    service point or branch company?

    ing services?

    other consultant companies?

    nce of the vendor in the past 2 years?

    recasts?

    e capital investors or show any signs of potential nancial crisis?

    debt? Is this vendor a candidate for takeover by another? Has its

    hort time?

  • ARTICLE IN PRESS

    F

    1/

    1/

    1

    1/

    1/

    uctionTable 3

    Paired comparison judgment matrices (decision maker 1)

    Total costs Implementation time

    Total costs 1 1/3

    Implementation time 3 1

    Functionality 3 4

    User-friendliness 1 1/3

    Flexibility 5 3

    C.-C. Wei et al. / Int. J. Prod60selection, all decision makers agreed that technicalability of the vendor was the most importantfactor. Vendor service ability and reputationfollowed as the second and third most importantconsideration.As shown in Table 5, decision makers 1 and 3

    preferred System A while decision maker 2preferred System B. However, the difference inthe preference of decision maker 2 for Systems A

    Reliability 1/4 1/6 1/

    Reputation

    Reputation 1

    Technical capability 7 1 3

    Service 5 1/3 1

    Table 4

    Relative weights of attributes

    Attributes

    System factors Total costs

    Implementation time

    Functionality

    User-friendliness

    Flexibility

    Reliability

    Vendor factors Reputation

    Technical capability

    Service

    Table 5

    Results of AHP analysis

    Alternatives DM 1 DM 2 DM 3 Geometric

    mean

    System A 0.429 (1) 0.378 (2) 0.449 (1) 0.410 (1)

    System B 0.349 (2) 0.381 (1) 0.360 (2) 0.356 (2)

    System C 0.224 (3) 0.242 (3) 0.191 (3) 0.210 (3)unctionality User-friendliness Flexibility Reliability

    3 1 1/5 4

    4 3 1/3 6

    7 3 9

    7 1 1/5 3

    3 5 1 7

    9 1/3 1/7 1

    Technical ability Service

    1/7 1/5

    Economics 96 (2005) 4762and B was minimal. The project team thusachieved sufcient agreement to choose System Afor implementation.

    5. Discussion

    To avoid being constrained by the existingstructure of objectives, the project team shouldask the questions and discuss the answers in anyorder during constructing the fundamental-objec-tive hierarchy and means-objective network(Clemen, 1996). It is important to rene thestructure of objectives iteratively to ensure thatthe decision situation has been examined fully anddifferent perspectives have been considered. Asshown in Fig. 1, during each round of discussion,the team was given an opportunity to review and

    DM 1 DM 2 DM 3

    0.063 (4) 0.170 (3) 0.119 (4)

    0.138 (3) 0.170 (3) 0.128 (3)

    0.457 (1) 0.351 (1) 0.420 (1)

    0.058 (5) 0.057 (5) 0.048 (5)

    0.257 (2) 0.208 (2) 0.247 (2)

    0.028 (6) 0.042 (6) 0.039 (6)

    0.072 (3) 0.094 (3) 0.072 (3)

    0.649 (1) 0.627 (1) 0.649 (1)

    0.279 (2) 0.280 (2) 0.279 (2)

  • strengths, and limitations of the AHP method.

    specications. These objectives also indicatehow outcomes should be measured and what

    (3)

    (4)

    Ref

    Badr

    g

    J

    Chie

    n

    T

    Clem

    t

    ARTICLE IN PRESS

    uctionDuring the development process, consistencychecks were conducted and the decision makersin some cases were asked to provide reasons anddetailed explications to justify and rene theirassessments.In practice, it seems to be time consuming

    to establish an objective framework in the rstplace. Very often, people rush into the stage ofcomparing available alternatives and conductingthe system demonstrations and tests beforethey identify the right problem through needsassessment and objective construction. However,people involved in the project team agreed thatthe entire process enabled detailed review ofthis important project and facilitated theclarication of problems to reach consensusin group decision process. Therefore, thedecision quality was increased while actuallysaving a lot of time in possibly revising thedecisions and projects. In this case, it took about2 weeks in total to construct and rene theobjective structure.

    6. Conclusion

    This study presents a comprehensive frameworkfor selecting a suitable ERP system based on anAHP-based decision analysis process. The pro-posed procedure allows a company to identify theelements of ERP system selection and formulatethe fundamental-objective hierarchy and means-objective network. The pertinent attributes forevaluating a variety of ERP systems and vendorscan be derived according to the structure ofrevise the hierarchy of fundamental-objectivesand the network of means-objectives to reach aconsensus on ERP system selection.The precision with which decision makers could

    provide a paired comparison was limited by theirknowledge, experience, and even cognitive biases,as well as by the complexity of the ERP systemselection problem (Chien et al., 2002). Thus, toavoid inconsistency among semantic descriptionsand score assignments to the attributes, we trainedthe decision makers to understand the details,

    C.-C. Wei et al. / Int. J. Prodobjectives.control software. IIE Solutions 27, 1216.

    Hong, K.K., Kim, Y.G., 2002. The critical success factors for

    ERP implementation: An organizational t perspective.Hick

    reIusiness Review 61 (1), 118125.

    n, C.F., Chen, S.L., Lin, Y.S., 2002. Using Bayesian

    etwork for fault location on distribution feeder. IEEE

    ransactions on Power Delivery 17, 785793.

    en, R.T., 1996. Making Hard Decisions: An Introduction

    o Decision Analysis. Duxbury Press, Pacic Grove.

    s, D.A., Stecke, K.E., 1995. The ERP maze: Enterprise

    source planning and other production and inventoryBuss

    Bphase, but also mitigate the resistance andinvisible costs in the implementation stage.

    erences

    i, M.A., Davis, D., Davis, D., 2001. A comprehensive 01

    oal programming model for project selection. International

    ournal of Project Management 19, 243252.

    , M.D.J., 1983. How to rank computer projects. Harvardamong multiple decision makers.The approach systematically assesses corpo-rate attributes and guidance based on thecompany goals and strategic development. Itcan not only reduce costs during the selectionkey points should be considered in the decisionprocess.The approach is exible enough to incorporateextra attributes or decision makers in theevaluation. Notably, the proposed frameworkcan accelerate the reaching of consensusThe proposed comprehensive ERP system selec-tion framework has the following advantages:

    (1) It ensures that the structure of objectives isconsistent with corporate goals and strategies.The project team can understand the relation-ships among different objectives and assesstheir inuence by modeling them to thehierarchical and network structures.

    (2) The project team can decompose the complexERP selection problem into simpler and morelogical judgments of the attributes. Particu-larly, knowledge of structure of objectives canhelp the project team to identify the companyrequirements and develop appropriate system

    Economics 96 (2005) 4762 61nformation & Management 40, 2540.

  • Keeney, R.L., Raiffa, H., 1993. Decisions with Multiple

    Objectives: Preferences and Value Tradeoffs. Cambridge

    University Press, New York.

    Kumar, V., Maheshwari, B., Kumar, U., 2002. Enterprise

    resource planning systems adoption process: A survey of

    Canadian organizations. International Journal of Produc-

    tion Research 40, 509523.

    Lai, V.S., Trueblood, R.P., Wong, B.K., 1999. Software

    selection: A case study of the application of the analytical

    hierarchical process to the selection of a multimedia

    authoring system. Information & Management 36, 221232.

    Lee, J.W., Kim, S.H., 2000. Using analytic network process and

    goal programming for interdependent information system

    project selection. Computers & Operations Research 27,

    367382.

    Lucas, H.C., Moore Jr., J.R., 1976. A multiple-criterion scoring

    approach to information system project selection. Infor. 14

    (1), 112.

    Motwani, J., Mirchandani, D., Madan, M., Gunasekaran, A.,

    2002. Successful implementation of ERP projects: Evidence

    from two case studies. International Journal of Production

    Economics 75, 8396.

    Ptak, C.A., 2000. ERP Tools, Techniques, and Applications for

    Integrating the Supply Chain. St. Lucie Press, New York.

    Saaty, T.L., 1980. The Analytic Hierarchy Process. McGraw-

    Hill, New York.

    Santhanam, R., Kyparisis, G.J., 1995. A multiple criteria

    decision model for information system project selection.

    Computers & Operations Research 22 (8), 807818.

    Santhanam, R., Kyparisis, G.J., 1996. A decision model for

    interdependent information system project selection. Eur-

    opean Journal of Operational Research 89, 380399.

    Sarkis, J., Sundarraj, R.P., 2000. Factors for strategic evalua-

    tion of enterprise information technologies. International

    Journal of Physical Distribution & Logistics Management

    30 (3/4), 196220.

    Schniederjans, M.J., Wilson, R.L., 1991. Using the analytic

    hierarchy process and goal programming for information

    system project selection. Information & Management 20,

    333342.

    Teltumbde, A., 2000. A framework of evaluating ERP projects.

    International Journal of Production Research 38, 45074520.

    Yao, Y., He, H.C., 2000. Data warehousing and the internets

    impact on ERP. IT Pro, March/ April, 3741.

    Yusuf, Y., Gunasekaran, A., Abthorpe, M.S., 2004. Enterprise

    information systems project implementation: A case study

    of ERP in Rolls-Royce. Journal of Production Economics

    87, 251266.

    ARTICLE IN PRESS

    C.-C. Wei et al. / Int. J. Production Economics 96 (2005) 476262

    An AHP-based approach to ERP system selectionIntroductionSelection method reviewProcedure for selecting a suitable ERP systemForm a project team and collect information on ERP systemsIdentify the ERP system characteristicsConstruct the structure of objectivesExtract the attributes used for evaluationScreen the unqualified ERP systemsEvaluate the ERP systems by using the AHP method

    Practical exampleIdentify the ERP system characteristicsOrganize the structure of objectivesExtract the attributes for evaluating ERP systemsScreen the ERP alternativesEvaluate the alternatives using AHP and select a suitable ERP system

    DiscussionConclusionReferences