AMSC PRODUCTIVITY RATE Item Activity Activity SUB Unit QTY Days OD (O) ID Description SITEWORKS Z0U34-0000 Site Clearing M2 1,502.00 4,200.00 0.36 2.000 0.72 1 Z0U34-0010 Setting-out / Layout M 160.08 76.00 2.11 3.000 6.32 1 SUBSTRUCTURE Z0U34-0020 Excavation for footings + Disposal of Materials M3 953.00 409.50 2.33 2.000 4.65 2 M3 555.00 345.60 1.61 8.250 13.25 3 5 Z0U34-0030 Formation Level & Compaction M3 238 252.00 0.94 6.250 5.90 2 Z0U34-0040 Anti-Termite Applications (Under PCC Footings) M2 571 202.50 2.82 1.000 2.82 1 Z0U34-0050 Backfill & Compaction upto bot. of PCC Tie-Beam M3 268 252.00 1.06 8.250 8.77 7 Z0U34-0060 Anti-Termite Applications (Under PCC Tie-Beam) M2 37 202.50 0.18 1.000 0.18 1 Z0U34-0070 Backfill & Compaction up to bot of PCC Grd. Slab M3 2,332.00 252.00 9.25 8.250 76.35 3 Z0U34-0080 Anti-Termite Applications (Under PCC Grade Slab) M2 894 202.50 4.41 1.000 4.41 1 Z0U34-0090 Shutters + 50mm Thk. PCC Under Footings M2 982 270.00 3.64 11.000 40.01 2 Prod. Rate Tot. Man Crew Desc. Tot. M- days ACTIVIT Y (unit/ day) 1 Operator 1 Helper 2 Carpenter 1 Helper For Excavation 1 Operator 1 Helper For Disposal 0.75 Operator 6 Driver 1.5 Helper .75 Operator 4 Driver 1.5 Helper 2 Technican 0.75 Operator 6 Driver 1.5 Helper 2 Technican 0.75 Operator 6 Driver 1.5 Helper 2 Technican 1 Mason 10 Helper

AMSC Productivity Rate - Turner

Embed Size (px)

Citation preview

Page 1: AMSC Productivity Rate - Turner

Page 1 of 50

AMSC PRODUCTIVITY RATE

ItemActivity Activity SUB Unit QTY Prod. Rate Days Tot. Man OD (O)

ID Description ACTIVITY (unit/day)

SITEWORKS

Z0U34-0000 Site Clearing M2 1,502.00 4,200.00 0.36 2.000 0.72 1 0.72

Z0U34-0010 Setting-out / Layout M 160.08 76.00 2.11 3.000 6.32 1 6.32

SUBSTRUCTURE

Z0U34-0020 Excavation for footings + Disposal of Materials M3 953.00 409.50 2.33 2.000 4.65 2 2.33

M3 555.00 345.60 1.61 8.250 13.25 3 4.42

5

Z0U34-0030 Formation Level & Compaction M3 238 252.00 0.94 6.250 5.90 2 2.95

Z0U34-0040 Anti-Termite Applications (Under PCC Footings) M2 571 202.50 2.82 1.000 2.82 1 2.82

Z0U34-0050 Backfill & Compaction upto bot. of PCC Tie-Beam M3 268 252.00 1.06 8.250 8.77 7 1.25

Z0U34-0060 Anti-Termite Applications (Under PCC Tie-Beam) M2 37 202.50 0.18 1.000 0.18 1 0.18

Z0U34-0070 Backfill & Compaction up to bot of PCC Grd. Slab M3 2,332.00 252.00 9.25 8.250 76.35 3 25.45

Z0U34-0080 Anti-Termite Applications (Under PCC Grade Slab) M2 894 202.50 4.41 1.000 4.41 1 4.41

Z0U34-0090 Shutters + 50mm Thk. PCC Under Footings M2 982 270.00 3.64 11.000 40.01 2 20.00

Crew Desc.

Tot. M-days

Manpower/day

1 Operator 1 Helper

2 Carpenter 1 Helper

For Excavation

1 Operator 1 Helper

For Disposal

0.75 Operator 6 Driver

1.5 Helper

.75 Operator 4 Driver 1.5 Helper

2 Technican

0.75 Operator 6 Driver

1.5 Helper

2 Technican

0.75 Operator 6 Driver

1.5 Helper

2 Technican

1 Mason 10 Helper

Page 2: AMSC Productivity Rate - Turner

Page 2 of 50

AMSC PRODUCTIVITY RATE

ItemActivity Activity SUB Unit QTY Prod. Rate Days Tot. Man OD (O)

ID Description ACTIVITY (unit/day)

Crew Desc.

Tot. M-days

Manpower/day

Z0U34-0100 50mm Protection Screed (Over W.P. Membrane-Ftg.) M2 2,246.00 270.00 8.32 11.000 91.50 2 45.75

Z0U34-0110 RCC For Footings Casting M3 244 180.00 1.36 26.000 35.24 1 35.24

Formworks M2 976.00 12.00 81.33 3.056 248.55 4 62.14

Rebars kg 43,920.00 250.00 175.68 2.056 361.20 3 120.40

M2 976.00 35.00 27.89 3.056 85.22 2 42.61

10

Z0U34-0120 RCC Necks Columns / Walls + MEP Sleeves Casting M3 154 81.00 1.90 22.000 41.83 1 41.83

Formworks M2 616.00 4.00 154.00 3.056 470.62 5 94.12

Rebars kg 27,720.00 200.00 138.60 2.056 284.96 4 71.24

1 Mason 10 Helper

1 Carpenter 18 Helper 6 Mason

1 Steel Fixer

2 Carpenter

1 Helper .056 Operator

1 Steel Fixer 1

Helper .056 Operator

Deshuttering

2 Carpenter

1 Helper .056 Operator

2 Carpenter 16 Helper 4 Mason

2 Carpenter

1 Helper .056 Operator

1 Steel Fixer 1

Helper .056 Operator

Page 3: AMSC Productivity Rate - Turner

Page 3 of 50

AMSC PRODUCTIVITY RATE

ItemActivity Activity SUB Unit QTY Prod. Rate Days Tot. Man OD (O)

ID Description ACTIVITY (unit/day)

Crew Desc.

Tot. M-days

Manpower/day

M2 616.00 28.00 22.00 3.056 67.23 2 33.62

12

Z0U34-0130 Shutters + 50mm Thk. PCC Under Tie-Beams M2 63 270.00 0.23 11.000 2.57 2 1.28

Z0U34-0140 50mm Screed (Over W.P. Membrane-T.B.) M2 144 270.00 0.53 11.000 5.87 2 2.93

Z0U34-0150 RCC Tie Beams + MEP Sleeves Casting M3 33 180.00 0.18 22.000 4.03 1 4.03

Formworks M2 132.00 4.00 33.00 3.056 100.85 4 25.21

Rebars kg 5,940.00 250.00 23.76 2.056 48.85 3 16.28

M2 132.00 28.00 4.71 3.056 14.41 2 7.20

10

Z0U34-0160 RCC Kickers Over Tie-Beam Casting M3 1 180.00 0.01 22.000 0.12 1 0.12

Deshuttering

2 Carpenter

1 Helper .056 Operator

1 Mason 10 Helper

1 Mason 10 Helper

1 Carpenter 16 Helper 4 Mason

1 Steel Fixer

2 Carpenter

1 Helper .056 Operator

1 Steel Fixer 1

Helper .056 Operator

Deshuttering

2 Carpenter

1 Helper .056 Operator

1 Carpenter 16 Helper 4 Mason

1 Steel Fixer

Page 4: AMSC Productivity Rate - Turner

Page 4 of 50

AMSC PRODUCTIVITY RATE

ItemActivity Activity SUB Unit QTY Prod. Rate Days Tot. Man OD (O)

ID Description ACTIVITY (unit/day)

Crew Desc.

Tot. M-days

Manpower/day

Formworks M2 4.00 4.00 1.00 3.056 3.06 1 3.06

Rebars kg 180.00 250.00 0.72 2.056 1.48 1 1.48

M2 4.00 28.00 0.14 3.056 0.44 1 0.44

4

Z0U34-0170 50mm Thk. PCC Under Grade Slab M2 1,537.00 270.00 5.69 11.000 62.62 2 31.31

Z0U34-0180 Mesh + Filler Board & RCC For Grade Slab M3 208 180.00 1.16 26.000 30.04 3 10.01

Z0U34-0190 50mm Thk. PCC Steps & Ramps M2 10 270.00 0.04 11.000 0.41 2 0.20

Z0U34-0200 Steps & Ramps Works + Place Conc. M3 5 180.00 0.03 26.000 0.72 8 0.09

Z0U34-0210 Waterproofing Membrane (Over PCC Footings) M2 1,047.00 152.00 6.89 6.000 41.33 2 20.66

Z0U34-0220 Water Proofing For Neck Column & Wall & Footing M2 2,021.00 152.00 13.30 6.000 79.78 3 26.59

2 Carpenter

1 Helper .056 Operator

1 Steel Fixer 1

Helper .056 Operator

Deshuttering

2 Carpenter

1 Helper .056 Operator

1 Mason 10 Helper

1 Carpenter 18 Helper 6 Mason

1 Steel Fixer

1 Mason 10 Helper

1 Carpenter 18 Helper 6 Mason

1 Steel Fixer

4 Waterproof

er 2 Helper

4 Waterproof

er 2 Helper

Page 5: AMSC Productivity Rate - Turner

Page 5 of 50

AMSC PRODUCTIVITY RATE

ItemActivity Activity SUB Unit QTY Prod. Rate Days Tot. Man OD (O)

ID Description ACTIVITY (unit/day)

Crew Desc.

Tot. M-days

Manpower/day

Z0U34-0230 Waterproofing Membrane (Over PCC Tie-beams) M2 67 152.00 0.44 6.000 2.64 2 1.32

Z0U34-0240 Waterproofing Membrane For Tie Beams M2 121 152.00 0.80 6.000 4.78 3 1.59

Z0U34-0250 50mm Thk. PCC Under Base of Tank M2 77 270.00 0.29 11.000 3.14 1 3.14

Z0U34-0260 Waterproofing Membrane (Over PCC - Base) M2 82 152.00 0.54 6.000 3.24 1 3.24

Z0U34-0270 50mm Protect'n Screed (Over W.P. Membrane-Base) M2 176 270.00 0.65 11.000 7.17 1 7.17

Z0U34-0280 RCC Water Tank Base + Deshuttering Casting M3 38 180.00 0.21 26.000 5.49 1 5.49

Formworks M2 152.00 12.00 12.67 3.056 38.71 1 38.71

Rebars kg 6,840.00 250.00 27.36 2.056 56.25 1 56.25

M2 152.00 35.00 4.34 3.056 13.27 1 13.27

4

Z0U34-0290 RCC Wall W/MEP Pipes & Water Stop + Deshuttering Casting M3 34 81.00 0.42 22.000 9.23 1 9.23

4 Waterproof

er 2 Helper

4 Waterproof

er 2 Helper

1 Mason 10 Helper

4 Waterproof

er 2 Helper

1 Mason 10 Helper

1 Carpenter 18 Helper 6 Mason

1 Steel Fixer

2 Carpenter

1 Helper .056 Operator

1 Steel Fixer 1

Helper .056 Operator

Deshuttering

2 Carpenter

1 Helper .056 Operator

2 Carpenter 16 Helper 4 Mason

Page 6: AMSC Productivity Rate - Turner

Page 6 of 50

AMSC PRODUCTIVITY RATE

ItemActivity Activity SUB Unit QTY Prod. Rate Days Tot. Man OD (O)

ID Description ACTIVITY (unit/day)

Crew Desc.

Tot. M-days

Manpower/day

Formworks M2 136.00 4.00 34.00 3.056 103.90 2 51.95

Rebars kg 6,120.00 200.00 30.60 2.056 62.91 1 62.91

M2 136.00 28.00 4.86 3.056 14.84 1 14.84

5

Z0U34-0300 RCC Top Slab + Deshuttering for Water Tank Casting M3 8.00 180.00 0.04 26.000 1.16 1 1.16

Formworks M2 40.00 16.00 2.50 3.056 7.64 2 3.82

Rebars kg 1,440.00 200.00 7.20 2.056 14.80 1 14.80

M2 40.00 32.00 1.25 3.056 3.82 1 3.82

5

Z0U34-0310 Water Proofing Membrane all around outside surfc M2 172 152.00 1.13 6.000 6.79 2 3.39

2 Carpenter

1 Helper .056 Operator

1 Steel Fixer 1

Helper .056 Operator

Deshuttering

2 Carpenter

1 Helper .056 Operator

1 Carpenter

18 Helper 6 Mason

1 Steel Fixer

2 Carpenter

1 Helper .056 Operator

1 Steel Fixer 1

Helper .056 Operator

Deshuttering

2 Carpenter

1 Helper .056 Operator

4 Waterproof

er 2 Helper

Page 7: AMSC Productivity Rate - Turner

Page 7 of 50

AMSC PRODUCTIVITY RATE

ItemActivity Activity SUB Unit QTY Prod. Rate Days Tot. Man OD (O)

ID Description ACTIVITY (unit/day)

Crew Desc.

Tot. M-days

Manpower/day

Z0U34-0320 Protection Board all around outside surface M2 172 152.00 1.13 6.000 6.79 2 3.39

Z0U34-0330 Backfill around Water tank walls M3 6 252.00 0.02 8.250 0.20 3 0.07

Z0U34-0340 G.R.P. Lining around inside + S.S. Lader & Door M2 221 20.00 11.05 2.000 22.10 3 7.37

Z0U34-0350 50mm Thk. PCC Under Base of Elevator Shaft M2 14 270.00 0.05 11.000 0.57 1 0.57

Z0U34-0360 Waterproofing Membrane (Over PCC - Base) M2 15 152.00 0.10 6.000 0.59 1 0.59

Z0U34-0370 50mm Protect'n Screed (Over W.P. Membrane-Base) M2 32 270.00 0.12 11.000 1.30 1 1.30

Z0U34-0380 RCC Elevator Shaft Base + Deshuttering Casting M3 7 180.00 0.04 26.000 1.01 1 1.01

Formworks M2 28.00 12.00 2.33 3.056 7.13 1 7.13

Rebars kg 1,260.00 250.00 5.04 2.056 10.36 1 10.36

M2 28.00 35.00 0.80 3.056 2.44 1 2.44

4

4 Waterproof

er 2 Helper

0.75 Operator 6 Driver

1.5 Helper

1 Mason 1 Helper

1 Mason 10 Helper

4 Waterproof

er 2 Helper

1 Mason 10 Helper

1 Carpenter 18 Helper 6 Mason

1 Steel Fixer

2 Carpenter

1 Helper .056 Operator

1 Steel Fixer 1

Helper .056 Operator

Deshuttering

2 Carpenter

1 Helper .056 Operator

Page 8: AMSC Productivity Rate - Turner

Page 8 of 50

AMSC PRODUCTIVITY RATE

ItemActivity Activity SUB Unit QTY Prod. Rate Days Tot. Man OD (O)

ID Description ACTIVITY (unit/day)

Crew Desc.

Tot. M-days

Manpower/day

Z0U34-0390 RCC Wall W/ MEP Cond. + Deshuttering Casting M3 4 81.00 0.05 22.000 1.09 1 1.09

Formworks M2 16.00 4.00 4.00 3.056 12.22 2 6.11

Rebars kg 720.00 200.00 3.60 2.056 7.40 1 7.40

M2 16.00 28.00 0.57 3.056 1.75 1 1.75

5

Z0U34-0400 Water Proofing Membrane all around outside surfc M2 60 152.00 0.39 6.000 2.37 3 0.79

Z0U34-0410 Protection Board all around outside surface M2 216 152.00 1.42 6.000 8.53 2 4.26

Z0U34-0420 Backfill around the Lift's Pit wall M3 9.89 252.00 0.04 8.250 0.32 3 0.11

Z0U34-0430 RCC For Wall/Col. From Top of Grade Slab-1L Casting M3 251 81.00 3.10 22.000 68.17 1 68.17

Formworks M2 1,004.00 4.00 251.00 3.056 767.06 5 153.41

2 Carpenter 16 Helper 4 Mason

2 Carpenter

1 Helper .056 Operator

1 Steel Fixer 1

Helper .056 Operator

Deshuttering

2 Carpenter

1 Helper .056 Operator

4 Waterproof

er 2 Helper

4 Waterproof

er 2 Helper

0.75 Operator 6 Driver

1.5 Helper

2 Carpenter 16 Helper 4 Mason

2 Carpenter

1 Helper .056 Operator

Page 9: AMSC Productivity Rate - Turner

Page 9 of 50

AMSC PRODUCTIVITY RATE

ItemActivity Activity SUB Unit QTY Prod. Rate Days Tot. Man OD (O)

ID Description ACTIVITY (unit/day)

Crew Desc.

Tot. M-days

Manpower/day

Rebars kg 45,180.00 200.00 225.90 2.056 464.45 4 116.11

M2 1,004.00 28.00 35.86 3.056 109.58 2 54.79

12

Z0U34-0440 Columns From Top of Grade Slab-1L (Canopy) Casting M3 1 81.00 0.01 22.000 0.27 1 0.27

Formworks M2 4.00 4.00 1.00 3.056 3.06 2 1.53

Rebars kg 180.00 200.00 0.90 2.056 1.85 2 0.93

M2 4.00 28.00 0.14 3.056 0.44 1 0.44

6

Z0U34-0450 RCC Slab / Beam - 1L Casting M3 231.00 180.00 1.28 26.000 33.37 1 33.37

Formworks M2 1,155.00 16.00 72.19 3.056 220.61 6 36.77

1 Steel Fixer 1

Helper .056 Operator

Deshuttering

2 Carpenter

1 Helper .056 Operator

2 Carpenter 16 Helper 4 Mason

2 Carpenter

1 Helper .056 Operator

1 Steel Fixer 1

Helper .056 Operator

Deshuttering

2 Carpenter

1 Helper .056 Operator

1 Carpenter

18 Helper 6 Mason

1 Steel Fixer

2 Carpenter

1 Helper .056 Operator

Page 10: AMSC Productivity Rate - Turner

Page 10 of 50

AMSC PRODUCTIVITY RATE

ItemActivity Activity SUB Unit QTY Prod. Rate Days Tot. Man OD (O)

ID Description ACTIVITY (unit/day)

Crew Desc.

Tot. M-days

Manpower/day

Rebars kg 41,580.00 200.00 207.90 2.056 427.44 5 85.49

M2 1,155.00 32.00 36.09 3.056 110.30 2 55.15

14

Z0U34-0460 RCC For Stair/Landings @ G.L. - 1L Casting M3 8 81.00 0.10 22.000 2.17 1 2.17

Formworks M2 40.00 4.00 10.00 3.056 30.56 4 7.64

Rebars kg 1,440.00 200.00 7.20 2.056 14.80 3 4.93

M2 40.00 28.00 1.43 3.056 4.37 2 2.18

10

Z0U34-0470 RCC Canopy Casting M3 8.00 180.00 0.04 26.000 1.16 1 1.16

Formworks M2 40.00 16.00 2.50 3.056 7.64 4 1.91

1 Steel Fixer 1

Helper .056 Operator

Deshuttering

2 Carpenter

1 Helper .056 Operator

2 Carpenter 16 Helper 4 Mason

2 Carpenter

1 Helper .056 Operator

1 Steel Fixer 1

Helper .056 Operator

Deshuttering

2 Carpenter

1 Helper .056 Operator

1 Carpenter

18 Helper 6 Mason

1 Steel Fixer

2 Carpenter

1 Helper .056 Operator

Page 11: AMSC Productivity Rate - Turner

Page 11 of 50

AMSC PRODUCTIVITY RATE

ItemActivity Activity SUB Unit QTY Prod. Rate Days Tot. Man OD (O)

ID Description ACTIVITY (unit/day)

Crew Desc.

Tot. M-days

Manpower/day

Rebars kg 1,440.00 200.00 7.20 2.056 14.80 3 4.93

M2 40.00 32.00 1.25 3.056 3.82 1 3.82

9

Z0U34-0480 RCC For Wall/Col. From Top of 1L-2L Casting M3 237 81.00 2.93 22.000 64.37 1 64.37

Formworks M2 948.00 4.00 237.00 3.056 724.27 5 144.85

Rebars kg 42,660.00 200.00 213.30 2.056 438.54 4 109.64

M2 948.00 28.00 33.86 3.056 103.47 2 51.73

12

Z0U34-0490 RCC Slab / Beam - 2L Casting M3 234.00 180.00 1.30 26.000 33.80 1 33.80

Formworks M2 1,170.00 16.00 73.13 3.056 223.47 6 37.25

1 Steel Fixer 1

Helper .056 Operator

Deshuttering

2 Carpenter

1 Helper .056 Operator

2 Carpenter 16 Helper 4 Mason

2 Carpenter

1 Helper .056 Operator

1 Steel Fixer 1

Helper .056 Operator

Deshuttering

2 Carpenter

1 Helper .056 Operator

1 Carpenter

18 Helper 6 Mason

1 Steel Fixer

2 Carpenter

1 Helper .056 Operator

Page 12: AMSC Productivity Rate - Turner

Page 12 of 50

AMSC PRODUCTIVITY RATE

ItemActivity Activity SUB Unit QTY Prod. Rate Days Tot. Man OD (O)

ID Description ACTIVITY (unit/day)

Crew Desc.

Tot. M-days

Manpower/day

Rebars kg 42,120.00 200.00 210.60 2.056 432.99 5 86.60

M2 1,170.00 32.00 36.56 3.056 111.74 2 55.87

14

Z0U34-0500 RCC for Stair/Landings @ 1L-2L Casting M3 7 81.00 0.09 22.000 1.90 1 1.90

Formworks M2 35.00 4.00 8.75 3.056 26.74 4 6.69

Rebars kg 1,260.00 200.00 6.30 2.056 12.95 3 4.32

M2 35.00 28.00 1.25 3.056 3.82 2 1.91

FINISHES

Z0U34-2710 I. Hollow Block Works + Lintels @ Grnd Flr. M2 1,879.00 10.00 187.90 2.056 386.32 14 27.59

Z0U34-2720 I. Internal Plaster Accessories & Rush @ GL M2 347.00 48.46 7.16 2.000 14.32 7 2.05

Z0U34-2730 I. Internal Plaster Works @ GL M2 2,413.00 20.00 120.65 2.000 241.30 12 20.11

1 Steel Fixer 1

Helper .056 Operator

Deshuttering

2 Carpenter

1 Helper .056 Operator

2 Carpenter 16 Helper 4 Mason

2 Carpenter

1 Helper .056 Operator

1 Steel Fixer 1

Helper .056 Operator

Deshuttering

2 Carpenter

1 Helper .056 Operator

1 Mason 1

Helper .056 Operator

1 Mason 1 Helper

1 Mason 1 Helper

Page 13: AMSC Productivity Rate - Turner

Page 13 of 50

AMSC PRODUCTIVITY RATE

ItemActivity Activity SUB Unit QTY Prod. Rate Days Tot. Man OD (O)

ID Description ACTIVITY (unit/day)

Crew Desc.

Tot. M-days

Manpower/day

Z0U34-2740 I. Glazed Ceramic Tile @ GL M2 826 12.00 68.83 2.056 141.52 14 10.11

Z0U34-2750 I. Block Works For Ducts @ Grnd Flr. M2 113 10.00 11.30 2.056 23.23 2 11.62

Z0U34-2760 I. Install False Ceiling (Susp. + Boarding) @ GL M2 509 7.20 70.69 2.056 145.35 14 10.38

Z0U34-2770 I. Screed + Ceramic Tiles & Skirtings @ GL M2 1572 12.00 131.00 2.056 269.34 14 19.24

Z0U34-2780 I. Screed + Non-Slip Ceramic Tiles &Skirtings@GL M2 354 32.00 11.06 2.056 22.74 14 1.62

Z0U34-2790 I. Water Proofing + Screed on Wet Areas - GL M2 683 64.00 10.67 6.000 64.03 10 6.40

Z0U34-2800 I. Frames Installations @ GL Nos. 59 4.80 12.29 2.056 25.27 14 1.81

Z0U34-2810 I. Doors w/ Ironmongery @ GL Nos. 59 4.80 12.29 2.056 25.27 12 2.11

Z0U34-2820 I. Frames Installation Works @ GL M2 108 4.80 22.50 2.056 46.26 14 3.30

Z0U34-2830 I.Aluminum + Glass & Other Associated Works @ GL M2 108 1.60 67.50 2.056 138.78 12 11.57

1 Mason 1

Helper .056 Operator

1 Mason 1

Helper .056 Operator

1 Carpenter

1 Helper .056 Operator

1 Mason 1

Helper .056 Operator

1 Mason 1

Helper .056 Operator

4Waterproofer 2 Helper

1 Carpenter

1 Helper .056 Operator

1 Carpenter

1 Helper .056 Operator

1 Carpenter

1 Helper .056 Operator

1 Alum. Tech 1

Helper .056 Operator

Page 14: AMSC Productivity Rate - Turner

Page 14 of 50

AMSC PRODUCTIVITY RATE

ItemActivity Activity SUB Unit QTY Prod. Rate Days Tot. Man OD (O)

ID Description ACTIVITY (unit/day)

Crew Desc.

Tot. M-days

Manpower/day

Z0U34-2840 I. Kitchen Cabinets @ GL Nos. 14 0.60 23.33 2.056 47.97 14 3.43

Z0U34-2850 I. Wardrobes @ GL Nos. 17 0.75 22.67 2.056 46.60 14 3.33

Z0U34-2860 I. Primer Application Works @ GL M2 864.00 54.60 15.82 1.000 1 Painter 15.82 10 1.58

Z0U34-2870 I. Stucco Application Works @ GL M2 864.00 16.40 52.68 1.000 1 Painter 52.68 14 3.76

Z0U34-2880 I. Emulsion Paint Works @ GL M2 1,626.00 32.20 50.50 1.000 1 Painter 50.50 12 4.21

Z0U34-2890 O. Plaster Accessories & Rush @ GL M2 52 48.46 1.07 2.000 2.15 7 0.31

Z0U34-2900 O. Plaster Works @ GL M2 316 20.00 15.80 2.000 31.60 12 2.63

Z0U34-2910 O. Polished Marble & Ceramic for Wall @ GL M2 37 10.00 3.70 2.056 7.61 14 0.54

Z0U34-2920 O. Blk Wks For Garbage Chutes+Plaster@ Grnd Flr. M2 16 10.00 1.60 2.056 3.29 2 1.64

Z0U34-2930 O. Gypsum Board +Washable Paint @ GL M2 66 16.00 4.13 2.056 8.48 14 0.61

Z0U34-2940 O. Semi Recessed G.R.G. Tiles @ GL M2 36 16.00 2.25 2.056 4.63 14 0.33

Z0U34-2950 O. Sreed + Graniti Tiles & Skirtings @ GL M2 514 12.00 42.83 2.056 88.07 14 6.29

1 Carpenter

1 Helper .056 Operator

1 Carpenter

1 Helper .056 Operator

1 Mason 1 Helper

1 Mason 1 Helper

1 Mason 1

Helper .056 Operator

1 Mason 1

Helper .056 Operator

1 Carpenter

1 Helper .056 Operator

1 Carpenter

1 Helper .056 Operator

1 Mason 1

Helper .056 Operator

Page 15: AMSC Productivity Rate - Turner

Page 15 of 50

AMSC PRODUCTIVITY RATE

ItemActivity Activity SUB Unit QTY Prod. Rate Days Tot. Man OD (O)

ID Description ACTIVITY (unit/day)

Crew Desc.

Tot. M-days

Manpower/day

Z0U34-2960 O. Screed + Polished Marble & Skirtings @ GL M2 148 12.00 12.33 2.056 25.36 14 1.81

Z0U34-2970 O. G. Stl, Powdr coated Railin to Staircase @ GL LM 24 20.00 1.20 2.056 2.47 10 0.25

Z0U34-2980 O. Primer ApplicationWorks @ GL. M2 109 54.60 2.00 1.000 1 Painter 2.00 8 0.25

Z0U34-2990 O. Stucco Application Works @ GL M2 109 16.40 6.65 1.000 1 Painter 6.65 12 0.55

Z0U34-3000 O. Emulsion Paint Works @ GL M2 58 32.20 1.80 1.000 1 Painter 1.80 10 0.18

Z0U34-3010 I. Hollow Block Works + Lintels @ 1st Flr. M2 1,950.00 10.00 195.00 2.056 400.92 14 28.64

Z0U34-3020 I. Internal Plaster Accessories & Rush @ 1L M2 347.00 48.46 7.16 2.000 14.32 7 2.05

Z0U34-3030 I. Internal Plaster Works @ 1L M2 2,581.00 20.00 129.05 2.000 258.10 12 21.51

Z0U34-3040 I. Glazed Ceramic Tile @ 1L M2 735 12.00 61.25 2.056 125.93 14 9.00

Z0U34-3050 I. Block Works For Ducts @ 1st Flr. M2 93 10.00 9.30 2.056 19.12 2 9.56

Z0U34-3060 I. Install False Ceiling (Susp. + Boarding) @ 1L M2 476 7.20 66.11 2.056 135.92 14 9.71

Z0U34-3070 I. Screed + Ceramic Tiles & Skirtings @ 1L M2 1746 12.00 145.50 2.056 299.15 14 21.37

1 Mason 1

Helper .056 Operator

1 Alum. Tech 1

Helper .056 Operator

1 Mason 1

Helper .056 Operator

1 Mason 1 Helper

1 Mason 1 Helper

1 Mason 1

Helper .056 Operator

1 Mason 1

Helper .056 Operator

1 Carpenter

1 Helper .056 Operator

1 Mason 1

Helper .056 Operator

Page 16: AMSC Productivity Rate - Turner

Page 16 of 50

AMSC PRODUCTIVITY RATE

ItemActivity Activity SUB Unit QTY Prod. Rate Days Tot. Man OD (O)

ID Description ACTIVITY (unit/day)

Crew Desc.

Tot. M-days

Manpower/day

Z0U34-3080 I. Screed + Non-Slip Ceramic Tiles &Skirtings@1L M2 269 32.00 8.41 2.056 17.28 8 2.16

Z0U34-3090 I. Water Proofing + Screed on Wet Areas - 1L M2 683 64.00 10.67 6.000 64.03 10 6.40

Z0U34-3100 I. Frames Installations @ 1L Nos. 72 4.80 15.00 2.056 30.84 14 2.20

Z0U34-3110 I. Doors w/ Ironmongery @ 1L Nos. 72 4.80 15.00 2.056 30.84 12 2.57

Z0U34-3120 I. Frames Installation Works @ GL M2 100 4.80 20.83 2.056 42.83 14 3.06

Z0U34-3130 I. Aluminum+Glass & Other Associated Works @ 1L M2 100 1.60 62.50 2.056 128.50 12 10.71

Z0U34-3140 I. Wardrobes @ 1L Nos. 17 0.75 22.67 2.056 46.60 14 3.33

Z0U34-3150 I. Kitchen Cabinets @ 1L Nos. 15 0.60 25.00 2.056 51.40 14 3.67

Z0U34-3160 I. Primer Application Works @ 1L M2 855.00 54.60 15.66 1.000 1 Painter 15.66 12 1.30

Z0U34-3170 I. Stucco Application Works @ 1L M2 855.00 16.40 52.13 1.000 1 Painter 52.13 14 3.72

Z0U34-3180 I. Emulsion Paint Works @ 1L M2 1,649.00 32.20 51.21 1.000 1 Painter 51.21 14 3.66

Z0U34-3190 O. Plaster Accessories & Rush @ 1L M2 52 48.46 1.07 2.000 2.15 7 0.31

Z0U34-3200 O. Plaster Works @ 1L M2 297 20.00 14.85 2.000 29.70 12 2.48

1 Mason 1

Helper .056 Operator

4Waterproofer 2 Helper

1 Carpenter

1 Helper .056 Operator

1 Carpenter

1 Helper .056 Operator

1 Carpenter

1 Helper .056 Operator

1 Alum. Tech 1

Helper .056 Operator

1 Carpenter

1 Helper .056 Operator

1 Carpenter

1 Helper .056 Operator

1 Mason 1 Helper

1 Mason 1 Helper

Page 17: AMSC Productivity Rate - Turner

Page 17 of 50

AMSC PRODUCTIVITY RATE

ItemActivity Activity SUB Unit QTY Prod. Rate Days Tot. Man OD (O)

ID Description ACTIVITY (unit/day)

Crew Desc.

Tot. M-days

Manpower/day

Z0U34-3210 O. Polished Marble & Ceramic for Wall @ 1L M2 36 10.00 3.60 2.056 7.40 14 0.53

Z0U34-3220 O. Blk Wks For Garbage Chutes+Plasters@ 1st Flr. M2 14 10.00 1.40 2.056 2.88 2 1.44

Z0U34-3230 O. Gypsum Board +Washable Paint @ 1L M2 66 16.00 4.13 2.056 8.48 14 0.61

Z0U34-3240 O. Semi Recessed G.R.G. Tiles @ 1L M2 36 16.00 2.25 2.056 4.63 14 0.33

Z0U34-3250 O. Sreed + Graniti Tiles & Skirtings @ 1L M2 425 12.00 35.42 2.056 72.82 14 5.20

Z0U34-3260 O. Screed + Polished Marble & Skirtings @ 1L M2 48 12.00 4.00 2.056 8.22 14 0.59

Z0U34-3270 O. G. Stl, Powdr coated Railin to Staircase @ 1L LM 26 20.00 1.30 2.056 2.67 10 0.27

Z0U34-3280 O. Primer Application Works @ 1L M2 103 54.60 1.89 1.000 1 Painter 1.89 8 0.24

Z0U34-3290 O. Stucco Application Works @ 1L M2 103 16.40 6.28 1.000 1 Painter 6.28 10 0.63

Z0U34-3300 O. Emulsion Paint Works @ 1L M2 58 32.20 1.80 1.000 1 Painter 1.80 12 0.15

1 Mason 1

Helper .056 Operator

1 Mason 1

Helper .056 Operator

1 Carpenter

1 Helper .056 Operator

1 Carpenter

1 Helper .056 Operator

1 Mason 1

Helper .056 Operator

1 Mason 1

Helper .056 Operator

1 Alum. Tech 1

Helper .056 Operator

Page 18: AMSC Productivity Rate - Turner

Page 18 of 50

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

SITEWORKS

Z0U34-0000 Site Clearing M2 1,502.00 4,200.00 0.36 2.000 0.72 1 0.72 0.36 0.36 1.000 1 Dozer 0.36 0.36

Z0U34-0010 Setting-out / Layout M 160.08 76.00 2.11 3.000 6.32 1 6.32 4.21 2.11

SUBSTRUCTURE

Z0U34-0020 Excavation for footings + Disposal of Materials M3 953.00 409.50 2.33 2.000 4.65 2 2.33 0.47 0.47 1.000 1 Dozer 2.33 0.47

M3 555.00 345.60 1.61 8.250 13.25 3 4.42 0.48 0.24 1.93 6.750 10.84 0.24 1.93

5 - - - 0.95 0.71 1.93 - - - - 0.47 0.24 1.93 - - - - - - -

Z0U34-0030 Formation Level & Compaction M3 238 252.00 0.94 6.250 5.90 2 2.95 0.71 0.35 1.89 4.750 4.49 0.24 1.89 0.12

Z0U34-0040 Anti-Termite Applications (Under PCC Footings) M2 571 202.50 2.82 1.000 2.82 1 2.82 2.82

Z0U34-0050 Backfill & Compaction upto bot. of PCC Tie-Beam M3 268 252.00 1.06 8.250 8.77 7 1.25 0.23 0.11 0.91 6.750 7.18 0.11 0.86 0.05

Z0U34-0060 Anti-Termite Applications (Under PCC Tie-Beam) M2 37 202.50 0.18 1.000 0.18 1 0.18 0.18

Z0U34-0070 Backfill & Compaction up to bot of PCC Grd. Slab M3 2,332.00 252.00 9.25 8.250 76.35 3 25.45 4.63 2.31 18.51 6.750 62.46 2.19 17.53 1.10

Z0U34-0080 Anti-Termite Applications (Under PCC Grade Slab) M2 894 202.50 4.41 1.000 4.41 1 4.41 4.41

Z0U34-0090 Shutters + 50mm Thk. PCC Under Footings M2 982 270.00 3.64 11.000 40.01 2 20.00 1.82 18.19

Z0U34-0100 50mm Protection Screed (Over W.P. Membrane-Ftg.) M2 2,246.00 270.00 8.32 11.000 91.50 2 45.75 4.16 41.59

Z0U34-0110 RCC For Footings Casting M3 244 180.00 1.36 26.000 35.24 1 35.24 0.500 0.68 0.07

Formworks M2 976.00 12.00 81.33 3.056 248.55 4 62.14 16.27 8.13 0.46 0.056 4.55 0.46

Rebars kg 43,920.00 250.00 175.68 2.056 361.20 3 120.40 17.57 17.57 0.98 0.056 9.84 0.98

M2 976.00 35.00 27.89 3.056 85.22 2 42.61 5.58 2.79 0.16 0.056 1.56 0.16

10 21.84 - 17.57 28.49 1.60 - - - - - - - - - - - 1.60 0.07 - -

Z0U34-0120 RCC Necks Columns / Walls + MEP Sleeves Casting M3 154 81.00 1.90 22.000 41.83 1 41.83 1.000 1 Vibrator 1.90 0.16

Formworks M2 616.00 4.00 154.00 3.056 470.62 5 94.12 25.67 12.83 0.72 0.056 8.62 0.72

Rebars kg 27,720.00 200.00 138.60 2.056 284.96 4 71.24 11.55 11.55 0.65 0.056 7.76 0.65

M2 616.00 28.00 22.00 3.056 67.23 2 33.62 3.67 1.83 0.10 0.056 1.23 0.10

12 29.33 - 11.55 26.22 1.47 - - - - - - - - - - - 1.47 0.16 - -

Z0U34-0130 Shutters + 50mm Thk. PCC Under Tie-Beams M2 63 270.00 0.23 11.000 2.57 2 1.28 0.12 1.17

Z0U34-0140 50mm Screed (Over W.P. Membrane-T.B.) M2 144 270.00 0.53 11.000 5.87 2 2.93 0.27 2.67

Z0U34-0150 RCC Tie Beams + MEP Sleeves Casting M3 33 180.00 0.18 22.000 4.03 1 4.03 0.500 0.09 0.01

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

1 Operator 1 Helper

2 Carpenter 1 Helper

For Excavation

1 Operator 1 Helper

For Disposal

0.75 Operator 6 Driver 1.5 Helper

0.75 Shovel 6 D. Truck

.75 Operator 4 Driver 1.5 Helper

0.5 Shovel 4 D. Truck .25 B. Roller

2 Technican

0.75 Operator 6 Driver 1.5 Helper

0.5 Shovel 6 D. Truck .25 B. Roller

2 Technican

0.75 Operator 6 Driver 1.5 Helper

0.5 Shovel 6 D. Truck .25 B. Roller

2 Technican

1 Mason 10 Helper

1 Mason 10 Helper

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

.5 Vibrator

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Mason 10 Helper

1 Mason 10 Helper

1 Carpenter 16 Helper 4 Mason 1 Steel Fixer

.5 Vibrator

Page 19: AMSC Productivity Rate - Turner

Page 19 of 50

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Formworks M2 132.00 4.00 33.00 3.056 100.85 4 25.21 6.60 3.30 0.18 0.056 1.85 0.18

Rebars kg 5,940.00 250.00 23.76 2.056 48.85 3 16.28 2.38 2.38 0.13 0.056 1.33 0.13

M2 132.00 28.00 4.71 3.056 14.41 2 7.20 0.94 0.47 0.03 0.056 0.26 0.03

10 7.54 - 2.38 6.15 0.34 - - - - - - - - - - - 0.34 0.01 - -

Z0U34-0160 RCC Kickers Over Tie-Beam Casting M3 1 180.00 0.01 22.000 0.12 1 0.12 0.500 0.00 0.001

Formworks M2 4.00 4.00 1.00 3.056 3.06 1 3.06 0.50 0.25 0.01 0.056 0.06 0.01

Rebars kg 180.00 250.00 0.72 2.056 1.48 1 1.48 0.18 0.18 0.01 0.056 0.04 0.01

M2 4.00 28.00 0.14 3.056 0.44 1 0.44 0.07 0.04 0.00 0.056 0.01 0.00

4 0.57 - 0.18 0.47 0.03 0.02608 0.000694

Z0U34-0170 50mm Thk. PCC Under Grade Slab M2 1,537.00 270.00 5.69 11.000 62.62 2 31.31 2.85 28.46

Z0U34-0180 Mesh + Filler Board & RCC For Grade Slab M3 208 180.00 1.16 26.000 30.04 3 10.01 0.39 2.31 0.39 6.93 1.000 1 Vibrator 1.16 0.39

Z0U34-0190 50mm Thk. PCC Steps & Ramps M2 10 270.00 0.04 11.000 0.41 2 0.20 0.02 0.19

Z0U34-0200 Steps & Ramps Works + Place Conc. M3 5 180.00 0.03 26.000 0.72 8 0.09 0.01 0.02 0.00 0.06 1.000 1 Vibrator 0.03 0.01

Z0U34-0210 Waterproofing Membrane (Over PCC Footings) M2 1,047.00 152.00 6.89 6.000 41.33 2 20.66 6.89 13.78 -

Z0U34-0220 Water Proofing For Neck Column & Wall & Footing M2 2,021.00 152.00 13.30 6.000 79.78 3 26.59 8.86 17.73 -

Z0U34-0230 Waterproofing Membrane (Over PCC Tie-beams) M2 67 152.00 0.44 6.000 2.64 2 1.32 0.44 0.88 -

Z0U34-0240 Waterproofing Membrane For Tie Beams M2 121 152.00 0.80 6.000 4.78 3 1.59 0.53 1.06 -

Z0U34-0250 50mm Thk. PCC Under Base of Tank M2 77 270.00 0.29 11.000 3.14 1 3.14 0.29 2.85 -

Z0U34-0260 Waterproofing Membrane (Over PCC - Base) M2 82 152.00 0.54 6.000 3.24 1 3.24 1.08 2.16 -

Z0U34-0270 50mm Protect'n Screed (Over W.P. Membrane-Base) M2 176 270.00 0.65 11.000 7.17 1 7.17 0.65 6.52 -

Z0U34-0280 RCC Water Tank Base + Deshuttering Casting M3 38 180.00 0.21 26.000 5.49 1 5.49 0.500 0.11 0.03

Formworks M2 152.00 12.00 12.67 3.056 38.71 1 38.71 6.33 3.17 0.18 0.056 0.71 0.18

Rebars kg 6,840.00 250.00 27.36 2.056 56.25 1 56.25 6.84 6.84 0.38 0.056 1.53 0.38

M2 152.00 35.00 4.34 3.056 13.27 1 13.27 2.17 1.09 0.06 0.056 0.24 0.06

4 8.50 - 6.84 11.09 0.62 - - - - - - - - - - - 0.62 0.03 - -

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Carpenter 16 Helper 4 Mason 1 Steel Fixer

.5 Vibrator

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Mason 10 Helper

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

1 Mason 10 Helper

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

4 Waterproofer 2 Helper

4 Waterproofer 2 Helper

4 Waterproofer 2 Helper

4 Waterproofer 2 Helper

1 Mason 10 Helper

4 Waterproofer 2 Helper

1 Mason 10 Helper

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

.5 Vibrator

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

Page 20: AMSC Productivity Rate - Turner

Page 20 of 50

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Z0U34-0290 RCC Wall W/MEP Pipes & Water Stop + Deshuttering Casting M3 34 81.00 0.42 22.000 9.23 1 9.23 1.000 1 Vibrator 0.42 0.08

Formworks M2 136.00 4.00 34.00 3.056 103.90 2 51.95 13.60 6.80 0.38 0.056 1.90 0.38

Rebars kg 6,120.00 200.00 30.60 2.056 62.91 1 62.91 6.12 6.12 0.34 0.056 1.71 0.34

M2 136.00 28.00 4.86 3.056 14.84 1 14.84 1.94 0.97 0.05 0.056 0.27 0.05

5 15.54 - 6.12 13.89 0.78 - - - - - - - - - - - 0.78 0.08 - -

Z0U34-0300 RCC Top Slab + Deshuttering for Water Tank Casting M3 8.00 180.00 0.04 26.000 1.16 1 1.16 1.000 1 Vibrator 0.04 0.01

Formworks M2 40.00 16.00 2.50 3.056 7.64 2 3.82 1.00 0.50 0.03 0.056 0.14 0.03

Rebars kg 1,440.00 200.00 7.20 2.056 14.80 1 14.80 1.44 1.44 0.08 0.056 0.40 0.08

M2 40.00 32.00 1.25 3.056 3.82 1 3.82 0.50 0.25 0.01 0.056 0.07 0.01

5 1.50 - 1.44 2.19 0.12 - - - - - - - - - - - 0.12 0.01 - -

Z0U34-0310 Water Proofing Membrane all around outside surfc M2 172 152.00 1.13 6.000 6.79 2 3.39 1.13 2.26 -

Z0U34-0320 Protection Board all around outside surface M2 172 152.00 1.13 6.000 6.79 2 3.39 1.13 2.26 -

Z0U34-0330 Backfill around Water tank walls M3 6 252.00 0.02 8.250 0.20 3 0.07 0.01 0.01 0.05 6.750 0.16 0.01 0.05 0.00

Z0U34-0340 G.R.P. Lining around inside + S.S. Lader & Door M2 221 20.00 11.05 2.000 22.10 3 7.37 3.68 3.68

Z0U34-0350 50mm Thk. PCC Under Base of Elevator Shaft M2 14 270.00 0.05 11.000 0.57 1 0.57 0.05 0.52 -

Z0U34-0360 Waterproofing Membrane (Over PCC - Base) M2 15 152.00 0.10 6.000 0.59 1 0.59 0.20 0.39 -

Z0U34-0370 50mm Protect'n Screed (Over W.P. Membrane-Base) M2 32 270.00 0.12 11.000 1.30 1 1.30 0.12 1.19 -

Z0U34-0380 RCC Elevator Shaft Base + Deshuttering Casting M3 7 180.00 0.04 26.000 1.01 1 1.01 0.500 0.02 0.00

Formworks M2 28.00 12.00 2.33 3.056 7.13 1 7.13 1.17 0.58 0.03 0.056 0.13 0.03

Rebars kg 1,260.00 250.00 5.04 2.056 10.36 1 10.36 1.26 1.26 0.07 0.056 0.28 0.07

M2 28.00 35.00 0.80 3.056 2.44 1 2.44 0.40 0.20 0.01 0.056 0.04 0.01

4 1.57 - 1.26 2.04 0.11 - - - - - - - - - - - 0.11 0.00 - -

Z0U34-0390 RCC Wall W/ MEP Cond. + Deshuttering Casting M3 4 81.00 0.05 22.000 1.09 1 1.09 1.000 1 Vibrator 0.05 0.01

Formworks M2 16.00 4.00 4.00 3.056 12.22 2 6.11 1.60 0.80 0.04 0.056 0.22 0.04

Rebars kg 720.00 200.00 3.60 2.056 7.40 1 7.40 0.72 0.72 0.04 0.056 0.20 0.04

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

4 Waterproofer 2 Helper

4 Waterproofer 2 Helper

0.75 Operator 6 Driver 1.5 Helper

0.5 Shovel 6 D. Truck .25 B. Roller

1 Mason 1 Helper

1 Mason 10 Helper

4 Waterproofer 2 Helper

1 Mason 10 Helper

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

.5 Vibrator

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Page 21: AMSC Productivity Rate - Turner

Page 21 of 50

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

M2 16.00 28.00 0.57 3.056 1.75 1 1.75 0.23 0.11 0.01 0.056 0.03 0.01

5 1.83 - 0.72 1.63 0.09 - - - - - - - - - - - 0.09 0.01 - -

Z0U34-0400 Water Proofing Membrane all around outside surfc M2 60 152.00 0.39 6.000 2.37 3 0.79 0.26 0.53 -

Z0U34-0410 Protection Board all around outside surface M2 216 152.00 1.42 6.000 8.53 2 4.26 1.42 2.84 -

Z0U34-0420 Backfill around the Lift's Pit wall M3 9.89 252.00 0.04 8.250 0.32 3 0.11 0.02 0.01 0.08 6.750 0.26 0.01 0.07 0.00

Z0U34-0430 RCC For Wall/Col. From Top of Grade Slab-1L Casting M3 251 81.00 3.10 22.000 68.17 1 68.17 1.000 1 Vibrator 3.10 0.26

Formworks M2 1,004.00 4.00 251.00 3.056 767.06 5 153.41 41.83 20.92 1.17 0.056 14.06 1.17

Rebars kg 45,180.00 200.00 225.90 2.056 464.45 4 116.11 18.83 18.83 1.05 0.056 12.65 1.05

M2 1,004.00 28.00 35.86 3.056 109.58 2 54.79 5.98 2.99 0.17 0.056 2.01 0.17

12 47.81 - 18.83 42.73 2.39 - - - - - - - - - - - 2.39 0.26 - -

Z0U34-0440 Columns From Top of Grade Slab-1L (Canopy) Casting M3 1 81.00 0.01 22.000 0.27 1 0.27 1.000 1 Vibrator 0.01 0.00

Formworks M2 4.00 4.00 1.00 3.056 3.06 2 1.53 0.33 0.17 0.01 0.056 0.06 0.01

Rebars kg 180.00 200.00 0.90 2.056 1.85 2 0.93 0.15 0.15 0.01 0.056 0.05 0.01

M2 4.00 28.00 0.14 3.056 0.44 1 0.44 0.05 0.02 0.00 0.056 0.01 0.00

6 0.38 - 0.15 0.34 0.02 - - - - - - - - - - - 0.02 0.00 - -

Z0U34-0450 RCC Slab / Beam - 1L Casting M3 231.00 180.00 1.28 26.000 33.37 1 33.37 1.000 1 Vibrator 1.28 0.09

Formworks M2 1,155.00 16.00 72.19 3.056 220.61 6 36.77 10.31 5.16 0.29 0.056 4.04 0.29

Rebars kg 41,580.00 200.00 207.90 2.056 427.44 5 85.49 14.85 14.85 0.83 0.056 11.64 0.83

M2 1,155.00 32.00 36.09 3.056 110.30 2 55.15 5.16 2.58 0.14 0.056 2.02 0.14

14 15.47 - 14.85 22.58 1.26 - - - - - - - - - - - 1.26 0.09 - -

Z0U34-0460 RCC For Stair/Landings @ G.L. - 1L Casting M3 8 81.00 0.10 22.000 2.17 1 2.17 1.000 1 Vibrator 0.10 0.01

Formworks M2 40.00 4.00 10.00 3.056 30.56 4 7.64 2.00 1.00 0.06 0.056 0.56 0.06

Rebars kg 1,440.00 200.00 7.20 2.056 14.80 3 4.93 0.72 0.72 0.04 0.056 0.40 0.04

M2 40.00 28.00 1.43 3.056 4.37 2 2.18 0.29 0.14 0.01 0.056 0.08 0.01

10 2.29 - 0.72 1.86 0.10 - - - - - - - - - - - 0.10 0.01 - -

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

4 Waterproofer 2 Helper

4 Waterproofer 2 Helper

0.75 Operator 6 Driver 1.5 Helper

0.5 Shovel 6 D. Truck .25 B. Roller

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

Page 22: AMSC Productivity Rate - Turner

Page 22 of 50

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Z0U34-0470 RCC Canopy Casting M3 8.00 180.00 0.04 26.000 1.16 1 1.16 1.000 1 Vibrator 0.04 0.00

Formworks M2 40.00 16.00 2.50 3.056 7.64 4 1.91 0.56 0.28 0.02 0.056 0.14 0.02

Rebars kg 1,440.00 200.00 7.20 2.056 14.80 3 4.93 0.80 0.80 0.04 0.056 0.40 0.04

M2 40.00 32.00 1.25 3.056 3.82 1 3.82 0.28 0.14 0.01 0.056 0.07 0.01

9 0.83 - 0.80 1.22 0.07 - - - - - - - - - - - 0.07 0.00 - -

Z0U34-0480 RCC For Wall/Col. From Top of 1L-2L Casting M3 237 81.00 2.93 22.000 64.37 1 64.37 1.000 1 Vibrator 2.93 0.24

Formworks M2 948.00 4.00 237.00 3.056 724.27 5 144.85 39.50 19.75 1.11 0.056 13.27 1.11

Rebars kg 42,660.00 200.00 213.30 2.056 438.54 4 109.64 17.78 17.78 1.00 0.056 11.94 1.00

M2 948.00 28.00 33.86 3.056 103.47 2 51.73 5.64 2.82 0.16 0.056 1.90 0.16

12 45.14 - 17.78 40.35 2.26 - - - - - - - - - - - 2.26 0.24 - -

Z0U34-0490 RCC Slab / Beam - 2L Casting M3 234.00 180.00 1.30 26.000 33.80 1 33.80 1.000 1 Vibrator 1.30 0.09

Formworks M2 1,170.00 16.00 73.13 3.056 223.47 6 37.25 10.45 5.22 0.29 0.056 4.10 0.29

Rebars kg 42,120.00 200.00 210.60 2.056 432.99 5 86.60 15.04 15.04 0.84 0.056 11.79 0.84

M2 1,170.00 32.00 36.56 3.056 111.74 2 55.87 5.22 2.61 0.15 0.056 2.05 0.15

14 15.67 - 15.04 22.88 1.28 - - - - - - - - - - - 1.28 0.09 - -

Z0U34-0500 RCC for Stair/Landings @ 1L-2L Casting M3 7 81.00 0.09 22.000 1.90 1 1.90 1.000 1 Vibrator 0.09 0.01

Formworks M2 35.00 4.00 8.75 3.056 26.74 4 6.69 1.75 0.88 0.05 0.056 0.49 0.05

Rebars kg 1,260.00 200.00 6.30 2.056 12.95 3 4.32 0.63 0.63 0.04 0.056 0.35 0.04

M2 35.00 28.00 1.25 3.056 3.82 2 1.91 0.25 0.13 0.01 0.056 0.07 0.01

10 2.00 - 0.63 1.63 0.09 - - - - - - - - - - - 0.09 0.01 - - Z0U34-0510 RCC For Wall/Col. From Top of 2L-3L M3 237 12Z0U34-0520 RCC Slab / Beam - 3L M3 234 14Z0U34-0530 RCC For Stair/Landings @ 2L-3L M3 7 10

Z0U34-0540 RCC For Wall/Col. From Top of 3L-4L Casting M3 236 81.00 2.91 22.000 64.10 1 64.10 1.000 1 Vibrator 2.91 0.24

Formworks M2 944.00 4.00 236.00 3.056 721.22 5 144.24 39.33 19.67 1.10 0.056 13.22 1.10

Rebars kg 42,480.00 200.00 212.40 2.056 436.69 4 109.17 17.70 17.70 0.99 0.056 11.89 0.99

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Page 23: AMSC Productivity Rate - Turner

Page 23 of 50

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

M2 944.00 28.00 33.71 3.056 103.03 2 51.52 5.62 2.81 0.16 0.056 1.89 0.16

12 44.95 - 17.70 40.18 2.25 - - - - - - - - - - - 2.25 0.24 - -

Z0U34-0550 RCC Slab / Beam - 4L Casting M3 237.00 180.00 1.32 26.000 34.23 1 34.23 1.000 1 Vibrator 1.32 0.09

Formworks M2 1,185.00 16.00 74.06 3.056 226.34 6 37.72 10.58 5.29 0.30 0.056 4.15 0.30

Rebars kg 42,660.00 200.00 213.30 2.056 438.54 5 87.71 15.24 15.24 0.85 0.056 11.94 0.85

M2 1,185.00 32.00 37.03 3.056 113.17 2 56.58 5.29 2.65 0.15 0.056 2.07 0.15

14 15.87 - 15.24 23.17 1.30 - - - - - - - - - - - 1.30 0.09 - - Z0U34-0560 RCC For Stair/Landings @ 3L-4L M3 7 10

Z0U34-0570 RCC For Wall/Col. From Top of 4L-RoofL Casting M3 148 81.00 1.83 22.000 40.20 1 40.20 1.000 1 Vibrator 1.83 0.18

Formworks M2 592.00 4.00 148.00 3.056 452.29 4 113.07 29.60 14.80 0.83 0.056 8.29 0.83

Rebars kg 26,640.00 200.00 133.20 2.056 273.86 3 91.29 13.32 13.32 0.75 0.056 7.46 0.75

M2 592.00 28.00 21.14 3.056 64.61 2 32.31 4.23 2.11 0.12 0.056 1.18 0.12

10 33.83 - 13.32 30.23 1.69 - - - - - - - - - - - 1.69 0.18 - -

Z0U34-0580 RCC Wall/Col. For Staircase From Top of 4L-RoofL Casting M3 3 81.00 0.04 22.000 0.81 1 0.81 1.000 1 Vibrator 0.04 0.01

Formworks M2 12.00 4.00 3.00 3.056 9.17 2 4.58 1.00 0.50 0.03 0.056 0.17 0.03

Rebars kg 540.00 200.00 2.70 2.056 5.55 2 2.78 0.45 0.45 0.03 0.056 0.15 0.03

M2 12.00 28.00 0.43 3.056 1.31 1 1.31 0.14 0.07 0.00 0.056 0.02 0.00

6 1.14 - 0.45 1.02 0.06 - - - - - - - - - - - 0.06 0.01 - -

Z0U34-0590 RCC Slab / Beam - RoofL Casting M3 152.00 180.00 0.84 26.000 21.96 1 21.96 1.000 1 Vibrator 0.84 0.07

Formworks M2 760.00 16.00 47.50 3.056 145.16 5 29.03 7.92 3.96 0.22 0.056 2.66 0.22

Rebars kg 27,360.00 200.00 136.80 2.056 281.26 4 70.32 11.40 11.40 0.64 0.056 7.66 0.64

M2 760.00 32.00 23.75 3.056 72.58 2 36.29 3.96 1.98 0.11 0.056 1.33 0.11

12 11.88 - 11.40 17.34 0.97 - - - - - - - - - - - 0.97 0.07 - -

Z0U34-0600 RCC For Stair/Landings @ 4L-RoofL Casting M3 3 81.00 0.04 22.000 0.81 1 0.81 1.000 1 Vibrator 0.04 0.00

Formworks M2 15.00 4.00 3.75 3.056 11.46 3 3.82 0.94 0.47 0.03 0.056 0.21 0.03

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

Page 24: AMSC Productivity Rate - Turner

Page 24 of 50

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Rebars kg 540.00 200.00 2.70 2.056 5.55 3 1.85 0.34 0.34 0.02 0.056 0.15 0.02

M2 15.00 28.00 0.54 3.056 1.64 1 1.64 0.13 0.07 0.00 0.056 0.03 0.00

8 1.07 - 0.34 0.87 0.05 - - - - - - - - - - - 0.05 0.00 - -

Z0U34-0610 RCC Slab / Beam for Staircase - RoofL Casting M3 4.00 180.00 0.02 26.000 0.58 1 0.58 1.000 1 Vibrator 0.02 0.00

Formworks M2 20.00 16.00 1.25 3.056 3.82 3 1.27 0.36 0.18 0.01 0.056 0.07 0.01

Rebars kg 720.00 200.00 3.60 2.056 7.40 2 3.70 0.51 0.51 0.03 0.056 0.20 0.03

M2 20.00 32.00 0.63 3.056 1.91 1 1.91 0.18 0.09 0.00 0.056 0.04 0.01

7 0.54 - 0.51 0.78 0.04 - - - - - - - - - - - 0.04 0.00 - -

Z0U34-0620 RCC For Lower Parapet Casting M3 24 81.00 0.30 22.000 6.52 1 6.52 1.000 1 Vibrator 0.30 0.03

Formworks M2 96.00 4.00 24.00 3.056 73.34 4 18.34 4.80 2.40 0.13 0.056 1.34 0.13

Rebars kg 4,320.00 200.00 21.60 2.056 44.41 3 14.80 2.16 2.16 0.12 0.056 1.21 0.12

M2 96.00 28.00 3.43 3.056 10.48 2 5.24 0.69 0.34 0.02 0.056 0.19 0.02

10 5.49 - 2.16 4.90 0.27 - - - - - - - - - - - 0.27 0.03 - -

Z0U34-0630 RCC For Wall/Col. From Roof L-Top of Roof L Casting M3 10 81.00 0.12 22.000 2.72 1 2.72 1.000 1 Vibrator 0.12 0.02

Formworks M2 40.00 4.00 10.00 3.056 30.56 2 15.28 3.33 1.67 0.09 0.056 0.56 0.09

Rebars kg 1,800.00 200.00 9.00 2.056 18.50 2 9.25 1.50 1.50 0.08 0.056 0.50 0.08

M2 40.00 28.00 1.43 3.056 4.37 1 4.37 0.48 0.24 0.01 0.056 0.08 0.01

6 3.81 - 1.50 3.40 0.19 - - - - - - - - - - - 0.19 0.02 - -

Z0U34-0640 RCC Slab / Beam Top Roof Level Casting M3 17.00 180.00 0.09 26.000 2.46 1 2.46 1.000 1 Vibrator 0.09 0.01

Formworks M2 85.00 16.00 5.31 3.056 16.24 3 5.41 1.52 0.76 0.04 0.056 0.30 0.04

Rebars kg 3,060.00 200.00 15.30 2.056 31.46 2 15.73 2.19 2.19 0.12 0.056 0.86 0.12

M2 85.00 32.00 2.66 3.056 8.12 1 8.12 0.76 0.38 0.02 0.056 0.15 0.02

7 2.28 - 2.19 3.32 0.19 - - - - - - - - - - - 0.19 0.01 - -

Z0U34-0650 RCC For Upper Parapet Casting M3 15 81.00 0.19 22.000 4.07 1 4.07 1.000 1 Vibrator 0.19 0.02

Formworks M2 60.00 4.00 15.00 3.056 45.84 3 15.28 3.75 1.88 0.11 0.056 0.84 0.11

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

Page 25: AMSC Productivity Rate - Turner

Page 25 of 50

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Rebars kg 2,700.00 200.00 13.50 2.056 27.76 3 9.25 1.69 1.69 0.09 0.056 0.76 0.09

M2 60.00 28.00 2.14 3.056 6.55 1 6.55 0.54 0.27 0.01 0.056 0.12 0.02

8 4.29 - 1.69 3.83 0.21 - - - - - - - - - - - 0.21 0.02 - -

Z0U34-0660 RCC Eqmt. Pads + Railing Casting M3 3 180.00 0.02 26.000 0.43 1 0.43 0.500 0.01 0.00

Formworks M2 12.00 12.00 1.00 3.056 3.06 4 0.76 0.20 0.10 0.01 0.056 0.06 0.01

Rebars kg 540.00 250.00 2.16 2.056 4.44 3 1.48 0.22 0.22 0.01 0.056 0.12 0.01

M2 12.00 35.00 0.34 3.056 1.05 2 0.52 0.07 0.03 0.00 0.056 0.02 0.00

10 0.27 - 0.22 0.35 0.02 - - - - - - - - - - - 0.02 0.00 - -

M E PFINISHES

Z0U34-2710 I. Hollow Block Works + Lintels @ Grnd Flr. M2 1,879.00 10.00 187.90 2.056 386.32 14 27.59 13.42 13.42 0.75 0.056 10.52 0.75

Z0U34-2720 I. Internal Plaster Accessories & Rush @ GL M2 347.00 48.46 7.16 2.000 14.32 7 2.05 1.02 1.02

Z0U34-2730 I. Internal Plaster Works @ GL M2 2,413.00 20.00 120.65 2.000 241.30 12 20.11 10.05 10.05

Z0U34-2740 I. Glazed Ceramic Tile @ GL M2 826 12.00 68.83 2.056 141.52 14 10.11 4.92 4.92 0.28 0.056 3.85 0.28

Z0U34-2750 I. Block Works For Ducts @ Grnd Flr. M2 113 10.00 11.30 2.056 23.23 2 11.62 5.65 5.65 0.32 0.056 0.63 0.32

Z0U34-2760 I. Install False Ceiling (Susp. + Boarding) @ GL M2 509 7.20 70.69 2.056 145.35 14 10.38 5.05 5.05 0.28 0.056 3.96 0.28

Z0U34-2770 I. Screed + Ceramic Tiles & Skirtings @ GL M2 1572 12.00 131.00 2.056 269.34 14 19.24 9.36 9.36 0.52 0.056 7.34 0.52

Z0U34-2780 I. Screed + Non-Slip Ceramic Tiles &Skirtings@GL M2 354 32.00 11.06 2.056 22.74 14 1.62 0.79 0.79 0.04 0.056 0.62 0.04

Z0U34-2790 I. Water Proofing + Screed on Wet Areas - GL M2 683 64.00 10.67 6.000 64.03 10 6.40 2.13 4.27

Z0U34-2800 I. Frames Installations @ GL Nos. 59 4.80 12.29 2.056 25.27 14 1.81 0.88 0.88 0.05 0.056 0.69 0.05

Z0U34-2810 I. Doors w/ Ironmongery @ GL Nos. 59 4.80 12.29 2.056 25.27 12 2.11 1.02 1.02 0.06 0.056 0.69 0.06

Z0U34-2820 I. Frames Installation Works @ GL M2 108 4.80 22.50 2.056 46.26 14 3.30 1.61 1.61 0.09 0.056 1.26 0.09

Z0U34-2830 I.Aluminum + Glass & Other Associated Works @ GL M2 108 1.60 67.50 2.056 138.78 12 11.57 5.63 0.32 5.63 0.056 3.78 0.32

Z0U34-2840 I. Kitchen Cabinets @ GL Nos. 14 0.60 23.33 2.056 47.97 14 3.43 1.67 1.67 0.09 0.056 1.31 0.09

Z0U34-2850 I. Wardrobes @ GL Nos. 17 0.75 22.67 2.056 46.60 14 3.33 1.62 1.62 0.09 0.056 1.27 0.09

Z0U34-2860 I. Primer Application Works @ GL M2 864.00 54.60 15.82 1.000 1 Painter 15.82 10 1.58 1.58

Z0U34-2870 I. Stucco Application Works @ GL M2 864.00 16.40 52.68 1.000 1 Painter 52.68 14 3.76 3.76

Z0U34-2880 I. Emulsion Paint Works @ GL M2 1,626.00 32.20 50.50 1.000 1 Painter 50.50 12 4.21 4.21

Z0U34-2890 O. Plaster Accessories & Rush @ GL M2 52 48.46 1.07 2.000 2.15 7 0.31 0.15 0.15

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

.5 Vibrator

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Deshuttering

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper

1 Mason 1 Helper

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

4Waterproofer 2 Helper

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Alum. Tech 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper

Page 26: AMSC Productivity Rate - Turner

Page 26 of 50

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Z0U34-2900 O. Plaster Works @ GL M2 316 20.00 15.80 2.000 31.60 12 2.63 1.32 1.32

Z0U34-2910 O. Polished Marble & Ceramic for Wall @ GL M2 37 10.00 3.70 2.056 7.61 14 0.54 0.26 0.26 0.01 0.056 0.21 0.01

Z0U34-2920 O. Blk Wks For Garbage Chutes+Plaster@ Grnd Flr. M2 16 10.00 1.60 2.056 3.29 2 1.64 0.80 0.80 0.04 0.056 0.09 0.04

Z0U34-2930 O. Gypsum Board +Washable Paint @ GL M2 66 16.00 4.13 2.056 8.48 14 0.61 0.29 0.29 0.02 0.056 0.23 0.02

Z0U34-2940 O. Semi Recessed G.R.G. Tiles @ GL M2 36 16.00 2.25 2.056 4.63 14 0.33 0.16 0.16 0.01 0.056 0.13 0.01

Z0U34-2950 O. Sreed + Graniti Tiles & Skirtings @ GL M2 514 12.00 42.83 2.056 88.07 14 6.29 3.06 3.06 0.17 0.056 2.40 0.17

Z0U34-2960 O. Screed + Polished Marble & Skirtings @ GL M2 148 12.00 12.33 2.056 25.36 14 1.81 0.88 0.88 0.05 0.056 0.69 0.05

Z0U34-2970 O. G. Stl, Powdr coated Railin to Staircase @ GL LM 24 20.00 1.20 2.056 2.47 10 0.25 0.12 0.01 0.12 0.056 0.07 0.01

Z0U34-2980 O. Primer ApplicationWorks @ GL. M2 109 54.60 2.00 1.000 1 Painter 2.00 8 0.25 0.25

Z0U34-2990 O. Stucco Application Works @ GL M2 109 16.40 6.65 1.000 1 Painter 6.65 12 0.55 0.55

Z0U34-3000 O. Emulsion Paint Works @ GL M2 58 32.20 1.80 1.000 1 Painter 1.80 10 0.18 0.18

Z0U34-3010 I. Hollow Block Works + Lintels @ 1st Flr. M2 1,950.00 10.00 195.00 2.056 400.92 14 28.64 13.93 13.93 0.78 0.056 10.92 0.78

Z0U34-3020 I. Internal Plaster Accessories & Rush @ 1L M2 347.00 48.46 7.16 2.000 14.32 7 2.05 1.02 1.02

Z0U34-3030 I. Internal Plaster Works @ 1L M2 2,581.00 20.00 129.05 2.000 258.10 12 21.51 10.75 10.75

Z0U34-3040 I. Glazed Ceramic Tile @ 1L M2 735 12.00 61.25 2.056 125.93 14 9.00 4.38 4.38 0.25 0.056 3.43 0.25

Z0U34-3050 I. Block Works For Ducts @ 1st Flr. M2 93 10.00 9.30 2.056 19.12 2 9.56 4.65 4.65 0.26 0.056 0.52 0.26

Z0U34-3060 I. Install False Ceiling (Susp. + Boarding) @ 1L M2 476 7.20 66.11 2.056 135.92 14 9.71 4.72 4.72 0.26 0.056 3.70 0.26

Z0U34-3070 I. Screed + Ceramic Tiles & Skirtings @ 1L M2 1746 12.00 145.50 2.056 299.15 14 21.37 10.39 10.39 0.58 0.056 8.15 0.58

Z0U34-3080 I. Screed + Non-Slip Ceramic Tiles &Skirtings@1L M2 269 32.00 8.41 2.056 17.28 8 2.16 1.05 1.05 0.06 0.056 0.47 0.06

Z0U34-3090 I. Water Proofing + Screed on Wet Areas - 1L M2 683 64.00 10.67 6.000 64.03 10 6.40 2.13 4.27

Z0U34-3100 I. Frames Installations @ 1L Nos. 72 4.80 15.00 2.056 30.84 14 2.20 1.07 1.07 0.06 0.056 0.84 0.06

Z0U34-3110 I. Doors w/ Ironmongery @ 1L Nos. 72 4.80 15.00 2.056 30.84 12 2.57 1.25 1.25 0.07 0.056 0.84 0.07

Z0U34-3120 I. Frames Installation Works @ GL M2 100 4.80 20.83 2.056 42.83 14 3.06 1.49 1.49 0.08 0.056 1.17 0.08

Z0U34-3130 I. Aluminum+Glass & Other Associated Works @ 1L M2 100 1.60 62.50 2.056 128.50 12 10.71 5.21 0.29 5.21 0.056 3.50 0.29

Z0U34-3140 I. Wardrobes @ 1L Nos. 17 0.75 22.67 2.056 46.60 14 3.33 1.62 1.62 0.09 0.056 1.27 0.09

Z0U34-3150 I. Kitchen Cabinets @ 1L Nos. 15 0.60 25.00 2.056 51.40 14 3.67 1.79 1.79 0.10 0.056 1.40 0.10

Z0U34-3160 I. Primer Application Works @ 1L M2 855.00 54.60 15.66 1.000 1 Painter 15.66 12 1.30 1.30

Z0U34-3170 I. Stucco Application Works @ 1L M2 855.00 16.40 52.13 1.000 1 Painter 52.13 14 3.72 3.72

Z0U34-3180 I. Emulsion Paint Works @ 1L M2 1,649.00 32.20 51.21 1.000 1 Painter 51.21 14 3.66 3.66

Z0U34-3190 O. Plaster Accessories & Rush @ 1L M2 52 48.46 1.07 2.000 2.15 7 0.31 0.15 0.15

1 Mason 1 Helper

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Alum. Tech 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper

1 Mason 1 Helper

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

4Waterproofer 2 Helper

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Alum. Tech 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper

Page 27: AMSC Productivity Rate - Turner

Page 27 of 50

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Z0U34-3200 O. Plaster Works @ 1L M2 297 20.00 14.85 2.000 29.70 12 2.48 1.24 1.24

Z0U34-3210 O. Polished Marble & Ceramic for Wall @ 1L M2 36 10.00 3.60 2.056 7.40 14 0.53 0.26 0.26 0.01 0.056 0.20 0.01

Z0U34-3220 O. Blk Wks For Garbage Chutes+Plasters@ 1st Flr. M2 14 10.00 1.40 2.056 2.88 2 1.44 0.70 0.70 0.04 0.056 0.08 0.04

Z0U34-3230 O. Gypsum Board +Washable Paint @ 1L M2 66 16.00 4.13 2.056 8.48 14 0.61 0.29 0.29 0.02 0.056 0.23 0.02

Z0U34-3240 O. Semi Recessed G.R.G. Tiles @ 1L M2 36 16.00 2.25 2.056 4.63 14 0.33 0.16 0.16 0.01 0.056 0.13 0.01

Z0U34-3250 O. Sreed + Graniti Tiles & Skirtings @ 1L M2 425 12.00 35.42 2.056 72.82 14 5.20 2.53 2.53 0.14 0.056 1.98 0.14

Z0U34-3260 O. Screed + Polished Marble & Skirtings @ 1L M2 48 12.00 4.00 2.056 8.22 14 0.59 0.29 0.29 0.02 0.056 0.22 0.02

Z0U34-3270 O. G. Stl, Powdr coated Railin to Staircase @ 1L LM 26 20.00 1.30 2.056 2.67 10 0.27 0.13 0.01 0.13 0.056 0.07 0.01

Z0U34-3280 O. Primer Application Works @ 1L M2 103 54.60 1.89 1.000 1 Painter 1.89 8 0.24 0.24

Z0U34-3290 O. Stucco Application Works @ 1L M2 103 16.40 6.28 1.000 1 Painter 6.28 10 0.63 0.63

Z0U34-3300 O. Emulsion Paint Works @ 1L M2 58 32.20 1.80 1.000 1 Painter 1.80 12 0.15 0.15

Z0U34-3310 I. Hollow Block Works + Lintels @ 2nd Flr. M2 1,950.00 10.00 195.00 2.056 400.92 14 28.64 13.93 13.93 0.78 0.056 10.92 0.78

Z0U34-3320 I. Internal Plaster Accessories & Rush @ 2L M2 347.00 48.46 7.16 2.000 14.32 7 2.05 1.02 1.02

Z0U34-3330 I. Internal Plaster Works @ 2L M2 2,581.00 20.00 129.05 2.000 258.10 12 21.51 10.75 10.75

Z0U34-3340 I. Glazed Ceramic Tile @ 2L M2 735 12.00 61.25 2.056 125.93 14 9.00 4.38 4.38 0.25 0.056 3.43 0.25

Z0U34-3350 I. Block Works For Ducts @ 2nd Flr. M2 93 10.00 9.30 2.056 19.12 2 9.56 4.65 4.65 0.26 0.056 0.52 0.26

Z0U34-3360 I. Install False Ceiling (Susp. + Boarding) @ 2L M2 476 7.20 66.11 2.056 135.92 14 9.71 4.72 4.72 0.26 0.056 3.70 0.26

Z0U34-3370 I. Screed + Ceramic Tiles & Skirtings @ 2L M2 1746 12.00 145.50 2.056 299.15 14 21.37 10.39 10.39 0.58 0.056 8.15 0.58

Z0U34-3380 I. Screed + Non-Slip Ceramic Tiles &Skirtings@2L M2 269 32.00 8.41 2.056 17.28 8 2.16 1.05 1.05 0.06 0.056 0.47 0.06

Z0U34-3390 I. Water Proofing + Screed on Wet Areas - 2L M2 683 64.00 10.67 6.000 64.03 10 6.40 2.13 4.27

Z0U34-3400 I. Frames Installations @ 2L Nos. 72 4.80 15.00 2.056 30.84 14 2.20 1.07 1.07 0.06 0.056 0.84 0.06

Z0U34-3410 I. Doors w/ Ironmongery @ 2L Nos. 72 4.80 15.00 2.056 30.84 12 2.57 1.25 1.25 0.07 0.056 0.84 0.07

Z0U34-3420 I. Frames Installation Works @ 2L M2 100 4.80 20.83 2.056 42.83 14 3.06 1.49 1.49 0.08 0.056 1.17 0.08

Z0U34-3430 I. Aluminum+Glass & Other Associated Works @ 2L M2 100 1.60 62.50 2.056 128.50 12 10.71 5.21 0.29 5.21 0.056 3.50 0.29

Z0U34-3440 I. Wardrobes @ 2L Nos. 17 0.75 22.67 2.056 46.60 14 3.33 1.62 1.62 0.09 0.056 1.27 0.09

Z0U34-3450 I. Kitchen Cabinets @ 2L Nos. 15 0.60 25.00 2.056 51.40 14 3.67 1.79 1.79 0.10 0.056 1.40 0.10

Z0U34-3460 I. Primer Application Works @ 2L M2 855.00 54.60 15.66 1.000 1 Painter 15.66 12 1.30 1.30

Z0U34-3470 I. Stucco Application Works @ 2L M2 855.00 16.40 52.13 1.000 1 Painter 52.13 14 3.72 3.72

Z0U34-3480 I. Emulsion Paint Works @ 2L M2 1,649.00 32.20 51.21 1.000 1 Painter 51.21 14 3.66 3.66

Z0U34-3490 O. Plaster Accessories & Rush @ 2L M2 52 48.46 1.07 2.000 2.15 7 0.31 0.15 0.15

1 Mason 1 Helper

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Alum. Tech 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper

1 Mason 1 Helper

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

4Waterproofer 2 Helper

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Alum. Tech 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper

Page 28: AMSC Productivity Rate - Turner

Page 28 of 50

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Z0U34-3500 O. Plaster Works @ 2L M2 297 20.00 14.85 2.000 29.70 12 2.48 1.24 1.24

Z0U34-3510 O. Polished Marble & Ceramic for Wall @ 2L M2 36 10.00 3.60 2.056 7.40 14 0.53 0.26 0.26 0.01 0.056 0.20 0.01

Z0U34-3520 O. Blk Wks For Garbage Chutes+Plasters@ 2nd Flr. M2 17 10.00 1.70 2.056 3.50 2 1.75 0.85 0.85 0.05 0.056 0.10 0.05

Z0U34-3530 O. Gypsum Board +Washable Paint @ 2L M2 66 16.00 4.13 2.056 8.48 14 0.61 0.29 0.29 0.02 0.056 0.23 0.02

Z0U34-3540 O. Semi Recessed G.R.G. Tiles @ 2L M2 36 16.00 2.25 2.056 4.63 14 0.33 0.16 0.16 0.01 0.056 0.13 0.01

Z0U34-3550 O. Sreed + Graniti Tiles & Skirtings @ 2L M2 425 12.00 35.42 2.056 72.82 14 5.20 2.53 2.53 0.14 0.056 1.98 0.14

Z0U34-3560 O. Screed + Polished Marble & Skirtings @ 2L M2 48 12.00 4.00 2.056 8.22 14 0.59 0.29 0.29 0.02 0.056 0.22 0.02

Z0U34-3570 O. G.Steel, Powder coated Railin to Staircase@2L LM 26 20.00 1.30 2.056 2.67 10 0.27 0.13 0.01 0.13 0.056 0.07 0.01

Z0U34-3580 O. Primer Application Works @ 2L M2 103 54.60 1.89 1.000 1 Painter 1.89 8 0.24 0.24

Z0U34-3590 O. Stucco Application Works @ 2L M2 103 16.40 6.28 1.000 1 Painter 6.28 10 0.63 0.63

Z0U34-3600 O. Emulsion Paint Works @ 2L M2 58 32.20 1.80 1.000 1 Painter 1.80 12 0.15 0.15

Z0U34-3610 I. Hollow Block Works + Lintels @ 3rd Flr. M2 1,950.00 10.00 195.00 2.056 400.92 14 28.64 13.93 13.93 0.78 0.056 10.92 0.78

Z0U34-3620 I. Internal Plaster Accessories & Rush @ 3L M2 347.00 48.46 7.16 2.000 14.32 7 2.05 1.02 1.02

Z0U34-3630 I. Internal Plaster Works @ 3L M2 2,581.00 20.00 129.05 2.000 258.10 12 21.51 10.75 10.75

Z0U34-3640 I. Glazed Ceramic Tile @ 3L M2 735 12.00 61.25 2.056 125.93 14 9.00 4.38 4.38 0.25 0.056 3.43 0.25

Z0U34-3650 I. Block Works For Ducts @ 3rd Flr. M2 93 10.00 9.30 2.056 19.12 2 9.56 4.65 4.65 0.26 0.056 0.52 0.26

Z0U34-3660 I. Install False Ceiling (Susp. + Boarding) @ 3L M2 476 7.20 66.11 2.056 135.92 14 9.71 4.72 4.72 0.26 0.056 3.70 0.26

Z0U34-3670 I. Screed + Ceramic Tiles & Skirtings @ 3L M2 1746 12.00 145.50 2.056 299.15 14 21.37 10.39 10.39 0.58 0.056 8.15 0.58

Z0U34-3680 I. Screed + Non-Slip Ceramic Tiles &Skirtings@3L M2 269 32.00 8.41 2.056 17.28 8 2.16 1.05 1.05 0.06 0.056 0.47 0.06

Z0U34-3690 I. Water Proofing + Screed on Wet Areas - 3L M2 683 64.00 10.67 6.000 64.03 10 6.40 2.13 4.27

Z0U34-3700 I. Frames Installations @ 3L Nos. 72 4.80 15.00 2.056 30.84 14 2.20 1.07 1.07 0.06 0.056 0.84 0.06

Z0U34-3710 I. Doors w/ Ironmongery @ 3L Nos. 72 4.80 15.00 2.056 30.84 12 2.57 1.25 1.25 0.07 0.056 0.84 0.07

Z0U34-3720 I. Frames Installation Works @ 3L M2 100 4.80 20.83 2.056 42.83 14 3.06 1.49 1.49 0.08 0.056 1.17 0.08

Z0U34-3730 I. Aluminum+Glass & Other Associated Works @ 3L M2 100 1.60 62.50 2.056 128.50 12 10.71 5.21 0.29 5.21 0.056 3.50 0.29

Z0U34-3740 I. Wardrobes @ 3L Nos. 17 0.75 22.67 2.056 46.60 14 3.33 1.62 1.62 0.09 0.056 1.27 0.09

Z0U34-3750 I. Kitchen Cabinets @ 3L Nos. 15 0.60 25.00 2.056 51.40 14 3.67 1.79 1.79 0.10 0.056 1.40 0.10

Z0U34-3760 I. Primer Appilcation Works @ 3L M2 855.00 54.60 15.66 1.000 1 Painter 15.66 12 1.30 1.30

Z0U34-3770 I. Stucco Application Works @ 3L M2 855.00 16.40 52.13 1.000 1 Painter 52.13 14 3.72 3.72

Z0U34-3780 I. Emulsion Paint Works @ 3L M2 1,649.00 32.20 51.21 1.000 1 Painter 51.21 14 3.66 3.66

Z0U34-3790 O. Plaster Accessories & Rush @ 3L M2 52 48.46 1.07 2.000 2.15 7 0.31 0.15 0.15

1 Mason 1 Helper

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Alum. Tech 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper

1 Mason 1 Helper

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

4Waterproofer 2 Helper

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Alum. Tech 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper

Page 29: AMSC Productivity Rate - Turner

Page 29 of 50

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Z0U34-3800 O. Plaster Works @ 3L M2 297 20.00 14.85 2.000 29.70 12 2.48 1.24 1.24

Z0U34-3810 O. Polished Marble & Ceramic for Wall @ 3L M2 36 10.00 3.60 2.056 7.40 14 0.53 0.26 0.26 0.01 0.056 0.20 0.01

Z0U34-3820 O. Blk Wks For Garbage Chutes+Plasters@ 3rd Flr. M2 17 10.00 1.70 2.056 3.50 2 1.75 0.85 0.85 0.05 0.056 0.10 0.05

Z0U34-3830 O. Gypsum Board +Washable Paint @ 3L M2 66 16.00 4.13 2.056 8.48 14 0.61 0.29 0.29 0.02 0.056 0.23 0.02

Z0U34-3840 O. Semi Recessed G.R.G. Tiles @ 3L M2 36 16.00 2.25 2.056 4.63 14 0.33 0.16 0.16 0.01 0.056 0.13 0.01

Z0U34-3850 O. Screed + Polished Marble & Skirtings @ 3L M2 48 12.00 4.00 2.056 8.22 14 0.59 0.29 0.29 0.02 0.056 0.22 0.02

Z0U34-3860 O. Sreed + Graniti Tiles & Skirtings @ 3L M2 425 12.00 35.42 2.056 72.82 14 5.20 2.53 2.53 0.14 0.056 1.98 0.14

Z0U34-3870 O. G.Steel, Powder coated Railin to Staircase@3L LM 26 20.00 1.30 2.056 2.67 10 0.27 0.13 0.01 0.13 0.056 0.07 0.01

Z0U34-3880 O. Primer Application Works @ 3L M2 103 54.60 1.89 1.000 1 Painter 1.89 8 0.24 0.24

Z0U34-3890 O. Stucco Application Works @ 3L M2 103 16.40 6.28 1.000 1 Painter 6.28 10 0.63 0.63

Z0U34-3900 O. Emulsion Paint Works @ 3L M2 58 32.20 1.80 1.000 1 Painter 1.80 12 0.15 0.15

Z0U34-3910 I. Hollow Block Works + Lintels @ 4th Flr. M2 1,188.00 10.00 118.80 2.056 244.25 12 20.35 9.90 9.90 0.55 0.056 6.65 0.55

Z0U34-3920 I. Internal Plaster Accessories & Rush @ 4L M2 347.00 48.46 7.16 2.000 14.32 7 2.05 1.02 1.02

Z0U34-3930 I. Internal Plaster Works @ 4L M2 1,252.00 20.00 62.60 2.000 125.20 10 12.52 6.26 6.26

Z0U34-3940 I. Glazed Ceramic Tile @ 4L M2 808.00 12.00 67.33 2.056 138.44 12 11.54 5.61 5.61 0.31 0.056 3.77 0.31

Z0U34-3950 I. Block Works For Ducts @ 4th Flr. M2 51 10.00 5.10 2.056 10.49 2 5.24 2.55 2.55 0.14 0.056 0.29 0.14

Z0U34-3960 I. Install False Ceiling (Susp. + Boarding) @ 4L M2 303 7.20 42.08 2.056 86.52 12 7.21 3.51 3.51 0.20 0.056 2.36 0.20

Z0U34-3970 I. Screed + Ceramic Tiles & Skirtings @ 4L M2 669 12.00 55.75 2.056 114.62 12 9.55 4.65 4.65 0.26 0.056 3.12 0.26

Z0U34-3980 I. Screed + Non-Slip Ceramic Tiles &Skirtings@4L M2 422 32.00 13.19 2.056 27.11 6 4.52 2.20 2.20 0.12 0.056 0.74 0.12

Z0U34-3990 I. Water Proofing + Screed on Wet Areas - 4L M2 379 64.00 5.92 6.000 35.53 8 4.44 1.48 2.96

Z0U34-4000 I. Frames Installations @ 4L Nos. 45 4.80 9.38 2.056 19.28 10 1.93 0.94 0.94 0.05 0.056 0.53 0.05

Z0U34-4010 I. Doors w/ Ironmongery @ 4L Nos. 45 4.80 9.38 2.056 19.28 8 2.41 1.17 1.17 0.07 0.056 0.53 0.07

Z0U34-4020 I. Frames Installation Works @ 4L M2 61 4.80 12.71 2.056 26.13 12 2.18 1.06 1.06 0.06 0.056 0.71 0.06

Z0U34-4030 I. Aluminum+Glass & Other Associated Works @ 4L M2 61 1.60 38.13 2.056 78.39 10 7.84 3.81 0.21 3.81 0.056 2.14 0.21

Z0U34-4040 I. Kitchen Cabinets @ 4L Nos. 7 0.75 9.33 2.056 19.19 12 1.60 0.78 0.78 0.04 0.056 0.52 0.04

Z0U34-4050 I. Wardrobes @ 4L Nos. 8 0.60 13.33 2.056 27.41 12 2.28 1.11 1.11 0.06 0.056 0.75 0.06

Z0U34-4060 I. Primer Application Works @ 4L M2 387.00 54.60 7.09 1.000 1 Painter 7.09 10 0.71 0.71

Z0U34-4070 I. Stucco Installation Works @ 4L M2 387.00 16.40 23.60 1.000 1 Painter 23.60 12 1.97 1.97

Z0U34-4080 I. Emulsion Paint Works @ 4L M2 876.00 32.20 27.20 1.000 1 Painter 27.20 12 2.27 2.27

Z0U34-4090 O. Plaster Accessories & Rush @ 4L M2 1 48.46 0.02 2.000 0.04 7 0.01 0.003 0.003

1 Mason 1 Helper

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Alum. Tech 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper

1 Mason 1 Helper

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

4Waterproofer 2 Helper

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Alum. Tech 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper

Page 30: AMSC Productivity Rate - Turner

Page 30 of 50

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Z0U34-4100 O. Blk Wks For Garbage Chutes+Plasters@ 4th Flr. M2 14 10.00 1.40 2.056 2.88 2 1.44 0.70 0.70 0.04 0.056 0.08 0.04

Z0U34-4110 O. Plaster Works @ 4L M2 114 20.00 5.70 2.000 11.40 10 1.14 0.57 0.57

Z0U34-4120 O. Polished Marble & Ceramic for Wall @ 4L M2 42 10.00 4.20 2.056 8.64 12 0.72 0.35 0.35 0.02 0.056 0.24 0.02

Z0U34-4130 O. Gypsum Board + Washable Paint @ 4L M2 37 16.00 2.31 2.056 4.75 12 0.40 0.19 0.19 0.01 0.056 0.13 0.01

Z0U34-4140 O. Semi Recessed G.R.G. Tiles @ 4L M2 20 16.00 1.25 2.056 2.57 12 0.21 0.10 0.10 0.01 0.056 0.07 0.01

Z0U34-4150 O. Screed + Polished Marble & Skirtings @ 4L M2 42 12.00 3.50 2.056 7.20 12 0.60 0.29 0.29 0.02 0.056 0.20 0.02

Z0U34-4160 O. Sreed + Graniti Tiles & Skirtings @ 4L M2 172 12.00 14.33 2.056 29.47 12 2.46 1.19 1.19 0.07 0.056 0.80 0.07

Z0U34-4170 O. G.Steel, Powder coated Railin to Staircase@4L LM 12 20.00 0.60 2.056 1.23 8 0.15 0.08 0.00 0.08 0.056 0.03 0.00

Z0U34-4180 O. Primer Application Works @ 4L M2 56 54.60 1.03 1.000 1 Painter 1.03 7 0.15 0.15

Z0U34-4190 O. Stucco Application Works @ 4L M2 56 16.40 3.41 1.000 1 Painter 3.41 8 0.43 0.43

Z0U34-4200 O. Emulsion Paint Works @ 4L M2 32 32.20 0.99 1.000 1 Painter 0.99 10 0.10 0.10

Z0U34-4210 Hollow Block Works + Lintels @ Roof Floor M2 194 10.00 19.40 2.056 39.89 10 3.99 1.94 1.94 0.11 0.056 1.09 0.11

Z0U34-4220 Plaster Accessories & Rush @ Roof Floor M2 52 48.46 1.07 2.000 2.15 5 0.43 0.215 0.215

Z0U34-4230 Plastering Works @ Roof Deck Floor M2 148 20.00 7.40 2.000 14.80 8 1.85 0.93 0.93

Z0U34-4240 Roof Drain & Access.+ Lightweight Concrete M2 281.00 7Z0U34-4250 One Coat Cold Bituminous Primer M2 13.00 2Z0U34-4260 2 Layers of SBS W.P. Membrane + Water Test M2 268.00 6Z0U34-4270 Alum. Foil Covering Fixed to Upstand w/ Sealant LM 107 3Z0U34-4280 50mm Thk. Extruded Polystyrene Insulation M2 268.00 2Z0U34-4290 Protection Layer M2 268.00 2Z0U34-4300 18mm-25mm Round Aggregates (50mm Thk.) M2 268.00 4Z0U34-4310 1mm Thk. Alum. Flashing Fixed into Conc. Upstand M2 107 3Z0U34-4320 Sealant Application Around top of Alum. Flashing M2 107 2Z0U34-4330 Channel & Rails Installation for Lifts Items 2 14Z0U34-4340 Cabin Assembly / Installation for lifts Items 2 10Z0U34-4350 Machine Installation for lifts Items 2 7Z0U34-4360 Doors Installation for lifts Items 2 10Z0U34-4370 Connections To Ele + Finishing Touches for lifts Items 2 12Z0U34-4380 Installation of Chute Tubes and Intake Throats Item 1 8Z0U34-4390 Install Intake Doors, Chute Vent & Accessories Item 1 4Z0U34-4400 Install Ground Floor Offset + Fire Shutter Door Item 1 2Z0U34-4410 Install Compactor with MCP Item 1 1Z0U34-4420 Installation of Garbage Container Item 1 1Z0U34-4430 Final Test & Comm. Item 1 3Z0U34-4440 Installation of Window Cleaning Eqmt. Item 1 14

Z0U34-4450 Primer Application Works @ Roof Deck M2 50 54.60 0.92 1.000 1 Painter 0.92 8 0.11 0.11

Z0U34-4460 Stucco Application Works @ Roof Deck M2 50 16.40 3.05 1.000 1 Painter 3.05 10 0.30 0.30

Z0U34-4470 Emulsion / Epoxy Paint Works @ Roof Deck M2 55 32.20 1.71 1.000 1 Painter 1.71 12 0.14 0.14

Z0U34-4480 Excavation Works External M3 7,137.50 315.00 22.66 2.000 45.32 5 9.06 4.53 4.53 1.000 22.66 4.53

Z0U34-4490 RCC Manholes / Gully Traps Nos. 54 5.63 9.60 5.000 48.00 14 3.43 1.37 0.69 0.69 0.69 1.000 9.60 0.69

Z0U34-4500 Water Proofing M2 91.07 76.00 1.20 6.000 7.19 12 0.60 0.20 0.40

Z0U34-4510 Sand Bedding M2 13.21 60.00 0.22 1.250 0.28 10 0.03 0.02 0.01 0.250 0.06 0.01

Z0U34-4520 Backfilling Works M3 7,125.36 601.00 11.86 7.500 88.92 14 6.35 2.54 1.27 2.54 4.500 53.35 0.42 2.54 0.42 0.42

Z0U34-4530 Instl Drainage Pipes &Con. To Existing Chambers Item 1 14Z0U34-4540 Instl Water Supply Pipes&Con. To Existg Chambers Item 1 12Z0U34-4550 Instl Chilled Water Pipes&Con. To Existg Chamber Item 1 14Z0U34-4560 Instl Central Gas Pipes &Con. To Existg Chambers Item 1 12Z0U34-4570 Instl Telephone Ducts &Con. To Existing Chambers Item 1 10Z0U34-4580 Laying of Power cables (By Others) Item 1 7Z0U34-4590 Hardscaping Works Item 1 14Z0U34-4600 Landscaping Works Item 1 12

Z0U34-4610 Ext. Plaster Accessories & Rush on Front Elev. M2 1,484.00 48.46 30.62 2.000 61.25 2 30.62 15.31 15.31

Z0U34-4620 Ext. Plaster Works on Front Elevation M2 19.00 8.00 2.38 2.000 4.75 4 1.19 0.59 0.59

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Alum. Tech 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper

1 Mason 1 Helper

1 Operator 1 Helper

1 Excavator

2 Carpenter 1 Mason 1 Helper 1 Operator

1 M. Crane

4Waterproofer 2 Helper

1 Helper 0.25 Operator

.25 Bob Cat

1.5 Operator 3 Driver 3 Helper

0.5 Shovel 3 Dump Truck .5 S. Roller .5 Bob Cat

1 Mason 1 Helper

1 Mason 1 Helper

Page 31: AMSC Productivity Rate - Turner

Page 31 of 50

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Z0U34-4630 Install Balcony Handrail on Front Elev. Nos. 35 15.00 2.33 2.250 5.25 12 0.44 0.19 0.19 0.05 0.250 0.58 0.05

Z0U34-4640 Decorative GRC Panels W/ Epoxy Paint @ F. Elev. Nos. 17 2.00 8.50 2.500 21.25 10 2.13 0.85 0.85 0.43 0.500 4.25 0.43

Z0U34-4650 Wooden Pergola on Front Elev. @ (1st & 2nd) Flr. LM 5 8.00 0.63 2.500 1.56 12 0.13 0.05 0.05 0.03 0.500 0.31 0.03

Z0U34-4660 External Painting Works on Front Elevation M2 1,503.00 32.20 46.68 3.000 3 Painter 140.03 14 10.00 10.00

Z0U34-4670 Ext. Plaster Access. & Rush on Leftside Elev. M2 606 48.46 12.51 2.000 25.01 2 12.51 6.25 6.25

Z0U34-4680 Ext. Plaster Works on Left Side Elevation M2 19 8.00 2.38 2.000 4.75 4 1.19 0.59 0.59

Z0U34-4690 Install Balcony Handrail on Leftside Elev. Nos. 0 15.00 - 2.250 - 10 0.00 - - - 0.250 - -

Z0U34-4700 Decorative GRC Panels W/ Epoxy Paint @ LS. Elev. Nos. 0 2.00 - 2.500 - 8 0.00 - - - 0.500 - -

Z0U34-4710 External Painting Works on Left Side Elevation M2 625 32.20 19.41 3.000 3 Painter 58.23 12 4.85 4.85

Z0U34-4720 Ext. Plaster Accessories & Rush on Rear Elev. M2 1,503.00 48.46 31.02 2.000 62.03 2 31.02 15.51 15.51

Z0U34-4730 Ext. Plaster Works on Rear Elevation M2 19.00 8.00 2.38 2.000 4.75 4 1.19 0.59 0.59

Z0U34-4740 Install Balcony Handrail on Rear Elev. Nos. 35 15.00 2.33 2.250 5.25 12 0.44 0.19 0.19 0.05 0.250 0.58 0.05

Z0U34-4750 Decorative GRC Panels W/ Epoxy Paint @ R. Elev. Nos. 17 2.00 8.50 2.500 21.25 10 2.13 0.85 0.85 0.43 0.500 4.25 0.43

Z0U34-4760 Wooden Pergola on Rear Elev. @ (1st & 2nd) Flr. LM 5 8.00 0.63 2.500 1.56 12 0.13 0.05 0.05 0.03 0.500 0.31 0.03

Z0U34-4770 External Painting Works on Rear Elevation M2 1,503.00 32.20 46.68 3.000 3 Painter 140.03 14 10.00 10.00

Z0U34-4780 Ext. Plaster Access. & Rush on Rightside Elev. M2 606 48.46 12.51 2.000 25.01 2 12.51 6.25 6.25

Z0U34-4790 Ext. Plaster Works on Right Side Elevation M2 19 8.00 2.38 2.000 4.75 4 1.19 0.59 0.59

Z0U34-4800 Install Balcony Handrail on Rigthside Elev. Nos. 0 15.00 - 2.250 - 10 0.00 - - - 0.250 - -

Z0U34-4810 Decorative GRC Panels W/ Epoxy Paint @ RS. Elev. Nos. 0 2.00 - 2.500 - 8 0.00 - - - 0.500 - -

Z0U34-4820 External Painting Works on Right Side Elevation M2 625 32.20 19.41 3.000 3 Painter 58.23 12 4.85 4.85 Z0U34-4830 Snagging & Desnagging For Finishes @ GF Item 1 30Z0U34-4840 Handing-Over For Finishes @ GF Item 1 10Z0U34-4850 Snagging & Desnagging For Finishes @ 1F Item 1 30Z0U34-4860 Handing-Over For Finishes @ 1F Item 1 10Z0U34-4870 Snagging & Desnagging For Finishes @ 2F Item 1 30Z0U34-4880 Handing-Over For Finishes @ 2F Item 1 10Z0U34-4890 Snagging & Desnagging For Finishes @ 3F Item 1 30Z0U34-4900 Handing-Over For Finishes @ 3F Item 1 10Z0U34-4910 Snagging & Desnagging For Finishes @ 4F Item 1 30Z0U34-4920 Handing-Over For Finishes @ 4F Item 1 10Z0U34-4930 Snagging & Desnagging For Finishes @ Roof Floor Item 1 30Z0U34-4940 Handing-Over For Finishes @ Roof Floor Item 1 10Z0U34-4950 Power On (By DEWA) 0 1Z0U34-4960 Precommissioning & Startup 0 21Z0U34-4970 Availability of Chilled Water (By Others) 0 1Z0U34-4980 Testing & Final Commissioning 0 35Z0U34-4990 Snagging & Desnagging For External Finishes Item 1 12Z0U34-5000 Handing-Over For External Finishes Item 1 2Z0U34-5010 Completion of Fdn./Superstructure -Building # 34 Item 1 1Z0U34-5020 Completion of External Works for Building # 34 Item 1 1Z0U34-5030 Completion of MEP Works for Building # 34 0 1Z0U34-5040 Completion of Finishes for Building # 34 Item 1 1Z0U34-5050 Completion of Fdn./SuperStruc. for Phase-1 BLDG. Item 1 0Z0U34-5060 Completion of External Works for Phase-1 BLDG. Item 1 0Z0U34-5070 Completion of MEP Works for Phase-1 BLDG. 0 0Z0U34-5080 Completion of Finishes for Phase-1 BLDG. Item 1 0

Z0U34-5090 Completion Milestone for Phase-1 Buildings Item 1 0

1 Mason 1 Helper .25 Operator

.25 M. Crane

1 Carpenter 1 Helper .5 Operator

..5 M. Crane

1 Carpenter 1 Helper .5 Operator

.5 M. Crane

1 Mason 1 Helper

1 Mason 1 Helper

1 Mason 1 Helper .25 Operator

.25 M. Crane

1 Carpenter 1 Helper .5 Operator

..5 M. Crane

1 Mason 1 Helper

1 Mason 1 Helper

1 Mason 1 Helper .25 Operator

.25 M. Crane

1 Carpenter 1 Helper .5 Operator

..5 M. Crane

1 Carpenter 1 Helper .5 Operator

.5 M. Crane

1 Mason 1 Helper

1 Mason 1 Helper

1 Mason 1 Helper .25 Operator

.25 M. Crane

1 Carpenter 1 Helper .5 Operator

..5 M. Crane

Page 32: AMSC Productivity Rate - Turner

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

SITEWORKS

Z2V33-0000 Site Clearing M2 1,597.00 4,200.00 0.38 2.000 0.76 1 0.76 0.38 0.38 1.000 1 Dozer 0.38 0.38

Z2V33-0010 Setting-out / Layout M 163.88 76.00 2.16 3.000 6.47 1 6.47 4.31 2.16

SUBSTRUCTURE

Z2V33-0020 Excavation for footings + Disposal of Materials M3 576.00 409.50 1.41 2.000 2.81 2 1.41 0.28 0.28 1.000 1 Dozer 1.41 0.28

For Disposal M3 288.00 345.60 0.83 8.250 6.88 3 2.29 0.25 0.13 1.00 6.750 5.63 0.13 1.00

5 - - - 0.53 0.41 1.00 - - - - 0.28 0.13 1.00 - - - - - - -

Z2V33-0030 Formation Level & Compaction M3 194 252.00 0.77 6.250 4.81 2 2.41 0.58 0.29 1.54 4.750 3.66 0.19 1.54 0.10

Z2V33-0040 Anti-Termite Applications (Under PCC Footings) M2 629 202.50 3.11 1.000 3.11 1 3.11 3.11

Z2V33-0050 Backfill & Compaction upto bot. of PCC Tie-Beam M3 286 252.00 1.13 8.250 9.36 7 1.34 0.24 0.12 0.97 6.750 7.66 0.12 0.92 0.06

Z2V33-0060 Anti-Termite Applications (Under PCC Tie-Beam) M2 47 202.50 0.23 1.000 0.23 1 0.23 0.23

Z2V33-0070 Backfill & Compaction up to bot of PCC Grd. Slab M3 1,431.00 252.00 5.68 8.250 46.85 3 15.62 2.84 1.42 11.36 6.750 38.33 1.34 10.76 0.67

Z2V33-0080 Anti-Termite Applications (Under PCC Grade Slab) M2 921 202.50 4.55 1.000 4.55 1 4.55 4.55

Z2V33-0090 Shutters + 50mm Thk. PCC Under Footings M2 711 270.00 2.63 11.000 28.97 2 14.48 1.32 13.17

Z2V33-0100 50mm Protection Screed (Over W.P. Membrane-Ftg.) M2 2,209.00 270.00 8.18 11.000 90.00 2 45.00 4.09 40.91

Z2V33-0110 RCC For Footings Casting M3 296 180.00 1.64 26.000 42.76 1 42.76 0.500 0.82 0.08

Formworks M2 1,184.00 12.00 98.67 3.056 301.53 4 75.38 19.73 9.87 0.55 0.056 5.53 0.55

Rebars kg 53,280.00 250.00 213.12 2.056 438.17 3 146.06 21.31 21.31 1.19 0.056 11.93 1.19

Deshuttering M2 1,184.00 35.00 33.83 3.056 103.38 2 51.69 6.77 3.38 0.19 0.056 1.89 0.19

10 26.50 - 21.31 34.56 1.94 - - - - - - - - - - - 1.94 0.08 - -

Z2V33-0120 RCC Necks Columns / Walls + MEP Sleeves Casting M3 104 81.00 1.28 22.000 28.25 1 28.25 1.000 1 Vibrator 1.28 0.11

Formworks M2 416.00 4.00 104.00 3.056 317.82 5 63.56 17.33 8.67 0.49 0.056 5.82 0.49

Rebars kg 18,720.00 200.00 93.60 2.056 192.44 4 48.11 7.80 7.80 0.44 0.056 5.24 0.44

Deshuttering M2 416.00 28.00 14.86 3.056 45.40 2 22.70 2.48 1.24 0.07 0.056 0.83 0.07

12 19.81 - 7.80 17.70 0.99 - - - - - - - - - - - 0.99 0.11 - -

Z2V33-0130 Shutters + 50mm Thk. PCC Under Tie-Beams M2 54 270.00 0.20 11.000 2.20 2 1.10 0.10 1.00

Z2V33-0140 50mm Screed (Over W.P. Membrane-T.B.) M2 167 270.00 0.62 11.000 6.80 2 3.40 0.31 3.09

Z2V33-0150 RCC Tie Beams + MEP Sleeves Casting M3 32 180.00 0.18 22.000 3.91 1 3.91 0.500 0.09 0.01

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

1 Operator 1 Helper

2 Carpenter 1 Helper

For Excavation1 Operator 1 Helper

0.75 Operator 6 Driver 1.5 Helper

0.75 Shovel 6 D. Truck

.75 Operator 4 Driver 1.5 Helper

0.5 Shovel 4 D. Truck .25 B. Roller

2 Technican

0.75 Operator 6 Driver 1.5 Helper

0.5 Shovel 6 D. Truck .25 B. Roller

2 Technican

0.75 Operator 6 Driver 1.5 Helper

0.5 Shovel 6 D. Truck .25 B. Roller

2 Technican

1 Mason 10 Helper

1 Mason 10 Helper

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

.5 Vibrator

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Mason 10 Helper

1 Mason 10 Helper

1 Carpenter 16 Helper 4 Mason 1 Steel Fixer

.5 Vibrator

Page 33: AMSC Productivity Rate - Turner

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Formworks M2 128.00 4.00 32.00 3.056 97.79 4 24.45 6.40 3.20 0.18 0.056 1.79 0.18

Rebars kg 5,760.00 250.00 23.04 2.056 47.37 3 15.79 2.30 2.30 0.13 0.056 1.29 0.13

Deshuttering M2 128.00 28.00 4.57 3.056 13.97 2 6.99 0.91 0.46 0.03 0.056 0.26 0.03

10 7.31 - 2.30 5.96 0.33 - - - - - - - - - - - 0.33 0.01 - -

Z2V33-0160 RCC Kickers Over Tie-Beam Casting M3 1 180.00 0.01 22.000 0.12 1 0.12 0.500 0.00 0.001

Formworks M2 4.00 4.00 1.00 3.056 3.06 1 3.06 0.50 0.25 0.01 0.056 0.06 0.01

Rebars kg 180.00 250.00 0.72 2.056 1.48 1 1.48 0.18 0.18 0.01 0.056 0.04 0.01

Deshuttering M2 4.00 28.00 0.14 3.056 0.44 1 0.44 0.07 0.04 0.00 0.056 0.01 0.00

4 0.57 - 0.18 0.47 0.03 0.02608 0.000694

Z2V33-0170 50mm Thk. PCC Under Grade Slab M2 1,041.00 270.00 3.86 11.000 42.41 2 21.21 1.93 19.28

Z2V33-0180 Mesh + Filler Board & RCC For Grade Slab M3 168 180.00 0.93 26.000 24.27 3 8.09 0.31 1.87 0.31 5.60 1.000 1 Vibrator 0.93 0.31

Z2V33-0190 50mm Thk. PCC Steps & Ramps M2 17 270.00 0.06 11.000 0.69 2 0.35 0.03 0.31

Z2V33-0200 Steps & Ramps Works + Place Conc. M3 7 180.00 0.04 26.000 1.01 8 0.13 0.01 0.03 0.00 0.09 1.000 1 Vibrator 0.04 0.01

Z2V33-0210 Waterproofing Membrane (Over PCC Footings) M2 1,754.00 152.00 11.54 6.000 69.24 2 34.62 11.54 23.08 -

Z2V33-0220 Water Proofing For Neck Column & Wall & Footing M2 2,639.00 152.00 17.36 6.000 104.17 3 34.72 11.57 23.15 -

Z2V33-0230 Waterproofing Membrane (Over PCC Tie-beams) M2 131 152.00 0.86 6.000 5.17 2 2.59 0.86 1.72 -

Z2V33-0240 Waterproofing Membrane For Tie Beams M2 134 152.00 0.88 6.000 5.29 3 1.76 0.59 1.18 -

Z2V33-0250 50mm Thk. PCC Under Base of Tank M2 68 270.00 0.25 11.000 2.77 1 2.77 0.25 2.52 -

Z2V33-0260 Waterproofing Membrane (Over PCC - Base) M2 121 152.00 0.80 6.000 4.78 1 4.78 1.59 3.18 -

Z2V33-0270 50mm Protect'n Screed (Over W.P. Membrane-Base) M2 210 270.00 0.78 11.000 8.56 1 8.56 0.78 7.78 -

Z2V33-0280 RCC Water Tank Base + Deshuttering Casting M3 39 180.00 0.22 26.000 5.63 1 5.63 0.500 0.11 0.03

Formworks M2 156.00 12.00 13.00 3.056 39.73 1 39.73 6.50 3.25 0.18 0.056 0.73 0.18

Rebars kg 7,020.00 250.00 28.08 2.056 57.73 1 57.73 7.02 7.02 0.39 0.056 1.57 0.39

Deshuttering M2 156.00 35.00 4.46 3.056 13.62 1 13.62 2.23 1.11 0.06 0.056 0.25 0.06

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Carpenter 16 Helper 4 Mason 1 Steel Fixer

.5 Vibrator

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Mason 10 Helper

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

1 Mason 10 Helper

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

4 Waterproofer 2 Helper

4 Waterproofer 2 Helper

4 Waterproofer 2 Helper

4 Waterproofer 2 Helper

1 Mason 10 Helper

4 Waterproofer 2 Helper

1 Mason 10 Helper

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

.5 Vibrator

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

Page 34: AMSC Productivity Rate - Turner

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

4 8.73 - 7.02 11.38 0.64 - - - - - - - - - - - 0.64 0.03 - -

Z2V33-0290 RCC Wall W/MEP Pipes & Water Stop + Deshuttering Casting M3 35 81.00 0.43 22.000 9.51 1 9.51 1.000 1 Vibrator 0.43 0.09

Formworks M2 140.00 4.00 35.00 3.056 106.96 2 53.48 14.00 7.00 0.39 0.056 1.96 0.39

Rebars kg 6,300.00 200.00 31.50 2.056 64.76 1 64.76 6.30 6.30 0.35 0.056 1.76 0.35

Deshuttering M2 140.00 28.00 5.00 3.056 15.28 1 15.28 2.00 1.00 0.06 0.056 0.28 0.06

5 16.00 - 6.30 14.30 0.80 - - - - - - - - - - - 0.80 0.09 - -

Z2V33-0300 RCC Top Slab + Deshuttering for Water Tank Casting M3 8.00 180.00 0.04 26.000 1.16 1 1.16 1.000 1 Vibrator 0.04 0.01

Formworks M2 40.00 16.00 2.50 3.056 7.64 2 3.82 1.00 0.50 0.03 0.056 0.14 0.03

Rebars kg 1,440.00 200.00 7.20 2.056 14.80 1 14.80 1.44 1.44 0.08 0.056 0.40 0.08

Deshuttering M2 40.00 32.00 1.25 3.056 3.82 1 3.82 0.50 0.25 0.01 0.056 0.07 0.01

5 1.50 - 1.44 2.19 0.12 - - - - - - - - - - - 0.12 0.01 - -

Z2V33-0310 Water Proofing Membrane all around outside surfc M2 235 152.00 1.55 6.000 9.28 2 4.64 1.55 3.09 -

Z2V33-0320 Protection Board all around outside surface M2 350 152.00 2.30 6.000 13.82 2 6.91 2.30 4.61 -

Z2V33-0330 Backfill around Water tank walls M3 7 252.00 0.03 8.250 0.23 3 0.08 0.01 0.01 0.06 6.750 0.19 0.01 0.05 0.00

Z2V33-0340 G.R.P. Lining around inside + S.S. Lader & Door M2 252 20.00 12.60 2.000 25.20 3 8.40 4.20 4.20

Z2V33-0350 50mm Thk. PCC Under Base of Elevator Shaft M2 30 270.00 0.11 11.000 1.22 1 1.22 0.11 1.11 -

Z2V33-0360 Waterproofing Membrane (Over PCC - Base) M2 54 152.00 0.36 6.000 2.13 1 2.13 0.71 1.42 -

Z2V33-0370 50mm Protect'n Screed (Over W.P. Membrane-Base) M2 94 270.00 0.35 11.000 3.83 1 3.83 0.35 3.48 -

Z2V33-0380 RCC Elevator Shaft Base + Deshuttering Casting M3 14 180.00 0.08 26.000 2.02 1 2.02 0.500 0.04 0.01

Formworks M2 56.00 12.00 4.67 3.056 14.26 1 14.26 2.33 1.17 0.07 0.056 0.26 0.07

Rebars kg 2,520.00 250.00 10.08 2.056 20.72 1 20.72 2.52 2.52 0.14 0.056 0.56 0.14

Deshuttering M2 56.00 35.00 1.60 3.056 4.89 1 4.89 0.80 0.40 0.02 0.056 0.09 0.02

4 3.13 - 2.52 4.09 0.23 - - - - - - - - - - - 0.23 0.01 - -

Z2V33-0390 RCC Wall W/ MEP Cond. + Deshuttering Casting M3 6 81.00 0.07 22.000 1.63 1 1.63 1.000 1 Vibrator 0.07 0.01

Formworks M2 24.00 4.00 6.00 3.056 18.34 2 9.17 2.40 1.20 0.07 0.056 0.34 0.07

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

4 Waterproofer 2 Helper

4 Waterproofer 2 Helper

0.75 Operator 6 Driver 1.5 Helper

0.5 Shovel 6 D. Truck .25 B. Roller

1 Mason 1 Helper

1 Mason 10 Helper

4 Waterproofer 2 Helper

1 Mason 10 Helper

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

.5 Vibrator

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

Page 35: AMSC Productivity Rate - Turner

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Rebars kg 1,080.00 200.00 5.40 2.056 11.10 1 11.10 1.08 1.08 0.06 0.056 0.30 0.06

Deshuttering M2 24.00 28.00 0.86 3.056 2.62 1 2.62 0.34 0.17 0.01 0.056 0.05 0.01

5 2.74 - 1.08 2.45 0.14 - - - - - - - - - - - 0.14 0.01 - -

Z2V33-0400 Water Proofing Membrane all around outside surfc M2 522 152.00 3.43 6.000 20.61 3 6.87 2.29 4.58 -

Z2V33-0410 Protection Board all around outside surface M2 50 152.00 0.33 6.000 1.97 2 0.99 0.33 0.66 -

Z2V33-0420 Backfill around the Lift's Pit wall M3 7 252.00 0.03 8.250 0.23 3 0.08 0.01 0.01 0.06 6.750 0.19 0.01 0.05 0.00

Z2V33-0430 RCC For Wall/Col. From Top of Grade Slab-1L Casting M3 245 81.00 3.02 22.000 66.54 1 66.54 1.000 1 Vibrator 3.02 0.25

Formworks M2 980.00 4.00 245.00 3.056 748.72 5 149.74 40.83 20.42 1.14 0.056 13.72 1.14

Rebars kg 44,100.00 200.00 220.50 2.056 453.35 4 113.34 18.38 18.38 1.03 0.056 12.35 1.03

Deshuttering M2 980.00 28.00 35.00 3.056 106.96 2 53.48 5.83 2.92 0.16 0.056 1.96 0.16

12 46.67 - 18.38 41.71 2.34 - - - - - - - - - - - 2.34 0.25 - -

Z2V33-0440 Columns From Top of Grade Slab-1L (Canopy) Casting M3 1 81.00 0.01 22.000 0.27 1 0.27 1.000 1 Vibrator 0.01 0.00

Formworks M2 4.00 4.00 1.00 3.056 3.06 2 1.53 0.33 0.17 0.01 0.056 0.06 0.01

Rebars kg 180.00 200.00 0.90 2.056 1.85 2 0.93 0.15 0.15 0.01 0.056 0.05 0.01

Deshuttering M2 4.00 28.00 0.14 3.056 0.44 1 0.44 0.05 0.02 0.00 0.056 0.01 0.00

6 0.38 - 0.15 0.34 0.02 - - - - - - - - - - - 0.02 0.00 - -

Z2V33-0450 RCC Slab / Beam - 1L Casting M3 181.00 180.00 1.01 26.000 26.14 1 26.14 1.000 1 Vibrator 1.01 0.07

Formworks M2 905.00 16.00 56.56 3.056 172.86 6 28.81 8.08 4.04 0.23 0.056 3.17 0.23

Rebars kg 32,580.00 200.00 162.90 2.056 334.92 5 66.98 11.64 11.64 0.65 0.056 9.12 0.65

Deshuttering M2 905.00 32.00 28.28 3.056 86.43 2 43.21 4.04 2.02 0.11 0.056 1.58 0.11

14 12.12 - 11.64 17.70 0.99 - - - - - - - - - - - 0.99 0.07 - -

Z2V33-0460 RCC For Stair/Landings @ G.L. - 1L Casting M3 9 81.00 0.11 22.000 2.44 1 2.44 1.000 1 Vibrator 0.11 0.01

Formworks M2 45.00 4.00 11.25 3.056 34.38 4 8.60 2.25 1.13 0.06 0.056 0.63 0.06

Rebars kg 1,620.00 200.00 8.10 2.056 16.65 3 5.55 0.81 0.81 0.05 0.056 0.45 0.05

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

4 Waterproofer 2 Helper

4 Waterproofer 2 Helper

0.75 Operator 6 Driver 1.5 Helper

0.5 Shovel 6 D. Truck .25 B. Roller

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Page 36: AMSC Productivity Rate - Turner

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Deshuttering M2 45.00 28.00 1.61 3.056 4.91 2 2.46 0.32 0.16 0.01 0.056 0.09 0.01

10 2.57 - 0.81 2.10 0.12 - - - - - - - - - - - 0.12 0.01 - -

Z2V33-0470 RCC Canopy Casting M3 8.00 180.00 0.04 26.000 1.16 1 1.16 1.000 1 Vibrator 0.04 0.00

Formworks M2 40.00 16.00 2.50 3.056 7.64 4 1.91 0.56 0.28 0.02 0.056 0.14 0.02

Rebars kg 1,440.00 200.00 7.20 2.056 14.80 3 4.93 0.80 0.80 0.04 0.056 0.40 0.04

Deshuttering M2 40.00 32.00 1.25 3.056 3.82 1 3.82 0.28 0.14 0.01 0.056 0.07 0.01

9 0.83 - 0.80 1.22 0.07 - - - - - - - - - - - 0.07 0.00 - -

Z2V33-0480 RCC For Wall/Col. From Top of 1L-2L Casting M3 235 81.00 2.90 22.000 63.83 1 63.83 1.000 1 Vibrator 2.90 0.24

Formworks M2 940.00 4.00 235.00 3.056 718.16 5 143.63 39.17 19.58 1.10 0.056 13.16 1.10

Rebars kg 42,300.00 200.00 211.50 2.056 434.84 4 108.71 17.63 17.63 0.99 0.056 11.84 0.99

Deshuttering M2 940.00 28.00 33.57 3.056 102.59 2 51.30 5.60 2.80 0.16 0.056 1.88 0.16

12 44.76 - 17.63 40.01 2.24 - - - - - - - - - - - 2.24 0.24 - -

Z2V33-0490 RCC Slab / Beam - 2L Casting M3 178.00 180.00 0.99 26.000 25.71 1 25.71 1.000 1 Vibrator 0.99 0.07

Formworks M2 890.00 16.00 55.63 3.056 169.99 6 28.33 7.95 3.97 0.22 0.056 3.12 0.22

Rebars kg 32,040.00 200.00 160.20 2.056 329.37 5 65.87 11.44 11.44 0.64 0.056 8.97 0.64

Deshuttering M2 890.00 32.00 27.81 3.056 85.00 2 42.50 3.97 1.99 0.11 0.056 1.56 0.11

14 11.92 - 11.44 17.40 0.97 - - - - - - - - - - - 0.97 0.07 - -

Z2V33-0500 RCC for Stair/Landings @ 1L-2L Casting M3 9 81.00 0.11 22.000 2.44 1 2.44 1.000 1 Vibrator 0.11 0.01

Formworks M2 45.00 4.00 11.25 3.056 34.38 4 8.60 2.25 1.13 0.06 0.056 0.63 0.06

Rebars kg 1,620.00 200.00 8.10 2.056 16.65 3 5.55 0.81 0.81 0.05 0.056 0.45 0.05

Deshuttering M2 45.00 28.00 1.61 3.056 4.91 2 2.46 0.32 0.16 0.01 0.056 0.09 0.01

10 2.57 - 0.81 2.10 0.12 - - - - - - - - - - - 0.12 0.01 - - Z2V33-0510 RCC For Wall/Col. From Top of 2L-3L M3 237 12Z2V33-0520 RCC Slab / Beam - 3L M3 234 14Z2V33-0530 RCC For Stair/Landings @ 2L-3L M3 7 10

Z2V33-0540 RCC For Wall/Col. From Top of 3L-4L Casting M3 237 81.00 2.93 22.000 64.37 1 64.37 1.000 1 Vibrator 2.93 0.24

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 16 Helper 4 Mason

Page 37: AMSC Productivity Rate - Turner

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Formworks M2 948.00 4.00 237.00 3.056 724.27 5 144.85 39.50 19.75 1.11 0.056 13.27 1.11

Rebars kg 42,660.00 200.00 213.30 2.056 438.54 4 109.64 17.78 17.78 1.00 0.056 11.94 1.00

Deshuttering M2 948.00 28.00 33.86 3.056 103.47 2 51.73 5.64 2.82 0.16 0.056 1.90 0.16

12 45.14 - 17.78 40.35 2.26 - - - - - - - - - - - 2.26 0.24 - -

Z2V33-0550 RCC Slab / Beam - 4L Casting M3 178.00 180.00 0.99 26.000 25.71 1 25.71 1.000 1 Vibrator 0.99 0.07

Formworks M2 890.00 16.00 55.63 3.056 169.99 6 28.33 7.95 3.97 0.22 0.056 3.12 0.22

Rebars kg 32,040.00 200.00 160.20 2.056 329.37 5 65.87 11.44 11.44 0.64 0.056 8.97 0.64

Deshuttering M2 890.00 32.00 27.81 3.056 85.00 2 42.50 3.97 1.99 0.11 0.056 1.56 0.11

14 11.92 - 11.44 17.40 0.97 - - - - - - - - - - - 0.97 0.07 - - Z2V33-0560 RCC For Stair/Landings @ 3L-4L M3 9 10

Z2V33-0570 RCC For Wall/Col. From Top of 4L-RoofL Casting M3 235 81.00 2.90 22.000 63.83 1 63.83 1.000 1 Vibrator 2.90 0.29

Formworks M2 940.00 4.00 235.00 3.056 718.16 4 179.54 47.00 23.50 1.32 0.056 13.16 1.32

Rebars kg 42,300.00 200.00 211.50 2.056 434.84 3 144.95 21.15 21.15 1.18 0.056 11.84 1.18

Deshuttering M2 940.00 28.00 33.57 3.056 102.59 2 51.30 6.71 3.36 0.19 0.056 1.88 0.19

10 53.71 - 21.15 48.01 2.69 - - - - - - - - - - - 2.69 0.29 - -

Z2V33-0580 RCC Wall/Col. For Staircase From Top of 4L-RoofL Casting M3 2 81.00 0.02 22.000 0.54 1 0.54 1.000 1 Vibrator 0.02 0.00

Formworks M2 8.00 4.00 2.00 3.056 6.11 2 3.06 0.67 0.33 0.02 0.056 0.11 0.02

Rebars kg 360.00 200.00 1.80 2.056 3.70 2 1.85 0.30 0.30 0.02 0.056 0.10 0.02

Deshuttering M2 8.00 28.00 0.29 3.056 0.87 1 0.87 0.10 0.05 0.00 0.056 0.02 0.00

6 0.76 - 0.30 0.68 0.04 - - - - - - - - - - - 0.04 0.00 - -

Z2V33-0590 RCC Slab / Beam - RoofL Casting M3 176.00 180.00 0.98 26.000 25.42 1 25.42 1.000 1 Vibrator 0.98 0.08

Formworks M2 880.00 16.00 55.00 3.056 168.08 5 33.62 9.17 4.58 0.26 0.056 3.08 0.26

Rebars kg 31,680.00 200.00 158.40 2.056 325.67 4 81.42 13.20 13.20 0.74 0.056 8.87 0.74

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

Page 38: AMSC Productivity Rate - Turner

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Deshuttering M2 880.00 32.00 27.50 3.056 84.04 2 42.02 4.58 2.29 0.13 0.056 1.54 0.13

12 13.75 - 13.20 20.08 1.12 - - - - - - - - - - - 1.12 0.08 - -

Z2V33-0600 RCC For Stair/Landings @ 4L-RoofL Casting M3 9 81.00 0.11 22.000 2.44 1 2.44 1.000 1 Vibrator 0.11 0.01

Formworks M2 45.00 4.00 11.25 3.056 34.38 3 11.46 2.81 1.41 0.08 0.056 0.63 0.08

Rebars kg 1,620.00 200.00 8.10 2.056 16.65 3 5.55 1.01 1.01 0.06 0.056 0.45 0.06

Deshuttering M2 45.00 28.00 1.61 3.056 4.91 1 4.91 0.40 0.20 0.01 0.056 0.09 0.01

8 3.21 - 1.01 2.62 0.15 - - - - - - - - - - - 0.15 0.01 - -

Z2V33-0610 RCC Slab / Beam for Staircase - RoofL Casting M3 4.00 180.00 0.02 26.000 0.58 1 0.58 1.000 1 Vibrator 0.02 0.00

Formworks M2 20.00 16.00 1.25 3.056 3.82 3 1.27 0.36 0.18 0.01 0.056 0.07 0.01

Rebars kg 720.00 200.00 3.60 2.056 7.40 2 3.70 0.51 0.51 0.03 0.056 0.20 0.03

Deshuttering M2 20.00 32.00 0.63 3.056 1.91 1 1.91 0.18 0.09 0.00 0.056 0.04 0.01

7 0.54 - 0.51 0.78 0.04 - - - - - - - - - - - 0.04 0.00 - -

Z2V33-0620 RCC For Lower Parapet Casting M3 19 81.00 0.23 22.000 5.16 1 5.16 1.000 1 Vibrator 0.23 0.02

Formworks M2 76.00 4.00 19.00 3.056 58.06 4 14.52 3.80 1.90 0.11 0.056 1.06 0.11

Rebars kg 3,420.00 200.00 17.10 2.056 35.16 3 11.72 1.71 1.71 0.10 0.056 0.96 0.10

Deshuttering M2 76.00 28.00 2.71 3.056 8.29 2 4.15 0.54 0.27 0.02 0.056 0.15 0.02

10 4.34 - 1.71 3.88 0.22 - - - - - - - - - - - 0.22 0.02 - -

Z2V33-0630 RCC For Wall/Col. From Roof L-Top of Roof L Casting M3 33 81.00 0.41 22.000 8.96 1 8.96 1.000 1 Vibrator 0.41 0.07

Formworks M2 132.00 4.00 33.00 3.056 100.85 2 50.42 11.00 5.50 0.31 0.056 1.85 0.31

Rebars kg 5,940.00 200.00 29.70 2.056 61.06 2 30.53 4.95 4.95 0.28 0.056 1.66 0.28

Deshuttering M2 132.00 28.00 4.71 3.056 14.41 1 14.41 1.57 0.79 0.04 0.056 0.26 0.04

6 12.57 - 4.95 11.24 0.63 - - - - - - - - - - - 0.63 0.07 - -

Z2V33-0640 RCC Slab / Beam Top Roof Level Casting M3 38.00 180.00 0.21 26.000 5.49 1 5.49 1.000 1 Vibrator 0.21 0.03

Formworks M2 190.00 16.00 11.88 3.056 36.29 3 12.10 3.39 1.70 0.09 0.056 0.67 0.10

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

Page 39: AMSC Productivity Rate - Turner

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Rebars kg 6,840.00 200.00 34.20 2.056 70.32 2 35.16 4.89 4.89 0.27 0.056 1.92 0.27

Deshuttering M2 190.00 32.00 5.94 3.056 18.15 1 18.15 1.70 0.85 0.05 0.056 0.33 0.05

7 5.09 - 4.89 7.43 0.42 - - - - - - - - - - - 0.42 0.03 - -

Z2V33-0650 RCC For Upper Parapet Casting M3 24 81.00 0.30 22.000 6.52 1 6.52 1.000 1 Vibrator 0.30 0.04

Formworks M2 96.00 4.00 24.00 3.056 73.34 3 24.45 6.00 3.00 0.17 0.056 1.34 0.17

Rebars kg 4,320.00 200.00 21.60 2.056 44.41 3 14.80 2.70 2.70 0.15 0.056 1.21 0.15

Deshuttering M2 96.00 28.00 3.43 3.056 10.48 1 10.48 0.86 0.43 0.02 0.056 0.19 0.02

8 6.86 - 2.70 6.13 0.34 - - - - - - - - - - - 0.34 0.04 - -

Z2V33-0660 RCC Eqmt. Pads + Railing Casting M3 1 180.00 0.01 26.000 0.14 1 0.14 0.500 0.00 0.00

Formworks M2 4.00 12.00 0.33 3.056 1.02 4 0.25 0.07 0.03 0.00 0.056 0.02 0.00

Rebars kg 180.00 250.00 0.72 2.056 1.48 3 0.49 0.07 0.07 0.00 0.056 0.04 0.00

Deshuttering M2 4.00 35.00 0.11 3.056 0.35 2 0.17 0.02 0.01 0.00 0.056 0.01 0.00

10 0.09 - 0.07 0.12 0.01 - - - - - - - - - - - 0.01 0.00 - -

M E PFINISHES

Z2V33-3090 I. Hollow Block Works + Lintels @ Grnd Flr. M2 1,512.00 10.00 151.20 2.056 310.87 14 22.20 10.80 10.80 0.60 0.056 8.47 0.60

Z2V33-3100 I. Internal Plaster Accessories & Rush @ GL M2 72.00 48.46 1.49 2.000 2.97 7 0.42 0.21 0.21

Z2V33-3110 I. Internal Plaster Works @ GL M2 2,436.00 20.00 121.80 2.000 243.60 12 20.30 10.15 10.15

Z2V33-3120 I. Glazed Ceramic Tile @ GL M2 712 12.00 59.33 2.056 121.99 14 8.71 4.24 4.24 0.24 0.056 3.32 0.24

Z2V33-3130 I. Block Works For Ducts @ Grnd Flr. M2 54 10.00 5.40 2.056 11.10 2 5.55 2.70 2.70 0.15 0.056 0.30 0.15

Z2V33-3140 I. Install False Ceiling (Susp. + Boarding) @ GL M2 373 7.20 51.81 2.056 106.51 14 7.61 3.70 3.70 0.21 0.056 2.90 0.21

Z2V33-3150 I. Screed + Ceramic Tiles & Skirtings @ GL M2 1212 12.00 101.00 2.056 207.66 14 14.83 7.21 7.21 0.40 0.056 5.66 0.40

Z2V33-3160 I. Screed + Non-Slip Ceramic Tiles &Skirtings@GL M2 314 32.00 9.81 2.056 20.17 14 1.44 0.70 0.70 0.04 0.056 0.55 0.04

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 16 Helper 4 Mason

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Carpenter 18 Helper 6 Mason 1 Steel Fixer

.5 Vibrator

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Steel Fixer 1 Helper .056 Operator

.056 M. Crane

2 Carpenter 1 Helper .056 Operator

.056 M. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper

1 Mason 1 Helper

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

Page 40: AMSC Productivity Rate - Turner

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Z2V33-3170 I. Water Proofing + Screed on Wet Areas - GL M2 683 64.00 10.67 6.000 64.03 10 6.40 2.13 4.27

Z2V33-3180 I. Frames Installations @ GL Nos. 54 4.80 11.25 2.056 23.13 14 1.65 0.80 0.80 0.05 0.056 0.63 0.05

Z2V33-3190 I. Doors w/ Ironmongery @ GL Nos. 54 4.80 11.25 2.056 23.13 12 1.93 0.94 0.94 0.05 0.056 0.63 0.05

Z2V33-3200 I. Frames Installation Works @ GL M2 183 4.80 38.13 2.056 78.39 14 5.60 2.72 2.72 0.15 0.056 2.14 0.15

Z2V33-3210 I.Aluminum + Glass & Other Associated Works @ GL M2 183 1.60 114.38 2.056 235.16 12 19.60 9.53 0.53 9.53 0.056 6.41 0.53

Z2V33-3220 I. Kitchen Cabinets @ GL Nos. 11 0.60 18.33 2.056 37.69 14 2.69 1.31 1.31 0.07 0.056 1.03 0.07

Z2V33-3230 I. Wardrobes @ GL Nos. 14 0.75 18.67 2.056 38.38 14 2.74 1.33 1.33 0.07 0.056 1.05 0.07

Z2V33-3240 I. Primer Application Works @ GL M2 788.00 54.60 14.43 1.000 1 Painter 14.43 10 1.44 1.44

Z2V33-3250 I. Stucco Application Works @ GL M2 788.00 16.40 48.05 1.000 1 Painter 48.05 14 3.43 3.43

Z2V33-3260 I. Emulsion Paint Works @ GL M2 971.00 32.20 30.16 1.000 1 Painter 30.16 12 2.51 2.51

Z2V33-3270 O. Plaster Accessories & Rush @ GL M2 72 48.46 1.49 2.000 2.97 7 0.42 0.21 0.21

Z2V33-3280 O. Plaster Works @ GL M2 370 20.00 18.50 2.000 37.00 12 3.08 1.54 1.54

Z2V33-3290 O. Polished Marble & Ceramic for Wall @ GL M2 351 10.00 35.10 2.056 72.17 14 5.15 2.51 2.51 0.14 0.056 1.97 0.14

Z2V33-3300 O. Blk Wks For Garbage Chutes+Plaster@ Grnd Flr. M2 27 10.00 2.70 2.056 5.55 2 2.78 1.35 1.35 0.08 0.056 0.15 0.08

Z2V33-3310 O. Gypsum Board +Washable Paint @ GL M2 61 16.00 3.81 2.056 7.84 14 0.56 0.27 0.27 0.02 0.056 0.21 0.02

Z2V33-3320 O. Semi Recessed G.R.G. Tiles @ GL M2 50 16.00 3.13 2.056 6.43 14 0.46 0.22 0.22 0.01 0.056 0.18 0.01

Z2V33-3330 O. Sreed + Graniti Tiles & Skirtings @ GL M2 427 12.00 35.58 2.056 73.16 14 5.23 2.54 2.54 0.14 0.056 1.99 0.14

Z2V33-3340 O. Screed + Polished Marble & Skirtings @ GL M2 196 12.00 16.33 2.056 33.58 14 2.40 1.17 1.17 0.07 0.056 0.91 0.07

Z2V33-3350 O. G. Stl, Powdr coated Railin to Staircase @ GL LM 24 20.00 1.20 2.056 2.47 10 0.25 0.12 0.01 0.12 0.056 0.07 0.01

Z2V33-3360 O. Primer ApplicationWorks @ GL. M2 111 54.60 2.03 1.000 1 Painter 2.03 8 0.25 0.25

Z2V33-3370 O. Stucco Application Works @ GL M2 111 16.40 6.77 1.000 1 Painter 6.77 12 0.56 0.56

Z2V33-3380 O. Emulsion Paint Works @ GL M2 49 32.20 1.52 1.000 1 Painter 1.52 10 0.15 0.15

4Waterproofer 2 Helper

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Alum. Tech 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper

1 Mason 1 Helper

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Alum. Tech 1 Helper .056 Operator

.056 T. Crane

Page 41: AMSC Productivity Rate - Turner

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Z2V33-3390 I. Hollow Block Works + Lintels @ 1st Flr. M2 1,598.00 10.00 159.80 2.056 328.55 14 23.47 11.41 11.41 0.64 0.056 8.95 0.64

Z2V33-3400 I. Internal Plaster Accessories & Rush @ 1L M2 72.00 48.46 1.49 2.000 2.97 7 0.42 0.21 0.21

Z2V33-3410 I. Internal Plaster Works @ 1L M2 2,395.00 20.00 119.75 2.000 239.50 12 19.96 9.98 9.98

Z2V33-3420 I. Glazed Ceramic Tile @ 1L M2 755 12.00 62.92 2.056 129.36 14 9.24 4.49 4.49 0.25 0.056 3.52 0.25

Z2V33-3430 I. Block Works For Ducts @ 1st Flr. M2 60 10.00 6.00 2.056 12.34 2 6.17 3.00 3.00 0.17 0.056 0.34 0.17

Z2V33-3440 I. Install False Ceiling (Susp. + Boarding) @ 1L M2 400 7.20 55.56 2.056 114.22 14 8.16 3.97 3.97 0.22 0.056 3.11 0.22

Z2V33-3450 I. Screed + Ceramic Tiles & Skirtings @ 1L M2 1268 12.00 105.67 2.056 217.25 14 15.52 7.55 7.55 0.42 0.056 5.92 0.42

Z2V33-3460 I. Screed + Non-Slip Ceramic Tiles &Skirtings@1L M2 218 32.00 6.81 2.056 14.01 8 1.75 0.85 0.85 0.05 0.056 0.38 0.05

Z2V33-3470 I. Water Proofing + Screed on Wet Areas - 1L M2 547 64.00 8.55 6.000 51.28 10 5.13 1.71 3.42

Z2V33-3480 I. Frames Installations @ 1L Nos. 62 4.80 12.92 2.056 26.56 14 1.90 0.92 0.92 0.05 0.056 0.72 0.05

Z2V33-3490 I. Doors w/ Ironmongery @ 1L Nos. 62 4.80 12.92 2.056 26.56 12 2.21 1.08 1.08 0.06 0.056 0.72 0.06

Z2V33-3500 I. Frames Installation Works @ GL M2 119 4.80 24.79 2.056 50.97 14 3.64 1.77 1.77 0.10 0.056 1.39 0.10

Z2V33-3510 I. Aluminum+Glass & Other Associated Works @ 1L M2 119 1.60 74.38 2.056 152.92 12 12.74 6.20 0.35 6.20 0.056 4.17 0.35

Z2V33-3520 I. Wardrobes @ 1L Nos. 17 0.75 22.67 2.056 46.60 14 3.33 1.62 1.62 0.09 0.056 1.27 0.09

Z2V33-3530 I. Kitchen Cabinets @ 1L Nos. 16 0.60 26.67 2.056 54.83 14 3.92 1.90 1.90 0.11 0.056 1.49 0.11

Z2V33-3540 I. Primer Application Works @ 1L M2 758.00 54.60 13.88 1.000 1 Painter 13.88 12 1.16 1.16

Z2V33-3550 I. Stucco Application Works @ 1L M2 758.00 16.40 46.22 1.000 1 Painter 46.22 14 3.30 3.30

Z2V33-3560 I. Emulsion Paint Works @ 1L M2 1,356.00 32.20 42.11 1.000 1 Painter 42.11 14 3.01 3.01

Z2V33-3570 O. Plaster Accessories & Rush @ 1L M2 72 48.46 1.49 2.000 2.97 7 0.42 0.21 0.21

Z2V33-3580 O. Plaster Works @ 1L M2 397 20.00 19.85 2.000 39.70 12 3.31 1.65 1.65

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper

1 Mason 1 Helper

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

4Waterproofer 2 Helper

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Alum. Tech 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper

1 Mason 1 Helper

Page 42: AMSC Productivity Rate - Turner

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Z2V33-3590 O. Polished Marble & Ceramic for Wall @ 1L M2 56 10.00 5.60 2.056 11.51 14 0.82 0.40 0.40 0.02 0.056 0.31 0.02

Z2V33-3600 O. Blk Wks For Garbage Chutes+Plasters@ 1st Flr. M2 14 10.00 1.40 2.056 2.88 2 1.44 0.70 0.70 0.04 0.056 0.08 0.04

Z2V33-3610 O. Gypsum Board +Washable Paint @ 1L M2 68 16.00 4.25 2.056 8.74 14 0.62 0.30 0.30 0.02 0.056 0.24 0.02

Z2V33-3620 O. Semi Recessed G.R.G. Tiles @ 1L M2 51 16.00 3.19 2.056 6.55 14 0.47 0.23 0.23 0.01 0.056 0.18 0.01

Z2V33-3630 O. Sreed + Graniti Tiles & Skirtings @ 1L M2 453 12.00 37.75 2.056 77.61 14 5.54 2.70 2.70 0.15 0.056 2.11 0.15

Z2V33-3640 O. Screed + Polished Marble & Skirtings @ 1L M2 50 12.00 4.17 2.056 8.57 14 0.61 0.30 0.30 0.02 0.056 0.23 0.02

Z2V33-3650 O. G. Stl, Powdr coated Railin to Staircase @ 1L LM 26 20.00 1.30 2.056 2.67 10 0.27 0.13 0.01 0.13 0.056 0.07 0.01

Z2V33-3660 O. Primer Application Works @ 1L M2 119 54.60 2.18 1.000 1 Painter 2.18 8 0.27 0.27

Z2V33-3670 O. Stucco Application Works @ 1L M2 119 16.40 7.26 1.000 1 Painter 7.26 10 0.73 0.73

Z2V33-3680 O. Emulsion Paint Works @ 1L M2 55 32.20 1.71 1.000 1 Painter 1.71 12 0.14 0.14

Z2V33-3690 I. Hollow Block Works + Lintels @ 2nd Flr. 1,598.00 M2 1,598.00 10.00 159.80 2.056 328.55 14 23.47 11.41 11.41 0.64 0.056 8.95 0.64

Z2V33-3700 I. Internal Plaster Accessories & Rush @ 2L 72.00 M2 72.00 48.46 1.49 2.000 2.97 7 0.42 0.21 0.21

Z2V33-3710 I. Internal Plaster Works @ 2L 2,395.00 M2 2,395.00 20.00 119.75 2.000 239.50 12 19.96 9.98 9.98

Z2V33-3720 I. Glazed Ceramic Tile @ 2L 755 M2 755 12.00 62.92 2.056 129.36 14 9.24 4.49 4.49 0.25 0.056 3.52 0.25

Z2V33-3730 I. Block Works For Ducts @ 2nd Flr. 60 M2 60 10.00 6.00 2.056 12.34 2 6.17 3.00 3.00 0.17 0.056 0.34 0.17

Z2V33-3740 I. Install False Ceiling (Susp. + Boarding) @ 2L 400 M2 400 7.20 55.56 2.056 114.22 14 8.16 3.97 3.97 0.22 0.056 3.11 0.22

Z2V33-3750 I. Screed + Ceramic Tiles & Skirtings @ 2L 1268 M2 1268 12.00 105.67 2.056 217.25 14 15.52 7.55 7.55 0.42 0.056 5.92 0.42

Z2V33-3760 I. Screed + Non-Slip Ceramic Tiles &Skirtings@2L 218 M2 218 32.00 6.81 2.056 14.01 8 1.75 0.85 0.85 0.05 0.056 0.38 0.05

Z2V33-3770 I. Water Proofing + Screed on Wet Areas - 2L 547 M2 547 64.00 8.55 6.000 51.28 10 5.13 1.71 3.42

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Alum. Tech 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper

1 Mason 1 Helper

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

4Waterproofer 2 Helper

Page 43: AMSC Productivity Rate - Turner

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Z2V33-3780 I. Frames Installations @ 2L 62 Nos. 62 4.80 12.92 2.056 26.56 14 1.90 0.92 0.92 0.05 0.056 0.72 0.05

Z2V33-3790 I. Doors w/ Ironmongery @ 2L 62 Nos. 62 4.80 12.92 2.056 26.56 12 2.21 1.08 1.08 0.06 0.056 0.72 0.06

Z2V33-3800 I. Frames Installation Works @ 2L 119 M2 119 4.80 24.79 2.056 50.97 14 3.64 1.77 1.77 0.10 0.056 1.39 0.10

Z2V33-3810 I. Aluminum+Glass & Other Associated Works @ 2L 119 M2 119 1.60 74.38 2.056 152.92 12 12.74 6.20 0.35 6.20 0.056 4.17 0.35

Z2V33-3820 I. Wardrobes @ 2L 17 Nos. 17 0.75 22.67 2.056 46.60 14 3.33 1.62 1.62 0.09 0.056 1.27 0.09

Z2V33-3830 I. Kitchen Cabinets @ 2L 16 Nos. 16 0.60 26.67 2.056 54.83 14 3.92 1.90 1.90 0.11 0.056 1.49 0.11

Z2V33-3840 I. Primer Application Works @ 2L 758.00 M2 758.00 54.60 13.88 1.000 1 Painter 13.88 12 1.16 1.16

Z2V33-3850 I. Stucco Application Works @ 2L 758.00 M2 758.00 16.40 46.22 1.000 1 Painter 46.22 14 3.30 3.30

Z2V33-3860 I. Emulsion Paint Works @ 2L 1,356.00 M2 1,356.00 32.20 42.11 1.000 1 Painter 42.11 14 3.01 3.01

Z2V33-3870 O. Plaster Accessories & Rush @ 2L 72 M2 72 48.46 1.49 2.000 2.97 7 0.42 0.21 0.21

Z2V33-3880 O. Plaster Works @ 2L 397 M2 397 20.00 19.85 2.000 39.70 12 3.31 1.65 1.65

Z2V33-3890 O. Polished Marble & Ceramic for Wall @ 2L 56 M2 56 10.00 5.60 2.056 11.51 14 0.82 0.40 0.40 0.02 0.056 0.31 0.02

Z2V33-3900 O. Blk Wks For Garbage Chutes+Plasters@ 2nd Flr. 14 M2 14 10.00 1.40 2.056 2.88 2 1.44 0.70 0.70 0.04 0.056 0.08 0.04

Z2V33-3910 O. Gypsum Board +Washable Paint @ 2L 68 M2 68 16.00 4.25 2.056 8.74 14 0.62 0.30 0.30 0.02 0.056 0.24 0.02

Z2V33-3920 O. Semi Recessed G.R.G. Tiles @ 2L 51 M2 51 16.00 3.19 2.056 6.55 14 0.47 0.23 0.23 0.01 0.056 0.18 0.01

Z2V33-3930 O. Sreed + Graniti Tiles & Skirtings @ 2L 453 M2 453 12.00 37.75 2.056 77.61 14 5.54 2.70 2.70 0.15 0.056 2.11 0.15

Z2V33-3940 O. Screed + Polished Marble & Skirtings @ 2L 45 M2 50 12.00 4.17 2.056 8.57 14 0.61 0.30 0.30 0.02 0.056 0.23 0.02

Z2V33-3950 O. G.Steel, Powder coated Railin to Staircase@2L 26 LM 26 20.00 1.30 2.056 2.67 10 0.27 0.13 0.01 0.13 0.056 0.07 0.01

Z2V33-3960 O. Primer Application Works @ 2L 119 M2 119 54.60 2.18 1.000 1 Painter 2.18 8 0.27 0.27

Z2V33-3970 O. Stucco Application Works @ 2L 119 M2 119 16.40 7.26 1.000 1 Painter 7.26 10 0.73 0.73

Z2V33-3980 O. Emulsion Paint Works @ 2L 55 M2 55 32.20 1.71 1.000 1 Painter 1.71 12 0.14 0.14

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Alum. Tech 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper

1 Mason 1 Helper

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Alum. Tech 1 Helper .056 Operator

.056 T. Crane

Page 44: AMSC Productivity Rate - Turner

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Z2V33-3990 I. Hollow Block Works + Lintels @ 3rd Flr. 1,598.00 M2 1,598.00 10.00 159.80 2.056 328.55 14 23.47 11.41 11.41 0.64 0.056 8.95 0.64

Z2V33-4000 I. Internal Plaster Accessories & Rush @ 3L 72.00 M2 72.00 48.46 1.49 2.000 2.97 7 0.42 0.21 0.21

Z2V33-4010 I. Internal Plaster Works @ 3L 2,395.00 M2 2,395.00 20.00 119.75 2.000 239.50 12 19.96 9.98 9.98

Z2V33-4020 I. Glazed Ceramic Tile @ 3L 755 M2 735 12.00 61.25 2.056 125.93 14 9.00 4.38 4.38 0.25 0.056 3.43 0.25

Z2V33-4030 I. Block Works For Ducts @ 3rd Flr. 60 M2 60 10.00 6.00 2.056 12.34 2 6.17 3.00 3.00 0.17 0.056 0.34 0.17

Z2V33-4040 I. Install False Ceiling (Susp. + Boarding) @ 3L 400 M2 400 7.20 55.56 2.056 114.22 14 8.16 3.97 3.97 0.22 0.056 3.11 0.22

Z2V33-4050 I. Screed + Ceramic Tiles & Skirtings @ 3L 1268 M2 1268 12.00 105.67 2.056 217.25 14 15.52 7.55 7.55 0.42 0.056 5.92 0.42

Z2V33-4060 I. Screed + Non-Slip Ceramic Tiles &Skirtings@3L 218 M2 218 32.00 6.81 2.056 14.01 8 1.75 0.85 0.85 0.05 0.056 0.38 0.05

Z2V33-4070 I. Water Proofing + Screed on Wet Areas - 3L 547 M2 547 64.00 8.55 6.000 51.28 10 5.13 1.71 3.42

Z2V33-4080 I. Frames Installations @ 3L 62 Nos. 62 4.80 12.92 2.056 26.56 14 1.90 0.92 0.92 0.05 0.056 0.72 0.05

Z2V33-4090 I. Doors w/ Ironmongery @ 3L 62 Nos. 62 4.80 12.92 2.056 26.56 12 2.21 1.08 1.08 0.06 0.056 0.72 0.06

Z2V33-4100 I. Frames Installation Works @ 3L 119 M2 119 4.80 24.79 2.056 50.97 14 3.64 1.77 1.77 0.10 0.056 1.39 0.10

Z2V33-4110 I. Aluminum+Glass & Other Associated Works @ 3L 119 M2 119 1.60 74.38 2.056 152.92 12 12.74 6.20 0.35 6.20 0.056 4.17 0.35

Z2V33-4120 I. Wardrobes @ 3L 17 Nos. 17 0.75 22.67 2.056 46.60 14 3.33 1.62 1.62 0.09 0.056 1.27 0.09

Z2V33-4130 I. Kitchen Cabinets @ 3L 16 Nos. 16 0.60 26.67 2.056 54.83 14 3.92 1.90 1.90 0.11 0.056 1.49 0.11

Z2V33-4140 I. Primer Appilcation Works @ 3L 758.00 M2 758.00 54.60 13.88 1.000 1 Painter 13.88 12 1.16 1.16

Z2V33-4150 I. Stucco Application Works @ 3L 758.00 M2 758.00 16.40 46.22 1.000 1 Painter 46.22 14 3.30 3.30

Z2V33-4160 I. Emulsion Paint Works @ 3L 1,356.00 M2 1,356.00 32.20 42.11 1.000 1 Painter 42.11 14 3.01 3.01

Z2V33-4170 O. Plaster Accessories & Rush @ 3L 72 M2 72 48.46 1.49 2.000 2.97 7 0.42 0.21 0.21

Z2V33-4180 O. Plaster Works @ 3L 397 M2 397 20.00 19.85 2.000 39.70 12 3.31 1.65 1.65

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper

1 Mason 1 Helper

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

4Waterproofer 2 Helper

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Alum. Tech 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper

1 Mason 1 Helper

Page 45: AMSC Productivity Rate - Turner

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Z2V33-4190 O. Polished Marble & Ceramic for Wall @ 3L 56 M2 56 10.00 5.60 2.056 11.51 14 0.82 0.40 0.40 0.02 0.056 0.31 0.02

Z2V33-4200 O. Blk Wks For Garbage Chutes+Plasters@ 3rd Flr. 14 M2 14 10.00 1.40 2.056 2.88 2 1.44 0.70 0.70 0.04 0.056 0.08 0.04

Z2V33-4210 O. Gypsum Board +Washable Paint @ 3L 68 M2 68 16.00 4.25 2.056 8.74 14 0.62 0.30 0.30 0.02 0.056 0.24 0.02

Z2V33-4220 O. Semi Recessed G.R.G. Tiles @ 3L 51 M2 51 16.00 3.19 2.056 6.55 14 0.47 0.23 0.23 0.01 0.056 0.18 0.01

Z2V33-4230 O. Screed + Polished Marble & Skirtings @ 3L 453 M2 453 12.00 37.75 2.056 77.61 14 5.54 2.70 2.70 0.15 0.056 2.11 0.15

Z2V33-4240 O. Sreed + Graniti Tiles & Skirtings @ 3L 45 M2 50 12.00 4.17 2.056 8.57 14 0.61 0.30 0.30 0.02 0.056 0.23 0.02

Z2V33-4250 O. G.Steel, Powder coated Railin to Staircase@3L 26 LM 26 20.00 1.30 2.056 2.67 10 0.27 0.13 0.01 0.13 0.056 0.07 0.01

Z2V33-4260 O. Primer Application Works @ 3L 119 M2 119 54.60 2.18 1.000 1 Painter 2.18 8 0.27 0.27

Z2V33-4270 O. Stucco Application Works @ 3L 119 M2 119 16.40 7.26 1.000 1 Painter 7.26 10 0.73 0.73

Z2V33-4280 O. Emulsion Paint Works @ 3L 55 M2 55 32.20 1.71 1.000 1 Painter 1.71 12 0.14 0.14

Z2V33-4290 I. Hollow Block Works + Lintels @ 4th Flr. 1,598.00 M2 1,598.00 10.00 159.80 2.056 328.55 12 27.38 13.32 13.32 0.75 0.056 8.95 0.75

Z2V33-4300 I. Internal Plaster Accessories & Rush @ 4L 72.00 M2 72.00 48.46 1.49 2.000 2.97 7 0.42 0.21 0.21

Z2V33-4310 I. Internal Plaster Works @ 4L 2,395.00 M2 2,395.00 20.00 119.75 2.000 239.50 10 23.95 11.98 11.98

Z2V33-4320 I. Glazed Ceramic Tile @ 4L 755 M2 755 12.00 62.92 2.056 129.36 12 10.78 5.24 5.24 0.29 0.056 3.52 0.29

Z2V33-4330 I. Block Works For Ducts @ 4th Flr. 60 M2 60 10.00 6.00 2.056 12.34 2 6.17 3.00 3.00 0.17 0.056 0.34 0.17

Z2V33-4340 I. Install False Ceiling (Susp. + Boarding) @ 4L 400 M2 400 7.20 55.56 2.056 114.22 12 9.52 4.63 4.63 0.26 0.056 3.11 0.26

Z2V33-4350 I. Screed + Ceramic Tiles & Skirtings @ 4L 1268 M2 1268 12.00 105.67 2.056 217.25 12 18.10 8.81 8.81 0.49 0.056 5.92 0.49

Z2V33-4360 I. Screed + Non-Slip Ceramic Tiles &Skirtings@4L 218 M2 218 32.00 6.81 2.056 14.01 6 2.33 1.14 1.14 0.06 0.056 0.38 0.06

Z2V33-4370 I. Water Proofing + Screed on Wet Areas - 4L 547 M2 547 64.00 8.55 6.000 51.28 8 6.41 2.14 4.27

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Alum. Tech 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper

1 Mason 1 Helper

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

4Waterproofer 2 Helper

Page 46: AMSC Productivity Rate - Turner

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Z2V33-4380 I. Frames Installations @ 4L 62 Nos. 62 4.80 12.92 2.056 26.56 10 2.66 1.29 1.29 0.07 0.056 0.72 0.07

Z2V33-4390 I. Doors w/ Ironmongery @ 4L 62 Nos. 62 4.80 12.92 2.056 26.56 8 3.32 1.61 1.61 0.09 0.056 0.72 0.09

Z2V33-4400 I. Frames Installation Works @ 4L 119 M2 119 4.80 24.79 2.056 50.97 12 4.25 2.07 2.07 0.12 0.056 1.39 0.12

Z2V33-4410 I. Aluminum+Glass & Other Associated Works @ 4L 119 M2 119 1.60 74.38 2.056 152.92 10 15.29 7.44 0.42 7.44 0.056 4.17 0.42

Z2V33-4420 I. Kitchen Cabinets @ 4L 17 Nos. 17 0.75 22.67 2.056 46.60 12 3.88 1.89 1.89 0.11 0.056 1.27 0.11

Z2V33-4430 I. Wardrobes @ 4L 16 Nos. 16 0.60 26.67 2.056 54.83 12 4.57 2.22 2.22 0.12 0.056 1.49 0.12

Z2V33-4440 I. Primer Application Works @ 4L 758.00 M2 758.00 54.60 13.88 1.000 1 Painter 13.88 10 1.39 1.39

Z2V33-4450 I. Stucco Installation Works @ 4L 758.00 M2 758.00 16.40 46.22 1.000 1 Painter 46.22 12 3.85 3.85

Z2V33-4460 I. Emulsion Paint Works @ 4L 1,356.00 M2 1,356.00 32.20 42.11 1.000 1 Painter 42.11 12 3.51 3.51

Z2V33-4470 O. Plaster Accessories & Rush @ 4L 72 M2 72 48.46 1.49 2.000 2.97 7 0.42 0.21 0.21

Z2V33-4480 O. Plaster Works @ 4L 397 M2 397 20.00 19.85 2.000 39.70 10 3.97 1.99 1.99

Z2V33-4490 O. Polished Marble & Ceramic for Wall @ 4L 56 M2 56 10.00 5.60 2.056 11.51 12 0.96 0.47 0.47 0.03 0.056 0.31 0.03

Z2V33-4500 O. Blk Wks For Garbage Chutes+Plasters@ 4th Flr. 14 M2 14 10.00 1.40 2.056 2.88 2 1.44 0.70 0.70 0.04 0.056 0.08 0.04

Z2V33-4510 O. Gypsum Board + Washable Paint @ 4L 68 M2 68 16.00 4.25 2.056 8.74 12 0.73 0.35 0.35 0.02 0.056 0.24 0.02

Z2V33-4520 O. Semi Recessed G.R.G. Tiles @ 4L 51 M2 51 16.00 3.19 2.056 6.55 12 0.55 0.27 0.27 0.01 0.056 0.18 0.01

Z2V33-4530 O. Screed + Polished Marble & Skirtings @ 4L 453 M2 453 12.00 37.75 2.056 77.61 12 6.47 3.15 3.15 0.18 0.056 2.11 0.18

Z2V33-4540 O. Sreed + Graniti Tiles & Skirtings @ 4L 45 M2 50 12.00 4.17 2.056 8.57 12 0.71 0.35 0.35 0.02 0.056 0.23 0.02

Z2V33-4550 O. G.Steel, Powder coated Railin to Staircase@4L 26 LM 26 20.00 1.30 2.056 2.67 8 0.33 0.16 0.01 0.16 0.056 0.07 0.01

Z2V33-4560 O. Primer Application Works @ 4L 119 M2 119 54.60 2.18 1.000 1 Painter 2.18 7 0.31 0.31

Z2V33-4570 O. Stucco Application Works @ 4L 119 M2 119 16.40 7.26 1.000 1 Painter 7.26 8 0.91 0.91

Z2V33-4580 O. Emulsion Paint Works @ 4L 55 M2 55 32.20 1.71 1.000 1 Painter 1.71 10 0.17 0.17

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Alum. Tech 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper

1 Mason 1 Helper

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Alum. Tech 1 Helper .056 Operator

.056 T. Crane

Page 47: AMSC Productivity Rate - Turner

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Z2V33-4590 I. Hollow Block Works + Lintels @ 5th Flr. M2 1,598.00 10.00 159.80 2.056 328.55 12 27.38 13.32 13.32 0.75 0.056 8.95 0.75

Z2V33-4600 I. Internal Plaster Accessories & Rush @ 5L M2 72.00 48.46 1.49 2.000 2.97 7 0.42 0.21 0.21

Z2V33-4610 I. Internal Plaster Works @ 5L M2 2,395.00 20.00 119.75 2.000 239.50 10 23.95 11.98 11.98

Z2V33-4620 I. Glazed Ceramic Tile @ 5L M2 755 12.00 62.92 2.056 129.36 12 10.78 5.24 5.24 0.29 0.056 3.52 0.29

Z2V33-4630 I. Block Works For Ducts @ 5th Flr. M2 60 10.00 6.00 2.056 12.34 2 6.17 3.00 3.00 0.17 0.056 0.34 0.17

Z2V33-4640 I. Install False Ceiling (Susp. + Boarding) @ 5L M2 400 7.20 55.56 2.056 114.22 12 9.52 4.63 4.63 0.26 0.056 3.11 0.26

Z2V33-4650 I. Screed + Ceramic Tiles & Skirtings @ 5L M2 1268 12.00 105.67 2.056 217.25 12 18.10 8.81 8.81 0.49 0.056 5.92 0.49

Z2V33-4660 I. Screed + Non-Slip Ceramic Tiles &Skirtings@5L M2 218 32.00 6.81 2.056 14.01 6 2.33 1.14 1.14 0.06 0.056 0.38 0.06

Z2V33-4670 I. Water Proofing + Screed on Wet Areas - 5L M2 547 64.00 8.55 6.000 51.28 8 6.41 2.14 4.27

Z2V33-4680 I. Frames Installations @ 5L Nos. 62 4.80 12.92 2.056 26.56 10 2.66 1.29 1.29 0.07 0.056 0.72 0.07

Z2V33-4690 I. Doors w/ Ironmongery @ 5L Nos. 62 4.80 12.92 2.056 26.56 8 3.32 1.61 1.61 0.09 0.056 0.72 0.09

Z2V33-4700 I. Frames Installation Works @ 5L M2 119 4.80 24.79 2.056 50.97 12 4.25 2.07 2.07 0.12 0.056 1.39 0.12

Z2V33-4710 I. Aluminum+Glass & Other Associated Works @ 5L M2 119 1.60 74.38 2.056 152.92 10 15.29 7.44 0.42 7.44 0.056 4.17 0.42

Z2V33-4720 I. Kitchen Cabinets @ 5L Nos. 17 0.75 22.67 2.056 46.60 12 3.88 1.89 1.89 0.11 0.056 1.27 0.11

Z2V33-4730 I. Wardrobes @ 5L Nos. 16 0.60 26.67 2.056 54.83 12 4.57 2.22 2.22 0.12 0.056 1.49 0.12

Z2V33-4740 I. Primer Application Works @ 5L M2 758.00 54.60 13.88 1.000 1 Painter 13.88 10 1.39 1.39

Z2V33-4750 I. Stucco Installation Works @ 5L M2 758.00 16.40 46.22 1.000 1 Painter 46.22 12 3.85 3.85

Z2V33-4760 I. Emulsion Paint Works @ 5L M2 1,356.00 32.20 42.11 1.000 1 Painter 42.11 12 3.51 3.51

Z2V33-4770 O. Plaster Accessories & Rush @ 5L M2 72 48.46 1.49 2.000 2.97 7 0.42 0.21 0.21

Z2V33-4780 O. Plaster Works @ 5L M2 397 20.00 19.85 2.000 39.70 10 3.97 1.99 1.99

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper

1 Mason 1 Helper

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

4Waterproofer 2 Helper

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Alum. Tech 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper

1 Mason 1 Helper

Page 48: AMSC Productivity Rate - Turner

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Z2V33-4790 O. Polished Marble & Ceramic for Wall @ 5L M2 56 10.00 5.60 2.056 11.51 12 0.96 0.47 0.47 0.03 0.056 0.31 0.03

Z2V33-4800 O. Blk Wks For Garbage Chutes+Plasters@ 5th Flr. M2 14 10.00 1.40 2.056 2.88 2 1.44 0.70 0.70 0.04 0.056 0.08 0.04

Z2V33-4810 O. Gypsum Board + Washable Paint @ 5L M2 68 16.00 4.25 2.056 8.74 12 0.73 0.35 0.35 0.02 0.056 0.24 0.02

Z2V33-4820 O. Semi Recessed G.R.G. Tiles @ 5L M2 51 16.00 3.19 2.056 6.55 12 0.55 0.27 0.27 0.01 0.056 0.18 0.01

Z2V33-4830 O. Screed + Polished Marble & Skirtings @ 5L M2 453 12.00 37.75 2.056 77.61 12 6.47 3.15 3.15 0.18 0.056 2.11 0.18

Z2V33-4840 O. Sreed + Graniti Tiles & Skirtings @ 5L M2 50 12.00 4.17 2.056 8.57 12 0.71 0.35 0.35 0.02 0.056 0.23 0.02

Z2V33-4850 O. G.Steel, Powder coated Railin to Staircase@5L LM 26 20.00 1.30 2.056 2.67 8 0.33 0.16 0.01 0.16 0.056 0.07 0.01

Z2V33-4860 O. Primer Application Works @ 5L M2 119 54.60 2.18 1.000 1 Painter 2.18 7 0.31 0.31

Z2V33-4870 O. Stucco Application Works @ 5L M2 119 16.40 7.26 1.000 1 Painter 7.26 8 0.91 0.91

Z2V33-4880 O. Emulsion Paint Works @ 5L M2 55 32.20 1.71 1.000 1 Painter 1.71 10 0.17 0.17

Z2V33-4890 Hollow Block Works + Lintels @ Roof Floor M2 307 10.00 30.70 2.056 63.12 10 6.31 3.07 3.07 0.17 0.056 1.72 0.17

Z2V33-4900 Plaster Accessories & Rush @ Roof Floor M2 72 48.46 1.49 2.000 2.97 5 0.59 0.30 0.30

Z2V33-4910 Plastering Works @ Roof Deck Floor M2 339 20.00 16.95 2.000 33.90 8 4.24 2.12 2.12

Z2V33-4920 Roof Drain & Access.+ Lightweight Concrete M2 365.00 7Z2V33-4930 One Coat Cold Bituminous Primer M2 106.00 2Z2V33-4940 2 Layers of SBS W.P. Membrane + Water Test M2 259.00 6Z2V33-4950 Alum. Foil Covering Fixed to Upstand w/ Sealant LM 83 3Z2V33-4960 50mm Thk. Extruded Polystyrene Insulation M2 259.00 2Z2V33-4970 Protection Layer M2 259.00 2Z2V33-4980 18mm-25mm Round Aggregates (50mm Thk.) M2 259.00 4Z2V33-4990 1mm Thk. Alum. Flashing Fixed into Conc. Upstand M2 83 3Z2V33-5000 Sealant Application Around top of Alum. Flashing M2 83 2Z2V33-5010 Channel & Rails Installation for Lifts Items 2 14Z2V33-5020 Cabin Assembly / Installation for lifts Items 2 10Z2V33-5030 Machine Installation for lifts Items 2 7Z2V33-5040 Doors Installation for lifts Items 2 10Z2V33-5050 Connections To Ele + Finishing Touches for lifts Items 2 12Z2V33-5060 Installation of Chute Tubes and Intake Throats Item 1 8Z2V33-5070 Install Intake Doors, Chute Vent & Accessories Item 1 4Z2V33-5080 Install Ground Floor Offset + Fire Shutter Door Item 1 2Z2V33-5090 Install Compactor with MCP Item 1 1Z2V33-5100 Installation of Garbage Container Item 1 1Z2V33-5110 Final Test & Comm. Item 1 3Z2V33-5120 Installation of Window Cleaning Eqmt. Item 1 14

Z2V33-5130 Primer Application Works @ Roof Deck M2 69 54.60 1.26 1.000 1 Painter 1.26 8 0.16 0.16

Z2V33-5140 Stucco Application Works @ Roof Deck M2 69 16.40 4.21 1.000 1 Painter 4.21 10 0.42 0.42

Z2V33-5150 Emulsion / Epoxy Paint Works @ Roof Deck M2 203 32.20 6.30 1.000 1 Painter 6.30 12 0.53 0.53

Z2V33-5160 Excavation Works External M3 6,887.67 315.00 21.87 2.000 43.73 5 8.75 4.37 4.37 1.000 21.87 4.37

Z2V33-5170 RCC Manholes / Gully Traps Nos. 69 5.63 12.27 5.000 61.33 14 4.38 1.75 0.88 0.88 0.88 1.000 12.27 0.88

Z2V33-5180 Water Proofing M2 124.30 76.00 1.64 6.000 9.81 12 0.82 0.27 0.55

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Carpenter 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Alum. Tech 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper .056 Operator

.056 T. Crane

1 Mason 1 Helper

1 Mason 1 Helper

1 Operator 1 Helper

1 Excavator

2 Carpenter 1 Mason 1 Helper 1 Operator

1 M. Crane

4Waterproofer 2 Helper

Page 49: AMSC Productivity Rate - Turner

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Z2V33-5190 Sand Bedding M2 52.67 60.00 0.88 1.250 1.10 10 0.11 0.09 0.02 0.250 0.22 0.02

Z2V33-5200 Backfilling Works M3 6,834.67 601.00 11.37 7.500 85.29 14 6.09 2.44 1.22 2.44 4.500 51.17 0.41 2.44 0.41 0.41

Z2V33-5210 Instl Drainage Pipes &Con. To Existing Chambers Item 1 14Z2V33-5220 Instl Water Supply Pipes&Con. To Existg Chambers Item 1 12Z2V33-5230 Instl Chilled Water Pipes&Con. To Existg Chamber Item 1 14Z2V33-5240 Instl Central Gas Pipes &Con. To Existg Chambers Item 1 12Z2V33-5250 Instl Telephone Ducts &Con. To Existing Chambers Item 1 10Z2V33-5260 Laying of Power cables (By Others) Item 1 7Z2V33-5270 Hardscaping Works Item 1 14Z2V33-5280 Landscaping Works Item 1 12

Z2V33-5290 Ext. Plaster Accessories & Rush on Front Elev. M2 1,865.00 48.46 38.49 2.000 76.97 2 38.49 19.24 19.24

Z2V33-5300 Ext. Plaster Works on Front Elevation M2 18.00 8.00 2.25 2.000 4.50 4 1.13 0.56 0.56

Z2V33-5310 Install Balcony Handrail on Front Elev. Nos. 19 15.00 1.27 2.250 2.85 12 0.24 0.11 0.11 0.03 0.250 0.32 0.03

Z2V33-5320 Decorative GRC Panels W/ Epoxy Paint @ F. Elev. Nos. 10 2.00 5.00 2.500 12.50 10 1.25 0.50 0.50 0.25 0.500 2.50 0.25

Z2V33-5330 Wooden Pergola on Front Elev. @ (1st & 2nd) Flr. LM 5 8.00 0.63 2.500 1.56 12 0.13 0.05 0.05 0.03 0.500 0.31 0.03

Z2V33-5340 External Painting Works on Front Elevation M2 1,883.00 32.20 58.48 3.000 3 Painter 175.43 14 12.53 12.53

Z2V33-5350 Ext. Plaster Access. & Rush on Leftside Elev. M2 688 48.46 14.20 2.000 28.39 2 14.20 7.10 7.10

Z2V33-5360 Ext. Plaster Works on Left Side Elevation M2 18 8.00 2.25 2.000 4.50 4 1.13 0.56 0.56

Z2V33-5370 Install Balcony Handrail on Leftside Elev. Nos. 15 15.00 1.00 2.250 2.25 10 0.23 0.10 0.10 0.03 0.250 0.25 0.03

Z2V33-5380 Decorative GRC Panels W/ Epoxy Paint @ LS. Elev. Nos. 1 2.00 0.50 2.500 1.25 8 0.16 0.06 0.06 0.03 0.500 0.25 0.03

Z2V33-5390 External Painting Works on Left Side Elevation M2 706 32.20 21.93 3.000 3 Painter 65.78 12 5.48 5.48

Z2V33-5400 Ext. Plaster Accessories & Rush on Rear Elev. M2 1,417.00 48.46 29.24 2.000 58.48 2 29.24 14.62 14.62

Z2V33-5410 Ext. Plaster Works on Rear Elevation M2 18.00 8.00 2.25 2.000 4.50 4 1.13 0.56 0.56

Z2V33-5420 Install Balcony Handrail on Rear Elev. Nos. 95 15.00 6.33 2.250 14.25 12 1.19 0.53 0.53 0.13 0.250 1.58 0.13

Z2V33-5430 Decorative GRC Panels W/ Epoxy Paint @ R. Elev. Nos. 22 2.00 11.00 2.500 27.50 10 2.75 1.10 1.10 0.55 0.500 5.50 0.55

Z2V33-5440 Wooden Pergola on Rear Elev. @ (1st & 2nd) Flr. LM 5 8.00 0.63 2.500 1.56 12 0.13 0.05 0.05 0.03 0.500 0.31 0.03

Z2V33-5450 External Painting Works on Rear Elevation M2 1,435.00 32.20 44.57 3.000 3 Painter 133.70 14 9.55 9.55

Z2V33-5460 Ext. Plaster Access. & Rush on Rightside Elev. M2 688 48.46 14.20 2.000 28.39 2 14.20 7.10 7.10

Z2V33-5470 Ext. Plaster Works on Right Side Elevation M2 18 8.00 2.25 2.000 4.50 4 1.13 0.56 0.56

1 Helper 0.25 Operator

.25 Bob Cat

1.5 Operator 3 Driver 3 Helper

0.5 Shovel 3 Dump Truck .5 S. Roller .5 Bob Cat

1 Mason 1 Helper

1 Mason 1 Helper

1 Mason 1 Helper .25 Operator

.25 M. Crane

1 Carpenter 1 Helper .5 Operator

..5 M. Crane

1 Carpenter 1 Helper .5 Operator

.5 M. Crane

1 Mason 1 Helper

1 Mason 1 Helper

1 Mason 1 Helper .25 Operator

.25 M. Crane

1 Carpenter 1 Helper .5 Operator

..5 M. Crane

1 Mason 1 Helper

1 Mason 1 Helper

1 Mason 1 Helper .25 Operator

.25 M. Crane

1 Carpenter 1 Helper .5 Operator

..5 M. Crane

1 Carpenter 1 Helper .5 Operator

.5 M. Crane

1 Mason 1 Helper

1 Mason 1 Helper

Page 50: AMSC Productivity Rate - Turner

ItemActivity Activity SUB Unit QTY (F) Days (H) OD (O) M A N - D A Y S E Q M T - D A Y S

ID Description ACTIVITY (unit/day) (F/G) (H x I) (N/O) Mason Helper Operator Driver Painter (H x I) Dozer Shovel Dump T. B. Roller B. Cat S. Roller M. Crane Vibrator

Prod. Rate (G)

Tot. Man (I)

Crew Desc.

Tot. M-days (K)

Manpower/day

Tot. Eqmt (X)

Eqmt Desc.

Tot. E-days (Z)

Carpenter

Steel Fixer

Technician

Alum. Tech

Waterproofer

Excavator

Tower Crane

Z2V33-5480 Install Balcony Handrail on Rigthside Elev. Nos. 15 15.00 1.00 2.250 2.25 10 0.23 0.10 0.10 0.03 0.250 0.25 0.03

Z2V33-5490 Decorative GRC Panels W/ Epoxy Paint @ RS. Elev. Nos. 1 2.00 0.50 2.500 1.25 8 0.16 0.06 0.06 0.03 0.500 0.25 0.03

Z2V33-5500 External Painting Works on Right Side Elevation M2 706 32.20 21.93 3.000 3 Painter 65.78 12 5.48 5.48

Z2V33-5510 Snagging & Desnagging For Finishes @ GF Item 1 30Z2V33-5520 Handing-Over For Finishes @ GF Item 1 10Z2V33-5530 Snagging & Desnagging For Finishes @ 1F Item 1 30Z2V33-5540 Handing-Over For Finishes @ 1F Item 1 10Z2V33-5550 Snagging & Desnagging For Finishes @ 2F Item 1 30Z2V33-5560 Handing-Over For Finishes @ 2F Item 1 10Z2V33-5570 Snagging & Desnagging For Finishes @ 3F Item 1 30Z2V33-5580 Handing-Over For Finishes @ 3F Item 1 10Z2V33-5590 Snagging & Desnagging For Finishes @ 4F Item 1 30Z2V33-5600 Handing-Over For Finishes @ 4F Item 1 10Z2V33-5610 Snagging & Desnagging For Finishes @ 5F Item 1 30Z2V33-5620 Handing-Over For Finishes @ 5F Item 1 10Z2V33-5630 Snagging & Desnagging For Finishes @ Roof Floor Item 1 1Z2V33-5640 Handing-Over For Finishes @ Roof Floor Item 1 21Z2V33-5650 Power On (By DEWA) 0 1Z2V33-5660 Precommissioning & Startup 0 35Z2V33-5670 Availability of Chilled Water (By Others) 0 12Z2V33-5680 Testing & Final Commissioning 0 2Z2V33-5690 Snagging & Desnagging For External Finishes Item 1 1Z2V33-5700 Handing-Over For External Finishes Item 1 1Z2V33-5710 Completion of Fdn./Superstructure -Building # 33 Item 1 1Z2V33-5720 Completion of External Works for Building # 33 Item 1 1Z2V33-5730 Completion of MEP Works for Building # 33 0Z2V33-5740 Completion of Finishes for Building # 33 Item 1 0Z2V33-5750 Completion of Fdn./SuperStruc. for Phase-2 BLDG. Item 1 0Z2V33-5760 Completion of External Works for Phase-2 BLDG. Item 1 0Z2V33-5770 Completion of MEP Works for Phase-2 BLDG. 0Z2V33-5780 Completion of Finishes for Phase-2 BLDG. Item 1Z2V33-5790 Completion Milestone for Phase-2 Buildings Item 1

1 Mason 1 Helper .25 Operator

.25 M. Crane

1 Carpenter 1 Helper .5 Operator

..5 M. Crane