12
1 AMS Monthly Management Report to the IETF Q1 2011 Table of Contents Site Selection Status 2011 - 2013 2 Registration Report – IETF 80 Prague, CZECH REPUBLIC 3 IETF Document Management Report New Internet Drafts Revised or Updated Internet Drafts IESG Last Call Internet Draft Activity Approved Internet Draft Activity 4 IETF Ticket Management 5 - 6 Intellectual Property Disclosures 7 – 8 Working Group Activity 9 IT Development Items 10 IETF Mail List Stats 11 - 12 IETF Website Stats Ietf.org Iab.org Iaoc.ietf.org trustee.ietf.org Available online at: URL/usagedata

AMS Q1 2011 MgmtReport pub - iaoc.ietf.org · Q1 2011 Table of Contents Site Selection Status 2011 - 2013 2 Registration Report – IETF 80 Prague, CZECH REPUBLIC 3 ... “Approved”

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: AMS Q1 2011 MgmtReport pub - iaoc.ietf.org · Q1 2011 Table of Contents Site Selection Status 2011 - 2013 2 Registration Report – IETF 80 Prague, CZECH REPUBLIC 3 ... “Approved”

1

AMS Monthly Management Report to the IETF Q1 2011

Table of Contents

Site Selection Status 2011 - 2013 2

Registration Report – IETF 80 Prague, CZECH REPUBLIC

3

IETF Document Management Report • New Internet Drafts • Revised or Updated Internet Drafts • IESG Last Call Internet Draft Activity • Approved Internet Draft Activity

4

IETF Ticket Management 5 - 6

Intellectual Property Disclosures 7 – 8

Working Group Activity 9

IT Development Items 10

IETF Mail List Stats 11 - 12

IETF Website Stats • Ietf.org • Iab.org • Iaoc.ietf.org • trustee.ietf.org

Available online at: URL/usagedata

Page 2: AMS Q1 2011 MgmtReport pub - iaoc.ietf.org · Q1 2011 Table of Contents Site Selection Status 2011 - 2013 2 Registration Report – IETF 80 Prague, CZECH REPUBLIC 3 ... “Approved”

2

Site Selection Status 2011 – 2013

# Meeting Prequalify Site Visit Tech Visit Venue

Contract Hotel Contract

Host

81 Jul 2011 Canada: Quebec City

√ √ √ √ √ RIM

82 Nov 2011 Asia: Taipei √ √ √ √ √ TWNIC

83 Mar 2012 Europe: Paris √ √ √ √ √ NONE

84 Jul 2012 Canada: Vancouver

√ √ √ √ √ GOOGLE

85 Nov 2012 North America: Atlanta (move from Fall 2010 )

√ N/A N/A √ √ NONE

86 Mar 2013 North America: Orlando

√ N/A N/A √ √ NONE

Page 3: AMS Q1 2011 MgmtReport pub - iaoc.ietf.org · Q1 2011 Table of Contents Site Selection Status 2011 - 2013 2 Registration Report – IETF 80 Prague, CZECH REPUBLIC 3 ... “Approved”

3

Registration Report – IETF 80 – Prague, Czech Republic

Page 4: AMS Q1 2011 MgmtReport pub - iaoc.ietf.org · Q1 2011 Table of Contents Site Selection Status 2011 - 2013 2 Registration Report – IETF 80 Prague, CZECH REPUBLIC 3 ... “Approved”

4

IETF Document Management Report Q1 2011

“New” refers to Internet Drafts presented for the first time “Revised or Updated” refers to Internet Drafts that were modified in some way, possibly more than once “Last Call” refers to the announcement to the community that the Internet Draft is about to be closed for comment “Approved” refers to Internet Drafts that are finished with the IESG Evaluation and have been passed to the RFC Editor for publication

Page 5: AMS Q1 2011 MgmtReport pub - iaoc.ietf.org · Q1 2011 Table of Contents Site Selection Status 2011 - 2013 2 Registration Report – IETF 80 Prague, CZECH REPUBLIC 3 ... “Approved”

5

IETF Ticket Management (ALL TICKETS) Q1 2011

Registrar – registration assistance; Action – technical issues; General – general IETF information; IESG – IESG support; Liaisons – Liaison submissions; IPR – IPR submissions; Meeting – request a meeting session; Mgmt – Mgmt Queue for Ray/Russ; Webex – Webex Requests; List-Manager – list management support

Page 6: AMS Q1 2011 MgmtReport pub - iaoc.ietf.org · Q1 2011 Table of Contents Site Selection Status 2011 - 2013 2 Registration Report – IETF 80 Prague, CZECH REPUBLIC 3 ... “Approved”

6

IESG Queue Ticket Management: Total Tickets Q1 2011

Page 7: AMS Q1 2011 MgmtReport pub - iaoc.ietf.org · Q1 2011 Table of Contents Site Selection Status 2011 - 2013 2 Registration Report – IETF 80 Prague, CZECH REPUBLIC 3 ... “Approved”

7

3rd Party IPR Disclosures

Date Discloser Possible Patent Owner Relevant IETF document or RFC

Research Status Verified

February 2, 2009

Yaron Sheffer

AT&T Bell Laboratories (possibly Alcatel-Lucent)

draft-sheffer-emu-eap-eke-01

Referred to Alcatel Lucent. Awaiting

Response. No

March 24, 2009

Yakov Rekhter

Cisco Systems draft-ietf-l3vpn-2547bis-

mcast-08

Cisco made specific disclosure Feb 2010 Yes

March 31, 2009

Enke Chen Redback Networks draft-margues-idr-best-external-01

Unable to Verify No

January 29, 2010

Simon Josefsson

University of California RFC 3447 Awaiting Response No

May 25, 2010

Yaron Sheffer

AT&T Bell Laboratories (possibly

Alcatel-Lucent)

draft-sheffer-ipsecme-hus-00

Awaiting Response. No

May 28, 2010

Martin Stiemerling

Telefonaktiebolaget LM Ericsson

draft-lindquist-sip-rtsp-01 Awaiting Response No

June 02, 2010

Priya Rajagopal

General Instrument Corporation

draft-lindquist-sip-rtsp-01 ED contacted counsel. Specific IPR

Disclosure filed August 2010

Yes

June 17, 2010

Martin Stiemerling

Telefonaktiebolaget LM Ericsson

draft-lindquist-sip-rtsp-02 ED contacted Ericsson general

counsel. Waiting on response.

No

July 12, 2010

Rene Struik Certicom Corporation draft-struik-ecc-efficiences-00

ED sent email to Certicom general

counsel. Waiting on response.

No

July 12, 2010

Rene Struik Certicom Corporation draft-ietf-roll-rpl-10 ED sent email to Certicom general

counsel. Waiting on response.

No

August 23, 2010

Tom Polk Huawei Symantec draft-dong-savi-cga-header-03

ED sent email to Huawei Symantec general counself.

Waiting for response

No

September 8, 2010

David Harrington

Enterasys Networks draft-ietf-geopriv-arch-02 ED contacted relevant patent attorneys.

Under Review Under Review

December 1, 2010

Rene Struik Certicom Corp

draft-igoe-secsh-x509v3-06

VERIFIED. See http://datatracker.iet

f.org/ipr/1468 Yes

December 9, 2010

Adrian Farrel

Nortel Networks draft-bhh-mpls-tp-oam-y1731-06

Awaiting Nortel response that they no

longer have a dept. that can assist with

these types of inquiries.

Unable to Verify

Page 8: AMS Q1 2011 MgmtReport pub - iaoc.ietf.org · Q1 2011 Table of Contents Site Selection Status 2011 - 2013 2 Registration Report – IETF 80 Prague, CZECH REPUBLIC 3 ... “Approved”

8

December 9, 2010

Adrian Farrel

Cisco Systems draft-bhh-mpls-tp-oam-y1731-06

Awaiting Response No

December 9, 2010

Adrian Farrel

ECI Telecom Ltd. draft-bhh-mpls-tp-oam-y1731-06

Awaiting Response No

March 25, 2011

Sean Turner

Certicom Corp draft-herzog-static-ecdh-06

Awaiting Response Under Review

Page 9: AMS Q1 2011 MgmtReport pub - iaoc.ietf.org · Q1 2011 Table of Contents Site Selection Status 2011 - 2013 2 Registration Report – IETF 80 Prague, CZECH REPUBLIC 3 ... “Approved”

9

Working Group Activity Q1 2011

New Working Groups January Audio/Video Transport Core Maintenance (avtcore) Audio/Video Transport Extensions (avtext) Audio/Video Transport Payloads (payload Metric Blocks for use with RTCP’s Extended Report Framework (xrblock) ControLling Multiple streams for tElepresence (clue) February NONE March Address Resolution for Massive numbers of hosts in the Data center (armd) Light-Weight Implementation Guidance (lwig) Verification Involving PSTN Reachability (vipr) Concluded Working Groups

January NONE February Crypto Forum Research Group (cfrg) Path Maximum Transmission Unit Discovery (pmutd) Scope Addressing Architecture Discussion(saad) IPv6 over IEEE 802.15.4 (lowpan) Lightweight Reachability softWires (lrw) Harnessing IP for Critical Communications Using Precedence (hiccup) Internet Area Proposed Working Group (intareawg) March Audio/Video Transport (avt) Next Steps in Signaling (nsis) Message Organization (morg) Multiple AoR reachabiliTy InformatioN Indication (martini)

Page 10: AMS Q1 2011 MgmtReport pub - iaoc.ietf.org · Q1 2011 Table of Contents Site Selection Status 2011 - 2013 2 Registration Report – IETF 80 Prague, CZECH REPUBLIC 3 ... “Approved”

10

IT Development Items In Progress or Complete

Additional Technical Tasks performed in Q1 2011 IETF Meeting Registration

Create ability for the registration system to automatically add subscribers to the various meeting mail lists. This is complete and will be available with IETF81 registration. (9.5 hours)

COMPLETED

IETF Meeting Registration

Companion registration and check in ability. (32. 5 hours) COMPLETED

IETF LOI System

Ability to link LOIs from Host web pages. Also the ability to have hardcopy requests for LOIs sent directly to the host via email (12 hours)

COMPLETED

IETF Social Event Registration System

Setup and deployment of IETF80 Social Event Registration System (19 hours) COMPLETED

Trace route Testing Page

Set up a trace route/testing page for the IETF Website to assist with IPv6 issue debugging (22 hours)

COMPLETED

IETF25 Webpage

Created photo upload page and IETF25 T-Shirt area for IETF Website (36 hours) COMPLETED

Public Interim Mtg Site

Created a Python script to generate a listing of the interim meeting files on a public web page, sortable by date and Working Group (17 hours)

COMPLETED

Nudge Tracker Compiled Nudge Report for January, February and March (34.5 hours) COMPLETED

Mailing List Management

Created (20 hours) -rtcweb, provreg, dtn-security, dtn-users, dtn-interest, nmrg, obscurity-interest, all dtn mailing lists including migrating archives, list settings and subscribers from external sources Migration -nmrg was a full migration from an external host

COMPLETED

Page 11: AMS Q1 2011 MgmtReport pub - iaoc.ietf.org · Q1 2011 Table of Contents Site Selection Status 2011 - 2013 2 Registration Report – IETF 80 Prague, CZECH REPUBLIC 3 ... “Approved”

11

Mail List Activity – Q1 2011

Page 12: AMS Q1 2011 MgmtReport pub - iaoc.ietf.org · Q1 2011 Table of Contents Site Selection Status 2011 - 2013 2 Registration Report – IETF 80 Prague, CZECH REPUBLIC 3 ... “Approved”

12